RBF Consulting - Agreement for Santa Teresa Blvd. Widening Project - Addendum No. 7FBF CONSULTING September 13, 2001 Ms. Kristi Abrams Traffic Engineer CITY OF GILROY 7351 Rosanna Street Gilroy, CA 95020 -6197 Subject: Addendum #7, Santa Teresa Boulevard Dear Ms. Abrams: JN 35- 100063.008 In response to your request, RBF Consulting is pleased to present this addendum to provide additional design services for the improvements of Santa Teresa Boulevard. Included in this scope are the revisions to the street improvement plans, and sections to implement the full reconstruction of Santa Teresa Boulevard. A electronic file will be transmitted for the entire project upon approval of the plans Enclosed for your review are the following exhibits: Scope of Services, Exhibit "A" and Proposed Compensation, Exhibit "B ". Should you have any questions, please do not hesitate to call me. Sincerely, WiL William J. Co rs, P.E. Senior Associ H:\PDATA\35100063\Proposal\AddO7.wpd cc: Accounting RBF PLANNING A DESIGN 4 CONSTRUCTION 1981 North Broadway, Suite 235, Walnut Creek, CA 94596 -3817 ■ 925.906.1460 ■ Fax 925.906.1465 Offices located throughout California, Arizona & Nevada ■ www.RBFcom pdnred - , ydad vaver RBF Consulting Contract Agreement for JN 35- 100063.008 EXHIBIT "A" SCOPE OF WORK SANTA TERESA BOULEVARD WIDENING TASK 1.0 IMPLEMENT PAVEMENT REPORT RECOMMENDATIONS TASK 1.1 MODIFY SANTA TERESA BLVD. IMPROVEMENT PLANS September 13, 2001 Page 2 of 4 Consultant will modify previously prepared plans to incorporate the recommendations of Earth Systems Consultants in their report dated August 27, 2001 for full reconstruction for the Santa Teresa Boulevard Project from 1400' south of 1St Street to Sunrise Drive. Modifications include revising the base plans, the dimensions, construction notes and other annotations on: • Three Typical Section Sheets • Six Demolition Plan Sheets • Eight Improvement Plan Sheets • Consultant will modify profile between Sta 21 +00 and Sta 28 +00 to minimize cross fall slope as a result of new construction. • Modify Curb Ramp and Soundwall Layout at the northwest corner of Longmeadow Drive to avoid right -of -way takes. TASK 1.2 FINAL QUANTITY AND COST ESTIMATES Consultant will modify previously prepare sections (75 sections) and recalculate total earthwork and pavement quantities. Consultant will revise final cost estimate for Santa Teresa Boulevard. TASK 1.3 MODIFY MANTELLI DRIVE IMPROVEMENT PLANS Consultant will modify previously prepared plans to include the following revisions: • Incorporate into plan set the recommendations of Earth Systems Consultants in their report dated August 27, 2001 • Revise Curb Ramps and Soundwall Layouts for west curbs on Mantelli Drive • Modify base plans and profiles to install extruded median curb rather than median curb and gutter • Modify profile on Mantelli Drive at Zinna Way based upon recent field survey of as -built conditions. • Modify storm drain lateral at Mantelli and Zinna to avoid newly installed electrical vault RBF Consulting Contract Agreement for JN 35- 100063.008 September 13, 2001 Page 3 of 4 • Revise cross sections and recalculate earthwork quantities based upon new structural sections. • Modify specifications, bid proposal and cost estimates based upon new structural section • Modify plans to incorporate maintenance vehicle turnout • Revise landscape and irrigation plans to incorporate maintenance vehicle turnout TASK 1.4 CONSTRUCTION EASEMENTS Consultantwill prepare the following additional legal descriptions and exhibits for the construction of Santa Teresa Boulevard. The new construction easements and vacations are a result of Lot 50 of Tract 7636 located at Sta. 65 +00 being divided into three parcels. That information was not available to us at the initial count. • 3 new construction easements for the soundwall construction • 3 new right of way vacation documents for the soundwall construction • 1 revised fee take at the southwest corner of Mantelli Drive based upon new soundwall layout. • 1 revised construction easement at the southwest corner of Mantelli Drive based upon new soundwall layout (Initial contract and addendums indicates that RBF was to provide 120 fee takes, right -of -way vacations and construction easements. To date RBF has provided 133 legal descriptions and exhibits.) RBF Consulting September 13, 2001 Contract Agreement for JN 35- 100063.008 Page 4 of 4 EXHIBIT "B" "PAYMENT SCHEDULE" SANTA TERESA BOULEVARD WIDENING ADDENDUM #7 The total payment to CONSULTANT for all work, service, material, equipment and incidentals necessary for performing and completing the Tasks set forth in this agreement, shall be for the sum of $26,076.00 CITY shall compensate CONSULTANT in proportion to the services performed and invoiced to the CITY as outlined below, subject to Article 4 of this agreement. TASK DESCRIPTION Task 1.0 IMPLEMENT PAVEMENT REPORT RECOMMENDATIONS Task 1.1 Modify STB Improvement Plans Task 1.2 Final Quantity and Cost Estimates (STB) Task 1.3 Modify Mantelli Drive Improvement Plans Task 1.4 Construction Easements Total Professional Fee FEE $9,928.00 $4,968.00 $6,800.00 $4,380.00 $26,076.00 Blueprinting, reproduction, messenger service and other direct expenses will be charged as additional costs plus a fifteen percent (15 %) handling fee. No escalation will be added for work remaining in the Year 2002 Santa Teresa Boulevard Widening Project Addendum #7 Pavement Report Implementation Prepared For: City of Gilroy Prepared By: RBF Consulting Job No. 35- 100063.008 September 13, 2001 Prepared By: William Conyers Task No. Task Sub Consultant Fee +15% Project Manager Hours Project Engineer Hours Design Engineer Hours Cadd Technician Hours Clerical Hours Survey Crew Hours Total Hours Fee Total Task 1.0 IMPLEMENT PAVEMENT REPORT RECOMMENDATIONS Task 101 Modify STB Improvement Plans 24 0 24 68 0 0 116 $9,928.00 Task 1.2 Final Quantity and Cost Estimates 8 0 56 0 0 64 $4,968.00 Task 1.3 Modify Mantelli Drive Improvement Plans 16 Ol 16 48 01 0 so $6,800.00 Task 1.4 Construction Easements 4 40 0 0 0 0 44 $4,380.00 Subtotal Task 1.0 52 40 40 172 0 0 304 $26,076.00 Hourly Rate $145.00 $95.00 $76.00 $68.00 $45.00 $178.00 Fee Total $0.00 $7,540.00 $3,800.00 $3,040.00 $11,696.00 $0.00 $0.00 $26,076.00