Loading...
Clark/Carlson/Hewell & Sheedy and Nowakowski - PDA No. 85-171% "1.-, 11�7 r /ems. NO FEE per GC Sec. 6103 Susanne E.'Steinmetz,City Clerk VCity of Gilroy ���[_ J�ti.1 7351 Rosanna St. Gilroy, CA 95020 OPF,R fY DFVE:iPP? IFN I AGRI`.E;tlFN f PESIORNFIAI, AGREE;MM I FOE F\ I E NS I "NS OF WA I I R D I:: I R I I PT I ON SYSTEMS! i NpROmEN f OF S I RFE I S : I NS fALLAI I "N OF SEWERS, STORM DRAINS AND OFHFR I OALIC tdOPKS FACILI 1 IFS �39SPA0 E �3 Mn 85 -17 This agreernrnt made and entered iNto thislst clay of July 19 85 , by and between the City of rilrov, a mu"iripal corporation, herein called the "City" and CLAM, CARLSON, lli'WELL & S=DY and NO AKa'JSKI a real property owner developer yr subdivider, herein calle l the -1r':o 1c op "t WHEREAS, a final map of subdi•;isiep, record of survey or building petmit (Site Clearance) application has now horn srbmittrd to the City for approval and acceptance, coveting certain real estate known as and called: APN 799 -10 -053, 054, and 055; & 799 -11 -046, 047, and 048 and, WHEREAS, the Developer requires certain utiliries and public works facilities in order to srr•:ice the property under the wi"im"m rtn"d aids est'thli,shed by the City anal, WHEREAS, the City, by nod throuc•h if City r-" "ri1, his enacted cot rain Codes, Ordinances and Rrs,lutiens and r,ttain Pill- and Cer"Klions have been pit- moirited concerning the subject matter of this ap,romvnt nod, WHEREAS, tho City has cettwin rP.;l„•n -,ibiIiIi,i tot maintenance and operation of such utilities and public srryice facilitiri alter acceptance by City, and lot providing the Necessary ronnrcting system, ventral plant and appurtenances, and the City is agreeing to dischnrg.r those ro spc•NSil,i I it ies. Nl'W 1HFItFFI ItF, in cans idrr at ion of the ra rmi,:rs and in order to rar r y on the intent and purpose of said Codes, ttrclinanrrr:, Rrs"l at ions and Regulations, it is agreed by and between the parties as follows: SECTION I llaat all Codes, alrclinivcrs, RrsNlut i"ns, R"las and Regulations and rstahl ished policies of the City and the laws of the State of California concerning the subject matter of this agteemen.t are hereby referred to and inrorporated herein try the same effect as if they were set out at length herein, Snid Codes, Ordinances rind Regulations include, but are not limited to, the following: the Code of the City of Gilroy (including but not limited to Chnptets 12A, 19, 20, 21 Res. 85 -9 and 76 -47, thereof pertaining to local improvement procedures in subdivision or development respectfully): Ordinance No. 83 -15 (Zoning Ord.): Resolution 85 -5 (1982 uniform Building Code): Rules and Regulations. Included in the above are all of the above referred to Codes, Ordinances, Resolutions, Regulations and Substitutions thereof, as amended to the time of execution of this ng,reNment. The Developer agrees: 1. to perform each and every provision required by the City to be performed by the Developer in each and every one of said Codes, Ordinances and ether Regulations. b. To giant to the City without chntgr, free and clear of encumbrances, any and all stipulated easements and rights of way in and to his said real property necessary for the City in order that its water, elect ricty, and /or sewer lines in or to said real property may be extended. C. To indemnify and (told the City harmless and free from all damage and liability dune to any utility, public incility or other material or installation of the City on said real estate which the Developer or any contractor or subcontractor of the Developer, or any employee thereof, shall do in grading or working upon said real estate. 1 :19 S PAGt, 15 9 0 d. To construct and improve all public works facilities and other improvements as set out herein, according to the standards heretofore established, and according to the grades, plans and specifications thereof, all as approved by the City Engineer, and shall furnish two (2) good and sufficient bonds. One shall be executed in the face amount of no less than $ 28,265.00 , and the other shall be executed in an amount no less than 50% of the above mentioned bond and shall secure payment to the contractor, his subcontractors and to persons renting equipment or furnishing labor or materials to them for the improvement hereunder, and as provided for in Section 4200 -4210 of the Government Cole of the State of California, the Codes, Ordinances, Resolutions, and Regulations of the City, and this agreement. The faithful performance bond hereinabove provided for, shall by the terms remain in full force and effect for a period of one (1) year after the completion and acceptance of said work, to guarantee the repair and replacement of defective material and faulty workmanship. In lieu of said faithful performance bond for maintenance, the Developer may furnish a maintenance bond in the amount of 10% of the total contract price (with a minimum amount of one thousand dollars, $1,000.00) to cover the one (1) year maintenance period. C. That upon approval of the final map of the subdivision, the record of survey or the building permit covering the real estate to be improved and before any work is done therein, the Developer shall pay to the City all sums, shown in Section 8 thereof to be due under the terms and provisions of this agreement. SECTION 3 That all Sums shown hvicin to hp pnyNhle by they Developer to the City nip glue and payable to the City upon the execution of this agreement. 9 RCT I nN & That all the provisions of this agreement and all work to be done pursuant to the terms of this agreement are to be completed within one year from and after the date and year first above written. SFCTtnN 5 That the special provisions concerning the particular real estate referred to above, being attached hereto, are hereby incorporated herein and expressly made a part of this agreement. SF.CT I nN 6 That the faithful and prompt performance by the Developer of each and every term and condition contained herein is made an express condition precedent to the duty of the City to perform any act in connection with this transaction, and the failure, neglect or refusal of the Developer to so perform, or to pay any monies due hereunder when due shall release the City from any and all obligations hereunder and the City, at its election, may enforce the performance of any provision herein, or any right accruing to the City or may pursue any remedy whatsoever it may have under the laws of the State of California or the Codes, Ordinances, Resolutions of the City, in the event of any such default by Developer. S FCT I nN 7 That this agreement, together with the attached stipulations, is an instrument affecting the title or possession of the real property described in Exhibit A. All the terms, covenants and conditions herein imposed shall be binding upon and inure to the benefit of the successors in interest of Developer. Upon the sale or division of the property described in Exhibit A, the terms of this agreement shall apply separately to each parcel and the Developer of each parcel shall succeed to "the obligations imposed on Developer by this agreement. -2- j PAGE 101 SECT ION 8 That the following are the estimated amounts of costs to be borne by the respec- tive parties hereto, and it is further understood and agreed that said amounts are estimated only and are subject to final dotermination upon completion of the work. FACILII'Y DEVELOPMENT COSr Engineering Map Checks a) Subdivisions $190.00 + $3.00 /lot $ n/a Parcel Splits $83.00 + $3.00 /let number of lots b) Miscellaneous Engineering Service $ 2 hours x $3i.00 /hr c) Public Works Microfilming $ 2 sheets x $5.00 /sheet d) Wood Pole Mounted Electrolier 502 FF @ $5.00 /FF 100 feet paid (84 -17) e) Engineering Plan Check and Inspection $ 5% of the Cost of Public Improvements 5% x $ 28,265.00 f) Storm Development Fees $ 0.34 Acres @$ /Acre Paid (84 -17) 0.68 Acres @ $2310.00 /Acre g) Front Foot Water Fee $ FF @ $ /FF h) Front Foot Sewer Fee FF @ $ /FF i) Street Improvements Includes pavement, curb b gutter, sidewalk, electroliers, fire hydrants, etc. (See Cost Schedule for breakdown.) j) Front Foot Storm Drain Fee FF @ $ /FF --I - $ 62.00 10.00 lh 2,510.00 1,413.00 1,571.00 nia n/a By Developer $ n/a J139SPASE15J2 k) Water Development Fee $ 6.520.00 8 Units @ $815.00 /Unit 4 Paid (84 -17) 1) Construction Water $ 150.00 300 LF @ $0.50 /FF + n/a Acres @ $20.00 /Acre m) Fire hydrant Location Fee $ n/a $31.00 for first five hydrants + 3.00 for each additional hydrants n) Sewer Development Fee $ w /Building Permit o) Public Works Cash Bonds and Deposits p) Other TOTAL DUE CITY $ 12,236.00 IN WITNESS WHEREOF, said parties have caused these presents to be executed the date a4id year first above written. r �✓ C �k L�y iJr }�� t C t T Y OF C I L ROY J V ATT ' T: City Clerk NOTE: if Developer is a corporation, the c, corporation and the corporate titles of the persons signing for the corporation shall appear above. t% -4 - J39SPAGE1593 STATE OF CALIFORNIA ) COUNTY OF Santa Clara ) SS On May 23, 1985 before me, the undersigned, a Notary Public in and for said State, Personally appeared Sabrina L. Howell Mark h. Newell, Denis T. Barroza, Cheryl Barroza, David L. Sheedy, Wayne C. Carlson, Roger Clark, Sylvia Clark, hay M. Carlson, Michael Nowakowski and Stephen J. Nowakowski personally known to me or proved to me on the basis of satisfactory evidence to be the persons whose names are subscribed to the within instrument and acknowledge that they executed the same. IVITNF.SS my hand and official seal. Signatt i T VI IM. ROVELLA o� T ��� o��. R�VFLiA �, ,u�����N�n / J "N I Y 39SPACE_1594 W. EIGHTH STREET - R 3 W fl 3 S- R 2 W B. 3 S. - R. I W. F- 37 5( f Q Z Z Q V) 0 m I 2 3 4 14 6 a PCL.A PCL.8 0 I 9 10 I� - P. M. 517- M - 26 517 M -27 - W. NINTH E— STREET B 4 S-R W. R 4 S -R 7W 2.4 S. -R IW 49.30 10070 0 160 60 vl 13940 I - lag ^ -� 60 82 0.17 L.21s 0 ISO 14 2 1 17 Iw 47 n - PCL.I ' 0 5O PCL.2 0.17 C. - C L. I Ln 48 0 -1 0.16 AC. - - 0.17A 3 0 /6 a 0.17 AC. 0.16AC. 20 U) TI -- 139 40 } C - -- N 3/ 12 I 5 v u� 2/5 N 152t I50 30 23 14 4 ° _^ N 154• I 25 I 150 3 < _- LA - r5/ N F- -- 16060 - -- .15,L _2 14 40 ~ F- -- - - - -_- �6 - - - (n N o 150.60 B1 — N Ld o ,3O 13 v 34 c ° 3 = 96.70 j v. 50 1 100 1 - -- - - - A - -4 4 3 0 60 I 71 - -- m 5 1 _ a P9 14 w 4 - -N 1 14940 In /0 6 u 4 m O LA 28 15 16 5 o d I w 3750 - -- - -- 1-- -- 75' - - - - -- 75 150.60 0 sO 150 ° 27 16 /9 0 9 5 0 - - - - - -- - - - -- } o 26 17 20 on C L. I C L. L. Q Z V o 25 18 B 2/ o co 8 4 5 6 laz- ui Z ^ I � - - - - - -- - -- 711- i1 J Q I oI 2 55 0 19 9 o 154 153 - - 24 - - __23 - 22 LU CC 7 I 17AC I ITAC .IT A u� I 0 150 71 71 F- 37 5( f Q Z Z Q V) 0 m I 2 3 4 14 6 a PCL.A PCL.8 0 I 9 10 I� - P. M. 517- M - 26 517 M -27 - W. NINTH E— STREET B 4 S-R W. R 4 S -R 7W 2.4 S. -R IW 49.30 10070 W. TENTH Y z l688 019 Y- /83607 F- U) 75 U 2 U PC L. 4 52 -, /8 I� CL. o ^ -� 0.17 L.21s 0 ISO 0.31 AC. 2 1 17 Iw 47 n - PCL.I ' 0 5O PCL.2 0.17 C. - C L. I Ln 48 0 -1 0.16 AC. - - 0.17A 3 0 /6 a 0.17 AC. 0.16AC. 20 U) 4 0 -- -1497Q } C - -- ° 15 I I 5 v ° 26 m 152t I50 30 23 14 4 1 6 _^ N 154• I 25 I 150 3 < _- m 7 0 I 14 156 4,0 X150 301 J _ 96.70 _- 53 So 100 �6 3 8 0 - B1 — N Ld _ 8 z v 34 c 9 0 = 96.70 j 53 50 1 100 W. TENTH Y z l688 019 Y- /83607 F- U) 75 U 2 U Iso Is 0 40 PC L. 4 52 -, •0.17 — I� 0 PCL 3 51 AC. -- - -i4s -� o� so y 0.31 AC. ai PCL.5 53 Iw Isl.so 0.16 AC. PCL.I ' 0 5O PCL.2 i PCL.6 Ln -- 0.17AC -1 0.16 AC. - - y 49 PCL. I I PCL.7 0.17 AC. 0.16AC. 20 U) 2 I 1 1 2/ 0 } C I 22 I ° 26 m al 23 u 0.34 AC. NET 24 a LLI I 25 _- m 151 50 I 14 W Iso Is 0 40 �° 1 X 1688368 Y- /83 72 / EXHIBIT A STREET 150 -, I� (n 0 PCL. B InFCL. A 44 y Iw 75 I 43 PCL.I ' Ln PC L 3 0.34 AC. NET y O 3 U) } C 42 al 4 0.34 AC. NET LLI I$0 _- m W 5 J _ 4 -- �6 -- _ -- 35 - B1 — N Ld P 8 z v 34 c s = I 81 69 152 �° 1 X 1688368 Y- /83 72 / EXHIBIT A STREET J 39 SWE15 -5 Front Foot Charges Water 02- 230 - 1300 - 720400 $ n/ a FF @$ /FF Sewer 02- 230 - 1300 - 720500 $ n/ a FF @$ /FF Street Improvements 02- 230 -1300- 720600 $ By Developer Pavement SF @ $ /SF = $ Curb & Gutter FF @ $10.87 /FF = $ Sidewalk SF @ $ 3.11/SF = $ Gal. Pole Electrolier & Conduit FF @ $ 5.00 /FF = $ Fire Hydrant Resident FF @ $ 2.54/FF = $ Comm & Ind. FF @ $ 2.85/FF = $ Storm Drain 02- 230 -1300- 720700 $ n/ a FF @$ /FF Sewer Development Fee 07- 705 -1300- 720100 $ w /Bldg. Permit Water Development Fee 07- 725 -1300- 720300 $ 6,520.00 3 Units @ $815.00 /Unit Units Paid (84 -17) Gals. @ $850.81/1000 GPD peak Construction Water 07- 720 - 1900 - 800100 $ 150.00 300 FF @ $0.50 /FF + Acres @ $20.00 /Acre Fire Hydrant Location Fee 07- 720 - 1900 - 800300 $ n / a $31.00 for the first 5 hydrants +$ 3.00 for each additional hydrant Public Works Cash Bonds and Deposits 08- 800 -1100- 600400 $ Other $ TOTAL DUE CITY $ 12,236.00 NOTE: (1) All deferred fees are payable at the rate in effect at time of payment. Accepted by: 1;41",- J�, 9, 4 e Date: -2- coo I �,.- x a CITY OF CILItOY s' DEVELOPMENT COST SCIII:DULE �� t� � -. i � P �1 � � No. 85 -17 Date 4 -18 -85 ,j Initialed SD -L Location of Property Northwest and Southwest corners of Church and Ninth Assessor's Parcel ;')'s 799 -10 -053, 054 & 055; and 799 -11 -046, 047 & 048 Name of Applicant RODGER CLARK, WAYNE CARLSON, HEWELL & SHEEDY and MIKE NOWAKOWSKI Address Type of Development Proposed Street Improvements for Duplexes I Area 1.02 acres Storm Drain Area "Q" Street Frontage 602 feet Special Public Works Services 01 -100 -1100- 600400 $ 2,582.00 Engineering t1ap Check Subdivisions $190.00 + $3.00 /lot $ n/a Parcel Splits $83.00 + $3.00 /lot number of lots tliscellaneous F,ngineering Service $ 62.00 2 hours x $31.00 /lir Public Works Microfilming (Maps and flans) $ 10.00 2 sheets x $5.00 /sheet , Wood Pole Mounted Electrolier $ 2510.00 502 FF @ $5.00 /FF 100 FF Paid (84 -17) Engineering Plan Check and Inspection 01 -100- 1100 - 600412 $ 1,413.00 5% of the Cost of Public Improvements 5% x $ Storm Development Fee Area "A" $1,850.00 /Acre 02- 220 - 1300 - 720200 $ Area "A -1" $3,680.00/Acre 02- 220 -1300- 720201 $ Area "8" $1,640.00 /Acre 02 -221 -1300- 720200 $ Area "C" $2,770.00 /Acre 02- 222 - 1300 - 720200 $ Area "D" $1,710.00 /Acre 02- 223 -1300- 720200 $ Area "E" $1,350.00 /Acre 02- 224 - 1300 - 720200 $ Area "F" $2,400.00 /Acre 02- 225 -1300- 720200 $ Area "Q" $2, 310.00 /Acre 02-226-1300-720200 $ 1,571.00 0.34 Acres @$ /Acre Paid (84 -17) 0.68 Acres @S 2310.00 /Acre a