Loading...
Obata Brothers - PDA No. 91-06k Susanne E. Steinmetz,CityClk City bf Gilroy 7351 Rosanna Street Gilroy, CA 95020 NO FEE PER GC SEC 27383 'ERTY DEVELOPMENT AGREEMENT COMMERCIAL, INDUSTRIAL, INSTITUTIONAL AGREEMENT FOR EXTENSIONS OF WATER DISTRIBUTION SYSTEMS: IMPROVEMENT OF STREETS: INSTALLATION OF SEWERS, STORM'S DRAINS AND OTHER PUBLIC WORKS FACILITIES No. 91 -06; This agreement made and entered into this st day of April , kl 19 by and between the City of Gilroy, a municipal corporation, herein called the CIO "City and obata Brothers , a real property owner CrN developer or subdivider, herein called the "Developer". WHEREAS, a final map of subdivision, record of survey or building permit (Site Clearance) application has now been submitted to the City for approval and acceptance, covering certain real estate known as and called: 18" Storm Drain Extension on Mayock Road and, WHEREAS, the Developer requires certain utilities and public works facilities in order to service the property under the minimum standards established by the City and, WHEREAS, the City, by and through its City Council, has enacted certain Codes, Ordinances and Resolutions and certain Rules and Regulations have been promulgated concerning the subject matter of this agreement and, WHEREAS, the City has certain responsibilities for maintenance and operation of such utilities and public service facilities after acceptance by City, and for providing the necessary connecting system, general plant and appurtenances, and the City is agreeing to discharge those responsibilities. NOW THEREFORE, in consideration of the "premises and in order to carry on the intent and purpose of said Codes, Ordinances, Resolutions and Regulations, it is agreed by and between the parties as follows: SECTION 1 That all Codes, Ordinances, Resolutions, Rules and Regulations and established policies of the City and the laws of the State of California concerning the subject matter of this agreement are hereby referred to and incorporated herein to the same effect as if they were set out at length herein. Said Codes, Ordinances and Regulations include, but are not limited to, the following: the Code of the City of Gilroy (including but not limited to Chapters 12A, 19, 20, 21 Res. 85 -9 and 76 -47, thereof pertaining to local improvement procedures in subdivision or development respectfully): Ordinance No. 83 -15 (Zoning Ord.): Resolution 85 -5 (1982 Uniform Building Code): Rules and Regulations. Included in the above are all of the above referred to Codes, Ordinances, Resolutions, Regulations and Substitutions thereof, as amended to the time of execution of this agreement. SECTION 2 The Developer agrees: a. To perform each and every provision required by the City to be performed by the Developer in each and every one of said Codes, Ordinances and other Regulations. b. To grant to the City without charge, free and clear of encumbrances, any and all stipulated easements and rights of way in and to his said real property necessary for the City in order that its water, electricty, and /or sewer lines in or to said real property may be extended. c. To indemnify and hold the City harmless and free from all damage and liability done to any utility, public facility or other material or installation of the City on said real estate which the Developer or any contractor or subcontractor of the Developer, or any employee thereof, shall do in grading or working upon said real estate. -1- d. To construct and improve all public works facilities and other improvements as set out herein, according to the standards heretofore established, and according to the grades, plans and specifications thereof, all as approved by the City Engineer, and shall furnish two (2) good and sufficient bonds. One shall be executed in the face amount of no less than $ 16,400.00 , and the other shall be executed in an amount no less than 50% of the above mentioned bond and shall secure payment to the contractor, his subcontractors and to persons renting equipment or furnishing labor or materials to them for the improvement hereunder, and as provided for in Section 4200 -4210 of the Government Code of the State of California, tl►e Codes, Ordinances, Resolutions, and Regulations of tl►e City, and this agreement. The faithful performance bond hereinabove provided for., shall by the terms remain in full force and effect for a period of one (1) year after the completion and acceptance of said work, to guarantee the repair and replacement of defective material and faulty workmanship. In lieu of said faithful performance bond for maintenance, the Developer may furnish a maintenance bond in the amount of 10% of the total contract price (with a minimum amount of one thousand dollars, $1,000.00) to cover the one (1) year maintenance period. e. That upon approval of the final map of the subdivision, the record of survey or the building permit covering tl►e real estate to be improved and before any work is done therein, the Developer shall pay to the City all sums, shown in Section 9 thereof to be due under the terms and provisions of this agreement. SECTION 3 That all sums shown herein to be payable by tl►e Developer to the City are due and payable to the City upon the execution of this agreement. SECTION 4 That all the provisions of this agreement and all work to be done pursuant to the terms of this agreement are to be completed within one year from and after tl►e date and year first above written. SECTION 5 That the special provisions concerning the particular real estate referred to above, being attached hereto, are hereby incorporated herein and expressly made a part of this agreement. SECTION 6 That the faithful and prompt performance by the Developer of each and every term and condition contained herein is made an express condition precedent to the duty of the City to perform any act in connection with this transaction, and the failure, neglect or refusal of tl►e Developer to so perform, or to pay any monies due hereunder when due shall release the City from any and all obligations hereunder and the City, at its election, may enforce the performance of any provision herein, or any right accruing to the City or may pursue any remedy whatsoever it may have under the laws of the State of California or the Codes, Ordinances, Resolutions of the City, in the event of any such default_ by Developer. SECTION 7 That this agreement, together with tl►e attached stipulations, is an instrument affecting the title or possession of tl►e real property described in Exhibit A. All the terms, covenants and conditions herein imposed shall be binding upon and inure to the benefit of the successors in interest of Developer. Upon the sale or division of the property described in Exhibit A, the terms of this agreement shall apply separately to each parcel and the Developer of each parcel shall succeed to the obligations imposed on Developer by this agreement. -2- 76t r-0 SECTION 8 The Developer will pay for a daily sewer and water allocation. The allocation limits are as follows: Sewer capacity not to exceed: N/A gal per day. Peak water use not to exceed: N/A gal per day. The City will attempt to provide additional capacity at the then current rate. If additional capacity is not available, the Developer agrees to maintain sewer and water use at or below the amounts purchased. The Developer shall have the option of measuring sewer effluent by: a. Installing and maintaining a sewer effluent meter. Said meter shall meet City Standards and specifications, or b. Measuring the building's water consumption through the water meter. Irrigation meters are required. PENALTY: Overuse of sewer and water allocations shall be penalized under the Rules and Regulations adopted by the Gilroy City Council. SECTION 9 That the following General Stipulations and the attached stipulations shall be completed subject to the approval of the Director of Public Works. 1. Locate and properly dispose of any wells, septic tanks and underground fuel storage facilites. NOTE: The capping of any well will require inspection by the Santa Clara Valley Water District. 2. Schedule the construction of improvements along existing public roads so that:the work affecting vehicular traffic is completed with a minimum interruption to traffic. 3. All work within the public right -of -way shall be subject to the approval of the City Engineer. 4. Before construction utilizing combustible materials may proceed, an all weather access must be provided to within 150 feet of the building site; and at least one in service fire hydrant must be available within 500 feet of each portion of the site wherein this construction is to take place. Location of the fire hydrants will be determined by the Fire Chief. RROTTnN 10 That the attached Development Cost Schedule enumerates all fees and their extentions. TOTAL AMOUNT DUE CITY -3- $ 2,217.20 L57sPIG-2029 IN WITNESS WHEREOF, said parties have caused these presents to be executed the date and year first above written. DEVELOPER BY BY - DATE NOTE: If Developer is a corporation, the complete legal name and corporate seal of the corporation and the corporate titles of the persons signing for the corporation shall appear above. CAT. NO. NNO0627 TO 1944 CA (9 -84) (Individual) W C W I W J L STATE OF C. COUNTY. OF On /—It said $tate, 4VM*tITLE INSURANCE W�. iRNIA C 1 � } SS. / icy (-j i , personally known to me or proved to m on the basis of satisfactory evidence to be n the perso whose namaS_L" r�subscr' d to//��he within instrument and acknowledged that Yex cuted the same. WITNESS my hand and official seal. Signature me, the yinder�igne�„ a Notary Public in and for NO FEE -4- 'E d ` S�J Py2.i, 199 .�FsJ (This area for official notarial seal) 10866908 1---4 _ r- co C3 .01- m — : min I„rk� A W. B. • P. b&9 S - "-6A- 252 613.26 i6 599 AC. /30 Id :L 2 I PCL.6 Wo ?es_7.4 r 281 :L.2 PCL.3 I„PCL sn�3 t.l 127 /22 q.'r — I - ,sf I 2. jSr 3 �N LE tsi.is 1.IOK•L.[it 23.4 PCLB* P"" - ;P.M.54# Y S �w PC- -p1593 1 /OS I'." 1 P. M. �i2AC. 58 IbO�+ 1Q, 603M•24' PCL.1� -'S"' 1 z.23 a` nag ?� X02 - - <°.y�S9� �� A 51 .852 .+ to Q / Zt ! ..� 1 i��i •!`�2'/ 8.62 AC. NET.0 4 LU ii1,+JE —=Y 1 5 AG i /./ 8.25 AC. NET °0 490 AC_ 437sz a� 5 AC. 1 • ; 1 //3 2` ��i% '• 3 112 «1 3.254 AC. 3.308 C. 1 so, G aC�O LoT p A C �.4 I C SBT gr! r9 -� LE 8'2 43102) GA FiL 10 ti p M. 524 P•M• 577-M-2 ' 14 VICINITY SITE MAP OBATA BROTHERS MAYOCK ROAD CITY OF GILROY DEVELOPMENT COST SCHEDULE Location of Property Ma ock Road Assessor's Parcel No L76PAE I No. 91 -06 Date 2/28/91 Initialed MF Name of Applicant Obata Bros c/o Jack Obata Address 740 Eschenburg Dr., Gilroy, CA Type of Development Proposed Storm drain extension Storm Drain Area D Area Street Frontage 305 L.F. of new storm drain Special Public Works Services Engineering Map Check for lots Final Maps $1,960.00 + $261.00 /lot Parcel Maps $416.25 + $202.00 /lot Miscellaneous Engineering Services 5 hours x $50.17 /hr 100 - 2600 -3- 600400 $ 250.85 $ 250.85 Public Works Microfilming (Maps and Plans) $ 1 - 6 sheets $129.64 + $5.51 /sheet 7 -12 sheets $165.66 + $5.51 /sheet 13 -18 sheets $201.68 + $5.51 /sheet number of sheets Engineering Plan Check and Inspection Cost of Public Improvements 10% of first $100,000 8% of $100,000 - $200,000 7% of over $200,000 Fire Hydrant Location Fee = 1,640.00 $38.33 for the first 5 hydrants +$ 3.84 for each additional hydrant 100 - 2600 -3- 600412 $ 1,640.00 $ 16,400.00 $ N/A L 6 76 Storm Development Fee FF Area "A" $2,120.18 /Acre 420 - 2600 -3- 680200 $ Area "B" $1,985.97/Acre 421 - 2600 -3- 680200 $ Area "C" $3,382.08/Acre 422 - 2600 -3- 680200 $ Area "D" $2,097.71 /Acre 423 - 2600 -3- 680200 $ N/A Area "E" $1,580.36 /Acre 424-2600-3-680200 $ Area "F" $2,918.53/Acre 425 - 2600 -3- 680200 $ Area "Q" $2,653.43/Acre 426 - 2600 -3- 680200 $ Area "R" $1,327.17 /Acre 427 - 2600 -3- 680200 $ FF @$ Acres @$ /Acre Front Foot Water inch diameter 430 - 2600 -3- 680400 $ N/A or 801 - 2680 -3- 680000 $ FF @$ FF Fire Hydrant Resident FF @ $ 2.98/FF = $ Comm & Ind. FF @ $ 3.98/FF = $ Front Foot Sewer - inch diameter 430 - 2600 -3- 680500 $ N/A or 801 - 2680 -3- 680000 $ FF @$ FF Front Foot Street Improvements 430 - 2600 -3- 680600 $ N/A or 801 - 2680 -3- 680000 $ Pavement SF @ $ /SF = $ Curb & gutter FF @ $13.00 /FF = $ Sidewalk SF @ $ 4.01 /SF = $ Gal. /Wood Pole Electrolier & Conduit FF @ $ 9.03 /FF = $ Front Foot Storm Drain - inch diameter 430 - 2600 -3- 680700 $ N/A or 801 - 2680 -3- 680000 $ FF @$ FF t W C W x W J 4 r a Utility Underground Fees @ $107.00 /LF (Single Frontage) Santa Teresa Improvements Units @ $1,540.65 /Dwelling Unit Sewer Development Fee Units @ $1,308.00 /Unit (Res) t 1 7:n tl 431- 2600 -3- 680300 $ N/A 433 - 2600 -3- 681000 $ N/A 435 - 2600 -3- 671000 $ N/A Gals. @ $547.00/100 GPD (Comm /Ind) or $1,308.00 whichever is greater Water Development Fee 436 - 2600 -3- 695000 $ N/A Units @ $1,075.00 /Unit (Res) Gals. @ $1,123.00/1000 GPD peak (Comm /Ind) Water User Fee (Construction Water) 720 - 0433 -3- 690000 $ 326.35 305 FF @ $1.07 /FF + Acres @ $69.10 /Acre Public Works Cash Bonds and Deposits 801 - 2680 -3- 680000 $24,600.00 Other $ Other $ TOTAL DUE CITY $ 2,217.20 BALANCE DUE NOTE: All deferred and /or estimated fees will be adjusted to the ra s in effect at the time Building Permits are issued. * Not included in total. X j X Accepted by: Date:J/JV/ CAT. NO. NNO0627 TO 1944 CA (9— / r� IC R 4EJr R GE (Individual) 1�" ' 6/''a �� �r� STATE OF CALIYORNIA ':OUN(TY OF /*V) On ,aid 4/ SS. , personally known to me or proved to me on the basis of satisfactory evidence to be the persork L whose name sa dAskroscr' ed to he within instrument and acknowledged that _xe- cuted WITI` Signa me, the pj�ndersigne , a o ary Public n and for 7� l !Cl ( � 6 , � ( fAA__ F� (This area for official notarial seal)