Loading...
Resolution 1997-22 . . RESOLUTION NO. 97-22 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GILROY APPROVING A/S 97-06 (PUD) , AN APPLICATION FOR ARCHITECTURAL AND SITE APPROVAL OF A PLANNED UNIT DEVELOPMENT (PUD) INVOLVING APPROXIMATELY 7.68 ACRES, APN 841- 14-067 WHEREAS, MVW Partners ("Applicant") submitted A/S 97-06 (PUD) , an application for architectural and site approval of a planned unit development ("PUD") for a 7.68 acre lot located on the Monterey Road freeway interchange, and backing to the Union Pacific Railway right-of-way to the east; and WHEREAS, pursuant to the California Environmental Quality Act ("CEQA") an initial study was prepared for this proj ect that identified potentially significant effects on the environment. However, the Applicant has agreed to specific revisions in the project and/or individual mitigation measures that will be applied to the project which avoid or mitigate the effects to a point where no significant effects will occur; and WHEREAS, the Planning Commission reviewed application A/S 97-06 (PUD) at its duly noticed meeting on April 3, 1997 and recommended that the City Council adopt the Negative Declaration containing 23 mitigation measures and further recommended that the City Council approve Application A/S 97-06 subject to 24 conditions; and WHEREAS, the City Council reviewed Application 97-06 (PUD) and all documents relating thereto and took oral and written testimony at its duly noticed meeting of April 21, 1997; and WHEREAS, the location and custodian of the documents or other materials which constitute the record of proceedings upon which this project approval is based is the office of the City Clerk; \KBAI339462.01 71-042804706002 -1- RESOLUTION NO. 97-22 . . NOW, THEREFORE, BE IT RESOLVED THAT: A. The City Council hereby finds that: 1. The. project is consistent with the Gilroy General Plan because it conforms to the land use designation for the property on the General Plan map, and it is substantially consistent with the intent of the text, goals and policies of the General Plan documents. 2. The project complies with the findings required to grant PUD architectural and site approval pursuant to subsections (a) through (i) of Section 50.55 of the Gilroy Zoning ordinance, and that the facts as set forth more fully in the record incorporated herein, including the staff report dated March 27, 1997 supports said findings. 3. There is no substantial evidence that the project as mitigated may have a significant effect on the environment. B. The Negative Declaration is adopted, with 23 mitigation measures, as completed in compliance with CEQA and reflecting the independent judgment of the City, and the mitigation/monitoring program associated therewith is adopted. C. A/S 97-06 (PUD) should be and hereby is approved, subject to 24 conditions set forth in the staff report dated March 27, 1997, attached hereto as Exhibit A and incorporated herein by this reference. \KBA\339462.01 71-042804706002 -2- RESOLUTION NO. 97-22 . . PASSED AND ADOPTED this 5th day of May, 1997 by the following vote: AYES: COUNCILMEMBERS: GILROY, MORALES, ROGERS, SPRINGER, VALDEZ, ROWLISON NOES: COUNCILMEMBERS: NONE ABSENT: COUNCILMEMBERS: NONE APPROVED: ~A~ ;f~~ Suellen Rowlison, Mayor Pro Tern :E~.. .. {! , '- i:- - ' ~:;f~ Rhonda. pellin, Interim City Clerk IKBA1339462.01 71-042804706002 -3- RESOLUTION NO. 97-22 . "Exhibit A" . ' Community Development Departme~t- Planning Division Staff Report . FILE NUMBER: i: .' March 27, 1997 A\S 97-06 (planned Unit Development design review) APPLICANT: MVW Partners (c/o Howard Vierra) LOCATION: 5900 Travel Park Circle, at the Monterey ROJld .freeway interchange, and backing to the Union Pacific railway right-of-way to the'east. STAFF PLANNER William Faus REQUESTED ACTION: The applicant is requesting Planned Unit Development (PUD) design review approval that will allow the development of a mini-mart gas station within a larger PUD project site. DESCRIPTION OF PROJECT: Parcel No: Parcel Size: Flood Zone: 841-14-067 approximately 7.68 acres (from a larger 14.78:t acre PUD site) "A", panel # 060340 0004D, dated 09/04/87 (revised with a LOMAR dated 04/18/91) STATUS OF PROPERTY: Existing Land Use Fallow Agricultural Land General Plan Designation General Services Commercial Zoning eM-PUD STATUS OF SURROUNDING PROPERTY: North: Existing Lapd Use South Valley Freeway Mixed Industrial Uses Mixed Industrial Uses Vacant Parcel South Valley Freeway Gas Station East: South: WeSt: -'fILl 13 ./, General Plan Designation CirculationIFreeway General Industrial General Industrial Industrial Park CirculationlFreeway Visitor Serving Commercial Zoning N/A M2 M2 M1 N/A HC A1S 97-06 (PUD) . . 2 3/-27/97 CONFORMANCE OF REOUEST WITH GENERAL PLAN: The proposed project,representating a part of a larger PUD approved under A/S 93-05, is substantially consistent with the land llse designation for the property on the General Plan map ( GENERAL SERVICES CO!v1MERCIAL). The proposed project is also consistent with the intent of the text of the General Plan document. In addition, the proposed site design is also consistent with the following South County Joint Area Plan poliCies (adopted by the City Council on 05/15/89): 20.00 mUCK STOPS "Truck stops should be located near major truck routes, and because of their demand for higher levels of police and fire protection, and the nature and range of activities they generate, proposals to develop truck stops should be thoroughly evaluated for a vari!!ty of locational, environmental, fiscal, and safety-related considerations..." 20.04 "Those truck stops which are allowed within the Cities of the South County should be located near major trucking routes in an area which will serve the maximum number of truckers, thereby minimizing the need for additional truck serving facilities, and minimizing the impacts of truck traffic on the community. " ENVIRONMENTAL IMPACTS: A prior Initial Study was prepared under General Plan Amendment request GP A 94-02, involving the subject 7.68:1: acre site. The expanded Initial Study, addressing the project, was independently reviewed by City staff and reflects the independent judgement of the City of Gilroy. The Initial Study identified potentially significant effects on the environment, however, the applicant agreed to specific revisions in the project and/or individual mitigation measures that applied to the. project which avoid or mitigate the potential effects to a point where no significant effects will occur. There is no substantial evidence that the proposed project, as revised, may have a significant effect on the environment. Therefore, a Negative Declaration was prepared and approved under GP A 94-02 (adopted by the City Council on January 17, 1995). Staffhas subsequently reviewed this report in conjunction with the current request CA/S 97-06) and finds the mini-mart project substantially consistent with the prior environmental documentation. RELATED APPLICATIONS: GPA94-02: A General Plan Amendment proposal that changed the prior General Plan land use map designation from INDUSTRIAL PARK and OPEN SPACE to GENERAL SERVICES COMMERCIAL, on 14.78:J: acres of land. This request was recommended for approval by the Planning Commission and approved by the City Council on January 17, 1995. . . A/S 97-06 (PUD) 3 3/27/97 " Z 92-07: } J ; A Zone Change request that changed the zoning designation on 14.78:1:: acres oflarid from the prior M1 (Limited Industrial, 12.60:!: acres owned by the applicant) and OS (Open Space, 2.18::t acres under CalTrans authority) to eM-PUD (Commercial Industrial, Planned Unit Development). This request was recommended for approval by the Planning Commission and approved by the City Council on January 17, 1995. TM 92-03: A Tentative Map request that created five parcels, each zoned CM-PUD. . The five parcels range in size from approximately 1.1:!: to 7. 7::t acres. A circular public street, connecting to Monterey Street at two separate locations, will facilitate all access to the five parcels. This tentative map request is part of the subject PUD submittals.. This request was recommended for approval by the Planning Commission and unanimously approved by the City Council on February 21, 1995. AlS 93-05 (PUD): Planned Unit Development approval for the overall truck stop site design, proposed uses, parcel configuration, on/off-site street improvements, and reciprocal parking arrangement between uses. This PUD application did not address specific architectural building designs. The Planning Commission specifically asked that proposed architectural building designs be brought back before them. This request was recommended for approval by the Planning Commission and unanimously approved by the City Council on February 21, 1995. ANALYSIS OF REOUEST: The proposed Architectural & Site plans submitted under this Planned Unit Development request will allow the applicant to develop a mini-mart gas station on one of the five independent parcels which comprise the truck stop complex on property zoned CM-PUD (Commercial Industrial, Planned Unit Development). The first page of the architectural drawings, submitted by the applicant for this request, illustrates the original PUD approval granted under AfS 93-05, and delineates the five parcels as created under 1M 92-03 (ranging in size from 1. I:!: to 7.7::t acres). A circular public street pattern, connecting to Monterey Road at two separate locations, will facilitate all access drives. No private access driveways directly to Monterey Road are proposed, with the exception of an " exit-only" curb cut for parcel one. As submitted and approved under the original pun application (A/S 93-05) the proposed project will involve the development of five parcels under one consolidated site plan design, with the following proposed uses: Parcel #1: Fast Food Restaurant Parcel #2: Full Service Restaurant Parcel #3: Motel Parcel #4: Public Mini-Storage Facility Parcel #5: Truck & Auto Fueling, Truck Parking, and Mini-Mart / gas station . . A/S 97-06 (pun) 4 3/27/97 Under the current Pun submittal, the applicant is requesting the following two actions: #1. Architectural design approval for the proposed Mini-Mart 1 Trucker's Lounge building (with second floor offices); and #2. Site design approval for the Mini-Mart 1 gas station portion of parcel fIVe (a review for consistency with the prior PUD approval granted under AfS 93-05). With this PUD submittal, the applicant would like to primarily focus on the architectural design of the proposed Mini-Mart 1 Trucker's Lounge building. . The applicant's intent is to receive City approval for the overall architectural style of the building, in order to begin the process of establishing guidelines for specific design criteria for the entire truck stop complex. ._ . Car Wash and Fuel Island Canopv As noted on the submitted site plan, the applicant does not have specific architectural construction plans for the proposed car wash or fuel island canopy. Staffis recommending that these structure designs (when submitted) be reviewed by staff through the standard Architectural & Site design review procedures, if findings can be made that the future designs are substantially consistent with the subject review. A finding ofinconsist~cyby staffwould require additional Pun review and approval by the Planning Commission. Truck Stop Use Prior to commencement of construction on the truck stop use (which includes all tenant improvements to the "Trucker's Lounge" within the proposed building), an approved Conditional Use Permit must be granted by the Planning Commission. Staff is recommending that the required CUP application for the specific "Truck Stop" use should serve in a dual capacity in addressing required PUD issues as well. All issues that are nonnally addressed within a PUD application could easily be covered within the CUP process. This action to combine the two applications into one (CUP + PUD) would save staff time, Commission time, and the applicant time. Traffic and Parking As delineated on the original PUD site plan, parcel five extends the entire length of the project site in a north-south orientation, and provides easy access to truck parking from any of the other four parcels. The proposed site design separates trUck uses from passenger vehicle uses in order to minimize traffic conflicts and maximize parking space dynamics. The mini-mart 1 gas station will be located directly adjacent to the proposed fastfood restaurant, hopefully keeping the bulk of car traffic within the interior parking lots. Most truck activities and traffic will focus within the southern part of parcel #5 with proposed truck fueling, weigh station, trucker's lounge & showers, and the bulk of truck parking. Only specific details for the mini-mart portion of parcel #5 are being reviewed under the current application reqJlest. In addition to the truck uses, a drainage detention basin will be constructed in the far southeastern comer of the project site in order to mitigate potential storm drainage impacts. . . 3/,27 /~7 A/S 97-06 (PUD) 5 Architectural design for the proposed Mini-Mart / Trucker's Lounge building I- The proposed two-story building will be constructed with full improvements for the .Mini-Mart business, in addition to providing a tenant shell for the future Trucker's Lounge and second floor offices. These future uses will be subject to additional on-site parking requirements, as regulated under the City's Zoning Ordinance. Proposed spaces within the building will be as follows: Mini-Mart Trucker's Lounge Offices [first floor, north end] . [first floor, south end] [entire second floor] 3,200 sq.ft. 3,200 sq. ft. 6,000 sq.ft. Future * Future * 11 These Future uses will require improved parking prior to occupancy. The proposed Mini-Mart 1 Trucker's Lounge building will have a "Country Ranch" influence with the following architectural characteristics: o Hipped roof, surfaced with high-profile asphalt shingles, and detailed eaves o A deep balcony with a wood balustrade around the entire second floor o Mix of horizontal wood siding and french windows for the second floor offices [future tenants will detennine window and door spacing] o Distinctive roof cupolas with louver details, in addition to exposed skylights o Two distinctive geometric scored concrete patterns for the first floor walls o Large windows and glass doors for the Mini-Mart entry, and the future lounge entry Site design for the Mini-Mart 1 gas station portion of parcel five Overall, the proposed site plan configuration is substantially consistent with the prior approved Planned Unit Development application A1S 93-05, reviewed by the Planning Commission and approved by the City Council on February 21, 1995. As originally proposed, an access drive will be improved to the adjoining parcel to the south in order to minimize increased traffic on Monterey Street, and help eliminate the creation of undesirable strip commercial. development. In addition, the site design separates truck and car parking which will help facilitate the operation of the complex as natural stop for both trucks and cars. The applicant has worked closely with City Staff and CalTrans to develop a site design that addresses a multitude of traffic issues and environmental concerns. As submitted, the subject Planned Unit Development site plan design is consistent with both the intent of the City's General Plan text and Land Use Map. A/S 97-06 (PUD) . . 6 3}27/97 REOUIRED FINDINGS: In order to grant Planned Unit Development design review approval, the Planning Commission and City Council must find that the proposal will: A Conform to the Gilroy General Plan in terms of general location and standards of development; B. Provide the type of development which will fill a specific need of the surrounding area; C. Not require urban services beyond those which are currently available; D. Provide a harmonious, integrated plan which justifies excep~ions, if such are required, to the normal requirements of this Ordinance; E. Reflect an economical and efficient pattern ofIand uses; F. Include greater provisions for landscaping and open space than would generally be required; G. Utilize aesthetic design principles to create attractive buildings and open areas which blend with the character of surrounding areas; H. Not create traffic congestion, noise, odor, or other adverse effects on surrounding areas; and I. Provide adequate access, parking, landscaping, trash areas and storage, as necessary. STAFF RECOMMENDATIONS: Staff is recommending that the Planning Commission forward a recommendation to the City Council to approve this PUD design review request for the following reasons: .... The proposed site design configuration is substantially consistent with the prior approved Planned Unit Development application A/S 93-05, reviewed by the Planning Commission and approved by the City Council on February 21, 1995; .... The proposed site design conforms to the land use designation for the property on the General Plan map, and is consistent with the intent of the text of the General Plan document; ... There will be no significant environmental impacts as a result of this project due to the required mitigation measures to be applied at the development stage; and ... .As submitted, the proposed development is consistent with the necessary PUD Findings A through I, as stated under Zoning Ordinance Section 50.55. A/S 97-06 (PUD) . 7 . 3/27/97 In addition. Staff recommends the foUowing conditions be placed on the granting ~f this request: 1. :MITIGATION :rvIEASURES #1 through #23, contained within the revised Negative Declaration dated 12/16/94 for GP A 94-02 involving the subject project, shall be applied to the approval of this Planned Unit Development in order to reduce and/or eliminate all potential significant impacts to a level of insignificance, as required under the California Environmental Quality Act (CEQA). 2. Specific improvement plans for the Car Wash and Fuel Island Canopy shall be reviewed under the City's Architectural & Site Review procedures, subject to the Planning Division's approval and a finding that the proposal is substantially consistent with this PUD design approval, as reviewed and approved under this application by the Planning Commission and City Council. 3. The specific truck stop and lounge uses will require a Conditional Use Permit, prior to building permit issuance, and subject to Planning Commission review and approval. The CUP application for the specific "Truck Stop" uses will serve in a dual capacity in addressing required PUD issues as well. All issues that are normally addressed within a PUD application will be covered within the CUP process. This will combine the two applications into one (CUP + PUD). 4. The proposed tenant shell for the future Truckers Lounge and second floor offices shall be subject to additional on-site parking requirements, as regulated under the City's Zoning Ordinance. These spaces shall not be occupied until all required parking is fully improved, subject to the review and approval by the Planning Division. 5. The size of the proposed :Mini-Mart shall be limited by the amount of on-site parking stalls provided and as required under Section 31 of the City's Zoning Ordinance. 6. Landscaping: Landscaping plans including specifications for an irrigation system shall be approved by the Planning Division in accordance with the City's Consolidated Landscaping Policy, prior to issuance of a building pennit. The landscaping shall be continuously maintained in an orderly, live, healthy, and relatively weed-free condition, in accordance with the adopted landscaping policy. 7. Trash Enclosures: All trash enclosures shall consist of visually solid fences and gates, six (6) feet in height, in accordance with the adopted City of Gilroy standard trash enclosure design plan, or a similar design approved by the Planning Division. All trash enclosures shall be located in accordance with the approved site plan and Uniform Fire Code. 8. Exterior Lighting: No unobstructed beam of exterior lighting shall be directed outward from the site toward any residential use or public right-of-way. 9. Mechanical Appurtenances: Mechanical equipment to be located oil the roof of a building shall be screened by an architectural feature of the building such that it cannot be seen from ground level at the far side of the adjacent public right-of-way, whenever possible. . . A/S 97-06 (PUD) 8 3/27/97 10. The applicant shall develop a comprehensive sign program for all project signage.(parcels #1 through #5), subject to Planning Division review and approval. 11. Building colors shall be earth tones, subject to Planning Division review and approval. 12. The location, type, and color. of all fencing material shall be indicated on the final construction plans. All proposed fencing shall be constructed in accordance with Zoning Ordinance Section 34, subject to the review and approval by the Planning Division. 13. All public sewer lines, storm drains, and water lines which traverse through private parcels shall be within access/utility easements, subject to the review and approval by the Community Development Department. - - 14. The developer/applicant must obtain a sewer allotment for this project, and sign a sewer allotment agreement prior to the issuance of any building permits. 15. All curb cuts for access drives shall be constructed at a minimum distance of ten (10) feet from adjacent fire hydrants and/or street light poles. 1 Ii. The developer shall separate the business water system from the landscaping system and provide an individual meter for each in accordance with City of Gilroy Standard Details. 17. All Utility lines to and adjacent to the site shall be located underground, subject to the review and approval by the Community Development Department. 18. The design for storm drainage improvements, both on and off site, shall be provided by the developer, subject to the review and approval by the Community Development Department and the Santa Clara Valley Water District. 19. The developer shall provide an emergency access roadway to within one hundred fifty feet (150') of the front side of any structure during project construction, subject to the review and approval by the Fire Department. 20. The developer shall provide and install Knox Boxes for each business, subject to the review and approval by the Fire Department. 21. The applicant is subject to Gilroy City Ordinance #83-6 (HMSO - Hazardous Materials Storage Ordinance) administered by the Fire Department, and shall therefore obtain, complete, and sign an HMIS (Hazardous Materials Inventory Statement). 22. The applicant shall be required to install an underground grease interceptor for all food processing uses, subject to the review and approval of the City's Industrial Waste Inspector. . . A/S 97-06 (PUD) 9 3/27/97 23. The applicant/developer shall install fire hydrants on the project site. Specific hydrant locations and water main sizing shall be subject to the review and approval by the Fire and Community Development Departments; and A Pipes which serve as fire sprinkler services are subject to the specifications of the Gilroy Fire Departmen~ once they depart from the City main and anyon-site or off-site hydrant system and must have a City standard valve intervening; and B. Inspection of on-site hydrants and water mains supplying them will be the responsibility of the Fire Department. 24. Any proposed truck wash rack shall be subject to the revi~YI and approval by the City's Industrial Waste Inspector. Respectfully, . ~ ~~ William Faus Planning Division Manager 4-3-97 At their meeting of April 3, 1997, the Planning Commission recommended approval of AjS 97-06, subject to 24 conditions as set forth in the staff report. AYES: NAYES: ABSENT: ARELLANO, BLANKLEY, PINHEIRO, PUENTE, TINSLEY, COLLIER NONE LAI ~lantling De'artment ~EGATIVE lEC LARATI ON . City of Gilroy _ 7351 Rosanna St.-. Gilroy, CA 95020 (408) 848-04~0 { REVISED } CITY FILE NUMBERS: GPA 94-02, Z 92-07, TM 92-03, PUD A/S 93-05 PROJECT DESCRIPTION: Name of project: Nature of project: MVW properties Truck stop Center General -plan Amendmant, Zone change, Tentative Map, and planned unit Development (PUP) .approvals to allow the proposed development of a truck stop complex. PROJECT LOCATION: Location: Approximately 15 acres on the west side of Bolsa Road, adjacent to the Highway 101 / Monterey street interchange. Assessor's Parcel Numbers: 841-14-067 Entitv or Person(s) undertakinq proiect: Name: MVW Partners (c/o Howard vierra) Address: 22650 McKean Road, San Jose. CA 95120 INITIAL STUDY: An expanded Initial study for this project was undertaken and prepared for the purpose of ascertaining whether the project might have a significant effect on the environment. A copy of this study is on file at the city of Gilroy Planning Department, 7351 Rosanna street, Gilroy, california. FINDINGS & REASONS: The Initial study identified potentially significant effects on the environment. However, the applicant has agreed to specific revisions in the project and/or the project has been revised. See the following list of MITIGATION MEASURES, which avoid or mitigate potential effects to a point where no significant effects will occur. There is no substantial evidence that the project, as revised, may have a significant effect on the environment. The following reasons will support these findings: A. The proposed Truck stop Center, under the provisions of a planned unit Development, is consistent with the city'S General plan land use map; B. The proposed planned unit Development is substantially consistent with the adopted goals and policies of the city'S General plan document; C. The granting of the General plan Amendment, Zone Change, Tentative Map, and planned unit Development (PUD) approvals will not adversely affect or impact adjacent parcels of land or developed industrial, commercial I .or agricultural properties in the vicinity; and D. The potential significant effects identified within the Initial study can be mitigated to reduce them to an insignificant level of ~pact. NEG. DEC. MVW ~RUCK STOP. 2 . 12/16/94 REVI$ED 1. The project shall be designed in accordance with earthquake design regulations of the Uniform Building code, subject to the review.~nd approval by the city Building, Life & Environmental Safety Department~ 2. A soils investigation shall be prepared for the project site by a qualified soils engineer. The recommendations of the soils investigation shall be incorporated into the final improvement plans and shall be reviewed and approved by the city Department of public works prior to approval of the final map. The purposes of the soils investigation are to determine the exact soils characteristics and limitations on the project site, specifically the shrink-swell potential of the soils, and to recommend appropriate engineering specifications for the proposed project. 3. ~he developer .shall construct f~nished floor elevatior.s at least o~e foot above the lOO-year flood elevation as delineat~d on the 1994 preliminary FIRM amp on file with the city of Gilroy. To accomplish this, the preliminary grading plan shall be revised to reflect the following changes: A. Raise the first floor of the motel elevation 186'; and B. Raise the first floor of the mini-storage buildings to elevation 187'. 4. The design of all storm drainage improvements serving the project site shall be provided by the developer, subject to review and approval by the city Department of Public Works. ~hese design plans shall include, but not be limited to: A. calculations verifying that at least 1.5 acre-feet of water detention storage will be provided at the project site; B. The water detention storage shall be lined. It shall have an appropriate inlet and outlet for releasinq water from the detention pond into a watercourse throuqh a storm drain system with adequate capacity to convey releases from the detention pond; C. Applicable storm water source and treatment-based best management practices, applied and maintained, as recommended in the California storm Water Best Management Practice Handbook; D. sediment and pollution control facilities within the storm drain detention facilities; and E. provisions for periodic sweeping for roadways, driveways, and parking areas on the project site. 5. Developers shall pay the appropriate storm drain development fees, subject to review by the city Department of Public Works prior to issuance of a building permit. 6. The project proponent shall be required to obtain a National pollution Discharge Elimination systems Program (NPDES) General Construction Permit, required under the Federal clean water Act, from the Regional Water Quality control Board, prior to issuance of a building permit. The NPDES construction permit requires implementing both construction and post- construction phase storm water pollution best management practices. Additionally, the proposed project shall implement provisions of the NPDES construction pe~t which requires preparing and complying with a storm Water pollution Prevention Plan. NEG .DEC. MVW TRUCK STOP . 3 . 12/16/94 REVIS~D 7. The project proponent shall conduct a velocity study to design slope protection for the railroad ballast. The study shall address the scouring effect of the floodway and the measures that will be needed to be undertaken to protect the railroad tracks, ballast, and slopes. This study and design shall be subject to review and approval by the city Public works Department. 8. The developer shall pay the appropriate traffic impact fee, subject to approval of the city Department of Public Works, prior to issuance of a building permit. 9. The developer shall signalize the Monterey street/southbound Highway 101 ramps intersection. 10. The developer shall prepare a traffic facilitie~ improvement plan to include the installation of the following improvements: A. Provide a sidewalk along the entire project Monterey street frontage; B. Provide bus turnouts along the project frontage as directed by the Santa clara county Transportation Agency; C. Provide two through lanes, as well as a left-turn lane on the northbound Bolsa Road approach at the project driveway. This will be needed to accommodate long-term traffic growth; D. Provide two left-turn lanes, a through lane, and a right-turn lane on the northbound Highway 101 off-ramp. The.left-turn lanes should provide a minimum of 300 feet of vehicular storage. The right-turn lane should provide a minimum of 200 feet of vehicular storage. This will be needed to accommodate long-term traffic conditions; E. signalize the Monterey street/Northbound Highway 101 ramps, project driveway intersection; F. Dedicate right-of-way and provide frontage improvements along the project frontage on Bolsa Road to accommodate a four-lane divided arterial; G. Provide verification that the vertical alignment of the project driveway can accommodate a 25 mile per hour design speed. This includes sight distance across Monterey street. currently Monterey Street if banked to the west with a 4 percent super elevation. The on- site driveway drops off to the east at a 5.5 percent grade. This is about a 10 percent change in gradient across the intersection. The ability for vehicles to maintain lane alignment east bound and west bound across the intersection must be maintained through the intersection; H. Provide a driveway on the easterly side of Parcel 2 to allow vehicle easier and clearer entry from an exit to the main project driveway. An east bound left-hand turn lane will need to be provided on the main project entrance to accommodate the inbound movement. The high turnover sit-down restaurant on Parcel 2 is currently proposed to be served by only a single driveway at the back side of the parcel; I. Install stop signs on the three exiting movements at the main project driveway intersection with the first on-site north/south cross aisle between Parcels 1 and 5; and REG. DEC. MVW TRUCK STOP. 4 . 12/16/94 ~VISED J. Provide for additional width required to allow for bike lanes on Monterey Road per city standards and specifications. Traffic facility improvement plans shall be subject to the review and approval by the city public works Department, prior to approval of the final map and final improvement plans. 11. The developers shall be responsible for submitting a dust and pollution control plan subject to review and approval by the city Building, Life & Environmental safety Department, consistent with existing city policies and codes prior to issuance of a building permit. This plan may include the following measures: A. Re'~ard engine timing on diesel-powered equipment to reduce NOx emissions. Maintain existing gasoline-power~d.~quipment in tune per manufacturer's instructions. B. Substitute electric-powered equipment for internal combustion-powered equipment, where feasible. c. substitute gasoline-powered equipment (preferably, with catalytic converters installed) for diesel-powered equipment, where feasible. D. Develop a comprehensive construction activity management plan to minimize the pieces of construction equipment operating and the extent of the site area worked during any given time period. E. Use water trucks or sprinkler systems to prevent airborne dust from leaving the site. Require increased wate~ing frequency whenever wind. speeds exceed 15 mph. F. Lay building pads and pave roadways area, sidewalks, parking lots, etc. as soon as possible. G. Limit the speed for all construction equipment to 15 mph on any unpaved surface. H. schedule hours to I. Water or as many construction truck trips as possible during non-peak reduce peak-hour emissions. securely cover all excavated material transported off-site. 12. Noise-generating construction activities shall be ~estricted to normal daytime hours (7: 00 am to 10: 00 pm). Construction equipment shall be properly muffled and maintained. The contractor work specifications for all construction activities shall reflect these measures subject to the review and approval of the city Building, Life & Environmental safety Department prior to issuance of a building permit. 13. A noise analysis shall be conducted to determine anticipated on-site noise levels generated by the proposed project. The analysis information shall be used to determine the need for any noise attenuation structures or special building design considerations for both the restaurant and the motel. The noise analysis shall be conducted subject to review and approval by the City Building, Life & Environmental safety Department prior to issuance of a building permit. REG. DEC. ~ TRUCK STOP. 5 . 12/16/94 ,REvisED 14. The developer shall provide design guidelines for the entire site which should include, but not limited to, the following components: A. Landscaping (paying special attention to the southern and western borders of the site, as well as between the truck parking area and the motel and restaurant). Development of ,the site shall conform to the city of Gilroy's Consolidated Landscaping Policy; and B. Architectural design (to ensure internal design compatibility and design which is compatible with southern Gilroy). These design guidelines shall be subject to the review and approval by the city planning Department prior to approval of the final map and shall be addressed fully within the city of Gilroy'S planned Unit Development procedures via Architectural & site Review. 15. The developer shall construct all utilities to~ through, and on the site underground subject to the review and approval by the city Department of Public Works. 16. Prior to development of the site, the developer shall pay required city of Gilroy Public safety impact fees. 17. The design of all water infrastructure improvements serving the project site shall be provided by the developer, subject to the review and approval by the city Department of Public works. The proposed project shall provide a looped 12 inch water system ~rom the existing line in Monterey street, to the existing stub located in souths ide Drive east of the railroad tracks. This will require a fully dedicated utility easement through the private properties the line traverses. A bore & jack, separate from the one required for the sewer extension, will be required under the railroad tracks. 18. Developers shall pay the appropriate water development fees, subject to review by the city Department of Public works prior to the issuance of a building permit. 19. All existing on-site wells shall be permanently capped in compliance with the standards set forth by the Santa clara Valley Water District and the city Department of Public works prior to the issuance of a building permit. 20. The design of all sewer infrastructure improvements serving the project site shall be provided by the developer subject to review and approval by the city Department of Public Works. Sewer lines shall be a minimum of 12 inches. 21. Developers shall pay the appropriate sewer development fees subject to review by the city Department of Public Works prior to issuance of a building permit. 22. Prior to development of the site, the developer must obtain sufficient sewer allocation to serve the prop~sed project and will be required to pay . city of Gilroy sanitary sewer connection fees. NEG.DEC. ~ TRUCK STO. 6 . 12/16/94 REVIS~D 23. Due to the possibility that significant buried cultural resources might be found during construction, language shall be printed on construction drawings to protect these resources, pursuant to the review by and approval of the city Planning Department. Such language might read as follows: "If archaeological resources or human remains are discovered during construction, work shall be halted within 50 meters (150 feet) of the find until it can be evaluated by a qualified professional archaeologist. If the find is determined to be significant, appropriate mitigation measures shall be formulated and implemented." Date prepared: Oc~ober 21, 1994 End of Review period: December 9, 1994 /S/ MICHAEL R. DO&~, Director of Planning Approved by city council: January 17, 1995 Michael Dorn, Director of Planning :l . . Attachment B I MITIGATION MONITORING PROGRAlVI CHECKLIST MVW Properties Truck Stop Center Expanded Initial Study I Prior to issuance of a Building Permit, the following mitigations shall be implemented: I Party Mitigation Responsible for Party Responsible for Number Nature of Mithration Implementation Monitoring- 1 Development designed in '. " accordance with earthquake Developer Building Department design regulations 5 Pay storm drain development Developer Department of Public Works fees 6 Obtain NPDES permit Developer Department of Public Works 8 Pav traffic impact fee Developer Department of Public Works 9 Design and install Monterey Developer Public Works Department Street/Southbound Highway 101 ramps intersection 11 Submit dust and pollution Developer Building Department control plan 12 Restrict construction activities to Developer Building Department normal daytime hours (7:00 am to 10:00 pm) 13 Conduct noise analvsis Developer Building- Department 15 Construct all utilities to, Developer Building Department through, and on the site undere:round 16 Pay required Public Safety Developer Planning Department impact fees 18 Pay the appropriate water Developer Department of Public Works development fees 19 Permanently cap existing on-site Developer Department of Public Works wells Santa Clara Valley Water District 21 Pay the appropriate sewer Developer Department of Public Works development fees 22 Obtain sufficient sewer Developer Department of Public Works allocation to serve the proposed project and pay City of Gilroy sanitary sewer connection fees 23 Protect any future Developer City Planning Department archaeologicalihistorical resources discovered on-site I I I I I I I I I I I I I I . . Attachment A MITIGATION MONITORING PROGRAM CHECKLIST MVW Properties Truck Stop Center Expanded Initial Study Prior to approval of the Final Subdivision Map, the following mitigations shall be implemented: Party Mitigation Responsible for Party Responsible for Number Nature of Mitig:ation Implementation Monitoring: 2 Prepared detailed soils Developer Public Works Department investigation 3 Revise preliminary grading plan Developer Building Department to reflect construction of finished .' .. floor elevations at least one foot above the 100-year flood elevation 4 Revise storm drain improvement Developer I Public Works Department plans 7 Conduct velocity study; design Developer Public Works Department slope protection for railroad ballast 10 Prepare traffic facilities Developer Public Works Department improvement plan 14 Provide architectural and Developer Planning Department landscape design 2Uidelines 17 Provide design of all water Developer Department of Public Works infrastructure improvements serving the proiect site 20 Provide design of all sewer Developer Public Works Department infrastructure improvements serving the proiect site , , . . I, RHONDA PELLIN, Interim City Clerk of the City of Gilroy, do hereby certify that the attached Resolution No. 97-22 is an original resolution, duly adopted by the Council of the City of Gilroy at a regular meeting of said Council held on the 5th day of May, 1997, at which meeting a quorum was present. IN WITNESS WHEREOF, I have hereunto set my hand ana affixed the Official Seal of the City of Gilroy this 19th day of May, 1997. ~f!k /) I~ ./ tPLc ~' Interim City Clerk of the City of Gilroy (Seal)