RBF Consulting - Agreement for Santa Teresa Blvd. Widening Project - Addendum No. 9VBF CONSULTING January 6, 2003 Ms. Kristi Abrams Traffic Engineer CITY OF GILROY 7351 Rosanna Street Gilroy, CA 95020 -6197 Subject: Addendum #09, Santa Teresa Boulevard Dear Ms. Abrams: .. JAN� 8 ?003 JN 35- 100063.010 In response to your request, RBF Consulting is pleased to present this addendum to provide the final design for the improvements of Santa Teresa Boulevard. Included in this scope of work are additional easements and modifications to the soundwalls, median lighting, and conceptual entry feature designs. Consultant will also meandered the sidewalk in locations previously identified and modify specifications for soundwall finish at no cost to the City. Excluded from this scope is any lighting of the soundwalls, modification to the existing median hardscape and final site plan and specifications for a design -build entry feature. Enclosed for your review are the following exhibits: Scope of Services, Exhibit "A" and Proposed Compensation, Exhibit "B ". Should you have any questions, please do not hesitate to call me. Sincerely, w William J. onyer,IP.E. Senior Ass ciate ' pr ity f ilroy PLANNING a DESIGN li CONSTRUCTION 1981 North Broadway, Suite 235, Walnut Creek, CA 94596 -3817 ■ 925.906.1460 ■ Fax 925.906.1465 Offices located throughout California, Arizona & Nevada ■ www.RBF.com p,,n ,d-mery ,d paper RBF Consulting, January 6, 2003 Contract Agreement for JN 35- 100063.010 Page 2 of 4 EXHIBIT "A" SCOPE OF WORK SANTA TERESA BOULEVARD WIDENING ADDENDUM #9 TASK I FINAL DESIGN PLANS, SPECIFICATIONS AND ESTIMATES TASK 1.01 IMPROVEMENT PLAN MODIFICATIONS Consultant will add 300' of soundwall to improvement plans between sta. 56 +00 and sta. 59 +00. Consultantwill prepare three construction easements for the new wall. Consultant will calculate and add wall quantities and costs to bid schedule and engineer's estimate. TASK 1.02 MEDIAN LIGHTING There is roughly 2600 feet of open area within the medians on Santa Teresa from 1" Street to Sunrise. The majority of the area is taken up by hardscape for 4' wide median areas. Consultant will prepare improvement plans for median landscape lights placing 2 lights on 20' intervals for approximately 260 lights. Consultant will place outlets at appropriate locations for possible Christmas or other decorative lights. TASK 1.03 CONCEPTUAL ENTRY MONUMENT DESIGN RBF will prepare three design alternatives for two entry monuments; one primary entry monument for major City entry's or gateways and one secondary entry monument for other city entry points (six drawings total). The design fo the entry monuments will be designed to resemble the mass and form of the "Custom entry and Painters" shown on page 12 in the Sierra Precast, Inc. catalogue and will include embossed lettering similar to the "sign plaques" shown on page 11 of that catalog. The designs will finish with a combination of stucco and stone and the other primarily of a stone finish. A rough preliminary design and a preliminary estimate of construction costs will be submitted to the city for review and comment. Upon review and comment by the City, RBF will refine the conceptual designs and cost estimates and submit to the City for review, comment and approval. The work tasks will include: 1. Research and investigation: visit Gilroy, historical research, identify a typical primary and secondary intersection, discuss options with Representatives of Sierra Precast. 2. Design approximately three alternatives for the primary and secondary RBF Consulting, Contract Agreement for JN 35- 100063.010 entries. 3. Prepare Preliminary Cost Estimates 4. Refine alternatives based on City input 5. Prepare final presentation and quality exhibits 6. Make final adjustments based on city input TASK 1.04 ESCALATION CLAUSE, DESIGN SERVICES January 6, 2003 Page 3 of 4 The terms of the base contract agreement for the design of Santa Teresa Boulevard provides for a 10% escalation clause for that portion of the contract work remaining after December 31, 2002. Based upon the December 2002 invoices, the remaining design work for the base contract and addendum #1 is $37,670.50 As such the escalation amount for design services is $3,767.00 TASK 1.05 ESCALATION CLAUSE, CONSTRUCTION SUPPORT SERVICES The terms of the base contract agreement for the design of Santa Teresa Boulevard provides for a 10% escalation clause for that portion of the contract work remaining after December 31, 2002. Based upon the December 2002 invoices, the remaining construction support services for the base contract and addendum #1 is $17,498.96. As such the escalation amount for the construction support services portion of the contract is $1,750.00 T RBF Consulting, Contract Agreement for JN 35- 100063.010 EXHIBIT "B" "PAYMENT SCHEDULE" SANTA TERESA BOULEVARD WIDENING ADDENDUM #09 January 6, 2003 Page 4 of 4 The total payment to CONSULTANT for all work, service, material, equipment and incidentals necessary for performing and completing the Tasks set forth in this agreement, shall be for the sum of $28,917.00 CITY shall compensate CONSULTANT in proportion to the services performed and invoiced to the CITY as outlined below, subject to Article 4 of this agreement. TASK I FINAL DESIGN PLANS, SPECIFICATIONS AND ESTIMATES TASK DESCRIPTION Task 1.01 Modify Improvement Plans Task 1.02 Median Lighting Task 1.03 Conceptual Entry Monument Design Task 1.04 Escalation Clause, Design Support Services Task 1.05 Escalation Clause, Const. Support Services Total Professional Fee FEE $2,400.00 $12,000.00 $9,000.00 $3,767.00 $1,750.00 $28,917.00 Blueprinting, reproduction, messenger service and other direct expenses will be charged as additional costs plus a fifteen percent (15 %) handling fee.