Loading...
Westwind Development and Sierra Alder Dey, Inc.PROPERTY DEVELOPMENT AGREEMENT #81 -6 AGREEMENT FOR EXTENSIONS OF WATER DISTRIBUTION SYSTEMS: IMPROVEMENT OF STREETS; INSTALLATION OF SEWERS, STORM DRAINS AND OTHER PUBLIC WORKS FACILITIES This agreement made, and entered into this 18th day of May 19 81 , by and between the City of Gilroy, a municipal corporation, herein called the "City" and Westwind Dev. Inc and Sierra Alder Dev. Inc , a real property owner developer or subdivider, herein called the "Developer." WHEREAS, a final map of subdivision, record of survey or building permit (Site Clearance) application -has now been submitted to the City for approval and acceptance, covering certain real estate known as and called: Lands of Woolworth and, WHEREAS, the Developer requires certain utilities and public works facili- ties in order to service the property under the minimum standards established by the City and, WHEREAS, the City, by and through its City Council, has enacted certain Codes, Ordinances and Resolutions and certain Rules and Regulations have been promulgated concerning the subject matter of this agreement and, WHEREAS, the City has certain responsibilities for maintenance and operation of such utilities and public service facilities after acceptance by City, and for providing the necessary connecting system, general plant and appurtenances, and the City is agreeing to discharge those responsibilities. NOW THEREFORE , in consideration of the premises and in order to carry on the intent and purpose of said Codes, Ordinances, Resulutions and Regulations, it is agreed by and between the parties as follows: That all Codes, Ordinances, Resolutions, Rules and Regulations and established policies of the City and the laws of the State of California concern- ing the subject matter of this agreement are hereby referred to and incorporated herein to the same effect as if they were set out at length herein. Said Codes, Ordinances and Regulations include, but are not limited -to, the following: the Code of the City of Gilroy (including but not limited to Chapters 12A, 19, 20, 21 Res. 76 -41 and 76 -47, thereof pertaining to local improvement procedures in subdivision or development respectively): Ordinance No. 602 (Subdivision Procedure, etc.): Ordinance No. 711(Zoning Ord.): Ordinance No. 1768 ( 1973 Uniform Building Code): Rules and Regulations. Included in the above are all of the above referred to Codes, Ordinances, Resollutions, Regulations and.Substitutions thereof, as amended to the time of execution of this agreement. 'SECTION 2 The Developer agrees: a. To perform each and every provision required by the City to be per- formed by the Developer in each and every one of said Codes, Ordin- ances and other Regulations. b. To grant to the City without charge, free and clear of encumbrances, any and all stipulated easements and rights of way in and to his said real property necessary for the City in order that its water, electricity, and /or sewer lines-in or to said real property may be extended. c. To Indemnify and hold the City harmless and free from all damage and liability done to any utility, public facility or other material or installation of the City on said real estate which the Developer or any contractor or subcontractor of the Developer, or any employee thereof, shall do in grading or working upon said real estate. d. To construct and Improve all public works facilities and other im- provements as set out herein, according to the standards heretofore established, and according to the grades, plans and specifications thereof, all as approved by the City Engineer, and shall furnish two (2) good and sufficient bonds. One shall be executed in the face amount of no less than $84'726.00 , and shall guarantee the faithful) performance of this agreement; one shall be executed in an amount no less than 50% of the above mentioned bond and shall secure payment to the contractor, his subcontractors and to persons renting equipment or furnishing labor or materials to them for the improve- ment hereunder, and as provided for in Section 4200 -4210 of the Government Code of the State of California, the Codes, Ordinances, Resolutions and Regulations of the City, and this agreement. e. That upon approval of the final map of the subdivision, the record of survey or the building permit covering the real estate to be improved and before any work is done therein, the Developer shall pay to the City all sums, except cost to be borne by the City, shown in Section 7 thereof to be due under the terms and provisions of this agreement. SECTION 3 That all sums shown herein to be payable by the Developer to the City are due and payable to the City upon the execution of this agreement- SECTION 4 That all the provisions of this agreement and all work to be done pur- suant to the terms of this agreement are to be completed within one year from ,and after the date and year first above written. SECTION 5 That the special provisions concerning the particular real estate re- ferred to above, being attached hereto, are hereby incorporated herein and expressly made a part of this agreement. SECTION 6 The faithful and prompt performance by the Developer of each and every term and condition contained herein is made an express condition precedent to the duty of the City to perform any act in connection with this transaction, and the failure, neglect or refusal of the.Developer to so perform, or to pay any monies due hereunder when due shall release the City from any and all CN: obligations hereunder and the City, at its election, may enforce the performance of any provision r ;-ein, or any right accruing to the City or may pursue any remedy whatsoever it may have under the laws of the State of California or the Codes, Ordinances, Resolutions or Regulations of the City, in the event of any such default by Developer. SECTION 7 That the following are the estimated amounts of costs to be borne by the respective parties hereto, and it is further understood and agreed that said amounts are estimated only land are subject to final determination upon comple- tion of the work. FACILITY a) Engineering Map Checks Subdivisions $167.00 + $2.50 (n) Parcel Maps $ 70.00 + $2.50 (n) n= Number of lots b) Engineering Plan Check and Inspection 4% x $ 84179A nn c) Miscellaneous.Engineer Service No.of hours x $25.00 3 hrs x $25.00 /hr d) Public Works Microfilming $5 /Sheet (Maps and Plans) $5.00/sheet x 4 sheets e) Fire Hydrant Location Fee $25.00 for the first hydrants + 2.50 for each additional 2 hydrants f) Area Water Charge I.813Acres @ $ 1372 /Acre = $2487.00 Acres @ $ /Acre $2487.00- $96o.00-, =1527 -See Calculation sheet. -3- DEVELOPMENT COST $ N.A. $ 3389.00 ,. $ 20.00 $ 25.00 C 9 L,R7 nn g) Construction Water 269 LF @ $0.30 /1-F + 1.813 Acres @ $11.30 /Acre h) Off -Site Storm Drainage 1.813 Acres @ $868 /Acre Acres @ /Acre Dictrict "A" i) Front Foot Water Fee LF @ /LF j) Front Foot Sewer Fee 265 LF @ _$8 /LF To be reimbursed to Monier Tile Co. Q Front Foot Storm Drain Fee LF @ /LF 1) Street Paving SF @ /SF m) Curb and Gutter LF @ /LF n) Galvanized Pole Electroliers LF @ $ /LF o) Electrolier Conduit LF @ $ /LF -4- $ 101.00 $ 1574.00 MM W.I.TTI $ By Developer $ By Developer $ By Developer $ By Developer $ By Developer p) Tre -hqd, LF @ $ /LF q) Utility Pole Mounted Electrolier LF @ $ AF r) Easements and Rights of Way "On Site" s) Easments and Rights of Way "Off Site" t) Other $ N_ A- '$ 100% ,. DUE CITY BY DEVELOPER $ 9791.00 DUE DEVELOPER BY CITY $ 960.00 NET DUE CITY $ 8831.00 IN WITNESS WHEREOF, said parties have caused these presents to be executed the date and year first above written. , ww"', /City Clerk NOTE: DEVELOPER WESTWIND DEVELOPMENT INC. BY ,A _ J - � Pressdent S A VE OPMENT, MC. - —�/ President DATE If Developer is a corporation, the complete legal name and corporate seal of the corporation and the corporate titles of the persons -5- CITY Of GILROY DLVEL0VMLIJT COST SCHEDULE No. 81 -6 Date 3 -30 -81 Initialed S. D -L. Location of property East side at the end of Brem Lane. Assessor's Parcel !! Naive of Applicant Westwind Dev._Inc. /d Si raAlder Dev. Inc Address _ZO.Camden Ave. Campbell, Ca. 95008 Type of Development Prt,posed Industrial Area 1.813 Acres Storm DrainDistrict "A" _ Street Frontage Engineering Map Checks 01 -100 -1100 - 6004 -II $ N.A. Subdivisions r (n) Parcel Mop (N) N = Number of tuts Engineer Plan Check and Inspection 01 -100 -1100 - 6004 -12 $ 3389 4% x $ -c X = Cost off ' U )'ii improvements Miscellaneous Engineer Service 01 -100 -1100- 6004 -13 $ No of hours X(25-00) 7� 3. hrs,. Public. Works Microfilminy 01-100 -1100- 6004 -14 $ 20 $$ /Sheet (maps and plans) x 4 sheets Emergency Services 01- 100 - 1100 - 6004 -15 $ N.A. No. of hours x ( ) Fire Hydrant Location Fame 01 -100 -1100- 6002 -01 $ 25 $25.00 for the fir,.t 5 hydrants + $ 2.50for each additional hydrant (2 hydrants) Area Water Charge 03- 300 -1300- 7203 -00 $ 1527 1.813 Acres P $1372 /Acre = $2487 -$960; Construction Water 07-720 -1900- 8001 -00 $ 101 269 LF P $0.30 /1-F 1.813 Acres Y$11.30 /Acre -See calculation sheet. Oil - Sit.- `term DI.,ill 02 -2.'()- 1 100 /202-()() "A" 5U 8 /A,- 02-27()- 1 ;500- %'U;' -o I "A -I" $3000 /Ac 02- 2.' 1 - 1 300- /:10:' -oo "b" 624/AC 02 -222- 1300 - 7202 - -t1() "C" /59/Ac 02 -223 - 1 300 - /:102 -6() "D" 720 1Ac. 02- 214-1300- 7202 -00 "E" ;117 /Ac 02-225 -1300- 7202 -00 "F" 868/Ac 1.813 Ac.rc�, (,,$ 868 Front Fuut C11.irc�e� WJtc r L F l� $ Sewer 265 L $8.00 Sturm D i a i n SLreet ImprovcmentS Pavement SF Cw $ Curb E Gutter LF Lj$ SldcwdIk SF Gdl.Pole E Icctrol ier LF h'$ Electrolier _ Condu i t $ F re llydrant LIB la $ -2- FA Di,Lrl,-1 "A" 5U 8 /A,- District "A -I" $3000 /Ac District "b" 624/AC District "C" /59/Ac District "D" 720 1Ac. District "E" ;117 /Ac D i S L I- i C L "F" 868/Ac /Acre. 02- 230 - 1300 - 7204 -00 /LF 02- 230 -1300- 7205 -00 /LF 02- 230 -1300- 7207 -00 /LF 02 -230- 1300 - 7206 -00 /SF " $ /SF = $ /LF _ $ /LF = $ Wood Polc Mounted Electrolier 01 -100 -1100- 6004 -20 —_ _LF �y $ - /LF Public Work, Cash Bondi and Dcpo,itt, 08- 800 -1100- 6004 -02 OLhcr $ 1574 $ 2.120 To be reimbursed to Monier Tile Co. $ By Developer $ By Developer $ N.A. C TO1AL $ 8831 c 3 7 7 02 -2.'t► 1 tuu J202 -00 02-220 -I 00- /2U:' -01 02- 22 1 - 1 300- /:'0 :' -00 02 -22'- 130c)- 02 - 7'--00 02- 223 -1100- /202 -U0 02- 224- 1 _JOo -/20 2 -00 02- 225 - 1300 - 7202 -00 1.813 A,. re s (, $ 868 Frunt Fuut Ch.ii cjes WaI.CI- LF l�$ Sewer `265 - - -- L F l °$8.00 -2- Di s t r i c t "A" $ii(,8 /A(- District "A -I" $3000/Ac DiStriCL "t)" 624// \C District "C" 759/A(_ DiStriCL "U" 72011\(- District "E" 547/1 \c D i S L f i C L "F" 868/1\(- /Acre — _ Sidewalk 02- 230 - 1300 - 7204 -00 /LFFp 08-803o- 1 f3ge6��65026fl /LF Sturm Drain 02- 230 -1300- 7207 -00 l_F y /LF Street (ml>ruvenrunts 02- 230 -1300- 7206 -00 PavcIIlent L$ /SF = $_ _ Curb & Gutter _SF Li$ /LF = $ — _ Sidewalk _LF $ _ _ /SF = $ _ GaI.Pole -^ _SF E IecLrul ier- L L = $ EIeCtrul ier - - -i -- Coiidu i t L 1 l� $__ /L F =$ A F re hydrant LF t� $ _ /LF $— Wood Pule Mounted Electrulier 01- 100 - 1100 - 6004 -20 /LF Public Wm kl , Cash Build-. and Uul,us i is 08- 800 - 1 100- 600', -02 Other 9 Ir $ 1574 $^ By Developer $ 2.120 To be reimbursed to Monier Tile Co. $ By Developer $ By Developer $ N.A. C TO1AL $ 8831 _ STIPULATIONS LANDS OF WOOLWORTH AGREEMENT l.) Locate and properly dispose of any wells, septic tanks and under ground fuel facilities. NOTE: The capping of any well will require inspection by the Santa Clara Valley Water District. 2.) All work within the public right of way shall be subject to the approval of the City Engineer. 3.) Before construction utilizing combustible material may proceed an all weather access must be provided to 150 feet of the build- ing site; and at least one in service fire hydrant must be avail- able within 500 feet of each portion of the site wherein this construction is to take place. 4.) Improvements to Brem Lane have been deferred until January, 1982 as per previous agreement. 5.) The private ingress /egress easement shall be improved to City Standards and specifications. SIERRA ALDER DEVELOPMENT, INC. /Preisdent Signed Mkt 8062 April 2, 1981 ONSITE 1. Grading 1280 2• 2" AC /6" CL II A.B. 17080 3• Catch basin 2 SUB TOTAL $ 77,024.00 10% CONTINGENCY 7,702.00 TOTAL ( OFFSITE) $ 84,726.00 C.Y. $ 2.50 OFFSITE S.F. 0.90 15,372.00 Each COST ESTIMATE 1,300.00 SUB TOTAL WOOLWORTH SITE PLAN (PCL 2 & 3) 1,987.00 ITEM DESCRIPTION UANTITY UNIT UNIT PRICE TOTAL 1. Grading including grade drain to 9950 S.F. $ 0.15 $ 1,493.00 2. 3. 4• 5• 6. 7. 8• 9. 10. 11. 12. 13• 14. 15. 16. 17. 18. 19. Std. Curb & Gutter 3" AC on 8" CL II A.B. 6" VCP Stub 8" VCP S.S. Manhole 12" D.I.P. 8" D.I.P. Fire Hydrant Assembly Catch Basin Area Drain Clean Out Outfall structure 18" RCP 12" RCP 18" CMP incl collar 2" services with meter S.D. Manhole Electrolier 575 8428 5 545 2 320 320 2 2 1 1 . 1 1216 . 28 20 2 2 1 L.F. S.F. L.F. L.F. Each L.F. L.F. Each Each Each Each L.S. L.F. L.F. L.F. Each Each Each 7.50 1.30 8.00 10.00 900,00 22.00 16.00 1,500.00 650.00 550.00 250.00 3,500.00 22.00 15.00 22.00 550.00 11000.00 1,500.00 4,313.00 10,956.00 40.00 5,450.00 1,800.00 7,040.00 5,120.00 3,000.00 1,300.00 550.00 250.00 3,500.00 26,752.00 420.00 440.00 11100.00 2,000.00 1,500.00 ONSITE 1. Grading 1280 2• 2" AC /6" CL II A.B. 17080 3• Catch basin 2 SUB TOTAL $ 77,024.00 10% CONTINGENCY 7,702.00 TOTAL ( OFFSITE) $ 84,726.00 C.Y. $ 2.50 $ 3,200.00 S.F. 0.90 15,372.00 Each 650.00 1,300.00 SUB TOTAL $ 19,872.00 10% CONTINGENCY 1,987.00 TOTAL ( ONSITE) 21,859.00 TOTAL ( OFFSITE) 84,726.00 GRAND TOTAL $ 106,585.00