06/01/2023 Planning Commission Regular Agenda Packet
June 1, 2023 | 6:00 PM Page 1 of 3 Planning Commission
Regular Meeting Agenda
PLANNING COMMISSION
REGULAR MEETING AGENDA
Thursday, June 1, 2023 | 6:00 PM
CITY COUNCIL CHAMBERS, CITY HALL
7351 ROSANNA STREET, GILROY, CA 95020
Chair: Manny Bhandal:
manny.bhandal@cityofgilroy.org
Vice Chair: Annedore Kushner:
annedore.kushner@cityofgilroy.org
Commissioners:
Stefanie Elle:
stefanie.elle@cityofgilroy.org
Adriana Leongardt:
adriana.leongardt@cityofgilroy.org
Joan Lewis:
joan.lewis@cityofgilroy.org
Kelly Ramirez
kelly.ramirez@cityofgilroy.org
Michelle Montez:
michelle.montez@cityofgilroy.org
Staff Liaison: Sharon Goei, Community Development Director | sharon.goei@cityofgilroy.org
Written comments can be submitted by email to planningdivision@cityofgilroy.org Please note that
written comments will not be read out loud, but will be part of the written record.
Comments by the public will be taken on any agenda item before action is taken by the Planning
Commission. Persons speaking on any matter are asked to state their name and address for the
record. Public testimony is subject to reasonable regulations, including but not limited to time
restrictions on particular issues and for each individual speaker. A minimum of 12 copies of
materials should be provided to the Clerk for distribution to the Commission and Staff. Public
comments are limited to no more than three-minutes, at the Chair’s discretion.
Comments on any agenda item may be emailed to the Planning Division at
planningdivision@cityofgilroy.org or mailed to the City of Gilroy, Community Development Department
at City Hall, 7351 Rosanna Street, Gilroy, CA 95020. Comments received by the Planning Division
by 1:00 pm on the day of a Planning Commission meeting will be distributed to the Planning
Commissioners prior to or at the meeting and are available for public inspection at the Planning
Division counter at City Hall, 7351 Rosanna Street. Any correspondence received will be
incorporated into the meeting record. Items received after the 1:00 pm deadline will be provided to
the Planning Commission as soon as practicable.
In compliance with the American Disabilities Act (ADA), the City will make reasonable
arrangements to ensure accessibility to this meeting. If you need special assistance to participate
in this meeting, please contact the City Clerk 72 hours prior to the meeting at (408) 846-0491. A
sound enhancement system is available in the City Council Chambers.
Planning Commission
Regular Meeting Agenda Page 2 of 3 June 1, 2023 | 6:00 PM
If you challenge any planning or land use decision made at this meeting in court, you may be
limited to raising only those issues you or someone else raised at the public hearing held at this
meeting, or in written correspondence delivered to the Planning Commission at, or prior to, the
public hearing. Please take notice that the time within which to seek judicial review of any final
administrative determination reached at this meeting is governed by Section 1094.6 of the
California Code of Civil Procedure.
Persons who wish to speak on matters set for Public Hearing will be heard when the presiding
officer calls for comments from those persons who are in support of or in opposition thereto. After
persons have spoken, the hearing is closed and brought to the Planning Commission level for
discussion and action. There is no further comment permitted from the audience unless requested
by the Planning Commission.
A Closed Session may be called during this meeting pursuant to Government Code Section
54956.9(b)(1) if a point has been reached where, in the opinion of the legislative body of the City
on the advice of its legal counsel, based on existing facts and circumstances, there is a significant
exposure to litigation against the City.
Materials related to an item on this agenda submitted to the Planning Commission after distribution
of the agenda packet are available for public inspection with the agenda packet in the lobby of
Administration at City Hall, 7351 Rosanna Street during normal business hours. These materials
are also available with the agenda packet on the City website at www.cityofgilroy.org
KNOW YOUR RIGHTS UNDER THE GILROY OPEN GOVERNMENT ORDINANCE.
Government's duty is to serve the public, reaching its decisions in full view of the public.
Commissions, task forces, councils and other agencies of the City exist to conduct the
people's business. This ordinance assures that deliberations are conducted before the
people and that City operations are open to the people's review.
FOR MORE INFORMATION ON YOUR RIGHTS UNDER THE OPEN GOVERNMENT
ORDINANCE, TO RECEIVE A FREE COPY OF THE ORDINANCE OR TO REPORT A
VIOLATION OF THE ORDINANCE, CONTACT THE OPEN GOVERNMENT COMMISSION
STAFF AT (408) 846-0204 or by email at cityclerk@cityofgilroy.org.
1. OPENING
2. PLEDGE OF ALLEGIANCE
3. REPORT ON POSTING THE AGENDA AND ROLL CALL
4. PUBLIC COMMENTS
(Three-minute time limit). This portion of the meeting is reserved for persons desiring to
address the Planning Commission on matters not on the agenda. The law does not permit
the Planning Commission action or extended discussion of any item not on the agenda except
under special circumstances. Comments on any agenda item may be emailed to the Planning
Division at planningdivision@cityofgilroy.org or mailed to Community Development
Department at City Hall, 7351 Rosanna Street, Gilroy, CA 95020. Comments received by the
Planning Division by 1:00pm on the day of a Planning Commission meeting will be distributed
to the Planning Commission prior to or at the meeting and available for public inspection with
the agenda packet located in the lobby of Planning Division at City Hall, 7351 Rosanna Street
prior to the meeting. Any correspondences received will be incorporated into the meeting
Planning Commission
Regular Meeting Agenda Page 3 of 3 June 1, 2023 | 6:00 PM
record. Items received after 1:00pm deadline will be provided to the Planning Commission as
soon as practicable. All statements that require a response will be referred to staff for reply in
writing.
PUBLIC HEARINGS FOR RELATED PROJECT APPLICATIONS WILL BE HEARD
CONCURRENTLY AND ACTION WILL BE TAKEN INDIVIDUALLY. COMPANION
PROJECTS UNDER NEW BUSINESS WILL BE TAKEN UP FOR ACTION PRIOR TO, OR
IMMEDIATELY FOLLOWING THE RELATED PUBLIC HEARING. THIS REQUIRES
DEVIATION IN THE ORDER OF BUSINESS AS NOTED WITHIN THE AGENDA. 5. CONSENT AGENDA
5.1. May 4, 2023 Planning Commission Meeting Minutes
6. PUBLIC HEARINGS
None.
7. NEW BUSINESS (CONTINUED FROM MAY 4, 2023)
7.1. Finding of Consistency for the Capital Improvement Program for Fiscal
Year 2024 through Fiscal Year 2028 to Determine its Consistency with the
City’s General Plan and the California Environmental Quality Act (CEQA)
1. Staff Report: Daryl Jordan, Public Works Director
2. Open Public Comment
3. Close Public Comment
4. Possible Action:
Staff has analyzed the proposed project, and recommends that the Planning
Commission:
a) Receive report on proposed Capital Improvement Program (CIP) Fiscal
Year 2024 through Fiscal Year 2028; and
b) Adopt a Resolution to make a Finding of Consistency with the General
Plan. (roll call vote) 8. INFORMATIONAL ITEMS
8.1. Planning Division Staff Approvals
9. PLANNING DIVISION REPORT
10. ASSISTANT CITY ATTORNEY REPORT
11. ADJOURNMENT To the Next Meeting of July 20, 2023 at 6:00 PM
Page 1 of 5
City of Gilroy
Planning Commission
Regular Meeting Minutes
Thursday, May 4, 2023 | 6:00 PM
1.OPENING
Chair Bhandal called the meeting to order at 6:00 p.m.
2.PLEDGE OF ALLEGIANCE
Chair Bhandal led the pledge of allegiance.
3.REPORT ON POSTING THE AGENDA AND ROLL CALL
The agenda was posted on Thursday, April 27, 2023 at 5:45 p.m.
Attendance Attendee Name
Present Stefanie Elle, Commissioner
Joan Lewis, Commissioner
Michelle Montez, Commissioner
Kelly Ramirez, Commissioner
Annedore Kushner, Vice Chair
Manny Bhandal, Chair
Absent Adriana Leongardt, Commissioner
4.PUBLIC COMMENTS
Chair Bhandal opened public comment for items not on the agenda.
There being no speakers, Chair Bhandal closed public comment for items not on the
agenda.
5.CONSENT AGENDA
5.1.April 6, 2023 Planning Commission Meeting Minutes
5.2.April 20, 2023 Planning Commission Meeting Minutes
Motion made by Commission Lewis; seconded by Chair Bhandal to approve the
consent agenda.
RESULT: Pass [6 – 0]
MOVER: Commissioner Lewis
SECONDER: Chair Bhandal
AYES: Commissioner Elle, Lewis, Montez, Ramirez, Vice Chair Kushner, and
Chair Bhandal
ABSENT: Commissioner Leongardt
6.PUBLIC HEARINGS
6.1.Gilroy Square proposed Gilroy Crossings Phase II Planned Unit
Development Zoning Amendment, Architectural and Site Plan Review, and
May 4, 2023 | 6:00 PM Page 2 of 5 Planning Commission
Regular Meeting Minutes
Tentative Map for property Located at 6970 Camino Arroyo (Z 22-01, AS 21-
13, TM 21-02).
1. Staff Report:
Kraig Tambornini, Senior Planner
2. Open Public Hearing
Chair Bhandal opened the item to public hearing.
3. Close Public Hearing
There being no speakers, Chair Bhandal closed the public
hearing.
4. Disclosure of Ex-Parte Communication
None.
5. Possible Action:
Staff has analyzed the proposed project, and recommends that the Planning
Commission:
a)Consider and recommend that the City Council adopt the Mitigated
Negative Declaration prepared for the project, based on findings required
by the California Environmental Quality Act (CEQA); and
b)Adopt a resolution recommending that the City Council approve the PUD
Zoning Amendment Z 22-01 for Gilroy Crossings Phase II as requested;
and
c)Adopt a resolution recommending that the City Council approve the
Architectural and Site Review AS 21-13 for the Planned Unit
Development, subject to certain findings and conditions; and
d)Adopt a resolution recommending that the City Council approve the
Tentative Map TM 21-02, subject to certain findings and conditions
Motion made by Chair Bhandal; seconded by Commissioner Elle to:
Consider and recommend that the City Council adopt the Mitigated Negative
Declaration prepared for the project, based on findings required by the California
Environmental Quality Act (CEQA);
RESULT: Pass [6 – 0]
MOVER: Chair Bhandal
SECONDER: Commissioner Elle
AYES: Commissioner Elle, Lewis, Montez, Ramirez, Vice Chair Kushner, and
Chair Bhandal
ABSENT: Commissioner Leongardt
Motion made by Commissioner Lewis; seconded by Vice Chair Kushner to:
Adopt a resolution recommending that the City Council approve the PUD Zoning
Amendment Z 22-01 for Gilroy Crossings Phase II as requested;
RESULT: Pass [6 – 0]
May 4, 2023 | 6:00 PM Page 3 of 5 Planning Commission
Regular Meeting Minutes
MOVER: Commissioner Lewis
SECONDER: Vice Chair Kushner
AYES: Commissioner Elle, Lewis, Montez, Ramirez, Vice Chair Kushner, and
Chair Bhandal
ABSENT: Commissioner Leongardt
Motion made by Commissioner Lewis; seconded by Chair Bhandal to:
Adopt a resolution recommending that the City Council approve the Architectural
and Site Review AS 21-13 for the Planned Unit Development, subject to certain
findings and conditions;
RESULT: Pass [6 – 0]
MOVER: Commissioner Lewis
SECONDER: Chair Bhandal
AYES: Commissioner Elle, Lewis, Montez, Ramirez, Vice Chair Kushner, and
Chair Bhandal
ABSENT: Commissioner Leongardt
Motion made by Vice Chair Kushner; seconded by Commissioner Ramirez to:
Adopt a resolution recommending that the City Council approve the Tentative
Map TM 21-02, subject to certain findings and conditions
RESULT: Pass [6 – 0]
MOVER: Vice Chair Kushner
SECONDER: Commissioner Ramirez
AYES: Commissioner Elle, Lewis, Montez, Ramirez, Vice Chair Kushner, and
Chair Bhandal
ABSENT: Commissioner Leongardt
7.NEW BUSINESS
7.1.Finding of Consistency for the Capital Improvement Program for Fiscal
Year 2024 through Fiscal Year 2028 to Determine its Consistency with the
City’s General Plan and the California Environmental Quality Act (CEQA)
Community Development Director, Sharon Goei, advised that Public Works staff
had requested that Item 7.1 be continued to a future date. Tentative date will be
discussed in Planning Division Report.
7.2.Planning Commission Review of a Resolution of the City Council of the
City of Gilroy Requesting the Allocation of Fiscal Year 2024 Transportation
Development Act Article 3 Pedestrian/Bicycle Project Funding from the
Metropolitan Transportation Commission
1. Staff Report:
Susana Ramirez, Engineer I
May 4, 2023 | 6:00 PM Page 4 of 5 Planning Commission
Regular Meeting Minutes
2. Open Public Comment
Chair Bhandal opened the item to public comment.
3. Close Public Comment
There being no speakers, Chair Bhandal closed the public comment.
4. Possible Action:
Receive report, provide feedback, and recommend City Council adopt a
resolution to approve the Transportation Development Act Article 3 grant funding
request from the Metropolitan Transportation Commission for Fiscal Year 2024.
Motion made by Chair Bhandal; seconded by Vice Chair Kushner to:
Receive report, provide feedback, and recommend City Council adopt a
resolution to approve the Transportation Development Act Article 3 grant funding
request from the Metropolitan Transportation Commission for Fiscal Year 2024.
RESULT: Pass [6 – 0]
MOVER: Chair Bhandal
SECONDER: Vice Chair Kushner
AYES: Commissioner Elle, Lewis, Montez, Ramirez, Vice Chair Kushner, and
Chair Bhandal
ABSENT: Commissioner Leongardt
8.INFORMATIONAL ITEMS
8.1.Planning Division Staff Approvals
None.
9.PLANNING DIVISION REPORT
Community Development Director Sharon Goei advised the Commission of an upcoming
special meeting on May 25, 2023 at 6:00 p.m. being tentatively planned for the Public Works
CIP Project.
Motion made by Chair Bhandal; seconded by Commissioner Lewis to hold a special meeting
on May 25, 2023 at 6:00 p.m.
RESULT: Fail [0 – 6]
MOVER: Chair Bhandal
SECONDER: Commissioner Lewis
NAYS: Commissioner Elle, Lewis, Montez, Ramirez, Vice Chair Kushner, and Chair
Bhandal
ABSENT: Commissioner Leongardt
Community Development Director Goei shared that staff will be hosting or co-hosing nine
outreach events on housing and community resources during the City’s Affordable Housing
and Building Safety Month in May and asked that Commissioners help distribute the
information.
May 4, 2023 | 6:00 PM Page 5 of 5 Planning Commission
Regular Meeting Minutes
10.ASSISTANT CITY ATTORNEY REPORT
None.
11.ADJOURNMENT
Chair Bhandal adjourned the meeting at 6:57 p.m.
Ariana Fabian
Ariana Fabian, Planning Technician
Community Development
Department
7351 Rosanna Street, Gilroy, CA 95020-6197
Telephone: (408) 846-0451 | Fax: (408) 846-0429
cityofgilroy.org |planningdivision@cityofgilroy.org
Sharon Goei
DIRECTOR
DATE: June 1, 2023
TO: Planning Commission
FROM: Daryl Jordan, Public Works Director
SUBJECT: Finding of Consistency for the Capital Improvement Program for Fiscal
Year 2024 through Fiscal Year 2028 to Determine its Consistency with the
City’s General Plan and the California Environmental Quality Act (CEQA)
RECOMMENDATION:
Staff has analyzed the proposed project, and recommends that the Planning
Commission:
a) Receive report on proposed Capital Improvement Program (CIP) Fiscal Year 2024
through Fiscal Year 2028; and
b) Adopt a Resolution to make a Finding of Consistency with the General Plan. (roll call
vote)
EXECUTIVE SUMMARY:
The City of Gilroy’s Capital Improvement Program (“CIP”) represents an ongoing budget
process through which the City identifies, prioritizes, and develops a multi-year work
plan for major capital expenditures and their associated funding sources in an effort to
improve and maintain the City of Gilroy’s roadways, parks, facilities, and other
infrastructure. Generally, CIP improvements are major expenditures that have a multi-
year life and result in becoming City assets.
The CIP is a strategic planning tool focusing on City-owned infrastructure, summarizing
in one document the City’s overall capital project needs and associated funding
requirements during a five-year period. The CIP document is a work plan and a
planning tool and should be used as such in the biannual operating budget preparation
process. There are a wide variety of funding sources for CIP projects, some steady and
predictable, while others are dependent on outside agencies.
PROJECT DESCRIPTION:
Review of the Capital Improvement Program (CIP) for Fiscal Year 2024 through Fiscal
Year 2028 to determine its consistency with the City’s General Plan.
BACKGROUND:
As part of the City’s budget process, the Planning Commission evaluates projects
proposed for the five-year capital improvement program for consistency with the City’s
2
1
1
5
2
General Plan. The Commission is requested to review the CIP and report its findings
and recommendations, relative to consistency with the General Plan, to the City
Council.
Environmental Review: Staff has reviewed the list of projects identified in the CIP and
determined that a number of projects will likely involve the need for preparation of
environmental documentation in accordance with the California Environmental Quality
Act (CEQA). As individual projects are selected to move forward through the CIP
process, the appropriate CEQA documents will be prepared as the project scopes are
more clearly defined.
The CIP General Plan conformity determination report is not a project per CEQA
Guidelines Section 15378. The CIP is a budgeting and fiscal planning tool. It does not
commit the City to construct or implement any specific project.
DISCUSSION AND ANALYSIS:
Staff provided the Planning Commission with an early draft of the FY24-FY28 CIP Budget
Book on April 27, 2023. Since that time, modifications to project budgets, schedules, and
funding sources were made. These modifications did not result in any new projects or any
changes to the projects in terms of General Plan consistency. The revised Draft FY24-
FY28 CIP Budget Book is provided in Attachment A.
Staff has reviewed the projects included in the proposed Capital Improvement Program
for Fiscal Year 2024 through Fiscal Year 2028 for General Plan consistency. A list of the
proposed CIP Projects with their associated General Plan Policies and/or Goals to
indicate consistency with the document is provided in Attachment B.
A draft resolution to make a Finding of Consistency with the General Plan is provided in
Attachment C.
NEXT STEPS:
The CIP will be presented to the City Council on June 5 with a recommendation for
adoption. Any significant changes made by the City Council may need to return to the
Planning Commission for review of General Plan consistency.
Attachments:
A. Draft FY24-28 CIP Budget Book
B. FY24-FY28 CIP General Plan Consistency Table
C. Draft Planning Commission Resolution for CIP General Plan Conformity
City of Gilroy
Capital Improvement Program
Fiscal Year 2024 to Fiscal Year 2028
Draft
DRAFT
This page intentionally left blank DRAFT
City of Gilroy
Capital Improvement Program
City Council
Marie Blankley, Mayor
Dion Bracco, Mayor Pro Tempore
Rebeca Armendariz, Council Member
Tom Cline, Council Member
Zach Hilton, Council Member
Carol Marques, Council Member
Fred Tovar, Council Member
Submitted by
Jimmy Forbis, City Administrator
Prepared by
Daryl Jordan, Public Works Director
Matt Jones, Deputy Public Works Director
Julie Oates, Engineer II
Ogarita Carranza, Management Analyst
Bryce Atkins, Assistant to the City Administrator
Harjot Sangha, Finance Director
Fiscal Year 2024 to Fiscal Year 2028
DRAFT
This page intentionally left blank DRAFT
Table of Contents
Capital Improvement Program Overview and Guide .......................................................... 1
Project Highlights and Analysis .......................................................................................... 1
Capital Improvement Program (CIP) Development Process .............................................. 6
Program Categories ........................................................................................................... 7
Funding Sources ................................................................................................................ 7
CIP Project Charter Anatomy / How to Read a Project Charter ........................................ 10
CIP Policy Document ........................................................................................................ 15
CIP Budget Summary ....................................................................................................... 19
CIP Budget Program Details ............................................................................................. 21
CIP Budget Fund Balance Details .................................................................................... 27
Appendices – CIP Project Charters .................................................................................. 49
Appendix A – Funded CIP Projects (Within 5-Year CIP) ............................................ 55
Appendix B – Unfunded CIP Projects (Recommended Beyond FY28) .................... 187
Appendix C – Funded Studies/Plans (Within 5-Year CIP) ......................................... 267
Appendix D – Unfunded Studies/Plans (Recommended Beyond FY28) ................... 277
Appendix E – Miscellaneous Funded CIP Projects (Within 5-Year CIP) ................... 299
Appendix F – Completed CIP Projects ...................................................................... 315 DRAFT
This page intentionally left blank DRAFTBack to Main Table of Contents
CAPITAL IMPROVEMENT PROGRAM OVERVIEW AND GUIDE
The City of Gilroy’s Capital Improvement
Program (“CIP”) represents an ongoing budget
process through which the City identifies,
prioritizes, and develops a multi-year work plan
for major capital expenditures and their
associated funding sources. As a planning tool,
the CIP document outlines the process and
activities required to improve and maintain the
City of Gilroy’s roadways, parks, facilities, and
other infrastructure. Generally, CIP
improvements are major expenditures that result
in becoming City assets which have a multi-year life span. The CIP is a strategic
planning tool focusing on City-owned infrastructure, summarizing in one document the
City’s overall capital project needs and associated funding requirements, during a five-
year period. The CIP document is a planning tool and should be used as such in the
biennial operating budget preparation and update process. There are a wide variety of
funding sources for CIP projects, some steady and predictable, while others are
dependent on outside agencies.
PROJECT HIGHLIGHTS AND ANALYSIS
Projects Recommended for Consideration in the Current CIP
Annual Citywide Pavement Rehabilitation – 800060
The purpose of this project is to rehabilitate and
maintain the City’s pavement condition. The City, with
approximately 265 lane miles of paved roads (not
including alleys), conducts a pavement condition
survey every two years. This project would prolong the
lifespan of the current pavement and prevent further
deterioration and reduction in the PCI. The project
scope includes:
•Preventive measures such as crack sealing, slurry seal, microsurfacing, and
cape seal for pavement in fair to good condition.
•Restoration measures such as grind and overlay, dig-outs, and cold-in-place
recycling for pavement in fair to poor condition.
•Rehabilitation/Reconstruction measures to remove and replace pavement in poor
to failed condition.
1DRAFT
Back to Main Table of Contents
Gilroy Ice Center – EN2402
This project will design and install the needed infrastructure for the future Gilroy Ice
Center located at the Gilroy Sports Park. Expected work includes design,
environmental, and construction for site grading, installation of the site stormwater
collection system and stormwater treatment facilities, sewer collection, water service
distribution, and joint trench. The project will also include the design and construction of
traffic signal improvements at the entrance to the Sports Park at the Monterey
Road/Monterey Frontage Road intersection. Construction of the ice center facility will be
implemented through a Design-Build contract.
Civic Center Master Plan – FC2403
The development of a Civic Center Master Plan would examine the City facilities within
the City Hall complex area to determine their remaining useful life, identify replacement
costs, and identify a phasing plan for implementation. While the Police Station and
Gilroy Library are relatively new buildings, other buildings within the complex area are in
various degrees of deterioration and need significant investment if the buildings are to
be kept in service for the next decade. Buildings considered for review in the master
plan effort include a Community Center, City Hall, Senior Center, City Hall Annex,
Wheeler Auditorium, and the Dowdy building.
Citywide Park Restroom Reroofing/Rehabilitation – PK2401
The Citywide Park Restroom Reroofing/Rehabilitation project would replace
approximately 32 park restrooms throughout the City with restrooms equipped with fire
retardant roofs and durable, fire-resistant building materials. It has become increasingly
challenging to maintain these public restrooms due to growing incidents of vandalism.
This project would enhance public safety and reduce maintenance costs and staff time.
2DRAFT
Back to Main Table of Contents
Master Plan Projects – Sewer Improvements – SW2401
The Master Plan Projects – Sewer Improvements project includes 15 individual projects
in 6 system areas throughout the City. The purpose of these projects is to mitigate
existing deficiencies in the City’s sewer system and implement improvements to service
anticipated future growth throughout the City. The projects include pipeline
replacements as well as new pipeline
improvements. The projects in each sub-
trunk system area are listed below:
•Santa Teresa - Long Meadow
Subtrunk – 1 Replacement
•Welburn Subtrunk – 2
Replacements
•Forest-Swanston Subtrunk – 2
Replacements
•Old Gilroy Subtrunk – 2
Replacements
•Uvas Park Subtrunk – 5
Replacements and 1 New
•Thomas Subtrunk – 2
Replacements
Master Plan Projects – Water Improvements – WT2401
The Master Plan Projects – Water Improvements project includes 26 individual projects
throughout the City. The purpose of these projects is to mitigate existing deficiencies in
the City’s water system and implement improvements to service anticipated future
growth throughout the City. The projects include pipeline replacements, new pipeline
improvements, groundwater well improvements, and storage reservoir improvements.
The number and types of projects in each category are summarized below:
•Pipeline Improvements -
13 Replacements and 9 New
•Storage Reservoir
Improvements - 1 New
•Groundwater Well
Improvements - 3 New
3DRAFT
Back to Main Table of Contents
Joint Morgan Hill / Gilroy Trunk Line Repairs – SW2402
The Master Plan Projects – Joint Trunk Sewer Improvements Project includes 8 projects
in the Joint Trunk Pipeline between the Cities of Gilroy and Morgan Hill. The purpose of
these projects is to mitigate existing deficiencies in the City’s sewer system joint trunk
pipeline. The projects include emergency to intermediate pipeline and manhole repairs.
The projects are listed below:
•Emergency/Immediate Pipeline Repairs – 5 Projects at various locations
•Emergency/Immediate Manhole Repairs – 40 Projects at various locations
•Intermediate Pipeline Repairs – Various locations
The costs for projects on the Joint Morgan Hill / Gilroy Trunk Line are shared 50/50
between Morgan Hill and Gilroy. Coordination with the City of Morgan Hill will be
required to ensure they have sufficient funding to cover their 50% of the costs when
projects are considered.
Projects on the Horizon
Tenth Street and Uvas Creek Bridge – 800020
This project consists of
constructing a two-lane
bridge with sidewalks and
Class II Bike Lanes to
extend Tenth Street over
Uvas Creek. The project will
also include a “breezeway
bridge” over the current
Class I Levee Path, which
will enable levee users to
cross under Tenth Street and avoid an at-grade vehicle/pedestrian crossing. The project
includes a new roundabout at the Uvas Park Drive/Tenth Street intersection. The bridge
will connect two segments of Tenth Street, which currently terminate on either side of
Uvas Creek, and allow Tenth Street to extend as one continuous roadway from the US
101/Tenth Street (Automall Parkway) Interchange to Santa Teresa Boulevard.
Automall Parkway Pavement Rehabilitation - 800040
The project includes pavement rehabilitation, repair and replacement of deteriorated
curb and gutter, reconstruction of approximately 20 curb ramps, drainage and striping
improvements, and the addition of Class II Bike Lanes along Automall Parkway between
Tenth Street and Luchessa Avenue. The project limits also include Automall Parkway
from the Caltrans right-of-way to the Automall Parkway/Tenth Street/Chestnut Street
intersection. The pavement condition along this road is in poor condition. This road
serves as a commute route and truck route, and provides access to a variety of
4DRAFT
Back to Main Table of Contents
commercial and industrial land uses, including many auto dealerships. This project will
promote economic development, improve traffic circulation, and enhance pedestrian
and bicyclist safety.
State Trash Amendments Stormwater Compliance Project - 800460
On April 7, 2015, the State Water Resources Control Board (SWRCB) adopted the
Statewide Trash Provisions which address the impacts trash has on the beneficial uses
of surface waters. The Trash Provisions establish a statewide water quality objective for
trash and a prohibition of trash discharge. The City is required to demonstrate full
compliance with the Trash Provisions by 2030, with preliminary milestones of 35% by
2026 and 70% by 2028. The City will complete this project as required under the State-
Issued Trash Amendments and upcoming reissued NPDES Permit (anticipated in
2024). The proposed project will ultimately include all expenses related to compliance
with the Trash Amendments. The tasks necessary to achieve compliance will include
resources to ground truth the infrastructure shown in stormwater maps, design,
installation, and long-term maintenance of full trash capture devices. The design and
installation of the trash capture devices will be conducted by an outside contractor.
Tenth Street and Highway 101 Bridge Widening – 800770
This project would widen the
existing bridge overcrossing at
the Tenth Street (Automall
Parkway)/US 101/SR 152
interchange to add one
additional lane through in each
direction. The project would
include widening the bridge
structure, ramp work, grading,
striping and signal modification
improvements. The project is also expected to include roadway widening and Class II
Bike Lanes between the Tenth Street/Automall Parkway/Chestnut Street and
SR152/Camino Arroyo intersections and associated ramp and intersection
improvements within the project limits. This project has been awarded $7,650,000 in
Measure B Highway Program grant funding for the Project Approval & Environmental
Documents (PA&ED) and the Planning/Project Initiation Documents (PID) phases.
Funding for construction has not yet been identified.
Santa Teresa Fire District – Temporary Fire Station – FR2401
This project would construct a temporary fire station on city-owned property near the
Christmas Hill Park Ranch Site (adjacent to the TEEC building) to serve the Santa
Teresa fire district. The structure will be a modular building and will include sleeping
quarters, an office, a shower, and a kitchen to allow for 24-hour staffing. This project
5DRAFT
Back to Main Table of Contents
would allow for improved emergency response times for the Santa Teresa fire district
until a permanent fire station can be built.
Master Plan Projects – Storm Drain Improvements – EN2405
The Master Plan Projects – Storm
Drain Improvements project includes
43 individual projects in 6 hydrologic
drainage areas throughout the City.
The purpose of these projects is to
mitigate existing deficiencies in the
City’s storm drain system and
implement improvements to service
anticipated future growth throughout
the City. The projects include pipeline
replacements as well as new pipeline
improvements. The number and types
of projects in each hydrologic area are
summarized below:
•Ronan Channel Drainage Area
–4 Replacements and 5 New
•Miller Slough Drainage Area – 6 Replacements
•North Uvas Drainage Area – 4 Replacements and 4 New
•South Uvas Drainage Area – 1 Replacement
•Princevalle Drainage Area – 12 Replacements and 1 New
•Lower Miller Slough Drainage Area – 6 Replacements
CAPITAL IMPROVEMENT PROGRAM (CIP) DEVELOPMENT PROCESS
Under direction from the City Administrator, the Public Works Department takes the lead
in the preparation of the Capital Improvement Program (CIP), and reports to Council of
its progress and status. Written reports on the progress of the CIP will be submitted to
Council through the City Administrator at the beginning and middle of each fiscal year.
The CIP development process starts with a call for projects. Each department submits a
CIP project submittal form to the Engineering Division of Public Works. Engineering
then develops a “project charter” for each project. A project charter provides the project
description, location, schedule, funding sources, expenditure timing, and an analysis of
ongoing maintenance costs. Project charters usually include photos related to the
project.
Once a draft of the CIP is developed, Engineering provides the draft CIP for official
review by the Planning Commission to ensure projects are consistent with the City’s
General Plan, prior to Council’s final CIP review. The proposed CIP is presented to the
City Council for final review at a CIP hearing.
6DRAFT
Back to Main Table of Contents
Program Categories
The CIP is intended to address the following multi-faceted infrastructure needs of the
City:
•Streets: projects that develop and
maintain the City’s roadway system.
•Parks and Trails: projects that develop
and improve parks and sports fields, park
structures, trails, and various citywide tree
planting and maintenance projects.
•Utilities: projects that develop and
maintain the City’s water, sewer, and
storm drain systems to provide safe,
reliable, and efficient service to customers.
•Public Facilities: projects that purchase,
construct, or make capital repairs to City buildings, structures, and equipment.
•Engineering: special projects, projects related to compliance with regulatory
requirements, and Engineering Division plans, standards, and specifications.
Funding Sources
•100 - General Fund: This fund is used to account for all resources except for
those where a separate fund is necessary for legal or administrative purposes.
This fund includes the City's general-purpose services that relate to public safety,
public works, community development, finance, and administration.
•200 - Sidewalk Repair Reserve: The original seed funds came from the State
Franchise Board lawsuit. This money was supplemented by General Fund
money. The interest on this fund is used for City sidewalk repair and
replacement, including the Annual Shared-Cost Sidewalk Replacement Program.
•202 – Downtown Parking Management: The Downtown Parking Management
fund is used to account for downtown parking programs. The funding for this
project will be derived from the General Fund in the form of a loan against future
revenue generated by the adopted downtown parking programs. This fund will be
set aside and accounted for in a new Special Revenue entitled the Down Parking
Management Fund. The repayment strategy will be refined and recommend
when the program is formally established with the defined annual revenues
generated by the program.
•205 - Gas Taxes: This is fuel tax money from the State and is used to fund Chip
Seal, traffic signal and streetlight maintenance and electricity, congestion and
pavement management, and related capital projects. Interest is allocated.
7DRAFT
Back to Main Table of Contents
•210 - Road Funds (SB1): This is a State fuel tax that is allocated on formulae
determined by statewide legislation. The City is allowed to use this funding for
local street and road repairs only until the City’s average Pavement Condition
Index (PCI) meets or exceeds 80, at which time a city or county may spend its
apportionment of SB1 funds on functions similar to the other Gas Taxes listed
above.
•212 – Measure B - Local Streets and Roads: This is a portion of the Santa Clara
County only sales tax measure intended to pay for various transportation
improvements in the county including transit, bicycle/pedestrian, highway
interchanges, and expressways, and grade separations. The Local Streets and
Roads portion of the funds is allocated on formulae determined by the revenue
measure and is allocated to the Santa Clara Valley Transportation Authority,
which allocates a portion to Gilroy for maintaining the City’s local streets and
roads. More stringent requirements regarding the use of these funds are in place
if the City’s PCI is below 70. This fund is used for street projects. Interest is
allocated.
•215 - Transportation/Mobility Grants: This is for various transportation grants.
Monies are received on a reimbursable basis. Interest is allocated.
•220 - Vehicle Registration Fee: This fund represents registration fees from Santa
Clara County which will be used for pavement maintenance, operations, signals,
signs, and marking. Interest is allocated.
•245 - Community Development Block Grant: HUD annual grant of federal funds
to operate the Community Development Block Grant Program. Interest is
allocated but must be paid back to the Federal Government.
•400 - Capital Projects: Allocates resources intended to be used for major capital
projects other than those financed by revenues of proprietary funds, including
projects that are partially funded from other sources such as grants or fuel tax.
Any unallocated interest is allocated to this fund.
•410 - Storm Drain Development: The purpose of the Storm Drain Development
Fund is to finance the construction of drainage collection and distribution systems
within the City as described in the City of Gilroy Storm Drain Master Plan.
Improvements and expansions of the City's storm drain system are needed to
accommodate the development of new residential, commercial, and industrial
uses within the City of Gilroy. The Storm Drain Development Fee is used to
expand system capacity to accommodate new development. Interest is allocated.
8DRAFT
Back to Main Table of Contents
•415 – Utility Undergrounding: Allocates resources to underground existing
overhead utilities (electricity, telephone, and cable) along fully constructed
streets. The City collects the fee from developers as development occurs along
these streets. Interest is allocated.
•420 - Street Tree Development: The Street Tree Development Fund collects a
front footage fee to plant trees in new developments. Interest is allocated.
•425 - Traffic Impact: The purpose of the Traffic Impact Fund is to finance the
construction of streets, bridges, interchanges, and traffic signals within the City
as described in the City of Gilroy's Circulation Element. Improvements and
expansions of the City's traffic circulation system are needed to accommodate
the development of new residential, commercial, and industrial uses within the
City of Gilroy. The Traffic Impact Fee is used to expand system capacity to
accommodate new development. Interest is allocated.
•430 - Sewer Development Impact: The purpose of the Sewer Development
Impact Fund is to finance the construction of sewer collection and conveyance
systems within the City as described in the City of Gilroy’s Sewer Master Plan.
Improvements and expansions of the City's sewer system are needed to
accommodate the development of new residential, commercial, and industrial
uses within the City of Gilroy. The Sewer Development Impact Fee is used to
expand system capacity to accommodate new development. Interest is allocated.
•435 - Water Development Impact: The purpose of the Water Development
Impact Fund is to finance the construction of water transmission, distribution, and
storage systems within Pressure Zone 1 of the City water system as described in
the City of Gilroy’s Water Master Plan. Improvements and expansions of the
City's water system are needed to accommodate the development of new
residential, commercial, and industrial uses within the City of Gilroy. The Water
Development Impact Fee is used to expand capacity to accommodate new
development. Interest is allocated.
•440 - Public Facilities Impact: The purpose of this fund is to finance the
construction of parks, police, fire, and other City Facilities as described in the City
of Gilroy’s Public Facilities Master Plan. These improvements to public facilities
are completed to accommodate new residential and commercial development.
Interest is allocated.
•487 – Downtown Beautification: The purpose of this fund is to finance the design
and construction of improvements along Gourmet Alley and Railroad Alley.
These improvements are funded by a $3.9M grant from Caltrans’ Clean
California Local Grant Program.
9DRAFT
Back to Main Table of Contents
•615 - Facilities: This internal service fund accounts for all expenses relating to
the operation and maintenance of City facilities. The costs are recovered through
an annual "user fee" which is charged to all departments/funds that have
facilities.
•625 - Equipment Outlay: This allocates resources intended for the purchase of
General Fund equipment costing more than $1,000.
•700 - Sewer: This is an enterprise fund which operates and maintains the sewer
collection system.
•705 - Water: This is an enterprise fund which operates and maintains the water
production and distribution system.
CIP Project Charter Anatomy / How to Read a Project Charter
The CIP is primarily organized by project charters. As explained above, a charter is a
brief plan for each capital project and provides the requisite information for scheduling
and funding a project within the CIP. CIP Charters have 16 separate parts which are
explained in detail below:
1.Project Number:
The project number is intended to identify a project, which could consist of a number
of phases or stages of development.
The project number consists of 6 digits. Currently funded projects begin with
800XX0. New projects in the draft CIP have been assigned “submittal numbers”
which will be discussed in the next section.
2.Submittal Number:
The submittal number is used to keep track of submissions. Departments submitting
requests for capital project consideration, funding, and scheduling are identified by a
two letter department (or division or section, as appropriate) designation, two letter
FY designation (for this budget it is 24), and then a consecutive two digit identifier
(recommended to be in priority order, but not necessary).
For example, the first project submitted by the Facilities Section would have the
designation FC2401.
The department/division/section codes are as follows:
AD – Administration, including
City Attorney
EN – Engineering
FC – Facilities
FR – Fire
PK – Parks
RC – Recreation
SW – Sewer
WT – Water
10DRAFT
Back to Main Table of Contents
3.Project Name:
The project name is related to a location, which could be a building name or street
name, and the broad category of work required. If the project is not tied to a single
location, then the most descriptive name available is used. Street names shall be
spelled, not numbered (e.g., Ninth Street, not 9th Street), and intersections shall list
the non-number street first, the more major street first, or the first alphabetical name
first.
4. Department:
The department listed represents the department/division/section that will be
managing the project. For example, the Master Plan Projects – Sewer Improvements
project is in the category of Wastewater: Sewer Collection, but the department is
listed as Public Works: Engineering with the project being managed by the City
Engineer. Some department designations may be further detailed into division or
section. Coordination of the project is assigned to the most appropriate person.
Usually this will be someone in Public Works Engineering, but could also be an
Operational section (e.g., Facilities, Parks), or a specialized expert. This person will
be the Project Manager.
5. Category:
Five categories have been identified for
capital projects. Within the categories,
there may be additional sub-categories.
The categories and sub-categories may be
revised or updated in any year by the CIP
committee and presented for Council
approval. Currently, these categories are:
1.Facilities
a. Buildings
b.Building Systems
c.Specialized Facilities
d.Parking Lots
2.Parks & Trails
a.New Parks
b.Park Expansion
c.Trails
d. Buildings
e.Play Equipment
f.Other Structures or Facilities
g.Master Plans
11DRAFT
Back to Main Table of Contents
3.Streets
a.Pavement
b.Pavement Markings
c.Signage
d.Traffic Signals
e. Bridges
f.Curbs & Sidewalks
g.Other Concrete Features
h.Congestion Management
i.Streetlights
j.Street Trees
4.Utilities
a. Water
i.Water Storage
ii.Wells & Pumping
iii. Distribution
iv.Fire Hydrants & Blow-Offs
v.Meters & Service Lines
b. Wastewater
i.Sewer Trunks
ii.Sewer Collection
iii.Manholes, Cleanouts, Etc.
iv.Lift Stations
v.Recycled Water
vi.Inspections
c.Storm Drain
i.Storm Trunks
ii.Storm Collection
iii.Manholes & Appurtenances
iv.Lift Stations
5. Engineering
a.Master Plans
b.Stormwater Compliance
c.Traffic Calming
d.Standard Drawings & Specs
e.Plans & Programs
f.Downtown
g.Utility Undergrounding
12DRAFT
Back to Main Table of Contents
6.Project Type:
There are seven categories for project type: New, Replacement, Rehabilitation,
Renovation, Modification, Demolition, and Studies & Reports. New projects add
capital value to the City’s asset base. Replacement projects provide an exchange or
substitution of a current City resource for a similar system. Rehabilitation projects
repair, enhance, or upgrade a current City property or resource. Renovation
projects remodel a current City property or resource. Modification projects modify a
current City property or resource. Demolition projects demolish a current City
property or resource. Studies & Reports projects do not necessarily directly improve
a City asset but are a planning/analysis tool for future CIP project identification
and/or implementation.
7. Project Manager:
The Project Manager is the individual in the department responsible for the oversight
of the project. For the charters, the CIP team listed the position of the person
responsible for delivering the project and not the name of the person that will serve
as the project manager because that person may change over the term of the 5-year
CIP.
8.Council Priorities:
Capital Improvement Projects satisfy the City Council priority to Maintain and
Improve City Infrastructure, which is indicated on each project charter.
9. Location:
Specifies either the general or specific location of the project. This may be a cross-
street, an address, or a general location like the Downtown.
10. Project Description:
This section describes the project in concise details, including any known special
aspects. This should include the location and type, or level of work involved, and the
project size in square feet of building, parking lot, or park, or in lineal feet for streets,
pipelines, sidewalks, trails, bike lanes, etc.
11. Project Justification:
This provides an explanation as to why this capital project is important and is
required. This section identifies the strategic goals and objectives of the project and
any Council priorities, Master Plan requirements, safety or health issues, public
issues or requests, and any other reason to complete this work.
12. Master Planning Document:
This section identifies if a project is contained in one of the City’s several Master
Plans. A project that is specifically referenced in a master plan gains additional
priority based on the City’s CIP Policy.
13DRAFT
Back to Main Table of Contents
13. Project Funding:
A.Project Costs – These include the cost of construction and the soft costs
associated with a project. The soft costs can include preliminary planning efforts,
property acquisition, design, construction management, inspection, public
outreach, and other non-construction costs that must be accounted for in a
thorough cost estimate.
B.Funding Source – This identifies the cost centers that will fund the project and
the specific amount that will be allocated for each year of project development
and delivery.
C.Project Fiscal Balance – From the Project Funding tables, it is easy to see if a
project is fully funded for each fiscal year. So long as the sum of the total funding
sources for a fiscal year match the sum of the project costs for that same fiscal
year, a project is fully funded for that year.
14. Financial Comments:
This section provides additional details related to a projects’ funding. It might be a
summary of the project funding source, or it might provide information related to
alternative funding strategies that might not be easily identified or easy to show in
tabular form.
15. Estimated Project Schedule:
This shows the various project phases, and what year those phases are planned to
be completed.
16. Ongoing Operational Cost Impact:
Ongoing operational costs identify maintenance costs that would be associated with
a fully constructed or delivered project, and the frequency of that maintenance.
14DRAFT
Back to Main Table of Contents
CIP Policy Document
1.Purpose/Background
The City of Gilroy’s 5-Year Capital Improvement Program (“CIP”) represents an ongoing
process through which the City identifies, prioritizes, and develops a multi-year work plan for
major capital expenditures and their associated funding sources, in an effort to improve and
maintain the City of Gilroy’s roadways, parks, facilities, and other infrastructure. Generally, CIP
improvements are major expenditures that have a multi-year life and result in becoming City
assets. The CIP is a strategic planning tool focusing on City owned infrastructure, summarizing
in one document the City’s overall capital project needs and associated funding requirements
during a five-year period. The CIP document is merely a planning tool and should be used as
such in the budget preparation process.
2.Policy
2.1. Capital Improvement Plan Overview
Since a city is comprised of diverse types of infrastructure, the CIP is structured under six
separate program areas in which projects are categorized by infrastructure type. This includes:
Streets Program; Parks and Trails Program; Utilities Program; Facilities Program, Fleet and
Equipment Program, and the Engineering Program. The six programs are structured as follows:
2.1.1. Streets Program
This program includes projects which develop and maintain the City’s roadway system to
provide safe and efficient traffic flows while minimizing traffic movement and noise through
residential neighborhoods; street lighting for traffic safety at intersections and throughout public
streets; infrastructure development and maintenance of street surfaces, storm drain systems,
curbs, gutters and sidewalks; bridges and retaining walls; and roadway landscaping to maintain
the quality streetscapes of the Gilroy community.
Gas Tax revenues, Sales Tax Revenues (Measure B), and Road Maintenance and
Rehabilitation Account (Senate Bill 1, SB1) funds are dedicated funding sources for the Streets
Program. Funding for projects may also come from prior year General Fund savings, from
development projects requiring mitigation of impacts, from partnerships with other jurisdictions,
or from federal, state, and local grants as either part of statewide initiatives or through grant
applications based on specific City projects.
2.1.2. Parks and Trails Program
This program includes projects to develop and improve parks and sport fields, park structures,
trails, the City Plaza Park, and various citywide tree planting and maintenance. Funding may
come from prior year General Fund savings, from grants and park bond funds, and from
donations. Park projects may, on occasion, include community volunteer services for minor
construction and clean-up projects.
2.1.3. Utilities Program
This program includes projects which develop and maintain the City’s water and sewer system
to provide safe, reliable, and efficient service to customers. This includes the installation of new
or upgraded transmission and distribution water lines, fire hydrants, water quality/conservation
devices and meters as well as reservoirs and pump stations. It also includes the installation,
15DRAFT
Back to Main Table of Contents
CIP Policy Document
replacement or upgrade of sanitary sewer collection mains and laterals and lift stations. The
funding for these projects comes from Utility Enterprise funds and Development Impact Fee
funds.
2.1.4. Facilities Program
This program includes projects for purchasing, constructing or making capital repairs to City
buildings, structures, and equipment. City buildings include City Hall, the Police Department
Building, several Fire Stations, the Wheeler Gym, the Senior Center and auxiliary structures, the
Corporation Yard and auxiliary structures, the Historical Buildings including Old City Hall and
Gilroy Museum, the Willey House, etc.; funding for these projects come primarily from the
General, Enterprise, and other capital project funds via the Internal Service Fund, as well as
grant funds.
2.1.5. Engineering Program
This program includes special projects, projects needed to bring the City into compliance with
certain regulatory requirements, and Engineering Division plans, standards, and specifications.
Examples of projects needed to bring the City into compliance with regulatory requirements
include State Water Resources Control Board regulatory requirements for capturing and
treatment of stormwater and California Public Utilities Commission (CPUC) mandates for
undergrounding overhead utilities.
2.2. Capital Improvement Plan Guidelines
2.2.1. Project Definition
The City’s definition of a Capital Improvement Plan (CIP) project includes the following:
For fixed capital infrastructure to be included in the CIP, it must:
•Have a total value greater than $25,000 USD (United States Dollars)
o individual year(s) may be less than $25,000 USD for phased or ongoing projects
so long as the total value when the project is completed is greater than $25,000
USD
•Estimated useful life of, or extending estimated useful life by, five (5) years or more
•Require advanced planning and design
•Have a project duration of more than three months from inception to completion
•Primarily non-recurring projects
•Be developed/implemented at a fixed location
For vehicles and equipment to be included in the CIP, it must:
•Have a total value greater than $15,000 USD
•Be an item that requires service and maintenance by the Fleet Section of the Public
Works’ Operations Division
2.2.2. Project Cost Estimates
Cost estimates shall be based on current year dollars for the near-term projects. For projects
three or more years out, the use of an escalation rate shall be considered. Project estimates are
updated every two years with the update to the CIP, based upon current design specifications
16DRAFT
Back to Main Table of Contents
CIP Policy Document
and bid prices. Equipment, operation, and maintenance costs incurred as an outcome of CIP
projects are to be identified and included in the operating budget. As part of the adoption of the
CIP, a resolution amending the Council-adopted operating budget(s) shall be proposed to
appropriate the expenditures needed to implement the projects identified in the adopted CIP.
2.2.3. CIP Document Preparation, Submittal and Reporting
Under direction from the City Administrator, the Public Works Department takes the lead in the
preparation of the current Capital Improvement Plan and reporting to Council of its progress and
status. Written reports on the progress of the CIP will be submitted to Council through the City
Administrator at the beginning and mid-year of each fiscal year.
Proposed projects are submitted by each department of the City via a CIP application form
submitted to the Engineering Division of Public Works as part of their biennial call for projects.
The projects being recommended for inclusion in the CIP shall have a project charter
developed, which will provide the project schedule, funding sources and timing, expenditure
timing, location information, a description of the project, and an analysis of the ongoing
maintenance and other cost impacts to the operating budget as a result of implementing the
project.
Projects are selected for proposed funding based on funding availability, project readiness,
regulatory requirements, critical health and safety issues, and Council priorities. Once the
projects and funding are assembled, Engineering submits the CIP to the Planning Commission
for review of conformity with General Plan goals and policies prior to Council’s final CIP review.
The proposed CIP is presented to the City Council for final review at a CIP hearing in spring,
with CIP and budget amendment approval scheduled in June.
The CIP also includes projects that are not proposed for funding due to lack of resources. These
projects proceed through the process, including presentation to the Planning Commission for
review of conformity with General Plan goals and policies. These unfunded projects will be
brought to Council for approval later when resources become available, and are included in the
CIP document for easy reference.
17DRAFT
Back to Main Table of Contents
This page intentionally left blank
18DRAFT
Back to Main Table of Contents
Proposed Proposed Forecast Forecast Forecast
By Project Category FY24 FY25 FY26 FY27 FY28 5-Year Total Percent
Streets 8,211,209$ 14,928,516$ 35,836,262$ 4,532,150$ 4,606,649$ 68,114,786$ 32%
Utilities 27,870,195 23,174,640 13,966,858 8,775,431 13,584,914 87,372,038 42%
Public Facilities 6,062,498 3,017,900 211,900 71,100 - 9,363,398 4%
Engineering 18,126,539 17,144,011 750,706 3,193,777 119,354 39,334,387 19%
Parks and Trails 1,201,379 4,340,971 350,000 350,000 350,000 6,592,350 3%
Utilities>Water 7,156,527 17,092,802 7,683,280 4,677,221 6,277,467 42,887,297 49%
Utilities>Wastewater 20,687,069 6,081,838 5,996,878 4,098,210 6,925,611 43,789,606 50%
Utilities>Storm Drain 26,599 - 286,700 - 381,836 695,135 1%
Total All Projects 61,471,820$ 62,606,038$ 51,115,726$ 16,922,458$ 18,660,917$ 210,776,959$ 100%
Proposed Proposed Forecast Forecast Forecast
By Project Category FY24 FY25 FY26 FY27 FY28 5-Year Total Percent
Streets 8,211,209$ 14,928,516$ 35,836,262$ 4,532,150$ 4,606,649$ 68,114,786$ 32%
Utilities 27,870,195 23,174,640 13,966,858 8,775,431 13,584,914 87,372,038 42%
Public Facilities 6,062,498 3,017,900 211,900 71,100 0 9,363,398 4%
Engineering 18,126,539 17,144,011 750,706 3,193,777 119,354 39,334,387 19%
Parks and Trails 1,201,379 4,340,971 350,000 350,000 350,000 6,592,350 3%
Utilities>Water 7,156,527$ 17,092,802$ 7,683,280$ 4,677,221$ 6,277,467$ 42,887,297$ 49%
Utilities>Wastewater 20,687,069 6,081,838 5,996,878 4,098,210 6,925,611 43,789,606 50%
Utilities>Storm Drain 26,599 - 286,700 - 381,836 695,135 1%
Total All Projects 61,471,820 62,606,038 51,115,726 16,922,458 18,660,917 210,776,959 100%
Note: Some projects are phased over multiple years. The "5-Year Total" represents the total number of individual projects per category.
Capital Improvement Program Summary
Budget by Project Category
FY24 - FY28
Capital Improvement Program Summary
Number of Projects by Project Category
FY24 - FY28
Streets
32%
Utilities
42%
Public Facilities
4%
Engineering
19%
Parks and
Trails
3%
CIP BY PROJECT CATEGORY
FY24 TO FY28
Utilities>Water
49%
Utilities>Wastewater
50%
Utilities>Storm Drain
1%
CIP BY UTILITIES PROJECT SUB-CATEGORY
FY24 TO FY28
19DRAFT
Back to Main Table of Contents
Proposed Proposed Forecast Forecast Forecast
By Funding Source FY24 FY25 FY26 FY27 FY28 5-Year Total Percent
100 - General Fund 2,047,800$ 1,950,000$ 350,000$ 350,000$ 350,000$ 5,047,800$ 2%
200 - Sidewalk Repair Reserve 500,000 500,000 500,000 500,000 500,000 2,500,000 1%
205 - Gas Taxes 1,034,120 1,191,573 903,493 872,200 890,810 4,892,196 2%
210 - Road Funds 1,482,596 1,527,074 1,565,251 1,604,382 1,644,492 7,823,795 4%
212 - Measure B 900,000 4,500,000 4,950,000 900,000 900,000 12,150,000 6%
215 - Transportation/ Mobility Gran 402,600 1,399,153 - - - 1,801,753 1%
220 - Vehicle Registration Fee 230,000 240,500 491,525 555,568 571,347 2,088,940 1%
245 - CDBG 261,950 99,500 311,900 100,000 100,000 873,350 0.4%
400 - Capital Projects 1,284,805 2,673,571 - - - 3,958,376 1.9%
410 - Storm Drain Development Im 231,827 230,811 631,506 605,477 501,190 2,200,811 1%
415 - Utility Undergrounding - - 405,900 2,588,300 - 2,994,200 1%
425 - Traffic Impact 2,913,050 8,660,209 27,325,993 - - 38,899,252 18%
430 - Sewer Development Impact 1,100,226 1,411,972 1,341,170 1,941,401 4,086,062 9,880,831 5%
435 - Water Development Impact 3,550,800 - - 2,885,454 3,029,726 9,465,980 4%
440 - Public Facilities Impact 13,888,793 13,441,107 - - - 27,329,900 13%
487 - Downtown Beautification 3,582,765 - - - - 3,582,765 2%
615 - Facilities 682,200 517,900 - 71,100 - 1,271,200 0.60%
625 - Equipment Outlay 4,185,718 2,500,000 - -- 6,685,718 3%
700 - Sewer 19,586,843 4,669,866 4,655,708 2,156,809 2,839,549 33,908,775 16%
705 - Water 3,605,727 17,092,802 7,683,280 1,791,767 3,247,741 33,421,317 16%
Total All Projects 61,471,820$ 62,606,038$ 51,115,726$ 16,922,458$ 18,660,917$ 210,776,959$ 100%
Capital Improvement Program Summary
Budget by Funding Source
FY24 - FY28
20DRAFT
Back to Main Table of Contents
Project Proposed Proposed Forecast Forecast Forecast
Number Project Title
FY24 FY25 FY26 FY27 FY28 5-Year Total
800020 Tenth Street and Uvas Creek
Bridge 1,000,000 - 26,617,000 - - 27,617,000
800060 Annual Citywide Pavement
Rehabilitation 4,482,596 4,527,074 2,965,251 3,004,382 3,044,492 18,023,7 95
800070 Annual Citywide Curb Ramp
Project 240,000 240,000 240,000 240,000 240,000 1 ,200,000
800080 Annual Safe Routes to Schools 62,600 65,730 69,017 72,467 76,091 345,905
800180 Traffic Calming 150,000 - - - - 150,000
800320 Annual Shared-Cost Sidewalk
Replacement Program 500,000 500,000 500,000 500,000 500,000 2 ,500,000
800330 Annual Pavement Markings 210,000 220,500 231,525 243,101 255,256 1,160,382
800340 Annual Signal/Street Light
Maintenance 321,520 337,596 354,476 372,200 390,810 1 ,776,602
800350 Luchessa/Church Traffic Signal
Installation 139,973 897,600 - - - 1,037,573
800360 Mantelli/Kern Traffic Signal
Installation 154,012 983,900 - - - 1,137,912
800370 Monterey/I.O.O.F. Traffic Signal
Installation 166,279 932,700 - - - 1,098,979
800410 Annual Citywide Traffic Signal
Upgrades 150,000 150,000 - - - 300,000
800440 Automall/Luchessa Traffic
Signal Installation 129,914 841,400 - - - 971,314
800450 Annual CDBG Sidewalk/Curb
Ramp Project 261,950 99,500 100,000 100,000 100,000 661,450
800480 First/Kern Traffic Signal
Installation 242,365 902,300 - - - 1,144,665
800770 Tenth Street/Hwy 101 Bridge
Widening - 4,230,216 4,758,993 - - 8,989,209
Total All Projects $ 8,211,209 $ 14,928,516 $ 35,836,262 $ 4,532,150 $ 4,606,649 $ 68,114,786
Proposed Proposed Forecast Forecast Forecast
Funding Sources FY24 FY25 FY26 FY27 FY28 5-Year Total
100 - General Fund 1,600,000 1,600,000 - - - 3,200,000
200 - Sidewalk Repair Reserve 500,000 500,000 500,000 500,000 500,000 2,500,000
205 - Gas Taxes 1,034,120 1,191,573 903,493 872,200 890,810 4,892,196
210 - Road Funds 1,482,596 1,527,074 1,565,251 1,604,382 1,644,492 7,823,795
212 - Measure B 900,000 4,500,000 4,950,000 900,000 900,000 12,150,000
215 - Transportation/ Mobility Grant 220,000 81,753 - - - 301,753
220 - Vehicle Registration Fee 230,000 240,500 491,525 555,568 571,347 2,088,940
245 - CDBG 261,950 99,500 100,000 100,000 100,000 661,450
425 - Traffic Impact 1,982,543 5,188,116 27,325,993 - - 34,496,652
Total All Projects $ 8,211,209 $ 14,928,516 $ 35,836,262 $ 4,532,150 $ 4,606,649 $ 68,114,786
Program Details
Streets
21DRAFT
Back to Main Table of Contents
Project Proposed Proposed Forecast Forecast Forecast
Number Project Title
FY24 FY25 FY26 FY27 FY28 5-Year Total
800270 Lions Creek Trail West of Santa
Teresa and Day 182,600 1,369,500 - - - 1,552,100
800740 San Ysidro Lighting / Picnic
Area Improvements Project 192,450 - - - - 192,450
PK2401 Citywide Park Restroom
Reroofing/Rehabilitation 350,000 350,000 350,000 350,000 350,000 1 ,750,000
900620 Miller Park Restrooms
Electrical Undergounding 97,800 - - - - 97,800
800780 San Ysidro Park Healthy Living
Enhancement 378,529 2,621,471 - - - 3,000,000
Total All Projects $ 1,201,379 $ 4,340,971 $ 350,000 $ 350,000 $ 350,000 $ 6,592,350
Proposed Proposed Forecast Forecast Forecast
Funding Sources FY24 FY25 FY26 FY27 FY28 5-Year Total
100 - General Fund 447,800 350,000 350,000 350,000 350,000 1,847,800
215 - Transportation/ Mobility Grant 182,600 1,317,400 - - - 1,500,000
400 - Capital Projects 570,979 2,673,571 - - - 3,244,550
Total All Projects $ 1,201,379 $ 4,340,971 $ 350,000 $ 350,000 $ 350,000 $ 6,592,350
Parks and Trails
Program Details
22DRAFT
Back to Main Table of Contents
Project Proposed Proposed Forecast Forecast Forecast
Number Project Title
FY24 FY25 FY26 FY27 FY28 5-Year Total
800050 McCarthy Site Well (Well #9) 3,550,800 - - - - 3,550,800
800250 Casey and Swanston Water
Line Replacement 466,707 2,825,800 - - - 3,292,507
800310 Automated Flexnet Water
Meter Installation 612,700 612,700 - - - 1,225,400
800390 Miller and Third Storm Drain
Rehabilitation - - 286,700 - - 286,700
800400 Monterey and Luchessa Storm
Drain Modifications - - - - 381,836 381,836
800430 Cohansey Avenue/Terri Court
Storm Drain Improvements 26,599 - - - - 26,599
800490 Annual Citywide Sewer Repair
and Rehabilitation Program 250,000 250,000 250,000 250,000 250,000 1 ,250,000
800510 Asbestos Cement Sewer Pipe
Replacement Citywide - 265,629 1,008,600 - - 1,274,229
800520 Carmel-Dowdy Alley - Sixth to
Seventh Sewer Replacement 75,401 273,200 - - - 348,601
800530 Large Diameter Sewer
Rehabilitation Citywide - 273,105 1,081,100 - - 1,354,205
800540 Monterey and Princevalle
Sewer Network - - - 755,038 2,840,381 3,595,419
800550 Old Gilroy - Chestnut to Forest
Sewer Upgrade 50,999 251,600 - - - 302,599
800560
Seventh St - Carmel-Dowdy to
Hanna-Rosanna Alleys Sewer
Replacement
- 62,706 211,300 - - 274,006
800570 Sewer Plant Expansion
(SCRWA) 15,700,000 1,900,000 500,000 - - 18,100,000
800590 Broadway and Sargent Water
Line Replacement - 185,295 877,600 - - 1,062,895
800600 Church and Gurries Water Line
Replacement 86,966 314,600 - - - 401,566
800610 Church Street - Welburn to First
Water Line Replacement - 250,335 1,173,400 - - 1,423,735
800620 Forest and Eighth Water Line
Replacement 89,974 369,200 - - - 459,174
800630 Steel Water Service Lines
Replacement Citywide 104,280 104,280 104,280 104,280 104,280 521,400
800640 Monterey and Eighth Water
Line Replacement - 101,325 406,700 - - 508,025
800650 Abandon 2" Water Line from
7041 to 7161 Monterey Street 108,900 847,000 - - - 955,900
800660 Murray at Burke Water Line
Reroute - 133,794 469,400 - - 603,194
800670 Saint Louise Hospital Large
Water Meter Replacement 63,200 - - - - 63,200
800690 Water Reservoirs A and B -
Painting 483,200 - - - - 483,200
800700 Water Reservoirs A and B -
Retrofit Overflow Piping 482,000 - - - - 482,000
800710 Water Well Nos. 1 and 4
Compliance Improvements 82,600 - - - - 82,600
800720 Water Well Nos. 1, 2, 4 and 6
Upgrade Improvements 1,025,200 10,527,000 - - - 11,552,200
900720 Old Gilroy Street at Railroad
Crossing Sewer Replacement - - - - 587,400 587,400
900730 Martin and Railroad Water Line
Replacement - - - - 1,371,600 1,371,600
900740 Monterey - Leavesley to Ronan
Water Line Replacement - 821,473 4,651,900 - - 5,473,373
SW2401 Master Plan Projects - Sewer
Improvements 2,671,998 2,805,598 2,945,878 3,093,172 3,247,830 14,764,4 76
SW2402 Joint Morgan Hill-Gilroy Trunk
Line Repairs 1,938,671 - - - - 1,938,671
WT2401 Master Plan Projects - Water
Improvements - - - 4,572,941 4,801,587 9,374,528
Total All Projects $ 27,870,195 $ 23,174,640 $ 13,966,858 $ 8,775,431 $ 13,584,914 $ 87,372,038
Proposed Proposed Forecast Forecast Forecast
Funding Sources FY24 FY25 FY26 FY27 FY28 5-Year Total
410 - Storm Drain Development Impact 26,599 - 286,700 - 381,836 695,135
430 - Sewer Development Impact 1,100,226 1,411,972 1,341,170 1,941,401 4,086,062 9,880,831
435 - Water Development Impact 3,550,800 - - 2,885,454 3,029,726 9,465,980
700 - Sewer 19,586,843 4,669,866 4,655,708 2,156,809 2,839,549 33,908,775
705 - Water 3,605,727 17,092,802 7,683,280 1,791,767 3,247,741 33,421,317
Total All Projects $ 27,870,195 $ 23,174,640 $ 13,966,858 $ 8,775,431 $ 13,584,914 $ 87,372,038
Utilities
Program Details
23DRAFT
Back to Main Table of Contents
Project Proposed Proposed Forecast Forecast Forecast
Number Project Title
FY24 FY25 FY26 FY27 FY28 5-Year Total
800160 Golf Course Water Tank
Replacement - 149,500 - - - 149,500
800230 Shooting Range Assessment 277,000 - - - - 277,000
900460
Electrical Panel Evaluation
Corporation Yard for OSHA
Requirements
44,500 - - - - 44,500
900480 Gilroy Center for the Arts HVAC
Replacement - 138,000 - - - 138,000
900490 Old City Hall HVAC
Replacement 360,700 - - - - 360,700
900520 Senior Center ADA Restroom
Access - - - 71,100 - 71,100
900530 Senior Center Roof
Replacement - 230,400 - - - 230,400
900590 Chestnut Fire Station Seismic
Upgrade and Remodel 250,000 1,250,000 - - - 1,500,000
900600 Las Animas Fire Station
Upgrade and Renovation 250,000 1,250,000 - - - 1,500,000
FC2401 Cherry Blossom Apartments
Reroofing - - 211,900 - - 211,900
FC2403 Civic Center Master Plan 750,000 - - - - 750,000
FC2404 Citywide Energy Saving
Measures 3,685,718 - - - - 3,685,718
FR2401 Santa Teresa Fire District -
Temporary Fire Station 444,580 - - - - 444,580
Total All Projects $ 6,062,498 $ 3,017,900 $ 211,900 $ 71,100 $- $ 9,363,398
Proposed Proposed Forecast Forecast Forecast
Funding Sources FY24 FY25 FY26 FY27 FY28 5-Year Total
100 - General Fund - - - - - -
245 - CDBG - - 211,900 - - 211,900
400 - Capital Projects 444,580 - - - - 444,580
440 - Public Facilities Impact 750,000 - - - - 750,000
615 - Facilities 682,200 517,900 - 71,100 - 1,271,200
625 - Equipment Outlay 4,185,718 2,500,000 - - - 6,685,718
Total All Projects $ 6,062,498 $ 3,017,900 $ 211,900 $ 71,100 $- $ 9,363,398
Program Details
Public Facilities
24DRAFT
Back to Main Table of Contents
Project Proposed Proposed Forecast Forecast Forecast
Number Project Title
FY24 FY25 FY26 FY27 FY28 5-Year Total
800240 Traffic Circulation Master Plan
and Traffic Impact Fee Update 400,000 - - - - 400,000
800420
Utility Undergrounding -
Monterey Street - Eighth to
Tenth
- - 405,900 2,588,300 - 2,994,200
800460 State Trash Amendments
Stormwater Compliance Project 118,800 118,800 237,600 470,737 10,000 955,937
800470 Stormwater NPDES
Compliance 86,428 112,011 107,206 134,740 109,354 549,739
800760 Gourmet and Railroad Alley
Improvements 3,582,765 - - - - 3,582,765
EN2402 Gilroy Ice Center 13,669,300 16,913,200 - - - 30,582,500
EN2403 Corporation Yard EV and EV
Charging 269,246 - - - - 269,246
Total All Projects $ 18,126,539 $ 17,144,011 $ 750,706 $ 3,193,777 $ 119,354 $ 39,334,387
Proposed Proposed Forecast Forecast Forecast
Funding Sources FY24 FY25 FY26 FY27 FY28 5-Year Total
400 - Capital Projects 269,246 - - - - 269,246
410 - Storm Drain Development Impact 205,228 230,811 344,806 605,477 119,354 1,505,676
415 - Utility Undergrounding - - 405,900 2,588,300 - 2,994,200
425 - Traffic Impact 930,507 3,472,093 - - - 4,402,600
440 - Public Facilities Impact 13,138,793 13,441,107 - - - 26,579,900
487 - Downtown Beautification 3,582,765 - - - - 3,582,765
Total All Projects $ 18,126,539 $ 17,144,011 $ 750,706 $ 3,193,777 $ 119,354 $ 39,334,387
Program Details
Engineering
25DRAFT
Back to Main Table of Contents
This page intentionally left blank
26DRAFT
Back to Main Table of Contents
Projected Proposed Proposed Forecast Forecast Forecast
FUND ACTIVITY DETAIL FY23 FY24 FY25 FY26 FY27 FY28
Fund: 200 - Sidewalk Repair Reserve
Acct. #:
Est. Beginning Fund Balance - July 1 1,365,613 1,557,855 1,318,975 1,080,059 841,360 602,881
Revenues
Impact Fees - - - - - -
Allocated Interest 22,200 22,700 23,153 23,732 24,325 24,933
Revenue Projections - - - - - -
Taxes - - - - - -
Licenses and Permits - - - - - -
Fines and Forfeitures - - - - - -
Intergovernmental Transfers - - - - - -
Special Assessments - - - - - -
Charges for Services - - - - - -
Use of Money/Property (Interest and Rents)- - - - - -
Other Revenue (Transfers In)250,000 250,000 250,000 250,000 250,000 250,000
Total Revenue 272,200 272,700 273,153 273,732 274,325 274,933
Fund Balance Subtotal after Revenue 1,637,813 1,830,555 1,592,128 1,353,791 1,115,685 877,814
Operating Expenditures
Personnel - - - - - -
Materials and Services (600) - - - - -
Capital Outlay - - - - - -
Transfers - - - - - -
Internal Service Fund Charges - (11,580) (12,069) (12,431) (12,804) (13,188)
Other Charges - - - - - -
Total Operating Expenses (600) (11,580) (12,069) (12,431) (12,804) (13,188)
Net Surplus/(Deficit)271,600 261,120 261,084 261,301 261,521 261,745
Total All Funds Available 1,637,213 1,818,975 1,580,059 1,341,360 1,102,881 864,626
Capital Projects:
800320 Annual Shared-Cost Sidewalk Replacement
Program (79,358) (500,000) (500,000) (500,000) (500,000) (500,000)
Total Capital Projects (79,358) (500,000) (500,000) (500,000) (500,000) (500,000)
Ending Fund Balance - June 30 1,557,855 1,318,975 1,080,059 841,360 602,881 364,626
Fund Balance Detail
200 - Sidewalk Repair Reserve
27DRAFT
Back to Main Table of Contents
Projected Proposed Proposed Forecast Forecast Forecast
FUND ACTIVITY DETAIL FY23 FY24 FY25 FY26 FY27 FY28
Fund: 202 - Downtown Parking Management Fund
Acct. #:
Est. Beginning Fund Balance - July 1 - 457 457 457 457 457
Revenues
Impact Fees - - - - - -
Allocated Interest 457 - - - - -
Revenue Projections - - - - - -
Taxes - - - - - -
Licenses and Permits - - - - - -
Fines and Forfeitures - - - - - -
Intergovernmental Transfers 300,761 - - - - -
Special Assessments - - - - - -
Charges for Services - - - - - -
Use of Money/Property (Interest and Rents)- - - - - -
Other Revenue (Transfers In)- - - - - -
Total Revenue 301,218 - - - - -
Fund Balance Subtotal after Revenue 301,218 457 457 457 457 457
Operating Expenditures
Personnel - - - - - -
Materials and Services - - - - - -
Capital Outlay - - - - - -
Transfers - - - - - -
Internal Service Fund Charges - - - - - -
Other Charges - - - - - -
Total Operating Expenses - - - - - -
Net Surplus/(Deficit)301,218 - - - - -
Total All Funds Available 301,218 457 457 457 457 457
Capital Projects:
800110 Downtown Parking Management Plan
(300,761) - - - - -
Total Capital Projects (300,761) - - - - -
Ending Fund Balance - June 30 457 457 457 457 457 457
202 - Downtown Parking Management Fund
Fund Balance Detail
28DRAFT
Back to Main Table of Contents
Projected Proposed Proposed Forecast Forecast Forecast
FUND ACTIVITY DETAIL FY23 FY24 FY25 FY26 FY27 FY28
Fund: 205 - Gas Taxes
Acct. #:
Est. Beginning Fund Balance - July 1 4,311,146 736,191 638,988 470,615 614,321 813,799
Revenues
Impact Fees - - - - - -
Allocated Interest 61,937 63,331 64,597 66,212 67,867 69,564
Revenue Projections - - - - - -
Taxes - - - - - -
Licenses and Permits - - - - - -
Fines and Forfeitures - - - - - -
Intergovernmental Transfers 1,532,669 1,704,012 1,873,663 1,920,505 1,968,517 2,017,730
Special Assessments - - - - - -
Charges for Services - - - - - -
Use of Money/Property (Interest and Rents)- - - - - -
Other Revenue - - - - - -
Total Revenue 1,594,606 1,767,343 1,938,260 1,986,717 2,036,385 2,087,294
Fund Balance Subtotal after Revenue 5,905,752 2,503,534 2,577,249 2,457,331 2,650,706 2,901,094
Operating Expenditures
Personnel - - - - - -
Materials and Services (548,454) (676,138) (758,477) (781,231) (804,668) (828,808)
Capital Outlay - - - - - -
Transfers (107,363) (99,863) (99,863) (99,863) (99,863) (99,863)
Internal Service Fund Charges (1,087) (54,425) (56,721) (58,423) (60,175) (61,981)
Other Charges - - - - - -
Total Operating Expenses (656,904) (830,426) (915,061) (939,517) (964,707) (990,652)
Net Surplus/(Deficit)937,702 936,917 1,023,199 1,047,200 1,071,678 1,096,642
Total All Funds Available 5,248,848 1,673,108 1,662,188 1,517,814 1,685,999 1,910,442
Capital Projects:
800060 Annual Citywide Pavement Rehabilitation (4,006,447) (500,000) (500,000) (500,000) (500,000) (500,000)
800070 Annual Citywide Curb Ramp Project (200,000) - (138,247) - - -
800080 Annual Safe Routes to Schools - (62,600) (65,730) (49,017) - -
800340 Annual Signal/Street Light Maintenance (306,210) (321,520) (337,596) (354,476) (372,200) (390,810)
800410 Annual Citywide Traffic Signal Upgrades - (150,000) (150,000) - - -
Total Capital Projects (4,512,657) (1,034,120) (1,191,573) (903,493) (872,200) (890,810)
Ending Fund Balance - June 30 736,191 638,988 470,615 614,321 813,799 1,019,632
Fund Balance Detail
205 - Gas Taxes
29DRAFT
Back to Main Table of Contents
Projected Proposed Proposed Forecast Forecast Forecast
FUND ACTIVITY DETAIL FY23 FY24 FY25 FY26 FY27 FY28
Fund: 210 - Road Funds
Acct. #:
Est. Beginning Fund Balance - July 1 2,455,639 1,611,044 1,662,883 1,715,858 1,770,150 1,825,775
Revenues
Impact Fees - - - - - -
Allocated Interest 55,605 56,856 57,993 59,443 60,929 62,452
Revenue Projections - - - - - -
Taxes - - - - - -
Licenses and Permits - - - - - -
Fines and Forfeitures - - - - - -
Intergovernmental Transfers 1,300,752 1,482,596 1,527,074 1,565,251 1,604,382 1,644,492
Special Assessments - - - - - -
Charges for Services - - - - - -
Use of Money/Property (Interest and Rents)- - - - - -
Other Revenue - - - - - -
Total Revenue 1,356,357 1,539,452 1,585,067 1,624,694 1,665,311 1,706,944
Fund Balance Subtotal after Revenue 3,811,996 3,150,496 3,247,950 3,340,551 3,435,461 3,532,718
Operating Expenditures
Personnel - - - - - -
Materials and Services (200) (5,000) (5,000) (5,150) (5,305) (5,464)
Capital Outlay - - - - - -
Transfers - - - - - -
Internal Service Fund Charges - (17) (18) - - -
Other Charges - - - - - -
Total Operating Expenses (200) (5,017) (5,018) (5,150) (5,305) (5,464)
Net Surplus/(Deficit)1,356,157 1,534,435 1,580,049 1,619,544 1,660,006 1,701,480
Total All Funds Available 3,811,796 3,145,479 3,242,932 3,335,401 3,430,157 3,527,255
Capital Projects:
800060 Annual Citywide Pavement Rehabilitation (2,200,752) (1,482,596) (1,527,074) (1,565,251) (1,604,382) (1,644,492)
Total Capital Projects (2,200,752) (1,482,596) (1,527,074) (1,565,251) (1,604,382) (1,644,492)
Ending Fund Balance - June 30 1,611,044 1,662,883 1,715,858 1,770,150 1,825,775 1,882,763
210 - Road Funds
Fund Balance Detail
30DRAFT
Back to Main Table of Contents
Projected Proposed Proposed Forecast Forecast Forecast
FUND ACTIVITY DETAIL FY23 FY24 FY25 FY26 FY27 FY28
Fund: 212 - Measure B
Acct. #:
Est. Beginning Fund Balance - July 1 2,061,910 3,260,517 3,290,260 3,320,588 3,351,672 3,383,530
Revenues
Impact Fees - - - - - -
Allocated Interest 29,547 30,211 30,816 31,586 32,376 33,185
Revenue Projections - - - - - -
Taxes - - - - - -
Licenses and Permits - - - - - -
Fines and Forfeitures - - - - - -
Intergovernmental Transfers 2,969,060 900,000 4,500,000 4,950,000 900,000 900,000
Special Assessments - - - - - -
Charges for Services - - - - - -
Use of Money/Property (Interest and Rents)- - - - - -
Other Revenue - - - - - -
Total Revenue 2,998,607 930,211 4,530,816 4,981,586 932,376 933,185
Fund Balance Subtotal after Revenue 5,060,517 4,190,728 7,821,076 8,302,174 4,284,048 4,316,715
Operating Expenditures
Personnel - - - - - -
Materials and Services - - - - - -
Capital Outlay - - - - - -
Transfers - - - - - -
Internal Service Fund Charges - (468) (488) (503) (518) (533)
Other Charges - -- -- -
Total Operating Expenses - (468) (488) (503) (518) (533)
Net Surplus/(Deficit)2,998,607 929,743 4,530,328 4,981,084 931,858 932,652
Total All Funds Available 5,060,517 4,190,260 7,820,588 8,301,672 4,283,530 4,316,182
Capital Projects:
800060 Annual Citywide Pavement Rehabilitation (1,800,000) (900,000) (900,000) (900,000) (900,000) (900,000)
800770 Tenth Street/Hwy 101 Bridge Widening - - (3,600,000) (4,050,000) - -
Total Capital Projects (1,800,000) (900,000) (4,500,000) (4,950,000) (900,000) (900,000)
Ending Fund Balance - June 30 3,260,517 3,290,260 3,320,588 3,351,672 3,383,530 3,416,182
212 - Measure B
Fund Balance Detail
31DRAFT
Back to Main Table of Contents
Projected Proposed Proposed Forecast Forecast Forecast
FUND ACTIVITY DETAIL FY23 FY24 FY25 FY26 FY27 FY28
Fund: 215 - Transportation/ Mobility Grant
Acct. #:
Est. Beginning Fund Balance - July 1 227,986 231,483 233,583 287,792 289,946 292,146
Revenues
Impact Fees - - - - - -
Allocated Interest 3,497 3,576 3,647 3,738 3,832 3,927
Revenue Projections - - - - - -
Taxes - - - - - -
Licenses and Permits - - - - - -
Fines and Forfeitures - - - - - -
Intergovernmental Transfers - 402,600 1,451,253 - - -
Special Assessments - - - - - -
Charges for Services - - - - - -
Use of Money/Property (Interest and Rents)- - - - - -
Other Revenue - - - - - -
Total Revenue 3,497 406,176 1,454,900 3,738 3,832 3,927
Fund Balance Subtotal after Revenue 231,483 637,659 1,688,483 291,530 293,778 296,073
Operating Expenditures
Personnel - - - - - -
Materials and Services - - - - - -
Capital Outlay - - - - - -
Transfers - - - - - -
Internal Service Fund Charges (1,476) (1,538) (1,584) (1,632) (1,681)
Other Charges - - - - - -
Total Operating Expenses - (1,476) (1,538) (1,584) (1,632) (1,681)
Net Surplus/(Deficit)3,497 404,700 1,453,362 2,154 2,200 2,247
Total All Funds Available 231,483 636,183 1,686,945 289,946 292,146 294,393
Capital Projects:
800070 Annual Citywide Curb Ramp Project - (220,000) (81,753) - - -
800270 Lions Creek Trail West of Santa Teresa and Day - (182,600) (1,317,400) - - -
Total Capital Projects - (402,600) (1,399,153) - - -
Ending Fund Balance - June 30 231,483 233,583 287,792 289,946 292,146 294,393
Fund Balance Detail
215 - Transportation/ Mobility Grant
32DRAFT
Back to Main Table of Contents
Projected Proposed Proposed Forecast Forecast Forecast
FUND ACTIVITY DETAIL FY23 FY24 FY25 FY26 FY27 FY28
Fund: 220 - Vehicle Registration Fee
Acct. #:
Est. Beginning Fund Balance - July 1 1,011,784 1,250,120 1,384,897 1,551,550 1,477,243 1,349,206
Revenues
Impact Fees - - - - - -
Allocated Interest 19,364 19,799 20,195 20,720 21,259 21,812
Revenue Projections - - - - - -
Taxes - - - - - -
Licenses and Permits - - - - - -
Fines and Forfeitures - - - - - -
Intergovernmental Transfers 389,944 401,642 413,692 424,034 434,635 445,501
Special Assessments - - - - - -
Charges for Services - - - - - -
Use of Money/Property (Interest and Rents)- - - - - -
Other Revenue - - - - - -
Total Revenue 409,308 421,441 433,887 444,754 455,894 467,312
Fund Balance Subtotal after Revenue 1,421,092 1,671,561 1,818,784 1,996,304 1,933,136 1,816,518
Operating Expenditures
Personnel - - - - - -
Materials and Services (972) (55,000) (25,000) (25,750) (26,523) (27,318)
Capital Outlay - - - - - -
Transfers - - - - - -
Internal Service Fund Charges - (1,664) (1,734) (1,786) (1,840) (1,895)
Other Charges - - - - - -
Total Operating Expenditures (972) (56,664) (26,734) (27,536) (28,362) (29,213)
Net Surplus/(Deficit)408,336 364,777 407,153 417,218 427,531 438,099
Total All Funds Available 1,420,120 1,614,897 1,792,050 1,968,768 1,904,774 1,787,305
Capital Projects:
800070 Annual Citywide Curb Ramp Project - (20,000) (20,000) (240,000) (240,000) (240,000)
800080 Annual Safe Routes to Schools - -- (20,000) (72,467) (76,091)
800330 Annual Pavement Markings (170,000) (210,000) (220,500) (231,525) (243,101) (255,256)
Total Capital Projects (170,000) (230,000) (240,500) (491,525) (555,568) (571,347)
Ending Fund Balance - June 30 1,250,120 1,384,897 1,551,550 1,477,243 1,349,206 1,215,958
Fund Balance Detail
220 - Vehicle Registration Fee
33DRAFT
Back to Main Table of Contents
Projected Proposed Proposed Forecast Forecast Forecast
FUND ACTIVITY DETAIL FY23 FY24 FY25 FY26 FY27 FY28
Fund: 245 - CDBG
Acct. #:
Est. Beginning Fund Balance - July 1 (362,209) (460,455) (461,356) (461,807) (682,833) (695,389)
Revenues
Impact Fees - - - - - -
Allocated Interest - - - - - -
Revenue Projections - - - - - -
Taxes - - - - - -
Licenses and Permits - - - - - -
Fines and Forfeitures - - - - - -
Intergovernmental Transfers 746,487 648,000 368,000 368,000 368,000 368,000
Special Assessments - - - - - -
Charges for Services - - - - - -
Use of Money/Property (Interest and Rents)- - - - - -
Other Revenue - - - - - -
Total Revenue 746,487 648,000 368,000 368,000 368,000 368,000
Fund Balance Subtotal after Revenue 384,278 187,545 (93,356) (93,807) (314,833) (327,389)
Operating Expenditures
Personnel (80,605) - - - - -
Materials and Services (77,387) (54,000) (54,000) (55,620) (57,289) (59,007)
Capital Outlay - - - - - -
Transfers (38,452) (56,999) (56,999) (58,709) (60,470) (62,284)
Internal Service Fund Charges (11,594) - - - - -
Other Charges (365,490) (275,952) (157,952) (162,797) (162,797) (162,797)
Total Operating Expenditures (573,528) (386,951) (268,951) (277,126) (280,556) (284,089)
Net Surplus/(Deficit)172,959 261,049 99,049 90,874 87,444 83,911
Total All Funds Available (189,250) (199,406) (362,307) (370,933) (595,389) (611,477)
Capital Projects:
800450 Annual CDBG Sidewalk/Curb Ramp Project (271,205) (261,950) (99,500) (100,000) (100,000) (100,000)
FC2401 Cherry Blossom Apartments Reroofing - - - (211,900) - -
Total Capital Projects (271,205) (261,950) (99,500) (311,900) (100,000) (100,000)
Ending Fund Balance - June 30 (460,455) (461,356) (461,807) (682,833) (695,389) (711,477)
Fund Balance Detail
245 - CDBG
34DRAFT
Back to Main Table of Contents
Projected Proposed Proposed Forecast Forecast Forecast
FUND ACTIVITY DETAIL FY23 FY24 FY25 FY26 FY27 FY28
Fund: 400 - Capital Projects
Acct. #:
Est. Beginning Fund Balance - July 1 5,494,297 5,301,288 4,896,690 4,885,366 4,927,160 4,969,998
Revenues
Impact Fees - - - - - -
Allocated Interest 39,343 40,229 41,033 42,059 43,110 44,188
Revenue Projections - - - - - -
Taxes - - - - - -
Licenses and Permits - - - - - -
Fines and Forfeitures - - - - - -
Intergovernmental Transfers 134,130 570,979 2,621,471 - - -
Special Assessments - - - - - -
Charges for Services - - - - - -
Use of Money/Property (Interest and Rents)- - - - - -
Other Revenue 2,336,794 269,246 - - - -
Total Revenue 2,510,267 880,454 2,662,504 42,059 43,110 44,188
Fund Balance Subtotal after Revenue 8,004,564 6,181,742 7,559,194 4,927,425 4,970,270 5,014,186
Operating Expenditures
Personnel - - - - - -
Materials and Services - - - - - -
Capital Outlay (430) - - - - -
Transfers - - - - - -
Internal Service Fund Charges - - - - - -
Other Charges (247) (257) (265) (273) (281)
Total Operating Expenditures (430) (247) (257) (265) (273) (281)
Net Surplus/(Deficit)2,509,837 880,207 2,662,247 41,794 42,838 43,907
Total All Funds Available 8,004,134 6,181,495 7,558,937 4,927,160 4,969,998 5,013,905
Capital Projects:
800090 Eigleberry and Seventh Parking Lot (2,551,396) - - - - -
800270 Lions Creek Trail West of Santa Teresa and Day - - (52,100) - - -
FC2403 Civic Center Master Plan - - - - - -
800740 San Ysidro Lighting / Picnic Area Improvements
Project
- (192,450) - - - -
800750 Gilroy Sports Park Playground Surface Repair (134,140) - - - - -
800780 San Ysidro Park Healthy Living Enhancement - (378,529) (2,621,471) - - -
EN2403 Corporation Yard EV and EV Charging - (269,246) - - - -
FR2401 Santa Teresa Fire District -Temporary Fire
Station
(17,310) (444,580) - - - -
Total Capital Projects (2,702,846) (1,284,805) (2,673,571) - - -
Ending Fund Balance - June 30 5,301,288 4,896,690 4,885,366 4,927,160 4,969,998 5,013,905
Fund Balance Detail
400 - Capital Projects
35DRAFT
Back to Main Table of Contents
Projected Proposed Proposed Forecast Forecast Forecast
FUND ACTIVITY DETAIL FY23 FY24 FY25 FY26 FY27 FY28
Fund: 410 - Storm Drain Development Impact
Acct. #:
Est. Beginning Fund Balance - July 1 1,223,210 876,982 823,495 959,485 578,284 113,912
Revenues
Impact Fees 66,697 99,608 259,878 142,258 28,573 59,110
Allocated Interest 19,239 19,672 20,065 20,567 21,081 21,608
Revenue Projections - - - - - -
Taxes - - - - - -
Licenses and Permits - - - - - -
Fines and Forfeitures - - - - - -
Intergovernmental Transfers 87,030 90,890 93,668 94,461 98,606 464,345
Special Assessments - - - - - -
Charges for Services - - - - - -
Use of Money/Property (Interest and Rents)- - - - - -
Other Revenue - - - - - -
Total Revenue 172,966 210,170 373,611 257,286 148,260 545,063
Fund Balance Subtotal after Revenue 1,396,176 1,087,152 1,197,106 1,216,771 726,544 658,975
Operating Expenditures
Personnel - - - - - -
Materials and Services (5,000) (31,100) (6,050) (6,201) (6,356) (6,515)
Capital Outlay - - - - - -
Transfers - - - - - -
Internal Service Fund Charges (194) (730) (760) (779) (798) (818)
Other Charges - -- -- -
Total Operating Expenditures (5,194) (31,830) (6,810) (6,980) (7,155) (7,334)
Net Surplus/(Deficit)167,772 178,340 366,801 250,305 141,105 537,729
Total All Funds Available 1,390,982 1,055,322 1,190,296 1,209,790 719,389 651,642
Capital Projects:
800390 Miller and Third Storm Drain Rehabilitation - - - (286,700) - -
800400 Monterey and Luchessa Storm Drain
Modifications - - - - - (381,836)
800430 Cohansey Avenue/Terri Court Storm Drain
Improvements - (26,599) - - - -
800460 State Trash Amendments Stormwater
Compliance Project - (118,800) (118,800) (237,600) (470,737) (10,000)
800470 Stormwater NPDES Compliance (514,000) (86,428) (112,011) (107,206) (134,740) (109,354)
Total Capital Projects (514,000) (231,827) (230,811) (631,506) (605,477) (501,190)
Ending Fund Balance - June 30 876,982 823,495 959,485 578,284 113,912 150,452
Fund Balance Detail
410 - Storm Drain Development Impact
36DRAFT
Back to Main Table of Contents
Projected Proposed Proposed Forecast Forecast Forecast
FUND ACTIVITY DETAIL FY23 FY24 FY25 FY26 FY27 FY28
Fund: 415 - Utility Undergrounding
Acct. #:
Est. Beginning Fund Balance - July 1 - - - - 3,081,441 493,141
Revenues
Impact Fees - - - - - -
Allocated Interest - - - - - -
Revenue Projections - - - - - -
Taxes - - - - - -
Licenses and Permits - - - - - -
Fines and Forfeitures - - - - - -
Intergovernmental Transfers - - - - - -
Special Assessments - - - - - -
Charges for Services - - - - - -
Use of Money/Property (Interest and Rents)- - - - - -
Other Revenue - - - 3,487,341 - -
Total Revenue - - - 3,487,341 - -
Fund Balance Subtotal after Revenue - - - 3,487,341 3,081,441 493,141
Operating Expenditures
Personnel - - - - - -
Materials and Services - - - - - -
Capital Outlay - - - - - -
Transfers - - - - - -
Internal Service Fund Charges - - - - - -
Other Charges - - - - - -
Total Operating Expenditures - - - - - -
Net Surplus/(Deficit)- - - 3,487,341 - -
Total All Funds Available - - - 3,487,341 3,081,441 493,141
Capital Projects:
800420 Utility Undergrounding - Monterey Street - Eighth
to Tenth
- - - (405,900) (2,588,300) -
Total Capital Projects - - - (405,900) (2,588,300) -
Ending Fund Balance - June 30 - - - 3,081,441 493,141 493,141
Fund Balance Detail
415 - Utility Undergrounding
37DRAFT
Back to Main Table of Contents
Projected Proposed Proposed Forecast Forecast Forecast
FUND ACTIVITY DETAIL FY23 FY24 FY25 FY26 FY27 FY28
Fund: 425 - Traffic Impact
Acct. #:
Est. Beginning Fund Balance - July 1 17,488,071 13,207,657 17,895,328 18,839,464 (2,391,299) 471,785
Revenues
Impact Fees 3,000,000 7,504,053 9,221,157 5,702,069 2,459,689 2,250,000
Allocated Interest 291,958 298,527 304,498 312,110 319,913 327,911
Revenue Projections - - - - - -
Taxes - - - - - -
Licenses and Permits - - - - - -
Fines and Forfeitures - - - - - -
Intergovernmental Transfers 48,769 97,538 97,538 100,464 103,478 106,582
Special Assessments - - - - - -
Charges for Services - - - - - -
Use of Money/Property (Interest and Rents)- - - - - -
Other Revenue - - - - - -
Total Revenue 3,340,727 7,900,118 9,623,193 6,114,644 2,883,080 2,684,493
Fund Balance Subtotal after Revenue 20,828,798 21,107,775 27,518,521 24,954,107 491,781 3,156,279
Operating Expenditures
Personnel - - - - - -
Materials and Services (402,149) (289,900) (8,950) (9,219) (9,495) (9,780)
Capital Outlay (3,802,766) - - - - -
Transfers - - - - - -
Internal Service Fund Charges (26) (9,497) (9,898) (10,195) (10,501) (10,816)
Other Charges - -- - - -
Total Operating Expenditures (4,204,941) (299,397) (18,848) (19,413) (19,996) (20,596)
Net Surplus/(Deficit)(864,214) 7,600,721 9,604,345 6,095,230 2,863,084 2,663,898
Total All Funds Available 16,623,858 20,808,378 27,499,673 24,934,694 471,785 3,135,683
Capital Projects:
800020 Tenth Street and Uvas Creek Bridge (2,416,201) (1,000,000) - (26,617,000) - -
800180 Traffic Calming - (150,000) - -- -
800240 Traffic Circulation Master Plan and Traffic Impact
Fee Update
- (400,000) - -- -
800350 Luchessa/Church Traffic Signal Installation - (139,973) (897,600) - - -
800360 Mantelli/Kern Traffic Signal Installation - (154,012) (983,900) - - -
800370 Monterey/I.O.O.F. Traffic Signal Installation - (166,279) (932,700) - - -
800440 Automall/Luchessa Traffic Signal Installation - (129,914) (841,400) - - -
800770 Tenth Street/Hwy 101 Bridge Widening (1,000,000) - (630,216) (708,993) - -
EN2402 Gilroy Ice Center - (530,507) (3,472,093) - - -
800480 First/Kern Traffic Signal Installation - (242,365) (902,300) - - -
Total Capital Projects (3,416,201) (2,913,050) (8,660,209) (27,325,993) - -
Ending Fund Balance - June 30 13,207,657 17,895,328 18,839,464 (2,391,299) 471,785 3,135,683
Fund Balance Detail
425 - Traffic Impact
38DRAFT
Back to Main Table of Contents
Projected Proposed Proposed Forecast Forecast Forecast
FUND ACTIVITY DETAIL FY23 FY24 FY25 FY26 FY27 FY28
Fund: 430 - Sewer Development Impact
Acct. #:
Est. Beginning Fund Balance - July 1 14,976,397 15,026,418 14,094,972 16,683,375 16,633,562 13,768,848
Revenues
Impact Fees 1,000,000 1,803,192 5,620,243 3,315,184 1,093,093 1,357,983
Allocated Interest 219,443 224,381 228,868 234,590 240,454 246,466
Revenue Projections - - - - - -
Taxes - - - - - -
Licenses and Permits - - - - - -
Fines and Forfeitures - - - - - -
Intergovernmental Transfers 386,083 437,408 410,049 - - -
Special Assessments - - - - - -
Charges for Services - - - - - -
Use of Money/Property (Interest and Rents)- - - - - -
Other Revenue - - - - - -
Total Revenue 1,605,526 2,464,981 6,259,160 3,549,774 1,333,547 1,604,449
Fund Balance Subtotal after Revenue 16,581,923 17,491,399 20,354,132 20,233,149 17,967,110 15,373,296
Operating Expenditures
Personnel - - - - - -
Materials and Services (7,500) (51,400) (13,550) (13,957) (14,375) (14,806)
Capital Outlay - - - - - -
Transfers (1,533,500) (2,244,000) (2,244,400) (2,243,600) (2,241,600) (2,243,300)
Internal Service Fund Charges - - - - - -
Other Charges (14,505) (801) (835) (860) (886) (912)
Anticipated Developer Reimbursements - - - - - -
Total Operating Expenditures (1,555,505) (2,296,201) (2,258,785) (2,258,417) (2,256,861) (2,259,019)
Net Surplus/(Deficit)50,021 168,780 4,000,375 1,291,357 (923,314) (654,570)
Total All Funds Available 15,026,418 15,195,198 18,095,347 17,974,732 15,710,249 13,114,277
Capital Projects:
800520 Carmel-Dowdy Alley - Sixth to Seventh Sewer
Replacement - (75,401) (273,200) - - -
800540 Monterey and Princevalle Sewer Network - -- - (755,038) (2,840,381)
800560 Seventh St - Carmel-Dowdy to Hanna-Rosanna
Alleys Sewer Replacement - -(62,706) (211,300) - -
SW2401 Master Plan Projects - Sewer Improvements - (1,024,825) (1,076,066) (1,129,870) (1,186,363) (1,245,681)
Total Capital Projects - (1,100,226) (1,411,972) (1,341,170) (1,941,401) (4,086,062)
Ending Fund Balance - June 30 15,026,418 14,094,972 16,683,375 16,633,562 13,768,848 9,028,215
Fund Balance Detail
430 - Sewer Development Impact
39DRAFT
Back to Main Table of Contents
Projected Proposed Proposed Forecast Forecast Forecast
FUND ACTIVITY DETAIL FY23 FY24 FY25 FY26 FY27 FY28
Fund: 435 - Water Development Impact
Acct. #:
Est. Beginning Fund Balance - July 1 6,053,344 5,904,670 2,929,136 4,540,034 5,535,025 3,051,658
Revenues
Impact Fees 319,569 478,204 1,512,512 892,597 297,121 363,752
Allocated Interest 93,615 95,721 97,635 100,076 102,578 105,142
Revenue Projections - - - - - -
Taxes - - - - - -
Licenses and Permits - - - - - -
Fines and Forfeitures - - - - - -
Intergovernmental Transfers 5,893 11,786 11,786 12,140 12,504 12,879
Special Assessments - - - - - -
Charges for Services - - - - - -
Use of Money/Property (Interest and Rents) - - - - - -
Other Revenue - - - - - -
Total Revenue 419,077 585,711 1,621,933 1,004,812 412,203 481,773
Fund Balance Subtotal after Revenue 6,472,421 6,490,381 4,551,069 5,544,846 5,947,228 3,533,431
Operating Expenditures
Personnel - (1,500) (1,500) - - -
Materials and Services (5,600) (8,000) (8,550) (8,807) (9,071) (9,343)
Capital Outlay - - - - - -
Transfers - - - - - -
Internal Service Fund Charges (6) (945) (985) (1,015) (1,045) (1,076)
Other Charges - - - - - -
Total Operating Expenditures (5,606) (10,445) (11,035) (9,821) (10,116) (10,419)
Net Surplus/(Deficit)413,471 575,266 1,610,898 994,991 402,087 471,354
Total All Funds Available 6,466,815 6,479,936 4,540,034 5,535,025 5,937,112 3,523,012
Capital Projects:
800050 McCarthy Site Well (Well #9)(562,145) (3,550,800) - - - -
WT2401 Master Plan Projects - Water Improvements - - - - (2,885,454) (3,029,726)
Total Capital Projects (562,145) (3,550,800) - - (2,885,454) (3,029,726)
Ending Fund Balance - June 30 5,904,670 2,929,136 4,540,034 5,535,025 3,051,658 493,286
435 - Water Development Impact
Fund Balance Detail
40DRAFT
Back to Main Table of Contents
Projected Proposed Proposed Forecast Forecast Forecast
FUND ACTIVITY DETAIL FY23 FY24 FY25 FY26 FY27 FY28
Fund: 440 - Public Facilities Impact
Acct. #:
Est. Beginning Fund Balance - July 1 4,734,333 2,395,159 917,977 7,289,338 10,418,160 9,163,452
Revenues
Impact Fees 1,500,000 3,635,084 10,934,196 6,769,131 2,326,152 2,416,349
Allocated Interest 61,002 62,374 63,622 65,213 66,843 68,514
Revenue Projections - - - - - -
Taxes - - - - - -
Licenses and Permits - - - - - -
Fines and Forfeitures - - - - - -
Intergovernmental Transfers 40,763 81,526 81,526 83,972 86,491 89,086
Special Assessments - - - - - -
Charges for Services - - - - - -
Use of Money/Property (Interest and Rents)- - - - - -
Other Revenue - 12,612,500 12,500,000 - - -
Total Revenue 1,601,765 16,391,484 23,579,344 6,918,315 2,479,486 2,573,949
Fund Balance Subtotal after Revenue 6,336,098 18,786,643 24,497,321 14,207,653 12,897,646 11,737,401
Operating Expenditures
Personnel - (1,500) (1,500) - - -
Materials and Services (10,000) (233,250) 9,075 9,347 9,628 9,916
Capital Outlay - - - - - -
Transfers (3,872,081) (3,729,591) (3,758,264) (3,782,168) (3,726,649) (4,023,015)
Internal Service Fund Charges - (15,532) (16,187) (16,673) (17,173) (17,688)
Other Charges (58,858) - - - - -
Total Operating Expenditures (3,940,939) (3,979,873) (3,766,876) (3,789,493) (3,734,194) (4,030,786)
Net Surplus/(Deficit)(2,339,174) 12,411,611 19,812,468 3,128,822 (1,254,708) (1,456,838)
Total All Funds Available 2,395,159 14,806,770 20,730,445 10,418,160 9,163,452 7,706,614
Capital Projects:
FC2403 Civic Center Master Plan - (750,000) - - - -
EN2402 Gilroy Ice Center - (13,138,793) (13,441,107) - - -
Total Capital Projects - (13,888,793) (13,441,107) - - -
Ending Fund Balance - June 30 2,395,159 917,977 7,289,338 10,418,160 9,163,452 7,706,614
Fund Balance Detail
440 - Public Facilities Impact
41DRAFT
Back to Main Table of Contents
Projected Proposed Proposed Forecast Forecast Forecast
FUND ACTIVITY DETAIL FY23 FY24 FY25 FY26 FY27 FY28
Fund: 487 - Downtown Beautification
Acct. #:
Est. Beginning Fund Balance - July 1 - - - - - -
Revenues
Impact Fees - - - - - -
Allocated Interest - - - - - -
Revenue Projections - - - - - -
Taxes - - - - - -
Licenses and Permits - - - - - -
Fines and Forfeitures - - - - - -
Intergovernmental Transfers 378,000 3,582,765 - - - -
Special Assessments - - - - - -
Charges for Services - - - - - -
Use of Money/Property (Interest and Rents)- - - - - -
Other Revenue - - - - - -
Total Revenue 378,000 3,582,765 - - - -
Fund Balance Subtotal after Revenue 378,000 3,582,765 - - - -
Operating Expenditures
Personnel - - - - - -
Materials and Services - - - - - -
Capital Outlay - - - - - -
Transfers - - - - - -
Internal Service Fund Charges - - - - - -
Other Charges - - - - - -
Total Operating Expenditures - - - - - -
Net Surplus/(Deficit)378,000 3,582,765 - - - -
Total All Funds Available 378,000 3,582,765 - - - -
Capital Projects:
800760 Gourmet and Railroad Alley Improvements (378,000) (3,582,765) - - - -
Total Capital Projects (378,000) (3,582,765) - - - -
Ending Fund Balance - June 30 - - - - - -
487 - Downtown Beautification
Fund Balance Detail
42DRAFT
Back to Main Table of Contents
Projected Proposed Proposed Forecast Forecast Forecast
FUND ACTIVITY DETAIL FY23 FY24 FY25 FY26 FY27 FY28
Fund: 615 - Facilities
Acct. #:
Est. Beginning Fund Balance - July 1 1,787,292 350,780 748,304 838,527 1,443,569 1,973,805
Revenues
Impact Fees - - - - - -
Allocated Interest 30,393 31,077 31,699 32,491 33,304 34,136
Revenue Projections - - - - - -
Taxes - - - - - -
Licenses and Permits - - - - - -
Fines and Forfeitures - - - - - -
Intergovernmental Transfers 133,291 300,000 - - - -
Special Assessments - - - - - -
Charges for Services 2,292,306 4,138,185 4,233,233 4,339,064 4,447,540 4,558,729
Use of Money/Property (Interest and Rents)171,435 176,280 180,058 185,460 191,024 196,754
Other Revenue - - - - - -
Total Revenue 2,627,425 4,645,542 4,444,990 4,557,015 4,671,868 4,789,620
Fund Balance Subtotal after Revenue 4,414,717 4,996,322 5,193,294 5,395,542 6,115,437 6,763,424
Operating Expenditures
Personnel (662,741) (803,164) (852,878) (878,464) (904,818) (931,963)
Materials and Services (2,608,563) (2,492,551) (2,701,888) (2,782,945) (2,866,433) (2,952,426)
Capital Outlay - - - - - -
Transfers (99,052) - - - - -
Internal Service Fund Charges (247,436) (201,475) (210,105) (216,408) (222,900) (229,587)
Other Charges (65,465) (68,628) (71,996) (74,156) (76,381) (78,672)
Total Operating Expenditures (3,683,257) (3,565,818) (3,836,867) (3,951,973) (4,070,532) (4,192,648)
Net Surplus/(Deficit)(1,055,832) 1,079,724 608,123 605,042 601,336 596,971
Total All Funds Available 731,460 1,430,504 1,356,427 1,443,569 2,044,905 2,570,776
Capital Projects:
800140 City Hall Backup Generator (316,880) - - - - -
800160 Golf Course Water Tank Replacement - - (149,500) - - -
800230 Shooting Range Assessment (63,800) (277,000) - - - -
900460 Electrical Panel Evaluation Corporation Yard for
OSHA Requirements - (44,500) - - - -
900480 Gilroy Center for the Arts HVAC Replacement - -(138,000) - - -
900490 Old City Hall HVAC Replacement - (360,700) - - - -
900520 Senior Center ADA Restroom Access - - - - (71,100) -
900530 Senior Center Roof Replacement - - (230,400) - - -
Total Capital Projects (380,680) (682,200) (517,900) - (71,100) -
Ending Fund Balance - June 30 350,780 748,304 838,527 1,443,569 1,973,805 2,570,776
Fund Balance Detail
615 - Facilities
43DRAFT
Back to Main Table of Contents
Projected Proposed Proposed Forecast Forecast Forecast
FUND ACTIVITY DETAIL FY23 FY24 FY25 FY26 FY27 FY28
Fund: 625 - Equipment Outlay
Acct. #:
Est. Beginning Fund Balance - July 1 3,078,025 3,818,760 (310,703) 246,395 305,210 365,494
Revenues
Impact Fees - - - - - -
Allocated Interest 55,017 56,255 57,380 58,815 60,285 61,792
Revenue Projections - - - - - -
Taxes - - - - - -
Licenses and Permits - - - - - -
Fines and Forfeitures - - - - - -
Intergovernmental Transfers 685,718 - - - - -
Special Assessments - - - - - -
Charges for Services - - - - - -
Use of Money/Property (Interest and Rents)- - - - - -
Other Revenue - - 3,685,718 - - -
Total Revenue 740,735 56,255 3,743,098 58,815 60,285 61,792
Fund Balance Subtotal after Revenue 3,818,760 3,875,015 3,432,395 305,210 365,494 427,286
Operating Expenditures
Personnel - - - - - -
Materials and Services - - - - - -
Capital Outlay - - - - - -
Transfers - - - - - -
Internal Service Fund Charges - - - - - -
Other Charges - - (686,000) - - -
Total Operating Expenditures - - (686,000) - - -
Net Surplus/(Deficit)740,735 56,255 3,057,098 58,815 60,285 61,792
Total All Funds Available 3,818,760 3,875,015 2,746,395 305,210 365,494 427,286
Capital Projects:
900590 Chestnut Fire Station Seismic Upgrade and
Remodel
- (250,000) (1,250,000) - - -
900600 Las Animas Fire Station Upgrade and
Renovation
- (250,000) (1,250,000) - - -
FC2404 Citywide Energy Saving Measures - (3,685,718) - - - -
Total Capital Projects - (4,185,718) (2,500,000) - - -
Ending Fund Balance - June 30 3,818,760 (310,703) 246,395 305,210 365,494 427,286
625 - Equipment Outlay
Fund Balance Detail
44DRAFT
Back to Main Table of Contents
Projected Proposed Proposed Forecast Forecast Forecast
FUND ACTIVITY DETAIL FY23 FY24 FY25 FY26 FY27 FY28
Fund: 700 - Sewer
Acct. #:
Est. Beginning Fund Balance - July 1 62,280,983 44,566,887 24,494,446 18,665,398 13,103,014 9,939,866
Revenues
Impact Fees - - - - - -
Allocated Interest 327,561 334,931 341,629 350,170 358,924 367,897
Revenue Projections - - - - - -
Taxes - - - - - -
Licenses and Permits - - - - - -
Fines and Forfeitures - - - - - -
Intergovernmental Transfers 1,533,500 2,244,000 2,244,400 2,243,600 2,241,600 2,243,300
Special Assessments - - - - - -
Charges for Services 13,261,505 13,526,940 13,797,388 14,142,323 14,495,881 14,858,278
Use of Money/Property (Interest and Rents)650,000 300,000 40,000 - - -
Other Revenue - - - - - -
Total Revenue 15,772,566 16,405,871 16,423,417 16,736,092 17,096,405 17,469,475
Fund Balance Subtotal after Revenue 78,053,549 60,972,758 40,917,863 35,401,490 30,199,419 27,409,341
Operating Expenditures
Personnel (2,911,081) (3,688,290) (4,144,391) (4,268,723) (4,396,784) (4,528,688)
Materials and Services (478,813) (1,109,063) (855,127) (880,781) (907,204) (934,420)
Capital Outlay (25,000) (404,450) (404,450) (416,584) (429,081) (441,953)
Transfers (7,158,762) (7,307,395) (7,737,458) (7,587,452) (7,815,075) (8,049,528)
Internal Service Fund Charges (1,753,298) (2,122,521) (2,180,223) (2,245,630) (2,312,999) (2,382,389)
Other Charges (3,359,708) (2,259,750) (2,260,950) (2,243,600) (2,241,600) (2,243,300)
Total Operating Expenditures (15,686,662) (16,891,469) (17,582,599) (17,642,768) (18,102,744) (18,580,278)
Net Surplus/(Deficit)85,904 (485,598) (1,159,182) (906,676) (1,006,339) (1,110,803)
Total All Funds Available 62,366,887 44,081,289 23,335,264 17,758,722 12,096,675 8,829,063
Capital Projects:
800490 Annual Citywide Sewer Repair and Rehabilitation - (250,000) (250,000) (250,000) (250,000) (250,000)
800510 Asbestos Cement Sewer Pipe Replacement
Citywide - - (265,629) (1,008,600) - -
800530 Large Diameter Sewer Rehabilitation Citywide - - (273,105) (1,081,100) - -
800550 Old Gilroy - Chestnut to Forest Sewer Upgrade - (50,999) (251,600) - - -
800570 Sewer Plant Expansion (SCRWA)(17,800,000) (15,700,000) (1,900,000) (500,000) - -
900720 Old Gilroy Street at Railroad Crossing Sewer
Replacement - - - - - (587,400)
SW2401 Master Plan Projects - Sewer Improvements - (1,647,173) (1,729,532) (1,816,008) (1,906,809) (2,002,149)
SW2402 Joint Morgan Hill-Gilroy Trunk Line Repairs - (1,938,671) - - - -
Total Capital Projects (17,800,000) (19,586,843) (4,669,866) (4,655,708) (2,156,809) (2,839,549)
Ending Fund Balance - June 30 44,566,887 24,494,446 18,665,398 13,103,014 9,939,866 5,989,514
Fund Balance Detail
700 - Sewer
45DRAFT
Back to Main Table of Contents
Projected Proposed Proposed Forecast Forecast Forecast
FUND ACTIVITY DETAIL FY23 FY24 FY25 FY26 FY27 FY28
Fund: 705 - Water
Acct. #:
Est. Beginning Fund Balance - July 1 30,616,245 32,170,505 26,825,722 8,115,067 217,146 (1,489,115)
Revenues
Impact Fees - - - - - -
Allocated Interest 483,737 494,621 504,514 519,649 535,239 551,296
Revenue Projections - - - - - -
Taxes - - - - - -
Licenses and Permits - - - - - -
Fines and Forfeitures - - - - - -
Intergovernmental Transfers - - - - - -
Special Assessments - - - - - -
Charges for Services 13,665,000 13,939,000 14,218,000 14,928,900 15,675,345 16,459,112
Use of Money/Property (Interest and Rents)- - - - - -
Other Revenue 110,370 115,000 117,000 119,925 122,923 125,996
Total Revenue 14,259,107 14,548,621 14,839,514 15,568,474 16,333,507 17,136,405
Fund Balance Subtotal after Revenue 44,875,352 46,719,126 41,665,236 23,683,541 16,550,653 15,647,289
Operating Expenditures
Personnel (3,401,649) (4,569,271) (5,045,437) (5,196,800) (5,352,704) (5,513,285)
Materials and Services (1,717,377) (2,865,573) (2,229,457) (1,721,443) (1,764,480) (1,808,591)
Capital Outlay (450,107) (479,450) (479,450) - - -
Transfers (355,796) (433,788) (458,181) (471,926) (486,084) (500,667)
Internal Service Fund Charges (2,616,242) (3,210,345) (3,282,742) (3,381,224) (3,482,661) (3,587,141)
Other Charges (3,369,476) (4,729,250) (4,962,100) (5,011,721) (5,162,073) (5,316,935)
Total Operating Expenditures (11,910,647) (16,287,677) (16,457,367) (15,783,115) (16,248,001) (16,726,619)
Net Surplus/(Deficit)2,348,460 (1,739,056) (1,617,853) (214,641) 85,506 409,785
Total All Funds Available 32,964,705 30,431,449 25,207,869 7,900,426 302,652 (1,079,330)
Capital Projects:
800250 Casey and Swanston Water Line Replacement
- (466,707) (2,825,800) - - -
800310 Automated Flexnet Water Meter Installation (794,200) (612,700) (612,700) - - -
800590 Broadway and Sargent Water Line Replacement - - (185,295) (877,600) - -
800600 Church and Gurries Water Line Replacement - (86,966) (314,600) - - -
800610 Church Street - Welburn to First Water Line
Replacement
- -(250,335) (1,173,400) - -
800620 Forest and Eighth Water Line Replacement - (89,974) (369,200) - - -
800630 Steel Water Service Lines Replacement Citywide - (104,280) (104,280) (104,280) (104,280) (104,280)
900740 Monterey - Leavesley to Ronan Water Line
Replacement
- - (821,473) (4,651,900) - -
800640 Monterey and Eighth Water Line Replacement - - (101,325) (406,700) - -
800650 Abandon 2" Water Line from 7041 to 7161
Monterey Street
- (108,900) (847,000) - - -
800660 Murray at Burke Water Line Reroute - - (133,794) (469,400) - -
800670 Saint Louise Hospital Large Water Meter
Replacement
- (63,200) - - - -
800690 Water Reservoirs A and B - Painting - (483,200) - - - -
800700 Water Reservoirs A and B - Retrofit Overflow
Piping
- (482,000) - - - -
800710 Water Well Nos. 1 and 4 Compliance
Improvements
- (82,600) - - - -
800720 Water Well Nos. 1, 2, 4 and 6 Upgrade
Improvements
- (1,025,200) (10,527,000) - - -
900730 Martin and Railroad Water Line Replacement - - - - - (1,371,600)
WT2401 Master Plan Projects - Water Improvements - - - - (1,687,487) (1,771,861)
Total Capital Projects (794,200) (3,605,727) (17,092,802) (7,683,280) (1,791,767) (3,247,741)
Ending Fund Balance - June 30 32,170,505 26,825,722 8,115,067 217,146 (1,489,115) (4,327,071)
Fund Balance Detail
705 - Water
46DRAFT
Back to Main Table of Contents
Projected Proposed Proposed Forecast Forecast Forecast
FUND ACTIVITY DETAIL FY23 FY24 FY25 FY26 FY27 FY28
Fund: 100 - General Fund
Capital Projects:
800060 Annual Citywide Pavement Rehabilitation (3,200,000) (1,600,000) (1,600,000) - - -
800470 Stormwater NPDES Compliance (120,000) - - - - -
900620 Miller Park Restrooms Electrical Undergrounding - (97,800) - - - -
PK2401 Citywide Park Restroom Reroofing/Rehabilitation - (350,000) (350,000) (350,000) (350,000) (350,000)
Total Capital Projects (3,320,000) (2,047,800) (1,950,000) (350,000) (350,000) (350,000)
Fund Balance Detail
100 - General Fund
47DRAFT
Back to Main Table of Contents
This page intentionally left blank
48DRAFT
Back to Main Table of Contents
Appendices
Fiscal Year 2024-2028
Capital Improvement Program
Project Charters
City of Gilroy
Public Works Department
49DRAFT
Back to Main Table of Contents
This page intentionally left blank
50DRAFT
Back to Main Table of Contents
Appendices – CIP Project Charters
Table of Contents
Appendix A – Funded CIP Projects (Within 5‐Year CIP) ............................................................... 55
800020 Tenth Street and Uvas Creek Bridge ......................................................................... 57
800050 McCarthy Site Well (Well #9) .................................................................................... 59
800060 Annual Citywide Pavement Rehabilitation ............................................................... 61
800070 Annual Citywide Curb Ramp Project ......................................................................... 63
800080 Annual Safe Routes to Schools ................................................................................. 65
800160 Golf Course Water Tank Replacement...................................................................... 67
800180 Traffic Calming .......................................................................................................... 69
800250 Casey and Swanston Water Line Replacement ........................................................ 71
800270 Lions Creek Trail West of Santa Teresa and Day ....................................................... 73
800290 Santa Teresa Fire District ‐ New Fire Station ............................................................ 75
800310 Automated Flexnet Water Meter Installation .......................................................... 77
800320 Annual Shared‐Cost Sidewalk Replacement Program .............................................. 79
800330 Annual Pavement Markings ...................................................................................... 81
800350 Luchessa/Church Traffic Signal Installation .............................................................. 83
800360 Mantelli/Kern Traffic Signal Installation ................................................................... 85
800370 Monterey/I.O.O.F. Traffic Signal Installation ............................................................ 87
800390 Miller and Third Storm Drain Rehabilitation ............................................................. 89
800400 Monterey and Luchessa Storm Drain Modifications ................................................ 91
800410 Annual Citywide Traffic Signal Upgrades .................................................................. 93
800420 Utility Undergrounding ‐ Monterey Street ‐ Eighth to Tenth ................................... 95
800440 Automall/Luchessa Traffic Signal Installation ........................................................... 97
800450 Annual CDBG Sidewalk/Curb Ramp Project .............................................................. 99
800480 First/Kern Traffic Signal Installation ........................................................................ 101
800490 Annual Citywide Sewer Repair and Rehabilitation Program .................................. 103
800510 Asbestos Cement Sewer Pipe Replacement Citywide ............................................ 105
800520 Carmel‐Dowdy Alley ‐ Sixth to Seventh Sewer Replacement ................................. 107
800530 Large Diameter Sewer Rehabilitation Citywide ...................................................... 109
800540 Monterey and Princevalle Sewer Network ............................................................. 111
800550 Old Gilroy ‐ Chestnut to Forest Sewer Upgrade ..................................................... 113
800560 Seventh St ‐ Carmel‐Dowdy to Hanna‐Rosanna Alleys Sewer Replacement .......... 115
800570 Wastewater Treatment Plant Expansion (SCRWA) ................................................. 117
800590 Broadway and Sargent Water Line Replacement ................................................... 119
800600 Church and Gurries Water Line Replacement ........................................................ 121
51DRAFT
Back to Main Table of Contents
800610 Church Street ‐ Welburn to First Water Line Replacement .................................... 123
800620 Forest and Eighth Water Line Replacement ........................................................... 125
800630 Steel Water Service Lines Replacement Citywide .................................................. 127
800640 Monterey and Eighth Water Line Replacement ..................................................... 129
800650 Abandon 2" Water Line from 7041 to 7161 Monterey Street ................................ 131
800660 Murray at Burke Water Line Reroute ..................................................................... 133
800670 Saint Louise Hospital Large Water Meter Replacement ......................................... 135
800690 Water Reservoirs A and B – Painting ...................................................................... 137
800700 Water Reservoirs A and B ‐ Retrofit Overflow Piping ............................................. 139
800710 Water Well Nos. 1 and 4 Compliance Improvements ............................................ 141
800720 Water Well Nos. 1 , 2, 4 and 6 Upgrade Improvements ......................................... 143
800740 San Ysidro Lighting / Picnic Area Improvements Project ........................................ 145
800760 Gourmet and Railroad Alley Improvements ........................................................... 147
800770 Tenth Street/Hwy 101 Bridge Widening ................................................................. 149
800780 San Ysidro Park Healthy Living Enhancement ......................................................... 151
900480 Gilroy Center for the Arts HVAC Replacement ....................................................... 153
900490 Old City Hall HVAC Replacement ............................................................................ 155
900530 Senior Center Roof Replacement ............................................................................ 157
900590 Chestnut Fire Station Seismic Upgrade ................................................................... 159
900600 Las Animas Fire Station Upgrade and Renovation .................................................. 161
900620 Miller Park Restrooms Electrical Undergrounding ................................................. 163
900720 Old Gilroy Street at Railroad Crossing Sewer Replacement ................................... 165
900730 Martin and Railroad Water Line Replacement ....................................................... 167
900740 Monterey ‐ Leavesley to Ronan Water Line Replacement ..................................... 169
EN2402 Gilroy Ice Center ..................................................................................................... 171
EN2403 Corporation Yard EV and EV Charging .................................................................... 173
FC2401 Cherry Blossom Apartments Reroofing .................................................................. 175
FR2401 Santa Teresa Fire District ‐ Temporary Fire Station ................................................ 177
PK2401 Citywide Park Restroom Reroofing/Rehabilitation ................................................. 179
SW2401 Master Plan Projects ‐ Sewer Improvements .......................................................... 181
SW2402 Joint Morgan Hill‐Gilroy Trunk Line Repairs ............................................................ 183
WT2401 Master Plan Projects ‐ Water Improvements .......................................................... 185
Appendix B – Unfunded CIP Projects (Recommended Beyond FY28) ....................................... 187
800010 Rancho Hills Development Concrete Repairs ......................................................... 189
800030 Corp Yard Stormwater Compliance Improvements ................................................ 191
800040 Automall Parkway Pavement Rehabilitation .......................................................... 193
52DRAFT
Back to Main Table of Contents
800120 Las Animas Park Tennis Court ‐ Fence Repairs ....................................................... 195
800280 Lions Creek Trail West Gap Closure ‐ Kern to Day .................................................. 197
800380 Church Street Storm Drain Extension ‐ Seventh to 7233 Church ........................... 199
800730 Gateway Senior Apartments Pedestrian Crossing Safety Improvements .............. 201
900030 Drainage Improvements to Mitigate Minor Flooding ............................................. 203
900070 Luchessa Bridge Pedestrian and Bicycle Safety Improvements .............................. 205
900090 Mantelli/Church Bulb‐Out and Crosswalk Improvements ...................................... 207
900100 Miller/Uvas Creek Trail Pedestrian Improvements ................................................ 209
900110 Murray Avenue Sidewalk Gap Closure.................................................................... 211
900120 Sidewalk Gap Closure ‐ 8340 Swanston Lane ......................................................... 213
900130 Storm Drain Cleaning and Inspection Program ...................................................... 215
900140 Fifth Street ‐ Miller to Princevalle Storm Drain Replacement ................................ 217
900150 Fifth Street ‐ Princevalle to Rosanna New Storm Drain Trunk ................................ 219
900160 Forest and Eighth Storm Drain Connection Replacement ...................................... 221
900170 Ninth Street Storm Drain Extension ‐ Monterey to Eigleberry ............................... 223
900180 Princevalle System ‐ Fifth to Santa Paula Storm Drain Improvements ................... 225
900190 Rosanna ‐ Fourth to Princevalle Channel Storm Drain Improvements ................... 227
900200 Second Street ‐ Hanna to Miller Slough Storm Drain Improvements ..................... 229
900210 Third Street Storm Drain Extension ‐ Hanna to Eigleberry ..................................... 231
900230 Wren Avenue Bridge Over Lions Creek BPMP ........................................................ 233
900320 Railroad At‐Grade Crossing Pedestrian Safety Improvements ............................... 235
900330 Neighborhood Street Lighting................................................................................. 237
900350 Church Street Sidewalk Gap Closure ...................................................................... 239
900400 Chestnut Fire Station Bay Heaters and HVAC Replacement ................................... 241
900450 7380 Dowdy Building Demolition ........................................................................... 243
900500 Parks/Civic Facilities Sidewalk Improvements Citywide ......................................... 245
900510 City‐Owned Parking Lots Resurfacing ..................................................................... 247
900610 Christmas Hill Park Trail Wayfinding Signage ......................................................... 249
900630 Forest Street Park Expansion .................................................................................. 251
900640 Las Animas Veterans Park Miscellaneous Facility Rehabilitation ........................... 253
900680 Gilroy Sports Park Improvements Phases IV and V ................................................ 255
900690 Rehabilitate Softball Fields at Las Animas and Christmas Hill Parks ....................... 257
EN2404 Monterey Rd Sidewalk ‐ Luchessa to Tenth ............................................................ 259
EN2405 Master Plan Projects ‐ Storm Drain Improvements ................................................ 261
EN2406 Luchessa Ave / Rossi Ln Reconstruction ................................................................. 263
PK2402 Parks Master Plan ................................................................................................... 265
53DRAFT
Back to Main Table of Contents
Appendix C – Funded Studies/Plans (Within 5‐Year CIP) .......................................................... 267
800110 Downtown Parking Management Plan ................................................................... 269
800230 Shooting Range Assessment ................................................................................... 271
800240 Traffic Circulation Master Plan and Traffic Impact Fee Update.............................. 273
FC2403 Civic Center Master Plan ......................................................................................... 275
Appendix D – Unfunded Studies/Plans (Recommended Beyond FY28) ................................... 277
900220 Storm Outfalls #6 and #7 ‐ Investigations and Monitoring for NPDES ................... 279
900250 Development of Stormwater Specifications ........................................................... 281
900260 Update to the City's Trails Master Plan (Bike Master Plan) .................................... 283
900270 Development of a Pedestrian Master Plan ............................................................. 285
900280 Update to the City's Standard Drawings/Specifications/Design Standards ........... 287
900290 Development of an ADA Transition Plan ................................................................ 289
900360 ADA Assessment ‐ City Facilities Citywide .............................................................. 291
900650 Christmas Hill Ranch Site Master Planning ............................................................. 293
900660 Farrell Park Facility Master Planning ...................................................................... 295
900670 Uvas Creek Staging and Neighborhood Park Master Planning ............................... 297
Appendix E – Miscellaneous Funded CIP Projects (Within 5‐Year CIP) ..................................... 299
800340 Annual Signal/Street Light Maintenance ................................................................ 301
800430 Cohansey Avenue/Terri Court Storm Drain Improvements ................................... 303
800460 State Trash Amendments Stormwater Compliance Project ................................... 305
800470 Stormwater NPDES Compliance ............................................................................. 307
900460 Electrical Panel Evaluation Corporation Yard for OSHA Requirements .................. 309
900520 Senior Center ADA Restroom Access ...................................................................... 311
FC2404 Citywide Energy Saving Measures .......................................................................... 313
Appendix F – Completed CIP Projects ........................................................................................ 315
800090 Eigleberry and Seventh Parking Lot ........................................................................ 317
800140 City Hall Backup Generator ..................................................................................... 319
800150 Corp Yard Fuel Tank Repair ..................................................................................... 321
800170 Citywide Regulatory Sign Replacement .................................................................. 323
800200 Citywide Sidewalk Condition Assessment .............................................................. 325
800210 Orchard/Tenth Crosswalk Enhancements .............................................................. 327
800260 Bridge Preventative Maintenance Program ........................................................... 329
800300 Replace Station Alerting System ‐ All Fire Stations ................................................. 331
800750 Gilroy Sports Park Playground Surface Repair ........................................................ 333
900380 CHS Aquatics Pool Re‐Plastering ............................................................................. 335
54DRAFT
Back to Main Table of Contents
Appendix A – Funded CIP Projects (Within 5‐Year CIP)
55DRAFT
Back to Main Table of Contents
This page intentionally left blank
56DRAFT
Back to Main Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Tenth Street and Uvas
Creek Bridge Project No. 800020
Category Streets: Bridges Department Public Works: Engineering
Project Type New Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Tenth Street at Uvas Creek
Project Description and Purpose
This project consists of constructing a two-lane bridge with sidewalks and Class II Bike Lanes along
Tenth Street over Uvas Creek, as well as other features. The project will also include a “breezeway
bridge” over the current Class I Levee Path, which will enable levee users to cross under Tenth
Street, avoiding an at-grade vehicle/pedestrian crossing. The project includes a new roundabout at
the Uvas Park Drive/Tenth Street intersection. The bridge will connect two segments of Tenth Street,
which currently terminate on either side of Uvas Creek, and allow Tenth Street to extend as one
continuous roadway from the US 101 / Tenth Street (Automall Parkway) Interchange to Santa Teresa
Boulevard.
Project Justification
This project is identified in the Traffic Circulation Master Plan. Per a 2005 Development Agreement
with the Glen Loma Ranch Development, the City will complete the design of the bridge and the
developer will build the bridge with reimbursement from the Traffic Impact Fee (TIF) Fund. The City
Council has directed the bridge to be designed with a width of 76 feet to accommodate four travel
lanes in the future. Construction of this bridge will provide improved transportation circulation within
the City and will improve emergency response time.
Master Planning Documents
This project is included in the City’s Traffic Circulation Master Plan which is part of the General Plan
Mobility Element.
Tenth St (Future)
57DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800020)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design
Design $2,020,125 $2,020,125
CEQA $396,076 $1,000,000 $1,396,076
Construction $23,145,000 $23,145,000
Con. Support $3,472,000 $3,472,000
Total $2,416,201 $1,000,000 $26,617,000 $30,033,201
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Traffic Impact
Fee (425) $2,416,201 $1,000,000 $26,617,000 $30,033,201
Total $2,416,201 $1,000,000 $26,617,000 $30,033,201
Financial Comments
This project will be funded by the Traffic Impact Fee Fund (425). The cost estimate assumes no
property acquisition for the project. It is assumed that the Gilroy Unified School District and Valley
Water would provide any needed property at no cost. If the project is required to purchase property
from the School District or Valley Water, project costs could increase significantly.
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Environmental FY24
Project Construction FY26
Project Completion FY26
Ongoing Operational Cost Impact
Ongoing maintenance to the bridge and associated project improvements will include bridge deck
sealing every three to five years, graffiti mitigation and general clean-up around the structure, and
landscape activities (if any) associated within the roundabout areas.
58DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name McCarthy Site Well (Well #9) Project No. 800050
Category Water: Wells & Pumping Department Public Works: Engineering
Project Type New Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location 6601 Cameron Boulevard
Project Description and Purpose
This project will design and construct a new potable water well to increase the City’s water supply by
approximately one million gallons per day (MGD). The investigation of possible well locations,
property acquisition, a Right-of-Entry Agreement, and the development of conceptual plans are
expected to be completed in FY24. The project includes drilling a test hole and a monitoring well and
constructing a production well and pump station with associated plumbing, electrical, and mechanical
equipment. A site located at 6601 Cameron Boulevard has been identified as a possible location for
the new well.
Project Justification
Based on the 2023 Water System Master Plan, the City’s existing water supply requirement is
approximately 16.3 million gallons per day (MGD). Based on the 2040 General Plan, the future
requirement will be 24.9 MGD, which results in a deficit of 5.1 MGD. As a result, the Water System
Master Plan recommends that three new groundwater wells be constructed to meet city performance
and design criteria. The City Council approved the design and construction of a new well based on
current and projected ADD and historical consumption.
Master Planning Documents
This project supports the City’s Water Master Plan by planning, developing, and financing water
system facilities to provide reliable and enhanced service for existing customers and to serve
anticipated growth.
Potential
Well #9 Site
59DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800050)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $205,647 $205,647
Design $356,498 $260,444 $616,942
CEQA $41,129 $41,129
Construction $2,632,285 $2,632,285
Con. Support $616,942 $616,942
Total $562,145 $3,550,800 $4,112,945
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Water
Development
Impact (435)
$562,145 $4,233,500 $4,795,645
Total $562,145 $3,550,800 $4,112,945
Financial Comments
This project will be funded by the Water Development Impact Fee Fund (435).
Estimated Project Schedule
Project Phase Timeline
Project Design FY20 – FY24
Project Advertisement FY24
Project Construction FY24
Project Completion FY24
Ongoing Operational Cost Impact
The annual cost for the operation and maintenance of the well is approximately $21,500. This
includes costs for chlorine, mechanical cleaning, semi-annual equipment testing, regulatory
permitting, and regular staff maintenance of the facility.
60DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
StreetSaver Pavement Management Program Summary of
Pavement Condition Index by Functional Street Classification as of April 2023
Project Name Annual Citywide
Pavement Rehabilitation Project No. 800060
Category Streets: Pavement Department Public Works: Engineering
Project Type Rehabilitation Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
The purpose of this project is to rehabilitate and maintain the City’s pavement condition. The City,
with approximately 270 lane miles of paved roads (not including alleys) conducts a pavement
condition survey every two years. This project will prolong the lifespan of the current pavement and
prevent further deterioration and reduction in the PCI. The project scope includes:
•Preventive measures such as crack sealing, slurry seal, microsurfacing, and cape seal for
pavement in fair to good condition.
•Restoration measures such as grind and overlay, dig-outs, and cold-in-place recycling for
pavement in fair to poor condition.
•Rehabilitation/Reconstruction measures to remove and replace pavement in poor to failed
condition.
Project Justification
The City’s current pavement assets are valued at $219.4 million, which represents one of the largest
assets owned and maintained by the City. Without proper maintenance, the investment needed to
sustain this asset becomes economically unsustainable. A drop in PCI results in much higher
maintenance and restoration costs.
Master Planning Documents
This project supports the City’s Traffic Circulation Master Plan by providing a safe and well-
maintained travel way.
61DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800060)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $448,260 $452,707 $296,525 $300,438 $304,449 $1,802,380
CEQA $2,241 $2,264 $1,483 $1,502 $1,522 $9,012
Construction $3,583,836 $3,619,396 $2,370,718 $2,402,003 $2,434,071 $14,410,024
Con. Support $448,260 $452,707 $296,525 $300,438 $304,449 $1,802,380
Total $4,482,596 $4,527,074 $2,965,251 $3,004,382 $3,044,492 $18,023,795
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
SB-1* (210) $1,482,596 $1,527,074 $1,565,251 $1,604,382 $1,644,492 $7,823,795
Measure B**
LS&R (212) $900,000 $900,000 $900,000 $900,000 $900,000 $4,500,000
Gas Taxes (205) $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000
General Fund
(100) $1,600,000 $1,600,000 $3,200,000
Total $4,482,596 $4,527,074 $2,965,251 $3,004,382 $3,044,492 $18,023,795
*The Road Repair and Accountability Act (SB-1) provides Transportation funding to state and local agencies for 10 years; the funding
comes from additional gas tax, vehicle license and registration fees.
** Measure B is a 30-year, half-cent countywide sales tax to enhance transit, highways, expressways, and active transportation; the
Local Streets and Roads category of Measure B provides for street pavement maintenance.
Financial Comments
Funding for this project will be from SB-1 (210), Measure B (212), Gas Taxes (205), and the General
Fund (100).
Estimated Project Schedule
Project Phase Timeline
All Phases FY24 and Ongoing
Ongoing Operational Cost Impact
This project directly addresses maintenance needs. As the City invests more funding in this program,
and as the City’s PCI increases, ongoing maintenance costs should be reduced.
62DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Annual Citywide
Curb Ramp Project Project No. 800070
Category Streets: Curbs and Sidewalks Department Public Works: Engineering
Project Type Rehabilitation Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
The purpose of this project is to upgrade existing pedestrian curb ramps and to install new pedestrian
curb ramps at high priority areas and locations with high levels of pedestrian activity. All upgraded
and new pedestrian curb ramps will be compliant with the Americans with Disabilities Act (ADA). It is
estimated that the city currently owns and maintains approximately 4,000 curb ramps. Curb ramps
are an important part of making sidewalks, street crossings, and the other pedestrian routes within
the public right-of-way accessible to all users, including people with disabilities.
Project Justification
Title II of the ADA requires local governments to make pedestrian crossings accessible to people with
disabilities by providing curb ramps. To allow people with disabilities to cross streets safely, local
governments must provide curb ramps at pedestrian crossings and at public transportation stops
where walkways intersect with a vertical curb. To comply with ADA requirements, the curb ramps
provided must meet specific standards for width, slope, cross slope, placement, and other features.
Per ADA standards, all streets constructed after January 26, 1992 must provide curb ramps in
compliance with ADA standards. In addition, any street that was constructed prior to 1992, but was
altered after 1992, must also provide ADA-compliant curb ramps.
Master Planning Documents
This project is consistent with the City’s General Plan goals and policies. These goals and policies
include correcting deficiencies and ensuring pedestrian facilities serve the function they are intended
to serve.
Example: Before Curb Ramp Upgrade Example: After Curb Ramp Upgrade
63DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800070)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $1,000 $1,000 $1,000 $1,000 $1,000 $5,000
Design $32,000 $32,000 $32,000 $32,000 $32,000 $160,000
CEQA $1,000 $1,000 $1,000 $1,000 $1,000 $5,000
Construction $184,000 $184,000 $184,000 $184,000 $184,000 $920,000
Con. Support $22,000 $22,000 $22,000 $22,000 $22,000 $110,000
Total $240,000 $240,000 $240,000 $240,000 $240,000 $1,200,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Gas Taxes (205) $138,247 $138,247
Vehicle
Registration Fees
(220)
$20,000 $20,000 $240,000 $240,000 $240,000 $760,000
Transportation/
Mobility Grant
(215)
$220,000 $81,753 $301,753
Total $240,000 $240,000 $240,000 $240,000 $240,000 $1,200,000
Financial Comments
This project will be funded by Gas Taxes (205), Vehicle Registration Fees (220), and
Transportation/Mobility Grant Funds (215).
Estimated Project Schedule
Project Phase Timeline
Project Design Annually
Project Advertisement Annually
Project Construction Annually
Project Completion Annually
Ongoing Operational Cost Impact
There are no net, new operational costs associated with this project.
64DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Annual Safe Routes to
Schools Project No. 800080
Category Streets: Curbs and Sidewalks Department Public Works: Engineering
Project Type Rehabilitation Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
The purpose of the Safe Routes to School (SRTS) project is to provide minor capital improvements to
enhance the safety of pedestrians and bicyclists around schools. Engineering staff attends regular
coordination meetings with the Gilroy Unified School District (GUSD) to address safety concerns and
develop strategies to encourage the use of alternative modes of transportation in the vicinity of
schools. This project will allow staff to identify and construct minor improvements based on
discussions with the School District, SRTS Groups, and the Bicycle Pedestrian Commission. SRTS
improvements may include pavement striping, regulatory and advisory signs, crosswalks, sidewalks,
and other minor concrete improvements.
Project Justification
In 2012, Council adopted Resolution 2012-20 supporting the SRTS program. This program is
designed to promote the health and safety of children who walk or bicycle to school. Per the
resolution, Council committed to encouraging walking, bicycling, and transit use among students and
families in the community. Since 2016, the Santa Clara County Public Health Department has
supported Gilroy in developing a SRTS Action Plan, which provides a framework for the GUSD and
the City to collaborate and improve safety through the implementation of SRTS. This project will allow
the City to address deficiencies which are highlighted in this plan.
Master Planning Documents
This project is consistent with the City’s General Plan goals and policies. These goals and policies
include correcting deficiencies and ensuring pedestrian facilities serve the function they are intended
to serve. 65DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800080)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $4,400 $4,620 $4,851 $5,094 $5,348 $24,313
Construction $56,000 $58,800 $61,740 $64,827 $68,069 $309,435
Con. Support $2,200 $2,310 $2,426 $2,547 $2,674 $12,156
Total $62,600 $65,730 $69,017 $72,467 $76,091 $345,905
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Gas Taxes (205) $62,600 $65,730 $49,017 $177,347
Vehicle
Registration (220) $20,000 $72,467 $76,091 $168,558
Total $62,600 $65,730 $69,017 $72,467 $76,091 $345,905
Financial Comments
It’s estimated that the first-year capital costs for this project would be approximately $63,000. This
cost includes engineering traffic studies, design, and construction of minor improvement. Future
investment is needed in order to provide upkeep for the improvement and expand to other schools
within the City. Future years will be funded using Gas Tax (205) and Vehicle Registration Fee (220).
An escalation factor of 5% is used to account for annual design and construction inflation.
Estimated Project Schedule
Project Phase Timeline
Project Design Annually
Project Advertisement Annually
Project Construction Annually
Project Completion Annually
Ongoing Operational Cost Impact
There are no net, new operational costs associated with this project.
66DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Golf Course Water Tank
Replacement Project No. 800160
Category Facilities: Specialized Facilities Department Facilities
Project Type Replacement Project Manager Facilities Manager
Council Priorities Maintain and Improve
City Infrastructure Location Gilroy Golf Course
Project Description and Purpose
This project would replace the current recycled water storage tank at Gilroy Golf Course. The project
would include the design of a suitable concrete pad for an 8,000-gallon water storage tank,
replacement of the current tank, duplication of the auto-fill plumbing, and an upgrade to the hardware
associated with the current irrigation system.
Project Justification
The existing 8,000-gallon recycled water tank was professionally assessed by a consultant, and they have
found the tank to be severely corroded and in dire need of replacement. The tank is required for the Golf
Course’s irrigation system. Should this tank rupture, it would render them unable to water the site, which
would severely impact the public that uses the course and cause extensive and expensive damage to the
greens and fairways. This tank has already received many repairs to stop previous leaks. A new tank is
needed to ensure the greens and fairways are irrigated and the golf course can remain open.
Recycled water is a reliable source of water for landscape irrigation, agriculture, and industrial operations.
It can contribute to the long-term water security of the region by alleviating water supply challenges such
as recurring droughts, and residential and commercial growth.
Master Planning Documents
Gilroy Golf Course receives its recycled water from the South County recycled water distribution
system. The South County Recycled Water Master Plan (Master Plan) was prepared in 2004 by the
Santa Clara Valley Water District (Valley Water) and the South County Regional Wastewater
Authority (SCRWA), with participation from the cities of Gilroy and Morgan Hill. The Master Plan was
updated in 2015.
Gilroy Golf Course Entrance
Hecker Pass Highway (SR152)
Recycled Water Storage Tank
67DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800160)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $17,600 $17,600
CEQA $1,100 $1,100
Construction $111,000 $111,000
Con. Support $19,800 $19,800
Total $149,500 $149,500
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Facilities (615) $149,500 $149,500
Total $149,500 $149,500
Financial Comments
This project would be funded by the Facilities Fund (615).
Estimated Project Schedule
Project Phase Timeline
Project Design FY25
Project Advertisement FY25
Project Construction FY25
Project Completion FY25
Ongoing Operational Cost Impact
This project would reduce operational costs because temporary repairs would no longer be needed.
68DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Traffic Calming Project No. 800180
Category Streets: Congestion Management Department Public Works: Engineering
Project Type New Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
This project will fund the installation of physical traffic calming devices to reduce or eliminate the
negative effects of motor vehicle traffic on residential streets. This can be done by causing drivers to
reduce their speed or to use an alternative route through the use of engineering solutions and the
installation of physical devices. These devices could include driver feedback signs, curb extensions,
speed cushions, and roundabouts, as identified through the community outreach process outlined in
the City’s Neighborhood Traffic Management Program (NTMP).
Project Justification
In November 2019, the City Council approved the City’s Neighborhood Traffic Management Program.
The NTMP includes provisions for the installation of traffic calming improvements. The City has
received approximately 20 neighborhood requests for traffic calming, which have been on hold
pending approval of the NTMP document. Moving forward, staff will conduct outreach with the
residents on the list and begin the process to determine the need for installation of actual traffic
calming improvements. The improvements will ultimately address neighborhood traffic concerns and
community safety issues.
Master Planning Documents
This project supports the City’s Traffic Circulation Master Plan by providing a safe and well-
maintained travel way.
69DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800180)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $10,000 $10,000
Construction $138,900 $138,900
Con. Support $1,100 $1,100
Total $150,000 $150,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
General Fund
(100) $150,000 $150,000
Total $150,000 $150,000
Financial Comments
Projects will be identified on a first come, first served basis, and comprehensive NTMP project
implementation will be funded through the CIP process, where projects will compete for funding
annually with other CIP projects.
It is hoped that this program could eventually be funded through Traffic Impact Fee (TIF) funds, but
the Traffic Impact Fee Program will need to be modified to do this.
Estimated Project Schedule
Project Phase Timeline
Project Design Ongoing
Project Advertisement Ongoing
Project Construction Ongoing
Project Completion Ongoing
Ongoing Operational Cost Impact
There are no operational costs associated with this project.
70DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Casey and Swanston Water
Line Replacement Project No. 800250
Category Water: Distribution Department Public Works: Engineering
Project Type Replacement Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Casey Lane and
Swanston Lane
Project Description and Purpose
This project would replace approximately 1,800 feet of deteriorating 6” cast iron water line with 10”
ductile iron pipe on Swanston Lane between Leavesley Road and Forest Street, and replace
approximately 600 feet of deteriorating 4” cast iron line with 10” ductile iron pipe on Casey Lane
between Monterey Road and Swanston Lane. This project also includes replacing service laterals
with new 1” and 2” copper service lines, installation of associated valves and fire hydrants, and
abandonment of the existing 4” water line.
Project Justification
These water lines have experienced numerous leaks and have reached the end of their useful life,
which could result in catastrophic failure if not replaced. This project will save City staff repair time
and water loss from leaks, and improve fire flow pressure to nearby commercial land uses. The
current pavement condition on Casey and Swanston Lanes is failed to poor. As a result, Casey Lane
will require full reconstruction and Swanston Lane will require a grind and overlay. Although not
included in this project’s cost estimate, the paving improvements could be combined with the water
line project, which would provide a cost savings by constructing these improvements as one project.
In addition to Enhancing Public Safety Capabilities, this project would also meet the Council Strategic
Goals of Ensuring Financial Stability and Ensuring Neighborhoods Benefit Equally from City Services.
Master Planning Documents
This project is not listed in any master plan document but will provide reliable and enhanced service
for existing customers and to serve anticipated future growth. Leavesley Rd Forest St
Swanston Ln
71DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800250)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $20,897 $20,897
Design $424,912 $424,912
CEQA $20,897 $20,897
Construction $2,332,000 $2,332,000
Con. Support $371,800 $371,800
Other Fees $122,000 $122,000
Total $466,707 $2,825,800 $3,292,507
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Water (720) $466,707 $2,825,800 $3,292,507
Total $466,707 $2,825,800 $3,292,507
Financial Comments
This project will be funded by the Water Fund (720).
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY25
Project Construction FY25
Project Completion FY25
Ongoing Operational Cost Impact
This project will create a reduction in maintenance costs associated with the aged and undersized
infrastructure that will be replaced.
72DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Lions Creek Trail West of
Santa Teresa and Day Project No. 800270
Category Parks and Trails: Trails Department Public Works: Engineering
Project Type New Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Lions Creek - Santa Teresa
Boulevard to Tapestry Drive
Project Description and Purpose
This project would construct a Class I, multi-use trail approximately 2,000 linear feet in length from
Santa Teresa Boulevard to Tapestry Drive along Lions Creek. The trail would provide recreational
usage along the creek and pedestrian access between nearby neighborhoods and Christopher High
School. The scope of work would include:
•Asphalt concrete Class I trail (for bicycles and pedestrians)
•ADA-compliant curb ramps at all trail entrances
•Concrete retaining wall
This project is adjacent to the unfunded Lions Creek Trail West Gap Closure (800280) project.
Additional grant funding is being pursued for the Lions Creek Trail. Upon successful award, staff will
evaluate both projects and apply the funds to section that provides the most benefit to the community.
Project Justification
This project was originally approved by Council for design in 2010 as a 6-foot wide trail as part of
three major trail projects in the City (the Ronan Channel Trail and two segments of the Lions Creek
Trail). However, funds previously allocated for this trail were diverted to the Ronan Channel Trail
project to allow the Ronan Channel Trail project to be constructed and to take full advantage of
federal funds that were available. The Lions Creek Trail project, which is currently at the 60% design
phase, qualifies for future local and federal grants for the construction phase.
Master Planning Documents
This project is in conformance with the adopted Trail Master Plan and has already received
environmental clearance, which is a prerequisite for permitting. Santa Teresa Blvd Tapestry Dr Lions Creek
Project Limits
73DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800270)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $6,600 $6,600
Design $121,000 $121,000
CEQA $55,000 $55,000
Construction $1,243,000 $1,243,000
Con. Support $126,500 $126,500
Total $182,600 $1,369,500 $1,552,100
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Transportation/
Mobility Grant
(215)(CPFCDS)
$182,600 $1,317,400 $1,500,000
Capital Projects
(400) $52,100 $52,100
Total $182,600 $1,369,500 $1,552,100
Financial Comments
This project will be largely funded by the Community Project Funding/Congressionally Directed
Spending (CPFCDS) federal grant for federal fiscal year 2023 which will be reimbursed to the
Transportation/Mobility Grant Fund (215). The remaining $52,100 will be funded from the Capital
Projects Fund (400).
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY24
Project Construction FY25
Project Completion FY25
Ongoing Operational Cost Impact
There are no operational costs associated with this project. Once completed, this project will require
an annual maintenance cost of approximately $16,000 per year. The trail will also require resurfacing
(Type II Slurry Seal and Restriping) every 8 years at approximately $35,000 per treatment.
74DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Santa Teresa Fire District –
New Fire Station Project No. 800290
Category Facilities: Buildings Department Fire
Project Type New Project Manager Fire Chief
Council Priorities Maintain and Improve
City Infrastructure Location West Luchessa Avenue and
Miller Avenue
Project Description and Purpose
This project would construct a new fire station within the Santa Teresa Fire District. The new fire
station is proposed to include two apparatus bays and a community meeting room. The community
meeting room would be designed to allow its future conversion into Chief Officer Quarters if needed.
The new facility would meet the recommended functional needs for Essential Facility Standards,
Environmental, Safety, Security, and Privacy.
Project Justification
The City of Gilroy entered into a Development Agreement in 2005 with the Glen Loma Group to build
housing along Santa Teresa Boulevard. The agreement includes a stipulation that the developer will
deliver a turnkey fire station to the City prior to the issuance of the 1,000th building permit. The
agreement was amended in 2018 to change the language to the 1,100th permit. The development
agreement contains a yearly escalation clause designed to keep up with inflation. The residential
project was delayed due to the 2007 Great Recession. With an improved economy in 2015, the
design of the new fire station began. However, the project was delayed again due to large increases
in construction costs. The City and developer agreed to wait until construction costs came down, or
until the City could provide gap funding to assist with constructing the fire station.
On November 18, 2019, the City Council approved the additional funding needed to build the Santa
Teresa Fire District Station.
Master Planning Documents
This project is included in the Glen Loma Ranch Specific Plan. 75DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Fire) (800290)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $60,500 $60,500
Design $1,292,500 $1,292,500
CEQA $60,500 $60,500
Construction $10,934,000 $10,934,000
Con. Support $1,082,400 $1,082,400
Permitting Fees $581,000 $581,000
Total $14,010,900 $14,010,900
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Capital Projects
(400) $14,010,900 $14,010,900
Total $14,010,900 $14,010,900
Financial Comments
This project is partially funded by the Capital Projects Fund (400). The remaining funds needed to
construct the project are held by the developer and will be submitted to the City in the future. On
November 18, 2019 Council approved an allocation of $2,900,000 from the General Fund unassigned
balance towards this project, which is now in the Capital Projects Fund (400). With that allocation,
remaining projects costs are estimated at $11,110,900 (79% of the total project cost).
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
The estimated ongoing annual maintenance cost of the station will initially be less than the current fire
station maintenance costs of $80,000 per year per station. As the station ages, however, the
maintenance costs will increase and will likely reach the $80,000 annual cost.
76DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Automated Flexnet Water
Meter Installation Project No. 800310
Category Water: Meters & Service Lines Department Public Works: Water
Project Type Rehabilitation Project Manager Water Operations Supervisor
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
This project would continue the ongoing process of converting all radio read meters to Advanced
Meter Infrastructure (AMI). The City currently has approximately 2,250 meters to upgrade. All of the
water meters in the City are already “radio read,” but they require a reader to be in the vicinity of the
meter. This project would allow real-time meter reading capabilities. This would enable leaks to be
identified more quickly, monitoring for concerning activity, verification of billing data, and any needed
updating for records. Over 85% of the City’s water meters have already been upgraded.
Project Justification
In 2012, with City Council approval, staff began exchanging traditional residential water meters with
AMI meters. AMI meters provide the City with remote access to water consumption information. This
information has enabled the City to notify customers of water leaks, saving them money and reducing
overall water demand. This has been a cornerstone of the City’s water conservation program and
targets non-beneficial uses of water. As of March 2023, approximately 12,750 out of 15,000 meters
have been upgraded to AMI meters.
Master Planning Documents
This project is not listed in any master plan document.
77DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800310)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $24,200 $18,700 $18,700 $61,600
Construction $770,000 $594,000 $594,000 $1,958,000
Total $794,200 $612,700 $612,700 $2,019,600
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Water (705) $794,200 $612,700 $612,700 $2,019,600
Total $794,200 $612,700 $612,700 $2,019,600
Financial Comments
This project will be funded by the Water Fund (705).
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY24
Project Construction FY25
Project Completion FY25
Ongoing Operational Cost Impact
There will be reduced operational costs for reading and maintaining meters in the future, allowing
staff to focus on other operational needs.
78DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Annual Shared-Cost Sidewalk
Replacement Program Project No. 800320
Category Streets: Curbs and Sidewalk s Department Public Works: Engineering
Project Type Replacement Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
The purpose of this program is to assist property owners in maintaining their sidewalk in a safe
manner. In doing so, the program assists residents in maintaining the condition of walkways for which
they have maintenance responsibility. To assist the property owners with these repairs, the current
program reimburses 50% of the sidewalk repair cost and 100% of any other repairs in the City’s right-
of-way, including; curb and gutter, driveway approach, street repair, tree removal (if warranted), and
replacement. To date the City has had over 1,500 residential participants and has expended over $5
million.
Project Justification
According to the California Streets and Highway Code, the owner of a property fronting a public street
must maintain the sidewalk, curb and gutter, and park strip area in a condition that will not endanger
persons or property, or interfere with the convenient use of the area. The current sidewalk program
began in 1994. Without this reimbursement mechanism, residents would be less likely to maintain the
structural quality of their sidewalk and curb, leaving the sidewalk system in a poor and unsafe
condition.
Master Planning Documents
This project is not listed in any master plan.
79DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800320)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $10,000 $10,000 $10,000 $10,000 $10,000 $50,000
Construction $470,000 $470,000 $470,000 $470,000 $470,000 $2,350,000
Con. Support $20,000 $20,000 $20,000 $20,000 $20,000 $100,000
Total $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Sidewalk Repair
Reserve (200) $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000
Total $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000
Financial Comments
This project will be funded by the Sidewalk Repair Reserve Fund (200) which is supplemented by the
General Fund (100).
Estimated Project Schedule
Project Phase Timeline
Project Design Annually
Project Advertisement Annually
Project Construction Annually
Project Completion Annually
Ongoing Operational Cost Impact
There are no operational costs associated with this project.
80DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Annual Pavement Markings Project No. 800330
Category Streets: Pavement Markings Department Public Works: Engineering
Project Type Rehabilitation Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
The purpose of this project is to upgrade and refresh existing pavement markings as needed
throughout the City per the requirements set forth by the California Department of Transportation
(Caltrans). Since 2017, the Council has approved an annual contract to restripe city streets and
maintain longitudinal pavement markings to a minimum level of retro-reflectivity. To date, the
approved funds have been expended through the restriping of approximately 192,000 linear feet of
pavement markings. It is estimated that there are a total of approximately 1.2 million linear feet of
markings throughout the City.
Project Justification
Per the recently adopted 2019 California Manual on Uniform Traffic Control Devices (MUTCD), local
governments are required to maintain a minimum level of retro-reflectivity for longitudinal pavement
markings. This new standard promotes safety while providing sufficient flexibility for agencies to
choose a maintenance method that best matches their specific conditions. Table 3A-1 of the
California MUTCD provides the minimum required levels for different types of pavement markings at
various types of locations. It is recommended that this type of project be continued on an annual
basis because the retro-reflectivity of pavement striping and markings will degrade over time, and can
pose a safety hazard for drivers and pedestrians.
Master Planning Documents
This project supports the City’s Traffic Circulation Master Plan by providing a safe and well-
maintained travel way.
81DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800330)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $15,000 $15,750 $16,538 $17,364 $18,233 $82,884
Construction $185,000 $194,250 $203,963 $214,161 $224,869 $1,022,242
Con. Support $10,000 $10,500 $11,025 $11,576 $12,155 $55,256
Total $210,000 $220,500 $231,525 $243,101 $255,256 $1,160,383
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Vehicle
Registration Fee
(220)
$210,000 $220,500 $231,525 $243,101 $255,256 $1,160,383
Total $210,000 $220,500 $231,525 $243,101 $255,256 $1,160,383
Financial Comments
This project will be funded by Vehicle Registration Fees (220).
Estimated Project Schedule
Project Phase Timeline
Project Design Annually
Project Advertisement Annually
Project Construction Annually
Project Completion Annually
Ongoing Operational Cost Impact
This project directly addresses maintenance needs. There are no new operational costs associated
with this project.
82DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Luchessa /Church Traffic
Signal Installation Project No. 800350
Category Streets: Traffic Signals Department Public Works: Engineering
Project Type New Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Luchessa Avenue and
Church Street
Project Description and Purpose
This project will design and construct a four-way, six-phase traffic signal at the Luchessa
Avenue/Church Street intersection. The signal will have dedicated left-turn phasing for the east-west
movements on Luchessa Avenue and passive left-turn phasing for the north-south movements on
Church Street. The project will include pedestrian countdown timers as well as other pedestrian and
lighting safety improvements at the intersection.
Project Justification
A signal warrant analysis was conducted for this intersection in late 2019. Signal warrants were close
to being met, which would justify installation of traffic signal improvements. With increased traffic
expected over the next several years, it is expected that signal warrants for this location will be met in
the next two years. Completing the signal design improvements in advance will put the City in a
position to put the project out to bid for construction once the signal warrants are met. This project will
enhance safety at this intersection.
Master Planning Documents
This project supports the City’s Traffic Circulation Master Plan by providing a safe and well-
maintained travel way.
Two-Way Stop Control at Luchessa Avenue and Church Street
83DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800350)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $16,151 $16,151
Design $118,439 $118,439
CEQA $5,384 $5,384
Construction $869,000 $869,000
Con. Support $28,600 $28,600
Total $139,973 $897,600 $1,037,573
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
TIF (425) $139,973 $897,600 $1,037,573
Total $139,973 $897,600 $1,037,573
Financial Comments
This project is fully funded through the Traffic Impact Fee Program (425).
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY24
Project Construction FY25
Project Completion FY25
Ongoing Operational Cost Impact
There would be minimal on-going maintenance costs associated with this project.
84DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Mantelli/Kern Traffic Signal
Installation Project No. 800360
Category Streets: Traffic Signals Department Public Works: Engineering
Project Type New Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Mantelli Drive and
Kern Avenue
Project Description and Purpose
This project will design and construct a four-way, eight-phase traffic signal at the intersection of
Mantelli Drive and Kern Ave. The signal will have dedicated left-turn phasing for the east-west
approaches along Mantelli Drive and the north-south approaches along Kern Avenue. The project will
include pedestrian count-down timers, intersection pedestrian improvements, and safety lighting.
Project Justification
Currently this skewed intersection at Mantelli Drive (a four-lane, two-way undivided roadway) and
Kern Avenue (a two-lane, two-way undivided roadway) is all-way stop controlled. However, the
geometry of the intersection has made it difficult for pedestrians and bicyclists to cross the
intersection. Under General Plan buildout conditions, this intersection is projected to meet traffic
signal warrants. In the meantime, pedestrian and bicycle volumes are projected to increase due to the
intersection’s proximity to Rod Kelley Elementary School, and the recent installation of Class II bike
lanes along Mantelli Drive. This intersection has long been the subject of numerous grievances to the
Gilroy Unified School District as well as Safe Routes to School groups.
Master Planning Documents
A traffic signal at this location is included in the Traffic Circulation Master Plan and the Traffic Impact
Fee program as Intersection Number 7.
All-Way Stop Control at Mantelli Drive and Kern Avenue
85DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800360)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $17,908 $17,908
Design $130,731 $130,731
CEQA $5,373 $5,373
Construction $952,000 $952,000
Con. Support $31,900 $31,900
Total $154,012 $983,900 $1,137,912
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
TIF (425) $154,012 $983,900 $1,137,912
Total $154,012 $983,900 $1,137,912
Financial Comments
This project will be funded by the Traffic Impact Fee (TIF) Program (425).
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY24
Project Construction FY25
Project Completion FY25
Ongoing Operational Cost Impact
Once completed, the operation and maintenance cost for the traffic signal is estimated at $6,500
annually.
86DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Monterey/I.O.O.F. Traffic
Signal Installation Project No. 800370
Category Streets: Traffic Signals Department Public Works: Engineering
Project Type New Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Monterey Street and
I.O.O.F. Avenue
Project Description and Purpose
This project will design and construct a four-way, four-phase traffic signal at the intersection of
Monterey Street and I.O.O.F. Avenue. The signal will have passive left-turn phasing for the north-
south and east-west approaches (including the private driveway). The project will include pedestrian
countdown timers as well as other pedestrian and lighting safety improvements at the intersection.
As part of the Monterey Street Pavement Rehabilitation project, a pedestrian Rectangular Rapid
Flashing Beacon (RRFB) system was installed in 2019 to increase pedestrian safety as part of the
Safe Routes to School Action Plan. Phase I (design) of the traffic signal improvements will begin as
soon as the signal warrants are met. Phase II (construction) will begin as funding is available.
Project Justification
A signal warrant analysis was conducted for this intersection in late 2019. Signal warrants were close
to being met, which would justify installation of the signal improvements. With increased activity in
downtown and increased traffic expected over the next several years, it is expected that signal
warrants for this location will be met in the next two years. Completing the signal design
improvements in advance will put the City in a position to put the project out to bid for construction
once the signal warrants are met. This project will enhance safety at this intersection.
Master Planning Documents
This project supports the City’s Traffic Circulation Master Plan by providing a safe and well-
maintained travel way.
One-Way Stop Control at Monterey Street and I.O.O.F. Avenue
87DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800370)
Project Costs Total
Prior FY24 FY25 FY25 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $15,116 $15,116
Design $146,124 $146,124
CEQA $5,039 $5,039
Construction $903,000 $903,000
Con. Support $29,700 $29,700
Total $166,279 $932,700 $1,098,979
Funding
Source
Total
Prior FY24 FY25 FY25 FY27 FY28 Beyond 5
Years Project Total
TIF (425) $166,279 $932,700 $1,098,979
Total $166,279 $932,700 $1,098,979
Financial Comments
This intersection is not currently included in the City’s Traffic Impact Fee (TIF) Program. However, it
will be added to the TIF Program during the update of the Transportation Circulation Master Plan and
Traffic Impact Fee updates. It will then be available for funding by the TIF Program (425).
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY24
Project Construction FY25
Project Completion FY25
Ongoing Operational Cost Impact
Once completed, the operation and maintenance cost for the traffic signal is estimated at $6,500
annually.
88DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Miller and Third Storm
Drain Rehabilitation Project No. 800390
Category Storm Drain: Storm Collection Department Public Works: Engin eering
Project Type Replacement Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Miller Avenue and
Third Street
Project Description and Purpose
This project would design and construct approximately 100 linear feet of new 18” storm drain pipe in
the vicinity of the Miller Avenue/Third Street intersection. The project scope includes:
•Remove and replace 100 linear feet of existing 12” reinforced concrete pipe (RCP) with 18”
RCP.
•Remove and relocate existing catch basin
•Connect new pipes to existing storm drain system
Project Justification
The existing catch basin at the intersection of Miller Avenue and Third Street is not optimally located.
During moderate rain events, flood waters have extended from Third Street to Miller Avenue where
there is high volume of vehicle at higher speed. This flooding may cause safety issues such as
hydroplaning. Additionally, the storm drain lateral pipe that is connecting this catch basin to the main
line is also acting as a mainline carrying additional volume from upper stream of this intersection. This
lateral is undersized and is restricting optimal flow to the mainline. By relocating and up-sizing this
line, flooding within this intersection will be eliminated and will restore additional operation capacity to
respond to other locations.
Master Planning Documents
This project supports the 2023 Storm Drainage System Master Plan.
Third St Santa Theresa Dr Miller Ave Project
Area
89DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800390)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $46,200 $46,200
CEQA $1,100 $1,100
Construction $202,000 $202,000
Con. Support $37,400 $37,400
Total $286,700 $286,700
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Storm Drain
Development
Impact (410)
$286,700 $286,700
Total $286,700 $286,700
Financial Comments
This project will be funded by the Storm Drain Development Impact Fund (410).
Estimated Project Schedule
Project Phase Timeline
Project Design FY26
Project Advertisement FY26
Project Construction FY26
Project Completion FY26
Ongoing Operational Cost Impact
The operational costs associated with this project would be nominal.
90DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Monterey and Luchessa
Storm Drain Modifications Project No. 800400
Category Storm Drain: Storm Collection Department Public Works: Engineering
Project Type New Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Monterey Road and
Luchessa Avenue
Project Description and Purpose
This project would design and construct two storm drain catch basins at the intersection of Monterey
Road and Luchessa Avenue. The project scope includes:
•Install 120 linear feet of reinforced concrete pipe
•Install 2 catch basins
•Connect new pipes to existing storm drain system
Project Justification
There is currently only one catch basin at the intersection of Monterey Road and Luchessa Avenue
that collects the storm water for this area. The catch basin is located at the northwest corner and is
not sufficient in collecting storm water for the other three corners. As this is a large intersection with
higher crown/slope along the roadway, there is no path for the water to travel to this existing catch
basin. During moderate rain events, the flooding has reached Monterey Road where there is high
volume of vehicle at higher speed. This flooding may cause safety issues such as hydroplaning. By
installing two new catch basins at the northeast and southeast corner, flooding at this intersection will
be eliminated restoring additional operation capacity to respond to other locations. The southwest
corner can be constructed once the fronting property is constructed.
Master Planning Documents
This project supports the 2023 Storm Drainage System Master Plan.
Luchessa Ave Project Area
91DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800400)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $76,760 $76,760
CEQA $1,476 $1,476
Construction $253,000 $253,000
Con. Support $50,600 $50,600
Total $381,836 $381,836
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Storm Drain
Development
Impact (410)
$381,836 $381,836
Total $381,836 $381,836
Financial Comments
This project will be funded by the Storm Drain Development Impact Fund (410).
Estimated Project Schedule
Project Phase Timeline
Project Design FY28
Project Advertisement FY28
Project Construction FY28
Project Completion FY28
Ongoing Operational Cost Impact
The operational costs associated with this project would be nominal and added to the maintenance
schedule.
92DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Annual Citywide Traffic
Signal Upgrades Project No. 800410
Category Streets: Traffic Signals Department Public Works: Engineering
Project Type Replacement Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
The purpose of this project is to assess the consistency of the City’s traffic signal equipment, and
make improvements so all 33 City-owned and controlled signalized intersections have the same
signal equipment. Each signalized intersection should have the same type 2070 signal controller,
cabinet, controller software, battery back-up system, pedestrian count-down timer, Accessible
Pedestrian Signal (APS) push button heads, and video detection. In addition to replacing the needed
signal equipment listed above to ensure equipment consistency, the project will also include replacing
underground loop traffic detectors with overhead video assisted traffic detection.
Project Justification
Having consistent signal equipment at all City signalized intersections will save on maintenance costs
and provide the best operational efficiency and safety for our residents.
Master Planning Documents
This project supports the City’s Traffic Circulation Master Plan.
93DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800410)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $10,000 $10,000 $20,000
Construction $140,000 $140,000 $280,000
Total $150,000 $150,000 $300,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Gas Taxes (205) $150,000 $150,000 $300,000
Total $150,000 $150,000 $300,000
Financial Comments
This project will be funded for the first two years by Gas Tax Funds (205). Funding will need to be
identified in FYs 26-28.
Estimated Project Schedule
Project Phase Timeline
Project Design FY24 – FY25
Project Advertisement
Project Construction FY24 – FY25
Project Completion FY24 – FY25
Ongoing Operational Cost Impact
There are no net new operational costs for this project.
Battery back-up systems are required to be replaced every five years at a total cost of replacement of
$1,000 per location.
94DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Utility Undergrounding –
Monterey St – Eighth to Tenth Project No. 800420
Category Engineering: Utility Undergrounding Department Public Works: Engineering
Project Type New Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Monterey St between Eighth
and Tenth Streets
Project Description and Purpose
This project would underground the existing overhead utility lines along Monterey Street between
Eighth Street and Tenth Street using PG&E Rule 20A Fund Credits. The project could include
sidewalk improvements, stormwater treatment improvements, street improvements, paving
improvements, and other utility coordination efforts.
Project Justification
Per California Public Utilities Commission (CPUC) mandates, Pacific Gas and Electric (PG&E) sets
aside funding each year for local agencies. Funding is allocated for undergrounding overhead utilities
in order to prevent future calamities. The City of Gilroy has an accumulated balance in excess of
$3,000,000 of these funds. Undergrounding utilities along Monterey Street, one of the primary
roadways leading into the City’s Transit Center and Downtown, would enhance the visual
characteristics of the area and enhance economic development.
Master Planning Documents
This project supports the Downtown Strategic Plan by supporting the downtown.
Typical Overhead Distribution Line Conduit and Trench for Underground Distribution
95DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800420)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $53,900 $53,900
Design $324,500 $324,500
CEQA $27,500 $27,500
Construction $2,453,000 $2,453,000
Con. Support $135,300 $135,300
Total $405,900 $2,588,300 $2,994,200
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Utility
Undergrounding
(415)
$405,900 $2,588,300 $2,994,200
Total $405,900 $2,588,300 $2,994,200
Financial Comments
This project is funded through PG&E Undergrounding Credits. The project is estimated at $2,994,200.
Per PG&E, as of March 2022, the City of Gilroy has 3,487,341 work credits ($3,487,341 value) that
can be utilized for undergrounding. With each work credit equaling one dollar of work that PG&E
would put towards the work they would perform on the project, there should be adequate funding for
this project. Funding for this project is through the Utility Undergrounding Fund (415) which will be
reimbursed from PG&E’s Rule 20A fund.
Estimated Project Schedule
Project Phase Timeline
Project Design FY26
Project Advertisement FY26
Project Construction FY27
Project Completion FY27
Ongoing Operational Cost Impact
Operational cost will be added to the current operating budget.
96DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Automall/Luchessa Traffic
Signal Installation Project No. 800440
Category Streets: Traffic Signals Department Public Works: Engineering
Project Type New Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Automall Parkway and
Luchessa Avenue
Project Description and Purpose
This project will design and construct a four-way, eight-phase traffic signal at the intersection of
Automall Parkway and Luchessa Avenue. The signal will have dedicated left-turn phasing for the
east-west movements along Luchessa Avenue and the north-south movements along Automall
Parkway. The project will include pedestrian count-down timers, intersection pedestrian
improvements, safety lighting, and coordination with the Union Pacific Railroad company.
Project Justification
This intersection currently meets traffic signal warrants for the installation of signal improvements.
This intersection has long been a high area of concern for residents as well as the business district
south of the City. Currently this intersection is one-way stop controlled on southbound Automall
Parkway. However, the high volume of trucks and passenger vehicles has degraded the level of
service for this intersection. The installation of signal improvements will improve the safety of the
intersection and optimize this intersection with minimal interference/conflict with the nearby at-grade
railroad crossing.
Master Planning Documents
This traffic signal is listed in the Traffic Circulation Master Plan and the Traffic Impact Fee program
under Intersection Number 26. Automall Pkwy Luchessa Ave Project Area
97DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800440)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $14,435 $14,435
Design $111,870 $111,870
CEQA $3,609 $3,609
Construction $815,000 $815,000
Con. Support $26,400 $26,400
Total $129,914 $841,400 $971,314
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
TIF (425) $129,914 $841,400 $971,314
Total $129,914 $841,400 $971,314
Financial Comments
This project will be funded by the Traffic Impact Fee Program (425). It includes additional funding for
coordination with the Union Pacific Railroad during design.
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY24
Project Construction FY25
Project Completion FY25
Ongoing Operational Cost Impact
Once completed, the operation and maintenance cost for the traffic signal is estimated at $7,500
annually.
98DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Annual CDBG Sidewalk/
Curb Ramp Project Project No. 800450
Category Streets: Curbs & Sidewalks Department Public Works: Engineering
Project Type New Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Various
Project Description and Purpose
This project will install new sidewalk (gap closures) and curb ramps, both new and replacement of
non-compliant existing ramps, where eligible for annual Community Development Block Grant
(CDBG) funding. Currently, these improvements can happen only in low- and moderate-income
neighborhoods. Depending on the potential adoption of a city-wide neighborhood revitalization area
designation, these funds may be used more broadly throughout the City in the future.
Project Justification
The City is required to install and maintain ADA accessible curb ramps and accessible sidewalk along
publicly accessible pathways within the City. This project will focus on installing and upgrading ADA
curb ramps in areas approved for CDBG funds expenditure. Consideration will also be given to
locations along streets scheduled to be paved under the annual Street Resurfacing Project, which is
funded using Measure B and SB-1 funds. This will allow the maximum use of the paving funds for
asphalt rehabilitation as opposed to using paving funding for curb ramp work. Construction of these
compliant new curb ramps will improve the accessibility and safety for the pedestrians in Gilroy.
Master Planning Documents
This project supports the City’s General Plan goals and policies. These goals and policies include
correcting deficiencies and ensuring pedestrian facilities serve the function they are intended to
serve.
99DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800450)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $15,717 $5,970 $6,000 $6,000 $6,000 $39,687
CEQA $2,620 $995 $1,000 $1,000 $1,000 $6,615
Construction $235,755 $89,550 $90,000 $90,000 $90,000 $595,305
Con. Support $7,859 $2,985 $3,000 $3,000 $3,000 $19,844
Total $261,950 $99,500 $100,000 $100,000 $100,000 $661,450
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
CDBG (245) $261,950 $99,500 $100,000 $100,000 $100,000 $661,450
Total $261,950 $99,500 $100,000 $100,000 $100,000 $661,450
Financial Comments
This project will be funded by Community Development Block Grant (CDBG) funds (245).
Estimated Project Schedule
Project Phase Timeline
Project Design Annually
Project Advertisement Annually
Project Construction Annually
Project Completion Annually
Ongoing Operational Cost Impact
There are no operational costs associated with this project.
100DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name First/Kern
Traffic Signal Installation Project No. 800480
Category Streets: Traffic Signals Department Public Works: Engineering
Project Type New Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location First Street and Kern Avenue
Project Description and Purpose
This project will design and construct a new traffic signal at the intersection of First Street and Kern
Avenue. The project will also include pedestrian count-down timers, safety lighting, and associated
signing and striping improvements.
Project Justification
This one-way stop-controlled intersection currently meets traffic signal warrants for the installation of
signal improvements. The high traffic volumes at this intersection have increased vehicular delay and
degraded the level of service to an unacceptable condition. In addition, a new residential
development is proposed to be constructed near the northeast corner of this intersection. The
residential development is in the project design and entitlement phase. Once this development is
constructed and occupied, it will generate additional traffic that will impact this intersection by
increasing delay and further degrading the level of service. The installation of signal improvements at
this location will improve the delay and level of service to an acceptable condition. These
improvements will also enhance the safety of all road users, including pedestrians, bicyclists, and
motorists.
Master Planning Documents
This traffic signal is identified in the Traffic Circulation Master Plan and the Traffic Impact Fee
program as Intersection Number 11. Kern Ave Wren Ave First St Project Area
101DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800480)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $46,721 $46,721
Design $189,804 $189,804
CEQA $5,840 $5,840
Construction $789,000 $789,000
Con. Support $113,300 $113,300
Total $242,365 $902,300 $1,144,665
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
TIF (425) $242,365 $902,300 $1,144,665
Total $242,365 $902,300 $1,144,665
Financial Comments
This project will be funded by the Traffic Impact Fee Program (425).
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY24
Project Construction FY25
Project Completion FY25
Ongoing Operational Cost Impact
The operation and maintenance cost for the traffic signal is estimated at $7,500 annually.
102DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Annual Citywide Sewer Repair
and Rehabilitation Program Project No. 800490
Category Wastewater: Sewer Collection Department Public Works: Engineering
Project Type Rehabilitation Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
This annual project will include sewer main repairs that are beyond the capability of City Maintenance
Crews who perform typical spot repairs. The project would include various locations identified through
regular video inspection activities, normal maintenance, and operational activities performed by
Maintenance Crews, and include engineering design, construction, construction management, and
inspection. The work will include various diameters of pipe in locations throughout the City.
In addition, areas with frequent customer concerns or service requests will be included in this
program.
Project Justification
This project will improve the City’s ability to prevent and respond to undue sewage spills and
backups. Some repair projects are not identifiable at one time and may individually be too small to be
considered for capital project bidding and construction. By gathering information from several sources
and identifying a reasonable size project over several locations, the City can be responsive to the
findings of the maintenance activities and be proactive in correcting deficiencies before there is a
catastrophic failure event. In accordance with the City’s updated Purchasing Policy, the Public Works
Department plans to issue a Job Order Contact/s (on-Call construction) for this work. The overall
scope is small enough to allow for quick processing of drawings and specifications, making this
approach more economical and reliable.
Master Planning Documents
This project provides reliable and enhanced sewer service for existing customers and anticipated
growth, which is the focus of the 2023 Sewer System Master Plan. 103DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800490)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $15,000 $15,000 $15,000 $15,000 $15,000 $75,000
CEQA $1,000 $1,000 $1,000 $1,000 $1,000 $5,000
Construction $184,000 $184,000 $184,000 $184,000 $184,000 $922,500
Con. Support $15,000 $15,000 $15,000 $15,000 $15,000 $75,500
Total $250,000 $250,000 $250,000 $250,000 $250,000 $1,250,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Sewer (700) $250,000 $250,000 $250,000 $250,000 $250,000 $1,250,000
Total $250,000 $250,000 $250,000 $250,000 $250,000 $1,250,000
Financial Comments
This project will be funded by the Sewer Fund (700).
Estimated Project Schedule
Project Phase Timeline
Project Design Annually
Project Advertisement Annually
Project Construction Annually
Project Completion Annually
Ongoing Operational Cost Impact
This project addresses maintenance needs. Completion of this project could reduce operational
costs. Any of these repairs are intended to be neutral or reduce operating costs and should also
provide savings in unknown emergency costs by preventing potential serious system failures.
104DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Asbestos Cement Sewer Pipe
Replacement Citywide Project No. 800510
Category Wastewater: Sewer Collection Department Public Works: Engineering
Project Type Rehabilitation Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
This project would replace all Asbestos Cement and Reinforced Concrete Pipe within the City’s
wastewater collection system. The project includes nine locations for a total of 1,740 linear feet. The
work will include replacing pipes of various diameters in locations throughout the City. The first year
will include verifying the locations, designing the improvements, and developing one or more
construction contracts to be completed in subsequent years.
Project Justification
Hydrogen sulfide corrodes concrete pipes and may cause sinkholes where the pipe wall is breached
and the surrounding soil is carried away. In addition, the wastewater may contaminate the soil. This
project will start by identifying the locations needing pipe replacement. The City has five Asbestos
Cement Pipe segments totaling 1,065 linear feet and four Reinforced Concrete Pipe segments
totaling 675 linear feet, for a total of 1,740 linear feet of gravity lines in the collection system. These
repairs are needed because of the potential for pipe collapse, which would undermine public streets
and cause blockages in the sanitary sewer collection system.
Master Planning Documents
This project provides for reliable and enhanced sewer service for existing customers and to serve
anticipated growth which is the focus of the 2023 Sewer System Master Plan.
105DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800510)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $5,870 $5,870
Design $234,810 $234,810
CEQA $24,949 $24,949
Construction $870,000 $870,000
Con. Support $138,600 $138,600
Total $265,629 $1,008,600 $1,274,229
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Sewer (700) $265,629 $1,008,600 $1,274,229
Total $265,629 $1,008,600 $1,274,229
Financial Comments
This project will be funded by the Sewer Fund (700).
Estimated Project Schedule
Project Phase Timeline
Project Design FY25
Project Advertisement FY25
Project Construction FY26
Project Completion FY26
Ongoing Operational Cost Impact
This project address maintenance needs. Completion of this project would reduce operational costs
for trouble spots.
106DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Carmel-Dowdy Alley – Sixth to
Seventh Sewer Replacement Project No. 800520
Category Wastewater: Sewer Collection Department Public Works: Engineering
Project Type Rehabilitation Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Carmel-Dowdy Alley from
Sixth Street to Seventh Street
Project Description and Purpose
This project will replace and upgrade approximately 600 linear feet of existing 8” sewer pipe to a 10”
sewer pipe in the alley between Carmel Street and Dowdy Street from Sixth Street to Seventh Street.
Project Justification
This portion of the subtrunk has a high likelihood of surcharging during wet weather conditions. Other
portions of the subtrunk were replaced per the recommendation of the 1993 Sewer System Master
Plan. Three portions of this subtrunk are recommended for replacement.
Master Planning Documents
This project is not identified in the 2023 Sewer System Master Plan.
Carmel St Sixth St Dowdy St Seventh St Project Area
107DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800520)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $73,951 $73,951
CEQA $1,450 $1,450
Construction $238,000 $238,000
Con. Support $35,200 $35,200
Total $75,401 $273,200 $348,601
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Sewer
Development
Impact (430)
$75,401 $273,200 $348,601
Total $75,401 $273,200 $348,601
Financial Comments
This project will be funded by the Sewer Development Impact Fund (430).
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY24
Project Construction FY25
Project Completion FY25
Ongoing Operational Cost Impact
No additional costs are expected. Completion of this project should reduce operational costs.
108DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Large Diameter Sewer
Rehabilitation Citywide Project No. 800530
Category Wastewater: Sewer Collection Department Public Works: Engineering
Project Type Rehabilitation Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
This project would repair sewer mains 10” and larger throughout the City that were inspected and
assessed in 2009. The project includes various locations. The first year will include verifying the
locations, design, and scoping. Construction will be completed in subsequent years.
Project Justification
The City hired a contractor to inspect and evaluate trunk sewer lines 10” in diameter and larger in
2009. A number of locations were identified as being severely impaired and requiring immediate
attention. This project will start by addressing those identified locations, including ascertaining the
locations and limits, starting with the information from 2009. In subsequent years additional locations
will be added based upon more current inspections. These repairs are significant because of the
volume of flow and the large areas that benefit from the trunk lines. Many of the large diameter trunks
run through important commercial locations in the City and will therefore be significantly impacted if
this project is not completed.
Master Planning Documents
This project provides for reliable and enhanced sewer service for existing customers and to serve
anticipated growth, which is the focus of the 2023 Sewer System Master Plan.
109DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800530)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $270,136 $270,136
CEQA $2,969 $2,969
Construction $915,000 $915,000
Con. Support $166,100 $166,100
Total $273,105 $1,081,100 $1,354,205
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Sewer Fund (700) $273,105 $1,081,100 $1,354,205
Total $273,105 $1,081,100 $1,354,205
Financial Comments
This project is funded by the Sewer Fund (700).
Estimated Project Schedule
Project Phase Timeline
Project Design FY25
Project Advertisement FY25
Project Construction FY26
Project Completion FY26
Ongoing Operational Cost Impact
This project addresses maintenance needs. Completion of this project should reduce operational
costs.
110DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Monterey and Princevalle
Sewer Network Project No. 800540
Category Wastewater: Sewer Collection Department Public Works: Engineering
Project Type Rehabilitation Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Tenth Street to
Luchessa Avenue
2.69
Project Description and Purpose
This project will replace and upgrade approximately 4,500 linear feet of existing sewer lines between
the intersections of Princevalle Street/Catherine Court and Monterey Road/Luchessa Avenue. This
replacement will consist of upsizing the current 18” sewer pipes to 21”.
Project Justification
The City’s Sewer System Master Plan indicated that this portion of the subtrunk may be undersized
due to the growth in the western foothills of the City and recommended these that lines should be
upsized. Alternative construction methods could be considered to save costs of construction and
surface restoration. The recommended mitigation is to upgrade the size of existing pipes to
accommodate the additional usage.
Master Planning Documents
This project is identified in the 2023 Sewer System Master Plan.
Luchessa Ave
London Pl Project Area
111DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800540)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $179,771 $179,771
Design $539,313 $539,313
CEQA $35,954 $35,954
Construction $2,301,068 $2,301,068
Con. Support $539,313 $539,313
Total $755,038 $2,840,381 $3,595,418
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Sewer
Development
Impact (430)
$755,038 $2,840,381 $3,595,418
Total $755,038 $2,840,381 $3,595,418
Financial Comments
This project will be funded by the Sewer Development Impact Fund (430).
Estimated Project Schedule
Project Phase Timeline
Project Design FY27
Project Advertisement FY27
Project Construction FY28
Project Completion FY28
Ongoing Operational Cost Impact
This project would result in decreased maintenance costs due to reductions in cleaning time.
112DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Old Gilroy – Chestnut to
Forest Sewer Upgrade Project No. 800550
Category Wastewater: Manholes & Cleanouts Department Public Works: Engineering
Project Type Rehabilitation Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Old Gilroy Street between
Forest St and Chestnut St
Project Description and Purpose
This project will redesign and modify a sewer manhole that has two sewer lines running through it,
including the higher as a PVC pipe with the crown removed, and the lower being an older line that
may now be abandoned. Investigation into the actual extent of the deeper, apparently abandoned line
will allow for proper design of how best to remove this potential overflow location from being a
concern.
Project Justification
Design and reconstruction of the sewer system in the area to correct the current condition is needed
for clarity of operations and maintenance functionality. Failure to act would result in delayed
response times to service calls and potential blockages that could result in impacts to the surrounding
community and the Downtown.
Master Planning Documents
This project is not included in the 2023 Sewer System Master Plan.
Project Area Old Gilroy St
113DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800550)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $49,405 $49,405
CEQA $1,594 $1,594
Construction $223,000 $223,000
Con. Support $28,600 $28,600
Total $50,999 $251,600 $302,599
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Sewer (700) $50,999 $251,600 $302,599
Total $50,999 $251,600 $302,599
Financial Comments
This project will be funded by the Sewer Fund (700). The scope of this project will not be fully known
until the line can be investigated. The project cost estimate is therefore based on what is believed to
be a “worst-case” scenario and may be conservatively high.
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY24
Project Construction FY25
Project Completion FY25
Ongoing Operational Cost Impact
No additional costs are expected. Completion of this project could reduce operational costs.
114DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Seventh St – Carmel-Dowdy
to Hanna-Rosanna Alleys
Sewer Replacement
Project No. 800560
Category Wastewater: Sewer Collection Department Public Works: Engineering
Project Type Rehabilitation Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Seventh St btwn Carmel-Dowdy
and Hanna-Rosanna Alleys
Project Description and Purpose
This project will replace and upgrade approximately 739 linear feet of existing 8” sewer pipe to a 10”
sewer pipe on Seventh Street from the alley between Carmel Street and Dowdy Street to the alley
between Hanna Street and Rosanna Street. This project is part of three segments to be replaced in
this subtrunk.
Project Justification
This portion of the subtrunk has a high likelihood of surcharging during wet weather conditions. Other
portions of the subtrunk were replaced per the recommendation of the 1993 Sewer Master Plan.
Three portions of this subtrunk are recommended for replacement. This segment is on the high
frequency cleaning list maintained by Public Works Operations.
Master Planning Documents
This project is not included in the 2023 Sewer Master Plan.
Seventh St Carmel St Dowdy St Hanna St Rosanna St Church St Princevalle St Project Area
115DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800560)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $61,281 $61,281
CEQA $1,425 $1,425
Construction $186,000 $186,000
Con. Support $25,300 $25,300
Total $62,706 $211,300 $274,006
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Sewer
Development
Impact (430)
$62,706 $211,300 $274,006
Total $62,706 $211,300 $274,006
Financial Comments
This project will be funded by the Sewer Development Impact Fee (430) fund.
Estimated Project Schedule
Project Phase Timeline
Project Design FY25
Project Advertisement FY25
Project Construction FY26
Project Completion FY26
Ongoing Operational Cost Impact
There are no operational costs associated with this project. This project will reduce future
maintenance costs.
116DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Wastewater Treatment Plant
Expansion (SCRWA) Project No. 800570
Category Wastewater: Wastewater Treatment Department Public Works: Engineering
Project Type Expansion Project Manager Director of Public Works
Council Priorities Maintain and Improve
City Infrastructure Location 1500 Southside Drive
Project Description and Purpose
The South County Regional Wastewater Authority (SCRWA) treatment plant was constructed in
1994. It treats wastewater for the Cities of Gilroy and Morgan Hill. This project would expand the
capacity of the existing plant to meet the demands associated with future growth in the area. In
addition to expanding the plant’s treatment capacity, this project would also implement new standards
for wastewater treatment to comply with State Water Resources Control Board requirements.
Project Justification
This project will allow the treatment plant to continue to provide adequate levels of service to its
customers and meet State Water Resources Control Board regulatory requirements.
Master Planning Documents
This project is included in the 2023 Sewer System Master Plan.
117DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800570)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Construction $16,198,000 $14,287,000 $1,729,000 $455,000 $32,669,000
Con. Support $1,602,000 $1,413,000 $171,000 $45,000 $3,231,000
Total $17,800,000 $15,700,000 $1,900,000 $500,000 $35,900,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Sewer (700) $17,800,000 $15,700,000 $1,900,000 $500,000 $35,900,000
Total $17,800,000 $15,700,000 $1,900,000 $500,000 $35,900,000
Financial Comments
This project will be funded from the Sewer Fund (700).
Estimated Project Schedule
Project Phase Timeline
Project Design
Project Advertisement
Project Construction FY24 – FY26
Project Completion FY26
Ongoing Operational Cost Impact
The ongoing operational costs will increase due to managing a larger plant. These costs are
necessary to manage the increased capacity due to the City’s growth, and will be offset by the
increased fees associated with the growth.
118DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Broadway and Sargent
Water Line Replacement Project No. 800590
Category Water: Distribution Department Public Works: Engineering
Project Type Rehabilitation Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Broadway Street and
Sargent Street
Project Description and Purpose
This project would upgrade water lines to ensure adequate water pressure for fire protection during
fire emergencies. This project will upgrade approximately 1,300 feet of 6” pipe to 8” pipe on Broadway
Street between Wayland Lane and Hanna Street, and approximately 200 feet of 4” pipe to 8” pipe on
Sargent Street from Broadway Street to 200 feet south of Broadway Street.
Project Justification
The Fire Marshal has indicated the water pressures in this area require this project to allow for new
construction and provide sufficient pressure for Fire Operations.
Master Planning Documents
This project supports the 2023 Water System Master Plan. Carmel St Broadway St
First St
119DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800590)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $183,725 $183,725
CEQA $1,570 $1,570
Construction $783,000 $783,000
Con. Support $94,600 $94,600
Total $185,295 $877,600 $1,062,895
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Water (705) $185,295 $877,600 $1,062,895
Total $185,295 $877,600 $1,062,895
Financial Comments
The water project is funded by the Water Fund (705).
Estimated Project Schedule
Project Phase Timeline
Project Design FY25
Project Advertisement FY25
Project Construction FY26
Project Completion FY26
Ongoing Operational Cost Impact
This project’s operational costs would be nominal.
120DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Church and Gurries Water
Line Replacement Project No. 800600
Category Water: Distribution Department Public Works: Engineering
Project Type Replacement Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Gurries Drive between Hanna
Street and Church Street
Project Description and Purpose
This project would upgrade water lines to ensure adequate water pressure for fire protection during
fire emergencies. This project will upgrade approximately 400 feet of 4” pipe to 6” pipe on Gurries
Drive from Church Street to approximately 400 feet west of Church Street. Due to their close
proximity to one another, this project could be combined with Project 800610 (Church – Welburn to
First Line Replacement).
Project Justification
The Fire Marshal has indicated the water pressures in this area require this project to allow for new
construction and provide sufficient pressure for Fire Operations.
Master Planning Documents
This project supports the 2023 Water System Master Plan. Hanna St First St
Project Area Church St Gurries Dr
121DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800600)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $85,517 $85,517
CEQA $1,449 $1,449
Construction $275,000 $275,000
Con. Support $39,600 $39,600
Total $86,966 $314,600 $401,566
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Water (705) $86,966 $314,600 $401,566
Total $86,966 $314,600 $401,566
Financial Comments
This project is funded by the Water Fund (705).
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY24
Project Construction FY25
Project Completion FY25
Ongoing Operational Cost Impact
This project’s operational costs would be nominal.
122DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Church Street – Welburn to
First Water Line Replacement Project No. 800610
Category Water: Distribution Department Public Works: Engineering
Project Type Replacement Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Church Street between
Welburn Ave and First St
Project Description and Purpose
This project would upgrade approximately 2,000 feet of 6” cast iron water main to an 8” or greater
ductile iron pipe along Church Street between Welburn Avenue and First Street. Due to their close
proximity to one another, this project could be combined with Project 800600 (Church and Gurries
Line Replacement).
Project Justification
This project is required due to the large number of failures in this line that have required expensive
repairs. The replacement of this line would save the City in staff overtime. All of the breaks on this line
require large sections of pipe to be replaced.
Master Planning Documents
This project improves reliability for existing customers and enhances the system to serve anticipated
growth which is the focus of the 2023 Water System Master Plan. Howson St First St Church St Gurries Dr Welburn Ave 123DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800610)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $248,770 $248,770
CEQA $1,565 $1,565
Construction $1,026,000 $1,026,000
Con. Support $147,400 $147,400
Total $250,335 $1,173,400 $1,423,735
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Water (705) $250,335 $1,173,400 $1,423,735
Total $250,335 $1,173,400 $1,423,735
Financial Comments
This project will be funded by the Water Fund (705).
Estimated Project Schedule
Project Phase Timeline
Project Design FY25
Project Advertisement FY25
Project Construction FY26
Project Completion FY26
Ongoing Operational Cost Impact
This project’s operational costs would be nominal.
124DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Forest and Eighth Water Line
Replacement Project No. 800620
Category Water: Distribution Department Public Works: Engineering
Project Type Replacement Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Eighth Street between
Alexander St and Forest St
Project Description and Purpose
This project would upgrade an existing water line to ensure adequate water pressure for fire
protection during fire emergencies. This project will upgrade approximately 375 feet of 4” pipe to 6”
pipe on Eighth Street between Alexander Street and Forest Street.
Project Justification
The Fire Marshal has indicated this project is necessary to allow for new construction and provide
sufficient water pressure for Fire Operations. This project is recommended for design and
construction as soon as possible to improve fire flows in the Gilroy water system.
Master Planning Documents
This project supports the 2023 Water System Master Plan. Forest St Eighth St Alexander St 125DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800620)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $86,975 $86,975
CEQA $2,999 $2,999
Construction $323,000 $323,000
Con. Support $46,200 $46,200
Total $89,974 $369,200 $459,174
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Water (705) $89,974 $369,200 $459,174
Total $89,974 $369,200 $459,174
Financial Comments
This project is funded by the Water Fund (705).
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY24
Project Construction FY25
Project Completion FY25
Ongoing Operational Cost Impact
This project’s operational costs would be nominal.
126DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Steel Water Service Lines
Replacement Citywide Project No. 800630
Category Water: Meters & Service Lines Department Public Works: Water
Project Type Replacement Project Manager Water Operations Supervisor
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
This project would replace steel water service lines that may have lead fittings throughout the City.
The City has approximately 250 steel service lines that need to be replaced by 2028. City crews will
replace approximately 210 of the smaller, less complicated services. Approximately 40 of the
remaining service lines may require design and construction to be performed by a consultant and
contractor.
Project Justification
Per State of California law (SB 1398 and SB 427), community water systems must replace all known
user service lines and their associated fittings that may contain lead and are actively used in the
water distribution system. The Steel Service Lines Replacement project will enhance the health and
safety of the community by ensuring the City’s water distribution system provides a reliable and
adequate supply of safe drinking water. The majority of the steel service lines associated with this
project are located within the City’s low- and moderate-income neighborhoods, as designated by the
US Department of Housing and Urban Development’s (HUD) Community Development Block Grant
(CDBG) Program. The City’s low- and moderate-income neighborhoods are in need of higher levels
of investment to meet the needs of the community.
Master Planning Documents
This project improves reliability for existing customers and enhances the system to serve anticipated
growth which is the focus of the 2023 Water System Master Plan.
127DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800630)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $14,080 $14,080 $14,080 $14,080 $14,080 $70,400
CEQA $440 $440 $440 $440 $440 $2,200
Construction $79,200 $79,200 $79,200 $79,200 $79,200 $396,000
Con. Support $10,560 $10,560 $10,560 $10,560 $10,560 $52,800
Total $104,280 $104,280 $104,280 $104,280 $104,280 $521,400
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Water (705) $104,280 $104,280 $104,280 $104,280 $104,280 $521,400
Total $104,280 $104,280 $104,280 $104,280 $104,280 $521,400
Financial Comments
This project will be funded by the Water Fund (705).
Estimated Project Schedule
Project Phase Timeline
Project Design FY24 – FY28
Project Advertisement FY24 – FY28
Project Construction FY24 – FY28
Project Completion FY24 – FY28
Ongoing Operational Cost Impact
This project will reduce operational costs.
128DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Monterey and Eighth Water
Line Replacement Project No. 800640
Category Water: Distribution Department Public Works: Engineering
Project Type Replacement Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Alley between Monterey St
and Eigleberry St
Project Description and Purpose
This project would upgrade water lines to ensure adequate water pressure for fire protection during
fire emergencies. This project will upgrade approximately 600 feet of 4” pipe to 8” pipe in the alley
between Eigleberry Street and Monterey Street, from West Eighth Street to approximately 600 feet
north of West Eighth Street.
Project Justification
The Fire Marshal has indicated this project is necessary to allow for new construction and provide
sufficient water pressure for Fire Operations. This project is recommended for design and
construction as soon as possible to improve fire flows in the Gilroy water system.
Master Planning Documents
This project supports the 2023 Water System Master Plan.
Project Area Seventh St Eighth St Monterey St
Eigleberry St
129DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800640)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $98,345 $98,345
CEQA $2,980 $2,980
Construction $355,000 $355,000
Con. Support $51,700 $51,700
Total $101,325 $406,700 $508,025
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Water (705) $101,325 $406,700 $508,025
Total $101,325 $406,700 $508,025
Financial Comments
This project will be funded by the Water Fund (705).
Estimated Project Schedule
Project Phase Timeline
Project Design FY25
Project Advertisement FY25
Project Construction FY26
Project Completion FY26
Ongoing Operational Cost Impact
This project’s operational costs would be nominal.
130DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Abandon 2” Water Line from
7041 to 7161 Monterey Street Project No. 800650
Category Water: Distribution Department Public Works: Engineering
Project Type Replacement Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location 7041 to 7161 Monterey Street
Project Description and Purpose
There is a substandard 2” galvanized water main that runs under the sidewalk and feeds 6 meters on
the west side of the street from 7041 to 7161 Monterey Street (between West Eighth Street and West
Tenth Street). This project would abandon the 2” galvanized water main, which is approximately 650
feet long, and replace and connect 6 service laterals, each of which are approximately 60 feet long, to
the existing 10” water main on Monterey Street.
Project Justification
This project would abandon an inadequate 2” water main that has been patched together over time. It
would also eliminate six steel service lines with lead fittings. This project would save the City money
by reducing staff time to conduct repairs to the deficient line.
Master Planning Documents
This project is not in cluded in the 2023 Water System Master Plan.
Monterey St Eighth St Tenth St Ninth St 131DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800650)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $107,800 $107,800
CEQA $1,100 $1,100
Construction $748,000 $748,000
Con. Support $99,000 $99,000
Total $108,900 $847,000 $955,900
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Water (705) $108,900 $847,000 $955,900
Total $108,900 $847,000 $955,900
Financial Comments
This project will be funded by the Water Fund (705).
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY24
Project Construction FY25
Project Completion FY25
Ongoing Operational Cost Impact
This project will reduce maintenance costs by approximately $5,000 per year based on repair history
to the current substandard line.
132DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Murray at Burke
Water Line Reroute Project No. 800660
Category Water: Distribution Department Public Works: Engineering
Project Type Replacement Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Murray Avenue North of
Leavesley Road
Project Description and Purpose
This project will upgrade water lines to ensure adequate water pressure is maintained to provide
protection during fire emergencies. It would abandon approximately 1,570 feet of 4” pipe on Murray
Avenue from Leavesley Road to 150 feet north of Garfield Court, and connect the 6” pipe on Burke
Drive to the 12” pipe on Murray Avenue. It will also require the reconnection of approximately 12
service lines on the west side of Murray Avenue from the abandoned 4” pipe to the existing 12” pipe.
Project Justification
The Fire Marshal has indicated the water pressures in this area require this project to allow for new
construction and provide sufficient pressure for Fire Operations.
Master Planning Documents
This project supports the 2023 Water System Master Plan.
Murray Ave
US 101
Project Area
133DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800660)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $130,917 $130,917
CEQA $2,877 $2,877
Construction $399,000 $399,000
Con. Support $70,400 $70,400
Total $133,794 $469,400 $603,194
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Water (705) $133,794 $469,400 $603,194
Total $133,794 $469,400 $603,194
Financial Comments
This project will be funded by the Water Fund (705).
Estimated Project Schedule
Project Phase Timeline
Project Design FY25
Project Advertisement FY25
Project Construction FY26
Project Completion FY26
Ongoing Operational Cost Impact
This project’s operational costs would be nominal.
134DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Saint Louise Hospital Large
Water Meter Replacement Project No. 800670
Category Water: Meters & Service Lines Department Public Works: Water
Project Type Replacement Project Manager Water Operations Supervisor
Council Priorities Maintain and Improve
City Infrastructure Location 9400 No Name Uno
Project Description and Purpose
This project would upgrade the large water meter at Saint Louise Hospital to a meter that can register
low flows. The current water meter valve is broken, so the meter cannot be replaced without affecting
water supply to the hospital. This project will install an additional water meter as a redundancy, repair
the existing valves, and replace the existing large water meter.
Project Justification
A new water meter is required to allow accurate billing and to replace non-functioning valves. This
meter serves an essential facility. As a result, the design effort for this project is expected to include
engineering review of the existing meter assembly and its condition, development of a plan for
sequence of construction, maintenance of service and phasing and coordination. Once all appropriate
plans have been identified, the replacement of the large water meter and fire service connection can
be accomplished with minimal issues/disruption.
Master Planning Documents
This project is not in a master plan document.
135DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800670)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $29,700 $29,700
CEQA $1,100 $1,100
Construction $25,800 $25,800
Con. Support $6,600 $6,600
Total $63,200 $63,200
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Water (705) $63,200 $63,200
Total $63,200 $63,200
Financial Comments
This project will be funded by the Water Fund (705).
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY24
Project Construction FY24
Project Completion FY24
Ongoing Operational Cost Impact
This project will not affect operational costs.
136DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Water Reservoirs A and B –
Painting Project No. 800690
Category Water: Water Storage Department Public Works: Engineering
Project Type Rehabilitation Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Upper Welburn Ave and
Miller Ave
Project Description and Purpose
This project is to paint the exterior of reservoirs A and B. Reservoir A is located on upper Welburn
Avenue, between Mantelli Drive and Rancho Real. Reservoir B is located on Miller Avenue,
southwest of the Santa Teresa Boulevard / West Tenth Street (formerly Miller Avenue) roundabout.
The interior coatings of these reservoirs have been recently inspected and are adequate. The
reservoirs will be re-inspected in five years.
Project Justification
This project is needed to prevent corrosion of the reservoirs. These reservoirs were inspected by the
State in 2017 and the paint condition was rated as fair to poor. This is a critical maintenance
operation to ensure the structural integrity and continuing operation of valuable City infrastructure.
Master Planning Documents
This project improves reliability for existing customers and enhances the system to serve anticipated
growth which is the focus of the 2023 Water System Master Plan.
Reservoir B – Miller Ave
Reservoir A – Welburn Ave
137DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800690)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $56,100 $56,100
CEQA $4,400 $4,400
Construction $371,000 $371,000
Con. Support $51,700 $51,700
Total $483,200 $483,200
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Water (705) $483,200 $483,200
Total $483,200 $483,200
Financial Comments
This project will be funded by the Water Fund (705).
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY24
Project Construction FY24
Project Completion FY24
Ongoing Operational Cost Impact
There are no operational costs associated with this project.
138DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Reservoirs A and B –
Retrofit Overflow Piping Project No. 800700
Category Water: Water Storage Department Public Works: Engineering
Project Type Rehabilitation Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Upper Welburn Ave and
Miller Ave
Project Description and Purpose
This project would retrofit the overflow piping at Reservoirs A and B to add an adequately sized air
gap between the outlet and the storm drain. The air gap would prevent the potential for storm water to
be drawn into the reservoirs. Reservoir A is located on upper Welburn Avenue, between Mantelli
Drive and Rancho Real. Reservoir B is located on Miller Avenue, southwest of the Santa Teresa
Boulevard / West Tenth Street (formerly Miller Avenue) roundabout.
Project Justification
During their 2018 inspection, the State Water Resources Control Board mandated the City install
adequately sized air gaps between the outlets and the storm drains. This project addresses this
mandate.
Master Planning Documents
This project is not listed in any master plan document, but it improves reliability for existing customers
and enhances the system to serve anticipated growth which is the focus of the 2023 Water System
Master Plan.
Reservoir B – Miller Ave
Reservoir A – Welburn Ave
139DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800700)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $64,900 $64,900
CEQA $4,400 $4,400
Construction $361,000 $361,000
Con. Support $51,700 $51,700
Total $482,000 $482,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Water (705) $482,000 $482,000
Total $482,000 $482,000
Financial Comments
This project will be funded by the Water Fund (705).
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY24
Project Construction FY24
Project Completion FY24
Ongoing Operational Cost Impact
There are no operational costs associated with this project.
140DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Well Nos. 1 and 4
Compliance Improvements Project No. 800710
Category Water: Wells & Pumping Department Public Works: Engineering
Project Type Rehabilitation Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location I.O.O.F. Avenue, First Street,
Ninth Street
Project Description and Purpose
This project will install a well head pedestal with associated plumbing and electrical improvements at
Wells No.1 and 4. This critical infrastructure must be installed as the first upgrade phase for the well
projects.
Project Justification
These improvements are necessary to enhance public health and safety by meeting the standards
set by the State Water Resources Control Board (SWRCB) and current codes, which require well
head pedestals to lift pumps a minimum of 18” above grade.
Master Planning Documents
This project improves reliability for existing customers and enhances the system to serve anticipated
growth which is the focus of the 2023 Water System Master Plan.
Well No. 1 – I.O.O.F. Ave
Well No. 4 – Ninth St
141DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800710)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $8,800 $8,800
Construction $66,100 $66,100
Con. Support $7,700 $7,700
Total $82,600 $82,600
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Water (705) $82,600 $82,600
Total $82,600 $82,600
Financial Comments
This project will be funded by the Water Fund (705).
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY24
Project Construction FY24
Project Completion FY24
Ongoing Operational Cost Impact
The operational costs associated with this project would be nominal.
142DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Well Nos. 1, 2, 4 & 6
Upgrade Improvements Project No. 800720
Category Water: Wells & Pumping Department Public Works: Engineering
Project Type Replacement Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location I.O.O.F. Avenue, First Street,
Ninth Street
Project Description and Purpose
This project will implement the following improvements at City Well Nos. 1, 2, and 6:
•Well No. 1 – Construct a new well house with AC system; interior installation of VFD, install
emergency generator with automatic transfer switch, install pump control valve, and perform
associated plumbing/ electrical improvements.
•Well No. 2 & 6 – Construct a new well house with AC system; interior installation of VFD and
perform associated plumbing and electrical improvements.
•Well No. 4 – Construct upgrades to Well Pedestal to 18” Per California Water Board
Requirement.
Project Justification
New well houses and AC systems are needed at Wells No. 1,2, & 6 to reduce over heating of VFD’s
and improve operating performance. Well No. 1 is the City’s only well that does not “pump to waste”
on startup and shutdown and does not have an emergency power source, per Department of Drinking
Water Standards. The pedestal in Well 4 will be upgraded to the State Requirement of 18”.
Master Planning Documents
This project improves reliability for existing customers and enhances the system to serve anticipated
growth which is the focus of the 2023 Water System Master Plan.
Well No. 1 – I.O.O.F. Ave Well No. 2 – First St
Well No. 4 – Ninth St Well No. 6 – Princevalle Channel
143DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800720)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $970,200 $970,200
CEQA $55,000 $55,000
Construction $9,900,000 $9,900,000
Con. Support $627,000 $627,000
Total $1,025,200 $10,527,000 $11,552,200
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Water (705) $1,025,200 $10,527,000 $11,552,200
Total $1,025,200 $10,527,000 $11,552,200
Financial Comments
This project will be funded by the Water Fund (705).
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY25
Project Construction FY25
Project Completion FY25
Ongoing Operational Cost Impact
The operational costs associated with this project would be nominal.
144DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name San Ysidro Lighting / Picnic
Area Improvements Project Project No. 800740
Category Parks and Trails: Other
Structures or Facilities Department Public Works: Parks
Project Type Replacement Project Manager Deputy Director Public Works
Council Priorities Maintain and Improve
City Infrastructure Location 7700 Murray Ave
Project Description and Purpose
The State of California Department of Parks and Recreation, Office of Grants and Local Services
(OGALS) allocates funds to cities and counties based on population under Proposition 68. The City
submitted a grant application to OGALS to provide new recreational opportunities at San Ysidro Park,
including new lighting, barbecue grills, trash enclosures, a picnic bench, and a shaded structure.
Project Justification
Although all City parks were considered, San Ysidro Park was selected for the application based on
eligibility requirements and other selection criteria including:
Proximity to critically underserved communities
Communities with low median household incomes
High number of people below the poverty level
Receiving community input in critically underserved communities
Broad representation of residents (all ages) participating in community outreach efforts
Solutions for safe public use and park beautification such as landscaping and public art
Benefit the health and quality of life for youth, seniors, and families
Mentoring of at-risk youth, senior socialization, and family bonding
Master Planning Documents
This project provides for a well-maintained park which is the focus of the Parks and Recreation
Systems Master Plan. 145DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800740)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design
Design
Construction $192,450 $192,450
Con. Support
Total $192,450 $192,450
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Capital Projects
(400) $192,450 $192,450
Total $192,450 $192,450
Financial Comments
This project will be funded by the Capital Projects Fund (400). The Capital Projects Fund will be
reimbursed $133,384 by State Proposition 68 grant funds.
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY24
Project Construction FY24
Project Completion FY24
Ongoing Operational Cost Impact
The park is currently maintained by the Parks Division with maintenance costs included in the budget.
146DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Gourmet and Railroad
Alley Improvements Project No. 800760
Category Engineering: Downtown Department Public Works: Engineering
Project Type New Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Gourmet and Railroad Alley
Between 4th and 7th Streets
Project Description and Purpose
The City of Gilroy was awarded a $3.9 million grant in March of 2022 from the California Department
of Transportation (“Caltrans”) Clean California Local Grant Program. The grant is for cleanup events
and infrastructure improvements along Gourmet Alley and Railroad Alley. Gourmet Alley and Railroad
Alley, which run parallel to each other between 4th and 7th Streets in Downtown Gilroy, are part of the
public right-of-way. Both relatively narrow pedestrian walkways connect the surrounding
neighborhoods to the Gilroy transit station and the Gilroy Center for the Arts. The space will be
beautified by paving the alleys with marked paths for walkers and recycling receptacles.
Project Justification
The lack of lighting and community-oriented infrastructure in both alleys has resulted in a high level of
illegal dumping, making both alleys appear undesirable for walking and community gatherings. The
Clean California grant will transform these important alleyways into clean, well-lit, walkable corridors
that connect the public to both the city’s main transit center and the Gilroy Center for the Arts .
Master Planning Documents
Improvements along Gourmet Alley and Railroad Alley are consistent with elements of the Gilroy
Downtown Specific Plan which was approved by the City Council in 2005. The Downtown Specific
Plan identifies the areas of need and identifies the improvements that were included in the grant
request.
147DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800760)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $378,000 $378,000
CEQA
Construction $3,582,765 $3,582,765
Con. Support
Total $378,000 $3,582,765 $3,960,765
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Downtown
Beautification
(487)
$378,000 $3,582,765 $3,960,765
Total $378,000 $3,582,765 $3,960,765
Financial Comments
This project would be implemented through the Clean California Local Grant Program (State),
administered by Caltrans, which was created to beautify and clean up local streets and roads, tribal
lands, parks, pathways, transit centers, and other public spaces. Reimbursable scopes of work
include lighting, landscape, surface improvements, and public clean-up.
Estimated Project Schedule
Project Phase Timeline
Project Design FY23
Project Advertisement FY24
Project Construction FY24
Project Completion FY24
Ongoing Operational Cost Impact
Increased maintenance and operation costs will be required upon completion of the project. Staff will
continue to maintain the improvements made during the lifespan of the project.
148DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Tenth Street/Highway 101
Bridge Widening Project No. 800770
Category Streets: Bridges Department Public Works: Engineering
Project Type Rehabilitation Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Tenth Street (Automall
Parkway) at US 101
Project Description and Purpose
This project would widen the existing bridge overcrossing at the Tenth Street (Automall Parkway)/US
101/SR 152 interchange to add one additional lane through in each direction. The project would
include widening the bridge structure, ramp work, grading, striping and signal modification
improvements.
Project Justification
The Tenth Street (Automall Parkway)/US 101/SR 152 interchange is one of the major ingress/egress
points to the City and connects the City’s arterial system to US 101 and SR 152. It is one of only three
interchanges in the City and is located between the Leavesley Road/US 101 interchange to the north
and the Monterey Road/US 101 interchange to the south. Tenth Street-Automall Parkway-SR 152 is
also a major gateway into the City. In peak times, especially the PM peaks, queues leading to the
interchange result in excessive back-ups along Tenth Street-Automall Parkway-SR 152. Adding one
lane in each direction on the bridge will improve the flow of eastbound and westbound traffic along
this corridor during peak times, provide better access to the freeways, and enhance overall traffic
circulation in the area. The Tenth Street-Automall Parkway-SR152 corridor also provides direct
access to the commercial areas east and west of US101, and to the auto dealerships on Automall
Parkway. Improving the flow of traffic along this important arterial area could encourage economic
development in the area.
Master Planning Documents
This project is included in the City’s Transportation Master Plan and is also listed in the State
Transportation Improvement Program (STIP), which makes it eligible for State and federal funding. 149DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800770)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $1,000,000 $1,000,000
CEQA $4,230,216 $4,230,216
Design $4,758,993 $4,758,993
ROW
Construction
Con. Support
Total $1,000,000 $4,230,216 $4,758,993 $9,989,209
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
TIF (425) $630,216 $708,993 $1,339,209
VTA Measure B
Highway Program
Fund (212)*
$1,000,000 $3,600,000 $4,050,000 $8,650,000
Total $1,000,000 $4,230,216 $4,758,993 $9,989,209
*Transferred from the Buena Vista interchange.
Financial Comments
The City is working in cooperation with VTA to develop this project. The project was awarded
$7,650,000 in Measure B Highway Program Funds for environmental and design. The City’s matching
funds for environmental and design are funded by the TIF. The total project cost is estimated at $50
million. The City worked with the VTA to move $1 million in Measure B Highway Program funding
from the Buena Vista / US 101 interchange to this project for Planning/Project Initiation Documents
(PID). The City will be responsible for its fair-share cost (14.6%) for each phase of the project.
Funding for construction has not been secured but is expected to come from VTA Measure B
Highway Program funds.
Estimated Project Schedule
Project Phase Timeline
Alternatives Analysis FY22 – FY23
Environmental Clearance FY24 – FY25
Design and Engineering FY26 – FY28
Construction FY29 – FY30
Ongoing Operational Cost Impact
There are no operational costs associated with this project.
150DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name San Ysidro Park Healthy
Living Enhancement Project No. 800780
Category Parks and Trails: Play Equipment Department Public Works: Parks
Project Type New Project Manager Deputy Director Public Works
Council Priorities Maintain and Improve
City Infrastructure Location 7700 Murray Ave
Project Description and Purpose
The City was awarded a Community Project Funding grant to provide new recreational opportunities
at San Ysidro Park. Possible recreational features include: new playground equipment, paved trail,
welcome kiosk, distance markers on paved trail, games etched in sidewalk, exercise equipment, new
volleyball court, new picnic barbecue grills, bottle filler station/non-bottle filler water fountain, lighting,
public art, and a drought resistant garden.
Project Justification
Although all City parks were considered, San Ysidro Park was selected for the application based on
the following criteria:
•Proximity to critically underserved communities
•Communities with low median household incomes
•High number of people below the poverty level
•Receiving community input in critically underserved communities
•Broad representation of residents (all ages) participating in community outreach efforts
•Solutions for safe public use and park beautification such as landscaping and public art
•Benefit the health and quality of life for youth, seniors and families
•Mentoring of at-risk youth, senior socialization and family bonding
Master Planning Documents
This project provides for a well-maintained park which is the focus of the Parks and Recreation
Systems Master Plan. 151DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800780)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $25,248 $25,248
Design $340,657 $340,657
CEQA $12,624 $12,624
Construction $2,293,534 $2,293,534
Con. Support $327,937 $327,937
Total $378,529 $2,621,471 $3,000,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Capital Projects
(400) $378,529 $2,621,471 $3,000,000
Total $378,529 $2,621,471 $3,000,000
Financial Comments
This project will be funded by the Capital Projects Fund (400). These funds will be reimbursed with
grant funding. The City was awarded a Community Project Funding Grant in the amount of
$3,000,000 for this project. There are no matching City funds required for this grant.
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY24
Project Construction FY25
Project Completion FY25
Ongoing Operational Cost Impact
The park is currently maintained by the Parks Division with maintenance costs included in the budget.
152DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Gilroy Center for the Arts
HVAC Replacement Project No. 900480
Category Facilities: Building Systems Department Facilities
Project Type Replacement Project Manager Facilities Manager
Council Priorities Maintain and Improve
City Infrastructure Location 7341 Monterey Street
Project Description and Purpose
The City Council approved replacing the Arts Center Heating, Ventilation, and Air Conditioning
(HVAC) units during the FY18 budget cycle. However, the project was put on hold due to plans to
fully renovate the building. The HVAC units on the building are 34 years old and are well past their
useful life. One of the two units no longer works as a heater, and they both need frequent repairs and
refrigerant refilling. The project scope is to replace the HVAC units.
Project Justification
The HVAC units are past their useful life are not reliable. If they break down during theater
performance dates, it could affect theater programming.
Master Planning Documents
This project is not listed in any master plan document.
153DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900480)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $33,000 $33,000
Construction $105,000 $105,000
Total $138,000 $138,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Facilities (615) $138,000 $138,000
Total $138,000 $138,000
Financial Comments
This project would be funded by the Facilities Fund (615).
Estimated Project Schedule
Project Phase Timeline
Project Design FY25
Project Advertisement N/A
Project Construction FY25
Project Completion FY25
Ongoing Operational Cost Impact
With more efficient heating and cooling, the utility bills for the Arts Center will be reduced. Repair
costs will substantially be reduced after the installation.
154DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Old City Hall HVAC
Replacement Project No. 900490
Category Facilities: Building Systems Department Facilities
Project Type Replacement Project Manager Facilities Manager
Council Priorities Maintain and Improve
City Infrastructure Location 7341 Monterey Street
Project Description and Purpose
The current Heating, Ventilation, and Air Conditioning (HVAC) equipment at Old City Hall Restaurant
is 35 years old and well past its useful life. The 12 units in the building frequently fail during large
events such as wedding receptions and parties. The units are not able to run at 100% due to the
chiller being excessively scaled with hard water deposits. All units and associated hardware and
plumbing need to be replaced.
Project Justification
The City is responsible for capital maintenance of the building and is currently responsible for HVAC
repairs. The units require frequent repairs and are unreliable. For example, staff was called out to
service the units during a wedding reception. Staff remained on site to pour water over the cooling
tower to make the units function. The HVAC repair company recommends replacing these units
because repairing them may no longer be an option. If this replacement is not completed while the
units are in a semi-functional state, there may be an extended downtime that will affect the tenants’
business.
Master Planning Documents
This project is not listed in any master plan document.
Photo Credit: https://visitgilroy.com/downtown-restaurants/
155DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900490)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $8,800 $8,800
Design $26,400 $26,400
Construction $309,000 $309,000
Con. Support $16,500 $16,500
Total $360,700 $360,700
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Facilities (615) $360,700 $360,700
Total $360,700 $360,700
Financial Comments
This project will be funded by the Facilities Fund (615).
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY24
Project Construction FY24
Project Completion FY24
Ongoing Operational Cost Impact
The project would reduce operational cost because the new units would be more energy efficient and
require less maintenance.
156DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Senior Center
Roof Replacement Project No. 900530
Category Facilities: Building Systems Department Facilities
Project Type Replacement Project Manager Facilities Manager
Council Priorities Maintain and Improve
City Infrastructure Location 7371 Hanna Street
Project Description and Purpose
The Senior Center’s roof shingles are over 27 years old and is starting to leak in multiple locations.
The shingles have lost their “grip” surface. The loss of the grip surface makes the roof slippery so it is
difficult to walk on it to perform inspections, or repairs on roof mounted equipment. This project would
replace the roof shingles, preventing leaks and extend the life of the Senior Center building.
Project Justification
This roof has developed leaks in multiple locations in the dining room area and kitchen. Furthermore,
new roof shingles would allow staff to traverse the roof easier and more safely while they perform
inspections and repairs on roof top HVAC equipment. .
Master Planning Documents
This project is not listed in any master plan document.
157DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900530)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $28,600 $28,600
Construction $182,000 $182,000
Con. Support $19,800 $19,800
Total $230,400 $230,400
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Facilities (615) $230,400 $230,400
Total $230,400 $230,400
Financial Comments
This project will be funded by the Facilities Fund (615).
Estimated Project Schedule
Project Phase Timeline
Project Design FY25
Project Advertisement FY25
Project Construction FY25
Project Completion FY25
Ongoing Operational Cost Impact
This project address maintenance needs. There are no operational costs associated with this project.
Costs may decrease if leaks are avoided.
158DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
Chestnut Fire Station
Seismic Upgrade and
Remodel
Project No. 900590
Category Facilities: Buildings Department Fire
Project Type Rehabilitation Project Manager Fire Chief
Council Priorities Maintain and Improve
City Infrastructure Location 7070 Chestnut Street
Project Description and Purpose
This project would remodel the existing Chestnut Fire Station/Fire Headquarters and implement a
seismic retrofit. The project includes replacing or upgrading the mechanical, electrical and plumbing
systems, structural repairs, assessment for lead paint and asbestos insulation, remodeling to provide
for increased staffing including privacy considerations and other requirements for multi-
gender/identity situations, and various operational support facilities, such as fueling and
decontamination.
Project Justification
The 2016 needs assessment report identified that the Chestnut Fire Station requires a significant
seismic retrofit/remodel and numerous upgrades to be compliant with the Essential Services
Buildings Seismic Safety Act (ESBSSA). Other recommended improvements include:
•Day room and kitchen improvements
•Accommodations for two companies
and all genders
•Expansion of restroom facilities
•Addition of a fitness room
•Addition of a decontamination room
•Expansion and improved ventilation of
the turnout room for PPE
•Expanded storage areas for equipment
and medical supplies
•Addition of a reception area for the
public
•Addition of ADA-compliant parking for
the public
Master Planning Documents
This project is recommended in the 2016 Fire Department needs assessment report. 159DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Fire) (900590)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $250,000 $330,000 $580,000
CEQA $60,000 $60,000
Construction $1,250,000 $2,160,000 $3,410,000
Con. Support $450,000 $450,000
Total $250,000 $1,250,000 $3,000,000 $4,500,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Equipment Outlay
(625) $250,000 $1,250,000 $1,500,000
Unfunded $3,000,000 $3,000,000
Total $250,000 $1,250,000 $3,000,000 $4,500,000
Financial Comments
The remodeling portion of this project is funded by the Equipment Outlay (625) Fund. The design
phase will be used to further refine the scope and provide more detailed cost estimates of the
required improvements. Funding for the seismic retrofit has not yet been identified.
Estimated Project Schedule
Project Phase Timeline
Project Design FY24 to Beyond FY28
Project Advertisement FY24 to Beyond FY28
Project Construction FY25 to Beyond FY28
Project Completion FY25 to Beyond FY28
Ongoing Operational Cost Impact
The project will result in a reduction of ongoing maintenance costs.
160DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Las Animas Fire Station
Upgrade and Renovation Project No. 900600
Category Facilities: Buildings Department Fire
Project Type Renovation Project Manager Fire Chief
Council Priorities Maintain and Improve
City Infrastructure Location 8383 Wren Avenue
Project Description and Purpose
This project would involve a seismic retrofit/remodel of the Las Animas Fire Station. A 2016 needs
assessment report indicated the Las Animas Fire Station requires a significant seismic
retrofit/remodel and numerous upgrades to be compliant with the Essential Services Buildings
Seismic Safety Act (ESBSSA).
Project Justification
The 2016 needs assessment report identified the following areas of concern:
(1)aged mechanical systems have exceeded their lifespans, (2) demand on electrical systems have
been exceeded, (3) lead and asbestos were common building materials when the station was built,
(4) thermostats all contain poisonous mercury, (5) dry rot and termites have led to a decrease in
structural stability, (6) built for only one gender, (7) built to accommodate only two personnel on duty,
(8) station does not qualify as an “Essential Facility”, (9) no on-site facility to fuel emergency
equipment, (10) ability to remain standing after a sizeable seismic event is questionable, (11) lack of
proper decontamination areas for medical equipment, (12) no facility to accommodate on duty
Division Chiefs overnight, (13) wear and tear due to increased call volume has taken a toll on the
station, and (14) privacy is a challenge.
Master Planning Documents
This project is recommended through the 2016 Fire Department needs assessment report.
161DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Fire) (900600)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $250,000 $330,000 $580,000
CEQA $60,000 $60,000
Construction $1,250,000 $2,160,000 $3,410,000
Con. Support $450,000 $450,000
Total $250,000 $1,250,000 $3,000,000 $4,500,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Equipment Outlay
(625) $250,000 $1,250,000 $1,500,000
Unfunded $3,000,000 $3,000,000
Total $250,000 $1,250,000 $3,000,000 $4,500,000
Financial Comments
The remodeling portion of this project is funded by the Equipment Outlay (625) Fund. The design
phase will be used to further refine the scope and provide more detailed cost estimates of the
required improvements. Funding for the seismic retrofit has not yet been identified.
Estimated Project Schedule
Project Phase Timeline
Project Design FY24 to Beyond FY28
Project Advertisement FY24 to Beyond FY28
Project Construction FY25 to Beyond FY28
Project Completion FY25 to Beyond FY28
Operational Cost Impact
The project will result in a reduction of ongoing maintenance costs.
162DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Miller Park Restrooms
Electrical Undergrounding Project No. 900620
Category Parks & Trails: Buildings Department Public Works: Parks
Project Type Replacement Project Manager Deputy Director Public Works
Council Priorities Maintain and Improve
City Infrastructure Location 7851 Carmel Street
Project Description and Purpose
The Miller Park restrooms have inadequate above ground electrical service that extends
approximately 30 feet from a nearby alley to a temporary construction electrical service. The electrical
service is then wired underground from the temporary electrical service to the restrooms. This project
would complete the 2017 Miller Park Restroom Replacement Project by fully undergrounding the
electrical service.
Project Justification
Construction of the Miller Park restrooms was partially funded with federal funds. Park projects which
receive any federal funding are required to have all overhead utilities undergrounded , per State and
Federal regulations.
Master Planning Documents
This project is not listed in a master plan document.
163DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900620)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $11,000 $11,000
Construction $79,100 $79,100
Con. Support $7,700 $7,700
Total $97,800 $97,800
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
General Fund
(100) $97,800 $97,800
Total $97,800 $97,800
Financial Comments
This project will be funded by the General Fund (100).
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY24
Project Construction FY24
Project Completion FY24
Ongoing Operational Cost Impact
This project will reduce operating costs because it will eliminate vandalism repairs to the temporary
electrical service.
164DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Old Gilroy Street at Railroad
Crossing Sewer Replacement Project No. 900720
Category Wastewater: Sewer Collection Department Public Works: Engineering
Project Type Rehabilitation Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Old Gilroy Street at
Railroad Crossing
Project Description and Purpose
This project will replace and upgrade 238 linear feet of existing 12” sewer pipe to a 15” sewer pipe
along the alley near the railroad crossing at Old Gilroy Street. This section was previously upgraded,
but operation crews recommended this section to be up-sized again for increased capacity. This
project is part of three segments to be replaced in this subtrunk.
Project Justification
This portion of the subtrunk has a high likelihood of surcharging during wet weather conditions. Other
portions of the subtrunk were replaced per the recommendation of the 1993 Sewer Master Plan.
Three portions of this subtrunk are recommended for replacement.
Master Planning Documents
This project is included in the 2023 Sewer System Master Plan.
Project Area
Old Gilroy St
165DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900720)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $106,700 $106,700
CEQA $2,200 $2,200
Construction $429,000 $429,000
Con. Support $49,500 $49,500
Total $587,400 $587,400
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Sewer (700) $587,400 $587,400
Total $587,400 $587,400
Financial Comments
This project will be funded by the Sewer Fund (700).
Estimated Project Schedule
Project Phase Timeline
Project Design FY28
Project Advertisement FY28
Project Construction FY28
Project Completion FY28
Ongoing Operational Cost Impact
There are no operational costs associated with this project, and it may reduce future maintenance
costs.
166DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Martin and Railroad Water
Line Replacement Project No. 900730
Category Water: Distribution Department Public Works: Engineering
Project Type Replacement Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Martin Street b etween
Monterey St and Railroad St
Project Description and Purpose
This project would upgrade water lines to ensure adequate water pressure for fire protection during
fire emergencies. This project will upgrade approximately 400 feet of 4” pipe to 6” pipe on Martin
Street between Monterey Street and Railroad Street. This alignment crosses under two sets of
railroad tracks. As a result, the project will include costs for coordination with Union Pacific Railroad
Company and associated permitting fees.
Project Justification
The Fire Marshal has indicated the water pressures in this area require this project to allow for new
construction and provide sufficient pressure for Fire Operations.
Master Planning Documents
This project supports the 2023 Water System Master Plan.
Martin St Monterey St Railroad St 167DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900730)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $198,000 $198,000
CEQA $1,100 $1,100
Construction $1,035,000 $1,035,000
Con. Support $137,500 $137,500
Total $1,371,600 $1,371,600
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Water (705) $1,371,600 $1,371,600
Total $1,371,600 $1,371,600
Financial Comments
This project will be funded by the Water Fund (705).
Estimated Project Schedule
Project Phase Timeline
Project Design FY28
Project Advertisement FY28
Project Construction FY28
Project Completion FY28
Ongoing Operational Cost Impact
This project’s operational costs would be nominal.
168DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
Monterey – Leavesley to
Ronan Water Line
Replacement
Project No. 900740
Category Water: Distribution Department Public Works: Engineering
Project Type Replacement Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Monterey Road between
Leavesley Rd and Ronan Ave
Project Description and Purpose
This project would upgrade a deteriorating 4” cast iron water line with a 12” ductile iron pipe on
Monterey Road from Leavesley Road to the end of the 4” line. The actual limits of the work will not be
known until the project area can be potholed. North of Ronan Avenue, the existing line is 12”. To be
conservative, it is estimated that the project limits will extend 2,450 feet to Ronan Avenue. The
existing line, which currently runs under curb, gutter, and sidewalk, will be abandoned.
Project Justification
The 4” line should be replaced because of its deteriorating condition and the restriction of flow due to
its location between two 12” lines. This project will also improve fire flow for this predominantly
commercial area between Leavesley Road and Cohansey Avenue.
Master Planning Documents
This project is not included in the 2023 Water System Master Plan.
Monterey Rd Project Area Leavesley Rd 169DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900740)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $33,736 $33,736
Design $770,869 $770,869
CEQA $16,868 $16,868
Construction $4,070,000 $4,070,000
Con. Support $581,900 $581,900
Total $821,473 $4,651,900 $5,473,373
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Water (705) $821,473 $4,651,900 $5,473,373
Total $821,473 $4,651,900 $5,473,373
Financial Comments
This project will be funded by the Water Fund (705).
Estimated Project Schedule
Project Phase Timeline
Project Design FY25
Project Advertisement FY25
Project Construction FY26
Project Completion FY26
Ongoing Operational Cost Impact
This project’s operational costs would be nominal.
170DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Photo Source:
https://www.sharksiceatsanjose.com/
Project Name Gilroy Ice Center Project No. EN2402
Category Engineering: Master Plans Department Public Works: Engineering
Project Type New Project Manager City Engineer
Council Priorities Economic Development, Maintain
and Improve City Infrastructure Location Gilroy Sports Park
Project Description and Purpose
This project will design and install the needed infrastructure for the future Gilroy Ice Center located at the
Gilroy Sports Park. Expected work includes design, environmental, and construction for site grading,
installation of the site stormwater collection system and stormwater treatment facilities, sewer collection, water
service distribution, and joint trench. The project also includes the design and construction of traffic signal
improvements at the entrance to the Sports Park at the Monterey Road/Monterey Frontage Road intersection.
Construction of the ice center facility will be implemented through a Design-Build contract.
Project Justification
The proposed facility would be a great opportunity for economic development and has the potential to heighten
the City’s position in the region as a destination location and increase travel and tourism to Gilroy. The ice rink
facility would likely include opportunities for a variety of sporting programs and ice hockey events. The project
would provide recreational opportunities for all Gilroy residents and those travelling to Gilroy for tournaments,
competitions, and other events.
Master Planning Documents
The development of the Gilroy Ice Center is consistent with the Council goals related to making Gilroy a
Recreation Destination.
171DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (EN2402)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $1,148,400 $1,148,400
Design-Build
(Facility) $12,500,000 $12,500,000 $25,000,000
CEQA $20,900 $20,900
Construction
(Infrastructure) $3,861,000 $3,861,000
Con. Support $552,200 $552,200
Total $13,669,300 $16,913,200 $30,582,500
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Public Facilities
(440) $638,793 $941,107 $1,579,900
Public Facilities
(440)(Bond
Proceeds)
$12,500,000 $12,500,000 $25,000,000
TIF (425) $530,507 $3,472,093 $4,002,600
Total $13,669,300 $16,913,200 $30,582,500
Financial Comments
Site work will be funded by the Public Facilities Fund (440) and traffic signal work will be funded by
the TIF Fund (425). Funding for the ice center facility will be provided through bond proceeds.
Estimated Project Schedule
Project Phase Timeline
Project Design FY24 – FY25
Project Advertisement FY24 – FY25
Project Construction FY24 – FY25
Project Completion FY24 – FY25
Ongoing Operational Cost Impact
There will be on-going operational costs for the site including storm, sewer, water, and signal
maintenance. The City will contract with an external operator who will be responsible for the ongoing
maintenance and repair as an operating expense of the facility.
172DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Corporation Yard EV
And EV Charging Project No. EN2403
Category Facilities: Building Systems Department Public Works: Facilities
Project Type New Project Manager Deputy Director Public Works
Council Priorities Maintain and Improve
City Infrastructure Location 613 Old Gilroy Street
Project Description and Purpose
City staff is working with Silicon Valley Clean Energy’s (SVCE) Consultant to identify opportunities for
energy resilience that could be implemented by the City. The Consultant developed an overview
report of resiliency strategies to inform the selection of a CapEx project by the City. Some of the
determining factors to identify eligible projects included an overview of commonly available
technology, design and implementation considerations, potential cost ranges and relevant case
studies. The Consultant prepared a Resilience Strategies Overview Report and Feasibility
Assessment (FA) for the project. The assessment provided an understanding of the requirements of a
given strategy to determine opportunities for implementation. The FA identified a combination of grid-
independent electric vehicle charging stations (EVCS) and electric utility vehicles (EV) as the optimal
usage of funding for this grant. Four grid independent EVCS and one vehicle option was assessed
(although multiple vehicle options were considered). City staff will evaluate and select a combination
of EVCS and EVs to provide the best value and practicality.
Project Justification
Silicon Valley Clean Energy (SVCE) launched its Community Energy Resilience Program in 2020 in
partnership with and through the support of its Member Agencies and local stakeholders. The
program is a $5.15 million investment to support community energy resilience planning efforts, build
capacity, and develop local energy resilience projects at local critical community facilities.
Master Planning Documents
This project is not included in any master planning documents.
Photo: https://svcleanenergy.org/ev -charging-assist/
173DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (EN2403)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Planning/Design
CEQA
Construction $269,246 $269,246
Con. Support
Total $269,246 $269,246
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Capital Projects
(400) $269,246 $269,246
Total $269,246 $269,246
Financial Comments
This project will be funded from the Capital Projects Fund (400). These funds will be reimbursed with
grant funding. The City of Gilroy has been approved for grant funding in the amount of $261,692
through the Silicon Valley Clean Energy (SVCE) Community Resilience Program. The project also
included a Planning Grant in the amount of $52,339 which was administered by and paid for via
SVCE. The Planning Grant was used to pay a consultant to prepare a Resilience Strategies Overview
Report and Feasibility Assessment (FA) for the project. An unused portion of the Planning Grant
($7,554) was rolled over to the CapEx project, providing the City with a total of $269,246 in grant
funding for construction.
Estimated Project Schedule
Project Phase Timeline
Project Design FY23
Project Advertisement FY24
Project Construction FY24
Project Completion FY24
Ongoing Operational Cost Impact
Ongoing operational costs will include the cost of the electricity to charge City vehicles and any
associated subscription fees with the EV charging station supplier.
174DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Cherry Blossom
Apartments Reroofing Project No. FC2401
Category Facilities: Building Systems Department Facilities
Project Type Replacement Project Manager Facilities Manager
Council Priorities Maintain and Improve
City Infrastructure Location 7259 Monterey Street
Project Description and Purpose
The Cherry Blossom Apartment’s flat roof flexes when walked on and has leaks in some areas.
Temporary roof repairs have been made, but this roof needs to be replaced. The roof is of unknown
age, but because of its current condition, the underlayment needs to be removed and replaced and
new roofing installed.
Project Justification
The Cherry Blossom Apartments provide one- and two-bedroom affordable apartment units to the
general population and supportive services to one unit. This facility would be impacted by roof leaks
should they occur in the future given the age of the roof.
Master Planning Documents
This project is not listed in any master plan document.
175DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (FC2401)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $17,600 $17,600
Construction $180,000 $180,000
Con. Support $14,300 $14,300
Total $211,900 $211,900
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
CDBG (245) $211,900 $211,900
Total $211,900 $211,900
Financial Comments
This project will be funded by the Community Development Block Grant (CDBG) Fund (245).
Estimated Project Schedule
Project Phase Timeline
Project Design FY26
Project Advertisement FY26
Project Construction FY26
Project Completion FY26
Ongoing Operational Cost Impact
This project address maintenance needs. There are no operational costs associated with this project.
Costs may decrease if leaks are avoided.
176DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Santa Teresa Fire District -
Temporary Fire Station Project No. FR2401
Category Facilities: Buildings Department Fire
Project Type New Project Manager Fire Chief
Council Priorities Maintain and Improve
City Infrastructure Location Christmas Hill Park
Ranch Site
Project Description and Purpose
This project would construct a temporary fire station on city-owned property near the Christmas Hill
Park Ranch Site (adjacent to the TEEC building) to serve the Santa Teresa fire district. The structure
will be a modular building and will include sleeping quarters, an office, a shower, and a kitchen to
allow for 24-hour staffing.
Project Justification
The project will allow for improved emergency response times for the Santa Teresa fire district until a
permanent fire station can be built.
Master Planning Documents
This project is not included in any master plan document. However, the permanent fire station was
identified in the Glen Loma Ranch Development EIR.
Project Location
177DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (FR2401)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $17,310 $17,310
Construction $444,580 $444,580
Con. Support
Total $17,310 $444,580 $461,890
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Capital Projects
(400) $17,310 $444,580 $461,890
Total $17,310 $444,580 $461,890
Financial Comments
This project will be funded by the Capital Projects Fund (400).
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY24
Project Construction FY24
Project Completion FY24
Ongoing Operational Cost Impact
The operational costs of this project are unknown at this time.
178DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Examples of fire-resistant
restroomshttps://modularconnecti
ons.com/restrooms-park-facilities/
Project Name Citywide Park Restroom
Reroofing/Rehabilitation Project No. PK2 401
Category Parks and Trails: Buildings Department Public Works: Parks
Project Type Replacement Project Manager Deputy Director Public Works
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
The Citywide Park Restroom Reroofing/Rehabilitation project would replace approximately 32 park
restrooms throughout the City with restrooms equipped with fire retardant roofs and durable, fire-
resistant building materials. It is anticipated the first restrooms would be installed at Christmas Hill
Park and Las Animas Veterans Memorial Park.
Project Justification
The City’s public restrooms have become increasingly challenging to maintain due to growing
incidents of vandalism. This has caused safety concerns for park users and has increased
maintenance costs and staff time.
Master Planning Documents
This project provides for well-maintained parks which is the focus of the Parks and Recreation
Systems Master Plan.
179DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (PK2401)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design
Design $35,000 $35,000 $35,000 $35,000 $35,000 $175,000
Construction $315,000 $315,000 $315,000 $315,000 $315,000 $1,575,000
Con. Support
Total $350,000 $350,000 $350,000 $350,000 $350,000 $1,750,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
General Fund
(100) $350,000 $350,000 $350,000 $350,000 $350,000 $1,750,000
Total $350,000 $350,000 $350,000 $350,000 $350,000 $1,750,000
Financial Comments
This project will be funded by the General Fund (100).
Estimated Project Schedule
Project Phase Timeline
Project Design FY24 – FY28
Project Advertisement FY24 – FY28
Project Construction FY24 – FY28
Project Completion FY24 – FY28
Ongoing Operational Cost Impact
This project will reduce maintenance costs for the City’s parks.
180DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Master Plan Projects –
Sewer Improvements Project No. SW2401
Category Wastewater: Sewer Collection Department Public Works: Engineering
Project Type New Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
The Master Plan Projects – Sewer Improvements Project includes 15 individual projects in 6 system
areas throughout the City. The purpose of these projects is to mitigate existing deficiencies in the
City’s sewer system and implement improvements to service anticipated future growth throughout the
City. The projects include pipeline replacements as well as new pipeline improvements. The projects
in each subtrunk system area are listed below:
•Santa Teresa - Long Meadow Subtrunk – 1 Replacement
•Welburn Subtrunk – 2 Replacements
•Forest-Swanston Subtrunk – 2 Replacements
•Old Gilroy Subtrunk – 2 Replacements
•Uvas Park Subtrunk – 5 Replacements and 1 New
•Thomas Subtrunk – 2 Replacements
Project Justification
These improvements are identified in the 2023 Sewer System Master Plan, which documents existing
system facilities, acceptable hydraulic performance criteria, and projected wastewater flows
consistent with the Urban Planning Area. The plan also included the development and calibration of
the City’s GIS-based hydraulic sewer collection system model.
Master Planning Documents
These improvements are included in the 2023 Sewer System Master Plan.
181DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (SW2401)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $204,965 $215,213 $225,974 $237,273 $249,136 $1,132,561
CEQA $10,248 $10,761 $11,299 $11,864 $12,457 $56,628
Construction $655,888 $688,682 $723,117 $759,272 $797,236 $3,624,195
Con. Support $1,800,897 $1,890,942 $1,985,489 $2,084,763 $2,189,001 $9,951,091
Total $2,671,998 $2,805,598 $2,945,878 $3,093,172 $3,247,830 $14,764,476
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Sewer (700) $1,647,173 $1,729,532 $1,816,008 $1,906,809 $2,002,149 $9,101,671
Sewer
Development
Impact (430)
$1,024,825 $1,076,066 $1,129,870 $1,186,363 $1,245,681 $5,662,805
Total $2,671,998 $2,805,598 $2,945,878 $3,093,172 $3,247,830 $14,764,476
Financial Comments
This project will be funded by the Sewer Fund (700) and the Sewer Development Impact Fund (430).
Estimated Project Schedule
Project Phase Timeline
Project Design Ongoing
Project Advertisement Ongoing
Project Construction Ongoing
Project Completion Ongoing
Ongoing Operational Cost Impact
The operational costs associated with this project would be nominal.
182DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Joint Morgan Hill-Gilroy
Trunk Line Repairs Project No. SW2402
Category Wastewater: Sewer Collection Department Public Works: Engineering
Project Type Rehabilitation Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Various
Project Description and Purpose
The Master Plan Projects – Joint Trunk Sewer Improvements Project includes 8 projects in the Joint
Trunk Pipeline between the Cities of Gilroy and Morgan Hill. The purpose of these projects is to
mitigate existing deficiencies in the City’s sewer system joint trunk pipeline. The projects include
emergency to intermediate pipeline and manhole repairs. The projects are listed below:
•Emergency/Immediate Pipeline Repairs – 5 Projects at various locations
•Emergency/Immediate Manhole Repairs – 40 Projects at various locations
•Intermediate Pipeline Repairs – Various locations
Project Justification
These improvements are identified in the 2023 Sewer System Master Plan, which documents existing
system facilities, acceptable hydraulic performance criteria, and projected wastewater flows
consistent with the Urban Planning Area. The plan also included the development and calibration of
the City’s GIS-based hydraulic sewer collection system model.
Master Planning Documents
These improvements are included in the 2023 Sewer System Master Plan.
183DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (SW2402)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $927,783 $4,060,287 $4,988,070
CEQA $46,391 $203,014 $249,405
Construction $2,351,933 $12,992,918 $15,344,851
Construction
Support $551,234 $3,045,215 $3,596,450
Total $3,877,342 $20,301,435 $24,178,777
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Sewer (700) $1,938,671 $10,150,718 $12,089,389
Morgan Hill $1,938,671 $10,150,718 $12,089,389
Total $3,877,342 $20,301,435 $24,178,778
Financial Comments
The costs for projects on the joint Morgan Hill/Gilroy Trunk Line are shared 50%-50% between
Morgan Hill and Gilroy. Coordination with Morgan Hill will be required to ensure they have sufficient
funding to cover their 50% when the projects are considered. The Gilroy portion of the project work
will be funded out of the Sewer Fund (700). The Emergency projects have been funded in FY24. The
Intermediate need projects have been pushed out beyond 5 years.
Estimated Project Schedule
Project Phase Timeline
Project Design FY24 and Beyond FY28
Project Advertisement FY24 and Beyond FY28
Project Construction FY24 and Beyond FY28
Project Completion FY24 and Beyond FY28
Ongoing Operational Cost Impact
The operational costs associated with this project would be nominal.
184DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Master Plan Projects –
Water Improvements Project No. WT2401
Category Water: Distribution Department Public Works: Engineering
Project Type New Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
The Master Plan Projects – Water System Improvements Project includes 26 individual projects
throughout the City. The purpose of these projects is to mitigate existing deficiencies in the City’s
water system and implement improvements to service anticipated future growth throughout the City.
The projects include pipeline replacements, new pipeline improvements, groundwater well
improvements, and storage reservoir improvements. The number and types of projects in each
category are summarized below:
•Pipeline Improvements - 13 Replacements and 9 New
•Storage Reservoir Improvements - 1 New
•Groundwater Well Improvements - 3 New
Project Justification
These improvements are identified in the City of Gilroy 2023 Water System Master Plan, which
documents existing distribution system facilities, acceptable hydraulic performance criteria, and
projected water demands consistent with the Urban Planning Area. The plan also included the
development of the City’s GIS-based hydraulic water model.
Master Planning Documents
These improvements are included in the 2023 Water System Master Plan.
185DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (WT2 401)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $914,588 $960,317 $9,628,695 $11,503,600
CEQA $45,729 $48,016 $481,441 $575,187
Construction $2,926,682 $3,073,016 $30,811,810 $36,811,508
Con. Support $685,941 $720,238 $7,221,510 $8,627,689
Total $4,572,941 $4,801,587 $48,143,457 $57,517,985
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Water (705) $1,687,487 $1,771,861 $17,765,708 $21,225,056
Water
Development
Impact (435)
$2,885,454 $3,029,726 $30,377,749 $36,292,928
Total $4,572,941 $4,801,587 $48,143,457 $57,517,985
Financial Comments
This project will be funded by the Water Fund (705) and Water Development Impact Fund (435).
Estimated Project Schedule
Project Phase Timeline
Project Design FY27 – Beyond 5 Years
Project Advertisement FY27 – Beyond 5 Years
Project Construction FY27 – Beyond 5 Years
Project Completion FY27 – Beyond 5 Years
Ongoing Operational Cost Impact
The operational costs associated with this project would be nominal.
186DRAFT
Back to Charter Table of Contents
Appendix B – Unfunded CIP Projects (Recommended Beyond FY28)
187DRAFT
Back to Main Table of Contents
This page intentionally left blank
188DRFT
Back to Main Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Rancho Hills Development
Concrete Repairs Project No. 800010
Category Streets: Curbs & Sidewalks Department Public Works: Engineering
Project Type Rehabilitation Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Rancho Hills Neighborhood
Project Description and Purpose
This project will replace sidewalks and curb ramps in the Rancho Hills Area, which display spalling
concrete (i.e., pieces of concrete flaking or breaking off). The City reached a settlement with the
construction company responsible for defective work in four housing tracts. The construction
company paid $380,000 towards the repair of the sidewalks and curb ramps. The Public Works
Department issued a bid for this work in the spring of 2020. In March 2020, the City Council awarded
construction of this project to EF&S Concrete, Inc. Construction of the contract was completed in
summer 2020. The bid prices and funding did not allow for the bid of the fourth tract (Tract 8627).
Therefore, tract four will remain in need of sidewalk and curb ramp repair work until new funding is
identified. The remaining work includes replacement of approximately 9,000 square feet (SF) of
sidewalk, 12,000 SF of driveway, 4,700 linear feet of curb and gutter, and some curb ramps.
Project Justification
The concrete in this area was not properly constructed and is in need of repair. In their current
condition, these sidewalks pose a potential safety hazard due to the uneven surfaces.
Master Planning Documents
This project is not listed in any master plan document. The project is consistent with a number of
General Plan goals and policies including correcting deficiencies and ensuring that pedestrian
facilities serve the function they are intended to serve while protecting the character of residential
neighborhoods.
189DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800010)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $117,700 $117,700
Construction $408,000 $961,000 $1,369,000
Con. Support $158,400 $158,400
Total $408,000 $1,237,100 $1,645,100
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Revolving
Deposit Fund $408,000 $408,000
Unfunded $1,237,100 $1,237,100
Total $408,000 $1,237,100 $1,645,100
Financial Comments
The first phase of this project was funded using money from the lawsuit settlement. Unfortunately, the
funding from the settlement was not adequate to repair the poorly constructed sidewalk within all the
impacted tracts. The sidewalk improvements within one tract, subdivision 8627, will need to be
funded separately. At this time, no funding is anticipated within the next five years.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
There are no ongoing operational costs associated with this project.
190DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Corp Yard Stormwater
Compliance Improvements Project No. 800030
Category Engineering: Stormwater
Compliance Department Public Works: Engineering
Project Type New Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location 613 Old Gilroy Street
Project Description and Purpose
This project would implement stormwater capturing and treatment improvements at the City’s
Corporation Yard to allow compliance with the State Water Resources Control Board Phase II
National Pollutant Discharge Elimination System (NPDES) Stormwater Permit (MS4 General Permit).
Improvements may include structures for covering stored materials, vehicles, and equipment, storm
drain inserts, and infiltration trenches to protect against stormwater borne pollutants and hazardous
materials spills
Project Justification
The City’s Corporation Yard is considered a hotspot facility (Provision E.11.d) under the jurisdiction of
the NPDES MS4 General Permit Regional Water Quality Control Board Order No.2013-0001-DWQ
effective on July 1, 2013. On February 8, 2016, the Central Coast Water Board issued the City a
Notice of Violation of the post-construction SWMP element of the MS4 General Permit. It was
determined the City’s Corporation Yard is in violation of the MS4 General Permit Good Housekeeping
provisions and should implement appropriate controls of pollution and Best Management Practices.
City staff implemented temporary compliance measures until the project was constructed.
Master Planning Documents
This project is necessary for proper stewardship of facilities and compliance the Central Coast Water
Board. Flood control, drainage, and water quality mitigation measures are included in the City’s
General Plan Environmental Impact Report (EIR).
Project Site
US 101 Old Gilroy St DRAFT191
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800030)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design
Design $194,980 $194,980
CEQA $4,400 $4,400
Construction $1,710,000 $1,710,000
Con. Support $115,000 $115,000
Total $2,024,380 $2,024,380
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $2,024,380 $2,024,380
Total $2,024,380 $2,024,380
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Pre-Design FY20
Design Beyond FY28
Construction Beyond FY28
Ongoing Operational Cost Impact
Ongoing maintenance and operational costs for the project will be approximately $18k per year. This
includes costs for maintenance of the on-site storm drainage inlets, infiltration trench and structure
preservation. DRAFT192
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Automall Parkway Pavement
Rehabilitation Project No. 800040
Category Streets: Pavement Department Public Works: Engineering
Project Type Rehabilitation Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Automall Parkway
Project Description and Purpose
The project includes: pavement rehabilitation, repair and replacement of deteriorated curb and gutter,
reconstruction of approximately 20 curb ramps, drainage and striping improvements, and the addition
of Class II Bike Lanes along Automall Parkway. The project limits include Automall Parkway from the
Caltrans right-of-way to the Automall Parkway/Luchessa Avenue intersection.
Project Justification
This project is important for promoting continued economic growth within the City and for the
businesses along these primary access roads (Automall Parkway and Tenth Street). These roadways
provide access to a wide variety of commercial and industrial land uses, including the auto
dealerships along Automall Parkway. This project supports the City Council’s goals related to
promoting economic development within the City, is consistent with the City’s General Plan policies,
will improve traffic circulation, and will enhance pedestrian and bicycle safety in the project area.
Completion of the project could also lead to further development of the commercial properties along
the roadways within the project limits, like the new Evergreen development. Failure to complete this
project would result in the continued deterioration of the roadway surface and could increase the
likelihood of damage to private vehicles due to poor pavement conditions.
Master Planning Documents
This project supports the City’s Traffic Circulation Master Plan by providing a safe and well-
maintained travel way. The street is also identified in StreetSaver as a failed street in need of
reconstruction.
Automall
Pkwy
Chestnut St
Tenth St
Tenth St
To US 101
193DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800040)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $316,752 $316,752
Design $154,048 $154,048
CEQA $14,300 $14,300
Construction $2,519,000 $2,519,000
Con. Support $359,700 $359,700
Total $316,752 $3,047,048 $3,363,800
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Vehicle
Registration Fee
(220)
$316,752 $316,752
Unfunded $3,047,048 $3,047,048
Total $316,752 $3,047,048 $3,363,800
Financial Comments
Although this project is currently unfunded, it has been identified as a high priority project and staff
will be pursuing alternative funding sources in an effort to secure funding for this project as soon as
possible.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
This project directly addresses maintenance needs. Once completed, this project will require periodic
surface maintenance treatments. These treatments will protect the surface from water, extend its life,
and reduce long-term maintenance expenses. Treatments typically occur every 5-7 years.
194DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Las Animas Park Tennis Court
–Fence Repairs Project No. 800120
Category Parks and Trails: Other
Structures or Facilities Department Public Works: Parks
Project Type Replacement Project Manager Deputy Director Public Works
Council Priorities Maintain and Improve
City Infrastructure Location Las Animas Veterans Park
Project Description and Purpose
This project would replace the fences around four of the six tennis courts at Las Animas Park. These
12-foot-tall chain-link fences, which were built in 1974, have sections that are rusted and falling apart.
The project would also include replacement of several structural fence poles, which have been
weakened due to high winds and heavy use.
Project Justification
The Las Animas Park tennis courts are heavily used by local residents and the Gilroy Tennis Club
(which funds the resurfacing of the courts every few years at no cost to the City). The rusted bottom
sections of the galvanized chain-link fences are, practically speaking, beyond repair. Multiple fence
contractors have evaluated the fences and recommended replacement instead of continuing repairs.
The deficient structural poles could fail during a high-wind storm, which could cause a total failure of
the fences and render the tennis courts unusable. In addition to Ensuring Financial Stability, this
project also meets the Council’s strategic goals of Providing Opportunities for Meaningful Public
Engagement and Ensuring Neighborhoods Benefit Equally from City Services.
Master Planning Documents
This project supports the City’s Parks & Recreation System Master Plan, which is to pursue a variety
of financing mechanisms for acquisition, development, long-term operations, and maintenance of the
City’s parks and recreation system.
195DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800120)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $1,100 $1,100
Design $4,400 $4,400
Construction $111,000 $111,000
Con. Support $7,700 $7,700
Total $124,200 $124,200
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $124,200 $124,200
Total $124,200 $124,200
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
Operational costs should be reduced for several years by removing the need to constantly repair the
broken bottom of the fences.
196DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Lions Creek Trail West Gap
Closure – Kern to Day Project No. 800280
Category Parks and Trails: Trails Department Public Works: Engineering
Project Type New Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Lions Creek – Santa Teresa
Blvd/Day Rd to Kern Ave
Project Description and Purpose
This project would construct a Class I, multi-use trail approximately 4,500 linear feet in length from
Santa Teresa Boulevard/Day Road to Kern Avenue along Lions Creek. This trail would provide
recreational usage along the creek and pedestrian access between nearby neighborhoods and
Christopher High School. The scope of work would include:
•Asphalt concrete Class I trail (for bicycles and pedestrians)
•ADA-compliant curb cramp at all trail entrances
•Concrete retaining wall
This project is adjacent to the funded Lions Creek Trail West of Santa Teresa and Day (800270)
project. Additional grant funding is being pursued for the Lions Creek Trail. Upon successful award,
staff will evaluate both projects and apply the funds to section that provides the most benefit to the
community.
Project Justification
This project was originally approved by Council for design in 2010 as part of three major trail projects
in the City (Ronan Channel Trail and two segments of the Lions Creek Trail). However, funds
previously allocated for this trail were diverted to the Ronan Channel Trail project for construction and
to take full advantage of federal funds that were available. The Lions Creek Trail project, which is
currently at the 60% design phase, qualifies for future local and federal grants for the construction
phase.
Master Planning Documents
This project is in conformance with the adopted Trail Master Plan and has already received
environmental clearance, which is a prerequisite for permitting. 197DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800280)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $22,000 $22,000
Design $440,000 $440,000
CEQA $89,100 $89,100
Construction $4,048,000 $4,048,000
Con. Support $367,400 $367,400
Total $4,966,500 $4,966,500
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $4,966,500 $4,966,500
Total $4,966,500 $4,966,500
Financial Comments
This project is currently unfunded. This project is on the Measure B Bicycle & Pedestrian Capital
Projects 10-year priority project list with a funding amount of $2.72M. This funding is still competitive
and would have to be requested. Additional funding would be needed for initial design activities.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
Once completed, this project will require an annual maintenance cost of approximately $16,000 per
year. The trail will also require resurfacing (Type II Slurry Seal and Restriping) every 8 years at
approximately $35,000 per treatment.
198DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
Church Street Storm Drain
Extension – Seventh to 7233
Church
Project No. 800380
Category Storm Drain : Storm Collection Department Public Works: Engineering
Project Type New Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Church/Seventh Intersection
to 7233 Church Street
Project Description and Purpose
The purpose of this project is to design and construct approximately 500 linear feet of new 12” storm
drain pipe along Church Street from the Church Street/Seventh Street intersection to 7223 Church
Street. The project scope includes:
•Install 500 linear feet of reinforced concrete pipe
•Install catch basins
•Connect new pipes to existing storm drain system
Project Justification
Church Street from Sixth Street to Eighth Street currently does not have a storm drain pipe. The
system is designed to accommodate surface flow along the gutter from Sixth Street to Eighth Street.
Due to uplifted curb and gutter along this segment, the surface is obstructed which causes temporary
flooding at the intersection of Seventh Street and Church Street. The Operations Division has
received numerous comments due to the flooding at this location and has had to expend resources.
During moderate rain events the flooding has reached Church Street, which experiences relatively
high traffic volumes and travel speeds. This type of flooding combined with higher travel speeds can
create safety issues such as hydroplaning.
Master Planning Documents
This project is not in any master plan document. Eighth St Seventh St Church St Project Area
199DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800380)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design
Design $53,729 $53,729
CEQA $2,686 $2,686
Construction $171,932 $171,932
Con. Support $40,297 $40,297
Total $268,644 $268,644
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $268,644 $268,644
Total $268,644 $268,644
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
The operational costs associated with this project would be nominal.
200DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
Gateway Senior Apartments
Pedestrian Crossing Safety
Improvements
Project No. 800730
Category Streets: Traffic Signals Department Public Works: Engineering
Project Type New Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Monterey Street between
Tenth St and Luchessa Ave
Project Description and Purpose
This project will install a High-Intensity Activated Crosswalk (HAWK), high visibility crosswalk
improvements, and curb ramps to provide a safe pedestrian crossing of Monterey Road in front of the
Gateway Senior Apartments.
Project Justification
The location of the Gateway Senior Apartments currently has challenges and safety issues in terms
of the surrounding pedestrian infrastructure along Monterey Street. The project was approved without
any adjacent sidewalk improvements. In a February 13, 2020 letter from the US Department of
Housing and Urban Development (HUD), the Office of Fair Housing and Equal Opportunity expressed
concerns over the lack of pedestrian accessibility in the area. The HAWK improvements would
address the accessibility gaps by providing safe pedestrian access to the west side of Monterey
Street where there are existing pedestrian facilities that lead to the Downtown. This project meets the
City Council goal of Enhancing Public Safety Capabilities.
Master Planning Documents
This project supports the City’s General Plan goals and policies. These goals and policies include
correcting deficiencies and ensuring pedestrian facilities serve the function they are intended to
serve.
High-Intensity Activated Crosswalk Example
201DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800730)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $48,500 $48,500
CEQA $2,200 $2,200
Construction $442,000 $442,000
Con. Support $41,800 $41,800
Total $48,500 $486,000 $534,500
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
CDBG (245) $48,500 $48,500
Unfunded $486,000 $486,000
Total $48,500 $486,000 $534,500
Financial Comments
The design of this project has been completed. The construction phase of this project is currently
unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
The operational costs associated with this project would be nominal.
202DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Drainage Improvements to
Mitigate Minor Flooding Project No. 900030
Category Storm Drain : Storm Collection Department Public Works: Engineering
Project Type New Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
This project will address a number of localized flooding issues throughout the City. Public Works
Operations has a list of locations where local flooding occurs during heavy rain events.
Project Justification
Public Works has identified a number of locations throughout the City that experience localized
flooding during storm events. A number of these locations affect vehicular travel lanes and pedestrian
walkways. Maintenance staff has to address these locations with each storm event, and places
advanced warning signage at a number of locations. This is time consuming and costly. Also, to the
extent these locations affect the health and safety of the public, the City is obligated to make repairs
and/or improvements to the storm drain system. Not doing so could leave the City exposed to liability.
Master Planning Documents
This project is not listed in any master plan, but provides flood control, drainage, and water quality
mitigation measures in support of the 2023 Storm Drainage System Master Plan.
Miller Avenue Closure – February 2017
203DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900030)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $1,100 $1,100
Design $71,500 $71,500
CEQA $1,100 $1,100
Construction $51,000 $51,000
Total $124,700 $124,700
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $124,700 $124,700
Total $124,700 $124,700
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
This project’s operational costs would be nominal.
204DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
Luchessa Bridge Pedestrian
and Bicycle Safety
Improvements
Project No. 900070
Category Streets: Pavement Markings Department Public Works: Engineering
Project Type New Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Luchessa Avenue between
Princevalle and Thomas
Project Description and Purpose
This project would construct approximately 700 linear feet of pedestrian pathway along westbound
Luchessa Avenue between Princevalle Street and Thomas Road. There are currently no sidewalks
on either side of this bridge/road segment. The scope of work includes:
•Concrete sidewalk
•ADA-compliant curb ramps
•Raised pedestrian walking
surface on the bridge
Project Justification
The pedestrian route along this segment, which is the shoulder of the road, does not provide a
vertical or horizontal separation between vehicles and pedestrians, is not ADA-compliant, and does
not meet current safety guidelines. The only feature currently provided between the shoulder and
travel way are temporary delineators, which is not the best possible safety measure. The Luchessa
Bridge provides the only pedestrian route to Gilroy High School for students that live west of Thomas
Road.
Master Planning Documents
Widening the Luchessa Avenue Bridge to two lanes in each direction is included in the City’s Traffic
Circulation Master Plan (TCMP), which would include providing pedestrian facilities on the bridge. In
addition, this project is consistent with the City’s General Plan goals and policies which include
correcting deficiencies and ensuring pedestrian facilities serve the function they are intended to
serve.
205DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900070)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $4,400 $4,400
Design $82,500 $82,500
CEQA $4,400 $4,400
Construction $707,000 $707,000
Con. Support $78,100 $78,100
Total $876,400 $876,400
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $876,400 $876,400
Total $876,400 $876,400
Financial Comments
This project is currently unfunded. Staff will continue to pursue state and federal grant opportunities to
partially or fully fund this project.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
There are no operational costs associated with this project. This project would reduce maintenance
costs as City crews would no longer be required to continuously replace the temporary delineators
that are currently installed between the shoulder and travel way.
206DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Mantelli/Church Bulb-Out and
Crosswalk Improvements Project No. 900090
Category Streets: Other Concrete
Features Department Public Works: Engineering
Project Type New Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Mantelli Drive and
Church Street
Project Description and Purpose
This project will install improvements to enhance the safety of pedestrians crossing Mantelli Drive at
the intersection of Mantelli Drive and Church Street. The scope of work includes:
•Install concrete bulb-out at the northwest corner of the intersection
•Install ADA-compliant directional curb ramps at the northwest corner of the intersection
•Relocate the stop sign at the northwest corner so it is closer to the travel lane
Project Justification
Staff has received multiple correspondences from residents concerned about pedestrian safety at this
skewed intersection, including observations of drivers turning right from southbound Church Street to
westbound Mantelli Drive without stopping at the stop sign (i.e., treating it as a “free” right-turn). The
crosswalk on the west leg of the intersection is also unusually long due to the skewed geometry of the
intersection. These improvements would discourage drivers from treating the southbound right-turn
movement as a “free” right-turn.
Master Planning Documents
This project supports the City’s Traffic Circulation Master Plan by providing a safe and well-
maintained travel way. The street is also identified in StreetSaver as a failed street in need of
reconstruction.
Project Corner
207DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900090)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $1,100 $1,100
Design $23,100 $23,100
CEQA $2,200 $2,200
Construction $179,000 $179,000
Con. Support $9,900 $9,900
Total $215,300 $215,300
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $215,300 $215,300
Total $215,300 $215,300
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
There are no operational costs associated with this project.
208DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Miller/Uvas Creek Trail
Pedestrian Improvements Project No. 900100
Category Streets: Curbs & Sidewalks Department Public Works: Engineering
Project Type New Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Miller Avenue and
Uvas Creek Trail
Project Description and Purpose
This project would enhance pedestrian safety at the Miller Avenue/Uvas Park Drive intersection. The
scope of work would include:
•Install raised concrete crosswalk for levee trail users to cross Miller Avenue
•Install concrete sidewalk and retaining wall at the southwest corner of the intersection
•Install ADA-compliant curb ramp at the southeast corner of the intersection
Project Justification
Staff has received multiple comments from residents and the Bicycle and Pedestrian Commission
regarding the safety of pedestrians crossing at this intersection. It was reported that drivers are not
making a complete stop at the intersection, particularly at the west leg of the intersection. As this
intersection serves nearby neighborhoods, Gilroy High School, Solarsano Middle School, and
Christmas Hill Park, it is important to investigate and identify possible solutions to enhance safety at
this intersection. This project would also provide for ADA-compliant improvements at this intersection.
Master Planning Documents
This project is not listed in any master plan document, but it is consistent with the City’s General Plan
goals and policies. These goals and policies include correcting deficiencies and ensuring pedestrian
facilities serve the function they are intended to serve. Miller Ave Uvas Creek Trail
Uvas Park Dr
Image Source: ruraldesignguide.com
209DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900100)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $1,100 $1,100
Design $22,000 $22,000
CEQA $4,400 $4,400
Construction $204,000 $204,000
Con. Support $11,000 $11,000
Total $242,500 $242,500
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $242,500 $242,500
Total $242,500 $242,500
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
There are no operational costs associated with this project.
210DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Murray Avenue Sidewalk
Gap Closure Project No. 900110
Category Streets: Curbs & Sidewalks Department Public Works: Engineering
Project Type New Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Murray Avenue between
Kishimura and Leavesley
Project Description and Purpose
The Murray Avenue Sidewalk Gap Closure Project will construct approximately 2,000 linear feet of
sidewalk on the west side of Murray Avenue between Kishimura Drive and Leavesley Road. This
project would complete the pedestrian network on this segment so that pedestrian access would be
provided on both sides of the street.
Project Justification
Numerous residents and businesses on the west side of this segment of Murray Avenue do not have
pedestrian facilities along their property’s frontage. The lack of a continuous sidewalk on this segment
of Murray Avenue also impacts the ability of transit users to access the bus stops in the area. This
project will enhance safety, connectivity, and access in low- and moderate-income neighborhoods as
designated by the US Department of Housing and Urban Development’s (HUD) Community
Development Block Grant (CDBG) Program.
Master Planning Documents
This project is not specifically listed in any master plan document, but it is consistent with the City’s
General Plan goals and policies. These goals and policies include correcting deficiencies and
ensuring pedestrian facilities serve the function they are intended to serve.
211DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900110)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $9,900 $9,900
Design $115,500 $115,500
CEQA $1,100 $1,100
Construction $933,000 $933,000
Con. Support $92,400 $92,400
Right-of-Way $110,000 $110,000
Total $1,261,900 $1,261,900
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $1,261,900 $1,261,900
Total $1,261,900 $1,261,900
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
There are no operational costs associated with this project.
212DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Sidewalk Gap Closure – 8340
Swanston Lane Project No. 900120
Category Streets: Curbs & Sidewalks Department Public Works: Engineering
Project Type New Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Swanston Lane between
Leavesley and Casey
Project Description and Purpose
This project will construct approximately 1,200 square feet of new sidewalk and 240 linear feet of new
curb and gutter on the east side of Swanston Lane between Leavesley Road and Casey Lane to
close the existing gap in continuous sidewalk. This project would complete the pedestrian network on
this segment so that pedestrian access would be provided on both sides of the street.
Project Justification
Residents have expressed safety concerns regarding the lack of continuous sidewalk along this
segment of Swanston Lane. This project will enhance safety, connectivity, and access in low- and
moderate-income neighborhoods that fall within the City’s Neighborhood Revitalization Strategy Area
(NRSA), as designated by the US Department of Housing and Urban Development’s (HUD)
Community Development Block Grant (CDBG) Program.
Master Planning Documents
This project is not listed in any master plan document, but it is consistent with the City’s General Plan
goals and policies. These goals and policies include correcting deficiencies and ensuring pedestrian
facilities serve the function they are intended to serve.
213DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900120)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $23,100 $23,100
CEQA $1,100 $1,100
Construction $136,000 $136,000
Con. Support $7,700 $7,700
Land Acq. $55,000 $55,000
Total $222,900 $222,900
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $222,900 $222,900
Total $222,900 $222,900
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
There are no operational costs associated with this project.
214DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Storm Drain Cleaning and
Inspection Program Project No. 900130
Category Storm Drain: Storm Collection Department Public Works: Engineering
Project Type Studies & Reports Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
The intent of this project is to video inspect the larger storm drain pipes and culverts within private
easements and the public right-of-way to identify deficiencies (including deficiencies in structural
integrity) and to clean the lines. Based on the video inspection, a capital improvement project would
be developed to repair identified deficiencies.
This project would be a multi-year , phased project. During the first year, locations that meet the
project parameters would be identified throughout the City. During the second year, the lines
identified in the first year would be inspected and improvements to address any identified deficiencies
would be designed. During the third year, the improvements would be constructed.
Project Justification
A number of large diameter storm drain lines are constructed using corrugated metal pipe and
reinforced concrete pipe (RCP). When these lines fail, they can create dangerous conditions including
sink holes in the public right-of-way, which can result in safety issues.
Master Planning Documents
This project is not in any master plan document.
Photo Credit: By C heerfulmonk, CC BY-NC-SA 2.0
215DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900130)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Consulting $66,400 $66,400
Salaries/Wages $7,000 $7,000
Total $73,400 $73,400
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $73,400 $73,400
Total $73,400 $73,400
Financial Comments
This project is currently unfunded. The first phase of the project, identification of locations that meet
the project parameters, is estimated to cost $73,400.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
There are no operational costs associated with this project.
216DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
Fifth Street – Miller to
Princevalle Storm Drain
Replacement
Project No. 900140
Category Storm Drain : Storm Collection Department Public Works: Engineering
Project Type Replacement Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Fifth Street between
Miller Ave and Princevalle St
Project Description and Purpose
This project would replace approximately 1,250 feet of existing 42” storm drain pipe with a 48” storm
drain pipe along Fifth Street between Miller Avenue and Princevalle Street to provide adequate storm
drainage capacity.
Project Justification
The City of Gilroy’s storm drainage system consists of a combination of curb and gutter facilities, curb
inlets, and underground pipelines draining to the nearest creek (Llagas Creek or Uvas Creek) or to a
manmade channel. Storm water runoff is ultimately discharged into creeks that flow through the City
and eventually reach Monterey Bay via the Pajaro River. The planning, development, and financing of
storm drainage system facilities is vital to provide reliable and enhanced service for existing
customers and to serve anticipated growth.
Master Planning Documents
This project is identified in the 2023 Storm Drainage System Master Plan.
Fifth St Project Area Princevalle St 217DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900140)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $268,644 $268,644
CEQA $13,432 $13,432
Construction $859,660 $859,660
Con. Support $201,483 $201,483
Total $1,343,219 $1,343,219
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $1,343,219 $1,343,219
Total $1,343,219 $1,343,219
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
The operational costs associated with this project would be nominal.
218DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
Fifth Street – Princevalle to
Rosanna New Storm Drain
Trunk
Project No. 900150
Category Storm Drain : Storm Collection Department Public Works: Engineering
Project Type New Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Fifth Street between
Princevalle and Rosanna
Project Description and Purpose
This project would construct a new 72” storm trunk approximately 1,500 feet in length along Fifth
Street between Princevalle Street and Rosanna Street to provide adequate storm drainage capacity.
Project Justification
The City of Gilroy’s storm drainage system consists of a combination of curb and gutter facilities, curb
inlets, and underground pipelines draining to the nearest creek (Llagas Creek or Uvas Creek) or to a
manmade channel. Storm water runoff is ultimately discharged into creeks that flow through the City
and eventually reach Monterey Bay via the Pajaro River. The planning, development, and financing of
storm drainage system facilities is vital to provide reliable and enhanced service for existing
customers and to serve anticipated growth.
Master Planning Documents
This project is not included in the 2023 Storm Drainage System Master Plan. Dowdy St Fifth St Project Area Carmel St Princevalle St Hanna St Rosanna St 219DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900150)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $446,520 $446,520
CEQA $22,326 $22,326
Construction $1,428,865 $1,428,865
Con. Support $334,890 $334,890
Total $2,232,602 $2,232,602
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $2,232,602 $2,232,602
Total $2,232,602 $2,232,602
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
The operational costs associated with this project would be nominal.
220DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Forest and Eighth Storm Drain
Connection Replacement Project No. 900160
Category Storm Drain : Storm Collection Department Public Works: Engineering
Project Type Replacement Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Forest Street and
Eighth Street
Project Description and Purpose
This project would remove and replace approximately 40 linear feet of 8” cast iron pipe with 15”
reinforced concrete pipe, and remove and replace approximately 40 linear feet of 6” vitrified clay pipe
with 15” reinforced concrete pipe near the intersection of Forest and Eighth Streets. This project
would also install a new storm drain inlet, and tie the improvements into the existing storm drain
system.
Project Justification
A resident near the intersection of Forest and Eighth Streets has submitted several service requests
related to pavement flooding at this location. Maintenance and Engineering staff has identified a small
inlet and smaller than required storm drain pipe network serving this location. With the increasing
frequency of 100-year rain fall events, this area could be prone to frequent flooding in the future.
These flooding events may result in damage to property and the City could be liable for these
damages.
Master Planning Documents
This project supports the 2023 Storm Drainage System Master Plan.
221DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900160)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $1,100 $1,100
Design $59,400 $59,400
CEQA $1,100 $1,100
Construction $237,000 $237,000
Con. Support $39,600 $39,600
Total $338,200 $338,200
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $338,200 $338,200
Total $338,200 $338,200
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
This project would result in nominal operational costs and the new assets would be added to the
City’s routine storm drain maintenance list.
222DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
Ninth Street Storm Drain
Extension – Monterey to
Eigleberry
Project No. 900170
Category Storm Drain : Storm Collection Department Public Works: Engineering
Project Type New Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Ninth Street between
Monterey and Eigleberry
Project Description and Purpose
This project will add a new 36” storm drain line for a total length of approximately 400 feet along Ninth
Street between Eigleberry Street and Monterey Street.
Project Justification
The City of Gilroy’s storm drainage system consists of a combination of curb and gutter facilities, curb
inlets, and underground pipelines draining to the nearest creek (Llagas Creek or Uvas Creek) or to a
manmade channel. Storm water runoff is ultimately discharged into creeks that flow through the City
and eventually reach Monterey Bay via the Pajaro River. The planning, development, and financing of
storm drainage system facilities is vital to provide reliable and enhanced service for existing
customers and to serve anticipated growth.
Master Planning Documents
This project is not included in the 2023 Storm Drainage System Master Plan.
Ninth St Monterey St Eigleberry St Project Area
223DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900170)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $62,737 $62,737
CEQA $3,137 $3,137
Construction $200,758 $200,758
Con. Support $47,053 $47,053
Total $313,685 $313,685
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $313,685 $313,685
Total $313,685 $313,685
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
The operational costs associated with this project would be nominal.
224DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
Princevalle System – Fifth to
Santa Paula Storm Drain
Improvements
Project No. 900180
Category Storm Drain : Storm Collection Department Public Works: Engineering
Project Type Replacement Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Third St, Santa Theresa Dr,
Fourth St and Miller Ave
Project Description and Purpose
This project will replace the existing 27” to 30” storm drain with 36” to 48” storm drain for a total length
of approximately 3,400 feet along portions of Third Street (Santa Paula Drive to Santa Theresa
Drive), Santa Theresa Drive (Third Street to Fourth Street), Fourth Street (Santa Theresa Drive to
Miller Avenue), and Miller Avenue (Fourth Street to Fifth Street).
Project Justification
The City of Gilroy’s storm drainage system consists of a combination of curb and gutter facilities, curb
inlets, and underground pipelines draining to the nearest creek (Llagas Creek or Uvas Creek) or to a
manmade channel. Storm water runoff is ultimately discharged into creeks that flow through the City
and eventually reach Monterey Bay via the Pajaro River. The planning, development, and financing of
storm drainage system facilities is vital to provide reliable and enhanced service for existing
customers and to serve anticipated growth.
Master Planning Documents
This project is included in the 2023 Storm Drainage System Master Plan.
Third St Santa Paula Dr Wren Ave Project Area Santa Theresa Dr Miller Ave 225DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900180)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $16,500 $16,500
Design $457,600 $457,600
CEQA $16,500 $16,500
Construction $2,967,000 $2,967,000
Con. Support $375,100 $375,100
Total $3,832,700 $3,832,700
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $3,832,700 $3,832,700
Total $3,832,700 $3,832,700
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
The operational costs associated with this project would be nominal.
226DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
Rosanna – Fourth to
Princevalle Channel Storm
Drain Improvements
Project No. 900190
Category Storm Drain : Storm Collection Department Public Works: Engineering
Project Type New Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Rosanna St, Sixth St,
Eigleberry St, Seventh St
Project Description and Purpose
This project will add new 36” to 84” storm drain line for a total length of approximately 6,700 feet
along Rosanna Street from Fourth Street to Sixth Street, Sixth Street from Rosanna Street to
Eigleberry Street, Eigleberry Street from Sixth Street to Seventh Street, Seventh Street from
Eigleberry Street to Rosanna Street, and Rosanna Street from Seventh Street to Princevalle Channel.
Project Justification
The City of Gilroy’s storm drainage system consists of a combination of curb and gutter facilities, curb
inlets, and underground pipelines draining to the nearest creek (Llagas Creek or Uvas Creek) or to a
manmade channel. Storm water runoff is ultimately discharged into creeks that flow through the City
and eventually reach Monterey Bay via the Pajaro River. The planning, development, and financing of
storm drainage system facilities is vital to provide reliable and enhanced service for existing
customers and to serve anticipated growth.
Master Planning Documents
This project is not included in the 2023 Storm Drainage System Master Plan. Fourth St Sixth St Seventh St Eigleberry St Tenth St Church St
Rosanna St Project Area
227DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900190)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $31,900 $31,900
Design $761,200 $761,200
CEQA $31,900 $31,900
Construction $5,854,000 $5,854,000
Con. Support $804,100 $804,100
Total $7,483,100 $7,483,100
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $7,483,100 $7,483,100
Total $7,483,100 $7,483,100
Financial Comments
This project is not currently funded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
The operational costs associated with this project would be nominal.
228DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
Second Street – Hanna to
Miller Slough Storm Drain
Improvements
Project No. 900200
Category Storm Drain : Storm Collection Department Public Works: Engineering
Project Type Replacement Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Second Street between
Hanna St and Miller Slough
Project Description and Purpose
This project will replace the existing 15” storm drain with a 36” storm drain for a total length of
approximately 1,450 feet along Second Street between Hanna Street and Monterey Road / Miller
Slough.
Project Justification
The City of Gilroy’s storm drainage system consists of a combination of curb and gutter facilities, curb
inlets, and underground pipelines draining to the nearest creek (Llagas Creek or Uvas Creek) or to a
manmade channel. Storm water runoff is ultimately discharged into creeks that flow through the City
and eventually reach Monterey Bay via the Pajaro River. The planning, development, and financing of
storm drainage system facilities is vital to provide reliable and enhanced service for existing
customers and to serve anticipated growth.
Master Planning Documents
This project is not included in the 2023 Storm Drainage System Master Plan.
First St
Second St Hanna St Project Area
229DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900200)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design
Design $227,421 $227,421
CEQA $11,371 $11,371
Construction $727,748 $727,748
Con. Support $170,566 $170,566
Total $1,137,107 $1,137,107
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $1,137,107 $1,137,107
Total $1,137,107 $1,137,107
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
The operational costs associated with this project would be nominal.
230DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
Third Street Storm Drain
Extension – Hanna to
Eigleberry
Project No. 900210
Category Storm Drain : Storm Collection Department Public Works: Engineering
Project Type Replacement Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Third Street between
Hanna St and Eigleberry St
Project Description and Purpose
This project would up-size approximately 1,200 linear feet of 6” storm drain line to 12” storm drain line
on Third Street between Hanna Street and Eigleberry Street. The project scope includes:
•Remove and replace 1,200 linear feet of 6” reinforced concrete pipe (RCP) with 12” RCP
•Remove and relocate existing catch basin
•Connect new pipes to existing storm drain system
Project Justification
The existing storm drain line on Third Street between Hanna Street and Eigleberry Street is not an
optimal size for this segment. During moderate rain events, flooding occurs at almost every
intersection on this segment. This flooding may cause safety issues such as hydroplaning. This main
line is undersized and is restricting optimal flow downstream. By up-sizing this line, flooding within this
segment will be eliminated and it will restore additional operational capacity to respond to other
locations. Currently, the Operations Division conducts frequent cleaning intervals at this segment just
to maintain minimal flow.
Master Planning Documents
This project is not included in the 2023 Storm Drainage System Master Plan. Eigleberry St Third St Project Area Church St Rosanna St Hanna St 231DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900210)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $128,949 $128,949
CEQA $6,447 $6,447
Construction $412,637 $412,637
Con. Support $96,712 $96,712
Total $644,745 $644,745
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $644,745 $644,745
Total $644,745 $644,745
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
The operational costs associated with this project would be nominal.
232DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Wren Avenue Bridge Over
Lions Creek BPMP Project No. 900230
Category Streets: Bridges Department Public Works: Engineering
Project Type Rehabilitation Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Wren Avenue North of
Tatum Avenue
Project Description and Purpose
In April 2006 Caltrans announced the creation of the Local Assistance Bridge Preventative
Maintenance Program (BPMP). The BPMP program is funded through the Federal Highway
Administration (FHWA) Highway Bridge Program (HBP), which, for the City of Gilroy, is administered
through Caltrans District 4 Local Assistance.
This project includes cleaning and treating the bridge deck on the Wren Avenue Bridge over Lions
Creek with High Molecular Weight Methacrylate (HMWM). The project will also include replacing
traffic stripes and pavement markings, and other incidental and appurtenant work necessary for the
proper construction of the improvements.
Project Justification
The purpose of the project is to extend the life of the bridge by performing certain qualifying items of
work, classified as “preventative maintenance”, to keep the bridge in structurally good condition while
conserving limited funds for other bridges which may require major rehabilitation or replacement.
Master Planning Documents
This project supports the City’s Traffic Circulation Master Plan by providing a safe and well-
maintained travel way. Kern Ave Lions Creek
Tatum Ave
Wren Avenue Bridge
Over Lions Creek
233DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900230)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $34,100 $34,100
CEQA $14,300 $14,300
Construction $121,000 $121,000
Con. Support $69,300 $69,300
Total $238,700 $238,700
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $238,700 $238,700
Total $238,700 $238,700
Financial Comments
This project is currently unfunded. When funded, this project would be implemented through the
Highway Bridge Program (HBP), which provides federal aid to local agencies for replacing and
rehabilitating deficient bridges. A large portion of the Construction and Construction
Engineering/Management Services for this project would be funded through the FHWA’s Highway
Bridge Program (88.53%), which will be reimbursed to the City upon completion of the project. The
City’s match for the project would be minimal (11.47%).
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
This project directly addresses maintenance needs. There are no operational costs associated with
this project.
234DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
Railroad At-Grade Crossing
Pedestrian Safety
Improvements
Project No. 900320
Category Streets: Curbs & Sidewalks Department Public Works: Engineering
Project Type New Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location At-Grade Highway/Railroad
Crossings within the City
Project Description and Purpose
The Railroad At-Grade Crossing Pedestrian Safety Improvements Project would improve safety at ten
at-grade railroad track crossings by installing improvements such as fencing, pedestrian gates,
sidewalks, and upgraded warning signals and signage. The project includes the at-grade
highway/railroad crossings at the following locations:
1.Luchessa Avenue
2.Tenth Street
3.Old Gilroy Street
4.Sixth Street
5. Martin Street
6.Lewis Street
7.I.O.O.F. Avenue
8.Leavesley Road
9.Las Animas Avenue
10. Cohansey Avenue
Project Justification
The City’s ten at-grade highway/railroad crossings all fall within the City’s Neighborhood
Revitalization Strategy Area (NRSA), as designated by the US Department of Housing and Urban
Development’s (HUD) Community Development Block Grant (CDBG) Program. Some of these
crossings are located near schools or other high pedestrian activity centers (i.e., shopping centers,
multi-family residential developments, etc.). This project would enhance safety, connectivity, and
access in low- and moderate-income neighborhoods that fall within the City’s NRSA.
Master Planning Documents
This project supports the City’s General Plan goals and policies. These goals and policies include
correcting deficiencies and ensuring pedestrian facilities serve the function they are intended to
serve.
Tenth Street At-Grade Railroad Crossing
235DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900320)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $66,000 $66,000
Design $2,112,000 $2,112,000
CEQA $253,000 $253,000
Construction $11,550,000 $11,550,000
Con. Support $2,167,000 $2,167,000
Total $16,148,000 $16,148,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $16,148,000 $16,148,000
Total $16,148,000 $16,148,000
Financial Comments
This project is currently unfunded. The City of Gilroy may collaborate with the High Speed Rail
Authority (HSRA) on this project with the majority of funding coming through their Environmental
Justice (EJ) CEQA program. The City would provide sidewalk improvements within the City’s right-of-
way to aid with the transition between City and railroad right-of-way. In addition, the City would
provide public outreach and coordination, project management, and oversight during the design and
construction of the project. Funding for the majority of the railroad safety improvements would come
from HSRA.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
There are no operational costs associated with this project.
236DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Neighborhood Street Lighting Project No. 900330
Category Streets: Street Lights Department Public Works: Engineering
Project Type New Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
The Neighborhood Street Lighting Project would install new street lights in areas where the street
lights do not meet the City’s minimum standards for street light spacing.
Project Justification
Adequate neighborhood street lighting improves safety by improving nighttime visibility and provides
sidewalk and road users with an increased sense of security. Street lighting can also provide a sense
of place and a more pleasing environment in residential and commercial areas. Some neighborhood
groups also believe that extra illumination can help prevent or reduce crime. Most of the
neighborhoods requiring street light improvements are located within the City’s Neighborhood
Revitalization Strategy Area (NRSA), as designated by the US Department of Housing and Urban
Development’s (HUD) Community Development Block Grant (CDBG) Program. The Neighborhood
Street Lighting Project will enhance safety, connectivity, and access in low- and moderate-income
neighborhoods that fall within the City’s NRSA.
Master Planning Documents
This project supports the City’s General Plan goals and policies. These goals and policies include
correcting deficiencies and ensuring pedestrian facilities serve the function they are intended to
serve.
Chestnut Street between Sixth and Seventh Streets
237DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900330)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $68,200 $68,200
CEQA $2,200 $2,200
Construction $311,000 $311,000
Con. Support $34,100 $34,100
Total $415,500 $415,500
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $415,500 $415,500
Total $415,500 $415,500
Financial Comments
This project is currently unfunded. The City of Gilroy may collaborate with the High Speed Rail
Authority (HSRA) on this project with the majority of funding coming through their Environmental
Justice (EJ) CEQA program. In addition, the City would provide public outreach and coordination,
project management, and oversight during the design and construction of the project. Funding for the
majority of the project would come from HSRA. The City requested funding for this project through the
EJ program.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
The operational costs associated with this project would be nominal.
238DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Church Street
Sidewalk Gap Closure Project No. 900350
Category Streets: Curbs & Sidewalks Department Public Works: Engineering
Project Type New Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location West Side of Church Street
North of First Street
Project Description and Purpose
This project will construct new sidewalk, curb, and gutter on the west side of Church Street, just north
of First Street, along the eastern façade of the building that is currently occupied by the El Rancho
Foods Supermarket. The diagonal parking spaces along the side of the building will be shifted
partially out towards the street to accommodate the new walkway against the building. The sidewalk
will tie into the existing sidewalk north and south of the building site.
Project Justification
The City has received a number of comments over the past several years regarding the lack of
continuous sidewalk along the Church Street frontage of this property. Due to the existing diagonal
parking configuration against the building, pedestrians are forced out into the street to travel along
this portion of Church Street. This project has the potential to be funded by Community Development
Block Grant (CDBG) Funds because of its location in a low- and moderate-income neighborhood.
Master Planning Documents
This project supports the City’s General Plan goals and policies of correcting deficiencies and
ensuring pedestrian facilities serve the function they are intended to serve.
239DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900350)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $20,900 $20,900
CEQA $1,100 $1,100
Construction $129,000 $129,000
Con. Support $26,400 $26,400
Total $177,400 $177,400
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $177,400 $177,400
Total $177,400 $177,400
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
The operational costs associated with this project would be nominal.
240DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
Chestnut Fire Station
Bay Heaters and HVAC
Replacement
Project No. 900400
Category Facilities: Building Systems Department Facilities
Project Type Replacement Project Manager Facilities Manager
Council Priorities Maintain and Improve
City Infrastructure Location 7070 Chestnut Street
Project Description and Purpose
The two apparatus bay heaters and one HVAC rooftop unit are past their designed lifetime, and due
to be replaced. These units are over 2 4 years old and are not expected to last much longer.
Project Justification
This project is necessary to keep Fire services operating properly and avoid downtime due to
potential future equipment failures.
Master Planning Documents
This project is not listed in a master plan.
241DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900400)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $12,100 $12,100
Construction $76,000 $76,000
Con. Support $2,200 $2,200
Total $90,300 $90,300
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $90,300 $90,300
Total $90,300 $90,300
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
There will be some cost savings due to higher efficiency equipment. Replacement is anticipated every
15 to 20 years.
242DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name 7380 Dowdy Building
Demolition Project No. 900450
Category Facilities: Buildings Department Facilities
Project Type Demolition Project Manager Facilities Manager
Council Priorities Maintain and Improve
City Infrastructure Location 7380 Dowdy Street
Project Description and Purpose
The City has been purchasing homes along Dowdy Street for construction of a new City parking lot.
This project would demolish a dilapidated City-owned home at 7380 Dowdy Street. This building is
deteriorating and periodically gets vandalized and broken into by the unhoused.
Project Justification
This project would provide needed parking spaces for the Senior Center, Library, and Police
Department.
Master Planning Documents
This project is not listed in any master plan document.
Gilroy Senior Center
Gilroy
Library
Gilroy Police Department
Dowdy St
243DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900450)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $8,800 $8,800
Construction $152,000 $152,000
Con. Support $8,800 $8,800
Total $169,600 $169,600
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $169,600 $169,600
Total $169,600 $169,600
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
This project will eliminate existing operational cost.
244DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Park s/Civic Facilities Sidewalk
Improvements Citywide Project No. 900500
Category Facilities: Specialized
Facilities Department Public Works: Engineering
Project Type Replacement Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
The City owns several properties including a Civic Center, Library, Police Station, various parks,
parking lots and other parcels. This project would correct all defective sidewalks and walkways with a
½” or more vertical separation (considered a “trip and fall” location) that could leave the City liable to
risk of lawsuit. This project would analyze the sidewalk condition along the frontage of all City-owned
properties (including all City parks and public-accessible properties) and design and implement
corrective measures to repair the defective areas to City Standards.
Project Justification
The California Streets and Highways Code requires the adjacent property owner to be responsible for
the condition of the sidewalk fronting their property. City Public Works Maintenance Staff do not have
the capacity to replace defective sidewalk along the frontage of all City-owned properties. The current
practice is to use high-visibility paint to make these locations more visible, but not necessarily to
make the repairs. This identifies potentially unsafe sidewalk conditions for the public, but leaves them
in the path of travel where the public can trip and then file a claim against the City. This project meets
several City Council goals including: Ensure Financial Stability and Ensure Neighborhoods Benefit
Equity from City Services. Depending on the scope of the project, it may be phased over several
years.
Master Planning Documents
This project is an action item in the Downtown Gilroy Strategic Plan.
245DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900500)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $12,100 $12,100
Construction $135,000 $135,000
Con. Support $7,700 $7,700
Total $154,800 $154,800
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $154,800 $154,800
Total $154,800 $154,800
Financial Comments
This project is currently unfunded. It is recommended that this type of project be conducted every 10
years to determine if the City remains risk free or risk neutral regarding City sidewalk conditions.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
There are no operational costs associated with this project.
246DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name City-Owned Parking Lots
Resurfacing Project No. 900510
Category Facilities: Parking Lots Department Public Works: Engineering
Project Type Rehabilitation Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Various Locations
Project Description and Purpose
The City owns and maintains eight parking lots in the downtown totaling approximately 129,000
square feet of paved surface area. This project would resurface and restripe these lots. The scope of
work includes asphalt resurfacing, pavement markings, wheel stops, striping, ADA parking stalls,
signage, and storm water management.
In addition, the parking lot at the northeast corner of Railroad Street and Sixth Street is a 0.58 acre lot
with 58 parking spaces. The lot is not adequately lit with many areas that are in shadows after the
lights turn on. The parking lot requires a new lighting design, poles and electrical service.
Project Justification
Pavement surfaces in City-owned lots have degraded over time. Many features of the parking lots,
such as parking stall marking, directional arrows, and signs, also require replacement. This project
would also provide an opportunity to review current parking lot layouts and optimize them to better
suit adjacent land uses. Per Title II of the ADA, parking lot resurfacing also triggers ADA
improvements. Since these are offsite parking lots, ADA accessibility shall comply with the City
Municipal Code. Since a number of these lots support the Downtown, this project meets the City
Council Goal of Downtown Revitalization.
Master Planning Documents
This project supports the Downtown Strategic Plan by providing adequate parking to accommodate
additional customers and residents thus improving the downtown’s market conditions and growing
appeal as a residential and commercial area.
Monterey St
Eigleberry St
Alexander St
Railroad St Lewis St Fourth St Sixth St Fifth St Seventh St 247DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900510)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $157,300 $157,300
Construction $694,000 $694,000
Con. Support $106,700 $106,700
Total $958,000 $958,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $958,000 $958,000
Total $958,000 $958,000
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
This project addresses maintenance needs. Parking lots should be maintained and resurfaced every
8-10 years.
248DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Christmas Hill Park Trail
Wayfinding Signage Project No. 900610
Category Parks & Trails : Other
Structures or Facilities Department Public Works: Parks
Project Type New Project Manager Deputy Director Public Works
Council Priorities Maintain and Improve
City Infrastructure Location 7050 Miller Avenue
Project Description and Purpose
This project will design and install wayfinding signs within Christmas Hill Park and DeBell Uvas Creek
Park Preserve. The project will also include associated trail maps and program graphics for
community outreach. This project is needed to establish standards for City hiking trail signs that
compliment and support various South County healthy living events and programs. Christmas Hill
Park and the DeBell Uvas Creek Park Preserve trails are proposed for promoting healthy living
activities for all age groups. Under guidance from a landscape consultant, the Santa Clara County
Public Health Department, and the Gilroy Parks and Recreation Commission, this project will create a
park trail signage program.
Project Justification
Community comments from healthy living events, the Parks and Recreation Commission, and the
County’s Healthy Living Program has indicated that the City has a need to provide significant park
trail signs and maps of the City’s trail system starting at Christmas Hill Park. This should include
public trail interfaces surrounding Christmas Hill Park and the adjacent DeBell Uvas Creek Park
Preserve.
Master Planning Documents
This project enhances park facilities, which is the goal of the Parks Master Plan.
Uvas Park Dr
DeBell Uvas Creek Park Preserve
Christmas Hill Park DeBell Uvas Creek Park Preserve
249DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900610)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $23,100 $23,100
CEQA $1,100 $1,100
Construction $103,400 $103,400
Con. Support $4,400 $4,400
Total $132,000 $132,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $132,000 $132,000
Total $132,000 $132,000
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
The annual estimated sign maintenance costs will gradually increase over a five to ten year period,
from $200 to $400 per year for direct repair materials, and $600 to $800 per year based on sign
hardiness and park visitor impacts.
250DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Forest Street Park Expansion Project No. 900630
Category Parks and Trails: Park Expansion Department Public Works: Parks
Project Type New Project Manager Deputy Director Public Works
Council Priorities Maintain and Improve
City Infrastructure Location 7325 Forest Street
Project Description and Purpose
The purpose of this project is to expand the Forest Street Park in accordance with the City’s approved
Forest Street Park Master Plan. The existing park has a children’s play area and a small picnic area.
The expanded park could include bocce ball courts and horseshoe pits. The project will include the
acquisition of the adjacent property just south of the park, which is currently occupied by a
commercial building. This is the second of two parcels needed to complete the approved master plan.
The first parcel has already been acquired. Significant soil testing and anticipated mitigation of soil
contamination is anticipated. Upon completion of property acquisition and soil mitigation, installation
of the proposed improvements would be completed.
Project Justification
This project in consistent with the Gilroy City Council goal of ensuring neighborhoods benefit equally
from City services. The Forest Street Park Expansion Project will promote a healthier population and
enhance the quality of life and property values in low-and-moderate -income neighborhoods by
expanding the existing recreational facility. The property is now for sale, making this an ideal time to
acquire it.
Master Planning Documents
This project is identified in the Forest Street Park Master Plan, and also provides for a safe and well
maintained park which is the focus of the Parks and Recreation Systems Master Plan.
251DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900630)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Land Acquisition $720,000 $720,000
Total $720,000 $720,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $720,000 $720,000
Total $720,000 $720,000
Financial Comments
This project is currently unfunded. Purchase of the property is estimated at $720,000. Mitigation of
soil contamination should be negotiated to be completed by the seller, as a condition of sale. Future
additional development costs will be determined when the final scope of the park is known.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
There will be minor increases in landscape and facility maintenance for new park development on this
final portion of the park. Park and contract maintenance staff already maintain the Forest Street Park,
so no additional mobilization is required, only an expansion of current activities and contract work.
252DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
Las Animas Veterans Park
Miscellaneous Facility
Rehabilitation
Project No. 900640
Category Parks & Trails: Other Structures or Facilities Department Public Works: Parks
Project Type Rehabilitation Project Manager Deputy Director Public Works
Council Priorities Maintain and Improve
City Infrastructure Location 400 Mantelli Drive
Project Description and Purpose
This project would restore, renovate, and upgrade the “Oaks” restroom and Lake Side group
barbecue area lighting and electrical, and remove and replace existing deteriorated asphalt pathways
with new concrete walkways. Paths would be widened from 10 to 12 feet to meet City trail standards
and would be wide enough for bicycles, walkers in both directions, and maintenance vehicles. The
project also includes renovation of the main Mantelli Drive parking lot. Improvements would require
replacement of several small bridges and path lighting upgrades. Replacement of the original low flow
pathway channel culvert near the tennis courts and minor ball field to meet safe storm flows is also
included. A new all-weather bridge for park visitors and service vehicles at the culvert is required. The
base rock pathway between the Wayland and Hanna parking lots is also included. Both the Hanna
parking lot and base rock pathway will need first time lights provided.
Project Justification
This park is the most heavily used in the City’s system. The Oaks restroom is old and needs
overhauling for facilities and utilities. Many of the asphalt pathway service roads are more than 40
years old and have been reduced to base rock. The City has received comments from users who
have expressed concerns after having fallen or been splashed at deteriorated locations. The need to
upgrade and replace failed pathways and install new parking lot lights for park users is an important
user safety and security measure.
Master Planning Documents
This project provides for a safe and well-maintained park, which is the focus of the Parks and
Recreation Systems Master Plan.
Arnold Dr
Las Animas
Veterans Park
253DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900640)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $30,800 $30,800
Design $609,400 $609,400
CEQA $91,300 $91,300
Construction $2,761,000 $2,761,000
Con. Support $364,100 $364,100
Total $3,856,600 $3,856,600
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $3,856,600 $3,856,600
Total $3,856,600 $3,856,600
Financial Comments
This project is currently unfunded. Funding for this project could come from state park grant funding
and possibly the General Fund.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
Operational cost impacts should be neutral. There will be less path and reduced restroom care work
required, but there is more irrigation adjustment work that will take time to complete.
254DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
Gilroy Sports Park
Improvements
Phases IV and V
Project No. 900680
Category Parks and Trails: Park Expansion Department Public Works: Parks
Project Type New Project Manager Deputy Director Public Works
Council Priorities Maintain and Improve
City Infrastructure Location 5925 Monterey
Frontage Road
Project Description and Purpose
This project would design, and construct sports fields and associated amenities at the Gilroy Sports
Park. The project would include four softball fields in a wagon wheel layout, and two soccer/football
facilities, described as Phases IV and V in the Gilroy Sports Park Master Plan. The project would also
include necessary support facilities such as restrooms, snack bar, parking, security residence,
maintenance yard, and sports lighting utilities. A BMX/Pump Track could be included in Phase IV
and/or V of the Sports Park project build out. Phase IV and V of the Sports Park project would involve
improvements on 14 to 16 acres of the 72-acre site.
Project Justification
The Gilroy Sports Park has become popular with local leagues and as a destination for regional
tournaments. The demand for local sports fields exceeds the available supply, suggesting this is the
right time to develop more of this specialty park. Additional fields will allow hosting larger
tournaments, and possibly increased revenues.
Master Planning Documents
This project is listed in the Parks and Recreation Systems Master Plan.
Phase I
Phase II
Phase III
Phase IV
Gilroy Sports Park Phase VI
Phase VII
Phase IX
Phase V
255DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900680)
Project Costs Total
Prior FY21 FY22 FY23 FY24 FY25 Beyond 5
Years Project Total
Pre-Design $64,900 $64,900
Design $1,252,900 $1,252,900
CEQA $195,800 $195,800
Construction $11,880,000 $11,880,000
Con. Support $1,436,600 $1,436,600
Bioswale $1,045,440 $1,045,440
Permitting Fees $82,500 $82,500
Total $15,958,140 $15,958,140
Funding
Source
Total
Prior FY21 FY22 FY23 FY24 FY25 Beyond 5
Years Project Total
Unfunded $15,958,140 $15,958,140
Total $15,958,140 $15,958,140
Financial Comments
This project is currently unfunded. Future funding could come from impact fees, state park
development grants, and matching funds from the General Fund (100).
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
Increased maintenance and operation costs will be required upon completion of the project, including
an estimated annual cost of $90,000 for storm water facility maintenance as well as buildings and
mobile trailers, with repairs as necessary. Costs could be partially offset by user fees and admission
charges, where feasible.
256DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
Rehabilitate Softball Fields at
Las Animas and Christmas
Hill Parks
Project No. 900690
Category Parks & Trails: Other Structures or Facilities Department Public Works: Parks
Project Type Rehabilitation Project Manager Deputy Director Public Works
Council Priorities Maintain and Improve
City Infrastructure Location 7050 Miller Avenue and
400 Mantelli Drive
Project Description and Purpose
This project would rehabilitate the major softball infields at Las Animas and Christmas Hill Parks. This
would include demolishing and removing four inches of infield material down to mineral soil, and
replacing it with the same infield material that was installed at the Gilroy Sports Park. The project will
also include re-grading for positive drainage and replacement of infield bases.
Project Justification
The Christmas Hill Park and Las Animas Park softball infields are inferior to those at the Gilroy Sports
Park. These infields have a grainier and coarser texture. This results in more abrasions and harsher
flesh wounds when players fall. This project would improve safety for users of the softball fields.
Master Planning Documents
This project provides for a safe and well-maintained park which is the focus of the Parks and
Recreation Systems Master Plan. Wren Ave Miller Ave Christmas Hill Park Softball Fields
Las Animas Park Softball Fields
257DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900690)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $28,600 $28,600
CEQA $1,100 $1,100
Construction $145,000 $145,000
Con. Support $7,700 $7,700
Total $182,400 $182,400
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $182,400 $182,400
Total $182,400 $182,400
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
There are no operational costs associated with this project. These parks are currently maintained by
the Parks Division with maintenance costs included in the budget.
258DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Monterey Rd Sidewalk –
Luchessa to Tenth Project No. EN2404
Category Streets: Curbs & Sidewalks Department Public Works: Engineering
Project Type New Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Monterey Rd from
Luchessa Ave to Tenth St
Project Description and Purpose
This project would design and construct approximately 3,000 linear feet of six-foot wide sidewalk on
the east side of Monterey Road between Tenth Street to Luchessa Avenue. The project would also
address drainage issues along this road segment by installing approximately 1,850 linear feet of 48-
inch and 1,550 feet of 90-inch storm drain pipeline.
Project Justification
There is currently only approximately 350 linear feet of sidewalk on the east side of Monterey Road
between Tenth Street and Luchessa Avenue, in front of the recently constructed Gateway Senior
Apartment complex. This project would improve accessibility and enhance safety by clos ing the gap
in sidewalks on the east side of Monterey Road. It would also improve connectivity between the
commercial and residential land uses on the east side of Monterey Road and commercial land uses
to the north and south of the project area.
Master Planning Documents
The storm drain improvements for this project are included in the 2022 Storm Drainage System
Master Plan.
Monterey Rd
New Sidewalk Tenth St Existing Sidewalk
259DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (EN2304)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $68,200 $68,200
Design $520,300 $520,300
CEQA $20,900 $20,900
Construction $6,237,000 $6,237,000
Con. Support $205,700 $205,700
Total $7,052,100 $7,052,100
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $7,052,100 $7,052,100
Total $7,052,100 $7,052,100
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
No additional costs are expected. Completion of this project should reduce operational costs.
260DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Master Plan Projects –
Storm Drain Improvements Project No. EN2405
Category Storm Drain : Storm Collection Department Public Works: Engineering
Project Type New Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
The Master Plan Projects – Storm Drain Improvements Project includes 43 individual projects in 6
hydrologic drainage areas throughout the City. The purpose of these projects is to mitigate existing
deficiencies in the City’s storm drain system and implement improvements to service anticipated
future growth throughout the City. The projects include pipeline replacements as well as new pipeline
improvements. The number and types of projects in each hydrologic area are summarized below:
•Ronan Channel Drainage Area – 4 Replacements and 5 New
•Miller Slough Drainage Area – 6 Replacements
•North Uvas Drainage Area – 4 Replacements and 4 New
•South Uvas Drainage Area – 1 Replacement
•Princevalle Drainage Area – 12 Replacements and 1 New
•Lower Miller Slough Drainage Area – 6 Replacements
Project Justification
The improvements are identified in the City of Gilroy 2023 Storm Drainage System Master Plan,
which documents existing system facilities, acceptable hydrologic and hydraulic performance criteria,
and projected stormwater runoff consistent with the Urban Planning Area. The plan also included the
development of the City’s GIS-based hydrologic and hydraulic stormwater models.
Master Planning Documents
These improvements are included in the 202 3 Storm Drainage System Master Plan.
261DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (EN2405)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $9,284,948 $9,284,948
CEQA $464,247 $464,247
Construction $29,711,835 $29,711,835
Con. Support $6,963,711 $6,963,711
Total $46,424,742 $46,424,742
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $46,424,742 $46,424,742
Total $46,424,742 $46,424,742
Financial Comments
The projects in the Storm Drainage System Master Plan are currently unfunded. The funding source
for new storm drainage lines and system upgrades would be the Storm Drain Development Impact
Fund (410).
The 2023 Storm Drainage System Master Plan identifies a total of $34.8M in current and future
capital improvements over a five-year time period. For this charter, this amount has been escalated
based on the Engineering News Record Construction Cost Index (CCI) to the amount shown here.
Future City capital improvement costs will be funded out of the storm drain development impact fee.
There is also a need to develop another revenue stream to pay for storm water improvements.
Additional funding mechanisms are required due to the fact that Storm Drainage is not currently one
of the City’s Enterprise Funds (funded by rate payers), like Sewer and Water. Because of this, storm
drain maintenance and capital projects must be paid out of the General Fund if they do not qualify for
the use of storm drain impact fees. There is a need to create a new Storm Drain Fund to pay for
Storm Drainage System Master Plan improvements. This will be studied over the next year.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
The operational costs associated with this project would be nominal.
262DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Luchessa Ave/Rossi Ln
Reconstruction Project No. EN2406
Category Streets: Pavement Department Public Works: Engineering
Project Type Replacement Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location
Luchessa from Monterey to
Rossi & Rossi from Luchessa
Ave to Mayock Rd
Project Description and Purpose
This project would reconstruct Luchessa Avenue from Monterey Road to Rossi Lane and reconstruct
Rossi Lane from Luchessa Avenue to Mayock Road. The project also includes new sidewalk on
Luchessa Avenue between Monterey Road and Automall Parkway. The project would also install
Class II bike lanes on Luchessa Avenue and Rossi Lane within the project limits, as well as other
traffic stripes and pavement markings.
Project Justification
The overall quality and condition of a road is measured using the Pavement Condition Index (PCI).
PCI is a numerical index between 0 and 100, with 100 representing the best possible condition and 0
representing the worst possible condition. Pavement features such as the existence of cracking and
potholes will impact the PCI classification.
The pavement within the project limits is very poor, with PCIs of 14 (Luchessa Avenue) and 18 (Rossi
Lane). These roads are located along a commuter route and in an industrial area and are thus heavily
traveled. The City has received numerous complaints from local commuters and business owners
regarding the condition of these roads. In addition, these roads experience high maintenance costs
due to their poor condition.
Master Planning Documents
This project is not included in any master planning documents.
Luchessa Ave Project Area
263DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (EN2406)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $408,000 $408,000
CEQA $1,000 $1,000
Construction $3,059,000 $3,059,000
Con. Support $612,000 $612,000
Total $4,080,000 $4,080,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $4,080,000 $4,080,000
Total $4,080,000 $4,080,000
Financial Comments
This project is currently unfunded. City staff have submitted grant applications in attempts to secure
funding to reconstruct these roads, but these attempts have been unsuccessful. Staff will continue to
pursue funding opportunities and will also consider alternative treatment options that may reduce
costs and make funding the project more feasible.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
This project would result in reduced maintenance costs.
264DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Parks Master Plan Project No. PK2 402
Category Parks and Trails:
Master Plans Department Public Works: Parks
Project Type Studies & Reports Project Manager Deputy Director Public Works
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
This project would create a Parks Master Plan for the City of Gilroy. The Parks Master Plan would
assess the condition of the City’s existing parks, conduct public outreach to identify community
needs, and recommend improvements based on feedback from the public and the goals and policies
within the 2040 General Plan. It will also identify potential funding sources for the proposed
improvements. The plan will assist decision-makers in prioritizing future park improvements,
allocating funding, and pursuing additional funding opportunities.
Project Justification
The City’s Parks & Recreation System Master Plan was last updated in September 2004. In addition
to identifying park deficiencies and proposed improvements, the Parks & Recreation System Master
Plan also evaluated recreation programs and special use facilities (e.g., Wheeler Community Center,
Gilroy Museum, etc.). The Parks Master Plan will review, update, and build upon the capital
improvements identified for parks within the 2004 Parks & Recreation System Master Plan. Having an
adopted Parks Master Plan in place will allow the City to develop a Parks Impact Fee Program which
will provide a funding source for park improvements throughout the City and will allow for continued
programming of Recreation Services within the City’s parks.
Master Planning Documents
This project will create a Parks Master Plan.
265DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (PK2402)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Consulting $225,000 $225,000
Salaries/Wages $25,000 $25,000
Total $250,000 $250,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $250,000 $250,000
Total $250,000 $250,000
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
This project will not generate operational costs and will inform additional capital development in the
future.
266DRAFT
Back to Charter Table of Contents
Appendix C – Funded Studies/Plans (Within 5‐Year CIP)
267DRAFT
Back to Main Table of Contents
This page intentionally left blank
268DRAFT
Back to Main Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Downtown Parking
Management Plan Project No. 800110
Category Engineering: Plans & Programs Department Public Works: Engineering
Project Type Studies & Reports Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Downtown
Project Description and Purpose
This project will fund a professional services agreement with a consultant to analyze the existing
parking conditions in the Downtown and provide recommendations regarding parking management
and supportive capital improvement needs.
Project Justification
Parking management in the Downtown Core is a high priority for the City. It supports the Downtown
and encourages economic development. The Gilroy Downtown Business Association (GDBA)
completed an informal Downtown Parking Assessment in 2019 which identified a significant shortage
in the number of parking spaces within the Downtown area. A Parking Management Plan will analyze
opportunity areas in the Downtown to create additional parking, suggest strategies for optimizing use,
and identify potential funding sources and strategies to pay for building and maintaining parking
assets within the district. The program will be developed through a survey of residents and business
owners, recommendations from the GDBA, additional research, and extensive public outreach. The
Parking Management Plan will be used to develop goals for fair and consolidated parking
management and may include recommendations for changes to City codes, administrative
regulations, practices, procedures, and enforcement.
Master Planning Documents
The Downtown Specific Plan, completed in 2005, calls for increased parking in the Downtown as well
as a comprehensive Parking Management Plan. This project also supports the downtown and will
encourage economic development.
269DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800110)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Contract Admin. $25,721 $25,721
Public Outreach $11,317 $11,317
Consulting $263,723 $263,723
Total $300,761 $300,761
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Downtown
Parking
Management
(202)
$300,761 $300,761
Total $300,761 $300,761
Financial Comments
This project received funding in FY23 and is currently underway. The project is expected to be
completed in FY24.
Estimated Project Schedule
Project Phase Timeline
Project Design N/A
Project Advertisement FY23
Project Construction N/A
Project Completion FY24
Ongoing Operational Cost Impact
There are no operational costs associated with this project.
270DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Shooting Range Assessment Project No. 800230
Category Facilities: Specialized Facilities Department Facilities
Project Type Rehabilitation Project Manager Facilities Manager
Council Priorities Maintain and Improve
City Infrastructure Location 1300 Southside Drive
Project Description and Purpose
This project involves conducting an assessment to determine the lead abatement procedures
necessary to bring the City’s shooting range into compliance with Federal Environmental Protection
Agency (EPA) standards, and to meet the provisions of the Clean Water Act. To satisfy these
requirements, it may be necessary to construct overhead structures, drainage ditches and storage
tanks, targets that encapsulate bullets, and other runoff collection devices. The extent of the required
modifications will not be known until the study is completed. Phase I of the project will be the
assessment and engineering of the abatement measures. Phase II will be construction and
implementation of the corrective measures identified during Phase I analysis determination.
Project Justification
This project is needed to bring the City’s shooting range into compliance with Federal EPA
regulations. It is needed to identify a system to ensure the lead is captured so it does not leach into
the soil and transfer into the local groundwater aquifer.
Master Planning Documents
This project is not specifically listed in any master plan document.
271DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Police) (800230)
Project Costs Total Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Consulting $55,000 $55,000
Salaries/Wages $8,800 $8,800
Construction $200,000 $200,000
Equipment $77,000 $77,000
Total $63,800 $277,000 $340,800
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Facilities (615) $63,800 $277,000 $340,800
Total $63,800 $277,000 $340,800
Financial Comments
This project would be funded out of the Facilities Fund (615).
Estimated Project Schedule
Project Phase Timeline
Project Design FY23
Project Advertisement FY24
Project Construction FY24
Project Completion FY24
Ongoing Operational Cost Impact
Operational costs are unknown but will involve continual lead abatement recycling efforts and runoff
prevention.
272DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
Traffic Circulation Master
Plan and Traffic Impact
Fee Update
Project No. 800240
Category Engineering: Master Plans Department Public Works: Engineering
Project Type New Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
The Traffic Circulation Master Plan (TCMP) Update will include a review of transportation projects
based on the 2040 General Plan and the City’s travel forecast model. It will include the identification
of all intersections (both short-term and long-term) that do not meet the City’s adopted Level of
Service (LOS) Standard, and will determine the level of improvements needed to bring levels of
service into compliance. The traffic analysis will include a review of intersection operations,
opportunities for needed improvements, and sufficient conceptual design to identify project
challenges, project right-of-way needs, and preliminary cost estimates. The Traffic Impact Fee (TIF)
update will include a nexus study to calculate the appropriate impact fees necessary to fund proposed
infrastructure improvements required to support future growth as identified in the updated Traffic
Circulation Master Plan and 2040 General Plan.
Project Justification
The City's Traffic Circulation Master Plan and Traffic Impact Fee program have not had major
updates since 2004. The documents need to be revised to correspond to the 2040 General Plan and
the City's updated 2040 travel forecast model. The TIF Program establishes the amount of Traffic
Impact Fees paid by developers, and the method for reimbursement of transportation-related
development costs to developers after project completion. Modifications to the TIF program could
make the collection of traffic impact fees more beneficial to the City.
Master Planning Documents
The Traffic Circulation Master Plan Update will be consistent with the new GP Mobility Element.
273DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800240)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Consulting $400,000 $400,000
Total $400,000 $400,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Traffic Impact
Fee (425) $400,000 $400,000
Total $400,000 $400,000
Financial Comments
This project will be funded using Traffic Impact Fees (425).
Estimated Project Schedule
Project Phase Timeline
Project Advertisement FY24
Project Completion FY24
Ongoing Operational Cost Impact
There are no operational costs associated with this project.
274DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Civic Center Master Plan Project No. FC2403
Category Facilities: Building Systems Department Administration
Project Type New Project Manager Assistant to City Administrator
Council Priorities Maintain and Improve
City Infrastructure Location Civic Center
Project Description and Purpose
The development of a Civic Center Master Plan would examine the City facilities within the City Hall
complex area, to determine their remaining useful life, identify replacement costs, and identify a
phasing plan for implementation. While the Police Station and Gilroy Library are relatively new
buildings, other buildings within the complex area are in various degrees of deterioration and are in
need of significant investment if the buildings are to be kept in service for the next decade. Buildings
considered for review in the master plan effort include a Community Center, City Hall, the Senior
Center, the City Hall Annex Building, Wheeler Auditorium, and the Dowdy building.
Project Justification
The creation of a Civic Center Master Plan would assist the City in laying the groundwork for
considering major and minor repairs to existing civic facilities, possible replacement of civic facilities,
identifying the addition of desired amenities, and providing a road map for future improvements as
funding becomes available. The improvements would address a number of City Council Strategic
Goals.
Master Planning Documents
This project is not included in any master plan document.
275DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (FC2403)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $750,000 $750,000
Design
Construction
Con. Support
Total $750,000 $750,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Public Facilities
Fund (440) $750,000 $750,000
Total $750,000 $750,000
Financial Comments
This project will be funded by the Public Facilities Fund (440). Cost savings from funds that were
previously set aside by the City Council to fund the City Hall HVAC Replacement will be used to fund
this project. The funding would pay for the development of a master plan. Construction funding for
identified improvements would need to be secured at a later date.
Estimated Project Schedule
Project Phase Timeline
Project Pre-Design FY24
Project Advertisement TBD
Project Construction TBD
Project Completion TBD
Ongoing Operational Cost Impact
There are no ongoing operational costs for this master plan development. Future costs associated
with maintaining new facilities would have to be considered with any future project construction
funding.
276DRAFT
Back to Charter Table of Contents
Appendix D – Unfunded Studies/Plans (Recommended Beyond FY28)
277DRAFT
Back to Main Table of Contents
This page intentionally left blank
278DRAFT
Back to Main Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
Storm Outfalls #6 and #7 –
Investigations and Monitoring
for NPDES
Project No. 900220
Category Engineering: Stormwater
Compliance Department Public Works: Engineering
Project Type Studies & Reports Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location West Branch Llagas Creek
and Princevalle Channel
Project Description and Purpose
The purpose of this project is to identify and eliminate the source(s) of high levels of human bacteria
coming from Outfall #6 (located in the West Branch of Llagas Creek) and Outfall #7 (located at the
west end of Princevalle Channel). The project has four phases, as described below:
1)A Desktop Study was completed within the two drainage areas to identify high risk areas
where underground stormwater pipes are most likely to be compromised.
2)Maintenance staff installed “Drains to Bay” medallions on all storm drain inlets in these
catchment areas where illegal discharge could possibly be taking place.
3)Based on future requirements and testing, a CCTV Investigative Program might be required for
all stormwater pipe segments identified in the high-risk zone. The focus would be to locate
compromised underground pipes that allow infiltration and inflow of stormwater, containing
high levels of human bacteria, during storm events.
4)A stormwater pipe repair program would then be generated to correct the compromised pipes.
Project Justification
The City of Gilroy is required under State Law to do this work for compliance with the National
Pollutant Discharge Elimination System (NPDES) Permit.
Master Planning Documents
This project supports the City’s General Plan. Flood control, drainage, and water quality mitigation
measures are included in the City’s General Plan Environmental Impact Report (EIR).
279DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900220)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design $10,000 $10,000
Design $40,000 $40,000
CEQA $1,000 $1,000
Construction $200,000 $200,000
Con. Support $50,000 $50,000
Total $10,000 $291,000 $301,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
General Fund -
Environmental
Programs (100-
2404)
$10,000 $10,000
Unfunded $291,000 $291,000
Total $10,000 $291,000 $301,000
Financial Comments
Funding for the cost of the video inspection and storm water pipe mitigation program has yet to be
determined.
Estimated Project Schedule
Project Phase Timeline
Phase 1 Complete
Phase 2 Complete
Water Sampling FY25
Phase 3 Beyond FY28
Phase 4 Beyond FY28
Ongoing Operational Cost Impact
There are no operational costs associated with this project.
280DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Development of Stormwater
Specifications Project No. 900250
Category Engineering: Standard
Drawings & Specs Department Public Works: Engineering
Project Type Studies & Reports Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
This project will develop a set of specifications for the City to be in compliance with the regions
stormwater requirements. These specifications will bring the City in compliance with the current
Municipal General Permit. The specifications will provide guidance for staff and the development
community regarding design and construction of storm water capture and treatment devices in
compliance with stormwater requirements.
Project Justification
The City is required to follow guidelines for stormwater design, construction, and management
dictated by the Regional Water Quality Control Board. The City does not have a set of specifications
that are up to date or in conformance with the current Board permit requirements. Having clear and
concise specifications is a requirement by the State, and which the City has recently received Notice
of Violations by the State in part related to the lack of stormwater specifications. Stormwater
specifications will ensure compliance with State requirements, satisfy the existing Notice of Violations,
and prevent penalties or future Notice of Violation from the Regional Board on this item.
Master Planning Documents
This project supports the 2022 Storm Drainage System Master Plan.
281DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900250)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Consulting $76,000 $76,000
Salaries/Wages $13,200 $13,200
Total $89,200 $89,200
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $89,200 $89,200
Total $89,200 $89,200
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
There are no operational costs associated with this project.
282DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
Update to the City’s Trails
Master Plan (Bike Master
Plan)
Project No. 900260
Category Engineering: Master Plans Department Public Works: Engineering
Project Type Studies & Reports Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
This project would update the City’s Trails Master Plan using a consultant specializing in bike and
pedestrian planning. The Master Plan would be updated to match the City’s current bicycle
infrastructure, review gaps in the bike network, recommend system upgrades, evaluate the network
for enhancements or modifications, and recommend alternate routes for those no longer safe or
reasonable. The plan would evaluate bike best practices/systems and make recommendations for
enhancements. The plan would also identify at least ten high priority projects that would be
individually chartered and estimated for future grant or CIP funding consideration. Input would be
obtained from the community through a series of community outreach meetings, and through the
City’s website.
Project Justification
Typically, bike Master Plans should be updated every five to ten years. The 2005 Trails Master Plan
is in need of update. This would keep the City up to date on current bike trends and other safety
considerations. This update would meet a number of high priority goals identified by the City’s Bicycle
and Pedestrian Commission (BPC). The City was also recently recognized as a Bronze Bicycle
Friendly Community. Upgrading the Master Plan would be in line with that honor. The Trails Master
Plan is 18 years old and should have been updated at least five to ten years ago. This project should
be a priority in the next one to two years.
Master Planning Documents
This project would update the City’s current Trails Master Plan (Bike Master Plan).
283DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900260)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Consulting $332,000 $332,000
Salaries/Wages $51,700 $51,700
Total $383,700 $383,700
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $383,700 $383,700
Total $383,700 $383,700
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Advertisement Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
There are no operational costs associated with this project.
284DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Development of a
Pedestrian Master Plan Project No. 900270
Category Engineering: Master Plans Department Public Works: Engineering
Project Type Studies & Reports Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
This project would develop a Pedestrian Master Plan using a consultant specializing in pedestrian
and accessible planning. It would define pedestrian standards for the City including sidewalk widths;
high-priority pedestrian zones or paths of travel; right-of-way zones including furniture, walkway, and
sidewalk seating for the Downtown; and identify pedestrian needs throughout the community. It could
also include Safe Routes to School improvements. The plan would evaluate best practices, make
recommendations for enhancements, and identify at least ten high-priority projects which would be
individually chartered and estimated for future grant or CIP funding consideration. Input would be
obtained from residents through a series of public outreach meetings and through the City’s website.
Project Justification
The City currently has a Trails (and Bike) Master Plan but not a pedestrian-specific master plan. In
cases where pedestrian and bicycle needs are combined into one document, the emphasis is usually
towards bicycle improvements. The Trails Master Plan is almost silent to the needs of pedestrians
and does not include sidewalk or pathway information. Creating this Master Plan would also meet a
number of high-priority goals identified by the City’s Bicycle and Pedestrian Commission (BPC).
Master Planning Documents
This project would create a Pedestrian Master Plan, which the City does not currently have. The
Pedestrian Master Plan could be developed in conjunction with the Bicycle Master Plan.
285DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900270)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Consulting $494,000 $494,000
Salaries/Wages $44,000 $44,000
Total $538,000 $538,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $538,000 $538,000
Total $538,000 $538,000
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
There are no operational costs associated with this project.
286DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
Update to the City’s Standard
Drawings/Specifications/
Design Standards
Project No. 900280
Category Engineering: Standard
Drawings & Specs Department Public Works: Engineering
Project Type Studies & Reports Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
This project would update the City’s Standard Drawings, Engineering Specifications, and Engineering
Design Standards to current industry standard practices. This would be done through the use of a
consultant hired through an RFP process.
Project Justification
It’s important to keep up to date on current engineering standards and best practices. The current
City Standard Details and specifications were recently updated in 2014. The City’s specifications are
inadequate for a city the size of Gilroy, which needs a full set of Engineering Design Specifications
and Design Standards that meet current industry standards and addresses emerging issues and
requirements. In addition, the City’s current Standard Details, although recently updated, are still
outdated. There is a need to reevaluate the way improvements are constructed in the City’s right-of-
way, and to develop comprehensive standards and guidance documents to direct the construction of
future improvements.
Master Planning Documents
This project supports the City’s General Plan and Water System, Sewer System, Storm Drainage
System, Trails, and Parks Master Plans by providing for properly-designed public infrastructure.
287DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900280)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Consulting $105,700 $105,700
Salaries/Wages $9,000 $9,000
Total $114,700 $114,700
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $114,700 $114,700
Total $114,700 $114,700
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
There are no operational costs associated with this project.
288DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Development of an ADA
Transition Plan Project No. 900290
Category Engineering: Plans &
Programs Department Public Works: Engineering
Project Type Studies & Reports Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
This project would develop an ADA Transition Plan for the City of Gilroy. An ADA Transition Plan
details a program that will bring a city’s programs, procedures, practices, facilities, sidewalks and curb
ramps into compliance with Americans with Disabilities Act (ADA) requirements. The plan would be
developed with the help of a consultant that specializes in this area of expertise.
Project Justification
The Americans with Disabilities Act (ADA) of 1990 provides comprehensive civil rights protections to
qualified individuals with disabilities in the areas of employment, public accommodations, State and
Local government services and telecommunications. Cities are required to have an ADA Transition
Plan. The Transition Plan will be developed with input from community members and is intended to
ensure access to City facilities, programs and services. Items identified in the ADA Transition Plan
will be incorporated into all applicable Capital Improvement Projects. The plan will require ADA
assessment of City facilities and buildings, as well as City infrastructure in the public right-of-way.
Master Planning Documents
This project supports the City’s Traffic Circulation Master Plan by providing safe and well-maintained
access for disabled persons.
289DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900290)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Consulting $222,000 $222,000
Salaries/Wages $18,000 $18,000
Total $240,000 $240,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $240,000 $240,000
Total $240,000 $240,000
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
There are no operational costs associated with this project.
290DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name ADA Assessment – City
Facilities Citywide Project No. 900360
Category Facilities: Buildings Department Facilities
Project Type Studies & Reports Project Manager Facilities Manager
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
The City owns facilities with restrooms, entry doors, walkways, etc. that do not comply with the
Americans with Disabilities Act (ADA). This project involves hiring a consultant to thoroughly analyze
City facilities for ADA compliance. The results of the analysis would be summarized in a report and
would include recommendations for developing a scope of work for improvements which would be
completed by a contractor.
Project Justification
This project would make City facilities more accessible for people with disabilities, and it would bring
the City into compliance with ADA requirements.
Master Planning Documents
This project is not listed in any master plan.
https://www.ada.gov/2010AD
Astandards_index.htm
291DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900360)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Consulting $127,000 $127,000
Salaries/Wages $6,600 $6,600
Total $133,600 $133,600
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $133,600 $133,600
Total $133,600 $133,600
Financial Comments
This project is currently unfunded. The cost to bring the deficient buildings up to ADA compliance
would be determined based on the deficiencies identified thorough the study.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
There are no operational costs associated with this project.
292DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Christmas Hill Ranch Site
Master Planning Project No. 900650
Category Parks and Trails: Master Plans Department Public Works: Parks
Project Type Studies & Reports Project Manager Deputy Director Public Works
Council Priorities Maintain and Improve
City Infrastructure Location 7049 and 7050 Miller Avenue
Project Description and Purpose
This project would update and complete the Master Plan for the Christmas Hill Park complex, which is
outdated. The update would include the Ranch Site, the Hillside addition, and the Uvas Creek
channel. Due to the complex interrelations with varying use and need areas, this project is needed as
soon as possible to guide actions which will have lasting impacts on health, safety, environmental
protection, and best public benefits. Proper time should be allowed to complete the plan adequately,
suggesting a multi-year schedule to coordinate with planning experts, City departments, state
agencies and the public.
Project Justification
There is an old Master Plan for Christmas Hill Park, but significant additions and improvements have
been made without updating the plan. The important adjacent interrelation with the Uvas Creek
channel and wildlife habitat should be explored and properly planned with regard to their unique
needs and opportunities. Important decisions are required related to restrooms, demolition of out of
date and dilapidated facilities, preservation of historic features, addition of barbecue areas, upgraded
trail planning, and adequate lighting. As the focal point of the Gilroy Garlic Festival, and adjacent to a
protected fishery, master planning this area is imperative to assure public needs are met while
protecting the environment and preserving historic resources.
Master Planning Documents
There have been significant additions and improvements done at Christmas Hill Park that are not
included in the master plan. Miller Ave Uvas Creek
Christmas Hill Park
Christmas Hill Park
Ranch Site
Uvas Park Dr
293DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900650)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Consulting $506,323 $506,323
Salaries/Wages $49,500 $49,500
Total $555,823 $555,823
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $555,823 $555,823
Total $555,823 $555,823
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
This project will not generate operational costs and will inform additional capital development in the
future.
294DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Farrell Park Facility
Master Planning Project No. 900660
Category Parks and Trails: Master Plans Department Public Works: Parks
Project Type Studies & Reports Project Manager Deputy Director Public Works
Council Priorities Maintain and Improve
City Infrastructure Location Wren Avenue and
Vickery Lane
Project Description and Purpose
This project would complete the conceptual master planning and cost estimating for this under-
utilized and underdeveloped neighborhood park at the corner of Wren Avenue and Vickery Lane.
Project Justification
The Farrell Park Site, dedicated and built by a developer a few years ago as an open space, is
currently not developed as a full use neighborhood park. Open turf was the interim use plan during
the recession. A Master Plan will provide a structure to move forward on constructing park
improvements and provide shovel ready plans for grant competition and state park funding
opportunities. The project will investigate the needs of the community and assess City park
organization documents to best meet the needs of the City and surrounding neighborhoods.
Master Planning Documents
The project provides a safe and well-maintained park which is the focus of the Parks Master Plan.
This neighborhood park site has been pending master plan guidance since acquisition in 2004.
295DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900660)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Consulting $266,000 $266,000
Salaries/Wages $40,700 $40,700
Total $306,700 $306,700
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $306,700 $306,700
Total $306,700 $306,700
Financial Comments
This project is currently unfunded.
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
There will be no operational costs as a result of the plan. However, when capital development of the
site is completed there will be the need for contract additions with a landscape maintenance
contractor and additional work load for Parks staff.
296DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
Uvas Creek Staging and
Neighborhood Park
Master Planning
Project No. 900670
Category Parks and Trails: Master Plans Department Public Works: Parks
Project Type Studies & Reports Project Manager Deputy Director Public Works
Council Priorities Maintain and Improve
City Infrastructure Location DeBell Uvas Creek Park
Preserve/Christmas Hill Park
Project Description and Purpose
This project would complete the Park Master Plan and conceptual construction cost estimating for
both a neighborhood serving park and public access for nearby DeBell Uvas Creek Park Preserve
and related Class I bicycle pathways. The site is located at the northwest corner of Uvas Park drive
and Miller Avenue.
Project Justification
A fully vetted park master planning process with significant community outreach is needed for this
five-acre park parcel which has been held since 2001. This neighborhood park site directly joins the
Uvas Creek channel and DeBell Uvas Creek Park Preserve. The City’s intent in acquiring this parcel
was to provide both a needed neighborhood park to nearby residents and a complementary park
preserve access point with destination park amenities (e.g., parking lot and restrooms). Completing a
site master plan and the required CEQA process will greatly help if and when the City competes for
grant funding opportunities. Proper and early planning of the future improvements of this park in
advance of any potential public pressure to complete the improvements will help avoid haphazard
park development. This park planning step will at a minimum ensure that the City Council strategic
goals and public needs are clear and are followed into the design and development stage.
Master Planning Documents
This project is listed in the Parks Master Plan.
297DRAFT
Back to Charter Table of Contents
CITY OF GILROY UNFUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900670)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Consulting $314,000 $314,000
Salaries/Wages $49,500 $49,500
Total $363,500 $363,500
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Unfunded $363,500 $363,500
Total $363,500 $363,500
Financial Comments
This project is currently unfunded. Future funding could come from impact fees, state park
development grants, and matching funds from the General Fund (100).
Estimated Project Schedule
Project Phase Timeline
Project Design Beyond FY28
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
There are no operational costs related to the development of the Master Plan for this site. Once
physical improvements are constructed on the site, there will be operational and maintenance costs.
The extent of such costs will depend upon the results of the Master Plan.
298DRAFT
Back to Charter Table of Contents
Appendix E – Miscellaneous Funded CIP Projects (Within 5‐Year CIP)
299DRAFT
Back to Main Table of Contents
This page intentionally left blank
300DRAFT
Back to Main Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Annual Signal/Street Light
Maintenance Project No. 800340
Category Streets: Traffic Signals Department Public Works: Engineering
Project Type Rehabilitation Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
The purpose of this project is to maintain the City’s current inventory of traffic signals and street lights.
Project Justification
Currently, the City owns and maintains 33 traffic signals and 4,757 streetlights. In addition, the City
also maintains 11 traffic signals owned by Caltrans. Both the traffic signal and streetlight systems
require regular maintenance that includes, but is not limited to:
•Monthly Routine Maintenance
•Three-Month Routine Maintenance
•Six-Month Routine Maintenance
•Annual Routine Maintenance
The Public Works Department does not have a functional unit dedicated to regular and emergency
traffic signal and streetlight maintenance. The Department fulfills this need with the help of a
specialized maintenance contractor.
Master Planning Documents
This project supports the goals of the City’s Traffic Circulation Master Plan.
301DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800340)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Traffic Signal
Maintenance $116,520 $122,346 $128,463 $134,886 $141,631 $643,846
Street Light
Maintenance $100,000 $105,000 $110,250 $115,763 $121,551 $552,564
USA Markings $100,000 $105,000 $110,250 $115,763 $121,551 $552,564
Additional
Services $5,000 $5,250 $5,513 $5,788 $6,078 $27,629
Total $321,520 $337,596 $354,476 $372,200 $390,810 $1,776,602
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Gas Taxes (205) $321,520 $337,596 $354,476 $372,200 $390,810 $1,776,602
Total $321,520 $337,596 $354,476 $372,200 $390,810 $1,776,602
Financial Comments
This project will be funded by the Gas Taxes Fund (205).
Estimated Project Schedule
Project Phase Timeline
Streetlight, Signal Maintenance
and USA Markings Annually
Ongoing Operational Cost Impact
There could be potential reductions in emergency maintenance costs because of proper signal
upkeep as a result of this project.
302DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Cohansey Avenue/Terri Court
Storm Drain Improvements Project No. 800430
Category Storm Drain: Storm Collection Department Public Works: Engineering
Project Type New Project Manager CIP Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Cohansey Avenue and
Terri Court
Project Description and Purpose
This project will address storm runoff issues at the intersection of Cohansey Avenue and Terri Court.
The drainage problems arise from a combination of the following factors:
1.Lack of adequate City drainage system in the vicinity of the property
2.Major land release from surrounding properties along Terri Court and other land uses, primarily
agricultural
3.Increased 100-year frequency storms and saturated ground
Project Justification
In the past few years, the property owner at 655 Cohansey Avenue has submitted several requests to
the City Public Works, Operations Division to address flooding issues. This property sits at the edge
of City and County boundary. In the past, City forces (and at times County maintenance crews) have
performed minor ditch grading and debris cleanup effort which has addressed the problem to a
certain extent. However, detailed analysis of the problem needs to be conducted and design plans
developed to identify a more sustainable solution.
Master Planning Documents
This project is not included in the 2023 Storm Drainage System Master Plan.
303DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800430)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $25,322 $25,322
CEQA $1,277 $1,277
Construction
Con. Support
Total $26,599 $26,599
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Storm Drain
Development
Impact (410)
$26,599 $26,599
Total $26,599 $26,599
Financial Comments
This project is funded by the Storm Drain Development Impact Fund (410).
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement Beyond FY28
Project Construction Beyond FY28
Project Completion Beyond FY28
Ongoing Operational Cost Impact
The operational costs associated with this project would be nominal.
304DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
State Trash Amendments
Stormwater Compliance
Project
Project No. 800460
Category Engineering: Stormwater
Compliance Department Public Works: Engineering
Project Type New Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
On April 7, 2015, the State Water Resources Control Board (SWRCB) adopted the Statewide Trash
Provisions which address the impacts trash has on the beneficial uses of surface waters. The Trash
Provisions establish a statewide water quality objective for trash and a prohibition of trash discharge. The
City is required to demonstrate full compliance with the Trash Provisions by 2030, with preliminary
milestones of 35% by 2026 and 70% by 2028. The City will complete this project as required under the
State-Issued Trash Amendments and upcoming reissued NPDES Permit (anticipated in 2024). The
proposed project will ultimately include all expenses related to compliance with the Trash Amendments.
The tasks necessary to achieve compliance will include resources to ground-truth the infrastructure shown
in stormwater maps, design, installation, and long-term maintenance of full trash capture devices. The
design and installation of the trash capture devices will be conducted by an outside contractor.
Project Justification
Full compliance with the Trash Provisions will require the City to install, operate, and maintain State-
certified Full Capture System (FCS) devices that capture all trash down to five millimeters in size from
Priority Land Use areas (PLUs) which include Commercial, Mixed Use, Industrial, High Density
Residential, and Transit Oriented Areas.
Master Planning Documents
This project supports the City’s General Plan and Storm Drain Master Plan to the extent the proposed
systems provide increased capacity. Flood control, drainage, and water quality mitigation measures are
included in the City’s General Plan Environmental Impact Report (EIR).
Uvas Creek
Image Source:
hhttps://swims
clean.com/stor
mtek/
Image Source:
https://www.en
viropod.com/en-
us/products/litta
trap
305DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800460)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design/Const. $118,800 $118,800 $237,600 $470,737 $10,000 $2,344,063 $3,300,000
Total $118,800 $118,800 $237,600 $470,737 $10,000 $2,344,063 $3,300,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Storm Drain
Development
Impact Fee (410)
$118,800 $118,800 $237,600 $470,737 $10,000 $955,937
Unfunded $2,344,063 $2,344,063
Total $118,800 $118,800 $237,600 $470,737 $10,000 $2,344,063 $3,300,000
Financial Comments
A Trash Amendments Cost Analysis was completed in FY23. The City will have until the year 2030 to
reach full compliance with the Trash Amendments. To reach the 70% compliance milestone by 2028,
$1,683,000 in funding would be required. An additional $1,617,000 would be needed to reach the
100% milestone by 2030. However, only $955,937 in funding has been identified for FY24 through
FY28. As a result, $727,063 of project costs are unfunded for FY27 and FY28. In addition,
$1,617,000 in project costs are unfunded beyond FY28.
These cost s do not include the operation and maintenance costs for long -term maintenance of the
installed devices.
There is potential for alternative compliance options to help meet these requirements. These
alternative options allow for flexibility in the compliance milestones where funding may be distributed
differently amongst the years, depending on how the City decides to comply.
Estimated Project Schedule
Project Phase Timeline
Project Design FY24 – FY28
Project Advertisement FY24 – FY28
Project Construction FY25 – FY30
Project Completion FY30
Ongoing Operational Cost Impact
Based on the Trash Amendment Cost Analysis, the anticipated operational and maintenance costs
associated with this project are approximately $49,725,000 for in-house staff. Beyond five years, the
ongoing costs may be approximately $47,775,000. This includes the rental of a vac truck at
$500/hour. Not included is an estimated cost to purchase a street sweeper to help keep the trash
capture devices clean. A street sweeper is between $50 ,000 to $100,000, depending on the truck
selected. A street sweeper will help decrease maintenance needed on the trash capture devices by
removing leaves and sediment debris on-land before entering the trash capture devices.
306DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Stormwater NPDES
Compliance Project No. 800470
Category Engineering: Stormwater
Compliance Department Public Works: Engineering
Project Type Studies & Reports Project Manager City Engineer
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
This project involves preparing the plans and studies required for compliance under the National
Pollutant Discharge Elimination System (NPDES) Program. The work will include receiving water
monitoring, outfall water monitoring, dry weather illicit discharge water monitoring, and microbial
source tracking. In addition, the project will include construction inspection support, GIS mapping, and
public outreach materials. It will also include completion of Water Quality Monitoring Reports, Total
Maximum Daily Load (TMDL) Status Updates, and Geodatabase updates for Annual State Reporting.
These efforts are based on the current NPDES Permit. A new permit is anticipated to become
effective in 2024. It is currently anticipated that the new permit will build on existing provisions and
programs, as well as include new significant provisions. The new permit will require new resources to
implement that are not included here.
Project Justification
The project is proposed for City compliance with the requirements of the City’s Phase II National
Pollutant Discharge Elimination System (NPDES) Stormwater Permit. This project will be ongoing into
perpetuity. Costs will change over time as new requirements are introduced by the State/Regional
Water Board.
Master Planning Documents
This project is not listed in any master plan document, but provides for flood control, drainage, and
water quality mitigation measures that are included in the City’s General Plan Environmental Impact
Report (EIR).
Source: EPA NPDES Permit Writer’s Manual
307DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800470)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Water Monitoring
Requirements $299,700 $47,826 $72,538 $48,617 $75,505 $49,455 $78,649 $672,290
Post Construction
Requirements $124,600 $8,747 $9,010 $27,500 $27,500 $27,500 $27,500 $252,357
State Trash
Compliance
GIS, Discharge,
Outreach, Inspect $202,700 $28,522 $29,130 $29,756 $30,402 $31,066 $31,750 $383,326
Salaries/Wages $7,000 $1,333 $1,333 $1,333 $1,333 $1,333 $1,333 $14,998
Total $634,000 $86,428 $112,011 $107,206 $134,740 $109,354 $139,232 $1,322,971
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
General Fund -
Environmental
Programs (100-
2404)
$60,000 $60,000
Storm Drain
Impact (410) $514,000 $86,428 $112,011 $107,206 $134,740 $109,354 $139,232 $1,202,971
General Fund –
Engineering (100-
2601)
$60,000 $60,000
Total $634,000 $86,428 $112,011 $107,206 $134,740 $109,354 $139,232 $1,322,971
Financial Comments
The project cost estimate is for Contract Services through 2028. The costs shown are for contract
services only (Plans and Studies) and do not include costs for other resources required to run the
Stormwater Program. State Trash Compliance is shown in the table with no cost estimate because
the City is submitting a separate Charter specific for Trash Compliance. The costs shown also do not
reflect charge rate increases anticipated to occur over time or costs for new permit requirements.
Estimated Project Schedule
Project Phase Timeline
Project Design N/A
Project Advertisement N/A
Project Construction N/A
Project Completion N/A
Ongoing Operational Cost Impact
There are no operational costs associated with this project.
308DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name
Electrical Panel Evaluation
Corporation Yard for OSHA
Requirements
Project No. 900460
Category Facilities: Building Systems Department Facilities
Project Type Studies and Reports Project Manager Facilities Manager
Council Priorities Maintain and Improve
City Infrastructure Location Corporation Yard
Project Description and Purpose
This project would involve hiring a consultant to assign an arc rating to all electrical panels at the
Corporation Yard and provide recommendations for Personal Protective Equipment (PPE).
Project Justification
The Occupational Safety and Health Administration (OSHA) requires electrical panels to be given an
arc flash rating that dictates the level of PPE needed to work safely on the panels. This project is
needed to as a first step towards meeting CalOSHA requirements for electrical panel safety and will
inform the City of th e level of PPE needed to safeguard employees. This is a safety issue.
Master Planning Documents
This project is not listed in any master plan document.
Photo Credit: "Electrical-Panel_Automatic -Fuses_DIN-Rail__4061IMG_1843" by Public Domain Photos is licensed under CC BY 2.0
309DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900460)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $2,200 $2,200
Construction $39,000 $39,000
Con. Support $3,300 $3,300
Total $44,500 $44,500
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Facilities (615) $44,500 $44,500
Total $44,500 $44,500
Financial Comments
This project will be funded by the Facilities Fund (615).
Estimated Project Schedule
Project Phase Timeline
Project Study FY23
Project Advertisement N/A
Project Construction FY24
Project Completion FY24
Ongoing Operational Cost Impact
One-time purchase cost of PPE and equipment. There will be a nominal operational cost thereafter.
310DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Senior Center
ADA Restroom Access Project No. 900520
Category Facilities: Building Systems Department Facilities
Project Type Rehabilitation Project Manager Facilities Manager
Council Priorities Maintain and Improve
City Infrastructure Location 7371 Hanna Street
Project Description and Purpose
This project would install self-opening restroom doors to the men’s and women’s restrooms in the
Gilroy Senior Center building. The current restroom doors have door handles that must be tightly
grasped and pulled open. A large number of Senior Center participants have challenges with mobility
and have expressed their difficulties with opening the restroom doors while simultaneously navigating
their use of a walker, cane, scooter, or wheelchair. The project would include installation of square
handicap push plates, consistent with the main entrance doors to the Senior Center.
Project Justification
Although the interiors of the restrooms are ADA accessible, as well as the Senior Center entry, the
restroom entries are not. To provide physical access to the Senior Center restrooms, there needs to
be the installation of self-opening restroom entry doors. Title III of the ADA requires public places, like
hotels, retailers, doctor's offices, and restaurants, to have handicap accessible facilities.
Master Planning Documents
This project is not listed in a master plan document.
311DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900520)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design $16,000 $16,000
Construction $55,100 $55,100
Total $71,100 $71,100
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Facilities (615) $71,100 $71,100
Total $71,100 $71,100
Financial Comments
This project will be funded by the Facilities Fund (615).
Estimated Project Schedule
Project Phase Timeline
Project Design FY27
Project Advertisement FY27
Project Construction FY27
Project Completion FY27
Ongoing Operational Cost Impact
There are no maintenance costs associated with this project.
312DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Citywide Energy Saving
Measures Project No. FC2404
Category Facilities: Specialized
Facilities Department Facilities
Project Type New Project Manager Facilities Manager
Council Priorities Maintain and Improve
City Infrastructure Location Citywide
Project Description and Purpose
To save energy and incorporate Green Energy Practices, the City is moving forward with Energy
Conservation Measures (ECM) such as HVAC control upgrades, HVAC refurbishments and
equipment replacement, duct sealing, heat pump installations, lighting upgrades, and transformer
replacements. These ECM projects and will save the City millions of dollars over the life of the
projects, while reducing the City’s energy consumption. This project will be implemented and financed
through PG&E’s On-Bill Financing (OBF) program.
The selected locations for the ECM projects include the Police Department, Chestnut Fire Station,
Las Animas Fire Station, Sunrise Fire Station, Senior Center, Wheeler Auditorium, Corporation Yard,
Gilroy Museum, City Hall, City Hall Annex, and other locations throughout the City.
Project Justification
This project will reduce energy consumption across City owned infrastructure, reduce the City’s
ongoing utility and operational costs, reduce overall City greenhouse gas emissions, upgrade aging
infrastructure by improving efficiencies of existing equipment and systems, and create safer and more
comfortable conditions for City staff and the general public.
Master Planning Documents
This project is not listed in any master plan document.
313DRAFT
Back to Charter Table of Contents
CITY OF GILROY FUNDED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (FC2404)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Design
Construction $3,685,718 $3,685,718
Con. Support
Total $3,685,718 $3,685,718
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Equipment Outlay
(625) $3,685,718 $3,685,718
Total $3,685,718 $3,685,718
Financial Comments
The City would pay the contractor an upfront cost of $3,685,718. This project would initially be funded
from the Equipment Outlay Fund (625) and reimbursed the following year through the On-Bill
Financing Program with PG&E.
Estimated Project Schedule
Project Phase Timeline
Project Design FY24
Project Advertisement FY24
Project Construction FY24
Project Completion FY24
Ongoing Operational Cost Impact
The ongoing operational cost impacts of this project would be nominal.
314DRAFT
Back to Charter Table of Contents
Appendix F – Completed CIP Projects
315DRAFT
Back to Main Table of Contents
This page intentionally left blank
316DRAFT
Back to Main Table of Contents
CITY OF GILROY COMPLETED
2021-2025 CAPITAL IMPROVEMENT PROGRAM
Project Name Eigleberry and Seventh
Parking Lot Project No. 800090
Category Facilities: Parking Lots Department Public Works: Facilities
Project Type New Project Manager Sr. CIP Engineer
Council Priorities Revitalize Downtown Location NE Corner of Eigleberry
Street and Seventh Street
Project Description and Purpose
This project would construct a surface parking lot at the northeast corner of Eigleberry Street and
Seventh Street. The scope of work would include removal of the existing community garden area,
which is proposed to be relocated to Christmas Hill Park, and construction of grading, drainage,
paving, sidewalk, landscaping, and decorative post-top lighting improvements.
Project Justification
The City owns several surface parking lots in the Downtown. However, the parking supply in the
existing lots is not sufficient to address the parking demand created by the residential and commercial
land uses in the Downtown. The Downtown Gilroy Business Association (GDBA) completed an
informal Downtown Parking Assessment in 2019. One of the assessment’s findings was that there is
a shortage of parking in the Downtown to support the existing and growing businesses in the area.
This site was identified as a potential site for an additional Downtown surface parking lot and would
enhance the economic development potential in the Downtown which is a City Council Priority.
Master Planning Documents
This project is supportive of the City’s General Plan, which places a high priority on the Downtown
and sets forth a variety of policies to support that position. The General Plan aims to provide
comprehensive direction for the area’s physical design and development, addressing issues such as
land use, circulation, parking, economic development, urban design, historic preservation, and public
facilities. The Downtown Specific Plan, completed in 2005, also calls for increased parking in the
Downtown as well as a comprehensive Parking Management Plan.
Monterey St
Project Site
Eigleberry St COMPLETED317DRAFT
Back to Charter Table of Contents
CITY OF GILROY COMPLETED
2021-2025 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800090)
Project Costs Total
Prior FY21 FY22 FY23 FY24 FY25 Beyond 5
Years Project Total
Design $205,138 $205,138
CEQA $36,258 $36,258
Construction $1,098,604 $1,098,604
Con. Support $85,000 $85,000
Permitting Fees $75,000 $75,000
Total $1,500,000 $1,500,000
Funding
Source
Total
Prior FY21 FY22 FY23 FY24 FY25 Beyond 5
Years Project Total
Capital Projects
Fund (400) $1,500,000 $1,500,000
Total $1,500,000 $1,500,000
Financial Comments
In fall 2019, the City Council allocated $1.5M towards the construction of this project.
Estimated Project Schedule
Project Phase Timeline
Project Design FY21
Project Advertisement FY21
Project Construction FY21
Project Completion FY21
Ongoing Operational Cost Impact
The operational costs associated with this project would be nominal. Maintenance costs include
pavement, striping, and stormwater facility maintenance. It is estimated that pavement crack sealing
would cost approximately $10,000 every four years and stormwater facility maintenance could cost
approximately $30,000 per year for three years. COMPLETED318DRAFT
Back to Charter Table of Contents
CITY OF GILROY COMPLETED
2021-2025 CAPITAL IMPROVEMENT PROGRAM
Project Name City Hall Backup Generator* Project No. 800140
Category Facilities: Building Systems Department Public Works: Facilities
Project Type Modification Project Manager Facilities Manager
Council Priorities Enhance Public Safety
Capabilities Location 7351 Rosanna Street
Project Description and Purpose
This project would provide a means for backup power for City Hall in the event of a power outage.
The Police Station has an oversized backup generator. This project would provide a connection from
the Police Department’s existing generator to the City Hall panel so that both buildings would be
functional during a power outage. The design for this project is currently underway.
Project Justification
This project would enable City Hall to remain functional during power outages. This is especially
important due to the growing threat of extreme weather and wildfires. In September 2019, PG&E
published their Public Safety Power Shutoff Policies and Procedures for turning off power when gusty
winds and dry conditions, combined with increased fire risks, threaten a portion of the electric system.
PG&E estimates that these Public Safety Power Shutoffs could occur several times per year.
This project will enable City staff to continue to provide customer service and perform other job
functions instead of closing City Hall and sending employees home when the power goes out. An
extended power outage at City Hall could also impact operations at the Emergency Operations
Center (EOC). The City’s servers are located in City Hall and these servers have a limited amount of
backup power. Loss of the servers would significantly impact operations in the EOC. As a result, this
project would also enhance safety for the community.
Master Planning Documents
This project is not specifically listed in any master plan document.
*This project is included in project 900570 - Civic Center Master Project
Photo Credit: "Generators" by Tim Dorr is licensed under CC COMPLETED319DRAFT
Back to Charter Table of Contents
CITY OF GILROY COMPLETED
2021-2025 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800140)
Project Costs Total
Prior FY21 FY22 FY23 FY24 FY25 Beyond 5
Years Project Total
Design $90,000 $90,000
CEQA $5,000 $5,000
Construction $385,000 $385,000
Con. Support $29,700 $29,700
Total $95,000 $414,700 $509,700
Funding
Source
Total
Prior FY21 FY22 FY23 FY24 FY25 Beyond 5
Years Project Total
Facilities Service
Fund (651) $95,000 $414,700 $509,700
Total $95,000 $414,700 $509,700
Financial Comments
This project design is underway and expected to be completed under an existing contract.
Construction for this project will be funded through the Facilities Service Fund (651).
Estimated Project Schedule
Project Phase Timeline
Project Design FY21
Project Advertisement FY21
Project Construction FY21
Project Completion FY21
Ongoing Operational Cost Impact
There are no anticipated operational costs associated with this project. There may be minor
maintenance costs associated with the new panel connection at City Hall. COMPLETED320DRAFT
Back to Charter Table of Contents
CITY OF GILROY COMPLETED
2021-2025 CAPITAL IMPROVEMENT PROGRAM
Project Name Corp Yard Fuel Tank Repair Project No. 800150
Category Facilities: Specialized Facilities Department Public Works: Facilities
Project Type Replacement Project Manager Sr. CIP Engineer
Council Priorities Enhance Public Safety
Capabilities Location 613 Old Gilroy Street
Project Description and Purpose
The City of Gilroy’s fuel station, located at the Corporation Yard, underwent Secondary Containment
Testing per SB 989 in August of 2017. The results of this test indicated that these secondary
containment systems did not pass. The purpose of this project is to replace the components of this
system that have failed. This project would install and replace two underground dispenser pans,
fiberglass piping, spill buckets, and a new manway.
Project Justification
These tests are done to ensure that if the primary fuel containment unit fails, the secondary
containment can assist with reducing leakage until the primary unit is fixed. This test is conducted
after installation of new systems, six months after installation of new systems, and at least once every
thirty-six months. The fuel station located at the Corporation Yard was last tested in August of 2017
and failed. These repairs are necessary to meet State Water Board and Environmental regulations.
Per State regulations, this fuel station will be due for another test by the end August 2020. These
repairs are vital to meet regulations and to ensure that if there is a failure in the primary containment
unit that the City will have all measures in place to reduce the chance of leaks and contamination.
Master Planning Documents
This project is not specifically listed in any master plan document.
US 101 Old Gilroy St Corp Yard Fuel Tank
321DRAFTCOMPLETED
Back to Charter Table of Contents
CITY OF GILROY COMPLETED
2021-2025 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800150)
Project Costs Total
Prior FY21 FY22 FY23 FY24 FY25 Beyond 5
Years Project Total
Pre-Design $1,100 $1,100
Design $46,925 $46,925
CEQA $1,100 $1,100
Construction $165,000 $165,000
Con. Support $26,400 $26,400
Total $240,525 $240,525
Funding
Source
Total
Prior FY21 FY22 FY23 FY24 FY25 Beyond 5
Years Project Total
Fleet Fund (600) $240,525 $240,525
Total $240,525 $240,525
Financial Comments
The design and construction of this project will be funded using the Fleet Fund (600).
Estimated Project Schedule
Project Phase Timeline
Project Design FY21
Project Advertisement FY21
Project Construction FY21
Project Completion FY21
Ongoing Operational Cost Impact
Operational expenses will continue to be $1,500 every thirty-six months for required SB989 testing.
322DRAFTCOMPLETED
Back to Charter Table of Contents
CITY OF GILROY COMPLETED
2021-2025 CAPITAL IMPROVEMENT PROGRAM
Project Name Citywide Regulatory Sign
Replacement Project No. 800170
Category Streets: Signage Department Public Works: Engineering
Project Type Replacement Project Manager City Transportation Engineer
Council Priorities Enhance Public Safety
Capabilities Location Citywide
Project Description and Purpose
This project would upgrade the City’s inventory of regulatory traffic signs. In 2018, Council approved a
contract to evaluate the compliance of approximately 6,700 regulatory traffic signs throughout the
City. Approximately 2,700 signs (40% of the entire inventory) were found to be deficient and in need
of replacement.
Project Justification
Regulatory signs inform road users of selected traffic laws or regulations. Retroreflectivity is one of
several factors associated with maintaining adequate nighttime sign visibility. The Manual on Uniform
Traffic Control Devices (MUTCD), issued by the United States Department of Transportation
(USDOT) Federal Highway Administration (FHWA), specifies standards for the design, installation,
and use of traffic signs, road surface markings, and traffic signals. This ensures that traffic control
devices conform to the national standard, which promotes highway safety and efficiency by providing
for the orderly movement of traffic for all road users. The State of California has also developed its
own MUTCD which substantially conforms to the federal MUTCD.
Per Section 2A.08 of the California MUTCD, local agencies are required to establish and implement a
sign assessment and management method to maintain a minimum level of sign retroreflectivity.
Master Planning Documents
This project supports the City’s Traffic Circulation Master Plan by providing a safe and well-
maintained travel way.
Image Source: CA MUTCD, Caltrans COMPLETED323DRAFT
Back to Charter Table of Contents
CITY OF GILROY COMPLETED
2021-2025 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800170)
Project Costs Total
Prior FY21 FY22 FY23 FY24 FY25 Beyond 5
Years Project Total
Design $69,807 $12,100 $81,700
CEQA $1,100 $1,100
Construction $300,000 $550,000
Con. Support $5,500 $11,500
Total $69,807 $318,700 $644,507
Funding
Source
Total
Prior FY21 FY22 FY23 FY24 FY25 Beyond 5
Years Project Total
Vehicle
Registration Fee
Fund (225)
$69,807 $243,700 $569,507
Gas Tax 2106
Fund (210) $55,000 $55,000
Gas Tax 2103
Fund (213) $20,000 $20,000
Total $69,807 $318,700 $644,507
Financial Comments
This project is proposed to be funded by the Vehicle Registration Fee Fund (225), Gas Tax 2106
Fund (210), and Gas Tax 2103 Fund (213).
Estimated Project Schedule
Project Phase Timeline
Phase I Sign Inventory and Condition Rating – Completed in 2018
Phase II High Priority Sign Replacement – FY21
Phase III All Other Non-Compliant Signs – Beyond 5 Years
Ongoing Operational Cost Impact
There are no net new operational costs associated with this project.
$256,000
$256,000
$250,000
$6,000
$256,000 COMPLETED324DRAFT
Back to Charter Table of Contents
CITY OF GILROY COMPLETED
2021-2025 CAPITAL IMPROVEMENT PROGRAM
Project Name Citywide Sidewalk Condition
Assessment Project No. 800200
Category Streets: Curbs & Sidewalks Department Public Works: Engineering
Project Type Rehabilitation Project Manager CIP Engineer
Council Priorities Enhance Public Safety
Capabilities Location Citywide
Project Description and Purpose
The purpose of this project is to develop a Sidewalk Network Management Program that would
include sidewalk and curb ramp data collection, condition rating, and maintenance optimization. Since
1995, the City has conducted a Sidewalk Assessment Program based on data collected by volunteers
that did not necessarily have the proper training and expertise in ADA-compliance review and
quantitative data analysis. This project would supplement the previously collected data and provide
recommended maintenance strategies to allow the City Council to evaluate recommendations and
determine the appropriate level of future investment needed to achieve the desired outcome. Once
completed, this program will function similar to that of the Pavement Management Program.
Project Justification
According to the California Streets and Highways Code, property owners are responsible for the
maintenance and upkeep of the sidewalks fronting their property. In order to create a more walkable
community, the Council has allocated funds in the past to improve the sidewalk network and assist
property owners with ensuring the sidewalks in front of their properties are safe. The previous
investments in sidewalk improvements have been inconsistent. This important City infrastructure
requires a more comprehensive program to enable the evaluation and implementation of sidewalk
improvements throughout the City.
Master Planning Documents
This project is not listed in any master plan document. COMPLETED325DRAFT
Back to Charter Table of Contents
CITY OF GILROY COMPLETED
2021-2025 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800200)
Project Costs Total
Prior FY21 FY22 FY23 FY24 FY25 Beyond 5
Years Project Total
Consulting $125,000 $125,000
Salaries/Wages $20,000 $20,000
Total $145,000 $145,000
Funding
Source
Total
Prior FY21 FY22 FY23 FY24 FY25 Beyond 5
Years Project Total
Gas Tax Fund
2105 (209) $145,000 $145,000
Total $145,000 $145,000
Financial Comments
The data collection cost and system initialization is estimated at $145,000 which is funded in the
FY21 Gas Tax Fund 2105 (209). Under the current sidewalk replacement program, it is
recommended that this project be conducted every 10 years to determine City sidewalk conditions
and level of liability risks associated with defective sidewalks.
Estimated Project Schedule
Project Phase Timeline
Project Design FY21
Project Advertisement FY21
Sidewalk Assessment FY21
Project Completion FY21
Ongoing Operational Cost Impact
There are no net, new operational costs associated with this project. COMPLETED326DRAFT
Back to Charter Table of Contents
CITY OF GILROY COMPLETED
2021-2025 CAPITAL IMPROVEMENT PROGRAM
Project Name Orchard/Tenth Crosswalk
Enhancements Project No. 800210
Category Streets: Traffic Signals Department Public Works: Engineering
Project Type New Project Manager CIP Engineer
Council Priorities Enhance Public Safety
Capabilities Location Tenth Street and
Orchard Drive
Project Description and Purpose
This project would install a Rectangular Rapid Flashing Beacon (RRFB) system at the intersection of
Orchard Drive and Tenth Street. The RRFBs will be installed at the northeast and southeast corners
of the intersection to increase the safety of students crossing the street to attend Gilroy High School.
As part of this project, the existing curb and gutter will be extended to create “bulb-outs”, which are
curb extensions used to narrow the roadway, shorten the pedestrian crossing distance, and provide
additional pedestrian refuge areas at intersections.
Project Justification
This project is needed to increase the safety of pedestrians crossing Tenth Street to reach the high
school. The current pedestrian crossing distance is approximately 80 feet in length. Traffic on
Orchard Drive is controlled by a stop sign and traffic on Tenth Street is uncontrolled. Although drivers
are required by law to yield to pedestrians crossing the street, citizens have expressed concerns of
drivers not yielding to pedestrians at this location. The RRFB system will increase safety by alerting
drivers that pedestrians are crossing the street. The addition of bulb-outs will reduce the pedestrian
crossing distance to approximately 50 feet and will provide a raised concrete pad for installing the
RRFBs, making them more visible to drivers and less likely to be damaged by vehicles.
Master Planning Documents
This project supports the City’s General Plan goals and policies. These goals and policies include
correcting deficiencies and ensuring pedestrian facilities serve the function they are intended to
serve.
RRFB System at Wren Avenue and Byers Street
Uncontrolled Crossing at Orchard Drive and Tenth Street COMPLETED327DRAFT
Back to Charter Table of Contents
CITY OF GILROY COMPLETED
2021-2025 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800210)
Project Costs Total
Prior FY21 FY22 FY23 FY24 FY25 Beyond 5
Years Project Total
Design $9,300 $9,300
Construction $62,700 $62,700
Con. Support $8,000 $8,000
Total $80,000 $80,000
Funding
Source
Total
Prior FY21 FY22 FY23 FY24 FY25 Beyond 5
Years Project Total
Gas Tax Fund
2107 (211) $80,000 $80,000
Total $80,000 $80,000
Financial Comments
This project will be funded with Gas Tax Fund 2107 (211).
Estimated Project Schedule
Project Phase Timeline
Project Design FY21
Project Advertisement FY21
Project Construction FY21
Project Completion FY21
Ongoing Operational Cost Impact
There are minimal ongoing operational costs associated with this project improvements.
Maintenance would be managed through the City’s Street Light and Signal Maintenance Contract. COMPLETED328DRAFT
Back to Charter Table of Contents
CITY OF GILROY COMPLETED
2021-2025 CAPITAL IMPROVEMENT PROGRAM
Project Name Bridge Preventative
Maintenance Program Project No. 800260
Category Streets: Bridges Department Public Works: Engineering
Project Type Rehabilitation Project Manager CIP Engineer
Council Priorities Enhance Public Safety
Capabilities Location Six Bridges at Various
Locations within the City
Project Description and Purpose
In April 2006 Caltrans announced the creation of the Local Assistance Bridge Preventative
Maintenance Program (BPMP). The BPMP program is funded through the Federal Highway
Administration (FHWA) Highway Bridge Program (HBP), which, for the City of Gilroy, is administered
through Caltrans District 4 Local Assistance.
This project includes cleaning and treating bridge decks with High Molecular Weight Methacrylate
(HMWM) at six bridges throughout the City. The project will also include replacing traffic stripes and
pavement markings, and other incidental and appurtenant work necessary for the proper construction
of the improvements.
Project Justification
The purpose of the project is to extend the life of bridges by performing certain qualifying items of
work, classified as “preventative maintenance”, to keep these bridges in structurally good condition
while conserving limited funds for other bridges which may require major rehabilitation or
replacement.
Master Planning Documents
This project is not listed in any master plan document but provides for safe and well-maintained
travel way as identified in the City’s Traffic Circulation Master Plan. COMPLETED329DRAFT
Back to Charter Table of Contents
CITY OF GILROY COMPLETED
2021-2025 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800260)
Project Costs Total Prior FY21 FY22 FY23 FY24 FY25 Beyond 5
Years Project Total
Design $42,072 $42,072
Construction $200,000 $200,000
Con. Support $142,909 $142,909
Total $42,072 $342,909 $384,981
Funding
Source
Total
Prior FY21 FY22 FY23 FY24 FY25 Beyond 5
Years Project Total
Transportation
Grants Fund
(224)
$304,385 $304,385
Gas Tax 2103
Fund (213) $42,072 $38,524 $80,596
Total $42,072 $342,909 $384,981
Financial Comments
A large portion of the Construction and Construction Engineering/Management Services for this
project will be funded through the FHWA’s Highway Bridge Program (88.53%), which will be
reimbursed to the City upon completion of the project. The City’s match (11.47%) to the project is
funded out of Gas Tax Fund 213.
Estimated Project Schedule
Project Phase Timeline
Project Design FY19
Project Advertisement FY20
Project Construction FY21
Project Completion FY21
Ongoing Operational Cost Impact
This project directly addresses maintenance needs. There are no new operational costs associated
with this project. COMPLETED330DRAFT
Back to Charter Table of Contents
CITY OF GILROY COMPLETED
2021-2025 CAPITAL IMPROVEMENT PROGRAM
Project Name Replace Station Alerting
System – All Fire Stations Project No. 800300
Category Facilities: Building Systems Department Fire
Project Type Replacement Project Manager Facilities Manager
Council Priorities Enhance Public Safety
Capabilities Location Chestnut, Las Animas, and
Sunrise Fire Stations
Project Description and Purpose
This project would replace the emergency altering system at the City’s three fire stations:
•Chestnut Fire Station – Chestnut Street/Ninth Street
•Las Animas Fire Station – Wren Avenue/Welburn Avenue
•Sunrise Fire Station – Sunrise Drive East of Comanche Street
Project Justification
The City’s current emergency alerting system is technologically out of date and experiences
consistent failures. Between August 2018 and February 2019, the Las Animas Fire Station alone
experienced over 60 station emergency alert system failures. These failures cause significant delays
in responding to emergencies. Replacing the system with a state of the art system meets the City
Council strategic goals of Enhancing Public Safety Capabilities. A new system will allow the City’s
emergency response personnel to provide improved response capabilities.
The Fire Department contracts with Santa Clara County Communications (SCCC) to repair and
maintain the City’s emergency alerting system. SCCC was able to create a temporary patch to the
system to fix the problem, but this patch cannot be maintained long term.
Master Planning Documents
This project is not listed in any master plan documents. COMPLETED331DRAFT
Back to Charter Table of Contents
CITY OF GILROY COMPLETED
2021-2025 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Fire) (800300)
Project Costs Total
Prior FY21 FY22 FY23 FY24 FY25 Beyond 5
Years Project Total
Design $6,600 $6,600
Construction $291,200 $291,200
Con. Support $2,200 $2,200
Total $300,000 $300,000
Funding
Source
Total
Prior FY21 FY22 FY23 FY24 FY25 Beyond 5
Years Project Total
Equipment Outlay
Fund (605) $300,000 $300,000
Total $300,000 $300,000
Financial Comments
This project is fully funded by the Equipment Outlay Fund (605).
Estimated Project Schedule
Project Phase Timeline
Project Design FY21
Project Advertisement FY21
Project Construction FY21
Project Completion FY21
Ongoing Operational Cost Impact
There is a one-time $40k cost for CAD software interface between Dispatch and the station alerting
system. Starting in year two, there is an ongoing annual maintenance cost of $3,600 for this CAD
interface. COMPLETED332DRAFT
Back to Charter Table of Contents
CITY OF GILROY COMPLETED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Name Gilroy Sports Park
Playground Surface Repair Project No. 800750
Category Parks and Trails: Play Equipment Department Public Works: Parks
Project Type Rehabilitation Project Manager Deputy Director Public Works
Council Priorities Maintain and Improve
City Infrastructure Location 5925 Monterey Frontage Rd
Project Description and Purpose
The State of California Department of Parks and Recreation, Office of Grants and Local Services
(OGALS) allocates funds to cities and counties based on population under Proposition 68. The City
submitted a grant application to OGALS to provide needed repairs at the Gilroy Sports Park. The
project will repair approximately 6,400 square feet of badly damaged recycled rubber playground
surface at the Gilroy Sports Park.
Project Justification
Although all City parks were considered, the Gilroy Sports Park was selected for the application
based on eligibility requirements and other selection criteria including:
•Proximity to critically underserved communities
•Communities with low median household incomes
•High number of people below the poverty level
•Receiving community input in critically underserved communities
•Broad representation of residents (all ages) participating in community outreach efforts
•Solutions for safe public use and park beautification such as landscaping and public art
•Benefit the health and quality of life for youth, seniors, and families
•Mentoring of at-risk youth, senior socialization, and family bonding
Master Planning Documents
This project provides for a well-maintained park which is the focus of the Parks and Recreation
Systems Master Plan. COMPLETED333DRAFT
Back to Charter Table of Contents
CITY OF GILROY COMPLETED
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800750)
Project Costs Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
Pre-Design
Design $21,000 $21,000
Construction $84,000 $84,000
Con. Support
Total $105,000 $105,000
Funding
Source
Total
Prior FY24 FY25 FY26 FY27 FY28 Beyond 5
Years Project Total
General Fund
(100) $105,000 $105,000
Total $105,000 $105,000
Financial Comments
This project will be funded by the General Fund (100). The General Fund will be reimbursed with
$78,750 in State Proposition 68 grant funding. The remaining $26,250 will be will be absorbed by the
General Fund’s Landscape Operating Budget.
Estimated Project Schedule
Project Phase Timeline
Project Design FY23
Project Advertisement FY23
Project Construction FY23
Project Completion FY23
Ongoing Operational Cost Impact
The park is currently maintained by the Parks Division with maintenance costs included in the budget. COMPLETED334DRAFT
Back to Charter Table of Contents
CITY OF GILROY COMPLETED
2021-2025 CAPITAL IMPROVEMENT PROGRAM
Project Name CHS Aquatics Pool
Re-Plastering Project No. 900380
Category Facilities: Specialized Facilities Department Public Works: Facilities
Project Type Rehabilitation Project Manager Facilities Manager
Council Priorities Ensure Neighborhoods Benefit
Equally from City Services Location 850 Day Road
Project Description and Purpose
There are two pools at Christopher High School, an Olympic pool and a shallow wading pool. The
plaster on the bottom of the shallow pool is peeling, cracking and bubbling. The plaster has been
repaired approximately eight times over the last three years. The temporary fixes are not enduring so
the entire pool requires re-plastering.
Project Justification
The County Health Department Health Inspector has documented that the bottom of the pool is
rough, with areas of cracking and buckling. The City’s Facilities staff has done some temporary
repairs to address these areas; however the repairs are not enduring. At some point the pool may be
shut down by the inspector. This pool is used by both the high school and the public, and is
considered a significant community benefit. Losing access to this pool would be a significant impact
to a number of stakeholders.
Master Planning Documents
This project is not listed in a master plan. COMPLETED335DRAFT
Back to Charter Table of Contents
CITY OF GILROY COMPLETED
2021-2025 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (900380)
Project Costs Total
Prior FY21 FY22 FY23 FY24 FY25 Beyond 5
Years Project Total
Design $24,200 $24,200
Construction $220,000 $220,000
Total $244,200 $244,200
Funding
Source
Total
Prior FY21 FY22 FY23 FY24 FY25 Beyond 5
Years Project Total
Unfunded $244,200 $244,200
Total $244,200 $244,200
Financial Comments
There is no funding for this project.
Estimated Project Schedule
Project Phase Timeline
Project Study Beyond FY25
Project Advertisement Beyond FY25
Project Construction Beyond FY25
Project Completion Beyond FY25
Ongoing Operational Cost Impact
Annual re-plastering is expected every 10 to 15 years. COMPLETED336DRAFT
Back to Charter Table of Contents
General Plan Consistency800010 Rancho Hills Development Concrete RepairsPolicy 1.05Existing Neighborhoods. Maintain and enhance the quality of existing residential neighborhoods, ensuring adequate public facilities such as parks schools, streets, water supply, and drainage.Policy 12.03Residential Street System Design. Design street systems in residential areas to encourage direct connections between neighborhoods; to encourage internal movement by bicycling and walking; and to provide safer and quieter neighborhoods.800020 Tenth Street and Uvas Creek Bridge800770 Tenth Street/Hwy 101 Bridge Widening900070 Luchessa Bridge Pedestrian and Bicycle Safety Improvements900090 Mantelli/Church Bulb-Out and Crosswalk Improvements900230 Wren Avenue Bridge Over Lions Creek BPMP800030 Corp Yard Stormwater Compliance ImprovementsPolicy 15.01Public Facilities and Development. Develop a system of public facilities that will:b) Minimize adverse impacts on the environment, and adverse fiscal, economic and social impacts on the community.800040 Automall Parkway Pavement RehabilitationPolicy 12.01Street System. Use the proposed major street system (designed to accommodate traffic at build-out of the General Plan) shown on the Circulation Map and the Bicycle Transportation Plan Map to guide long-term planning of the citywide circulation system.Policy 14.03Bicycle and Pedestrian Paths and Facilities. Correct deficiencies, expand existing facilities, and provide for the design of safer, convenient and attractive bicycle and pedestrian facilities whenever possible. Proposed roadways will be planned to accommodate bicycle traffic in accordance with the bikeway designations set forth in the City’s Bicycle Transportation Plan. Similarly, greenbelts, linear parks, public easements and drainages reserved in public open space will be planned to accommodate bike and pedestrian traffic if they are so designated in the Bicycle Transportation Plan.Action 14.FRoad Surfacing. Strive to maintain and improve the quality of the surface of the right-hand portion of existing roads as well as the travel lanes so that they are suitable for bicycle travel, regardless of whether or not bikeways are designated.800060 Annual Citywide Pavement RehabilitationPolicy 1.05Existing Neighborhoods. Maintain and enhance the quality of existing residential neighborhoods, ensuring adequate public facilities such as parks, schools, streets, water supply, and drainage.Policy 12.01Street System. Use the proposed major street system (designed to accommodate traffic at build-out of the General Plan) shown on the Circulation Map and the Bicycle Transportation Plan Map to guide long-term planning of the citywide circulation system.800080 Annual Safe Routes to SchoolsPolicy 1.05Existing Neighborhoods. Maintain and enhance the quality of existing residential neighborhoods, ensuring adequate public facilities such as parks, schools, streets, water supply, and drainage.Policy 12.03Residential Street System Design. Design street systems in residential areas to encourage direct connections between neighborhoods; to encourage internal movement by bicycling and walking; and to provide safer and quieter neighborhoods.800110 Downtown Parking Management PlanAction 12.GDowntown Parking District. Use the Downtown Specific Plan process to address parking coordination and design issues in the Downtown, and update the City’s Downtown Parking Ordinance as necessary to ensure adequate parking facilities while maintaining the area’s pedestrian orientation.800120 Las Animas Park Tennis Court - Fence ReplacementPolicy 1.05Existing Neighborhoods. Maintain and enhance the quality of existing residential neighborhoods, ensuring adequate public facilities such as parks, schools, streets, water supply, and drainage.Policy 16.09Physical Access. Ensure that all facilities and parks comply with State and Federal accessibility codes and standards, such as those established by the Americans with Disabilities Act (ADA), and California Building Standards Code (Title 24, California Code of Regulations).FY24 to FY28 Capital Improvement Program General Plan ConsistencyPolicy 12.01Street System. Use the proposed major street system (designed to accommodate traffic at build-out of the General Plan) shown on the Circulation Map and the Bicycle Transportation Plan Map to guide long-term planning of the citywide circulation system.Policy 12.03Residential Street System Design. Design street systems in residential areas to encourage direct connections between neighborhoods; to encourage internal movement by bicycling and walking; and to provide safer and quieter neighborhoods.Policy 1.05Existing Neighborhoods. Maintain and enhance the quality of existing residential neighborhoods, ensuring adequate public facilities such as parks, schools, streets, water supply, and drainage.Policy 14.04Crossings. Design street crossings to provide for the safety needs of bicyclists and pedestrians. River and other crossings by bridges will be designed to accommodate bike lanes or paths in accordance with the designationsset forth in the Bicycle Transportation Plan. Bridges for the exclusive use of pedestrians and bicycles should be considered whenever barriers exist which impede convenient and safe access.Project Number and TitlePage 1 of 8
General Plan ConsistencyFY24 to FY28 Capital Improvement Program General Plan ConsistencyProject Number and Title800050 McCarthy Site Well (Well #9)800070 Annual Citywide Curb Ramp Project800250 Casey and Swanston Water Line Replacement800590 Broadway and Sargent Water Line Replacement800600 Church and Gurries Water Line Replacement800610 Church Street - Welburn to First Water Line Replacement800620 Forest and Eighth Water Line Replacement800630 Steel Water Service Lines Replacement Citywide800640 Monterey and Eighth Water Line Replacement800650 Abandon 2" Water Line from 7041 to 7161 Monterey Street800660 Murray at Burke Water Line Reroute800670 Saint Louise Hospital Large Water Meter Replacement800690 Water Reservoirs A and B - Painting800700 Water Reservoirs A and B - Retrofit Overflow Piping800710 Water Well Nos. 1, 2 and 4 Compliance Improvements800720 Water Well Nos. 1 and 2 Upgrade Improvements900730 Martin and Railroad Water Line Replacement900740 Monterey - Leavesley to Ronan Water Line Replacement800160 Golf Course Water Tank Replacement800780 San Ysidro Park Healthy Living Enhancement900450 7380 Dowdy Building Demolition900460 Electrical Panel Evaluation Citywide for OSHA Requirements900480 Gilroy Center for the Arts HVAC Replacement900490 Old City Hall HVAC Replacement900500 Parks/Civic Facilities Sidewalk Improvements Citywide900510 City-Owned Parking Lots Resurfacing900520 Senior Center ADA Restroom Access900530 Senior Center Roof Replacement900610 Christmas Hill Park Trail Wayfinding Signage900620 Miller Park Restrooms Electrical Undergrounding900630 Forest Street Park Expansion900640 Las Animas Veterans Park Miscellaneous Facility Rehabilitation900680 Gilroy Sports Park Improvements Phases IV and V900690 Rehabilitate Softball Fields at Las Animas and Christmas Hill ParksFC2401 Cherry Blossom Apartments ReroofingFC2403 Civic Center Master Plan800180 Traffic CalmingPolicy 12.02System Function and Neighborhood Protection. Ensure that the existing and proposed highways, streets, bikeways and pedestrian paths serve the functions they are intended to serve, while protecting the character of residential neighborhoods.Policy 1.05Existing Neighborhoods. Maintain and enhance the quality of existing residential neighborhoods, ensuring adequate public facilities such as parks, schools, streets, water supply, and drainage. Policy 1.05Existing Neighborhoods. Maintain and enhance the quality of existing residential neighborhoods, ensuring adequate public facilities such as parks, schools, streets, water supply, and drainage.Policy 15.06Service Delivery. Provide adequate staffing and program support to maintain high quality service to residents at all community facilities.Page 2 of 8
General Plan ConsistencyFY24 to FY28 Capital Improvement Program General Plan ConsistencyProject Number and Title800230 Shooting Range AssessmentPolicy 18.01Standards of Service. Continue to provide and maintain police and fire servicesthat are adequate in manpower, equipment, and resources to respond to localizedemergencies and calls for service within the City. The departments’ current levels ofservice should be maintained or improved as the City continues to grow, with average emergency response times for police services of approximately 4.5 minutes and average emergency response times for fire services of less than 5.0 minutes.Policy 15.06Service Delivery. Provide adequate staffing and program support to maintainhigh quality service to residents at all community facilities.800240 Traffic Circulation Master Plan UpdatePolicy 1.05Existing Neighborhoods. Maintain and enhance the quality of existing residential neighborhoods, ensuring adequate public facilities such as parks, schools, streets, water supply, and drainage.Policy 12.01Street System. Use the proposed major street system (designed to accommodate traffic at build-out of the General Plan) shown on the Circulation Map and the Bicycle Transportation Plan Map to guide long-term planning of the citywide circulation system.Policy 12.03Residential Street System Design. Design street systems in residential areas to encourage direct connections between neighborhoods; to encourage internal movement by bicycling and walking; and to provide safer and quieter neighborhoods.800270 Lions Creek Trail West of Santa Teresa and Day800280 Lions Creek Trail West Gap Closure - Kern to Day800320 Annual Shared-Cost Sidewalk Replacement Program800330 Annual Pavement Markings800450 Annual CDBG Sidewalk/Curb Ramp Project900100 Miller/Uvas Creek Trail Pedestrian Improvements900400 Chestnut Fire Station Bay Heaters and HVAC Replacement900590 Chestnut Fire Station Seismic Upgrade800290 Santa Teresa Fire District Station - New Station900600 Las Animas Fire Station Upgrade and RenovationFR2401 Santa Teresa Fire District Temporary Fire Station800310 Automated Flexnet Water Meter InstallationGoal 19 InfrastructureGOAL: Infrastructure systems that meet residents’ needs; conserve resources; protect the environment; and protect public health and safety.800340 Annual Signal/Street Light MaintenanceAction 12.JSignal Timing. In accordance with the recommendations of the Bay Area Air Quality Management District in the 2000 Clean Air Plan, continue and expand local signal timing programs.Policy 1.05Existing Neighborhoods. Maintain and enhance the quality of existing residential neighborhoods, ensuring adequate public facilities such as parks, schools, streets, water supply, and drainage.Policy 12.01Street System. Use the proposed major street system (designed to accommodate traffic at build-out of the General Plan) shown on the Circulation Map and the Bicycle Transportation Plan Map to guide long-term planning of the citywide circulation system.Policy 12.03Residential Street System Design. Design street systems in residential areas to encourage direct connections between neighborhoods; to encourage internal movement by bicycling and walking; and to provide safer and quieter neighborhoods.Policy 12.08Standard Level of Service (LOS). Maintain traffic conditions at LOSC or better at Gilroy intersections and roadways, allowing some areas (as specified on the ‘Level of Service D Areas’ Map, page 6-11) subject to the timing and other limitations imposed by the Gilroy Urban Growth Boundary Initiative) to operate at LOSD or better. Exceptions to this standard will be allowed only where the City Council determines that the improvements needed to maintain the City’s standard level of service at specific locations are infeasible.Policy 16.05Trails Master Plan. Develop a Trails Master Plan to guide the planning, design and implementation of a citywide trail network. The Plan should indicate specific trail alignments and opportunities, identify private and public property with trails potential, and set forth acquisition/easement priorities. To support implementation of the Trails Master Plan, encourage incentive points for on-site trails dedication or contribution to off-site trails as part of the RDO process.Policy 12.01Street System. Use the proposed major street system (designed to accommodate traffic at build-out of the General Plan) shown on the Circulation Map and the Bicycle Transportation Plan Map to guide long-term planning of the citywide circulation system.Policy 12.03Residential Street System Design. Design street systems in residential areas to encourage direct connections between neighborhoods; to encourage internal movement by bicycling and walking; and to provide safer and quieter neighborhoods.Policy 1.05Existing Neighborhoods. Maintain and enhance the quality of existing residential neighborhoods, ensuring adequate public facilities such as parks, schools, streets, water supply, and drainage.Policy 18.01Standards of Service. Continue to provide and maintain police and fire services that are adequate in manpower, equipment, and resources to respond to localized emergencies and calls for service within the City. The departments’ current levels of service should be maintained or improved as the City continues to grow, with average emergency response times for police services of approximately 4.5 minutes and average emergency response times for fire services of less than 5.0 minutes.Policy 15.06Service Delivery. Provide adequate staffing and program support to maintain high quality service to residents at all community facilities.Page 3 of 8
General Plan ConsistencyFY24 to FY28 Capital Improvement Program General Plan ConsistencyProject Number and Title800350 Luchessa/Church Traffic Signal InstallationAction 12.JSignal Timing. In accordance with the recommendations of the Bay Area Air Quality Management District in the 2000 Clean Air Plan, continue and expand local signal timing programs.Policy 1.05Existing Neighborhoods. Maintain and enhance the quality of existing residential neighborhoods, ensuring adequate public facilities such as parks, schools, streets, water supply, and drainage.Policy 12.01Street System. Use the proposed major street system (designed to accommodate traffic at build-out of the General Plan) shown on the Circulation Map and the Bicycle Transportation Plan Map to guide long-term planning of the citywide circulation system.Policy 12.03Residential Street System Design. Design street systems in residential areas to encourage direct connections between neighborhoods; to encourage internal movement by bicycling and walking; and to provide safer and quieter neighborhoods.800360 Mantelli/Kern Traffic Signal InstallationAction 12.JSignal Timing. In accordance with the recommendations of the Bay Area Air Quality Management District in the 2000 Clean Air Plan, continue and expand local signal timing programs.Policy 1.05Existing Neighborhoods. Maintain and enhance the quality of existing residential neighborhoods, ensuring adequate public facilities such as parks, schools, streets, water supply, and drainage.Policy 12.01Street System. Use the proposed major street system (designed to accommodate traffic at build-out of the General Plan) shown on the Circulation Map and the Bicycle Transportation Plan Map to guide long-term planning of the citywide circulation system.Policy 12.03Residential Street System Design. Design street systems in residential areas to encourage direct connections between neighborhoods; to encourage internal movement by bicycling and walking; and to provide safer and quieter neighborhoods.800370 Monterey/I.O.O.F. Traffic Signal InstallationAction 12.JSignal Timing. In accordance with the recommendations of the Bay Area Air Quality Management District in the 2000 Clean Air Plan, continue and expand local signal timing programs.Policy 1.05Existing Neighborhoods. Maintain and enhance the quality of existing residential neighborhoods, ensuring adequate public facilities such as parks, schools, streets, water supply, and drainage.Policy 12.01Street System. Use the proposed major street system (designed to accommodate traffic at build-out of the General Plan) shown on the Circulation Map and the Bicycle Transportation Plan Map to guide long-term planning of the citywide circulation system.Policy 12.03Residential Street System Design. Design street systems in residential areas to encourage direct connections between neighborhoods; to encourage internal movement by bicycling and walking; and to provide safer and quieter neighborhoods.800380 Church Street Storm Drain Extension - Seventh to 7233 Church800390 Miller and Third Storm Drain Rehabilitation800400 Monterey and Luchessa Storm Drain Modifications800430 Cohansey Avenue/Terri Court Storm Drain Improvements900030 Drainage Improvements to Mitigate Minor Flooding900130 Storm Drain Cleaning and Inspection Program900140 Fifth Street - Miller to Princevalle Storm Drain Replacement900150 Fifth Street - Princevalle to Rosanna New Storm Drain Trunk900160 Forest and Eighth Storm Drain Connection Replacement900170 Ninth Street Storm Drain Extension - Monterey to Eigleberry900180 Princevalle System - Fifth to Santa Paula Storm Drain Improvements900190 Rosanna - Fourth to Princevalle Channel Storm Drain Improvements900200 Second Street - Hanna to Miller Slough Storm Drain Improvements900210 Third Street Storm Drain Extension - Hanna to EigleberryEN2405 Master Plan Projects - Storm Drain Improvements800410 Traffic Signal Upgrades CitywideAction 12.JSignal Timing. In accordance with the recommendations of the Bay Area AirQuality Management District in the 2000 Clean Air Plan, continue and expandlocal signal timing programs.Policy 1.05Existing Neighborhoods. Maintain and enhance the quality of existingresidential neighborhoods, ensuring adequate public facilities such as parks,schools, streets, water supply, and drainage.Policy 12.01Street System. Use the proposed major street system (designed to accommodatetraffic at build-out of the General Plan) shown on the Circulation Map and theBicycle Transportation Plan Map to guide long-term planning of the citywide circulation system.Policy 12.03Residential Street System Design. Design street systems in residential areas toencourage direct connections between neighborhoods; to encourage internalmovement by bicycling and walking; and to provide safer and quieter neighborhoods.Policy 19.09Storm Drain System. Provide and maintain a system of storm drains to protect areas of development from localized flooding.Page 4 of 8
General Plan ConsistencyFY24 to FY28 Capital Improvement Program General Plan ConsistencyProject Number and Title800420 Utility Undergrounding - Monterey Street - Eighth to TenthPolicy 1.13Undergrounding of Utilities. Remove overhead utility lines and wooden poles in central areas, and ultimately throughout the City, and require undergrounding of utilities in all new developments.800440 Automall/Luchessa Traffic Signal InstallationAction 12.JSignal Timing. In accordance with the recommendations of the Bay Area Air Quality Management District in the 2000 Clean Air Plan, continue and expand local signal timing programs.Policy 1.05Existing Neighborhoods. Maintain and enhance the quality of existing residential neighborhoods, ensuring adequate public facilities such as parks, schools, streets, water supply, and drainage.Policy 12.01Street System. Use the proposed major street system (designed to accommodate traffic at build-out of the General Plan) shown on the Circulation Map and the Bicycle Transportation Plan Map to guide long-term planning of the citywide circulation system.Policy 12.03Residential Street System Design. Design street systems in residential areas to encourage direct connections between neighborhoods; to encourage internal movement by bicycling and walking; and to provide safer and quieter neighborhoods.800460State Trash Amendments Stormwater ComplianceProject800470 Stormwater NPDES Compliance900220 Storm Outfalls #6 and #7 - Investigations and Monitoring900250 Development of Stormwater Specifications800480 First/Kern Traffic Signal InstallationAction 12.JSignal Timing. In accordance with the recommendations of the Bay Area Air Quality Management District in the 2000 Clean Air Plan, continue and expand local signal timing programs.Policy 1.05Existing Neighborhoods. Maintain and enhance the quality of existing residential neighborhoods, ensuring adequate public facilities such as parks, schools, streets, water supply, and drainage.Policy 12.01Street System. Use the proposed major street system (designed to accommodate traffic at build-out of the General Plan) shown on the Circulation Map and the Bicycle Transportation Plan Map to guide long-term planning of the citywide circulation system.Policy 12.03Residential Street System Design. Design street systems in residential areas to encourage direct connections between neighborhoods; to encourage internal movement by bicycling and walking; and to provide safer and quieter neighborhoods.800490 Annual Citywide Sewer Repair and Rehabilitation800510 Asbestos Cement Sewer Pipe Replacement Citywide800520 Carmel-Dowdy Alley - Sixth to Seventh Sewer Replacement800530 Large Diameter Sewer Rehabilitation Citywide800540 Monterey and Princevalle Sewer Network800550 Old Gilroy - Chestnut to Forest Sewer Upgrade800560Seventh St - Carmel-Dowdy to Hanna-Rosanna Alleys SewerReplacement800570 Sewer Plan Expansion (SCRWA)900720 Old Gilroy Street at Railroad Crossing Sewer ReplacementSW2401 Master Plan Projects - Sewer ImprovementsSW2402 Joint Morgan Hill-Gilroy Trunk Line RepairsPolicy 19.09Storm Drain System. Provide and maintain a system of storm drains to protect areas of development from localized flooding.Policy 19.03Sewer, Treatment, and Disposal Capacities. Provide and maintain adequate sewers, wastewater treatment, and treated water disposal capacities to meet the needs of future growth (residential, industrial, and other).Page 5 of 8
General Plan ConsistencyFY24 to FY28 Capital Improvement Program General Plan ConsistencyProject Number and Title800730 Gateway Senior Apartments Pedestrian Crossing Safety ImprovementsPolicy 12.03Residential Street System Design. Design street systems in residential areas to encourage direct connections between neighborhoods; to encourage internal movement by bicycling and walking; and to provide safer and quieter neighborhoods.Policy 1.05Existing Neighborhoods. Maintain and enhance the quality of existing residential neighborhoods, ensuring adequate public facilities such as parks, schools, streets, water supply, and drainage.800760 Gourmet and Railroad Alley ImprovementsPolicy 1.06Downtown. Promote the old downtown section of Monterey Street as the focal point for community identity, providing a “sense of place” and feeling of historic continuity for Gilroy residents.Action 12. GDowntown Parking District. Use the Downtown Specific Plan process to address parking coordination and design issues in the Downtown, and update theCity’s Downtown Parking Ordinance as necessary to ensure adequate parking facilities while maintaining the area’s pedestrian orientation.900110 Murray Avenue Sidewalk Gap ClosurePolicy 16.05Trails Master Plan. Develop a Trails Master Plan to guide the planning, designand implementation of a citywide trail network. The Plan should indicate specific trail alignments and opportunities, identify private and public property withtrails potential, and set forth acquisition/easement priorities. To support implementation of the Trails Master Plan, encourage incentive points for on-site trailsdedication or contribution to off-site trails as part of the RDO process.Policy 12.01Street System. Use the proposed major street system (designed to accommodatetraffic at build-out of the General Plan) shown on the Circulation Map and theBicycle Transportation Plan Map to guide long-term planning of the citywide circulation system.Policy 12.03Residential Street System Design. Design street systems in residential areas toencourage direct connections between neighborhoods; to encourage internalmovement by bicycling and walking; and to provide safer and quieter neighborhoods.Policy 1.05Existing Neighborhoods. Maintain and enhance the quality of existingresidential neighborhoods, ensuring adequate public facilities such as parks, schools, streets, water supply, and drainage.900120 Sidewalk Gap Closure - 8340 Swanston LanePolicy 16.05Trails Master Plan. Develop a Trails Master Plan to guide the planning, design and implementation of a citywide trail network. The Plan should indicate specific trail alignments and opportunities, identify private and public property with trails potential, and set forth acquisition/easement priorities. To support implementation of the Trails Master Plan, encourage incentive points for on-site trails dedication or contribution to off-site trails as part of the RDO process.Policy 12.01Street System. Use the proposed major street system (designed to accommodate traffic at build-out of the General Plan) shown on the Circulation Map and the Bicycle Transportation Plan Map to guide long-term planning of the citywide circulation system.Policy 12.03Residential Street System Design. Design street systems in residential areas to encourage direct connections between neighborhoods; to encourage internal movement by bicycling and walking; and to provide safer and quieter neighborhoods.Policy 1.05Existing Neighborhoods. Maintain and enhance the quality of existing residential neighborhoods, ensuring adequate public facilities such as parks, schools, streets, water supply, and drainage.900260 Update to the City's Trails Master Plan (Bike Master Plan)900270 Development of a Pedestrian Master PlanPolicy 16.05Trails Master Plan. Develop a Trails Master Plan to guide the planning, design and implementation of a citywide trail network. The Plan should indicate specific trail alignments and opportunities, identify private and public property with trails potential, and set forth acquisition/easement priorities. To support implementation of the Trails Master Plan, encourage incentive points for on-site trails dedication or contribution to off-site trails as part of the RDO process.Page 6 of 8
General Plan ConsistencyFY24 to FY28 Capital Improvement Program General Plan ConsistencyProject Number and Title900280 Update to the City's Standard Drawings/Specifications/ Design StandardsGoal 12 Traffic Circulation and ParkingGOAL: (a) A functional and balanced transportation system that provides access for all, is compatible with existing and proposed land uses, and minimizes emissions of air pollutants; (b) A coordinated multi-modal system that accommodates private motor vehicles, pedestrians, bicycles and mass transit.900290 Development of an ADA Transition PlanPolicy 16.09Physical Access. Ensure that all facilities and parks comply with State and Federalaccessibility codes and standards, such as those established by the Americans withDisabilities Act (ADA), and California Building Standards Code (Title 24, California Code of Regulations).Policy 15.06Service Delivery. Provide adequate staffing and program support to maintainhigh quality service to residents at all community facilities.900320 Railroad At-Grade Crossing Pedestrian Safety ImprovementsPolicy 1.03Uses East of Highway 101. Restrict lands east of Highway 101 to industrialand agricultural use except for (1) commercial developments that draw a clearmajority of customers from outside of Gilroy, in accordance with criteriaestablished by the City of Gilroy; and (2) public and quasi-public facilitiesidentified on the Land Use Plan Map. The City will encourage the maintenanceof agricultural uses in all undeveloped industrially designated areas. Residentialcare facilities will only be allowed in the area east of Highway 101 if they meetthe criteria set forth in Policy 14.05, Residential Care Facilities for Seniors.Policy 12.01Street System. Use the proposed major street system (designed to accommodatetraffic at build-out of the General Plan) shown on the Circulation Map and theBicycle Transportation Plan Map to guide long-term planning of the citywide circulation system.Policy 12.03Residential Street System Design. Design street systems in residential areas toencourage direct connections between neighborhoods; to encourage internalmovement by bicycling and walking; and to provide safer and quieter neighborhoods.Policy 1.05Existing Neighborhoods. Maintain and enhance the quality of existingresidential neighborhoods, ensuring adequate public facilities such as parks,schools, streets, water supply, and drainage.Policy 14.04Crossings. Design street crossings to provide for the safety needs of bicyclistsand pedestrians. River and other crossings by bridges will be designed to accommodate bike lanes or paths in accordance with the designations set forth in theBicycle Transportation Plan. Bridges for the exclusive use of pedestrians and bicycles should be considered whenever barriers exist which impede convenient andsafe access.900330 Neighborhood Street LightingPolicy 12.03Residential Street System Design. Design street systems in residential areas to encourage direct connections between neighborhoods; to encourage internal movement by bicycling and walking; and to provide safer and quieter neighborhoods.Policy 1.05Existing Neighborhoods. Maintain and enhance the quality of existing residential neighborhoods, ensuring adequate public facilities such as parks, schools, streets, water supply, and drainage.900350 Church Street Sidewalk Gap ClosurePolicy 12.01Street System. Use the proposed major street system (designed to accommodate traffic at build-out of the General Plan) shown on the Circulation Map and the Bicycle Transportation Plan Map to guide long-term planning of the citywide circulation system.Policy 12.03Residential Street System Design. Design street systems in residential areas to encourage direct connections between neighborhoods; to encourage internal movement by bicycling and walking; and to provide safer and quieter neighborhoods.Policy 1.05Existing Neighborhoods. Maintain and enhance the quality of existing residential neighborhoods, ensuring adequate public facilities such as parks, schools, streets, water supply, and drainage.900360 ADA Assessment - City Facilities CitywidePolicy 16.09Physical Access. Ensure that all facilities and parks comply with State and Federal accessibility codes and standards, such as those established by the Americans with Disabilities Act (ADA), and California Building Standards Code (Title 24, California Code of Regulations).Policy 15.06Service Delivery. Provide adequate staffing and program support to maintain high quality service to residents at all community facilities.900650 Christmas Hill Ranch Site Master Planning900660 Farrell Park Facility Master Planning900670 Uvas Creek Staging and Neighborhood Park Master PlanningPolicy 15.06Service Delivery. Provide adequate staffing and program support to maintain high quality service to residents at all community facilities.Policy 16.04Parks and Recreation System Master Plan. Develop and regularly update a Parks and Recreation System Master Plan to guide the planning, design and implementation of a citywide system of parks and recreation facilities and programs, including cultural and other special use facilities, in keeping with the goals and policies of the General Plan. The Parks and Recreation System Master Plan should be reviewed and updated every 5 years, in coordination with the General Plan when feasible.Page 7 of 8
General Plan ConsistencyFY24 to FY28 Capital Improvement Program General Plan ConsistencyProject Number and TitleEN2402 Gilroy Ice CenterPolicy 15.06Service Delivery. Provide adequate staffing and program support to maintain high quality service to residents at all community facilities.Policy 16.04Parks and Recreation System Master Plan. Develop and regularly update a Parks and Recreation System Master Plan to guide the planning, design and implementation of a citywide system of parks and recreation facilities and programs, including cultural and other special use facilities, in keeping with the goals and policies of the General Plan. The Parks and Recreation System Master Plan should be reviewed and updated every 5 years, in coordination with the General Plan when feasible.Goal 19 InfrastructureGOAL: Infrastructure systems that meet residents’ needs; conserve resources; protect the environment; and protect public health and safety.EN2403 Corporation Yard EV and EV ChargingGoal 19 InfrastructureGOAL: Infrastructure systems that meet residents’ needs; conserve resources; protect the environment; and protect public health and safety.EN2404 Monterey Rd Sidewalk - Luchessa to TenthPolicy 12.03Residential Street System Design. Design street systems in residential areas to encourage direct connections between neighborhoods; to encourage internal movement by bicycling and walking; and to provide safer and quieter neighborhoods.Policy 1.05Existing Neighborhoods. Maintain and enhance the quality of existing residential neighborhoods, ensuring adequate public facilities such as parks, schools, streets, water supply, and drainage.EN2406 Luchessa Ave / Rossi Ln ReconstructionPolicy 16.05Trails Master Plan. Develop a Trails Master Plan to guide the planning, design and implementation of a citywide trail network. The Plan should indicate specific trail alignments and opportunities, identify private and public property with trails potential, and set forth acquisition/easement priorities. To support implementation of the Trails Master Plan, encourage incentive points for on-site trails dedication or contribution to off-site trails as part of the RDO process.Policy 12.01Street System. Use the proposed major street system (designed to accommodate traffic at build-out of the General Plan) shown on the Circulation Map and the Bicycle Transportation Plan Map to guide long-term planning of the citywide circulation system.Policy 12.03Residential Street System Design. Design street systems in residential areas to encourage direct connections between neighborhoods; to encourage internal movement by bicycling and walking; and to provide safer and quieter neighborhoods.Policy 1.05Existing Neighborhoods. Maintain and enhance the quality of existing residential neighborhoods, ensuring adequate public facilities such as parks, schools, streets, water supply, and drainage.FC2404 Citywide Energy Saving MeasuresGoal 19 InfrastructureGOAL: Infrastructure systems that meet residents’ needs; conserve resources; protect the environment; and protect public health and safety.PK2401 Citywide Park Restroom Reroofing/RehabilitationPolicy 15.06Service Delivery. Provide adequate staffing and program support to maintain high quality service to residents at all community facilities.Policy 16.04Parks and Recreation System Master Plan. Develop and regularly update a Parks and Recreation System Master Plan to guide the planning, design and implementation of a citywide system of parks and recreation facilities and programs, including cultural and other special use facilities, in keeping with the goals and policies of the General Plan. The Parks and Recreation System Master Plan should be reviewed and updated every 5 years, in coordination with the General Plan when feasible.Goal 19 InfrastructureGOAL: Infrastructure systems that meet residents’ needs; conserve resources; protect the environment; and protect public health and safety.PK2402 Parks Master PlanPolicy 16.04Parks and Recreation System Master Plan. Develop and regularly update a Parks and Recreation System Master Plan to guide the planning, design and implementation of a citywide system of parks and recreation facilities and programs, including cultural and other special use facilities, in keeping with the goals and policies of the General Plan. The Parks and Recreation System Master Plan should be reviewed and updated every 5 years, in coordination with the General Plan when feasible.WT2401 Master Plan Projects - Water ImprovementsPolicy 1.05Existing Neighborhoods. Maintain and enhance the quality of existing residential neighborhoods, ensuring adequate public facilities such as parks, schools, streets, water supply, and drainage.Page 8 of 8
RESOLUTION NO. 2023-XX
RESOLUTION NO. 2023-XX
A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF GILROY FINDING THE PROPOSED 2024-
2028 CAPITAL IMPROVEMENT PROGRAM IN
CONFORMANCE WITH THE GENERAL PLAN
WHEREAS, the City of Gilroy Capital Improvement Program (CIP) is a five-year program
adjusted annually that outlines public improvements and estimated expenditures to construct
improvements. The current CIP has been updated for the 2024-2028 time period for City Council
review and consideration; and
WHEREAS, California Government Code Section 65401 requires that the City’s Planning
Commission make a determination that the annual CIP is in conformance with the City’s General
Plan; and
WHEREAS, the Planning Division completed an environmental assessment for the project
in accordance with the California Environmental Quality Act (CEQA), and recommends that the
Planning Commission determine that the General Plan Conformity Finding is not subject to the
California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15378 in
that the General Plan conformance finding as required by State law is not a project as defined
under CEQA; and
WHEREAS, on June 1, 2023, the Planning Commission held a public meeting and
reviewed the 2024-2028 CIP for consistency with the General Plan 2040.
NOW, THEREFORE, the Planning Commission of the City of Gilroy hereby finds,
determines and resolves as follows:
Section 1: The Planning Commission has duly considered the full record before it,
including the City staff report, the 2024-2028 CIP, testimony by staff and the public, and other
materials and evidence submitted or provided to the Commission. Furthermore, the recitals set
forth above are found to be true and correct and are incorporated herein by reference.
Section 2: The Planning Commission determines that the General Plan Conformity
Finding is not subject to the California Environmental Quality Act (CEQA) pursuant to CEQA
Guidelines Section 15378 since it is not a project as defined under CEQA.
Section 3: The Planning Commission finds that each of the Capital Improvement Projects
contained in the proposed 2024-2028 Capital Improvement Program is in conformance with the
City of Gilroy General Plan 2040 as outlined in the General Plan Consistency Table attached to
the Planning Commission staff report dated June 1, 2023.
Section 4: The Planning Commission of the City of Gilroy hereby adopts this Resolution
finding the proposed 2024-2028 Capital Improvement Program is in conformity with the General
Plan and directs staff to transmit this finding to the City Council in compliance with Government
Code section 65401.
RESOLUTION NO. 2023-XX
PASSED AND ADOPTED this 1st day of June, 2023 by the following roll call vote:
AYES:
NOES:
ABSENT:
ATTEST: APPROVED:
Sharon Goei, Secretary Manny Bhandal, Chairperson
Community Development Director
Community Development
Department
7351 Rosanna Street, Gilroy, California 95020-6197
Telephone: (408) 846-0451 Fax: (408) 846-0429
http://www.cityofgilroy.org
TO:Planning Commission
FROM:Sharon Goei, Community Development Director
Kraig Tambornini, Senior Planner
DATE:June 1, 2023
SUBJECT:Planning Division Staff Approvals
In conformance with Gilroy Municipal Code Sections 30.50.20(b) and 30.50.46, the
following table lists all Minor Deviation approvals and all Architectural and Site
approval/denial actions taken by the Planning Division since the last report was
provided to the Planning Commission at its May 4, 2023 meeting.
APPROVED PROJECT #LOCATION PROJECT NAME & DESCRIPTION
None
DENIED PROJECT #LOCATION PROJECT NAME & DESCRIPTION
None
AS Architectural and Site Review
The current status of other planning projects is available online at:
https://www.cityofgilroy.org/298/Development-Activity-Projects