Loading...
Resolution 2019-50RESOLUTION NO.2019-50 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GILROY REVISING THE COMPREHENSIVE SCHEDULE OF FEES CHARGED BY ALL DEPARTMENTS OF THE CITY WHEREAS, State law allows cities to charge fees or charges for the filing, accepting, reviewing, approving or issuing of an application, permit or entitlement, so long as the amount of those fees and charges do not exceed the estimated cost required to provide the service for which the fees or charges are levied; and, WHEREAS, the revitalization of Gilroy's downtown will benefit the public by providing much needed economic development, and, WHEREAS, resetting certain processing fees for a temporary period of time will help to reduce barriers to new businesses and to revitalize existing businesses, and, WHEREAS, these revised processing fees include certain Community Development, Building Life Environmental Safety and Planning fees, which are set forth in Addendum A, Fee Schedule for Downtown Commercial Corridor, to the City of Gilroy Comprehensive Fee Schedule. Addendum A is attached hereto as Exhibit "A"; and WHEREAS, the Downtown Commercial Corridor is described as those properties that abut to Monterey Street beginning at the intersection of First Street and ending at the intersection of Tenth Street, as depicted in Exhibit "B' ; and WHEREAS, after review and analysis with all departments and the City Administrator, Staff has prepared and recommended revisions of the City of Gilroy Comprehensive Fee Schedule, as authorized by the various Sections of the City Code, and, WHEREAS, the public meeting for the revision of Comprehensive Fee Schedule has been publicly noticed for August 19, 2019; and, WHEREAS, this Resolution is exempt from environmental review pursuant to Section 15273 of the State Guidelines implementing the California Environmental Quality Act of 1970, as amended; and, WHEREAS, pursuant to Section 7. 4 of the Gilroy City Code provides that all fees and charges set forth shall take effect after the City Council has duly passed by Resolution the City of Gilroy' s Comprehensive Fee Schedule. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Gilroy does hereby adopt the revised processing fees set forth in Addendum A, Fee Schedule for Downtown Commercial Corridor, to the City of Gilroy Comprehensive Fee Schedule. Addendum A is attached hereto as Exhibit "A" incorporated by this reference. The revised processing fees shall apply to all appropriate departments of the City of Gilroy. 4837-4057-99950 RESOLUTION NO.2019-50 JH104706083 ADDENDUM A Fee Schedule for Downtown Commercial Corridorl Fee Schedule Items Communitv Development • General Inspections and Fees (page 11 of fee schedule) o Additional plan review required by changes, additions or revisions to approved plans o Inspections for which no fee is specifically indicated o Inspections outside of normal business hours ■ Bldg ■ Planning o Re -inspection fees assessed o CA Bldg Code Sec. 107.3.4.1 Deferred Submittal Building Life Environmental Safetv (BLES) • Miscellaneous Fees (page 12-13 of fee schedule) o Accessibility ■ Equivalent Facilitation ■ Unreasonable Hardship o Alternative Materials Review o Certificate of Occupancy o Building Code Appeal Fee o Demolition ■ Historical Building ■ Major ■ Minor o Physically Challenged Board of Appeal o Plot Plan Review/Lot Change o Temporary Certificate of Occupancy o Bond Application and Utility Bond Application Permit Fees (page 13 of fee schedule) o Building Permit o Electrical, Mechanical, and Plumbing o Grading o Commercial/Industrial Pre -roof Inspections o Re-roof—Commercial/Industrial • Fire Prevention Fees (page 29 of fee schedule) o Fire Alternates Materials Review New Fee for Downtown Commercial Corridor One fourth of Division(s) hourly rate (2 hour minimum) One fourth of Division(s) hourly rate (.5 hour minimum) $131.25 + $42.50/hour after 3 hours $143.75 + $46.25/hours after 3 hours $18.75 + One fourth of Division(s) hourly rate $18.75 + One fourth of Division(s) hourly rate (2 hour minimum) $150.00/first 3 hours + one fourth divisional hourly rate for each additional hour $150.00/first 3 hours + one fourth divisional hourly rate for each additional hour $298.75 $12.5 $545 $891.25 $262.5 $98.75 $545 $137.5 $86.25 $61.25 One fourth as set forth in Table 1-A (page 17 of fee schedule) One fourth as set forth in Tables B, C, and D (page 18-27 of fee schedule) One fourth as set forth in Tables B, C, and D (page 28 of fee schedule) $51.25 minimum fee plus $32.5.00/each add'l hour $18.25 Application Fee plus $138.75/1st 25 squares plus $37.5/Ea. additional 25 squares plus $43.75/Ea. additional inspection after 3 (1/2 hr.) inspection One fourth of division hourly rates + contractual o Fire Clearance Inspection o Fire Code Permits o Fire Code Re -Inspection o Fire Flow Per Hydrant o Permit for new Fire or Haz Mat Systems o Fire Plan Check o Special Inspection/Consultant o State Fire Marshal Required Inspection (non apartment) Hazardous Materials Fees (page 30 of fee schedule) o Facility Closure o Hazardous Material Facility Review (new facility) o Hazardous Material Plan Check/Inspection o Hazardous Material Storage Ordinance Permit Fees ■ HMSORT ■ HMSO1 ■ HMS02 ■ HMS03 ■ HMS04 ■ HMS05 o Corrosive, Toxic, & Highly Toxic Gas Fees ■ Storage below MAQ ■ Storage above MAQ ■ Use below MAQ ■ Use above MAQ o Cryogens (not corrosive, toxic or highly toxic) o Hazardous Waste Generator Fees ■ HWG 1 ■ HWG2 ■ 14WG 3 ■ HWG 4 ■ 14WG5 ■ HWG 6 ■ HWG7 ■ HWG 8 o Hazardous Waste Generator (HWGO) - Retail/Episodic o Hazardous Waste Generator RCRALQG o Tiered Permit Fees ■ Conditional Exempt (CE) ■ Conditional Authorization (CA) ■ Permit By Rule (PBR) o Flammable/Combustible Material above -ground o Spill Investigation, Response/Cleanup oversight costs/ $66.25 minimum/application + $32.50/hour for each additional review/inspection $28.75/hour with 1 hour minimum $68.75 $32.50/hour,'/z hour minimum $75.00 One fourth of fee set forth (in Building Section Table A (page 17) $100.00 + $32.50/hour after 2 hours (including resubmittals) $77.50 minimum + $31.25 for each additional hour after 2 + consultant cost $35/hour, 1 hour minimum $73.75 for first 2 hours + $31.25 for each additional hour $31.25/hour $31.25/hour $35.00/year + $17.50/year $3 5.00/year + hourly over 1 hour inspection $67.50/year + hourly over 2 hours inspection $125.00/year + hourly over 4 hours inspection $172.50/year + hourly over 51h hours inspection $205.00/year + hourly over 61/z hours inspection $31.25/annual $93.75/annual $125.00/annual $250.00/annual $67.50/annual $25.00/year $40.00/year $87.50/year $166.25/year $197.5/year $228.75/year $260.00/year $322.50/year $12.50/year $12.50/year $62.5/annual $125/annual $251.25/annual + recording fees $255.00/address One fourth of departments)/division(s) hourly rates, $125.00 min o Underground Tank ■ Installation ■ Modification (piping & repair only) ■ Operating Permit ■ Re -inspection ■ Removal ■ Testing Planning • Processing Fees and Charges (page 34 -37 of fee schedule) o Architectural and Site Review Request Commercial and Miscellaneous ■ New Construction ■ Remodeling o Conditional Use Permit Request o Continuance Request by Applicant o Administrative Time Extension o Environmental ■ Categorical Exemption ■ Initial Study Review ■ Environmental Impact Report Review Environmental Impact Report / Initial Study Contract o Historic Structure Demolition ■ Residential ■ Commercial and Miscellaneous ■ Industrial o Mills Act Request o Minor Deviation Variance Review o Planning Inspections o Planning Plan Check o Security Deposit Application Fee o Tentative Parcel Map o Tentative Tract Map Request o Tentative Tract Map Extension o Sign Permit Request o Variance Request 0 o Miscellaneous Projects $297.5.00/site up to 3 tanks. $67.50 minimum + $31.25/hour additional review/inspection $125.00/site annually, full compliance $67.5.00/each re -inspection $203.75/tank $62.50/tank $2,225.00/first 5,000 sq. ft. + $173.75/add'1 10,000 sq. ft. $1,016.25 $1,318.75 + publishing costs One Fourth Planning Division hourly rate (minimum $370.00) + publishing costs $95 + publishing costs $112.50 One fourth Department(s) / Division(s) hourly rates with $2,353.75 min. fee+ publishing and invoice costs, attorney fees, and consultant hourly rate for mitigation monitoring 15% of contract price with a $19,820.00 minimum + publishing costs Actual contract cost plus 15% contingency $227.50 $791.25 $603.75 $326.25 $308.75 One fourth divisional hourly rate, $17.25 minimum One fourth divisional hourly rate, $17.25 minimum $67.50 plus $30.00 each additional lot affected by same request $1,838.75/first 4 lots+ $36.25/add'l lot + publishing cost $3,498.75/first 12 lots + $28.75/add'1 flat land lot $125.00/each add'1 hillside lot + publishing cost $252.5 $31.50/first 25 sq. ft. plus $7.25/each add'125 sq. ft. $1,296.25 + publishing costs One fourth divisional hourly rate One fourth divisional hourly rate THEREFORE, BE IT FURTHER RESOLVED that the fees and charges contained in Exhibit "A" shall take effect August 20th, 2019. PASSED AND ADOPTED this 19'h day of August, 2019 by the following roll call vote: AYES: COUNCILMEMBERS NOES: COUNCILMEMBERS: ABSENT: COUNCILMEMBERS: BLANKLEY, BRACCO, LEROE-MUNOZ, MARQUES, TOVAR, TUCKER and VELASCO NONE NONE Roland Velasco, Mayor 48374057-9995vl JH104706083 RESOLUTION NO.2019-50 Exhibit B Map of Downtown Corridor Santa Clara County Map Legend City Labels - ' Cities [� Counties Major Roads Streets Major Roads Freeways t♦ Highways, Routes VA Expressways Arterials - Major Arterials Streets Streets Ramps/Others Street Centerlines AddressPoints Parcels Condos Parcels Boundary Footprint Image ■ Red: Band-1 ■ Green: Band-2 ■ Blue: Band_3 0 0.11 0.2 Miles 1: 9,027.98 Disclaimer The GIs data is provided "AS IS". The COUNTY makes no warranties, express or implied, including without limitation, any implied warranties of merchantability and/or fitness for a particular purpose, regarding the accuracy, completeness, value, quality, validity, merchantability, suitability, and condition, of the GIS data. Users of COUNTY's GIs data are hereby notified that current public primary information sources should be consulted for verification of the data and information contained herein. Since the GIS data is dynamic, it will by its nature, be inconsistent with the official COUNTY assessment roll file produced by the Office of the Assessor. Any use of COUNTY's GIs data without consulting current Public Records for verification is done exclusively at the risk of the party making such use I, SHAWNA FREELS, City Clerk of the City of Gilroy, do hereby certify that the attached Resolution No. 2019-50 is an original resolution, or true and correct copy of a city Resolution, duly adopted by the Council of the City of Gilroy at a regular meeting of said held on the 19th day of August, 2019, at which meeting a quorum was present. IN WITNESS WHEREOF, I have hereunto set my hand and axed the Official Seal of the City of Gilroy this 20th daf August, 2019. City Clerk of the City of Gilroy (Seal)