Loading...
Resolution 1986-10 . . RESOLUTION NO. 86-10 RESOLUTION OF THE COUNCIL OF THE CITY OF GILROY REVISING THE COMPREHENSIVE SCHEDULE OF FEES CHARGED BY ALL DEPARTMENTS OF THE CITY WHEREAS, after study and consultation with all departments, the City Administrator and staff have prepared and recommended revisions of the City of Gilroy Comprehensive Fee Schedule, as authorized by the various sections of the City Code, and good cause appearing therefor, NOW, THEREFORE, BE IT RESOLVED that the Council of the City of Gilroy approves the attached revisions to the City of Gilroy Comprehensive Fee Schedule consisting of four pages, and adopts the same to apply to all departments of the City of Gilroy. PASSED AND ADOPTED this 3rd day of February 1986, by the following vote: AYES: COUNCILMEMBERS: NOES: ABSENT: COUNCILMEl1BERS: ALBERTi GAGEA KLOECY~R, MUSSAL EM, P LMERLEE, VALDEZ and HUGHAN NONE COUNCILMEMBERS: NONE APPROVED: I ATTEST: ~~~ity~ :,~~ I / RESOLUTION NO. 86-10 . . 1 986 CURRENT FEE CHANGES Finance Department: Former Returned Check Fee $ 10. 00 Fee to collect delinquent licences and other accounts receivable General Service Fee 2.00 Delinquent Penalty 30.00 Payment for reconnection after 3:00 p.m. $ 19.00 Meter Test: 3/4" to 1" V2" and over $ 15.00 $ 30.00 Water Meter Deposits: Residence Commercial Per Apartment Unit ~ 20.00 $ 30.00 $ 10.00 New $ 20.00 $ 20.00 + court costs $ 10.00 $ 40.00 $ 50.00 $ 30.00 $ 50.00 $ 50.00 $ 75.00 $ 20.00 Business Licenses: Narrative change only. (Changes underlined): Retail, wholesale businesses, manufacturing, food processors, with fixed places of business and fireworks booths and Christmas tree lots. Planninq Department: Santa Teresa Blvd. Road Improvement Fee $ 574.00/unit . . . Industrlal Development Fees: . Filing Fees Processing Fees Project Fee $ 250.00 $1000.00 1/4 of a of the principal amount of bonds less filing and processing fees Building Department: Re~ulatory Bar Permit $ 40.00 All Permit Fees ~sed on 1982 Administrative Code RESOLUTION NO. 86~10 -1- $1422. DO/unit. $ 500.00 $1500.00 1/4 of 1% of the principe amount of bonds $ 80.00 Based on 1985 Adminis- trative Code . . / Former New Fire Department: Tent Erections (in excess of 200 s.f.) $ 35.00 ea. Fumigation or Thermal Insecticidal $ 20.00 ea. Fo9qin9 $ 85.00 per year t, 20.00 per year Public Horks: Water Development Fee (Offsite): Residential Industrial/Co~mercial S315.00/unit $350.81/1000 gals. S O.50/l.f. plus $20/acre S880.88/unit $918.17/1000 nals. $ 0.55/1.f. plus $21/acre Construction Water Storm Development Fees (Offs1te): Zone A Zone A-I Zone B Zone C Zone D Zone E Zone F Zone fl $1850.00/ac., $3680.00/ac. S1640.00/ac. $2770.00/ac. $1770.00/ac. $1350.00/ac. $2400.00/ac. $2310. OO/ac. . $1868.00/ac. S3716.00/ac. $1656.00/ac. $2798.00/ac. $1788.00/ac. $1364.00/ac. $2424.00/ac. $2331.00/ac. Street Reimbursement: 3'1 AC on 811 AS 311 AC on 1011 AS 311 AC on 1211 AB '311 AC on 1511 AS Sidewalk 411 on 411 includinq driveway 6" on 6" i $ 1.44/s.f. . $ 1.54/s.f. ,$ 1.64/s.f. $ 1. 84/ s . f. S 1.51/s.f. $ 1.6l/s.f. S lo72/s.f. S 1.93/s f. $ 3. III s . f. $ 3.27/s.f. $llo41/f.f. Curb & Gutter on 611 rock $10.87/f.f. Water ~1ains, including valves and box: (Developer is responsible for up to and including 1211 mai"ns) F . "~,.o...;..', . ormer ~.~n Full Pipe Half Pipe Full Pipe Half Pipe 611 Main S 14.001l.f. ~ 7 . 00 If. f. $ 14.70/1.f. $ 7.35/f.f. ~ 3" t1a i n $ 16.50/1.f. $ 8.25/f.f. S 17.33/1.f. $ 8.66/f.f. 10" tia in S 19.40/1.f. $ 9.70/f.f. $ 20.37/1.f. S10.19/f.f. 12" Main $ 27.00/1.f. $ 13.50/f.f. S 28.35/1.f. SI4.18/f.f. 14" Main $ 35.00/1. f. $ 17.50/f.f. $36.75/1. f. SI8.38/f.f. 16" Main $50.0011. f. S 25.00/f.f. $.52.S0/Lf. $26.25/f.f. RESOLUTION NO. 86-10 -2- .' ~ . . ... -.- ! .. Sewer t1ains, inclJding manhole: (Developer is resnonsible for up to and including 12" mains) 6" f1a i n [3" Main 10 " t.1a i n 12" Ma in 15" Main Full Pipe $ 15.n3/l.f. $ 17.63/1.f. S 19.63/1.f. $ 21.63/1. f. $ 23.63/1.f. Former NeW-' Full Pipe Half Pipe $ 16.41/l.f. $ 8.21/f.f. $ 18.51/l.f. $ 9.26/f.f. $ 20.61/l.f. S 10.31/f.f. S 22.71/l.f. $ 11.36/f.f. $ 24.81/l.f. S 12.41/f.f. Half PiDe , $ 7 . 82 I f. f. $ 8. 82/f. f. $ ?82/f.f. $ 10.82/f. oF. $ 11. 82 / f. f. Storm Mains, includina manholes and catch basins: (Developer is responsible for size required - r.1inimum 24() 18" t.1a i n 21" t~a i n 24" Ma i n 27" ~1a i n 30" Main 33" Main 3 G " ~1a i n 42" Main 4[3" Main 54" Main 60" Main 72" t1a i n 84" Main 96" t.1a in S 29.15/1. f. $ 14.58/f.f. $ 30.60/1.f. $ 15. 311 f . f. S 29.87/1.f. $ 14.94/f.f. $ 31. 36/1. f. $ 15.69/f.f. $ 30.59/1.f. $ 15.30/f.f. S 32.12/1.f. $ IG.07/f.f. $ 32.99/1.f. S 16.50/f.f. S 34.6411. f. . $ 17.33/f.f. .$ 35.39/l.f. $ 17.iO/f.f. $ 37.16/1.f. $ le.59/f.f. $ 42.59/1.f. $ 21. 30 If. f. $ 44.72/l.f. $ 22.171 f. f. $ 49.79/1.f. $ 24.90/f.f. $ 52.28/1.f. $2n.15/f. f. $ 62.99/1.f. $ 31.50/f.f. S 66.14/1. f. $ 33.081 f. f. $ 71. 39/1. f. $ 35 .70/f. f. $ 74.96/1.f. $ 37.49/f.f. S 88.19/1. f. S 44.10/f.f. $ 92.6011. f. $ 46.11/f.f. $102.59/1.f. $ 5 1. 30 If. f. Sl07. 72/1. f. $ 53.87/f.f. S 191. 31/1. f. $ 95.66/f.f. SiQO.88/l.f. SlOO.44/f. f. $221. 31/1. f. SIlO.66/f.f. $221. 31/1. f. S1l6.19/f.f. S251.31/l.f. SI25.66/f.f. $263.88/1. f. S131.94/f.f. Full Price Half Price Full Price Half Price $ 5.0711. f. $ 2.54/f.f. $ 5.3211. f. $ 2.67/f.f. $ 5.07/1.f. $ 2.85/f.f. $ 5.:)2 I 1. f. $ 2.99/f.f. Fire Hydrants: Residential Commercial/Indus- trial El ectrol',i ers: Conduit & Steel Pole vJood Po 1 e SID.OO/1.f. $ 5.00/f.f. SI0.00/l.f. S 5.00/f.f. Misc. Engineering Services Hater t1eters: (Present Rates) Size of Meter Basic Cost 3/4" $ 45.00 I" $ 75.00 1!2" S175.00 ~" $255.00 RESOLUTION NO. 86-10 $10.50/1.f. S10. SOIl. f. $ 5.25/f.f. $ 5.25/f.f. ~ $ 31.00/hr. N~w: $ 32.55/hr. Curb Stop $ 15.00 $ 17.00 $ 35.00 $35.00 Corporation Stop & Tap $ 50.00 $ 50.00 $113.00 $113.00 Total Cost SUr).OO S)~2.00 $323.00 $401.00 -3- .' . '~2ter ~~eters: (NewRates Size of Meter 3/4" 1" 1!2" ")11 t.. RESOLUTION NO. 86-10 Basic Cost $ 66.00 $ 98.00 $200.00 $276.00 Curb Stop S 16.00 $ 18.00 $ 37.00 $ 37.00 -4- . Corporation Stop ~ Tap S109.00 $109.00 $157.00 $157.00 Total Cost $191.00 $225.00 $394.00 $t170.00 . . , .. " I, SUSANNE E. STEINMETZ; City Clerk of the City of Gilroy, do 86-10 hereby certify that the attached Resolution No. is an original resolution, duly adopted by the Council of the City of Gilroy at a regular meeting of said Council held on the 3rd day of February , 19 ~, at which meeting a quorum was present. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the Official Seal of the City of Gilroy this 10th day of February 19 ~. .