Loading...
Resolution 1995-01 . . '-' RESOLUTION NO. 95-1 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GILROY APPROVING TM 94-02, FOR A TENTATIVE SUBDIVISION MAP FOR A 45-LOT RESIDENTIAL SUBDIVISION ON APPROXIMATELY 78 ACRES LOCATED WEST OF RANCHO HILLS DRIVE, NORTH OF MANTELLI DRIVE, APNS 783-52-003, -004, AND -005. WHEREAS, New Cities Development Group has made application TM 94-02, for a tentative sUbdivision map to create 45 single family lots of 6,000 square feet or larger on approximately 78 acres located west of Rancho Hills Drive, North of Mantelli Drive, APNS 783-52-003, -004, AND -005; and, WHEREAS, the City has prepared and circulated an Initial Study for this project in accordance with the California Environ- mental Quality Act ("CEQA"); and, WHEREAS, following its independent review of the Initial Study, the City has prepared and circulated in accordance with CEQA a Negative Declaration for this project with 46 mitigation measures and a mitigation monitoring program, such Negative Declaration as is attached hereto as Exhibit "A" and incorporated herein by this reference; and, WHEREAS, City staff have proposed that the City's approval of this project be subject to 28 conditions as set forth in that certain staff report dated November 21, 1994, such staff report as is attached hereto as Exhibit "B" and incorporated herein by this reference; and, WHEREAS, the Gilroy City Planning Commission held a duly noticed public hearing on TM 94-02 on December 1, 1994, and after that public hearing voted to recommend approval of TM 94-02, subject to the 28 conditions set forth in the staff report (Exhibit B), with a minor modification to condition no. 1, reflecting a revised date for the mitigated Negative Declaration from October 21, 1994 to November 30, 1994; and, RESOLUTION NO. 95-1 -1- "., . . WHEREAS, this City Council held a duly noticed pUblic hearing on TM 94-02 on December 19, 1994, at which pUblic hearing the Council considered the project along with the prOposed conditions and mitigation measures and mitigation monitoring program and, based upon substantial evidence produced both in writing and orally, resolved that the project should be approved with conditions; and, WHEREAS, the location and custodian of the documents or other material which constitute the record of proceedings upon which this resolution is based is the Office of the City Clerk. NOW, THEREFORE, BE IT RESOLVED THAT: A. The Council hereby finds that the Negative Declara- tion for this project, contained in Exhibit A, has been completed in compliance with CEQA and reflects the independent jUdgement of the City. B. The Negative Declaration is hereby approved on the basis that the Initial Study, pUblic comments, oral and written testimony and other documents received and considered indicate there is no substantial evidence the project as mitigated will have a significant effect on the environment. C. The Council finds the project is consistent with the Gilroy General Plan because it conforms to the land use designation for the property on the General Plan Map, and it is consistent with the intent of the text, goals, and policies of the General Plan documents. D. The Council finds none of the reasons for denial of this subdivision pursuant to Government Code Section 66474 exist in this case. E. TM 94-02 should be and hereby is approved, subject to the mitigation measures and mitigation monitoring program set forth in the Negative Declaration and the 28 conditions contained in the staff report attached as Exhibit B, with the one exception that the date in Condition Number 1 in the staff report be changed RESOLUTION NO. 95-1 -2- . . ,0 from October 21, 1994 to November 30, 1994, to reflect that latter date of the mitigated Negative Declaration. PASSED AND ADOPTED this 3rd day of January, 1995 by the following vote: AYES: COUNCILMEMBERS: KLOECKER, MORALES, ROGERS, ROWLISON, VALDEZ and GAGE NOES: COUNCILMEMBERS: NONE ABSENT: COUNCILMEMBERS: GILROY RESOLUTION NO. 95-1 -3- . Planning Department NEGATIVE DECLARATION . ,. '. Ci t:y of Gilroy 7351 Rosanna $10_ Gilroy, CA 95020 (408) 848-0440 (revised} CITY FILE NUMBERS: Z 94-3. ~ 94-2. ~ 94-3. POD A/S 94-14 PROJECT DESCRIPTION: Name of Project: New cities Development Group, .Carriage Bills. Nature of Project: Proposed request to rezone a portion of the site from Rl (single Family Residential), RB (Residential Bi1lside), and PF (park/Public Facility) to R1-PUD (Single Family Residential, planned unit Development) and RB (Residential Billside); two Tentative Map requests to subdivide the property into 140 single family lots with a remaining lot; and a planned Unit Development request far design review covering the 140 single family , homes and future park site. PROJECT LOCATION: Location: West of Rancho Bills Drive, and north of Mantel1i Drive. Assessor's parcel Numbers: 783-52-003, 004, and 005 Entitv or Personlsl undertakinq proiect: Name: New cities Development Group Address: 9781 Blue Larkspur Lane, Monterey, CA 93940 EXPANDED INITIAL STUDY: An Expanded Initial study far this project was undertaken and prepared far the purpose of ascertaining whether the project might have a significant effect an the environment. A copy of this study is on file at the city of Gilroy planning Department, 7351 Rosanna street, Gilroy, california. FINDINGS & REASONS: The Initial study identified potentially significant effects on the environment. However, the applicant has agreed to specific revisions in the project and/or the project has been revised. See the fallowing list of Mitigation Measures, which avoid or mitigate potential effects to a point where no significant effects will OCCur4 There is no substantial evidence that the project, as revised, may have a significant effect on the environment.- . The- following-*easons will -support, these findings: A. The proposed Rezoning, Tentative Maps, and planned unit Development applications are consistent with the city's General Plan land use map; B. The proposed project is substantially consistent with the adapted goals and policies of the city's General plan document; c. The granting of this request will not adversely affect or impact neighboring parcels of land or adjacent developed residential properties; and D. All potential significant effects can be mitigated to reduce them to an insignificant level of impact. EXHJBIT A . staff Report TM 94-02 . 11/21/94 2 CONFORMANCE OF REQUEST WITH GENERAL PLAN: The proposed Tentative Map request conforms to the LOW DENSITY RESIDENTIAL and land use designation for the property an the General plan map and is consistent with the intent of the text of the General plan document. ENVIRONMENTAL IMPACTS: , I , An expanded Initial study was prepared under accompanying Zone change request Z 94-03, involving the subject 78.2x acre site. The current tentative map request will allow the subdivision of a portion of this site into 45 single family parcels, with a remaining parcel representing Tentative Map TM 94-03. The Initial study, that addresses these projects, was independently reviewed by city staff and reflects the independent judgement of the City of Gilroy. The Initial study identified potentially significant effects on the environment, however, the applicant has agreed to specific revisions in the project and/or individual mitigation measures will be applied to the project which avoid or mitigate the effects to a point where no significant effects will occur. There is no substantial evidence that the proposed project, as revised, may have a significant effect on the environment. Therefore, a Negative Declaration was prepared under accompanying Zone change application Z 94-03. ( ihh: RELATED APPLICATIONS: Z 94-03: Proposed request to rezone a portion of the site from R1 (single Family Residential), RB (Residential Billside), and PF (park/public Facility) to RI-PUD (single Family Residential, planned Unit Development) and RB (Residential Billside). ~ 94-03: {a vesting tentative map} Tentative map approval to create 95 single family lots within a 6,000x sq.ft. and 5,600x sq. ft. range. This map represents approved ROO buildout phases III (a portion), IV, and V (a portion of 1996 @ 35 dw, 1997 @ 34 dw, and 1998 @ 41 dw). The recording of the final map will correspond to the approved ROO buildout schedule adapted by the city council. Following the completion of this map the applicant will have 12 ROO buildout allocations remaining. -._,T-he-app1i..aot.- 9O<p8~ ~o-receive- addit.-ional-RDO -a.J.-location in future years in order to complete the project. POD A/5 94-14: Planned Unit Development (PUD) approval far the overall project design and lot configuration far 140 units, and specific design approval far the construction of the single family detached dwellings. specific development plans for that portion of the project site involving the future townhouse units (72 dwellings) and the hillside lots (approximately 39 lots) will require additional PUD review and approval by the Planning commission and city council prior to buildout. staff . Report TM 94-02 . 11/21/94 3 ROO BACKGROUND: The applicant received Residential Development Ordinance (ROO) approval far the subject project during the 1992 ROO competition. The project was given a partial buildout approval far 152 dwelling units, aut of a total of 270 units requested, over a five year schedule (1994 @ 12 dw, 1995 @ 30 dw, 1996 @ 35 dw, 1997 @ 34 dw, and 1998 @ 41 dw). On June 6, 1994, the applicant received city council approval that allowed modifications to their original RO,92-16 development scheme. In short, the request essentially decreased the overall buildout from 270 units to 251 units, a net decrease of 19 dwelling units~ ANALYSIS OF REOUEST: The applicant (New cities Development Group) is requesting Tentative Map approval to subdivide the subject 78.2f acre site into 45 lots, with a remainder portion representing Tentative Map TM 94-03 (accompanying this request). As submitted under proposed TM 94-02 and TM 94-03, the proposed project will entail the fallowing buildout: ( OVERALL PROJECT PROPOSAL Billside Lots: 39 6,000+ sq.ft. Lots: 71 5,600f sq.ft. Lots: 69 Townhouse Units: 72 Totals: 251 APPROVED ROO o (39 future) 71 RO 92-16 69 RO 92-16 12 /60 future) 152 PROPOSED TENTATIVE MAPS 71 ~ 94-02 and TM 94-03 69 TM 94-03 o (not submitted vet) 140 The proposed subdivision of 45 single family 6,000+ sq.ft. lots is consistent with the city's General plan land use map which designates the site as RESIDENTIAL LOW DENSITY. A maximum build-aut density not to exceed 7.25 units per net acre is allowed under the RI-PUD designation. under the proposed Tentative Map TM 94-02, as a part of the ultimate buildout at 251 dwelling units, the project will have a density of approximately 6.5f units per acre under the RI-PUO portion of the site. Access to the 45 single family lots will be provided from Rancho Bills Drive, a General plan collector street running along the easterly border of the project site. secondary access (lots 18 through 24) will be afforded under ultimate buildout when the project is connected to the country .Estates ._developmentuto..Lhe-in'anediata-southwest. ' As submitted, the requested tentative map is consistent with the intent of the city's General plan text and Land Use Map, Zoning ordinance, Subdivision and Land Development Code, and prior ROO buildout approval granted by the city council. The actual design of individual homes and specific grading improvements will be addressed through the city's planned unit Development (POO) approval processes (see PUO: A/S 94-14). . staff Report TM 94-02 . 4 11/21/94 The applicant and their engineers have worked closely with staff to overcome obstacles concerning street design, density transfer, public park location, minimizing hillside disturbance, and open space issues. As submitted, staff is confident with the design of the proposed tentative map. STAFF RECOMMENDATIONS: staff recommends approval of this request for the fallowing reasons: A. The project proposal is generally consistent with the approval granted to ~he developer by the City council under the Residential Development ordinance; B. The proposed tentative map is consistent with the intent of the goals and policies of the City's General plan document; C. The proposed development is consistent with the Zoning Ordinance and the City's subdivision and Land Development Code; D. public utilities and infrastructure improvements needed in.order to serve the proposed project are in close proximity; and E. There will be no significant environmental impacts as a result of this project due to the required mitigation measures to be applied. In addition. Staff recommends qrantinq of this request: the follawinq conditions be placed on the d \\!S6!Cl'- 1. MITIGATION MEASURES tl throuqh t46, contain w~. -~ the Negative Declaration prepared under Z 94-03, dated (0/21/9~, shall be applied to the approval of the project in order to re~/or eliminate all potential significant impacts to a level of insignificance, as required under the california Environmental Quality Act (CEQA). 2. An all-weather access road, not less than twenty (20) feet in width, far fire engines shall be provided before commencing any combustible construction. Fire hydrants shall also be installed and maintained -, before -combustible.. construction. begUls, -to mee.t.. the -approval of, the City Fire Department. 3. Hydrant locations, and water main sizing shall be approved by the Gilroy Fire Department prior to the issuance of any building permit~. 4. Dead-end access roads, in excess of one hundred fifty (150) feet in length, shall be provided provisions far the turning around of Fire Department apparatus. Turning radii shall not be less than thirty-nine (39) feet. ( . . '. staff Report TM 94-02 5 11/21/94 5. The Developer shall provide adequate dual access for each phase of development to meet the approval of the public works and Fire Departments. 6. street improvements and the design of all storm drainage, sewer and water lines, and all street sections and widths shall be subject to the review and approval by the Public works Department. 7. All utilities to, through, and an the site shall be installed underground in accordance with section 21.120, subject to the review and approval by the public works Department. 8. All retaining walls must be constructed of permanent materials such as concrete or masonry, woad shall not be permitted, subject to the review and approval by the Building and public works Departments. 9. All existing water wells shall be sealed to meet the approval of the city Engineer and the santa clara valley Water District (SCVWD). 10. All grading, site preparation, and fill construction shall be conducted under the observation of, and tested by, a licensed soils or geotechnical engineer and a report shall be filed with the city of Gilroy stating that all site preparation and fill construction meets the requirements of the geotechnical investigation, subject to the review and approval by the Public works Department. ( 11. In addition to the shown subdrain location an the tentative maps, wet weather testing by the soils engineer and/or field conditions may require additional subdrain installation. This decision shall be made by the city Engineer with the consultation of the project soils Engineer. 12. A letter from the california Department of Fish & Game shall be required stating that they approve the limits of grading which extend beyond the tentative map boundaries. This letter shall be received by the public works Department before final map approval. 13. Right-of-way and easements shall include any area necessary far slopes and slope maintenance access to retaining walls, water drainage and sewer facilities and any appurtenances, subject to the review and approval by the public works Department. 14. Grading operations and solid compaction activities shall be in . __.accordance-with.-t.he-approved.-soUs-repar-t--and -geologic- s.tudy subject to the approval of the city Engineer. 15. The developer agrees that the utility improvements, storm drain, water system and sanitary sewer mains shall be constructed per the approved utility Master plans designed by Greiner, Inc. Any changes to these Master plans will need to be reviewed and approved by the city Engineer. . . '. staff Report TM 94-02 6 11/21/94 16. street alignments connecting to adjoining developments shall be coordinated with those projects and approved by the city Engineer. 17. street improvements and the design of all street sections and widths shall be in accordance with current city standard Details and subject to the approval of the city Engineer. 18. The developer/owner agrees to perform specific modeling studies of the water pipe system to assure the system design meets the fallowing: a. pipe sizes shall assure maximum efficiency; ( b. Fire hydrant flaw meets Fire Department requirements. At 2000 gpm @ 20 psi residual; c. Minimum and maximum pressures shall be evaluated at each home site for in-house booster pumps or pressure r~duction; d. Main break failure shall be reviewed to see how many homes will be without water when a main break occurs; e. Evaluate end of main pressure and flow; and f. Deficiencies in any of the above systems shall be corrected by the developer as directed by the city. :*ll 19. The developer shall provide a positive marking system for the water zones and components in the system. Pipe shall be positively identified with plastic tape marking each zone. services, hydrants and valves shall be tagged with brass tags identifying the zone served by that facility. The marking system shall agree with the one established for country Estates, subject to the review and approval by the Public works Department. ( 20. The developer agrees to perform field verification testing of the water system and will modify any part of the system that does not perform to the standards established by the city, subject to the review and approval by the public works Department. 21. All drainage structures shall lead to an appropriate inlet connected to a storm drain system. Inlets shall be spaced to preclude flooding in the street. Pelican Boods shall be used throughout the development. Lot development will not be complete until ditches and concrete channels are constructed to protect the adjacent lower properties. All drainage structures, including ditches and inlets, shall be designed per the country Estates Development Plans, subject to the review and approval by the public works Department. 22. A storm Drainage system Map will be prepared with contributing runoff areas. calculated-.-for ,f,low.._.-Al.l_areas-of__runoff.,<that ..will-contribute in the future shall be included in the calculation for pipe sizing far the present and future phases of the project and areas within the runoff area that are outside of the project boundary, subject to the review and approval by the public works Department. 23. All storm facilities shall be designed for a 100 year storm with an overflow far events greater than the 100 year storm. This includes the ditches and all piping, subject to the review and approval by the public works Department. staff ~ Report TM 94-0~ ~ 7 . 11/21/94 24. The ditches shall have a wet test performed at the 100 year storm level. If the ditches do not contain the storm, then they shall be redesigned, reconstructed and retested until they pass the test, subject to the review and approval by the Public works ~epartment. ( , 25. All ditches and slape easements an private property shall be maintained by a homeowners association or the owner of each property. The only exception is in a public utility easement and along the public right- of-way that is accessible in all weather conditions, subject to the review and approval by the public works Department. 26. A drainage report shall be prepared by the project engineer far submittal to the city. The report shall include all calculations and a verbal interpretation of the drainage conditions before and after development. should modifications be required by ather adjacent agencies, the developer shall at his cast make modifications to those systems to bring them up to a condition that is acceptable, subject to the review and approval by the public Works Department. 27. All lots shall became a member of City of Gilroy Maintenance District No.1. This district covers all the additional maintenance casts resulting from hillside developments including the additional water zones required to serve them. All the development shall be annexed into the district before the sale of any lots, subject to the review and approval by the Public works Department. ( 28. All lot drainage is to be drained to the streets with no runoff crossing property lines. All subdrains in back yards shall not crass property lines, subject to the review and approval by the public works Department. Respectfully, ~f)o-- Michael Dorn Director of Planning attaohments Planning4)epartmen'" STAFF REPORT November 21, 1994 FILE NUMBER: TM 94-02 APPLICANT: New cities Development Group (c/o Lee Newell) LOCATION: property west of Rancho Bills Drive, north of Mantelli Drive STAFF pLAFNER: william Faus ****************************************************************~************* ****************************************************************************** REOUESTED ACTION: ( The applicant is requesting Tentative Map approval to create 45 single family lots of 6,000 square feet or larger. This map represents approved ROO buildout phases I, II, and a portion of III (1994 @ 12 dW, 1995 @ 30 dw, and a portion 1996 @ 35 dw). The recording of the final map will correspond to the prior approved ROO buildout schedule adopted by the city council. DESCRIPTION OF PROPERTY: parcel No.: parcel size: Flood Zone: A portion of 783-52-003, 004, and 005 approximately 7St acres "B", panel # 060 340 OOOlC, dated 10/06/81 STATUS OF PROPERTY: Existina Land Use undeveloped Ranch Land General plan Desianation Residential Law Density zonina Rl, RI-PUD STATUS OFSURROUNDING~ROPERTY,: Existinq Land Use N: single Family DWelling E: single Family Dwellings S: single Family DWellings single Family DWellings W: undeveloped Hillside General plan oesianation Residential LoW Density Residential Law Density Residential Low Density Residential Hillside Residential Billside zonina R1 Rl R1-PUD RH RB EXHIBIT B staff 'Report TM 94-03~ 2 . 11/21/94 r CONFORMANCE OF REQUEST WIT!! GENERAL PLAN: The proposed Tentative Map request conforms to the LOW DENSITY RESIDENTIAL and RESIDENTIAL HILLSIDE land use designation far the property on the General plan map and is consistent with the intent of the text of the General plan document. ENVIRONMENTAL IMPACTS: An expanded Initial study was prepared under accompanying Zone change request Z 94-03, involving the subject 69~ acre site. The current tentative map request wiil allow the subdivision of a portion of this site into 95 single family parcels, with a remaining parcel representing future townhouse and hillside lots. The Initial study, that addresses these projects, was independently reviewed by city staff and reflects the independent judgement of the city of Gilroy. The Initial study identified potentially significant effects on the environment, however, the applicant has agreed to specific revisions in the project and/or individual mitigation measures will be applied to the project which avoid or mitigate the effects to a point where no significant effects will occur. There is no substantial evidence that the proposed project, as revised, may have a significant effect on the environment. Therefore, a Negative Decl~ation was prepared under accompanying Zone change application Z.94-03. ( ( RELATED APPLICATIONS: Z 94-03: proposed request to rezone a portion of the site from R1 (Single Family Residential), RB (Residential Billside) , and PF (park/public Facility) to RI-PUD (single Family Residential, Planned unit Development) and RB (Residential Billside). TM 94-02: A tentative map request to create 45 single family lots of 6,000+ square feet or larger. This map represents approved ROO buildout phases I, II, and a portion of III (1994 @ 12 dw, 1995 @ 30 dw, and a portion 1996 @ 35 dw). The recording of the final map far this portion of the project will correspond to the approved ROO buildout schedule adapted by the city council. PUO A/S 94-14: Planned Unit Development (PUD) approval far the overall project design and lot configuration far 140 units, and specific design approval for the construction of the single family detached dwellings. Specific development plans far that portion of the project site involving the future townhouse units (72 dwellings) and the hillside lots (approximately 39) will require additional PUD review and approval by the planning commission and city Council prior to buildout. . staff Report TM 94-0~ 3 . 11/;2.1/94, ROO BACKGROUND: The applicant received Residential Development ordinance (RDO) approval for the subject project during the 1992 RDO competition. The project was given a partial buildout approval far 152 dwelling units, aut of a total of 270 units requested, aver a five year schedule (1994 @ 12 dw, 1995 @ 30 dw, 1996 @ 35 dw, 1997 @ 34 dw, and 1998 @ 41 dw). On June 6, 1994, the applicant received city council approval that allowed modifications to their original RD 92-16 development scheme. In short, the request essentially decreased the overall buildout from 270 units to 251 units, a net decrease of 19 dwelling units. ANALYSIS OF REOUEST: The applicant (NeW cities Development Group) is requesting vesting Tentative Map approval to subdivide the subject 69t acre site into 95 lots, with a remainder portion representing the future townhouse units and hillside lots. As submitted under proposed TM 94.03 (and accompanying TH 94-02) the proposed project will entail the fallowing buildout: ( OVERALL PROJECT PROPOSAL Billside Lots: 39 6,000+ sq. ft. Lots: 71 5,600t sq.ft. Lots: 69 Townhouse units: 72 Totals: 251 APPROVED RDO o (39 future) 71 RD 92-16 69 RD 92-16 12 (60 future) 152 PROPOSED TENTATIVE MAPS 71 TM 94-02 and TN 94-03 69 'rH 94-03 o (not submitted vet) 140 Fallowing the completion of this map the applicant will have 12 ROO buildout allocations remaining. The applicant expects to receive additional RDO allocation in future years in order to complete the project. The proposed subdivision of 95 single family lots in the 6,000+ sq.ft. range and the 5,600t range is consistent with the city'S General plan land use map which designates the site as RESIDENTIAL LOW DENSITY. A maximum build-out density not to exceed 7.25 units per net acre is allowed under the RI-PUD designation. under the proposed Tentative Map TM 94-03, as a part of the ultimate buildout at 251 dwelling units, the project will have a density -of, approximately -6 .5t--,units-per. acre under.-the -R1-PUD portion. primary access to the 95 single family lots will be provided from Rancho Bills Drive, a General Plan collector street located to the immediate east. Future secondary access will be afforded when the Country Estates development is completed immediately to the west (acoess paint at the northwest corner of the development site). 'staff'Report TM 94-0~ . 11/2,1/94 4 The subject request has been submitted to the city as a .Vesting" tentative map~ unl~ke a standard tentative map, the vesting tentative map gives the developer a vested right to proceed with development of the project as originally approved. This would include the right to obtain all necessary building permits and discretionary approvals, in accordance with city codes, ordinances, policies, and standards in effect when the tentative map was first approved. Tentative maps submitted to the city as "vesting" require a higher initial level of specific design and engineering detail than standard tentative maps (note: these details are typically required after approval far standard tentative maps). Accordingly, specific grading ( plans accompany the tentative map submission under this request. staff has reviewed the applicant's proposed vesting tentative map and finds the submittal consistent with the city's General plan text, Land Use Map, zoning.ordinance, city codes, and all applicable development standards. The actual design of individual homes will be addressed through the city's planned unit Development (POO) approval processes (see POO: A/S 94-14). The applicant and their engineers have worked closely with staff to overcome obstacles concerning street design, density transfer, public park location, minimizing hillside disturbance, and open space issues. As submitted, staff is confident with the proposed vesting tentative map. STAFF RECOMMENDATIONS: staff recommends approval of the proposed vesting tentative map far the following reasons: A. The project proposal is generally consistent with the approval granted to the developer by the city council under the Residential Development ordinance; B. The proposed tentative map is consistent with the intent of the goals and policies of the cityts General plan document; c. The proposed-development...is consistent with the, zoning. ordinance and the city's subdivision and Land Development code; D. public utilities and infrastructure improvements needed in drder to serve the proposed project are in close proximity; and E. There will be no significant environmental impacts as a result of this project due to the required mitigation measures to be applied. ~ . staff Report TM 94-0. . 1l/2J./94 '. 5 In addition. Staff recommends the followiDQ conditions be Dlaced aD the arantina of this reauest: 1. MITIGATION MEASURES #1 throuqh #46, contained within the Negative Declaration prepared under Z 94-03, dated 10/21/94, shall be applied to the approval of the project in order to reduce and/or eliminate all potential significant impacts to a level of insignificance, as required under the california Environmental Quality Act (CEQA). 2. An all-weather access road, not less than twenty (20) feet in width, far fire engines shall be provided before commencing any combustible construction. Fire hydrants shall also be installed and maintained before combustible construction begins, to meet the approval of the city Fire Department. 3. Bydrant locations, and water main s1z1ng shall be approved by the Gilroy Fire Department prior to the issuance of any building permits. 4. Dead-end access roads, in excess of one hundred fifty (150) feet in length, shall be provided provisions far the turning around of Fire Department apparatus. TUrning radii shall not be less than thirty-nine (39) feet. I " 5. The Developer shall provide adequate dual access far each phase of development to meet the approval of the Public works and Fire Departments. 6. street improvements and the design of all storm drainage, sewer and water lines, and all street sections and widths shall be subject to the review and approval by the Public works Department. 7. All utilities to, through, and an the site shall be installed underground in accordance with section 21.120, subject to the review and approval by the public Works Department. 8~ All retaining walls must be constructed of permanent materials such as concrete or masonry, woad shall not be permitted, subject to the review and approval by the Building and public works Departments. 9. All existing water wells shall be sealed to meet the approval of the city Engineer and the Santa Clara valley water District (SCVWD). 10. All grading,-site..preparation, ,and-fill construction shall be conducted under the observation of, and tested by, a licensed sails or geotechnical engineer and a report shall be-filed with the city of Gilroy stating that all site preparation and fill construction meets the requirements of the geotechnical investigation, subjec~ to the review and approval by the Public works Department. 'staff' Report TM -94-0. 6 . 11/2.1/94 '. 11. In addition to the shawn subdrain location on the tentative maps, wet weather testing by the sails engineer and/or field conditions may require additional subdrain installation. This decision shall be made by the city Engineer with the consultation of the project sails Engineer. 12. A letter from the California Department of Fish & Game shall, be required stating that they approve the limits of grading which extend beyond the tentative map boundaries. This letter shall be received by the Public works Department before final map approval. (' 13. Right-of-way and easements shall include any area necessary far slopes and slape maintenance access to retaining walls, water drainage and sewer fa=ilities and any appurtenances, subject to the re~iew and approval by the public works Department. 14. Grading operations and solid compaction activities shall be in accordance with the approved soils report and geologic study subject to the approval of the city Engineer. 15. The developer agrees that the utility improvements, storm drain, water system and sanitary sewer mains shall be constructed per the approved utility Master plans designed by Greiner, Inc. Any changes to these Master plans will need to be reviewed and approved by the city Engineer. 16. street alignments connecting to adjoining developments shall be coordinated with those projects and approved by the city Engineer. 17. street improvements and the design of all street sections and widths shall be in accordance with current city standard Details and subject to the approval of the city Engineer. 18. The developer/owner agrees to perform specific modeling studies of the water pipe system to assure the system design meets the fallowing: a. pipe sizes shall assure maximum efficiency: b. Fire hydrant flaw meets Fire Department requirements. At 2000 gpm @ 20 psi residual; c. Minimum and maximum pressures shall be evaluated at each home site for in-house booster pumps or pressure reduction; d. Main break failure shall be reviewed to see how many homes will be without water when a main break occurs; e. Evaluate end of main pressure and flow; and f.. Deficiencies in.-any, of. the above systems shall be corrected by the developer as directed by the city. 19. The developer shall provide a positive marking system far the water zones and components in the system. pipe shall be positively identified with plastic tape marking each zone. services, hydrants and valves shall be tagged with brass tags identifying the zone served by that facility. The marking system shall agree with the one established for country Estates, subject to the review and approval by the public works Department. , staff Report TM 94-0. . 11/21/94 '. 7 20. The developer agrees to perform field verification testing of the water system and will modify any part of the system that does not perform to the standards established by the city, subject to the review and approval by the public works Department. 21. All drainage structures shall lead to an appropriate inlet connected to a storm drain system. Inlets shall be spaced to preclude flooding in the street. Pelican Hoods shall be used throughout the development. Lot development will not be complete until ditches and concrete channels are constructed to protect the adjacent lower properties. All drainage structures, including ditches and inlets, shall be designed per the country Estates Development Plans, subject to the review and approval by the public works Department. 22. A storm Drainage system Map will be prepared with contributing runoff areas calculated far flaw. All areas of runoff that will contribute in the future shall be included in the calculation far pipe sizing for the present and future phases of the project and areas within the runoff area that are outside of the project boundary, subject to the review and approval by the public works Department. 23. All storm facilities shall be designed far a 100 year storm with an overflow for events greater than the 100 year storm. This includes the ditches and all piping, subject to the review and approval by the public works Department. ( 24. The ditches shall have a wet test performed at the 100 year storm level. If the ditches do not contain the storm, then they shall be redesigned, reconstructed and retested until they pass the test, subject to the review and approval by the Public works Department. 25. All ditches and slape easements on private property shall be maintained by a homeowners association or the owner of each property. The only exception is in a public utility easement and along the public right- of-way that is accessible in all weather conditions, subject to the review and approval by the Public works Department. 26. A drainage report shall be prepared by the project engineer far submittal to the city. The report shall include all calculations and a verbal interpretation of the drainage conditions before and after development. Should modifications be required by ather adjacent agencies, the developer shall at his cost make modifications to those systems to bring them up to a condition that is acceptable, subject to the review and appr<lval..by the Public works Department. 27. All lots shall became a member of City of Gilroy Maintenance District No.1. This district covers all the additional maintenance" costs resulting from hillside developments including the additional water zones required to serve them. All the development shall be annexed into the district before the sale of any lots, subject to the review and approval by the public works Department. 'staff' Report TM 94-03~ B . 11/2-1./94 , I 28. All lot drainage is to be drained to the streets with no runoff crossing property lines. All subdrains in back yards shall not cross property lines, subject to the review and approval by the public works Department. Respectfully, 1J<<dJ Po-- ( Michael Darn oirector of Planning attachments I \ . . '. AYES: NAYES: ABSENT: At their meeting of December 1, 1994, tbe Planning Commission, by a vote of 6-0-1 (Commissioner Gage absent), recommended approval ofTM 94-03, subject to 28 conditions as set fortb in the staff report, with a minor modification to condition #1, reflecting a revised date for the mitigated Negative Declaration from 10/21/94 to 11/30/94. (Resolution #94-37} AreHano, Bucbanan, Cooper, Puente, Suyeyasu, Lai None Gage 12-1-94 / \ . . I, SUSANNE E. STEINMETZ, City Clerk of the city of Gilroy, do hereby certify that the attached Resolution No. 95-1 is an original resolution, duly adapted by the Council of the City of Gilroy at a regular meeting of said Council held an the ~ day of Januarv , 19--2,L, at which meeting a quorum was present. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the Official Seal of the City of Gilroy this 6th day of Januarv ,1995. tJ?u ity Clerk of the (Seal)