RBF Consulting - Agreement for Santa Teresa Blvd. Widening Project - Addendum No. 8C �J 3 FBF CONSULTING July 10, 2002 July 30, 2002 (Revised) Ms. Kristi Abrams Traffic Engineer CITY OF GILROY 7351 Rosanna Street Gilroy, CA 95020 -6197 Subject: Addendum #08, Santa Teresa Boulevard Dear Ms. Abrams: R�C,EFJV a AUG 01 ?002 JN 35- 100063.009 In response to your request, RBF Consulting is pleased to present this addendum to provide the final design for the improvements of Santa Teresa Boulevard. Included in this scope of work are the required modifications to the existing plans to provide for the join at 1St Street as a result of the plans being developed by Higgins & Associates and the modifications to the plans as a result of the proposed undergrounding of utilities. As a documentation item, the subconsultant contract with RGA provides for dry utility design services "from" 1St Street to Day Road West. The addition of the 1St intersection utility sheets plus bid schedule and specifications was considered additional services. However, because of funding issues and coordination with the County, it is our understanding that the services between Sunrise and Day Road West has been deleted from the contract. As such, no additional fee will be requested for the 1St Street utility plans. Enclosed for your review are the following exhibits: Scope of Services, Exhibit "A" and Proposed Compensation, Exhibit "B ". Should you have any questions, please do Sincerely, William J. Conyers, E. proved Senior As ociate ty of Gilroy �i Jay Baksa, City Administrator PLANNING k DESIGN CONSTRUCTION 1981 North Broadway, Suite 235, Walnut Creek, CA 94596 -3817 ■ 925.906.1460 ■ Fax 925.906.1465 Offices located throughout California, Arizona & Nevada ■ www.RBF.conn pr.-d on recycled paper RBF Consulting Contract Agreement for JN 35- 100063.009 EXHIBIT "A" SCOPE OF WORK SANTA TERESA BOULEVARD WIDENING ADDENDUM #8 July 30, 2002 Page 2 of 7 TASK I FINAL DESIGN PLANS, SPECIFICATIONS AND ESTIMATES TASK 1.01 IMPROVEMENT PLAN MODIFICATIONS Consultant will modify previously prepared improvement plan sheets to join to the new improvements at 1s' Street being prepared by Higgins and Associates. Consultant will modify plan and profile to avoid relocation of Verizon vaults. Consultant will modify improvement plans to accommodate the new vaults being placed by PG& E. The following modifications are anticipated: • Insert Higgins and Associates improvement plans at 1St to show on RBF plans as constructed base. • Modify typical section sheets to reflect new join at 1St Street and delete sections for construction on 1 St Street as no long applicable to this project. Modify typical sections to reflect grading at vault. Provide vault grading detail • Delete RBF intersection detail plan at 1s' Street as no longer applicable to this project. • Modify demolition plan to reflect new base and to show median curb removal required to construct Santa Teresa Blvd. north of 1St Street. • Modify profiles Santa Teresa Blvd. north of 1St Street to join Higgins plan and show median curb replacement removed under previous line item for traffic control movements. • Modify curb between Sta. 45 +00 and Sta. 45 +80 to avoid Verizon manhole. • Modify curb and median curb plan and profile between Sta. 58 +00 and Sta. 68 +00 to avoid two Verizon vaults. • Adjust storm drain lateral A -3 at Sta. 22 +00, storm drain laterals E1 & E2 at sta. 66 +50 at storm drain lateral F1 at Sta 75 +70 as a result of modifications to curb line to avoid Verizon vaults and join Higgins plans. • Modify soundwall plans in seven locations at a result of the installation of the underground utility vaults. • Modify soundwall plans between Sta. 65 +00 and Sta. 72 +00 as a result of utility trench going behind curb line • Adjust street light plans between sta. 58 +00 and sta. 68 +00 as a result of new curb line. • Add new joint trench and vaults to base drawings RBF Consulting Contract Agreement for JN 35- 100063.009 July 30, 2002 Page 3 of 7 • Delete metric street improvement plans and storm drain plans at 1" Street as no longer applicable to this project. • Modify 30sections as a result of changes in profile and curb lines and grading around vaults. • Modify sheet numbering, all sheets. • Re calculate earthwork and soundwall quantities as a result in changes in grading. TASK 1.02 CONSTRUCTION STAGING / TRAFFIC CONTROL /STRIPING PLANS Consultant will modify previously prepared traffic control plans and striping plans to reflect new constructed base south of the 1St Street and to reflect adjustment in curb line to avoid Verizon vaults between Sta. 58 +00 and Sta. 68 +00. It is anticipated that six traffic control sheets will require modification. It is anticipated that three sign and striping sheets will require modification. TASK 1.03 BOX CULVERT STRUCTURAL COVER Consultant shall modify previously prepared plans to install eight foot wide steel grate over the center of the box culvert structural cover on South Morey Channel. TASK 1.04 PG&E EASEMENT Consultant shall provide easement in two locations for the installation of a electrical vault on the northwest corner of Santa Teresa Blvd. and 1 St Street. TASK 1.05 TRAFFIC SIGNAL MODIFICATION PLANS Consultant will screen back traffic signal plan prepared by Higgins & Associates at 1St Street and show loop replacements at the north side of Santa Teresa Blvd. in a format acceptable by Caltrans and process as part of the encroachment permit required by Caltrans for working through their intersection. Provide for a modification of the Mantelli Drive Signal plan for a power back up. Provide specification for the power back up on the Mantelli Signal. Provide temporary street light plan for Mantelli Drive. TASK 1.06 RETAINING WALL Consultant will provide retaining wall design and grading plan at three locations at the N.W. corner of Santa Teresa Blvd. and 1 St Street for the new vaults. Plan to be developed separate from Santa Teresa Blvd. for inclusion into the CRP plan set. Consultant to provide specifications and bid items. RBF Consulting Contract Agreement for JN 35- 100063.009 TASK 1.07 ESCALATION CLAUSE, DESIGN SERVICES July 30, 2002 Page 4 of 7 The terms of the base contract agreement for the design of Santa Teresa Boulevard provides for a 10% escalation clause for that portion of the contract work remaining after December 31, 2001. Based upon the December 2001 invoices, the remaining design work for the base contract and addendum #1 is $47,676.00 As such the escalation amount for design services is $4,768.00 TASK 1.08 ESCALATION CLAUSE, CONSTRUCTION SUPPORT SERVICES The terms of the base contract agreement for the design of Santa Teresa Boulevard provides for a 10% escalation clause for that portion of the contract work remaining after December 31, 2001. Based upon the December 2000 invoices, the remaining construction support services for the base contract and addendum #1 is $23,430. As such the escalation amount for the construction support services portion of the contract is $2,343 TASK 1.09 PROJECT MEETING TIME Consultant will attend up to five (5) coordination meetings with the City and other agencies during the final implementation of the Santa Teresa Blvd. plans. Consultant will arrange meetings, provide discussion materials and agendas and develop and distribute meeting notes. Task 1.10 Profile Dry Utilities Consultant will provide vertical profile for dry utilities based upon horizontal layout prepared by RGA for Santa Teresa Blvd. Profiles will be at a scale of 1"=40' horizontal and 1"=4' vertical. Profile sheets will be double loaded. Sections will be provided at locations of vaults. Profiles will show existing ground, proposed finish street surface and subgrade along with top of conduit elevations. Profiles will also show wet utility crossings. Sections for the vaults will be provided in twelve locations. Consultant will provide horizontal survey control sheet. It is anticipated that 6 sheets will required for this task. RBF Consulting Contract Agreement for JN 35- 100063.009 Task 1.11 Dry Utility Design Coordination July 30, 2002 Page 5 of 7 Consultant will provide additional design coordination and management services to provide for separate utility contract. Consultant will provide: • Review with RGA the constraints of the project and problem solve for location of joint trench • Incorporate joint trench designs, specifications and bid forms into separate bid documents for utility contract • Provide for additional government processing with the City and County for separate utility contract. EXCLUSIONS: • Traffic Control Plans • Any civil drawings associated with improvements other than profiling and horizontal survey control plan • Construction Staking or Verification RBF Consulting Contract Agreement for JN 35- 100063.009 EXHIBIT "B" "PAYMENT SCHEDULE" SANTA TERESA BOULEVARD WIDENING ADDENDUM #08 July 30, 2002 Page 6 of 7 The total payment to CONSULTANT for all work, service, material, equipment and incidentals necessary for performing and completing the Tasks set forth in this agreement, shall be for the sum of $77,895.00 CITY shall compensate CONSULTANT in proportion to the services performed and invoiced to the CITY as outlined below, subject to Article 4 of this agreement. TASK I FINAL DESIGN PLANS, SPECIFICATIONS AND ESTIMATES TASK DESCRIPTION Task 1.01 Modify Improvement Plans Task 1.02 Stage Construction/Traffic Control /Striping Plans Task 1.03 Box Culvert Structural Cover Task 1.04 PG &E Easement Task 1.05 Traffic Signal Modification Plans Task 1.06 Retaining Wall Task 1.07 Escalation Clause, Design Services Task 1.08 Escalation Clause, Construction Services Task 1.09 Project Meeting Time Task 1.10 Profile Dry Utilities Task 1.11 Dry Utility Design Coordination FEE $15,864.00 $7,656.00 $1,964.00 $900.00 $2,352.00 $3,160.00 $4,768.00 $2,343.00 $3,000.00 $18,604.00 $7,284.00 Subtotal Professional Fee $67,895.00 Reimburseable Expense $10,000.00 Total Professional Fee $77,895.00 RBF Consulting Contract Agreement for JN 35- 100063.009 July 30, 2002 Page 7 of 7 Blueprinting, reproduction, messenger service and other direct expenses will be charged as additional costs plus a fifteen percent (15 %) handling fee. A Subconsultant Management Fee of fifteen percent (15 %) has be added to the direct cost of any subconsultant services to provide for the costs of administration, subconsultant consultation and insurance. Santa Teresa Boulevard Widening Project Addendum #8 Final Design Plans, Specifications & Estimates Prepared For: City of Gilroy Prepared By: RBF Consulting Job No. 35- 100063.009 July 30, 2002 Prepared By: William Conyers Task No. Task Lump Sum Items Project Manager Hours Project Engineer Hours Design Engineer Hours Cadd Technician Hours Clerical Hours Survey Crew Hours Total Hours Fee Total Task 1.0 FINAL DESIGN PLANS, SPECIFICATIONS & ESTIMATES Task 1.01 Improvement Plan Modifications 20 0 132 32 0 0 184 $15,864.00 Task 1.02 Construction Sta in /Traffic Control/Striping Control/Striping Plan 4 36 0 48 0 0 88 $7,656.00 Task 1.03 113ox Culvert Structural Cover 1 2 81 0 12 01 0 22 $1,964.00 Task 1.04 PG &E Easement 2 6 0 0 0 0 8 $900.00 Task 1.05 Traffic Signal Modification Plan 4 6 0 16 0 0 0 $2,352.00 Task 1.06 Retaining Wall Plan 4 0 32 0 0 0 0 $3,160.00 Task 1.07 Escalation Clause, Design Services $4,768 0 0 0 0 0 0 0 $4,768.00 Task 1.08 Escalation Clause, Construction Support Services $2,343 0 0 0 0 0 0 0 $2,343.00 Task 1.09 Project Meeting Time 20 0 0 0 0 0 0 $3,000.00 Task 1.10 Profile Dry Utilities 24 7 150 32 0 0 213 $18,604.00 Task 1.11 Dry Utility Coordination 32 0 0 32 4 0 68 $7,284.00 Subtotal Task 1.0 112 63 314 172 4 0 583 $67,895.00 Hourly Rate $150.00 $100.00 $80.00 $72.00 $45.00 $184.00 Fee Total $7,111.00 $16,800.00 $6,300.00 $25,120.00 $12,384.00 $180.00 $0.00 $67,895.00