Loading...
RBF Consulting - Agreement for Santa Teresa Blvd. Widening Project - Addendum No. 11\; ,, ` , } eftv of Offrop � 0 COMMUNITY DEVELOPMENT DEPARTMENT 7351 Rosanna Street, Gilroy, CA 95020 ��D MP Planning Division (408) 846 -0440 FAX (408) 846 -0429 Engineering Division (408) 846 -0450 FAX (408) 846 -0429 Building, Life & Environmental Safety Division (408) 846 -0430 FAX (408) 846 -0429 Housing & Community Development (408) 846 -0290 FAX (408) 846 -0429 CHANGE ORDER TO AGREEMENT FOR SERVICES BETWEEN THE CITY OF GILROY AND ROBERT BEIN, WILLIAM FROST & ASSOCIATES DATED FEBRUARY 8, 2000 Consultant: Robert Bein, William Frost & Associates 226 Airport Parkway, Suite 600 San Jose, CA 95110 -3705 This order shall become effective when it has been signed by the City Administrator, Project Engineer, and Consultant. Upon acceptance by the City, the Consultant's original will be returned to him. Description of Work: Santa Teresa Boulevard Widening and Mantelli Drive Gap Closure project. This Change Order extends the term of the agreement to February 8, 2006. Consultant Date ROBERT BEIN, WILLIAM FROST & ASSOCIATES Garrett Gritz FBF CONSULTING December 10, 2003 Ms. Kristi Abrams CITY OF GILROY 7351 Rosanna Street Gilroy, CA 95020 -6197 Subject: Addendum #11, Santa Teresa Boulevard Dear Ms. Abrams: JN 35- 100063.012 In response to your request, RBF Consulting is pleased to present this addendum to provide additional services for the final design for the improvements of Santa Teresa Boulevard. The additional services include revising the previously prepared electrical lighting plans to meet IES standards, and developing an irrigation loop system for Santa Teresa Boulevard. Enclosed for your review are the following exhibits: Scope of Services, Exhibit "A" and Proposed Compensation, Exhibit "B ". Should you have any questions, please do not hesitate to call me. Sincerely, RBF Consulting Willi Senl PLANNING Ii DESIGN 0 CONSTRUCTION 500 Ygnacio Valley Road, Suite 270, Walnut Creek, CA 94596 -3847 ■ 925.906.1460 ■ Fax 925.906.1465 Offices located throughout California, Arizona & Nevada ■ www.RBF.com printed on recycled paper *Z/ RBF Consulting December 10, 2003 Contract Agreement for JN 35- 100063.012 Page 2 of 3 EXHIBIT "A" SCOPE OF WORK SANTA TERESA BOULEVARD WIDENING ADDENDUM #11 TASK I FINAL DESIGN PLANS, SPECIFICATIONS AND ESTIMATES Task 1.01 Electrical Lighting Design RBF will conduct photometric lighting evaluation (6 options) for Santa Teresa Boulevard to meet IES standards, revise the current plans tc implement the criteria and calculate new wiring diagrams for the plans. RBF will provide revise cost estimate. Task 1.02 Irrigation Plans RBF will revise the previously completed irrigation plans to provide for an irrigation loop system with points of connections at Mantelli Drive and Longmeadow Drive. RBF will delete the current point of connection at First Street and delete the irrigation and landscaping on the bank property. RBF will provide for a service truck turn out at the Longmeadow point on of connection. RBF will provide a revised cost estimate for the irrigation plans. RBF will revise specifications for repair of damaged landscaping and irrigation system and bank. RBF Consulting Contract Agreement for JN 35- 100063.012 Exhibit "B" "PAYMENT SCHEDULE" SANTA TERESA BOULEVARD WIDENING ADDENDUM #11 December 10, 2003 Page 3 of 3 The total payment to CONSULTANT for all work, service, material, equipment and incidentals necessary for performing and completing the Tasks set forth in this agreement, shall be for the sum of $9,700.00 CITY shall compensate CONSULTANT in proportion to the services performed and invoiced to the CITY as outlined below, subject to Article 4 of this agreement. Task Description Fee Task I Final Design Plans, Specifications and Estimates Task 1.01 Electrical Lighting Plan $5,000.00 Task 1.02 Irrigation Plans $4,700.00 Total $9,700.00