Loading...
Roberts Construction Company�1� ! rJF iil`1f J, s �rJr � (ff ?ff U, 21 PROPER'T'Y DEVELOPME'N'T AGREEME'N'T AGREEMENT FOR EXTENSIONS OF WATEK DISTRIBUTION SYSTEMS: IMPROVEMENT OF S'T'REETS: LNSTAL.LATLON OF SEWERS, SToKM DRAINS AND OTHER PUBLIC WORKS FACHATIES No. 84 -7 l This agreement made and entered into this 7th day of May 19 84 , by and between the City of Gilroy, a municipal corporation, herein called the "City" and ROBERTS CONSTRUCTION CO. it real property owner developer or subdivider, herein called Lite "Developer WHEREAS, a final map of subdivision, record of survey or building permit (Site Clearance) application has now been submitted Lo Lite City for approval and acceptance, covering certain real estate known as and called: Assessor's Parcel No. 841 -01 -107 WHEREAS, the Developer requires certain utilities and public works facilities in order to service the property under the minimum standards established by the City an<I, WHEREAS, the City, by and through its City Council, has enacted certain Codes, Ordinances and Resolutions and certain Rules and Regulations have been promulgated concerning the subject matter of this agreement and WHEREAS, the City, by and through its. City Council, has enacted certain Codes, Ordinances and Resolutions and certain Rules and Regulations have been promulgated concerning the subject matter of this agreement and, WHEREAS, the City has certain responsibilities for ❑iaintenance and operation of such utilities and public service facilities alter acct- plance by City, and for providing the necessary connecting system, general plant Mud appurtenances, and Lire City is agreeing to discharge those responsibilities. NOW THEREFORE, in consideration of Lite premises and in order- to carry on the intent and purpose of said Codes, Ordinances, kesolutions and Regulations, it is agreed by and between the parties as follows: �: is r•r t nrJ t That all Codes, Ordinances, Resolutions, Rules and Regulations and established policies of the City and the laws of the State of CaMornLa concerning Lite subject matter of this agreement are hereby referred to and incorporated herein to the same effect as if they were set out at length herein. Said Codes, Ordinances and Regulations include, but are not limited ter, the following: Lite Code of the City of Gilroy (including but not limited to Chapters 12A, 19, 20, 21 Res. 80 -58 and 76 -47, thereot pertaining to local improvement procedures in subdivision or development respectfully): Ordinance No. 711 (Zoning Ord.): 1(esolutiotr 81 -17 (1`)79 Uniform Building Code): Rules and Regulations. included in the above are ail of Lite above referred to Codes, Ordinances, I(eaolutions„ kegu lat. iortt; utd SubstIt tit iorus thereof, at; amended to the time of execution of this ck) "It•emk-nt . The Developer agrees: a. To perform each and every provision required by the City to be performed by the Developer in each and every one of said Curies, Ordinances and other Regulations. b. To grant to the City without charge, free and clear of encumbrances, any and all stipulated easements and rights of way In and to his said real property necessary for the City in order that its water, electricty, and /or sewer lines in or to said real property may be extended. C. To indemnify and hold the City harmless and free from all damage and liability done to any utility, public facility or other - material or installation of tike City on said real estate which the Developer or any contractor or subcontractor of Lite Developer, or any employee thereof, shall do in grading or working upon said real estate. d. To construct and improve all public works facilities and other improvements as set out herein, according to Lite standards heretofore established, and according to the grades, plans and specifications thereof, all as approved by ti►e Ctty Engineer, and shall furnish two (2) good and sufficient bonds. One shall be executed in the face anwurkt of nu less than $ 21,000.00 _, and the other shall be executed in an amount no less than 50% of the. above mentioned bond and Shall secure payment to the contractor, his subcontractors and to persons renting equipment or furnishing labor or materials to them for the improveukeut hereunder, and as provided for in Section 4200 -4210 of the Covernuuent Code of the State of California, the Codes, Ordinances, Resolutions, and kegulations of the City, and Lhis agreeukcuL. The faithful performance bond hereinabove provided for, shall by the terms remain in full force and effect for a period of one (1) year after the completion and acceptance of said work, Lo guarantee the repair and replacenu;nt of defective material and faulty workmanship. In lieu of said faithful performance bond for maintenance, the Developer may furnish a maintenance bond in the amourkt of 10% of tine total contract price (with a n►ininu►uk aokount of one thousand dollars, $1,000.00) to cover tl►e one (1) year maiktlerkauce period. e. That upon approval of the final. mat) of the subdivision, the record of survey or the building permiL covering the real estate to be improved and before any work is done therein, th Developer shall pay to the City all sums, except cost to he borne by the City, shown in Section 7 thereof to be due under the terms akkd provisions of this agreement. sP.CriON 3 That all sums shown herein to be payi_ble by the Developer to tike City are due and payable to the City upon the execution of this agreement. ,-; r ( "I' it 1 N L That all the provisions of this agreement and ail work to lx: done pursuant to the terms of this agreement are to be completed within one year from and after tike date and year first above written. SFICTION 5 That the special provisions concerning the particular real estate referred to above, being attached hereto, are hereby incorporated herein and expressly made a part of this agreement. The faithful and prompt performance by the Developer of each and every term and condition contained herein is made an express condition precedent to Lite duty of the City to perform any act in connection with this transaction, and the failure, neglect or refusal of Lite Developer to so perform, or to pay any monies due hereunder when. due shall release the City from any and all obLig;ations hereunder and the City, at its election, may enforce the performance of any provision herein, or any right accruing to the City or may pursue any remedy whatsoever it may have under the laws of the State of California or the Codes, Ordinances, Resolutions of the City, in Lite event of any such default by Developer. SECTION 7 That the following are the estimated amounts of costs to be borne by the respec- tive parties hereto, and it is further understood and agreed that said amounts are estimated only and are subject to final determination upon completion of the work. FACILITY Engineering Mae Checks a) Subdivisons $ + $ (,1) Parcel Maps $ + $ (n) n= Number of lots b) Engineering Plan Check and inspection 5% x $ 20, 890.27 DEVELOPMENT COST $ n/a 1,045.00 c) Miscellaneous Engineer $ 62.00 Service No. of hours x $31.00 2 hours d) Public Works Microfilming; $ n/a $S /Sheet (Maps and Plans) e) Fire Hydrant Location Fee $ n/a $ for first five hydrants + for each additional f) Area Water Charge 1.553 Acres @ $ 1,808.00 /Acre Acres @ $ /Acre 9) Construction Water $ 540.51 LF @ $0.40 /LF + 1.553 Acres @ $14.89 /Acre 239.00 - 207.00 = $32.00 (Paid 3- 12 -84) h) Off -Site Storm Drainage 1.553 Acres @ $ 1,432.00 /Acre Acres @ $ /Acre i) Front Foot Water Fee LF Leavesiey 350.48 LF @ $ 16.46 LF - $5,769.00 Swanston T7 F@ 9. 8 7 '� F= 1, 876 . 0 0 j) Front Foot Sewer Fee Leavesley 350.48 LF @ $ 11.85 LF = $4,153.00 Swanston 190.03 LF @ $ 11.85 LF = 2,252.00 k) Front Foot Storm Drain Fee LF @ $ LF 1) Street Imurovements Includes pavement, curb & gutter, sidewalk, electroliers, fire hydrants, etc. (See Cost Schedule for breakdown.) 2,808.00 32.00 2,224.00 $ 7,645.00 $ 6,405.00 $ By Developer $ 10,903.00 m) Utility Pole Mounted Electrolter LF @ $ /LF -4- n) Other $ 2,629.00 Median Landscaping 350.48 LF @ $7.50 /LF , o) Other $ 5,127.00 Off -site Sewer 1486 gal /day @ $345.00/100 gal /day DUE CITY BY DEVELOPER $ DUE DEVELOPER BY CL'rY $ NET DUE CITY $ 38,880.00 IN WITNESS WMKEOF, said parties have caused these presents to be executed the date and year first above written. n'rrF r City Clerk "7� CITY OF CILROY NOTE: If Developer is a corporation, the complete legal 11auuc ,111(1 Corporate seal of the corporation and the corporate titles of the petsonh slguinE for tike corporation shall appear above. rrrrrrr 1rb s+ CITY OF CILKOY UEVELOPMENT COST SCHEDULE No. 84 -7 ♦� ~rf�J ��l }1'���� x Date _3 -27 -84 - -- Initialed SD -L Location of Property Southwest corner of Swanston Lane and Leavesley Road Assessor's Parcel # 841 -01 -107 Name of Applicant ROBERTS CONSTRUCTION CO._ (Employment Office) Address 5304 A Monterey_ Road, San Jose, CA 95111 Type of Development Proposed Commercial Office Buildings Area 1.553 Acres Storm Drain Area "C" Street Frontage 350.43 feet on Leavesley Road and 190.03 feet on Swanston Lane. h:ni;ineering Map Check 01 -100- 11(0 - 6004 -11 $ n/a Subdivisions $ +$ 61) Parcel Splits $ +$ (n) n= number of lots Engineering Plan Check and Inspection 01 -100 -1100- 6004 -12 $ 1,045.00 5% of the Cost of Public improvements 5% x $ 20, 890. 27 See Estimate attached. Miscellaneous Engineering Service 01 -100- 1100 - 6004 -13 $ 62.00 2 hours x ( $31.00 ) Public Works Microfilming U1 -100- 1100 - 6004 -14 $ n/a $5.00 per sheet (maps and plans) fire Hydrant Location Fee O7 - /20- 1900 - 8001 -00 $ a $ for the first 5 hydrants +$ each add i t. Iona i hyd rain ;; Area Water Charge O "i- 100 -13Ou- 7201-00 $ 2,808.00 1.553 Acres @$ 1008.OQ'acro Acres @$ /acre• C'mistruetton Water O /- /ZO-- I9OU- ti001 -00 $ 32.00 540. 51 LF @$ 0.40 /LF+ 1.553 Acrt?s (+ r 14.89 /acre = 239.00 Paid 207.00 3 -12 -84 32.00 011 -Site Storm Drain Fee Area "A° $ /Acre Area "A -1 "$ /Acre Area "H" $ /Acre : Area "C" $ 1, 432. 00 /Acre Area "D" $ /Acre Area "E" $ /Acre Area "F" $ /Acre Area "Q" $ /Acre 1.553 Acres @$ 1,432.00 /Acre 11.85 /LF = Acres @$ /Acre Front Foot Charles Storm Drain LF @$ /LF 02- 220 - 1300 -- 7202 -00 Water 02 -220- 1300 - 7202 -U1 $ 02- 221- 130U- 72U2 -00 $ Leavesley 350.48 LF @$ 16.46 /LF = 5,769.00 swanston 190.03 LF @$ 9.87 /LF = 1,876.00 By Developer Sewer Sidewalk SF CC$ Leavesley 350.48 LF @$ 11.85 /LF = 4,154.00 Swanston 190.03 LF @$ 11.85 /LF = 2,252.00 Storm Drain LF @$ /LF 02- 220 - 1300 -- 7202 -00 $ 02 -220- 1300 - 7202 -U1 $ 02- 221- 130U- 72U2 -00 $ 02- 222 - 1300 - 7202 -00 $ 2,224.00 02- 223 - 1300 - 7202 -UU $ 02- 224 - 1'100- 1202 -00 $ 02- 225 - ,1300- 7202 -00 $ 02- 226 - 1300 - 7202 -00 02- 230 -1300- 1204 -00 $ 7,645.00 02 -23U- 1300 - -7205 -U0 $ 6,405.00 02- 230 -131JU- 7207 -UU $ By Developer Street lmpruvementa 02- 230- 1300 - 7207 -0U $ 10,903.00 f "eaves ley 3504.80 SF @$ 1.52 /sf' =$ 5,327.00 SwansLoll Pavement 2850.45 SF L$ 1.52 /SF -$ 4,333.00 Curb b Gutter LF @$ /I.F -$ By Developer Sidewalk SF CC$ Gal. Pole Electrolier LF @$ Electrulier Fire Iiydrant 540.51LF l''$ 2.30 /I.F-s 1,243.00 Wood Pole ttouated Electroller 01 -100 -1100- 6004 -00 $ n/a LF @$ /LF Public Works Cash Honda and Deposits 08 -800- 1100 - 6004 -02 $ other Median Landscaping 08- 800 -1100- 6270 -00 $ 2,629.00 350.48 LF @ $7.50 /LF — utl►er Off -site sewer connection 03 -310- 1300 - 7210 -00 $ 5,127.00 1486 gal /day x $345/100 gal /day 38,880.00 NOTE:: All deterred tees are payable at the rite lu ettect it Ltme of payment. -2- STIPULATIONS ROBERTS CONSTRUCTION CO. AGREEMENT 1. Locate and properly dispose of any wells, septic tanks and underground fuel facilities. NOTE: The capping of any well will require inspection by Santa Clara Valley Water District. 2. Schedule the construction of improvements along existing public roads so that the work affecting vehicular traffic is completed with a minimum interruption to traffic. 3. All work within the public right -of -way shall be subject to the approval of the City Engineer and Cal Trans. 4. Install curb, gutter and sidewalk to City standards along the entire property frontage. 5. All fees shall be paid at the rates in effect at that time. 6. Before construction utilizing combustible materials may proceed, an all weather access must be provided to within 150 feet of the building site; and at least one in service fire hydrant must be available within 500 feet of each portion of the site wherein this construction is to take place. Location of the fire hydrants will be determined by the Fire Chief. 7. Thisiagreement shall run with the land and be binding upon any successors in interest. 8. The assignment of the agreement by the developer to another party shall require prior approval of the City Council. 9. The developer shall obtain a State Encroachment Permit prior to the start of work along Leavesley Road (State Hwy 152). 'i Accepted by Title �. i_ Date: OFF -SITE ESTIMATE Leavesley and Swanston SWANSTON LANE: Curb & Gutter Paving 3/12 3' x 190.03' Electroliers Sidewalk 4.5 x 190.03 Handicap Ramp 15" RCP Catch Basin Curb & Gutter Paving 3/12 2' x 350.48 Electroliers Sidewalk 4.5 x 350.48 190.03 L.F. C $ 7.00 /L.F. = 1,330.21 570.09 S.F. 2.00 /S.F. = 1,140.18 1 1,500.00 /each = 1,500.00 855.14 S.F. P 2.00 /S.F. = 1,710.28 1 500.00 /each = 500.00 40 L.F. 0 50.00 /L.F. = 2,000.00 1 1,200.00 /each = 1,200.00 Sub -total = 9,380.67 350.18 L.F. ( S 700.96 S.F. 9 3 ? 1577.16 S.F. 2.n O /S.F. 1,5 On. (,,O /each 2.00 /S.F. Sub -total TOTAL q 1.c1) 1) c 1,4O1.n2 4, 50(`.n� 3,154,32 1 1 , 509.6') 20,890.27