Loading...
Gilroy-Del Monte Properties - PDA No. 90-33WHEREAS, a final map of subdivision, record of survey or building permit (Site Clearance) application has now been submitted to the City for approval and acceptance, covering certain real estate known as and called: Tract 8361, Oak Tree Teri-ace APN 799 -04 -046 and, WHEREAS, the Developer requires certain utilities and public works facilities in order to service the property under the minimum standards established by the City and, WHEREAS, the City, by and through its City Council, has enacted certain Codes, Ordinances and Resolutions and certain Rules and Regulations have been promulgated concerning the subject matter of this agreement and, WHEREAS, the City has certain responsibilities for maintenance and operation of such utilities and public service facilities after acceptance by City, and for providing the necessary connecting system, general plant and appurtenances, and the City is agreeing to discharge those responsibilities. NOW THEREFORE, in consideration of the premises and in order to carry on the intent and purpose of said Codes, Ordinances, Resolutions and Regulations, it is agreed by and between the parties as follows: SECTION 1 That all Codes, Ordinances, Resolutions, Rules and Regulations and established policies of the City and the laws of the State of California concerning the subject matter of this agreement are hereby referred to and incorporated herein to the same effect as if they were set out at length herein. Said Codes, Ordinances and Regulations include, but are not limited to, the following: the Code of the City of Gilroy (including but not limited to Chapters 12A, 19, 20, 21 Res. 85 -9 and 76 -47, thereof pertaining to local improvement procedures in subdivision or development respectfully): Ordinance No. 83 -15 (Zoning Ord.): Resolution 85 -5 (1982 Uniform Building Code): Rules and Regulations. Included in the above are all of the above referred to Codes, Ordinances, Resolutions, Regulations and Substitutions thereof, as amended to the time of execution of this agreement. SFCTTnN 2 The Developer agrees: a. To perform each and every provision required by the City to be performed by the Developer in each and every one of said Codes, Ordinances and other Regulations. b. To grant to the City without charge, free and clear of encumbrances, any and all stipulated easements and rights of way in and to his said real property necessary for the City in order that its water, electricty, and /or sewer lines in or to said real property may be extended. C. To indemnify and hold the City harmless and free from all damage and liability done to any utility, public facility or other material or installation of the City on said real estate which the Developer or any contractor or subcontractor of the Developer, or any employee thereof, shall do in grading or working upon said real estate. ' - / ' i / A / Susanne E.'Steinmetz, City Cler NO-FEE PER CC SEC 27383 N r L/ U I C•. ty of G il'roy c 7351 Rosanna Street Gilroy, _ CA 95020 - '��j�t ='+T ' PROPERTY DEVELOPMENT AGREEMENT c.' 1 r" RE S I DENT I AL _ _" C� C� AGREEMENT FOR EXTENSIONS OF WATER DISTRIBUTION SYSTEMS: (A IMPROVEMENT OF STREETS: INSTALLATION OF SEWERS, STORM DRAINS AND OTHER PUBLIC WORKS FACILITIES No. 90 -33 1 06 , x'012 This agreement made and entered into this 6th day of August 19 90 by and between the City of Gilroy, a municipal corporation, herein called the --_1 "City" and Gilroy -Del Monte Properties, Inc. a real property owner developer or subdivider, herein called the Developer'. WHEREAS, a final map of subdivision, record of survey or building permit (Site Clearance) application has now been submitted to the City for approval and acceptance, covering certain real estate known as and called: Tract 8361, Oak Tree Teri-ace APN 799 -04 -046 and, WHEREAS, the Developer requires certain utilities and public works facilities in order to service the property under the minimum standards established by the City and, WHEREAS, the City, by and through its City Council, has enacted certain Codes, Ordinances and Resolutions and certain Rules and Regulations have been promulgated concerning the subject matter of this agreement and, WHEREAS, the City has certain responsibilities for maintenance and operation of such utilities and public service facilities after acceptance by City, and for providing the necessary connecting system, general plant and appurtenances, and the City is agreeing to discharge those responsibilities. NOW THEREFORE, in consideration of the premises and in order to carry on the intent and purpose of said Codes, Ordinances, Resolutions and Regulations, it is agreed by and between the parties as follows: SECTION 1 That all Codes, Ordinances, Resolutions, Rules and Regulations and established policies of the City and the laws of the State of California concerning the subject matter of this agreement are hereby referred to and incorporated herein to the same effect as if they were set out at length herein. Said Codes, Ordinances and Regulations include, but are not limited to, the following: the Code of the City of Gilroy (including but not limited to Chapters 12A, 19, 20, 21 Res. 85 -9 and 76 -47, thereof pertaining to local improvement procedures in subdivision or development respectfully): Ordinance No. 83 -15 (Zoning Ord.): Resolution 85 -5 (1982 Uniform Building Code): Rules and Regulations. Included in the above are all of the above referred to Codes, Ordinances, Resolutions, Regulations and Substitutions thereof, as amended to the time of execution of this agreement. SFCTTnN 2 The Developer agrees: a. To perform each and every provision required by the City to be performed by the Developer in each and every one of said Codes, Ordinances and other Regulations. b. To grant to the City without charge, free and clear of encumbrances, any and all stipulated easements and rights of way in and to his said real property necessary for the City in order that its water, electricty, and /or sewer lines in or to said real property may be extended. C. To indemnify and hold the City harmless and free from all damage and liability done to any utility, public facility or other material or installation of the City on said real estate which the Developer or any contractor or subcontractor of the Developer, or any employee thereof, shall do in grading or working upon said real estate. d. To construct and improve all public works facilities and other improvements as set out herein, according to the standards heretofore established, and according to the grades, plans and specifications thereof, all as approved by the City Engineer, and shall furnish two (2) good and sufficient bonds. One shall be executed in the face amount of no less than $ 214,823.40 , and the other shall be executed in an amount no less than 50% of the above mentioned bond and shall secure payment to the contractor, his subcontractors and to persons renting equipment or furnishing labor or materials to them for the improvement hereunder, and as provided for in Section 4200 -4210 of the Government Code of the State of California, the Codes, Ordinances, Resolutions, and Regulations of the City, and this agreement. The faithful performance bond hereinabove provided for, shall by the terms remain in full force and effect for a period of one (1) year after the completion and acceptance of said work, to guarantee the repair and replacement of defective material and faulty workmanship. In lieu of said faithful performance bond for maintenance, the Developer may furnish a maintenance bond in the amount of 10% of the total contract price (with a minimum amount of one thousand dollars, $1,000.00) to cover the one (1) year maintenance period. e. That upon approval of the final map of the subdivision, the record of survey or the building permit covering the real estate to be improved and before any work is done therein, the Developer shall pay to the City all sums, shown in Section 8 thereof to be due under the terms and provisions of this agreement. SECTION 3 That all sums shown herein to be payable by the Developer to the City are due and payable to the City upon the execution of this agreement. SECTION 4 That all the provisions of this agreement and all work to be done pursuant to the terms of this agreement are to be completed within one year from and after the date and year first above written. SECTION 5 That the special provisions concerning the particular real estate referred to above, being attached hereto, are hereby incorporated herein and expressly made a part of this agreement. SECTION 6 That the faithful and prompt performance by the Developer of each and every term and condition contained herein is made an express condition precedent to the duty of the City to perform any act in connection with this transaction; and the failure, neglect or refusal of the Developer to so perform, or to pay any monies due hereunder when due shall release the City from any and all obligations hereunder and the City, at its election, may enforce the performance of any provision herein, or any right accruing to the City or may pursue any remedy whatsoever it may have under the laws of the State of California or the Codes, Ordinances, Resolutions of the City, in the event of any such default by Developer. SFC'TTnN 7 That this agreement, together with the attached stipulations, is an instrument affecting the title or possession of the real property described in Exhibit A. All the terms, covenants and conditions herein imposed shall be binding upon and inure to the benefit of the successors in interest of Developer. Upon the sale or division of the property described in Exhibit A, the terms of this agreement shall apply separately to each parcel and the Developer of each parcel shall succeed to the obligations imposed on Developer by this agreement. -2- SECTION 8 That the following General Stipulations and the attached stipulations shall be completed subject to the approval of the Director of Public Works. 1. Locate and properly dispose of any wells, septic tanks and underground fuel storage facilites. NOTE: The capping of any well will require inspection by the Santa Clara Valley Water District. 2. Schedule the construction of improvements along existing public roads so that the work affecting vehicular traffic is completed with a minimum interruption to traffic. 3. All work within the public right —of —way shall be subject to the approval of the City Engineer. 4. Before construction utilizing combustible materials may proceed, an all weather access must be provided to within 150 feet of the building site; and at least one in service fire hydrant must be available within 500 feet of each portion of the site wherein this construction is to take place. Location of the fire hydrants will be determined by the Fire Chief. gRrTTnN 9 That the attached Development.Cost Schedule enumerates all fees and their extentions. TOTAL AMOUNT DUE CITY q 65,819.96 IN WITNESS WHEREOF, said parties have caused these presents to be executed the date and year first above written. ;, ATTES City; Clerk FORM APPROVED: r 'City Attorney BY d ✓������ BY DATE 7-31- 9 0 NOTE: If Developer is a corporation, the complete legal name and corporate seal of the corporation and the corporate titles of the persons signing for the corporation shall appear above. agla CAT. NO. NNO0737 TO 1945 CA (8 -84) (Corporation) STATE OF CALL RN SS COUNTY Oh . l/ fore said ate, p onally appeared A. p onally known to me or proved to me on the basis r of satisfactory evidence to be the person who executed � the within instrutry� �1yt/��as���the = President, and L �( (iL Q i _ personally known to me or F proved to me on the basis of satisfactory evidence to be • the person who executed the within instrument as the Secretary of the Corporation that executed the within instrument and acknowledged to me that such corporation executed the within instru- ment pursuant to its by -laws or a resolution of its board of directors. WITNESS my ha' d and offiei seal. Signature L�:�15F,n— , -n J TICOR TITLE IVRANCE the undersigned, a Notary Public in and for (This area for official notarial seal) �i STIPULATIONS TO DEVELOPMENT AGREEMENT NO. 90 -33 1. Coordination of the construction of offsite improvements with the burial of existing overhead utilities on the Rosanna Street and Church Street frontage is required. Developer has opted to pay a utility undergrounding shared cost fee ($107 x 300 /F.F.) for the Third Street frontage of this property. 2. All construction around and near the area of the existing six specimen oak trees shall strictly comply with the recommendations report provided by Harrison's Tree Service, Inc., dated June 21, 1990, and incorporated into sheet C -3 of the improvements plans, tract 8361. 3. Developer shall at this time participate with the City in the cost of a proposed 18 inch RCP storm drain in Third Street. The cost is based on current City reimbursement fees for 1/2 pipe x 375 L.F., center line of Rosanna Street to Center line of Church Street. Location of Property_ Assessor's Parcel No. Name of Applicant Address Type of Development P Area 2.32 CITY OF GILROY No. 90 -33 DEVELOPMENT COST SCHEDULE Date 6/27/90 Initialed LP SW Third & Church to Rosanna St., Tract 8361 799 -04 -046 Gilroy -Del Monte Properties, Inc. 8339 Church St., Suite 209, Gilroy, CA roposed PUD Storm Drain Area _Street Frontage Special Public works Services Engineering Map Check for 24 lots Final Maps $333.00 + $44.40/lot Parcel Maps $416.25 + $34.41/lot 100 - 2600 -3- 600400 $ 1,561.72 (1,561.72 pd) $ 1,242.09 Miscellaneous Engineering Services $ 182.04 4 hours x $45.51/hr Public Works Microfilming (Maps and Plans) $ 137.59 1 - 6 sheets $117.59 + $5.00 /sheet 7 -12 sheets $150.26 + $5.00 /sheet 13 -18 sheets $182.93 + $5.00 /sheet 4 number of sheets Wood Pole Mounted Electrolier FF @ $8.58/FF Engineering Plan Check and inspection Cost of Public Improvements $ 0.00 100 - 2600 -3- 600412 $19,072.41 (19,072.41 pd) $ 214,823.40 10% of first $100,000 = 10,000.00 8% of $100,000 - $200,000 = 8,000.00 7% of over $200,000 = 1,037.64 (Subject to change based on actual cost.) Fire Hydrant Location Fee $ 34. $34.77 for the first 5 hydrants +$ 3.48 for each additional hydrant L ' .- Storm Development Fee Area "A" $2,016.07 /Acre Area "A -1" $4,018.85 /Acre Area "B" $1,888.45/Acre Area "C" $3,216.01 /Acre Area "D" $1,994.71 /Acre Area "E" $1,502.76 /Acre Area "F" $2,775.22/Acre Area "Q" $2,523.14/Acre Area "R" $1,262.00 /Acre 2.32 Acres @ 2,523.14 /Acre Front Foot Charges water - 8 inch diameter FF @$ FF Sewer - inch diameter FF @$ FF Street Improvements Pavement SF @ $ /SF = $ Curb & gutter FF @ $12.36/FF = $ Sidewalk SF @ $ 3.81 /SF = $ Gal. Pole Electrolier & Conduit FF @ $ 8.58/FF = $ 220 - 2640 -3- 680200 220 - 2640 -3- 680201 $ 221 - 2641 -3- 680200 $ 222 - 2642 -3- 680200 $ Fire Hydrant Resident FF @ $ 2.83/FF = $ Comm & Ind. FF @ $ 3.78/FF = $ Storm Drain - 18 inch diameter 375 18.42 /FF Utility Underground Fees 300 FF @ 107.00 /FF (300) (139.00) 223 - 2643 -3- 680200 224 - 2644 -3- 680200 $ 225 - 2645 -3- 680200 $ 226- 2646 -3- 680200 $ 5,853.68 (5,853.68pd) 227 - 2648 -3- 680200 $ 230 - 2636 -3- 680400 $ 0.00 230 - 2636 -3- 680500 $ 0.00 230 - 2636 -3- 680600 $ 0.00 230 - 2636 -3- 680700 $ 6,907.50 (0.00 pd) 231 - 2600 -3- 680300 $32,100.00 ** (41,700.00 pd) L r t, Sewer Development Fee 705- 2662 -3- 671000 $ 0.00 1 Units @ $1,308.00 /Unit (Res) Gals. @ $547.00/100 GPD (Comm /Ind) Water Development Fee 725 - 2672 -3- 695000 $ 0.00 1 Units @ $1,075.00 /Unit (Res) Gals. @ $1,123.00/1000 GPD peak (Comm /Ind) Construction Water 720 - 0433 -3- 690000 $ 324.65 (324.65 pd) 335 FF @ $0.67 /FF + 2.32 Acres @ $43.19 /Acre Public Works Cash Bonds and Deposits 801 - 2680 -3- 680000 $322,235.10 Other $ other $ TOTAL DUE CITY PAID 6/27/90 REFUND DUE $ 65,819.96 (68,512.46) $ 2,692.50 NOTE: All deferred and /or estimated fees will be adjusted to the rates in effect at the time Building Permits are issued. * Not included in total. Accepted by: Date:- %/ -� * *New utility undergrounding fee adopted July 1990. STIPULATIONS TO DEVELOPMENT AGREEMENT NO. 90 -33 1. Coordination of the construction of offsite improvements with the burial of existing overhead utilities on the Rosanna Street and Church Street frontage is required. Developer has opted to pay a utility undergrounding shared cost fee ($107 x 300 /F.F.) for the Third Street frontage of this property. 2. All construction around and near the area of the existing six specimen oak trees shall strictly comply with the recommendations report provided by Harrison's Tree Service, Inc., dated June 21, 1990, and incorporated into sheet C -3 of the improvements plans, tract 8361. 3. Developer shall at this time participate with the City in the cost of a proposed 18 inch RCP storm drain in Third Street. The cost is based on current City reimbursement fees for 1/2 pipe x 375 L.F., center line of Rosanna Street to Center line of Church Street. Location of Property_ Assessor's Parcel No. Name of Applicant Address Type of Development P Area 2.32 CITY OF GILROY DEVELOPMENT COST SCHEDULE No. 90 -33 Date 6/27/90 Initialed LP SW Third & Church to Rosanna St., Tract 8361 799 -04 -046 Gilroy -Del Monte Properties, Inc. 8339 Church St., Suite 209, Gilroy, CA roposed PUD Storm Drain Area _Street Frontage Special Public Works Services Engineering Map Check for 24 lots Final Maps $333.00 + $44.40/lot Parcel Maps $416.25 + $34.41/lot 100 - 2600 -3- 600400 $ 1,561.72 (1,561.72 pd) $ 1,242.09 Miscellaneous Engineering Services $ 4 hours x $45.51/hr Public Works Microfilming (Maps and Plans) $ 1 - 6 sheets $117.59 + $5.00 /sheet 7 -12 sheets $150.26 + $5.00 /sheet 13 -18 sheets $182.93 + $5.00 /sheet 4 number of sheets Wood Pole Mounted Electrolier FF @ $8.58/FF Engineering Plan Check and Inspection Cost of Public Improvements 182.04 137.59 $ 0.00 100 - 2600 -3- 600412 $19,072.41 (19,072.41 pd) $ 214,823.40 10% of first $100,000 = 10,000.00 8% of $100,000 - $200,000 = 8,000.00 7% of over $200,000 - 1,037.64 (Subject to change based on actual cost.) Fire Hydrant Location Fee $ 34. $34.77 for the first 5 hydrants +$ 3.48 for each additional hydrant Storm Development Fee Area "A" $2,016.07 /Acre Area "A -1" $4,018.85 /Acre Area "8" $1,888.45 /Acre Area "C" $3,216.01 /Acre Area "D" $1,994.71 /Acre Area "E" $1,502.76 /Acre Area "F" $2,775.22/Acre Area "Q" $2,523.14 /Acre Area "R" $1,262.00 /Acre 2.32 Acres @ 2,523.14 /Acre Front Foot Charges water - 8 inch diameter FF @$ FF Sewer - inch diameter FF @$ Street improvements Pavement Curb & gutter Sidewalk Gal. Pole Electrolier & Conduit Fire Hydrant Resident Comm & Ind. Storm Drain - 18 inch 375 18.42 Utility Underground Fees 300 FF @ 107.00 (300) (139.00) 220 - 2640 -3- 680200 $ 220 - 2640 -3- 680201 $ 221 - 2641 -3- 680200 $ 222 - 2642 -3- 680200 $ 223 - 2643 -3- 680200 $ 224 - 2644 -3- 680200 $ 225 - 2645 -3- 680200 $ 226 - 2646 -3- 680200 $ 5,853.68 (5,853.68pd) 227 - 2648 -3- 680200 $ SF @ $ /SF = $ FF @ $12.36/FF = $ SF @ $ 3.81/SF = $ 230 - 2636 -3- 680400 $ 0.00 FF @ $ 8.58/FF = $ FF @ $ 2.83/FF = $ FF @ $ 3.78/FF = $ iiameter /FF /FF 230 - 2636 -3- 680500 $ 0.00 230 - 2636 -3- 680600 $ 0.00 230 - 2636 -3- 680700 $ 6,907.50 (0.00 pd) 231 - 2600 -3- 680300 $32,100.00 ** (41,700.00 pd) P , sewer Development Fee 705 - 2662 -3- 671000 $ 0.00 1 Units @ $1,308.00 /Unit (Res) Gals. @ $547.00/100 GPD (Comm /Ind) Water Development Fee 725 - 2672 -3- 695000 $ 0.00 1 Units @ $1,075.00 /Unit (Res) Gals. @ $1,123.00/1000 GPD peak (Comm /Ind) Construction Water 720 - 0433 -3- 690000 $ 324.65 (324.65 pd) 335 FF @ $0.67 /FF + 2.32 Acres @ $43.19 /Acre Public Works Cash Bonds and Deposits 801 - 2680 -3- 680000 $322,235.10 Other $ Other $ TOTAL DUE CITY $ 65,819.96 PAID 6/27/90 (68,512.46) REFUND DUE $ 2,692.50 NOTE: All deferred and /or estimated fees will be adjusted to the rates in effect at the time Building Permits are issued. C * Not included in total. '1 Accepted by: Date: * *New utility undergrounding fee adopted July 1990.