Loading...
HomeMy WebLinkAboutAgreement - HydroScience Engineers, Inc. - Amendment 1 Contract No. 24UT2045-1 - Expires 2028-11-30City of Gilroy Agreement/Contract Tracking Today’s Date: April 1, 2026 Your Name: Yeni Martinez Contract Type: Services over $5k - Contractor - Design Professional Phone Number: 408-846-0221 Contract Effective Date: (Date contract goes into effect) 4/8/2026 Contract Expiration Date: 11/30/2028 Contractor / Consultant Name: (if an individual’s name, format as last name, first name) HydroScience Engineers Inc Contract Subject: (no more than 100 characters) Amendment to Trunk Line Repairs to add additional services. Contract Amount: (Total Amount of contract. If no amount, leave blank) $727,642.00 By submitting this form, I confirm this information is complete: ➢ Date of Contract ➢ Contractor/Consultant name and complete address ➢ Terms of the agreement (start date, completion date or “until project completion”, cap of compensation to be paid) ➢ Scope of Services, Terms of Payment, Milestone Schedule and exhibit(s) attached ➢ Taxpayer ID or Social Security # and Contractors License # if applicable ➢ Contractor/Consultant signer’s name and title ➢ City Administrator or Department Head Name, City Clerk (Attest), City Attorney (Approved as to Form) Routing Steps for Electronic Signature Department Head – Karl Bjarke Risk Manager – LeeAnn McPhillips City Attorney Approval As to Form – Andy Faber City Administrator (if needed) – Matt Morley City Clerk Attestation – Kim Mancera Docusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 TYPE OF PROCURMENT DOLLAR THRESHOLD / SIGNING AUTHORITY STAFF LEVEL DEPARTMENT HEAD CITY ADMINISTRATOR COUNCIL APPROVAL $0-$999.99 $1,000-$49,999.99 $50,000-$99,999.99 $100,000-Above EQUIPMENT /SUPPLIES/ MATERIALS Furniture, hoses, parts, pipe manholes, office supplies, fuel, tools, PPE items, etc… • Vendor selection at discretion of staff Payment Method Purchase Card or Payment Request (if vendor does not accept credit cards) • Informal bid/quotation – 3 quotes (verbal or written) • Purchasing Summary form w/ Purchasing Approval • Purchase Requisition Payment Method Purchase Order* • Informal bid/quotation – 3 written quotes • Purchasing Summary form w/ City Administrator Approval • Purchase Requisition Payment Method Purchase Order • Formal Bid • Advertisement • Council Approval • Purchase Requisition signed by City Administrator Payment Method Purchase Order GENERAL SERVICES Janitorial, landscape maintenance, equipment repair, installation, graffiti abatement, service inspections, uniform cleaning, etc… • Vendor selection at discretion of staff • May require insurance documents depending on scope/ nature of work Payment Method Purchase Card (if incorporated) Signed Payment Request (if sole proprietor or partner) • Informal bid/quotation – 3 quotes (verbal or written) • Purchasing Summary form w/ Department Head Approval • Standard Agreement • Purchase Requisition Payment Method Purchase Order* • Informal Bid/RFP quotation – 3 written quotes • Purchasing Summary form w/ City Administrator Approval • Standard Agreement • Purchase Requisition Payment Method Purchase Order • Formal Bid/RFP/RFQ • Advertisement • Council Approval • Standard Agreement • Purchase Requisition Payment Method Purchase Order PROFESSIONAL SERVICES Consultants, architects, designers, auditors, etc... • Vendor selection at the discretion of staff • Purchase Summary Form w/ Purchasing Approval • Standard Agreement signed by Department Head • Purchase Requisition Payment Method Purchase Order • RFP/RFQ to at least 3 consultants • Purchase Summary Form w/ Department Head Approval • Standard Agreement • Purchase Requisition Payment Method Purchase Order • RFP/RFQ to a list of consultants • Evaluation Spreadsheet w/ City Administrator Approval • Standard Agreement • Purchase Requisition Payment Method Purchase Order • Formal RFP/RFQ • Advertisement • Council Approval • Standard Agreement signed by City Administrator • Purchase Requisition Payment Method Purchase Order Docusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 -1- FIRST AMENDMENT TO AGREEMENT WITH HYDROSCIENCE ENGINEERS, INC. FOR DESIGN OF JOINT MORGAN HILL–GILROY SEWER TRUNK LINE REPAIRS NO. 24- RFP-PW-499 This the First Amendment to the Agreement for Services (“First Amendment”) is made and entered into as of April 8, 2026 (“Effective Date”), by and between the City of Gilroy, a municipal corporation (“City”), and HydroScience Engineers (“Consultant”). WHEREAS, the City and Consultant entered into that certain agreement entitled “Agreement For Services” for Joint Morgan Hill–Gilroy Sewer Trunk Line Repairs Project No. 24-RFP-PW-499, dated September 16, 2024, hereinafter referred to as “Original Agreement”; and WHEREAS, City and Consultant have determined it is in their mutual interest to amend certain terms of the Original Agreement. NOW, THEREFORE, for valuable consideration, the parties hereto agree as follows: 1. Article 1 (Term of Agreement) of the Original Agreement shall be amended to read as follows: This Agreement will become effective on April 8, 2026 and will continue in effect through November 30, 2028 unless terminated in accordance with the provisions of Article 7 of this Agreement. Any lapse in insurance coverage as required under Article 5, Section D of this Agreement shall terminate this Agreement regardless of any provision stated herein. 2. Article 4 Compensation of the Original Agreement shall be further amended to read as follows: A. Consideration In consideration for the additional services performed by CONSULTANT, CITY agrees to pay CONSULTANT the amount set forth in Exhibit “D” as amended herein. The total compensation of the original amount shall increase by $54,297 for a total amount not to exceed $727,645. 3. Exhibit “D” (Payment Schedule) of the Original Agreement shall be amended as attached herein. 4. Consultant acknowledges and agrees that: x No additional out of scope work shall be performed without prior written authorization from the City. x No meetings and other work prior to this amendment, including the March 19, 2026 meeting, will be billed as extra work. x At each 65%, 95%, final bid ready submittal, final conformed plans and specification, and the final record drawings, Consultant will provide: PDF plans, AutoCAD e-transmit package, and Word versions of specifications.        Docusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 -2- 5. Except as expressly modified herein, all of the provisions of the Original Agreement and subsequent amendments shall remain in full force and effect. In the case of any inconsistencies between the Original Agreement, any subsequent amendments, and this Amendment, the terms of this Amendment shall control. 6. This Amendment may be executed in counterparts, each of which shall be deemed an original, but all of which together shall constitute one and the same instrument. IN WITNESS WHEREOF, the parties have caused this Amendment to be executed as of the dates set forth besides their signatures below. [name] City Attorney - Andy Faber City Clerk - Kim Mancera %LOO6OHQWHU 3ULQFLSDO(QJLQHHU        Docusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 4/13/2026 Jo i n t M o r g a n H i l l - G i l r o y S e w e r T r u n k L i n e R e p a i r s P r o j e c t N o . 2 4 - R F P - P W - 4 9 9 Up d a t e d P r o j e c t B u d g e t 3 / 2 3 / 2 0 2 6 Ta s k De s c r i p t i o n Eric Petrel Peer Review Staff Engineer CAD Manager Labor Hours Fee HMH Surveying Direct Costs Total Fee Phase Totals Ra t e C l a s s i f i c a t i o n P r i n c E - I X E - V E - V E - I I I E - I C A D - M Ho u r l y b i l l i n g r a t e $3 0 5 $ 2 9 2 $ 2 4 2 $ 2 4 2 $ 2 1 5 $ 1 8 7 $ 1 6 0 Pr o j e c t M a n a g e m e n t 6 2 4 8 38 $ 9 , 5 7 4 $ 0 $ 9 , 5 7 4 Me e t i n g s a n d W o r k s h o p s 2 0 2 0 8 48 $ 1 1 , 4 0 0 $ 0 $ 1 1 , 4 0 0 10 3 2 42 $ 1 0 , 7 9 4 $ 0 $ 1 0 , 7 9 4 4 2 0 24 $ 6 , 0 6 0 $ 0 $ 6 , 0 6 0 Si t e W a l k / R e c o r d s R e v i e w 8 1 6 8 32 $ 7 , 3 0 4 $3 0 0 $3 3 0 $ 7 , 6 3 4 To p o g r a p h i c S u r v e y 1 2 4 7 $ 1 , 3 6 6 $7 1 , 2 0 0 $7 8 , 3 2 0 $ 7 9 , 6 8 6 Ut i l i t y C o o r d i n a t i o n 2 6 2 0 6 34 $ 6 , 6 3 6 $ 0 $ 6 , 6 3 6 CE Q A N O E 1 1 0 11 $ 2 , 6 6 2 $ 0 $ 2 , 6 6 2 Te c h n i c a l E v a l u a t i o n s 1 6 1 6 3 5 4 3 0 10 1 $ 2 3 , 4 8 4 $ 0 $ 2 3 , 4 8 4 St a t e h o l d e r C o o r d i o n a t i o n 8 2 4 1 6 3 0 78 $ 1 6 , 7 9 4 $ 0 $ 1 6 , 7 9 4 5 2 7 1 1 43 $ 1 0 , 4 1 4 $1 1 , 4 0 2 $1 2 , 5 4 2 $ 2 2 , 9 5 6 14 2 0 2 0 54 $ 1 2 , 5 2 8 $ 0 $ 1 2 , 5 2 8 5 4 0 2 0 2 0 85 $ 2 0 , 3 4 5 $ 0 $ 2 0 , 3 4 5 35 % S u b m i t t a l 6 3 5 9 0 8 0 4 0 25 1 $ 5 3 , 3 6 2 $ 0 $ 5 3 , 3 6 2 65 % S u b m i t t a l 1 2 6 5 1 1 0 1 0 1 0 0 2 4 32 1 $ 7 0 , 5 4 4 $ 0 $ 7 0 , 5 4 4 95 % S u b m i t t a l 1 0 3 5 9 0 3 6 1 2 5 2 4 32 0 $ 6 8 , 1 2 5 $ 0 $ 6 8 , 1 2 5 Bi d P a c k a g e 2 2 5 4 0 1 0 3 0 8 11 5 $ 2 5 , 3 5 4 $2 5 0 $2 7 5 $ 2 5 , 6 2 9 10 1 0 20 $ 4 , 5 7 0 $ 0 $ 4 , 5 7 0 14 . 7 14 . 7 0 6 $ 2 , 7 5 0 -$ 2 , 5 0 0 -$ 2 , 7 5 0 $ 0 En g i n e e r i n g S e r v i c e s D u r i n g B i d d i n g 1 6 2 0 1 5 5 56 $ 1 2 , 3 1 7 $ 0 $ 1 2 , 3 1 7 In i t i a l / C o n s t r u c t i o n M e e t i n g s 2 4 2 4 48 $ 1 1 , 6 1 6 $5 0 0 $5 5 0 $ 1 2 , 1 6 6 RF I s 1 4 2 6 4 0 80 $ 1 7 , 1 6 0 $ 0 $ 1 7 , 1 6 0 Su b m i t t a l s 1 0 2 5 3 5 5 0 12 0 $ 2 6 , 7 9 0 $ 0 $ 2 6 , 7 9 0 Ch a n g e O r d e r s 4 1 2 6 22 $ 4 , 9 9 4 $ 0 $ 4 , 9 9 4 Pu n c h L i s t / C l o s e O u t 4 1 2 8 24 $ 5 , 3 6 8 $3 0 0 $3 3 0 $ 5 , 6 9 8 Re c o r d D r a w i n g s 4 8 1 6 28 $ 5 , 4 6 4 $2 5 0 $2 7 5 $ 5 , 7 3 9 Pr o j e c t C o o r d i n a t i o n / G e n e r a l A s s i s t a n c e 1 0 2 2 6 1 5 53 $ 1 1 , 8 3 9 $ 0 $ 1 1 , 8 3 9 At t a c h m e n t 1 : A m e n d e d E x h i b i t D - P a y m e n t S c h e d u l e        Docusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 -1- 4845-6718-3385v1 LAC\04706083 AGREEMENT FOR SERVICES (For design professional contracts over $5,000) This AGREEMENT made this 16th day of September, 2024 between: CITY: City of Gilroy, having a principal place of business at 7351 Rosanna Street, Gilroy, California and CONSULTANT: HydroScience Engineers, Inc., having a principal place of business at 10569 Old Placerville Rd, Sacramento, CA 95827. ARTICLE 1. TERM OF AGREEMENT This Agreement will become effective on October 1, 2024 and will continue in effect through December 31, 2027 unless terminated in accordance with the provisions of Article 7 of this Agreement. ARTICLE 2. INDEPENDENT CONTRACTOR STATUS It is the express intention of the parties that CONSULTANT is an independent contractor and not an employee, agent, joint venturer or partner of CITY. Nothing in this Agreement shall be interpreted or construed as creating or establishing the relationship of employer and employee between CITY and CONSULTANT or any employee or agent of CONSULTANT. Both parties acknowledge that CONSULTANT is not an employee for state or federal tax purposes. CONSULTANT shall not be entitled to any of the rights or benefits afforded to CITY’S employees, including, without limitation, disability or unemployment insurance, workers’ compensation, medical insurance, sick leave, retirement benefits or any other employment benefits. CONSULTANT shall retain the right to perform services for others during the term of this Agreement. ARTICLE 3. SERVICES TO BE PERFORMED BY CONSULTANT A. Specific Services CONSULTANT agrees to: perform the services as outlined in Exhibit “A” (“Specific Provisions”) and Exhibit “B” (“Scope of Services”) within the time periods described in and Exhibit “C” (“Milestone Schedule”). B. Method of Performing Services CONSULTANT shall determine the method, details and means of performing the above-described services. CITY shall have no right to, and shall not, control the manner or determine the method of accomplishing CONSULTANT’S services. Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 -2- 4845-6718-3385v1 LAC\04706083 C. Employment of Assistants CONSULTANT may, at the CONSULTANT’S own expense, employ such assistants as CONSULTANT deems necessary to perform the services required of CONSULTANT by this Agreement, subject to the prohibition against assignment and subcontracting contained in Article 5 below. CITY may not control, direct, or supervise CONSULTANT’S assistants in the performance of those services. CONSULTANT assumes full and sole responsibility for the payment of all compensation and expenses of these assistants and for all state and federal income tax, unemployment insurance, Social Security, disability insurance and other applicable withholding. D. Place of Work CONSULTANT shall perform the services required by this Agreement at any place or location and at such times as CONSULTANT shall determine is necessary to properly and timely perform CONSULTANT’S services. ARTICLE 4. COMPENSATION A. Consideration In consideration for the services to be performed by CONSULTANT, CITY agrees to pay CONSULTANT the amounts set forth in Exhibit “D”. In no event however shall the total compensation paid to CONSULTANT exceed $673,348.00. B. Invoices CONSULTANT shall submit invoices for all services rendered. C. Payment Payment shall be due according to the payment schedule set forth in Exhibit “D”. No payment will be made unless CONSULTANT has first provided City with a written receipt of invoice describing the work performed and any approved direct expenses (as provided for in Exhibit “A”, Section IV) incurred during the preceding period. If CITY objects to all or any portion of any invoice, CITY shall notify CONSULTANT of the objection within thirty (30) days from receipt of the invoice, give reasons for the objection, and pay that portion of the invoice not in dispute. It shall not constitute a default or breach of this Agreement for CITY not to pay any invoiced amounts to which it has objected until the objection has been resolved by mutual agreement of the parties. D. Expenses CONSULTANT shall be responsible for all costs and expenses incident to the performance of services for CITY, including but not limited to, all costs of equipment used or provided by CONSULTANT, all fees, fines, licenses, bonds or taxes required of or imposed against CONSULTANT and all other of CONSULTANT’S costs of doing business. CITY shall not be responsible for any expenses incurred by CONSULTANT in performing services for CITY, except for those expenses constituting “direct expenses” referenced on Exhibit “A.” Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 -3- 4845-6718-3385v1 LAC\04706083 ARTICLE 5. OBLIGATIONS OF CONSULTANT A. Tools and Instrumentalities CONSULTANT shall supply all tools and instrumentalities required to perform the services under this Agreement at its sole cost and expense. CONSULTANT is not required to purchase or rent any tools, equipment or services from CITY. B. Workers’ Compensation CONSULTANT agrees to provide workers’ compensation insurance for CONSULTANT’S employees and agents and agrees to hold harmless, defend with counsel acceptable to CITY and indemnify CITY, its officers, representatives, agents and employees from and against any and all claims, suits, damages, costs, fees, demands, causes of action, losses, liabilities and expenses, including without limitation attorneys’ fees, arising out of any injury, disability, or death of any of CONSULTANT’S employees. C. Indemnification of Liability, Duty to Defend 1. As to professional liability, to the fullest extent permitted by law, CONSULTANT shall defend, through counsel approved by CITY (which approval shall not be unreasonably withheld), indemnify and hold harmless CITY, its officers, representatives, agents and employees against any and all suits, damages, costs, fees, claims, demands, causes of action, losses, liabilities and expenses, including without limitation attorneys’ fees, to the extent arising or resulting directly or indirectly from any willful or negligent acts, errors or omissions of CONSULTANT or CONSULTANT’S assistants, employees or agents, including all claims relating to the injury or death of any person or damage to any property. 2. As to other liability, to the fullest extent permitted by law, CONSULTANT shall defend, through counsel approved by CITY (which approval shall not be unreasonably withheld), indemnify and hold harmless CITY, its officers, representatives, agents and employees against any and all suits, damages, costs, fees, claims, demands, causes of action, losses, liabilities and expenses, including without limitation attorneys’ fees, arising or resulting directly or indirectly from any act or omission of CONSULTANT or CONSULTANT’S assistants, employees or agents, including all claims relating to the injury or death of any person or damage to any property. D. Insurance In addition to any other obligations under this Agreement, CONSULTANT shall, at no cost to CITY, obtain and maintain throughout the term of this Agreement: (a) Commercial Liability Insurance on a per occurrence basis, including coverage for owned and non-owned automobiles, with a minimum combined single limit coverage of $1,000,000 per occurrence for all damages due to bodily injury, sickness or disease, or death to any person, and damage to property, including the loss of use thereof; and (b) Professional Liability Insurance (Errors & Omissions) with a minimum coverage of $1,000,000 per occurrence or claim, and $2,000,000 aggregate; provided however, Professional Liability Insurance written on a claims made basis must comply with the requirements set forth below. Professional Liability Insurance written on a claims made basis (including without Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 -4- 4845-6718-3385v1 LAC\04706083 limitation the initial policy obtained and all subsequent policies purchased as renewals or replacements) must show the retroactive date, and the retroactive date must be before the earlier of the effective date of the contract or the beginning of the contract work. Claims made Professional Liability Insurance must be maintained, and written evidence of insurance must be provided, for at least five (5) years after the completion of the contract work. If claims made coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the earlier of the effective date of the contract or the beginning of the contract work, CONSULTANT must purchase so called “extended reporting” or “tail” coverage for a minimum of five (5) years after completion of work, which must also show a retroactive date that is before the earlier of the effective date of the contract or the beginning of the contract work. As a condition precedent to CITY’S obligations under this Agreement, CONSULTANT shall furnish written evidence of such coverage (naming CITY, its officers and employees as additional insureds on the Comprehensive Liability insurance policy referred to in (a) immediately above via a specific endorsement) and requiring thirty (30) days written notice of policy lapse or cancellation, or of a material change in policy terms. E. Assignment Notwithstanding any other provision of this Agreement, neither this Agreement nor any duties or obligations of CONSULTANT under this Agreement may be assigned or subcontracted by CONSULTANT without the prior written consent of CITY, which CITY may withhold in its sole and absolute discretion. F. State and Federal Taxes As CONSULTANT is not CITY’S employee, CONSULTANT shall be responsible for paying all required state and federal taxes. Without limiting the foregoing, CONSULTANT acknowledges and agrees that:  CITY will not withhold FICA (Social Security) from CONSULTANT’S payments;  CITY will not make state or federal unemployment insurance contributions on CONSULTANT’S behalf;  CITY will not withhold state or federal income tax from payment to CONSULTANT;  CITY will not make disability insurance contributions on behalf of CONSULTANT;  CITY will not obtain workers’ compensation insurance on behalf of CONSULTANT. Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 G. Prevailing Wage CONSULTANT agrees and acknowledges that it is its obligation to determine whether, and to what extent, any work performed is or any workers employed relative to any construction to be performed under this Agreement are subject to any Codes, Ordinances, Resolutions, Rules and other Regulations and established policies of CITY and the laws of the State of California and the United States, including, without limitation, the California Labor Code and Public Contract Code relating to public contracting and prevailing wage requirements (“Prevailing Wage Laws”). To the extent Prevailing Wage Laws apply to work performed or workers employed for the purpose of performing work under this Agreement, CONSULTANT shall fully comply with and ensure that all workers and/or subcontractors are informed of and comply with all Prevailing Wage Laws and specifically any applicable requirement of California Labor Code Sections 1720 et seq. and 1770 et seq. and the regulations thereunder, which require the payment of prevailing wage rates based on labor classification, as determined by the State of California, and the performance of other requirements on certain “public works” or “maintenance” projects. It is the duty of CONTRACTOR to post a copy of applicable prevailing wages at the job site. Prevailing wage information may be obtained at www.dir.ca.gov. No CONSULTANT or Subconsultant may be awarded an Agreement containing Public work elements unless registered with the Department of Industrial Relations (DIR) pursuant to Labor Code 1725.5. Registration with DIR must be maintained throughout the entire term of this AGREEMENT, including any subsequent amendments. -5- 4845-6718-3385v1 LAC\04706083 Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 -6- 4845-6718-3385v1 LAC\04706083 ARTICLE 6. OBLIGATIONS OF CITY A.Cooperation of City CITY agrees to respond to all reasonable requests of CONSULTANT and provide access, at reasonable times following receipt by CITY of reasonable notice, to all documents reasonably necessary to the performance of CONSULTANT’S duties under this Agreement. B.Assignment CITY may assign this Agreement or any duties or obligations thereunder to a successor governmental entity without the consent of CONSULTANT. Such assignment shall not release CONSULTANT from any of CONSULTANT’S duties or obligations under this Agreement. ARTICLE 7. TERMINATION OF AGREEMENT A.Sale of Consultant’s Business/ Death of Consultant. CONSULTANT shall notify CITY of the proposed sale of CONSULTANT’s business no later than thirty (30) days prior to any such sale. CITY shall have the option of terminating this Agreement within thirty (30) days after receiving such notice of sale. Any such CITY termination pursuant to this Article 7.A shall be in writing and sent to the address for notices to CONSULTANT set forth in Exhibit A, Subsection V.I., no later than thirty (30) days after CITY’ receipt of such notice of sale. If CONSULTANT is an individual, this Agreement shall be deemed automatically terminated upon death of CONSULTANT. B.Termination by City for Default of Consultant Should CONSULTANT default in the performance of this Agreement or materially breach any of its provisions, CITY, at CITY’S option, may terminate this Agreement by giving written notification to CONSULTANT. For the purposes of this section, material breach of this Agreement shall include, but not be limited to the following: 1.CONSULTANT’S failure to professionally and/or timely perform any of the services contemplated by this Agreement. 2.CONSULTANT’S breach of any of its representations, warranties or covenants contained in this Agreement. CONSULTANT shall be entitled to payment only for work satisfactorily completed through the date of the termination notice, as reasonably determined by CITY, provided that such payment shall not exceed the amounts set forth in this Agreement for the tasks described on Exhibit C” which have been fully, competently and timely rendered by CONSULTANT. Notwithstanding the foregoing, if CITY terminates this Agreement due to CONSULTANT’S default in the performance of this Agreement or material breach by CONSULTANT of any of its provisions, then in addition to any other rights and remedies CITY may have, CONSULTANT shall reimburse Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 -7- 4845-6718-3385v1 LAC\04706083 CITY, within ten (10) days after demand, for any and all costs and expenses incurred by CITY in order to complete the tasks constituting the scope of work as described in this Agreement, to the extent such costs and expenses exceed the amounts CITY would have been obligated to pay CONSULTANT for the performance of that task pursuant to this Agreement. C.Termination for Failure to Make Agreed-Upon Payments Should CITY fail to pay CONSULTANT all or any part of the compensation set forth in Article 4 of this Agreement on the date due, then if and only if such nonpayment constitutes a default under this Agreement, CONSULTANT, at the CONSULTANT’S option, may terminate this Agreement if such default is not remedied by CITY within thirty (30) days after demand for such payment is given by CONSULTANT to CITY. D.Transition after Termination Upon termination, CONSULTANT shall immediately stop work, unless cessation could potentially cause any damage or harm to person or property, in which case CONSULTANT shall cease such work as soon as it is safe to do so. CONSULTANT shall incur no further expenses in connection with this Agreement. CONSULTANT shall promptly deliver to CITY all work done toward completion of the services required hereunder, and shall act in such a manner as to facilitate any the assumption of CONSULTANT’s duties by any new consultant hired by the CITY to complete such services. ARTICLE 8. GENERAL PROVISIONS A.Amendment & Modification No amendments, modifications, alterations or changes to the terms of this Agreement shall be effective unless and until made in a writing signed by both parties hereto. B.Americans with Disabilities Act of 1990 Throughout the term of this Agreement, the CONSULTANT shall use due professional care to comply fully with all applicable provisions of the Americans with Disabilities Act of 1990 (“the Act”) in its current form and as it may be amended from time to time. CONSULTANT shall also require such compliance of all subcontractors performing work under this Agreement, subject to the prohibition against assignment and subcontracting contained in Article 5 above. The CONSULTANT shall defend with counsel acceptable to CITY, indemnify and hold harmless the CITY OF GILROY, its officers, employees, agents and representatives from and against all suits, claims, demands, damages, costs, causes of action, losses, liabilities, expenses and fees, including without limitation attorneys’ fees, that may arise out of any violations of the Act by the CONSULTANT, its subcontractors, or the officers, employees, agents or representatives of either. C.Attorneys’ Fees If any action at law or in equity, including an action for declaratory relief, is brought to enforce or interpret the provisions of this Agreement, the prevailing party will be entitled to reasonable Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 -8- 4845-6718-3385v1 LAC\04706083 attorneys’ fees, which may be set by the court in the same action or in a separate action brought for that purpose, in addition to any other relief to which that party may be entitled. D.Captions The captions and headings of the various sections, paragraphs and subparagraphs of the Agreement are for convenience only and shall not be considered nor referred to for resolving questions of interpretation. E.Compliance with Laws The CONSULTANT shall keep itself informed of all State and National laws and all municipal ordinances and regulations of the CITY which in any manner affect those engaged or employed in the work, or the materials used in the work, or which in any way affect the conduct of the work, and of all such orders and decrees of bodies or tribunals having any jurisdiction or authority over the same. Without limiting the foregoing, CONSULTANT agrees to observe the provisions of the Municipal Code of the CITY OF GILROY, obligating every contractor or subcontractor under a contract or subcontract to the CITY OF GILROY for public works or for goods or services to refrain from discriminatory employment or subcontracting practices on the basis of the race, color, sex, religious creed, national origin, ancestry of any employee, applicant for employment, or any potential subcontractor. F.Conflict of Interest CONSULTANT certifies that to the best of its knowledge, no CITY employee or office of any public agency interested in this Agreement has any pecuniary interest in the business of CONSULTANT and that no person associated with CONSULTANT has any interest that would constitute a conflict of interest in any manner or degree as to the execution or performance of this Agreement. G.Entire Agreement This Agreement supersedes any and all prior agreements, whether oral or written, between the parties hereto with respect to the rendering of services by CONSULTANT for CITY and contains all the covenants and agreements between the parties with respect to the rendering of such services in any manner whatsoever. Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which are not embodied herein, and that no other agreement, statement or promise not contained in this Agreement shall be valid or binding. No other agreements or conversation with any officer, agent or employee of CITY prior to execution of this Agreement shall affect or modify any of the terms or obligations contained in any documents comprising this Agreement. Such other agreements or conversations shall be considered as unofficial information and in no way binding upon CITY. Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 -9- 4845-6718-3385v1 LAC\04706083 H.Governing Law and Venue This Agreement shall be governed by and construed in accordance with the laws of the State of California without regard to the conflict of laws provisions of any jurisdiction. The exclusive jurisdiction and venue with respect to any and all disputes arising hereunder shall be in state and federal courts located in Santa Clara County, California. I. Notices Any notice to be given hereunder by either party to the other may be effected either by personal delivery in writing or by mail, registered or certified, postage prepaid with return receipt requested. Mailed notices shall be addressed to the parties at the addresses appearing in Exhibit “A”, Section V.I. but each party may change the address by written notice in accordance with this paragraph. Notices delivered personally will be deemed delivered as of actual receipt; mailed notices will be deemed delivered as of three (3) days after mailing. J. Partial Invalidity If any provision in this Agreement is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions will nevertheless continue in full force without being impaired or invalidated in any way. K.Time of the Essence All dates and times referred to in this Agreement are of the essence. L. Waiver CONSULTANT agrees that waiver by CITY of any one or more of the conditions of performance under this Agreement shall not be construed as waiver(s) of any other condition of performance under this Agreement. Executed at Gilroy, California, on the date and year first above written. CONSULTANT: CITY: H droScience En ineers, Inc. CITY OF GILROY B : B : ame: William Slente ame: Jimm Forbis Title: Principal Title: Cit Administrato Social Securit or Taxpa e Identification Numbe 94-3288991 H.Governing Law and Venue This Agreement shall be governed by and construed in accordance with the laws of the State of California without regard to the conflict of laws provisions of any jurisdiction. The exclusive jurisdiction and venue with respect to any and all disputes arising hereunder shall be in state and federal courts located in Santa Clara County, California. I. Notices Any notice to be given hereunder by either party to the other may be effected either by personal delivery in writing or by mail, registered or certified, postage prepaid with return receipt requested. Mailed notices shall be addressed to the parties at the addresses appearing in Exhibit “A”, Section V.I. but each party may change the address by written notice in accordance with this paragraph. Notices delivered personally will be deemed delivered as of actual receipt; mailed notices will be deemed delivered as of three (3) days after mailing. J. Partial Invalidity If any provision in this Agreement is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions will nevertheless continue in full force without being impaired or invalidated in any way. K. Time of the Essence All dates and times referred to in this Agreement are of the essence. L. Waiver CONSULTANT agrees that waiver by CITY of any one or more of the conditions of performance under this Agreement shall not be construed as waiver(s) of any other condition of performance under this Agreement. Executed at Gilroy, California, on the date and year first above written. CONSULTANT: CITY: H droScience En ineers, Inc. CITY OF GILROY B : B : ame: William Slente ame: Jimm Forbis Title: Principal Title: Cit Administrato Social Securit or Taxpa e Identification Numbe 94-3288991 Approved as to Form ATTEST: City Attorney City Clerk Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 -1- 4845-6718-3385v1 LAC\04706083 EXHIBIT “A” SPECIFIC PROVISIONS I. PROJECT MANAGER CONSULTANT shall provide the services indicated on the attached Exhibit “B”, Scope of Services (“Services”). (All exhibits referenced are incorporated herein by reference.) To accomplish that end, CONSULTANT agrees to assign Robert Le, who will act in the capacity of Project Manager, and who will personally direct such Services. Except as may be specified elsewhere in this Agreement, CONSULTANT shall furnish all technical and professional services including labor, material, equipment, transportation, supervision and expertise to perform all operations necessary and required to satisfactorily complete the Services required herein. II. NOTICE TO PROCEED/COMPLETION OF SERVICE A. NOTICE TO PROCEED CONSULTANT shall commence the Services upon delivery to CONSULTANT of a written “Notice to Proceed”, which Notice to Proceed shall be in the form of a written communication from designated City contact person(s). Notice to Proceed may be in the form of e-mail, fax or letter authorizing commencement of the Services. For purposes of this Agreement, Bret Swain shall be the designated City contact person(s). Notice to Proceed shall be deemed to have been delivered upon actual receipt by CONSULTANT or if otherwise delivered as provided in the Section V.I. (“Notices”) of this Exhibit “A”. B. COMPLETION OF SERVICES When CITY determines that CONSULTANT has satisfactorily completed all of the Services, CITY shall give CONSULTANT written Notice of Final Acceptance, and CONSULTANT shall not incur any further costs hereunder. CONSULTANT may request this determination of completion when, in its opinion, it has satisfactorily completed all of the Services and, if so requested, CITY shall make this determination within two (2) weeks of such request, or if CITY determines that CONSULTANT has not satisfactorily completed all of such Services, CITY shall so inform CONSULTANT within this two (2) week period. III. PROGRESS SCHEDULE The schedule for performance and completion of the Services will be as set forth in the attached Exhibit “C”. IV. PAYMENT OF FEES AND DIRECT EXPENSES Payments shall be made to CONSULTANT as provided for in Article 4 of this Agreement. Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 -2- 4845-6718-3385v1 LAC\04706083 Direct expenses are charges and fees not included in Exhibit “B”. CITY shall be obligated to pay only for those direct expenses which have been previously approved in writing by CITY. CONSULTANT shall obtain written approval from CITY prior to incurring or billing of direct expenses. Copies of pertinent financial records, including invoices, will be included with the submission of billing(s) for all direct expenses. V. OTHER PROVISIONS A. CONSULTANT’S SERVICES TO BE APPROVED BY A REGISTERED PROFESSIONAL ENGINEER All civil (including structural and geotechnical) engineering plans, calculations, specifications and reports shall be prepared by, or under the responsible charge of, a licensed civil engineer and shall include his or her name and license number. Interim documents shall include a notation as to the intended purpose of the document, such as “preliminary” or “for review only.” All civil engineering plans and specifications that are permitted or that are to be released for construction shall bear the signature and seal of the licensee and the date of signing and sealing or stamping. All final civil engineering calculations and reports shall bear the signature and seal or stamp of the licensee, and the date of signing and sealing or stamping. B. STANDARD OF WORKMANSHIP CONSULTANT represents and warrants that it has the qualifications, skills and licenses necessary to perform the Services, and its duties and obligations, expressed and implied, contained herein, and CITY expressly relies upon CONSULTANT’S representations and warranties regarding its skills, qualifications and licenses. CONSULTANT shall perform such Services and duties in conformance to and consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Any plans, designs, specifications, estimates, calculations, reports and other documents furnished under this Agreement shall be of a quality acceptable to CITY. The minimum criteria for acceptance shall be a product of neat appearance, well-organized, technically and grammatically correct, checked and having the maker and checker identified. The minimum standard of appearance, organization and content of the drawings shall be that used by CITY for similar purposes. C. RESPONSIBILITY OF CONSULTANT CONSULTANT shall be responsible for the professional quality, technical accuracy, and the coordination of the Services furnished by it under this Agreement. The CITY’S review, acceptance or payment for any of the Services shall not be construed to operate as a waiver of any rights under this Agreement or of any cause of action arising out of the performance of this Agreement, and CONSULTANT shall be and remain liable to CITY in accordance with applicable Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 -3- 4845-6718-3385v1 LAC\04706083 law for all damages to CITY caused by CONSULTANT’S negligent performance of any of the services furnished under this Agreement. D. RIGHT OF CITY TO INSPECT RECORDS OF CONSULTANT CITY, through its authorized employees, representatives or agents, shall have the right, at any and all reasonable times, to audit the books and records (including, but not limited to, invoices, vouchers, canceled checks, time cards, etc.) of CONSULTANT for the purpose of verifying any and all charges made by CONSULTANT in connection with this Agreement. CONSULTANT shall maintain for a minimum period of three (3) years (from the date of final payment to CONSULTANT), or for any longer period required by law, sufficient books and records in accordance with standard California accounting practices to establish the correctness of all charges submitted to CITY by CONSULTANT, all of which shall be made available to CITY at the CITY’s offices within five (5) business days after CITY’s request. E. CONFIDENTIALITY OF MATERIAL All ideas, memoranda, specifications, plans, manufacturing procedures, data (including, but not limited to, computer data and source code), drawings, descriptions, documents, discussions or other information developed or received by or for CONSULTANT and all other written and oral information developed or received by or for CONSULTANT and all other written and oral information submitted to CONSULTANT in connection with the performance of this Agreement shall be held confidential by CONSULTANT and shall not, without the prior written consent of CITY, be used for any purposes other than the performance of the Services, nor be disclosed to an entity not connected with the performance of the such Services. Nothing furnished to CONSULTANT which is otherwise known to CONSULTANT or is or becomes generally known to the related industry (other than that which becomes generally known as the result of CONSULTANT’S disclosure thereof) shall be deemed confidential. CONSULTANT shall not use CITY’S name or insignia, or distribute publicity pertaining to the services rendered under this Agreement in any magazine, trade paper, newspaper or other medium without the express written consent of CITY. F. NO PLEDGING OF CITY’S CREDIT. Under no circumstances shall CONSULTANT have the authority or power to pledge the credit of CITY or incur any obligation in the name of CITY. G. OWNERSHIP OF MATERIAL. All material including, but not limited to, computer information, data and source code, sketches, tracings, drawings, plans, diagrams, quantities, estimates, specifications, proposals, tests, maps, calculations, photographs, reports and other material developed, collected, prepared (or caused to be prepared) under this Agreement shall be the property of CITY, but CONSULTANT may retain and use copies thereof subject to Section V.E of this Exhibit “A”. CITY shall not be limited in any way in its use of said material at any time for any work, whether or not associated with the City project for which the Services are performed. Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 -4- 4845-6718-3385v1 LAC\04706083 H. NO THIRD PARTY BENEFICIARY. This Agreement shall not be construed or deemed to be an agreement for the benefit of any third party or parties, and no third party or parties shall have any claim or right of action hereunder for any cause whatsoever. I. NOTICES. Notices are to be sent as follows: CITY: Bret Swain, PE City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 CONSULTANT: Robert Le, PE HydroScience Engineers, Inc. 10569 Old Placerville Rd Sacramento, CA 95827-2504 J. FEDERAL FUNDING REQUIREMENTS. If the box to the left of this sentence is checked, this Agreement involves federal funding and the requirements of this Section V.J. apply. If the box to the left of this sentence is checked, this Agreement does not involve federal funding and the requirements of this Section V.J. do not apply. 1. DBE Program CONSULTANT shall comply with the requirements of Title 49, Part 26, Code of Federal Regulations (49 CFR 26) and the City-adopted Disadvantaged Business Enterprise programs. 2. Cost Principles Federal Acquisition Regulations in Title 48, CFR 31, shall be used to determine the allowable cost for individual items. 3. Covenant against Contingent Fees The CONSULTANT warrants that he/she has not employed or retained any company or person, other than a bona fide employee working for the CONSULTANT, to solicit or secure this Agreement, and that he/she has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage, brokerage fee, gift or any other consideration, contingent upon or resulting from the award or formation of this Agreement. For breach or violation of this warranty, the Local Agency shall have the right to annul this Agreement without liability or, at its discretion, to deduct from the agreement price or consideration, or otherwise recover, the full amount of such fee, commission, percentage, brokerage fee, gift or contingent fee. Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 -1- 4845-6718-3385v1 LAC\04706083 EXHIBIT “B” SCOPE OF SERVICES Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 Engineering Services for Joint Morgan Hill-Gilroy Sewer Trunk Line Repairs Project No. 24-RFP-PW-499 Scope of Work The scope includes design, bid, and construction phase support. It also includes necessary studies identified by HydroScience to inform the design, supporting topographic mapping and optional geotechnical investigation, research, utility coordination, and permitting. • Task 1 – Project Management • Task 2 – Preliminary Engineering • Task 3 – Detailed Design/Bid Package • Task 4 – Engineering Services During the Bidding Phase • Task 5 – Construction Engineering Support Services Task 1 – Project Management HydroScience will prepare for, coordinate, and facilitate one kickoff meeting with the City. During the kickoff meeting, HydroScience will confirm the scope of work, schedule, budget, and availability of project documents and electronic files; review project goals, priorities, and conceptual design requests; review unique project features, discuss format of deliverables; review regulatory items, approval processes, and administrative procedures; and clarify responsibilities of each party. HydroScience will provide general project management activities, including team coordination, project budget tracking and reporting, managing subconsultants, invoicing, and maintaining the project schedule. The project schedule will identify tasks, subtasks, design development milestones, critical path designation, and progress meetings. HydroScience will prepare for, coordinate, and facilitate the design review workshops at the 35%, 65%, and 95% level of design submittal milestones, as well as a meeting at the completion of the Technical Evaluations. The intent of the workshops is to help facilitate the City’s review of the design progress. Following the workshops, City will provide a set of consolidated review comments to HydroScience. HydroScience will maintain a tracking log of comments and outstanding items, which will be returned to the City with responses/action taken. A peer review of the plans will occur at the 95% stage. This peer review will be performed by Eric Petrel, who has over 36 years of experience designing pipeline and manhole Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 rehabilitations all over California. Eric will review the plans and prepare the Certification of Peer Review on HydroScience Letterhead for submittal with the 95% Submittal. Deliverables • Project schedule in Gantt chart format (Microsoft Project) • Monthly progress reports included with each invoice • Response to comments (PDF/Excel) • Peer Review Submittal (PDF) • Meeting agendas and minutes (PDF) Task 2 – Preliminary Engineering Under this task, HydroScience will gather and evaluate existing design documents for the existing infrastructure, including but not limited to: easements, design documents, AutoCAD files, City as-builts/record drawings, and available utility maps. Details of this task include the following. Site Walk: HydroScience will conduct an initial walkthrough along the project alignment to identify existing conditions in comparison to records, manhole locations, traffic circulation, pavement conditions, access challenges, potential bypass pipe routings, and related information. For manholes within private properties, HydroScience will identify potential impacts of the work on businesses which will inform our stakeholder coordination strategy. Records Review: We will gather and review City as-built drawings and CCTV inspection records to fully understand the configuration and alignment of the existing Joint Trunk and the interior of the pipe segments and the manholes to be rehabilitated. We assume all data files associated with the Condition Assessment will be provided on flash drive for our use. This data will help us to determine the optimal method of repair to be performed, any excavation for access, traffic impacts, contractor work areas, any necessary spot repairs prior to lining, laterals to be reinstated, and related design considerations. We will also review our existing records from our work in those areas on the Relief Trunk Project and the SCRWA Projects. Topographic field survey/Record Boundary Mapping: Our subconsultant, HMH, will provide topographic surveying and mapping to support the design of the Project. After setting up survey control for the projects, HMH will perform field topographic surveying to obtain the following information for an 800 LF segment of Leavesley Road (open cut replacement) at a width of 170 ft (back of walk to back of walk) plus a 3,100 LF segment on the Access Road at a width of 80 ft (CIPP segments): • Location, rim, invert, pipe size, and direction of flow of accessible sanitary sewer manholes, storm drain manholes, storm drain inlets. • All surface features from back-of-sidewalk to back-of-sidewalk. Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 • Utility surface features: utility vaults, boxes, hydrants • Water valves: Location, rim, top of nut, and length of extension of water valves • Street monuments and trees • All USA-marked utilities • Develop 3d TIN surface with contours. • Deliverables in AutoCAD 2018 and PDF Using current Assessor’s maps and recorded maps and documents from the County of Santa Clara, HMH will prepare a record boundary in AutoCAD format. This record boundary shall contain the street right-of-way lines along the defined alignment. The right-of-way lines of intersecting streets will also be shown up to the curb return along with 25 feet of the side property lines. The street centerlines or monument lines, as appropriate for any particular street, will also be provided in the base file. The record right-of-way will be tied to the field survey by locating sufficient street monuments. Evidence of property corners will not be searched for in the field and no monuments will be set. Since no title reports are to be provided, there may be street easements or other documents that affect the street right-of-way lines that would not be shown in the base file. Also, the existence of other easements or appurtenant rights cannot be determined without title reports and therefore, will not be shown. Utility Service Alert (USA) will be contacted to obtain record information regarding the existence of utilities within the street right-of-way. In addition to the two sewer segments noted above, HMH will perform field topographic surveying for 40 (forty) sewer manholes to obtain location, rim, invert, pipe size, and direction of flow. Also included will be a 10’ square of surface topo around each sewer manhole. Utility research will be performed for the 8 manholes that will be raised. Utility Coordination: HydroScience will send utility research/as-built plans request letters to local utility companies that may have facilities within the project limits. A map of the approximate utility locations (including underground utilities) will be created based on data provided by the utility companies and surface utility features as identified during the topographic survey. When the existing data allows, the drawing will indicate utility type, diameter, material, approximate cover, and the horizontal location of the utility. HydroScience will review utility information provided by the City and other utility providers. If information provided by the utility providers does not match information collected during the site walk and information in the previous design drawings, HydroScience will identify potential candidates for utility potholing. CEQA Notice of Exemption: An initial review of the project indicates that the project likely qualifies for a “Replacement or Reconstruction” exemption under CEQA Section 15301(h) as well as Section 15303(f). HydroScience will prepare a technical project description and Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 assist the City with the filing of a Notice of Exemption. This form will be filed with the County Clerk’s office. Technical Evaluations: HydroScience will conduct the following technical evaluations which will be documented in a technical memorandum prepared for the City’s review: • Evaluation of two (2) manhole lining alternatives (CIPM and cementitious), budgetary cost comparison, bypassing requirements or alternatives (flow-through plug), service life comparison, CCTV observations affecting liner selection and installation requirements. • Pipeline CIPP lining parameters, construction access and excavation requirements for installing the liner in the identified locations, CCTV observations affecting liner selection and installation requirements. • Flow bypass strategy for the CIPP and open-cut segments. • Pipe crown spray lining requirements, maximum allowable sewer flow during lining and time of day/season acceptable for installation, surface preparation requirements. • Prepare a preliminary construction cost estimate incorporating recommended approaches from this evaluation. • Preliminarily identify any required potholing to inform the detailed design. Each evaluation item will be examined from the standpoint of feasibility, cost- effectiveness, risk, and minimization of impacts. HydroScience will document the evaluations in a focused technical memorandum and present to the City for review. HydroScience will conduct a review workshop to discuss questions and arrive at decisions for detailed design. Stakeholder Coordination: HydroScience will assist the City in coordinating work that may affect private properties, such as the Premium Outlets, Gilroy Crossing, landowners along the gravel access road, and PG&E for transmission towers in the access road and Renz Lane. Our scope includes a total of 78 hours to assist with this coordination. This effort will inform specification requirements and drawing notes addressing any special provisions required to facilitate operation of these services during construction and sequencing of work to minimize downtime. The contract documents will identify allowable hours of work and maximum amount of time that access to any property can be interrupted. Requirements for critical facilities (for example, maintaining at least one access to businesses at all times) will be specified on the Drawings. Deliverables • CEQA Notice of Exemption • Utility Potholing Report • Technical Evaluations Memorandum Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 Assumptions • Borings are located within City right-of-way and will be completed during the daytime. • Disposal of excess soil cuttings from borings will be placed in 55-gallon drums and disposed of, except on the access road where they will be spread. Disposal of hazardous materials is not included in this task. • No-fee encroachment permits for surveying, geotechnical, and utility locating will be issued by the City for this task. • No new monuments will be set. Survey monument preservation, as defined and required by Section 8771 of the Professional Land Surveyor’s Act, is not included in this task. • Title reports are excluded, and Right-of-way acquisition is not necessary. • Stamped traffic control plans are not required for exploration work in City rights of way. • City will provide as-built drawings for the entire length of the existing trunk sewer. • The existing trunk sewer is entirely contained within existing City right-of-way and easements. Task 3 – Detailed Design/Bid Package The detailed design will include three interim submittals and the stamped and final Bid Package. The scope of work for each submittal is as follows: 35% Submittal: This submittal will include the topographic survey, utility information collected from the utilities, the visual observations collected during the site walk, the right- of-way limits and boundaries from the record boundary survey, and the proposed plans for open cut and CIPP repairs. Preliminary manhole repair and raising typical details will be provided, and preliminary details and references to City standards included as appropriate. Where utility information may be lacking or require verification, proposed pothole locations will be identified. Additional components of the 35% Submittal will include a table of contents for technical specifications and a construction cost estimate based on the likely bid items for each project component. Where required, a list of expected permits will be identified. 65% Submittal: Comments on the 35% Submittal will be reviewed and the responses incorporated into the 65% Submittal. The 65% Submittal will also include construction details and flow bypassing diagrams. An updated estimate of probable construction costs, as well as a draft of the technical specifications will be prepared. 95% Submittal: Comments on the 65% Submittal will be reviewed and the responses incorporated into the 95% Submittal. The 95% Submittal will also include all of the elements required to have a complete set of contract documents suitable for advertising, Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 pending final City review. The submittal will be peer reviewed per the scope in Task 1, and will include front end specifications, including the City’s agreement, using the City’s standard front-end specifications. An updated estimate of probable construction costs, as well as a draft of the technical and special provisions will be prepared. The 95% Submittal will be used to submit to Caltrans for permit review and approval. The portions going to Caltrans will be stamped and formatted in accordance with their requirements. The City will be responsible for any permit fees Caltrans requires for their review and permitting of the project. Bid Package: The Bid Package will incorporate all comments on the 95% Submittal and be a stamped set of contract documents that are suitable for advertisement. The detailed design effort will include the following: Temporary Traffic Control Plan: HydroScience will prepare a temporary traffic control plan for the open cut work at Leavesley to satisfy Caltrans Requirements. We will additionally prepare 2-3 typical traffic control details and specifications for the contractor to comply with in accordance with MUTCD requirements. The contractor shall prepare detailed temporary traffic control plans for all areas other than the open-cut based on our typical plans and specification requirements. Temporary Construction Easements (TCEs) and Encroachment Permits (EPs): During Preliminary Engineering, the full extent of TCEs and EPs will be determined based on facility locations, excavation extents, and record boundary locations. For the purposes of scoping, we have assumed the following are required and these will be prepared by HydroScience in coordination with the City: • County EP for manhole repairs north of City limits. • Caltrans EP for Open Cut and manhole repairs in Leavesley Rd. • TCEs for CIPP and manhole work in the access road. • TCEs for manhole work in private property. HydroScience will facilitate a design review meeting at the 35%, 65% and 95% submittals. We have assumed these will be conducted as virtual meetings. Deliverables: • 35% Submittal, PDF/Word/Excel • Response to Comments, 35%, 65%, 95%, Excel • 65% Submittal, PDF/Word/Excel • 95% Submittal, PDF/Word/Excel • Caltrans Permit Application (PDF) • Bid Package, one full size set of stamped plans (bond), one hard copy of the specifications, and electronic copies of the plans (CAD/PDF), specifications (Word/PDF), and estimate (Excel/PDF) Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 • Meeting agendas and minutes for three design review meetings • Comment log with responses Assumptions • Stakeholder coordination assistance is limited to the total number of hours shown. • City will pay any costs for the Caltrans Permit Application • Project disturbance is less than 1 acre. The Contractor will address all Storm Water and Water Pollution Control Plan per our standard specification. HydroScience will prepare a Water Pollution Control Plan form and if required an exhibit to satisfy Caltrans. • Manhole repairs will not require pumped bypass from the upstream to the downstream manhole. HydroScience will evaluate a flow through plug option as part of rehabilitation evaluation. HydroScience’s scope for bypass schematics is limited to the three pipe repair sections. • Flow data required for bypassing plans and schematics will be provided by the City. • Review comments for each design submittal will be compiled by the City and submitted as a single set of comments. • City to provide their standard front-end specifications. If needed, HydroScience will make minor project-specific edits to the front-ends. Task 4 – Engineering Services During the Bidding Phase HydroScience will assist the City during bid solicitation and bid phase services as needed and requested up to the allowance outlined in the proposed budget. Services may include: • Response to prospective bidder inquiries during the bidding period • Preparation of up to two addenda • Attending the pre-bid meeting • Review and evaluation of bids • Preparing conformed contract document package that incorporates all addenda to issue for bid award Assumptions • The City is responsible for bid advertisement and any costs associated with advertisement • The City is responsible for preparing for, coordinating, and hosting pre-bid meetings • Addenda prepared during bidding will be based on relatively minor comments or clarification to the design, not requiring significant design revisions Deliverables • Responses to inquiries and addenda in PDF format Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 Task 5 – Construction Engineering Support Services HydroScience will provide engineering support services in support of the City’s Construction Management efforts. It is expected that HydroScience will provide engineering services during construction as needed and requested up to the proposed budget. Services may include the following: • Attend and prepare material for an internal handoff meeting from the design team to the City’s construction management team. HydroScience will brief the City on key issues, permit requirements, possible construction risks, and items of note regarding the design, construction sequencing, or other items of concern. • HydroScience will attend selected construction meetings as directed by the City. For the purpose of this budget, we have assumed attending one pre-construction meeting and up to five construction progress meetings, two on-site and three virtual. We have budgeted approximately 48 hours for this work, which includes attending weekly construction meetings and completing action items assigned to HydroScience at these meetings. • HydroScience will respond to selected RFIs generated by the Contractor. RFI reviews will be provided in the same format as the RFI was submitted. RFIs may address changed conditions, corrective actions, or items requested by the Contractor. Responding to up to 20 RFIs results in a budget of 80 hours to respond to RFIs, an average of four hours per RFI. • We expect that the City will require HydroScience to review up to 20 separate submittals, and their corresponding resubmittals. It is not expected that the City will ask HydroScience to review all submittals. Submittal reviews will be returned to the City in the format utilized by the construction manager, which is expected to be either email or an electronic document tracking cloud software system. At an average of about 6 hours per submittal, we have budgeted a total of 120 hours for this task. It is expected that any potential product substitutions will be included in submittals from the Contractor. • HydroScience will prepare a final punch list of incomplete and/or unacceptable items of construction work for the City’s review and approval. HydroScience will attend a final close-out walk through with the City when all punch list items have been corrected by the Contractor. • Prepare Record Drawings. Based on red-lines developed and provided by the Contractor, HydroScience will prepare Record Drawings and provide the AutoCAD and PDF drawings to the City. Assumptions • City to provide Construction Management services and address administrative submittals. HydroScience is not responsible for providing construction quality control testing. • City to prepare for and run all construction meetings. Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 Deliverables: • Responses to RFIs, submittals, and potential change orders, using the cloud based software provided by the City’s Construction Manager • Punch List, Excel • Record Drawings, AutoCAD and PDF Optional Scope Items The following scope items are offered as optional scope items, itemized separately in the fee. HydroScience will work with the City during Preliminary Engineering to determine the merits and benefits of including this work: Geotechnical Investigation at Leavesley Rd: Geo-Logic will perform the project geotechnical study. The geotechnical study will include subsurface exploration at the Leavesley Rd open-cut segment, performing engineering analysis of data, developing geotechnical recommendations for the project design, and analytical testing of selected soil samples that may be disposed during construction for hazardous material. The analytical testing will include testing for CAM 17 metals, total hydrocarbons, VOC (8260B), and pesticides. Geo-Logic will perform a site reconnaissance to observe surface site conditions, plan and perform up to 2 exploratory borings by means of a tract or truck-mounted drilling rig to a depth of 20 feet below ground surface, prepare traffic control plans, and obtain an encroachment permit from Caltrans for planned borings. Soil sampling and penetration testing will be performed at about 5-foot intervals. Laboratory testing of soil samples will include natural moisture content and unit weight, Atterberg Limits, unconfined compressive strength, percent passing a No. 200 sieve, and sieve analysis. Borings will be backfilled with cement grout, and in existing pavement areas the borings will be capped at the top with cold-patch asphalt or cement with black dye. Geotechnical Investigation at CIPP Repair Segments: Optionally, Geo-Logic will complete an additional 4 exploratory borings up to 20 deep each at the two CIPP repair segments and evaluate the collected data in accordance with the description in the base scope. A no-fee City encroachment permit will be secured for this exploratory work. Soil cuttings will be spread in vacant areas near the boring locations. Potholing: BESS Testlab (BTL) will optionally perform up to 10 utility potholes using hydro- vacuum excavation methods and Ground Penetrating Radar (GPR) locating at locations specified by HydroScience within the Project limits. Potholing will be performed to identify the precise horizontal and vertical position of existing utilities that need to be located to complete the pipeline design. Data collected as a result of potholing activities will be presented in a report that will include utility type, size, material, depth and pictures of the exposed utility. Pothole locations (in the field) will be marked with wooden lath and ribbon, Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 with the pothole number, utility size and depth or MAG nail with pertinent utility data annotated on the ground surface. The following is included/assumed: • 8 potholes in asphalt paved locations and 2 potholes in the access road (compacted dirt) • GPR locating of buried manhole tops • Secure exploration permits from County of Santa Clara, City of Gilroy, Caltrans (Leavesley) • Day work for all locations except Leavesley. Night work for 2 potholes on Leavesley. • Pothole plan to be prepared in advance of field work. • Provide a Traffic Control Plan that is stamped and signed by a P.E. or T.E. for the potholing work. • Restoration per City of Gilroy Standard Details UN-1 • All potholes to be within existing ROWs • HMH will perform a second mobilization to survey completed potholes and add this data to the CAD backgrounds. Manhole Bypassing Design and Additional Construction Services: The base scope assumes that manhole repairs will not require pumped bypass from the upstream to the downstream manhole. Optionally, HydroScience will develop bypass schematics for the manhole repairs that would facilitate manhole lining options that require a completely dry manhole, and include these in the Contract Documents. HydroScience will provide additional Construction Engineering Support Services for this additional construction scope. The following are assumed in this optional budget: • Bypassing of up to 40 manholes will be addressed • There will be enough similarity in the bypassing requirements for some of the manholes that schematics can be copied and lightly modified, and in some cases multiple manholes can be bypassed in one operation, such that the number of unique schematics assumed for budgeting is a quantity of 30. • An additional 3 RFIs and 5 submittals will be reviewed as a result of the additional bypassing. Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 -1- 4845-6718-3385v1 LAC\04706083 EXHIBIT “C” MILESTONE SCHEDULE Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 ID Task Name Duration Start Finish 1 Notice to Proceed 0 days Tue 10/1/24 Tue 10/1/24 2 Preliminary Engineering 125 days Mon 10/7/24 Mon 3/31/25 3 Kickoff Meeting & Site Visit 0 days Mon 10/7/24 Mon 10/7/24 4 Site Walk and Records Review 5 days Tue 10/8/24 Mon 10/14/24 5 Geotechnical 40 days Tue 10/29/24 Mon 12/23/24 6 Topographic Survey 40 days Tue 10/15/24 Mon 12/9/24 7 Utility Coordination 20 days Tue 12/10/24 Mon 1/6/25 8 Prepare Technical Eval Memo 40 days Tue 10/15/24 Mon 12/9/24 9 City Review 15 days Tue 12/10/24 Mon 12/30/24 10 CEQA Notice of Exemption 10 days Tue 2/11/25 Mon 2/24/25 11 Potholing 10 days Tue 2/11/25 Mon 2/24/25 12 Stakeholder Coordination 45 days Tue 1/28/25 Mon 3/31/25 13 Detailed Design/Bid Package 314 days Tue 12/10/24 Fri 2/20/26 14 Prepare 35% PS&E 45 days Tue 12/10/24 Mon 2/10/25 15 City Review 15 days Tue 2/11/25 Mon 3/3/25 16 Review Meeting 0 days Tue 2/25/25 Tue 2/25/25 17 Prepare 65% PS&E 45 days Tue 2/25/25 Mon 4/28/25 18 City Review 15 days Tue 4/29/25 Mon 5/19/25 19 Review Meeting 0 days Tue 5/13/25 Tue 5/13/25 20 Prepare 95% PS&E 45 days Tue 5/13/25 Mon 7/14/25 21 City Review 5 days Tue 7/15/25 Mon 7/21/25 22 Review Meeting 0 days Mon 7/21/25 Mon 7/21/25 23 Caltrans Permitting (Longitudinal)9 emons Mon 4/28/25 Fri 1/23/26 24 TCEs and EPs 3 emons Mon 7/14/25 Sun 10/12/25 25 Prepare Final PS&E 10 days Mon 1/26/26 Fri 2/6/26 26 City Review 5 days Mon 2/9/26 Fri 2/13/26 27 Camera-Ready Submittal 5 days Mon 2/16/26 Fri 2/20/26 28 Bid Phase 55 days Fri 2/20/26 Fri 5/8/26 29 Council Approval to Bid 0 days Fri 2/20/26 Fri 2/20/26 30 Advertise 40 days Mon 2/23/26 Fri 4/17/26 31 Pre-Bid Conference 0 days Fri 4/17/26 Fri 4/17/26 32 Bid Opening 0 days Fri 4/17/26 Fri 4/17/26 33 Notice of Intent to Award 5 days Mon 4/20/26 Fri 4/24/26 34 Council Package and Approval 5 days Mon 4/27/26 Fri 5/1/26 35 Execute Contract 5 days Mon 5/4/26 Fri 5/8/26 36 Construction Phase 270 days Fri 5/15/26 Fri 5/28/27 37 Pre-Construction Meeting 0 days Fri 5/15/26 Fri 5/15/26 38 Mobilization, Submittals 30 days Mon 5/18/26 Fri 6/26/26 39 Procure Materials 60 days Mon 6/29/26 Fri 9/18/26 40 Construction (review RFIs, COs; attend meetings) 180 days Mon 9/21/26 Fri 5/28/27 41 Surface Restoration and Punch List 20 days Mon 5/3/27 Fri 5/28/27 42 Project Close-out and As-Built Drawings 20 days Mon 5/3/27 Fri 5/28/27 43 Construction Window 371 days Fri 5/1/26 Fri 10/1/27 44 Dry Weather Flow Period 110 days Fri 5/1/26 Thu 10/1/26 45 Dry Weather Flow Period 110 days Mon 5/3/27 Fri 10/1/27 Notice to Proceed 10/1 Kickoff Meeting & Site Visit 10/7 Site Walk and Records Review 10/14 Geotechnical 12/23 Topographic Survey 12/9 Utility Coordination 1/6 Prepare Technical Eval Memo 12/9 City Review 12/30 CEQA Notice of Exemption 2/24 Potholing 2/24 Stakeholder Coordination 3/31 Prepare 35% PS&E 2/10 City Review 3/3 Review Meeting 2/25 Prepare 65% PS&E 4/28 City Review 5/19 Review Meeting 5/13 Prepare 95% PS&E 7/14 City Review 7/21 Review Meeting 7/21 Caltrans Permitting (Longitudinal) 1/23 TCEs and EPs 10/12 Prepare Final PS&E 2/6 City Review 2/13 Camera-Ready Submittal 2/20 Council Approval to Bid 2/20 Advertise 4/17 Pre-Bid Conference 4/17 Bid Opening 4/17 Notice of Intent to Award 4/24 Council Package and Approval 5/1 Execute Contract 5/8 Pre-Construction Meeting 5/15 Mobilization, Submittals 6/26 Procure Materials 9/18 Construction (review RFIs, COs; attend meetings) 5/28 Surface Restoration and Punch List 5/28 Project Close-out and As-Built Drawings 5/28 Dry Weather Flow Period 10/1 Dry Weather Flow Period 10/1 M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 2024 2025 2026 2027 Task Milestone Summary City Task Contractor Task Page 1 City of Gilroy Engineering Services for Project Schedule Updated: Wed 9/4/24 Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 -1- 4845-6718-3385v1 LAC\04706083 EXHIBIT “D” PAYMENT SCHEDULE Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 Fee for Engineering Services for Joint Morgan Hill-Gilroy Sewer Trunk Line Repairs Project No. 24-RFP-PW-499 June 14, 2024 Task Description Bi l l S l e n t e r Pr i n c i p a l - i n - C h a r g e Er i c P e t r e l Pe e r R e v i e w Ro b e r t L e Pr o j e c t M a n a g e r Wi l s o n Z h u Pr o j e c t E n g i n e e r Ma r c F e r n a n d e z Pe r m i t t i n g , P v m t , T C P s St a f f E n g i n e e r CA D M a n a g e r La b o r H o u r s Fe e HM H Su r v e y i n g Ge o - L o g i c Ge o t e c h n i c a l BE S S T e s t l a b Ut i l i t y L o c a t i n g Di r e c t C o s t s Ex p e n s e S u b t o t a l w i t h Ma r k u p To t a l F e e Ph a s e T o t a l s Rate Classification Princ E-IX E-V E-V E-III E-I CAD-M Hourly billing rate $305 $292 $242 $242 $215 $187 $160 1 Project Management $20,974 Project Management 6 24 8 38 $9,574 $0 $9,574 Meetings and Workshops 20 20 8 48 $11,400 $0 $11,400 2 Preliminary Engineering $136,896 Site Walk/Records Review 8 16 8 32 $7,304 $300 $330 $7,634 Topographic Survey 1 2 4 7 $1,366 $71,200 $78,320 $79,686 Utility Coordination 2 6 20 6 34 $6,636 $0 $6,636 CEQA NOE 1 10 11 $2,662 $0 $2,662 Technical Evaluations 16 16 35 4 30 101 $23,484 $0 $23,484 Stateholder Coordionation 8 24 16 30 78 $16,794 $0 $16,794 3 Detailed Design/Bid Package $217,660 35% Submittal 6 35 90 80 40 251 $53,362 $0 $53,362 65% Submittal 12 65 110 10 100 24 321 $70,544 $0 $70,544 95% Submittal 10 35 90 36 125 24 320 $68,125 $0 $68,125 Bid Package 2 25 40 10 30 8 115 $25,354 $250 $275 $25,629 4 Engineering Services During Bidding $12,317 Engineering Services During Bidding 16 20 15 5 56 $12,317 $0 $12,317 5 Construction Engineering Support Services $84,386 Initial/Construction Meetings 24 24 48 $11,616 $500 $550 $12,166 RFIs 14 26 40 80 $17,160 $0 $17,160 Submittals 10 25 35 50 120 $26,790 $0 $26,790 Change Orders 4 12 6 22 $4,994 $0 $4,994 Punch List/Close Out 4 12 8 24 $5,368 $300 $330 $5,698 Record Drawings 4 8 16 28 $5,464 $250 $275 $5,739 Project Coordination/General Assistance 10 22 6 15 53 $11,839 $0 $11,839 TOTAL - Base Services Tasks 6 56 341 610 90 557 127 1787 $392,153 $71,200 $0 $0 $1,600 $80,080 $472,233 Optional Tasks Geotechnical Investigation at Leavesley Rd 0 $0 $36,280 $36,280 $36,280 Geotechnical Investigation at CIPP Repair Segments 0 $0 $16,860 $16,860 $16,860 Potholing and GPR (allowance) + Survey 0 $0 $4,700 $48,673 $53,373 $53,373 Manhole Bypassing Design 4 8 90 90 120 120 432 $85,874 $0 $85,874 Manhole Bypassing Additional Construction Services 2 8 8 24 42 $8,728 $0 $8,728 TOTAL - Optional Tasks 0 6 16 90 98 144 120 474 $94,602 $4,700 $53,140 $48,673 $0 $106,513 $201,115 $201,115 Summary Total Base Tasks Total Optional Tasks Total Base + Optional Tasks $472,233 $201,115 $673,348 Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 HydroScience Engineers 2 City of Gilroy  Engineering Services for Joint Morgan Hill-Gilroy Trunk Line Repairs  Project No. 24-RFP-PW-499Cost Proposal LABOR CLASSIFICATION HOURLY RATE Principal $305 Engineer IX $292 Engineer VIII $280 Engineer VII $265 Engineer VI $253 Engineer V $242 Engineer IV $231 Engineer III $215 Engineer II $204 Engineer I $187 Engineering Aide $110 Construction Professional VI $200 Construction Professional V $190 Construction Professional IV $180 Construction Professional III $170 Construction Professional II $150 Construction Professional I $140 Cross Connection Control Specialist $135 CAD Manager $160 CAD Designer I $140 Marketing Professional $120 Administrative II $110 Administrative $95 HYDROSCIENCE ENGINEERS, INC. 2024 Standard Schedule of Billing Rates Rates are subject to increase 3% annually Hourly billing rates include postage and telephone charges that are normal to the work authorized. Other direct costs for travel, reproduction, mail service, outside services, etc. will be invoiced at 110 percent of the actual cost. Rates for expert witness services shall be billed at the quoted rates plus $50/hour. Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 HydroScience Engineers 3 City of Gilroy  Engineering Services for Joint Morgan Hill-Gilroy Trunk Line Repairs  Project No. 24-RFP-PW-499Cost Proposal Schedule 2024 NorCal Effective Through 12/31/2024 2024 FEE SCHEDULE PROFESSIONAL STAFF Staff Professional I ....................................................................................................... $1 Staff Professional II ........................................................................................................ Staff Professional III ....................................................................................................... Project Professional I ..................................................................................................... 18 Project Professional II .................................................................................................... 20 Project Professional III ................................................................................................... 21 Senior Professional I ...................................................................................................... 22 Senior Professional II ..................................................................................................... 23 9.00/Hour Senior Professional III .................................................................................................... 25 5.00/Hour Principal Professional I .................................................................................................. 270 .00/Hour Principal Professional II ................................................................................................. 289 .00/Hour Principal Professional III ................................................................................................ 308 .00/Hour Court Appearance (Expert Witness, Deposition, etc.; four-hour minimum) ............. 2 x HourlyRate FIELD/LABORATORY STAFF Technician I ...................................................................................................................... 97.00/Hour Technician II ................................................................................................................... 117.00/Hour Technician III (or Minimum Prevailing Wage) ............................................................... 132.00/Hour Technician IV ................................................................................................................. 146.00/Hour Laboratory Manager ...................................................................................................... 176.0 Principal Technician ....................................................................................................... 19 7.00/Hour Managing Technician ..................................................................................................... 211.0 0/Hour CADD/GIS CADD/GIS/Database Manager I ..................................................................................... 117.00/Hour CADD/GIS/Database Manager II .................................................................................... 138.00/Hour CADD Designer .............................................................................................................. 15 GIS Specialist .................................................................................................................. 153.00/Hour SUPPORT STAFF Administrative Assistant I .............................................................................................. 117.0 Administrative Assistant II ............................................................................................. 132.0 0/Hour Administrative Assistant III ............................................................................................ 135.0 0/Hour Technical Editor ............................................................................................................. 109.00/Hour Senior Technical Editor .................................................................................................. 153.00/Hour *Overtime Premium is 35% of PERSONNEL CHARGE EQUIPMENT CHARGES BAT Permeameter ........................................................................................................... 200 .00/Day Compaction Testing Equipment & Supplies ...................................................................... 50.00/Day Peel & Shear Strength Apparatus (FML Seams) ......................................................... 900.00/Month Portable Laboratory (8’ x 32’ trailer) with equipment ................................................. 1,200/Month Portable Laboratory (mobilization / demobilization) ...........................................................1,500.00 ReMi/Refraction Seismograph ........................................................................................ 600.00/Day Sealed Single Ring Infiltrometer (SSRI) ............................................... 200.00/Day or 750.00/Month Sealed Double Ring Infiltrometer (SDRI) ..................................................................... Call for Quote Slope Inclinometer .......................................................................................................... 2 50.00/Day Unmanned Aerial Vehicle (Drone) Reconnaissance ........................................................ 250.00/Day Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 HydroScience Engineers 4 City of Gilroy  Engineering Services for Joint Morgan Hill-Gilroy Trunk Line Repairs  Project No. 24-RFP-PW-499Cost Proposal Schedule 2024 NorCal Effective Through 12/31/2024 EXPENSES Vehicle Use for Field Services ............................................................... 17.00/Hour or 500.00/week Soil Sampling Equipment & Drilling Supplies ..................................................................... 7.00/Hour Groundwater Sampling Equipment and Supplies ............................................................ 17.00/Hour Per Diem ............................................................. Lesser of (Cost +15%) or (Local Government Rate) Outside Services (Consultants, Surveys, Chemical lab Tests, etc.) ................................... Cost + 15% Reimbursables (Maps, Photos, Permits, Expendable Supplies, etc.)................................ Cost + 15% Outside Equipment (Drill Rig, Backhoe, Monitoring Equipment, etc.) ............................................ Cost + 15% PERMITS, FEES AND BONDS The costs of all permits, fees, and performance bonds required by government agencies are to be paid by the Client, unless stated otherwise in an accompanying proposal. INSURANCE Geo-Logic Associates, Inc. carries workers' compensation, comprehensive general liability and automobile with policy limits normally acceptable to most clients. The cost for this insurance is covered by the fees listed in this schedule. Cost of any special insurance required by the Client, including increases in policy limits, adding additional insured parties and waivers of subrogation, are charged at cost plus 15%. Unless otherwise stated, such charges are in addition to the estimated or maximum charges stated in any accompanying proposal. TERMS Payment is due upon presentation of invoice and is past due thirty (30) days from invoice date. Past due accounts are subject to a finance charge of one and one-half percent (1-1/2%) per month, or the maximum rate allowed by law. PROPOSAL PERIOD Unless otherwise stated, a proposal accompanying this schedule is effective for sixty (60) days. If authorization to proceed is not received within this period, Geo-Logic Associates, Inc. reserves the right to renegotiate the fee. Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 HydroScience Engineers 5 City of Gilroy  Engineering Services for Joint Morgan Hill-Gilroy Trunk Line Repairs  Project No. 24-RFP-PW-499Cost Proposal Schedule 2024 NorCal Effective Through 12/31/2024 2024 FEE SCHEDULE TEST NAME TEST METHOD UNIT RATE Geotechnical / Physical Properties Moisture Content, gravimetric .................................................................D2216/AASHTO T265 ....... $26/Test Moisture Content (volumetric and gravimetric) and Bulk Density ..........D2216/D7263 ................... $60/Test Porosity ............................................................................................................................................... $60/Test Particle Size Analyses Standard Sieves and Hydrometer ........................................................D422 ............................... $225/Test Standard Sieves; no Hydrometer .........................................................D422 ............................... $180/Test Particle Size Analysis – Aggregate, no hydrometer .............................D422/C136/CT202 .......... $180/Test Particle Size Analysis with Gravel with hydrometer ............................D422 ............................... $230/Test Percent Passing #200 Sieve ..................................................................D1140/C117 ..................... $90/Test Particle Size Analysis, #4, #40, #200 with wash ............................................................................. $70/Test Atterberg Limits Liquid Limit, Plastic Limit, Plasticity Index (LL, PL, and PI) ...................D4318 ............................. $170/Test Wet preparation, add .................................................................................................................... $55/Test USCS Classification (included with sieve and Atterberg Limits) ...............D2487 ............................. $350/Test Specific Gravity,Fine (<4.75mm diameter materials) ...............................D854 ............................... $115/Test Specific Gravity,Coarse (>4.75mm diameter materials) ...........................C127 ............................... $125/Test Dispersion Testing Double Hydrometer (add second hydrometer) ...................................D4221 ............................. $150/Test Proctor Compaction Test Method A or B (<25% retained on a 3/8” sieve) ..................................D698/D1557 ................... $250/Test Method C (>25% retained on a 3/8” sieve) .........................................D698/D 1557 ................... $265/Test Moisture Density Single Point, std/mod (Proctor check point) ...........D698/D1557 .................. $125/Point Percent Organic Matter by Muffle Furnace .............................................D2974 ............................. $105/Test Permeability / Conductivity Testing Hydraulic Conductivity, Fixed Wall up to 8” Diameter Cell .........................................................................D5856/USBR 5600-89 .... $380/Test up to 12” Diameter Cell .......................................................................D5856/USBR 5600-89 .... $540/Test Extra Load per Test ..................................................................................................................... $140/Load Hydraulic Conductivity, Flexible Wall Falling Head, Rising Tail, 1” to 4” Diameter Sample ............................D5084 ............................. $370/Test Falling Head, Rising Tail, 6” Diameter Sample .....................................D5084 ............................. $665/Test High Pressure (<1200 psi) per sample, add ................................................................................... $65/Test Ksat with other permeant fluid, long term ..........................................D7100 .......................... $5,00 0/Test Added machine time per day .............................................................................................................. $80/Day Intrinsic Permeability (Calculation) ..........................................................Fetter .............................. No Charge Strength and Consolidation Testing Consolidation Testing Consolidation Test – Method A ...........................................................D2435A ........................... $460/Test Consolidation Test – Method B ............................................................D2435B ........................... $560/Test Consolidation Test (single point) .........................................................D2435 ............................. $125/Test Consolidation Test (without rate data) ................................................D2435 ............................. $190/Test Test rate data per load increment .......................................................D2435 ...................... $90/Test-Load Consolidate Test (multiple points and time rates) ..............................D2435 ............................. $465/Test Strength Testing Unconfined Compressive Strength (UC), 2-3” .....................................D2166 ............................. $110/Test Unconfined Compressive Strength (UC), 4 or 6” .................................D2166 ............................. $150/Test Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 HydroScience Engineers 6 City of Gilroy  Engineering Services for Joint Morgan Hill-Gilroy Trunk Line Repairs  Project No. 24-RFP-PW-499Cost Proposal Schedule 2024 NorCal Effective Through 12/31/2024 Strength and Consolidation Testing, Continued Triaxial Compression Unconsol.-Undrained Triax. Compression (UU), 2-3”, 1-pt test ..........D2850 ............................. $215/Test Unconsol.-Undrained Triax. Compression (UU), 4”, 1-pt test ..............D2850 ............................. $255/Test Unconsol.-Undrained Triax. Compression (UU), 6”, 1-pt test ..............D2850 ............................. $450/Test Consolidated Undrained Triax. Compression (CU), 2-3” (3 pt. test) ....D4767 .......................... $1,500/Test Consolidated Undrained Triax. Compression (CU), 2-3” (per point) ...D4767 ............................ $500/Point Consolidated Undrained Triax. Compression (CU), 4” (3 pt. test) .......D4767 .......................... $1,665/Test Consolidated Undrained Triax. Compression (CU), 4” (per point) .......D4767 ............................ $555/Point Consolidated Undrained Triax. Compression (CU), 6” (3 pt. test) .......D4767 .......................... $3,015/Test Consolidated Undrained Triax. Compression (CU), 6” (per point) .......D4767 .........................$1,055/Point CU – add per point for progressive (staged) test ........................................................................ $315/Point Consolidated Drained Triax. Compression (CD), 2-3” (3 pt. test) ........D7181 .......................... $1,890/Test Consolidated Drained Triax. Compression (CD), 2-3” (per point) ........D7181 ............................ $630/Point Consolidated Drained Triax. Compression (CD), 4” (3 pt. test) ...........D7181 .......................... $2,115/Test Consolidated Drained Triax. Compression (CD), 4” (per point) ...........D7181 ............................ $705/Point Consolidated Drained Triax. Compression (CD), 6” (3 pt. test) ...........D7181 .......................... $3,300/Test Consolidated Drained Triax. Compression (CD), 6” (per point) ...........D7181 .........................$1,100/Point High Pressure (>120 psi), add ....................................................................................................... $80/Point Direct Shear Direct Shear, 2.5” (3 pt. test) ...............................................................D3080 ............................. $615/Test Direct Shear, 2.5” (per point) ...............................................................D3080 ............................ $205/Point Additional Cycles (per load) .................................................................D3080 .............................. $55/Load Direct Shear, 12” (3 pt. test) ................................................................D3080 .......................... $1,155/Test Direct Shear, 12” (per point) ................................................................D3080 ............................ $385/Point California Bearing Ratio (per point) ..........................................................D1883 ............................ $350/Point Added machine time when > 2 days of shear ..................................................................................... $80/Day Aggregate and Rock Testing Dry Rodded Unit Weight ..........................................................................C29 ................................... $90/Test Rock Density .............................................................................................D7263 ............................... $60/Test Saturated Hydraulic Conductivity .............................................................D5084 ............................. $370/Test Rock Point Load Index, 1-break ................................................................D5731 ............................... $55/Test Rock Point Load Index, multiple breaks ...................................................D5731 ............................. $210/Test Rock Joint Direct Shear, per point ............................................................D5607 ............................ $290/Point Rock Joint Direct Shear, add per load ......................................................D5607 ............................ $105/Load Uniaxial Strength, Peak Only ....................................................................D7012 ............................. $145/Test Geosynthetics Testing Large Scale Direct Shear Geosynthetic/Geosynthetic, 3-point test ............................................D5321 ............................. $7 50/Test Geosynthetic/Geosynthetic, per point ................................................D5321 ............................. $250/Test Soil/Geosynthetic, 3-point test ............................................................D5321 .......................... $1,005/Test Soil/Geosynthetic, per point ................................................................D5321 ............................. $335/Test Geosynthetic Clay Liner (GCL), 3-point test .........................................D6243 .......................... $1,0 65/Test Geosynthetic Clay Liner (GCL), per point .............................................D6243 ............................. $355/Test Soil/GCL, 3-point test ...........................................................................D6243 .......................... $1,005/Test Soil/GCL, per point ...............................................................................D6243 ............................. $335/Test Sandwich (multiple layers), 3-point test ................................................................................... $1,410/Test Sandwich (multiple layers), per point ......................................................................................... $470/Point Large Scale Puncture Large Scale Puncture, modified ...........................................................D5514 ............................. $465/Test Puncture Test High Pressure (>120 psi), per point ....................................................................... $95/Point Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 HydroScience Engineers 7 City of Gilroy  Engineering Services for Joint Morgan Hill-Gilroy Trunk Line Repairs  Project No. 24-RFP-PW-499Cost Proposal Schedule 2024 NorCal Effective Through 12/31/2024 Soil with Amendments and Slurry Testing Slurry Wall Soil/Bentonite Saturated Hydraulic Conductivity, Falling Head, Rising Tail 1-100 samples ......................................................................................D5084 ............................. $325/Test 101-200 samples ..................................................................................D5084 ............................. $315/Test 201-300 samples ..................................................................................D5084 ............................. $305/Test 301-400 samples ..................................................................................D5084 ............................. $294/Test Greater than 400 samples ...................................................................D5084 ............................. $290/Test Soi/Cement/Bentonite, Unconfined Compressive (UC) Strength ............D4832 ............................... $28/Test Soil / Bentonite Mix Evaluation ........................................................................................................ $325/Test Soil / Cement / Bentonite Mix Evaluation ........................................................................................ $430/Test Pocket Penetrometer ......................................................................................................................... $20/Test Soil Chemistry pH of Soil ............................................................................................................................................ $25/Test All test methods are ASTM unless otherwise noted. Special sample preparation and laboratory testing not listed above will be charged at applicable personnel rates. All laboratory test rates are for standard turn-around time and normal reporting procedures. Rush orders will be subject to a 50 percent premium. Manpower requirements or test protocol may preclude the granting of a rush request. Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 HydroScience Engineers 8 City of Gilroy  Engineering Services for Joint Morgan Hill-Gilroy Trunk Line Repairs  Project No. 24-RFP-PW-499Cost Proposal CHARGE RATE SCHEDULE Professional & Office Per Hour Principal Senior Land Development Manager $270 $254 Senior Civil Engineering or Land Surveying or Landscape Architect Manager $245 Land Development Manager $218 Civil Engineering, Land Surveying or Landscape Architect Manager $214 Senior Planner $234 Senior Civil Engineer, Land Surveyor, or Landscape Architect $198 Engineering Design Specialist $190 Design Specialist $176 Project Planner $212 Project Civil Engineer, Land Surveyor, or Landscape Architect $182 Project Arborist $170 Senior Engineer, Surveyor, or Landscape Designer $186 Engineer, Planner, Surveyor, or Landscape Designer $174 Assistant Engineer, Surveyor, Planner, or Landscape Designer $154 Junior Engineer, Surveyor, Planner, or Landscape Designer $144 Senior Technician $156 Project Technician $144 Technician $134 Assistant Technician $124 Junior Technician $102 Intern $ 96 Project Support Staff $ 96 Field Services Per Hour 2-Person Field Crew $290 3-Person Field Crew $380 1-Person Field Crew $202 Senior Field Engineer $192 Field Engineer $168 Printing, Reproductions & Materials at Cost, Plus 20% Transportation at Cost, including mileage based upon IRS rates Other Outside Services at Cost, Plus 20% Rates are subject to Adjustment July 1, 2024 DRS Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 HydroScience Engineers 9 City of Gilroy  Engineering Services for Joint Morgan Hill-Gilroy Trunk Line Repairs  Project No. 24-RFP-PW-499Cost Proposal Services Houlry Rate Night/OT Rate Emergency Rate Project Management $185.00 Project Coordination $145.00 Utility Foreman $185.50 Licensed Professional (Civil / Surveyor )$190.00 LiDAR / UAV / Data Processing and Extraction $125.00 CAD Technician $117.00 Reports / Sketches / Clerical $101.00 Administrative Support $101.00 Data Processing and Extraction $132.50 Utility Location & Gas Transmission Standby 1-Person Utility Designation w/ GPR & EM Pipe Locator $185.50 $296.80 $371.00 2-Person Utility Designation w/ Multi Antenna GPR $371.00 $593.60 $742.00 1-Person Gas Transmisson Stand by w/truck and equipment $196.00 $313.60 $392.00 Potholing and Vacuum Excavation 2-Person Utility Potholing w/ air vacuum truck $330.00 $429.00 $528.00 1-Person Utility Potholing w/ hydro vacuum truck $317.00 $412.10 $507.20 2-Person Utility Potholing w/ hydro vacuum truck $397.00 $516.10 $635.20 2-Person Utility Potholing w/ Air OX vacuum truck $444.00 $577.20 $710.40 2-Person Key Hole & Surface Restoration w/ equipment $320.00 $416.00 $512.00 1-Person Dump Truck Crew w/equipment $214.00 $278.20 $342.40 Traffic Control 1-Person Traffic Control w/ arrow truck $163.00 $211.90 $260.80 2-Person Traffic Control w/ arrow truck $259.00 $336.70 $414.40 1-Person Flagger / TC Helper $140.00 $182.00 $224.00 GPR Concrete Scanning and Coring 1-Person GPR Concrete Scanning w/ equipment $200.00 $260.00 $320.00 1-Person GPR Concrete Scanning w/ equipment Prevailing Wage $268.00 $348.40 $428.80 1-Person Saw Cutting & Coring w/ equipment $154.00 $200.20 $246.40 1-Person Saw Cutting & Coring w/ equipment Prevailing Wage $175.00 $227.50 $280.00 CCTV Camera – Video Inspection 2-Person CCTV Pipe Inspection w/ Main Line Crawler Unit $334.00 $434.20 $534.40 2-Person CCTV Pipe Inspection w/ Lateral Line Push Unit $323.00 $419.90 $516.80 2-Person Hydro Flushing w/ hydro vacuum truck $397.00 $516.10 $635.20 Surveying and Mapping 1-Person Survey Crew - GPS / Robotic / 3D Scanner $197.00 $256.10 $315.20 2-Person Survey Crew - GPS / Robotic / 3D Scanner $280.00 $364.00 $448.00 2-Person Survey Crew - Mobile LiDAR Scanner $364.00 $473.20 $582.40 2-Person Survey Crew - UAV Data Collection $289.00 $375.70 $462.40 Additional Cost 1-Person Utility Support Truck $160.00 $208.00 $256.00 1-Person General Labor Hourly Rate $140.00 $182.00 $148.40 1-Person Operator Hourly Rate $180.00 $234.00 $288.00 1-Person Utility Truck Mobilization Rate $111.00 Air/hydrovac Utility Truck Mobilization Rate $290.00 Hydrovac Utility Truck Mobilization Rate $330.00 Large Specialty Utility Truck Mobilization Rate $370.00 Traffic Control Plans – non-stamped (per sheet)$400.00 Traffic Control Plans – Stamped (per sheet)$600.00 Mileage, if applicable Current IRS Rate Lodging and meals, applies when over 50 miles Current GSA Rate Remote Hose Per 25' Section (3" 4" or 6" 10")$27/Each Off site disposal of Non-Hazardous Material $1,100/Load Off-Road Vehicle Rental Cost +10% Outside reproductions, shipping, services and consultants Cost +10% Cost of specialty field supplies,rental equipment, bridge tolls etc. Cost +10% Conditions Work site must be safe and prepared in advanced prior to scheduleing our crews (if managed by client) Show up cost is a 4 hour minimum per our houlry rates (Per National Pipe Line agreement) Minimum charge is 4 hours Over time applies after eight hours of work on site and weekends Emergencies and Sundays are double time Rates above apply to day shift (typical BESS day shift hours are 7:00 AM to 3:30 PM). Night rate applies outside of normal shift hours. Overtime after 8hrs on site up to 12hrs and Saturdays Overtime after 12hrs, Emergency,Sundays and Holidays 3% escalation may apply for multi year contracts NOTE: Rates are portal to portal from our nearst office. Mobilization may apply for distances further than 50 miles from nearest office. Hayward (Corporate) | Fresno | Los Angeles | Sacramento | F. (408) 988-0101 Utility Locating - Ground Penetrating Radar (GPR) - Electromagnetic Pipe Locators Structural Concrete Scanning - Potholing Vacuum Excavation - CCTV Pipe Inspection Mobile LiDAR Scanning - 3D Scanning - 3D Utility Mapping - Gas Standy by - www.besstestlab.com DBE 34267 - CSLB 817532 - DIR 1000007058 - MBE 1208095 - SBE 38052 - SLEB 18-00111 - ISN 400231830 BESS Utility Solutions Rate Schedule 2023 Docusign Envelope ID: F0D8DFF4-12E9-4EC8-8480-839FA649F57DDocusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57SBABB8BJ2 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57SBABB8BJ2 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57SBABB8BJ2 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57SBABB8BJ2 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57SBABB8BJ2 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57SBABB8BJ2 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57SBABB8BJ2 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57SBABB8BJ2 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57UECBE2565 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57UECBE2565 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57UECBE2565 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57UECBE2565 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57UECBE2565 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57UECBE2565 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57UECBE2565 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57UECBE2565 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57UECBE2565 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57UECBE2565 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 "6 13.Racing Covered "autos" while used in any pro­ fessional or organized racing or demoli­ tion contest or stunting activity, or while practicing for such contest or activity. This insurance also does not apply while that covered "auto" is being prepared for such a contest or activity. C.Limit Of Insurance Regardless of the number of covered "autos", "insureds", premiums paid, claims made or vehicles involved in the 11 accident11 , the most we will pay for the total of all damages and "covered pollution cost or ex­ pense" combined, resulting from any one "accident" is the Limit of Insurance for Liabil­ ity Coverage shown in the Declarations. All 0bodily injury," "property damage" and 11covered pollution cost or expense" resulting from continuous or repeated exposure to substantially the same conditions will be con­ sidered as resulting from one 11accident". No one will be entitled to receive duplicate payments for the same elements of "loss" under this Coverage Form and any Medical Payments Coverage Endorsement, Uninsured Motorists Coverage Endorsement or Underin­ sured Motorists Coverage Endorsement at­ tached to this Coverage Part. SECTION Ill • PHYSICAL DAMAGE COVERAGE A.Coverage 1.We will pay for "loss" to a covered "auto" or its equipment under: a.Comprehensive Coverage. From any cause except: (1)The covered "auto's"collision with another object; or (2)The covered 11 auto's" overturn. b.Specified Causes of Loss Coverage. Caused by: (1)Fire, lightning or explosion; (2)Theft; (3)Windstorm, hail or earthquake; (4)Flood; (5)Mischief or vandalism; or (6)The sinking, burning, collision or derailment of any conveyance transporting the covered 11auto". c.Collision Coverage. Caused by: (1)The covered "auto's"collision with another object; or (2)The covered "auto's" overturn. 2.Towing. We will pay up to the limit shown in the Declarations for towing and labor costs incurred each time a covered 11 auto11 of the private passenger type is disabled. However, the labor must be performed at the place of disablement. 3.Glass Breakage -Hitting a Bird or Ani­ mal -Falling Objects or Missiles. If you carry Comprehensive Coverage for the damaged covered "auto", we will pay for the following under Comprehen­ sive Coverage: a.Glass breakage; b."Loss" caused by hitting a bird or animal; and c."Loss" caused by falling objects or missiles. However, you have the option of having glass breakage caused by a covered "auto's" collision or overturn considered a "loss" under Collision Coverage. 4.Coverage Extensions a.Transporation Expenses We will pay up to $20 per day to a maximum of $600 for temporary transportation expense incurred by you because of the total theft of a covered "auto1 1 of the private pas­ senger type. We will pay only for those covered "autos" for which you carry either Comprehensive or Speci­ fied Causes of Loss Coverage. We will pay for temporary transportation expenses incurred during the period beginning 48 hours after the theft and ending, regardless of the poli­ cy's expiration, when the covered "auto" is returned to use or we pay for its "loss". b.Loss Of Use Expenses For Hired Auto Physical Damage, we will pay expenses for which an "in­ sured" becomes legally responsible to pay for loss of use of a vehicle rented or hired without a driver, un­ der a written rental contract or agreement. We will pay for loss of use expenses if caused by: (1)Other than collision only if the Declarations indicate that Com­ prehensive Coverage is provided for any covered "auto"; CAOO 0103 06 ®ISO Properties, Inc., 2005 Page 6 of 13 57UECBE2565 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57UECBE2565 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57UECBE2565 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57UECBE2565 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57UECBE2565 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57UECBE2565 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57UECBE2565 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 57UECBE2565 Docusign Envelope ID: 821AEAEB-A021-40D8-B0B1-780EC55F48CCDocusign Envelope ID: B536C704-8F44-4D88-9778-AF8D7015C962 Certificate Of Completion Envelope Id: B536C704-8F44-4D88-9778-AF8D7015C962 Status: Completed Subject: Joint Trunk Line Amendment Source Envelope: Document Pages: 97 Signatures: 8 Envelope Originator: Certificate Pages: 2 Initials: 0 Yeni Martinez AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 707 17th Street Suite 4000 Denver, CO 80202 Yeni.Martinez@cityofgilroy.org IP Address: 66.189.161.134 Record Tracking Status: Original 4/1/2026 2:07:57 PM Holder: Yeni Martinez Yeni.Martinez@cityofgilroy.org Location: DocuSign Signer Events Signature Timestamp Karl Bjarke karl.bjarke@cityofgilroy.org Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 66.189.161.134 Sent: 4/1/2026 2:20:32 PM Viewed: 4/2/2026 11:23:23 AM Signed: 4/2/2026 11:24:29 AM Electronic Record and Signature Disclosure: Not Offered via Docusign LeeAnn McPhillips leeann.mcphillips@cityofgilroy.org Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 66.189.161.134 Sent: 4/2/2026 11:24:33 AM Viewed: 4/2/2026 2:48:20 PM Signed: 4/3/2026 12:09:59 PM Electronic Record and Signature Disclosure: Not Offered via Docusign Andy Faber andy.faber@berliner.com City Attorney Berliner Cohen Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 68.121.158.241 Sent: 4/3/2026 12:10:04 PM Resent: 4/7/2026 8:22:44 AM Resent: 4/13/2026 11:13:20 AM Viewed: 4/13/2026 11:19:34 AM Signed: 4/13/2026 11:20:10 AM Electronic Record and Signature Disclosure: Not Offered via Docusign Matt Morley matt.morley@cityofgilroy.org City Administrator City of Gilroy Security Level: Email, Account Authentication (None) Signature Adoption: Uploaded Signature Image Using IP Address: 66.189.161.134 Sent: 4/13/2026 11:20:15 AM Viewed: 4/13/2026 5:13:22 PM Signed: 4/13/2026 5:13:33 PM Electronic Record and Signature Disclosure: Not Offered via Docusign Signer Events Signature Timestamp Kim Mancera kim.mancera@cityofgilroy.org City Clerk City of Gilroy Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 66.189.161.134 Sent: 4/13/2026 5:13:37 PM Viewed: 4/14/2026 7:08:54 AM Signed: 4/14/2026 7:08:59 AM Electronic Record and Signature Disclosure: Not Offered via Docusign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Stefan Mercer stefan.mercer@cityofgilroy.org Security Level: Email, Account Authentication (None) Sent: 4/14/2026 7:09:02 AM Viewed: 4/14/2026 8:21:43 AM Electronic Record and Signature Disclosure: Not Offered via Docusign Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 4/1/2026 2:20:32 PM Envelope Updated Security Checked 4/3/2026 11:41:21 AM Certified Delivered Security Checked 4/14/2026 7:08:54 AM Signing Complete Security Checked 4/14/2026 7:08:59 AM Completed Security Checked 4/14/2026 7:09:03 AM Payment Events Status Timestamps