Resolution 1986-10
.
.
RESOLUTION NO. 86-10
RESOLUTION OF THE COUNCIL OF THE CITY
OF GILROY REVISING THE COMPREHENSIVE
SCHEDULE OF FEES CHARGED BY ALL DEPARTMENTS
OF THE CITY
WHEREAS, after study and consultation with all
departments, the City Administrator and staff have prepared
and recommended revisions of the City of Gilroy Comprehensive
Fee Schedule, as authorized by the various sections of the
City Code, and good cause appearing therefor,
NOW, THEREFORE, BE IT RESOLVED that the Council
of the City of Gilroy approves the attached revisions to
the City of Gilroy Comprehensive Fee Schedule consisting of
four pages, and adopts the same to apply to all departments
of the City of Gilroy.
PASSED AND ADOPTED this 3rd day of February 1986,
by the following vote:
AYES:
COUNCILMEMBERS:
NOES:
ABSENT:
COUNCILMEl1BERS:
ALBERTi GAGEA KLOECY~R,
MUSSAL EM, P LMERLEE,
VALDEZ and HUGHAN
NONE
COUNCILMEMBERS: NONE
APPROVED:
I
ATTEST:
~~~ity~
:,~~
I
/
RESOLUTION NO. 86-10
.
.
1 986
CURRENT FEE CHANGES
Finance Department:
Former
Returned Check Fee
$ 10. 00
Fee to collect delinquent licences
and other accounts receivable
General Service Fee
2.00
Delinquent Penalty
30.00
Payment for reconnection after 3:00 p.m. $ 19.00
Meter Test: 3/4" to 1"
V2" and over
$ 15.00
$ 30.00
Water Meter Deposits:
Residence
Commercial
Per Apartment Unit
~ 20.00
$ 30.00
$ 10.00
New
$ 20.00
$ 20.00 + court costs
$ 10.00
$ 40.00
$ 50.00
$ 30.00
$ 50.00
$ 50.00
$ 75.00
$ 20.00
Business Licenses: Narrative change only. (Changes underlined):
Retail, wholesale businesses, manufacturing, food processors, with fixed places of
business and fireworks booths and Christmas tree lots.
Planninq Department:
Santa Teresa Blvd. Road
Improvement Fee
$ 574.00/unit
. . .
Industrlal Development Fees: .
Filing Fees
Processing Fees
Project Fee
$ 250.00
$1000.00
1/4 of a of the
principal amount
of bonds less filing
and processing fees
Building Department:
Re~ulatory Bar Permit
$ 40.00
All Permit Fees
~sed on 1982
Administrative Code
RESOLUTION NO. 86~10
-1-
$1422. DO/unit.
$ 500.00
$1500.00
1/4 of 1% of the principe
amount of bonds
$ 80.00
Based on 1985 Adminis-
trative Code
.
.
/
Former
New
Fire Department:
Tent Erections (in excess of 200 s.f.) $ 35.00 ea.
Fumigation or Thermal Insecticidal $ 20.00 ea.
Fo9qin9
$ 85.00 per year
t, 20.00 per year
Public Horks:
Water Development Fee (Offsite):
Residential
Industrial/Co~mercial
S315.00/unit
$350.81/1000 gals.
S O.50/l.f. plus
$20/acre
S880.88/unit
$918.17/1000 nals.
$ 0.55/1.f. plus
$21/acre
Construction Water
Storm Development Fees (Offs1te):
Zone A
Zone A-I
Zone B
Zone C
Zone D
Zone E
Zone F
Zone fl
$1850.00/ac.,
$3680.00/ac.
S1640.00/ac.
$2770.00/ac.
$1770.00/ac.
$1350.00/ac.
$2400.00/ac.
$2310. OO/ac. .
$1868.00/ac.
S3716.00/ac.
$1656.00/ac.
$2798.00/ac.
$1788.00/ac.
$1364.00/ac.
$2424.00/ac.
$2331.00/ac.
Street Reimbursement:
3'1 AC on 811 AS
311 AC on 1011 AS
311 AC on 1211 AB
'311 AC on 1511 AS
Sidewalk 411 on 411 includinq
driveway 6" on 6"
i
$ 1.44/s.f. .
$ 1.54/s.f.
,$ 1.64/s.f.
$ 1. 84/ s . f.
S 1.51/s.f.
$ 1.6l/s.f.
S lo72/s.f.
S 1.93/s f.
$ 3. III s . f.
$ 3.27/s.f.
$llo41/f.f.
Curb & Gutter on 611 rock
$10.87/f.f.
Water ~1ains, including valves and box: (Developer is responsible for up to and
including 1211 mai"ns) F . "~,.o...;..',
. ormer ~.~n
Full Pipe Half Pipe Full Pipe Half Pipe
611 Main S 14.001l.f. ~ 7 . 00 If. f. $ 14.70/1.f. $ 7.35/f.f.
~
3" t1a i n $ 16.50/1.f. $ 8.25/f.f. S 17.33/1.f. $ 8.66/f.f.
10" tia in S 19.40/1.f. $ 9.70/f.f. $ 20.37/1.f. S10.19/f.f.
12" Main $ 27.00/1.f. $ 13.50/f.f. S 28.35/1.f. SI4.18/f.f.
14" Main $ 35.00/1. f. $ 17.50/f.f. $36.75/1. f. SI8.38/f.f.
16" Main $50.0011. f. S 25.00/f.f. $.52.S0/Lf. $26.25/f.f.
RESOLUTION NO. 86-10
-2-
.'
~
.
.
... -.- ! ..
Sewer t1ains, inclJding manhole: (Developer is resnonsible for up to and including
12" mains)
6" f1a i n
[3" Main
10 " t.1a i n
12" Ma in
15" Main
Full Pipe
$ 15.n3/l.f.
$ 17.63/1.f.
S 19.63/1.f.
$ 21.63/1. f.
$ 23.63/1.f.
Former
NeW-'
Full Pipe Half Pipe
$ 16.41/l.f. $ 8.21/f.f.
$ 18.51/l.f. $ 9.26/f.f.
$ 20.61/l.f. S 10.31/f.f.
S 22.71/l.f. $ 11.36/f.f.
$ 24.81/l.f. S 12.41/f.f.
Half PiDe
,
$ 7 . 82 I f. f.
$ 8. 82/f. f.
$ ?82/f.f.
$ 10.82/f. oF.
$ 11. 82 / f. f.
Storm Mains, includina manholes and catch basins: (Developer is responsible for size
required - r.1inimum 24()
18" t.1a i n
21" t~a i n
24" Ma i n
27" ~1a i n
30" Main
33" Main
3 G " ~1a i n
42" Main
4[3" Main
54" Main
60" Main
72" t1a i n
84" Main
96" t.1a in
S 29.15/1. f. $ 14.58/f.f. $ 30.60/1.f. $ 15. 311 f . f.
S 29.87/1.f. $ 14.94/f.f. $ 31. 36/1. f. $ 15.69/f.f.
$ 30.59/1.f. $ 15.30/f.f. S 32.12/1.f. $ IG.07/f.f.
$ 32.99/1.f. S 16.50/f.f. S 34.6411. f. . $ 17.33/f.f.
.$ 35.39/l.f. $ 17.iO/f.f. $ 37.16/1.f. $ le.59/f.f.
$ 42.59/1.f. $ 21. 30 If. f. $ 44.72/l.f. $ 22.171 f. f.
$ 49.79/1.f. $ 24.90/f.f. $ 52.28/1.f. $2n.15/f. f.
$ 62.99/1.f. $ 31.50/f.f. S 66.14/1. f. $ 33.081 f. f.
$ 71. 39/1. f. $ 35 .70/f. f. $ 74.96/1.f. $ 37.49/f.f.
S 88.19/1. f. S 44.10/f.f. $ 92.6011. f. $ 46.11/f.f.
$102.59/1.f. $ 5 1. 30 If. f. Sl07. 72/1. f. $ 53.87/f.f.
S 191. 31/1. f. $ 95.66/f.f. SiQO.88/l.f. SlOO.44/f. f.
$221. 31/1. f. SIlO.66/f.f. $221. 31/1. f. S1l6.19/f.f.
S251.31/l.f. SI25.66/f.f. $263.88/1. f. S131.94/f.f.
Full Price Half Price Full Price Half Price
$ 5.0711. f. $ 2.54/f.f. $ 5.3211. f. $ 2.67/f.f.
$ 5.07/1.f. $ 2.85/f.f. $ 5.:)2 I 1. f. $ 2.99/f.f.
Fire Hydrants:
Residential
Commercial/Indus-
trial
El ectrol',i ers:
Conduit & Steel
Pole
vJood Po 1 e
SID.OO/1.f. $ 5.00/f.f.
SI0.00/l.f. S 5.00/f.f.
Misc. Engineering Services
Hater t1eters: (Present Rates)
Size of Meter Basic Cost
3/4" $ 45.00
I" $ 75.00
1!2" S175.00
~" $255.00
RESOLUTION NO. 86-10
$10.50/1.f.
S10. SOIl. f.
$ 5.25/f.f.
$ 5.25/f.f.
~
$ 31.00/hr.
N~w:
$ 32.55/hr.
Curb Stop
$ 15.00
$ 17.00
$ 35.00
$35.00
Corporation
Stop & Tap
$ 50.00
$ 50.00
$113.00
$113.00
Total Cost
SUr).OO
S)~2.00
$323.00
$401.00
-3-
.'
.
'~2ter ~~eters: (NewRates
Size of Meter
3/4"
1"
1!2"
")11
t..
RESOLUTION NO. 86-10
Basic Cost
$ 66.00
$ 98.00
$200.00
$276.00
Curb Stop
S 16.00
$ 18.00
$ 37.00
$ 37.00
-4-
.
Corporation
Stop ~ Tap
S109.00
$109.00
$157.00
$157.00
Total Cost
$191.00
$225.00
$394.00
$t170.00
.
.
,
..
"
I, SUSANNE E. STEINMETZ; City Clerk of the City of Gilroy, do
86-10
hereby certify that the attached Resolution No.
is an
original resolution, duly adopted by the Council of the City of
Gilroy at a regular meeting of said Council held on the 3rd
day of February , 19 ~, at which meeting a quorum was
present.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the
Official Seal of the City of Gilroy this 10th
day of February
19 ~.
.