Resolution 689
,___~,_;.t.;..,..._t'!~.~_l!! ~~._."':'.',_+""""",,,",_,,-~_.,
GI~
'F \ Lt:,
o 'cr.
..... I,.,
APPENDIX
a
RBSOLUTIOI NO. 689
RESOLUTION OP THE CITY COUNCIL OP THE
CITY' OP GILROY
ADOPTING AND SUBMITTING A BUDOIT lOR &,XPINDrruRI OP
PUliDS ALLOCATKD PROM THI STATE HIGHWAY PUND TO Cl'rIlS
;". '~+
t '
WH&RIAS, a .ater agreement haa been executecS bl the C1tJ' ancS
the State ot CalItornla on February 28 , 196J..., tor expencS-
Iture ot tuncla allocated troll the State hIlhwal tund to o1tlea; ancS,
WHBRBAS, the cltl council has prepared a proJeot ataw-nt
ahOlflnc est1Mted expendIture. ot luoh tunda ree~ndedto ~ ...de
<turlna the 19~ ..Q3f1acal lear; and,
WHlRlAS,. the c1tl counoll has heard reacS ..ld proJeot atateMnt
and 1. tamlllar w1th the content. thereof;
THIRIPORI, be 1t resolved by the o1tJ councll ot the CltJ or
GILROY
that N1d project ltat..nt be ancS 1t 1a
hereby adopted aa the budget of propoaed expencU turel ot the p. ta&
allocatlon to citiea, ..1cS project atatellent be and the .... la
hereby approved and the .,or and the cltJ clerk are cl1NOted to
J
a1&n the .... on behalt of .ald Cl t1, and ..1d proJeot atat..nt to
be subm1tted to the DepartMnt of Publ10 Workl, State or CaUfornu,
1n accordanoe w1th the prov1110n. or Section 197 ot the Streeta ancS
H1&hwa,.1 Code.
APPROVED AID SUBMITTICD th1. 4th cia)' ot June , 1962.
~~~rnoY
(I '.L
Att..t ~~~~';;:\j' c:~;;{:fVl~I~OY
I hereb7 certU'J that the torelo1nc resolutlon ... da.llJ and
Neular1, pa.sed bJ the cltl councll ot the CltJ ot Gilroy
at a Neular .euna thereot held June 4 , 196.2.
AYES: COUNCI L MEMBERS:Duffin,Goodrfch,Jordan,Pe rstn/QuJrt, i rol i
Sanchez. C2Juo~ - _ T w '".
NOES: COUNC I L MEMBERS: None . 0 _ 0 GI Y
ABSENT: COUNCIL MEMBERS:Wentworth
/'
and
~J
.-oN MC-9 (12-60)
.
In ~ q
1..
~I~ Flc~~
CoP\(
Project Statel""'llt No.
for the fiscal .r ending
June 30, 19 J1~__.
June 4
Date
62
, 19
STATE HIGHWAY ENGINEER
'Sacramento, California
(TO BE TRANSMITTED THROUGH DISTRICT ENGINEER)
Mr. J. p. Sinolair, Assistant State Highway Eng1neer '
District Enllineer
AddressP.O.Box 3366, Rinoon Annex, San Franoiso() 19. Ca11f.
The City of GILROY hereby
submits thIs budget proposal for expenditure of funds allocated from the State Highway fund to citIes during the
19 -_. _ fiscal year. All work accomplished by this budget shall be done under the terms of the master agree-
ment coverIng the budgeting and expenditure of these funds as executed on
.(dat.,)
SUMMARY OF FUNDS BUDGETED FOR EXPENDITURE
Source of Fund. Maintenance Other Right of Way Con.tructlon*
State allocated (5/8.) fund. Z3>>849.9~
._--
State Highway Budget Fl!nd.
-.
City Fund.
-...
. Other Fund.
Total 23,840.00
---
(See folloWing pagesfot details)
· Includes preliminary and construction engIneering.
SUMMARY OF ST. TF ~lLOCATED (5/8~) FUNDS AVAtLABLE"
Section 2107 Gas Tax Funds
Section 2107.5 Gas Tax Funds
$ 22,040.00
2,000.00
Total funds available
$ 24,040. 00
Pions, speclflcotlons and ."'mo'" of Cln' lor ellch con~ I
.I'uc:t1"n 0' hn"fovemen' ",olec' will beo suhmlltlltl In
Ilcr-",dnnce INlth Site' Ion 199 01 the Streets Clnd Hlghwny~ I
.~n:!:..p~~~_~.~~~,tlllng or commencinG work ~!.~~!_I~~,,,,.
_._--~..._._._--- ._--
S if. nntllt'e RlIthor;?oo officin'
· · Mtoch oclcllflonot page II
mar. spar.. It neeclecl (or
'hi s summary,'
. ._.__ CiSy__ ~ngi.n~~.r____._.,___.
Officint 1 itlr.
FORM Me-I' '1(,0)
.- 1 -
PROPOSED IMPROVEMENT MAJOR CITY STREETS
. . . \ (Use separate sheet for each prolect)
:"," '-(Pi ty)
DESCRIPTIOM
Name of Street
,/;;,(..",,,1. ",'u <':11"C
Beginning and end .,
of proposed work Lt,ke): :d.':,:C: ~'LJh):.iY t:)~Jr.,;h ,,;.1.y J..I(t,.',
Length In Miles
0.50
The proposed work consists of
!~~
,to t!'aifi;,;;~ant:s. Sbould>!2'!S
_~, l~t.at.;fl;-: .;ti.I.;:~. t. .. pr~) j ec l,.
(j, .)l&.lt mix on (;:ntb:E:: ';Jidth late!'.
And total estlmoted cost Is $ , including engineering.
TRAFFIC
Estimated hourly traffic volume approaching Intersections will not exceed capocity of proposed street for current
traffic ond for traffic ten years hence. (Ref.: Division of Hlghwoys Circular letter No. 58-42) (YES) (NO)
If NO, explanation given on Page 4.
BIGHT OF WAY
Estimated cost $
;M('Ufi:
feet. Proposed width
ft. (present).
ft. (proposed)
Present width
66
Total width provided by set-backs
. To be acquired by (City) (State).
66
feet.
COMSTRUCTIOM
Estimated cost $ 23,340.00 (Including engineering).
Supervision of construction and construction engineering. (City) (State).
Supervision of preliminary engineering. (City) (State) -
GEOMETRIC SECTIOM
(Ref.: Topic 4.01 City and Cooperative Prolects Manual of Instructions)
Number and width of traffic lanes
Width of curb parking
lanes
Median Width
Width of l;urb off-sets
Width of turning
lanes
Total width between exterior curbs
POSSIBLE FUTURE
EXISTING PROPOSED DEVELOPMENT
'J ':;l H\' ? t;~ i'U
Lt. Rt. Lt. Rt. Lt. I Rt.
',^ . "tnA I
....... '"'."
Lt Rt. Lt. I Rt.
I
,.... 11
.-
Reasons for less than desirable widths explained on page 4.
STRUCTURAL SECTION.
Pavement thlckne.. and type
Base thickness and type
*Types: BS - bituminous seal,
AC- asphaltic concrete,
Other
EXISTING
PROPOSED
(TentCltlye)
# 2nd St.age
I
RMAS- road-mix asphaltic surface
PCC - Portland cement concrete
CTB - cement treated base
AB - aggregate base,
AS - aggregate sub-base
-1,-