Loading...
RBF Consulting - Agreement for Santa Teresa Blvd. Widening Project - Addendum No. 12May 18, 2004 Mr. Don Dey Traffic Engineer CITY OF GILROY 7351 Rosanna Street Gilroy, CA 95020 $ *W* CONSULTING JN 35- 100063.013 Subject: Addendum No. 12 — Santa Teresa Boulevard Traffic Signal Plans Dear Mr. Dey, r nistrator RBF Consulting is pleased to present this addendum to provide additional engineering services for the subject project. This addendum is for additional services requested by the City to revise the previously approved traffic signal plans to include video detection system and interconnect plans. We have provided the following Scope of Services and Compensation Summary attached as Exhibits "A" and "B ", for your review and approval. After your approval, please return a copy of the signed agreement for our records. RBF Consulting is looking forward to work with you on this project and is available to initiate work immediately. Please call me at 925 - 906 -1460 if you have any question or need additional information. Sincerely, RBF Consulting William J. Senior As: cc: Carlos Ortiz, RBF CITY OF GILROY Approved By: Date: 512 /O 500 Ygnacio Valley Road, Suite 270, Walnut Creek, CA 94596 -3847 ■ 925.906.1460 ■ Fax 925.906.1465 Offices located throughout California, Arizona & Nevada ■ www.RBF.com p,,1(1d - r,lycloA paper Santa Teresa Boulevard - Additional Traffic Engineering Services EXHIBIT "A" ADDITIONAL SERVICES SANTA TERESA BOULEVARD CITY OF GILROY Task 1 Traffic Signal Plans Revisions May 18, 2004 Page 2 RBF has prepared traffic signal plans for the improvements along Santa Teresa Boulevard. The traffic signal plans included loop detectors at all the approaches. The City wants to replace the loop detectors with Econlite's Autoscope Solo video detection system at each location. RBF will revise the previously prepared /approved traffic signal plans to show video detection system at each signalized intersection including location of video cameras, video cables, detection zones, mounting details and auxiliary equipment. The following traffic signal plans will be revised accordingly. These are: • Santa Teresa Boulevard at First Street • Santa Teresa Boulevard at Welburn Avenue • Santa Teresa Boulevard at Mantelli Drive • Santa Teresa Boulevard at Longmeadow Drive Product: Revised Traffic Signal Plans (4 Sheets) Task 2 Interconnect Plan Revisions RBF will the current Interconnect Plans to incorporate "quad duct" and details Product: Revised Interconnect Plans (3 Sheets) Santa Teresa Boulevard - Additional Traffic Engineering Services EXHIBIT "B" COMPENSATION SANTA TERESA BOULEVARD CITY OF GILROY Task Description Task 1 Traffic Signal Plan Revisions Task 2 Interconnect Plan Revisions Subtotal Professional Fee Reimburseable Expense Budget Grand Total May 18, 2004 Page 3 Fee $3,776.00 $1,348.00 $5,124.00 600.00 5,724.00 L R d N 7 m R .� d d m R O O O N co Ln L j co p Z Co -0 lo O 0) c 52 c O U p U- M U L 0 N � N L6 CL a aa) 0) 0- a N X N E c m a Q (D rn co a w M T ti (00 161, C F�- M 1 to L6 L � Ef} EA FA d4 � I CO � \l L Li. O ~ 2 O O. _ O fi? r' U) i U - i O C— —Ip p Ip p •L Ln ER, O TQ p- I OO i l Qd O U �- 2 - L (niN �-I N - c) ,p O10' r- CD C1 7, C O O �iN EF> O W 61k, �+ d N! N O O V Li pOO m O O M � I L = = a : K3 :C 64 W cr (V loo ' L 00 d L OIW a o a�_ 613- 611 c m m 'N Y N m Q = w Cl) M x H m C a — c� w C > M o L ! �,; o E L OO d/ E C G1 mo - N -- — W Lco M CL N X N E c m a Q (D rn co a