Resolution 2020-191
RESOLUTION NO. 2020-19
RESOLUTION NO. 2020-19
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GILROY
AMENDING THE FISCAL YEAR 2020-2021 BUDGET TO INCORPORATE
A LIST OF PROJECTS FUNDED BY SENATE BILL 1: THE ROAD
REPAIR AND ACCOUNTABILITY ACT AND TO INCREASE
APPROPRIATIONS IN THE ROAD MAINTENANCE AND
REHABILITATION FUND BY $2,510,621
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017
(Chapter 5, Statutes of 2017) was passed by the Legislature and signed into law by the Governor in
April 2017 in order to address the significant multi-modal transportation funding shortfalls
statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure
the residents of our City are aware of the projects proposed for funding in our community and
which projects have been completed each fiscal year; and
WHEREAS, the City must include a list of all projects proposed to receive funding from
the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, in the City
budget, which must include a description and the location of each proposed project, a proposed
schedule for the project’s completion, and the estimated useful life of the improvement; and
WHEREAS, the City of Gilroy received $327,760 in RMRA funding in Fiscal Year
2017-18, $996,191 in Fiscal Year 2018-19, and is estimated to receive $1,030,367 in Fiscal
Year 2019-2020, and $1,056,303 in Fiscal Year 2020-2021 from SB 1; and
WHEREAS, the City used a Pavement Management System to develop the SB 1 project
list to ensure revenues are being used on the most high-priority and cost-effective projects that
also meet the communities priorities for transportation investment; and
WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate over 1.4
million square feet of pavement, and implement the complete streets ordinance on streets in the
project and into the future; and
WHEREAS, the 2016 California Statewide Local Streets and Roads Needs Assessment
found that the City’s streets and roads are, on average, in good condition, but 15 percent of the
streets are in poor or very poor condition. This revenue will help increase the overall quality of
our road system and over the next decade will keep our streets and roads in a good condition;
and
DocuSign Envelope ID: F41BFEAF-A979-47F8-A376-E3662C381386
2
RESOLUTION NO. 2020-19
WHEREAS, without revenue from SB 1, the City’s average Pavement Condition Index,
a measure of the pavement condition, would have otherwise continued to decrease at an
increasing rate; and
WHEREAS, if the Legislature and Governor failed to act, city streets and county roads
would have continued to deteriorate, having many and varied negative impacts on our
community; and
WHEREAS, cities and counties own and operate more than 81 percent of streets and
roads in California, and from the moment we open our front door to drive to work, bike to
school, or walk to the bus station, people are dependent upon a safe, reliable local transportation
network; and
WHEREAS, modernizing the local street and road system provides well-
paying construction jobs and boosts local economies; and
WHEREAS, the local street and road system is also critical for farm to market
needs, interconnectivity, multimodal needs, and commerce; and
WHEREAS, police, fire, and emergency medical services all need safe reliable roads to
react quickly to emergency calls and a few minutes of delay can be a matter of life and death;
and
WHEREAS, maintaining and preserving the local street and road system in good
condition will reduce drive times and traffic congestion, improve bicycle safety, and make the
pedestrian experience safer and more appealing, which leads to reduced vehicle emissions
helping the State achieve its air quality and greenhouse gas emissions reductions goals; and
WHEREAS, restoring roads before they fail also reduces construction time which
results in less air pollution from heavy equipment and less water pollution from site run-off;
and
WHEREAS, the SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting-edge technology, materials and practices, will have significant
positive co-benefits statewide.
NOW, THEREFORE IT IS HEREBY RESOLVED by the City Council of the City
of Gilroy as follows:
1. The foregoing recitals are true and correct.
2. The Capital Improvement Plan (CIP) for fiscal year 2020-2021 is
amended to incorporate the following list of projects planned to be
funded with Road Maintenance and Rehabilitation Account revenues:
DocuSign Envelope ID: F41BFEAF-A979-47F8-A376-E3662C381386
RESOLUTION NO. 2020-19
Each of the following street segments would receive a pavement treatment
consisting of removal and replacement of failed areas (known as “digouts”) and
a microsurfacing and/or type II Slurry. This treatment is expected to extend the
useful life of each street segment by 5-7 years. The projects are expected to be
completed by the end of Fiscal Year 2020-2021.
Road Name Beg Location End Location Classification Section
Area(Sf)
Farrell Ave Wren Ave Monterey Rd Arterial 83,506
Eighth St Princevalle St Church St Collector 70,528
Martin St Monterey Rd Chestnut St Collector 47,949
Murray Ave I.O.O.F. Ave Leavesley Rd Collector 114,600
San Ysidro Ave 2250 Ft N Of
Leavesley Rd Las Animas Ave Collector 61,245
Monterey Road Cohansey Ave. Leavesley Rd. Arterial 448,000
Camino Arroyo Venture Wy. Pacheco Pass Hwy Collector 176,300
Camino Arroyo Pacheco Pass Hwy Gilman Rd. Collector 206,800
Chestnut St. 10th St. 450 North of Martin
St. Collector 194,100
3. Appropriations for Fiscal Year 2020-21 are hereby increased in the Road Maintenance
and Rehabilitation Fund, Fund 215, by $2,510,621.
PASSED AND ADOPTED this 6th day of April 2020, by the following roll call vote:
AYES: COUNCILMEMBERS: BLANKLEY, BRACCO, LEROE-MUÑOZ,
MARQUES, TOVAR, TUCKER and VELASCO
NOES: COUNCILMEMBERS: NONE
ABSENT: COUNCILMEMBERS: NONE
APPROVED:
_______________________________
Roland Velasco, Mayor
ATTEST:
_______________________________
Shawna Freels, City Clerk
DocuSign Envelope ID: F41BFEAF-A979-47F8-A376-E3662C381386
RESOLUTION NO. 2020-19
I, SHAWNA FREELS, City Clerk of the City of Gilroy, do hereby certify that the attached
Resolution No. 2020-19 is an original resolution, or true and correct copy of a City Resolution,
duly adopted by the Council of the City of Gilroy at a regular meeting of said held on Council held
on the 6th day of April, 2020, at which meeting a quorum was present.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the Official Seal of the
City of Gilroy this 8th day of April, 2020.
____________________________________
Shawna Freels, MMC
City Clerk of the City of Gilroy
(Seal)
DocuSign Envelope ID: F41BFEAF-A979-47F8-A376-E3662C381386
Certificate Of Completion
Envelope Id: F41BFEAFA97947F8A376E3662C381386 Status: Completed
Subject: You have a pending request to eSign a document
Source Envelope:
Document Pages: 4 Signatures: 3 Envelope Originator:
Certificate Pages: 2 Initials: 0 Shawna Freels
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
2633 Camino Ramon Ste 500
San Ramon, CA 94583
shawna.freels@ci.gilroy.ca.us
IP Address: 207.7.154.9
Record Tracking
Status: Original
4/8/2020 12:38:56 PM
Holder: Shawna Freels
shawna.freels@ci.gilroy.ca.us
Location: DocuSign
Signer Events Signature Timestamp
Roland Velasco
roland.velasco@cityofgilroy.org
eSign
Security Level: Email, Account Authentication
(None)Signature Adoption: Drawn on Device
Using IP Address: 71.80.234.156
Signed using mobile
Sent: 4/9/2020 11:17:01 AM
Viewed: 4/9/2020 11:21:35 AM
Signed: 4/9/2020 11:22:55 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Shawna Freels
shawna.freels@ci.gilroy.ca.us
Mrs.
Accela, Inc.
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 141.126.124.171
Sent: 4/9/2020 11:22:56 AM
Viewed: 4/9/2020 12:21:10 PM
Signed: 4/9/2020 12:21:22 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 4/9/2020 11:22:56 AM
Certified Delivered Security Checked 4/9/2020 12:21:10 PM
Signing Complete Security Checked 4/9/2020 12:21:22 PM
Envelope Summary Events Status Timestamps
Completed Security Checked 4/9/2020 12:21:22 PM
Payment Events Status Timestamps