2020-05-19 Parks & Rec Commission Regular Meeting Agenda Packet
CITY OF GILROY
PARKS AND RECREATION COMMISSION
REGULAR MEETING
MAY 19, 2020
6:00 p.m.
City Council Chambers
7351 Rosanna Street
Gilroy, CA 95020
AGENDA
Page 1 of 4
PUBLIC PARTICIPATION IN THIS MEETING WILL BE LIMITED.
THIS MEETING WILL BE CONDUCTED PURSUANT TO THE PROVISIONS OF THE
GOVERNOR’S EXECUTIVE ORDER N-29-20
MEETING MATERIAL IS AVAILABLE ON THE CITY WEBSITE www.cityofgilroy.org.
In order to minimize the spread of the COVID 19 virus, the City will be offering telephone
and email options for public comments at this meeting. The public is encouraged to
participate in this meeting by as follows:
VIEW THE MEETING LIVE ON FACEBOOK
https://www.facebook.com/GilroyCityHallMeetings
PUBLIC COMMENTS WILL BE TAKEN ON AGENDA ITEMS BEFORE ACTION IS
TAKEN BY THE PARKS & RECREATION COMMISSION. COMMENTS MAY BE
EMAILED PRIOR TO OR DURING THE MEETING TO ADAM HENIG AT
adam.henig@cityofgilroy.org AND MUST BE RECEIVED BEFORE THE
CHAIRPERSON OPENS PUBLIC COMMENT FOR THE ITEM. ADDITIONALLY,
COMMENTS MAY BE MADE BY LEAVING A VOICE MESSAGE AT (408) 846-0577,
PRIOR TO 5:00 P.M. May 19, 2020. IMPORTANT: identify the Agenda Item Number
or PUBLIC COMMENT in the subject line of your email. The Clerk will read the first
three minutes of each email into the public record.
In compliance with the Americans with Disabilities Act, and Governors Order N-29-
20, the City will make reasonable arrangements to ensure accessibility to this
meeting. If you need special assistance to participate in this meeting, please
contact the City a minimum of 2 hours prior to the meeting at (408) 846-0577.
Materials related to an item on this agenda submitted to the City of Gilroy Parks and
Recreation Commission after distribution of the agenda packet are available for public
inspection with the agenda packet in the Recreation Department at City Hall, 7351
Rosanna Street during normal business hours. These materials are also available with
the agenda packet on the City website at www.cityofgilroy.org
Page 2 of 4
I. CALL TO ORDER
II. ROLL CALL
Chair: Michelle Wexler 12/21 Vice Chair: Theresa Graham 12/23
Angela Reinert 12/23 Patricia Bentson 12/20
Robert Miller 12/21 Ermelindo Puente 12/23
III. FLAG SALUTE
IV. SECRETARY'S REPORT
V. APPROVAL OF MINUTES
A. January 21, 2020 Meeting Minutes
VI. APPROVAL OF AGENDA
VII. INTRODUCTIONS
VIII. AWARDS/RECOGNITIONS
IX. PUBLIC COMMENT ON ITEMS NOT ON THE AGENDA
X. NEW BUSINESS
A. Parks and Recreation Commission Review of FY21-26 Capital
Improvement Program Projects
1. Staff Report: Gary Heap, City Engineer/Transportation Engineer
2. Public Comment
3. Possible Action:
Receive and comment on review of FY21-26 Capital Improvement
program projects
B. Draft 2025 Consolidated Plan and Fiscal Year 2020-2021 Projects
1. Staff Report: Sue O'Strander, Deputy Director of Community
Development
2. Public Comment
3. Possible Action:
Receive Draft 2025 Consolidated Plan and Fiscal Year 2020 -2021
Projects and comment on report.
XI. OLD BUSINESS
A. Review and Adopt Proposed Parks and Recreation Commission 2020
Work Plan
Page 3 of 4
1. Staff Report: Adam Henig, Recreation Manager
2. Public Comment
3. Possible Action:
Review and adopt proposed Parks and Recreation Commission
2020 Work Plan
B. Modify Parks and Recreation Commissioner's park monitoring
assignments
1. Staff Report: Adam Henig, Recreation Manager
2. Public Comment
3. Possible Action:
Motion to approve reassigning parks and recreation commissioner
city parks for the purpose of monitoring and reporting at monthly
meetings.
XII. DEPARTMENT UPDATES
A. Recreation Department Updates
1. Staff Report: Adam Henig, Recreation Manager
2. Public Comment
3. Possible Action:
Receive recreation report and comment.
B. Status of City Parks
1. Staff Report: Adam Henig, Recreation Manager
2. Public Comment
3. Possible Action:
Receive parks report and comment.
XIII. COMMISSIONER PARK REPORTS & COMMENTS
Park Assignments
· Pat Bentson: Christmas Hill Park, Cydney Casper, and Del Rey Park
· Carriage Hills Park, Los Arroyos Park, and Sunrise Park
· Las Animas Veterans Park
· Theresa Graham: Miller Park and Rainbow Park
· Ermelindo Puente: Butcher Park, Forest Street Park, Renz Park, and San
Ysidro Park
· Michelle Wexler: Hecker Pass Park
· Robert Miller: El Roble Park and Gilroy Sports Park
XIV. STAFF COMMENTS
XV. NEXT MONTH AGENDA ITEMS
XVI. FUTURE MEETINGS June 16, 2020 at 6:00 P.M.
Page 4 of 4
XVII. ADJOURNMENT
CITY OF GILROY
PARKS AND RECREATION COMMISSION
REGULAR MEETING
JANUARY 21, 2020
6:00 p.m.
Recreation Conference Room
7351 Rosanna Street
Gilroy, CA 95020
MINUTES
Page 1 of 5
I. CALL TO ORDER
The regular meeting of the Parks and Recreation Commission was called to
order by Vice Chair Puente at 6:00 p.m.
II. ROLL CALL
ROLL CALL
Present:
Chair Patricia Bentson (arrived at 6:02pm), Vice Chair Ermelindo Puente,
Commissioner Angela Reinert, Commissioner Theresa Graham,
Commissioner Michelle Wexler, and Commissioner Robert Miller.
Absent: Commissioner Gonzalez
III. FLAG SALUTE
Vice Chair Puente led the pledge of allegiance.
IV. SECRETARY'S REPORT
The agenda was posted on the City’s website on January 16, 2020 at 4:49
pm.
V. APPROVAL OF MINUTES
Motion was made to approve the December 3, 2019 meeting minutes by
Commissioner Miller; seconded by Chair Bentson and carried with a vote of
6-0-0.
VI. APPROVAL OF AGENDA
Motion to approve the agenda was made by Commissioner Miller; seconded
by Vice Chair Puente.
VII. INTRODUCTIONS
Recreation Manager Adam Henig introduced Angela Reinert as the newest
commissioner.
VIII. AWARDS/RECOGNITIONS
Recreation Manager Adam Henig stated Commissioner Gonzalez resigned
5.A
Packet Pg. 5 Communication: January 21, 2020 Meeting Minutes (APPROVAL OF MINUTES)
Page 2 of 5
from the Parks and Recreation Commission and in honor of his service, a
certificate of recognition will be mailed to his attention.
IX. PUBLIC COMMENT ON ITEMS NOT ON THE AGENDA
None.
X. NEW BUSINESS
A. Selection of Chair and Vice-Chair of Parks and Recreation
Commission
Motion was made by Chair Bentson to elect Commissioner Wexler as Chair
for 2020; seconded by Commissioner Graham with a motion amendment to
select Commissioner Graham as Vice Chair.
Motion passed 6-0-0.
B. Selection of Arbor Day Date and Site
Parks Supervisor Headley recommended Arbor Day event to be held April
21, 2020 which coincides with Arbor Day week. West Coast Arborists will
provide and plant 4-5 trees on the frontage of the park.
The event will be advertised in social media. The commissioners discussed
ideas on finding ways to engage the community for future park related
events.
Motion made by Chair Bentson to hold the Annual Arbor Day event on April
21, 2020 at Ferrell Avenue Park with a start time of 5:30 p.m. – 6:00 p.m.
The regular Parks & Recreation Commission meeting will be conducted at
City Hall Council Chambers at its regular time of 6:00 p.m.
Motion passed 6-0-0.
C. Approval of the 2020 Parks & Recreation Commission annual retreat
Focus of the retreat will be to develop a work plan for the 2020 calendar
year.
Motion to hold the annual retreat on February 29, 2020 at the Willey Cultural
Center was made by Commissioner Graham; seconded by Commissioner
Wexler.
Motion passed 6-0-0.
D. Proposed Parks and Recreation Commission Monthly Meeting Date
Change in February 2020
5.A
Packet Pg. 6 Communication: January 21, 2020 Meeting Minutes (APPROVAL OF MINUTES)
Page 3 of 5
Due to a schedule conflict, Henig asked if we the commissioners can meet
on an alternative date. City Traffic Engineer Gary Heap would like to present
on the proposed capital improvement program presentation ideally in the
month of February.
Motion made by Chair Bentson to hold the next regular meeting on February
11, 2020 in replacement of the February 18, 2020 meeting; seconded by
Commissioner Graham.
Motion passed 6-0-0.
Henig will follow up about providing information regarding the San Jose
Sharks proposed project ice rink at Gilroy Sports Park.
XI. OLD BUSINESS
A. 2019 Parks and Recreation Commission Work Plan
Henig referred commissioners to packet page 16 and went through all of the
items.
B. Fiscal Year 2020 Training Budget Expenditures
Henig referred commissioners to packet page 18; he stated $245 has been
spent leaving a balance of $755 for the Parks and Recreation Commission
to utilize. Bentson asked if a portion of the budget can be paid for her
lodging for the upcoming training in Long Beach she’ll be attending.
Motion was made by Vice Chair Puente to pay for one night of Bentson’s
lodging with a reimbursement up to $150; seconded by Commissioner
Miller.
Motion passed 6-0-0.
XII. DEPARTMENT UPDATES
A. Recreation Department Updates
Henig referred commissioners to packet page 19 and noted a few updates.
B. Status of City Parks
Parks Supervisor Bill Headley referred commissioners to packet page 22.
Headley will present a thorough work plan presentation to the Parks &
Recreation Commission at the upcoming March meeting date.
XIII. COMMISSIONER PARK REPORTS & COMMENTS
Park Assignments
Pat Bentson:
Christmas Hill Park- One of the women’s bathroom door is vandalized, the
memorial site has numerous weathered items; noted a homeless person
living in a black vehicle closest to the Ranch side, outside of gate.
Cydney Casper-Issue with Hopscotch markings; Headley stated this area
5.A
Packet Pg. 7 Communication: January 21, 2020 Meeting Minutes (APPROVAL OF MINUTES)
Page 4 of 5
will be worked in the spring.
Del Rey Park- Pleased to see the planting of numerous plants.
Angela Reinert: Bentson suggested that Reinert should drive by the parks,
Carriage Hills Park, Los Arroyos Park, and Sunrise Park
Theresa Graham:
Miller Park-Numerous men hanging out by restroom and park; concerned
with the children at Brownell, which is across the street; Puente mentioned
there are cable lines close to the branch limbs.
Rainbow Park-Stated the park needs shade. The rubberized item at the
playground is cracked and noticed graffiti on the panel.
Ermelindo Puente-
Butcher Park- Stated the street needs painting so it’s ADA compliant.
Forest Street Park- Nothing to report
Renz Park- Nothing to report
San Ysidro Park- Noticed the garbage cans were filled. The horseshoe faucet
is broken; bathroom is messy. Numerous lights are out.
Michelle Wexler:
Hecker Pass Park-Noticed children continuing to climb the pergola; 150th
anniversary with the City’s. There is $50k, help to hire a consultant to review
the parks. Gilroy is the only city that allows smoking.
Robert Miller:
El Roble Park-There are numerous potholes. Its’ the cleanest he’s seen it.
Gilroy Sports Park-Stated the water fountain is fixed. The 5-12 year old
playground is breaking away from concrete.
A. CAPRCBM Newsletter
Henig will forward the newsletter to the commissioners.
XIV. STAFF COMMENTS
None.
XV. NEXT MONTH AGENDA ITEMS
City Traffic Engineer Gary Heap will provide a capital improvement
presentation.
XVI. FUTURE MEETINGS February 11, 2020 at 6:00 P.M.
The next meeting is scheduled for February 11, 2020 at 6:00pm
XVII. ADJOURNMENT
The meeting was adjourned at 8:08 pm.
5.A
Packet Pg. 8 Communication: January 21, 2020 Meeting Minutes (APPROVAL OF MINUTES)
Page 5 of 5
Zinnia Navarro
Recording Secretary
Recreation Department
5.A
Packet Pg. 9 Communication: January 21, 2020 Meeting Minutes (APPROVAL OF MINUTES)
PARKS AND RECREATION COMMISSION
STAFF REPORT
Agenda Item Title: Parks and Recreation Commission Review of FY21-26 Capital
Improvement Program Projects
Meeting Date: May 19, 2020
Submitted By: Adam Henig
Prepared By: Gary Heap
Recommendation:
Receive and comment on review of FY21-26 Capital Improvement program projects
See attachment.
Attachments:
1. PRC CIP Budget Staff Report - 5-19-20
10.A
Packet Pg. 10
City of Gilroy
STAFF REPORT
Agenda Item Title: Parks and Recreation Commission Review of FY21-26 Capital Improvement
Program Projects
Meeting Date:
From:
Department:
Submitted By:
May 19, 2020
Girum Awoke, Director of Public
Works Public Works Department
Gary Heap, City Engineer
RECOMMENDATION
Receive report and provide feedback.
BACKGROUND
The City of Gilroy’s 5-Year Capital Improvement Program (CIP) represents an on-going
process through which the City identifies, prioritizes, and develops a multi-year work
plan for major capital expenditures and their associated funding sources, in an effort to
improve and maintain the City of Gilroy’s roadways, parks, facilities, and other
infrastructure. Generally, CIP improvements are major expenditures that have a multi-
year life and result in becoming City assets. The CIP is a strategic planning tool
focusing on City owned infrastructure, summarizing in one document the City’s overall
capital project needs and associated funding requirements during a five-year period.
The CIP document is merely a planning tool and should be used as such in the budget
preparation process.
For a project to be considered for funding within the CIP, the project must meet
the following criteria identified in the CIP Policy Document:
•Have a total value greater than $25,000 USD (United States Dollars)
o individual year(s) may be less than $25,000 USD for phased or ongoing
projects so long as the total value when the project is completed is greater
than $25,000 USD
•Estimated useful life of, or extending estimated useful life by, five (5) years or
more
•Require advanced planning and design
•Have a project duration of more than three months from inception to completion
•Primarily non-recurring projects
•Be developed/implemented at a fixed location
26
10.A.a
Packet Pg. 11 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
Projects not meeting these criteria are not considered capital projects and may be
funded as maintenance or one-time projects. In past years, Public Works used a
different process to plan for capital project funding needs. This is the first year that the
City is using a 5-year Capital Improvement Program model.
ANALYSIS
The process to develop the 5-year CIP began with a call for projects being sent out
throughout the City to all departments. Engineering, who is managing the CIP process,
received project requests from a number of City Departments and Divisions including
CDD, Recreation, and Fire Departments. Within Public Works, we received projects
from Water, Facilities, Sewer, Parks and Streets. These were combined with a number
of projects identified from our various Master Planning documents to come up with a
total list of 105 projects. Of those, 34 were carried over as on-going projects from
previous years since they were either previously funded or funded and partially
completed. Thus, this FY21-26 CIP contains 139 new projects. These projects will be
analyzed, and prioritized. The selected projects will be scheduled for funding and
delivery over the next five years. The remainder of the projects will be included in the
CIP as unfunded projects, which will be considered in the next CIP cycle.
Staff has prepared project charters for each of the 139 projects contained within the
CIP. Staff will be sharing a total of 50 projects that have issues of relevance to the
Parks and Recreation Commission at this meeting. Those projects contain
components that improve bicycle or pedestrian environments, improve sidewalk, or
roadways, or that are related to a park or other facility improvement. A listing of the
project charters for Parks and Recreation Commission review is as follows:
Project
Number
Project Name
800020 Tenth Street & Uvas Creek Bridge
800040 Automall Parkway
800060 Pavement Maintenance
800070 Curb Ramps Citywide
800080 Safe Routes to Schools
800120 Tenth Street & Hwy 101 Bridge Widening
800160 Golf Course Water Tank Replacement
800200 Citywide Sidewalk Condition Assessment
800210 Orchard & Tenth Crosswalk Enhancements
800240 Traffic Circulation Master Plan Update
800250 Las Animas Park Tennis Court - Fence Replacement
800260 Bridge Preventative Maintenance Project
27
10.A.a
Packet Pg. 12 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
EN2101 50/50 Sidewalk Program
EN2108 Lions Creek SCVWD Trail West of Santa Teresa & Day
EN2109 Lions Creek Trail West Gap Closure - Kern to Day
EN2111 Luchessa Bridge Pedestrian and Bike Lane Safety Improvements
EN2112 Luchessa Pavement Maintenance - Monterey to Rossi
EN2113 Mantelli & Church Bulbout and Crosswalk Improvements
EN2115 Miller Crossing & Uvas Creek Pedestrian Improvements
EN2117 Murray Street - Sidewalk Gap Closure
EN2119 Pavement Marking
EN2120 Sidewalk Gap Closure - 8340 Swanston Lane
EN2142 Update to the City's Trail's Master Plan (Bike Master Plan)
EN2143 Development of a Pedestrian Master Plan
EN2144 Update to the City's Standard Drawings/Specifications/Design Standards
EN2145 Development of an ADA Transition Plan
EN2147 Annual Sidewalk/Curb Ramp Project
EN2148 Downtown Sesquicentennial Beautification Project
EN2149 State Trash Amendments Stormwater Compliance Project
FC2101 ADA Assessment - City facilities citywide
FC2103 Aquatics Pool Re-plastering
FC2104 Boxing Gym - Lighting Improvements
FC2112 Facilities Needs Assessment
FC2115 Park/civic Facilities Sidewalk Improvements Citywide
FC2116 City-owned Parking Lots Resurfacing - Various Locations
FC2117 Senior Center - ADA restroom access
FC2120 Senior Center Roof Replacement
FC2121 Wheeler - Cooling Center Upgrades
FC2122 Wheeler - Evacuation Center Upgrades
FC2124 Wheeler Trellis Replacement
PK2101 Christmas Hill Park Trail Wayfinding Signage
PK2103 Miller Park Restrooms
PK2104 Ranch Site Trailer Demolition
PK2106 Las Animas Veterans Park Miscellaneous Facility Rehabilitation
PK2107 Christmas Hill Ranch Site Master Planning
PK2108 Farrell Park Facility Master Planning
28
10.A.a
Packet Pg. 13 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
Pk2109 Uvas Creek Staging and Neighborhood Park Master Planning
PK2110 Gilroy Sports Park Improvements Phases IV and V
RC2101 Redo Softball Fields at Las Animas and Christmas Hill Park
RC2102 San Ysidro Park Healthy Living Enhancement Project
FISCAL IMPACT/FUNDING SOURCE
The CIP is being planned for the next five years. A number of the identified projects will
not be recommended for funding during this CIP cycle. Those unfunded projects will be
considered for funding during the next funding cycle in two years.
NEXT STEPS
Staff will be recommending to the City Council projects that are on-going, maintenance
projects, and projects that rank high based on the scoring criteria established in the CIP
Policy Document.
PUBLIC OUTREACH
Project Charters will be shared with two commissions prior to being reviewed by the
City Council. The Bike and Pedestrian Commission reviewed the CIP charters on
February 25th, and the Parks and Recreation Commission on May 19th. All project
charters will be shared with the public at a community meeting the week of June 23rd.
The City Council will begin the review of the CIP with the budget meetings in June.
Attachments:
1.CIP Charters for Parks and Recreation Commission Review
29
10.A.a
Packet Pg. 14 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
CAPITAL IMPROVEMENT PLAN
FY2021‐2026
DRAFT PROJECT CHARTERS
30
10.A.a
Packet Pg. 15 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
Table of Contents
800020 ‐ Tenth Street & Uvas Creek Bridge ................................................................................................. 1
800040 ‐ Automall Parkway .......................................................................................................................... 3
800060 ‐ Pavement Maintenance ................................................................................................................. 5
800070 ‐ Curb Ramps Citywide ..................................................................................................................... 7
800080 ‐ Safe Routes to School .................................................................................................................... 9
800120 ‐ Las Animas Park Tennis Court Fence ........................................................................................... 11
800160 ‐ Golf Course Water Tank Replacement ........................................................................................ 13
800200 ‐ Citywide Sidewalk Condition Assessment ‐ ................................................................................. 15
800210 ‐ Orchard & Tenth Crosswalk Enhancements ................................................................................ 17
800240 ‐ Traffic Circulation Master Plan Update ....................................................................................... 19
800260 ‐ Bridge Preventative Maintenance ............................................................................................... 21
800270 ‐ Lions Creek SCVWD Trail West of Santa Teresa & Day ................................................................ 23
800280 ‐ Lions Creek Trail West Gap Closure ‐ Kern to Day ....................................................................... 25
800320 ‐ 50‐50 Sidewalk Program .............................................................................................................. 27
800330 ‐ Pavement Markings ..................................................................................................................... 29
EN2111 ‐ Luchessa Bridge Pedestrian and Bike Lane Safety Imp ............................................................... 31
EN2112 ‐ Luchessa Pavement Maintenance ‐ Monterey to Rossi .............................................................. 33
EN2113 ‐ Mantelli & Church Bulbout and Crosswalk Imps ......................................................................... 35
EN2115 ‐ Miller Crossing & Uvas Creek Ped Imps ...................................................................................... 37
EN2117 ‐ Murray Avenue Sidewalk Gap Closure ........................................................................................ 39
EN2120 ‐ Sidewalk Gap Closure ‐ 8340 Swanston Lane .............................................................................. 41
EN2142 ‐ Update to City's Trail's Master Plan ............................................................................................ 43
EN2143 ‐ Development of a Pedestrian Master Plan ................................................................................. 45
EN2144 ‐ Update to City Standard Drawings‐Specs‐Design Stds ................................................................ 47
EN2145 ‐ Development of an ADA Transition Plan ..................................................................................... 49
EN2147 ‐ Annual Sidewalk ‐ Curb Ramp ..................................................................................................... 51
EN2148 ‐ Downtown Sesquicentennial Beautification ............................................................................... 53
EN2149 ‐ State Trash Amendments Stormwater Compliance Project ....................................................... 55
31
10.A.a
Packet Pg. 16 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
Table of Contents (continued)
EN2150 ‐ Tenth Street Bridge Widening Over US101 ................................................................................. 57
FC2101 ‐ ADA Assessment ‐ City Facilities Citywide CIP Charter ................................................................ 59
FC2103 ‐ Aquatics Pool Re‐plastering ......................................................................................................... 61
FC2104 ‐ Boxing Gym ‐ Lighting Improvements .......................................................................................... 63
FC2112 ‐ Facilities Needs Assessment ........................................................................................................ 65
FC2115 ‐ Park‐Civic Facilities Sidewalk Imp Citywide ................................................................................. 67
FC2116 ‐ City‐Owned Parking Lots Resurfacing ‐ Various ‐ ......................................................................... 69
FC2117 ‐ Senior Center ‐ ADA Restroom Access ......................................................................................... 71
FC2120 ‐ Senior Center Roof Replacement................................................................................................. 73
FC2121 ‐ Wheeler ‐ Cooling Center Upgrades ............................................................................................ 75
FC2122 ‐ Wheeler Evacuation Center Upgrades ......................................................................................... 77
FC2124 ‐ Wheeler Trellis Replacement Charter .......................................................................................... 79
PK2101 ‐ Christmas Hill Park Trail Wayfinding Signage .............................................................................. 81
PK2103 ‐ Miller Park Restrooms ................................................................................................................. 83
PK2104 ‐ Ranch Site Abandoned Building and Trailer Demolition ............................................................. 85
PK2106 ‐ Las Animas Veterans Park Miscellaneous Facility Rehabilitation Charter ................................... 87
PK2107 ‐ Christmas Hill Park Ranch Site Master Planning Charter ............................................................. 89
PK2108 ‐ Farrell Park Master Planning Charter .......................................................................................... 91
PK2109 ‐ Uvas Creek Staging and Neighborhood Park Master Planning Charter ....................................... 93
PK2110 ‐ Gilroy Sports Park Phases IV and V Charter ................................................................................. 95
RC2101 ‐ Redo Softball Fields at Las Animas and Christmas Hill Park ........................................................ 97
RC2102 ‐ San Ysidro Park Healthy Living Enhancement ............................................................................. 99
32
10.A.a
Packet Pg. 17 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Tenth Street & Uvas Creek
Bridge
Project No. 800020
Category Streets/Bridges Department Public Works/Engineering
Project Type New Project Manager Faranak Mahdavi
Council Priorities Enhanced Public Safety Location Tenth Street at Uvas Creek
Project Description and Purpose
This project consists of constructing a two-lane bridge with sidewalks and Class II Bike Lanes along
Tenth Street over Uvas Creek. The project will also include a “breezeway bridge” over the current
Class I levee path, which will enable levee users to cross under Tenth Street, thus avoiding an at-
grade vehicle/pedestrian crossing. The project also includes a new roundabout at the Uvas Park
Drive/Tenth Street intersection. The bridge will connect two segments of Tenth Street, which currently
terminate on either side of Uvas Creek, and allow Tenth Street to extend as one continuous roadway
from the US 101 / Tenth Street (Automall Parkway) interchange to Santa Teresa Boulevard.
Project Justification
This project is identified in the Traffic Circulation Master Plan. Per a 2005 Development Agreement
with the Glen Loma Ranch Development, the City will complete the design of the bridge and the
developer will build the bridge with guaranteed reimbursement from the Traffic Impact Fee (TIF)
Fund. The City Council has directed the bridge to be designed with a width of 76’ to accommodate
four travel lanes in the future. Construction of this bridge will provide improved transportation
circulation within the City and will improve emergency vehicle response time.
This project meets the City Council Strategic Goal of enhancing public safety.
Master Planning Documents
This project is included in the City’s Traffic Circulation Master Plan which is part of the General Plan’s
Transportation and Circulation Element.
33
10.A.a
Packet Pg. 18 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800020)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design $97,000 $97,000
Design $3,097,000 $3,097,000
CEQA $583,000 $583,000
Construction $6,482,666 $6,482,666 $6,482,666 $19,448,000
Const.
Support $291,666 $291,666 $291,666 $875,000
Permitting
Fees $118,800 $118,800
Total $ 3,895,800 $6,774,333 $6,774,333 6,774,333 $ $24,218,800
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $
Financial Comments
Estimated Project Schedule
Timeline
Project Design FY2021
Project Advertisement FY2022
Project Construction FY2022-2024
Project Completion FY2025
Operational Cost Impact
There are no operational costs associated with this project.
34
10.A.a
Packet Pg. 19 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Automall Parkway Project No. 800040
Category Pavement Department Public Works
Project Type Rehabilitation Project Manager Julie Oates
Council Priorities Enhanced Public Safety,
Economic Development
Location Automall Parkway
Project Description and Purpose
The scope of work includes: pavement rehabilitation, repair and replacement of deteriorated curb and
gutter, reconstruction of approximately 20 curb ramps, drainage and striping improvements, and the
addition of Class II Bike Lanes along Automall Parkway. The limits of the project include Automall
Parkway from the Caltrans right-of-way through the Automall Parkway/Chestnut Street /Tenth Street
intersection, and Automall Parkway between the Automall Parkway/Chestnut Street /Tenth Street
intersection and the Automall Parkway/Luchessa Avenue intersection to the south.
Project Justification
This project is important for promoting continued economic growth within the City and for the
businesses along these primary access roads (Automall Parkway and Tenth Street). These roadways
provide access to a wide variety of commercial and industrial land uses, including the auto
dealerships along Automall Parkway. This project supports the City Council’s goals related to
promoting economic development within the City, is consistent with the City’s General Plan policies,
will improve traffic circulation, and will enhance pedestrian and bicycle safety in the project area.
Completion of the project could also lead to further development of the commercial properties along
the roadways within the project limits. Failure to complete this project would result in the continued
deterioration of the roadway surface, could lead to the loss of auto dealership businesses, and could
increase the likelihood of damage to private vehicles due to poor pavement conditions.
Master Planning Documents
This project is not specifically listed in any master plan document, but it does meet the spirit of the
City’s Traffic Circulation Master Plan by providing a safe and well-maintained travel way. The street is
also identified in StreetSaver as a failed street in need of reconstruction.
35
10.A.a
Packet Pg. 20 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800040)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design $8,000 $8,000
Design $461,000 $461,000
CEQA $8,000 $8,000
Construction $1,639,000 $1,639,000
Const.
Support $279,000 $279,000
Total $ $477,000 $1,918,000 $ $ $ $2,395,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Measure B
SB-1
Gen Fund
Total $ $ $ $ $ $ $
Financial Comments
Funding for this project will be from Measure B (Sales Tax), SB-1 (Gas Tax), and possibly the
General Fund.
Estimated Project Schedule
Timeline
Project Design FY2020-21
Project Advertisement FY2020-21
Project Construction FY2020-21
Project Completion FY2021-22
Operational Cost Impact
This project directly addresses maintenance needs. This project, once completed, will eventually
require periodic surface maintenance treatments. These treatments will protect the surface from
water, extend its life, and reduce long-term maintenance expenses. These treatments typically occur
every 5-7 years.
36
10.A.a
Packet Pg. 21 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
PCI Rating Example
Project Name Pavement Maintenance Project No. 800060
Category Streets/Pavement Department Public Works/Engineering
Project Type Rehabilitation Project Manager Nirorn Than
Council
Priorities
Financial Stability and Neighborhoods
Benefit Equally from City Services
Location Citywide
Project Description and Purpose
The purpose of this project is to rehabilitate and maintain the pavement condition within the City. The
City has approximately 270 lane miles of paved roads, not including alleys. The City conducts a
pavement condition survey every two years. The 2019 survey showed the citywide average
Pavement Condition Index (PCI) is 62 out of 100. This pavement maintenance project would prolong
the lifespan of the current pavement and prevent further deterioration and reduction in the PCI. The
project scope includes:
Preventive measures such as crack sealing, slurry seal, microsurfacing, and cape seal for
pavement in fair to good condition.
Restoration measures such as grind and overlay, dig-outs, and cold-in-place recycling for
pavement in fair to poor condition.
Rehabilitation/Reconstruction measures to remove and replace pavement in poor to failed
condition.
Project Justification
The City’s current pavement assets are valued at $219.4 million, which represents one of the largest
assets owned and maintained by the City. Without proper maintenance, this investment could
become economically unsustainable. The City’s PCI dropped from 69 in 2017 to 62 in 2019. This
significant drop in PCI has resulted in much higher maintenance and restoration costs.
Master Planning Documents
This project is not specifically listed in any master plan document, but it does meet the spirit of the
City’s Traffic Circulation Master Plan by providing a safe and well-maintained travel way.
37
10.A.a
Packet Pg. 22 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800060)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design $10,000 $10,000 $10,000 $10,000 $10,000 $50,000
Design $148,000 $148,000 $148,000 $148,000 $148,000 $740,000
CEQA $2,000 $2,000 $2,000 $2,000 $2,000 $10,000
Construction $1,982,805 $1,982,805 $1,982,805 $1,982,805 $1,982,805 $9,914,025
Const.
Support $124,000 $124,000 $124,000 $124,000 $124,000 $620,000
Total $ $2,266,805 $2,266,805 $2,266,805 $2,266,805 $2,266,805 $11,334,025
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Measure B
SB-1
Gen Fund
Gas Tax
General
Fund
Total $ $ $ $ $ $ $
Financial Comments
Funding for this project will be from Measure B (Sales Tax), SB-1 (Gas Tax), regular Gas Tax, and
the General Fund. Based on current funding from SB-1 and Measure B ($1.8 million per year), the
City’s PCI is expected to drop to 59 by 2024. At that time, backlog costs are projected to rise to $53.7
million with more than 16% of the City’s pavement rated at very poor condition (Category V).
Category V conditions would result in higher demand on city forces and pose a higher risk of liability
for the City. In addition, at PCI 59 the City would not be able to use Measure B funding for other
transportation programs, such as congestion relief projects. The City is also required to meet the
Maintenance of Effort Requirements (MOE) set forth in the agreements for SB-1 and Measure B. All
MOE funds must be allocated to pavement maintenance efforts.
Estimated Project Schedule
Timeline
Project Design FY2020-21 and Ongoing
Project Advertisement FY2020-21 and Ongoing
Project Construction FY2020-21 and Ongoing
Project Completion FY2020-21 and Ongoing
Operational Cost Impact
This project directly addresses maintenance needs. There are no other operational costs associated
with this project.
38
10.A.a
Packet Pg. 23 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Curb Ramps Citywide Project No. 800070
Category Streets/Curbs & Sidewalks Department Public Works/Engineering
Project Type Rehabilitation Project Manager Nirorn Than
Council Priorities Ensure Neighborhoods
Benefit Equally from City
Services
Location Citywide
Project Description and Purpose
The purpose of this project is to upgrade existing pedestrian curb ramps and to install new pedestrian
curb ramps at high priority areas and locations with high levels of pedestrian activity. All upgraded
and new pedestrian curb ramps will be compliant with the Americans with Disabilities Act (ADA). It is
estimated that the city currently owns and maintains approximately 4,000 curb ramps. Curb ramps
are a small but important part of making sidewalks, street crossings, and the other pedestrian routes
within the public right-of-way accessible to all users, including people with disabilities.
Project Justification
Title II of the ADA requires local governments to make pedestrian crossings accessible to people with
disabilities by providing curb ramps. To allow people with disabilities to cross streets safely, local
governments must provide curb ramps at pedestrian crossings and at public transportation stops
where walkways intersect with a vertical curb. To comply with ADA requirements, the curb ramps
provided must meet specific standards for width, slope, cross slope, placement, and other features.
Per ADA standards, all streets constructed after January 26, 1992 must provide curb ramps in
compliance with ADA standards. In addition, any street that was constructed prior to 1992, but was
altered after 1992, must also provide ADA-compliant curb ramps.
Master Planning Documents
This project is not specifically listed in any master plan document, but it is consistent with the City’s
General Plan goals and policies. These goals and policies include correcting deficiencies and
ensuring pedestrian facilities serve the function they are intended to serve.
Before Curb Ramp Upgrade After Curb Ramp Upgrade
39
10.A.a
Packet Pg. 24 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800070)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design $1,000 $1,000 $1,000 $1,000 $1,000 $5,000
Design $34,000 $34,000 $34,000 $34,000 $34,000 $170,000
CEQA $1,000 $1,000 $1,000 $1,000 $1,000 $5,000
Construction $184,000 $184,000 $184,000 $184,000 $184,000 $920,000
Const.
Support $20,000 $20,000 $20,000 $20,000 $20,000 $100,000
Total $ $240,000 $240,000 $240,000 $240,000 $240,000 $1,200,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $
Financial Comments
Estimated Project Schedule
Timeline
Project Design Beginning FY 2020-21
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
There are no operational costs associated with this project.
40
10.A.a
Packet Pg. 25 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Safe Routes to School (SRTS) Project No. 800080
Category Streets/Curbs & Sidewalks Department Public Works/Engineering
Project Type Rehabilitation Project Manager Nirorn Than
Council Priorities Enhance Public Safety, Ensure
Neighborhoods Benefit Equally
from City Services
Location Citywide
Project Description and Purpose
The purpose of the Safe Routes to School (SRTS) project is to provide minor capital improvements to
enhance the safety of pedestrians and bicyclists around schools. Engineering staff attends regular
coordination meetings with the Gilroy Unified School District (GUSD) to address safety concerns and
develop strategies to encourage the use of alternative modes of transportation in the vicinity of
schools. This project will allow staff to identify and construct minor improvements based on
discussions with the School District, SRTS Groups, and the Bicycle Pedestrian Commission. SRTS
improvements may include pavement striping, regulatory and advisory signs, crosswalks, sidewalks,
and other minor concrete improvements.
Project Justification
In 2012, Council adopted Resolution 2012-20 supporting the SRTS program. This program is
designed to promote the health and safety of children who walk or bicycle to school. Per the
resolution, council committed to encouraging walking, bicycling, and transit use among students and
families in the community. Since 2016, the Santa Clara County Public Health Department has
supported Gilroy in developing a SRTS Action Plan, which provides a framework for the GUSD and
the City to collaborate and improve safety through the implementation of SRTS. This project will allow
the City to address deficiencies which are highlighted in this plan.
Master Planning Documents
This project is not specifically listed in any master plan document, but it is consistent with the City’s
General Plan goals and policies. These goals and policies include correcting deficiencies and
ensuring pedestrian facilities serve the function they are intended to serve.
41
10.A.a
Packet Pg. 26 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800080)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design $1,000 $1,000 $1,000 $3,000
CEQA
Construction $46,400 $46,400 $46,400 $139,200
Const.
Support $3,000 $3,000 $3,000 $9,000
Total $ $50,400 $ $50,400 $ $50,400 $151,200
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $
Financial Comments
It’s estimated that the first year capital costs for this project would be approximately $50,000. This
cost includes engineering traffic studies, design, and construction of minor improvement. During the
FY19 and FY20 budget process, council has approved a budget of $50,400 from the Vehicle
Registration Fee. Future investment is needed in order to provide upkeep for the improvement and
expand to other schools within the City.
Estimated Project Schedule
Timeline
Project Design FY 2020-21 and on-going every 2 to 3 years
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
There are no operational costs associated with this project.
42
10.A.a
Packet Pg. 27 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Las Animas Park Tennis Court-
Fence Replacement
Project No. 800120
Category Other Structures & Facilities Department Public Works/Parks
Project Type Replacement Project Manager Bill Headley
Council Priorities Ensure Financial Stability, Provide
Opportunities for Meaningful Public
Engagement, Ensure
Neighborhoods Benefit Equally
from City Services
Location Las Animas Park
Project Description and Purpose
This project would replace the fences around four of the six tennis courts at Las Animas Park. These
12-foot-tall chain-link fences, which were built in 1974, have sections that are rusted and falling apart.
The project would also include replacement of several structural fence poles, which have been
weakened due to high winds and heavy use.
Project Justification
The Las Animas Park tennis courts are heavily used by local residents and the Gilroy Tennis Club
(which funds the resurfacing of the courts every few years at no cost to the City). The rusted bottom
sections of the galvanized chain-link fences are, practically speaking, beyond repair. Multiple fence
contractors have evaluated the fences and recommended replacement instead of continuing repairs.
The deficient structural poles could fail during a high-wind storm, which could cause a total failure of
the fences and render the tennis courts unusable.
Master Planning Documents
This project is not specifically listed in any master plan document, but it does meet a goal of the City’s
Parks & Recreation System Master Plan, which is to pursue a variety of financing mechanisms for
acquisition, development, long-term operations, and maintenance of the City’s parks and recreation
system.
43
10.A.a
Packet Pg. 28 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800120)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design
CEQA
Construction
Const.
Support
Total $ $ $ $ $ $
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $
Financial Comments
This project was added to the CIP and approved for funding in the FY20 budget. Capital cost is
estimated at $47,000 (including construction, design, management and inspection)
Estimated Project Schedule
Timeline
Project Design FY2020-21
Project Advertisement FY2020-21
Project Construction FY2020-21
Project Completion FY2020-21
Operational Cost Impact
Operational costs should be reduced for several years by removing the need to constantly repair the
broken bottom of the fences.
$47,000
44
10.A.a
Packet Pg. 29 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Golf Course Water Tank
Replacement
Project No. 800160
Category Facilities Department Public Works/Facilities
Project Type Replacement Project Manager
Council Priorities Ensure Financial Stability Location Gilroy Golf Course
Project Description and Purpose
This project would replace the current recycled water storage tank at Gilroy Golf Course. The project
would include the design of a suitable concrete pad for an 8,000 gallon water storage tank,
replacement of the current tank, duplication of the auto-fill plumbing, and an upgrade to the hardware
associated with the current irrigation system.
Project Justification
Recycled water is a reliable source of water for landscape irrigation, agriculture, and industrial
operations. It can contribute to the long-term water security of the region by alleviating water supply
challenges such as recurring droughts, residential and commercial growth, and the variability of
imported water. The existing 8,000 gallon recycled water tank at Gilroy Golf Course is severely
corroded and needs to be replaced. The tank is used for irrigation, so should it rupture, the golf
course would not be able to irrigate their greens and fairways. This tank has already received
temporary repairs to seal leaks. The tank was professionally assessed by a consultant and it was
recommended that the tank be replaced. A new tank is needed to ensure the greens and fairways are
irrigated and the golf course can remain open.
Master Planning Documents
Gilroy Golf Course receives its recycled water from the South County recycled water distribution
system. The South County Recycled Water Master Plan (Master Plan) was prepared in 2004 by the
Santa Clara Valley Water District (Valley Water) and the South County Regional Wastewater
Authority (SCRWA), with participation from the cities of Gilroy and Morgan Hill. The Master Plan was
updated in 2015.
Gilroy Golf Course Entrance
Hecker Pass Highway (SR152)
Recycled Water
Storage Tank
45
10.A.a
Packet Pg. 30 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800160)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design
CEQA
Construction
Const.
Support
Total $ $ $ $ $ $ $
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $
Financial Comments
Estimated Project Schedule
Timeline
Project Design FY2020-21
Project Advertisement FY2020-21
Project Construction FY2020-21
Project Completion FY2020-21
Operational Cost Impact
This project would reduce operational costs because temporary repairs would no longer be needed.
90,000
46
10.A.a
Packet Pg. 31 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Citywide Sidewalk Condition
Assessment
Project No. 800200
Category Streets/Curbs & Sidewalks Department Public Works/Engineering
Project Type Rehabilitation Project Manager Nirorn Than
Council Priorities Enhanced Public Safety Location Citywide
Project Description and Purpose
The purpose of this project is to develop a Sidewalk Network Management Program. This program
would include sidewalk and curb ramp data collection, condition rating, and maintenance
optimization. Since 1995, the City has conducted a Sidewalk Assessment Program. This program
was based on data collected by volunteers that did not necessarily have the proper training and
expertise in ADA-compliance review and quantitative data analysis. This project is designed to
supplement the previously collected data and provide recommended maintenance strategies. This will
allow the City Council to evaluate the recommendations and determine the appropriate level of future
investment needed to achieve the desired outcome. Once completed, this program will function
similar to that of the Pavement Management Program.
Project Justification
According to the California Streets and Highways Code, property owners are responsible for the
maintenance and upkeep of the sidewalks fronting their property. In order to create a more walkable
community, the Council has allocated funds in the past to improve the sidewalk network and assist
property owners with ensuring the sidewalks in front of their properties are safe. The previous
investments in sidewalk improvements have been inconsistent. This important City infrastructure
requires a more comprehensive program to enable the evaluation and implementation of sidewalk
improvements throughout the City.
Master Planning Documents
This project is not specifically listed in any master plan document, but it is consistent with the City’s
General Plan goals and policies. These goals and policies include correcting deficiencies and
ensuring pedestrian facilities serve the function they are intended to serve.
47
10.A.a
Packet Pg. 32 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800200)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Consulting
Services $125,000 $125,000
Salaries &
Wages $20,000 $20,000
Total $145,000 $ $ $ $ $ $145,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $
Financial Comments
The data collection cost and system initialization is estimated at $145,000 which is funded in the
FY20 Operating budget. Under the current sidewalk replacement program, it is recommended that
this project be conducted every 10 years to determine City sidewalk conditions and level of liability
risks associated with defective sidewalks.
Estimated Project Schedule
Timeline
Phase 1, Data Collection FY2019-20
Phase 2, System Initialization FY2019-20
Project Construction N/A
Project Completion Ongoing – Every 10 years
Operational Cost Impact
There are no operational costs associated with this project.
48
10.A.a
Packet Pg. 33 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Orchard & Tenth Crosswalk
Enhancements
Project No. 800210
Category Streets/Pavement Markings Department Public Works/Engineering
Project Type New Project Manager Eric Argamaso
Council Priorities Enhanced Public Safety Location Tenth Street/Orchard Drive
Project Description and Purpose
This project would install a Rectangular Rapid Flashing Beacon (RRFB) system at the intersection of
Orchard Drive and Tenth Street. The RRFBs will be installed at the northeast and southeast corners
of the intersection to increase the safety of students crossing the street to attend Gilroy High School.
As part of this project, the existing curb and gutter will be extended to create “bulb-outs”, which are
curb extensions used to narrow the roadway, shorten the pedestrian crossing distance, and provide
additional pedestrian refuge areas at intersections.
Project Justification
This project is needed to increase the safety of pedestrians crossing Tenth Street to reach the high
school. The current pedestrian crossing distance is approximately 80 feet in length. Traffic on
Orchard Drive is controlled by a stop sign and traffic on Tenth Street is uncontrolled. Although drivers
are required by law to yield to pedestrians crossing the street, there have been complaints of drivers
not yielding to pedestrians at this location. The RRFB system will increase safety by alerting drivers
that pedestrians are crossing the street. The addition of bulb-outs will reduce the pedestrian crossing
distance to approximately 50 feet and will provide a raised concrete pad for installing the RRFBs,
making them more visible to drivers and less likely to be damaged by vehicles.
Master Planning Documents
This project is not specifically listed in any master plan document, but it is consistent with the City’s
General Plan goals and policies. These goals and policies include correcting deficiencies and
ensuring pedestrian facilities serve the function they are intended to serve.
RRFB System at Wren Avenue and Byers Street
Uncontrolled Crossing at Orchard Drive and Tenth Street
49
10.A.a
Packet Pg. 34 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800210)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design $16,000 $16,000
CEQA
Construction $96,000 $96,000
Const.
Support $11,000 $11,000
Total $16,000 $107,000 $ $ $ $ $123,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $
Financial Comments
Estimated Project Schedule
Timeline
Project Design FY2019-20
Project Advertisement FY2020-21
Project Construction FY2020-21
Project Completion FY2020-21
Operational Cost Impact
There are no operational costs associated with this project.
50
10.A.a
Packet Pg. 35 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Traffic Circulation Master Plan
Update
Project No. 800240
Category Streets/Planning Department Public Works/Engineering
Project Type New Project Manager Gary Heap
Council Priorities Ensure Financial Stability Location Citywide
Project Description and Purpose
The update of the Traffic Circulation Master Plan will include a review of transportation projects based
on the updated General Plan and the City’s travel forecast model. It will include the identification of all
intersections (both short-term and long-term) that do not meet the City’s adopted Level of Service
(LOS) Standard, and will determine the level of improvements needed to bring levels of service into
compliance. The traffic analysis will include a review of intersection operations, opportunities for
needed improvements, and sufficient conceptual design to identify project challenges, project right-of-
way needs, and preliminary cost estimates. The updated Traffic Circulation Master Plan will be the
basis for an update to the City's Traffic Impact Fee (TIF) Program, which is also outdated and due for
a major revision.
Project Justification
The City's Traffic Circulation Master Plan has not been updated since it was drafted in 2004. The
document needs to be revised to correspond to the updated General Plan Circulation Element, Land
Use Alternatives, and the City's updated traffic model. Once updated, the Traffic Circulation Master
Plan will be used to update the City’s Traffic Impact Fee (TIF) Program. The TIF Program establishes
the amount of Traffic Impact Fees paid by developers, and the method for reimbursement of
transportation-related development costs to developers after project completion. It is believed that
modifications to the TIF program could make the collection of traffic impact fees more beneficial to the
City.
Master Planning Documents
The Traffic Circulation Master Plan Update will be part of the new General Plan’s Circulation Element.
51
10.A.a
Packet Pg. 36 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800240)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Consulting
Services $20,000 $20,000
Salaries &
Wages $155,000 $155,000
Total $20,000 $155,000 $ $ $ $ $175,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $
Financial Comments
This project was funded during the FY20 CIP Budget cycle in the amount of $175,000. No additional
funds are being requested at this time.
Estimated Project Schedule
Timeline
Project Design
Project Advertisement FY2019-20
Project Construction
Project Completion FY2020-21
Operational Cost Impact
There are no operational costs associated with this project.
52
10.A.a
Packet Pg. 37 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Bridge Preventative
Maintenance Program
Project No. 800260
Category Streets/Bridges & Other
Structures
Department Public Works/Engineering
Project Type Rehabilitation Project Manager Julie Oates
Council Priorities Ensure Financial Stability,
Enhance Public Safety
Capabilities
Location Six Bridges at Various
Locations within the City
Project Description and Purpose
This project includes cleaning and treating bridge decks with High Molecular Weight Methacrylate
(HMWM) at six bridges throughout the City. The project will also include replacing traffic stripes and
pavement markings, and other incidental and appurtenant work necessary for the proper construction
of the improvements. The purpose of the project is to extend the life of bridges by performing certain
qualifying items of work, classified as “preventative maintenance”, to keep these bridges in
structurally good condition while conserving limited funds for other bridges which may require major
rehabilitation or replacement.
Project Justification
In April 2006 Caltrans announced the creation of the Local Assistance Bridge Preventative
Maintenance Program (BPMP). The BPMP program is funded through the Federal Highway
Administration (FHWA) Highway Bridge Program (HBP), which, for the City of Gilroy, is administered
through Caltrans District 4 Local Assistance.
Master Planning Documents
This project is not specifically listed in any master plan document, but it does meet the spirit of the
City’s Traffic Circulation Master Plan by providing a safe and well-maintained travel way.
53
10.A.a
Packet Pg. 38 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800260)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design $48,000 $48,000
CEQA $1,000 $1,000
Construction $195,000 $195,000
Const.
Support $106,000 $106,000
Total $ $ $ $ $ $ $350,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $
Financial Comments
A large portion of the Construction and Construction Management Services for this project will be
funded through the FHWA’s Highway Bridge Program, which will be reimbursed to the City upon
completion of the project.
Estimated Project Schedule
Timeline
Project Design FY2018-19
Project Advertisement FY2019-20
Project Construction FY2020-21
Project Completion FY2020-21
Operational Cost Impact
This project directly addresses maintenance needs. There are no operational costs associated with
this project.
54
10.A.a
Packet Pg. 39 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Lions Creek SCVWD Trail
West of Santa Teresa &
Tapestry
Project No. 800270
Category Parks & Trails/Trails Department Public Works/Engineering
Project Type New Project Manager Nirorn Than
Council Priorities Ensure Financial Stability,
Ensure Neighborhoods
Benefit Equally from City
Services
Location Along Lions Creek between
Santa Teresa Boulevard and
Tapestry Drive
Project Description and Purpose
This project would construct a Class I, multi-use trail approximately 2,000 linear feet in length from
Santa Teresa Boulevard to Tapestry Drive along Lions Creek. The trail would provide recreational
usage along the creek and pedestrian access between nearby neighborhoods and Christopher High
School. The scope of work would include:
Asphalt concrete Class I trail (for bicycles and pedestrians)
ADA-compliant curb ramps at all trail entrances
Concrete retaining wall
Project Justification
This project was originally approved by Council for design in 2010 as part of three major trail projects
in the City (the Ronan Channel Trail and two segments of the Lions Creek Trail). However, funds
previously allocated for this trail were diverted to the Ronan Channel Trail project to allow the Ronan
Channel Trail project to be constructed and to take full advantage of federal funds that were available.
The Lions Creek Trail project, which is currently at the 60% design phase, qualifies for future local
and federal grants for the construction phase.
Master Planning Documents
This project is in conformance with the adopted Trail Master Plan and has already received
environmental clearance, which is a prerequisite for permitting. Santa Teresa Boulevard Tapestry Drive Project Limits
55
10.A.a
Packet Pg. 40 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800270)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design $5,000 $5,000
Design $112,000 $112,000
CEQA $40,000 $40,000
Construction $992,000 $992,000
Const.
Support $92,000 $92,000
Total $ $1,241,000 $ $ $ $ $1,241,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $
Financial Comments
This project qualifies for the Measure B Bicycle & Pedestrian Capital Projects Competitive Grant
Program and Valley Water’s Access to Trails & Open Space Grant funding.
Estimated Project Schedule
Timeline
Project Design FY2020-21
Project Advertisement FY2020-21
Project Construction FY2020-21
Project Completion FY2020-21
Operational Cost Impact
There are no operational costs associated with this project. Once completed, this project will require
an annual maintenance cost of approximately $16,000 per year. The trail will also require resurfacing
(Type II Slurry Seal and Restriping) every 8 years at approximately $35,000 per treatment.
56
10.A.a
Packet Pg. 41 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Lions Creek Trail West Gap
Closure – Kern to Day
Project No. 800280
Category Parks & Trails/Trails Department Public Works/Engineering
Project Type New Project Manager Nirorn Than
Council Priorities Ensure Financial Stability,
Ensure Neighborhoods
Benefit Equally from City
Services
Location Along Lions Creek between
Santa Teresa Boulevard/Day
Road and Kern Avenue
Project Description and Purpose
This project would construct a Class I, multi-use trail approximately 4,500 linear feet in length from
Santa Teresa Boulevard/Day Road to Kern Avenue along Lions Creek. This trail would provide
recreational usage along the creek and pedestrian access between nearby neighborhoods and
Christopher High School. The scope of work would include:
Asphalt concrete Class I trail (for bicycles and pedestrians)
ADA-compliant curb cramp at all trail entrances
Concrete retaining wall
Project Justification
This project was originally approved by Council for design in 2010 as part of three major trail projects
in the City (Ronan Channel Trail and two segments of the Lions Creek Trail). However, funds
previously allocated for this trail were diverted to the Ronan Channel Trail project to allow the Ronan
Channel Trail project to be constructed and to take full advantage of federal funds that were available .
The Lions Creek Trail project, which is currently at the 60% design phase, qualifies for future local
and federal grants for the construction phase.
Master Planning Documents
This project is in conformance with the adopted Trail Master Plan and has already received
environmental clearance, which is a prerequisite for permitting.
57
10.A.a
Packet Pg. 42 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800280)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design $12,000 $12,000
Design $292,000 $292,000
CEQA $49,000 $49,000
Construction $2,464,000 $2,464,000
Const.
Support $203,000 $203,000
Total $ $3,023,000 $ $ $ $ $3,023,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $
Financial Comments
This project qualifies for the Measure B Bicycle & Pedestrian Capital Projects Competitive Grant
Program and Valley Water’s Access to Trails & Open Space Grant funding.
Estimated Project Schedule
Timeline
Project Design FY2020-21
Project Advertisement FY2020-21
Project Construction FY2020-21
Project Completion FY2020-21
Operational Cost Impact
There are no operational costs associated with this project. Once completed, this project will require
an annual maintenance cost of approximately $16,000 per year. The trail will also require resurfacing
(Type II Slurry Seal and Restriping) every 8 years at approximately $35,000 per treatment.
58
10.A.a
Packet Pg. 43 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name 50/50 Sidewalk Program Project No. 800320
Category Streets/Curbs & Sidewalk Department Public
Works/Engineering
Project Type Replacement Project Manager Nirorn Than
Council
Priorities
Ensure Financial Stability, Enhance Public
Safety Capabilities, Provide Opportunities
for Meaningful Public Engagement, Ensure
Neighborhoods Benefit Equally from City
Services
Location Citywide
Project Description and Purpose
The purpose of this program is to assist property owners in maintaining their sidewalk in a safe
manner. In doing so, the program assists residents in maintaining the condition of walkways for which
they have maintenance responsibility. To assist the property owners with these repairs, the current
program reimburses 50% of the sidewalk repair cost and 100% of any other repairs in the City’s right -
of-way, including; curb and gutter, driveway approach, street repair, tree removal (if warranted), and
replacement. To date the City has had over 1,500 residential participants, and has expended over $5
million.
Project Justification
According to the California Streets and Highway Code, the owner of a property fronting a public street
must maintain the sidewalk, curb and gutter, and park strip area in a condition that will not endanger
persons or property, or interfere with the convenient use of the area. The current sidewalk program
began in 1994, and has been a popular program. Without this reimbursement mechanism, residents
would be less likely to maintain the structural quality of their sidewalk and curb, leaving the sidewalk
system in a poor and unsafe condition.
Master Planning Documents
This project is not specifically listed in any master plan document, but it is consistent with the City’s
General Plan goals and policies. These goals and policies include correcting deficiencies and
ensuring pedestrian facilities serve the function they are intended to serve.
59
10.A.a
Packet Pg. 44 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800320)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design $8,000 $8,000 $16,000
CEQA
Construction $238,000 $238,000 $476,000
Const.
Support $10,000 $10,000 $20,000
Total $ $256,000 $256,000 $ $ $ $512,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Measure B
SB-1
Gen Fund
Total $ $ $ $ $ $ $
Financial Comments
This project has been ongoing since 1994. Council has continually supported the program and has
appropriated funds for the program for FY2019-20. It is recommended that this project continue to be
funded for FY20-21 and FY21-22, and further evaluated after the completion of the sidewalk condition
assessment which is scheduled for FY20-21. This will provide a better understanding of the City’s
overall sidewalk conditions and the budget needs to provide a continuous and safe sidewalk system.
Estimated Project Schedule
Timeline
Project Design FY2020-21, FY2021-2022
Project Advertisement FY2020-21, FY2021-2022
Project Construction FY2020-21, FY2021-2022
Project Completion FY2020-21, FY2021-2022
Operational Cost Impact
There are no operational costs associated with this project.
60
10.A.a
Packet Pg. 45 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Pavement Markings Project No. 800330
Category Streets/Pavement Markings Department Public Works/Engineering
Project Type New Project Manager Nirorn Than
Council Priorities Enhance Public Safety
Capabilities
Location Citywide
Project Description and Purpose
The purpose of this project is to upgrade and refresh existing pavement markings as needed
throughout the City per the requirements set forth by the California Department of Transportation
(Caltrans). Since 2017, the Council has approved an annual contract to restripe city streets and
maintain longitudinal pavement markings to a minimum level of retro-reflectivity. To date, the
approved funds have been expended through the restriping of approximately 127,000 linear feet of
pavement markings. It is estimated that there are a total of approximately 1.2M linear feet of markings
throughout the City.
Project Justification
Per the recently adopted 2019 California Manual on Uniform Traffic Control Devices (MUTCD), local
governments are required to maintain a minimum level of retro-reflectivity for longitudinal pavement
markings. This new standard promotes safety while providing sufficient flexibility for agencies to
choose a maintenance method that best matches their specific conditions. Table 3A-1 of the
California MUTCD provides the minimum required levels for different types of pavement markings at
various types of locations. It is recommended that this type of project be continued on an annual
basis because the retro-reflectivity of pavement striping and markings will degrade over time, and can
pose a safety hazard for drivers and pedestrians.
Master Planning Documents
This project is not specifically listed in any master plan document, but it does meet the spirit of the
City’s Traffic Circulation Master Plan by providing a safe and well-maintained travel way.
61
10.A.a
Packet Pg. 46 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (800330)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design $11,000 $11,000 $11,000 $11,000 $11,000 $55,000
CEQA
Construction $170,000 $170,000 $170,000 $170,000 $170,000 $850,000
Const.
Support $6,000 $6,000 $6,000 $6,000 $6,000 $30,000
Total $ $187,000 $187,000 $187,000 $187,000 $187,000 $935,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $
Financial Comments
Funding for this program currently comes from the Gas Tax.
Estimated Project Schedule
Timeline
Project Design FY2020-21 and Ongoing
Project Advertisement FY2020-21 and Ongoing
Project Construction FY2020-21 and Ongoing
Project Completion FY2020-21 and Ongoing
Operational Cost Impact
There are no operational costs associated with this project.
62
10.A.a
Packet Pg. 47 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Luchessa Bridge Pedestrian and Bike
Lane Safety Improvements
Project No. EN2111
Category Streets/Pavement Markings Department Public Works/Engineering
Project Type New Project
Manager
Nirorn Than
Council
Priorities
Ensure Financial Stability, Ensure
Neighborhoods Benefit Equally from
City Services
Location Luchessa Avenue between
Princevalle Street and
Thomas Road
Project Description and Purpose
This project would construct approximately 700 linear feet of pedestrian pathway along westbound
Luchessa Avenue between Princevalle Street and Thomas Road. There are currently no sidewalks
on either side of this bridge/road segment. The scope of work includes:
Concrete sidewalk
ADA-compliant curb ramps
Raised pedestrian walking
surface on the bridge
Project Justification
The pedestrian route along this segment, which is the shoulder of the road, does not provide a
vertical or horizontal separation between vehicles and pedestrians, is not ADA-compliant, and does
not meet current safety guidelines. The only feature currently provided between the shoulder and
travel way are temporary delineators, which is not their intended use. The Luchessa Bridge provides
the only pedestrian route to Gilroy High School for students that live west of Thomas Road.
Master Planning Documents
This project is not specifically listed in any master plan document. However, widening the Luchessa
Avenue Bridge to two lanes in each direction is included in the City’s Traffic Circulation Master Plan
(TCMP), which would include providing pedestrian facilities on the bridge. In addition, this project is
consistent with the City’s General Plan goals and policies which include correcting deficiencies and
ensuring pedestrian facilities serve the function they are intended to serve.
63
10.A.a
Packet Pg. 48 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (EN2111)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design $2,000 $2,000
Design $58,000 $58,000
CEQA $2,000 $2,000
Construction $461,000 $461,000
Const.
Support $46,000 $46,000
Total $ $62,000 $507,000 $ $ $ $569,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $
Financial Comments
Estimated Project Schedule
Timeline
Project Design FY2020-21
Project Advertisement FY2021-22
Project Construction FY2021-22
Project Completion FY2021-22
Operational Cost Impact
There are no operational costs associated with this project. This project would reduce maintenance
costs as City crews would no longer be required to continuously replace the temporary delineators
that are currently installed between the shoulder and travel way.
64
10.A.a
Packet Pg. 49 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Luchessa Pavement
Maintenance – Monterey to
Rossi
Project No. EN2112
Category Streets/Pavement Department Public Works/Engineering
Project Type New Project Manager Nirorn Than
Council Priorities Ensure Financial Stability,
Ensure Neighborhoods
Benefit Equally from City
Services
Location Luchessa Avenue between
Monterey Road and Rossi
Lane
Project Description and Purpose
This project would rehabilitate and maintain the pavement condition along Luchessa Avenue between
Monterey Road and Rossi Lane. The project scope includes:
Pavement rehabilitation: apply rehabilitation/reconstruction measures to remove and replace
existing poor and very poor pavement.
ADA-compliant curb ramp upgrades
Striping and pavement markings
Project Justification
This segment of Luchessa Avenue has a Pavement Condition Index (PCI) rating of 13, which is
considered a very poor street. This segment currently serves approximately 8,000 vehicles per day
and is a major thoroughfare for the commercial/industrial district on the south side of the City. This
road requires frequent and on-going pothole repairs to keep the road safe for the traveling public.
This segment will continue to degrade and remain a safety hazard for the traveling public until this
project can be constructed.
Master Planning Documents
This project is not specifically listed in any master plan document, but it does meet the spirit of the
City’s Traffic Circulation Master Plan by providing a safe and well-maintained travel way. The street is
also identified in StreetSaver as a failed street in need of reconstruction.
65
10.A.a
Packet Pg. 50 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (EN2112)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design $16,000 $16,000
Design $327,000 $327,000
CEQA $33,000 $33,000
Construction $3,289,000 $3,289,000
Const.
Support $271,000 $271,000
Total $ $376,000 $3,560,000 $ $ $ $3,936,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $
Financial Comments
At this time, no major property acquisition or utility is anticipated. However, it is understood that there
is a major recycled water pipeline project planned along this corridor which is expected to be
constructed in the next few years.
Estimated Project Schedule
Timeline
Project Design FY2020-21
Project Advertisement FY2021-22
Project Construction FY2021-22
Project Completion FY2021-22
Operational Cost Impact
This project directly addresses maintenance needs. This project, once completed, will eventually
require periodic surface maintenance treatments. These treatments will protect the surface from
water, extend its life, and reduce long-term maintenance expenses. These treatments typically occur
every 5-7 years.
66
10.A.a
Packet Pg. 51 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Mantelli & Church Bulb-Out and
Crosswalk Improvements
Project No. EN2113
Category Streets/Other Concrete Features Department Public
Works/Engineering
Project Type New Project Manager Nirorn Than
Council
Priorities
Ensure Financial Stability, Ensure
Neighborhoods Benefit Equally from City
Services
Location Mantelli Drive / Church
Street Intersection
Project Description and Purpose
This project will install improvements to enhance the safety of pedestrians crossing Mantelli Drive at
the intersection of Mantelli Drive and Church Street. The scope of work includes:
Install concrete bulb-out at the northwest corner of the intersection
Install ADA-compliant directional curb ramps at the northwest corner of the intersection
Relocate the stop sign at the northwest corner so it is closer to the travel lane
Project Justification
Staff has received multiple complaints from residents regarding pedestrian safety at this skewed
intersection, including observations of drivers turning right from southbound Church Street to
westbound Mantelli Drive without stopping at the stop sign (i.e., treating it as a “free” ri ght-turn). The
crosswalk on the west leg of the intersection is also unusually long due to the skewed geometry of the
intersection. These improvements would discourage drivers from treating the southbound right-turn
movement as a “free” right-turn.
Master Planning Documents
This project is not specifically listed in any master plan document, but it is consistent with the City’s
General Plan goals and policies. These goals and policies include correcting deficiencies and
ensuring pedestrian facilities serve the function they are intended to serve.
Project Corner
67
10.A.a
Packet Pg. 52 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (EN2113)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design $1,000 $1,000
Design $16,000 $16,000
CEQA $1,000 $1,000
Construction $118,000 $118,000
Const.
Support $6,000 $6,000
Total $ $18,000 $124,000 $ $ $ $142,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $
Financial Comments
Estimated Project Schedule
Timeline
Project Design FY2020-21
Project Advertisement FY2021-22
Project Construction FY2021-22
Project Completion FY2021-22
Operational Cost Impact
There are no operational costs associated with this project.
68
10.A.a
Packet Pg. 53 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Miller Crossing & Uvas Creek
Pedestrian Improvements
Project No. EN2115
Category Streets/Traffic Control Department Public Works/Engineering
Project Type New Project Manager Nirorn Than
Council Priorities Ensure Financial Stability,
Ensure Neighborhoods
Benefit Equally from City
Services
Location Miller Avenue / Uvas Creek
Levee Trail Intersection
Project Description and Purpose
This project would enhance pedestrian safety at the Miller Avenue/Uvas Park Drive intersection. The
scope of work would include:
Install raised concrete crosswalk for levee trail users to cross Miller Avenue
Install concrete sidewalk and retaining wall at the southwest corner of the intersection
Install ADA-compliant curb ramp at the southeast corner of the intersection
Project Justification
Staff has received multiple complaints from residents as well as comments from the Bicycle and
Pedestrian Commission regarding the safety of pedestrians crossing at this intersection. It was
reported that drivers are not making a complete stop at the intersection, more specifically at the west
leg of the intersection. As this intersection serves nearby neighborhoods, Gilroy High School,
Solarsano Middle School, and Christmas Hill Park, it is important to investigate and identify possible
solutions for this intersection. This project would also provide for ADA-compliant improvements at this
intersection.
Master Planning Documents
This project is not specifically listed in any master plan document, but it is consistent with the City’s
General Plan goals and policies. These goals and policies include correcting deficiencies and
ensuring pedestrian facilities serve the function they are intended to serve.
Uvas Park Drive Miller Avenue Conceptual Rendering of Similar Improvements
Levee Trail
69
10.A.a
Packet Pg. 54 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (EN2115)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design $1,000 $1,000
Design $15,000 $15,000
CEQA $3,000 $3,000
Construction $129,000 $129,000
Const.
Support $6,000 $6,000
Total $ $$19,000 135,000$ $ $ $ $154,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $
Financial Comments
Due to potential impacts to the Uvas Creek Levee, this project would require permitting with Valley
Water as well as the US Army Corps of Engineers.
Estimated Project Schedule
Timeline
Project Design FY2020-21
Project Advertisement FY2021-22
Project Construction FY2021-22
Project Completion FY2021-22
Operational Cost Impact
There are no operational costs associated with this project.
70
10.A.a
Packet Pg. 55 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Murray Street Sidewalk Gap
Closure
Project No. EN2117
Category Streets/Curb & Sidewalk Department Public Works/Engineering
Project Type New Project Manager Eric Argamaso
Council Priorities Ensure Financial Stability,
Enhanced Public Safety,
Ensure Neighborhoods
Benefit Equally from City
Services
Location Murray Avenue between
Kishimura Drive and
Leavesley Road
Project Description and Purpose
The Murray Avenue Sidewalk Gap Closure Project will construct approximately 2,000 linear feet of
sidewalk on the west side of Murray Avenue between Kishimura Drive and Leavesley Road. This
project would complete the pedestrian network on this segment so that pedestrian access would be
provided on both sides of the street.
Project Justification
Numerous residents and businesses on the west side of this segment of Murray Avenue do not have
pedestrian facilities along their property’s frontage. The lack of a continuous sidewalk on this segment
of Murray Avenue also impacts the ability of transit users to access the bus stops in the area. This
project will enhance safety, connectivity, and access in low- and moderate-income neighborhoods
that fall within the City’s Neighborhood Revitalization Strategy Area (NRSA), as designated by the US
Department of Housing and Urban Development’s (HUD) Community Development Block Grant
(CDBG) Program.
Master Planning Documents
This project is not specifically listed in any master plan document, but it is consistent with the City’s
General Plan goals and policies. These goals and policies include correcting deficiencies and
ensuring pedestrian facilities serve the function they are intended to serve.
71
10.A.a
Packet Pg. 56 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (EN2117)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design $9,000 $9,000
Design $122,000 $122,000
ROW $110,000 $110,000
Construction $912,000 $912,000
Const.
Support $82,000 $82,000
Total $ $241,000 $994,000 $ $ $ $1,235,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $
Financial Comments
Estimated Project Schedule
Timeline
Project Design FY2020-21
Project Advertisement FY2021-22
Project Construction FY2021-22
Project Completion FY2021-22
Operational Cost Impact
There are no operational costs associated with this project.
72
10.A.a
Packet Pg. 57 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Sidewalk Gap Closure – 8340
Swanston Lane
Project No. EN2120
Category Streets/Curbs & Sidewalk Department Public Works/Engineering
Project Type New Project Manager Eric Argamaso
Council Priorities Enhanced Public Safety,
Ensure Neighborhoods
Benefit Equally from City
Services
Location Swanston Lane between
Leavesley Road and Casey
Lane
Project Description and Purpose
This project will construct approximately 1,200 square feet of new sidewalk and 240 linear feet of new
curb and gutter on the east side of Swanston Lane between Leavesley Road and Casey Lane to
close the existing gap in continuous sidewalk. This project would complete the pedestrian network on
this segment so that pedestrian access would be provided on both sides of the street.
Project Justification
Residents have expressed safety concerns regarding the lack of continuous sidewalk along this
segment of Swanston Lane. This project will enhance safety, connectivity, and access in low- and
moderate-income neighborhoods that fall within the City’s Neighborhood Revitalization Strategy Area
(NRSA), as designated by the US Department of Housing and Urban Development’s (HUD)
Community Development Block Grant (CDBG) Program.
Master Planning Documents
This project is not specifically listed in any master plan document, but it is consistent with the City’s
General Plan goals and policies. These goals and policies include correcting deficiencies and
ensuring pedestrian facilities serve the function they are intended to serve.
73
10.A.a
Packet Pg. 58 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (EN2120)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design $13,000
CEQA
Construction $89,000
Const.
Support $4,000
Total $ $ $ $ $ $ $106,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $
Financial Comments
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
There are no operational costs associated with this project.
74
10.A.a
Packet Pg. 59 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project
Name
Update to the City’s Trails Master Plan (Bike
Master Plan)
Project No. EN2142
Category Streets/Markings Department Public
Works/Engineering
Project Type Plans & Studies Project Manager Gary Heap
Council
Priorities
Provide Opportunities for Meaningful Public
Engagement, Ensure Neighborhoods Benefit
Equally from City Services
Location Citywide
Project Description and Purpose
This project would update the City’s Trails Master Plan using a consultant specializing in bike and
pedestrian planning. The Master Plan would be updated to match the City’s current bicycle
infrastructure, review gaps in the bike network, recommend system upgrades, evaluate the network
for enhancements or modifications, and recommend alternate routes for those no longer safe or
reasonable. The plan would evaluate bike best practices/systems and make recommendations for
enhancements. The plan would also identify at least ten high priority projects that would be
individually chartered and estimated for future grant or CIP funding consideration. Input would be
obtained from the community through a series of community outreach meetings, and through the
City’s website.
Project Justification
Typically, bike Master Plans should be updated every five to ten years. The 2005 Trails Master Plan
is in need of update. This would keep the City up to date on current bike trends and other safety
considerations. This update would meet a number of high priority goals identified by the City’s Bicycle
and Pedestrian Commission (BPC). The City was also recently recognized as a Bronze Bicycle
Friendly Community. Upgrading the Master Plan would be in line with that honor. The Trails Master
Plan is 15 years old and should have been updated at least five to ten years ago. This project should
be a priority in the next one to two years.
Master Planning Documents
This project would update the City’s current Trails Master Plan (Bike Master Plan).
75
10.A.a
Packet Pg. 60 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (EN2142)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Consulting
Services $229,000 $229,000
Salaries &
Wages $21,000 $21,000
Total $ $ $250,000 $ $ $ $250,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $
Financial Comments
Estimated Project Schedule
Timeline
Project Advertisement FY2021-22
Project Planning FY2021-22
Project Completion FY2021-22
Operational Cost Impact
There are no operational costs associated with this project.
76
10.A.a
Packet Pg. 61 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Development of a Pedestrian
Master Plan
Project No. EN2143
Category Streets/Curb & Sidewalks Department Public Works/Engineering
Project Type Plans & Studies Project Manager Gary Heap
Council Priorities Provide Opportunities for
Meaningful Public
Engagement, Ensure
Neighborhoods Benefit
Equally from City Services
Location Citywide
Project Description and Purpose
This project would develop a Pedestrian Master Plan using a consultant specializing in pedestrian
and accessible planning. It would define pedestrian standards for the City including sidewalk widths;
high-priority pedestrian zones or paths of travel; right-of-way zones including furniture, walkway, and
sidewalk seating for the Downtown; and identify pedestrian needs throughout the community. It could
also include Safe Routes to School improvements. The plan would evaluate best practices, make
recommendations for enhancements, and identify at least ten high-priority projects which would be
individually chartered and estimated for future grant or CIP funding consideration. Input would be
obtained from residents through a series of public outreach meetings and through the City’s website.
Project Justification
The City currently has a Trails (and Bike) Master Plan but not a pedestrian-specific master plan. In
cases where pedestrian and bicycle needs are combined into one document, the emphasis is usually
towards bicycle improvements. The Trails Master Plan is almost silent to the needs of pedestrians
and does not include sidewalk or pathway information. Creating this Master Plan would also meet a
number of high-priority goals identified by the City’s Bicycle and Pedestrian Commission (BPC).
Master Planning Documents
This project would create a Pedestrian Master Plan, which the City does not currently have. The
Pedestrian Master Plan could be developed in conjunction with the Bicycle Master Plan.
77
10.A.a
Packet Pg. 62 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (EN2143)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Consulting
Services $320,000 $320,000
Salaries &
Wages $28,000 $28,000
Total $ $ $348,000 $ $ $ $348,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $
Financial Comments
Estimated Project Schedule
Timeline
Project Advertisement FY2021-22
Project Planning FY2021-22
Project Completion FY2021-22
Operational Cost Impact
There are no operational costs associated with this project.
78
10.A.a
Packet Pg. 63 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Update to City’s Standard
Drawings/Specifications/Design
Standards
Project No. EN2144
Category Streets/Curb & Sidewalk Department Public Works/Engineering
Project Type Plans & Studies Project Manager Gary Heap
Council Priorities Enhanced Public Safety,
Provide Opportunities for
Meaningful Public Engagement
Location Citywide
Project Description and Purpose
This project would update the City’s Standard Drawings, Engineering Specifications, and Engineering
Design Standards to current industry standard practices. This would be done through the use of a
consultant hired through an RFP process.
Project Justification
It’s important to keep up to date on current engineering standards and best practices. The current
City Standard Details and specifications were recently updated in 2014. However, the City’s
specifications are inadequate for a city the size of Gilroy, which needs a full set of Engineering Design
Specifications and Design Standards that meet current industry standards and address es emerging
issues and requirements. In addition, the City’s current Standard Details, although recently updated,
are still outdated. There is a need to reevaluate the way improvements are constructed in the City’s
right-of-way, and to develop comprehensive standards and guidance documents to direct the
construction of future improvements.
Master Planning Documents
This project is not specifically listed in any master plan document, but it does meet the spirit of the
City’s General Plan and Water System, Sewer System, Storm Drainage System, Trails, and Parks
Master Plans by providing for properly-designed public infrastructure.
79
10.A.a
Packet Pg. 64 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (EN2144)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Consulting
Services $69,000 $69,000
Salaries &
Wages $6,000 $6,000
Total $ $ $75,000 $ $ $ $75,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $
Financial Comments
Estimated Project Schedule
Timeline
Project Advertisement FY2021-22
Project Planning FY2021-22
Project Completion FY2021-22
Operational Cost Impact
There are no operational costs associated with this project.
80
10.A.a
Packet Pg. 65 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Development of an ADA
Transition Plan
Project No. EN2145
Category Facilities/ROW Department Public Works/Engineering
Project Type Plans & Studies Project Manager Gary Heap
Council Priorities Ensure Financial Stability,
Provide Opportunities for
Meaningful Public
Engagement, Ensure
Neighborhoods Benefit
Equally from City Services
Location Citywide
Project Description and Purpose
This project would develop an ADA Transition Plan for the City of Gilroy. An ADA Transition Plan
details a program that will bring a city’s programs, procedures, practices, facilities, sidewalks and curb
ramps into compliance with Americans with Disabilities Act (ADA) requirements. The plan would be
developed with the help of a consultant that specializes in this area of expertise.
Project Justification
The Americans with Disabilities Act (ADA) of 1990 provides comprehensive civil rights protections to
qualified individuals with disabilities in the areas of employment, public accommodations, State and
Local government services and telecommunications. Cities are required to have an ADA Transition
Plan. The Transition Plan will be developed with input from community members and is intended to
ensure access to City facilities, programs and services. Items identified in the ADA Transition Plan
will be incorporated into all applicable Capital Improvement Projects. The plan will require ADA
assessment of City facilities and buildings, as well as City infrastructure in the public right-of-way.
Master Planning Documents
This project is not specifically listed in any master plan document, but it does meet the spirit of the
City’s Traffic Circulation Master Plan by providing safe and well-maintained access for disabled
persons.
Image Source: Howard Stein Hudson
81
10.A.a
Packet Pg. 66 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (EN2145)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Consulting
Services $138,000 $138,000
Salaries &
Wages $12,000 $12,000
Total $ $150,000 $ $ $ $ $150,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $
Financial Comments
Estimated Project Schedule
Timeline
Project Advertisement FY2020-21
Project Planning FY2020-21
Project Completion FY2020-21
Operational Cost Impact
There are no operational costs associated with this project.
82
10.A.a
Packet Pg. 67 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Annual Sidewalk/Curb Ramp
Project
Project No. EN2147
Category Streets/Curb & Sidewalk Department Public Works
Project Type New Project Manager TBD
Council Priorities Enhance Public Safety
Capabilities, Ensure
Neighborhoods Benefit
Equally from City Services
Location NRSA Zone
Project Description and Purpose
This project will install new sidewalk (gap closures) and curb ramps, both new and replacement of
non-compliant existing ramps, where eligible for annual Community Development Block Grant
(CDBG) funding. Currently, these improvements can happen only in the City’s NRSA zone.
Depending on the potential adoption of a city wide neighborhood revitalization area designation,
these funds may be used more broadly throughout the City in the future.
Project Justification
The City is required to install and maintain ADA accessible curb ramps and accessible sidewalk along
publicly accessible pathways within the City. This project will focus on installing and upgrading ADA
curb ramps in areas approved for CDBG funds expenditure. Consideration will also be given to
locations along streets scheduled to be paved under the annual Street Resurfacing Project, which is
funded using Measure B and SB-1 funds. This will allow the maximum use of the paving funds for
asphalt rehabilitation. Construction of these compliant new curb ramps will improve the accessibility
and safety for the pedestrians in Gilroy.
Master Planning Documents
This project is not specifically listed in any master plan document.
83
10.A.a
Packet Pg. 68 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (EN2147)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design
CEQA
Construction
Const.
Support
Total $ $ $ $ $ $ $175,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $175,000
Financial Comments
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
No impact.
84
10.A.a
Packet Pg. 69 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Downtown Sesquicentennial
Beautification Project
Project No. EN2148
Category Streets/Traffic Control Department Public Works
Project Type Rehabilitation Project Manager Gary Heap
Council Priorities Ensure Financial Stability,
Revitalize Downtown, and
Focus on Revenue Driving
Economic Development
Location Downtown
Project Description and Purpose
The City’s 150th celebration will take place in March 2020. This project will provide for
commemorative infrastructure improvements including a beautification effort in our Downtown. The
Sesquicentennial Beautification Project will:
Paint the Street Lights and Signal Poles in the Downtown a decorative black color to match
existing decorative lighting in downtown
Provide Landscaping Enhancements at key locations in the Downtown
Design a Sesquicentennial Brand Logo to be included on new Intersection and Street Name
Signs in the Downtown
Correct Deficient Alley Driveway locations along Gourmet Alley
Project Justification
The City’s 150th Birthday is a special occasion. The year will be celebrated with events and activities
commemorating Gilroy’s sesquicentennial. A new City Logo has already been designed for this
event. We can take this opportunity to enhance the Downtown to provide some low-cost
beautification improvements that will improve the look and character of the Downtown during this
celebratory year.
Master Planning Documents
This project is not specifically listed in any master plan document, but it does meet the spirit of the
Downtown Gilroy Strategic Plan.
85
10.A.a
Packet Pg. 70 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (EN2148)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design
CEQA
Construction
Const.
Support
Total $ $ $ $ $ $ $150,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $150,000
Financial Comments
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
On-going maintenance of any additional landscaping could be added to the City’s current Downtown
Landscape Maintenance Contract at a cost of $1,000 or less.
86
10.A.a
Packet Pg. 71 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name State Trash Amendments
Stormwater Compliance Project
Project No. EN2149
Category Utilities/Wastewater/Stormwater Department Public Works
Project Type New Project Manager Tanya Carothers
Council Priorities Location Citywide
Project Description and Purpose
On April 7, 2015, the State Water Resources Control Board (SWRCB) adopted the Statewide Trash Provisions
which address the impacts trash has on the beneficial uses of surface waters. The Trash Provisions establish a
statewide water quality objective for trash and a prohibition of trash discharge. The City is required to
demonstrate 100 percent compliance with the Trash Provisions within 10 years of the effective date of the
implementing National Pollutant Discharge Detection and Elimination System (NPDES) Permit. Full
compliance with the Trash Provisions requires the City to install, operate, and maintain State-certified Full
Capture System (FCS) devices that capture all trash down to 5 millimeters in size from Priority Land Use areas
(PLUs) which include Commercial, Mixed Use, Industrial, High Density Residential, and Transit Oriented
Areas.
The proposed project includes all expenses related to compliance with the Trash Amendments. Tasks for
compliance will range from studies needed to estimate budgets, resources needed to ground-truth
infrastructure shown in stormwater maps, research and calculations conducted to properly size and choose full
trash capture devices, management and upkeep of ArcGIS files, installation and long-term maintenance of
Trash devices, etc.
Project Justification
The City is completing this project as required under the State-Issued Trash Amendments and to achieve
compliance with the City’s NPDES Permit to be issued in approximately late 2020 or early 2021.
Master Planning Documents
This project is not specifically listed in any master plan document, but it does meet the spirit of the Storm Drain
Master Plan by complying with the City’s NPDES Permit.
87
10.A.a
Packet Pg. 72 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (EN2149)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design
CEQA
Construction
Const.
Support
Total $ $ $ $ $ $ $60,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $60,000
Financial Comments
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
There would be no impact to operational cost for this project.
88
10.A.a
Packet Pg. 73 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Tenth Street Bridge Widening
Over US101
Project No. EN2150
Category Streets/Bridges Department Public Works/Engineering
Project Type Rehabilitation Project Manager Faranak Mahdavi
Council Priorities Ensure Financial Stability and
Focusing on Revenue Driving
Economic Development
Location Tenth Street (Automall
Parkway) at US101
Project Description and Purpose
This project would widen the existing bridge overcrossing at the Tenth Street (Automall Parkway)/US
101/SR 152 interchange to add one additional lane in each direction. The project would include
widening the bridge structure, ramp work, grading, striping and signal modification improvements.
Project Justification
The Tenth Street (Automall Parkway)/US101/SR152 interchange is one of the major ingress/egress
points to the City and connects the City’s arterial system to US101 and SR152. It is one of only three
interchanges in the City and is located between the Leavesley Road/US101 interchange to the north
and the Monterey Road/US101 interchange to the south. Tenth Street-Automall Parkway-SR152 is
also a major gateway into the City. In peak times, especially the PM peaks, queues leading to the
interchange result in excessive back-ups along Tenth Street-Automall Parkway-SR152. Adding one
lane in each direction on the bridge will improve the flow of eastbound and westbound traffic along
this corridor during peak times, provide better access to the freeways, and enhance overall traffic
circulation in the area. The Tenth Street-Automall Parkway-SR152 corridor also provides direct
access to the commercial areas east and west of US101, and to the auto dealerships on Automall
Parkway. Improving the flow of traffic along this important arterial area could encourage economic
development in the area.
Master Planning Documents
This project is included in the City’s Transportation Master Plan and is also listed in the State
Transportation Improvement Program (STIP), which makes it eligible for State and federal funding.
89
10.A.a
Packet Pg. 74 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (EN2150)
Project Costs Total
Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project
Total
Pre-Design $53,000
Design $1,674,000
CEQA $319,000
Construction $10,636,000
Const.
Support $479,000
Permits $129,800
Total $ $$$$$ $13,310,800
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project
Total
Total $ $ $ $ $ $ $
Financial Comments
In 2018, this project was estimated to cost $10M without any contingencies or soft costs included.
Including those items could increase the project to $13M. Another funding alternative could be to
transfer the funds currently identified in the Measure B project category for the Buena Vista
interchange and use those funds to fully or partially pay for the widening of the Tenth Street
overcrossing bridge.
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
There are no operational costs associated with this project.
90
10.A.a
Packet Pg. 75 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name ADA Assessment - City
facilities citywide
Project No. FC2101
Category PW/Facilities Department PW/Facilities
Project Type Plans and Studies Project Manager TBD
Council Priorities Provide Opportunity for
Meaningful Public
Engagement and Ensure
Neighborhoods Benefit
Equally from City services
Location Citywide
Project Description and Purpose
The City has facilities that have bathrooms, entry doors, walkways, etc. that do not comply with the
American with Disabilities Act (ADA). This project would hire a consultant to thoroughly analyze City
facilities for ADA compliance. The recommendations from the report would be used to develop a
scope of work for a contractor to make the needed modifications/improvements.
Project Justification
This project would make City facilities more accessible for people with disabilities, and it would bring
the City into compliance with ADA. Having buildings ADA accessible is legally required.
Master Planning Documents
This project is not specifically listed in any master plan.
91
10.A.a
Packet Pg. 76 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (FC2101)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design
CEQA
Construction
Const.
Support
Total $ $ $ $ $ $ $75,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $75,000
Financial Comments
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
There would be no impact to operational cost for this project.
92
10.A.a
Packet Pg. 77 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Aquatics Pool Re-plastering Project No. FC2103
Category Facilities/Building systems Department PW/Facilities
Project Type Rehabilitation Project Manager Walter Dunkle
Council Priorities Ensures Neighborhoods
Benefit Equally from City
Services
Location 850 Day Road
Project Description and Purpose
There are two pools at Christopher High School, an Olympic pool and a shallow wading pool. The
plaster on the bottom of the shallow pool is peeling, cracking and bubbling. The plaster has been
repaired approximately 8 times over the last three years. The temporary fixes are not enduring so the
entire pool requires re-plastering.
Project Justification
The County Health Department Health Inspector has documented that the bottom of the pool is
rough, with areas of cracking and buckling. The City’s Facilities staff has done some temporary
repairs to address these areas; however the repairs are not enduring. At some point the pool may be
shut down by the inspector. This pool is used by both the school and the public, and is considered a
significant community benefit. Losing access to this pool would be a significant impact to a number of
entities.
Master Planning Documents
This project is not in any master plan.
93
10.A.a
Packet Pg. 78 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (FC2103)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design
CEQA
Construction
Const.
Support
Total $ $ $ $ $ $ $200,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $200,000
Financial Comments
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
Annual re-plastering is expected every 10 to 15 years.
94
10.A.a
Packet Pg. 79 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Boxing Gym - Lighting
Improvements
Project No. FC2104
Category Facilities/Building systems Department PW/Facilities
Project Type Rehabilitation Project Manager TBD
Council Priorities Enhance Public Safety
Capabilities, Revitalize
Downtown and Focus on
Revenue Driven Economic
Development
Location 7400 Alexander Street
Project Description and Purpose
The Boxing Gym parking lot is a 0.58 acre lot with 58 parking spaces. The lot is not adequately lit
with many areas that are in shadow after the lights turn on. The parking lot requires a new lighting
design, poles and electrical service.
Project Justification
Council has identified parking in downtown as one of its main priorities. This parking lot provides
nearby parking for downtown visitors.
Master Planning Documents
This project is an action item in the Downtown Gilroy Strategic Plan.
95
10.A.a
Packet Pg. 80 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (FC2104)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design
CEQA
Construction
Const.
Support
Total $ $ $ $ $ $ $125,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $125,000
Financial Comments
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
The operational costs would be minimal due to the long life of the LED bulbs.
96
10.A.a
Packet Pg. 81 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Facilities Needs Assessment Project No. FC2112
Category Facilities/Building systems Department PW/Facilities
Project Type Replacement Project Manager TBD
Council Priorities Retain Stability in the City’s
Workforce and Revitalize
Downtown
Location Various Locations
Project Description and Purpose
A facilities needs assessment is a long-term plan for City facilities. The assessment provides a
detailed condition analysis of City facilities by evaluating building interior and exterior structures,
building envelope (roof, walls windows doors, etc.), Mechanical, Electrical and Plumbing (MEP)
Systems, maintenance needs and accessibility issues. Essentially, the assessment would identify
areas that require repair or improvement and provide a cost estimate to improve facilities to a level
that can be maintained by staff. This assessment could also be used as the City Facilities portion of
the ADA Transition Plan (see FC2101 and EN2145).
Project Justification
The recommendation for a facility needs assessment was made during a 2017 Council budget study
session regarding unfunded liabilities. A City-wide Facilities Needs Assessment was approved by the
City Council as part of a decision package for the Fiscal Year 2017-2018 budget. It is also an action
item in the 2017 Strategic Implementation Action Plan to evaluate parks and facilities for accessibility.
Master Planning Documents
This project is not specifically listed in any master plan document.
97
10.A.a
Packet Pg. 82 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (FC2112)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design
CEQA
Construction
Const.
Support
Total $ $ $ $ $ $ $155,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $155,000
Financial Comments
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
There is no additional operational cost; however, there will be a reduction in cost if recommended
repairs are made to the City’s buildings.
98
10.A.a
Packet Pg. 83 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Park-Civic Facilities Sidewalk
Improvements Citywide
Project No. FC2115
Category Facilities/Sidewalk Department PW/Facilities
Project Type Replacement Project Manager TBD
Council Priorities Ensure Financial Stability and
Ensure Neighborhood Benefit
Equity from City Services
Location Various Locations
Project Description and Purpose
The City owns several properties including a Civic Center, a library, a Police Station, various parks, parking
lots and other parcels. The purpose of this project would be to correct all defective sidewalk/walkways with a
½” or more vertical separation that would be considered a “trip and fall” location that could leave the City open
or liable to risk of law suit. This project would analyze the sidewalk condition along the frontage of all City
owned property, and within all City parks and public-accessible properties, and design and implement
corrective measures to repair the defective areas to City Standards.
Project Justification
The California Streets and Highways Code require the adjacent property owner to be responsible for the
sidewalk condition that is fronting their property. Unfortunately, City Public Works Maintenance Staff does not
have the capacity to replace defective sidewalk along the frontage of City Parks, or at other locations where
the City is responsible for the maintenance of safe sidewalk. The current City practice is to use high visibility
paint to make these locations visibly identifiable, but not necessarily to make the repairs. This identifies
potentially unsafe sidewalk conditions for the public, but leaves them in the path of travel where the public can
trip and then file a claim against the City. This project corrects a current safety issue by identifying all defective
public accessible sidewalks within City parks and facilities, and along the frontage of City owned properties,
and proposes to replace the defective sidewalk with City Standard accessible sidewalk. This project meets
several City Council goals including: Ensure Financial Stability and Ensure Neighborhood Benefit Equity from
City Services. Depending on the scope of the project, it may be phased over several years.
Master Planning Documents
This project is an action item in the Downtown Gilroy Strategic Plan.
99
10.A.a
Packet Pg. 84 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (FC2115)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design
CEQA
Construction
Const.
Support
Total $ $ $ $ $ $ $100,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $100,000
Financial Comments
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
It is recommended that this type of project be conducted every 10 years to determine if the City remains risk
free or risk neutral regarding City sidewalk conditions.
100
10.A.a
Packet Pg. 85 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name City-owned Parking Lots
Resurfacing – Various
Locations
Project No. FC2116
Category Facilities/Paving Department PW/Facilities
Project Type Rehabilitation Project Manager TBD
Council Priorities Downtown Revitalization Location Various Locations
Project Description and Purpose
Currently the City owned and maintained 8 parking lots in the downtown. This totals to approximately 128,540
square feet of paved area. The purpose of this project is to resurface and restripe these parking lots. The
scope of work includes:
Asphalt resurfacing
Pavement marking
Wheel stops
Striping of ADA parking stalls and accessible route
Storm water management
Parking lot signage
Project Justification
Over the years, the pavement surface in all of the parking lots has degraded. Many features of the parking lots
such as parking stall marking, directional arrows, and signs also require replacement. In addition to the
restoration and rehabilitation work, this also provides an opportunity to review the current parking layout and
optimize them to better suit the adjacent land use. Per Title II of the ADA, this parking lot resurfacing also
triggers ADA improvement. As this is an offsite parking lot, ADA accessibility shall comply with the City
Municipal Code. Since a number of these lots support the Downtown, this project meets the City Council Goal
of Downtown Revitalization.
Master Planning Documents
This project is not specifically listed in any master plan document, but it does meet the spirit of the Downtown
Strategic Plan by providing adequate parking to accommodate additional customers and residents thus
improving the downtown’s market conditions and growing appeal as a residential and commercial area.
101
10.A.a
Packet Pg. 86 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (FC2116)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design
CEQA
Construction
Const.
Support
Total $ $ $ $ $ $ $488,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $488,000
Financial Comments
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
Parking lots should be maintained and resurfaced every 8-10 years.
102
10.A.a
Packet Pg. 87 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Senior Center - ADA
Restroom Access
Project No. FC2117
Category Facilities/Building systems Department PW/Facilities
Project Type Rehabilitation Project Manager Walter Dunkle
Council Priorities Provide Opportunities for
Meaningful Public
Engagement
Location 7371 Hanna Street
Project Description and Purpose
This request is for the installation of ADA access for the men and women’s restrooms located at the
Gilroy Senior Center. Currently, the entry to both the men and women’s bathrooms is via a door
handle. A large number of Senior Center participants have mobility limitations and get around using a
walker, cane, scooter or a wheel chair. Using these restroom facilities is problematic and challenging
for center participants due to their physical limitations. Although the interior of the restrooms are ADA
accessible, as well as the Senior Center entry, the bathroom entries are not.
Project Justification
To provide physical access to the Senior Center restroom, there needs to be the installation of self-
opening restroom entry doors. The request is for the restroom entries to be ADA accessible doors to
include the installation of square handicap push plates, consistent with the Senior Center entry doors.
Currently, Senior Center participants need to tightly grasp and pull open the restroom door handles to
use the facilities. They have expressed difficulty with this effort while simultaneously navigating their
use of a walker, cane, scooter or wheelchair. Additionally, Title III of the ADA requires public places,
like hotels, retailers, doctor's offices and restaurants, to have handicap accessible facilities.
Master Planning Documents
This project is not specifically listed in any master plan document.
103
10.A.a
Packet Pg. 88 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (FC2117)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design
CEQA
Construction
Const.
Support
Total $ $ $ $ $ $ $50,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $50,000
Financial Comments
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
There are no maintenance costs associated with this request.
104
10.A.a
Packet Pg. 89 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Senior Center Roof
Replacement
Project No. FC2120
Category Facilities/Building systems Department PW/Facilities
Project Type Replacement Project Manager TBD
Council Priorities None Location 7371 Hanna Street
Project Description and Purpose
The Senior Center roof shingles are over 25 years old and have lost its “grip” surface. The loss of the
grip surface makes the roof slippery so it is difficult to walk on it to repair roof mounted equipment.
Additionally, the deteriorated shingles may develop leaks. This project would replace the roof
shingles.
Project Justification
The Senior Center is a popular recreational facility that would be impacted by roof leaks should they
occur in the future given the age of the roof. Furthermore, new roof shingles would allow staff to
traverse the roof easier and more safely.
Master Planning Documents
This project is not specifically listed in any master plan document.
105
10.A.a
Packet Pg. 90 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (FC2120)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design
CEQA
Construction
Const.
Support
Total $ $ $ $ $ $ $120,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $120,000
Financial Comments
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
No impact.
106
10.A.a
Packet Pg. 91 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Wheeler - Cooling Center
Upgrades
Project No. FC2121
Category Facilities/Building systems Department PW/Facilities
Project Type Rehabilitation Project Manager TBD
Council Priorities Enhance public safety
capabilities
Location 250 Sixth Street
Project Description and Purpose
Installing a HVAC system that would be able to cool such a large building would be a substantial
undertaking, and would require upgrading the electrical panel that supplies power to the building,
upgrading the generator that supplies emergency power to the building, and engineering a large
HVAC system that Wheeler’s 1940 structure could support.
Project Justification
Wheeler has been designated as a Cooling Center, should the City determine the outdoor
temperature reach a point that it is a danger to the public whom might not have a place to shelter.
However, the main gym (our shelter location) does not have air conditioning.
At this time, it is hard to justify this expense to the 1940 building that does not currently have the
electrical infrastructure to support. It may be cheaper to add a generator to a building that already has
HVAC and electrical infrastructure that would support this. One building like this would be the Senior
Center.
Master Planning Documents
This project is not specifically listed in any master plan document.
107
10.A.a
Packet Pg. 92 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (FC2121)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design
CEQA
Construction
Const.
Support
Total $ $ $ $ $ $ $650,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $6500,000
Financial Comments
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
Since the building was built to 1940 standards, heating and cooling costs would be very expensive for
this building. If the system was only used when the building was used as a cooling center (perhaps
only once or twice every two years) the operational costs would not be very high. If the system was
used for all the events and programs in the gym, these costs would be substantial.
108
10.A.a
Packet Pg. 93 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Wheeler Evacuation Center
Upgrades
Project No. FC2122
Category Facilities Department Recreation
Project Type Replacement Project Manager Walter Dunkle
Council Priorities Enhance public safety
capabilities
Location 250 Sixth Street
Project Description and Purpose
This project requests includes the upgrading of bathrooms, showers, flooring, plumbing and
countertops to be ADA accessible. Additionally, the replacement of the kitchenette countertops, sinks,
flooring and appliances are also included in this request.
Project Justification
It was noted during the most recent EOC activation, Garlic Incident, that although Wheeler Center is
designated as a city shelter, it is not equip to support the sheltering of displaced residents for more
than a 24 hour period. This facility does not have working showers, is outdated and is not ADA
accessible. The gym does not have air conditioning and the kitchenette counters, plumbing and
appliances are not suitable to support a large-scale EOC activation.
The City of Gilroy needs to be able to provide an operable EOC shelter for future activations. During
the recent Garlic Incident, with Wheeler Center not having the adequate amenities of an EOC shelter,
all displaced individuals had to be housed at a school shelter. Since this shelter was off-site, this
required City staff to transport displaced individuals to a school shelter site, as well as transport
meals, personal hygiene products, and social services, resulting in additional resources and delayed
services.
Master Planning Documents
This project is not specifically listed in any master plan document.
109
10.A.a
Packet Pg. 94 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (FC2122)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design $200,000
CEQA
Construction
Const.
Support
Total $ $ $ $ $ $ $200,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $200,000
Financial Comments
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
There will not be a change in operational costs. Actually, with improvements, it will be more cost
effective and more efficient to maintain.
110
10.A.a
Packet Pg. 95 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Wheeler Trellis Replacement Project No. FC2124
Category Facilities/Building systems Department PW/Facilities
Project Type Replacement Project Manager TBD
Council Priorities Enhance public safety
capabilities
Location 250 Sixth Street
Project Description and Purpose
Wheeler has a 300 foot trellis surrounding over half of the building. This structure has significant rot
and about 15% of the trellis structure has been removed to prevent structural failure. Trellis removal
and possible replacement is needed.
Project Justification
The main horizontal support beams are of concern because parts of the structure would fall if the
beams fail. This structure at a minimum needs to be removed. Employees and visitors walk under
trellises when Wheeler is open for preschool classes, or events. Further deterioration of the trellis
could create a dangerous situation for staff and Wheeler customers.
Master Planning Documents
This project is not specifically listed in any master plan document.
111
10.A.a
Packet Pg. 96 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (FC2124)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design
CEQA
Construction
Const.
Support
Total $ $ $ $ $ $ $400,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $400,000
Financial Comments
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
No additional operational cost. Any of the three options will lower operational maintenance of the
current trellis.
112
10.A.a
Packet Pg. 97 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Christmas Hill Park Trail
Wayfinding Signage
Project No. PK2101
Category Parks/ Trails Department Public Works/Parks
Project Type New Project Manager TBD
Council Priorities Provide Opportunities for
Meaningful Public
Engagement
Location 7050 Miller Ave
Project Description and Purpose
This project will design and install wayfinding signs at Christmas Hill Park and Uvas Debell Creek
Park Preserve, and include associated trail maps and program graphics for community outreach. The
sign project is needed to establish standard City hiking trail signs that compliment and support to
various south County healthy living events and programs. Christmas Hill Park and the Uvas Creek
channel trails are proposed City park areas recommended to start and promote strong healthy
walking by all age groups. Under guidance from a landscape consultant, County Health, and the
Gilroy Park and Recreation Commission, create a park trail signage program.
Project Justification
Community comments from healthy living events, from the Park and Recreation Commission, and the
County Health Living has indicated that the City has a need to provide significant park trail signs and
maps of the City’s trail system starting at Christmas Hill Park. This should include public trail
interfacings with all surrounding communities to Christmas Hill Park and the adjacent Uvas Debell
Park Preserve.
Master Planning Documents
This project is not specifically listed in any master plan document, but it does meet the spirit of the
Parks Master Plan by providing a safe and well-maintained park.
113
10.A.a
Packet Pg. 98 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (PK2101)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design
CEQA
Construction
Const.
Support
Total $ $ $ $ $ $ $65,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $65,000
Financial Comments
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
The annual estimated sign maintenance costs will gradually increase over a 5 to 10 year period from
$200 to $400 per year for direct repair materials to $600 to $800 per year based on sign hardiness
and park visitor impacts
114
10.A.a
Packet Pg. 99 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Miller Park Restrooms –
Underground Electrical
Service
Project No. PK2103
Category Facilities/ Building Systems Department Public Works/Parks
Project Type New Project Manager TBD
Council Priorities Ensure neighborhoods benefit
equally from City services
Location 7851 Carmel Street
Project Description and Purpose
The Miller Park restroom has an inadequate above ground electrical service that extends from the
alley approximately 30’ to a temporary construction service. The electrical service is then wired
underground from the temporary electrical service to the restroom. This project will complete the
2017 Miller Park Restroom Replacement Project by fully undergrounding the electrical service.
Project Justification
Construction of the Miller Park restroom was partially funded with Federal funds. Park projects which
receive any federal funding are required to have all overhead utilities routed underground, per State
and Federal regulations.
Master Planning Documents
This project is not specifically listed in any master plan document, but it does meet the spirit of the
Parks Master Plan by providing a safe and well-maintained park.
115
10.A.a
Packet Pg. 100 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (PK2103)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design
CEQA
Construction
Const.
Support
Total $ $ $ $ $ $ $35,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $35,000
Financial Comments
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
Reduced operating cost because project will eliminate vandalism repairs to the temporary electrical
service.
116
10.A.a
Packet Pg. 101 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Ranch Site Abandoned House
and Construction Trailer
Demolition
Project No. PK2104
Category Facilities/ Demolition Department Public Works/ Parks
Project Type New Project Manager TBD
Council Priorities Enhance Public Safety
Capabilities, Ensure Financial
Stability
Location 7049 Miller Ave
Project Description and Purpose
This project is to demolish derelict structures that are not part of the Parks Master Plan. The failing
construction trailer is left over from the 1996 Uvas Creek Preserve Restoration Project. The trailer
and Glen Loma Ranch house are uninhabitable, unrepairable, unsellable, and are an attractive
nuisance. These structures were previously scheduled to be demolished; however, the work was
cancelled due to the 2008-09 recession and the project has been lost and forgotten.
Project Justification
This project would eliminate potential health and safety hazards caused by deteriorating, unusable
structures, which would also reduce the City’s liability for any related damage or injuries. Work should
be scheduled as soon as is practicable, as this project is already more than 10 years overdue, and is
a nuisance location about which the City is aware.
Master Planning Documents
This project is not specifically listed in any master plan document, but it does meet the spirit of the
Parks and Recreation Systems Master Plan by providing a safe and well-maintained park.
117
10.A.a
Packet Pg. 102 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (PK2104)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design
CEQA
Construction
Const.
Support
Total $ $ $ $ $ $ $50,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
$50,000
Financial Comments
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
None.
118
10.A.a
Packet Pg. 103 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Las Animas Veterans Park
Miscellaneous Facility
Rehabilitation
Project No. PK2106
Category Park Department Public
Works/Operations/Parks
Project Type Rehabilitation and Upgrade Project Manager TBD
Council Priorities Provide Opportunities for
Meaningful Public
Engagement, Ensure Financial
Stability, Ensure
Neighborhoods Benefit Equally
from City Services, Enhance
Public Safety Capabilities
Location 400 Mantellli Drive
Project Description and Purpose
Restore, renovate, and upgrade the “Oaks” restroom, the Lake Side group barbecue area lighting and
electrical, and complete removal and upgrade of existing deteriorated asphalt pathways and replace with new
concrete walkways. Paths would be widened and upgraded from 10 feet to 12 feet to meet City trail standards.
Wider pathways provide sufficient width to bicycles, walkers in both directions, as well as use by park
maintenance vehicles. Renovation of the main Mantelli parking lot is included with pathway work. Path
improvements would require replacement of several small bridges and overhaul of the path lighting system.
Replacement and upgrade of the original low flow pathway channel culvert crossing near the Tennis Courts
and minor ballfield to meet safe storm flows is also included. A new all-weather bridge for park visitors and
service vehicles at the culvert is required. The fully base rock pathway between the Wayland and Hanna
Parking Lots is included. Both the Hanna Parking Lot and base rock pathway will need first time lights
provided.
Project Justification
Las Animas Veterans Park is the most heavily used park in the City system. In addition to the tennis courts,
bicycle and skate park sections, there are several barbecue areas, shade trees, and trails for walking and
accessing facilities. The Oaks restroom is old and needs overhauling for facilities and utilities. Many of the
pathway service roads are more than 40 years old, constructed of asphalt, and have received minor
maintenance over time. The original material is worn through in many locations, reducing the trails to base
119
10.A.a
Packet Pg. 104 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
rock. The City has received complaints from park users who have fallen or been splashed at deteriorated
locations of the trails. The upgraded concrete pathways would have a long life to provide the use required to
serve this neighborhood. The need to upgrade and replace failed pathway and install new parking lot lights for
park users is an important user safety and security measure.
Master Planning Documents
This project is not specifically listed in any master plan document, but it does meet the spirit of the Parks and
Recreation Systems Master Plan by providing a safe and well-maintained park.
Project Funding (Public Works) (PK2106)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design
CEQA
Construction
Const.
Support
Total $ $ $ $ $ $ $1,100,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
State Park
Grant
Gen Fund
Total $ $ $ $ $ $ $1,100,000
Financial Comments
Funding for this project will be from state park grant funding and possibly the General Fund.
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
Operational cost impacts should be neutral. There will be less path and reduce restroom care work required,
but there is more irrigation adjustment work that will take time to complete.
120
10.A.a
Packet Pg. 105 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Christmas Hill Ranch Site
Master Planning
Project No. PK2107
Category Parks Department Public Works
Project Type Plans and Studies Project Manager TBD
Council Priorities Provide Opportunities for
Meaningful Public
Engagement, Enhance Public
Safety Capabilities
Location 7049 & 7050 Miller Ave
Project Description and Purpose
Update and complete out of date master plan for the Christmas Hill Park complex, including the
Ranch Site, the Hillside addition, and the Uvas Channel. Due to the complex interrelations with
varying use and need areas, this project is needed as soon as possible to guide actions which will
have lasting impact on health, safety, environmental protection, and best public benefit. Proper time
should be allowed to complete the plan adequately, suggesting a multi-year schedule to work the
planning through with experts, City departments, state agencies and the public.
Project Justification
There is an old Master Plan for Christmas Hill Park, but there have been significant additions and
improvements without updating that plan. The important adjacent interrelation with the Uvas Creek
channel and wildlife habitat should be explored and properly planned with regard to their unique
needs and opportunities. Important decisions are required related to restrooms, demolition of out of
date and dilapidated facilities, preservation of historic features, addition of barbecue areas, upgraded
trail planning and adequate lighting. As the focal point of the Gilroy Garlic Festival, and adjacent to a
protected fishery, master planning this area is imperative to assure meeting of public needs,
environmental protection, and historic preservation.
Master Planning Documents
This project is not specifically listed in the Park Master Plan document, but there have been
significant additions and improvements done at Christmas Hill Park that are not included in the
master plan.
121
10.A.a
Packet Pg. 106 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (PK2107)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design $300,000
Design
CEQA
Construction $1,300,000
Const.
Support
Total $ $ $ $ $ $ $1,600,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $ 1,600,000
Financial Comments
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
This project will not generate operational costs, but should inform additional capital development in
the future.
122
10.A.a
Packet Pg. 107 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Farrell Park Site Master
Planning
Project No. PK2108
Category Parks Department Public
Works/Operations/Parks
Project Type Plans and Studies Project Manager TBD
Council Priorities Provide Opportunities for
Meaningful Public
Engagement, Ensure
Financial Stability, Ensure
Neighborhoods Benefit
Equally from City Services
Location Wren Ave /Vickery Ln
Project Description and Purpose
Complete the conceptual master planning for cost estimating to complete this under-utilized and
under developed neighborhood park.
Project Justification
The Farrell Park Site is currently not developed as a full use neighborhood park. Open turf was the
interim use plan during the recession. A park Master Plan will provide a structure to move forward on
constructing park improvements and provide shovel ready plans for grant competition and state park
funding opportunities. Decisions need to be addressed with the community and worked together with
overall City park organization documents to best meet the needs of the City and surrounding
neighborhood.
Master Planning Documents
This project is not specifically listed in any master plan document, but it does meet the spirit of the
Parks Master Plan by providing a safe and well-maintained travel park. This neighborhood park site
has been pending master plan guidance since acquisition in 2004.
123
10.A.a
Packet Pg. 108 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (PK2108)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design $200,000 $200,000
Design
CEQA
Construction
Const.
Support
Total $ $ $ $ $ $ $200,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Grant $200,000 $200,000
Total $ $ $ $ $ $ $ 200,000
Financial Comments
Funding for this project will be from state park grant funding.
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
There will not be operational costs as a result of the plan. However, when capital development of the
site is completed there will be the need for contract additions with landscape maintenance contractor,
and work load on the Parks staff.
124
10.A.a
Packet Pg. 109 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Uvas Creek Park Preserve
Staging and Neighborhood
Park Planning
Project No. PK2109
Category Parks Department Public
Works/Operations/Parks
Project Type Plans and Studies Project Manager TBD
Council Priorities Provide Opportunities for
Meaningful Public Engagement,
Ensure Financial Stability,
Ensure Neighborhoods Benefit
Equally from City Services
Location Bordered by Uvas Creek
Levee on the North and
Christmas Hill Park on the
South
Project Description and Purpose
Complete park master plan and conceptual construction cost estimating for both a neighborhood
serving park and public access for nearby Uvas Creek Park Preserve and related class I bicycle
pathways.
Project Justification
A fully vetted park master planning process with significant community outreach is needed for this
long held five acre park parcel from 2001. This neighborhood park site directly a joins the Uvas
Creek channel and park preserve. The City acquisition intent was to provide both a needed
neighborhood park to nearby residents and a complementary park preserve access point with
destination park amenities (parking lot and restroom). Completing a site master plan and required
CEQA process will greatly help if and when we compete for grant funding opportunities. Failure to
properly plan park improvements in advance of response to public pressure to complete could result
in haphazard park development. This park planning step will at minimum insure that the City
strategic goals and public needs are clear and are followed into the design-development future.
Master Planning Documents
This project is listed in the Parks Master Plan.
125
10.A.a
Packet Pg. 110 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (PK2109)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design
CEQA
Construction
Const.
Support
Total $ $ $ $ $ $ $235,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $235,000
Financial Comments
Funding to come from impact fees, state park development grants, and matching funding from the
General Fund.
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
There are no operational costs related to the development of the Master Plan for this site. Once
physical improvements are constructed on the site, there will be operational and maintenance costs.
The extent of such costs will depend upon the results of the Master Plan.
126
10.A.a
Packet Pg. 111 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Gilroy Sports Park
Improvements Phases IV and V
Project No. PK2110
Category Parks Department Public
Works/Operations/Parks
Project Type New Project Manager TBD
Council Priorities Provide Opportunities for
Meaningful Public Engagement,
Ensure Financial Stability,
Ensure Neighborhoods Benefit
Equally from City Services
Location 5925 Monterey Frontage
Project Description and Purpose
The project is to design, bid and prepare construction documents to add needed sports fields.
Included are a four softball fields wagon wheel layout, and two soccer/football facilities, as described
as phases IV and V of the Master Plan for the Sports Park, including necessary support facilities:
restrooms, snack bar, parking, security residence, maintenance yard, and sports lighting utilities.
This project scope would involve improvements on 14 to 16 acres of the 72 acre site.
Project Justification
The Gilroy Sports Park has become popular with local leagues and a destination for regional
tournaments. The need for local sports fields exceeds what is available, suggesting this is the right
time to develop more of this specialty park. Additional fields will allow for hosting larger tournaments,
and possibly increased revenues.
Master Planning Documents
This project is listed in the Parks and Recreation Systems Master Plan.
127
10.A.a
Packet Pg. 112 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (PK2110)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design $700,000
Design $950,000
CEQA $100,000
Construction $7,500,000
Const.
Support $750,000
Total $ $ $ $ $ $ $10,000,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Total $ $ $ $ $ $ $ 10,000,000
Financial Comments
Funding to come from impact fees, state park development grants, and matching funding from the
General Fund.
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
Increased maintenance and operation costs will be required upon completion of the project. An
amendment will be required with the contract landscaper, and a budget will be required to maintain
buildings and mobile residence, with repairs as necessary. Costs could be partially offset by use fees
and admission charges, where feasible.
128
10.A.a
Packet Pg. 113 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name Rehab In-Fields at Las
Animas and Christmas Hill
Parks
Project No. RC2101
Category Facilities Rehab Department Recreation/Parks
Project Type New Project Manager Bill Headley
Council Priorities Provide Opportunities for
Meaningful Public
Engagement,
Ensure Neighborhoods
Benefit Equally from City
Services
Location 7050 Miller Avenue &
400 Mantelli Drive
Project Description and Purpose
Rehab the major in-fields of Las Animas and Christmas Hill Parks. This includes the demolition and
removal of 4 inches of in-field material down to mineral soil and replacing it with the same in-field
material installed at the Gilroy Sports Park Standards. This will involve re-grading for positive
drainage and replacement of in-field bases,
Project Justification
The Christmas Hill and Las Animas softball in-fields are inferior to the Gilroy Sports Park Standards.
These in-fields have a grainer and coarser texture which results in a more abrasive and harsher flesh
wound when a player falls and injuries occur.
Master Planning Documents
This project is not specifically listed in any master plan document, but it does meet the spirit of the
Parks and Recreation Systems Master Plan by providing a safe and well-maintained park.
129
10.A.a
Packet Pg. 114 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Funding (Public Works) (RC2101)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design
Design
CEQA
Construction $60,000
Const.
Support
Total $ $ $ $ $ $ $60,000
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Landscape
Maintenance
Fund $60,000
Total $ $ $ $ $ $ $ 60,000
Financial Comments
Funding for this project will be from the Landscape Maintenance - General Fund.
Estimated Project Schedule
Timeline
Project Design
Project Advertisement
Project Construction
Project Completion
Operational Cost Impact
There will be no operational costs associated with this request. The park is currently maintained by
the Parks Division with maintenance costs included in the budget.
130
10.A.a
Packet Pg. 115 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Project Name San Ysidro Park Healthy
Living Enhancement
Project No. RC2102
Category Parks/ Play Equipment Department Recreation
Project Type New Project Manager TBD
Council Priorities Provide Opportunities for
Meaningful Public
Engagement and Ensure
Neighborhood Benefit
Equity from City Services
Location 7700 Murray Ave
Project Description and Purpose
The City submitted a grant application to the State of California Department of Parks and Recreation Office of
Grants and Local Services to provide new recreation opportunities at San Ysidro Park by creating recreation
features that will encourage healthy communities by connecting people to parks. Possible recreation features
include: new playground equipment, paved trail, welcome kiosk, distance markers on paved trail, games
etched in sidewalk, exercise equipment, new volleyball court, new picnic barbecue grills, bottle filler
station/non-bottle filler water fountain, lighting, public art, and a drought resistant garden.
Project Justification
Although all City parks were considered, not all the parks were eligible based on the grant guideline
requirements. San Ysidro Park was selected because the project selection criteria indicated supporting
projects which incorporated examples of the following:
dents (children, youth, parents, seniors) participating in community outreach
efforts
entoring of at-risk youth, senior socialization and family bonding
131
10.A.a
Packet Pg. 116 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
CITY OF GILROY
2021-2026 CAPITAL IMPROVEMENT PROGRAM
Master Planning Documents
This project is not specifically listed in any master plan document, but it does meet the spirit of the Parks and
Recreation Systems Master Plan by providing a safe and well-maintained park.
Project Funding (Public Works) (RC2102)
Project Costs Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
Pre-Design $262,600 $262,600
Design $10,500 $10,500
CEQA
Construction $2,475,400 $2,475,400
Const.
Support $273,100 $273,100
Total $ $273,100 $2,748,500 $ $ $ $3,021,600
Funding
Source Total Prior FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 FY 2024/25 Project Total
State Prop.
68 Grant $262,600 $2,475,400
$10,500 $273,100
Total $ $273,100 $2,748,500 $ $ $ $ 3,021,600
Financial Comments
There are no matching funds required for this and if awarded, the State Proposition 68 grant will fund the total
project cost.
Estimated Project Schedule
Timeline
Project Design May - October 2020
Project Advertisement November – December 2021
Project Construction May 2021
Project Completion October 2021
Operational Cost Impact
The park is currently maintained by the Parks Division with maintenance costs included in the budget.
132
10.A.a
Packet Pg. 117 Attachment: PRC CIP Budget Staff Report - 5-19-20 (2789 : Parks and Recreation Commission Review of FY21-26 Capital Improvement Program
PARKS AND RECREATION COMMISSION
STAFF REPORT
Agenda Item Title: Draft 2025 Consolidated Plan and Fiscal Year 2020-2021 Projects
Meeting Date: May 19, 2020
Submitted By: Adam Henig
Prepared By: Sue O'Strander
Recommendation:
Receive Draft 2025 Consolidated Plan and Fiscal Year 2020-2021 Projects and
comment on report.
See attachment.
Attachments:
1. PRC 5-19-2020 ConPlan Info Report
10.B
Packet Pg. 118
1
Memorandum
Date: May 19, 2020
To: Parks & Recreation Commission
From: Sue O’Strander, AICP, Deputy Community Development Director
Subject: Draft 2020-2025 Consolidated Plan and Fiscal Year 2020-2021 Projects
BACKGROUND
The City of Gilroy has received Community Development Block Grant (CDBG) funding direct
from the federal Housing and Urban Development (HUD) since 1984. As a jurisdiction that
receives such funding, Gilroy is required, every 5 years, to prepare a Consolidated Plan
(ConPlan) to assess affordable housing and community development needs during this period.
In Santa Clara County, CDBG grantee agencies coordinate these efforts through a regional
planning effort. The ConPlan is carried out through Annual Action Plans, which provide a
concise summary of the actions, activities, and the specific federal and non -federal resources
that will be used each year to address priority needs and specific goals identified by the
ConPlan.
In May 2019, Santa Clara County issu ed a Request For Proposals for a consultant to initiate the
regional ConPlan for the 2020-2025 period. Among the various tasks, the selected consultant
(Michael Baker International, or MBI) conducted various workshops and meetings to identify
regional and local concerns relating to housing affordability and service needs. Gilroy was
particularly successful in a survey outreach whereby 512 responses were received (355 paper
format and 157 electronic/online).
Gilroy’s 2020-2025 ConPlan and Fiscal Year (FY) 2020-2021 Action Plan will be available for
public comment and review, beginning May 15, 2020 and ending June 15, 2020.
This report is provided to the Parks & Recreation Commission for informational purposes only.
GOALS AND PROJECTS
On March 11, 2020, the Housing & Neighborhood Revitalization Committee (HNRC), considered
recommended goals to include in Gilroy’s 2020-2025 ConPlan. The recommended goals were
based on the extensive outreach efforts conducted in 2019 and early 2020 , and will be
presented to City Council for final decision.
City of Gilroy
Housing Division
10.B.a
Packet Pg. 119 Attachment: PRC 5-19-2020 ConPlan Info Report (2823 : Draft 2025 Consolidated Plan and Fiscal Year 2020-2021 Projects)
2
At the same meeting, the HNRC made recommendations with regard to prioritization of grant
funding for FY 2020-2021. Since the public services and rehabilitation programs comprise Year
2 activities of a two-year cycle, there was not a competitive process for this year’s allocations.
The allocations are carried over from Year 1 and include funding from both CDBG and local
Housing Trust Fund (HTF). Specific actions of the HNRC include the following actions:
A. Recommended goals for inclusion in the Draft 2020-2025 ConPlan:
Preserve affordable housing for home ownership.
Install safety and enhanced public improvements within low/moderate income
blocks.
Support small business and workforce development opportunities to low/moderate
individuals and families.
Enhance basic supportive service needs for homeless and special needs
populations.
B. Approved the following public services and rehabilitation program funding for FY
2020-2021, including both CDBG and HTF funding sources:
Public Services:
o Live Oak Adult Day Services (adult day care) $11,292
o Gilroy Compassion Center (day center for the homeless) $39,754
o Catholic Charities of Santa Clara County (long term care ombudsman) $9,410
o City of Gilroy Recreation Department (youth center) $35,684**
o City of Gilroy Recreation Department (swim lessons) $1,955**
o The Health Trust (meals on wheels) $20,000
o St. Joseph’s Family Center (homeless prevention and safety net services)
$50,000
o St. Joseph’s Family Center (Gilroy Street Team) $35,000
o Silicon Valley Independent Living Center (housing and emergency services for
persons with disabilities) $25,000
o Project Sentinel (fair housing) $21,000
o Project Sentinel (tenant/landlord counseling and dispute resolution) $26,000
Rehabilitation Programs:
o Rebuilding Together Silicon Valley (rebuilding home repair, housing
rehabilitation and accessibility modification) $144,364
** At the time of the writing of this report, staff was planning to present to HNRC an adjustment
request by Gilroy Recreation to shift $1200 from Swim Lessons to the Youth Center.
C. Prioritized capital projects for the FY 2020-2021 Annual Action Plan starting with
the highest priority, as follows:
1. Annual Sidewalk/Curb Ramp Program (specific to sites within the NRSA)
2. Other capital projects within the NRSA (projects listed for reference, but no priority
order recommended by Committee)
Gateway Senior Apartments Pedestrian Crossing Safety Improvements
Murray Avenue Sidewalk Gap Closure
Sidewalk Gap Closure – 8340 Swanston Lane
El Rancho Foods Sidewalk Gap Closure
10.B.a
Packet Pg. 120 Attachment: PRC 5-19-2020 ConPlan Info Report (2823 : Draft 2025 Consolidated Plan and Fiscal Year 2020-2021 Projects)
3
3. Capital projects outside the NRSA (projects listed for reference, but no priority
order recommended by Committee)
Miller Crossing and Uvas Creek Pedestrian Improvements
Mantelli & Church Bulb-Out and Crosswalk Improvements
NEXT STEPS
The HNRC’s recommended goals will be included in the Draft 2020-2025 ConPlan, anticipated
to be released for a 30-day public review period beginning on May 15, 2020. Along with the
Draft 2020-2025 ConPlan, HNRC recommendations on the FY 2020-2021 activities (public
services, rehabilitation programs, and capital projects) will be presented to the City Council on
June 1, 2020 for discussion, following by f inal adoption of the 2020-2025 ConPlan tentatively
scheduled on June 15, 2020.
10.B.a
Packet Pg. 121 Attachment: PRC 5-19-2020 ConPlan Info Report (2823 : Draft 2025 Consolidated Plan and Fiscal Year 2020-2021 Projects)
PARKS AND RECREATION COMMISSION
STAFF REPORT
Agenda Item Title: Review and Adopt Proposed Parks and Recreation Commission
2020 Work Plan
Meeting Date: May 19, 2020
Submitted By: Adam Henig
Prepared By: Adam Henig
Recommendation:
Review and adopt proposed Parks and Recreation Commission 2020 Work Plan
Executive Summary
On Saturday, February 29, 2020, the Parks and Recreation Commission held a retreat
and brainstormed topics for their work plan.
Prepared in coordination with staff, a work plan is the plan and statement of goals within
the purview of the commission for the year. It should reflect the goals, priorities and
policies of the City Council. It identifies important problems, challenges, and
opportunities, offers a jointly developed plan to address these over the course of the
year, and furthers a sense of shared purpose and responsibility among advisory body
members.
An adopted and published work plan will:
Establish viable short-range objectives that further the long-range goals of the
advisory body
Provide group direction, and keep the advisory body on course
Provide a basis for measuring accomplishment
Assist in the allocation of time, energy, and resources
Promote continuity of action, and help keep the big picture focused
The work plan should also align with the current City Council priorities:
11.A
Packet Pg. 122
Ensure Financial Stability
Enhance Public Safety Capabilities
Revitalize Downtown
Focus on Revenue Driven Economic Development
Retain Stability in the City’s Workforce
Provide Opportunities for Meaningful Public Engagement
Ensure Neighborhoods Benefit Equally from City Services
To better gauge the proposed projects that were identified at the retreat, the Chair and
staff grouped the ideas discussed into eight topics:
1. Advocacy related to Access to parks
2. Promote Parks and Recreation
3. Research Funding Sources
4. Promote Health & Wellness
5. Research Best Practices
6. Partner with other Commissions
7. Park Opportunities
8. Ongoing
Given the Covid-19 crisis, the Commission has less time and resources now than when
these ideas were initially discussed. Consequently, staff recommends remaining
focused on the existing deliverables (i.e., ongoing assignments) and perhaps exploring
one or two additional ideas from the other categories. In addition, keep the following in
mind when considering additional projects for the workplan:
Commissioner must be willing to work on it
It must fulfill one of the Council priorities
Take into consideration available resources and staff time
How beneficial is it to the community?
What is the deliverable at the end of the year? Is it realistic?
Is another body (commission/board/agency) already working on it?
Attachments:
1. Work Plan revised 5.8.2020
11.A
Packet Pg. 123
*On previous year’s work plan
2020 Parks & Recreation Commission Work Plan
Advocacy Access Promote Parks and
Recreation
Research Funding
Sources
Promote
Health &
Wellness
Research Best
Practices
Partner with other
commissions
Park Opportunities Ongoing
Making parks more
accessible by foot and/or
bike for all ages
Using social media and
news media to promote city
parks and recreation
programs
Prop. 68 follow-
through/support (when
needed)
Smoke-free policy
(currently underway)
Explore the
possibility of a park
ranger position
(currently no funding
available)
Collaboration with other
commissions/boards such as Bike
and Pedestrian Commission (needs
to be specified)
Develop a map of City of
Gilroy trails/parks
Commissioner Park
Assignments*
Expand or promote
running/hiking trails and
bike paths in Gilroy
CAPRCBM awards Explore parks and
recreation related grant
opportunities
Field Trips for
commissioners to
view other city
parks
ADA-focused park (location &
funding options required;
currently neither is available)
Raise Youth Scholarship
Fund*
Parks & Recreation
Foundation
Engaged with future of
park-related projects at
Gilroy Gardens
Capital Improvement
Project Review
Downtown Signage from
Uvas Creek Levee Trail
Tree City/Arbor Day*
Stay engaged with Gilroy
Sports Park
Provide input to council.
BMX Pump Track in Gilroy
Response to Recreation
Needs Assessment
Explore possibility of
creating a mural at the
handball courts at Las
Animas Veterans Park
(currently no funding
available)
Monitor new
construction projects
related to park access and
recreational opportunities
Audio history of
city parks
Participate in Citywide
events (if possible)
Bathroom Renovation at Las
Animas Veterans Park
11.A.a
Packet Pg. 124 Attachment: Work Plan revised 5.8.2020 (2785 : Review and Adopt Proposed Parks and Recreation
*On previous year’s work plan
11.A.a
Packet Pg. 125 Attachment: Work Plan revised 5.8.2020 (2785 : Review and Adopt Proposed Parks and Recreation
PARKS AND RECREATION COMMISSION
STAFF REPORT
Agenda Item Title: Modify Parks and Recreation Commissioner's park monitoring
assignments
Meeting Date: May 19, 2020
Submitted By: Adam Henig
Prepared By: Adam Henig
Recommendation:
Motion to approve reassigning parks and recreation commissioner city parks for the
purpose of monitoring and reporting at monthly meetings.
Executive Summary
Every year, all parks and recreation commissioners select which city parks they would
like be assigned for the purpose of monitoring user activity and the grounds.
Commissioners are expected to report findings at monthly meetings.
The parks comprise of:
Butcher Park
Carriage Hills Park
Christmas Hill Park
Christmas Hill Park Ranch Site
Cydney Casper Park
Del Rey Park
Uvas Creek/Gilroy Sports Park
El Roble Park
Forest Street Park
Hecker Pass Park
Las Animas Veterans Park
Los Arroyos Park
Miller Park
Rainbow Park
Renz Park
11.B
Packet Pg. 126
San Ysidro Park
Sunrise Park
11.B
Packet Pg. 127
PARKS AND RECREATION COMMISSION
STAFF REPORT
Agenda Item Title: Recreation Department Updates
Meeting Date: May 19, 2020
Submitted By: Adam Henig
Prepared By: Adam Henig
Recommendation:
Receive recreation report and comment.
On Saturday, March 7, the Gilroy Youth Commission hosted the annual Pampered
Princess Party at Wheeler Center Gym. More than 50 girls between the ages of 4 and
11 years old were “pampered.” There were guest appearances by M’oana and Jasmine.
12.A
Packet Pg. 128
On March 17, per the County’s shelter-in-place orders, the City of Gilroy closed City Hall
and employees began working remotely. The Recreation Department begun what would
be a 10-week endeavor of cancelling and refunding hundreds of participants from
dozens of spring programs that included the youth soccer league (500+ participants),
dance classes, preschool, adult softball league and many, many more. The Department
also had to issue refunds for picnic and facility reservations. These comprised of
birthday parties, graduation parties, and other private gatherings. The Department has
cancelled the Kids Triathlon and the children’s spring and summer theater productions.
It also closed the aquatics center for the season and postponed Party in the Park , which
was scheduled for June 20, 2020.
In lieu of offering in-person programs, the Recreation Department is developing virtual
programs. Led by city staff and independent contract instructors, these programs will
include abbreviated day camp experience, early childhood recreation cla sses, and
SafeSitters. Registration will begin on Friday, May 22 and the first day of programs will
be on June 22, 2020. The Recreation Department is continuing with its needs
assessment and the final report is expected to be issued in August. The financial impact
of Covid-19 on the Recreation Department, all city services and all municipalities is
uncertain. Commissioners are encouraged to watch the upcoming Monday, May 18 City
Council meeting for a budget update and City Council recommendations for a balanced
budget. If needed, your participation and advocacy would be welcomed.
12.A
Packet Pg. 129
PARKS AND RECREATION COMMISSION
STAFF REPORT
Agenda Item Title: Status of City Parks
Meeting Date: May 19, 2020
Submitted By: Adam Henig
Prepared By: Adam Henig
Recommendation:
Receive parks report and comment.
Attachments:
1. PRC Park Operations Report_Mar N April for May 19_ 2020_
12.B
Packet Pg. 130
7351 Rosanna St. Gilroy, CA 95020-6197 www.ci.gilroy.ca.us (408) 846-0451
City of Gilroy
Public Works Department
Parks and Landscape Division
MEMORANDUM
Date: May 19, 2020
To: Parks and Recreation Commission
CC: Girum Awoke, Public Works Director, Damian Skinner, Deputy Director
From: Bill Headley, Park Operations Supervisor
Subject: Public Works Park Operations Report
REPORT TO COMMISSION for March and April, 2020
1. Street Tree Brochure draft text is being prepared by PRC commissioner Pat Bentson. April is
the updated target to month to publish the first draft text for review by the Commission and City
Staff. Blocking and selection of graphics will begin after the text blocking is substantially confirmed
by all reviewers.
2. Forest Street Park parcel acquisition status to complete park master plan is actively under
Public Works review for the up-coming Capital Improvement Program. Standby for a planned
Public Works report to the Commission in March
3. Commission Inspection Comment Follow -up; Gateway Park – A drinking fountain with a
bottle filler feature was not park of the originally approved construction documents however, City
Engineering is negotiating a change order to get a unit with a bottle filler / Casper Park - failed
Tic Tac Toe sidewalk graphic will we repainted by park staff during warmer spring weather /
4. Informational article handouts / “Designing Parks to Enhance a Community’s Tax Base”
and “Tips To Keep You and Your Kids Safe While Playing In A Playground”
5. Corvid-19 Sheltering Impacts on Park Operations
March 17; First day of Sheltering Orders applied and reduced park staffing to two Park staff
for park gate opening, restroom care and sanitizing, general park and landscape health and
safety inspections, and closure of park facilities to public use, vandalism and facility repairs.
Facility closures included all park recreation programs and group reservations terminated, all
playgrounds, basketball hoops removed, tennis courts locked(unlocked May 6th), skateboard
park, dog parks, and all soccer goals removed from sports turf areas.
March 26; Both City landscaping contract work for Jensen and Alpine Landscaping
suspended City wide.
March 26; Essential daily Park person crew increased from two to three for litter and trash
can basic service after landscape contracts suspended
April 16; Partial contract landscape maintenance services resumed for care of Park and
Landscape turf.
May 1; Full landscape contracting services restarted with Jensen and Alpine landscape
contractors City-wide.
12.B.a
Packet Pg. 131 Attachment: PRC Park Operations Report_Mar N April for May 19_ 2020_ (2824 : Status of City Parks)
7351 Rosanna St. Gilroy, CA 95020-6197 www.ci.gilroy.ca.us (408) 846-0451
May 1; All City part time staff laid off. Two part time Park staff of five part time positions
furloughed until further notice
May 1; Two full time Park staff assigned to cover all weekend and holidays until further
notice and reducing weekday staff two days per week
Related impacts; General landscape weed control suspended or greatly reduced, formal
weekly written inspection reports suspended for the 8 City Landscape maintenance districts
(parks, trails, civic landscapes, landscaped roadways), weekly contract coordination meetings
suspended with issues directly reported verbally, text or email, limited graffiti abatement
12.B.a
Packet Pg. 132 Attachment: PRC Park Operations Report_Mar N April for May 19_ 2020_ (2824 : Status of City Parks)
7351 Rosanna St. Gilroy, CA 95020-6197 www.ci.gilroy.ca.us (408) 846-0451
12.B.a
Packet Pg. 133 Attachment: PRC Park Operations Report_Mar N April for May 19_ 2020_ (2824 : Status of City Parks)
7351 Rosanna St. Gilroy, CA 95020-6197 www.ci.gilroy.ca.us (408) 846-0451
Parks / City Incident Reports
Public Works Operations
January & February, 2020
DATE FACILITY NAME VANDALISM THEFT OTHER
1/3/2020 CHP
Graffiti in men’s
amphitheater restroom
1/4/2020
Miller Park
Restroom
Cleanout
Flooded with
toilet paper
and feces
1/7/2020 Casper Park
Honey Locus tree snapped
in half, tree dead and will
need to be replaced
1/10/2020 Las Animas Park
Water fountain was broken
off and water was running
1/10/2020 Las Animas Park
Fire was set right outside of
entry gate to tennis court 6
along pathway
1/11/2020
Miller Park
Restroom
Restroom drainage filled
with feces and toilet paper
and graffiti in bathroom
1/19/2020 Lions Creek Trail
Graffiti on Lions Creek Trail
at Kern and Wren overpass
1/21/2020 San Ysidro Park
Latches on window
shutters were not aligned.
Also a slide bolt was
missing and a latch was
broken off
1/23/2020 Del Rey Park
Someone broke the branch
at Del Rey Park
1/29/2020 San Ysidro Park
Sewerage backup causing
flooding in all three
bathrooms and office.
Ernie’s plumbing was called
out to unclog.
12.B.a
Packet Pg. 134 Attachment: PRC Park Operations Report_Mar N April for May 19_ 2020_ (2824 : Status of City Parks)
7351 Rosanna St. Gilroy, CA 95020-6197 www.ci.gilroy.ca.us (408) 846-0451
1/31/2020
Christmas Hill
Park
Several spray paint tags at
the Amphitheater stage,
restrooms and electrical
panels. Graffiti was gang
related.
2/1/2020
Christmas Hill
Park
Graffiti on the Metal Box
front and back
2/4/2020 Las Animas Park
Tennis court 5-6 electrical
receptacle on fence pole
vandalize w/wire exposed
and electric plug damaged
2/8/2020 Gilroy Sports Park
Chain link fence was cut
and broken into and two
batteries off two lawn
mowers had been stolen.
Police report made and
fence repaired.
2/11/2020 Las Animas Park
Soap
dispensers
stolen from
the Lakeside
men’s
bathroom
2/14/2020 Rainbow Park
Drinking fountain faucet
broken and handle on
faucet was bent
2/14/2020 Las Animas Park
HAZMAT at 4
locations
where human
feces was
located.
2/14/2020 Las Animas Park
Tennis court fences
vandalized, chain link fence
had been cut in 5 different
locations.
2/18/2020 Corp Yard
Break in at
Corp Yard,
trucks were
broken into
and tools
stolen. Police
report made
2/22/2020 CHP
Graffiti in restrooms and
counter and park tables at
Mulberry Picnic Area
12.B.a
Packet Pg. 135 Attachment: PRC Park Operations Report_Mar N April for May 19_ 2020_ (2824 : Status of City Parks)
7351 Rosanna St. Gilroy, CA 95020-6197 www.ci.gilroy.ca.us (408) 846-0451
2/24/2020
Roundabout at
3rd St. @ Santa
Teresa Blvd
Documenting old traffic
circle planter curb damage.
Planter boarder damage
and traffic sign damage.
Repairs remain unresolved
after almost one year.
2/28/2020
5925 Monterey
Frontage Road
Upon inspection found
Mag-Lock removed from
door frame at south west
restroom next to A4
connected to snack bar
Total 22
INCIDENT REPORTS
Do to City part time staff lay-offs, the monthly incident reports will not be included in future Park Reports
starting with April for future commission park reports.
PARK CAPITAL PROJECTS
The State Proposition 68 Grant project Team completed and submitted the San Ysidro Park grant proposal to the state
for the competitive state-wide grant competition. The state recently reported that Gilroy was not a finalist in the first round
of grant awards. The state did advise Gilroy that we are welcome to resubmit the Gilroy grant. Updating grant proposal
before submitting to the second grant submittal round will be considered.
Las Animas Veterans Park (LAVP) Trail Rehabilitation project (Phase I) work was completed in 2018. Funding for
irrigation and sod repairs along new concrete bike path ran out. Funding to complete all park pathway rehabilitation work
is under current CIP review process for 2020 funding cycle.
MAINTENANCE HIGHLIGHTS (future weekly reporting suspended during Covid-19 Sheltering)
Parks Section Weekly Report January 1-10, 2020
Gilroy Little League try outs were held at GSP
Four staff members took QAC tests in Gault on Saturday
Three clogged sewer drain incidents were repaired by contract staff.
Raised oak tree along Uvas/Debell trail just east of Hecker Pass Park.
Raised oak tree along Ponderosa Soundwall to prevent homeless camp from returning.
Build equipment shelter at CHP-TEEC Yard
Frame and pour four concrete pads for trash cans
Repair vandalized drinking fountain at the “Oaks” barbecue area
Final walkthrough at Farrell Park-City is now maintaining park
Harvest Park Final Punch list walk through was completed
Irrigation Class has started
12.B.a
Packet Pg. 136 Attachment: PRC Park Operations Report_Mar N April for May 19_ 2020_ (2824 : Status of City Parks)
7351 Rosanna St. Gilroy, CA 95020-6197 www.ci.gilroy.ca.us (408) 846-0451
More soil was removed from GSP Pond by Ecology
Replaced five valve boxes per Valley Water Recycle Water Punch List
Contractor repaired Sunrise Park mainline leak
Contractor replaced leaking valve at Sunrise Park
Contractor replaced valve at PD that was not opening
Staff Meeting on “Professionalism”
Parks Section Weekly Report January 31, 2020
All existing Park and Park Preserve and Class I and pedestrian trails were surveyed for
Recreation
LAVP and CHP ballfields inspected and prepared for Gilroy Little League practice month of
February
GSP A-1 and A-2 prepared for GLL practice month
Casper Park purple recycled irrigation lid replaced, vandalized tree replaced, black wood chips
installed where street tree bricks were removed
Jensen contact maintenance staff, 1of 2 on -duty assaulted by female (hit in face with fist) while
both were doing late morning trash can and litter pickup duties at San Ysidro Park Sunday
1/26/2020. No suspect at this time
Two more homeless camps along Santa Teresa Blvd. soundwall north of Mantelli Dr. on west side
and north of Welburn Ave. on the east side
San Ysidro Park restroom sewer power cleanout (all three toilets stop up) after hour (4hrs).
Underwear finally removed from sewer line by contract plumber and City Park staff
Broken water line from supply valve through Renz Park drinking fountain replaced. Concrete
hardscape around drinking fountain removed and replaced to make repairs
Parks Section Weekly Report February 7, 2020
Annual City Yard Stormwater management inspection
Four replacement tree plantings completed at Casper Park
Vertical banner arm repaired downtown
El Roble Park pathway pot hole temp repair with base rock
One unisex restroom painted at Miller Park
In-service irrigation training class #4 held
Broken tennis court lights on LAVP courts # 5 & 6 repaired by Facilities
Aerial truck in-service training for Park Staff
Weed control and spring of I00F Street median planter completed
Thee plus yards of wood chips from recent tree pruning spread as planter mulch at GSP
Parks Section Weekly Report February 14, 2020
In-service irrigation training class #5 held
LAVP Quad area drinking fountain repaired
Sunday windstorm down limb cleanup Monday with chipper unit at LAVP, Miller Park, and CHP
CHP graffiti bombed requiring major abatement efforts with pressure washer, painting, and spray remover
Concrete tan fence post repair on Hecker Pass class I bik e path along Uvas Creek
Chainsaw in-service training held on down tree at10th and Uvas Levee CHP overflow parking lot
Downtown green smoking urn repaired
Major rebuild of GSP A-4 ballfield pitching mound
MWA Part Time Job Announcement flyers distributed t o 10 plus bulletin boards at local stores and Gavilan College
Parks Section Weekly Report February 21, 2020
Weed control spraying of PD shooting range
Two park trucks parked next to freeway fence burglarized. Hole was made in the chain link fence
Sunrise fire station irrigation main repaired
Repair of irrigation quick coupler along Santa Teresa Blvd. soundwall landscaping
12.B.a
Packet Pg. 137 Attachment: PRC Park Operations Report_Mar N April for May 19_ 2020_ (2824 : Status of City Parks)
7351 Rosanna St. Gilroy, CA 95020-6197 www.ci.gilroy.ca.us (408) 846-0451
THANKS FOR HELPING TO KEEP OUR PARKS SAFE
When you notice something that you feel is a safety hazard or
that needs attention, no need to wait until the Parks & Recreation
Commission meeting to report it. Please call (408) 846-0460
during regular business hours, or the non-emergency after-hours
number, (408) 846-0350, to report.
Ten new park directional arrow and picnic table signs to SYP have been installed
Park staff completed removal of down storm tree in the CHP 10th Street at Levee overflow dirt parking lot
The 6th in-service irrigation class held for park staff
CHP Mulberry BBQ restroom flush plumbing unit replaced
Missing tennis net replaced at El Roble Park
Three new park staff attended QAC training class in San Jose. State testing pending
Parks Section Weekly Report February 28, 2020
Repair of mainline leak in Sunrise turf grass.
Sod repair around rebuilt A-4 pitching mound at Gilroy Sports Park
Spread wood chip mulch pills at Sports Park
New Park staff member on probation passed Class A DMV drivers test
Irrigation lateral repair in Santa Teresa Blvd. median
Leaking valve repair at Senior Center
Broken playground slide replace at Christmas Hill Park
Seventh in-service irrigation training class held for Park staff and three school district maintenance staff
To report graffiti, please call the
Graffiti Hotline @ (408) 846-0395
12.B.a
Packet Pg. 138 Attachment: PRC Park Operations Report_Mar N April for May 19_ 2020_ (2824 : Status of City Parks)