RBF Consulting - Agreement for Santa Teresa Blvd. Widening Project - Addendum No. 10FBF
A
CONSULTING
July 24, 2003
Ms. Kristi Abrams
CITY OF GILROY
7351 Rosanna Street
Gilroy, CA 95020 -6197
Subject: Addendum #10, Santa Teresa Boulevard
Revised
Dear Ms. Abrams:
RECEIVE)
JUL 2 5 2003
ENGINEERING
JN 35- 100063.011
In response to your request, RBF Consulting is pleased to present this addendum to provide
additional services for the final design for the improvements of Santa Teresa Boulevard and an
expanded involvement for the joint trench construction and the Santa Teresa Blvd. general
construction. To the best of our knowledge, this addendum represents the last addendum to
complete the engineering services for Santa Teresa Boulevard. Two items that we discussed
on July 22 that may be potential additional services include:
a.) If the County of Santa Clara requires any additional documentation to assure
compliance with the new NPDES permit requirements.
b.) RBF was not involved in the negotiations or review of impacts to private properties
behind the soundwalls to be constructed as part of this project. RBF will write a
specification requiring the Contractor to review the easement documents and to identify
to the City anticipated additional impacts, not negotiated with the private property
owners, based upon an assessment of the Contractor's construction methods and
means. At this time we anticipate that the Contractor and the Cities' construction
manager will handle impacts and the mitigation of those impacts and that there will be
no involvement by RBF.
The services to be provided for the various components to the Santa Teresa Blvd. project are
as follows:
• Design
Included in this scope of work are the additional requested services of a new landscape concept
rendering; revising the previously prepared landscape construction drawings to conform to the
new concept; and additional meeting time, management and general consultation time to
complete the design of Santa Teresa Blvd.
• Construction Support Services: Joint Trench
RBF and its dry utility consultant, RGA, will provide construction support services on an as
requested bases for the construction of the joint trench. These services are a direct result of the
complexity of the joint trench design; the need for consultant availability for city staff
consultation; the possibility of a need to adjust the trench to avoid existing utilities; and the
ongoing communication with the utility companies.
PLANNING a. DESIGN r CONSTRUCTION
500 Ygnacio Valley Road, Suite 270, Walnut Creek, CA 94596 -3847 ■ 925.906.1460 ■ Fax 925.906.1465
Offices located throughout California, Arizona & Nevada ■ www.RBF.com
p-ted — recycled Paper
RBF Consulting July 24, 2003,
Contract Agreement for JN 35- 100063.011 Page 2 of 7
• Construction Support Services: Santa Teresa Blvd.
At the request of City staff, additional evaluation was conducted to determine the
potential expanded involvement in the construction support of Santa Teresa Blvd. This
service will be on an "as requested basis ". Additionally the previous "Bid Support"
budget was exhausted for Mantelli Drive and the Joint Trench project. Additional
budget for "Bid Support" will be added under the Construction Support line item of this
proposal.
• Reimburseable Expense
At the request of City staff, a complete evaluation of the reimburseable expense budget was
conducted to determine the anticipated budget to complete the design of the project.
The review of this budget argumentation should take into consideration, not only that the scope
of construction work for this project has almost double since the original contract, but also the
complexity and coordination of the project has increased with the addition of the soundwalls and
the undergrounding of the utilities. The splitting of Mantelli Drive and the undergrounding of
utilities into separate contracts along with the delays in dealing with utility companies with
financial concerns has extended the design period of this project now to a projected four years.
These factors have all affected the budget.
Enclosed for your review are the following exhibits: Scope of Services, Exhibit "A" and Proposed
Compensation, Exhibit "B ".
Should you have any questions, please do not hesitate to call me.
Sincerely,
RBF Consulting
/ Y
William J. Con rs, P. .
Senior Ass to (7jBaksa, City Administrator
City of Gilroy
Approved
RBF Consulting
Contract Agreement for JN 35- 100063.011
ADDENDUM SUMMATION
July 24, 2003,
Page 3 of 7
This summation is broken into two categories; the first are services provided as a direct
result of an expanded scope of work or changes in direction that had administrative and
cost advantages for the City; the second were a change in direction as a result of new
information or changing criteria.
Addendum
Category #1
Category #2
Description
Org. Contract
$422,185.00
Design 600' south of 1St Street to 600' north of
Mantelli Drive and Mantelli Drive, provide geometrics
to Day Road East
Add. #1
$176,045.00
Design 600' north of Mantelli Drive to 1000' north of
Longmeadow Drive
Add. #2
$19,050.00
Modification for sound wall offset and varying height,
new retaining walls at box culverts, additional
landscape rendering and provide for dual ramps at
intersections.
Add #3
$21,500.00
Provide vacation of Right of Way for soundwall pop
outs and prepare SWPPP
Add #4
$33,648.00
Prepare geometric approval drawings for separate
Mantelli Drive project, split Mantelli Drive into
separate contract document, revise Santa Teresa
Blvd. as a result that Mantelli Drive is complete.
Add #5
$16,100.00
$12,608.00
Provide potholing of existing utilities, escalation for
project extending a year (2001).
Add #6
$108,538.00
Prepare geometric approval drawing from Day Road
East to north of Day Road West, provide dry utility
design to underground all overhead utilities
Add #7
$26,076.00
Modify STB and Mantelli plans and cross sections to
provide for new structural section based upon a new
soil report, provide new easements as result of lot
split and new direction at intersections.
Add #8
$35,888.00
$42,007.00
Profile dry utilities and provide separate construction
contract for the undergrounding of the utilities.
Modify improvement plans, traffic control, traffic
signal, striping plans to accommodate the elimination
of that portion of STB south of 1St Street being
constructed by CRP and to avoid utility conflicts.
Modify grading and soundwall plans to accommodate
new utility vaults adjacent to soundwalls, revise box
culvert cover design at the request of SCVWD,
provide PG &E easement, provide escalation for a
year extension of remaining contract (2002), and
additional reimburseable expense budget
Add #9
$23,400.00
$5,517.00
Add new soundwall , provide median lighting, provide
monument wall concept, provide escalation for a year
extension on remaining contract (2003)
Totals
$837,304.00
$105,258.00
RBF Consulting
Contract Agreement for JN 35- 100063.011
EXHIBIT "A"
SCOPE OF WORK
SANTA TERESA BOULEVARD WIDENING
ADDENDUM #10
TASK I FINAL DESIGN PLANS, SPECIFICATIONS AND ESTIMATES
Task 1.01 New Landscape Concept Plan
July 24, 2003,
Page 4 of 7
RBF shall prepare one revised presentation quality landscape concept
plan for the project site. The plan shall depict the landscape concept for
the portion of Santa Teresa between the approximate stations of 47 +00
(Mantelli Drive) and 74 +00 (Longmeadow Drive) only. The plan shall be
prepared based on site opportunities and constraints, Client goals and
objectives and the design standards of the City. It is assumed the design
will resemble the landscaping in Longmeadow Drive. The plan shall depict
pertinent site improvements, such as curbs, gutters, sidewalks, decorative
median pavement, sound/ screen walls and streetlights and landscape
concepts, including trees, shrubs and ground covers. The plan shall be
prepared at an appropriate scale on a base map prepared by RBF under a
separate task.
Task 1.02 Revised Landscape Construction Plans
RBF will revise the previously completed landscape construction plans to
conform to the anticipated new landscape concept following the
Longmeadow Drive model.
Task 1.03 Project Meeting Time And General Consultation
RBF will provide general consultation, management and meeting time for
the continuation of this project. A budget of 40 hours has been established
for this effort.
RBF Consulting July 24, 2003,
Contract Agreement for JN 35- 100063.011 Page 5 of 7
TASK II CONSTRUCTION SUPPORT SERVICES, JOINT TRENCH
Task 2.01 Construction Support Services, Joint Trench
RGA (RBF's dry utility subconsultant) will, on an as requested basis,
provide services during the construction phase of the joint trench project
by responding to questions, preparing plan revisions as required and the
review of any shop drawings. Services will be provided on time and
material basis within the budget established under the fee section. The
budget is based upon an assumption of 20 working weeks of construction.
The involvement by the project manager is estimated at 4 hours per week.
Additional time has been added for minor plan revisions as a result of
unforeseen site conditions or adjustments requested by the client.
Additional services beyond the authorized fee will be performed, if
required, on an hourly basis for an additional fee.
Task 2.02 Construction Support Services, Joint Trench
RBF will, on an as requested basis, during the construction phase of the
joint trench project, provide services by responding to questions, preparing
plan revisions, as required, and the review of any shop drawings. Services
will be provided on a time and material basis within the budget established
under the fee section. The budget is based upon an assumption of 20
working weeks of construction. The involvement by the project manager is
estimated at 4 hours per week. Additional time has been added for minor
plan revisions as a result of unforeseen site conditions or adjustments
requested by the client. Additional services beyond the authorized fee will
be performed, if required, on an hourly basis for an additional fee.
TASK III CONSTRUCTION SUPPORT SERVICES, STB
Task 3.01 Construction Support Services, STB
RBF will, on an as requested basis, during the construction phase of the
Santa Teresa Blvd. project provide services by responding to questions,
preparing plan revisions, as required, and provide review of any shop
drawings. Services will be provided on a time and material basis within
the budget established under the fee sections. The budget is based upon
an assumption of 50 working weeks of construction. The involvement of
the project manager is estimated at 4 hours per week for 10 weeks and 2
hours per week for 40 weeks. Additional time has been added for shop
drawing review, RFI's and minor plan revisions based upon unforeseen
site conditions or adjustments requested by the client.
RBF Consulting
Contract Agreement for JN 35- 100063.011
July 24, 2003,
Page 6 of 7
This scope is an augmentation of a previously established budget, but
increased based upon the expanded scope of the project and the
anticipate support requested by the City. Included in this budget is bid
award support for Santa Teresa Boulevard. Additional services beyond
the authorized fee will be performed, if required, on an hourly basis for an
additional fee.
RBF Consulting July 24, 2003,
Contract Agreement for JN 35- 100063.011 Page 7 of 7
EXHIBIT "B"
"PAYMENT SCHEDULE"
SANTA TERESA BOULEVARD WIDENING
ADDENDUM #10
The total payment to CONSULTANT for all work, service, material, equipment and
incidentals necessary for performing and completing the Tasks set forth in this
agreement, shall be for the sum of $80,467.00
CITY shall compensate CONSULTANT in proportion to the services performed and
invoiced to the CITY as outlined below, subject to Article 4 of this agreement.
Task
Description
Fee
Task I
Final Design Plans, Specifications and Estimates
Task 1.01
Revised Landscape Concept Plan
$4,500.00
Task 1.02
Revised Landscape Construction Plans
$4,500.00
Task 1.03
Project Meeting Time and General Consultation
$6,200.00
Subtotal
$15,200.00
Task II
Construction Support Services, Joint Trench
Task 2.01
Construction Support Services, RGA
$13,600.00
Task 2.02 Construction Support Services, RBF $15,800.00
Subtotal
$29,400.00
Task III Construction Support Services, STB
Task 3.01 Construction Support Services $15,867.00
Subtotal $15,867.00
Total Professional Fee $60,467.00
Reimburseable Expense Budget $20,000.00
Total Fee $80,467.00
Blueprinting, reproduction, messenger service and other direct expenses will be charged as additional
costs plus a fifteen percent (15 %) handling fee. Fee escalations have been included in these budget
requests.
Santa Teresa Boulevard Widening Project
Addendum #10
Prepared For: City of Gilroy
Prepared By: RBF Consulting
Job No. 35- 100063.011
July 24, 2003
Prepared By: William Conyers
Task No.
Task
Sub
Consultant
Fee +15%)
Project
Manager
Hours
Project
Engineer
Hours
Design
Engineer
Hours
Cadd
Technician
Hours
Clerical
Hours
Survey
Crew Hours
Total
Hours
Fee Total
$1,800.00
5000 bond copies @ $1.50 per sheet
$7,500.00
250 mylars $36 per sheet
$9,000.00
Color Copies for Landscape Rendering
$500.00
25,000 pages zerox @ $0.12
$3,000.00
3000 pages, 11"x1 T' @ $0.32
$960.00
Task It
Construction Support Services, Joint Trench
Task 2.01
Construction Support Services, RGA
80
40
0
0
0
0
120
$13,600.00
Task 2.02
Construction Support Services, RBF
80
0
40
0
0
0
120
$15,800.00
Subtotal Task II
$12,400.00
$0.00
$3,400.00
$0.00
1 $0.00
$0.00
$29,400.00
Task III
Construction Support Services, STB
Task 3.01
Construction Support Services, RBF
120
40
60
0
0
0
220
$29,295.00
(Less Authorized Budget)
$13,428.00
Subtotal Task III
$19,530.00
$4,410.00
$5,355.00
$0.00
$0.00
$0.00
$15,867.00
RGA's Hourly Rate 2003
$115.00
$110.00
RBF's Hourly Rate 2003)
$155.00
$105.00
$85.00
$72.00
$45.00
$196.00
RBF's Hourly Rate 2004
$162.75
$110.25
$89.25
$75.60
$47.25
$207.90
Reimbursable Expense Assessment
Assume:
a. The final plan for STB set will contain roughly 120 sheets
b. Two plan checks & 12 sets per plan check
c. 2 mylar sets, one for City, one for RBF
300 Vellums @ $6.00 /per sheet
$1,800.00
5000 bond copies @ $1.50 per sheet
$7,500.00
250 mylars $36 per sheet
$9,000.00
Color Copies for Landscape Rendering
$500.00
25,000 pages zerox @ $0.12
$3,000.00
3000 pages, 11"x1 T' @ $0.32
$960.00
Milage 20 trips @ 160 miles @ $0.40
$1,280.00
Subtotal $24,040.00
15% $3,606.00
Total $27,606.00
Say $30,000.00
less current budget <$10.000.00>
This argumentation $20,000.00
Does not include expenses that may incur during
construction support phase of main contract for STB.
To be evaluated after completion of design phase.
(D (D
a �
CD Q C.
c O
:i] n
W
00
S G)
ul
O
�l<
3
n
cn
D
-n Z
my
m_q
Cl) m
�em
m>
v 00
N O
C
mr-
mm
�a
v
N
(L]
CD
O
h
N
T
--I
C
CU
lu
U)
CA
N
y
W
10)
W
W
W
W
W
W
W
W
N
N
-�
CD
N
N
N
N
N
N
N
N
N
bo
—
—
—
—
—
—
—
A
W
N
C)
(D.
OD
v
0
W
D
O)
Cn
A
W
N-
O
(D
OD
V
O
Ui
A
W
N
CD
D
00
V
O
Cn
A
co
N
-�
0
C:
m
m
-
Xcn0
-a
KcnTxc)r
-'
cnocnm
'
co)
-0
DTTvDTT
-0-0
mcnTcnr-
T
-0
G)
cn„X
-�-i
_
M
—
n
n�
o
N
o
c
O
<
O
CD
CD
CAD
N
O
j
CD
v
N
v
N
w
0
(D
N
(D
C
C
O
(D
CD
CD
(D
(D
(D
CD
CD
(D
-.
(D
3
C
O
c
d
N
3
-,
fD
CD
0
-'
0
(D
-Tj
-�
tD
N
'-►
O
C
N
v
N
N
?
°
3
C
v
3
Q
(D
fD
n>
=
(�
�;
O
q
Q
n
C)
n
�:
C)
CD
,
(D
=)
U
,+
O
(D
o
3
Q
ili
C3
tli
O
v
O
Q
d
(u
'a
N
"O
N
"O
n)
3
<
'+
M
O
CD
n
-0
Q
(n
—
_
3
_
3
O
3
3
Q
N
CD
n
7c
W
at
O
O
O
3
O
v
�—
N
fJo
c,
o
N
fD
cn
cn
Cn
cn
r
O
>.
pr.—
CD
C
���
v
fD
(D
-0
��
CD
CD
(D
�vo,�r.m
CD
7
C
N
°'
�
°
(u
n
03
7
v
3
=
CD
N
D—
O
N
O
O
O
3
3
3
(D
N
O"
p
CA
O
c°
6
'C1
go
c
tT
N
7
CD
3
N-0
7-
cn
n
3
—�
Cll
(D
-O
(D
N
n
� .
"O
O
C<)
N
0
CD
'0
-„
0
�.
0
N
3
-«
3=
v
CD
3
-3.
N
3
3
Cli
Cu
N
3
O
O
°
o
3
3'
O
Q
C2
C1
0
0
3
3
n�
0,:2
3
_�
3
O
N
Ln
(n
(D
-0�
3
Q
O
r-
—
Cn
c
-
-�
--
go
C
—
3
N<
CD
'U
Q
O
O
c
n'
(n
0
0
CD'
v
3
C
c
Cll
O
-•
n,
c
O
N<
(D
CD
m
n
cr
(o
3
O
�0
CD
p)
90
CD
-�
3
�
�
N
�
[n
3
3
2
�
(T1
CD
2
(n
(n
cn
n
�
CD
r
3
W
°
CD
�
to
3
CD
O
3
CD
to
•
v
r:
0
00
3
3
n
N
(n
3
j
m
Cn
..
3
-�
°
CD
o
CD
N
=
(D
N
3
Z7
D
(D
N
c
c
CD
c
p
3
w
3
0
CD
3
3
0
<
D
?
n
=
3
0
3
n0(n
-'
•O
lD
CD
CD
n
(D
o
c
7
C3
!
.�<
--.:3
O
3.Q
Q3
CD
CD
(D
CD
O
o
QO
fT1
._Y
cn
v
A
O
CD
3
3•
N
(n
°
(oD
O
(D
O
U)
3
3
3'
D
Z
Cn
n
3,
to
-"
<
(n
U)
Qa'
�
cn
((n
v
�
3
m
°
o
Q°
0
3
u,
cn
Q°
(n
�'
ED
N
°
�,
?
sp
(°n
z
3
C
fD
3
En
con
n
v
3<
()
CD
-
Cll
CD
3
O
�'
°
n
Q1
n
N
CD
TI
7
v
7
°'
3
M.
�
CD
o
0
=�
u,
O-_*
CD
1
3
m
?
fD
p'
CD
CD
3
v
O
3
CD
N
(D
to
O
jinn
n
n
CD
C7
v
cn
°
o
n
3°
a,<
cn
�_°�n)
7�
CD
='
.Zl
�''
O
3
X
�
po
�
7
�'
Q
cn
3
3
O
r.
�
to
.�
N
3
0
3'�N
�
r«
<'N
o
<
�
o
m(n
(n
CD
N
N
spo
3
3
v
(D
3
3
�'
3
�'
N
(n
=
o
to
n
O
3
CD
CD
O
3
O
0
3
CD
<
u,
0
v
5•m
Ov
3
CD
CD
CD
cn
x
n
3
O
=r
O
°
3
7
0
m
m
(n
cn
c
cn
m
O
69
CO
CA
69
69
69
69
69
69
�
�
"
69
69
��
N
1
69
69
A
M
69
69
69
69
69
69
A
�
N
69
(9
tq
69
69
N
69
A
69
69
n
A
9)
O
Vn
W
OD
90
A
69
O
cn
N
go
U7
—
00
O
CO
go
N"
-0)
O
6
_ W
N
69
69
69
W
Cn
W
W
O
O
Cn
00
CO
O
N
O
V
C)1
-I
w
O
A
tD
m
(D
m
N
A
I
W
O
m
N
Cn
v
(A
N
A
A
N
O
N
O
O
W
O
A
N
Cn
(n
n
O
N
00
W
W
O
O
�I
A
00
N
00
O
CD
cn
I
(n
W
N
A
O
(b
O
V
-L
O
A
OD
0
Cb
0
N
A
A
00
(n
O
Cn
Cb
Cn
O
O
W
O
00
�
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
C71
0
0
0
0
0
0
0
0
Cn
O
O
0
0
0
0
0
0
0
0
0
0
0
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
0
0
0
0
0
0
0
0
0
0
0
O
*
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
Q
C)
C)
0
0
0
0
0
0
0
0
a
40
A
ffl69Efl69696969
�
b9
696969699
N
69
N
i
eW
a
Cn
O
N
N
A
N
4tq
N
o
Cn
9)
CJ�
O
O
O
A
O
()
O
V7
N
cn
W
O
CTn
N
(D
O
Cn
m
W
N
(D
-1
Cn
A
O
N
CY)
O
A
W
Cn
N
4
O
00
OD
W
CO
O
C)
OD
A
-4
Ul
Ul
"
CJ1
OOOOOOOOOOOOOOOOOOCn
O
O
p
O
O
O
O
O
O
O
O
O
O(D
O
O
O
O
O
O
O
O
CD
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
vi
Q-
"
cD
W
P.
:N
Cn
O O
cn
O
V
O
C)
O
N
O
O
O
O
O
O
O
O
O
O
O
O
O
01
O
ICDI
_
N
69
Qa
00
O
O
O
W
O
O
O
CD
0
Q
CD
a
N
69
69
69
69
CL
CL
t0
N
69
A
N
9
OV
O
O
A
CO
N
N
Cn
(A
O
�
(D
W
O
(A
9)
p
(D
N
A
a
O
O
O
O
O
O
O
O
O
O
O
O
O
C)l
I
O
a
V%
N
69
69
"
6A
"
t!9
0
�)
a
CA
N
O
W
W
�
Ch
O
A
0)
O
C0
p
p
woo
O
o
CD
aoo
CD
CD
0
CD,
I
I
I
I
I
I
I
0
a
C.
�
a
ago
00
6A
�I
W
ffl
W
69
N
Efl
N
O
W
N
NAO
(b
O
O
co
O
O
O
O
O
O
C)0
P
O
O
O
O
O CD
O
O
O
O
a
CL
40
-64
CL
rn
04
V
V
m
000
N
CA
p
O
W
O
O
O
O
CL
0)
CL
69
"
69
69
69
ffl
69
69
k
V
�I
00
N
A
Cn
W
,I
N
Cn
t)D
00
N
C)
W
4
O
O
(A
co
OD
CO
00
O
A
O
N
O
O
Cn
Cn
(A
p
A
A
W
W
A
O
O
O
N
A
0
0
0
0
0
O
O
O
O
CD
O
O
O
O
O
O
O
I
1
CD
0
0
O
O
a
a
ow
_69
a
I._4
69
69
N
E O
C
A
CD
CO
-I
V
A
O
O
O
tD
O
:_l
O
O
O
O
O
1
JcDja
I
I
ICDI
01
1
1
1
1
1
1
1
1
1
1
1
1
1
lQl
O
a
C.
E9
N
A
A
C,
O
O
O
O
O
O
O
O
O
O
O
O
O
lc:)l
I
1
161
O
O
m
69
69
69
69
69
69
69
(fl
69
69
69
69
69
69
69
69
69
-4
69
69
69
69
M
.;�,
—
(D
69
—
"
69
ffl
N
69
69
N
"
-�
A
W
N
69
69
69
A
co
69
A
"
N
CD
69
69
69
69
69
69
A
V
69
69
N
69
69
W
69
(A
"
69
CID
A
N
()
W
W
(A
Cb
O
�I
tD
Cn
-�
W
�l
00
(A
"
O
v
O
A
co
C)
A
A
CO
Co
N"
"
O
69
co
N
69
69
69
N
Cn
00
Cl
co
M
"
M
M
W
N
j
A
N
A
00
O
O
(D
U1
A"
W
O
O"
tD
N
m
CD
CD
A
N
W
N"
�4
n
(A
O
(A
A
00
Cb
_
O
v
W
A
Co
W
O
Cn
N
N
A
O
Cn
(D
O
O
(n
N
O
co
O
O
N
co
N
A
W
Cn
O
CA
OD
00
Cn
W
W
Cn
O
-1
O
O
co
O
00
W
O
�I
A
N
O
N
CO
A
O
n
W
O
W
W
O
Cb
0
0
o
A
O
O
O
O
N
W
N
O
(A
O
W
O
O
N
O
O
O
W
Nf
0
0
0
0
0
0
0
0
0
0
'D
0
0
0
p
A
O
(A
A
O
0
0
0
0
CD
C)
0
0
0
a
0
0
0
0
0
0
0
C)
0
0
0
0
0
CD
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Q
0
a
CD
M
0
CD
(D
0
0
a
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
CDO
C)(DO
O
O
0
0
0
0
0
0
0
0
0
0
0
0
Q
CD
C)
0
0
0
0
0
0
0
(D (D
a �
CD Q C.
c O
:i] n
W
00
S G)
ul
O
�l<
3
n
cn
D
-n Z
my
m_q
Cl) m
�em
m>
v 00
N O
C
mr-
mm
�a
v
N
(L]
CD
O
h
N
(D m
v v
(D (�D
Q a
� O
� C7
00,
� G)
N 1
= O
7'
(o
C0
D
Z
mD
rn-4
to m
�cl)
mD
D Oo
v0
c
=r
mm
m�
—j D
v
N
(o
(D
N
O
N
N
lax--i
(D
A
<
Dp
p
W
o
o
D
O
C
V
Q
O
O
su
3
w
a
W
(vv=
0
CL
cr
O
S.
90
'+
su
A-
m�
N
moo'°'o=
0
7
7
CL
5
O
'n
CD
y,
Cn(ncn()
0
(D
O
Q
c
c
O
fn
x
v000
o
0
CD
m
T
CD
�
�
-'4-
c
m
CDM
cCDD
((DD
cn
cn
(n
0'
CD
0
O
D'
m
0
A
1.9
A
VA
N
O
s
69
Efl
Efl
ffl
N
-n
V
V
A
-I
N
CD
-a
-L
to
O
O
(O
00000
A
W
OOO
to
O
to
O
O
O
O
O
O
O
O
O
O
O
O
O
�
(�
01
O
O>
07
N
W
O
O
O
N
A
co
N
O
O
O
O
0
0
0
O
O
O
O
O
O
o
C)l
151
Efl
EA
CD
to
N
�
N
O
O
O
O
O
O
CD1
O
O
40
40
N
N
N
to
000
°o
°O
Co
w
w
P
FOoPO
000
000
4A
40
p
p
V
V
OE,9
0
Oo
O
Oo
000
000
,1.94A
O
—
to
mop
W
C)
W
OD
O
Oo
000
coo
in
N
N
O
W
V
Eft
V
tn1
O
p
O
O
O
O
O
O
ta
V
T
V
O
V
co
COO
w
N
O
Cn
O
O
O
O
O
o
EA
69
N
N
O
00
-&
�
-64
V
O
V
Q
O
O
o
O
Q1
I
40-69
40
Gq
00
N
0)
46
N
O
O
O
(J1
o
(n
A
O
4
N
A
0o
V
O
V
V
O
0
0
o
O
O
O
O
O
al
101
O
O
EA
b9
O
69
to
40
Ei9
to
N
O
to
O
tO
N
N
Efl
69
W
Un
00
00
�l
O
v
N
�
00
O
00
O)
�
A
N
O
co
N
O
N
to
�l
O
O
O
O
to
O
to
V
O
O
�I
O
O
O
O
O
0
0
0
0
0
0
O
O
O
0
0
0
0
0
0
(D m
v v
(D (�D
Q a
� O
� C7
00,
� G)
N 1
= O
7'
(o
C0
D
Z
mD
rn-4
to m
�cl)
mD
D Oo
v0
c
=r
mm
m�
—j D
v
N
(o
(D
N
O
N