Loading...
Gulf Oil CorporationPROPERTY DEVELOPMENT AGREEMENT AGREEMENT FOR EXTENSIONS OF 14ATER DISTRIBUTION SYSTEMS: IMPROVEMENT OF STREETS; INSTALLATION OF SEWERS, STORM DRAINS AND OTHER PUBLIC WORKS FACILITIES This agreement made and entered into this day of , 19 by and between the City of Gilroy, a municpal corporation, herein called the "City" and Gulf Oil Corporation , a real property owner, developer or subdivider, herein called the "Developer ". WITNESSETH: WHEREAS, a final map of subdivision, record of survey or building permit (Site Clearance) application has now been submitted to the City for approval and acceptance, covering certain real estate known as and called: Southeast Corner of Leavesley Road and Murray Avenue and, WHEREAS, the Developer requires certain utilities and public works facili- ties in order to service the property under the minimum standards established by the City and, WHEREAS, the City, by and through its City Council, has enacted certain Codes, Ordinances and Resolutions and certain Rules and Regulations have been promulgated concerning the subject matter of this agreement and, WHEREAS, the City has certain responsibilities for maintenance and operation of such utilities and public service facilities after acceptance by City, and for providing the necessary connecting system, general plant and appurtenances, and the City is agreeing to discharge those responsibilities. NOW THEREFORE, in consideration of the premises and in order to carry on the intent and purpose of said Codes, Ordinances, Resolutions and Regulations, it is agreed by and between the parties as follows: SECTION I That all Codes, Ordinances, Resolutions, Rules and Regulations and established policies of the City and the laws of the State of California concern- ing the subject matter of this agreement are hereby referred to and incorporated herein to the same effect as if they were set out at length herein. Said Codes, Ordinances and Regulations include, but are not limited to, the following: The Code of the City of Gilroy (including but not limited to Chapters 12 A, 19, 20 and 21 thereof pertaining to local improvement procedures In subdivision or development respectively); Ordinance mo. 602 (Subdivision Procedure, etc.); Ordi- nance !o. 711 (Zoning Ordinance); Ordinance No. 865 (1967 Uniform Building Code); Rules and Regulations. Included in the above are all of the above referred to Codes, Ordinances, Resolutions, Regulations and Substitutions therefor, as amend- ed to the time of execution of this agreement. 3 SECTION 2 The Developer agrees: a. To perform each and every provision required by the City to be performed by the Developer in each and every one of said Codes, Ordinances and other Regulations. b. To grant to the City without charge, free and clear of encumbrances, any and all stipulated easements and rights of way in and to his said real property necessary for the City in order that its water, electri- city and /or sewer lines in or to said real property may be extended. c. To indemnify and hold the City harmless and free from all damage and liability done to any utility, public facility or other material or installation of the City on said real estate which the Developer or any contractor or sub- contractor of the Developer, or any employee thereof, shall do in grading or working upon said real estate. d. To construct and improve all public works facilities and other im- provements as set out herein, according to the standards heretofore established, and according to the grades, plans and specifications thereof, all as approved by the City Engineer; and shall furnish two (2) good and sufficient bonds, each of which shall be executed in the face amount of no less than $ 7,000. , and one of which bonds shall guarantee that faithful performance of this agreement and the other said bond shall secure payment to the contractor, his sub - contractors and to persons renting equipment or furnishing labor or materials to them for the improvement hereunder, and as provided for in Section 11612 of the Business and Professions Code of the State of California, the Codes, Ordinances, Resolutions and Regulations of the City, and this agreement. e. That upon approval of the final map of the subdivision, the record of survey or the building permit covering the real estate to be improved, and before any work is done therein, the Developer shall pay to the City all sums, except costs to be borne by the City, shown in Section 7 thereof to be due under the terms and provisions of this agreement. SECTION 3 That all sums shown herein to be payable by the Developer to the City are due and payable to the City upon the execution of this agreement. SECTION 4 That all the provisions of this agreement and all work to be done pursuant to the terms of this agreement are to be completed within one year from and after the date and year first above written. SECTION 5 That the special provisions concerning the particular real estate referred to above, being attached hereto, are hereby incorporated herein and expressly made a part of this agreement. SECTION 6 The faithful and prompt performance by the Developer of each and every term and condition contained herein is made an express condition precedent to the duty of the City to perform any act in connection with this transaction, and the failure, neglect or refusal of the Developer to so perform, or to pay any monies due hereunder when due shall release the City from any and all obligations -2- i hereunder and the City, at its election, may enforce the performance of any provision herein, or any right accruing to the City or may pursue any remedy whatsoever it may have under the laws of the State of California or the Codes, Ordinances, Resolutions or Regulations of the City, in the event of any such default by Developer. SECTION 7 That the following are the estimated amounts of costs to be borne by the respective parties hereto, and it is further understood and agreed that said amounts are estimated only and are subject to final determination upon completion of the work. FACILITY DEVELOPMENT COSTS CITY'S COSTS a. Easements S Rights -of -way "On Site ", $ 100% $ 0 See Stip. No. 1 b. Easements & Right -of -way "Off Site", $ None $ 0 c. Street Paving $ 1,5Z5.00 $ 0 See Calculation Sheet d. Street Curbing; $ 1001 $ 0 e. Sidewalks; f. Street Name Signs; $ 100% $ 100% -3- $ 0 $ 0 .f M g. Street Tree Planting Parkway Improvements; City Code, h. Street Lighting; Electroliers shall become the _property of the City I. Water "On Site" See Calc. Sheet $ 100% $ 100% $ 1,260.00 $ 0 $ 0 $ 0 j. Water "Off Site" $ 161.70 $ 0 0.7 Acres @ $231 /Acre k. Sanitary Sewer t1On Site ", $ _ 437.50 $ 0 Sgee Ca 1 c. Sheet 1. Sanitary Sewer, "Off site ", $ 105,00 $ 0 5105 /LOt m. Storm Drains "On Site "; $ 100i_ $ n n. Storm Drains, 'Off Site ", 0_J anrP x $380_ /ar P o. Engineering, Inspection s; Plan Check 3% x $ 7,000. $ 210.00 -4- I DUE CITY BY DEVELOPER DUE DEVELOPER BY CITY $ 4,015.69 $ 0 * Does not include building permit fees or water meter charge. IN WITNESS WHEREOF, said parties have caused these presents to be executed the date and year first above written. ATTEST: City C erk CITY OF GILROY Mayor i City duff W! trator AS ro DEVELOPER IQQ� LAW CEPY• GULF O LL,, CORPORATION BY''�"� isemann, Attorney in F=t BY NOTE: If Developer is a corporation, the complete legal name and corporate seal of the corporation and the corporate titles of the persons signing for the corporation shall appear above. STIPULATIONS 1. Developer shall dedicate a 26 foot wide strip along Murray Avenue and a 40 foot return radius for the ultimate widening of Murray Avenue. 2. The proposed building shall be in conformance with the approved plans as submitted to the Planning Commission. -5- GULF OIL CO. SOUTHEAST CORNER MURRAY AND LEAVESLEY- CALCULATION SHEET EXISTING 1) Street Paving (Leavesley Road) 175 Ft. x 18' x $0.50 /SF = $1,575.00 2) 12" Water Main (Existing on Leavesley Road and Murray Aveenue Charge for 1/2 of 10" Main less 10% reduction) 175 + 175 = 350 - 35 = 315 x $4.00 $1,260.00 3) Existing Sanitary Sewer 8" Charge (Leavesley Road) 175 x 2.50 FF $ 437.50 4) Offsite Water .7 acre @ $231.00 /acre $ 161.70 5) Offsite Storm .7 acre @ $380.70 /acre $ 266.49 6) Offsite Sanitary $105 /Lot $ 105.00