HomeMy WebLinkAboutResolution No. 2026-69 | Civic Center Master Plan Resolution | Adopted 10/05/2026
RESOLUTION NO. 2026-69
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF GILROY APPROVING THE 2026 UPDATE OF THE
GILROY CIVIC CENTER MASTER PLAN AND
CERTIFYING THE FINAL ENVIRONMENTAL IMPACT
REPORT INCLUDING FINDINGS FOR CERTIFICATION
OF AN ENVIRONMENTAL IMPACT REPORT (SCH#
2025091066), FINDINGS ON SIGNIFICANT
ENVIRONMENTAL IMPACTS, STATEMENT OF
OVERRIDING CONSIDERATIONS, AND A MITIGATION
MONITORING AND REPORTING PROGRAM FOR THE
GILROY CIVIC CENTER MASTER PLAN
WHEREAS, the City of Gilroy City Council adopted the 2002 Gilroy Civic Center Master
Plan and determined that the documents need an update to address the increasing demands of the
community, underutilized spaces, and aging facilities; and
WHEREAS, in fiscal year 2023-24 the City of Gilroy City Council allocated $750,000
towards a future project to begin the comprehensive planning process for the update to the Gilroy
Civic Center Master Plan; and
WHEREAS, on November 18, 2024, at a regularly scheduled meeting, the City of Gilroy
City Council awarded a contract to ELS Architecture and Urban Design to lead the master plan
process; and
WHEREAS, a community meeting was held to present the draft Gilroy Civic Center
Master Plan and draft EIR on February 25, 2026; and
WHEREAS, the City of Gilroy hosted three community workshops (March 4, 2025, April
8, 2025, and May 20, 2025) where community members had the opportunity to review concepts,
share their ideas, priorities, and concerns; and
WHEREAS, the proposed Gilroy Civic Center Master Plan includes demolition of the
existing City Hall, Wheeler Auditorium, City Hall Annex, Senior Center, Civic Center parking lot,
and Hanna Street, and construction of a new City Hall, multi-generational recreation center with
outdoor swimming pool, multi-generational community center, and a paseo and civic park, as well
as 425 parking spaces; and
WHEREAS, the existing police station and library would remain, on-site trees would be
removed, and there would be 206,389 square feet of sidewalks and planting areas; and
WHEREAS, the function and intensity of some uses (e.g., City Hall) will not increase
even though there will be a net increase in building square footage compared to existing conditions;
and
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Resolution No. 2026-69
Civic Center Master Plan EIR
City Council Regular Meeting | October 5, 2026
Page 2 of 15
WHEREAS, the Wheeler Auditorium is the only structure on-site that is designated
historic (designated historic on August 15, 1983) by the City of Gilroy City Council; and
WHEREAS, the City determined that the appropriate level of review for the Gilroy Civic
Center Master Plan would be an EIR; and
WHEREAS, a Notice of Preparation was circulated to trustee and responsible agencies,
members of the public, and other interested parties, the Governor’s Office of Land Use and Climate
Innovation, and the State Clearinghouse from September 23, 2025 to October 22, 2025 pursuant
to CEQA Guidelines Section 15082, and two comment letters were received from the California
Department of Transportation District 4 and the Department of Toxic Substances Control; and
WHEREAS, pursuant to CEQA Guidelines Sections 15087(d) and (f), the City posted a
Notice of Availability with the Santa Clara County Clerk-Recorder on February 2, 2026, and
posted said notice to its website on February 2, 2026, published the Notice of Availability in the
San Jose Mercury News on February 2, 2026, submitted a Notice of Completion to the State
Clearinghouse on February 3, 2026, and mailed the Notice of Availability to those agencies and
organizations on the City’s distribution list believed to potentially have an interest in the proposed
Gilroy Civic Center Mater Plan; and
WHEREAS, the City prepared the Gilroy Civic Center Master Plan Draft EIR and posted
it to the City’s website on February 3, 2026, and made it available for public review at the Gilroy
Planning Division counter and the Santa Clara County Public Library – Gilroy Branch, and
circulated it for public review with direct mailing and through the State Clearinghouse from
February 3, 2026 to March 27, 2026 pursuant to CEQA Guidelines Sections 15087 and 15105; and
WHEREAS, the City received thirty-six (36) comment letters from individuals,
organizations, and agencies, and responded to those comments in a final environmental impact
report dated August 7, 2026, pursuant to CEQA Guidelines Sections 15089 and 15132, and
provided a copy of the responses to commenters on September 17, 2026, pursuant to CEQA
Guidelines Section 15088(b); and
WHEREAS, a Planning Commission meeting was held to present the draft Gilroy Civic
Center Master Plan and draft EIR on May 7, 2026 not for any recommendation but as a courtesy
review; and
WHEREAS, the City Council considered the Gilroy Civic Center Master Plan Final
Environmental Impact Report, inclusive of the draft and final volumes, on October 5, 2026; and
NOW, THEREFORE, THE CITY OF GILROY CITY COUNCIL DOES HEREBY
make the following findings with respect to the significant effects on the environment of the Gilroy
Civic Center Master Plan pursuant to CEQA Guidelines Section 15091, and statements of
overriding considerations pursuant to CEQA Guidelines Section 15093:
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Resolution No. 2026-69
Civic Center Master Plan EIR
City Council Regular Meeting | October 5, 2026
Page 3 of 15
The findings provide the written analysis and conclusions of the City Council in regard to
environmental impacts and mitigation measures related to the Gilroy Civic Center Master
Plan, and incorporate the draft and final environmental impact report, appendices. The
findings represent the independent judgment of the City Council of the City of Gilroy.
The City Clerk's office of the City of Gilroy, at 7351 Rosanna Street, Gilroy, California
95020 shall be the custodian of documents and record of proceedings on which the decision
is based;
The City makes the following findings, pursuant to CEQA Guidelines Section 15091(a)(1),
regarding significant impacts that are mitigated to a less-than-significant level; i.e. that
changes or alterations have been required in, or incorporated into, the project which avoid
or substantially lessen the significant environmental effect as identified in the final EIR.
The following findings relate specifically to the Gilroy Civic Center Master Plan Final
Environmental Impact Report:
Air Quality
Impact: Operation of Construction Equipment Could Expose Sensitive Receptors to Toxic Air
Contaminants
Mitigation Measure:
AQ-1. With each construction project, the City of Gilroy shall prepare a Construction Management
Plan to include the following measures to reduce TAC emissions during construction:
a. Heavy-duty diesel vehicles will have 2010 or newer model year engines, in
compliance with the California Air Resources Board’s Truck and Bus Regulation;
b. Idling of construction equipment and heavy-duty diesel trucks will be avoided
where feasible, and if idling is necessary, it will not exceed three minutes;
c. All construction equipment will be maintained and properly tuned in accordance
with manufacturer’s specifications and will be checked by a certified visible emissions
evaluator; and
d. All non-road diesel construction equipment will, at a minimum, meet Tier 3
emission standards listed in the Code of Federal Regulations Title 40, Part 89, Subpart B,
§89.112. Further, where feasible, construction equipment will use alternative fuels such as
compressed natural gas, propane, electricity, or biodiesel.
Finding:
Changes or alterations have been required in the project that avoid or substantially lessen the
significant environmental effect as identified in the Draft EIR. Specifically, the abovementioned
mitigation measure imposed upon the project mitigates the impact to a less-than-significant level.
(Less Than Significant with Mitigation Incorporated)
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Resolution No. 2026-69
Civic Center Master Plan EIR
City Council Regular Meeting | October 5, 2026
Page 4 of 15
Facts in Support of Finding:
The dust control measures identified in Mitigation Measure AQ-1 have been recommended by the
air district over time as best management measures for reducing emissions from diesel equipment
used during construction activities. Diesel particulate matter contained in those emissions can be
a health risk to nearby sensitive receptors. Imposition of the measures as contractor specifications
is a common CEQA mitigation approach. The measures will sufficiently reduce diesel emissions
from construction activities such that this potentially significant impact will be reduced to less than
significant.
Biological Resources
Impact: Potential disturbance of Roosting Sites Occupied by Special-Status Bats During
Construction Activities Could Results in the Loss or Harm to Species
Mitigation Measure:
BIO 1. Special-Status Bat Species. Within 14 days prior to tree removal, vegetation clearing,
building demolition, grading, or the initiation of any construction activity in any area of
the project site, a qualified wildlife biologist shall conduct a habitat assessment for bats
and potential roosting sites in trees to be removed, in buildings and trees within 50 feet of
the construction footprint, and surrounding structures situated within 50 feet of disturbance
activities by the project. In the event that construction activities are suspended for 14
consecutive days or longer, these surveys shall be repeated.
Surveys shall include a visual inspection of potential roosting features (bats need not be
present) and a search for presence of guano within the project site, construction access
routes, and 50 feet around these areas. Cavities, crevices, exfoliating bark, and bark fissures
that could provide suitable potential nest or roost habitat for bats shall be surveyed.
Assumptions can be made on what species is present due to observed visual characteristics
along with habitat use, or the bats can be identified to the species level with the use of a
bat echolocation detector such as an “Anabat” unit. Potential roosting features found during
the survey shall be flagged or marked.
Locations off the site to which access is not available may be surveyed from within the site
or from public areas.
If no roosting sites or bats are found, a letter report confirming absence shall be submitted
by the biologist to the City of Gilroy Community Development Department, Planning
Division, where it will be kept on file, and no further mitigation is required.
If bats or roosting sites are found, a letter report and supplemental documents shall be
provided by the biologist to the City of Gilroy Community Development Department,
Planning Division, prior to ground disturbance activities and the following monitoring,
exclusion, and habitat replacement measures shall be implemented:
a. If bats are found roosting outside of the nursery season (May 1 through October 1),
they shall be evicted as described under (b) below. If bats are found roosting during
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Resolution No. 2026-69
Civic Center Master Plan EIR
City Council Regular Meeting | October 5, 2026
Page 5 of 15
the nursery season, they shall be monitored to determine if the roost site is a
maternal roost. This could occur by either visual inspection of the roost bat pups, if
possible, or by monitoring the roost after the adults leave for the night to listen for
bat pups. If the roost is determined to not be a maternal roost, then the bats shall be
evicted as described under (b) below. Because bat pups cannot leave the roost until
they are mature enough, eviction of a maternal roost cannot occur during the
nursery season. Therefore, if a maternal roost is present, a 50-foot buffer zone (or
different size if determined in consultation with the California Department of Fish
and Wildlife) shall be established around the roosting site within which no
construction activities including tree removal or structure disturbance shall occur
until after the nursery season.
b. If a non-breeding bat hibernaculum is found in a tree or snag scheduled for removal
or on any structures within 50 feet of project disturbance activities, the individuals
shall be safely evicted, under the direction of a qualified bat biologist. If pre-
construction surveys determine that there are bats present in any trees or structures
to be removed, exclusion structures (e.g., one-way doors or similar methods) shall
be installed by a qualified biologist. The exclusion structures shall not be placed
until the time of year in which young are able to fly, outside of the nursery season.
Information on placement of exclusion structures shall be provided to the California
Department of Fish and Wildlife prior to construction. If needed, other removal
methods could include: carefully opening the roosting area in a tree or snag by hand
to expose the cavity and opening doors/windows on structures, or creating openings
in walls to allow light into the structures. Removal of any trees or snags and
disturbance within 50 feet of any structures shall be conducted no earlier than the
following day (i.e., at least one night shall be provided between initial roost eviction
disturbance and tree removal/disturbance activities). This action will allow bats to
leave during dark hours, which increases their chance of finding new roosts with a
minimum of potential predation.
Finding:
Changes or alterations have been required in the project that avoid or substantially lessen the
significant environmental effect as identified in the EIR. Specifically, the abovementioned
mitigation measure imposed upon the project mitigates the impact to a less-than-significant level
(Less Than Significant with Mitigation Incorporated)
Facts in Support of Finding:
If special-status bat species are present during construction activities, including tree or building
removal, the project could result in the disturbance of roost sites occupied by special-status bat
species if the activities were to occur on or adjacent to the project site. Implementation of this
mitigation measure would reduce potential impacts to special-status bat species to less than
significant by requiring a habitat assessment for bats and potential roosting sites in trees or
buildings within 50 feet of the construction easement within 14 days prior to issuance of tree
removal, vegetation clearing, building demolition, grading, or the initiation of any construction
activity in any area of the project site. If bats or roosting sites are found, bats shall not be disturbed
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Resolution No. 2026-69
Civic Center Master Plan EIR
City Council Regular Meeting | October 5, 2026
Page 6 of 15
and a notice shall be sent to the City of Gilroy Community Development Department, Planning
Division as well as a specific notice to, and consultation with, California Department of Fish and
Wildlife. Therefore, this impact is less than significant with mitigation incorporated.
Impact: Potential disturbance to Nesting Migratory Birds and Raptors During Construction Could
Results in the Loss or Harm to Species
Mitigation Measure:
BIO-2. To avoid impacts to nesting birds during the nesting season (February 1 through September
15), construction activities that include any tree removal, vegetation clearance, or ground
disturbance (such as grading or grubbing), shall be conducted between September 16 and
January 31, which is outside of the bird nesting season. If construction activities must
commence during the bird nesting season, then a qualified biologist shall conduct a pre-
construction survey for nesting birds to ensure that no nests would be disturbed during
project construction.
a. Two surveys for active nests of such birds shall occur within 10 days prior to start
of construction, with the second survey conducted within 48 hours prior to start of
construction. Appropriate minimum survey radius surrounding the work area is
typically 250 feet for passerines, 500 feet for smaller raptors, and 1,000 feet for
larger raptors. Surveys shall be conducted at the appropriate times of day to observe
nesting activities. Evidence of completion of the preconstruction survey shall be
submitted to the Gilroy Community Development Department, Planning Division,
where it will be kept on file, prior to initiation of ground disturbing activities.
b. If the qualified biologist documents active nests at the project site, an appropriate
buffer between each nest and active construction shall be established. The buffer
shall be clearly marked and maintained until the young have fledged and are foraging
independently. Prior to construction, the qualified biologist shall conduct baseline
monitoring of each nest to characterize “normal” bird behavior and establish a buffer
distance, which allows the birds to exhibit normal behavior. The qualified biologist
shall monitor the nesting birds daily during construction activities and increase the
buffer if birds show signs of unusual or distressed behavior (e.g., defensive flights
and vocalizations, standing up from a brooding position, and/or flying away from
the nest). If buffer establishment is not possible, the qualified biologist shall have
the authority to cease all construction work in the area until the young have fledged
and the nest is no longer active. This measure shall be implemented by the City of
Gilroy prior to initiation of ground disturbing activities.
Finding:
Changes or alterations have been required in the project that avoid or substantially lessen the
significant environmental effect as identified in the EIR. Specifically, the abovementioned
mitigation measure imposed upon the project mitigates the impact to a less-than-significant level
(Less Than Significant with Mitigation Incorporated)
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Resolution No. 2026-69
Civic Center Master Plan EIR
City Council Regular Meeting | October 5, 2026
Page 7 of 15
Facts in Support of the Findings:
If nesting birds and raptors protected by state and federal regulations are present during soil-
disturbing or construction activities including vegetation removal and site preparation, the
proposed project may directly result in loss of active nests, or indirectly result in nest abandonment
and thereby cause loss of fertile eggs or nestlings. Implementation of this mitigation measure
would reduce potential impacts to nesting birds and raptors to less than significant by requiring
preconstruction surveys prior to construction in and adjacent to the project site. If nesting activity
is observed, measures to protect the nest(s) shall be implemented. Therefore, this impact is less
than significant with mitigation incorporated
Impact: The Project May Require Removal of Protected Trees
Mitigation Measure:
BIO-3. Prior to approval of each construction project, the City of Gilroy shall prepare a Landscape
Plan for review and approval by the Community Development Department, Planning
Division indicating the location, size and species of existing trees found within the project
site boundaries. The plan shall indicate which trees are planned for removal. Based on
review of the Landscape Plan, the City shall determine which trees, if any, are
“significant.”
If significant trees are determined to be located on the project site, they shall be retained,
to the greatest extent feasible. The dripline of significant trees to be retained shall be fenced
prior to grading activities to prevent root damage. If retention of all significant trees on the
project site is infeasible, a written report shall be prepared by a certified arborist including
the number and location of each significant tree to be removed, the type and approximate
size of each significant tree, the reason for removal, and specifications for replacing
significant trees to be removed. The written report shall be prepared prior to the
commencement of grading activities, subject to approval by the City of Gilroy Community
Development Department, Planning Division, and a tree removal permit shall be obtained
if needed.
Prior to commencement of construction activities, the protected zone (one to 1.5 times the
distance from the trunk to the dripline, depending on the tree species) of any trees or groups
of trees to be retained shall be fenced to prevent injury to the trees during construction. Soil
compaction, parking of vehicles or heavy equipment, stockpiling of construction materials,
and/or dumping of materials shall not be allowed within the protected zone. The fencing
shall remain in place until all construction activities are complete. The City of Gilroy shall
submit evidence of the locations and extent tree protection measures to the Community
Development Department, Planning Division, where it will be kept on file, prior to
initiation of ground disturbing activities.
Finding:
Changes or alterations have been required in the project that avoid or substantially lessen the
significant environmental effect as identified in the EIR. Specifically, the abovementioned
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Resolution No. 2026-69
Civic Center Master Plan EIR
City Council Regular Meeting | October 5, 2026
Page 8 of 15
mitigation measure imposed upon the project mitigates the impact to a less-than-significant level.
(Less Than Significant with Mitigation Incorporated)
Facts in Support of the Findings:
If there are significant/protected trees on the project site, implementation of the proposed project
could result in the loss of said trees. Implementation of this mitigation measure would reduce
potential impacts to protected trees to less than significant by requiring the preparation of a
landscape plan prior to approval of each construction project. The landscape plan will identify the
location, size, and species of existing trees found within the project site boundaries and which are
planned for removal. Based upon this plan, the City will determine which trees are considered
“significant.” If significant trees are found on the site, the landscape plan will outline the measures
to take in order to retain these trees, to the greatest extent feasible. Therefore, this impact is less
than significant with mitigation incorporated
Cultural Resources
Impact: Potential Loss of or Damage to Unique Archaeological Resources During Construction
Mitigation Measure:
CUL-2. In the event archaeological resources are encountered during ground disturbing activities;
contractor shall temporarily halt or divert excavations within a 50 meter (165 feet) of the
find until it can be evaluated. All potentially significant archaeological deposits shall be
evaluated to demonstrate whether the resource is eligible for inclusion on the California
Register of Historic Resources, even if discovered during construction. If archaeological
deposits are encountered, they shall be evaluated and mitigated simultaneously in the
timeliest manner practicable, allowing for recovery of materials and data by standard
archaeological procedures. For precontact and indigenous archaeological sites, this data
recovery involves the hand-excavated recovery and non-destructive analysis of a small
sample of the deposit. Any previously undiscovered resources found during construction
activities shall be recorded on appropriate California Department of Parks and Recreation
(DPR) forms and evaluated for significance by a qualified archaeologist. Unique
archaeological cultural resources consist of but are not limited to stone (ground and flaked),
bone, organic materials, ceramics, fossils, wood, or shell artifacts. Features include hearths,
cairns, middens, and postholes.
Finding:
Changes or alterations have been required in the project that avoid or substantially lessen the
significant environmental effect as identified in the EIR. Specifically, the abovementioned
mitigation measure imposed upon the project mitigates the impact to a less-than-significant level
(Less Than Significant with Mitigation Incorporated)
Facts in Support of the Findings:
According to General Plan EIR Figure 3.5-1, Archaeological Sensitivity, the project site is in a
low archaeological sensitivity zone, which is consistent with a recent review of Northwest
Information Center files from previous searches of Gilroy. Nonetheless, Mitigation Measure CUL-
2 is designed to ensure that, if unknown unique archaeological resources are accidentally
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Resolution No. 2026-69
Civic Center Master Plan EIR
City Council Regular Meeting | October 5, 2026
Page 9 of 15
uncovered during construction activities, appropriate measures are taken to protect and treat the
resources. This is standard mitigation that ensures the potential impact on unique archaeological
resources, if present, are reduced to less than significant.
Impact: Potential to Disturb Native American Human Remains During Construction
Mitigation Measure:
CUL-3. In the event that human remains (or remains that may be human) are discovered at the
project site, Public Resource Code Section 5097.98 shall be followed. All grading or
earthmoving activities shall immediately stop within 50 meters (165 feet) of the find. The
Santa Clara County Corner will be notified immediately, and the coroner shall be permitted
to examine the remains as required by California Health and Safety Code Section
7050.5(b). Section 7050.5 requires that excavation be stopped in the vicinity of discovered
human remains until the coroner can determine whether the remains are those of a Native
American. If human remains are determined as those of Native American origin, the City
of Gilroy shall comply with the state relating to the disposition of Native American burials
that fall within the jurisdiction of the NAHC (Public Resource Code [PRC] § 5097). The
coroner shall contact the Native American Heritage Commission (NAHC) to determine the
most likely descendant(s) (MLD). The MLD shall complete his or her inspection and make
recommendations or preferences for treatment within 48 hours of being granted access to
the site. The MLD will determine the most appropriate means of treating the human
remains and associated grave artifacts, and shall oversee the disposition of the remains. In
the event the NAHC is unable to identify an MLD or the MLD fails to make a
recommendation within 48 hours after being granted access to the site, the landowner or
his/her authorized representative shall rebury the Native American human remains and
associated grave goods with appropriate dignity within the project site in a location not
subject to further subsurface disturbance if: a) the Native American Heritage Commission
is unable to identify the MLD or the MLD failed to make a recommendation within 48
hours after being allowed access to the site; b) the descendent identified fails to make a
recommendation; or c) the landowner or his authorized representative rejects the
recommendation of the descendent, and the mediation by the Native American Heritage
Commission fails to provide measures acceptable to the landowner.
Finding:
Changes or alterations have been required in the project that avoid or substantially lessen the
significant environmental effect as identified in the EIR. Specifically, the abovementioned
mitigation measure imposed upon the project mitigates the impact to a less-than-significant level
(Less Than Significant with Mitigation Incorporated)
Facts in Support of the Findings:
Mitigation Measure CUL-3 is designed specifically to provide direction for actions to be taken if
human remains, rather than other cultural resource artifacts, are uncovered during construction.
This is standard mitigation that will ensure potential impacts on Native American human remains,
if present, are reduced to less than significant.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Resolution No. 2026-69
Civic Center Master Plan EIR
City Council Regular Meeting | October 5, 2026
Page 10 of 15
Greenhouse Gas Emissions
Impact: Generate Greenhouse Gas Emissions During Operation of the Project
Mitigation Measure:
GHG-1. The following GHG emissions reduction performance measures shall be incorporated into
the final project designs and plans for each development project:
a. No permanent natural gas infrastructure shall be permitted; no natural gas shall be
made available through permanent natural gas infrastructure. The project shall be all
electric; and
b. Electric vehicle infrastructure (e.g., elective vehicle parking spaces, charging
station infrastructure, chargers, etc.) consistent with the CALGreen Tier 2 standards in
effect at the time building permits are issued shall be included in the project.
Final plans for the development shall be reviewed by the City of Gilroy Community
Development Department, Planning Division Director or his/her designee prior to
approval of project entitlements to ensure that all performance standards are
incorporated into the project design. Verification of development consistent with the
performance standards shall be assured prior to approval of occupancy permits.
Finding:
Changes or alterations have been required in the project that avoid or substantially lessen the
significant environmental effect as identified in the EIR. Specifically, the abovementioned
mitigation measure imposed upon the project mitigates the impact to a less-than-significant level.
(Less Than Significant with Mitigation Incorporated)
Facts in Support of the Findings:
The standards for eliminating natural gas infrastructure and implementing electric vehicle (EV)
infrastructure are not explicitly stated as part of the proposed project or in other City regulations
that apply to future development within the project site. Therefore, Mitigation Measure GHG-1 is
required to ensure that all future projects constructed on the project site will be all electric (no
natural gas), and parking lots will incorporate EV infrastructure consistent with CALGreen Tier 2
standards. This mitigation ensures that the project’s greenhouse gas emissions are reduced to less
than significant.
Impact: Conflict with an Applicable Plan, Policy, or Regulation for Reducing Greenhouse Gases
Mitigation Measure:
GHG-1. See above.
Finding:
Changes or alterations have been required in the project that avoid or substantially lessen the
significant environmental effect as identified in the EIR. Specifically, the abovementioned
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Resolution No. 2026-69
Civic Center Master Plan EIR
City Council Regular Meeting | October 5, 2026
Page 11 of 15
mitigation measure imposed upon the project mitigates the impact to a less-than-significant level.
(Less Than Significant with Mitigation Incorporated)
Facts in Support of the Findings:
With implementation of Mitigation Measure GHG-1, the proposed project would meet the four
performance standards identified by the air district in the 2022 CEQA Thresholds guidance as
necessary to find GHG impacts to be less than significant. Therefore, with mitigation implemented,
the project would not conflict with the applicable plan for reducing GHG emissions.
Significant and Unavoidable Environmental Impacts
The City, pursuant to CEQA Guidelines Section 15091(a)(3), makes the following findings
that specific economic, legal, social, technological, and other benefits of the proposed use
outweigh significant loss of a historic resource that may not be mitigated to a less-than-
significant level:
Impact: The Proposed Recreational Center Would Result in the Loss of the Historic Wheeler
Auditorium, which is on the City of Gilroy’s List of Historic Resources
Mitigation Measure:
CUL-1.a. Prior to issuance of any demolition permit, a qualified architectural historian shall
document the Wheeler Auditorium at 7377 Church Street in accordance with the guidelines
established for the Historic American Building Survey (HABS). Documentation shall
consist of the following components:
1. Drawings – Prepare sketch floor plans.
2. Photographs – Digital photographic documentation of the interior, exterior, and setting
of the buildings in compliance with the National Register Photo Policy Fact Sheet.
Photos must have a permanency rating of approximately 75 years.
3. Written Data – HABS written documentation in short form.
An architectural historian meeting the Secretary of the Interior’s Professional Qualification
Standards shall oversee the preparation of the sketch plans, photographs and written data.
The existing DPR forms shall fulfill the requirements for the written data report.
The City of Gilroy’s Historian shall review the documentation, and then file the
documentation with the Northwest Information Center at Sonoma State University, the
repository for the California Historical Resources Information System. All documentation
shall be submitted on archival paper.
CUL-1.b. The City shall develop the material prepared in CUL-1 into a public educational display
within the new community center.
Finding:
The proposed project includes the demolition of several of the existing on-site structures, including
the Wheeler Auditorium. The Wheeler Auditorium is the only structure on-site that is designated
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Resolution No. 2026-69
Civic Center Master Plan EIR
City Council Regular Meeting | October 5, 2026
Page 12 of 15
as historic. Implementation of the following mitigation measures will provide some mitigation
relief; however, there are no mitigation measures that would reduce the impact to a less-than-
significant level. Therefore, even with the mitigation measures presented above, the impact would
be significant and unavoidable. (Significant and Unavoidable)
Facts in Support of the Finding:
Documentation of the Wheeler Auditorium pursuant to the Historic American Building Survey
and displaying this documentation in a public educational display within the new community
center would help preserve information about the building but cannot offset or replace the loss of
the resource itself. Therefore, the impact is significant and unavoidable.
The City makes the following Statement of Overriding Considerations for the significant and
unavoidable environmental impact (Loss of a Historic Resource):
The City finds and determines that the benefits of the proposed project are sufficient to make a
finding that the environmental effect that is not reduced to a level of less than significant is
acceptable and justify the adoption of a Statement of Overriding Considerations. The following
Findings cite substantial evidence in the record and state the City of Gilroy’s specific reasoning
(CEQA Guidelines Section 15093(b). In the event that any finding is declared unenforceable or
inadequate as a matter of law, such finding will be considered deleted, and the remaining findings
shall remain in full force and effect.
The proposed project, as set forth in the City’s Findings, would feasibly and inclusively achieve
all of the specific economic, legal, social, technological, or other benefits identified below. In
accordance with CEQA Guidelines Section 15093, the City Council finds that the benefits of the
proposed project outweigh the unavoidable adverse environmental effects that would result from
its implementation, and that the adverse environmental effect listed above is considered
acceptable, for the specific reasons set forth below:
Although the Wheeler Auditorium is on the City of Gilroy list of historic resources, it is a
stand-alone, individual resource that does not have any direct contextual associations, nor
does it appear to have any direct associations to historical events.
The architecture is otherwise and evidently basic, plain and minimal, without a site or site
features of historical character. The interior architecture, excluding the minimal extension
into the lobby, is architecturally utilitarian.
The original architects and builders, Binder & Curtis and George Renz, respectively, may
be noteworthy yet are not of limited historic importance.
The historical association to the Wheelers is supportive yet in name only as that association
does not translate into physical forms or features (Preservation Architecture August 2026).
The proposed recreation center would offer more opportunities for youth, adult, and senior
programs, include gym facilities, aquatics programming, and arts and crafts workshops for
all age groups, than currently available in the Wheeler Auditorium.
The aquatic facility would provide a public aquatic center for the southern and eastern parts
of Gilroy, as there is no facility in the immediate area available to the public.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Resolution No. 2026-69
Civic Center Master Plan EIR
City Council Regular Meeting | October 5, 2026
Page 13 of 15
The proposed project is anticipated to capably serve the full range of municipal services demanded
by the City of Gilroy. As set forth above, the proposed project provides significant benefits to the
City and the community of Gilroy as a whole. The City Council has weighed the benefits of the
proposed project against the significant and unavoidable impact of the proposed project identified
in the Final EIR and listed above. The City Council hereby determines that the benefits of the
proposed project outweigh the adverse impacts of the proposed project, and further determines that
the significant and unavoidable cultural/historic resources impact is acceptable.
Accordingly, the City Council adopts the Statement of Overriding Considerations, recognizing
that a significant and unavoidable impact will result from implementation of the proposed project.
Having adopted all feasible mitigation measures as discussed in the Draft EIR, Final EIR, and
Findings; rejected infeasible alternatives to the proposed project as discussed in the Draft and Final
EIR, the Findings, and this Statement of Overriding Considerations; and recognized the significant
and unavoidable impact of the proposed project, the City Council hereby finds that each of the
separate benefits of the proposed project, as stated herein, is determined to be unto itself an
overriding consideration, independent of other benefits, that warrants approval of the proposed
project and outweighs and overrides its significant and unavoidable impact, and thereby justifies
the approval of the proposed project.
NOW, THEREFORE, THE CITY OF GILROY CITY COUNCIL FURTHER
RESOLVE to certify the Gilroy Civic Center Master Plan Environmental Impact Report
(SCH#2025091066) attached as Exhibit A in its entirety pursuant to CEQA Guidelines Section
15090, and adopts a mitigation monitoring and reporting program, attached at Exhibit B, pursuant
to CEQA Guidelines Sections 15091(d) and 15097.
NOW, THEREFORE, BE IT RESOLVED.
PASSED AND ADOPTED this 5th day of October 2026 by the following roll call vote:
AYES: COUNCIL MEMBERS: BRACCO, CLINE, HILTON, FUGAZZI
MARQUES, RAMIREZ, BOZZO
NOES: COUNCIL MEMBERS: NONE
ABSTAIN: COUNCIL MEMBERS: NONE
ABSENT: COUNCIL MEMBERS: NONE
NOW, THEREFORE, THE CITY OF GILROY CITY COUNCIL DOES FURTHER
RESOLVE to approve the 2026 update to the Gilroy Civic Center Master Plan attached as Exhibit
C.
NOW, THEREFORE, BE IT RESOLVED.
PASSED AND ADOPTED this 5th day of October 2026 by the following roll call vote:
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Resolution No. 2026-69
Civic Center Master Plan EIR
City Council Regular Meeting | October 5, 2026
Page 14 of 15
AYES: COUNCIL MEMBERS: BRACCO, CLINE, HILTON,
MARQUES, RAMIREZ, BOZZO
NOES: COUNCIL MEMBERS: FUGAZZI
ABSTAIN: COUNCIL MEMBERS: NONE
ABSENT: COUNCIL MEMBERS: NONE
APPROVED:
Greg Bozzo, Mayor
ATTEST:
Kim Mancera, City Clerk
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Resolution No. 2026-69
Civic Center Master Plan EIR
City Council Regular Meeting | October 5, 2026
Page 15 of 15
CERTIFICATE OF THE CLERK
I, KIM MANCERA, City Clerk of the City of Gilroy, do hereby certify that the attached
Resolution No. 2026-69 is an original resolution, or true and correct copy of a City Resolution,
duly adopted by the Council of the City of Gilroy at a Regular Meeting of said Council held on
Monday, October 5, 2026, with a quorum present.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the Official Seal of
the City of Gilroy this Wednesday, October 7, 2026
Kim Mancera
City Clerk of the City of Gilroy
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Final E nvironmental I mpact R eport
Gilroy Civic Center Master Plan
SCH # 2025091066
August 7, 2026
Prepared by
EMC Planning Group
Exhibit ADocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
This document was produced on recycled paper.
FINAL E NVIRONMENTAL I MPACT R EPORT
G ILROY C IVIC C ENTER M ASTER P LAN
SCH# 2025091066
PREPARED FOR
City of Gilroy
Ryan Osenton, Project Manager
7351 Rosanna Street
Gilroy, CA 95020
Tel 408.846.0277
Ryan.Osenton@cityofgilroy.org
PREPARED BY
EMC Planning Group Inc.
601 Abrego Street
Monterey, CA 93940
Tel 831.649.1799
Fax 831.649.8399
Shoshana Lutz, Senior Planner
lutz@emcplanning.com
www.emcplanning.com
August 7, 2026
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
EMC Planning Group Inc.
Table of Contents
1.0 INTRODUCTION.................................................................................................... 1-1
1.1 CEQA Requirements ....................................................................................................... 1-1
1.2 Purpose of Public Review ............................................................................................... 1-2
1.3 Final EIR ............................................................................................................................ 1-3
2.0 DRAFT EIR COMMENTS AND RESPONSES ........................................................ 2-1
2.1 CEQA Requirements ....................................................................................................... 2-1
2.2 Written Comments on the Draft EIR ........................................................................... 2-1
3.0 CHANGES TO THE DRAFT EIR ........................................................................... 3-1
3.1 CEQA Requirements ....................................................................................................... 3-1
3.2 Changes to Section 1.0 Introduction ............................................................................. 3-1
3.3 Changes to Section 4.0 Project Description ................................................................. 3-2
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 1.0 Introduction 1-1 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
1.0
Introduction
1.1 CEQA Requirements
Before approving a project that may cause a significant environmental impact, the California
Environmental Quality Act (CEQA) requires the City of Gilroy (“City”), acting as the Lead Agency
under CEQA, to prepare and certify a final environmental impact report (“final EIR”). The contents
of a final EIR are specified in CEQA Guidelines Section 15132, which states that:
The final EIR shall consist of:
a) The draft EIR or a revision of the draft;
b) Comments and recommendations received on the draft EIR either verbatim or in summary;
c) A list of persons, organizations, and public agencies commenting on the draft EIR;
d) The responses of the Lead Agency to significant environmental points raised in the review and
consultation process; and
e) Any other information added by the Lead Agency.
All comments addressing environmental issues received on the draft EIR during the public review
period from February 3, 2026 to March 27, 2026 have been addressed in this final EIR. The draft
EIR is incorporated by reference.
CEQA Guidelines section 15204(a) states that in reviewing a draft EIR, persons and public agencies
should focus on the sufficiency of the document in identifying and analyzing the possible impacts on
the environment and ways in which the significant effects of the project might be avoided or
mitigated. Comments are most helpful when they suggest additional specific alternatives or
mitigation measures that would provide better ways to avoid or mitigate the significant
environmental effects. At the same time, reviewers should be aware that the adequacy of an EIR is
determined in terms of what is reasonably feasible, in light of factors such as the magnitude of the
project at issue, the severity of its likely environmental impacts, and the geographic scope of the
project.
Per CEQA Guidelines section15204(a), CEQA does not require a lead agency to conduct every test
or perform all research, study, and experimentation recommended or demanded by commenters.
Likewise, a lead agency also need not respond to general reference materials submitted in support of
comments, comments that repeat those already considered, or comments that are clearly irrelevant.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 1.0 Introduction 1-2 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
According to CEQA Guidelines section 15204(a), when responding to comments, lead agencies
need only respond to significant environmental issues and do not need to provide all information
requested by reviewers, as long as a good faith effort at full disclosure is made in the EIR, as also
described in CEQA Guidelines sections 15088(c) and 15132(d).
CEQA Guidelines section 15204(c) states that reviewers should explain the basis for their
comments, and should submit data or references offering facts, reasonable assumptions based on
facts, or expert opinion supported by facts in support of the comments. Pursuant to section 15064,
an effect shall not be considered significant in the absence of substantial evidence.
CEQA Guidelines section 15088 requires the lead agency to provide a written proposed response to
a public agency on comments made by that public agency at least 10 days prior to certifying an EIR.
Written responses to comments have been prepared to address comments on the project and have
been sent to the commenting agencies and organizations.
CEQA Guidelines 15095(a) also requires that the lead agency file a copy of the final EIR with the
appropriate planning agency of any city, county, or city and county where significant effects on the
environment may occur. A copy of this final EIR is available for review at the City of Gilroy
Planning Department, 7351 Rosanna Street, Gilroy.
1.2 Purpose of Public Review
CEQA Guidelines section 15200 indicates that the purposes of the public review process include the
following:
sharing expertise;
disclosing agency analysis;
checking for accuracy;
detecting omissions;
discovering public concerns; and
soliciting counter proposals.
In compliance with CEQA public noticing requirements, the City prepared a draft EIR for the
proposed project that was circulated for public review from February 3, 2026 to March 27, 2026.
The City received 36 comment letters/emails from organizations and individuals.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 1.0 Introduction 1-3 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
1.3 Final EIR
This final EIR has been prepared to address timely comments received on the draft EIR in the
manner specified in the Notice of Completion/Availability and, together with the draft EIR,
constitutes the complete Gilroy Civic Center Master Plan Final EIR. This final EIR is organized into the
following sections:
Section 1 - introduction to the final EIR;
Section 2 - list of persons, organizations, and public agencies that commented on the draft EIR,
written comments on the draft EIR and the responses to those comments; and
Section 3 - changes to the draft EIR made in response to comments on the draft EIR. Such
changes clarify, amplify, or otherwise make modifications to the draft.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 1.0 Introduction 1-4 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
This side intentionally left blank.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-1 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
2.0
Draft EIR Comments and Responses
2.1 CEQA Requirements
CEQA Guidelines section 15132(c) requires that a final EIR contain a list of persons, organizations,
and public agencies that have commented on the draft EIR. A list of the correspondence received
during the public review period is presented below.
CEQA Guidelines sections 15132(b) and 15132(d) require that a final EIR contain the comments
that raise significant environmental points in the review and consultation process, and written
responses to those comments. A copy of each comment letter or other form of correspondence
received during the public review period is provided, with each letter identified by a number at the
top of the first page. Individual comments to which responses are provided are numbered along the
left margin in each letter. Responses corresponding to the numbered comments are presented
immediately following each letter.
Where required, revisions have been made to the text or graphics of the draft EIR in response to
comments. Comments that trigger changes to the draft EIR are so noted as part of the response.
2.2 Written Comments on the Draft EIR
The City received written comments from the following organizations and individuals during the
public review period:
1. Gilroy Bicycle Pedestrian Advisory Committee, February 17, 2026;
2. Chet Kirby, February 20, 2026;
3. Casey Estorga, February 21, 2026;
4. Michael Griffis, March 14, 2026;
5. Gilroy Historical Society, March 23, 2026;
6. Ruben Dario Villa, March 27, 2026;
7. Santa Clara Valley Transportation Authority, March 27, 2026;
8. Rebecca Scheel, February 10, 2026;
9. Wells Wadleigh, February 23, 2026;
10. Gina Johnson, February 24, 2026;
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-2 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
11. Margaret Aron, March 27, 2026;
12. Cynthia Van Laar, Gilroy Gator Swim Team Board President, February 24, 2026;
13. Luis Ramirez, February 25, 2026;
14. Alexis Morales, February 26, 2026;
15. Yolanda Calimpong, March 14, 2026;
16. Peter Van Dyke, March 14, 2026;
17. Frank Sanchez, March 15, 2026;
18. Linda, March 15, 2026;
19. Dr. David Matuszak and Mrs. Maureen M. Hunter, Gilroy Historical Society, March 15, 2026;
20. Maretta Juarez, March 16, 2026;
21. Corina R. Deleon, March 16, 2026;
22. Judy Garcia, March 20, 2026;
23. Edward Aguirre, March 23, 2026;
24. Bernadette Rowlison, March 23, 2026;
25. Pat Reinhart, March 23, 2026;
26. Pamela Salter, Member of Gilroy Historical Society, March 23, 2026;
27. Teddy Goodrich, March 24, 2026;
28. Toby Echelberry, March 25, 2026;
29. Samantha Emburton, March 25, 2026;
30. Christine Flautt, March 25, 2026;
31. Kathi Orlando, March 25, 2026;
32. Conrad Calimpong, March 25, 2026;
33. Len Stimic, March 25, 2026;
34. Phil Stimic, March 26, 2026;
35. Len Stimic, March 26, 2026; and
36. Kathy Sullivan, March 27, 2026.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:Gilroy BPAC
To:Ryan Osenton
Subject:EXTERNAL - Public Comment for Civic Center Master Plan Draft EIR (CIP 800930)
Date:Tuesday, February 17, 2026 7:59:27 AM
Attachments:Civic Center Master Plan EIR_GilroyBPAC.pdf
Ryan Osenton,
Attached is our public comment for Civic Center Master Plan Draft EIR (CIP 800930) 45-day
public comment period ending March 27, 2026.
https://www.cityofgilroy.org/1063/Civic-Center-Master-Plan
We also wanted to ask add the following to the Civic Center Maser Plan webpage to make it
more clear how to provide public comment during the CEQA 45-day public period. This info
below isn't on there but we saw it on social media and newsletters.
How to Participate-
Review the DEIR and submit written comments by email to Ryan.Osenton@cityofgilroy.org
during the 45-day review period which closes March 27, 2026.
Community Meeting-
City staff will present the Draft Master Plan and DEIR findings, followed by Q&A and
discussion.
Date: Wednesday, February 25
Time: 6:00 PM
Location: Council Chambers
Thank you.
Gilroy Bicycle Pedestrian Advisory Committee (Gilroy BPAC)
GilroyBPAC@gmail.com
&RPPHQW/HWWHU
1
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
February 17, 2026
Re: Civic Center Master Plan Draft EIR
Project Number: (CIP 800930)
Project Title: Civic Center Master Plan
Project Applicant: City of Gilroy
Project Location: Spanning approximately 14 acres in central Gilroy, the Civic Center site is
bordered by Sixth Street, Seventh Street, Dowdy Street, and Church Street.
Assessor Parcel No: N/A
Ryan Osenton,
Thank you for the opportunity to respond to the Civic Center Master Plan Draft EIR. Comments
below are based on the review of the Draft EIR. Additional comments may be forthcoming
pending final review. This project will have a direct impact in the City of Gilroy by achieving our
goal to reduce air emissions from on-road motor vehicles and future developments. Improve air
quality by encouraging our residents, commuters, employees to mode shift from vehicles to
cycling, increase walking as alternatives to driving for short and first/last mile trips, and add new
riders to the transit system.
We are glad to see the inclusion of bike parking to further reduce Vehicle Miles Traveled (VMT)
and greenhouse gas (GHG) emissions. With its convenient location to transit, shopping, and
bike/ped facilities there are few barriers to reducing VMT at this project. With the recent
adoption of our City’s General Plan 2040, we as a community called for bold actions that include
continuing to promote cleaner modes of transportation. We encourage existing and proposed
development to incorporate Transportation Demand Management (TDM) measures such as
car-sharing, transit passes, and unbundling of parking (requiring separate purchase or lease of
a parking space) where such measures will result in a reduction in vehicle miles traveled,
reduction of required amount of parking or an increase in the use of alternate transportation
modes. We suggest all new construction incorporate an all-electric model and be fossil fuel free
in order to reduce greenhouse gas emissions.
We are actively embracing, advancing ideas, and projects that promote the concept of free-
range people in the City of Gilroy. We advocate for building and planning that considers future
generations as well as current residents who don’t own cars. Advancing mobility options reflects
what we are teaching the youth in our community through Safe Routes to School and why we
are nationally recognized as a Bronze Bicycle Friendly Community from the League of American
1
2
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Bicyclists, as well as recognized by the World Health Organization as an Age-Friendly
Community. Continuing to leverage our Measure B Education & Encouragement (E&E) funding
for established work plans/programs will further enhance Gilroy’s efforts. Measure B E&E Bike
to Work Day, Community Bike/Walks Counts, Community Engagement, General, Online Media
Campaign, and Safe Routes to School work plans.
While there might be portions of our city that are isolated from transit, this development is not in
one of those areas. Gilroy has a fully connected bike network and transit options. We have a
large population that works, visits, and attends schools in Gilroy that benefits from local transit
and rideshare. Gilroy has the vision that the glass is half full, we have the ability to innovate, and
adapt to programs that will further reduce our VMT.
Providing an incentive that rewards the effort of biking/walking/transit is important. This project
connects to 6th St and Church St which are designated by the General Plan 2040 as a
Pedestrian-Oriented Street. We thank city staff, consultant, and applicant for always prioritizing
short and long term bike parking, transit options, TDM programs, street trees, and sidewalks.
We have the following recommendations and comments based on the Civic Center
Master Plan Draft EIR and our General Plan 2040 Mobility-
Thank you for recognizing Impact 8-1 Generate Greenhouse Gas Emissions GHG-1. The
following GHG emissions reduction performance measures shall be incorporated into the final
project designs and plans for each development project:
Buildings
-No permanent natural gas infrastructure shall be permitted; no natural gas shall be
made available through permanent natural gas infrastructure. The project shall be all
electric.
Transportation
-Achieve a reduction in project-generated vehicle miles traveled (VMT) below the
regional average consistent with the current version of the California Climate Change
Scoping Plan (currently 15 percent) or meet a locally adopted Senate Bill 743 VMT
target, reflecting the recommendations provided in the Governor’s Office of Planning and
Research's Technical Advisory on Evaluating Transportation Impacts in CEQA.
-Electric vehicle infrastructure (e.g., elective vehicle parking spaces, charging
station infrastructure, chargers, etc.) consistent with the CALGreen Tier 2 standards in
effect at the time building permits are issued shall be included in the project.
REACH Code for Electric Vehicle (EV)- The adoption of the 2022 California Green Building
Standards Code pertaining to electric vehicle (EV) charging for new residential and
non-residential construction REACH codes for EV’s applies to this project or CALGreen Tier 2
whichever requires more. Recommend Installation of Electric Vehicle (EV) Charging
2
3
2
cont'd
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Stations as mitigation for the Bay Area Air Quality Management District 2022 Consistency
with GHG Reduction Performance Standards Support
Staff, Recommend Shower, Locker, & Dressing Facilities- Provide staff showers and
dressing areas for each gender. Provide dressing rooms for each gender and one locker for
each required long-term bicycle parking space. Required lockers shall be located in relation to
required showers and dressing areas to permit access to locker areas by either gender.
Recommend a Dero Bike Fixit Station with Air Kit Bike Pump and Public Outdoor Feature-
We recommend placing additional bike fixit stations near the required bike parking. This would
add to the current network throughout the City. https://www.dero.com/product/fixit/
General Plan 2040 Mobility-The Mobility Element provides the framework for decisions in
Gilroy concerning the citywide transportation system. It seeks to create a balanced
transportation network that supports and encourages walking, bicycling, and transit ridership.
The goals and policies address a variety of topics, including multimodal transportation, complete
streets, pedestrian facilities, bikeways, public transit, vehicular transportation, parking, and
goods movement.
Goal of Mobility M4- Plan for efficient and convenient local and regional transit systems
that respond to the changing needs of Gilroy. Mobility 4.2- Transit and Development
require new developments to fully accommodate, enhance, and facilitate public transit,
including pedestrian and bicycle access to transit. What has this development done to
enhance pedestrian and bicycle access to transit? Partnerships with cities are essential for
improving access to public transit.
Mobility 1.7: Reduce Vehicle Miles Traveled. Reduce VMT and GHG emissions by
developing a transportation network that makes it convenient to use transit, ride a
bicycle, walk, or use other non-automobile modes of transportation. Support and we are
excited to see the City of Gilroy implement their own Bike Parking Ordinance and VMT/TDM
Ordinance so that future developments don’t have to continue to rely on VTA.
Policy M 4.2. Transit and Development. Require new development to fully accommodate,
enhance, and facilitate public transit, including pedestrian and bicycle access to transit.
Support
Policy M 5.3: Promote Non-Auto Modes of Transportation. Consider offering incentives
as part of a multimodal system approach, for projects that incorporate travel demand
management techniques and promote transit ridership, biking, and walking in order to
reduce air pollution, energy consumption, and GHG emission.
Existing Transit Services- The nearest VTA bus stops serving the development are Frequent
Route 68 (15 minute headway Monterey Rd/7th Gilroy Transit Center) less than 1/4 mile east of
the project site. Local Route 85 (1 hour headway 6th/Rosanna) serves the project site. Route
568 Rapid (30 minute headway) stops located at Gilroy Transit Center. You can take your bike
3
3
cont'd
5
7
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
with you or park it at an e-locker at the Gilroy Transit Center. This is a great opportunity to
promote the use of public transit to the residents and visitors through outreach programs
established in a Transportation Demand Management (TDM) program. Leverage the Measure B
E&E funding the city has and the marketing outreach resources from Valley Transportation
Authority (VTA)1. Bus service between Santa Clara County and Monterey County with 4 round
trips Mon-Fri on Bus Line 59 running between VTA’s Gilroy Transit Center and Salinas
Intermodal Transit Center/AMTRAK.2
Sincerely,
Gilroy Bicycle Pedestrian Advisory Committee (Gilroy BPAC)
GilroyBPAC@gmail.com
https://www.facebook.com/GilroyBPAC
We are a community group actively embracing, advancing ideas, and projects that promote the concept of
free-range people in Gilroy. We support building projects that are energy resilient and promote the
reduction of greenhouse gasses (GHG). We are seeking your input whether you are a BMX rider, trail
runner, recreational bike rider, MTB rider, walker, and hiker! #GilroyBPAC
2 https://mst.org/wp-content/media/59.pdf
1 https://www.vta.org/faq/how-do-i-start-riding-vta
4
7
cont'd
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-8 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 1 – Gilroy Bicycle Pedestrian Advisory Committee (BPAC)
1. The commenter requests that language be added to the master plan webpage to make it more
clear how to provide public comment during the 45-day public review period.
The comment does not raise an environmental issue associated with the adequacy of the draft
EIR. Therefore, no response is required. No change to the draft EIR is required.
2. The commenter states that the project will have a direct impact in achieving goals to reduce
air emissions and improve air quality as well as encourage residents, commuters, and
employees to shift from driving to cycling, walking, and transit use. The commenter notes
support for increasing walking for short trips, first/last mile connections, and adding new
transit riders. The commenter states that they are glad to see the inclusion of bike parking and
that the site’s location near transit and bicycle/pedestrian facilities all reduce vehicle miles
traveled (VMT) and greenhouse gas (GHG) emissions. The commenter encourages existing
and proposed development to incorporate Transportation Demand Management measures
and suggests that all new construction incorporate an all-electric model and be fossil fuel free
to reduce GHG emissions. The commenter also notes that the project site is not in an area
isolated from transit and discusses the benefits of local transit and rideshare in Gilroy.
Refer to Section 9.12, Transportation (beginning on page 9-23), of the draft EIR, which
addresses VMT. As described therein, the VMT analysis prepared for the project, and
included as Appendix D of the draft EIR, concluded that the proposed uses consist of local-
serving public facilities located within an established community. Such uses are expected to
result in shorter trips and reduced travel distances, as they provide services that would
otherwise be sought elsewhere. Therefore, the project would result in a less than significant
VMT impact and no transportation demand management measures are required. Although
they cannot be required as mitigation measures, the City could choose to include them in the
master plan.
Section 8.0, Greenhouse Gases (beginning on page 8-16), of the draft EIR, addresses building
energy use and GHG emissions. As described therein, natural gas use is a source of direct
GHG emissions, and all-electric development is identified as necessary to support State goals
for carbon neutrality. Mitigation Measure GHG-1 requires that no permanent natural gas
infrastructure be permitted and that all future development be constructed as all-electric.
No change to the draft EIR is required.
3. The commenter references draft EIR Impact 8-1 (GHG emissions) and acknowledges
Mitigation Measure GHG-1, which requires the project to be all electric (no natural gas) and
requires electric vehicle infrastructure (e.g., elective vehicle parking spaces, charging station
infrastructure, chargers, etc.) consistent with the CALGreen Tier 2 standards. The commenter
implies that they would also like the following additional mitigation added:
Achieve a reduction in project-generated vehicle miles traveled (VMT) below the regional
average consistent with the current version of the California Climate Change Scoping
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-9 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Plan (currently 15 percent) or meet a locally adopted Senate Bill 743 VMT target,
reflecting the recommendations provided in the Governor’s Office of Planning and
Research's Technical Advisory on Evaluating Transportation Impacts in CEQA.
Refer to Section 8.0, Greenhouse Gases (beginning on page 8-16), of the draft EIR, which
evaluates operational greenhouse gas (GHG) emissions and concludes that impacts would be
less than significant with mitigation. As described therein, project-generated GHG emissions
would primarily result from transportation, energy use, water and wastewater, and solid waste.
The analysis applies Bay Area Air Quality Management District performance standards, which
includes less than significant vehicle miles traveled (VMT) impacts, less than significant
energy impacts, elimination of natural gas infrastructure, and incorporation of electric vehicle
(EV) infrastructure. The analysis concludes that the project would achieve less than
significant impacts related to energy use and VMT, and with implementation of Mitigation
Measure GHG-1 (requiring all-electric construction and EV infrastructure consistent with
CALGreen Tier 2 standards), the project would meet all applicable performance standards
and reduce GHG impacts to a less-than-significant level. Therefore, the commenter’s
recommended inclusion of the VMT-related performance standard is not necessary because
the project already meets that performance standard. Refer to Section 9.12, Transportation,
(as well as Appendix D for the Transportation analysis) for the VMT analysis, which
concludes the VMT impact is less than significant.
No change to the draft EIR is required.
4. The commenter recommends that the project include staff showers and dressing areas for
each gender and one locker for each required long-term bicycle parking space. The
commenter also recommends the installation of bicycle repair stations near bicycle parking.
In theory, providing staff showers, lockers, and bicycle repair stations could encourage
employees and visitors to ride a bicycle instead of driving a car. These measures cannot be
added to the EIR as mitigation measures, as the impacts are already mitigated to a less than
significant level. However, the City could choose to include them in the master plan.
No change to the draft EIR is required.
5. The commenter references the General Plan 2040 Mobility Element and asks what the
development has done to enhance pedestrian and bicycle access to transit.
As described in Section 9.12, Transportation, page 9-22 of the draft EIR, the proposed
project is consistent with General Plan Policy M 4.2, which requires new development to fully
accommodate, enhance, and facilitate public transit, including pedestrian and bicycle access to
transit. The nearest bus stop is on 6th Street at the northeast corner of the project site. The
proposed project would include walkways leading to this bus stop. Additionally, existing
bicycle facilities on 6th Street from Dowdy Street and Hanna Street and on Church Street
would not be removed or otherwise damaged thereby accommodating access to existing
transit facilities.
No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-10 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
6. The commenter references the General Plan 2040 Mobility Element and includes several
policies that they support. The commenter also notes that they’re excited for the City to
implement their own Bike Parking Ordinance and VMT/TDM Ordinance so the City doesn’t
have to rely on VTA.
The comment does not raise an environmental issue associated with the adequacy of the draft
EIR and, therefore no response is required. No change to the draft EIR is required.
7. The commenter identifies existing transit services serving the project area and notes
proximity to the Gilroy Transit Center. The commenter states that transit access, bicycle
accommodations, and connections to regional transit are available and encourages promotion
of transit use through outreach and Transportation Demand Management (TDM) programs.
The comment does not raise an environmental issue associated with the adequacy of the draft
EIR and no response is required. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:krrrbc@charter.net
To:Ryan Osenton
Subject:EXTERNAL - Civic Center Master Plan
Date:Friday, February 20, 2026 8:16:09 AM
Do we really need to do this? What is the justification for this plan?
What is the estimated cost?
Where is the money coming from?
How long is the project expected to take once started?
What is the proposed start date?
What is the anticipated traffic impact during and after the project?
Respectfully;
Chet Kirby
408-607-2023BBBBBBBBBBBBBBB
Comment Letter #2
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-12 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 2 – Chet Kirby
1. The commenter asks what the estimated cost of the project is, the source of funding, and the
anticipated project timeline once construction begins.
The comment does not raise an environmental issue associated with the adequacy of the draft
EIR and, therefore, no response is required. No change to the draft EIR is required.
2. The commenter asks what the anticipated traffic impacts would be during and after the
project.
Refer to Section 9.12, Transportation (beginning on page 9-22), which addresses
transportation impacts. As described therein, the project would not conflict with applicable
plans, policies, or programs related to circulation, including transit, roadway, bicycle, and
pedestrian facilities. The project primarily consists of local-serving public facilities and does
not include substantial roadway modifications, aside from removal of Hanna Street within the
project site, and would not introduce new roadway extensions. The VMT analysis concludes
that the project would result in a less than significant impact, as the uses would remain local-
serving and would support shorter trips within the community. In addition, all site access and
circulation improvements would be designed in accordance with City standards and reviewed
by applicable departments to ensure safe operation and adequate emergency access.
Therefore, transportation impacts associated with the project would be less than significant.
No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
From:Casey Estorga
To:Ryan Osenton
Subject:EXTERNAL - Civic Center EIR - Question re: East Block
Date:Saturday, February 21, 2026 8:54:50 PM
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
Ryan,
I could not find where the EIR considered how saturating the area adjacent to the East Block will impact circulation
specifically with respect to the alley between Church Street and Rosanna Street.
That alley is a natural outlet as the Church Street at 6th Street intersection already has extensive traffic during its
peaks. The alley is already in disrepair and has been for years (maybe decades). This includes damaged curb access
on both ends, failing pavement throughout, and unmaintained landscaping in the public right of way. There are also
blind spots as vehicles park illegally - both within the alley and on both ends.
These concerns do not apply to the Central Block or the West Block as they are not adjacent to an intersection with
activity similar to that of Church Street at 6th Street.
The alley already gets increased traffic when Wheeler Auditorium is active with events. How does the City plan to
mitigate the negative impacts to the alley as it undoubtedly becomes a cut-through (aka a desire path) when the
Civic Center is fully built-out, including with a high-traffic Recreation and Aquatics Center at the corner? As the
EIR notes, people would be advised to park along 6th Street to access these amenities. Is part of the Civic Center
plan to revitalize the alley so it can handle more intensified traffic (of all modes)?
Thanks!
Truly,
Casey
1
Comment Letter #3
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-14 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 3 – Casey Estorga
1. The commenter states that they could not find where the EIR considered circulation impacts
adjacent to the East Block, specifically with respect to the alley between Church Street and
Rosanna Street. The commenter states that the alley functions as an outlet due to traffic at the
Church Street and 6th Street intersection and experiences increased traffic during events at
Wheeler Auditorium. The commenter further states that the alley is in disrepair, including
damaged curb access, failing pavement, and unmaintained landscaping within the public right-
of-way. The commenter also notes blind spots caused by illegal vehicle parking within the
alley and at both ends. The commenter clarifies that these concerns do not apply to the
Central Block or West Block as they are not adjacent to an intersection with similar activity.
The commenter states that the alley would become a cut-through route when the Civic
Center is built out, including the Recreation and Aquatics Center, and asks how the City plans
to address potential increases in traffic. The commenter references that the draft EIR states
that people would be advised to park along 6th Street to access project amenities and
questions how this would affect use of the alley and whether the Civic Center plan includes
improvements to the alley so it can accommodate increased traffic and use.
A vehicle miles traveled analysis was prepared for the project as required per CEQA. The
evaluation of traffic operations and vehicular congestion is no longer required under CEQA.
However, the City could choose to prepare an operations analysis evaluating off-site facilities
at some point, but it is not required for CEQA compliance.
No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:Mike Griffis
To:Ryan Osenton
Subject:EXTERNAL - Comments Against the Demolition of Wheeler Auditorium as Part of the Civic Center Master Plan
Date:Saturday, March 14, 2026 6:22:56 AM
I was appalled to read in a recent Dispatch article that the City was even considering tearing
down Wheeler Auditorium.
Wheeler Auditorium was constructed in the 1940's, and was designated as a Historic Structure
by the City Council in 1983.
The City of Gilroy 2040 General Plan calls for public and private efforts for the preservation
of historic and architecturally significant buildings. Under the Historic and Cultural
Resources section, it states that "The policies in this section strive to preserve Gilroy's historic
and cultural resources to preserve its local heritage for future generations. " And lists Goal
NCR 5 "Preserve significant historic buildings, sites, and resources to enrich the sense of place
and appreciation of the city's history."
The above is about complying with the city's 2040 Plan, but what about doing the morally
right thing for our community. The Historic Wheeler Auditorium has provided recreational
and cultural activities to generations of the people of Gilroy. In my own personal
experiences, I have seen my children and grandchildren participate in recreational activities in
the Auditorium. Just the thought that our City Council would consider demolishing the
Auditorium is beyond belief to me.
Don't destroy a part of our history just to provide for some new shiny buildings.
Michael Griffis
3/14/2026
Yahoo Mail: Search, Organize, Conquer
1
2
Comment Letter #4
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-16 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 4 – Michael Griffis
1. The commenter states that the Wheeler Auditorium was constructed in the 1940s and was
designated as a Historic Structure by the City Council in 1983. The commenter also
references the City of Gilroy 2040 General Plan and that it calls for preservation of historic and
architecturally significant buildings, including policies and goals related to preserving historic
and cultural resources.
Preservation Architect prepared a memo on August 6, 2026 providing their historic
architectural considerations of the Wheeler Auditorium and concluded that the Wheeler
Auditorium is a stand-alone, individual resource as it does not have any direct contextual
associations and does not appear to have any direct associations to historical events. While
there is an established basis for a finding of historic importance, the architecture is otherwise
and evidently basic, plain and minimal, without a site or site features of historical character
(Preservation Architect 2026).
Also refer to Section 7.0, Cultural Resources, of the draft EIR, which provides an analysis of
the project’s impacts to cultural resources. The draft EIR concludes that demolition of the
Wheeler Auditorium would result in a significant and unavoidable impact even with
implementation of Mitigation Measure CUL-1.a and CUL-1.b, which requires that a qualified
architectural historian document the auditorium in accordance with the guidelines established
for the Historic American Building Survey; an architectural historian meeting the Secretary of
the Interior’s Professional Qualification Standards shall oversee the preparation of the plans,
photographs, and written data; the City’s Historian shall review the documentation and file it
with the Northwest Information Center at Sonoma State University, the repository for the
California Historic Resources Information System; and requires developing all of this material
into a public educational display within the new community center.
Section 13.0, Alternatives, of the draft EIR discusses Alternative #2, which would retain the
historic structure in place and require a redesign of the project. The conclusion states that this
alternative is the environmentally superior alternative as it would avoid the significant and
unavoidable impact. However, this alternative meets the fundamental project objectives to a
lesser degree because the intent of the project is to maximize site uses and meet space needs
for applicable City staff and programming at City buildout. As discussed in Section 12.0,
Significant and Unavoidable Impacts, of the draft EIR, if the City Council approves the
project, they would be required to adopt a Statement of Overriding Considerations, finding
that the benefits of the project outweigh the significant and unavoidable impacts.
No change to the draft EIR is required.
2. The commenter states that Wheeler Auditorium has provided recreational and cultural
activities to generations of the community and references personal experiences associated
with the facility. The commenter also states opposition to the potential demolition of
Wheeler Auditorium as part of the project.
The comment does not raise an environmental issue associated with the adequacy of the draft
EIR and, therefore, no response is required. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
From:Steve Brady
To:Ryan Osenton; Mayor Greg Bozzo; Council Member Carol Marques; Council Member Dion Bracco; Council
Member Tom Cline; Council Member Terence Fugazzi; Council Member Zachary Hilton; Council Member Kelly
Ramirez; Matt Morley
Cc:Joanie M. Lewis; Connie Rogers; Linda; lcsjr31@garlic.com; johnson95020@yahoo.com; etcavall@hotmail.com;
MaureenHunter8@yahoo.com; karenpedigo10@aol.com; dmatuzak2@aol.com; blhmft@gmail.com;
sosar@verizon.net
Subject:EXTERNAL - GHS Comments to Civic Center Master Plan/Draft EIR - Wheeler Auditorium
Date:Monday, March 23, 2026 1:36:31 PM
CAUTION: This email originated from an External Source. Please use proper judgment and caution
when opening attachments, clicking links, or responding to this email.
Mr Osenton, City Council Members & City Administrator,
See the attached letter containing the Gilroy Historical Society’s comments and position on the
subject Master Plan/Draft EIR, particularly regarding the demolition of the historic Wheeler
Auditorium.
Please do not hesitate to contact our President Ms Joanie Lewis regarding our concerns as expressed
in the letter. Hard copies of the letter will be hand carried to the city administration offices today.
Sincerely,
Steve Brady
GHS Vice President
$PNNFOU-FUUFS
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@
DPOUhE
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-20 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 5 – Gilroy Historical Society
1. The commenter states that the Draft EIR identifies demolition of Wheeler Auditorium as a
significant and unavoidable impact and states that this outcome is unacceptable. The
commenter states a preference for Alternative #2, the “Retain Historic Wheeler Auditorium
in Place and Redesign the Proposed Project” alternative identified in the draft EIR. The
commenter states that Wheeler Auditorium is listed on the City’s Historic Resources list and
describes its architectural style as Moderne (also described as Art Deco) and states that while
the interior may need renovation, the exterior is worth preserving. The commenter states that
Wheeler Auditorium has been used for community events, including plays, dances, concerts,
weddings, and classes, and that it is accessible to the community and provides a sense of
place. The commenter states that the building can continue to fulfill its purpose if the interior
is remodeled to better meet current needs. The commenter further states that demolition of
the building would result in a loss of a major part of Gilroy’s history that cannot be retrieved
or replaced.
See response to letter 4, comment 1. No change to the draft EIR is required.
2. The commenter states that locating an aquatics center in or next to a new recreation building
would increase traffic on 6th Street and Church Street and that it would be difficult to
accommodate this increase, even with additional parking. The commenter believes that
people would rather not swim next to two very busy streets.
Refer to Section 9.12, Transportation (beginning on page 9-22), of the draft EIR, which
addresses transportation impacts. As described therein, the project would modify site access
and circulation but would be designed in accordance with City standards and reviewed by
applicable City Departments to ensure safe operation. Additionally, the VMT impacts
evaluated in the draft EIR are concluded to be less than significant because although the
building square footages would increase compared to existing conditions, the intensity of
these uses would not increase and all proposed uses would continue to be local-serving public
services. The VMT analysis (Appendix D of the draft EIR) concludes that the project’s public
services improve people’s proximity to recreational and other community services resulting in
shorter trips and a decrease in VMT (p. 2). Therefore, transportation impacts overall would
be less than significant.
No change to the draft EIR is required.
3. The commenter states that the recreation/aquatics center facility would result in a negative
impact of noise and traffic on the character and quality of life of the surrounding
neighborhood. The commenter states opposition to locating the facility at the proposed
location and indicates a preference for locating such a facility at other sites, including
Christmas Hill Park or Christopher High School.
Refer to Section 9.8, Noise (beginning on page 9-17), of the draft EIR, which addresses noise
impacts. As described therein, construction noise would be temporary and limited to hours
permitted by the City’s General Plan and Municipal Code, and operational noise associated
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-21 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
with the project would be minimal and consistent with existing conditions. The project would
also be required to comply with applicable noise standards ensuring that noise levels do not
exceed established thresholds. Therefore, construction and operational noise impacts
associated with the project would be less than significant. Refer to the response under
comment 2 above for a discussion about traffic impacts. No change to the draft EIR is
required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:Ruben Dario Villa
To:Ryan Osenton
Cc:All Council Members
Subject:EXTERNAL - RE: Comments on Public Review Draft EIR – Gilroy Civic Center Master Plan (SCH# 2025091066)
Date:Friday, March 27, 2026 12:20:41 AM
Dear Mayor, City Council, and Staff,
Thank you for the opportunity to comment on the Public Review Draft Environmental
Impact Report (Draft EIR) for the Gilroy Civic Center Master Plan. These comments are
submitted on behalf of community organizations and stakeholders engaged in arts, culture, and
downtown vitality in Gilroy, including SV Creates, Gilroy Foundation, Gilroy Downtown
Business Association, Gilroy Arts Alliance, and Gilroy Arts Roundtable among others.
We appreciate the City’s effort to plan comprehensively for the future of the Civic Center and
downtown. The Civic Center will serve as a defining civic space for Gilroy for decades to
come, and thoughtful planning now will help ensure the project successfully supports
community use, cultural programming, and downtown vitality.
We also note the City Council’s recent approval of the Community Event Support Program.
As the number of events continues to grow, it becomes increasingly important that civic
spaces like Civic Park are designed to support recurring events efficiently—minimizing cost
and logistical barriers while providing consistent, well-designed environments for safe
community use.
As organizations and community leaders actively involved in arts, culture, and downtown
programming in Gilroy, we are particularly interested in how the Civic Center’s design will
support public events, cultural programming, and community gatherings over time.
Purpose of Comment
The purpose of these comments is to help ensure the Final EIR clearly describes how the
proposed Civic Center will function once fully activated and to clarify key assumptions related
to event programming, the intended role of Civic Park, and peak-use conditions.
+ + +
1. Civic Park Programming and Performance Infrastructure
The Civic Center Master Plan describes Civic Park as a flexible open space capable of hosting
community gatherings such as farmers markets, performances, and civic events. However, the
plan does not clearly define whether outdoor concerts or amplified music events are intended
uses of the park. This creates uncertainty about whether the park’s design is aligned with its
intended function.
Previous iterations of the Master Plan included a stage or designated performance area within
Civic Park. It was only during recent public discussions associated with the Draft EIR that
stakeholders became aware this element had been removed, reportedly due to acoustic
considerations. In response, we re-engaged with participating organizations and community
stakeholders to confirm whether there remains support for outdoor performance infrastructure.
1
2
Comment Letter #6
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
There is strong and consistent support for including a permanent stage or integrated
performance platform as part of the park design.
If Civic Park is intended to function as a venue for performances, concerts, and cultural events
—as described in the Master Plan—then the project should include a permanent stage or
integrated performance platform as part of the park design.
Purpose-built performance infrastructure would allow the City to orient sound appropriately,
reduce repeated temporary stage installations, and lower logistical costs for community event
producers. It would also allow acoustic considerations to be addressed proactively through
design rather than reactively through temporary solutions. From a practical standpoint, the
presence—or absence—of basic performance infrastructure directly affects the feasibility and
quality of civic programming.
While acoustic considerations present real design challenges, they are commonly addressed
through site orientation, sound engineering, and operational guidelines. The removal of
performance infrastructure, rather than its thoughtful design, risks limiting the Civic Center’s
ability to achieve its stated goals of supporting community programming and cultural
activation.
A clearly defined program, supported by appropriate infrastructure, will help ensure Civic
Park becomes an intentional and well-activated public space.
Requested Clarification for the Final EIR
The Final EIR should clearly state whether Civic Park is intended to support outdoor
performances and, if so, should reflect the inclusion of a permanent stage or integrated
performance infrastructure as part of the project design.
+ + +
2. Operational Noise and Event Programming
The Draft EIR concludes that operational noise increases associated with the Civic Center
redevelopment would be minimal and generally consistent with existing civic uses. However,
the project description anticipates community programming and public gatherings.
If the Civic Center is intended to support events such as markets, festivals, and performances,
the noise analysis should clearly reflect those uses. Event programming can introduce
conditions that differ from typical daytime civic operations, particularly where amplified
sound is involved.
Requested Clarification for the Final EIR
The Final EIR should clearly describe the assumptions used in the noise analysis, including
the anticipated frequency, timing, and amplification of community events, to ensure the
analysis reflects the reasonably foreseeable use of the civic campus.
+ + +
3. Transportation and Parking – Peak Use Conditions
The Draft EIR relies primarily on a Vehicle Miles Traveled (VMT) screening approach and
concludes that the project would not result in significant transportation impacts. While
2
cont'd
3
4
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
consistent with current CEQA practice, this approach does not fully address how the Civic
Center campus will function during peak-use conditions.
The Master Plan envisions a more active civic campus with expanded programming and
community use. However, the analysis does not clearly describe how the site will operate
during periods of higher activity, such as evenings, weekends, or special events when multiple
uses may occur simultaneously.
Requested Clarification for the Final EIR
The Final EIR should clarify the assumptions used to conclude that project intensity would not
increase and should include a qualitative discussion of how the Civic Center will
accommodate peak-use conditions, including overlapping civic uses and community events.
+ + +
Conclusion
The Civic Center Master Plan represents a significant opportunity to shape the civic heart of
Gilroy. Providing additional clarity around event programming, the intended role of Civic
Park, and peak-use conditions will strengthen the Final EIR and help ensure the project’s
design aligns with its long-term civic goals.
Thank you for your time and consideration.
Respectfully submitted,
Silicon Valley Creates
Alexandra Urbanowski, Executive Director
Gilroy Foundation
Jaclyn Muro, Executive Director
Gilroy Downtown Business Association
Amber Attebery, Co-Chair
Gilroy Arts Alliance
Marianne Eichenbaum, President
Sharon Albert, Vice President
Gilroy Arts Roundtable Steering Committee
La Ofrenda Festival / Casa de Cultura y Arte
Ruben Dario Villa, Executive Director
MANOS Folklórico
Mina Castañeda, Director
The Neon Exchange
Toni Bowles, CEO
Ruben Dario Villa
5
4
cont'd
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Chair, Arts and Culture Commission
Luis Ramirez
Commissioner, Parks and Recreations Commission
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-26 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 6 – Ruben Dario Villa
1. The commenter acknowledges the opportunity to comment on the draft EIR and states
appreciation for the City’s effort to plan for the Civic Center and downtown. The commenter
states that the Civic Center will serve as a defining civic space and should support community
use, cultural programming, and downtown vitality. The commenter references the City’s
Community Event Support Program and states that as events increase, civic spaces should be
designed to support recurring events efficiently and reduce logistical barriers. The commenter
states that the purpose of the comments is to ensure the Final EIR clearly describes how the
Civic Center will function once fully activated, including assumptions related to event
programming, the role of Civic Park, and peak-use conditions.
The comment is introductory to the comments in the letter and does not raise an
environmental issue. Therefore, no response is required. No change to the draft EIR is
required.
2. The commenter states that the Master Plan describes Civic Park as a flexible space for
community gatherings but does not clearly state whether outdoor concerts or amplified music
events are intended uses. The commenter states that previous versions of the Master Plan
included a stage or designated performance area, which has been removed. The commenter
states that there is support for including a permanent stage or integrated performance
platform and requests that the Final EIR clarify whether Civic Park is intended to support
outdoor performances and reflect inclusion of performance infrastructure if applicable. The
commenter states that if Civic Park is intended to support performances and events, the
project design should include appropriate infrastructure and clearly defined programming.
While the amphitheater was considered in earlier design options, it is not currently proposed
as part of the master plan, and therefore, the noise associated with an amphitheater was not
evaluated in the draft EIR. The reference to the amphitheater was inadvertently left in the
EIR project description. Section 4.0, Project Description, of the draft EIR has been revised to
remove reference to the amphitheater, which is no longer part of the project design. Refer to
Section 3.0, Changes to the draft EIR, of this final EIR. If the City does decide to add an
amphitheater or music venue to the civic center, supplemental environmental analysis would
be required.
3. The commenter states that the draft EIR concludes operational noise would be minimal but
that the project anticipates community programming and public gatherings. The commenter
states that event programming, including markets, festivals, and performances, may introduce
different noise conditions, particularly where amplified sound is involved. The commenter
requests that the Final EIR describe the assumptions used in the noise analysis, including
frequency, timing, and amplification of community events.
The proposed master plan includes a Multigenerational Community Center that would
include a community theatre seating up to 200 people for music, drama, dance, and spoken-
word performances. The master plan does not contemplate large outdoor music gatherings.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-27 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Refer to Section 9.8, Noise, on page 9-17, of the draft EIR, which discusses operational noise
impacts of the proposed project. The proposed project would be subject to compliance with
City Municipal Code standards for noise to ensure that events and activities conducted at the
site would not exceed such standards. The assumptions for what types of activities and events
may occur at the project site are identified within Section 4.0, Project Description, of the draft
EIR. Refer also to the response under comment 2, above.
No change to the draft EIR is required.
4. The commenter states that the draft EIR relies on a Vehicle Miles Traveled (VMT) screening
approach and does not fully address how the Civic Center would function during peak-use
conditions. The commenter states that the analysis does not clearly describe how the site
would operate during periods of higher activity, such as evenings, weekends, or special events
when multiple uses may occur simultaneously. The commenter requests that the Final EIR
clarify assumptions related to project intensity and include discussion of how peak-use
conditions and overlapping uses would be accommodated.
See response to letter 3 regarding traffic operations. No change to the draft EIR is required.
5. The commenter states that additional clarity regarding programming, Civic Park role, and
peak-use conditions would help align the project with long-term civic goals.
Comment acknowledged. Refer to the response under comment 4, above. No change to the
draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:Crighton, Triana
To:Ryan Osenton
Cc:Swierk, Robert; plan.review; Bus.Stop
Subject:EXTERNAL - VTA Comments on Draft Gilroy Civic Center Master Plan & Draft EIR [GI2601]
Date:Friday, March 27, 2026 3:48:28 PM
Attachments:Outlook-av2pcmgn.png
VTAComments_GI2601_GilCivicCenter_MasterPlan_EIR.pdf
Ryan,
VTA appreciates the opportunity to comment on the draft Environmental Impact Report
(EIR) and public review draft for the Gilroy Civic Center Master Plan.
Our formal comment letter is attached.
Thank you again for the opportunity to review this plan. If you have any questions, please
feel free to contact me if any clarification is needed.
Best,
Triana K. Crighton (she/her)
Senior Transportation Planner || Land Use and Development Review
Phone: 408-321-5691
Comment Letter #7
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
March 27, 2026
City of Gilroy
7351 Rosanna Street
Gilroy, CA 95020
Attn: Ryan Osenton
Dear Ryan,
VTA appreciates the opportunity to comment on the draft Environmental Impact Report (EIR)
and public review draft for the Gilroy Civic Center Master Plan, shared with VTA staff by City
Council Member Zachary Hilton on February 13, 2026.
VTA has reviewed the documents and has the following comments:
Overall Plan Area Design
VTA supports the Master Plan’s intent to strengthen and modernize the public service and
recreational uses of the Plan Area. The planned three new civic buildings and the new Civic
Center Park will help create an environment that is connected, vibrant, and active – providing
green spaces, recreational uses, and public services. With residential areas, downtown Gilroy
shops and restaurants, and public transit services nearby, the reimagined Gilroy Civic Center will
contribute to the kind of work-live-play environment that VTA encourages and supports.
Active Transportation Connectivity to Downtown Gilroy
Acknowledging the current Plan Area’s Walk Score of 90, VTA staff still encourages the City to
consider what active transportation improvements can be planned and implemented to better
connect the new Gilroy Civic Center to downtown Gilroy along 6th Street and 7th Street. For
example, intersection improvements at West 7th and Church Street, and dedicated/striped bicycle
lanes on either 6th Street or 7th Street would help improve safety and comfort for bicyclists and
pedestrians.
Community Design and Transportation (CDT) Manual
As it applies to the future specific design of the Master Plan Area, VTA encourages the City to
utilize VTA’s Community Design and Transportation (CDT) Manual to inform the Plan Area's
design. The CDT guidelines provide strategies for shaping the built environment and parking
layouts to promote pedestrian activity, support transit, and enhance community character.
Transportation Demand Management (TDM) Measures
VTA supports the Gilroy Bicycle Pedestrian Advisory Committee’s comment letter regarding
incorporating TDM measures within the Master Plan. Acknowledging that the buildout of the
Plan Area will not produce significant VMT impacts, VTA still encourages the City consider
TDM measures that can enhance and complement non-automobile modes of travel to and around
the Plan Area. BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
sd>ĂŶĚhƐĞΘĞǀĞůŽƉŵĞŶƚZĞǀŝĞǁ
WĂŐĞϮŽĨϮ
Bus Stop Improvements
VTA’s Local Bus Route 85 services West 6th Street along the Plan Area. Local Route 85
connects several key areas such as downtown Gilroy and the Gilroy Caltrain Station. VTA has
two existing bus stops on the Plan Area frontage:
x 6th & Hanna
x 6th and Rosanna
As specific streetscape design proceeds for the Plan Area, please coordinate with the VTA
Passenger Facilities Team via e-mail at Bus.Stop@vta.org. Additionally, VTA would like the
opportunity to review future specific site plans to ensure the placement of driveways,
landscaping and any other features do not conflict with bus operations. VTA’s Transit Passenger
Environment Plan provides design guidelines for bus stops. VTA’s Bus Stop Placement,
Closures and Relocations Policy details VTA’s policies for these topics.
Proposed Parking Reconfiguration on 7th Street
The Gilroy Civic Center Master Plan Civil Conceptual Narrative states (on Appendix B, page
109) that “The existing parallel parking on 7th Street between Church and Hanna however is
proposed to be converted to angled parking. This will require the curb to be shifted into the site
thereby eliminating the existing planting strip.” VTA recommends that the City carefully
consider how this proposed parking reconfiguration would affect safety and comfort of
pedestrians and cyclists along 7th Street, as well as pedestrians and cyclists approaching the Civic
Center area on Rosanna Street from the south.
Thank you again for the opportunity to review this plan. If you have any questions, please do not
hesitate to contact me at triana.crighton@vta.org, or the VTA Land Use and Development
Review team at plan.review@vta.org
Sincerely,
Triana Crighton
Senior Transportation Planner
GI2601 BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-31 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 7 – Santa Clara Valley Transportation Authority
1. The commenter states support for the Master Plan’s intent to strengthen and modernize
public service and recreational uses and notes that the project would create a connected and
active environment with access to transit, residential areas, and downtown uses.
The comment does not raise an environmental issue associated with the adequacy of the draft
EIR and, therefore, no response is required. No change to the draft EIR is required.
2. The commenter encourages the City to consider active transportation improvements to better
connect the Civic Center to downtown along 6th Street and 7th Street, including intersection
improvements and dedicated or striped bicycle lanes.
Although active transportation improvements cannot be required as mitigation measures
because there is no significant adverse transportation impact, the City could choose to include
them in the master plan. No change to the draft EIR is required.
3. The commenter encourages the City to utilize VTA’s Community Design and Transportation
Manual to inform future design of the Plan Area, including strategies for pedestrian activity,
transit support, and parking layout.
Although strategies for pedestrian activity, transit support, and parking layout cannot be
required as mitigation measures because there is no significant adverse transportation impact,
the City could choose to include them in the master plan. No change to the draft EIR is
required.
4. The commenter supports incorporation of Transportation Demand Management (TDM)
measures and encourages the City to consider measures that enhance non-automobile modes
of travel to and around the Plan Area.
Refer to response to letter 1, comment 3. No change to the draft EIR is required.
5. The commenter states that VTA Route 85 serves the project area and identifies existing bus
stops along 6th Street. The commenter requests coordination with VTA on future site design
to ensure compatibility with bus operations and references applicable VTA design guidelines
and policies.
The comment does not raise an environmental issue associated with the adequacy of the draft
EIR and, therefore, no response is required. No change to the draft EIR is required.
6. The commenter references proposed conversion of parallel parking to angled parking on 7th
Street and recommends that the City consider potential effects on safety and comfort for
pedestrians and cyclists.
The comment does not raise an environmental issue associated with the adequacy of the draft
EIR and, therefore, no response is required. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:REBECCA SCHEEL
To:Ryan Osenton
Subject:EXTERNAL - Gilroy Civic Center questions
Date:Tuesday, February 10, 2026 8:19:46 AM
Good morning Ryan,
I’ve communicated with you before, I’m a Gilroy resident who swims laps regularly, currently
at Gavilan College. I’m interested in the Pool options in the Plan.
Can you pls tell me how many lanes there will be in the outdoor Pool & the length of the lanes
(for lap swimming)?
Also, it’s very hard to tell from the photos but it looks like the play area/non-lap area is
connected to the Lap Pool without a wall or separation. Is it the same body of water or are
there two separate pools?
If it’s the same water, I’m concerned about the water temperature & other unpleasant things
which little kids do in the water which causes pools to close for cleaning. (It happens at the
Morgan Hill YMCA indoor pool regularly.)
If the temperature of the play area pool is kept warmer, the lap lanes will be too warm for
workouts. Gavilan College has temperature issues since they changed their 2 pools to 1 pool
with a swim-way/isle. The lap pool & the lower level pool (for aquatics) are separated by an
swim-way/isle. They did it to save money on heating the pool but they have regretted it.
Thank you,
Rebecca
Rebecca Scheel
rscheel@verizon.net
mobile: 408.930.8805
1
Comment Letter #8
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-33 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 8 – Rebecca Scheel
1. The commenter asks questions about the proposed pool, such as how many lanes will be
provided and the length of the lanes for lap swimming. The commenter expresses concern
that if the pools are combined, differences in water temperature and maintenance issues could
affect lap swimming conditions.
The comment is regarding specific pool design and does not raise an environmental issue and,
therefore, no response is required. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:Wells Wadleigh
To:Ryan Osenton
Subject:EXTERNAL - Comments on Civic Center plan
Date:Monday, February 23, 2026 8:41:55 AM
Hello
I am very concerned about the plan for PARKING near the library. The planners seem to be
unaware of the location of the main entrance to the library. Please go to the site as it
currently exists and look again.
The planners have placed a swimming pool east of the library in an area that currently
provides a number of parking spots that are essential for library patrons. Seniors will be
especially inconvenienced and even discouraged from using the library if they have to walk all
the way from the west side. Are you planning to create another entrance for the library? I
don't see that in the plans. Users of the pool will be taking many of the parking places that
are now used by library patrons. And I suspect that the average pool user will be occupying a
parking space much longer than the average library user.
Sincerely yours,
Wells Wadleigh
2901 Grassland Way
Gilroy
1
2
Comment Letter #9
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-35 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 9 – Wells Wadleigh
1. The commenter states concern regarding the location and availability of parking near the
library and indicates that the proposed placement of the swimming pool would remove
existing parking spaces used by library patrons. The commenter states this may inconvenience
users, including seniors.
The comment does not raise an environmental issue and, therefore, no response is required.
No change to the draft EIR is required.
2. The commenter asks whether a new library entrance is proposed and states that the plans do
not appear to show an additional entrance. Additionally, the commenter notes that pool users
may occupy parking spaces for longer durations than library users.
The comment is on the parking design and does not raise an environmental issue and,
therefore, no response is required. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:Gina Johnson
To:Ryan Osenton
Subject:EXTERNAL - Civic Center master plan
Date:Tuesday, February 24, 2026 7:59:54 PM
Hi I do not think the Wheeler Civic Center should be torn down. It was built in 1940 and is
aesthetically pleasing. Getting rid of older buildings makes cities loose their charm. Plus the
buildings on the plan look like the police station which is not very attractive. It would be
cheaper to fix the existing buildings rather than to tear them down and build new ones. There
is also the debris from the buildings that would fill our land fills. I also don’t think we need
another pool. There are 3 in Gilroy plus the aquatic center at Gilroy gardens. There is also the
pool center in Morgan Hill and the indoor pool at the CRC. There is also the added cost of
maintaining the pool, insurance for liability, and opens the city up to lawsuits. There is also
the cost of this project. Where is the money coming from? Wouldn’t it be cheaper to remodel
what we have since in the plan it says that the square footage of City Hall would not change
much from the current building.
Thanks
Gina Johnson
1
2
3
4
Comment Letter #10
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-37 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 10 – Gina Johnson
1. The commenter states opposition to the demolition of Wheeler Auditorium, noting its age
and aesthetic value, and states a preference for repairing existing buildings rather than
constructing new ones.
See response to letter 4, comment 1. No change to the draft EIR is required.
2. The commenter states that the debris from the buildings would fill the landfills.
Section 9.14, Utilities and Service Systems of the draft EIR beginning on page 9-127,
addresses solid waste generation and concludes the project would comply with applicable
regulations related to solid waste disposal and recycling, and sufficient landfill capacity exists
to accommodate project-generated waste. Therefore, impacts related to solid waste would be
less than significant.
No change to the draft EIR is required.
3. The commenter states that an additional pool is not needed and expresses concern regarding
maintenance costs, insurance, and liability associated with the proposed pool.
The comment does not raise an environmental issue and, therefore, no response is required.
No change to the draft EIR is required.
4. The commenter asks about the cost of the project, the source of funding, and questions the
need for redevelopment given that the plan indicates City Hall square footage would not
change substantially.
The comment does not raise an environmental issue and, therefore, no response is required.
No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
From:Margaret Aron
To:Ryan Osenton
Subject:EXTERNAL - civic center
Date:Friday, March 27, 2026 5:54:54 PM
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
Hello, Here are some concerns that I have.
The parking garage. It is surrounded by homes and at two stories is too tall.
Limited safety at night.
The crosswalk at 6th and Hanna is used by children from the elementary school, church goers,
and folks going to the senior center and is very busy adding another dirveway would be dangerous.
The Wheeler auditorium should be left in place. It is historic. It is listed.
It is being used for many activities now so must meet standards to
be used.
After attending the meetings the design is nice if we were a new city. Gilroy is not and should try and honor the
previous civic members who developed the center over time The center was also redesigned during the
development of the library and police station. It is wasteful to start all over again even as the new trees and
landscaping are still very young.
The buildings we have are functional. If the HVAC needs updating do so.
Sadly , I do not think we would ever get the pool so please don't use it as a selling point.
Thank you for your time. Margaret Aron
1
2
Comment Letter #11
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-39 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 11 – Margaret Aron
1. The commenter states concern regarding the proposed parking garage, including its height,
proximity to surrounding homes, and safety, and states that an additional driveway at 6th
Street and Hanna Street would be dangerous due to existing pedestrian activity.
Refer to Section 9.1, Aesthetics (beginning on page 9-1), which addresses aesthetic impacts
including height. As described therein, the proposed two-level parking garage is planned to be
25 feet, which complies with the height limits of the Civic/Cultural Arts Zoning District
(minimum of 25 feet at street front and maximum of 50 feet). No change to the draft EIR is
required.
Refer to Section 9.12, Transportation (beginning on page 9-22), which addresses circulation
and hazards. As described therein, all circulation improvements would be designed in
accordance with City standard specifications for safe and efficient facility design, including
requirements for emergency access, sight distance, and vehicle movement. In addition,
circulation improvements would be subject to review by the City’s Public Works, Fire, and
Police Departments to ensure safe operation for vehicles, pedestrians, bicyclists, and
emergency responders. Therefore, the project would not result in increased hazards and
impacts would be less than significant. No change to the draft EIR is required.
2. The commenter states that Wheeler Auditorium should remain in place, identifies it as a
historic resource, and states that it is currently used for activities. Additionally, the commenter
states that existing buildings are functional and questions the need for redevelopment,
including replacement of relatively recent improvements. Lastly, the commenter states that
the pool may not be constructed and should not be relied upon as part of the project.
Refer to response to letter 4, comment 1. The remainder of the comment does not raise an
environmental issue associated with adequacy of the draft EIR and, therefore, no further
response is required. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:Cynthia Van Laar
To:Ryan Osenton
Cc:Parks and Recreation Commissioner Luis Ramirez; Parks and Recreation Commissioner Emily Miller; Parks and
Recreation Commissioner Javier Martinez; Parks and Recreation Commissioner Jesse Jimenez; Parks and
Recreation Commissioner Greg Felios; Parks and Recreation Commissioner Andrew Brinton; Mayor Greg Bozzo;
Council Member Tom Cline; Council Member Dion Bracco; Council Member Terence Fugazzi; Council Member
Carol Marques; Council Member Zachary Hilton; Council Member Kelly Ramirez
Subject:EXTERNAL - Written Comments Related to DEIR
Date:Tuesday, February 24, 2026 8:56:08 PM
Hello Mr. Osenton,
After reviewing the City of Gilroy DEIR, I’m writing to encourage thoughtful
consideration of the long-term benefits of building a larger-scale aquatic center in
Gilroy, rather than limiting the project to an 8-lane facility.
The proposed facility is substantially smaller than both high school pools, significantly
limiting growth and pool-use opportunities for Gilroy. Gilroy High School has an 11-
lane competition pool and a 4-lane instructional pool, and Christopher High School
has a 14-lane pool with a sloped instructional area. An 8-lane pool significantly limits
our ability to host sanctioned swim meets and regional competitions. A 16-lane
competition pool (50 meters by 25 yards) and 6-lane instructional pool would position
Gilroy to host meets that bring athletes, families, and spectators into our community,
generating economic activity for local restaurants, hotels, and businesses while
elevating Gilroy’s visibility as a regional destination.
In comparison, the Morgan Hill Aquatics Center and the Baler Aquatic Center in
Hollister provide recreational programs across the lifespan and host regional short-
and long-course meets, generating revenue for their communities while also meeting
recreational needs.
Beyond economics, a larger pool increases equitable access for our local swim
teams, as well as adult and youth programs. Lane availability is already limited in
Gilroy. Expanding capacity ensures more opportunities for training, competition, and
skill development without overcrowding or restricted schedules.
This is not simply a recreational amenity; it is an investment in youth development,
public health, and community growth. If we are going to build, we should build with
the future in mind.
I respectfully urge you to consider the long-term community and economic benefits of
a larger aquatic center that fully supports Gilroy’s athletes and families.
Thank you for your time and leadership on this important decision.
Sincerely,
Cynthia Van Laar
Gilroy Gator Swim Team Board President
1
Comment Letter #12
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-41 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 12 – Cynthia Van Laar
1. The commenter states that the proposed 8-lane pool is smaller than existing high school
pools and would limit pool use and opportunities, including the ability to host swim meets
and regional competitions that could generate economic activity and increase visibility. The
commenter references aquatic centers in Morgan Hill and Hollister and states that these
facilities support recreational programs and host competitions. The commenter states that a
larger pool would increase access for swim teams and community programs and address
limited lane availability. Lastly, the commenter states that a larger aquatic facility would
support youth development, public health, and community growth and encourages
consideration of long-term benefits.
The comment does not raise an environmental issue and, therefore, no response is required.
No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:Luis Ramirez
To:Ryan Osenton
Subject:EXTERNAL - Civic Master Plan
Date:Wednesday, February 25, 2026 6:35:39 PM
Hello Ryan
I am not in favor of retaining Wheeler Auditorium for a variety of reasons. Although it may
have historical significance to a minority part of our community, it would severely alter the
plan of the civic center and defeat the purpose of creating the plan.
Luis Ramirez
1
Comment Letter #13
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-43 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 13 – Luis Ramirez
1. The commenter states opposition to retaining Wheeler Auditorium and indicates that doing
so would alter the Civic Center plan and defeat the purpose of the plan.
The comment does not raise an environmental issue associated with the adequacy of the draft
EIR and, therefore, no response is required. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:Alexis Morales
To:Ryan Osenton
Subject:EXTERNAL - Civic Center Master Plan Input
Date:Thursday, February 26, 2026 12:16:38 AM
Hello Mr. Osenton,
I would like to submit a recommendation during the Civic Center Master Plan review period.
I strongly encourage the city to include a new playground within the proposed civic park with
the removal of the existing play structure next to Wheeler Civic Auditorium. The current plan
appears to show a large open grass area without a defined recreational use. While open lawn
space has value, similar areas at other parks (such as Miller park in front of Brownell Middle
School) are not utilized as much as they may have originally been intended. During the
summer, families tend to gather under the trees at each end of the park and avoid the open
grass field due to the extreme heat for birthdays or casual time together. It shows that having
large open space without shade or clear intended use often results in wasted space. This
presents an opportunity to create a more functional, family focused area in the new civic park.
After speaking with other Gilroy families, it’s clear that a well designed playground is one of
the most important missing elements in this remodel. Families in Gilroy are looking for safe,
engaging spaces where children of all ages can play, explore, and spend time outdoors
together. The collective feedback is that two play areas, one for toddlers and young children,
and one for older elementary aged children, would best meet the needs of local families. Given
how hot Gilroy’s summers can be, shaded play structures, through trees and/or canopies,
would be essential to ensure the space remains functional, safe, and usable throughout the
year.
Adding a thoughtfully designed playground would turn the civic park into a vibrant,
multigenerational destination where families can gather, children can play, and the community
can thrive. This is a rare opportunity to make a lasting, positive impact for families in Gilroy,
and it’s important to explore all possibilities to make this remodel the best it can be!
I look forward to hearing how this community feedback will be weighed into the drafting of
the final plan!
Sincerely,
Alexis
1
Comment Letter #14
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-45 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 14 – Alexis Morales
1. The commenter recommends inclusion of a playground within the proposed civic park and
states that the current plan appears to show a large open grass area without defined
recreational use. The commenter states that shaded play areas and multiple play areas for
different age groups would better serve families and improve usability of the space.
The comment does not raise an environmental issue and, therefore, no response is required.
No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
From:Yolanda Calimpong
To:Ryan Osenton
Subject:EXTERNAL - Do Not Tear Down Wheeler Auditorium!
Date:Saturday, March 14, 2026 12:07:45 PM
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
Please consider every alternative for not tearing down Wheeler Auditorium.
What other alternatives can be considered? Could the iconic outside be preserved? 6th & Church facade for
example? Inside and other walls & inside could be retrofitted to meet the Civic Center vision & communities
needs?
Respectfully submitted.
Yolanda Calimpong
Sent from my iPhone
1
Comment Letter #15
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-47 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 15 – Yolanda Calimpong
1. The commenter requests consideration of alternatives to demolishing Wheeler Auditorium,
including preserving portions of the exterior façade and retrofitting the interior to meet
project needs.
Refer to response to letter 4, comment 1. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:Peter Van Dyke
To:Ryan Osenton
Subject:EXTERNAL - Wheeler Auditorium
Date:Saturday, March 14, 2026 3:16:56 PM
You need to come up with a better plan than tearing down the Wheeler Auditorium and
replacing it with something that looks like it should be in New Jersey or San jose. The City
leadership is and has been ruining the once quaint sustainable town of Gilroy. The rampant
poorly planned development, the expansion into the only fertile cropland left in the county, the
mowing down of Gilroy's history and the utter disregard for the downtown and the wishes of
the inhabitants is not what the people desire. Gilroy used to be a community and we are
desperately trying to hold on to that. The city is making that harder by turning us into the
kitchen, bedroom and toilet for the "Silicon Valley." The tearing down of Wheeler Auditorium
is just another lurch towards the detached internal malignancy that Gilroy leadership has
become.
Peter Van Dyke.
1
Comment Letter #16
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-49 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 16 – Peter Van Dyke
1. The commenter states opposition to demolishing Wheeler Auditorium and expresses concern
regarding the proposed replacement and broader development patterns in the City.
Refer to response to letter 4, comment 1. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:franksanchez20.fs
To:Ryan Osenton
Subject:EXTERNAL - Wheeler Auditorium
Date:Sunday, March 15, 2026 6:24:04 PM
The Auditorium is more than historical it is part of the fabric of Gilroy. It would be like
tearing down Old City Hall, just restructure the existing building and keep the memories alive.
If you have a sayso in this project please use your influence to stop the demolition.
Thank You
Sent from my Galaxy
1
Comment Letter #17
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-51 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 17 – Frank Sanchez
1. The commenter states opposition to demolishing Wheeler Auditorium and recommends
restructuring the existing building to retain its historical and community value.
Refer to response to letter 4, comment 1. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:Linda
To:Ryan Osenton
Cc:Mayor Greg Bozzo; Council Member Dion Bracco; Council Member Terence Fugazzi; Council Member Carol
Marques; Council Member Tom Cline; kellyramirez@cityofgilroy.org; zacharyhilton@cityofgilroy.org
Subject:EXTERNAL - Wheeler auditorium
Date:Sunday, March 15, 2026 3:19:34 PM
I want to express my disappointment that the auditorium is being considered for demolition.
We have lost too many of our historic buildings (the Strand Theater, Dick Bruhn's/Robinson
Hardware, Hall's, and likely soon, the Creamery) without giving thought to their still valuable
place in our downtown.
As shown by the continual use of the Auditorium it is still functional with the
possibility/probability to continue. Why spend many dollars to demolish and replace when no
good reason exists?
When will we start to recognize the value of our historic resources?
Sent from my Galaxy
1
Comment Letter #18
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-53 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 18 – Linda
1. The commenter states opposition to demolition of Wheeler Auditorium, references the loss
of other historic buildings, and states that the auditorium remains functional and should be
retained.
Refer to response to letter 4, comment 1. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:Dmatuszak2
To:Ryan Osenton
Cc:Connie Rogers; Joanie Lewis; Linda White; karenpedigo10@aol.com; Eileen Cavallaro; Gilroy Museum; Babs
Holiday; Dan Donovan; Pam Salter; Steve Brady; Russell Sosa; Diana Johnson; Mayor Greg Bozzo; Council
Member Dion Bracco; terrence.fugazzi@cityofgilroy.org; Council Member Carol Marques; Council Member Kelly
Ramirez; Council Member Zachary Hilton; Council Member Tom Cline
Subject:EXTERNAL - Wheeler Auditorium
Date:Sunday, March 15, 2026 3:01:18 PM
Mr. Osenton:
We are opposed to the demolition of Wheeler Auditorium as part of the City Hall Campus
Master Plan.
The building has historical significance, is in good condition, and is used for a wide variety of
community functions, especially for small and mid-sized events.
Wheeler Auditorium is one of the few historic buildings left standing that honors our past and
inspires our future. It should be incorporated into the new campus as a revered symbol of the
past while the library and police station display our commitment to the present. The new City
Hall and other buildings that comprise the new campus will showcase our vision for the future.
Linwood Wheeler, highly respected local businessman and philanthropist, donated $60,000 in
1940 to construct a combined assembly hall, civic center, and armory. The completed building
was highlighted as an example of the Streamlined style of Architecture by the Pacific Coast
Architecture Database.
It was a built as a symbol of hope for the future as the City was pulling out of the Great
Depression.
Wheeler Auditorium is on the National Register of Historic Places because of its contribution
to Gilroy's past -- we need to ensure that it is part of Gilroy's future, too!
Sincerely,
Dr. David J. Matuszak and Mrs. Maureen M. Hunter
Gilroy Historical Society
Members of the Board of Directors
Sent from AOL on Android
1
Comment Letter #19
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-55 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 19 – Dr. David Matuszak and Mrs. Maureen M. Hunter,
Gilroy Historical Society
1. The commenter states opposition to demolition of Wheeler Auditorium, noting its historical
significance, continued use, and condition, and states that it should be incorporated into the
proposed Civic Center plan.
Refer to response to letter 4, comment 1. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
From:maretta j
To:Ryan Osenton
Subject:EXTERNAL - Save Wheeler Auditorium
Date:Monday, March 16, 2026 5:47:26 PM
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
Dear Mr. Osenton,
I am a lifetime resident of Gilroy. I was born and raised in this beautiful town. I grew up when this town was mostly
agricultural lands and orchard groves. Our Downtown Monterey Road was the Highway. I have raised my children
here, and my grandchildren have been residents.
Wheeler Auditorium is an iconic historical landmark. When I was in my teens, I took recreational classes there.
When I had children, my kids were enrolled in the preschool that was operating. My grandchildren went to that
preschool. My children also participated in dance classes and played youth league basketball offered by Parks and
Rec at the auditorium. I used to sell arts and crafts during the annual Christmas faire. Many wonderful family and
community events creating precious generational memories.
Save Wheeler Auditorium! Please find an alternative!
Respectfully submitted,
Maretta Juarez
Sent from my iPhone
1
Comment Letter #20
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-57 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 20 – Maretta Juarez
1. The commenter states opposition to demolition of Wheeler Auditorium, identifies it as a
historical landmark, and references its use for community and recreational activities.
Refer to response to letter 4, comment 1. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:corina deleon
To:Ryan Osenton
Subject:EXTERNAL - Wheeler Auditorim
Date:Monday, March 16, 2026 12:19:10 PM
I was raised in Gilroy since 1966 and agree to keep this historical building for our future
generations as a historical gem for our youth can learn and enjoy this treasure.
I’m suggesting a different location!
A concerned citizen.
Corina R Deleon
MFT
1
Comment Letter #21
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-59 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 21 – Corina R. Deleon
1. The commenter states support for retaining Wheeler Auditorium as a historical building and
suggests considering a different location for the proposed project.
Refer to response to letter 4, comment 1. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:judy garcia
To:Ryan Osenton
Subject:EXTERNAL - Wheeler Auditorium Destruction
Date:Friday, March 20, 2026 8:37:53 AM
Ryan, I know that Wheeler Hospital is on the National Registry of Historical
sites. What about the auditorium that will be torn down? Will the hospital
be spared? Could the architecture of the new auditorium blend with
hospital? Many of the new/old towns I visit integrate the new and old
architecture. How will Gilroy blend the new with the existing historical
buildings?
Thank you,
Judy Garcia
7531 Church St
669-205-2697
1
Comment Letter #22
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-61 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 22 – Judy Garcia
1. The commenter states that Wheeler Hospital is on the National Register of Historic Sites and
asks whether the auditorium will be torn down and whether the hospital will be spared. The
commenter asks whether the architecture of new development will blend with existing
historic buildings and references integrating new and old architecture.
The Wheeler Hospital is located at 650 5th Street, which is outside of the project boundary.
Therefore, the proposed project does not impact the Wheeler Hospital.
Refer to response to letter 4, comment 1. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:El Lalo
To:Ryan Osenton
Subject:EXTERNAL - Demolition of Wheeler Auditorium
Date:Monday, March 23, 2026 3:26:00 PM
Dear Mr. Osenton,
I would hope you would do whatever you can to preserve this one! So many fond
memories of Saturday Night Dances, Battle of the Bands, etc. This place has lots of
history so why not prevserve it! Spend the money it would take to knock it down, to
renovate it instead!
Thank you and regards,
Concerned Citizen and long time resident
Edward Aguirre ...
1
Comment Letter #23
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-63 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 23 – Edward Aguirre
1. The commenter states support for preserving Wheeler Auditorium, references past
community uses, and recommends renovating the building instead of demolishing it.
Refer to response to letter 4, comment 1. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:Bernadette Rowlison
To:Ryan Osenton
Subject:EXTERNAL - Please consider saving Wheeler Auditorium from demolition
Date:Monday, March 23, 2026 1:14:45 PM
Mr. Osenton - City Project Manager,
I was a resident of Gilroy from 1972 to 1990 until I moved away to attend a four-year
university. Gilroy has a unique history as it sits on the crossroads of California State
Route 152 and U.S. Route 101. Gilroy is quintessentially small-town America; it is
historically and culturally a farm town. This charm is found in such places as the
Carnegie Library, Wheeler Hospital, Wheeler Auditorium, The Grange Hall (whose land
was donated by Lin Walker Wheeler, the same philanthropist as the hospital and
auditorium are named after) ought to be preserved.
For perspective, the U.S. has a penchant for generic building patterns; Walmart the
second largest company in the U.S. has built over five thousand "big box" stores. Only
one of those (which I have visited while on active duty in the U.S. military) has
architecture that is aesthetically pleasing; Woodland Park, Colorado is designed like a
Swiss Chalet to blend in with the mountain landscape. Wheeler Auditorium has classy
Art Deco design and holds special history for past and present residents.
In the 1970's, I took ballet and tap dance lessons at Wheeler Auditorium from Greta
Tegel (provenance: Manchester, England) through Gilroy Parks & Recreation. (For the
record, Misty Copeland retired American Ballet Theater prima ballerina was discovered
at a Parks & Recreation ballet class in southern California.) In the 1980s, I took ballet
and jazz lessons at Le Grande E'tage (near historic Strand Theater) on the second floor of
a stately building with ornate ceilings in the grand ballroom located on the east side of
Monterey Street in Gilroy. (Tragically, it has since burned down in a suspected arson
case). In the following years, my mother served on Gilroy City Council and rotated as
Mayor Pro Tempore. Additionally, my father was a Gilroy Rotarian and the senior pastor
of Gilroy Presbyterian Church for 34 years. He began his pastorate in 1972 at the historic
church on 5th & Church streets, but eventually the congregation exceeded the building
capacity. The new site at 6000 Miller Avenue was not dedicated until 1988, so in the
interim Wheeler Auditorium allowed GPC to hold Easter services. My family was and still
is vested in the community and its landmarks. All this is to say that there is economic
potential for the Gilroy regarding historic preservation. Please do not let Gilroy turn into a
cookie cutter strip mall. If I hold these fond memories, it is highly likely that there will be
thousands of more Gilroyans who share my sentiments. Please consider our pleas.
1
Comment Letter #24
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Very Respectfully,
Former SSG Rowlison, Bernadette
1363 Woodland Avenue
Chico, California 95928
gazellegirl@yahoo.com
(530) 897-0226 land line
(719) 828-3885 mobile
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-66 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 24 – Bernadette Rowlison
1. The commenter states support for preserving Wheeler Auditorium, references its historical
and architectural value, and states that it should be retained as part of the City’s historic
resources. The commenter also recounts memories spent at the Wheeler Auditorium.
Refer to response to letter 4, comment 1. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:patitipton@aol.com
To:Ryan Osenton
Subject:EXTERNAL - Wheeler Auditorium
Date:Monday, March 23, 2026 1:05:21 PM
Having lived in Gilroy for seven years, I realize the historical importance of Wheeler
Auditorium.
It is a recognized Gilroy landmark! Instead of demolishing it, I'd love to see the
exterior
maintained, with any necessary improvements made to the interior.
Pat Reinhart
1
Comment Letter #25
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-68 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 25 – Pat Reinhart
1. The commenter states that Wheeler Auditorium is a recognized landmark and recommends
maintaining the exterior while making improvements to the interior rather than demolishing
the building.
Refer to response to letter 4, comment 1. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:Pamela Salter
To:Ryan Osenton; Mayor Greg Bozzo
Subject:EXTERNAL - Wheeler Auditorium Civic Center
Date:Monday, March 23, 2026 4:02:25 PM
Dear City Project Manager - Ryan Osenton,
I would like to express my frustration, anger, and sadness on the master plan
proposal for the new Gilroy Civic Center. The Planning Committee has not vetted this
enough throughout the Gilroy community, and I believe it to be a huge mistake.
Wheeler Auditorium is a landmark in Gilroy. It was constructed in 1940 by William
Binder. It was a combined assembly hall, civic center, and armory in 1940.
This building has been long treasured by the citizens of Gilroy and on the city’s list of
Historic Resources.
I do not see why the planning committee is not planning the new center around
Wheeler Auditorium. It needs to be saved. It is part of our history. The building has
so many memories for many of the community. At one time it hosted craft fairs, local
business, tiny tots tumbling, gymnastics, Taekwondo, cooking class, dance and much
more. It used to have a day care. It currently is a place where young people can play
basketball and other indoor sports.
Stop demolishing the historical buildings in Gilroy. Preserve what you can and
renovate the interiors. Same goes for the Creamery before we lose it completely.
Do something NOW!!!!
Pam Salter
Resident of Gilroy and member of Gilroy Historical Society
555 5th Street
Gilroy, CA 95020
408-406-8954
purrkats@yahoo.com
1
Comment Letter #26
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-70 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 26 – Pamela Salter
1. The commenter states opposition to demolition of Wheeler Auditorium, identifies it as a
historic landmark, and states that it should be preserved and incorporated into the Civic
Center plan rather than replaced.
Refer to response to letter 4, comment 1. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:Teddy Goodrich
To:Ryan Osenton; Mayor Greg Bozzo; Council Member Dion Bracco; Council Member Tom Cline; Council Member
Terence Fugazzi; zach.hilton@cityofgilroy.org; Council Member Carol Marques; Council Member Kelly Ramirez
Subject:EXTERNAL - Wheeler Auditorium
Date:Tuesday, March 24, 2026 3:54:07 PM
Wheeler Auditorium should be renovated and preserved. Donated by philanthropist
Linwood Wheeler in 1940, it is an important part of Gilroy History. It has served the
community in countless ways since its construction, and if the inside was repaired
and the outside renovated, it could continue to act as a place for community
meetings, school plays, and classes. The possibilities are limited only by our
imagination.
Please preserve this important part of the history of our community. We don't need
more "cleaned up, cookie cutter" civic buildings!
Teddy Goodrich
1
Comment Letter #27
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-72 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 27 – Teddy Goodrich
1. The commenter states that Wheeler Auditorium should be preserved and renovated, notes its
historical significance, and states that it could continue to serve community uses.
Refer to response to letter 4, comment 1. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
From:City Historian Toby Echelberry
To:Ryan Osenton
Cc:Kim Mancera
Subject:Civic Center Master Plan and Wheeler Civic Auditorium
Date:Wednesday, March 25, 2026 1:15:39 PM
Ryan,
This email is in response to the Civic Center Master Plan as it relates to the
Wheeler Auditorium. As you are quite aware the City of Gilroy has an existing HRI
outlining each of the most important existing structures in the city. The Wheeler
Auditorium has been recognized as one of those buildings. Wheeler Auditorium may not
have fanfare and publicity as many other state HRI properties, but nonetheless the
Wheeler Auditorium has been a constant contributor to the community for the past eight
decades. This structure was recognized by the Gilroy City Council on August 15, 1983,
as local historic building that needs to be protected.
In March 1936 the Common Council and Mayor created a special committee to
develop plans for the creation of the Armory and Auditorium. This committee by
September had determined that there was great public interest and a municipal
auditorium was desired for assembly as well as convention hall. On October 27, 1936, a
special election was held (by Ordinance No. 419) to raise $31,000 in municipal bonds to
pay for the acquisition, construction and completion of the Auditorium. The overall
response was favored by 93% of the votes cast.
In 1940 L. M. Wheeler, chairman of the Auditorium-Armory Building Committee
pushes forward with the construction. At this time, Binder & Curtis were retained to
develop the plans and specifications, and the municipal bonds were issued for this
$60,000 project. Money was also donated by Linwood Wheeler as well the entire project
was supported by a Public Works Administration (PWA) grant as part of the New Deal
relief program. Various meetings were held and reported back to Council with updates.
An interesting find is in the City Clerk’s minutes of April 19, 1940, where it was
approved to add reinforcing steel and concrete floors to put in a rifle range. In July 1940
a communication was read to install floodlighting to the rear of the facility so the
grounds can be used as a drill ground and parking area for the National Guard.
In the City Clerk’s minutes of October 21, 1940, it had been decided by Council
and Captain Cecil Carlyle, chairman of the auditorium dedication committee that the
auditorium be redesignated as “Wheeler Civic Auditorium.” At the same meeting the
matter of a cornerstone was ordered as well. In November of 1940, is when the lease
was finally signed by Adjutant General of the State of California for the National Guard.
Mrs. Hall S. Schrader presented the flag to hoist over the Wheeler Civic Auditorium. In
December 1940, the Council passed Resolution No. 128 marking the Notice of
Completion of the Wheeler Civic Auditorium.
1
Comment Letter #28
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
In the years that followed the property was used as a civic center by the National
Guard until they moved to their present location on Wren Street in 1973. The facility has
been used for various city meetings and used for special services such as the 1942 Alien
registration all the way until recently used for the COVID-19 pandemic support services.
As well the City of Gilroy utilized a portion of the facility as an interim City Hall between
1968 to 1980 since the Monterey Street building was too small and in too great of repair
and upkeep, until it moved to its present campus. Since 1980 the facility has been used
to host meetings but mainly used as a storage facility.
Aside from history as a government civic utility, the Wheeler Civic Auditorium was
the social center for many decades as well. In 1941 the USO appeared and performed a
show for the troops stationed here. For many years the Auditorium was used thousand
times by Gilroy High School, various non-profit organizations as well as society groups
for meetings, concerts, and award ceremonies. In its heyday there was even a special
commission which provided oversight for the Wheeler Civic Auditorium managing the
calendar and handling all the maintenance of the facility. This center generated
significant amount of income for the city as well over those years especially when
managed by these groups.
Instead of demolishing this facility, I would recommend looking at any way of
providing a bit of upkeep to the facility, create a historical component recognizes its
contribution and celebrating it as well marketing it for future growth in the new Civic
Center Master Plan.
Sincerely,
Toby A. Echelberry
Gilroy City Historian
1
cont'd
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-75 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 28 – Toby Echelberry
1. The commenter states that Wheeler Auditorium is identified as a historic resource by the City,
provides historical background on its development and use, and recommends that the
building be preserved, maintained, and incorporated into the Civic Center Master Plan rather
than demolished.
Refer to response to letter 4, comment 1. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:Samantha Emburton
To:Ryan Osenton
Subject:EXTERNAL - Possible Demolition of Wheeler Auditorium
Date:Wednesday, March 25, 2026 11:05:03 PM
Good Evening,
I was on facebook this evening and saw a post from the Gilroy Historical Society and Gilroy
Museum that the wheeler auditorium is up for possible demolition. Please do not demolish this
beautiful landmark. So many Gilroyans have beautiful memories centered around this building
and area that is would be a great loss to our community should a demolition occur. Is there any
way the community can have input on this? Thank you for your time and consideration.
Best Wishes, Samantha Emburton
1
Comment Letter #29
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-77 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 29 – Samantha Emburton
1. The commenter states opposition to demolition of Wheeler Auditorium, references
community value and memories associated with the building, and asks whether there is an
opportunity for community input.
Refer to response to letter 4, comment 1. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
From:Christine Flautt
To:Ryan Osenton
Subject:EXTERNAL - Wheeler Auditorium
Date:Wednesday, March 25, 2026 2:35:09 PM
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
Mayor, City Council Members and staff,
Please reconsider the Gilroy Civic Center Master Plan Draft to demolish the Wheeler Auditorium. I do not agree
with this plan to demolish this building. I am sure it
could be completely redone inside to fit the needs of our City.
The Wheeler Auditorium is an historical building in our town. It would be a shame
to demolish another historical site in Gilroy.
Hopefully the mayor, council members, staff and consultant take into consideration
the input of the public response to this demolishing of another historical site and
think about keeping the exterior of the building and just retrofit the interior.
Thank you for your consideration in this matter.
Christine Blaettler Flautt.
Resident since 1944 and born in old Wheeler Hospital
Sent from my iPad
1
Comment Letter #30
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-79 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 30 – Christine Flautt
1. The commenter states opposition to demolition of Wheeler Auditorium, identifies it as a
historical building, and recommends retaining the exterior and renovating the interior to meet
City needs.
Refer to response to letter 4, comment 1. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:Kathi Orlando
To:Ryan Osenton
Subject:EXTERNAL - Wheeler Auditorium
Date:Wednesday, March 25, 2026 2:01:53 PM
Very concerned about the destruction of another Gilroy landmark. What would downtown be
without the old City Hall. The council once thought the site would be better served as a
parking lot. Watched as ALL the schools were demolished by saying they were an earthquake
hazard. Oh, yeah, even the wrecking ball had a tough go of it. Please find a place in your plans
thst would spare this significant building.
1
Comment Letter #31
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-81 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 31 – Kathi Orlando
1. The commenter states concern regarding demolition of Wheeler Auditorium, identifies it as a
significant building, and requests that it be preserved within the project plans.
Refer to response to letter 4, comment 1. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
From:Conrad Calimpong
To:Ryan Osenton
Subject:EXTERNAL - Wheeler Auditorium
Date:Wednesday, March 25, 2026 8:11:38 AM
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
Dear Ryan,
I’ve just received word that there are plans to demolish Wheeler Auditorium. Unthinkable. Wheeler Auditorium
has played a significant role in so many people’s lives who grew up in Gilroy. It has been an integral part of the
community for many decades. It would be a shame to remove this landmark building from the community. So
many memories and lives were intertwined in the activities that occurred on those hardwood floors that I swept on
occasion. I participated in karate lessons, attended dances, carried drums on stage for my brother in a battle of the
bands, and watched as others clapped, cried, hooted and hollered in their celebrations. Wheeler Auditorium was so
much a part of the fabric of Gilroy’s community when I grew up there in the 50’s, 60’s, and early 70’s. Let’s not
destroy this historic landmark building and the important role it has played in the community.
Sincerely,
Conrad Calimpong
Sent from my iPhone
1
Comment Letter #32
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-83 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 32 – Conrad Calimpong
1. The commenter states opposition to demolition of Wheeler Auditorium, identifies it as a
historic landmark, and references its role in community activities and history.
Refer to response to letter 4, comment 1. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:len stimac
To:Ryan Osenton
Subject:EXTERNAL - Wheeler Auditorium
Date:Wednesday, March 25, 2026 11:15:21 PM
Our alley between Church and Rosanna from 5th street dead ended into 6th street. Bob, Ben and
Al Vega were half of a 3 on 3 football game and when Don and Dan Kludt showed up we almost
didn't fit a 5 on 5 on the lawn. Sometimes we would pull from the west side of the west of town
from the Carmel Street neighborhood and Scott Hager would join and maybe Rick Repetti from
the north. During my Gavilan days i performed a couple originals with Jerry Navarro Eric Daum
David Porcella John Orca and Chuck Tujillo during a Christmas show. My big story is if i havent
told you yet, ill tell you again, in 65' maybe or when the new police station was built at the south
side of the auditorium we removed a steel grate . . . you can see in the photo . . . that was
covering a 12 x 8 vent in the foundation and fit thru to enter the crawl space. At the south side of
the auditorium under the stage was a door we were able to enter into a room. It is where the
police were storing stolen property. it was filled with bikes, guns and stuff. No iphones. We did not
repurpose anything out onto the streets and we didn't get caught.
Climbing on the National Guard tanks parked in the back on their weekends. Who was in the
guard in the 60's?
Margie Jinks studio for tap Frank and Becki Galvan Frank Galvan.
Battle of the bands John Garcia.
City league basketball for a while there along with youth sports.
Do You think we lose all memory during passage like a building might? This may look profitable,
But like the East Wing . . . Gilroy, this is a wrong idea.
Len Stimac
1
Comment Letter #33
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-85 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 33 – Len Stimac
1. The commenter appears to share an opposition to the demolition of Wheeler Auditorium and
references its role in past community activities and memories associated with the building.
Refer to response to letter 4, comment 1. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:Phil Stimac
To:Ryan Osenton
Subject:EXTERNAL - Save Wheeler Auditorium
Date:Thursday, March 26, 2026 10:18:19 PM
As a Gilroy native, I think Wheeler Auditorium, like the Old City Hall should be
preserved. Phil Stimac1
Comment Letter #34
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-87 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 34 – Phil Stimac
1. The commenter states opposition to demolition of Wheeler Auditorium.
Refer to response to letter 4, comment 1. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
From:len stimac
To:Ryan Osenton
Subject:Re: EXTERNAL - Wheeler Auditorium
Date:Thursday, March 26, 2026 1:53:07 PM
Attachments:image001.png
Ryan
As my response is coming to you from a non resident of Gilroy at this time,
who understands the effects that progress and modernization presents to
the past, our history is what has allowed our present day. My father Leonard
Stimac Sr. who was an early occupant at Wheeler Auditorium while
stationed in the 40's as a mail sergeant and who's mail route ran from
Bradley Ca. to Eureka Ca, would surely have more to say than me. While a
resident on Church street in the 1960's he was commissioned for one dollar
by the owner Jack Kasanjan (sp} to remove a structure located where the
parking lot adjacent to the Presbyterian Church at the corner of 5th street
and Church street was located, now the Salvation Army.This was a spiraled
stair cased, 3- two storied brick fireplace, first cut Coastal Redwood board
including lath structure. Ruth Doan another neighbor to the building
identified it as an early stage stop in Gilroy which was reduced by Leonard's
five child work crew during multiple months of nail pulling and bundling of
lumber for sale to a parking lot. For years the structure was available as
rental units to many families that I remember, that have since become well
known Gilroy residents. Understanding that progress is always upon us,
there are like structures mostly in neighboring city's that are still standing
and affordable to keep not only economically but historically. Gilroy has also
seen the removal of the F&P Cannery which my mother Eda Bozzo Stimac
had grown up living next to on Lewis Street from 1922 upon her migration
from Italy to the mid 1940's. Again progress has it's limits and it's ways. This
again is understood. I only offer these stories to be a tool for deliberation
and consideration as a final decision is shortly upon you.
This is not to speak for the generations of families that have been residents
long before my family that have their own history.
Of course the time and expense for your new civic center looks spectacular,
include the expense of the loss of this iconic building to so many.
Thanks for the open eyes and ears,
Len Stimac
On Thursday, March 26, 2026 at 07:58:50 AM MST, Ryan Osenton <ryan.osenton@cityofgilroy.org>
wrote:
1
Comment Letter #35
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
Hey Len,
Thank you for submitting your comments. I will add these to our list to be reviewed and
considered when finalizing both the Civic Center Master Plan and Environmental Impact
Report, respectively.
Thanks,
Ryan
Ryan Osenton | Project Manager
Public Works | Engineering
7351 Rosanna Street, Gilroy, CA 95020
Direct 408.846.0277 | Cell 669.766.8752
http://www.cityofgilroy.org
From: len stimac <stimedia@yahoo.com>
Sent: Wednesday, March 25, 2026 11:15 PM
To: Ryan Osenton <Ryan.Osenton@cityofgilroy.org>
Subject: EXTERNAL - Wheeler Auditorium
Our alley between Church and Rosanna from 5th street dead ended into 6th street. Bob, Ben and Al Vega
were half of a 3 on 3 football game and when Don and Dan Kludt showed up we almost didn't fit a 5 on 5
on the lawn. Sometimes we would pull from the west side of the west of town from the Carmel Street
neighborhood and Scott Hager would join and maybe Rick Repetti from the north. During my Gavilan days
i performed a couple originals with Jerry Navarro Eric Daum David Porcella John Orca and Chuck Tujillo
during a Christmas show. My big story is if i havent told you yet, ill tell you again, in 65' maybe or when
the new police station was built at the south side of the auditorium we removed a steel grate . . . you can see
in the photo . . . that was covering a 12 x 8 vent in the foundation and fit thru to enter the crawl space. At
the south side of the auditorium under the stage was a door we were able to enter into a room. It is where
the police were storing stolen property. it was filled with bikes, guns and stuff. No iphones. We did not
repurpose anything out onto the streets and we didn't get caught.
Climbing on the National Guard tanks parked in the back on their weekends. Who was in the guard in the
60's?
Margie Jinks studio for tap Frank and Becki Galvan Frank Galvan.
Battle of the bands John Garcia.
City league basketball for a while there along with youth sports.
Do You think we lose all memory during passage like a building might? This may look profitable, But like
the East Wing . . . Gilroy, this is a wrong idea.
Len Stimac
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-90 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 35 – Len Stimac
1. The commenter states opposition to demolition of Wheeler Auditorium, references its
historical significance and community history, and expresses concern regarding the loss of the
building as part of the proposed project.
Refer to response to letter 4, comment 1. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
From:Kathy Sullivan
To:Ryan Osenton
Cc:Connie Rogers; Johnson Tere; Knopf Roger
Subject:EXTERNAL - Fwd: Save Wheeler Auditorium
Date:Friday, March 27, 2026 5:29:35 PM
From: Kathy Sullivan <kcks05@aol.com>
Date: March 27, 2026 at 12:32:08ௗPM PDT
To: Ryan.Osentum@cityofgilroy.org
Cc: Rogers Connie <jrogers@garlic.com>, Johnson Tere
<terejohnson@morganhillhistoricalsociety.com>, Shepherd Robin
<rshepherd@morganhillhistoricalsociety.com>
Subject: Save Wheeler Auditorium
Dear Ryan,
As the former president of the Morgan Hill Historical Society, I became aware of
the historical structures that had been demolished in Morgan Hill. It’s easier to
tear them down than plan for renovations that bring history to the community.
It is a shame to see these noted structures be bulldozed. They help connect us to
the past and tell the stories of how we have developed into the beloved
communities we are today. As populations expand, newcomers have questions
about the who, why and how of their community. These structures bring the
answers to life.
For the sake of history, I support saving this building and making it another place
for at community to enjoy it’s history.
Kathy Sullivan
Morgan Hill
408-230-7876
1
Comment Letter #36
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 2.0 Draft EIR Comments and Responses 2-92 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Letter 36 – Kathy Sullivan
1. The commenter states support for preserving Wheeler Auditorium, references the importance
of historic structures in connecting communities to their history, and recommends retaining
the building for community use.
Refer to response to letter 4, comment 1. No change to the draft EIR is required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 3.0 Changes to the Draft EIR 3-1 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
3.0
Changes to the Draft EIR
3.1 CEQA Requirements
CEQA Guidelines section 15132 requires that a final EIR contain either the draft EIR or a revision
of the draft EIR. This final EIR incorporates the draft EIR by reference and includes revisions to
the draft EIR made primarily in response to comments included in Section 2.0, Response to
Comments.
This section contains text from the draft EIR with changes indicated. Additions to the text are
shown with underlined text (underline) and deletions are shown with strikethrough text
(strikethrough). The changes are described below.
3.2 Changes to Section 1.0 Introduction
Page 1-4
The following correction is made:
A notice of preparation was prepared for the proposed project and circulated for 30 days from
September 23, 2025 to October 22, 2025 June 19, 2025 to July 19, 2025 as required by CEQA, and
two responses were received. No responses to the notice of preparation were received. The notice
of preparation, along with the responses, is are included in Appendix A. Written responses to the
notice of preparation were received from the following:
Department of Toxic Substances Control, dated September 26, 2025
The Department of Toxic Substances Control (DTSC) recommended that pre-demolition surveys
be conducted to identify the presence of lead-based paint, asbestos-containing materials, mercury,
and polychlorinated biphenyls and that any removal or disposal of such materials comply with
applicable environmental regulations. Additionally, DTSC recommends sampling be conducted near
current and/or former building in accordance with DTSC Preliminary Endangerment Assessment
Guidance Manual. DTSC further advises that any imported soil or fill material be tested for
contaminants in accordance with DTSC’s Preliminary Endangerment Assessment Guidance Manual
and Clean Imported Fill Material Fact Sheet to ensure suitability for intended land use.
These recommendations are addressed in Section 9.5 Hazards and Hazardous Materials of the draft
EIR.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Section 3.0 Changes to the Draft EIR 3-2 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
California Department of Transportation, dated October 22, 2025
The California Department of Transportation (Caltrans) provided preliminary comments for
informational purposes. Caltrans expressed interest in reviewing the draft EIR, particularly the
vehicle miles traveled analysis, and also noted that construction activities involving oversized or
excessive load vehicles on State roadways will require a transportation permit issued by Caltrans.
This comment is acknowledged in Section 9.12 Transportation of the draft EIR.
3.3 Changes to Section 4.0 Project Description
Page 4-2
The following clarification is made:
Gilroy Civic Park (New)
Features: A large lawn area, walking paths (equivalent to a football field), an amphitheater similar
in size to Morgan Hill’s Amphitheater, and a splash pad/interactive water feature.
Events: Designed to accommodate art & wine festivals, farmers' markets and other similar
events.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Mitigation Monitoring and Reporting Program 1 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Mitigation Monitoring and Reporting Program
1.1 Introduction
CEQA Guidelines section 15097 requires public agencies to adopt reporting or monitoring
programs when they approve projects subject to an environmental impact report or a negative
declaration that includes mitigation measures to avoid significant adverse environmental effects. The
reporting or monitoring program is to be designed to ensure compliance with conditions of project
approval during project implementation in order to avoid significant adverse environmental effects.
The law was passed in response to historic non-implementation of mitigation measures presented in
environmental documents and subsequently adopted as conditions of project approval. In addition,
monitoring ensures that mitigation measures are implemented and thereby provides a mechanism to
evaluate the effectiveness of the mitigation measures.
A definitive set of project conditions would include enough detailed information and enforcement
procedures to ensure the measure's compliance. This monitoring program is designed to provide a
mechanism to ensure that mitigation measures and subsequent conditions of project approval are
implemented.
1.2 Monitoring and Reporting Program
The basis for this monitoring program are the mitigation measures included in the project
environmental impact report. These mitigation measures are designed to eliminate or reduce
significant adverse environmental effects to less than significant levels. These mitigation measures
become conditions of project approval, which the City of Gilroy is required to complete before,
during and after implementation of the proposed project.
The attached checklist is proposed for monitoring the implementation of the mitigation measures.
This monitoring checklist contains all appropriate mitigation measures in the environmental impact
report.
1.3 Monitoring and Reporting Program Procedures
The City of Gilroy shall use the attached monitoring checklist for the proposed project. The
monitoring program should be implemented as follows:
Exhibit BDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Mitigation Monitoring and Reporting Program 2 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
1. The Gilroy Community Development Department should be responsible for coordination of
the monitoring program, including the monitoring checklist. The Community Development
Department should be responsible for completing the monitoring checklist and distributing the
checklist to the responsible individuals or agencies for their use in monitoring the mitigation
measures.
2. Each responsible individual or agency will then be responsible for determining whether the
mitigation measures contained in the monitoring checklist have been complied with. Once all
mitigation measures have been complied with, the responsible individual or agency should
submit a copy of the monitoring checklist to the Community Development Department to be
placed in the project file. If the mitigation measure has not been complied with, the monitoring
checklist should not be returned to the Community Development Department.
3. The Gilroy Community Development Department will review the checklist to ensure that
appropriate mitigation measures and additional conditions of project approval included in the
monitoring checklist have been complied with at the appropriate time, e.g. prior to issuance of a
use permit, etc. Compliance with mitigation measures is required for project approvals.
4. If a responsible individual or agency determines that a non-compliance has occurred, a written
notice should be delivered by certified mail to the City of Gilroy within 10 days, with a copy to
the Community Development Department, describing the non-compliance and requiring
compliance within a specified period of time. If non-compliance still exists at the expiration of
the specified period of time, construction may be halted and fines may be imposed at the
discretion of the City of Gilroy.
1.4 Monitoring and Reporting Checklist
Step 1 - Prior to Issuance of Ground Disturbing Activities (e.g., Demolition,
Grading or Tree Removal Permits)
AQ-1 With each construction project, the City of Gilroy shall prepare a Construction
Management Plan to include the following measures to reduce toxic air contaminants
emissions during construction:
a. Heavy-duty diesel vehicles will have 2010 or newer model year engines, in
compliance with the California Air Resources Board’s Truck and Bus Regulation;
b. Idling of construction equipment and heavy-duty diesel trucks will be avoided where
feasible, and if idling is necessary, it will not exceed three minutes;
c. All construction equipment will be maintained and properly tuned in accordance
with manufacturer’s specifications and will be checked by a certified visible emissions
evaluator; and
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Mitigation Monitoring and Reporting Program 3 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
d. All non-road diesel construction equipment will, at a minimum, meet Tier 3 emission
standards listed in the Code of Federal Regulations Title 40, Part 89, Subpart B,
§89.112. Further, where feasible, construction equipment will use alternative fuels
such as compressed natural gas, propane, electricity, or biodiesel.
Party Responsible for Implementation: City of Gilroy
Party Responsible for Monitoring: Gilroy Community Development Department
Monitoring Notes:
____________________________________________________________________
____________________________________________________________________
____________________________________________________________________
BIO-1 Special-Status Bat Species. Within 14 days prior to tree removal, vegetation clearing,
building demolition, grading, or the initiation of any construction activity in any area of
the project site, a qualified wildlife biologist shall conduct a habitat assessment for bats
and potential roosting sites in trees to be removed, in buildings and trees within 50 feet
of the construction footprint, and surrounding structures situated within 50 feet of
disturbance activities by the project. In the event that construction activities are
suspended for 14 consecutive days or longer, these surveys shall be repeated.
Surveys shall include a visual inspection of potential roosting features (bats need not be
present) and a search for presence of guano within the project site, construction access
routes, and 50 feet around these areas. Cavities, crevices, exfoliating bark, and bark
fissures that could provide suitable potential nest or roost habitat for bats shall be
surveyed. Assumptions can be made on what species is present due to observed visual
characteristics along with habitat use, or the bats can be identified to the species level
with the use of a bat echolocation detector such as an “Anabat” unit. Potential roosting
features found during the survey shall be flagged or marked. Locations off the site to
which access is not available may be surveyed from within the site or from public areas.
If no roosting sites or bats are found, a letter report confirming absence shall be
submitted by the biologist to the City of Gilroy Community Development Department,
Planning Division, where it will be kept on file, and no further mitigation is required.
If bats or roosting sites are found, a letter report and supplemental documents shall be
provided by the biologist to the City of Gilroy Community Development Department,
Planning Division, prior to ground disturbance activities and the following monitoring,
exclusion, and habitat replacement measures shall be implemented:
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Mitigation Monitoring and Reporting Program 4 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
a. If bats are found roosting outside of the nursery season (May 1 through October 1),
they shall be evicted as described under (b) below. If bats are found roosting during
the nursery season, they shall be monitored to determine if the roost site is a
maternal roost. This could occur by either visual inspection of the roost bat pups, if
possible, or by monitoring the roost after the adults leave for the night to listen for
bat pups. If the roost is determined to not be a maternal roost, then the bats shall be
evicted as described under (b) below. Because bat pups cannot leave the roost until
they are mature enough, eviction of a maternal roost cannot occur during the nursery
season. Therefore, if a maternal roost is present, a 50-foot buffer zone (or different
size if determined in consultation with the California Department of Fish and
Wildlife) shall be established around the roosting site within which no construction
activities including tree removal or structure disturbance shall occur until after the
nursery season.
b. If a non-breeding bat hibernaculum is found in a tree or snag scheduled for removal
or on any structures within 50 feet of project disturbance activities, the individuals
shall be safely evicted, under the direction of a qualified bat biologist. If pre-
construction surveys determine that there are bats present in any trees or structures
to be removed, exclusion structures (e.g., one-way doors or similar methods) shall be
installed by a qualified biologist. The exclusion structures shall not be placed until the
time of year in which young are able to fly, outside of the nursery season.
Information on placement of exclusion structures shall be provided to the California
Department of Fish and Wildlife prior to construction. If needed, other removal
methods could include: carefully opening the roosting area in a tree or snag by hand
to expose the cavity and opening doors/windows on structures, or creating openings
in walls to allow light into the structures. Removal of any trees or snags and
disturbance within 50 feet of any structures shall be conducted no earlier than the
following day (i.e., at least one night shall be provided between initial roost eviction
disturbance and tree removal/disturbance activities). This action will allow bats to
leave during dark hours, which increases their chance of finding new roosts with a
minimum of potential predation.
Party Responsible for Implementation: City of Gilroy
Party Responsible for Monitoring: Gilroy Community Development Department
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Mitigation Monitoring and Reporting Program 5 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Monitoring Notes:
____________________________________________________________________
____________________________________________________________________
____________________________________________________________________
BIO-2 To avoid impacts to nesting birds during the nesting season (February 1 through
September 15), construction activities that include any tree removal, vegetation
clearance, or ground disturbance (such as grading or grubbing), shall be conducted
between September 16 and January 31, which is outside of the bird nesting season. If
construction activities must commence during the bird nesting season, then a qualified
biologist shall conduct a pre-construction survey for nesting birds to ensure that no nests
would be disturbed during project construction.
a. Two surveys for active nests of such birds shall occur within 10 days prior to start of
construction, with the second survey conducted within 48 hours prior to start of
construction. Appropriate minimum survey radius surrounding the work area is
typically 250 feet for passerines, 500 feet for smaller raptors, and 1,000 feet for larger
raptors. Surveys shall be conducted at the appropriate times of day to observe
nesting activities. Evidence of completion of the preconstruction survey shall be
submitted to the Gilroy Community Development Department, Planning Division,
where it will be kept on file, prior to initiation of ground disturbing activities.
b. If the qualified biologist documents active nests at the project site, an appropriate
buffer between each nest and active construction shall be established. The buffer
shall be clearly marked and maintained until the young have fledged and are foraging
independently. Prior to construction, the qualified biologist shall conduct baseline
monitoring of each nest to characterize “normal” bird behavior and establish a
buffer distance, which allows the birds to exhibit normal behavior. The qualified
biologist shall monitor the nesting birds daily during construction activities and
increase the buffer if birds show signs of unusual or distressed behavior (e.g.,
defensive flights and vocalizations, standing up from a brooding position, and/or
flying away from the nest). If buffer establishment is not possible, the qualified
biologist shall have the authority to cease all construction work in the area until the
young have fledged and the nest is no longer active. This measure shall be
implemented by the City of Gilroy prior to initiation of ground disturbing activities.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Mitigation Monitoring and Reporting Program 6 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Party Responsible for Implementation: City of Gilroy
Party Responsible for Monitoring: Gilroy Community Development Department
Monitoring Notes:
____________________________________________________________________
____________________________________________________________________
____________________________________________________________________
BIO-3 Prior to approval of each construction project, the City of Gilroy shall prepare a
Landscape Plan for review and approval by the Community Development Department,
Planning Division indicating the location, size and species of existing trees found within
the project site boundaries. The plan shall indicate which trees are planned for removal.
Based on review of the Landscape Plan, the City shall determine which trees, if any, are
“significant.”
If significant trees are determined to be located on the project site, they shall be retained,
to the greatest extent feasible. The dripline of significant trees to be retained shall be
fenced prior to grading activities to prevent root damage. If retention of all significant
trees on the project site is infeasible, a written report shall be prepared by a certified
arborist including the number and location of each significant tree to be removed, the
type and approximate size of each significant tree, the reason for removal, and
specifications for replacing significant trees to be removed. The written report shall be
prepared prior to the commencement of grading activities, subject to approval by the
City of Gilroy Community Development Department, Planning Division, and a tree
removal permit shall be obtained if needed.
Prior to commencement of construction activities, the protected zone (one to 1.5 times
the distance from the trunk to the dripline, depending on the tree species) of any trees or
groups of trees to be retained shall be fenced to prevent injury to the trees during
construction. Soil compaction, parking of vehicles or heavy equipment, stockpiling of
construction materials, and/or dumping of materials shall not be allowed within the
protected zone. The fencing shall remain in place until all construction activities are
complete. The City of Gilroy shall submit evidence of the locations and extent tree
protection measures to the Community Development Department, Planning Division,
where it will be kept on file, prior to initiation of ground disturbing activities.
Party Responsible for Implementation: City of Gilroy
Party Responsible for Monitoring: Gilroy Community Development Department
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Mitigation Monitoring and Reporting Program 7 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Monitoring Notes:
____________________________________________________________________
____________________________________________________________________
____________________________________________________________________
CUL-1.a Prior to issuance of any demolition permit, a qualified architectural historian shall
document the Wheeler Auditorium at 7377 Church Street in accordance with the
guidelines established for the Historic American Building Survey (HABS).
Documentation shall consist of the following components:
1. Drawings – Prepare sketch floor plans.
2. Photographs – Digital photographic documentation of the interior, exterior, and
setting of the buildings in compliance with the National Register Photo Policy Fact
Sheet. Photos must have a permanency rating of approximately 75 years.
3. Written Data – HABS written documentation in short form.
An architectural historian meeting the Secretary of the Interior’s Professional
Qualification Standards shall oversee the preparation of the sketch plans, photographs
and written data. The existing DPR forms shall fulfill the requirements for the written
data report.
The City of Gilroy’s Historian shall review the documentation, and then file the
documentation with the Northwest Information Center at Sonoma State University, the
repository for the California Historical Resources Information System. All
documentation shall be submitted on archival paper.
CUL-1.b The City shall develop the material prepared in CUL-1 into a public educational display
within the new community center.
Party Responsible for Implementation: City of Gilroy
Party Responsible for Monitoring: City of Gilroy Historian
Monitoring Notes:
____________________________________________________________________
____________________________________________________________________
____________________________________________________________________
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Mitigation Monitoring and Reporting Program 8 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Step 2 - Prior to Issuance of a Building Permit
GHG-1 The following GHG emissions reduction performance measures shall be incorporated
into the final project designs and plans for each development project:
a. No permanent natural gas infrastructure shall be permitted; no natural gas shall be
made available through permanent natural gas infrastructure. The project shall be all
electric; and
b. Electric vehicle infrastructure (e.g., elective vehicle parking spaces, charging station
infrastructure, chargers, etc.) consistent with the CALGreen Tier 2 standards in
effect at the time building permits are issued shall be included in the project.
Final plans for the development shall be reviewed by the City of Gilroy Community
Development Department, Planning Division Director or his/her designee prior to
approval of project entitlements to ensure that all performance standards are
incorporated into the project design. Verification of development consistent with the
performance standards shall be assured prior to approval of occupancy permits.
Party Responsible for Implementation: City of Gilroy
Party Responsible for Monitoring: Gilroy Community Development Department
Monitoring Notes:
____________________________________________________________________
____________________________________________________________________
____________________________________________________________________
Step 3 – During Construction and Ground Disturbing Activities
CUL-2 In the event archaeological resources are encountered during ground disturbing
activities; contractor shall temporarily halt or divert excavations within a 50 meter (165
feet) of the find until it can be evaluated. All potentially significant archaeological
deposits shall be evaluated to demonstrate whether the resource is eligible for inclusion
on the California Register of Historic Resources, even if discovered during construction.
If archaeological deposits are encountered, they shall be evaluated and mitigated
simultaneously in the timeliest manner practicable, allowing for recovery of materials and
data by standard archaeological procedures. For precontact and indigenous
archaeological sites, this data recovery involves the hand‐excavated recovery and non‐
destructive analysis of a small sample of the deposit. Any previously undiscovered
resources found during construction activities shall be recorded on appropriate
California Department of Parks and Recreation (DPR) forms and evaluated for
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Mitigation Monitoring and Reporting Program 9 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
significance by a qualified archaeologist. Unique archaeological cultural resources consist
of but are not limited to stone (ground and flaked), bone, organic materials, ceramics,
fossils, wood, or shell artifacts. Features include hearths, cairns, middens, and postholes.
Party Responsible for Implementation: City of Gilroy
Party Responsible for Monitoring: Gilroy Community Development Department
Monitoring Notes:
____________________________________________________________________
____________________________________________________________________
____________________________________________________________________
CUL-3 In the event that human remains (or remains that may be human) are discovered at the
project site, Public Resource Code Section 5097.98 shall be followed. All grading or
earthmoving activities shall immediately stop within 50 meters (165 feet) of the find. The
Santa Clara County Corner will be notified immediately, and the coroner shall be
permitted to examine the remains as required by California Health and Safety Code
Section 7050.5(b). Section 7050.5 requires that excavation be stopped in the vicinity of
discovered human remains until the coroner can determine whether the remains are
those of a Native American. If human remains are determined as those of Native
American origin, the City of Gilroy shall comply with the state relating to the disposition
of Native American burials that fall within the jurisdiction of the NAHC (Public
Resource Code [PRC] § 5097). The coroner shall contact the Native American Heritage
Commission (NAHC) to determine the most likely descendant(s) (MLD). The MLD
shall complete his or her inspection and make recommendations or preferences for
treatment within 48 hours of being granted access to the site. The MLD will determine
the most appropriate means of treating the human remains and associated grave artifacts,
and shall oversee the disposition of the remains. In the event the NAHC is unable to
identify an MLD or the MLD fails to make a recommendation within 48 hours after
being granted access to the site, the landowner or his/her authorized representative shall
rebury the Native American human remains and associated grave goods with appropriate
dignity within the project site in a location not subject to further subsurface disturbance
if: a) the Native American Heritage Commission is unable to identify the MLD or the
MLD failed to make a recommendation within 48 hours after being allowed access to the
site; b) the descendent identified fails to make a recommendation; or c) the landowner or
his authorized representative rejects the recommendation of the descendent, and the
mediation by the Native American Heritage Commission fails to provide measures
acceptable to the landowner.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Mitigation Monitoring and Reporting Program 10 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Party Responsible for Implementation: City of Gilroy
Party Responsible for Monitoring: Gilroy Community Development Department
Monitoring Notes:
____________________________________________________________________
____________________________________________________________________
____________________________________________________________________
Step 4 – Prior to Issuance of Occupancy Permits
CUL-1.a Prior to issuance of any demolition permit, a qualified architectural historian shall
document the Wheeler Auditorium at 7377 Church Street in accordance with the
guidelines established for the Historic American Building Survey (HABS).
Documentation shall consist of the following components:
1. Drawings – Prepare sketch floor plans.
2. Photographs – Digital photographic documentation of the interior, exterior, and
setting of the buildings in compliance with the National Register Photo Policy Fact
Sheet. Photos must have a permanency rating of approximately 75 years.
3. Written Data – HABS written documentation in short form.
An architectural historian meeting the Secretary of the Interior’s Professional
Qualification Standards shall oversee the preparation of the sketch plans, photographs
and written data. The existing DPR forms shall fulfill the requirements for the written
data report.
The City of Gilroy’s Historian shall review the documentation, and then file the
documentation with the Northwest Information Center at Sonoma State University, the
repository for the California Historical Resources Information System. All
documentation shall be submitted on archival paper.
CUL-1.b The City shall develop the material prepared in CUL-1 into a public educational display
within the new community center.
Party Responsible for Implementation: City of Gilroy
Party Responsible for Monitoring: Gilroy Community Development Department
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Mitigation Monitoring and Reporting Program 11 EMC Planning Group
Gilroy Civic Center Master Plan Final EIR August 2026
Monitoring Notes:
____________________________________________________________________
____________________________________________________________________
____________________________________________________________________
GHG-1 The following GHG emissions reduction performance measures shall be incorporated
into the final project designs and plans for each development project:
a. No permanent natural gas infrastructure shall be permitted; no natural gas shall be
made available through permanent natural gas infrastructure. The project shall be all
electric; and
b. Electric vehicle infrastructure (e.g., elective vehicle parking spaces, charging station
infrastructure, chargers, etc.) consistent with the CALGreen Tier 2 standards in
effect at the time building permits are issued shall be included in the project.
Final plans for the development shall be reviewed by the City of Gilroy Community
Development Department, Planning Division Director or his/her designee prior to
approval of project entitlements to ensure that all performance standards are
incorporated into the project design. Verification of development consistent with the
performance standards shall be assured prior to approval of occupancy permits.
Party Responsible for Implementation: City of Gilroy
Party Responsible for Monitoring: Gilroy Community Development Department
Monitoring Notes:
____________________________________________________________________
____________________________________________________________________
____________________________________________________________________
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Gilroy Civic Center Master Plan
CITY OF GILROY
August 6, 2025
Exhibit CDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ACKNOWLEDGMENTS
City of Gilroy
GILROY CITY COUNCIL
Greg Bozzo
Mayor
Carol Marques
Mayor Pro Tempore
Dion Bracco
Council Member
Tom Cline
Council Member
Terence Fugazzi
Council Member
Zach Hilton
Council Member
Kelly Ramirez
Council Member
GILROY COMMISSIONS AND COMMITTEES
Planning Commission
Library Commission
Youth Commission
Parks and Recreation Commission
Personnel Commission
Arts and Culture Commission
GILROY CITY STAFF
Bryce Atkins
Assistant to the City Administrator
LeeAnn McPhillips
Human Resources Director/Risk Mgr
John Doughty
Public Works Director
Sharon Goei
Community Development Director
Rachelle Bedell
Communication & Engagement Mgr
Ryan Osenton
Project Manager
RETIRED:
Jimmy Forbis
City Administrator
ACKNOWLEDGEMENTS
ELS Architecture and Urban Design + EMC Planning Group
ELS ARCHITECTURE AND URBAN DESIGN
Architecture and Urban Design
Clarence D. Mamuyac, Jr.,
FAIA, LEED AP BD+C
Principal for Community Design
David Masenten,
AIA, AICP, LEED AP BD+C
Project Principal
Kenneth Hasegawa,
AIA
Design Principal
Susan Vutz,
AIA, LEED AP
Project Manager
Ken Loretto,
AIA
Design Director
Dana Vollmer-Grant,
Assoc AIA, WELL AP
Community Engagement Specialist
Angelo Razo,
Architect
Project Architect
Jose Rodriguez
Designer
Aylin Casas Mejia
Intern Designer
EMC PLANNING GROUP
CEQA Consulting
SWA Landscape Architects
Marco Esposito
Principal Landscape Architect
Xiaomeng Ma
Designer
Consultants
HEXAGON TRANSPORTATION CONSULTANTS, INC. Transportation Consultant
BKF ENGINEERS Civil Engineering
GUTTMANN & BLAEVOET CONSULTING ENGINEERS, Mechanical, Electrical, Plumbing and Low Voltage
FORELL ELSESSER ENGINEERS, INC. Structural Engineering
BRIGHTWORKS SUSTAINABILITY LEED and Sustainability Consulting
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Gilroy Civic Center Master Plan
TABLE OF CONTENTS
I. + Executive Summary ...........................4
II. + Final Concept Design ........................6
A. Renderings ...............................11
B. Site Plan Illustratives and Diagrams ......23
C. Multigenerational Community Center
building plans/site sections/elevations ....31
D. Recreation & Aquatic Center
building plans/site sections/elevations ....36
E. City Hall
building plans/site sections/elevations ....41
III. + Program ....................................46
A. Multigenerational Community Center .......47
B. Recreation & Aquatic Center ..............48
C. City Hall ................................49
IV. + Community Engagement .......................50
A. Community Engagement Process .............51
- Advertising and Engagement .............57
- Workshop #1 – Gallery Walk .............61
- Workshop #2 – Alternate Concepts .......82
- Workshop #3 – Preferred Concept ........89
B. Summary of Feedback ......................91
V. + Technical Memos ............................94
A. Existing Conditions ......................96
B. Traffic and Parking .......................99
C. Civil Engineering .......................108
D. Structural Engineering ..................112
E. Mechanical, Electrical,
Plumbing, and Low Voltage ...............114
F. Sustainability and LEED Scorecards .......143
VI. + Schedule ..................................147
VII. + Appendix .................................149
A. City Hall Detailed Program ..............150
- Detailed Program Tabulation ...........151
- Needs Assessment ......................155
B. Survey Responses ........................175
C. Meeting Notes and Presentations .........195
D. Reference Materials .....................251
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
l +executive summary
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 5Gilroy Civic Center Master Plan
Executive Summary
GILROY CIVIC CENTER MASTER PLAN
In November 2024, the City of Gilroy selected ELS Architecture and
Urban Design to lead a comprehensive study of its three-block, 14-
acre Civic Center. This area—bounded by Sixth Street, Seventh Street,
Dowdy Street, and Church Street—holds essential places such as City
Hall, Wheeler Center, the Police Headquarters, the Gilroy Library, the
Senior Center, and other community-serving facilities.
While some Civic Center buildings, like the Gilroy Library and the
Police Headquarters, are relatively new and will remain in place, others
are aging and no longer meet the city’s evolving needs. Meanwhile,
municipal departments are seeing a steady increase in service
demands from a population that has grown by 42% in the last 25 years.
While these challenges come amid rapidly evolving standards that
affect countless social and financial norms, the people of Gilroy and
their leaders share a common bond: the timeless desire for gathering
around public experiences.
In response, city leadership is seizing this opportunity to create a
Civic Center that can serve Gilroy’s immediate needs and broader
aspirations. This Master Plan is the result of an inclusive, six-month
process that has been driven largely by its community—that is, by the
people who use the existing site and, in using its successor, will draw
profound new benefits from the site’s transformation.
Through a series of city council sessions (conducted in accordance with
the Brown Act), public workshops, and stakeholder meetings, over 500
community members have contributed their voices and reimagined what
this place is capable of. In reflecting the priorities and aspirations of the
broadest possible portion of Gilroy residents, this final plan envisions a
modern, inclusive, and vibrant hub that honors the city’s heritage while
embracing contemporary practices in programming and sustainability.
WHY A NEW MASTER PLAN?
In 1905, 35 years after its incorporation, the City of Gilroy built its first
seat of government at the corner of Monterey Road and West 6th
Street. The handsome stone City Hall, which still stands today, housed
offices for the mayor and the city clerk, a jail, and the fire department.
For a city of less than 2,000 people, the building was likely sufficient to
meet all needs.
Today, Gilroy’s administrators will make no claims of sufficiency.
Amid a generally expanding population now nearing 60,000 and a
corresponding expansion of government services, there have been
minimal expansions in capacity through new or renovated buildings.
The last Civic Center Master Plan was adopted in 2002, when Gilroy
had roughly 42% fewer residents.
Meanwhile, the land on which the site’s buildings sit is dominated
by pavement, the majority of which is dedicated to surface parking.
The need for a pedestrian-friendly, modernized civic core is clear.
The current Senior Center, Wheeler Center and City Hall are beyond
their useful life and capacity, complicating the city’s ability to provide
even basic essential services. The new Master Plan addresses these
challenges by aligning city infrastructure with the community’s present
and future needs, representing a bold and thoughtful investment in the
city’s future.
A REIMAGINED CIVIC CENTER
As envisioned in this master plan, the new Gilroy Civic Center will
capably serve the full range of municipal services. It will also set more
far-reaching goals, with enticing amenities in wellness, recreation, and
cultural programming, among other features. These components will
be supported by strategies in architecture and landscape architecture
that unite to form a dynamic, pedestrian-friendly campus. The
beautifully designed park setting will cohesively integrate government
services and innovative, engaging, and personalized civic uses. Key
elements include:
• Preservation of Existing Assets: The Gilroy Library and Police
Headquarters will remain and continue to serve the community for
decades to come.
• New Civic Facilities: Outdated buildings such as Wheeler
Center, City Hall, and the Senior Center will be replaced with
modern, sustainable, high-capacity facilities designed to support
multigenerational programming and future growth.
KEY COMPONENTS OF THE PLAN
Gilroy Civic Center Park
The most definitive component of the entire plan is a new Civic
Center Park. Envisioned as the heart of Gilroy, this central green space
connects all civic buildings through two major features:
• The East/West Paseo: A pedestrian corridor linking the Police
Headquarters, the Library, and the future City Hall.
• The Big Green: Flanked on the north by the new Recreation
and Aquatics Center and, on the south, the Multigenerational
Community Center, this large open lawn space will host picnics,
farmers markets, performances, and community gatherings.
New Civic Buildings
Three new buildings will anchor the reimagined Civic Center:
1. Multigenerational Community Center: Offering programming
in theater, the arts, and media, along with dedicated spaces for
youth, teens, and seniors.
2. Recreation and Aquatics Center: Featuring competitive and
recreational pools, wellness programs, and inclusive sports
facilities.
3. New City Hall: Designed to efficiently support the city’s growing
needs in administration and public service.
COMMUNITY ENGAGEMENT
For this planning process, public participation was seen as an essential
tool that would help ensure the Civic Center’s success once the site
concludes its build-out. In addition to a prominent web presence
and consistent outreach by post and email, the city held four
bilingual community workshops that included a Spanish-language
“Cafecito” event hosted by the Gilroy Police Department. These four
sessions, primarily held at Wheeler Center, were each designed to
build consistently upon the previous. This process of accrual helped
participants to share and refine their vision for the Civic Center by
offering residents direct influence over their city’s future.
STRUCTURE FOR THE MASTER PLAN REPORT
This report describes the Master Plan in detail through the following
components:
• Final Concept Design
• Program
• Community Engagement
• Technical Memoranda
• Construction Cost Estimate
• Schedule
• Appendices
CEQA REVIEW
As part of ELS Architecture and Urban Design’s scope of services, the
Gilroy Civic Center Master Plan is currently undergoing environmental
review in accordance with the California Environmental Quality Act
(CEQA). This analysis is being conducted by EMC Planning Group and is
anticipated for completion by summer 2026.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ll +final concept design
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 7Gilroy Civic Center Master Plan
Final Concept Design
Urban Design/Planning and Landscape
Since at least 1940, the Gilroy Civic Center site has been gradually
pieced together, leading to a patchwork experience characterized
primarily by stand-alone facilities, driveways, and large expanses of
disconnected surface parking.
City staff and stakeholders have now reimagined the Civic Center as
cohesive, iconic campus defined by contemporary buildings, vibrant
public spaces, and a central downtown park. This Master Plan envisions
a unified, walkable, and welcoming destination by consolidating
parking, replacing aging single-story facilities with efficient two-story
buildings, and eliminating perimeter fencing. The people-first plan
increases usable open space, forms new pedestrian connections to the
nearby downtown, and dramatically enhances the site’s relationship
with the population it serves.
This bold vision reflects the transformation of the Civic Center into a
truly public amenity and adds new meaning to Gilroy’s public identity.
PLAN DESCRIPTION
Anchored by three new buildings (City Hall, a Recreation & Aquatics
Center, and an Arts & Community Center with a 250-seat theater),
the plan weaves these new facilities into the existing Library and
Police Headquarters around a central park for events, all of which are
connected by a tree-lined paseo.
The design adds to Gilroy’s identity as a place that places a high value
on inclusion and community-wide connections. In plan view, the edges
of each building are often activated where they meet adjacent green
space, resulting in a pleasing, site-wide assembly of mutually beneficial
indoor-outdoor relationships. These edges have a special vitality: large
building doors open onto event terraces; patios invite people to gather,
read, and dine; and recreational activities draw energy through their
proximity to the park.
The plan makes the most of the site’s proximity to downtown Gilroy,
just a short walk west along 6th Street or Monterey Street, by
reinforcing pedestrian connections and extending the experience
of downtown eastward. In so doing, the Civic Center can at last
strengthen its relationship with the historic commercial core and play a
more important role in the city’s evolving network of public spaces.
At its core, the master plan draws from best practices in urban
design to establish a sense of place, scale, and connectivity, helping
to promote walkability, economic vitality, and a stronger sense of
community identity. Buildings are intentionally arranged to frame a
central civic park and pedestrian paseo, creating a strong east-west
relationship that orients visitors and links to key destinations. The
design transforms auto-dominated infrastructure into a pedestrian-
prioritized landscape, consolidating numerous scattered driveways
into concentrated primary access points to reduce vehicular conflict,
improve safety, and reclaim surface area for green space and public
use. Generous setbacks, shaded seating, and an intuitive network of
pathways make the site inviting and porous, encouraging pedestrian
access and impromptu gatherings across all ages and abilities.
At the center of the new community buildings is the Civic Park, a two-
block green space fronting Church Street, forms the Master Plan’s
heart and functions as the literal and symbolic center of Gilroy’s civic
life. Encircled by the Community Center, Recreation Center, City Hall,
and Library, the park supports both daily use (with shaded paths, picnic
lawns, playgrounds, and fitness stations) and large-scale community
events. Merging the uses of an amphitheater, community lawn, and
event plaza, the park can host concerts, movie nights, markets, and
seasonal festivals; its surrounding promenade provides space for
markets and outdoor gatherings. To mark a key public confluence—
of the park, paseo, and walkway to Rosanna Street—several arcs of
fountain jets form a playful focal point and, where adjacent events
require additional usable space, can be turned off.
CIVIC BUILDINGS
The new City Hall, located prominently at the southern edge of
the civic park and easily visible from key access points, is designed
around notions of contemporaneity, efficiency, and transparency.
The building’s easily legible layout includes a welcoming lobby, flexible
workspaces, and public meeting rooms that establish this as an
approachable, accessible place characterized by open governance.
The building design allows a direct visual connection between the
adjacent plaza and the council chambers, allowing for larger crowds
while reinforcing the community connecting to the seat of government.
Its central location reaffirms its role as the symbol and the seat of
Gilroy’s public life.
The Recreation & Aquatics Center is a wellness hub for all ages. Its
design offers indoor courts, fitness studios, swimming pools, and
water therapy, in a facility suitable for year-round use. Generous
glazing along its primary facades offers a visual connection to the park,
showcasing physical activity and encouraging participation. With a
similar design intent, the Arts & Community Center supports lifelong
curiosity through cultural programming, education, and performance,
with spaces adaptable for everything from youth art classes to civic
ceremonies. Its 250-seat theater doubles as a venue for local arts
and large public gatherings, while the senior dining room has a direct
connection to outdoor views of the park and other civic amenities.
PASEO
The paseo is a tree-lined promenade that, as an interconnecting spine,
organizes the broader Civic Center site. It extends the park experience
westward, connects Civic Park with the Police Headquarters, library,
City Hall and site parking, and promotes a sense of continuity and flow.
The paseo is lined with benches and communal tables set beneath
large canopy trees selected to match the site’s existing heritage
trees and those along nearby streets. The paseo’s axial orientation
allows for long views toward Gilroy’s hilly landscape—by turns gold or
green—reinforcing the sense of a place that is rooted in the natural
environment. The site is further unified by a consistent materials
palette and generous landscaping.
PARKING
To support the site’s transformation, the master plan consolidates
14 scattered driveways into just five primary access points, helping
to reduce pavement area and improve public safety. Parking is
consolidated into two primary lots occupying the site’s northwest
corner. One lot extends from the Library along Sixth Street and
the other serves City Hall, the Community Center, and the Police
Headquarters. Together, these lots provide 300 on-site spaces,
complemented by 125 additional spaces along the site’s frontage
facilitated in part by replacing parallel spaces with angled parking. If
future needs require it, the larger lot is designed to accommodate
structured parking, which will increase capacity without sacrificing
open space.
BEING A GOOD NEIGHBOR
This project’s designers have been mindful of the fact that the Civic
Center site occupies a single-family residential neighborhood, with
many homes facing directly onto the project’s common access points
and gathering areas. The master plan respects this context. The
plan’s buildings, driveway locations, and site-edge landscaping have
all been sensitively designed to minimize potential negative impacts
on the surrounding neighborhood. New buildings step down in mass
and in height near adjacent homes, while landscaped buffers and
pedestrian-scaled transitions help blend the civic campus into the
neighborhood fabric. This edge condition is conceived as a prominent,
desirable neighborhood frontage, with pedestrian-scaled lighting, clear
sightlines, and walkable connections that welcome residents to stroll,
bike, or jog easily and safely into the site without needing to drive. This
approach seeks, at its core, to create a pedestrian-oriented site that
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 8Gilroy Civic Center Master Plan
extends the surrounding open space network and integrates into the
district as if it were just another amenity-rich neighborhood park.
SUSTAINABLE, RESILIENT STRATEGIES
The Master Plan’s design strategies exemplify the value of resilient,
sustainable urban infrastructure. Native landscaping, bioswales, and
permeable paving all manage stormwater while reducing the urban
heat-island effect. Passive design strategies—such as optimized
building orientation and shading devices—minimize energy use and
enhance outdoor comfort. In this vision, the Civic Center becomes not
only a center of public life but a tool for exploring the teachable values
of sustainable planning and design.
EQUITY AND INCLUSION
Equity and inclusion are core to the plan, with every aspect of
the campus—from building entries to playgrounds—designed to
welcome the region’s cultures and to embody the principles of
universal accessibility. Community input, particularly from historically
underrepresented groups, has helped to ensure that the project
serves the immediate needs of a diverse spectrum of Gilroy residents.
In particular, the park and paseo prioritize multigenerational,
multifunctional design strategies and create space for youth, families,
and seniors to gather. Pathways and entries will be universally
accessible; multilingual signage and culturally inclusive programming
will deepen public perceptions of this place as welcome to all.
The plan proposes far more than a collection of new buildings. It
envisions a civic common for the 21st century, one that can meet the
evolving needs of Gilroy’s people and environment. By integrating
functional municipal infrastructure with beautiful public space,
the plan reflects the pride, aspirations, and diversity of its city’s
stakeholders while delivering flexible, future-ready infrastructure that
will serve the region for many coming generations.
Architecture
CAMPUS PLAN
A campus can be thought of as any well-defined place where people
come to share in a set of common purposes. To envision and articulate
a place that helps fulfill those purposes has been one of the primary
objectives for this Master Plan. As visitors approach the site, they will
see buildings that frame the park and form a clear dialogue between
structure and landscape. In plan view, the spaces in between each
building offer areas that support civic purpose by enabling informal
community gatherings. Each building has two levels, helping to
minimize its horizontal footprint while maximizing the available area for
outdoor recreation and amenities.
The Master Plan gathers the site’s new and existing structures around
a strongly linear, east-west gateway known as the Paseo. On its western
side, the Paseo extends from the parking lot and existing Police
Headquarters towards the large civic park and community-focused
buildings on the eastern side, where much of the recreation and
leisure activities are concentrated.
The Multigenerational Community Center is located along West 7th
Street, and the Recreation & Aquatics Center is located to the north,
along West 6th Street. The new City Hall is sited along West 7th Street in
the central campus block, where the current City Hall is located. These
three new buildings, together with the existing Library and the Police
Headquarters, help define the overall campus perimeter. When a visitor
is at the site’s eastern edge, the eye moves west and toward the central
Paseo. The park-facing facades of City Hall, the Community Center,
the Recreation and Aquatics Center and the Library all progressively
narrow down to frame the park and Paseo, a reduction that helps to
concentrate a visitor’s focus and invites them to explore the site’s various
civic uses more deeply. Conversely, looking east from the western end of
the Paseo frames an extensive view of the Civic Park that expands as one
moves down the gateway towards Church Street.
This campus plan effectively choreographs the site’s countless civic
activities and helps to bridge the official functions of a municipality
with everyday experiences related to recreation, wellness, and culture.
CIVIC ARCHITECTURAL IDENTITY
Already one of the most recognized places in Gilroy, the Civic Center
site must now achieve new forms of recognition. The Civic Center
master plan envisions a place where people can experience the best of
life in the area and, through countless opportunities for engagement,
assert their values and civic pride. To seize this site’s enormous
potential, the master plan maximizes opportunities for cohesion
throughout the three-block campus and among the relationships
between its structures and landscape. In so doing, the realized plan will
bring contemporary meaning to Gilroy’s established civic architectural
identity and create a popular venue for community-building efforts.
With those goals in mind, this master plan retains two of the site’s
existing buildings (the library and the police headquarters) and
calls for three new buildings: the Multigenerational Community
Center; the Recreation & Aquatics Center; and City Hall. Each new
building follows a design strategy that draws on the site’s existing
architectural vocabulary and on its broader context—historical, social,
environmental, and functional.
Viewed collectively, these five buildings and their supporting landscape
form a unified expression that is rooted in three architectural
principles: materials and massing, connections through transparency,
and operational and environmental resilience.
Materials and Massing
The master plan’s new buildings draw essential design cues from three
of the site’s existing buildings—the library, the police headquarters,
and City Hall, all of which share the Mission Revival style that gives
the site its common architectural language. By acknowledging and
interpreting the architectural style of their existing neighbors, the
new facilities translate the Mission Revival style’s simple, relatable
materials and forms into a fresh, contemporary architectural response.
This stylistic interplay—between familiar and new, existing and
contemporary—establishes a formal dialogue across the five-building
collective. In addition, the use of materials and massing emphasizes
cohesion, providing a sense of unity that effectively balances the
unique characteristics and uses that define each building. This balance
will help visitors see the site as a cohesive place, despite its diverse
program and uses. For this project, the new buildings use a primary
exterior material palette of white cement plaster, terracotta tile, wood,
and glass. Each building’s massing is composed of sloped gable roofs
and rectilinear volumes. Of these volumes, certain facades are defined
by wood trellises that offer shade, material warmth, and additional
relief and scale. The facades receive further articulation from deep,
rhythmically punched openings. These openings are concentrated
along the site’s perimeter—Church Street, West 6th Street, and West
7th Street—to create a unified expression along the street frontages.
While the new buildings feel connected to and consistent with the
familiar Mission Revival style, they avoid merely replicating it. Instead,
they offer a contemporary evolution of Gilroy’s civic architecture, one
that pays homage to the city’s traditional expressions while looking to
the future.
Connections Through Transparency
Critical to this new civic identity is the idea that transparency can
be a tool for creating connection. To that end, expansive glazed
openings provide ample views and natural light, even as they are
shaded by trellises and awnings to reduce solar gain. These openings
afford grand views of the civic park, sky, and lush landscape beyond,
enabling building occupants to remain visually connected with the
neighborhood and natural environment. From outside each building,
people in the park or on the sidewalk can easily see inside various
spaces and note the bustling activities within.
The plan emphasizes physical transparency in other ways. In plan
view, the edges of each building are often activated where they meet
adjacent green space, through numerous interconnected plazas and
decks that, where applicable, are equipped with bi-fold doors to allow
for unobstructed openings. This strategy maximizes the benefits of
the plan’s strong indoor-outdoor relationship and helps define the
site as a place of seamless transition between the buildings’ countless
interior functions and all the uses found just beyond in its exterior
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 9Gilroy Civic Center Master Plan
environment, from public events to recreational and leisure activities.
Through the transparency that characterizes these indoor-outdoor
relationships, the site’s users immediately comprehend the fluid
integration of architecture and landscape and experience the two
spaces as a unified whole.
Access to natural light is crucial to establishing a space that is
comfortable, healthy, and inviting. Natural light can also reduce
operational costs by minimizing or even eliminating the need for
artificial daytime lighting. The plan’s double-height atriums and interior
glazing enable visual connections across floor levels and bring natural
light into various uses and departments. Natural light and visual
connections are often taken for granted but they are essential factors
for any project that seeks to promote intermingling and strengthen
community interaction.
Sustainability and Resiliency
The integration of sustainable and resilient strategies is central to the
project’s architectural identity and underscore Gilroy’s commitment to
climate and environmental action.
Prominent design features include:
• Use of renewable materials, most notably cross-laminated timber
as a primary structural system
• Photovoltaic solar arrays atop flat roofs for on-site renewable
energy
• Daylighting strategies maximize diffuse natural light and minimize
reliance on artificial lighting
• All-electric HVAC and pool heating systems, eliminating use of
natural gas
• Passive ventilation via stack effect in double-height spaces for
naturally cooled buildings
• Use of fire-resistant exterior materials
These strategies are critical to embodying the city’s values through a
forward-thinking complex. They also serve as public educational tools
that help to build community awareness of sustainable and resilient
design.
MULTIGENERATIONAL COMMUNITY CENTER
The Multigenerational Community Center collects diverse program
elements into a facility that can adapt to the needs of all users, with
spaces for youth and seniors, arts, dining, performance, and recreation.
The building’s layered forms help to anchor the site’s southeastern
corner and are primarily organized around the program’s two largest
spaces: a half-court gymnasium to the east and a 262-seat theater
to the west. While these two spaces are distinct volumes, they are
uniformly clad in a combination of white cement plaster and terracotta
and capped by gable roof forms. The gym’s north and south facades
include a series of repeated punched openings that provide views from
West 7th Street through to the park. The state-of-the-art, two-level
theater will provide a flexible venue supporting a rich variety of uses in
community events and the performing arts.
Between the gymnasium and theater, a series of rectilinear volumes
step (in plan view and in section view) to create an interlocking mass
uniting different users and spaces (for Dining, Seniors and Youth as
well as Arts and Administration). The Arts and Administrative spaces
are organized along the south, street-facing facade, while the Dining,
Seniors and Youth programs are located on the north, park-facing
facade, where each interior space opens directly onto outdoor spaces.
These interior spaces include the Dining Hall, where a bi-fold glass
partition system offers visitors the option of eating indoors or at a large
outdoor dining terrace. Likewise, the interior spaces for seniors open
onto a dedicated outdoor patio, and the second-floor interior spaces
for youth have a balcony with views out to Civic Park.
These various layered elements are unified by a central double-
height atrium that extends from West 7th Street all the way to the
park. Two large glass skylights bring daylight into the soaring space,
which, as the building’s lobby, serves as a place for the facility’s users
to meet and gather.
RECREATION AND AQUATICS CENTER
The Recreation and Aquatics Center is a dynamic facility that houses
programing in indoor sports, fitness, and aquatics. Situated at the civic
campus’s prominent northeast corner, the building and its landscape
form a key access point from the street and establish a civic sense
of arrival. Transparent design elements highlight active uses of the
venue and support its integration into the Master Plan. The building
is organized around a full-court gymnasium and a series of stacked
volumes lining the gym on two sides.
The gymnasium occupies the building’s north, street-facing facade,
which is articulated to break up its scale. Rhythmic punched openings
provide views along West 6th Street and Church Street, while a
second-level balcony, with a running track, projects outward to create
a ground-level arcade along Church Street.
To the south, stacked volumes house the main lobby, administrative
offices, weight and cardio rooms, and multi-purpose rooms. The lower
volume is clad in cement plaster, while the upper cantilevered gable
volume is clad in terracotta roof and wall tiles for a contemporary take
on the Mission Revival style. Deeply recessed windows, covered with
wood trellises, admit diffuse natural light and remind users of the park
setting. At the second level, an offset between the two volumes creates
balconies with views to the park.
The facility’s western edge holds locker rooms and provides direct
access to the outdoor aquatics area—an 8-lane 25-yard competition
pool with an attached fun-water pool. The pool deck projects outward
towards the park, offering a prominent and lively showcase for the
facility’s uses.
Inside, a central double-height lobby offers visual continuity to help
tie together the building’s uses. The open interior, which allows for
intuitive wayfinding, has expansive glazing along the gymnasium’s south
wall, providing views directly into the courts and the running track.
Extending from the lobby to the aquatics area, a corridor is set slightly
askew from the building’s broader axis, offering wide-angle views of the
water that highlight the importance of aquatics to the overall facility.
CITY HALL
City Hall has a unique architectural expression that sets it apart from
other facilities in the Master Plan. This distinct quality emphasizes the
building’s importance to the entire Civic Center—and to the city that
the Civic Center serves. It will replace the existing City Hall, south of
the Library, and will occupy the lower half of the plan’s middle block.
Its highly central siting puts City Hall at the heart of the plan and uses
the building’s northern edge to articulate the Paseo as it leads towards
Civic Park. This will be a future-focused seat of government, with a
design that prioritizes transparency and adaptability.
The building’s mass is organized into three primary volumes. To the
north are the Council Chambers and the main lobby; to the south is
the administrative wing, which houses various city departments (Public
Works, Finance, Community Development, Utilities, Fire Administration,
Emergency Services, Human Resources, and Administration). These
functions are located within a simple, two-story gable volume,
clad in cement plaster with terracotta roof tiles. The ground level
holds rhythmic punched openings, with wood trellises that bring in
daylight and establish a welcoming civic scale. Atop a more traditional
Mission Revival base are second-floor ribbon windows that provide
a contemporary counterpoint to the building’s lower level and offer
sweeping views of the surrounding context.
Visitors seeking to access the City departments will pass through a
double-height lobby that serves as the primary public entry and a
central access point for administrative functions. This abundantly daylit
space will draw its diffuse illumination from a large expanse of north-
facing glazing that connects to an adjacent outdoor patio.
Adjacent to the Lobby is the Council Chambers, whose distinct
architectural presence asserts its unique and symbolic role within the
campus and the city. While it has a sloped roof that resonates with the
gable roofs found elsewhere in the site’s Mission Revival-style facilities,
the Chambers moves away from traditional expressions to introduce a
bold and contemporary statement of geometric form that is unique on
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 10Gilroy Civic Center Master Plan
the campus. The Chambers’ truncated exterior volume is clad in a red
travertine rainscreen system that compliments nearby buildings’ warm
terracotta tones and establishes this place as a landmark of special
civic value.
The proceedings and sessions that fill any Council Chambers lead
to meaningful changes for a city and its residents. The space’s
interior architecture acknowledges the importance of the Council
Chambers by using height and natural light to instill the Chambers’
official functions with the humane, affirmative qualities of a special
civic space. A large oculus in the ceiling brings daylight into the
Chambers and reminds occupants of their connection to the natural
environment. An adjoining Anteroom functions as a secondary public
entry and a flexible space for events and overflow.
The Chambers’ full-height glazing frames long views of Civic Park
and creates a direct visual and emotional connection between civic
governance inside and community life outside. The City Hall asserts
the importance of tradition and of innovation and, grounded in
transparency and civic pride, creates a forward-looking facility for the
coming generations of Gilroy’s residents, stakeholders, and leadership.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
MULTIGENERATIONAL COMMUNITY CENTER
BUILDING PLANS | SITE SECTIONS | ELEVATIONSRENDERINGS
Multigenerational Community Center / Recreation & Aquatic Center / City Hall
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
View Looking West
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
View Looking Northwest
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
View Looking East
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
View Looking Southeast
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
MULTIGENERATIONAL COMMUNITY CENTER
Entrance from Big Green
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
MULTIGENERATIONAL COMMUNITY CENTER
Lobby at 2nd Floor
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Skylight at Lobby
MULTIGENERATIONAL COMMUNITY CENTERDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
RECREATION & AQUATIC CENTER
Entrance from Big Green
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
RECREATION & AQUATIC CENTER
Pool Deck
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CITY HALL
View from Big Green
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
CITY HALL
Entrance from Paseo
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
SITE PLAN ILLUSTRATIVES AND DIAGRAMS
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Site Plan Illustrative
6TH STREET
7TH STREETDOWDY CHURCHDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Site Plan Illustrative
PARKING DISBURSEMENT
6TH STREET
7TH STREETDOWDY CHURCHDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Site Plan Illustrative
FARMER’S MARKET SCENARIO
6TH STREET
7TH STREETDOWDY CHURCHDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
6TH STREET
7TH STREETDOWDY CHURCHSite Plan Illustrative
SCALE COMPARISON, 5 TENNIS COURTS
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Site Plan Illustrative
SCALE COMPARISON, FOOTBALL FIELD
6TH STREET
7TH STREETDOWDY CHURCHDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Site Plan Illustrative
URBAN DESIGN FEATURES AND OPPORTUNITIES
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Site Plan Illustrative
ENVIRONMENTAL FACTORS
6TH STREET
7TH STREETDOWDY CHURCHDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
MULTIGENERATIONAL COMMUNITY CENTER
BUILDING PLANS | SITE SECTIONS | ELEVATIONSMULTIGENERATIONAL COMMUNITY CENTER
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 32Gilroy Civic Center Master Plan
UP
UP
3
4
1
2
AA
B
B
COMMUNITY
SENIOR
LOUNGE
COMMUNITY
SENIOR
ACTIVITY ROOM
WOMEN'SRESTROOM MEN'SRESTROOM
RESTROOM RESTROOM
OFFICE OFFICE STOR.
BREAK ROOMOFFICEOFFICE
UTILITY
THEATER
COMMERCIALKITCHEN
DINING/MULTI-PURPOSE
ROOM
STOR
HALF GYM
OPEN OFFICEAREA GYM
LOBBY
PERFORMANCE
PLATFORMBACK STAGE
B
B
STORAGE
LIGHTLOCK
LIGHT
LOCK
LOADING
CONFERENCE/
STOR.
RECEPTION
15'30'60'0'N
MULTI-GENERATIONAL COMMUNITY CENTER
FLOOR PLAN LEVEL 1
MULTIGENERATIONAL COMMUNITY CENTER
Floor Plan Level 1
Floor Plan Level 1
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 33Gilroy Civic Center Master Plan
DN
DN
3
4
1
2
AA
B
B
ART STUDIO ARTMULTI-PURPOSE
STOR
STOR
WOMEN'S
RESTROOM
MEN'S
RESTROOM
RESTROOM RESTROOM
YOUTH ACTIVITYYOUTH LOUNGE
UTILITY
OPEN TO BELOW
OPEN TO BELOW
OPEN TO BELOW
OPEN TO
BELOW
BALCONY
CONTROL BOOTH
B
B
LIGHT
LOCK
LIGHTLOCK
GALLERY
ACCESS
LOBBY
ROOF BELOW
BALCONY SEATING
15'30'60'0'N
MULTI-GENERATIONAL COMMUNITY CENTER
FLOOR PLAN LEVEL 2
MULTIGENERATIONAL COMMUNITY CENTER
Floor Plan Level 2
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 34Gilroy Civic Center Master Plan
LOBBY
THEATER
ART STUDIO ARTMULTI-PURPOSE
UTILITYSTOR.OFFICEOFFICERECEPTIONOPEN OFFICE
AREA
GYM
HALF GYMSTOR
LOBBY
B TRANSVERSE BUILDING SECTION
A LONGITUDINAL BUILDING SECTION
15'30'60'0'
MULTI-GENERATIONAL COMMUNITY CENTER
BUILDING SECTIONS
MULTIGENERATIONAL COMMUNITY CENTER
Building Sections
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
3 EAST
2 NORTH
4 SOUTH
1 WEST
15'30'60'0'
MULTI-GENERATIONAL COMMUNITY CENTER
EXTERIOR ELEVATIONS
MULTIGENERATIONAL COMMUNITY CENTER
Elevations
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
MULTIGENERATIONAL COMMUNITY CENTER
BUILDING PLANS | SITE SECTIONS | ELEVATIONSRECREATION & AQUATIC CENTER
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 37Gilroy Civic Center Master Plan
1
2
4
3
B
B
AA
GYMNASIUM
FLEX ROOM
MULTIPURPOSE
ROOM
ENTRY LOBBY
OFFICESTOR.OFFICE
BREAK
OFFICE
STOR.GN
FCFC
MEN'S LOCKERROOM
MECH
WOMEN'S
LOCKER ROOM
GYM STOR.
POOL MECH.
LIFEG.POOL STORAGE
ACID
ELEC.
LAP POOL
OFFICES /RECEPTION
ELEV.
UP
UP
ACTIVITY POOL
MULTIPURPOSE
ROOM
AA
CHLORINE
ELEC.
15'30'60'0'N
RECREATION AND AQUATICS CENTER
FLOOR PLAN LEVEL 1
RECREATION & AQUATIC CENTER
Floor Plan Level 1
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 38Gilroy Civic Center Master Plan
1
2
4
3
B
B
AA
OPEN ADMIN.
MEN'S LOCKERROOM
FC/RR
WOMEN'SLOCKER ROOM
FC/RR
MECH.
STOR.
MULTIPURPOSE
ROOM
FITNESS -CARDIO /
WEIGHTS
FITNESS
CLASSROOM 1
POOL BELOW
OFFICE STOR. OFFICE
MANAG. OFFICE
CONFERENCE/BREAK ROOM
GN
ELEC.
TRACK
ELEV.
OPEN TO
BELOW
OPEN TO
BELOW
DN
DN
EXTERIORBALCONY
AA
15'30'60'0'N
RECREATION AND AQUATICS CENTER
FLOOR PLAN LEVEL 2
RECREATION & AQUATIC CENTER
Floor Plan Level 2
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 39Gilroy Civic Center Master Plan
GYMNASIUM
ENTRY LOBBY
PUBLIC SPACETRACKTRACK
PUBLIC SPACE
ENTRY LOBBY OFFICE STOR. OFFICE
OFFICESTOR.OFFICE
FITNESS -CARDIO /
WEIGHTS
LAP POOL
B TRANSVERSE BUILDING SECTION
A LONGITUDINAL BUILDING SECTION
15'30'60'0'
RECREATION AND AQUATICS CENTER
BUILDING SECTIONS
RECREATION & AQUATIC CENTER
Building Sections
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 40Gilroy Civic Center Master Plan
15'30'60'0'
1 NORTH ELEVATION
4 SOUTH ELEVATION
2 EAST ELEVATION 3 WEST ELEVATION
RECREATION AND AQUATICS CENTER
ELEVATIONS
RECREATION & AQUATIC CENTER
Elevations
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
MULTIGENERATIONAL COMMUNITY CENTER
BUILDING PLANS | SITE SECTIONS | ELEVATIONS
E. City Hall building plans/site sections/elevations
CITY HALL
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 42Gilroy Civic Center Master Plan
UP
UP
UP
3
4
1
2
AA
B
B
FINANCEPUBLIC WORKS
MECH
JAN
MECH
ELEC
COMMUNITYDEVELOPMENT
LOBBY/
CHAIR & TABLE
STORAGERESTROOM
MAIL HUDDLE
WOMEN'SRESTROOM
MEN'SRESTROOM
PUBLIC COUNTER PUBLIC COUNTER PUBLIC COUNTER
EQUIPMENT
ROOM STAFF
CLOSEDSESSION
CONFERENCE
LOBBY/RECEPTION
COUNCILCHAMBERS PRE-FUNCTION AREA
15'30'60'0'N
CITY HALL
FLOOR PLAN LEVEL 1
CITY HALL
Floor Plan Level 1
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 43Gilroy Civic Center Master Plan
DN
DN
DN 3
4
1
2
AA
B
B
EMERGENCYSERVICES
CENTER
EMERGENCYSERVICES
CENTER
HUMANRESOURCES ADMINISTRATION
BREAK ROOM
MEN'SRESTROOM
FIRE ADMIN
ELEC
MECH
UTILITIES
OPEN TO BELOW
OPEN TO BELOW
TERRACE
PUBLIC COUNTER RECEPTION/WAITING
WOMEN'SRESTROOM
SHARED CONF /CLASSROOM
RECEPTION/WAITING
OPEN TO BELOW
INTERSTITIAL SPACE
CITY HALL
FLOOR PLAN LEVEL 2
15'30'60'0'NFloor Plan Level 2
CITY HALLDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 44Gilroy Civic Center Master Plan
UTILITIES FIRE ADMIN
PUBLIC WORKS MECH MECH FINANCE
HUMANRESOURCES ADMINISTRATION
COMMUNITYDEVELOPMENT
TERRACEMEN'SRESTROOM
EMERGENCY
SERVICES
CENTER
MECH
LOBBY/RECEPTION
A LONGITUDINAL BUILDING SECTION
B TRANSVERSE BUILDING SECTION
15'30'60'0'
CITY HALL
BUILDING SECTIONS
CITY HALL
Building Sections
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 45Gilroy Civic Center Master Plan
3 EAST2NORTH
4 SOUTH
1 WEST
15'30'60'0'
CITY HALL
ELEVATIONS
CITY HALL
Elevations
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
lll +program
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 47Gilroy Civic Center Master Plan
Multigenerational Arts and Community Center
Space
Program
Target Plan Area Total Area Remarks
Lower Level
Lobby 2,500 3,100
Theater (First Level)6,000 6,400
Dining/Multipurpose Room & Chair Storage 2,500 2,700
Seat 150 for meals, 200 to 250 for
assembly
Commercial Kitchen 1,000 950
1/2 Gym 4,690 4,650
Gym Storage 280 225
Restrooms 700 950
Admin
Office 100 100
Office 100 100
Office 100 100
Office 100 100
Open Office Area 250 320
Reception 150 160
Conference/Breakroom 150 160
Storage 100 100
Seniors
Community Senior Activity Room 1,200 1,250
Community Senior Lounge 600 720
Storage 120 120
Upper Level
Lobby 800 1,550
Theater Second level 1,500 1,450
Upper Level Restrooms 800 930
Youth
Youth Activity Room 1,200 1,120
Youth Lounge 600 700
Arts
Art Multi-purpose Room 900 1,020
Art Studio 900 950
Total Program Area 27,340 29,925
Circulation, Walls, and Misc.11,679
Total Building Area 41,604
First floor 24,688
Second Floor 16,916
MULTIGENERATIONAL COMMUNITY CENTERDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 48Gilroy Civic Center Master Plan
Multigenerational Recreation and Aquatics Center
Space
Program
Target Plan Area Total Area Remarks
Lower Level
Lobby/Reception 1,000 2,100
Locker Room/Toilets, Mens 1,000 1,280
Locker Room/Toilets, Womens 1,000 1,150
Family Changing Rooms/Toilets 250 320
Mulitpurpose Room 1,000 933
Multipurpose Room 1,000 933
Storage and Mechanical 700 309
Aquatics
Open Office 550 570
Office 100 100
Office 100 100
Office 100 180
Staff Breakroom 150 225
Lifeguard 150 127
Pool Mechanical 2,000 1,780
Electrical 120 120
Outdoor Pool Storage 610 - not included in total
Recreation
Gymnasium - 3 courts with track 12,000 10,900
Gymnasium Storage 500 370
Upper Level
Locker Room/Toilets, Mens 600 680
Locker Room/Toilets, Womens 600 680
Family Change Rooms/Toilets 500 400
Recreation
Office 100 120
Office 100 90
Manager Office 120 140
Open Administration 240 340
Storage 80 105
Conference/Breakroom 140 240
Fitness Area - Cardio/Weights 2,000 1,850
Multipurpose Room 900 906
Fitness Storage 120 370
Fitness Classroom 1 1,200 1,140
Second Floor Track 5,000 4,710 3 lanes
Total Program Area 33,420 33,268
Circulation, Walls, and Misc.9,347
Building Total 42,615
First Floor 26180
Second Floor 16435
RECREATION & AQUATIC CENTERDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 49Gilroy Civic Center Master Plan
City Hall
Space
Target
Area Plan Area Total Area Remarks
Lower Level
Lobby and Reception 1,150 2,050
Huddle and Mail Room 250 220
Council Chambers
Chambers 2,500 2,510
Anteroom 1,500 1,240
Closed Session Conference Room 200 350
Equipment Room 100 260
Staff Area 170 Staff Area in Council Chamber
Restrooms 120
Storage 200 245
Departments
Public Works 3,900 4,433 3, 102 sf net*
Finance 3,960 4,607 3,164 sf net*
Community Development 5,500 5,860 4,390 sf net*
Restrooms 600 720
Mechanical/Misc.600 754
Upper Level
Departments
Utilities 3,550 3,900 2,828 sf net*
Fire Admin 1,000 860 834 sf net*
Emergency Operations Center 2,787 2,246 2,230 sf net*
Human Resources 2,467 2,658 1,974 sf net*
Adminstration 3,257 3,400 2,606 sf net*
Training Room / Large Conference Room 900 761
Lunch/Breakroom 400 464
Restrooms/Showers 500 581
Mechanical/Misc.600 530
*Note: Program areas from the detailed program have been increased to allow for circulation and walls within departments
Total Program Area 35,921 38,939
Circulation, Walls, and Misc.8,568
Total Building Area 47,507
First floor 28,055
Second Floor 19,452
CITY HALL
The new City Hall will combine departments that currently occupy City
Hall: Administration, Administrative Services, Community Development,
Finance, and Public Works, with departments that are currently
housed in other locations: Emergency Operations, Utilities, and Fire
Department Administration, to provide these critical city functions and
the Council Chambers all under one roof.
To determine space needs, ELS distributed questionnaires about space
requirements to department heads and team leaders, and conducted
a series of follow-up interviews for each department. Detailed notes
from these needs assessment interviews and questionnaires are
included in the appendix to this report. Information gathered in
these interviews and questionnaires provided the basis for a detailed
program tabulation (also included in the appendix).
This detailed program was then tested in actual plan layouts of city hall,
and area was added to allow for circulation within each department
resulting in the final program shown here.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
lV +community engagement
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
COMMUNITY ENGAGEMENT PROCESS
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 52Gilroy Civic Center Master Plan
Community Engagement Process
The engagement process for the Gilroy Civic Center Master Plan
sought to encourage participation from the broadest possible range
of stakeholders, residents, and city staff in shaping the future of this
important public place. The multi-faceted engagement strategies
included residents of all ages, community groups, and staff at City
entities and agencies. Outreach documentation took the form of
surveys, banners, flyers, and mailings; in-person engagement occurred
at meetings, and workshops.
Advertising and Stakeholder Engagement
This process began with the City of Gilroy’s Communication and
Engagement Manager, Rachelle Bedell, sending community and civic
organizations a brief Engagement Letter outlining the project and
asking for community input at a series of workshops over the coming
months. The letter was sent in various forms to local organizations
including the South County Collaborative, Gilroy Unified School District,
Chamber of Commerce, South County Youth Task Force, and Gilroy
Police and Fire Departments, among others.
The centerpiece of the community engagement process was the
Community Workshops. The City and design team conducted six
Community Workshops over nearly three months. Each workshop
was held at Wheeler Center over three days (Tuesday, March 4,
2025; Tuesday, April 8, 2025; and Tuesday, May 20, 2025), with
morning and evening sessions on each day. The structure and
content of each meeting built upon the content of the previous
meeting, advancing stakeholders towards a preferred concept
design for the Gilroy Civic Center.
Advertisements for the workshop series were posted on city websites
and distributed in the form of flyers; these flyers were also inserted into
residential customers’ water bills. Large display boards advertising the
workshop series in Spanish and English were also placed in the library,
at Wheeler Center, at the Senior Center, and in two locations at City
Hall. In addition, prior to the April 8, 2025 Community Workshops, City
staff distributed door hangers to each home in an area comprising
roughly thirty blocks surrounding the Civic Center, from Tenth
Street (on perimeter’s south) to Third Street (on the north) and from
Engleberry (on the east) to Princevalle (on the west).
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 53Gilroy Civic Center Master Plan
Workshop Series Structure
The structure of the workshop series was as follows:
WORKSHOP 1
Gallery Walk | Community Open House
March 4, 2025, 9AM and 6PM
This workshop introduced participants to the concepts and possibilities
of a new Civic Center through large display boards addressing relevant
topics. These topics included the Community Engagement Process, the
Project Site, and the possibilities for potential new facilities such as a
Senior Center, an Aquatics Center, a Community Recreation Center,
and an Arts Center. Given the workshop’s open house structure,
there were no formal presentations and attendees could browse
the venue freely to read about the topics presented on each board
and ask questions of the project’s design staff, stationed around the
room. A board for posting thoughts and comments also provided
opportunities for attendees to post additional written comments and
notes. Workshop materials in Spanish and English were posted on the
City’s website, for those who might not be able to attend the workshop.
A survey on the City’s website allowed for further community input.
Workshop notes have been included in the appendix to this report.
The morning and evening sessions were each well attended, with strong
representation from city staff, stakeholders, community groups, and
residents.
Attendees enthusiastically supported the idea of a new community
center and recreation center in the Civic Center that would offer
youth programs, address the need for outdoor gathering spaces (for
recreation, music, and other forms of cultural expression), and include
an indoor venue for the performing arts.
Many participants voiced support for an aquatic center, since local
options and hours for public swimming are limited. There was also
notable support for strengthening the connection between the new
Civic Center and the existing historic downtown. Several important
topics of concern related to addressing the challenges of parking and
traffic. For a detailed compilation of community input, please see the
Summary of Feedback later in this report and the March 4th meeting
notes in the appendix.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 54Gilroy Civic Center Master Plan
WORKSHOP 2
Presentation of Alternate Concepts and Charrette to Select a Preferred Design Direction
April 8, 2025, 9AM & 6PM
Following the March 4th workshops, the design team developed three
alternate concepts for the Civic Center, building on feedback from
the first workshop and on needs-assessment interviews with city
departments. Each concept included the following:
• a large central Civic Park
• three new buildings
-City Hall
-Multigenerational Arts & Community Center
-Recreation & Aquatics Center
• a central pedestrian promenade connecting the site through the
center (from Civic Park on the east to the Police Headquarters and
parking lot on the west)
After a presentation reviewing the options in detail, workshop
participants gathered into small groups around tables and discussed
the options; at each table, a facilitator from the design team took
notes. Community members then shared their thoughts on the three
options, with a designated spokesperson presenting each group’s ideas
and preferences to the larger gathering. Through these discussions,
the group came to a consensus that represented a hybrid of Concept A
and Concept B.
Information was made available in Spanish and English, with an
interpreter providing simultaneous translation. Following the workshop,
all information was posted on the city’s website in both Spanish and
English, along with a survey to solicit additional community input.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 55Gilroy Civic Center Master Plan
WORKSHOP 3
Presentation of Preferred Concept, Community Charrette, and Collect Final Comments
May 20, 2025, 9AM & 6PM
Following the April 8th workshops, and after the design team’s
review and incorporation of city staff and community feedback, ELS
developed a final Preferred Concept. The Preferred Concept was
developed through synthesizing stakeholder feedback and organizing
elements of Concept A and Concept B into a new plan. Here, two
buildings (the Recreation & Aquatics Center and the Multigenerational
Arts & Community Center) flank a large civic park on the site’s east
side, along Church Street, while the new City Hall is located on 7th
Street across from the library.
ELS presented the final Preferred Concept and its development to
workshop participants who then gathered at tables to consider the
new design and provide their feedback. As at the previous workshops,
a member of the design team facilitated the discussion and a
spokesperson from each table presented their findings to the larger
group.
Comments and feedback on the Preferred Concept included
enthusiastic reviews of the overall design. Some concerns were
expressed about parking and accessibility, adequate shade in the park,
adequate lighting, and security measures. Like the previous workshops,
all materials were posted on the city’s website in Spanish and English,
along with a survey to solicit additional community input.
More detailed information about the feedback received is included in
the Summary of Feedback later in this report and in meeting notes and
detailed survey results included in the appendix.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 56Gilroy Civic Center Master Plan
Cafecito and Cops
Through an invitation from the Gilroy Police Department, the design
team participated in the May 9, 2025 Cafecito and Cops event at San
Ysidro Park. Held regularly in venues around Gilroy, these sessions
are an important forum for discussing topics with the Spanish-
speaking community. To encourage the community’s participation
and generate interest in the Civic Center master-planning process,
the design team gave a bilingual presentation on the project’s
progress. This presentation explored the project vision, the results
of the workshops to date, upcoming engagement opportunities, and
survey links for community feedback. This event gave the design
team access to underserved residents that had not attended design
workshops, and, in many cases, had not been aware of the chance
to participate.
City Commissions
Outreach efforts for the Civic Center Master Plan included
presentations of the three Workshop 2 options to various City
Commissions. The City’s Project Manager, Ryan Osenton, met with
each of the following seven commissions to discuss goals for the
project, review the Civic Center plan alternates, and extend invitations
to upcoming community outreach sessions.
City Commissions and meeting dates:
• Planning Commission, April 3, 2025
• Library Commission, April 9, 2025
• Youth Commission, April 14, 2025
• Parks and Recreation Commission, April 15, 2025
• Personnel Commission, April 28, 2025
• Arts and Culture Commission, May 13, 2025
• Senior Luncheon, May 14, 2025
Meetings with City Council Members
At strategic points in the process, city staff and the design team
conducted small meetings with City Council members, with one or
two council members at a time. These presentations allowed the
design team and city staff to update council members on the design
process and to obtain their feedback, both of which were important
prior to the Workshop 3 presentation of the final Preferred Concept.
The presentations provided council members with a preview of
material presented at the community workshops, while the small-
meeting format avoided any conflict with the Brown Act. It also
provided an informal setting where the design team could hear and
respond to comments prior to the final workshop.
These meetings were held over multiple sessions during the
following dates:
• After Workshop 1, week of 3/17/25
• After Workshop 2, week of 4/21/25
• Before Workshop 3, week of 5/12/25
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
MULTIGENERATIONAL COMMUNITY CENTER
BUILDING PLANS | SITE SECTIONS | ELEVATIONSADVERTISING AND ENGAGEMENT
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 58Gilroy Civic Center Master Plan
Help Shape the Future of Gilroy’s Civic Center
The City of Gilroy is reimagining the Civic Center and developing a new Master Plan to better serve our growing
community and address the increasing demands of our community, underutilized spaces, and aging facilities. To
assist with this effort, we’ve contracted with ELS Architecture and Urban Design.
Spanning approximately 14 acres in central Gilroy, the Civic Center site is located between Sixth and Seventh
Streets. The site currently houses key community facilities, including City Hall, the Police Station, Wheeler
Community Center, the Gilroy Library, the Senior Center, and Wheeler Park. While some buildings will remain,
others need rethinking to meet the future needs of Gilroy residents.
We need your input! Your feedback will shape the future of this important space. Join us at a series of community
workshops to share your ideas. Each workshop will be conducted twice.
Community Workshop #1: Open House & Gallery Information Walk
Tuesday, March 4, 2025 | 9:00 AM or 6:00 PM
Wheeler Community Center, 270 W 6th Street
Community Workshop #2: Alternative Concepts & Visioning Sessions
Tuesday, April 8, 2025 | 9:00 AM or 6:00 PM
Wheeler Community Center, 270 W 6th Street
Community Workshop #3: Preferred Concept & Visioning Sessions
Tuesday, May 20, 2025 | 9:00 AM or 6:00 PM
Wheeler Community Center, 270 W 6th Street
All meetings and materials will be provided in English and Spanish.
Each workshop will provide an opportunity to learn about the project, share your ideas, and collaborate with City
staff and the ELS team. After each workshop, an online summary and survey will be available for those who were
unable to attend and for those who want to continue the conversation and provide additional input.
Visit http://www.cityofgilroy.org/CCMP for project updates and workshop details. For additional questions or
information, please email ryan.osenton@cityofgilroy.org.
We look forward to seeing you!
ENGAGEMENT LETTERDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 59Gilroy Civic Center Master Plan
3’ X 7’ BOARD FOR LOBBY DISPLAY & DOORHANGER
Please join us for two community workshop
events taking place at the
Jerome Center
726 South Center Street
Santa Ana, CA 92704
Community Workshop #1
Thursday, August 24, 2023
6:30pm to 8:30pm
Open House/Gallery Walk
We will share
project information
and look forward to hearing and
discussing your ideas, thoughts and
feedback.
Community Workshop #2
Thursday, September 14, 2023
6:30pm to 8:30pm
Concept Design Charrette
We will share initial concept
ideas and look forward to your
thoughts and feedback in a community
design charrette to help us finalize
the Master Plan for a
reimagined Memorial Park and Pool
Please Join Us!
Help us reimagine Memorial Park and pool
Hope to see you there!
Please Join Us!
Help us reimagine Memorial Park and Pool
Please join us for our final community workshop
taking place at the
Jerome Center
726 South Center Street
Santa Ana, CA 92704
Community Workshop #2
Thursday
September 14, 2023
6:30pm to 8:30pm
Community Design Charrette
Community Workshop #2
Thursday, September 14, 2023
6:30pm to 8:30pm
Concept Design Charrette
We will share initial concept ideas and look forward to
your thoughts and feedback in a community design
charrette to help us finalize the Master Plan for a
reimagined Memorial Park and Pool.
Hope to see you there!
A community workshop series presented and
facilitated by the City of Santa Ana and their design
consultant team, els+swa – architects, landscape
architects, designers and community collaborators.
Please join us for our final community workshop
taking place at the
Jerome Center
726 South Center Street
Santa Ana, CA 92704
Community Workshop #2
Thursday, September 14, 2023
6:30pm to 8:30pm
Concept Design Charrette
We will share initial concept
ideas and look forward to your
thoughts and feedback in a community
design charrette to help us finalize
the Master Plan for a
reimagined Memorial Park and Pool
Please Join Us!
Help us reimagine Memorial Park and Pool
Hope to see you there!
Banner or Board for Lobby Display For social media postBOARD FOR LOBBY DISPLAY
Please join us!
Visioning the Gilroy Civic Center Master Plan
Community Workshop Series
at the Wheeler Community Center, Main Gym
Hope to see you there!
Community Workshop #1
Open House & Gallery
Information Walk
Tuesday, March 4, 2025
9am or 6pm (two sessions)
Community Workshop #2
Alternative Concepts
& Visioning Sessions
Tuesday, April 8, 2025
9am or 6pm (two sessions)
Community Workshop #3
Preferred Concept
& Visioning Sessions
Tuesday, May 20, 2025
9am or 6pm (two sessions)
Workshops will be conducted
in English and Spanish
For additional information,
please visit,
www.cityofgilroy.org/CCMP
or scan QR code.
Architects, Designers, and Community Collaborators
DOORHANGER
Please
join us!
Visioning the
Gilroy Civic Center Master Plan
Community Workshop #2
Alternative Concepts & Visioning SessionsTuesday, April 8, 20259am or 6pm (two sessions)
Community Workshop #3
Preferred Concept & Visioning SessionsTuesday, May 20, 20259am or 6pm (two sessions)
Snacks and childcare will be provided.
Community Workshop Series
at the Wheeler Center, 270 W 6th Street
Ryan Osenton
Project Manager
Direct: 408.846.0277
ryan.osenton@cityofgilroy.org
The City of Gilroy is developing a new Civic Center
Master Plan to better serve the growing community,
address increasing demands, improve underutilized
spaces, and update aging facilities.
Community Workshop #1 took place on March 4.
Join us for Community Workshop #2 and #3 to
provide your input on what a possible future
Civic Center could look like.
Workshops will be conducted in English and Spanish
For additional information, please visit,
www.cityofgilroy.org.CCMP or scan the
QR code.
City of Gilroy (408) 846-0219 www.cityofgilroy.org
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 60Gilroy Civic Center Master Plan
Architects, Designers, and
Community Collaborators
¡Favor de acompañarnos!
Para más
información,
favor de visitar,
www.cityofgilroy.org/CCMP
o escanee el código QR.
Taller Comunitario #1
Visita Comunitaria y Paseo
Informativo por la Galería
Martes, marzo 4, 2025
9am o 6pm (dos sesiones)
Taller Comunitario #2
Conceptos Alternativos
y Sesiones de Visualización
Martes, abril 8, 2025
9am o 6pm (dos sesiones)
Taller Comunitario #3
Concepto Preferido
y Sesiones de Visualización
Martes, mayo 20, 2025
9am o 6pm (dos sesiones)
Habrá bocadillos y cuidado de niños.
Serie de Talleres Comunitarios en el Centro Wheeler, Gimnasio Principal
La Ciudad de Gilroy está lanzando un proyecto para
modernizar y reimaginar el Centro Cívico mediante el
desarrollo de un nuevo Plan Maestro del Centro Cívico.
El Plan Maestro actual, adoptado en el 2002, necesita
una actualización para hacer frente al aumento de las
demandas de la comunidad, a los espacios infrautilizados
y al envejecimiento de las instalaciones.
Se invita a la comunidad a participar en una serie de
talleres para compartir sus ideas y prioridades para un
nuevo centro cívico.
Ayuntamiento de Gilroy
7351 Rosanna St.
Gilroy, CA 95020
408.846.0219
www.cityofgilroy.org
Ryan Osenton
Gerente del Proyecto
Directo: 408.846.0277
ryan.osenton@cityofgilroy.org
Los talleres se realizarán en inglés y en español
Visualizar el Plan Maestro del Centro Cívico de Gilroy
Architects, Designers, and
Community Collaborators
Please join us!
Visioning the Gilroy Civic Center Master Plan
For additional
information,
please visit,
www.cityofgilroy.org/CCMP
or scan QR code.
Community Workshop #1
Open House & Gallery Information Walk
Tuesday, March 4, 2025
9am or 6pm (two sessions)
Community Workshop #2
Alternative Concepts & Visioning Sessions
Tuesday, April 8, 2025
9am or 6pm (two sessions)
Community Workshop #3
Preferred Concept & Visioning Sessions
Tuesday, May 20, 2025
9am or 6pm (two sessions)
Snacks and childcare will be provided.
Community Workshop Series
at the Wheeler Community Center, Main Gym
The City of Gilroy is launching a project to
modernize and reimagine the Civic Center
by developing a new Civic Center Master
Plan. The existing Master Plan, adopted in
2002, needs an update to address the
increasing demands of the community,
underutilized spaces, and aging facilities.
The community is invited to participate in a
series of workshops to share your ideas and
priorities for a new civic center.
Gilroy City Hall
7351 Rosanna St.
Gilroy, CA 95020
408.846.0219
www.cityofgilroy.org
Ryan Osenton
Project Manager
Direct: 408.846.0277
ryan.osenton@cityofgilroy.org
Workshops will be conducted in English and Spanish
FLYER IN ENGLISH AND SPANISHDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
MULTIGENERATIONAL COMMUNITY CENTER
BUILDING PLANS | SITE SECTIONS | ELEVATIONS
Boards | Spanish Handouts
WORKSHOP #1 - GALLERY WALK
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 62Gilroy Civic Center Master Plan
What is the Gilroy Civic Center Master Plan?
A: The City of Gilroy is launching a project
to reimagine the Civic Center by developing
a new Master Plan for the site. The existing Master Plan, adopted in 2002, needs an update
to address the increasing demands of the
community alongside underutilized spaces and
aging facilities.
What area of Gilroy is the focus of the Civic Center Master Plan?
A: Spanning approximately 14 acres in central
Gilroy, the Civic Center site is bordered by
Sixth Street, Seventh Street, Dowdy Street,
and Church Street. This site currently houses
key community facilities, including City Hall,
the Police Station, Wheeler Center, the Gilroy
Library, the Senior Center, and other essential
spaces.
How much will the Gilroy Civic Center Master Plan cost?
A: In Fiscal Year 2023-24, the Gilroy City
Council approved a $750,000 budget to begin
the comprehensive planning process for this
critical project.
What are some possible components of the Gilroy Civic Center Master Plan?
A: A range of uses are under consideration,
including a new senior center, a new recreation
center, a new aquatics center, a new youth
center and a new city hall, all within a beautiful
outdoor space.
Who did the City hire to prepare the Master Plan?
A: On November 18, 2024, the Council awarded
a contract to ELS Architecture and Urban
Design to lead the Master Plan process, which
will culminate in the design of a Civic Center Master Plan that reflects the aspirations and
needs of our community.
02 Gilroy Civic Center Master Plan
PROJECT INFORMATION FAQ'S
Architects, Designers, and Community Collaborators
Please Join Us!
The Gilroy Civic Center will be designed for and by the community.
The success of the Civic Center
Master Plan relies on your input.
Public engagement is central to
this effort, ensuring that the final
plan aligns with the community’s
priorities and vision for the future. Please join us at our community
workshop series to help shape the
future of this important civic space:
COMMUNITY WORKSHOP #1 Open House & Gallery Information Walk Tuesday, March 4, 2025
9am or 6pm (two sessions)
COMMUNITY WORKSHOP #2 Alternative Concepts & Visioning Sessions
Tuesday, April 8, 2025
9am or 6pm (two sessions)
COMMUNITY WORKSHOP #3 Preferred Concept & Visioning Sessions
Tuesday, May 20, 2025
9am or 6pm (two sessions)
Workshops will be conducted in English and Spanish
01 Gilroy Civic Center Master Plan
OUR COMMUNITY PROCESS
Architects, Designers, and Community Collaborators
6’ X 7’ / 9’ X 7’ GALLERY WALK BOARDSDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 63Gilroy Civic Center Master Plan
What the Master Plan Will Deliver?
The updated Civic Center Master Plan
will give an overview of current facilities and open spaces, evaluate their uses, and identify opportunities for improvement. The Plan will include:
Needs Assessment:
To identify current and future programming
and operational requirements.
Civic Center Master Plan
Concept Alternatives:
To narrow our direction to a single, preferred
vision, at least three conceptual design plans
will be presented during Workshop #2 (April 8).
Preferred Civic Center Master Plan Vision:
To establish and present a preferred direction
and concept design for community input
and review during Workshop #3 (May 20), as
based upon community collaboration during
Workshop #2 (April 8).
Final Civic Center Master Plan + Cost Estimate:
To present the preferred vision for the Civic
Center Master Plan to a series of commissions,
with a final presentation to City Council for
adoption following certification of CEQA
compliance documents; work is based upon
the community’s review and input during
Workshop #3 (May 20).
Financing Strategies:
To recommend ways of funding the
redevelopment, including the possibility
of a general obligation bond measure.
Project Timeline
The project initiated in January 2025
and is structured into seven phases over
approximately two years:
• Project Initiation
• Existing Conditions Assessment
• Needs Assessment
• Master Plan Design
• CEQA Compliance
• Master Plan Adoption
• Project Financing Strategies
03 Gilroy Civic Center Master Plan
MORE ABOUT THE CIVIC CENTER MASTER PLAN
Architects, Designers, and Community Collaborators
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 64Gilroy Civic Center Master Plan
04
The Context of the Gilroy Civic Center
The Gilroy Civic Center, coupled with its
proximity to the Downtown, is a bustling zone
that serves as the heart of the community. It
is home to several key facilities, including the
Gilroy Library, the Police Station, City Hall, the
Senior Center, and the Wheeler Center, all of
which are part of the Gilroy Civic Center.
The Civic Center is surrounded by Sixth Street,
Seventh Street, Dowdy Street, and Church
Street. These facilities are all close to each
other, making it convenient for residents to
access a variety of services and resources in
one central location. The Civic Center Master
Plan aims to further enhance this area by
modernizing and reimagining the space to
better serve our growing community.
Public Transportation: The area is well-
serviced by public transportation, including
the Gilroy Caltrain Station, which provides
commuter rail services to San Jose and
beyond. Additionally, Greyhound Bus Lines
operate in the area, offering long-distance bus
travel.
Walkability: Downtown Gilroy and the Civic
Center area combine to form a walkable
community, with many amenities and services
within walking distance. The area has a Walk
Score of 90 out of 100, indicating that daily
errands do not require a car.
Bikeability: Gilroy is also a bike-friendly
community, with several multi-use bike paths
and bike repair stations throughout the city.
The city has made efforts to ensure safe and
convenient bicycle routes, making it easy for
residents to explore the area by bike.
Downtown Gilroy's connection to key facilities
underscores its importance as a central hub
for the community, providing essential services
and fostering a sense of community and
engagement.
Overall, the Gilroy Civic Center and Downtown
Gilroy together are a vibrant and accessible
community hub, offering a range of services
and amenities for residents and visitors alike.
Gilroy Civic Center Master Plan
GILROY CONTEXT
Architects, Designers, and Community Collaborators
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 65Gilroy Civic Center Master Plan
LIBRARY
W 6 th STREET W 7 th STREET DOWDY STREET
CHURCH STREET
WHEELER
POLICE
CITY HAL
L
Spanning approximately 14 acres in central Gilroy,
the Civic Center site is bordered by Sixth Street, Seventh Street, Dowdy
Street, and Church Street.
This site currently houses key
community facilities, including City
Hall, the Police Station, Wheeler
Center, the Gilroy Library, the Senior
Center, and other essential spaces.
While some of these buildings, such as the Gilroy Library and
Police Station, are relatively new
and will be preserved, others are
significantly older and less suited to
meet current and future demands.
With increasing service needs, it
is time to thoughtfully transform the Civic Center into a space
that balances preservation with modernization, ensuring that it is
able to serve a vibrant and growing
community for many decades.
05 Gilroy Civic Center Master Plan
THE SITE - THREE CITY BLOCKS
Architects, Designers, and Community Collaborators
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 66Gilroy Civic Center Master Plan
What is a LEED-rated project?
A LEED-rated project is one that has been certified under the Leadership in Energy
and Environmental Design (LEED) program, which is an internationally recognized
green building certification system developed by the U.S. Green Building Council (USGBC). LEED certification provides third-party verification that a building or community was designed and
built using strategies aimed at improving performance across key areas such as
energy savings, water efficiency, carbon dioxide emissions reduction, and improved
indoor environmental quality.
LEED certification is based on a points system,
and projects can earn different levels of
certification based on the number of points
they achieve. The levels are:
• CERTIFIED: 40-49 points
• SILVER: 50-59 points
• GOLD: 60-79 points
• PLATINUM: 80 points and above
Points are awarded for various sustainable
practices, including site selection, water
efficiency, energy use, materials and resources,
and indoor environmental quality.
Gilroy Civic Center Master Plan
GREEN DESIGN – GUIDED BY USGBC LEED07
Architects, Designers, and Community Collaborators
What is Universal Design?
Universal design is about creating products, environments, and services that are
usable by all people, to the greatest extent possible, without the need for adaptation
or specialized design. Here are the key principles that define universal design:
Equitable Use:
The design is useful and marketable to people
with diverse abilities. For example, automatic
doors that open for everyone, regardless of
mobility.
Flexibility in Use:
The design accommodates a wide range of
individual preferences and abilities. A good
example is a multi-functional tool that can be
used in different ways.
Simple and Intuitive:
The design is easy to understand, regardless
of the user's experience, knowledge, language
skills, or concentration level. Think of a
straightforward, easy-to-navigate website.
Perceptible Information: The design communicates necessary
information effectively to the user, regardless
of ambient conditions or the user's sensory
abilities. For example, an appliance with both
visual and auditory signals.
Tolerance for Error:
The design minimizes hazards and the adverse
consequences of accidental or unintended
actions. A self-correcting software that
prevents common user errors is a great
example.
Low Physical Effort:
The design can be used efficiently and
comfortably with minimal fatigue. Consider
door lever handles, which require less grip
strength to operate, instead of knobs.
Size and Space for Approach and Use: Appropriate size and space are provided
for approach, reach, manipulation, and use,
regardless of the user's body size, posture, or
mobility. For example, a spacious restroom that
accommodates wheelchair users.
By following these principles, universal design
aims to make life easier, healthier, and more
inclusive for everyone.
Gilroy Civic Center Master Plan
APPLYING UNIVERSAL DESIGN 06
Architects, Designers, and Community Collaborators
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 67Gilroy Civic Center Master Plan
What could a new Senior Center offer?
Senior centers offer a variety of programs
designed to enhance the well-being and quality of life for older adults. Here are some
key programming components:
Health and Wellness Programs:
These include fitness classes, health
screenings, nutrition workshops, and mental
health support.
Educational Opportunities:
Senior centers often provide classes on topics
like technology, arts and crafts, history, and
languages.
Social Activities:
Events such as game nights, movie screenings,
and group outings help foster social
connections.
Support Services:
These may include counseling, legal assistance,
and help with accessing community resources.
Volunteer and Employment Opportunities:
Programs that encourage seniors to volunteer
or find part-time work can provide a sense of
purpose and community engagement.
Recreational Activities:
Activities like gardening, dancing, and music
sessions offer fun and relaxation.
These components aim to address the diverse needs and interests of older adults, promoting
a holistic approach to aging well.
Gilroy Civic Center Master Plan
A POSSIBLE NEW SENIOR CENTER09
Architects, Designers, and Community Collaborators
What could a new Civic Center Outdoor Space offer?
A Civic Center Outdoor Space is a versatile
community space that can offer a range of programs and activities to engage residents and visitors. Here are some potential programming components:
Community Events:
Festivals, farmers' markets, and cultural
celebrations that bring the community
together.
Recreational Activities:
Fitness classes, yoga sessions, sports leagues,
and outdoor games.
Educational Programs:
Workshops, lectures, and classes on various
topics such as gardening, history, and
environmental conservation.
Arts and Culture:
Public art installations, outdoor concerts,
theater performances, and art exhibitions.
Youth Programs:
Activities for children and teenagers, including
summer camps, after-school programs, and
youth sports.
Senior Programs:
Social gatherings, fitness classes, and
educational workshops tailored for older
adults.
Volunteer Opportunities:
Programs that encourage community members
to get involved with the community through
event planning and other volunteer activities .
Special Events:
Holiday celebrations, movie nights, and themed
events that provide entertainment and foster
community spirit.
These components aim to create a vibrant
and inclusive environment that caters to the
diverse interests and needs of the community.
Gilroy Civic Center Master Plan
A POSSIBLE NEW CIVIC CENTER OUTDOOR SPACE08
Architects, Designers, and Community Collaborators
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 68Gilroy Civic Center Master Plan
What could a new Youth Center offer?
Youth centers provide a variety of
programs aimed at promoting the development, well-being, and engagement of young people. Here are some of the key programming components:
Educational Support:
Tutoring, homework help, and STEAM (science,
technology, engineering, art, and math)
programs to support academic achievement.
Recreational Activities:
Sports leagues, fitness classes, and outdoor
adventures like hiking and camping to promote
physical health.
Creative Arts:
Opportunities for young people to explore arts
and crafts, music, theater, dance, and other
creative outlets.
Social and Leadership Development:
Programs that focus on building social skills,
leadership, and teamwork through activities
like group projects, peer mentoring, and youth
councils.
Life Skills Training:
Workshops on topics such as financial literacy,
cooking, career planning, and job readiness to
prepare youth for independent living.
Health and Wellness:
Services and programs that address mental
health, nutrition, and overall well-being,
including counseling and peer support groups.
Community Engagement:
Opportunities for youth to participate in
community service projects, volunteer work,
and civic engagement activities.
Technology and Digital Literacy:
Classes and workshops that teach digital skills,
coding, and responsible use of technology.
These components aim to provide a supportive
and enriching environment for young people,
helping them develop into well-rounded
individuals.
11 Gilroy Civic Center Master Plan
A POSSIBLE NEW YOUTH CENTER
Architects, Designers, and Community Collaborators
What could a new Recreation Center offer?
Recreation centers offer a wide range
of programs to engage and benefit the community. Here are some key programming components:
Fitness and Sports:
This includes gym facilities, group exercise
classes, and team sports like basketball, soccer,
and tennis.
Youth Programs:
Activities such as after-school programs,
summer camps, and youth leagues that focus
on physical activity, education, and social skills.
Adult Programs:
Opportunities for adults to participate in fitness
classes, sports leagues, workshops, and social
events.
Senior Programs:
Tailored activities for older adults, including
low-impact fitness classes, social gatherings,
and educational workshops.
Arts and Crafts:
Classes and workshops in areas like painting,
pottery, and other creative pursuits.
Community Events:
Events like holiday celebrations, festivals, and
cultural activities that bring the community
together.
Special Interest Groups:
Clubs and groups focused on specific hobbies
or interests, such as gardening, hiking, or book
clubs.
These components aim to promote physical
health, social interaction, and lifelong learning
for individuals of all ages in the community.
Gilroy Civic Center Master Plan
A POSSIBLE NEW RECREATION CENTER10
Architects, Designers, and Community Collaborators
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 69Gilroy Civic Center Master Plan
What could a new Aquatics Center offer?
A Community Aquatics Center typically
offers a variety of programs to cater to both competitive swimmers and community members looking for recreational activities. Here are some key programming components:
Competitive Swimming, Diving, Water Polo and Artistic Swimming:
Training programs, tournaments and meets,
and competitions for various age groups and
skill levels.
Recreational Swimming:
Open swim times, family swim sessions, and
leisure activities like water slides and splash
pads.
Swim Lessons:
Classes for all ages and skill levels, from
beginners to advanced swimmers, including
specialized lessons like water safety and
lifeguard training.
Fitness Programs:
Water aerobics, aqua Zumba, and other aquatic
fitness classes that promote physical health
and well-being.
Therapeutic Programs:
Aquatic therapy sessions for individuals with
physical disabilities or injuries, often led by
trained professionals.
Special Events:
Community events, swim-a-thons, and themed
swim nights that bring people together and
promote community engagement.
Youth Programs:
Swim teams, junior lifeguard programs, and
summer camps that focus on skill development
and fun.
Senior Programs:
Low-impact water exercises and social swim
sessions tailored for older adults.
These components aim to provide a well-
rounded and inclusive environment that
supports both competitive and recreational
aquatic activities.
Gilroy Civic Center Master Plan
A POSSIBLE NEW AQUATICS CENTER13
Architects, Designers, and Community Collaborators
What could a new Center for the Arts offer?
A Center for the Arts typically offers
a diverse range of programs designed to foster creativity and appreciation for artistic expression and cultural representation. Here are some key programming components:
Performing Arts:
Opportunities for participation in theater,
dance, music, and other performance arts,
including rehearsals, productions, and recitals.
Visual Arts:
Classes and workshops in painting, drawing,
sculpture, ceramics, photography, and other
visual media.
Exhibitions and Galleries:
Spaces for displaying artwork from local
artists, students, and touring exhibitions, often
accompanied by artist talks and gallery tours.
Film and Media Arts:
Screenings of independent films,
documentaries, and media art, along with
workshops in film making, animation, and
digital media.
Literary Arts:
Programs that encourage creative writing,
poetry, and literature, including writing
workshops, author readings, and book clubs.
Community Engagement:
Outreach programs that bring arts education
to schools, community centers, and under-
served populations, as well as public art
projects and cultural festivals.
Art Education:
Classes and workshops for all ages, from
children to adults, covering a wide range of
artistic disciplines and techniques.
These components aim to create a vibrant
and inclusive environment that supports
artistic expression and community-wide
cultural enrichment.
Gilroy Civic Center Master Plan
A POSSIBLE NEW CENTER FOR THE ARTS 12
Architects, Designers, and Community Collaborators
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 70Gilroy Civic Center Master Plan
The Gilroy Library
The Gilroy Library is a modern and spacious facility located at 350 W. Sixth Street, and
spans approximately 53,000 square feet. It
was completed and opened on April 28, 2012.
The construction cost for the library was
approximately $18.2 million.
Regarding renovations, the Gilroy Library is part
of the Civic Center Master Plan, which aims to
reimagine the Civic Center area. The library is
relatively new and in excellent condition, thus
will remain in place and serve as one of the
anchor community service buildings in the new
Civic Center Master Plan.
The Gilroy Police Station
The Gilroy Police Station is a one-story
building atop a platform understory with a
total area of approximately 28,000 square
feet. It was completed and opened in March
2007. The construction cost for the station was
approximately $26.7 million.
The Gilroy Police Station is part of the Civic
Center Master Plan, which aims to reimagine
the Civic Center area. The police station is
relatively new and beautifully maintained, thus
will remain in place and serve as one of the
anchor community service buildings in the new
Civic Center Master Plan.
15 Gilroy Civic Center Master Plan
YOUR LIBRARY AND POLICE STATION
Architects, Designers, and Community Collaborators
What could a new City Hall offer?
A City Hall serves as the administrative
center for local government and offers a range of programs and services to the community. Here are some key programming components:
Government Services:
Offices for elected officials and various
municipal departments.
Public Meetings and Hearings:
Spaces for city council meetings, community
forums, and public hearings where residents
can engage with local government and voice
concerns.
Permits and Licensing:
Services for obtaining permits and licenses for
businesses, construction, events, and other
activities.
Community Programs:
Initiatives and events that promote civic
engagement, such as neighborhood clean-ups,
town hall meetings, and cultural celebrations.
Support Services:
Resources and assistance for residents,
including housing support, social services, and
legal aid.
Public Information:
Access to information on city policies, projects,
and services through the city’s website,
newsletters, and public notices.
Elections and Voting:
Management of local elections, voter
registration, and polling locations to ensure
democratic participation.
Historical and Cultural Programs:
Preservation and promotion of local history
and culture through museums, archives, and
cultural events.
These components help the city operate
smoothly and support access to essential
services and opportunities for civic
engagement.
Gilroy Civic Center Master Plan
A POSSIBLE NEW CITY HALL14
Architects, Designers, and Community Collaborators
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 71Gilroy Civic Center Master Plan
Please let us know your thoughts.
What are your thoughts about the Civic Center Master Plan process?
What are your thoughts on the site as it currently exists (Gilroy Library, Wheeler Center, and/or the Senior Center)?
Which of the new proposed uses (Senior Center, Youth Center, Recreation Center, Aquatic Center, and/or Arts Center) do you like most and why?
Which uses (Senior Center, Youth Center, Recreation Center, Aquatic Center, and/or Arts Center) make the most sense? Which make the least sense?
What concerns you most about the Civic Center Master Plan project?
What excites you most about the Civic Center Master Plan Project?
What have we missed?
16 Gilroy Civic Center Master Plan
ADDITIONAL THOUGHTS
Architects, Designers, and Community Collaborators
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 72Gilroy Civic Center Master Plan
SPANISH TRANSLATION GALLERY WALK HANDOUTS
¡Por favor, acompáñenos!
El Centro Cívico de Gilroy será
diseñado para y por la comunidad.
El éxito del Plan Maestro del Centro
Cívico depende de su aportación. La
participación pública es fundamental para este esfuerzo, asegurando
que el plan final se alinee con
las prioridades y la visión que la
comunidad tiene para el futuro.
Por favor, acompáñenos en nuestra
serie de Talleres Comunitarios para
ayudar a forjar el futuro de este importante espacio cívico:
TALLER COMUNITARIO #1 Visita Comunitaria y Paseo Informativo por la Galería
Martes, marzo 4, 2025
9am o 6pm (dos sesiones)
TALLER COMUNITARIO #2 Conceptos Alternativos y Sesiones de Visualización
Martes, abril 8, 2025
9am o 6pm (dos sesiones)
TALLER COMUNITARIO #3 Concepto Preferido y Sesiones de Visualización
Martes, mayo 20, 2025 9am o 6pm (dos sesiones)
Los talleres se realizarán
en inglés y en español
01 Centro Cívico de Gilroy Plan Maestro
NUESTRO PROCESO COMUNITARIO
Architects, Designers, and Community Collaborators
¿Qué es el Plan Maestro del Centro Cívico de Gilroy?
R: La Ciudad de Gilroy está lanzando un proyecto
para reimaginar el Centro Cívico mediante el
desarrollo de un nuevo Plan Maestro para el sitio. El Plan Maestro actual, adoptado en el
2002, necesita una actualización para abordar
las crecientes demandas de la comunidad junto
con los espacios infrautilizados y las instalaciones
obsoletas.
¿En qué área de Gilroy se enfoca el Plan Maestro del Centro Cívico?
R: Con una extensión de unos 14 acres en el
centro de Gilroy, el recinto del Centro Cívico está
delimitado por las calles Sexta, Séptima, Dowdy
y Church. En la actualidad, este recinto alberga
instalaciones comunitarias clave, que incluyen el
Ayuntamiento, la Estación de Policía, el Centro
Wheeler, la Biblioteca de Gilroy, el Centro de
Adultos Mayores y otros espacios esenciales.
¿Cuánto costará el Plan Maestro del Centro Cívico de Gilroy?
R: En el Año Fiscal 2023-24, el Concejo Municipal
de Gilroy aprobó un presupuesto de $750,000
para comenzar el proceso de planificación
integral de este proyecto crítico.
¿Cuáles son algunos de los posibles componentes del Plan Maestro del Centro Cívico de Gilroy?
R: Se están considerando una serie de usos, que
incluyen un nuevo centro de adultos mayores,
un nuevo centro de recreación, un nuevo centro
acuático, un nuevo centro juvenil y un nuevo
ayuntamiento, todo ello dentro de un hermoso
espacio al aire libre.
¿A quién contrató la Ciudad para preparar el Plan Maestro?
R: El 18 de noviembre del 2024, el Concejo
adjudicó un contrato a ELS Architecture and
Urban Design para dirigir el proceso del Plan
Maestro, que culminará con el diseño de un
Plan Maestro del Centro Cívico que refleje
las aspiraciones y necesidades de nuestra
comunidad.
02 Centro Cívico de Gilroy Plan Maestro
PREGUNTAS FRECUENTES SOBRE EL PROYECTO
Architects, Designers, and Community Collaborators
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 73Gilroy Civic Center Master Plan
¿Qué aportará el Plan Maestro?
El Plan Maestro del Centro Cívico actualizado ofrecerá una visión general de las instalaciones y espacios abiertos actuales, la evaluación de sus usos y la identificación de oportunidades de mejora. El Plan incluirá:
Evaluación de Necesidades:
Para identificar los requisitos operativos y de
programas actuales y futuros.
Plan Maestro del Centro Cívico Alternativas de Conceptos:
Para concretar nuestra dirección hacia una visión
única y preferida, se presentarán al menos tres
planes de diseño conceptual durante el Taller #2
(8 de abril).
Visión Preferida del Plan Maestro del Centro
Cívico:
Para establecer y presentar una dirección y un
diseño conceptual preferidos para la aportación
de y revisión por la comunidad durante el Taller
#3 (20 de mayo), basados en la colaboración
comunitaria durante el Taller #2 (8 de abril).
Plan Maestro del Centro Cívico Final
+ Costo Calculado:
Para presentar la visión preferida para el Plan
Maestro del Centro Cívico a una serie de comisiones,
con una presentación final al Concejo Municipal para
su adopción tras la certificación de los documentos
de cumplimiento de CEQA; el trabajo se basa en la
revisión y los comentarios comunitarios durante el
Taller Comunitario #3 (20 de mayo).
Estrategias de Financiamiento:
Para recomendar formas de financiar la
remodelación, incluida la posibilidad de una
medida de bonos de obligación general.
Cronología del Proyecto
El proyecto se inició en enero del 2025 y
está estructurado en siete fases a lo largo de
aproximadamente dos años:
• Inicio del proyecto
• Evaluación de las condiciones actuales
• Evaluación de Necesidades
• Diseño del Plan Maestro
• Cumplimiento de CEQA
• Adopción del Plan Maestro
• Estrategias de financiación del proyecto
03 Centro Cívico de Gilroy Plan Maestro
MÁS SOBRE EL PLAN MAESTRO DEL CENTRO CÍVICO
Architects, Designers, and Community Collaborators
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 74Gilroy Civic Center Master Plan
04
El Contexto del Centro Cívico de Gilroy
El Centro Cívico de Gilroy, junto con su proximidad
al Casco Urbano, es una zona bulliciosa que sirve
como el corazón de la comunidad. Es el hogar de
varias instalaciones clave, incluyendo la Biblioteca
de Gilroy, la Estación de Policía, el Ayuntamiento,
el Centro de Adultos Mayores y el Centro Wheeler,
todos los cuales son parte del Centro Cívico de
Gilroy.
El Centro Cívico está rodeado por las calles
Sexta, Séptima, Dowdy y Church. Todas estas
instalaciones están cerca unas de otras, lo que
facilita a los residentes el acceso a una variedad
de servicios y recursos en una ubicación central.
El Plan Maestro del Centro Cívico tiene como
objetivo mejorar aún más esta área mediante la
modernización y la reimaginación del espacio para
servir mejor a nuestra creciente comunidad.
Transporte público: El área cuenta con un buen
servicio de transporte público, incluida la Estación
Caltrain de Gilroy, que brinda servicios de trenes
interurbanos a San José y más allá. Además,
Greyhound Bus Lines opera en el área, con viajes
en autobús de larga distancia.
Caminabilidad: El Centro de Gilroy y el área
del Centro Cívico se combinan para formar una
comunidad caminable, con muchas amenidades y servicios a poca distancia. El área tiene una
puntuación de caminabilidad de 90 sobre 100,
lo que indica que los quehaceres diarios no
requieren un automóvil.
Ciclabilidad: Gilroy también es una comunidad
favorable a las bicicletas, con varias sendas para
bicicletas de usos múltiples y estaciones de
reparación de bicicletas en toda la ciudad. La
ciudad ha hecho esfuerzos para asegurar rutas de
bicicleta seguras y convenientes, lo que facilita a
los residentes explorar el área en bicicleta.
La conexión del Centro de Gilroy con
instalaciones clave subraya su importancia como
centro de actividades de la comunidad, ya que
proporciona servicios esenciales y fomenta un
sentido de comunidad y participación.
En general, el Centro Cívico de Gilroy y el Centro de Gilroy juntos son un centro comunitario
vibrante y de fácil acceso, que ofrece una gama
de servicios y amenidades para residentes y
visitantes por igual.
Centro Cívico de Gilroy Plan Maestro
CONTEXTO DE GILROY
(RESIDEN
CI
A
L)
(CENTRO
)
Architects, Designers, and Community Collaborators
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 75Gilroy Civic Center Master Plan
Con una expansión de unos 14 acres en el centro de Gilroy, el recinto del Centro
Cívico está delimitado por las calles
Sexta, Séptima, Dowdy y Church.
Este sitio alberga actualmente
instalaciones comunitarias
clave, como el Ayuntamiento, la
Estación de Policía, el Centro
Wheeler, la Biblioteca Gilroy, el
Centro de Adultos Mayores y otros espacios esenciales. Aunque
algunos de estos edificios, como la Biblioteca Gilroy y la Estación
de Policía, son relativamente
nuevos y se conservarán, otros son
significativamente más antiguos y
menos adecuados para satisfacer las demandas actuales y futuras.
Con el aumento de las necesidades de servicio, es hora de transformar
cuidadosamente el Centro Cívico
en un espacio que equilibre la
preservación con la modernización,
asegurando que sea capaz de
servir a una comunidad vibrante
y en crecimiento durante muchas décadas.
05 Centro Cívico de Gilroy Plan Maestro
EL RECINTO - TRES MANZANAS MUNICIPALES
BIBLIOTE
C
A
CALLE 6
O
E
S
T
E CALLE 7
O
E
S
T
E CALLE DOWDYCALLE CHURCH
WHEELER
POLICÍA
AYUNTAMI
E
N
T
O
Architects, Designers, and Community Collaborators
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 76Gilroy Civic Center Master Plan
¿Qué es el diseño universal?
El diseño universal consiste en la creación de productos, entornos y servicios que
puedan ser utilizados por todas las perso-nas, en el mayor grado posible, sin necesi-
dad de adaptación o diseño especializado. Aquí están los principios clave que definen el diseño universal:
Uso equitativo:
El diseño es útil y comercializable para personas
con capacidades diversas. Por ejemplo, puertas
automáticas que se abren para todos, independi-
entemente de la movilidad.
Flexibilidad de uso:
El diseño se adapta a una amplia gama de prefer-
encias y habilidades individuales. Un buen ejem-
plo es una herramienta multifuncional que se
puede usar de diferentes maneras.
Simple e intuitivo:
El diseño es fácil de entender, independientemente
de la experiencia, conocimientos, habilidades de
lenguaje o nivel de concentración del usuario.
Imagine un sitio web sencillo y fácil de navegar.
Información perceptible:
El diseño comunica la información necesaria de
manera efectiva al usuario, independientemente
de las condiciones ambientales o de las capaci-
dades sensoriales del usuario. Por ejemplo, un
electrodoméstico con señales tanto visuales
como auditivas.
Tolerancia al error:
El diseño minimiza los peligros y las consecuencias
adversas de acciones accidentales o involuntarias.
Un software autocorrectivo que evita errores co-
munes de los usuarios es un gran ejemplo.
Bajo esfuerzo físico:
El diseño puede ser usado de manera eficiente y có-
moda con una fatiga mínima. Considere las mani-
jas de las puertas, que requieren menos fortaleza de
empuñadura para operar, en lugar de perillas.
Tamaño y espacio para acercarse y usar:
Se brindan el tamaño y espacio adecuados para
acercarse, alcanzar, manipular y usar, sin importar
el tamaño corporal, la postura o la movilidad del
usuario. Por ejemplo, un sanitario espacioso que
dé cabida a usuarios de sillas de ruedas.
Al seguir estos principios, el diseño universal
tiene por objeto hacer la vida más fácil, más sa-
ludable y más inclusiva para todos.
Centro Cívico de Gilroy Plan Maestro
SE APLICA EL DISEÑO UNIVERSAL06
Architects, Designers, and Community Collaborators
¿Qué es un proyecto con clasificación LEED?
Un proyecto con clasificación LEED es aquel
que ha sido certificado bajo el programa Liderazgo en Energía y Diseño Ambiental (LEED, por sus siglas en inglés), que es un sistema de certificación de edificios ecológicos reconocido internacionalmente
y desarrollado por el Concejo de Edificios Ecológicos de EE. UU. (USGBC).
La certificación LEED proporciona una verificación por parte de terceros de que
un edificio o comunidad fue diseñado y construido utilizando estrategias destinadas a mejorar el rendimiento en áreas clave como ahorro de energía, eficiencia en el uso del agua, reducción
de emisiones de dióxido de carbono y una mejor calidad ambiental interior.
La certificación LEED se basa en un sistema
de puntos, y los proyectos pueden obtener
diferentes niveles de certificación en función
del número de puntos que obtengan. Los
niveles son:
• CERTIFICADO: 40 a 49 puntos
• PLATA: 50 a 59 puntos
• ORO: 60 a 79 puntos
• PLATINO: 80 puntos o más
Se otorgan puntos por diversas prácticas
sostenibles, que incluyen la selección del sitio,
la eficiencia del agua, el uso de energía, los
materiales y recursos, y la calidad ambiental
interior.
Centro Cívico de Gilroy Plan Maestro
DISEÑO ECOLÓGICO – GUIADO POR USGBC LEED07
Architects, Designers, and Community Collaborators
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 77Gilroy Civic Center Master Plan
¿Qué podría ofrecer un nuevo espacio al aire libre en el Centro Cívico?
Un espacio al aire libre en el centro cívico es un espacio comunitario versátil que puede ofrecer una serie de programas
y actividades para la participación de residentes y visitantes. Aquí encontrará
algunos posibles componentes del programa:
Eventos comunitarios:
Festivales, mercados de agricultores y
celebraciones culturales que unen a la
comunidad.
Actividades recreativas:
Clases de condición física, sesiones de yoga, ligas
deportivas y juegos al aire libre.
Programas educativos:
Talleres, conferencias y clases sobre diversos
temas como jardinería, historia y conservación
del medio ambiente.
Arte y cultura:
Instalaciones de arte público, conciertos al aire
libre, representaciones teatrales y exposiciones
de arte.
Programas para jóvenes:
Actividades para niños y adolescentes,
incluyendo campamentos de verano, programas
después de clases y deportes juveniles.
Programas para adultos mayores:
Reuniones sociales, clases de condición física
y talleres educativos adaptados para adultos
mayores.
Oportunidades de voluntariado:
Programas que animan a los miembros de la
comunidad a involucrarse en la comunidad
mediante la planificación de eventos y otras
actividades de voluntariado.
Eventos especiales:
Celebraciones de días festivos, noches de cine y
eventos temáticos que brindan entretenimiento y
fomentan el espíritu comunitario.
Estos componentes tienen por objeto la
creación de un entorno vibrante e inclusivo que
atienda los diversos intereses y necesidades de
la comunidad.
Centro Cívico de Gilroy Plan Maestro
UN POSIBLE NUEVO ESPACIO AL AIRE LIBRE EN EL CENTRO CÍVICO08
Architects, Designers, and Community Collaborators
¿Qué podría ofrecer un nuevo Centro de Adultos Mayores?
Los centros de adultos mayores ofrecen
una variedad de programas diseñados para mejorar el bienestar y la calidad de vida de
los adultos mayores. Aquí encontrará algunos componentes clave de los programas:
Programas de salud y bienestar:
Estos incluyen clases de condición física,
chequeos de salud, talleres de nutrición y
apoyo para la salud mental.
Oportunidades educativas:
Los centros de adultos mayores suelen ofrecer
clases sobre temas como tecnología, artes y
manualidades, historia y lenguajes.
Actividades sociales:
Eventos como noches de juegos, proyecciones
de películas y salidas en grupo para ayudar a
fomentar conexiones sociales.
Servicios de apoyo:
Estos pueden incluir consejería, ayuda legal y
ayuda para acceder a recursos comunitarios.
Oportunidades de voluntariado y empleo:
Los programas que animan a los adultos
mayores a ser voluntarios o a encontrar trabajo
a tiempo parcial pueden brindar un sentido de
propósito y participación comunitaria.
Actividades recreativas:
Actividades como la jardinería, el baile y
las sesiones de música ofrecen diversión y
relajación.
Estos componentes tienen por objeto abordar
las diversas necesidades e intereses de las
personas mayores, con el fin de promover un
enfoque holístico del envejecimiento saludable.
Centro Cívico de Gilroy Plan Maestro
UN POSIBLE NUEVO CENTRO DE ADULTOS MAYORES09
Architects, Designers, and Community Collaborators
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 78Gilroy Civic Center Master Plan
¿Qué podría ofrecer un nuevo Centro de Recreación?
Los centros de recreación ofrecen
una amplia gama de programas para la participación y el beneficio de la comunidad. Aquí encontrará algunos componentes clave de los programas:
Condición física y deportes:
Esto incluye instalaciones de gimnasio, clases
de ejercicio en grupo y deportes en equipo
como baloncesto, futbol y tenis.
Programas para jóvenes:
Actividades como programas después de
clases, campamentos de verano y ligas juveniles
que se enfocan en la actividad física, la
educación y las aptitudes sociales.
Programas para adultos:
Oportunidades para que los adultos participen
en clases de condición física, ligas deportivas,
talleres y eventos sociales.
Programas para adultos mayores:
Actividades personalizadas para adultos
mayores, que incluyen clases de condición
física de bajo impacto, reuniones sociales y
talleres educativos.
Artes y manualidades:
Clases y talleres en áreas como pintura,
cerámica y otras actividades creativas.
Eventos comunitarios:
Eventos como celebraciones de días festivos,
festivales y actividades culturales que unen a la
comunidad.
Grupos de intereses especiales:
Clubes y grupos enfocados en pasatiempos
o intereses específicos, como jardinería,
senderismo o clubes de lectura.
Estos componentes tienen por objeto
promover la salud física, la interacción social
y el aprendizaje vitalicio de las personas de
todas las edades en la comunidad.
Centro Cívico de Gilroy Plan Maestro
UN POSIBLE NUEVO CENTRO DE RECREACIÓN10
Architects, Designers, and Community Collaborators
¿Qué podría ofrecer un nuevo Centro para Jóvenes?
Los Centros para Jóvenes brindan una
variedad de programas que tienen por objeto promover el desarrollo, el bienestar y la participación de los jóvenes. Aquí encontrará algunos de los componentes clave de los programas:
Apoyo educativo:
Tutoría, ayuda con las tareas y programas
STEAM (ciencia, tecnología, ingeniería, arte y
matemáticas) para apoyar el aprovechamiento
académico.
Actividades recreativas:
Ligas deportivas, clases de condición física
y aventuras al aire libre como senderismo y
acampada para promover la salud física.
Artes creativas:
Oportunidades para que los jóvenes exploren
artes y manualidades, música, teatro, danza y
otras formas de expresión creativa.
Desarrollo social y de liderazgo:
Programas que se centran en el desarrollo de
aptitudes sociales, liderazgo y trabajo en equipo
mediante actividades como proyectos en grupo,
mentoría entre pares y consejos juveniles.
Formación en habilidades para la vida:
Talleres sobre temas como educación financiera,
cocina, planificación de la carrera y preparación
para el empleo, con el fin de preparar a los
jóvenes para una vida independiente.
Salud y bienestar:
Servicios y programas que abordan la salud
mental, nutrición y bienestar general, incluyendo
consejería y grupos de apoyo entre pares.
Participación comunitaria:
Oportunidades para que los jóvenes participen
en proyectos de servicio comunitario, trabajo voluntario y actividades de participación cívica.
Tecnología y alfabetización digital:
Clases y talleres que enseñan habilidades
digitales, codificación y uso responsable de la
tecnología.
Estos componentes tienen por objeto
proporcionar un entorno de apoyo y
enriquecimiento para los jóvenes, para
ayudarles a convertirse en personas integrales.
11 Centro Cívico de Gilroy Plan Maestro
UN POSIBLE NUEVO CENTRO PARA JÓVENES
Architects, Designers, and Community Collaborators
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 79Gilroy Civic Center Master Plan
¿Qué podría ofrecer un nuevo Centro de las Artes?
Un Centro de las Artes ofrece normalmente
una amplia gama de programas diseñados para fomentar la creatividad y la apreciación de la expresión artística y la representación cultural. Aquí están algunos componentes clave de la programación:
Artes escénicas:
Oportunidades para participar en teatro, danza,
música y otras artes escénicas, incluyendo
ensayos, producciones y recitales.
Artes visuales:
Clases y talleres de pintura, dibujo, escultura,
cerámica, fotografía y otros medios visuales.
Exposiciones y galerías:
Espacios para exhibir obras de arte de artistas
locales, alumnos y exposiciones itinerantes, a
menudo acompañados de charlas de artistas y
visitas de galerías.
Artes cinematográficas y audiovisuales:
Proyecciones de películas independientes,
documentales y arte de multimedios, junto con
talleres de cine, animación y medios digitales.
Artes literarias:
Programas que fomentan escritura creativa,
poesía y literatura, incluyendo talleres de
escritura, lecturas de autores y clubes de
lectura.
Participación comunitaria:
Programas de difusión que llevan la educación
artística a escuelas, centros comunitarios y
poblaciones desatendidas, así como proyectos
de arte público y festivales culturales.
Educación artística:
Clases y talleres para todas las edades, desde
niños hasta adultos, que abarcan una amplia
gama de disciplinas y técnicas artísticas.
Estos componentes tienen por objeto la
creación de un entorno vibrante e inclusivo
que apoye la expresión artística y el
enriquecimiento cultural de toda la comunidad.
Centro Cívico de Gilroy Plan Maestro
UN POSIBLE NUEVO CENTRO PARA LAS ARTES12
Architects, Designers, and Community Collaborators
¿Qué podría ofrecer un nuevo Centro Acuático?
Un Centro Acuático Comunitario suele
ofrecer una variedad de programas para atender tanto a nadadores de competición como a miembros de la comunidad que buscan actividades recreativas. Aquí tiene algunos componentes clave de la
programación:
Natación de competición, clavados, polo acuático y natación artística:
Programas de formación, torneos y encuentros,
y competiciones para diversos grupos de edad y
niveles de habilidad.
Natación recreativa:
Horarios de natación abiertos, sesiones de
natación en familia y actividades de esparcimiento
como toboganes de agua y zonas de chapoteo.
Lecciones de natación:
Clases para todas las edades y niveles de habilidad,
desde principiantes hasta nadadores avanzados,
incluyendo lecciones especializadas como
seguridad en el agua y formación de socorristas.
Programas de condición física:
Ejercicios aeróbicos en el agua, aqua Zumba y
otras clases de acondicionamiento físico acuático
que promueven la salud física y el bienestar.
Programas terapéuticos:
Sesiones de terapia acuática para personas con
discapacidades físicas o lesiones, a menudo
dirigidas por profesionales capacitados.
Eventos especiales:
Eventos comunitarios, maratones de natación y
noches temáticas de natación que reúnen a la
gente y promueven la participación comunitaria.
Programas para jóvenes:
Equipos de natación, programas de socorrismo
para jóvenes y campamentos de verano que se enfocan en el desarrollo de habilidades y la
diversión.
Programas para adultos mayores:
Ejercicios acuáticos de bajo impacto y sesiones de
natación social adaptadas a personas mayores.
Estos componentes tienen por objeto
proporcionar un entorno completo e inclusivo
que apoye tanto las actividades acuáticas
competitivas como recreativas.
Centro Cívico de Gilroy Plan Maestro
UN POSIBLE NUEVO CENTRO ACUÁTICO13
Architects, Designers, and Community Collaborators
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 80Gilroy Civic Center Master Plan
¿Qué podría ofrecer un nuevo Ayuntamiento?
Un Ayuntamiento sirve como centro
administrativo del gobierno local y ofrece una serie de programas y servicios a la comunidad. Aquí encontrará algunos componentes clave de la programación:
Servicios gubernamentales:
Oficinas para oficiales electos y varios
departamentos municipales.
Reuniones y audiencias públicas:
Espacios para reuniones del concejo municipal,
foros comunitarios y audiencias públicas donde
los residentes pueden interactuar con el
gobierno local y expresar sus inquietudes.
Permisos y licencias:
Servicios para la obtención de permisos y
licencias para negocios, construcción, eventos
y otras actividades.
Programas comunitarios:
Iniciativas y eventos que promueven la
participación cívica, como limpiezas del
vecindario, reuniones comunitarias y
celebraciones culturales.
Servicios de apoyo:
Recursos y ayuda para residentes, incluyendo
apoyo de vivienda, servicios sociales y
asistencia legal.
Información pública:
Acceso a información sobre normas, proyectos
y servicios de la ciudad mediante el sitio web,
boletines y avisos públicos de la ciudad.
Elecciones y votación:
Gestión de elecciones locales, registro de
electores y ubicaciones de centros de votación
para asegurar la participación democrática.
Programas históricos y culturales:
Preservación y promoción de la historia y la
cultura locales mediante museos, archivos y
eventos culturales.
Estos componentes ayudan a la ciudad a
funcionar sin problemas y apoyan el acceso
a servicios esenciales y oportunidades de
participación cívica.
Centro Cívico de Gilroy Plan Maestro
UN POSIBLE NUEVO AYUNTAMIENTO14
Architects, Designers, and Community Collaborators
La Biblioteca Gilroy
La Biblioteca Gilroy es una instalación moderna y espaciosa ubicada en 350 W. Sixth Street,
y abarca aproximadamente 53,000 pies
cuadrados. Fue completada e inaugurada el
28 de abril del 2012. El costo de construcción
de la biblioteca fue de aproximadamente $18.2
millones.
En cuanto a las renovaciones, la Biblioteca
Gilroy forma parte del Plan Maestro del Centro
Cívico, que tiene como objetivo reimaginar
el área del Centro Cívico. La biblioteca es
relativamente nueva y está en excelentes
condiciones, por lo que permanecerá en su
lugar y servirá como uno de los edificios de
servicios comunitarios ancla en el nuevo Plan
Maestro del Centro Cívico.
La Estación de Policía de Gilroy
La Estación de Policía de Gilroy es un edificio
de un piso sobre una plataforma subterránea
con un área total de aproximadamente 28,000
pies cuadrados. Fue terminada e inaugurada
en marzo del 2007. El costo de construcción
de la estación fue de aproximadamente $26.7
millones.
La Estación de Policía de Gilroy forma parte del
Plan Maestro del Centro Cívico, que tiene por
objeto reimaginar el área del Centro Cívico. La
estación de policía es relativamente nueva y está
muy bien mantenida, por lo que permanecerá
en su lugar y servirá como uno de los edificios
de servicios comunitarios de anclaje en el nuevo
Plan Maestro del Centro Cívico.
15 Centro Cívico de Gilroy Plan Maestro
SU BIBLIOTECA Y ESTACIÓN DE POLICÍA
Architects, Designers, and Community Collaborators
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 81Gilroy Civic Center Master Plan
Por favor, comparta sus pensamientos.
¿Qué opina del proceso del Plan Maestro del Centro Cívico?
¿Qué opina del recinto en su estado actual (Biblioteca Gilroy, el Centro Wheeler y/o el Centro de Adultos Mayores)?
¿Cuál de los nuevos usos propuestos (Centro de Adultos Mayores, Centro para Jóvenes, Centro de Recreación, Centro Acuático y/o Centro de Arte) le gusta más y por qué?
¿Qué usos (Centro de Adultos Mayores, Centro para Jóvenes, Centro de Recreación, Centro Acuático y/o Centro de Arte) tienen más sentido? ¿Cuáles tienen menos sentido?
¿Cuál es su mayor inquietud con respecto al proyecto del Plan Maestro del Centro Cívico?
¿Qué es lo que más le entusiasma del Proyecto del Plan Maestro del Centro Cívico?
¿Qué nos falta?
16 Centro Cívico de Gilroy Plan Maestro
COMENTARIOS ADICIONALES
Architects, Designers, and Community Collaborators
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Concept Boards
WORKSHOP #2 - ALTERNATE CONCEPTS
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 83Gilroy Civic Center Master Plan
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 84Gilroy Civic Center Master Plan
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 85Gilroy Civic Center Master Plan
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 86Gilroy Civic Center Master Plan
Estacionamiento Biblioteca
POLICÍA
Centro Acuático y
Recreativo
Multigeneracional
Centro Acuático y
Recreativo
Multigeneracional
Centro Comunitario Multigeneracional –
Programación para artes/adultos
mayores/jóvenes
Centro Comunitario Multigeneracional –
Programación para artes/adultos
mayores/jóvenes
PARQUE CÍVICO
GILROY
AYUNTAMIENTO
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 87Gilroy Civic Center Master Plan
Estacionamiento Biblioteca
POLICÍA
Centro Acuático y
Recreativo
Multigeneracional
Centro Acuático y
Recreativo
Multigeneracional
Centro Comunitario Multigeneracional –
Programación para artes/adultos
mayores/jóvenes
Centro Comunitario Multigeneracional –
Programación para artes/adultos
mayores/jóvenes
PARQUE CÍVICO
GILROY
AYUNTAMIENTO
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 88Gilroy Civic Center Master Plan
Estacionamiento Biblioteca
POLICÍA
Centro Acuático y
Recreativo
Multigeneracional
Centro Acuático y
Recreativo
Multigeneracional
Centro Comunitario Multigeneracional –
Programación para artes/adultos
mayores/jóvenes
Centro Comunitario Multigeneracional –
Programación para artes/adultos
mayores/jóvenes
AYUNTAMIENTO
PARQUE CÍVICO
GILROY
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Concept Board
WORKSHOP #3 - PREFERRED CONCEPT
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 90Gilroy Civic Center Master Plan
LIBRARYPARKING LOT
POLICE
MULTIGENERATIONAL
COMMUNITY CENTER
Arts/Seniors/Youth
6th STREET
7th STREET
MULTIGENERATIONAL
RECREATION & AQUATICS
CENTER
CITY HALL
GILROY CIVIC PARKPASEO
DOWDYCHURCHBIBLIOTECAESTACIONAMIENTO
POLICÍA
CENTRO COMUNITARIO
MULTIGENERACIONAL
Programación para artes/adultos
mayores/jóvenes
CENTRO ACUÁTICO Y
RECREATIVO
MULTIGENERACIONAL
AYUNTAMIENTO
PARQUE CÍVICO GILROY
0 50’
Gilroy Civic Center Preferred Concept Workshop #3 05/20/2025
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
COMMUNITY ENGAGEMENT FEEDBACK
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 92Gilroy Civic Center Master Plan
Summary of Feedback
Over the course of three public workshops and multiple online surveys
conducted in both English and Spanish, community members were
invited to share their perspectives on the proposed Recreation &
Aquatic Center, Senior Center, Multigenerational Arts & Community
Center, City Hall, and Civic Park. This engagement process provided a
rich array of insights, priorities, and aspirations, all of which have been
an immense source of inspiration and support for the design team as
they refine the proposed plan.
Across all three phases of community input, the most consistently
voiced priorities centered around the creation of a modern
Recreation & Aquatic Center, a facility that received overwhelming
stakeholder support. There was a strong desire for year-round
indoor aquatic facilities, space for lap swimming and water aerobics,
and amenities that support people of all ages and abilities. Many
residents cited similar facilities in neighboring cities like Morgan Hill
and expressed the need for Gilroy to offer a comparable or more
extensive community resource.
Equally important to stakeholders was the creation of a flexible and
inclusive Arts & Community center that could serve both youth and
seniors. Respondents advocated for spaces that could accommodate
arts programming, youth activities, and senior services under one
roof. Several community members suggested a three-story facility
to ensure adequate space for all generations of users, with uses
that could include art studios, gathering areas, and various forms of
cultural expression.
The Civic Park was also seen as a valuable public asset, with clear
support for shaded playgrounds, amphitheater space, and pathways
connecting to the broader downtown. While the park space was
widely embraced, written comments raised concerns about noise,
event capacity, and safety—especially near residential streets.
Stakeholders suggested design ideas that would allow the park to
support lively and popular community gatherings while considering
the priorities of adjacent residential properties and maintaining a
welcoming atmosphere.
Throughout the workshops, certain concerns arose repeatedly. Several
related to the challenges of parking and traffic, especially surrounding
event coordination, access by seniors, and increased demand over
time. Many stakeholders felt that the proposed parking layout was
insufficient for the proposed uses and too remote from key facilities.
In addition, numerous participants emphasized their desire for a
sustainable and environmentally conscious design, expressing the
importance of solar panels, EV charging stations, reclaimed water
systems, and green infrastructure.
Other concerns surfaced related to the area’s architectural heritage.
Several residents expressed a desire to retain and adaptively reuse
the historic Wheeler Center, citing its longtime significance to the
community, and exploring the possibly of integrating the structure into
the proposed Civic Center plan. These desires were often supported
by broader requests to honor the character of the surrounding
neighborhoods and to ensure that the new Civic Center reflect Gilroy’s
unique identity.
Overall, the feedback shows an active, thoughtful, and engaged
community that clearly understands the purpose and value of a civic
core and that is deeply invested in the site’s future. Residents are
eager to see a well-designed, accessible, multiuse plan that serves the
city’s entire population, whether young or old, long-time residents or
newcomers, from all walks of life and regardless of background.
The process of developing the Civic Center Master Plan has
established a strong sense of momentum and shared ownership.
As the City moves forward with the plan’s refinement and
implementation, new questions and decisions (related to funding,
phasing, and design) will require city staff and stakeholders to
continue engaging the community through clear communication and
a recognition of common priorities.
TOP PRIORITIES
1. Recreation & Aquatic Center: High enthusiasm across all
workshops for a modern, indoor, multi-use facility. Residents
advocated for features like lap pools, water aerobics, and
accessible, inclusive recreation.
2. Youth and Senior Services: Strong call for expanded programming
and facilities tailored to youth and older adults, including gathering
spaces, arts, and sports.
3. Civic Park and Open Space: Envisioned as a flexible, community
event space with room for a playground, shade, and possible
amphitheater/stage.
4. Multi-purpose Community Center: Recommendations to increase
square footage and include floors for youth, seniors, and the arts,
with adaptive spaces.
5. Accessibility and Safety: Centralized parking, ADA access, lighting,
and secure pathways were emphasized.
6. Environmental Sustainability: Strong interest in solar panels,
EV charging, reclaimed water systems, and other green
infrastructure.
COMMON CONCERNS
1. Location and capacity of the proposed parking area, which was
frequently seen as inadequate for the proposed uses.
2. Need for more detailed budget, funding plan, and transparent
timeline for refinement and implementation.
3. Potential loss of historic Wheeler Center.
4. Potential impacts of noise and traffic on the character and quality
of life of surrounding neighborhoods.
5. Community fragmentation if buildings are too dispersed or if
facility access is inconsistent.
6. Optimizing areas of integration with historic downtown, existing
and future bike routes, and adjacent pedestrian infrastructure.
COMMUNITY RECOMMENDATIONS
1. Begin construction on park areas and recreation facilities to serve
families quickly.
2. Preserve and repurpose historic buildings where possible.
3. Expand outreach to Spanish-speaking and underserved residents.
4. Design a flexible master plan that grows with the city and
anticipates future needs.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 93Gilroy Civic Center Master Plan
SUMMARY OF SURVEY RESULTS
Please see the appendix of this report for detailed survey results and responses. All surveys were conducted online.
WORKSHOP 1 ONLINE SURVEY Summary of Results
Total Responses:
39 (39 English, 0 Spanish)
Focus:
General feedback on proposed civic facilities and priorities for future
development
Key Themes:
• Strong support for a Recreation & Aquatic Center, particularly with
year-round indoor facilities
• Residents emphasized the need for:
-Youth programs and space for children and teens
-A well-equipped Senior Center
-Inclusive, multi-generational community access
• Community priorities included accessibility, central location, and
flexibility of use
• Concerns included:
-Costs of maintenance and operations
-Preserving historic sites (e.g., Wheeler Center)
-Insufficient parking
-Limited shade opportunities
-Equity in outreach and programming
WORKSHOP 2 ONLINE SURVEY Summary of Results
Total Responses:
56 (54 English, 2 Spanish)
Focus:
Feedback on three alternative master plan concepts (A, B, C)
Community Preferences:
• Concept C received the most support overall, followed by
Concept B
• Favorable features included:
-Open space and amphitheater integration
-Strategic placement of Civic Park
-Grouping of buildings for accessibility
• Respondents emphasized:
-Balance of park and civic space
-Close proximity between parking and civic uses (especially
senior/youth areas)
-Amphitheater use for events/arts
• Spanish-speaking participants supported Concepts B and C, citing
benefits to surrounding neighborhoods and youth activities
• Disfavored elements related to the following:
-Distance between buildings
-Visibility and accessibility of City Hall
-Design that felt closed-off or disjointed
WORKSHOP 3 ONLINE SURVEY Summary of Results
Total Responses:
77 (76 English, 1 Spanish)
Focus:
Final feedback on a preferred draft concept plan.
Key Takeaways:
• The Recreation & Aquatic Center was the most popular element
(52.7% of respondents), followed by Civic Park and the Community
Center.
• Least liked element: Parking layout (29.6%), followed by City Hall
and Community Center configurations.
• 65% of respondents felt that no elements needed to be removed
• Community members emphasized priorities that included:
-Indoor lap pool and improved aquatics for all ages
-Expanded parking capacity, especially for seniors and people
with disabilities
-Multiuse Community Center with more space for youth, arts,
and senior services
-Playground additions and more shade
-Environmental features: solar panels, EV chargers, green
infrastructure
-Safety and security, especially regarding unhoused presence
and access routes
• Several called for the preservation or adaptive reuse of the
Wheeler Center
• Spanish-language respondents again offered positive feedback,
though participation was very limited. The respondents liked all
ideas and suggested no eliminations
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
V +technical memos
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 95Gilroy Civic Center Master Plan
Technical Memos
INTRODUCTION
The narratives and parking analysis in this section establish a technical
foundation for the Civic Center design and provide guidance for future
development. They were generated in conjunction with the building
and site design to result in a final master plan informed by the technical
concerns and constraints inherent in the building process, the site,
and the environment. Overall sustainability goals are outlined in the
sustainability section, with more detailed descriptions in each separate
technical narrative.
• Existing Conditions provides background information about the
site and existing buildings, their condition, age and history, as
well as the planning and zoning context that informed the design,
including decisions that were made about which buildings and site
features should remain.
• Parking Demand Study: This study by Hexagon Transportation
Consultants, Inc., based on actual parking counts, provides a basis
for determining the number of parking spaces needed onsite for
the new master plan.
• Civil Engineering: The civil engineering narrative provides
the background and basis for utilities serving the civic center
and assesses the impact of the project on existing utilities to
determine whether existing surrounding utilities will be sufficient
to serve the new buildings. It also addresses issues of storm water
management.
• Structural Engineering: This narrative defines the structural basis
of design and structural sustainability goals that inform the design,
such as use of mass timber and concrete with low embodied
carbon.
• Mechanical, Electrical, Plumbing and Low Voltage: This narrative
provides the basis for design of essential systems for all buildings,
including sustainability goals and recommendations for all-electric
buildings.
• Sustainability and LEED Scorecards: This section lays out the
vision for a sustainable Civic Center and provides a pathway to
LEED Platinum (with a minimum rating of LEED Gold) for all three
new buildings and the Civic Center campus as a whole.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 96Gilroy Civic Center Master Plan
INTRODUCTION
The Civic Center has been used as a location for civic activities and
city government for many years. Although our research found no
definitive history, its first public facility was Wheeler Auditorium in 1940.
The old Police Station (now referred to as the Annex Building), was built
in 1965 and the current City Hall was built in 1979. In reviewing historic
satellite images, we see a pattern of increased public development
and a corresponding reduction in the number of single-family homes.
(For example, a 1998 image shows homes in the location now occupied
by the police facility.) The city now owns this entire three-block area,
apart from three residential lots on Dowdy Street.
PLANNING AND ZONING
The three blocks of the Gilroy Civic Center are bounded by West 6th
Street to the north and West 7th Street the south, and by Dowdy Street
to the east and Church Street to the west. According to the Gilroy
2040 General Plan Land Use Diagram, adopted in 2020, the land use for
this area is “Public and Quasi-Public Facility.” The current zoning map
lists the three-block area as “PF – Park/Public Facility,”, a designation
that is, according to Article XXV of the city’s zoning ordinance,
“intended to provide land for governmental, public utility, educational,
and community service or recreational facilities.” The ordinance
continues: “Such uses are unique in that their proximity to sensitive
land uses is not generally detrimental to the quality of life, and in many
cases, is desirable and convenient.” That is, the zoning ordinance
promotes the establishment of community services and recreational
facilities near existing single-family homes because they are desirable
amenities for those residents. The PF – Park/Public Facilities District
designation limits building height to 30 feet and sets the maximum
building coverage at 30% of the total site area. Parking requirements
are outlined in a separate area of this report.
EXISTING BUILDINGS
The Gilroy Civic Center currently consists of six buildings serving
different functions, each built separately across more than 80 years.
A brief description of each is below, starting with the most recent:
• The Gilroy Library at 350 W. 6th Street, was built in 2012 to replace
a library on the same site from 1975. It is part of the Santa Clara
County Library District and thus not directly managed by the
City of Gilroy. Designed by HED in a modern Mission style, with a
stucco exterior, deep arched openings, and tile roof, the 53,000-
sf building includes a library and multipurpose rooms for various
community functions and is in excellent condition today. In July
2025, the City of Gilroy Public Works Department issued a Request
for Proposals for library improvements and renovation to update
the building management system and reorganize some of the
community spaces.
• The Gilroy Police Department, at 7301 Hanna Street, was
completed in 2007. This 105,000-sf complex, named after a
former police chief, C.J. Laizure, has a 55,000 sf on-grade parking
structure with a police station above. The complex replaces the
old police department building adjacent to Wheeler Center, which
has been repurposed for other city functions and is now called the
Annex. The tile-roofed two-story building has an upper level clad
in stucco; the ground floor parking garage, constructed of exposed
concrete masonry units, has what some describe as a fortress-
like appearance. The public entrance is on the second floor, up a
monumental flight of concrete steps from Hanna Street.
• Gilroy City Hall, at 7351 Rosanna Street, was designed by William
W. Hedley, Jr. and built in 1979. The building has been remodeled
and expanded over the years, with the most recent expansion
and renovation in 1992. Today, it has roughly 27,000 sf of area
which houses city departments including Finance, Administrative
Services, Public Works, and Community Development. City Council
sessions and other regular commission meetings are held in its
City Council Chambers. In addition to being too small to meet the
city’s current needs, City Hall’s systems are out of date, requiring
new mechanical, plumbing, electrical and information technology
systems. The building is a single-story, wood framed structure with
exposed interior glulam beams and a tile roof.
• The Annex, formerly the police department building, currently
houses the City’s Utilities Department and Emergency Operations
Center. It was constructed in 1965 and has been altered several
times since then, with a major addition in 1986. When police
department functions were relocated to the new building, the
emergency communications infrastructure and equipment
remained at the Annex, and are still in use. The single-story wood-
framed building is adjacent to Wheeler Center and includes about
17,000 sf of area, with a 5,000 sf basement level that currently
A. Existing ConditionsEXISTING CONDITIONS
Gilroy Library Plaza
Gilroy Library Interior
Old City Hall
Gilroy City Hall Exterior
Annex Exterior Annex Interior
Gilroy City Hall Interior
Gilroy Police Building Entrance
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 97Gilroy Civic Center Master Plan
houses the Emergency Operations Center server rooms, main
workroom, and management room. This basement location may
put the city’s emergency command center at risk of flooding.
• The Senior Center, at 7371 Hanna Street, was expanded and
renovated in 1987, but the original construction date is unknown.
The renovation included an addition of 5,400 sf, bringing the
building’s current area to roughly 10,700 sf. The Senior Center
contains flexible meeting spaces, offices of the Recreation Division,
and a commercial kitchen, all within a single-story, wood-framed
stucco structure with an asphalt shingle roof. The facility serves
seniors in the morning, including lunches for up to 150, and it hosts
community activities and recreation classes in the afternoon.
• Wheeler Center, constructed in 1940, was named after Lin
Wheeler, a prominent Gilroy resident and philanthropist who
was pivotal to the area’s growth as an agricultural center. With
an estimated 17,000 sf of area, this building is currently used
as a multifunctional recreation space with a basketball court,
pickleball courts, and some smaller multi-purpose spaces and
offices. Previously known as Wheeler Auditorium, it is considered
a local historic resource and is included on the city’s list of
historic sites as “L – Designated Historic”. The building does
not appear to have undergone significant upgrades since its
construction. Upper-level rooms (including office spaces) are
accessible only by stairs, and the original auditorium stage has
been blocked off and is no longer in use.
SITE
The civic center site spans three city blocks, each 300 feet wide and
ranging from 543 to 550 feet long, with two streets (75-foot-wide
rights-of-way) between the blocks. Assessor’s parcel maps show that
each block was further divided into parcels ranging from 50 to 75-feet
wide and 140 feet long with a 20-foot alley in between. These alleys,
extending north-south down the center, of each block have been
abandoned in the civic center, but are still seen in today’s surrounding
residential blocks. The site’s available properties and parcels have
been consolidated by the City so that only three residential sites along
Dowdy Street remain. Rosanna Street, which once ran though the site,
has been abandoned, and a traffic island was added on Hanna Street,
between the Police Department building and the library to discourage
through traffic. The three blocks include multiple parking areas for city
and public use. A fenced city lot, adjacent to the Annex at the corner
of Church and West 7th Streets, is reserved for City of Gilroy vehicles
and had a photovoltaic array added in 2025.
2002 MASTER PLAN
In 2002, WLC Architects completed a Civic Center Master Plan that
included three options whose primary differences related to potential
uses of the Annex area at the corner of Church Street and West 7th
Street. One option included the removal of the City Hall Annex and
the addition of a new Cultural Arts Center Building and a Civic Center
Park. Another kept the City Hall Annex and inserted an amphitheater
at the corner. The Master Plan also called for the construction of a
new library, a new police facility, a roundabout at Hanna Street, and
a central plaza adjacent to the library, with a walkway connecting
Hanna Street, the plaza, and the library. It also called for the expansion
and renovation of three existing buildings: an addition to Wheeler
Center, an addition to the Senior Center, and the renovation and
modernization of the existing City Hall, Annex, and Senior Center.
The library and police building, with their connecting walkways and
roundabout, were eventually built; other elements of the Master Plan
have not been realized.
NEW MASTER PLAN
In October 2024, the City of Gilroy issued an RFP for a new, “updated,
comprehensive Civic Center Master Plan to supersede the 2002
adopted plan that will create a clear vision, action plan, timeline, and
financial strategy for the re-development of the Gilroy Civic Center.”
Now, more than 20 years beyond that original master plan, the Senior
Center, Annex, and City Hall have all aged further without the benefit
of modernization as recommended in the 2002 plan.
The effort and expense required to renovate these buildings is much
greater today than it was then, since the buildings have aged and
their systems and technologies are now more out of date. They also
no longer serve the city’s programmatic needs. For example, the
cost to upgrade City Hall’s mechanical system alone was estimated
to be nine million dollars in 2020, an investment that the City found
difficult to justify given the age of the building and its other outdated
systems. In addition, the city has outgrown the current location, with
Senior Center Exterior
Wheeler Center Exterior Wheeler Center Interior
Senior Center Interior
Civic Center Site Civic Center Site
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 98Gilroy Civic Center Master Plan
city departments divided between the current City Hall and the Annex.
Similarly, the Senior Center and Wheeler Center are too small to
serve the Recreation Division’s program needs today. Ultimately, City
leadership made the decision to retain only the library and the police
building. This allows the most flexibility for the master-planning effort
by providing a relatively clean slate for the new Civic Center vision.
Wheeler Center: During the initial assessment of existing buildings,
Wheeler Center—listed on the local historic register and a favorite
of some locals—was given additional consideration. However, like
City Hall, Wheeler Center no longer meets the needs of the people
it serves, since it is not large enough to support the city’s recreation
needs. And, given the requirements of a major renovation (including
a structural retrofit, major ADA upgrades, and the replacement of
mechanical, electrical, and plumbing systems), retaining Wheeler
Center would require a significant investment which could instead
be applied towards a new, larger facility. Another difficulty is the
location of Wheeler Center, which is set back from the street in a
large expanse of lawn. This setting, which in 1940 was likely seen as a
grand gesture for a civic auditorium, now makes efficient use of the
civic center site difficult.
Solar Array: As of the beginning of this master planning effort, a new
solar array over the city vehicle parking area was under construction
at the corner of Church Street and West 7th Street, within the
footprint of the master plan area. The array’s structure consists of
concrete foundations and steel frames supporting the solar panels,
providing shade for the parking area. Because planning for this project
began well before the launch of the new master plan process, and
because construction on the new master plan is expected to occur
well into the future, city leadership has opted to complete the solar
array’s construction. In the meantime, the city will benefit from the
production of clean energy that the panels provide. The new master
plan lays out a vision for sustainability that includes all-electric
buildings and rooftop solar panels that will replace and exceed the
energy generated by this existing system.
Existing Paseo
1998 aerial showing residences along Dowdy
Street where the Police Department is today.
The Civic Center in 2025 with solar panels
at the corner of Church and W. 7th Street.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 99Gilroy Civic Center Master Plan
Parking Summary
A central goal of the master plan process has been to create a
pedestrian-oriented, welcoming, human-centered environment
organized around a large public green space. To accomplish this, most
parking has been concentrated on the street around the perimeter
of the site (where some of the existing parallel parking has been
converted to angled parking) and in a lot at the northwest corner of
the site. This creates a Civic Center that invites residents to walk from
downtown and enjoy activities within the park. In contrast, the current
civic center is fragmented by, and dominated by, multiple asphalt
parking lots.
During the master planning process, we heard comments from some
in the community that parking is currently a problem. This perception
is heightened by the location of the civic center in a residential
neighborhood where residents are concerned about overflow
parking impacting neighborhood street parking. However, the parking
study in the following pages conducted by Hexagon Transportation
Consultants indicates that existing parking is more than sufficient for
the current uses and recommends a total of 359 spaces for the new
Civic Center Master Plan. The peak demand (assuming all buildings
are at peak capacity at the same time) is projected to be 466 spaces.
However, this peak demand is unlikely to occur since all buildings do
not experience their peak demand at the same time. For example,
the recreation center and community center will likely be busiest on
weekends when City Hall is closed.
The master plan provides a total of 425 parking spaces: 300 spaces
on site (including 16 employee parking spaces in a city-owned lot
across W. 7th Street), and 125 spaces around the perimeter of the
site. Many factors could influence parking demand in the future, and
if the need arises for additional parking, for example to accommodate
large numbers of people for park events, a one- or two-deck parking
structure could be added above the surface lot on the northwest side
of the site to provide about 100 additional spaces per level.
PARKING DEMAND STUDY
Memorandum
Date: June 18, 2025
To: Susan Vutz, ELS
David Masenten, ELS
From: Gicela Del Rio, T.E.
Subject: Parking Demand Study for the Proposed Gilroy Civic Center Master Plan Update
Hexagon Transportation Consultants, Inc. has completed a parking demand study for the proposed
Gilroy Civic Center Master Plan update. The purpose of the parking demand study is to determine the
parking needs associated with the Civic Center Master Plan update, based on the existing parking
demand at the Civic Center and available parking demand rates information. This report presents the
analysis and results of the parking study.
Civic Center Master Plan
The Civic Center sites comprise approximately 14 acres bordered by Sixth and Seventh Streets to the
north and south, respectively, Dowdy Street to the west, and Church Street to the east (see Figure 1.)
All sites within this area are City owned with the exception of four single-family homes located at the
north-west corner of the Civic Center area (southeast corner of the Dowdy Street/Sixth Street
intersection). The Civic Center currently includes the following buildings and areas: City Hall, City Hall
Annex (former Police Department headquarters and currently housing the Emergency Operations
Center, computer training lab, and other extra office and storage spaces), Wheeler Community Center,
library, Senior Center, current Police Headquarters, Wheeler Park, several parking areas, small grassy
area and central open area. The current Civic Center Master Plan was adopted in 2002. The existing
Civic Center area is shown on Figure 1.
To address the aging and underutilized Civic Center facilities and the growing service demand, the City
is seeking to modernize and redevelop the City’s Civic Center, requiring the preparation of an updated
comprehensive Civic Center Master Plan that would supersede the currently adopted plan. The
updated Civic Center Master Plan must meet current and future City and community programming
needs, including parking needs.
Proposed Improvements
With the exception of the existing Police Station headquarters and the library, all other existing
buildings and open areas within the Civic Center are planned to be reconstructed and reconfigured to
meet the growing community needs. The existing Police Station headquarters and library buildings
were opened in 2007 and 2012, respectively, as an expansion of their previous buildings. These two
building facilities will remain unchanged with the proposed redevelopment of the Civic Center.
Table 1 below summarizes the existing and proposed land use and size within the Civic Center. Figure
2 shows a conceptual site layout of the Civic Center Master Plan update.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 100Gilroy Civic Center Master Plan
Civic Center Master Plan Update Parking Demand Study June 18, 2025
Page | 2
Figure 1
Existing Gilroy Civic Center
= Gilroy Civic Center
LEGEND
W 6th StW 6th St
Hanna StHanna StHanna StHanna StDowdy StDowdy StChurch StChurch StHanna StHanna StW 7th StW 7th St
Rosanna StRosanna StGilroy
Police Department
Gilroy
Police Department
City of Gilroy
City Hall
City of Gilroy
City Hall
City of Gilroy
Gilroy Community Development
City of Gilroy
Gilroy Community Development
City of Gilroy
Senior Center
City of Gilroy
Senior Center
Gilroy LibraryGilroy Library
Wheeler
Community
Center
Wheeler
Community
Center
City Hall AnnexCity Hall Annex
Civic Center Master Plan Update Parking Demand Study June 18, 2025
Page | 3
Figure 2
Civic Center Master Plan – Conceptual Site Layout
EXISTING LIBRARY
EXISTING POLICESTATION NEW CITY HALL
NEWCOMMUNITY/ARTSCENTER
NEW RECREATIONCENTER
POOL LOCKERROOMS ANDEQUIPMENT
NEW PUBLIC PARK
POSSIBLE
PARKING
ABOVE (2
DECKS)
Source: ELS Architecture + Urban DesignSource: ELS Architecture + Urban Design
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 101Gilroy Civic Center Master Plan
Civic Center Master Plan Update Parking Demand Study June 18, 2025
Page | 4
Table 1
Existing and Proposed Civic Center Land Use
Existing Parking Supply and Demand
The existing parking supply at the Civic Center was determined with the use of aerial photography and
field visits. The parking demand for the existing uses within the Civic Center was determined based on
parking occupancy counts. These are described below.
Existing Parking Supply
Numerous on-site surface parking areas currently serve the existing buildings on site. In addition, a City
owned surface parking located across the street from City Hall (on the southwest corner of the
Rosanna Street/Seventh Street intersection) is utilized by City employees. Unrestricted on-street
parking also is available along both sides of all streets surrounding the Civic Center. All on-site (and on-
street) parking, with the exception of the parking lot serving the City Hall Annex building (southwest
corner of the Civic Center area), is available for use by all users, visitors, and employees of the Civic
Center.
The City Hall Annex parking area has restricted access and is used to park and store City owned
vehicles. This parking area is not included as part of the existing parking supply. However, it should
also be noted that with the Civic Center Master Plan update, these parking spaces would continue to be
required, whether on-site or off-site, to continue to provide parking and storage for City vehicles.
Land Use
Size
(s.f.) 2 Land Use
Size
(s.f.)
Existing Buildings to be Reconstructed/Replace
City Hall 26,959 City Hall 48,055
Wheeler Gymnasium 18,575 Recreation Center 42,940
Senior Center 11,071 Community/Arts Center 34,354
City Hall Annex 16,919
Wheeler Park Public Park
Total Building Square Footage:73,524 125,349
Existing Buildings to Remain Unchanged
Police Headquarters 50,000 Police Headquarters 50,000
Library 53,000 Library 53,000
Total Building Square Footage:103,000 103,000
Civic Center Grand Total Building
Square Footage:176,524 228,349
Proposed Change in Building Size:51,825
Notes:
1 Existing building size were obtained from available building drawings, published (online) building information,
aerial photographs, and field visits.
2 Building size, in square footage, are approximate.
ProposedExisting 1
Civic Center Master Plan Update Parking Demand Study June 18, 2025
Page | 5
Additionally, the Police Station headquarters include a parking garage on the first level of the building,
which is used by Police personnel and houses all police vehicles. This existing parking supply will
remain unchanged and, just like the existing Annex building parking supply, is excluded from the
available parking supply for the Civic Center evaluated in this analysis.
The available parking areas serving the Civic Center are shown on Figure 3.
In total, the Civic Center is currently served by seven on-site parking areas (although parking Area 7 is
located across the street from the Civic Center, for the purpose of this analysis, it is also considered an
on-site parking area), providing a total of 300 parking spaces. Additionally, there are a total of
approximately 75 on-street parking spaces along the Civic Center frontage on 6th Street, 7th Street,
Church Street, and Dowdy Street plus an additional 79 on-street parking spaces on the opposite side of
these same streets (across the street from the Civic Center.)
The total existing parking supply is summarized in Table 2.
Table 2
Existing On-Site and On-Street Parking Supply
On-Site
Parking Area
Buildings
Serving/Adjacent To 1
Total Parking
Spaces 2
Number of
Accessible
Spaces
1 Library 53 3
2 Library/Wheeler Gym 56 3
3 Library/Senior Center 29 2
4 Senior Center/Police Station 42 3
5 Police Station 12 2
6 City Hall 92 6
7 Off-Site Parking 16 0
Total: 300 19
On-Street
Parking
Buildings
Serving/Adjacent To 1
Total Parking
Along Both
Sides of the
Street 2
Total Parking
Along Civic
Center Frontage 2
Sixth Street Senior Center, Library, Wheeler Gym 49 25
Seventh Street Police Station, City Hall 44 22
Dowdy Street Police Station, Senior Center 34 17
Church Street Wheeler Gym 27 11
Total: 154 75
1 For the purpose of this analysis, the parking areas were assumed to serve the adjacent buildings
(visitors will park next to or as close as possible to the building they are visiting, if parking is available)
although parking spaces are not designated for specific buildings.
2 Existing parking supply numbers obtained with the use of aerial photographs and confirmed in the field.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 102Gilroy Civic Center Master Plan
Civic Center Master Plan Update Parking Demand Study June 18, 2025
Page | 6
Figure 3
Civic Center Parking Areas
4
= On-site Parking Areas
LEGEND
= Gated Area, Restricted Access (not part of study)
11
22
33
55 66
77
4
W 6th StW 6th St
Hanna StHanna StHanna StHanna StDowdy StDowdy StChurch StChurch StHanna StHanna StW 7th StW 7th St
Rosanna StRosanna StGilroy
Police Department
Gilroy
Police Department
City of Gilroy
City Hall
City of Gilroy
City Hall
City of Gilroy
Gilroy Community Development
City of Gilroy
Gilroy Community Development
City of Gilroy
Senior Center
City of Gilroy
Senior Center
Gilroy LibraryGilroy Library
Wheeler
Community
Center
Wheeler
Community
Center
City Hall AnnexCity Hall Annex
Civic Center Master Plan Update Parking Demand Study June 18, 2025
Page | 7
Existing Parking Demand
The parking demand for the existing uses within the Civic Center were determined based on parking
occupancy counts conducted on Tuesday May 6, 2025, a day considered to be an “average” day at the
Civic Center (no untypical events were scheduled to take place at the Civic Center on this day.) The
counts were collected every hour from 7:00 AM to 7:00 PM. Both on-site and on-street parking spaces
were counted during the 12-hour period.
On-Site Parking Counts
The results of the parking counts indicate that the Civic Center’s peak parking demand occurs at 11:00
AM. At its peak, the on-site parking demand was observed to be 163 parking spaces, or 54% of the
total number of on-site parking spaces available. When evaluating the parking areas separately, the
occupancy rate per area are generally higher than the occupancy rate for the entire site since different
areas peak at different times.
Based on the parking count data, the following can be concluded regarding the existing on-site parking
demand:
- Overall, the parking counts show that the current Civic Center parking supply exceeds the
parking demand.
- Parking demand for most of the different parking areas peaks between 10-11 AM, with the
exception of Areas 1 and 2 (serving the library and the Wheeler Community Center), which were
observed to peak at 7 PM.
- Parking Area 3, which mainly serves the Senior Center, was the only parking area that was
observed to be 100% occupied. This occurred at 11 AM. After 1 PM, Parking Area 3 was only
occupied approximately 10-20% of its capacity.
- In average, all parking areas, with the exception of Parking Area 4, had less than 50% of its
parking spaces occupied. In average, Parking Area 4 had approximately 66% of its parking
spaces occupied, with a peak demand of 98% of the stalls at 10 AM. Area 4 serves the Police
Station and the Senior Center.
- Less than 50% of the total accessible parking spaces were occupied every hour.
- All accessible parking spaces within Parking Areas 3 and 4 were occupied between 9 and 11
AM. All other parking areas had one or more accessible parking spaces available every hour.
The hourly parking demand for the entire site and for each parking area separately are summarized in
Table 3 below. Table 4 summarizes the hourly demand for accessible parking spaces.
Figure 4 show the percent occupancy for each of the surveyed parking spaces, or the ratio between the
number of times each space was occupied and the total number of surveys per day. Figure 5 shows the
occupied parking spaces during the site’s peak parking demand.
On-Street Parking Counts
On-street parking counts also were collected during the same 12-hour period in an effort to capture all
Civic Center parking demand. Since it was shown by the on-site parking counts that excess parking is
currently being provided on-site, on-street parking could be used as a convenient option. However, it is
most likely that Civic Center traffic opting to park on the street solely because it is convenient would do
so along the Civic Center frontage only, avoiding crossing the street. Therefore, based on this
assumption, it is conservatively assumed that all on-street parking along the Civic Center perimeter is
Civic Center-generated traffic.
The on-street parking counts (summarized in Table 5) show the maximum on-street parking demand
along the Civic Center perimeter is 25 parking spaces.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 103Gilroy Civic Center Master Plan
Civic Center Master Plan Update Parking Demand Study June 18, 2025
Page | 8
Table 3
Parking Demand Counts – All On-Site Parking Spaces
Parking Area Average
7AM 8AM 9AM 10AM 11AM 12PM 1PM 2PM 3PM 4PM 5PM 6PM 7PM
All On-Site Parking 300 47 76 131 155 163 133 141 141 140 145 134 123 126
Occupied Number of Spaces 47 76 131 155 163 133 141 141 140 145 134 123 126 127
Percent Occupancy (out of 298)16% 25% 44% 52% 54% 44% 47% 47% 47% 48% 45% 41% 42% 42%
Number of Unoccupied Spaces 253 224 169 145 137 167 159 159 160 155 166 177 174 173
Parking Area 1 53 2 6 10 13 20 22 28 36 29 38 43 47 47
Occupied Number of Spaces 2 6 10 13 20 22 28 36 29 38 43 47 47 26
Percent Occupancy (out of 53)4% 11% 19% 25% 38% 42% 53% 68% 55% 72% 81% 89% 89% 49%
Number of Unoccupied Spaces 51 47 43 40 33 31 25 17 24 15 10 6 6 27
Parking Area 2 56 0 4 9 10 12 16 17 20 21 22 27 25 36
Occupied Number of Spaces 0 4 9 10 12 16 17 20 21 22 27 25 36 17
Percent Occupancy (out of 56)0% 7% 16% 18% 21% 29% 30% 36% 38% 39% 48% 45% 64% 30%
Number of Unoccupied Spaces 56 52 47 46 44 40 39 36 35 34 29 31 20 39
Parking Area 3 29 041527291810576533
Occupied Number of Spaces 0 4 15 27 29 18 10 5 7 6 5 3 3 10
Percent Occupancy (out of 29)0% 14% 52% 93% 100% 62% 34% 17% 24% 21% 17% 10% 10% 35%
Number of Unoccupied Spaces 29 25 14 2 0 11 19 24 22 23 24 26 26 19
Parking Area 4 42 22 28 38 41 39 25 25 27 26 27 24 19 18
Occupied Number of Spaces 22 28 38 41 39 25 25 27 26 27 24 19 18 28
Percent Occupancy (out of 42)52% 67% 90% 98% 93% 60% 60% 64% 62% 64% 57% 45% 43% 66%
Number of Unoccupied Spaces 20 14 4 1 3 17 17 15 16 15 18 23 24 14
Parking Area 5 12 22791166254276
Occupied Number of Spaces 2 2 7 9 11 6 6 2 5 4 2 7 6 5
Percent Occupancy (out of 12)17% 17% 58% 75% 92% 50% 50% 17% 42% 33% 17% 58% 50% 44%
Number of Unoccupied Spaces 10 10 5 3 1 6 6 10 7 8 10 5 6 7
Parking Area 6 92 17 24 42 44 44 39 49 43 44 40 28 19 15
Occupied Number of Spaces 17 24 42 44 44 39 49 43 44 40 28 19 15 34
Percent Occupancy (out of 92)18% 26% 46% 48% 48% 42% 53% 47% 48% 43% 30% 21% 16% 37%
Number of Unoccupied Spaces 75 68 50 48 48 53 43 49 48 52 64 73 77 58
Parking Area 7 16 481011876888531
Occupied Number of Spaces 4 8 10 11 8 7 6 8 8 8 5 3 1 7
Percent Occupancy (out of 16)25% 50% 63% 69% 50% 44% 38% 50% 50% 50% 31% 19% 6% 42%
Number of Unoccupied Spaces 12 8 6 5 8 9 10 8 8 8 11 13 15 9
Source: Parking counts conducted on May 6, 2025.
Box indicates peak parking demand.
Total Number of
Parking Spaces Hourly Counts
Civic Center Master Plan Update Parking Demand Study June 18, 2025
Page | 9
Table 4
Parking Demand Counts – Accessible Parking Spaces
Parking Area Average
7AM 8AM 9AM 10AM 11AM 12PM 1PM 2PM 3PM 4PM 5PM 6PM 7PM
All On-Site Parking 19 1277856254365
Occupied Number of Spaces 12778562543655
Number of Unoccupied Spaces 18 17 12 12 11 14 13 17 14 15 16 13 14 14
Parking Area 1 3 0000002111122
Occupied Number of Spaces 00000021111221
Number of Unoccupied Spaces 3 3 3 3 3 3 1 2 2 2 2 1 1 2
Parking Area 2 3 0000011000000
Occupied Number of Spaces 00000110000000
Number of Unoccupied Spaces 3 3 3 3 3 2 2 3 3 3 3 3 3 3
Parking Area 3 2 0022210000000
Occupied Number of Spaces 00222100000001
Number of Unoccupied Spaces 2 2 0 0 0 1 2 2 2 2 2 2 2 1
Parking Area 4 3 0133310011011
Occupied Number of Spaces 01333100110111
Number of Unoccupied Spaces 3 2 0 0 0 2 3 3 2 2 3 2 2 2
Parking Area 5 2 0011101010011
Occupied Number of Spaces 00111010100111
Number of Unoccupied Spaces 2 2 1 1 1 2 1 2 1 2 2 1 1 1
Parking Area 6 6 1111222122221
Occupied Number of Spaces 11112221222212
Number of Unoccupied Spaces 5 5 5 5 4 4 4 5 4 4 4 4 5 4
Source: Parking counts conducted on May 6, 2025.
Total Number of
ADA Parking
Spaces Hourly Counts
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 104Gilroy Civic Center Master Plan
Civic Center Master Plan Update Parking Demand Study June 18, 2025
Page | 10
Figure 4
Parking Occupancy Rates per Parking Space
10101111121213134141415151616717171818191920201212122222323242425252626727272828448484494954545555565675757585859596868
77373122122139139% Occupancy =Number of Times Occupied
Total Number of Surveys
LEGEND
= 0 - 10%
> 10% - 20%
> 20% - 30%
> 30% - 40%
> 40% - 50%
> 50% - 60%
> 60% - 70%
> 70% - 80%
> 80% - 90%
> 90% - 100%Hanna StHanna StW 6th StW 6th St
City of Gilroy
Senior Center
City of Gilroy
Senior Center
Gilroy LibraryGilroy Library
Civic Center Master Plan Update Parking Demand Study June 18, 2025
Page | 11
Figure 4 (Continued)
Parking Occupancy Rates per Parking Space
Hanna StHanna StHanna StHanna StW 7th StW 7th St
Rosanna StRosanna St181181
192192 207207
1215215 4234234
283283
300300Gilroy
Police Department
Gilroy
Police Department
City of Gilroy
City Hall
City of Gilroy
City Hall
City of Gilroy
Gilroy Community Development
City of Gilroy
Gilroy Community Development
% Occupancy =Number of Times Occupied
Total Number of Surveys
LEGEND
= 0 - 10%
> 10% - 20%
> 20% - 30%
> 30% - 40%
> 40% - 50%
> 50% - 60%
> 60% - 70%
> 70% - 80%
> 80% - 90%
> 90% - 100%
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 105Gilroy Civic Center Master Plan
Civic Center Master Plan Update Parking Demand Study June 18, 2025
Page | 12
Figure 5
Peak Parking Occupied Spaces
112233445566778899101011111212131314141515161617171818191920202121222223232424252526262727282829293030313132323333343435353636373738383939404041414242434344444545464647474848494950505151525253535454555556565757585859596060
6161
6262
6363
6464
6565
6666
6767
6868
6969
7070
7171
7272
7373
7474
7575
7676
7777
7878
7979
8080
8181
8282
8383
8484
8585
8686
8787
8888
8989
9090
9191
9292
9393
9494
9595
9696
9797
9898
9999
100100
101101
102102
103103
104104
105105
106106
107107
108108
109109
110110
111111
112112
113113
114114
115115
116116
117117
118118
119119
120120
121121
122122
123123
124124
125125
126126
127127
128128
129129
130130
131131
132132
133133
134134
135135
136136
137137
138138
139139140140141141142142143143144144145145146146147147148148149149150150151151152152153153154154155155156156157157158158159159160160161161162162163163164164165165166166167167168168169169170170171171172172173173174174175175176176177177
178178
179179
180180
LEGEND
= Space Occupied
Hanna StHanna StW 6th StW 6th St
City of Gilroy
Senior Center
City of Gilroy
Senior Center
Gilroy LibraryGilroy Library
Civic Center Master Plan Update Parking Demand Study June 18, 2025
Page | 13
Figure 5 (Continued)
Peak Parking Occupied Spaces
Hanna StHanna StHanna StHanna StW 7th StW 7th St
Rosanna StRosanna St181181
182182
183183
184184
185185
186186
187187
188188
189189
190190
191191
192192
193193
194194
195195
196196
197197
198198
199199
200200
201201
202202
203203
204204
205205
206206
207207 208208
209209
210210
211211
212212
213213
214214
215215
216216
217217
218218219219220220221221222222223223 224224225225226226227227228228229229230230231231232232
233233 234234
235235
236236
237237
238238
239239
240240
241241
242242
243243
244244 245245246246247247248248249249250250251251252252253253
254254
255255
256256
257257
258258
259259
260260
261261
262262
263263
264264
265265266266267267268268269269270270271271272272273273274274275275276276277277278278279279280280281281282282283283
284284
285285286286287287288288289289290290291291292292293293294294295295296296297297298298299299300300Gilroy
Police Department
Gilroy
Police Department
City of Gilroy
City Hall
City of Gilroy
City Hall
City of Gilroy
Gilroy Community Development
City of Gilroy
Gilroy Community Development
LEGEND
= Space Occupied
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 106Gilroy Civic Center Master Plan
Civic Center Master Plan Update Parking Demand Study June 18, 2025
Page | 14
Table 5
Parking Demand Counts – On-Street Parking Spaces
Total Number of
On-Street
Parking Spaces
Total Demand
Along Civic
Center
Time
Frontage
7am 45095101218 21
8am 53095101218 22
9am 8509591215 25
10am 7 5 1 10 4 10 11 14 23
11am 7628471212 25
12pm 6 7 3 10 4 10 12 13 25
1pm 56094101313 22
2pm 6 5 2 10 4 11 12 18 24
3pm 5 5 3 10 4 11 13 15 25
4pm 4 5 3 10 4 11 13 15 24
5pm 3 6 2 10 4 11 11 20 20
6pm 47284121018 20
7pm 4718512920 19
Source: Parking counts conducted on May 6, 2025.
2222
Church Street 7th Street
Occupied Spaces Occupied Spaces Occupied Spaces Occupied Spaces
17 17 2425 1611
Civic
Center
Frontage
Opposite
Side of
Street
Civic
Center
Frontage
Opposite
Side of
Street
Dowdy St 6th Street
Civic
Center
Frontage
Opposite
Side of
Street
Civic
Center
Frontage
Opposite
Side of
Street
Civic Center Master Plan Update Parking Demand Study June 18, 2025
Page | 15
Civic Center Parking Demand Estimates
Based on the on-site and on-street peak parking demand, it is estimated that the total Civic Center
peak parking demand is approximately 188 parking spaces. A total of 300 on-site parking spaces plus
an additional 75 on-street parking spaces are available to serve the existing demand.
When evaluating each of the land uses within the Civic Center separately, their combined peak parking
demand is approximately 249 parking spaces. However, this is an extremely conservative scenario that
most likely would never happen since, as the parking counts showed, the peak parking demand for the
different on-site facilities and services occurs at different times during the day. This maximum parking
demand scenario was included for comparison to parking demand calculations based on City of Gilroy
off-street parking requirements (City of Gilroy Zoning Ordinance, Chapter 30, Article 31) and the
Institute of Transportation Engineers (ITE) Parking Generation Manual, 6th Edition, 2023. When
calculating parking demand using adopted rates, each land use is typically evaluated separately without
the benefit of the different peak periods or potential share parking between the uses.
For this comparison, the following conservative assumptions were made:
It was assumed that all library-generated traffic utilizes Parking Area 1 only and all Police
Station traffic utilizes half of Parking Area 4 and all of Parking Area 5.
It was assumed that the existing Wheeler Park generates a neglectable number of vehicular
trips.
The parking demand includes both on-site and on-street parking demand.
The estimated parking demand for each of the Civic Center land uses are shown on Table 6. The
parking demand comparison shows that the observed peak parking demand for the individual land uses
is consistent with the parking demand estimated using City of Gilroy and ITE parking demand rates.
Estimated Future Parking Demand
The future parking demand with the implementation of the Civic Center Master Plan update was
estimated based on the proposed land use, building size, and applying the parking demand rates
calculated using the parking count data. The Police Station and library were assumed to continue to
generate the same parking demand as it was identified by the parking counts. In addition, parking
demand for the proposed new public park was estimated based on ITE parking demand rates since the
City of Gilroy parking demand rates do not include rates for public parks. However, it should be noted
that the ITE parking data associated with public parks is limited and should be used cautiously.
Based on the above information, with the Civic Center Master Plan update, the parking demand is
estimated to be approximately 359 parking spaces. The future parking demand estimates are
summarized on Table 7.
For informational purposes, the maximum parking demand (associated with each land use’s peak
demand) and the parking demand based on City of Gilroy parking rates also were estimated and are
shown on Table 7.
Conclusion
Based on the parking demand counts, the total Civic Center peak parking demand is approximately 188
parking spaces. A total of 300 on-site parking spaces plus an additional 75 on-street parking spaces
are available to serve the existing demand. Based on the existing parking demand count information
and the proposed project description, the parking demand for the Civic Center Master Plan update is
estimated to be approximately 359 parking spaces.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 107Gilroy Civic Center Master Plan
Civic Center Master Plan Update Parking Demand Study June 18, 2025
Page | 16
Table 6
Existing Parkind Demand Comparison
Land Use
Size
(s.f.) 1
Parking
Areas
Utilized 2
Available #
of Spaces 3
Site Peak
Parking
Demand
Specific Use
Peak Parking
Demand City Rates
Required #
of Spaces ITE Rates
Required #
of Spaces
Existing Buildings to be Reconstructed/Replace
City Hall 26,959 6, 7 122 62 70 3 spaces per 1,000 s.f. 81 73 4.04 per 1,000 s.f. 109
Wheeler Gymnasium 18,575 2 75 18 42 3 spaces per 1,000 s.f. 56 49 2.32 per 1,000 s.f. 44
Senior Center 11,071 3, 1/2 of 4 64 52 53 3 spaces per 1,000 s.f. 34 49 2.32 per 1,000 s.f. 26
City Hall Annex 16,919 Not Included
Total: 73,524 261 132 165 171 179
Existing Buildings to Remain Unchanged (for Informational Purposes)
Police Headquarters 50,000 1/2 of 4, 5 50 37 38 3 spaces per 1,000 s.f. 150 73 N/A 7
Library 53,000 1 64 20 47 3 spaces per 1,000 s.f. 159 59 4.4 per 1,000 s.f. 234
Total: 103,000 114 57 85 309 234
Total: 176,524 375 188 249 480 413
Notes:
1 Existing building size were obtained from available building drawings, published (online) building information,
aerial photographs, and field visits. Building size, in square footage, are approximate.
2 Assumed, based on the parking area location relative to the building.
3 Includes on-street parking spaces along the perimeter of the Civic Center.
4 Based on parking counts conducted on Tuesday May 6, 2025. Includes both on-site and on-street parking demand.
Site peak demand represents the total peak demand for the site combined. Specific use peak demand represents the peak demand for each individual land use on site.
5 City of Gilroy Downtown Specific Plan parking requirements apply. Civic uses rates were utilized for all Civic Center land uses.
6 Institute of Transportation Engineers (ITE) Parking Generation Manual, 6th Edition, 2023. Municipal Government Office Building (#730), Recreational Community
Center (#495), and Library (#590) parking generation rates were applied. Rates correspond to the 85th percentile peak period parking demand.
7 No parking generation rates specific to this land use are available.
Parking Counts 4 City of Gilroy Parking Rates 5 ITE Parking Rates 6
Civic Center Master Plan Update Parking Demand Study June 18, 2025
Page | 17
Table 7
Civic Center Master Plan Parking Demand Estimates
Land Use
Size
(s.f.)
Calculated Peak
Demand Rate
Required #
of Spaces
Calculated Peak
Demand Rate
Required #
of Spaces City Rates
Required #
of Spaces
City Hall 48,055 1 spaces per 435 s.f. 111 1 spaces per 385 s.f. 125 3 spaces per 1,000 s. 145 73
Recreation Center 42,940 1 spaces per 427 s.f. 101 1 spaces per 314 s.f. 137 3 spaces per 1,000 s. 129 49
Community/Arts Center 34,354 1 spaces per 427 s.f. 81 1 spaces per 314 s.f. 110 3 spaces per 1,000 s. 104 49
Public Park 4 1.5 acre 5.52 per acre
5 9 5.52 per acre 5 9 5.52 per acre 5 9
125,349 302 381 387
Existing Buildings to Remain Unchanged
Police Headquarters 50,000 6 37 6 38 6 38 73
Library 53,000 6 20 6 47 6 47 59
103,000 57 85 85
Civic Center Total: 228,349 359 466 472
1 Parking demand rates derived from parking counts conducted on Tuesday May 6, 2025. This parking demand represents the total peak demand for the site combined.
2 Parking demand rates derived from parking counts conducted on Tuesday May 6, 2025. This parking demand represents the peak demand for each individual land use on site.
3 City of Gilroy Downtown Specific Plan parking requirements apply. Civic uses rates were utilized for all Civic Center land uses with the exception of the public park.
4 Based on preliminary conceptual site plans, the proposed public park is assumed to be approximately 1.5 acres.
5 Institute of Transportation Engineers (ITE) Parking Generation Manual , 6th Edition, 2023, was used to estimate the parking demand for the proposed public park.
However, ITE parking demand data associated with public parks is limited and should be used cautiously.
6 The parking demand for the Police Station and the library were assumed to remain unchanged from existing conditions.
Site Specific Parking Demand 2Civic Center Site Parking Demand 1Proposed City of Gilroy Parking Rates 3
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 108Gilroy Civic Center Master Plan
GILROY CIVIC CENTER MASTER PLAN
August 1, 2025
BKF ENGINEERS
Pleasanton Office: 7901 Stoneridge Drive, Suite 360, Pleasanton, CA 94588 | 925.396.7700
Civil Conceptual Narrative
Page 2 of 7 BKF ENGINEERS
SECTION 1: SITE DESCRIPTION
The Civil Center development site is proposed on the existing City of Gilroy Civic Center in Downtown Gilroy. The approximate 14-acre site occupies three full city blocks and is bordered by 6TH Street to the north, 7th Street to the south, Dowdy Street to the west, and Church Street bordering the east. The site
has numerous buildings that were built during different time periods including the Gilroy Police
Department, Library, Senior Center, Recreation Center, and Gilroy Civic Building. In addition, there are existing residential single-family homes within the western portion of the site fronting Dowdy Street. Three of the residential parcels will remain and are not part of the proposed Civic Center Master Plan.
The Master Plan intends to retain the existing Police Department and City Library Buildings while
demolishing and redeveloping the remaining buildings and site infrastructure within the project area. This includes a new recreation building, civic building, community building, civic park, and on-site and off-site parking improvements. The site is largely impervious with buildings, pavement, and other associated hardscape occupying the majority of the development area. Small areas of grass exist around the library plaza as well as within the undeveloped corner parcel at 6th and Dowdy Street. The topography of the Civic Center is relatively flat sloping gently west to east with generally consistent slopes of less than 1%, which equates to approximately 4.5 feet of vertical change over the entire 14-acre development area.
Existing Site Topography
C. Civil EngineeringCIVIL ENGINEERINGDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 109Gilroy Civic Center Master Plan
Page 3 of 7 BKF ENGINEERS
SECTION 2: LAND USE
The Civil Center development site is located in the Downtown Specific Plan Area within the Civic/Cultural Arts District. This district is intended to provide a regional destination for events and outdoor activities on weekend and evenings with civic campus activities being the primary use during
the week. Desirable uses are listed as follows:
• Civic
• Cultural
• Office
• Residential
• Passive Recreation
• Retail Uses that directly serve the Civic Center The Civic/Cultural Arts District also prohibits specific uses such as industrial and manufacturing uses, retail not specifically servicing the Civic Center, and service commercial uses. All of the proposed uses within the Civic Center Master Plan conform to the district’s desired uses and therefore will not require any additional zoning modifications in order to implement.
SECTION 3: STREET AND FRONTAGE IMPROVEMENTS
The perimeter frontage streets are all within established public rights of way and are paved with asphalt within the vehicular drives and concrete curb, gutter, and sidewalk constructed on both sides. The existing sidewalk is largely configured in a detached configuration with 5’-6’ curb adjacent planter strips along the majority of the 6th Street, 7th Street, and Church Street frontages. Dowdy Street has an attached sidewalk without a planter strip along the western frontage. All of the intersections surrounding the Civic Center are currently stop controlled without the use of signalization. Curb adjacent parallel parking is available on portions of all the frontage streets outside of the designated bus stops and red curbed areas. The Master Plan intends to maintain the majority of the public frontage street curb locations and parking programs that border the project site. The existing parallel parking on 7th Street between church and Hanna however is proposed to be converted to angled parking. This will require the curb to be shifted into the site thereby eliminating the existing planting strip.
Public right of way for Hanna Street and Rosanna Street currently extends through the Civic Center in
the north south direction. Both of these right of ways between 6th and 7th Street will be vacated as part of the redevelopment with those areas reprogrammed with internal parking and site circulation, plazas, and other associated landscape improvements. Existing Hanna and Rosanna street access from 6th and
7th Streets will be converted to driveway entry points or closed off entirely.
SECTION 4: WATER IMPROVEMENTS
The City of Gilroy is located in the Santa Clara Valley Water District (SCVWD). The Llagas Groundwater Sub-basin serves as Gilroy’s potable water source for most residential, municipal, and industrial land uses. The municipal water supply comes from ground-water well sources within the Llagas Basin Aquifer. The City is serviced by the Gilroy Community Services Department and currently operates eight water wells that supply the City’s residents and businesses of Gilroy. There are also six storage reservoirs
Page 4 of 7 BKF ENGINEERS
that serve three water pressure zones. Prior to distribution, the water is treated with chlorine disinfection to remove or reduce potential contaminants from the source water. Existing potable water mains are available within each of the perimeter frontage streets and provide domestic, fire, and irrigation service to the existing Civic Center development. It is our understanding that the existing potable water network is sufficient to support the proposed development without off-site infrastructure upgrades. Existing water mains within the portion of Hanna Street and Rosanna Street that are to be vacated may need to be removed or rerouted if they are in conflict with proposed improvements. Existing water services to the buildings designated for removal will be terminated and new services established per City standards for the Recreation Center, Civic Center, Community Center, and site irrigation. Each new building will require a separate fire service and will by fully sprinklered.
SCRWA operates a recycled water facility in partnership with the Santa Clara Valley Water District. This facility produces high-quality recycled water that is used for irrigation, industrial reuse, groundwater recharge, and indirect potable reuse. Recycled water is available within portions of Gilroy, primarily along the southern perimeter of the City. The existing system consists of more than 15 miles of 8-inch to 36-inch recycled water pipelines that extend from the SCRWA waste water treatment plan all the way to the western edge of the City along Hecker Pass Road. The 2020 Urban Water Management Plan identifies future improvements that will further expand the existing recycled water distribution system with additional recycled water mains, storage tanks and booster stations. Although future planned improvements do not currently include extending recycled water facilities to the downtown Civic Center area, the project should consider improvements that can accommodate recycled water in the future. This includes installing irrigation systems that can be converted over to recycled water as well as looking for opportunities within the new buildings for using in flushing toilets and urinals.
Figure 6.3 from the City of Gilroy 2020 Urban Water Management Plan
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 110Gilroy Civic Center Master Plan
Page 5 of 7 BKF ENGINEERS
SECTION 5: WASTEWATER IMPROVEMENTS
The City of Gilroy is served by the South County Regional Wastewater Authority (SCRWA), which
manages the treatment of wastewater for both Gilroy and Morgan Hill. The SCRWA wastewater
treatment plant was built in 1990 and was constructed with state-of-the-art fully automated high efficiency equipment. The City of Gilroy’s Engineering Division is responsible for the oversight and maintenance of the City wastewater treatment system. The City of Gilroy operates a gravity sewer system, with pipes ranging in diameter from 6 inches to 30 inches. The Downtown area is primarily
serviced with older, 6-inch diameter clay pipes, many of which are situated in alleys and easements. To
the west and north of the city center, pipes tend to be newer and on average 8 inches in diameter. These are pipes typically constructed within public streets and cul-de-sacs. The network of collector sewer pipes discharges into an interceptor sewer trunk line that then carries the wastewater to the SCRWA Wastewater Treatment Plant. Currently the plant receives an average of 3.1 mgd from the entire City of Gilroy. With proposed plant expansions, the future build-out capacity is estimated to be 15 mgd. Proposed Wastewater Conditions Project impacts were evaluated as part of the Downtown Gilroy Specific Plan Mitigated Negative Declaration (MND) and it determined there were no significant regional capacity impacts that would require infrastructure upgrades. Existing clay sewer mains that run through the development parcel are recommended to be replaced with PVC SDR 26 or HDPE pipe per City specifications. Existing sewer laterals serving buildings slated for demolition should be removed
and capped in conformance with City requirements. All new City standard sewer laterals will be constructed for each new building.
SECTION 6: STORM WATER IMPROVEMENTS
The City of Gilroy is situated within two major watersheds: the Uvas Creek and Llagas Creek watersheds. Stormwater is conveyed within the City through surface flow, underground pipe networks, open channels, detention/retention basins, and a series of key water channels that include Uvas Creek, Llagas Creek, Miller Slough, West Branch Llagas Creek, Lions Creek, North Morey Creek, and South Morey Creek. Gilroy’s existing storm drain infrastructure primarily consists of reinforced concrete and corrugated metal pipes that discharge into these channels that eventually discharge into the Monterey Bay. Stormwater management within the city of Gilroy is subject to the National Pollutant Discharge
Elimination System (NPDES) regulations that requires the City of Gilroy to implement stormwater
management programs in alignment with the Clean Water Act. This includes stormwater management requirements both during and post-construction that include both stormwater quality and quantity measures. Under the NPDES Permit, the City is responsible for implementing measures to regulate the
quality of stormwater from private developments that ultimately flow into the ocean.
The Gilroy Civic Center development will both reduce stormwater runoff and improve stormwater quality through the reduction of impervious surfaces and implementation of Low Impact Design (LID) measures. Reducing the stormwater runoff will result in a lower stormwater capacity impact to the existing public storm drain infrastructure that currently serves the site. As such, no mitigation of off-site storm drain capacity is anticipated in order to accommodate the proposed Civil Center programming.
Page 6 of 7 BKF ENGINEERS
All on-site storm water from impervious surfaces such as conventional building roofs, pavements, and other similar hardscape will be collected and conveyed to on-site LID treatment facilities before being discharged off-site. Proposed LID measures include in-ground biofiltration basins, flow-through planters, permeable paving, and on-structure landscaping. Approximately 4% of the newly constructed impervious surfaces will be dedicated to stormwater treatment facilities within the development that will filter site pollutants and reduce pre-development stormwater flow prior to discharging to the frontage stormwater pipes. All site stormwater facilities will be sized to accommodate a 10-year design storm event in conformance with the City of Gilroy’s design standards. Opportunities for on-site storm water collection and treatment for use in gray water applications should also be considered. Stormwater from roof runoff can be collected in stormwater cisterns programmed
within the new buildings, treated, and utilized for site irrigation and/or toilet and urinal flushing to help
reduce annual potable water demand.
SECTION 7: FLOOD PROTECTION
The Civic Center development site is located in FEMA’s Zone X, which is outside of a designated FEMA Special Flood Hazard Area. Zone X is defined as an area which is a 0.2% annual chance flood hazard area having 1% annual chance of flooding with average depths of less than one foot. Given this low risk flood designation no specific flood mitigation is required to facilitate this development. Standard best
practices for on-site stormwater management and conformance to the City’s requirement to design on-
site stormwater facilities to convey a 10-year design storm event will be sufficient to reasonably mitigate storm water flooding potential within the site.
FEMA National Flood Hazzard Map
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 111Gilroy Civic Center Master Plan
Page 7 of 7 BKF ENGINEERS
SECTION 8: GAS AND ELECTRIC IMPROVEMENTS
The Pacific Gas and Electric Company (PG&E) provides electric and gas service to customers within the City of Gilroy and is regulated by the California Public Utilities Commission. PG&E owns and operates the Llagas electrical substation located on the east side of Gilroy. 115 KV transmission lines run
predominantly around the perimeter of Gilroy and along Highway 101. These transmission lines are located in dedicated PG&E rights-of-way and maintained by PG&E. Electricity is distributed from the transmission lines through local pole mounted overhead electrical wires or via underground trenches within streets. Gas mains are similarly located in underground trenches within City rights of way throughout the City, which also serves the development site. PG&E is required to meet each project
electrical and gas demands as part of their franchise agreement with the CPUC. Although off-site
electrical and gas infrastructure upgrades are not anticipated to be required to support this development, any regional upgrades required would be the responsibility of PG&E. Electric distribution facilities are located underground within Church Street and Dowdy Street and overhead on the opposite frontage within 6th and 7th Streets. All new electric services to the site will be made with underground services. No New gas service is expected to be needed since the proposed buildings will be all-electric.
SECTION 9: SOLID WASTE
Residential and commercial solid waste disposal and recycling services provided by the City of Gilroy. The City contracts with Recology South Valley for all of its solid waste, street sweeping, and recycling needs. SVDR transports its waste collection to the San Martin Transfer Station. From the Transfer Station, garbage is taken to Landfill, recyclables are sent to the BFI Waste Systems Recycling facility in San Jose, and clean yard waste is transported to South Valley Organics, a compost facility located at Pacheco Pass Landfill. The City of Gilroy facilitates an expanded recycling program that includes food waste composting, scrap metal, and plastic bags. Yard waste combined with food waste is now collected every week. A waste disposal program will need to be coordinated with Recoogy South Valley for the new building waste management operations.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 112Gilroy Civic Center Master Plan
July 14, 2025
Gilroy Civic Center Master Plan
ELS Architects
Concept Design – Structural Narrative
Page 1
160 Pine Street, Suite 600, San Francisco, California, 94111 | 415 837 0700
www.forell.com
Forell | Elsesser Engineers
July 14, 2025
F/E Job Number: 24-082
By: Allen Nudel & Lindsey Maclise
GENERAL:
This document is a Concept level structural narrative associated with the Gilroy Civic Center
Master Plan Project. The narrative provides a project description, structural criteria, and a
description of the structural systems. This narrative is based on ELS’s preliminary building plans
provided in June 2025.
PROJECT DESCRIPTION:
The project site will be located at the existing Gilroy Civic Center and provides an expansion and
replacement of the City’s existing facilities. The project consists of three new building structures:
a City Hall, a Recreation Center, and a Community Arts Center. The buildings are all two stories
in height and will have sloped roofs to mirror the existing architecture on the site.
The City Hall will contain spaces for public works, finance, and community development at the
ground level with additional public services for utilities, human resources and administration
above. Additionally, the council chambers will be located in the building in a double height space.
The overall building dimensions are approximately 270 ft by 150 ft.
The Recreation Center contains an open-air pool with single-story pool support space, and a
double height gym with adjacent locker rooms, offices, and flex rooms. At the second level, there
will be cardio and workout spaces, additional locked rooms, and a running track surrounding the
gymnasium. The overall building dimensions are approximately 210 ft by 125 ft.
The Community Arts Center provides a gymnasium, auditorium, and senior dining facility. The
gymnasium and auditorium will be double height spaces, while the senior dining facility will be a
single-story portion of the building, with accessible roof above. A central core joins the three
main spaces providing offices, restrooms, and activity spaces. The overall building dimensions
are approximately 275 ft by 120 ft.
BUILDING FRAMING SYSTEM:
The proposed structural system for the buildings is assumed to be consistent across all three
buildings to allow for a uniform approach and efficiency for the project. To allow for the long
spans of the multiple double height spaces that occur in all three buildings, a steel gravity system
is proposed. The structural floor and roof will be Cross Laminated Timber (CLT) which will also
act as the lateral diaphragm for seismic and wind loads. At the roof, to create the sloped
approach, steel gable trusses will be provided.
For the pool support structure, the building will be a single-story CMU building with a metal deck
roof. The CMU walls will provide both the gravity and seismic support for the building. Steel
beams will be provided at approximately 10 feet on center to support the metal deck and allow for
attachment of MEP distribution systems.
July 14, 2025
Gilroy Civic Center Master Plan
ELS Architects
Concept Design – Structural Narrative
Page 2
160 Pine Street, Suite 600, San Francisco, California, 94111 | 415 837 0700
www.forell.com
Based on the review of the available geotechnical information, the building is assumed to be
founded on shallow foundations with a reinforced concrete slab on grade. A final foundation
system will be confirmed following the geotechnical engineering report and recommendations.
LATERAL LOAD RESISTING SYSTEM:
The lateral load resisting system for the buildings is proposed to be Buckling Restrained Braced
Frames. The floor and roof slabs described above will function as horizontal seismic diaphragms
spanning between the braced frame locations. During the schematic design phase additional
lateral systems will be explored.
STRUCTURAL CRITERIA:
The design will conform to the 2025 California Building Code.
Vertical and Lateral Loads:
Dead Loads: Self-weight. See below for superimposed loading assumptions.
Live Loads (From Existing Drawings):
a. Typical Floors: 100 psf
b. Terrace: 100 psf
c. Roof Areas: 20 psf (reducible)
Superimposed Dead Loads
a. Terrace: 100 psf
b. Typical Floor: 15 psf
c. Roof: 15 psf + 5 psf PV
Cladding: Metal Panel with glazing and curtain wall, 20psf assumed maximum.
Deflection Limits:
Floor LL L/360
Floor TL L/240
Roof LL L/360
Roof TL L/240
Exterior Beam LL L/360
Elevator Machine Beams L/1666
Floor Flatness:
FF=30 FL=20 Overall
FF=24 FL=15 Local
Wind:
Risk Category II
Basic Wind Speed: 92 mph
Surface Roughness Category: B
Exposure Category: B
Seismic, based on 2025 CBC/ASCE7-22:
Risk Category II
V = SDS/(R/I))*W
STRUCTURAL ENGINEERINGDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 113Gilroy Civic Center Master Plan
July 14, 2025
Gilroy Civic Center Master Plan
ELS Architects
Concept Design – Structural Narrative
Page 3
160 Pine Street, Suite 600, San Francisco, California, 94111 | 415 837 0700
www.forell.com
ρ = 1.0
Soil Site Class: D Assumed
Seismic Design Category: D
SS=1.72g
S1=0.63g
SDS=1.26g
SD1=1.25g
I= 1.0
Buckling Restrained Braced Frame:
R=8
Ω = 2.5
CD=5
MATERIAL PROPERTIES:
Concrete Compression Strength:
• Foundations 4,000psi
• Slab-on-grade 3,000psi
Steel Reinforcement (Deformed):
• ASTM A615, Grade 60
Structural Steel:
• Wide Flange: ASTM A992, Grade 50
• HSS: ASTM A1085
• Plate: ASTM A572, Grade 36
Wood:
• CLT: Grade V2M1.1
• Glulam: Douglas Fir, Grade 24F
SUSTAINABILITY GOALS:
The structural sustainability goals for the project are focused on the selection of low-embodied
carbon materials. The selection of mass timber for the primary floor system provides a low initial
embodied carbon number along with the benefits of biogenic carbon due to the stored carbon in
the wood. For the concrete embodied carbon, based on market availability, it is recommended
that the project target an embodied carbon number of 242 kgCO2e/m3, which is 25% below the
Carbon Leadership Baseline for the region which is 323 kgCO2e/m3.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 114Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 2 of 56
TABLE OF CONTENTS
• SECTION 1 - GENERAL
• SECTION 2 – HEATING, VENTILATION AND AIR CONDITIONING ARTS BUILDING
• SECTION 3 – HEATING, VENTILATION AND AIR CONDITIONING CITY HALL
• SECTION 4 – HEATING, VENTILATION AND AIR CONDITIONING RECREATIONAL BUILDING
• SECTION 5 – PLUMBING
• SECTION 6 – ELECTRICAL
• SECTION 7 – LOW VOLTAGE ARTS BUILDING
• SECTION 8 – LOW VOLTAGE CITY HALL
• SECTION 9 – LOW VOLTAGE RECREATION BUILDING
1620 Montgomery Street, Suite 30, San Francisco, CA 94111 p 415.655.4000
SAN FRANCISCO SACRAMENTO www.gb-eng.com
Mechanical, Electrical, and Plumbing
Conceptual Narrative – Rev-02
Gilroy Civic Center Master Plan
MECHANICAL, ELECTRICAL, PLUMBING, AND LOW VOLTAGEDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 115Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 4 of 56
• Minimize pressure drop.
• Minimize reheat loads.
• Minimize total air movement using point of use techniques such as chilled beams.
• Minimize lighting energy use through effective daylighting strategies.
• Reduce electrical plug loads as much as possible including the use of demand control.
• Employ extremely efficient mechanical systems to handle the remaining loads including:
o Natural ventilation where feasible.
o Mixed mode ventilation where feasible.
o Use of displacement ventilation with destratification fans in spaces with high
ceilings.
o Use of transfer air from clean to dirty space for additional make up air.
o Maximize economizer hours.
o Provide energy recovery.
• The coefficient of performance of moving energy using a heat pump versus transforming
energy by using fossil fuels to create energy through combustion can go from 95% for
high efficiency condensing boilers to 500% using efficient heat pump technology.
• Develop accurate predictions of annual energy consumption and life cycle cost analysis.
• Commission your systems and ensure proper functioning of the system.
• Implement a Monitoring Based Commissioning Plan (MBCx)
II. CODES
Systems will be designed in accordance with the latest edition of the following codes:
• California Codes and Regulations.
• California Green Building Code – Tier-II.
• DSA – Division of the State Architect.
• NFPA – National Fire Protection Association.
• SMACNA
• IAPMO
• ANSI
• ASHRAE
• Local Amendments to above Codes.
END OF SECTION-1 GENERAL
SECTION 2 – HEATING, VENTILATION AND AIR CONDITIONING ARTS BUILDING
I. GENERAL
The project shall be all electric with no use of fossil fuels for heating or cooking. There will be no
gas service to the buildings.
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 3 of 56
SECTION 1: GENERAL
I. PROJECT SCOPE
The project consists of master planning services for redevelopment of the existing Civic Center
site. The Civic Center site currently contains: City Hall; the City Hall Annex (housing the
Emergency Operations Center, computer training lab, and other extra office and storage
spaces); Wheeler Gymnasium; Library; Senior Center; current Police Headquarters; seven
parking lots of various sizes; four (4) single family residential homes (three (3) are not currently
city-owned) that will be demolished; one small grass area; Wheeler Park; and a central open
area.
This document is a high-level systems narrative for the new proposed buildings: City Hall,
Community Center, and Recreation Center with an outdoor pool.
The intention is that the project design will exclude the use of fossil fuels, meeting
CALGreen Tier-II and LEED Gold minimum with the aim for LEED Platinum if budget allows.
To minimize energy use we recommend a passive approach including:
• Define sustainability goals.
o All electric
o Net zero site or source energy; based on past experience we recommend using
site energy.
o Carbon action plan including scope; based on past experience we recommend
Scope-1 and 2 reductions by:
▪ Eliminate the use of fossil fuels.
▪ Eliminate the use of refrigerants in line with California Air Resource Board
(CARB) regulations
o Energy Use Intensity (EUI) in kBtu/Sqft/Yr. This item requires additional modeling
to estimate potential reductions in energy consumption. This should be done
before project RFP’s are issued. Based on targets set by other organizations for
new projects, being administration type of spaces, we recommend a target of
less than 25kBtu/Sqft/Yr.
• Understand the microclimate of the project site.
o Establish the design criteria for system performance. We recommend using the
20Yr predicted ASHRAE 0.1% extreme ambient design conditions. See HVAC
design criteria provided below.
o Design the orientation, form, and mass of the building to maximize the use of
natural energy flows and reduce external loads to the absolute practical
minimum.
o The architecture and detailing are key in limiting infiltration such that the
envelope is built tight and the building is ventilated as needed for the occupants
with minimum external influence. We recommend an air tightness of less than 3
M3/Hr/M2 at 50 Pascals.
o Use of strategically placed thermal mass and night flush strategies to offset peak
demand.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 116Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 6 of 56
o Where transfer or return air paths are required in full height acoustical partitions,
include a sound boot, ideally two 90° elbows separated by a minimum 4’-0” of
straight ductwork and fully internally lined, to maintain acoustical sound isolation
performance.
o Locate volume dampers at least 4’ upstream of diffusers or return grilles; locate
farther upstream if possible.
o The design will include crosstalk mitigation between spaces with common duct
runs.
o VAV units should be at least 8’ from diffusers.
o Mechanical equipment shall be located above non-noise sensitive areas.
o FCUs for conference rooms shall be sized to meet the intended load at medium
set point.
• Vibration Isolation:
o All major pieces of rotating or vibrating equipment shall be supported on vibration
isolation mounts.
o Vibration isolators shall consist of unhoused helical steel springs in series with
neoprene pads, and seismic snubbers.
o All vibration isolators shall be sized according to the weight, distribution, static
and dynamic loads to be supported.
o Vibration isolator ratings shall be expressed as static deflection and sized for at
least eight times the static deflection of the supporting structure.
o Seismic restraint of equipment will not inhibit vibration isolation.
o Multi-fan arrays shall be isolated using neoprene mounts between each motor
and frame.
• Seismic Control:
o Shall meet the requirements of Chapter 16 of the California Building Code.
o Force factor of 1.0 will be applied for non-critical facilities.
o Force factor of 1.5 will be applied for any critical facility that may require
continued operations after an event.
III. HVAC ZONING FOR TEMPERATURE CONTROL
The project shall be designed such that enough zones are provided to achieve the
“Controllability of Systems” credit for LEED.
• Perimeter zones shall be separated from interior zones.
• Corner rooms shall be on their own zone if they have glazing on a different orientation
from other rooms.
• Zoning shall be provided as follows
o Meet LEED Controllability Credit
o Corner offices shall be a dedicated zone
o Zones shall be made up of similar use space and on the same orientation
o Perimeter zones shall be separated from interior zones.
o Conference rooms and meeting rooms shall have their own dedicated zones.
o Lobbies and reception shall have dedicated zoning.
o MDF/IDF/IT rooms shall have dedicated zone
o Restrooms and corridor shall be controlled via adjacent controlled spaces.
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 5 of 56
II. HVAC DESIGN CRITERIA
Outdoor Design Criteria
• Summer Outdoor Design Conditions 108F DB, 77F WB (ASHRAE 0.1% 20yr Extreme)
• Winter Outdoor Design Conditions 32F DB (ASHRAE 0.2%)
Indoor Design Criteria
• Heating Indoor Design Temperature 68F DB +/- 2 F
• Cooling Indoor Design Temperature 72F DB +/- 2 F
• Telecommunications Space Colg only 68 to 72F DB
• No humidity control will be provided unless specifically required by for operational needs.
Outside Air Quantities per California Building Code
• Restrooms
o Greater of 10 ACH or 50cfm/fixture when occupied.
o 4 ACH when unoccupied.
• Locker/Shower rooms
o 12 ACH when occupied.
o 6 ACH when unoccupied
• Waiting Rooms - 10 ach/hr
• Janitors Closets - 2 CFM per Sqft.
• All other spaces, minimum of 30% higher than ASHRAE Standard 62.1
Noise, Vibration, and Seismic Control for Mechanical Systems.
• Acoustic treatment
o Acoustic treatment shall be provided on AHU’s and exhaust fans
o Select AHUs with end discharge and return.
o The AHU selection shall be such that an acoustical silencer is not required to
meet the noise levels to reduce pressure drop. Coplanar Silencers would be
recommended.
o All service connections (ducts, piping and conduit) shall be resiliently isolated
from oscillating units via flexible connections.
o Seismic restraints will be compatible with the vibration isolation equipment.
Seismic restraints should not create rigid connections between equipment and
structural building elements.
o Terminal units shall be located away from noise sensitive spaces such as
conference rooms, offices, training rooms, etc. Where such placements cannot
be avoided, additional noise control measures may be required to minimize
radiated noise levels.
o Diffusers and return grilles should be rated at least 5 NC points lower than the
target maximum NC of the room in which they are to be located.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 117Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 8 of 56
o Cold Water
o Irrigation
o Electric
• Sub Meters
o Domestic Hot Water
o Receptacles
o Lighting
o Equipment
• BTU Meters
o Chilled Water
o Heating Hot Water
VI. CENTRAL PLANT
The heating and cooling load for the project shall be via the use of Air Sourced Heat Pump
(ASHP) technology. The ASHP can be located on grade or at roof level with the following
features:
• A minimum of two ASHP in parallel, each at 75% duty.
• The ASHP shall produce Chilled Water (CHW) and Heating Hot Water (HHW)
concurrently.
• Primary/Secondary configuration, each loop with three pumps at 50% duty each.
• Buffer tanks provided for the CHW and HHW.
• Heating element for safe oil return to compressor on emergency power.
VII. CUSTOM AIR HANDLING UNITS
All administration, and public areas shall be served by high efficiency variable air volume (VAV)
custom air handling units.
The AHUs shall be provided with:
• Low pressure drop.
• Maximum 350fpm face velocity.
• Economizer
• MERV-8 Pre-filters
• Stainless steel frames and accessories for coils, and filters.
• Energy Recovery with by-pass
• Copper/Copper Heating coil with by-pass
• Cooling coil with by-pass
• Stainless steel drain pans
• Stainless steel downstream of the cooling coil
• Multi-fan array optimized to run multiple fans for best efficiency to meet demand
including N+1 (fan) redundancy.
• VFD and local disconnect per fan
• Coplanar silencers
• MERV-13 Final-filters with Stainless steel frames and accessories.
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 7 of 56
o Rooms that can be divided by operable partitions shall be provided with controls
for each divided space. The setpoints shall have adequate adjustable differential
to prevent the zones fighting each other.
o Electrical and mechanical shall have a dedicated cooling unit.
IV. BUILDING AUTOMATION SYSTEM (BAS)
The BAS shall compose of direct digital controls (DDC) which shall communicate with the
central campus head end computer local area network (LAN) located at the Facilities
Operations Office (FOO).
In addition to minimizing equipment energy use, the system shall report malfunctions of critical
equipment via alarms to the FOO.
Environmental controls for the building will be fully DDC, computerized Building Automation
System per the standard set for the Gilroy Civic Center. The system will be PC based and will
include color graphic representation of mechanical building systems. The BAS software will
include scheduling operation of mechanical equipment, alarm and logging (data file and/or
printed) of events. Room thermostats will be remotely re-settable and concealed or locking type
in public areas. The control system shall be web-enabled to allow remote access with different
priorities set for different users.
CO2 control shall be provided for each AHU. The sensor shall be space mounted per code.
Local supervisory BAS shall be provided with communication back to the Gilroy Civic Center
FOO. All Building Controllers installed shall be connecting to the FOO server.
All installed energy meters shall be able to communicate over the LAN, either inherently or via
an installed gateway, using BACnet IP™.
Sequence of Operations shall be per ASHRAE Guideline-36 with trim and response resets for
equipment including temperature resets for temporary unoccupied, unoccupied, and night
setback.
Operable windows will be used where possible including window interlock with the HVAC
system.
No compressor energy used to cool the supply air if the ambient conditions are =<74F
No compressor energy used to heat the supply air if the ambient conditions are =>66F
V. METERING
All meters shall be mapped to an equipment record created on the FOO server. Meter shall be
provided per Title-24, LEED and the following:
• Main Meters
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 118Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 10 of 56
• Heating Indoor Design Temperature 68F DB +/- 2 F
• Cooling Indoor Design Temperature 72F DB +/- 2 F
• Telecommunications Space Clg only 68 to 72F DB
• No humidity control will be provided unless specifically required by for operational needs.
Outside Air Quantities per California Building Code
• Restrooms
o Greater of 10 ACH or 50cfm/fixture when occupied.
o 4 ACH when unoccupied.
• Locker/Shower rooms
o 12 ACH when occupied.
o 6 ACH when unoccupied
• Waiting Rooms - 10 ach/hr
• Janitors Closets - 2 CFM per Sqft.
• All other spaces, minimum of 30% higher than ASHRAE Standard 62.1
Noise, Vibration, and Seismic Control for Mechanical Systems.
• Acoustic treatment
o Acoustic treatment shall be provided on AHU’s and exhaust fans
o Select AHUs with end discharge and return.
o The AHU selection shall be such that an acoustical silencer is not required to
meet the noise levels to reduce pressure drop. Coplanar Silencers would be
recommended.
o All service connections (ducts, piping and conduit) shall be resiliently isolated
from oscillating units via flexible connections.
o Seismic restraints will be compatible with the vibration isolation equipment.
Seismic restraints should not create rigid connections between equipment and
structural building elements.
o Terminal units shall be located away from noise sensitive spaces such as
conference rooms, offices, training rooms, etc. Where such placements cannot
be avoided, additional noise control measures may be required to minimize
radiated noise levels.
o Diffusers and return grilles should be rated at least 5 NC points lower than the
target maximum NC of the room in which they are to be located.
o Where transfer or return air paths are required in full height acoustical partitions,
include a sound boot, ideally two 90° elbows separated by a minimum 4’-0” of
straight ductwork and fully internally lined, to maintain acoustical sound isolation
performance.
o Locate volume dampers at least 4’ upstream of diffusers or return grilles; locate
farther upstream if possible.
o The design will include crosstalk mitigation between spaces with common duct
runs.
o VAV units should be at least 8’ from diffusers.
o Mechanical equipment shall be located above non-noise sensitive areas.
o FCUs for conference rooms shall be sized to meet the intended load at medium
set point.
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 9 of 56
• Air flow station.
With wildfires becoming a norm each year, we recommend the AHU filter housing is suitable for
carbon filters. The fan motors will need to be sized to overcome the pressure drop for these
filters when used. In the event of a wild fire the normal MERV-13 filters can be swapped out with
the carbon filters. We also recommend:
• The carbon filters are used only when needed because they come at a cost and have a
higher pressure drop which results in higher running cost.
• The carbon filters are purchase ahead of time so that they are available for use when
needed.
VIII. SPACE CONDITIONING
• Auditorium: Dedicated ultra quiet system using displacement ventilation and
destratification fans.
• Gymnasium: Displacement ventilation with destratification fans.
• Kitchen/Dinning: Demand control ventilation using heat and smoke for controlling the
exhaust including use of transfer air from the dining room to serve as make up air for the
commercial kitchen. The commercial kitchen may have a Type-I and Type-II hood each
with dedicated exhaust hood based on demand. The AHU for the Dining area will be
having return air capability to recirculate dining room air when used for events.
• Equipment room: All equipment rooms such as electrical rooms, MDF/IDF rooms,
machine elevator rooms, and mechanical rooms shall have dedicated cooling using Dx-
Split units. Critical spaces as required by the Owner will have backup systems.
• Other Spaces: The remainder of the building will be served using a dedicated demand
control ventilation system. Restrooms, Janitors closets, locker rooms will have dedicated
exhaust with transfer air from adjacent space for make air.
END OF SECTION-2 HVAC ARTS BUILDING
SECTION 3 – HEATING, VENTILATION AND AIR CONDITIONING CITY HALL
I. GENERAL
The project shall be all electric with no use of fossil fuels for heating or cooking. There will be no
gas service to the building.
II. HVAC DESIGN CRITERIA
Outdoor Design Criteria
• Summer Outdoor Design Conditions 108F DB, 77F WB (ASHRAE 0.1% 20yr Extreme)
• Winter Outdoor Design Conditions 32F DB (ASHRAE 0.2%)
Indoor Design Criteria
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 119Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 10 of 56
• Heating Indoor Design Temperature 68F DB +/- 2 F
• Cooling Indoor Design Temperature 72F DB +/- 2 F
• Telecommunications Space Clg only 68 to 72F DB
• No humidity control will be provided unless specifically required by for operational needs.
Outside Air Quantities per California Building Code
• Restrooms
o Greater of 10 ACH or 50cfm/fixture when occupied.
o 4 ACH when unoccupied.
• Locker/Shower rooms
o 12 ACH when occupied.
o 6 ACH when unoccupied
• Waiting Rooms - 10 ach/hr
• Janitors Closets - 2 CFM per Sqft.
• All other spaces, minimum of 30% higher than ASHRAE Standard 62.1
Noise, Vibration, and Seismic Control for Mechanical Systems.
• Acoustic treatment
o Acoustic treatment shall be provided on AHU’s and exhaust fans
o Select AHUs with end discharge and return.
o The AHU selection shall be such that an acoustical silencer is not required to
meet the noise levels to reduce pressure drop. Coplanar Silencers would be
recommended.
o All service connections (ducts, piping and conduit) shall be resiliently isolated
from oscillating units via flexible connections.
o Seismic restraints will be compatible with the vibration isolation equipment.
Seismic restraints should not create rigid connections between equipment and
structural building elements.
o Terminal units shall be located away from noise sensitive spaces such as
conference rooms, offices, training rooms, etc. Where such placements cannot
be avoided, additional noise control measures may be required to minimize
radiated noise levels.
o Diffusers and return grilles should be rated at least 5 NC points lower than the
target maximum NC of the room in which they are to be located.
o Where transfer or return air paths are required in full height acoustical partitions,
include a sound boot, ideally two 90° elbows separated by a minimum 4’-0” of
straight ductwork and fully internally lined, to maintain acoustical sound isolation
performance.
o Locate volume dampers at least 4’ upstream of diffusers or return grilles; locate
farther upstream if possible.
o The design will include crosstalk mitigation between spaces with common duct
runs.
o VAV units should be at least 8’ from diffusers.
o Mechanical equipment shall be located above non-noise sensitive areas.
o FCUs for conference rooms shall be sized to meet the intended load at medium
set point.
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 9 of 56
• Air flow station.
With wildfires becoming a norm each year, we recommend the AHU filter housing is suitable for
carbon filters. The fan motors will need to be sized to overcome the pressure drop for these
filters when used. In the event of a wild fire the normal MERV-13 filters can be swapped out with
the carbon filters. We also recommend:
• The carbon filters are used only when needed because they come at a cost and have a
higher pressure drop which results in higher running cost.
• The carbon filters are purchase ahead of time so that they are available for use when
needed.
VIII. SPACE CONDITIONING
• Auditorium: Dedicated ultra quiet system using displacement ventilation and
destratification fans.
• Gymnasium: Displacement ventilation with destratification fans.
• Kitchen/Dinning: Demand control ventilation using heat and smoke for controlling the
exhaust including use of transfer air from the dining room to serve as make up air for the
commercial kitchen. The commercial kitchen may have a Type-I and Type-II hood each
with dedicated exhaust hood based on demand. The AHU for the Dining area will be
having return air capability to recirculate dining room air when used for events.
• Equipment room: All equipment rooms such as electrical rooms, MDF/IDF rooms,
machine elevator rooms, and mechanical rooms shall have dedicated cooling using Dx-
Split units. Critical spaces as required by the Owner will have backup systems.
• Other Spaces: The remainder of the building will be served using a dedicated demand
control ventilation system. Restrooms, Janitors closets, locker rooms will have dedicated
exhaust with transfer air from adjacent space for make air.
END OF SECTION-2 HVAC ARTS BUILDING
SECTION 3 – HEATING, VENTILATION AND AIR CONDITIONING CITY HALL
I. GENERAL
The project shall be all electric with no use of fossil fuels for heating or cooking. There will be no
gas service to the building.
II. HVAC DESIGN CRITERIA
Outdoor Design Criteria
• Summer Outdoor Design Conditions 108F DB, 77F WB (ASHRAE 0.1% 20yr Extreme)
• Winter Outdoor Design Conditions 32F DB (ASHRAE 0.2%)
Indoor Design Criteria
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 120Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 12 of 56
In addition to minimizing equipment energy use, the system shall report malfunctions of critical
equipment via alarms to the FOO.
Environmental controls for the building will be fully DDC, computerized Building Automation
System per the standard set for the Gilroy Civic Center. The system will be PC based and will
include color graphic representation of mechanical building systems. The BAS software will
include scheduling operation of mechanical equipment, alarm and logging (data file and/or
printed) of events. Room thermostats will be remotely re-settable and concealed or locking type
in public areas. The control system shall be web-enabled to allow remote access with different
priorities set for different users.
CO2 control shall be provided for each AHU. The sensor shall be space mounted per code.
Local supervisory BAS shall be provided with communication back to the Gilroy Civic Center
FOO. All Building Controllers installed shall be connecting to the FOO server.
All installed energy meters shall be able to communicate over the LAN, either inherently or via
an installed gateway, using BACnet IP™.
Sequence of Operations shall be per ASHRAE Guideline-36 with trim and response resets for
equipment including temperature resets for temporary unoccupied, unoccupied, and night
setback.
Operable windows will be used where possible including window interlock with the HVAC
system.
No compressor energy used to cool the supply air if the ambient conditions are =<74F
No compressor energy used to heat the supply air if the ambient conditions are =>66F
V. METERING
All meters shall be mapped to an equipment record created on the FOO server. Meter shall be
provided per Title-24, LEED and the following:
• Main Meters
o Cold Water
o Irrigation
o Electric
• Sub Meters
o Domestic Hot Water
o Receptacles
o Lighting
o Equipment
• BTU Meters
o Chilled Water
o Heating Hot Water
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 11 of 56
• Vibration Isolation:
o All major pieces of rotating or vibrating equipment shall be supported on vibration
isolation mounts.
o Vibration isolators shall consist of unhoused helical steel springs in series with
neoprene pads, and seismic snubbers.
o All vibration isolators shall be sized according to the weight, distribution, static
and dynamic loads to be supported.
o Vibration isolator ratings shall be expressed as static deflection and sized for at
least eight times the static deflection of the supporting structure.
o Seismic restraint of equipment will not inhibit vibration isolation.
o Multi-fan arrays shall be isolated using neoprene mounts between each motor
and frame.
• Seismic Control:
o Shall meet the requirements of Chapter 16 of the California Building Code.
o Force factor of 1.0 will be applied for non-critical facilities.
o Force factor of 1.5 will be applied for any critical facility that may require
continued operations after an event.
III. HVAC ZONING FOR TEMPERATURE CONTROL
The project shall be designed such that enough zones are provided to achieve the
“Controllability of Systems” credit for LEED.
• Perimeter zones shall be separated from interior zones.
• Corner rooms shall be on their own zone if they have glazing on a different orientation
from other rooms.
• Zoning shall be provided as follows
o Meet LEED Controllability Credit
o Corner offices shall be a dedicated zone
o Zones shall be made up of similar use space and on the same orientation
o Perimeter zones shall be separated from interior zones.
o Conference rooms and meeting rooms shall have their own dedicated zones.
o Lobbies and reception shall have dedicated zoning.
o MDF/IDF/IT rooms shall have dedicated zone
o Restrooms and corridor shall be controlled via adjacent controlled spaces.
o Rooms that can be divided by operable partitions shall be provided with controls
for each divided space. The setpoints shall have adequate adjustable differential
to prevent the zones fighting each other.
o Electrical and mechanical shall have a dedicated cooling unit.
IV. BUILDING AUTOMATION SYSTEM (BAS)
The BAS shall compose of direct digital controls (DDC) which shall communicate with the
central campus head end computer local area network (LAN) located at the Facilities
Operations Office (FOO).
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 121Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 14 of 56
• Other Spaces: The remainder of the building will be served using a dedicated demand
control ventilation system. Restrooms, Janitors closets, locker rooms will have dedicated
exhaust with transfer air from adjacent space for make air.
END OF SECTION-3 HVAC CITY HALL
SECTION 4 – HEATING, VENTILATION AND AIR CONDITIONING RECREATIONAL
BUILDING
IX. GENERAL
The project shall be all electric with no use of fossil fuels for heating or cooking. There will be no
gas service to the building.
X. HVAC DESIGN CRITERIA
Outdoor Design Criteria
• Summer Outdoor Design Conditions 108F DB, 77F WB (ASHRAE 0.1% 20yr Extreme)
• Winter Outdoor Design Conditions 32F DB (ASHRAE 0.2%)
• No compressor energy used to cool the supply air if the ambient conditions are =<74F
• No compressor energy used to heat the supply air if the ambient conditions are =>66F
Indoor Design Criteria
• Heating Indoor Design Temperature 68F DB +/- 2 F
• Cooling Indoor Design Temperature 72F DB +/- 2 F
• Telecommunications Space Clg only 68 to 72F DB
• No humidity control will be provided unless specifically required by for operational needs.
Outside Air Quantities per California Building Code
• Restrooms
o Greater of 10 ACH or 50cfm/fixture when occupied.
o 4 ACH when unoccupied.
• Locker/Shower rooms
o 12 ACH when occupied.
o 6 ACH when unoccupied
• Waiting Rooms - 10 ach/hr
• Janitors Closets - 2 CFM per Sqft.
• All other spaces, minimum of 30% higher than ASHRAE Standard 62.1
Noise, Vibration, and Seismic Control for Mechanical Systems.
• Acoustic treatment
o Acoustic treatment shall be provided on AHU’s and exhaust fans
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 13 of 56
VI. CENTRAL PLANT
The heating and cooling load for the project shall be via the use of Air Sourced Heat Pump
(ASHP) technology. The ASHP can be located on grade or at roof level with the following
features:
• A minimum of two ASHP in parallel, each at 75% duty.
• The ASHP shall produce Chilled Water (CHW) and Heating Hot Water (HHW)
concurrently.
• Primary/Secondary configuration, each loop with three pumps at 50% duty each.
• Buffer tanks provided for the CHW and HHW.
• Heating element for safe oil return to compressor on emergency power.
VII. CUSTOM AIR HANDLING UNITS
All administration, and public areas shall be served by high efficiency variable air volume (VAV)
custom air handling units.
The AHUs shall be provided with:
• Low pressure drop.
• Maximum 350fpm face velocity.
• Economizer
• Merv-8 Pre-filters
• Stainless steel frames and accessories for coils, and filters.
• Energy Recovery with by-pass
• Copper/Copper Heating coil with by-pass
• Cooling coil with by-pass
• Stainless steel drain pans
• Stainless steel downstream of the cooling coil
• Multi-fan array optimized to run multiple fans for best efficiency to meet demand
including N+1 (fan) redundancy.
• VFD and local disconnect per fan
• Coplanar silencers
• Merv-13 Final-filters with Stainless steel frames and accessories.
• Air flow station.
VIII. SPACE CONDITIONING
• Counsil Chamber: Dedicated ultra quiet system using displacement ventilation and
destratification fans.
• Equipment room: All equipment rooms such as electrical rooms, MDF/IDF rooms,
machine elevator rooms, and mechanical rooms shall have dedicated cooling using Dx-
Split units. Critical spaces as required by the Owner will have backup systems.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 122Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 16 of 56
The project shall be designed such that enough zones are provided to achieve the
“Controllability of Systems” credit for LEED.
• Perimeter zones shall be separated from interior zones.
• Corner rooms shall be on their own zone if they have glazing on a different orientation
from other rooms.
• Zoning shall be provided as follows
o Meet LEED Controllability Credit
o Corner offices shall be a dedicated zone
o Zones shall be made up of similar use space and on the same orientation
o Perimeter zones shall be separated from interior zones.
o Conference rooms and meeting rooms shall have their own dedicated zones.
o Lobbies and reception shall have dedicated zoning.
o MDF/IDF/IT rooms shall have dedicated zone
o Restrooms and corridor shall be controlled via adjacent controlled spaces.
o Rooms that can be divided by operable partitions shall be provided with controls
for each divided space. The setpoints shall have adequate adjustable differential
to prevent the zones fighting each other.
o Electrical and mechanical shall have a dedicated cooling unit.
XII. BUILDING AUTOMATION SYSTEM (BAS)
The BAS shall compose of direct digital controls (DDC) which shall communicate with the
central campus head end computer local area network (LAN) located at the Facilities
Operations Office (FOO).
In addition to minimizing equipment energy use, the system shall report malfunctions of critical
equipment via alarms to the FOO.
Environmental controls for the building will be fully DDC, computerized Building Automation
System per the standard set for the Gilroy Civic Center. The system will be PC based and will
include color graphic representation of mechanical building systems. The BAS software will
include scheduling operation of mechanical equipment, alarm and logging (data file and/or
printed) of events. Room thermostats will be remotely re-settable and concealed or locking type
in public areas. The control system shall be web-enabled to allow remote access with different
priorities set for different users.
CO2 control shall be provided for each AHU. The sensor shall be space mounted per code.
Local supervisory BAS shall be provided with communication back to the Gilroy Civic Center
FOO. All Building Controllers installed shall be connecting to the FOO server.
All installed energy meters shall be able to communicate over the LAN, either inherently or via
an installed gateway, using BACnet IP™.
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 15 of 56
o Select AHUs with end discharge and return.
o The AHU selection shall be such that an acoustical silencer is not required to
meet the noise levels to reduce pressure drop. Coplanar Silencers would be
recommended.
o All service connections (ducts, piping and conduit) shall be resiliently isolated
from oscillating units via flexible connections.
o Seismic restraints will be compatible with the vibration isolation equipment.
Seismic restraints should not create rigid connections between equipment and
structural building elements.
o Terminal units shall be located away from noise sensitive spaces such as
conference rooms, offices, training rooms, etc. Where such placements cannot
be avoided, additional noise control measures may be required to minimize
radiated noise levels.
o Diffusers and return grilles should be rated at least 5 NC points lower than the
target maximum NC of the room in which they are to be located.
o Where transfer or return air paths are required in full height acoustical partitions,
include a sound boot, ideally two 90° elbows separated by a minimum 4’-0” of
straight ductwork and fully internally lined, to maintain acoustical sound isolation
performance.
o Locate volume dampers at least 4’ upstream of diffusers or return grilles; locate
farther upstream if possible.
o The design will include crosstalk mitigation between spaces with common duct
runs.
o VAV units should be at least 8’ from diffusers.
o Mechanical equipment shall be located above non-noise sensitive areas.
o FCUs for conference rooms shall be sized to meet the intended load at medium
set point.
• Vibration Isolation:
o All major pieces of rotating or vibrating equipment shall be supported on vibration
isolation mounts.
o Vibration isolators shall consist of unhoused helical steel springs in series with
neoprene pads, and seismic snubbers.
o All vibration isolators shall be sized according to the weight, distribution, static
and dynamic loads to be supported.
o Vibration isolator ratings shall be expressed as static deflection and sized for at
least eight times the static deflection of the supporting structure.
o Seismic restraint of equipment will not inhibit vibration isolation.
o Multi-fan arrays shall be isolated using neoprene mounts between each motor
and frame.
• Seismic Control:
o Shall meet the requirements of Chapter 16 of the California Building Code.
o Force factor of 1.0 will be applied for non-critical facilities.
o Force factor of 1.5 will be applied for any critical facility that may require
continued operations after an event.
XI. HVAC ZONING FOR TEMPERATURE CONTROL
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 123Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 18 of 56
The outdoor pool will be heated using a dedicated ASHP system. Titanium plate and frame Heat
Exchangers (HEX) will used between the pool loop and the heat source. Three pumps sized at
50% each will be used to circulated the heating hot water. The pool side of the HEX will also
have three pumps sized at 50% each along with a dedicated pool control system to maintain
temperature, circulation rate and chemical treatment as required by code and the Health
Department.
For further pool efficiency measures, if budget allows, we recommend:
• Wind effects are minimized on the pool surface.
• Pools covers are used, out of hours, when the pool is not being used.
• The building ASHP is interconnected with the pool system heating loop for providing
heat energy when the building has access available capacity.
• A PVT system can be installed to heat the pool when the ambient conditions are
suitable. From experience the larger the PVT system, the quicker the return on
investment.
XV. CUSTOM AIR HANDLING UNITS
All administration, and public areas shall be served by high efficiency variable air volume (VAV)
custom air handling units.
The AHUs shall be provided with:
• Low pressure drop.
• Maximum 350fpm face velocity.
• Economizer
• Merv-8 Pre-filters
• Stainless steel frames and accessories for coils, and filters.
• Energy Recovery with by-pass
• Copper/Copper Heating coil with by-pass
• Cooling coil with by-pass
• Stainless steel drain pans
• Stainless steel downstream of the cooling coil
• Multi-fan array optimized to run multiple fans for best efficiency to meet demand
including N+1 (fan) redundancy.
• VFD and local disconnect per fan
• Coplanar silencers
• Merv-13 Final-filters with Stainless steel frames and accessories.
• Air flow station.
XVI. SPACE CONDITIONING
• Gymnasium: Displacement ventilation with destratification fans.
• Equipment room: All equipment rooms such as electrical rooms, MDF/IDF rooms,
machine elevator rooms, and mechanical rooms shall have dedicated cooling using Dx-
Split units. Critical spaces as required by the Owner will have backup systems.
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 17 of 56
Sequence of Operations shall be per ASHRAE Guideline-36 with trim and response resets for
equipment including temperature resets for temporary unoccupied, unoccupied, and night
setback.
Operable windows will be used where possible including window interlock with the HVAC
system.
No compressor energy used to cool the supply air if the ambient conditions are =<74F
No compressor energy used to heat the supply air if the ambient conditions are =>66F
XIII. METERING
All meters shall be mapped to an equipment record created on the FOO server. Meter shall be
provided per Title-24, LEED and the following:
• Main Meters
o Cold Water
o Irrigation
o Electric
• Sub Meters
o Domestic Hot Water
o Receptacles
o Lighting
o Equipment
• BTU Meters
o Chilled Water
o Heating Hot Water
XIV. CENTRAL PLANT
The heating and cooling load for the project shall be via the use of Air Sourced Heat Pump
(ASHP) technology. The ASHP can be located on grade or at roof level with the following
features:
• A minimum of two ASHP in parallel, each at 75% duty.
• The ASHP shall produce Chilled Water (CHW) and Heating Hot Water (HHW)
concurrently.
• Primary/Secondary configuration, each loop with three pumps at 50% duty each.
• Buffer tanks provided for the CHW and HHW.
• Heating element for safe oil return to compressor on emergency power.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 124Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 20 of 56
3. Storm Drain; Based on building square footage four 6” or one 10” storm drain would
be required.
4. Domestic Water Heating; Based on the space assumptions above a single roof or
grade mounted heat pump water heater combined with a moderately sized (+/-1000
gallons combined) storage and swing tank would be adequate for hot water usage
in this building.
5. Based on the anticipated simultaneous usage of fixtures, tank type heat pump water
heaters are not able to provide sufficient hot water even if the kitchen utilized a
separate water heater from the rest of the building.
6. Fire Sprinkler; Coordination to provide a 6” Fire Service to the building would likely
be required until complete calculations are done.
II. CITY HALL
A. ASSUMPTIONS
1. Water, sewer, and storm utilities in the area are of adequate size, depth and
pressure to accommodate the new buildings.
2. No provisions for Essential Facilities or Emergency Operations have been included
in these estimates.
3. Water Closets are assumed to be Flush Valve type.
B. POTENTIAL SPACES WITH WATER USE
1. Two Public Women’s Restrooms
2. Two Public Men’s Restrooms
3. One Single Occupant Restroom
4. Mechanical Rooms
5. Bar Sinks and/or Drinking Fountains are assumed for each department (Public
Works, Human Resources, Admin, etc.) and Common Spaces/Lobbies
C. UTILITIES REQUIRED
1. Sewer; A 6” sewer is recommended
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 19 of 56
• Other Spaces: The remainder of the building will be served using a dedicated demand
control ventilation system. Restrooms, Chemical rooms, Janitors closets, locker rooms
will have dedicated exhaust with transfer air from adjacent space for make air.
END OF SECTION-4 HVAC RECREATIONAL BUILDING
SECTION 5: PLUMBING
I. ART BUILDING
A. ASSUMPTIONS
1. Water, sewer, and storm utilities in the area are of adequate size, depth and
pressure to accommodate the new buildings.
2. No provisions for Essential Facilities or Emergency Operations have been included
in these estimates.
3. Water Closets are assumed to be Flush Valve type.
B. POTENTIAL SPACES WITH WATER USE
1. Two Public Women’s Restrooms
2. Two Public Men’s Restrooms
3. Four Gender Neutral Restrooms
4. Utility Rooms
5. Art Rooms
6. A Commercial Kitchen (General Fixtures with 3-Compartment sink, no commercial
dishwasher assumed)
7. Bar Sinks and/or Drinking Fountains are assumed for Youth/Elderly Lounge and
Activity Rooms and Common Spaces/Lobbies
C. UTILITIES REQUIRED
1. Sewer; A 6” sewer is recommended
2. Domestic Water; A 2-1/2” Domestic Water Service would be anticipated. This would
be capable of serving all Domestic Water uses in the building as well as make-up
water to the HVAC system if required.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 125Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 22 of 56
7. Pool Mechanical Room
C. UTILITIES REQUIRED
1. Sewer; An 8” sewer is anticipated due to the impact of the swimming pool drainage.
A 6” sewer serving the Recreational Center building only would be adequate.
2. Domestic Water; An 8” Domestic Water Service would be anticipated due to the
impact of the pool make-up water required. A 2-1/2” Domestic Water Service
serving the Recreational Center building only would be adequate. This would be
capable of serving all Domestic Water uses in the building as well as make-up water
to the HVAC system if required.
4. A 4” make-up water to the Pool Equipment an a 2” make-up water connection to the
Pool Heat Pump system would be anticipated.
5. Storm Drain; Based on building square footage four 6” or one 10” storm drain would
be required for the Recreation Center Building and a 4” drain would be required for
the Pool Mechanical Building.
6. Domestic Water Heating; Based on the space assumptions above two roof or grade
mounted heat pump water heaters combined with storage and a swing tank (+/-
2000 gallons combined) would be adequate for hot water usage in this building.
7. Pool Water Heating; Based on the pool square footage represented space should
be allocated to accommodate +/- 30 heat pump chillers for pool heating.
8. Pool Mechanical; Due to chemical storage a safety shower will be required at the
Pool Mechanical Building. In order to avoid circulating large hot water supply pipes
to the Pool Mechanical Building a dedicated water heater within the building may be
recommended.
9. Fire Sprinkler; Coordination to provide a 6” Fire Service to the building would likely
be required until complete calculations are done.
END OF SECTION-5 PLUMBING
SECTION 6: ELECTRICAL
I. ELECTRICAL
A. DESCRIPTION OF WORK
1. The project scope of work is in accordance with the Project Scope. Power to the
site will be a new service by PG&E to a new pad-mounted transformer and will be
distributed to the buildings in one of two ways:
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 21 of 56
2. Domestic Water; A 2-1/2” Domestic Water Service would be anticipated. This would
be capable of serving all Domestic Water uses in the building as well as make-up
water to the HVAC system if required.
3. Storm Drain; Based on building square footage four 6” or one 10” storm drain would
be required.
4. Domestic Water Heating Options; Based on the space assumptions above a single
roof or grade mounted heat pump water heater combined with a moderately sized
(+/-1000 gallons combined) storage and swing tank would be adequate for hot
water usage in this building.
5. A single self-contained Tank Type Heat Pump Water Heater may be adequate to
serve the building. A room of 3200 square feet minimum and/or louvers to the
outside would be required to accommodate the Tank Type Heat Pump Water
Heater.
6. Fire Sprinkler; Coordination to provide a 6” Fire Service to the building would likely
be required until complete calculations are done.
III. RECREATION CENTER
A. ASSUMPTIONS
1. Water, sewer, and storm utilities in the area are of adequate size, depth and
pressure to accommodate the new buildings.
2. No provisions for Essential Facilities or Emergency Operations have been included
in these estimates.
3. Water Closets are assumed to be Flush Valve type.
B. POTENTIAL SPACES WITH WATER USE
1. Two Women’s Locker Rooms
2. Two Men’s Locker Rooms
3. Four Family Changing Rooms
4. Two Gender Neutral Restrooms
5. Mechanical Rooms
6. Bar Sinks and/or Drinking Fountains are assumed for Flex Rooms, Break Room,
Conference Room and Common Spaces/Lobbies
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 126Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 24 of 56
4. These inverters will feed directly into the main switchboard and shall be located
in the main electrical room. A disconnect for each inverter shall be provided in
each main electrical room.
E. HEATED POOLS
1. Heated pools will be provided in the project. How heating is provided is to be
determined it is our understanding the system will be all electric with no use of
fossil fuels.
F. TELECOM/IDF
1. Telecom/IDF space shall be provided. One or more network switches shall provide all
telecom needs for the building, which shall be owner furnished and owner installed. Data ports
shall be provided through the building in areas not designated as wet locations. For additional
information see low voltage narratives.
G. LIGHTING SYSTEMS
1. Interior Lighting:
(a) All lighting will utilize high efficacy LED sources.
(b) All lighting will be designed to meet or exceed California Title 24 power
density and mandatory measure requirements.
(c) The standard correlated color temperature (CCT) for LED lighting will be
3500 or 4000K for the Interior spaces and 3000K or 4000K for Exterior.
Provide CRI no less than 90 for interior spaces (except utility rooms to have
min. 80 CRI) and no less than 70 for exterior.
(d) LED (Solid State Lighting) shall be tested to LM 79 and LM 80.
(e) Average maintained interior light levels will be as defined in accordance with
the IESNA 10th edition.
(f) Egress illumination will be connected to the emergency power supply and will
extend through the exit discharge which terminates at the exterior exit or
public way. Egress illumination will be provided to maintain an average of 1
footcandle (fc) at the center and a minimum of 0.1 fc at the edge measured at
the floor. Uniformity ratios of 40 to 1 will not be exceeded.
(g) Exit signs will be single circuit LED type and will be located to define the
egress pathway through the exit discharge. Exit signage will be illuminated
internally and will be connected to the emergency power system. No areas
more than 100 ft. to be without exit sign.
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 23 of 56
(a) A single service to an outdoor main switchboard. This switchboard will then
feed to each building on site.
(b) Three services, one service per building.
2. A new electrical distribution and new lighting system shall be provided within each
new building and around the site and pools.
B. SERVICE AND DISTRIBUTION SYSTEM EQUIPMENT
1. New Service: A new service and a new pad-mounted transformer will be provided.
The Utility shall provide the transformer and cables to the main switchboard(s). This
project will provide the required concrete pad and conduit connections.
2. Main Switchboard: A new switchboard will be provided for all distribution for the
building and site. The switchboard shall be provided with a utility-provided net-
energy meter since PVs will be provided. This allows the owner to sell energy
back to the Utility when PV electrical production exceeds building and site
electrical loads.
3. Title 24 Separation of Loads for Future Metering: Provisions within the main
switchboard shall be provided for se9paration of loads for future metering of the
feeders serving lighting, receptacles, plumbing, and HVAC loads.
4. Panelboards: One or more 225A-208/120V panelboards shall be provided for
each load type; Equipment, Receptacles, Lighting, etc as required by Title 24.
C. EMERGENCY POWER
1. The only loads that require emergency power are code-required egress lighting.
An emergency inverter with batteries shall be provided as required. Additional
emergency power may be provided depending upon the City’s needs.
D. PHOTOVOLTAIC SYSTEMSH
1. A portion of the rooftop areas of the buildings will be designated for photovoltaic
(PV) panels.
2. The PV system will feed its power into two (2) inverters. Two inverters are
provided for both redundancy and to facilitate maintenance/changeout of an
individual inverter without completely removing PV system capability.
3. The inverters shall be “grid-interactive” capable and be able to feed back into the
utility electrical grid when power generated exceeds the building loads. This will
require “net-energy metering” from service utility so that the client can sell power
back to the Utility.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 127Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 26 of 56
(d) Constants such as lumen output per lamp, fixture efficiency, maintenance
factor, or coefficient of utilization, shall be shown with the source of the
constants identified, such as a product cut sheet. In most cases, the
maintenance factors should be chosen on the basis of a medium-intensity
maintenance program, full rated voltage applied, no ceiling, and floor
reflectance’s with architectural finishes and explain significant excursions
from the 80/50/20% standard.
(e) Calculate the vertical illumination level for those rooms and spaces where
adequate illumination of walls, display cases and boards, or shelves is
important to the function of the room.
(f) For exterior photometric calculation, use isolux curves to design ground or
fence lighting systems to obtain the required minimum foot candle level,
horizontal, at ground level.
(g) Use the point-by-point method to develop isolux curves for design of parking,
ground, flood, or perimeter fence lighting systems to design the required
horizontal foot candle levels and uniformities at ground level. Submit the
exterior lighting calculations as part of the design package. Commercial
software programs explained in the IESNA Handbook are preferred in place
of isolux curves method. Identify the program used by trade name and
version number.
8. Site Lighting:
(a) Pole-mounted site lighting shall be provided as required. The site lighting
shall be provided with cutoff to comply with “dark sky” requirements and to
reduce glare to neighboring buildings.
9. Lighting Control System:
(a) The lighting control system will use a combination of automatic astronomical
time clock-controlled relay control panels and local occupancy sensors
(ultrasonic/infrared type where appropriate). Automatic daylighting controls
will be provided in interior and as required and will automatically either dim or
switch off the lighting when sufficient daylight is present. Local wall control
will be provided as well.
(b) Building mounted and Exterior lighting will be controlled with photocells and
by programmable controllable relays and where necessary shall also be
equipped with motion sensors.
(c) Lighting controls shall be provided to all spaces and comply with current Title-
24 mandatory control requirements. Provide lighting control dashboards that
completely shows current plans.
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 25 of 56
2. Main Lobby and Stairs
The Lobby area shall have recessed linear lighting that is uniform with the hallway lights.
The reception area shall have decorative pendant fixtures for additional illumination. Light
fixtures are on the following page.
3. Office: Office lighting shall employ recessed 2’x2’ or 2’x4’.
4. Corridors: Corridor lighting shall employ recessed linear at T-grid ceiling and
combination of pendant or wall mounted linear lights when there is no ceiling.
5. Restrooms: These areas will be lit with continuous perimeter linear fixtures at the
toilet wall and above sinks. Recessed downlights will be added to fill in light in the
other areas. Fixtures rated for wet areas will be used in the showers.
The washrooms will employ energy efficient ceiling mounted downlight luminaires in
general circulation area and vanity recessed ceiling mount luminaires and linear perimeter
ceiling slot lighting fixtures along the walls.
6. Storage, Stairs, MEP rooms, and Other Back-of-House Rooms:
Utilitarian inexpensive lighting will be used. Lighting location will be coordinated with
equipment location. Lighting will be surface or pendant mounted depending on room
height.
7. Lighting documentation/plans:
(a) The final construction documents shall show all luminaire, luminaire types
and mounting elevations with respect to bottom of fixture from finish floor,
lighting symbols showing recessed, circuits, conduits, wires, boxes,
homeruns, switches, occupancy sensors, day lighting sensors, dimmers and
other controls, notes, lights that are designated as emergency egress per
CBC 1006 and the Architect's life safety egress plan, exit signs, multi-level
switching designations (a/b) on switches and lights, evening and night lights,
manual override switches at building entrances at minimum, and all other
applicable items.
(b) Coordinate with the Architectural reflected ceiling plan. Provide 3 or 4 way
switching for all rooms with more than one door.
(c) For interior photometric calculation, calculate the horizontal illumination levels
for each room using the zonal cavity method described in the IESNA
Handbook 10th Edition. Similar sized rooms may be reported under a single
spreadsheet calculation when the illumination level does not vary more than
5%-10% across the group of rooms.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 128Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 28 of 56
(n) All exterior lighting shall be on a programmed time coordinated with the
Owner. Provide separate zoning per fixture types and locations.
(o) Safety and Security being priority, extended hours for some lights to stay ‘ON’
after the programmed control OFF of most of the exterior lights, particularly at
main entry and exit door/areas.
(p) Provide a sequence of operation that is coordinated with the Owner (i.e. time
scheduling, individual space control functions, remote monitoring, etc.).
H. FIRE ALARM SYSTEM
(a) A new, automatic, addressable, fire alarm system shall be provided to meet
the requirements of the adopted editions of the California Building Code,
California Fire Code, National Fire Alarm and Signaling Code (NFPA 72), as
well as local requirements by the AHJ.
(b) The fire alarm system will provide system alarm, supervisory and trouble
signal monitoring, and alarm notification for the building. The system will
report to an outside agency through a wireless DACT connection or Cellular
DACT. The system will have batteries to provide a secondary power source
in case of primary power loss to the control panel or any remote power
supply.
(c) Activation of any system smoke detectors, heat detectors, manual pull
stations, sprinkler water flow switches and suppression systems will initiate
alarm signals on the fire alarm control panel (FACP) and fire alarm
annunciator (FAA), and activate the audible and visual notification appliances
throughout the building(s) per the fire alarm sequence of operations.
Activation of sprinkler tamper switches and HVAC duct smoke detectors will
initiate supervisory signals, which will annunciate on the FACP and the FAA.
(d) The need for automatic smoke detection throughout the space will be
determined. In any case, smoke detection will be required in air handling
units and at any fire/smoke dampers.
(e) Manual pull stations will be provided within 4’ of exits as required by the code.
Audible and/or visual alarm devices will be provided throughout the building
for ADA compliant notification and signaling.
(f) Control outputs will be provided for fire safety functions, such as air handler
shut down, fire smoke damper closure and fire door release and elevator
control.
I. GENERAL
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 27 of 56
(d) Provide pre and post construction commissioning of controls from the
manufacturer to assure controls functions are per controls sequence and
energy simulation/performance.
(e) Provide Owner assistance and control usage on site tutorials. Minimum two
site visits.
(f) Low voltage wall mounted manual lighting controls will be provided at each
area surrounded by floor to ceiling walls.
(g) All areas with more than one light fixture installed or exceeds 0.5 watts per
sq. ft. will be equipped with local wall mounted Bi-level controls or continuous
dimming controls allowing the lighting to be turned off or raised and lowered
in an even fashion as desired by the occupant.
(h) In areas where effective daylight is available (primary, secondary and
skylights) and as required by code, an automatic daylighting sensor will be
integrated into the lighting control systems.
(i) In areas such as mechanical and electrical space, where local automatic
lighting controls may create a hazard by false cycling, automatic controls will
not be utilized.
(j) Lobbies, corridors and other public circulation spaces will be controlled by low
voltage relay panels equipped with an automatic integral digital astronomical
timeclock. Local timeclock override will be accomplished by low voltage “on”
only signals from wall override push button controls located conveniently to
the users at each floor, in the quadrant where the override signal will be
applied. The maximum limit of lighting controlled is that installed inside 5,000
square feet.
(k) The lighting control system will interface with the fire alarm system. Upon an
alarm signal from the fire alarm system, the lighting control system will
override the local and overall control inputs and shall turn on the lighting not
deactivated by a photocell device. Provide UL-924 devices at light fixtures on
emergency branch circuits that are controlled with the normal branch circuit
fixtures.
(l) Private offices, Staff, Lockers and Multi-purpose room shall be provided with
occupancy type sensors.
(m) Corridors shall also be provided with occupancy type sensors capable of
reducing the lighting power by at least 50% when space is unoccupied.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 129Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 30 of 56
Telecommunication spaces shall be provided with designated electrical power, with emergency
and any redundancy requirements taken into consideration. The spaces shall be equipped to
provide adequate power for the maximum design load for all equipment as well as a growth
factor of 25 percent. Separate convenience receptacles shall be provided on a minimum of two
separate walls and shall be on a separate distribution panel.
Lighting Provided in telecommunication spaces shall include 24” to 48” linear LED strips
located to the front and rear of data racks. Provide minimum 50-foot candles at 36” above
finished floor. Provide one fixture within each TR with a battery-operated ballast (or
connection to the building emergency generator, if available), locate emergency fixture
closest to the door.
Fire alarm and detection shall be provided in telecommunication spaces to meet code
requirements. Fire suppression system installation shall be performed by a licensed and/or
certified fire protection engineer to meet all code, AHJ, and client requirements. Special care
shall be taken in coordination to the layout to protect the equipment in the telecom spaces
and avoid obstruction to sprinklers and access to the alarm.
Equipment that is not directly related to the support of the room shall not be installed or pass
through the room.
Telecommunication spaces design shall include, room ceilings that shall be open to the
underside of the floor above and have a minimum clearance of nine feet, walls of the
telecommunication spaces shall extend from the floor to the bottom of deck continuously,
rooms shall include ¾” A Grade fire rated plywood wrapped around room, painted, fire-resistant
fire inspection stamp shall not be covered by paint to allow easy viewing by inspectors. Minimum
clearances shall be 3.28 feet. The rooms shall not include any exterior windows.
Door size shall be minimum 36 inches wide and 7 feet high with no window and shall be hinged
to open outward if allowed by the AHJ, in not allowed, the door shall be Located at a corner such that the
door swings into the adjacent wall, and not into the room’s open space. Access to
telecommunication rooms shall be electronically controlled. Door shall be rated the same as
walls within the telecommunications space.
III. TELECOMMUNICATIONS PATHWAYS
Backbone and Horizontal pathways shall include Cable support infrastructure including cable tray,
J-Hooks, and conduit systems. Ladder rack systems shall be used within telecom spaces. The
system shall be designed to facilitate ongoing maintenance, accommodate future MAC’s and future
growth of a minimum of 20%.
All pathways shall be installed with clearance and accessibility taken into consideration and be
sized appropriately with fill ratios of 50%. Cable trays shall not be placed within 5-inches of any
overhead light fixture and within 12-inches of any electrical ballast. Cable Tray shall be installed
in accessible ceiling areas only and shall have seismic bracing as designed by a California
licensed structural engineer.
Conduit shall be sized appropriately for cable fill ratios and used in inaccessible areas and
routed to TO’s when necessary.
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 29 of 56
The electrical work shall include all materials, labor, equipment, services and incidentals
necessary to install the electrical work complete.
END OF SECTION-6 ELECTRICAL
SECTION 7: LOW VOLTAGE ARTS BUILDING
I. GENERAL
Telecommunication structured cabling infrastructure system will include a complete system
including but not limited to telecommunication spaces, pathways, firestopping, bonding
infrastructure, and media for backbone and horizontal infrastructure. The infrastructure shall
support wired and wireless network communication including internet access and facility
network applications.
II. TELECOMMUNICATIONS SPACES
Telecommunication spaces shall meet industry design standards as set forth in the
Telecommunication Distribution Methods Manual (TDMM) 15 th Edition. Telecommunications
spaces shall provide a location for network hardware and other information, communications, and
technology systems including Interbuilding backbone, Intrabuilding backbone and horizontal structured
cabling systems, network (LAN) access switches, network routers, wireless access point controllers,
power and connectivity accessories providing services to the IT equipment, Mechanical equipment
providing services to the IT equipment, UPS and PDU units providing services to the IT equipment,
Security video and access control headend equipment, emergency radio communication enhancement
systems (ERCES), and two-way communication panel.
A Primary telecommunication room(TR) shall be provided on level one of the Arts building and be
connected to the Equipment room through interbuilding backbone and act as Intermediate
Backbone and Horizontal cross-connect distribution space. This telecom room shall be a minimum
size of 10’ X 12’. There shall be a secondary Telecom room on level two for horizontal distribution
and shall be sized a minimum of 8’ X 10’. Telecom rooms shall be centrally located within
distribution area and vertically aligned whenever possible.
TR(s) shall include 2-post equipment racks, 4-post equipment racks (if needed) and overhead
cable ladder rack system sized to ensure 40% fill ratio.
Telecommunication spaces shall be located to keep separation from elevators, pump motors,
generators, radar transmitters, induction heating devices, sources of mechanical vibration, and
other potential sources of electromagnetic interference (EMI). Telecommunication spaces shall
not have shared wall or be located below any plumbing or water pipes, including restrooms,
sinks, etc.
Telecommunication space shall maintain continuous and dedicated environmental control 24
hours a day, 365 days a year and shall maintain a positive pressure with a minimum of one
air change per hour and shall satisfy all applicable building codes. Temperature and
humidity level to the intake of telecommunication equipment shall be as recommended by
manufacturer and ASHRAE.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 130Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 32 of 56
A Primary Bonding Busbar (PBB) shall be provided in the Primary Telecom Room and Secondary
Bonding busbar (SBB’s) shall be provided in each Telecommunication room and enclosure. The PBB
shall connect to the building grounding electrode with a telecommunications Bonding Conductor
(TBC). A telecommunications bonding backbone (TBB) shall connect to all SBB’s in telecom spaces.
Where multiple telecom rooms occur on the same level, a grounding equalizer (GE) will be provided
on every third level, starting from the top floor. PBB/SBB’s shall connect to rack bonding busbar
(RBB) which shall connect to telecommunications equipment within the racks. All metal equipment
shall connect to the Telecommunications bonding infrastructure. 2 -hole compression ground lugs
shall be used.
Telecommunications bonding infrastructure shall be bonded to building steel when possible .
Bonding conductors shall be green or marked with a distinctive green color, labeled, and routed with
minimum bends or changes in direction.
Grounding conductors shall not share pathways with communications cabling.
The bonding conductors shall be calculated for a size that conforms to the guidelines set by the CEC.
Sizing of the
TBB
TBB length linear m (ft) TBB Size (AWG)
Less than 4 (13) 6
4-6 (14-20) 4
6-8 (21-26) 3
8-10 (27-33) 2
10-13 (34-41) 1
13-16 (42-52) 1/0
16-20 (53-66) 2/0
Greater than 20 (66) 3/0
VI. TELECOMMUNICATIONS INTER-BUILDING BACKBONE
Inter-building backbone shall be brought into the Primary telecom room through conduits from the
Entrance Facility located in the City Hall building and connect to a horizontal cross connect or pass
through building pathways to the level two telecom room.
VII. TELECOMMUNICATIONS INTRA-BUILDING BACKBONE
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 31 of 56
J-hooks and independent supports shall support horizontal cable in main corridor spaces and
shall be spaced no further than 48”- 60” between J-hooks and within six-inches of the conduit
stub-in. J-hooks shall be attached using pencil rod or ¼” threaded rod. Data cable shall not sag or
rest on any electrical conduit, HVAC duct, water pipes, ceiling supports or other non-cable support
systems. Do not use tie-wraps or vinyl tape to secure data cable to j-hook. Refer to
manufacturer of J-Hooks to determine quantity data cable per j-hook.
Where Pathways extend into the Telecommunication Spaces utilize a manufacturer’s radius drop
out (waterfall) to protect station cables. Where conduits drop down onto ladder rack provide plastic
spillways to prevent kinking of the installed cable bundle.
Provide horizontal sleeves to penetrate Nonrated walls that will protect cabling, which may
include bushings.
Pathways to telecommunications outlets shall include a 5” square, 2-7/8” deep back box with a single
gang ring, 1-1/4” conduit stubbed from back box into accessible space. Data outlet conduits shall
have protective bushings on all conduit stubs into accessible ceilings. If a telecommunications outlet
location has more than 4 cables, the junction box shall be finished with a double gang mud ring.
IV. TELECOMMUNICATIONS FIRESTOP REQUIREMENT
Fire rated walls shall require UL listed approved firestop assemblies. Fire stop material s shall
meet F and T-rating requirements of building and fire code. Penetrations through firewalls shall
allow cable installers to firestop around the cables after they are installed. Tray-based mechanical
firestop systems shall be used when a cable tray penetrates a fire barrier. All firestopping
installations shall be labeled in accordance with ANSI/TIA 606-C.
Provide UL rated firestop systems at each deck and fire-rated wall partition. The UL system
must maintain the rating of the deck or partition being penetrated.
V. TELECOMMUNICATIONS BONDING INFRASTRUCTURE
A telecommunications bonding infrastructure shall be provided to ensure a low impedance path
to ground for telecommunications equipment and support systems. The telecommunication
bonding infrastructure shall connect to the nearest approved building grounding electrode and
the equipment grounding system by exothermic weld by an electrical contractor. Connection
point shall be coordinated with electrical engineer.
The telecommunications Bonding infrastructure shall meet the standards as set forth by
ANSI/TIA-607-D
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 131Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 34 of 56
IX. TELECOMMUNICATION WIRELESS INFRASTRUCTURE
The wireless infrastructure will be part of the overall distribution system selected and shall include
Cat 6A cable for final connections to wireless access points that will be placed based on coverage
criteria per the manufacturer recommendations.
X. AUDIO VISUAL SYSTEMS
Audio visual systems shall be provided for the Auditorium, Dining room, senior activity room,
Gymnasium, youth activity room, Art Multi-purpose room, and Art Studio, as well as a zoned
paging/public address systems in public areas and will include Sound, video and display
systems as well as assisted listening system where required by ADA.
All AV systems shall meet the most current Americans with Disabilities Act (ADA) requirements,
including assistive listening systems, visual access, and other accommodations.
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 33 of 56
Intrabuilding Backbone cable within the Arts building shall include copper and fiber optic cable, the
backbone that will originate from the Primary Telecom room and connect to the Telecom room
located on the second level. The backbone cable will home run to each Telecom room with no
splices.
VIII. TELECOMMUNICATIONS HORIZONTAL CABLING
The horizontal cabling system shall provide connectivity to users, building IP systems and
devices, Wi-Fi devices, and other components and systems requiring IP connection. A twisted
Pair distribution -Horizontal cabling shall be 4-pair U/UTP Category 6A rated, with cable jacket
rating based on application, plenum vs riser vs outside rated. Distribution will come from the
horizontal cross-connect at the nearest Telecom space to the TO or device and cable distances
shall not exceed 295 feet, channels shall not exceed 328 feet. Consolidation points (CP’s) and
multiuser telecommunication outlet assemblies (MUTOAs) shall be considered in the distribution
to make future moves and changes easier to accommodate. See below typical horizontal
cabling system diagram from the BICSI TDMM 15th edition.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 132Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 36 of 56
The intrusion detection system shall provide protection at locations including, but not limited to:
• Perimeter – Doors and windows
• Area of space – office space and hallways as well as duress buttons at reception area
as deemed appropriate by owner.
The system shall include the following components:
• Detection sensors – Passive infrared/ultrasonic and door contacts.
• Processing and transmitting devices – Control panel and dialer
• Annunciators and sounding devices – bells, horns, and strobe lights
• Power source – Transformers and batteries
XIV. VIDEO SURVEILLANCE SYSTEM (VSS)
The Video surveillance system shall be comprised of cameras that will provide security while
maintaining reasonable expectations of privacy. The cameras shall be placed in public areas,
including lobby, hallways, offices, activity spaces, auditorium, and entrances. No cameras shall
be placed in restrooms. Cameras shall be placed in locations that monitor all entrances to the
building.
It is assumed all cameras will be owner provided and contractor installed to meet the
requirements determined in a needs assessment. The designer will determine appropriate
camera technology, camera placement, and lens selection.
Cameras can be mounted on the wall or ceiling based on the location and need of the space,
and should be mounted above 8 ft AFF to prevent tampering. Lighting shall be considered in
camera placement to ensure there is enough lighting but no interference. Mounting and housing
will be selected based on security needs and may include
• Fixed- dedicated to single view.
• Pan and tilt – controlled from a remote viewing station to allow for 180 or 360 -degree
views.
IP based video shall be used and integrate with the structured cabling system so that IP video
can be continuously transmitted to any point on the network, and video can be stored on network
servers or storage facilities as determined with owner. The IP based system will allow for the
support of any number of cameras at one time, limited only by connection speed.
XV. TWO-WAY COMMUNICATION SYSTEM- AREA OF REFUGE
Per CBC section 1009.6.5 areas of refuge shall be provided with Two -way communication system
complying with Section CBC 1009.8.1 and CBC 1009.8.2
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 35 of 56
The design of the AV system shall be based upon customer requirements as well as the
intended room function. The electronic equipment and cabling shall be consistent with industry
standards (AVIXA and BICSI) and shall meet minimum performance standards.
Sound systems shall be muted during fire alarm. The sound system shall connect to the fire
alarm system via dry contact; as acceptable to the Authority Having Jurisdiction (AHJ)/Fire
Marshal.
XI. SECURITY
The electronic security will be a system that is layered to provide protection through access
control, intrusion detection, video surveillance, and duress/lock down systems.
XII. ACCESS CONTROL SYSTEM
Access control shall be provided at select doors where access can be monitored, tracked and
controlled per the campus requirements. Card readers are required for main entries, public
entries, Telcom and building infrastructure rooms including electrical, mechanical, etc.., door to
roof, elevators, and stairwell entry to regulate and manage entry to the campus and specific
areas identified through risk assessment. This ensures that only authorized individuals, such as
staff, or approved visitors, are allowed to enter certain restricted zones. Manufacturer shall be
confirmed with owner and card readers shall be owner furnished and contractor installed. The
system shall provide the capability of being controlled remotely, allowing administrators to lock
or unlock doors with the click of a button.
The system shall provide access for disabled community and shall meet all ADA code
requirements
System shall be installed by a security vendor that is certified and approved by the manufacturer
to install and certify the access control system.
XIII. INTRUSION DETECTION AND DURESS
An intrusion detection system will be designed to provide visual, audible, and/or electronic
notification of the security problem. The system shall be comprised of three common
components:
• Sensors – shall detect the undesired or desired activity and alarm when certain preset
conditions are met.
• Sending circuit – Provides power to sensors and monitors the condition of the sensors-
monitoring can include
o Local alarm – visual or audible devices notifying anyone in the immediate area
o Central station – off-site and a contract service monitoring fire and intrusion
alarms through a contracted central station location or a fire, emergency medical
service, or police dispatch center
• Annunciator
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 133Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 38 of 56
SECTION 8: LOW VOLTAGE CITY HALL
I. GENERAL
Telecommunication structured cabling infrastructure system will include a complete system
including but not limited to telecommunication spaces, pathways, firestopping, bonding
infrastructure, and media for backbone and horizontal infrastructure. The infrastructure shall
support wired and wireless network communication including internet access and facility
network applications.
II. TELECOMMUNICATIONS SPACES
Telecommunication spaces shall meet industry design standards as set forth in the
Telecommunication Distribution Methods Manual (TDMM) 15th Edition. Telecommunications
spaces shall provide a location for network hardware and other information, communications, and
technology systems including Interbuilding backbone, Intrabuilding backbone and horizontal
structured cabling systems, network (LAN) access switches, network routers, wireless access
point controllers, power and connectivity accessories providing services to the IT equipment,
Mechanical equipment providing services to the IT equipment, UPS and PDU units providing
services to the IT equipment, Security video and access control headend equipment, emergency
radio communication enhancement systems (ERCES), and two -way communication panel.
Campus Entrance Facility (EF) (previously called MPOE) shall be provided on level one of the city
hall building and shall provide space for containing an entrance for public and private network
service media, including wireless. The space shall be sized to meet the known requirements of the
campus and main cross connect with future growth. The size of the cabling termination field (ex.
Wall-mounted cross connect terminations, size, and quantity of patch panels) is based on the
quantity of cable to be terminated which includes incoming SP cables, Protector units, Campus
cables, Building/premise EF minimum size shall be 4’ X 6’
An Equipment room (ER) shall support the main cross connect for the campus infrastructure and
be located in close proximity to the Entrance facility. The ER shall function as the main backbone
cross-connect and provide Horizontal distribution to level one of the City Hall building. The ER
shall be minimum size 12’ X 15’ to provide sufficient space for existing requirements and future
growth.
A Telecommunication room(TR) shall be provided on level two of the city hall building and be
connected to the Equipment room through intrabuilding backbone and act as Horizontal cross -
connect distribution. This telecom room shall be a minimum size of 9’ X 10’. Telecom rooms shall
be centrally located withing distribution area and vertically aligned whenever possible.
Equipment in ER and TR(s) include 2 -post equipment racks, 4-post equipment racks (if needed)
and overhead cable ladder rack system sized to ensure 40% fill ratio.
Telecommunication spaces shall be located to keep separation from elevators, pump motors,
generators, radar transmitters, induction heating devices, sources of mechanical vibration, and
other potential sources of electromagnetic interference (EMI). Telecommunication spaces shall
not have shared wall or be located below any plumbing or water pipes, including restrooms, sinks,
etc.
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 37 of 56
The system shall provide devices at the landing serving each elevator or bank of elevators and
stairways that are listed as areas of refuge on each accessible floor that is one or more stories
above or below the level of discharge.
Two -way communication systems shall provide communication between each required location
and the fire command center, or an approved control point location approved by the fire
department.
Both two-way communications systems primary and secondary power supplies along with each
two-way communications system circuit shall be monitored by the fire alarm system for failure,
open and short circuit conditions, respectively, and report such conditions as trouble alarm.
All conductors interconnecting the communications stations and two -way communications control
point(s) shall be circuit integrity -rated, cable or circuit integrity in conduit cable to meet the
requirements of NFPA 72 that pass the two -hour U.L. 2196 flame test.
XVI. EMERGENCY RESPONDER COMMUNICATIONS ENHANCEMENT SYSTEMS
(ERCES)
Public safety radio coverage infrastructure shall be in accordance with NFPA 1221 and 1225 and
sections of CFC 510.5.1 through CFC 510.5.4 per CBC section 918.1.
ERCES designer and lead installation personnel shall have minimum qualifications that include:
unless adequate skills and experience have been demonstrated and is satisfactory to the AHJ.
• Valid FCC -issued general radio operator’s license
• Certification of in-building system training issued by an approved organization or school.
• Certificate issued by the manufacturer of the equipment being installed.
ERCES vendor shall provide full design for review by local agency prior to installation, make any
corrections as needed. Resubmit design to local agency for approval prior to work starting.
System shall include pathways, rated cable, connectors, splitters, donor antennas, indoor antennas,
BDA, power supplies, batteries, interface with fire alarm system and monitoring panel which
monitors the following conditions:
• AC Input normal.
• Loss of normal AC power.
• Battery charger failure.
• Loss of battery.
• Active RF emitting device malfunction.
• Donor antenna disconnection.
• Donor antenna malfunction.
ERCES testing shall comply with CFC 510.5.4. All ERCES system installation and components
shall comply with all applicable federal regulations including but not limited to, FCC 47 CFR Part
90.219.
END OF SECTION-7 LOW VOLTAGE ARTS BUILDING
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 134Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 40 of 56
All pathways shall be installed with clearance and accessibility taken into consideration and be
sized appropriately with fill ratios of 50%. Cable trays shall not be placed within 5 -inches of any
overhead light fixture and within 12 -inches of any electrical ballast. Cable Tray shall be installed in
accessible ceiling areas only and shall have seismic bracing as designed by a California licensed
structural engineer.
Conduit shall be sized appropriately for cable fill ratios and used in inaccessible areas and routed
to TO’s when necessary.
J-hooks and independent supports shall support horizontal cable in main corridor spaces and shall
be spaced no further than 48”- 60” between J-hooks and within six-inches of the conduit stub-in. J-
hooks shall be attached using pencil rod or ¼” threaded rod. Data cable shall not sag or rest on
any electrical conduit, HVAC duct, water pipes, ceiling supports or other non -cable support
systems. Do not use tie-wraps or vinyl tape to secure data cable to j -hook. Refer to manufacturer
of J-Hooks to determine quantity data cable per j -hook.
Where Pathways extend into the Telecommunication Spaces utilize a manufacturer’s radius drop
out (waterfall) to protect station cables. Where conduits drop down onto ladder rack provide plastic
spillways to prevent kinking of the installed cable bundle.
Provide horizontal sleeves to penetrate Nonrated walls that will protect cabling, which may include
bushings.
Pathways to telecommunications outlets shall include a 5” square, 2 -7/8” deep back box with a
single gang ring, 1-1/4” conduit stubbed from back box into accessible space. Data outlet conduits
shall have protective bushings on all conduit stubs into accessible ceilings. If a
telecommunications outlet location has more than 4 cables, the junction box shall be finished with
a double gang mud ring.
IV. TELECOMMUNICATIONS FIRESTOP REQUIREMENT
Fire rated walls shall require UL listed approved firestop assemblies. Fire stop material s shall
meet F and T-rating requirements of building and fire code. Penetrations through firewalls shall
allow cable installers to firestop around the cables after they are installed. Tray-based mechanical
firestop systems shall be used when a cable tray penetrates a fire barrier. All firestopping
installations shall be labeled in accordance with ANSI/TIA 606-C.
Provide UL rated firestop systems at each deck and fire-rated wall partition. The UL system
must maintain the rating of the deck or partition being penetrated.
V. TELECOMMUNICATIONS BONDING INFRASTRUCTURE
A telecommunications bonding infrastructure shall be provided to ensure a low impedance path
to ground for telecommunications equipment and support systems. The telecommunication
bonding infrastructure shall connect to the nearest approved building grounding electrode and
the equipment grounding system by exothermic weld by an electrical contractor. Connection
point shall be coordinated with electrical engineer.
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 39 of 56
Telecommunication space shall maintain continuous and dedicated environmental control 24
hours a day, 365 days a year and shall maintain a positive pressure with a minimum of one air
change per hour and shall satisfy all applicable building codes. Temperature and humidity level to
the intake of telecommunication equipment shall be as recommended by manufacturer and
ASHRAE.
Telecommunication spaces shall be provided with designated electrical power, with emergency
and any redundancy requirements taken into consideration. The spaces shall be equipped to
provide adequate power for the maximum design load for all equipment as well as a growth factor
of 25 percent. Separate convenience receptacles shall be provided on a minimum of two separate
walls and shall be on a separate distribution panel.
Lighting Provided in telecommunication spaces shall include 24” to 48” linear LED strips located to
the front and rear of data racks. Provide minimum 50 -foot candles at 36” above finished floor.
Provide one fixture within each TR with a battery-operated ballast (or connection to the building
emergency generator, if available), locate emergency fixture closest to the door.
Fire alarm and detection shall be provided in telecommunication spaces to meet code
requirements. Fire suppression system installation shall be performed by a licensed and/or
certified fire protection engineer to meet all code, AHJ, and client requirements. Special care shall
be taken in coordination to the layout to protect the equipment in the telecom spaces and avoid
obstruction to sprinklers and access to the alarm.
Equipment that is not directly related to the support of the room shall not be installed or pass
through the room.
Telecommunication spaces design shall include, room ceilings that shall be open to the underside
of the floor above and have a minimum clearance of nine feet, walls of the telecommunication
spaces shall extend from the floor to the bottom of deck continuously, rooms shall include ¾” A
Grade fire rated plywood wrapped around room, painted, fire -resistant fire inspection stamp shall
not be covered by paint to allow easy viewing by inspectors. Minimum clearances shall be 3.28
feet. The rooms shall not include any exterior windows.
Door size shall be minimum 36 inches wide and 7 feet high with no window and shall be hinged to
open outward if allowed by the AHJ, in not allowed, the door shall be Located at a corner such that
the door swings into the adjacent wall, and not into the room’s open space. Access to
telecommunication rooms shall be electronically controlled. Door shall be rated the same as walls
within the telecommunications space.
III. TELECOMMUNICATIONS PATHWAYS
Backbone and Horizontal pathways shall include Cable support infrastructure including cable tray,
J-Hooks, and conduit systems. Ladder rack systems shall be used within telecom spaces. The
system shall be designed to facilitate ongoing maintenance, accommodate future MAC’s and
future growth of a minimum of 20%.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 135Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 42 of 56
The Entrance facility shall receive both a copper and fiber optic cable Backbone that will originate
from the Service provider vault, the service provider shall be responsible for the cable up to the
demarcation point. The backbone cable will connect at the City Hall Equipment room for main cross
connect and home run from the EF to the recreation building and the art buildings primary Telecom
rooms with no splices. Fiber optic and copper backbone cable shall terminate onto a rack mounted
termination hardware.
Fiber optic housing shall be rack mounted and sized to accommodate single and multi -mode fiber
optic cable. fiber optic panels shall be LC type couplers. Coordinate with current approved connector
types.
Shall install building entrance protectors (BEP) at origination point and destination. Include all solid -
state fuses. BEP shall be sized to accommodate incoming copper cable.
VII. TELECOMMUNICATIONS INTRA-BUILDING BACKBONE
Intrabuilding Backbone cable within the City Hall building shall include copper and fiber optic cable,
the backbone that will originate from the Equipment room and connect to the Telecom room located
on the second level. The backbone cable will home run from the Equipment Room to each Telecom
room with no splices.
VIII. TELECOMMUNICATIONS HORIZONTAL CABLING
The horizontal cabling system shall provide connectivity to users, building IP systems and devices,
Wi-Fi devices, and other components and systems requiring IP connection. A twisted Pair distribution
-Horizontal cabling shall be 4-pair U/UTP Category 6A rated, with cable jacket rating based on
application, plenum vs riser vs outside rated. Distribution will come from the horizontal cross -connect
at the nearest Telecom space to the TO or device and cable distances shall not exceed 295 feet,
channels shall not exceed 328 feet. Consolidation points (CP’s) and multiuser telecommunication
outlet assemblies (MUTOAs) shall be considered in the distribution to make future moves and
changes easier to accommodate. See below typical horizontal cabling system diagram from the
BICSI TDMM 15th edition.
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 41 of 56
The telecommunications Bonding infrastructure shall meet the standards as set forth by
ANSI/TIA-607-D
A Primary Bonding Busbar (PBB) shall be provided in the Entrance Facility and Secondary Bonding
busbar (SBB’s) shall be provided in each Telecommunication room and enclosure. The PBB shall
connect to the building grounding electrode with a telecommunications Bonding Conductor (TBC). A
telecommunications bonding backbone (TBB) shall connect to all SBB’s in telecom spaces. Where
multiple telecom rooms occur on the same level, a grounding equalizer (GE) will be provided on
every third level, starting from the top floor. PBB/SBB’s shall connect to rack bonding busbar (RBB)
which shall connect to telecommunications equipment within the racks. All metal equipment shall
connect to the Telecommunications bonding infrastructure. 2 -hole compression ground lugs shall be
used.
Telecommunications bonding infrastructure shall be bonded to building steel when possible .
Bonding conductors shall be green or marked with a distinctive green color, labeled, and routed with
minimum bends or changes in direction.
Grounding conductors shall not share pathways with communications cabling.
The bonding conductors shall be calculated for a size that conforms to the guidelines set by the CEC.
Sizing of the
TBB
TBB length linear m (ft) TBB Size (AWG)
Less than 4 (13) 6
4-6 (14-20) 4
6-8 (21-26) 3
8-10 (27-33) 2
10-13 (34-41) 1
13-16 (42-52) 1/0
16-20 (53-66) 2/0
Greater than 20 (66) 3/0
VI. TELECOMMUNICATIONS INTER-BUILDING BACKBONE
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 136Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 44 of 56
X. AUDIO VISUAL SYSTEMS
Audio visual systems shall be provided for the council chambers, lobby and program spaces as well
as a zoned paging/public address systems in public areas and will include Sound, video and display
systems as well as assisted listening system where required by ADA.
All AV systems shall meet the most current Americans with Disabilities Act (ADA) requirements,
including assistive listening systems, visual access, and other accommodations.
The design of the AV system shall be based upon customer requirements as well as the intended
room function. The electronic equipment and cabling shall be consistent with industry standards
(AVIXA and BICSI) and shall meet minimum performance standards.
Sound systems shall be muted during fire alarm. The sound system shall connect to the fire alarm
system via dry contact; as acceptable to the Authority Having Jurisdiction (AHJ)/Fire Marshal.
XI. SECURITY
The electronic security will be a system that is layered to provide protection through access control,
intrusion detection, video surveillance, and duress/lock down systems.
XII. ACCESS CONTROL SYSTEM
Access control shall be provided at select doors where access can be monitored, tracked and
controlled per the campus requirements. Card readers are required for main entries, public entries,
Telcom and building infrastructure rooms including electrical, mechanical, etc.., door to roof,
elevators, and stairwell entry to regulate and manage entry to the campus and specific areas
identified through risk assessment. This ensures that only authorized individuals, such as students,
staff, or approved visitors, are allowed to enter certain restricted zones. Manufacturer shall be
confirmed with owner and card readers shall be owner furnished and contractor installed. The system
shall provide the capability of being controlled remotely, allowing administrators to lock or unlock
doors with the click of a button.
The system shall provide access for disabled community and shall meet all ADA code requirements
System shall be installed by a security vendor that is certified and approved by the manufacturer to
install and certify the access control system.
XIII. INTRUSION DETECTION AND DURESS
An intrusion detection system will be designed to provide visual, audible, and/or electronic notification
of the security problem. The system shall be comprised of three common components:
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 43 of 56
IX. TELECOMMUNICATION WIRELESS INFRASTRUCTURE
The wireless infrastructure will be part of the overall distribution system selected and shall include
Cat 6A cable for final connections to wireless access points that will be placed based on coverage
criteria per the manufacturer recommendations.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 137Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 46 of 56
IP based video shall be used and integrate with the structured cabling system so that IP video can be
continuously transmitted to any point on the network, and video can be stored on network servers or
storage facilities as determined with owner. The IP based system will allow for the support of any
number of cameras at one time, limited only by connection speed.
XV. TWO-WAY COMMUNICATION SYSTEM- AREA OF REFUGE
Per CBC section 1009.6.5 areas of refuge shall be provided with Two -way communication system
complying with Section CBC 1009.8.1 and CBC 1009.8.2
The system shall provide devices at the landing serving each elevator or bank of elevators and
stairways that are listed as areas of refuge on each accessible floor that is one or more stories above
or below the level of discharge.
Two -way communication systems shall provide communication between each required location and
the fire command center, or an approved control point location approved by the fire department.
Both two-way communications systems primary and secondary power supplies along with each two -
way communications system circuit shall be monitored by the fire alarm system for failure, open and
short circuit conditions, respectively, and report such conditions as trouble alarm.
All conductors interconnecting the communications stations and two -way communications control
point(s) shall be circuit integrity-rated, cable or circuit integrity in conduit cable to meet the
requirements of NFPA 72 that pass the two -hour U.L. 2196 flame test.
XVI. EMERGENCY RESPONDER COMMUNICATIONS ENHANCEMENT SYSTEMS
(ERCES)
Public safety radio coverage infrastructure shall be in accordance with NFPA 1221 and 1225 and
sections of CFC 510.5.1 through CFC 510.5.4 per CBC section 918.1.
ERCES designer and lead installation personnel shall have minimum qualifications that include:
unless adequate skills and experience have been demonstrated and is satisfactory to the AHJ.
• Valid FCC-issued general radio operator’s license
• Certification of in-building system training issued by an approved organization or school.
• Certificate issued by the manufacturer of the equipment being installed.
ERCES vendor shall provide full design for review by local agency prior to installation, make any
corrections as needed. Resubmit design to local agency for approval prior to work starting.
System shall include pathways, rated cable, connectors, splitters, donor antennas, indoor antennas,
BDA, power supplies, batteries, interface with fire alarm system and monitoring panel which monitors
the following conditions:
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 45 of 56
• Sensors – shall detect the undesired or desired activity and alarm when certain preset
conditions are met.
• Sending circuit – Provides power to sensors and monitors the condition of the sensors-
monitoring can include
o Local alarm – visual or audible devices notifying anyone in the immediate area
o Central station – off-site and a contract service monitoring fire and intrusion
alarms through a contracted central station location or a fire, emergency medical
service, or police dispatch center
• Annunciator
The intrusion detection system shall provide protection at locations including, but not limited to:
• Perimeter – Doors and windows
• Area of space – office space and hallways as well as duress buttons at reception area
as deemed appropriate by owner.
The system shall include the following components:
• Detection sensors – Passive infrared/ultrasonic and door contacts.
• Processing and transmitting devices – Control panel and dialer
• Annunciators and sounding devices – bells, horns, and strobe lights
• Power source – Transformers and batteries
XIV. VIDEO SURVEILLANCE SYSTEM (VSS)
The Video surveillance system shall be comprised of cameras that will provide security while
maintaining reasonable expectations of privacy. The cameras shall be placed in public areas,
including lobby, hallways, offices, and entrances. No cameras shall be placed in restrooms. Cameras
shall be placed in locations that monitor all entrances to the building.
It is assumed all cameras will be owner provided and contractor installed to meet the requirements
determined in a needs assessment. The designer will determine appropriate camera technology,
camera placement, and lens selection.
Cameras can be mounted on the wall or ceiling based on the location and need of the space, and
should be mounted above 8 ft AFF to prevent tampering. Lighting shall be considered in camera
placement to ensure there is enough lighting but no interference. Mounting and housing will be
selected based on security needs and may include
• Fixed- dedicated to single view
• Pan and tilt – controlled from a remote viewing station to allow for 180 or 360-degree
views.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 138Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 48 of 56
A Primary telecommunication room (TR) shall be provided on level one of the Recreation building
and be connected to the Equipment room through interbuilding backbone and act as Intermediate
Backbone and Horizontal cross-connect distribution space. This telecom room shall be a minimum
size of 10’ X 12’. There shall be a secondary Telecom room on level two for horizontal distribution
and shall be sized a minimum of 8’ X 10’. Telecom rooms shall be centrally located within
distribution area and vertically aligned whenever possible.
TR(s) shall include 2-post equipment racks, 4-post equipment racks (if needed) and overhead
cable ladder rack system sized to ensure 40% fill ratio.
Telecommunication spaces shall be located to keep separation from elevators, pump motors,
generators, radar transmitters, induction heating devices, sources of mechanical vibration, and
other potential sources of electromagnetic interference (EMI). Telecommunication spaces shall
not have shared wall or be located below any plumbing or water pipes, including restrooms,
sinks, etc.
Telecommunication space shall maintain continuous and dedicated environmental control 24
hours a day, 365 days a year and shall maintain a positive pressure with a minimum of one
air change per hour and shall satisfy all applicable building codes. Temperature and
humidity level to the intake of telecommunication equipment shall be as recommended by
manufacturer and ASHRAE.
Telecommunication spaces shall be provided with designated electrical power, with emergency
and any redundancy requirements taken into consideration. The spaces shall be equipped to
provide adequate power for the maximum design load for all equipment as well as a growth
factor of 25 percent. Separate convenience receptacles shall be provided on a minimum of two
separate walls and shall be on a separate distribution panel.
Lighting Provided in telecommunication spaces shall include 24” to 48” linear LED strips
located to the front and rear of data racks. Provide minimum 50-foot candles at 36” above
finished floor. Provide one fixture within each TR with a battery-operated ballast (or
connection to the building emergency generator, if available), locate emergency fixture
closest to the door.
Fire alarm and detection shall be provided in telecommunication spaces to meet code
requirements. Fire suppression system installation shall be performed by a licensed and/or
certified fire protection engineer to meet all code, AHJ, and client requirements. Special care
shall be taken in coordination to the layout to protect the equipment in the telecom spaces
and avoid obstruction to sprinklers and access to the alarm.
Equipment that is not directly related to the support of the room shall not be installed or pass
through the room.
Telecommunication spaces design shall include, room ceilings that shall be open to the
underside of the floor above and have a minimum clearance of nine feet, walls of the
telecommunication spaces shall extend from the floor to the bottom of deck continuously,
rooms shall include ¾” A Grade fire rated plywood wrapped around room, painted, fire-resistant
fire inspection stamp shall not be covered by paint to allow easy viewing by inspectors. Minimum
clearances shall be 3.28 feet. The rooms shall not include any exterior windows.
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 47 of 56
• AC Input normal.
• Loss of normal AC power.
• Battery charger failure.
• Loss of battery.
• Active RF emitting device malfunction.
• Donor antenna disconnection.
• Donor antenna malfunction.
ERCES testing shall comply with CFC 510.5.4. All ERCES system installation and components shall
comply with all applicable federal regulations including but not limited to, FCC 47 CFR Part 90.219.
XVII. RADIO TOWER
The existing radio tower shall remain operational without interruption through demolition of the city
hall annex and relocation to the police station. It is recommended that a new tower be provided to
meet current FCC and information, communication and technology standards and shall be designed
and installed by a qualified Radio Frequency Engineer.
END OF SECTION-8 LOW VOLTAGE CITY HALL
SECTION 9: LOW VOLTAGE RECREATION BUILDING
I. GENERAL
Telecommunication structured cabling infrastructure system will include a complete system
including but not limited to telecommunication spaces, pathways, firestopping, bonding
infrastructure, and media for backbone and horizontal infrastructure. The infrastructure shall
support wired and wireless network communication including internet access and facility
network applications.
II. TELECOMMUNICATIONS SPACES
Telecommunication spaces shall meet industry design standards as set forth in the
Telecommunication Distribution Methods Manual (TDMM) 15 th Edition. Telecommunications
spaces shall provide a location for network hardware and other information, communications, and
technology systems including Interbuilding backbone, Intrabuilding backbone and horizontal structured
cabling systems, network (LAN) access switches, network routers, wireless access point controllers,
power and connectivity accessories providing services to the IT equipment, Mechanical equipment
providing services to the IT equipment, UPS and PDU units providing services to the IT equipment,
Security video and access control headend equipment, emergency radio communication enhancement
systems (ERCES), and two-way communication panel.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 139Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 50 of 56
Provide UL rated firestop systems at each deck and fire-rated wall partition. The UL system
must maintain the rating of the deck or partition being penetrated.
V. TELECOMMUNICATIONS BONDING INFRASTRUCTURE
A telecommunications bonding infrastructure shall be provided to ensure a low impedance path
to ground for telecommunications equipment and support systems. The telecommunication
bonding infrastructure shall connect to the nearest approved building grounding electrode and
the equipment grounding system by exothermic weld by an electrical contractor. Connection
point shall be coordinated with electrical engineer.
The telecommunications Bonding infrastructure shall meet the standards as set forth by
ANSI/TIA-607-D
A Primary Bonding Busbar (PBB) shall be provided in the Primary Telecom Room and Secondary
Bonding busbar (SBB’s) shall be provided in each Telecommunication room and enclosure. The PBB
shall connect to the building grounding electrode with a telecommunications Bonding Conductor
(TBC). A telecommunications bonding backbone (TBB) shall connect to all SBB’s in telecom spaces.
Where multiple telecom rooms occur on the same level, a grounding equalizer (GE) will be provided
on every third level, starting from the top floor. PBB/SBB’s shall connect to rack bonding busbar
(RBB) which shall connect to telecommunications equipment within the racks. All metal equipment
shall connect to the Telecommunications bonding infrastructure. 2 -hole compression ground lugs
shall be used.
Telecommunications bonding infrastructure shall be bonded to building steel when possible .
Bonding conductors shall be green or marked with a distinctive green color, labeled, and routed with
minimum bends or changes in direction.
Grounding conductors shall not share pathways with communications cabling.
The bonding conductors shall be calculated for a size that conforms to the guidelines set by the CEC.
Sizing of the
TBB
TBB length linear m (ft) TBB Size (AWG)
Less than 4 (13) 6
4-6 (14-20) 4
6-8 (21-26) 3
8-10 (27-33) 2
10-13 (34-41) 1
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 49 of 56
Door size shall be minimum 36 inches wide and 7 feet high with no window and shall be hinged
to open outward if allowed by the AHJ, in not allowed, the door shall be Located at a corner such that the
door swings into the adjacent wall, and not into the room’s open space. Access to
telecommunication rooms shall be electronically controlled. Door shall be rated the same as
walls within the telecommunications space.
III. TELECOMMUNICATIONS PATHWAYS
Backbone and Horizontal pathways shall include Cable support infrastructure including cable tray,
J-Hooks, and conduit systems. Ladder rack systems shall be used within telecom spaces. The
system shall be designed to facilitate ongoing maintenance, accommodate future MAC’s and future
growth of a minimum of 20%.
All pathways shall be installed with clearance and accessibility taken into consideration and be
sized appropriately with fill ratios of 50%. Cable trays shall not be placed within 5-inches of any
overhead light fixture and within 12-inches of any electrical ballast. Cable Tray shall be installed
in accessible ceiling areas only and shall have seismic bracing as designed by a California
licensed structural engineer.
Conduit shall be sized appropriately for cable fill ratios and used in inaccessible areas and
routed to TO’s when necessary.
J-hooks and independent supports shall support horizontal cable in main corridor spaces and
shall be spaced no further than 48”- 60” between J-hooks and within six-inches of the conduit
stub-in. J-hooks shall be attached using pencil rod or ¼” threaded rod. Data cable shall not sag or
rest on any electrical conduit, HVAC duct, water pipes, ceiling supports or other non-cable support
systems. Do not use tie-wraps or vinyl tape to secure data cable to j-hook. Refer to
manufacturer of J-Hooks to determine quantity data cable per j-hook.
Where Pathways extend into the Telecommunication Spaces utilize a manufacturer’s radius drop
out (waterfall) to protect station cables. Where conduits drop down onto ladder rack provide plastic
spillways to prevent kinking of the installed cable bundle.
Provide horizontal sleeves to penetrate Nonrated walls that will protect cabling, which may
include bushings.
Pathways to telecommunications outlets shall include a 5” square, 2-7/8” deep back box with a single
gang ring, 1-1/4” conduit stubbed from back box into accessible space. Data outlet conduits shall
have protective bushings on all conduit stubs into accessible ceilings. If a telecommunications outlet
location has more than 4 cables, the junction box shall be finished with a double gang mud ring.
IV. TELECOMMUNICATIONS FIRESTOP REQUIREMENT
Fire rated walls shall require UL listed approved firestop assemblies. Fire stop material s shall
meet F and T-rating requirements of building and fire code. Penetrations through firewalls shall
allow cable installers to firestop around the cables after they are installed. Tray-based mechanical
firestop systems shall be used when a cable tray penetrates a fire barrier. All firestopping
installations shall be labeled in accordance with ANSI/TIA 606-C.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 140Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 52 of 56
IX. TELECOMMUNICATION WIRELESS INFRASTRUCTURE
The wireless infrastructure will be part of the overall distribution system selected and shall include
Cat 6A cable for final connections to wireless access points that will be placed based on coverage
criteria per the manufacturer recommendations.
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 51 of 56
13-16 (42-52) 1/0
16-20 (53-66) 2/0
Greater than 20 (66) 3/0
VI. TELECOMMUNICATIONS INTER-BUILDING BACKBONE
Inter-building backbone shall be brought into the Primary telecom room through conduits from the
Entrance Facility located in the City Hall building and connect to a horizontal cross connect or pass
through building pathways to the level two telecom room.
VII. TELECOMMUNICATIONS INTRA-BUILDING BACKBONE
Intrabuilding Backbone cable within the Recreation building shall include copper and fiber optic cable,
the backbone that will originate from the Primary Telecom room and connect to the Telecom room
located on the second level. The backbone cable will home run to each Telecom room with no
splices.
VIII. TELECOMMUNICATIONS HORIZONTAL CABLING
The horizontal cabling system shall provide connectivity to users, building IP systems and
devices, Wi-Fi devices, and other components and systems requiring IP connection. A twisted
Pair distribution -Horizontal cabling shall be 4-pair U/UTP Category 6A rated, with cable jacket
rating based on application, plenum vs riser vs outside rated. Distribution will come from the
horizontal cross-connect at the nearest Telecom space to the TO or device and cable distances
shall not exceed 295 feet, channels shall not exceed 328 feet. Consolidation points (CP’s) and
multiuser telecommunication outlet assemblies (MUTOAs) shall be considered in the distribution
to make future moves and changes easier to accommodate. See below typical horizontal
cabling system diagram from the BICSI TDMM 15th edition.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 141Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 54 of 56
An intrusion detection system will be designed to provide visual, audible, and/or electronic
notification of the security problem. The system shall be comprised of three common
components:
• Sensors – shall detect the undesired or desired activity and alarm when certain preset
conditions are met.
• Sending circuit – Provides power to sensors and monitors the condition of the sensors-
monitoring can include
o Local alarm – visual or audible devices notifying anyone in the immediate area
o Central station – off -site and a contract service monitoring fire and intrusion
alarms through a contracted central station location or a fire, emergency medical
service, or police dispatch center
• Annunciator
The intrusion detection system shall provide protection at locations including, but not limited to:
• Perimeter – Doors and windows
• Area of space – office space and hallways as well as duress buttons at reception area
as deemed appropriate by owner.
The system shall include the following components:
• Detection sensors – Passive infrared/ultrasonic and door contacts.
• Processing and transmitting devices – Control panel and dialer
• Annunciators and sounding devices – bells, horns, and strobe lights
• Power source – Transformers and batteries
XIV. VIDEO SURVEILLANCE SYSTEM (VSS)
The Video surveillance system shall be comprised of cameras that will provide security while
maintaining reasonable expectations of privacy. The cameras shall be placed in public areas,
including lobby, hallways, offices, activity spaces, auditorium, and entrances. No cameras shall
be placed in restrooms. Cameras shall be placed in locations that monitor all entrances to the
building.
It is assumed all cameras will be owner provided and contractor installed to meet the
requirements determined in a needs assessment. The designer will determine appropriate
camera technology, camera placement, and lens selection.
Cameras can be mounted on the wall or ceiling based on the location and need of the space,
and should be mounted above 8 ft AFF to prevent tampering. Lighting shall be considered in
camera placement to ensure there is enough lighting but no interference. Mounting and housing
will be selected based on security needs and may include
• Fixed- dedicated to single view
• Pan and tilt – controlled from a remote viewing station to allow for 180 or 360 -degree
views.
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 53 of 56
X. AUDIO VISUAL SYSTEMS
Audio visual systems shall be provided for the flex rooms, gymnasium, fitness rooms,
conference room and pool area, as well as a zoned paging/public address systems in public
areas and will include Sound, video and display systems as well as assisted listening system
where required by ADA.
All AV systems shall meet the most current Americans with Disabilities Act (ADA) requirements,
including assistive listening systems, visual access, and other accommodations.
The design of the AV system shall be based upon customer requirements as well as the
intended room function. The electronic equipment and cabling shall be consistent with industry
standards (AVIXA and BICSI) and shall meet minimum performance standards.
Sound systems shall be muted during fire alarm. The sound system shall connect to the fire
alarm system via dry contact; as acceptable to the Authority Having Jurisdiction (AHJ)/Fire
Marshal.
XI. SECURITY
The electronic security will be a system that is layered to provide protection through access
control, intrusion detection, video surveillance, and duress/lock down systems.
XII. ACCESS CONTROL SYSTEM
Access control shall be provided at select doors where access can be monitored, tracked and
controlled per the campus requirements. Card readers are required for main entries, public
entries, Telcom and building infrastructure rooms including electrical, mechanical, etc.., door to
roof, elevators, and stairwell entry to regulate and manage entry to the campus and specific
areas identified through risk assessment. This ensures that only authorized individuals, such as
staff, or approved visitors, are allowed to enter certain restricted zones. Manufacturer shall be
confirmed with owner and card readers shall be owner furnished and contractor installed. The
system shall provide the capability of being controlled remotely, allowing administrators to lock
or unlock doors with the click of a button.
The system shall provide access for disabled community and shall meet all ADA code
requirements
System shall be installed by a security vendor that is certified and approved by the
manufacturer to install and certify the access control system.
XIII. INTRUSION DETECTION AND DURESS
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 142Gilroy Civic Center Master Plan
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 56 of 56
• Donor antenna disconnection.
• Donor antenna malfunction.
ERCES testing shall comply with CFC 510.5.4. All ERCES system installation and components
shall comply with all applicable federal regulations including but not limited to, FCC 47 CFR Part
90.219.
END OF SECTION-9 LOW VOLTAGE RECREATION BUILDING
Mechanical, Electrical, and Plumbing Narrative
Gilroy Civic Center Master Plan
Page 55 of 56
IP based video shall be used and integrate with the structured cabling system so that IP video
can be continuously transmitted to any point on the network, and video can be stored on
network servers or storage facilities as determined with owner. The IP based system will allow
for the support of any number of cameras at one time, limited only by connection speed.
XV. TWO-WAY COMMUNICATION SYSTEM- AREA OF REFUGE
Per CBC section 1009.6.5 areas of refuge shall be provided with Two-way communication
system complying with Section CBC 1009.8.1 and CBC 1009.8.2
The system shall provide devices at the landing serving each elevator or bank of elevators and
stairways that are listed as areas of refuge on each accessible floor that is one or more stories
above or below the level of discharge.
Two -way communication systems shall provide communication between each required location
and the fire command center, or an approved control point location approved by the fire
department.
Both two-way communications systems primary and secondary power supplies along with each
two-way communications system circuit shall be monitored by the fire alarm system for failure,
open and short circuit conditions, respectively, and report such conditions as trouble alarm.
All conductors interconnecting the communications stations and two-way communications
control point(s) shall be circuit integrity-rated, cable or circuit integrity in conduit cable to meet
the requirements of NFPA 72 that pass the two-hour U.L. 2196 flame test.
XVI. EMERGENCY RESPONDER COMMUNICATIONS ENHANCEMENT SYSTEMS
(ERCES)
Public safety radio coverage infrastructure shall be in accordance with NFPA 1221 and 1225
and sections of CFC 510.5.1 through CFC 510.5.4 per CBC section 918.1.
ERCES designer and lead installation personnel shall have minimum qualifications that include:
unless adequate skills and experience have been demonstrated and is satisfactory to the AHJ.
• Valid FCC -issued general radio operator’s license
• Certification of in-building system training issued by an approved organization or school.
• Certificate issued by the manufacturer of the equipment being installed.
ERCES vendor shall provide full design for review by local agency prior to installation, make any
corrections as needed. Resubmit design to local agency for approval prior to work starting.
System shall include pathways, rated cable, connectors, splitters, donor antennas, indoor antennas,
BDA, power supplies, batteries, interface with fire alarm system and monitoring panel which
monitors the following conditions:
• AC Input normal.
• Loss of normal AC power.
• Battery charger failure.
• Loss of battery.
• Active RF emitting device malfunction.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 143Gilroy Civic Center Master Plan
сҞ Gilroy Civic Center Sustainability
o #$)").*'-*)/-*'–$)'0$)"/- ./*'*&.0)
o /0-'1 )/$'/$*)/#-*0"#*+ -' *+ )$)".)$)*-+*-/ ./&1 )/$'/$*)
/ #)$,0 .—0.$)"/'' -+-/.*!/# 0$'$)"/* )#) $-!'*2)- (*1 #*/$-ѵ
• /$'$5 .*'-*)0$'$)".Ѹ+*..$'4$)/ "-/ ..# ./-0/0- .!*-/# 0$'$)"*-+-&$)"
- .
• ' /-$ #$' #-"$)"+*2 - 4.*'-
• (+'*4 3/- ( '4 !!$$ )/( #)$'.4./ (./*#)' /# - ($)$)"'*.$)'0$)"ѷ
o /0-'1 )/$'/$*)2# - ! .$' ѵ
o $3 (* 1 )/$'/$*)2# - ! .$' ѵ
o . *!$.+' ( )/1 )/$'/$*)2$/# ./-/$!$/$*)!).$).+ .2$/##$"# $'$)".ѵ
o . *!/-).! -$-!-*(' )/*$-/4.+ !*-$/$*)'(& 0+$-ѵ
o 3$($5 *)*($5 -#*0-.ѵ
o -*1$ ) -"4- *1 -4ѵ
Water
• /$'$5 - 4' 2/ -!*-$--$"/$*))/*$' /!'0.#$)"Ѹ$/2.)*/ /# $/4*!$'-*4#. ../*
- 4' 2/ -
• . -*0"#/Ҋ/*' -)/+')/$)") !!$$ )/$--$"/$*)
• )" ./*-(2/ -*)Ҋ.$/ /#-*0"#1$.$' ').+ ./-/ "$ .''*2$)"1$.$/*-./*. /#
*)) /$*) /2 )/# .$"))- .+*).$' 0. *!2/ -
Site Access, Public Health and Comfort
• *)) /2$/#/# 3$./$)"$/4"-$)- / . ). *!--$1'/$/4 ''
• -$*-$/$5 + ./-$).! /4).$/ *)) /$1$/4
• 0++*-/$)'0.$1 ../*0$'$)".).$/ ( )$/$ .
• -*1$ .# )*(!*-/' *0/**-.+ .
• . )/0-'4'$"#/)1 )/$'/$*)2# - ! .$'
• $)$($5 3$./$)"#-.+ !-*(+-&$)")*-$ )/0$'$)"./*) 2+-&.+
• .$")+0'$- .!*-*((0)$/4!0)/$*).Ѷ.0#.!-( -.(-& /.
• .$")0$'$)".4./ (.2$/# !$'/ -#*0.$)"$..0$/' !*--*)!$'/ -.!*-$/$*)'
+-*/ /$*)0-$)"2$'!$- ҝ.(*& 1 )/.
Materials and Resources
• -$*-$/$5 /# 0. *!'*2-*)(/ -$'./*'*2 -/# (*$ -*)!**/+-$)/
o ../$( -*)./-0/$*)
o
*2-*)*)- /
o $*. (/ -$'.җ ѵ"ѵ./-2$).0'/$*)Ҙ
•
)*-+*-/ *)./-0/$*))(/ -$'.'1" ./-/ "$ ./*- 0. 3$./$)"0$'$)"(/ -$'.
*).$/ *-$1 -//# (!-*(')!$''Ѷ- 0$)"2./ ) (*$ -*)ѵ
• . '*2Ҋ ($//$)")0-' (/ -$'.
рҞ Gilroy Civic Center Sustainability
цҝсфҝспсф
-#$/ /0-
-$"#/2*-&.0./$)$'$/4
$/4*!$'-*4
$'-*4$1$ )/ -0./$)$'$/4--/$1
-$"#/2*-&.0./$)$'$/4*''*-/ 2$/#
)/# -* - .$")/ (/*-!/' -
sustainability narrative for the City of Gilroy Civic Center, rooted in the City’s climate commitments and the
.0./$)$'$/4+-$*-$/$ .$ )/$!$ 0-$)" -'4 .$")ѵ
)+-'' 'Ѷ-$"#/2*-&. 1 '*+
-/$!$/$*)++-*#Ѷ$)'0$)"-!/.*- -./-" /$)"
'/$)0(!*-/# $1$ )/ -0$'$)".ѵ
*" /# -Ѷ/# . '$1 -' .2$''# '+/# $/4' -'4)*).$./ )/'4*((0)$/ $/.+-*% /"*'..$/
+0-.0 .!0)$)"*++*-/0)$/$ .)+- +- .!*-+0'$ )"" ( )/)++-*1'.ѵ
$'-*4$1$ )/ -0./$)$'$/4--/$1
0-+*.
#$.)--/$1 *0/'$) ./# .0./$)$'$/41$.$*))"0$$)"./-/ "$ .!*-/# $'-*4$1$ )/ -
- 1 '*+( )/ѵ
/$.$)/ ) /*.0++*-/ .$") $.$*).Ѷ'$")./& #*' -.Ѷ). -1 .!*0)/$*)
for communicating the City’s goals to the public, !0)$)"" )$ .Ѷ) ' / *!!$$'.ѵ#
- 1 '*+( )/*!/# .$/ 2$''$)'0 + ./-$)( )$/$ .Ѷ+-&)/#- ) 20$'$)".ѷ) 2$/4
#''Ѷ) 2-/.)*((0)$/4 )/ -)) 2- - /$*) )/ -2$/#+**'ѵ
0./$)$'$/4$.$*)
# $'-*4$1$ )/ -$. )1$.$*) .+ *+' Ҋcentered public campus that reflects the City’s values of
)1$-*)( )/'- .+*).$$'$/4Ѷ'*)"Ҋ/ -(- .$'$ ) Ѷ)*((0)$/42 ''Ҋ $)"ѵ# +-*% /2$''+-$*-$/$5
''Ҋ ' /-$0$'$)".4./ (.Ѷ+..$1 .$")./-/ "$ .—$)'0$)")/0-'1 )/$'/$*)2# - ! .$' —)
/# !!$$ )/0. *! ) -"4)2/ -- .*0- .ѵ0/**-.+ .2$'' .$") !*-*(!*-/$)#*/
2 /# -Ѷ.0++*-/$)"*/#*((0)$/40. )'$(/ - .$'$ ) ѵ0./$)$'$/4./-/ "$ .2$''
$)/ "-/ $)/*/# 0$'$)".)').+ $)24./#/.0++*-/+ -!*-() Ѷ0-$'$/4Ѷ) . *!
($)/ )) —while also creating opportunities to share the story of the City’s environmental goals
/#-*0"#1$.$' Ѷ 0/$*)' .$")! /0- .ѵ
40./$)$'$/4-$*-$/$ .
# !*''*2$)"/# ( .- !' / -'4+-$*-$/$ .$.0.. 2$/#/# .$")/ (Ѷ/# $/4)"' ) /#-*0"#
/# *((0)$/4*0/- #+-* ..ѵ# . ./-/ "$ .- '*-/ *)$)/# .$")$.$+'$) )--/$1 .
). -1 ./# .$.!*-/#
-/$!$/$*)./-/ "4ѵ
Energy and Carbon
• .$"))*)./-0/ ) -"4 !!$$ )/Ѷ''Ҋ ' /-$0$'$)".4./ (.җ$)'0$)"/# +**'Ҙ
• -$*-$/$5 +..$1 .$")./-/ "$ ./*- 0 *+ -/$*)*./.
o Ҋ0$'$)"*-$ )//$*)/#/*+/$($5 .)/0-'4'$"#/)- 0 ..*'-# /"$)
o . *!./-/ "$''4+' /# -('(..))$"#/!'0.#./-/ "$ ./**!!. /+ & ()ѵ
SUSTAINABILITY AND LEED SCORECARDSDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 144Gilroy Civic Center Master Plan
$'-*4Ҋ-/.)*((0)$/4 )/ -
Ҋ1у*- -
*'ѷ '/$)0(
.#*2)ѷ*'җ/#/*'/$)0(ѷ$ )/$!4ррҊру(4 4 .+*$)/.Ҙ
цр рт х сп -/$!$ упҊуш+*$)/.$'1 -фпҊфш+*$)/.*'хпҊцш+*$)/.'/$)0(чп*-(*- +*$)/.
.ѼѼ* .ѼѼ*
р - $/р
)/ "-/$1 -* ..р ц с с с / -$'.о .*0- .рт*$)/.*..$'
- - ,рҊ
ч ч
*/$*))-).+*-//$*)рх*$)/.*..$' - - ,с Ҋ
рх - $/рҊҊҊ рх р р р с - $/р ф
р - $/с- 1$*0.'4 1 '*+ р с - $/с с
р р - $/т -$*-$/4 .$")/$*)с р р - $/т с
т с - $/у '&*- цп ф р р - $/у с
ф - $/ф ҊҊҊ ф с - $/ф с
р - $/х р
р - $/ц тпڿ 0 -&$)"р ш с т с
)**-)1$-*)( )/'0'$/4 рх*$)/.*..$'
р - $/чѶфڿ.+ .р - - ,рҊ
- - ,сҊ
ц р р р 0./$)' $/ .рп*$)/.*..$' р - $/рѵр р
- - ,рҊ р - $/рѵс р
р - $/рр т - $/ст
с - $/сҊҊҊ с р - $/т р
р - $/тр р р - $/у с
р р р - $/у ҊҊҊ т р - $/фр
с - $/ф ҊҊҊ с р р - $/х с
р - $/х р р р р - $/ц т
р - $/ч р
х ф / -!!$$ )4 рр*$)/.*..$' р - $/ш р
- - ,р Ҋ
- - ,с Ҋ х
))*1/$*)о .$")-* ..х*$)/.*..$'
- - ,т Ҋ р - $/рѵр $'*/ѷ$-*''$.$*) / -- ) җ*-*/# -Ҙ р
р р - $/р 0 фпڿ с р - $/рѵс $'*/ѷ-*0- ( )/*!
*2-*)*)./-0/$*)/ -$'.җ*-*/# -Ҙ р
у с - $/с 0 упڿ х р - $/рѵт $'*/ѷ'' ) - ./-**(.җ*-*/# -Ҙ р
с - $/т ҊҊҊ с р - $/рѵу $'*/ѷ-$+/$('җ*-*/# -Ҙ р
р - $/у р р - $/рѵф 3 (+'-4 -!*-() ѷ.җ*-*/# -Ҙ р
р - $/сLEED™ Accredited Professional р
су ч р ) -"4о/(*.+# - тт*$)/.*..$'
- - ,рҊ у "$*)'-$*-$/4 у*$)/.*..$'
- - ,сҊ
- - ,тҊ р - $/рѵр +/$($5 ) -"4 -!*-() җрп+/.Ҙр
- - ,у Ҋ р - $/рѵс 0/**-/ -. 0/$*)җс+/.Ҙ р
ф р - $/р )#ѵ3۔*)$/*-۔)1ѵ х р - $/рѵт ) 2' ) -"4-*0/$*)җс+/.Ҙ р
х т - $/сѵр фпڿ 0/$*)ш р - $/рѵу 0 -&$)"**/+-$)/җр+/Ҙ р
х т - $/сѵс хпڿ 0/$*)ш р - $/рѵф
)**-/ -. 0/$*)җу+/.Ҙ р
р - $/тр р - $/рѵх $)2/ -)" ( )/җт+/.Ҙ р
с - $/у
*' 3$$'$/4о"(/с
ф - $/фспڿ$ -р ф
р - $/хр
#*' 0$'$)"
цҝсфҝспсф
/*-" о*'' /$*)*! 4'' .
*)./-0/$*)о (*./ "(/')
$"#*-#** 1 '*+( )/
*/$*)0$'$)"
$! Ҋ4'
(+/ 0/$*)җ1уѵрҘ
).$/$1
)-*/ /$*))1$-*)( )/'-*0/ '-/$*).җ1уѵрҘ сп.۔)#)
$"#-$*-$/4$/ *0-$)"*!2/ -$'.җ1уѵрҘ рфڿ4*./
)#)
/-/ "$ .җртѶрпѾѶ 3#0./$.*'/$*)Ҙ
0--*0)$)" ).$/4)$1 -. . ./ -$'
)"- $ )/.җ1уѵрҘ сп$.'*.0- .
../*0'$/4-).$/җ1уѵрҘ*)./-0/$*)о (*'$/$*)./ "(/$1 -/цфڿоу./- (.
$4' $'$/$ .
0 -&$)"**/+-$)/җ1уѵрҘ(+0.++-*#
' /-$ #$' .җ1уѵрҘ(+0.++-*#$)$(0(
-!*-()
)1$-*)( )/'**(*& *)/-*'
$)2/ -)" ( )/җ1уѵрҘ(+0.++-*## -('*(!*-/
*)./-0/$*)/$1$/4*''0/$*)- 1 )/$*))#)
/-/ "$ .җтпڿ$)ѵ1 )/ѵҝс(*)$/*-.Ҙ с ).*-.
$/ .. ..( )/(+0.++-*#
*2Ҋ($//$)"/ -$'.җ1уѵрҘ у/ "*-$ .
-*/ /*- ./*- $//җ1уѵрҘ(+0.++-*#*)./-0/$*)
)**-$-0'$/4"(/
+ )+ (+0.++-*#
)**-$-0'$/4.. ..( )/'0.#*0/Ҋ !*- ѵ
/
.') 0/$*)(+0.++-*#
)/ -$*-
$"#/$)"җ1уѵрҘ
$"#/$)"*)/-*'.
$"#/*''0/$*) 0/$*)(+0.++-*#4'$"#/җ1уѵрҘ ҊҊҊ
шфпсп
0'$/4$ 2.
*0./$ -!*-() җ1уѵрҘ
0/**-/ -. 0/$*)Ѷтпڿ
)**-/ -. 0/$*)Ѷспڿ
0$'$)"Ҋ
1 '/ - / -$)"
0/**-/ -. 0/$*)ѶфпڿҊрппڿ
)**-/ -. 0/$*)ѶсфڿҊфпڿ
**'$)"*2 -/ -.
/ - / -$)"
0)( )/'*(($..$*)$)") -$!$/$*)
$)$(0() -"4 -!*-()
() .+*).
) 2' ) -"4-*0/$*)җ1уѵрҘ
)#) !-$" -)/)" ( )/
0$'$)"Ҋ
1 ') -"4 / -$)"
0)( )/' !-$" -)/)" ( )/
)#) *(($..$*)$)"
+/$($5 ) -"4 -!*-() Ѷ*./ҝ*0- ) -"4
+/$($5 ) -"4 -!*-() Ѷ ($..$*).
1) ) -"4 / -$)"
LEED SCORECARD MULTIGENERATIONAL COMMUNITY CENTERDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 145Gilroy Civic Center Master Plan
$'-*4Ҋ )/ -
Ҋ1у*- -
*'ѷ '/$)0(
.#*2)ѷ*'җ/#/*'/$)0(ѷ$ )/$!4рпҊрт(4 4 .+*$)/.Ҙ
цт ш х сс -/$!$ упҊуш+*$)/.$'1 -фпҊфш+*$)/.*'хпҊцш+*$)/.'/$)0(чп*-(*- +*$)/.
.ѼѼ* .ѼѼ*
р - $/р
)/ "-/$1 -* ..р ц с с с / -$'.о .*0- .рт*$)/.*..$'
- - ,рҊ
ч ч
*/$*))-).+*-//$*)рх*$)/.*..$' - - ,с Ҋ
рх - $/рҊҊҊ рх р р р с - $/р ф
р - $/с- 1$*0.'4 1 '*+ р с - $/с с
р р - $/т -$*-$/4 .$")/$*)с р р - $/т с
т с - $/у '&*- цп ф р р - $/у с
ф - $/ф ҊҊҊ ф с - $/ф с
р - $/х р
р - $/ц тпڿ 0 -&$)"р рп р т с
)**-)1$-*)( )/'0'$/4 рх*$)/.*..$'
р - $/чѶфڿ.+ .р - - ,рҊ
- - ,сҊ
ц р р р 0./$)' $/ .рп*$)/.*..$' р - $/рѵр р
- - ,рҊ р - $/рѵс р
р - $/рр т - $/ст
с - $/сҊҊҊ с р - $/т р
р - $/тр р р - $/у с
р р р - $/у ҊҊҊ т р - $/фр
с - $/ф ҊҊҊ с р р - $/х с
р - $/х р р р р - $/ц т
р - $/ч р
х ф / -!!$$ )4 рр*$)/.*..$' р - $/ш р
- - ,р Ҋ
- - ,с Ҋ х
))*1/$*)о .$")-* ..х*$)/.*..$'
- - ,т Ҋ р - $/рѵр $'*/ѷ$-*''$.$*) / -- ) җ*-*/# -Ҙ р
р р - $/р 0 фпڿ с р - $/рѵс $'*/ѷ-*0- ( )/*!
*2-*)*)./-0/$*)/ -$'.җ*-*/# -Ҙ р
у с - $/с 0 упڿ х р - $/рѵт $'*/ѷ'' ) - ./-**(.җ*-*/# -Ҙ р
с - $/т ҊҊҊ с р - $/рѵу $'*/ѷ-$+/$('җ*-*/# -Ҙ р
р - $/у р р - $/рѵф 3 (+'-4 -!*-() ѷ.җ*-*/# -Ҙ р
р - $/сLEED™ Accredited Professional р
сф ф т ) -"4о/(*.+# - тт*$)/.*..$'
- - ,рҊ у "$*)'-$*-$/4 у*$)/.*..$'
- - ,сҊ
- - ,тҊ р - $/рѵр +/$($5 ) -"4 -!*-() җрп+/.Ҙр
- - ,у Ҋ р - $/рѵс 0/**-/ -. 0/$*)җс+/.Ҙ р
ф р - $/р )#ѵ3۔*)$/*-۔)1ѵ х р - $/рѵт ) 2' ) -"4-*0/$*)җс+/.Ҙ р
ч р - $/сѵр хпڿ 0/$*)ш р - $/рѵу 0 -&$)"**/+-$)/җр+/Ҙ р
ч р - $/сѵс чфڿ 0/$*)ш р - $/рѵф
)**-/ -. 0/$*)җу+/.Ҙ р
р - $/тр р - $/рѵх $)2/ -)" ( )/җт+/.Ҙ р
с - $/у
*' 3$$'$/4о"(/с
с т - $/фспڿ$ -р ф
р - $/хр
#*' 0$'$)"
цҝсфҝспсф
/*-" о*'' /$*)*! 4'' .
*)./-0/$*)о (*./ "(/')
$"#*-#** 1 '*+( )/
*/$*)0$'$)"
$! Ҋ4'
(+/ 0/$*)җ1уѵрҘ
).$/$1
)-*/ /$*))1$-*)( )/'-*0/ '-/$*).җ1уѵрҘ сп.۔)#)
$"#-$*-$/4$/ *0-$)"*!2/ -$'.җ1уѵрҘ рфڿ4*./
)#)
/-/ "$ .җртѶрпѾѶ 3#0./$.*'/$*)Ҙ
0--*0)$)" ).$/4)$1 -. . ./ -$'
)"- $ )/.җ1уѵрҘ сп$.'*.0- .
../*0'$/4-).$/җ1уѵрҘ*)./-0/$*)о (*'$/$*)./ "(/$1 -/цфڿоу./- (.
$4' $'$/$ .
0 -&$)"**/+-$)/җ1уѵрҘ(+0.++-*#
' /-$ #$' .җ1уѵрҘ(+0.++-*#$)$(0(
-!*-()
)1$-*)( )/'**(*& *)/-*'
$)2/ -)" ( )/җ1уѵрҘ(+0.++-*## -('*(!*-/
*)./-0/$*)/$1$/4*''0/$*)- 1 )/$*))#)
/-/ "$ .җтпڿ$)ѵ1 )/ѵҝс(*)$/*-.Ҙ с ).*-.
$/ .. ..( )/(+0.++-*#
*2Ҋ($//$)"/ -$'.җ1уѵрҘ у/ "*-$ .
-*/ /*- ./*- $//җ1уѵрҘ(+0.++-*#*)./-0/$*)
)**-$-0'$/4"(/
+ )+ (+0.++-*#
)**-$-0'$/4.. ..( )/'0.#*0/Ҋ !*- ѵ
/
.') 0/$*)(+0.++-*#
)/ -$*-
$"#/$)"җ1уѵрҘ
$"#/$)"*)/-*'.
$"#/*''0/$*) 0/$*)(+0.++-*#4'$"#/җ1уѵрҘ $(0'/$*)ѷ.упڿ
шфпсп
0'$/4$ 2.
*0./$ -!*-() җ1уѵрҘ
0/**-/ -. 0/$*)Ѷтпڿ
)**-/ -. 0/$*)Ѷспڿ
0$'$)"Ҋ
1 '/ - / -$)"
0/**-/ -. 0/$*)ѶфпڿҊрппڿ
)**-/ -. 0/$*)ѶсфڿҊфпڿ
**'$)"*2 -/ -.
/ - / -$)"
0)( )/'*(($..$*)$)") -$!$/$*)
$)$(0() -"4 -!*-()
() .+*).
) 2' ) -"4-*0/$*)җ1уѵрҘ
)#) !-$" -)/)" ( )/
0$'$)"Ҋ
1 ') -"4 / -$)"
0)( )/' !-$" -)/)" ( )/
)#) *(($..$*)$)"
+/$($5 ) -"4 -!*-() Ѷ*./ҝ*0- ) -"4
+/$($5 ) -"4 -!*-() Ѷ ($..$*).
1) ) -"4 / -$)"
LEED SCORECARD RECREATION & AQUATIC CENTERDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 146Gilroy Civic Center Master Plan
$'-*4Ҋ$/4 ''
Ҋ1у*- -
*'ѷ '/$)0(
.#*2)ѷ*'җ/#/*'/$)0(ѷ$ )/$!4шҊрс(4 4 .+*$)/.Ҙ
цф рф т рц -/$!$ упҊуш+*$)/.$'1 -фпҊфш+*$)/.*'хпҊцш+*$)/.'/$)0(чп*-(*- +*$)/.
.ѼѼ* .ѼѼ*
р - $/р
)/ "-/$1 -* ..р ч т р р / -$'.о .*0- .рт*$)/.*..$'
- - ,рҊ
ч ч
*/$*))-).+*-//$*)рх*$)/.*..$' - - ,с Ҋ
рх - $/рҊҊҊ рх с с р - $/р ф
р - $/с- 1$*0.'4 1 '*+ р с - $/с с
р р - $/т -$*-$/4 .$")/$*)с р р - $/т с
т с - $/у '&*- цп ф р р - $/у с
ф - $/ф ҊҊҊ ф с - $/ф с
р - $/х р
р - $/ц тпڿ 0 -&$)"р рс т р
)**-)1$-*)( )/'0'$/4 рх*$)/.*..$'
р - $/чѶфڿ.+ .р - - ,рҊ
- - ,сҊ
ц р р р 0./$)' $/ .рп*$)/.*..$' р - $/рѵр р
- - ,рҊ р - $/рѵс р
р - $/рр т - $/ст
с - $/сҊҊҊ с р - $/т р
р - $/тр р р - $/у с
р р р - $/у ҊҊҊ т р - $/фр
с - $/ф ҊҊҊ с р р - $/х с
р - $/х р с р - $/ц т
р - $/ч р
х ф / -!!$$ )4 рр*$)/.*..$' р - $/ш р
- - ,р Ҋ
- - ,с Ҋ х
))*1/$*)о .$")-* ..х*$)/.*..$'
- - ,т Ҋ р - $/рѵр $'*/ѷ$-*''$.$*) / -- ) җ*-*/# -Ҙ р
р р - $/р 0 фпڿ с р - $/рѵс $'*/ѷ-*0- ( )/*!
*2-*)*)./-0/$*)/ -$'.җ*-*/# -Ҙ р
у с - $/с 0 упڿ х р - $/рѵт $'*/ѷ'' ) - ./-**(.җ*-*/# -Ҙ р
с - $/т ҊҊҊ с р - $/рѵу $'*/ѷ-$+/$('җ*-*/# -Ҙ р
р - $/у р р - $/рѵф 3 (+'-4 -!*-() ѷ.җ*-*/# -Ҙ р
р - $/сLEED™ Accredited Professional р
су ч р ) -"4о/(*.+# - тт*$)/.*..$'
- - ,рҊ у "$*)'-$*-$/4 у*$)/.*..$'
- - ,сҊ
- - ,тҊ р - $/рѵр +/$($5 ) -"4 -!*-() җрп+/.Ҙр
- - ,у Ҋ р - $/рѵс 0/**-/ -. 0/$*)җс+/.Ҙ р
ф р - $/р )#ѵ3۔*)$/*-۔)1ѵ х р - $/рѵт ) 2' ) -"4-*0/$*)җс+/.Ҙ р
х т - $/сѵр фпڿ 0/$*)ш р - $/рѵу 0 -&$)"**/+-$)/җр+/Ҙ р
х т - $/сѵс хпڿ 0/$*)ш р - $/рѵф
)**-/ -. 0/$*)җу+/.Ҙ р
р - $/тр р - $/рѵх $)2/ -)" ( )/җт+/.Ҙ р
с - $/у
*' 3$$'$/4о"(/с
ф - $/фспڿ$ -р ф
р - $/хр
$)$(0(
-!*-()
)1$-*)( )/'**(*& *)/-*'
с ).*-.
шфпсп
$(0'/$*)ѷ.ффڿ
у/ "*-$ .
'0.#*0/Ҋ !*- ѵ
$"#/$)"*)/-*'.
)#)
/-/ "$ .җтпڿ$)ѵ1 )/ѵҝс(*)$/*-.Ҙ
*2Ҋ($//$)"/ -$'.җ1уѵрҘ
*)./-0/$*)
)**-$-0'$/4"(/
)**-$-0'$/4.. ..( )/
# -('*(!*-/
)/ -$*-
$"#/$)"җ1уѵрҘ
)#)
/-/ "$ .җртѶрпѾѶ 3#0./$.*'/$*)Ҙ
*)./-0/$*)о (*'$/$*)./ "(/
#*' 0$'$)"
сп.۔)#)
рфڿ4*./
сп$.'*.0- .
../*0'$/4-).$/җ1уѵрҘ
$4' $'$/$ .
цҝсфҝспсф
$1 -/цфڿоу./- (.
' /-$ #$' .җ1уѵрҘ(+0.++-*#
0 -&$)"**/+-$)/җ1уѵрҘ(+0.++-*#
).$/$1
)-*/ /$*)
$"#-$*-$/4$/
$"#*-#** 1 '*+( )/
*/$*)
0--*0)$)" ).$/4)$1 -. . .
/*-" о*'' /$*)*! 4'' .
*)./-0/$*)о (*./ "(/')
0$'$)"
$! Ҋ4'
(+/ 0/$*)җ1уѵрҘ
)1$-*)( )/'-*0/ '-/$*).җ1уѵрҘ
*0-$)"*!2/ -$'.җ1уѵрҘ
/ -$'
)"- $ )/.җ1уѵрҘ
1) ) -"4 / -$)"
() .+*).
) 2' ) -"4-*0/$*)җ1уѵрҘ
)#) !-$" -)/)" ( )/
+/$($5 ) -"4 -!*-() Ѷ*./ҝ*0- ) -"4
+/$($5 ) -"4 -!*-() Ѷ ($..$*).
)#) *(($..$*)$)"
*)./-0/$*)/$1$/4*''0/$*)- 1 )/$*)
$/ .. ..( )/(+0.++-*#
+ )+ (+0.++-*#
$)2/ -)" ( )/җ1уѵрҘ(+0.++-*#
/
.') 0/$*)(+0.++-*#
)**-/ -. 0/$*)Ѷспڿ
0$'$)"Ҋ
1 '/ - / -$)"
0)( )/'*(($..$*)$)") -$!$/$*)
0)( )/' !-$" -)/)" ( )/
/ - / -$)"
**'$)"*2 -/ -.
$"#/*''0/$*) 0/$*)(+0.++-*#
0/**-/ -. 0/$*)Ѷтпڿ
-*/ /*- ./*- $//җ1уѵрҘ(+0.++-*#
0/**-/ -. 0/$*)ѶфпڿҊрппڿ
)**-/ -. 0/$*)ѶсфڿҊфпڿ
$)$(0() -"4 -!*-()
0$'$)"Ҋ
1 ') -"4 / -$)"
4'$"#/җ1уѵрҘ
0'$/4$ 2.
*0./$ -!*-() җ1уѵрҘ
LEED SCORECARD CITY HALLDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Vl +schedule
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 148Gilroy Civic Center Master Plan
2024 2025 2026
Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
11-Nov18-Nov25-Nov2-Dec9-Dec16-Dec23-Dec30-Dec6-Jan13-Jan20-Jan27-Jan3-Feb10-Feb17-Feb24-Feb3-Mar10-Mar17-Mar24-Mar31-Mar7-Apr14-Apr21-Apr28-Apr5-May12-May19-May26-May2-Jun9-Jun16-Jun23-Jun30-Jun7-Jul14-Jul21-Jul28-Jul4-Aug11-Aug18-Aug25-Aug1-Sep8-Sep15-Sep22-Sep29-Sep6-Oct13-Oct20-Oct27-Oct3-Nov10-Nov17-Nov24-Nov1-Dec8-Dec15-Dec22-Dec29-Dec5-Jan12-Jan19-Jan26-Jan2-Feb9-Feb16-Feb23-Feb2-Mar9-Mar16-Mar23-Mar30-MarMASTER PLAN
Kickoff Meeting
November 20, 2024
Existing Conditions Assessment
Visit Site, Survey, Review Existing Documentation
City Administrator + Department Heads Briefing
Approach to Community Engagement + Concept Master Planning Process
Needs Assessment
Interview Department Heads / Develop Program
Facilities Tour - Redwood City and Mountain View
2/27/2025
Master Plan Alternatives andCommunity Engagement
COMMUNITY ENGAGEMENT - WORKSHOP #1
Tuesday March 4, 2025 - 9AM OR 6PM
Prepare Concept Alternatives for Workshop #2
City Council Check-in
COMMUNITY ENGAGEMENT - WORKSHOP #2
Tuesday April 8, 2025 - 9AM OR 6PM
Refine Preferred Concept for Workshop #3
City Council Check-in
COMMUNITY ENGAGEMENT - CAFECITO
May 9, 2025 - 6PM
City Council Check-in
COMMUNITY ENGAGEMENT - WORKSHOP #3
Tuesday May 20, 2025 - 9AM OR 6PM
Commissions - Preferred Concept Presentation
Youth Commission - April 14, 2025
Arts and Culture Commission - May 13, 2025
Library Commission - April 9, 2025
Parks and Recreation Commission - April 15, 2025
Planning Commission - April 3, 2025
Personnel Commission - April 28, 2025
Senior Luncheon - May 14, 2025
Update and Refine Preferred Concept
City Council Session - Final Concept Presentation
June 16, 2025.
Prepare Final Report
CEQA
Tribal Consultation
3 Months
Prepare Draft and Final NOP
30 day Review Period
Traffic Consultants Prepare VMT Analysis
Prepare Administrative Draft EIR
City Staff Review and Noticing
Public Review Period
45-Days
Prepare Final EIR / MMP / NOD
PUBLIC HEARINGS
February 2, 2026 to February 27, 2026
CITY COUNCIL ADOPTS/CERTIFIES CEQA DOCUMENTS
March City Council Session
PRELIMINARY PROJECT SCHEDULE
May 13, 2025
ELS/SWA SITE VISIT
12/11/24
NEEDS ASSESSMENT
MASTER PLAN ALTERNATIVES & COMMUNITY ENGAGEMENT
EXISTINGCONDITIONS ASSESSMENT
WORKSHOP #3 - 9AM - Present Preferred Concept, Engage in Community Charrette and Collect Final Comments
TRIBAL CONSULTATION
WORKSHOP #1 - 6PM - Gallery Walk - Community Open House - Project confirmation
WORKSHOP #2 - 6PM - Present Concept Alternatives, Engage in Community Charrette and Select a preferred Design Direction/Concept
WORKSHOP #3 - 6PM - Present Preferred Concept, Engage in Community Charrette and Collect Final Comments
ELS/SWA SITE VISIT01/13/25
FACILITIES TOUR
02/27/25
MASTER PLAN DEVELOPMENT
CEQAPROCESS
WORKSHOP #1 - 9AM - Gallery Walk - Community Open House - Project Confirmation
WORKSHOP #2 - 9AM - Present Concept Alternatives, Engage in Community Charrette and Select a preferred Design Direction/Concept
SUBMIT COMPLETED MATERIALS PRIOR TO COUNCIL MEETINGMASTER PLAN COMPLETECEQA COMPLETECIVIC CENTER MASTER PLAN
30-DAYREVIEW PERIOD
PREPARE ADMINISTRATIVE DRAFT EIR
NOTICING& STAFF REVIEW
45-DAY PUBLICREVIEW
PREPAREFINAL EIR
PUBLIC HEARINGS
VMT ANALYSIS
CITY COUNCIL APPROVAL
DRAFT & FINAL NOP
COMMUNITY ENGAGEMENT - 6PM - Cafecito at San Ysidro Park (Presented in Spanish)
7/22/2025, 2:52 PM
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
Vll +appendix
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
City Hall
DETAILED PROGRAM
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 151Gilroy Civic Center Master Plan
CITY HALL
Gilroy Civic Center Master Plan
CITY HALL PROGRAM
DEPARTMENT/SPACE
WORK‐
STATIONS OFFICES AREA (SF)Total Area (SF)Notes
RECEPTION / LOBBY
Lobby and Waiting Area 1,000
Central Reception/Information Desk 150 All visitors to City Hall check in here.
Shipping and Receiving Area 150 Package and mail deliveries and outgoing shipping
Huddle Room 100
Space adjacent to the lobby for side conversations with
customers
Public Restrooms 600
RECEPTION TOTAL NET AREA 2,000
FINANCE
Finance Service Counter 3 550
Bill paying counter with three service positions, cash tills, and
three workstations in area behind counter.
Open office area 4 64 256 Net area for four 8x8 workstations.
Flex Workstations 2 64 128 Net area for two 8x8 workstations
Office 8 100 800
Director's Office 1 200 200
IT Help Desk 150 150 Needs to be centrally located, adjacent to IT storage
IT Storage 100 100 Adjacent to IT Help Desk
Dedicated Records Storage 200 200
Central Printer and Supplies (dedicated to Finance)80 80
Cash Storage Safe 50 50 Armored car pickup for cash twice per week
Network Server Room 400 400 Area based on size of current server room
Conference Room 200 200 Staff and/or public meetings
Large Conference Room N/A N/A Shared ‐ see Common Areas
Coffee Station 50 50 Kitchenette with sink
FINANCE DEPARTMENT TOTAL NET AREA 3,164
ADMINISTRATION
Mayor's Office 1 200 200
City Administrator's Office 1 200 200
Communications and Engagement Office 1 150 150 Office with space for table and chairs
Offices 10 100 1,000
Open Office Area 4 64 256 Net area for four 8x8 workstations.
Copier and additional seating (in open office area)100
DETAILED PROGRAM TABULATIONDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 152Gilroy Civic Center Master Plan
DEPARTMENT/SPACE
WORK‐
STATIONS OFFICES AREA (SF)Total Area (SF)Notes
Informal Reception Area with two WS and small waiting
area 200
2 workstations at 64 for Management Analyst and
Management Assistant plus waiting area
Conference Room to Seat 20 400 Could be shared, but with Admin priority
Copy/Mail/Supplies Storage 50
Coffee Station/Break Area 50 Kitchenette with sink
ADMINISTRATION DEPARTMENT TOTAL NET AREA 2,606
HUMAN RESOURCES & RISK MANAGEMENT
Director's Office 1 200 200
Offices 4 100 400
Workstations 6 64 384 Net area for six 8x8 workstations
Reception/Waiting 120 120
Dedicated waiting area for one to two people adjacent to two
workstations
Workroom 200 200
Records Storage 250 250
Coffee Station/Break Area 50 50 Kitchenette with sink
Printer Area 50 50 Secure, private, not shared with other departments
Interview Room 120 120
Medium Conference Room 200 200 Seat 6‐8
HUMAN RESOURCES & RISK MANAGEMENT TOTAL NET AREA 1,974
UTILITIES DEPARTMENT
Director's Office 1 200 200
Business Manager's Office 1 150 150
Office 8 100 800
Workstations 12 64 768 Net area for (12) 8x8 workstations
Public Counter with One Service Position 100 Does not need to be near lobby area
Plan Review Counter/Work Area 100
File Storage Room 200 200
Library 50 50 Technical reference materials
Supply Closet 10 10
Printer Room 100 100
Large format printer can be shared with Community
Development and Public Works
Conference Room 150 150 One dedicated conference room to seat 6‐8
Conference Room 150 150 One shared conference room to seat 6‐8
Coffee Station/Break Area 50 50 Kitchenette with sink
UTILITIES DEPARTMENT TOTAL NET AREA 2,828
PUBLIC WORKS
Gilroy Civic Center Master Plan
City Hall Program 2 of 4 4/16/2025
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 153Gilroy Civic Center Master Plan
DEPARTMENT/SPACE
WORK‐
STATIONS OFFICES AREA (SF)Total Area (SF)Notes
Director's Office 200 200
Offices 11 100 1,100
Workstations 18 64 1,152 Net area for (18) 8x8 workstations
Open Work Area 150 150
Public Counter with Two Service Stations 100 100 Separate waiting area not required ‐ people wait in lobby
Storage 200 200
Coffee/Break Area 50 50
Large Format Printer N/A Shared with Public Utilities
Large Conference Room (Seat up to 20)N/A Shared with Other Departments (see Common Areas)
Conference Room 150 150 Seat 6‐8 (could be shared?)
PUBLIC WORKS TOTAL NET AREA 3,102
COMMUNITY DEVELOPMENT
Director's Office 1 200 200
Manager's Office 2 150 300
Office 17 100 1,700
Workstations 20 64 1,280 Net area for (18) 8x8 workstations
Permit Counter 600 600
Kiosk 10 10
Coffee/Break Area 50 50
Library 50 50 Book shelves for technical manuals and codes
Copier/Supplies 50 50
Conference Room (seat 15)N/A Shared
Small/Medium Conference Room 150 150
COMMUNITY DEVELOPMENT TOTAL NET AREA 4,390
FIRE ADMINISTRATION
Director's Office 1 200 200
Office 1 100 100
Workstations 6 64 384 Net area for six 8x8 workstations
Conference Room 1 150 150 Could be shared?
FIRE ADMINISTRATION TOTAL NET AREA 834
EMERGENCY OPERATIONS CENTER
Main EOC Workroom 800 800 Computer workstations for up to 25 (current size about 532sf)
Management Room 300 300 Accommodate 8‐10 (current size 352sf)
Radio Room 100 100
Server and IT Equipment Room 150 150
Gilroy Civic Center Master Plan
City Hall Program 3 of 4 4/16/2025
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 154Gilroy Civic Center Master Plan
DEPARTMENT/SPACE
WORK‐
STATIONS OFFICES AREA (SF)Total Area (SF)Notes
Training Room N/A N/A
Accommodate 30 for training, lectures, etc. (Dimensions
assumed: 25' x 36'). Shared room. Included in Common Areas
Crash Room 240 240 2 rooms with 2 cots at 120sf each
Restrooms with showers N/A Nearby
Kitchen Area N/A Nearby
Storage for Food and Supplies 500 500
Storage for Educational Materials 80 80
Medication Cache 60 60
CHEMPACK room. Needs HVAC and access controls. 60sf
minimum size
EMERGENCY OPERATIONS CENTER TOTAL NET AREA 2,230
COUNCIL CHAMBERS
Council Chambers 2500 2500
Lobby/Pre‐function Area 1500 1500
Chair and Table Storage 200 200
Equipment Room 100 100
Conference Room 200 200 For private council meetings
COUNCIL CHAMBERS TOTAL NET AREA 4,500
COMMON AREAS
Large Training Room/Conference Room/Classroom 900 900 For department‐wide meetings, training, EOC
Staff Restrooms and Showers 600 600
Public Restrooms (2nd Floor)500 500 First floor public restrooms included with lobby area
Recycling/Trash Room 200 200
Lunch Room 400 400
Mechanical/Electrical Equipment Rooms 1200 1200
Telcom/Data Rooms 300 300
Janitor Closets 100 100 Two closets at 50 sf each
COMMON AREA TOTAL NET AREA 3,300
Total NSF 30,928
Circulation and Support Spaces (25%)7,732
TOTAL GROSS SQUARE FEET 38,660
Gilroy Civic Center Master Plan
City Hall Program 4 of 4 4/16/2025
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 155Gilroy Civic Center Master Plan
CITY HALL
NEEDS ASSESSMENT - Needs AssessmentDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 156Gilroy Civic Center Master Plan
•
•
•
•
•
•
•
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 157Gilroy Civic Center Master Plan
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 158Gilroy Civic Center Master Plan
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 159Gilroy Civic Center Master Plan
Gilroy Civic Center Master Plan
Needs Assessment
Administrative Services Department
•
•
•
•
•
•
•
•
•
Gilroy Civic Center Master Plan
Needs Assessment
Administrative Services Department
•
•
•
•
•
•
•
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 160Gilroy Civic Center Master Plan
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 161Gilroy Civic Center Master Plan
•
•
•
•
•
•
•
•
•
•
•
•
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 162Gilroy Civic Center Master Plan
Gilroy Civic Center Master Plan
Needs Assessment
City Council Chambers
•
•
•
•
•
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 163Gilroy Civic Center Master Plan
Gilroy Civic Center Master Plan
Needs Assessment
Emergency Operations Center
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Gilroy Civic Center Master Plan
Needs Assessment
Emergency Operations Center
•
•
•
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 164Gilroy Civic Center Master Plan
•
•
•
•
•
•
•
•
•
•
•
Gilroy Civic Center Master Plan
Needs Assessment
Finance
•
•
•
•
•
•
•
•
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 165Gilroy Civic Center Master Plan
Gilroy Civic Center Master Plan
Needs Assessment
Finance
•
•
•
•
•
•
•
•
•
•
•
•
•
Gilroy Civic Center Master Plan
Needs Assessment
Finance
•
•
•
•
•
•
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 166Gilroy Civic Center Master Plan
Gilroy Civic Center Master Plan
Needs Assessment
Finance
•
•
•
•
•
•
•
•
•
•
•
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 167Gilroy Civic Center Master Plan
Gilroy Civic Center Master Plan
Needs Assessment
Public Works
•
•
•
•
Gilroy Civic Center Master Plan
Needs Assessment
Public Works
•
•
•
•
•
•
•
•
•
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 168Gilroy Civic Center Master Plan
•
•
•
•
•
•
•
•
•
•
Gilroy Civic Center Master Plan
Needs Assessment
Public Utilities
•
•
•
•
•
•
•
•
•
•
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 169Gilroy Civic Center Master Plan
Gilroy Civic Center Master Plan
Needs Assessment
Public Utilities
•
•
•
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 170Gilroy Civic Center Master Plan
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 171Gilroy Civic Center Master Plan
Gilroy Civic Center Master Plan
Needs Assessment
VIP 2305
CSO 2025 Investigations
Graffitti Investigations
CSO 2511 Investigations
CSO / VIP 2834 Investigations
1809 Investigations
1811 Investigations
SRO (2931)GPOA
SRO (1410)
Admin Prius
ADMIN Sgt
ADMIN Sgt
Cmd Staff
Animal Control
Mounted Truck
SOG Trailer
POV 20 PD Ranger Truck 2404
POV 21 PD Malibu (1221)
POV 22 171529271711 2827K920202826160228322825282428232922Elevator
CSIVehicle Evidence
Cages Water Filtration / Softener System
EvidPOV 8EvidPOV 7Transport VaStorage POV 9POV 10POV 11EvidEvidEvidEvidEvidEvidPOV 2POV 3POV 4On DutyOn DutyOn DutyOn DutyPOV 6Electrical Room / PG&E meter BEARCAT DSO TahoCmd Staff
POV 1Cmd Staff
Cmd Staff
Hanna Street
PT CruiserTrafficTrafficElevator
ACT ACT ACTACTACTACTACTACTACTPOV 5No Parking2713283129262925292327192727272828122822
Sally PortJail
No Parking
Gilroy Police Building
Parking Diagram
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 172Gilroy Civic Center Master Plan
Gilroy Civic Center Master Plan
Needs Assessment
Recreation Division
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 173Gilroy Civic Center Master Plan
314.32 sf
HR & RISK
MANAGEMENT
IT OFFICES AND
SERVER ROOM
break
rm.
counter/ reception -
2 work stations
work/team room
lobby/waiting (on deck area)
for HR and Admin
barricade/employee
access
HR storage low & high counter + 2 work stations
Director's office
analyst offices
too
small
finance
counter
info
desk
waiting
area
4 cubicles
3 ws
2 ws city hall
employee
breakroom
2 accountants
finance
conference
office 6
counterwsws
ws
conf.
IT
IT Office
IT Open
Office IT Office
IT Office
wall removed
office 5
office 4
office 3
office 2 office 1 office
public counter
part time admin staff + inspector
2 env. staff
printer area large format
and regular
IT closet
storage
conf.
Project
Manager
shared
office
(2ws)
Admin
PW director office
office
office
office
open office area with 4
WS and table
permit
tech permit counter
3 technicians
office supplies
copier
planner
conf.
(too
small)
bullpen area
central table
kitchen
cubicles (2)
storage
+technician
copy and mail room
paper storage
city
administrator
flex
space
counsel office
Mayor
ED
Manager
shared:
Emergency
management
communications
and engagement
office
supplies and
records city clerk
(former
reception area):
2 staff:
management
analyst and
management
asst.
Bryce
Asst. City
Admin
Admin.
Conf.
Needs to be larger
Seat 20--Could be
shared, but with
admin. priority
break area supply storage -
refreshments, utensils,
etc.
vacant
open office
4 cubicles
copier
seating
ADMINISTRATION
FINANCE
PUBLIC WORKS &
ENGINEERING
COMMUNITY
DEVELOPMENT
GILROY CITY HALL
EXISTING FACILITIES
AS REVIEWED IN
NEEDS ASSESSMENT MEETINGS
February , 2025
staff table
AV room
Electrical/HVAC
Phone
553.48 sf
240.02 sf
369.65 sf
2,908.01 sf
193.08 sf 195.11 sf
127.15 sf
240.13 sf
102.41 sf
195.45 sf
225.2 sfvault -
records
storage
342.7 sf
2,190.19 sf794.47 sf
80.53 sf
COUNCIL
CHAMBERS
IT Server
Room
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 174Gilroy Civic Center Master Plan
367.51 sf
99.49 sf
531.56 sf
352.09 sf
221.48 sf
636.44 sf
Main EOC
Workroom
25 max.
Radio
Room
Management
Room
(activated for
major events)
8-10 People
Shared Training Room
(If training room is shared, it
should not be located withinthe EOC.)
NEEDS:
Radio Room
Conference roomServer/IT Room
Crash Room for key personnel
during emergencies
Supplies
Incl. food,
water
and other
supplies
Need more space
Server
Room
IT
Equipment
94.17 sf
257.36 sf
12'-4 1/4"
54'-11 1/4"GILROY ANNEX
OLD POLICE BUILDING
EMERGENCY OPERATIONS
CENTER
EXISTING FACILITIES
AS REVIEWED IN
NEEDS ASSESSMENT MEETING
February, 25, 2025
emergency
preparedness
outreach materials/
education resources
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
MULTIGENERATIONAL COMMUNITY CENTER
BUILDING PLANS | SITE SECTIONS | ELEVATIONSSURVEY RESPONSES
B. Survey ResponsesDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 176Gilroy Civic Center Master Plan
Civic Center M aster Plan <br>Community Workshop #1 Online Survey
2 / 13
23 Taking on too muc h...no room for rec/swim, arts , new city hall and senior expansion at this
location
3/7/2025 11:58 AM
24 With the growing population, this is a great way to bring people together and c reate soc ial
groups!
3/7/2025 11:31 AM
25 The Civic center master plan proces s seems fine. The hardes t part will be getting input from
various types of users so we c an be all inclusive.
3/7/2025 10:48 AM
26 Seems like this will c ost a ton of money. Who will pay for this and how much?3/7/2025 8:42 AM
27 It seems to be tak ing a l ong time since the 750,000 was pass ed.3/7/2025 8:31 AM
28 I appreciate the city sharing the possibilities for the site and getting input from the citizens of
their priorities.
3/7/2025 7:41 AM
29 It’s a great idea and a must for Gilroy 3/7/2025 7:29 AM
30 It's about time! The following facilities (City Hall, Wheeler Community Center & Senior Center)
are completely outdated and look terrible especially when compared to the giant PD building
and s tate of the art library.
3/7/2025 7:29 AM
31 I’m ex cited about the potential to dev elop this area further. As a res ident living les s than two
block s away, I frequently us e the space, but I’ve noticed that it feels underutilized. I appreciate
the city ’s efforts to c reate a thoughtful master plan, and I hope the process prioritiz es
acc ess ibility, c ommunity engagement, and vibrant public spaces that benefit residents and
vis itors alike.
3/4/2025 10:19 PM
32 Please send out surv eys to all res idents , linking a s urvey to the water bills .3/4/2025 7:55 PM
33 We need to be as transparent as possible, ens uring that immediate neighbors are involved or
hav e a c hance to voice their needs, wants and c onc erns . I attended the 3/4/25 event, and
lined that I was able to speak to both consultants and city staff about my interest and ideas for
this plan.
3/4/2025 10:20 AM
34 Very happy we are moving toward a community center. Critical to build it right and make it part
of our his tory and future. Need to garner as much input as pos sible. Communication across all
Gilroy is v ital.
3/4/2025 10:02 AM
35 The proces s seems ok. The challenge is to reach more people. There are too many for whom
“online” is an obs tacle.
3/4/2025 9:51 AM
Q2 What are you thoughts on the site as it currently exists (the three-city
block area and including buildings housing the Gilroy Library, Wheeler
Center, and/or Senior Center)?
Answered: 35 Skipped: 4
#RESPONSES DATE
1 I love the open spaces. People are out there doing tai c hi. I love the murals. It feels welcoming
and safe because there’s no hidden open spac es.
4/8/2025 2:14 AM
2 It makes sense to build on this site sinc e the c ity owns it and it's c entrally located and
accessible by public transit.
3/25/2025 9:53 AM
3 I think the s ite is located in a good spot and many can acces s it.3/24/2025 8:37 AM
4 If designed appropriately it c ould become the nexis for our c ity. It would be great to place city
s ervices (offic es) and City Hall by the PD s o this would the c iv ic area for Gilroy and dev elop
the remaining space with Art, Recreation and Aquatic Center whic h would be inclus ive of the
existing library.
3/17/2025 2:32 PM
5 old but paid for 3/17/2025 12:30 PM
Civic Center Master Plan <br>Community Workshop #1 Online Survey
1 / 13
Q1 What are your thoughts about the Civic Center Master Plan process?
Ans wered: 35 Skipped: 4
#RESPONSES DATE
1 It seems fantas tic and well thought out so far.4/8/2025 2:14 AM
2 It seems to be working fine.3/25/2025 9:53 AM
3 Look great but I still consider about the plants and shade for the aquatic s wimming pool and
outdoor space. The mos t obs tacles that people don't want to come on summer when exces s
heat becaus e there's no shade.
3/19/2025 9:04 PM
4 In conc ept, this is a fabulous addition to the Gilroy community. It would afford our citizens
many opportunities for tapping into healthy activ ities to enhanc e their mental and physic al
health.
3/17/2025 2:32 PM
5 swim center at the ball fields 3/17/2025 12:30 PM
6 LETS BUILD IT AT THE SPORTS CENTER. CURRENT LOCATION IS NOT THE BEST FOR
TRAFFIC AND LOCAL SAFETY
3/17/2025 9:07 AM
7 I appreciate that there is a focus on the Civic Center Master Plan. I truly do hope that you
listen to the communities' needs and engage the most v ulnerable populations in various ways
and not just by promoting these s essions online. Underserved communities quite often don't
understand what a master plan is and how they can contribute.
3/17/2025 8:00 AM
8 I’m glad we’re thoughtfully planning it.3/16/2025 9:04 AM
9 A rec center like the CRC would be a great addition to our community.3/15/2025 9:17 PM
10 I love the idea of hav ing youth/community programs all av ailable in one central area!3/14/2025 4:58 PM
11 I lov e the plan for aquatic c enter however it has to be a year around facility ie c overed. There
is high demand in a recreation facility here in Gilroy considering the population increase of
families.
3/14/2025 8:34 AM
12 It's ex citing!3/14/2025 7:27 AM
13 Solar is great, but maybe the solar projec t on 7th street should have waited for the new cos tly
master plan?
3/13/2025 9:36 AM
14 Exc ited to see the process begin 3/11/2025 10:38 AM
15 That it good that there will be a place for high schoolers and middle schoolers 3/10/2025 5:52 PM
16 I think that the plan is good and it is going the correct way that it should go 3/10/2025 5:50 PM
17 It sounds interesting, it is also kind of exc iting that there c ould be more to do in gilroy if the
civic center is built.
3/10/2025 5:45 PM
18 I think this is a great idea with diffrent things for youth and ev eryone in the community 3/10/2025 5:45 PM
19 I believe this is a good idea for the community 3/10/2025 5:45 PM
20 Our city needs to offer nicer public fac ilities focused on families . Downtown is a bar joint not a
family friendly area. You get what you attract.
3/8/2025 3:42 PM
21 Should have more outreach, perhaps by mail, to let c itiz ens know about the proces s. Public
meetings need a "hook" to get citizens engage. Website and QR codes are not enough
outreac h.
3/7/2025 10:33 PM
22 You are making an effort to gather all community input. To pas s a GO bond you will need to
have "buy in" from the community big time - Gilroy hates tax increases but with proper
leadership it might pass like the library bonds did.
3/7/2025 6:07 PM
SURVEY RESPONSESWORKSHOP #1 - ENGLISHDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 177Gilroy Civic Center Master Plan
Civic Center M aster Plan <br>Community Workshop #1 Online Survey
4 / 13
center dangerous, complic ated, and often uncomfortable due to the frequent vehicle cros sings.
Prioritizing pedestrian-friendly design s hould be a key consideration. In terms of architec ture
and lay out, new development should follow the example of the Wheeler Center, which is well-
integrated with both the street and the central plaza. Its acc ess ibility on all sides enhances
permeability and encourages interaction with public spaces. In c ontrast, too many buildings in
the area are oriented toward parking lots, whic h diminis hes the quality and vibranc y of public
spaces . Future planning s hould prioritize designs that engage with the street and c entral
gathering areas rather than being dominated by parking.
32 Love the library and historical features of the Wheeler Center. Consider upgrading the building
while preserving historical value.
3/4/2025 7:55 PM
33 Ex cept for the PD and library buildings , the site is dated and spread out. The available open
space is disjointed and does not s eem usable for large gatherings. There does not feel like
there is a central outside meeting place.
3/4/2025 10:20 AM
34 Excellent site! City owns the land and c entrally located. Park ing is critical so design has to
address this .
3/4/2025 10:02 AM
35 I agree that the Library and Police Station are too new to mes s with. Ev erything else should be
replaced. The c urrent s ite is well loc ated and large enough to work with.
3/4/2025 9:51 AM
Q3 Which of the new proposed uses (Senior Center, Youth Center,
Recreation Center, Aquatic Center, and/or Arts Center) do you like most
and why?
Answered: 38 Skipped: 1
#RESPONSES DATE
1 I like the amphitheater. I lik e the recreation center. I used to go to the YMCA on the was t coast
and they had an indoor walk ing path. I loved that for safety reasons. My partner would love the
pool as he likes to swim. I would too.
4/8/2025 2:14 AM
2 Recreation Center sinc e it c an used to serve the mos t people, regardless of age or interest.3/25/2025 9:53 AM
3 Youth center and recreation center- we need more positive things for y outh to do 3/24/2025 8:37 AM
4 I like the outdoor space. However, need to c hoose the plants that give the romantic theme.
Example, in Korea, they plant the ginkgo plants , cherry bloss om and other plants that made
the unique look.
3/19/2025 9:04 PM
5 I believ e we could have one large building that could house Youth, Senior and Rec reation
needs while building an Aquatic and Art Center for a Performing Arts venue.
3/17/2025 2:32 PM
6 build by the freeway not in the city 3/17/2025 12:30 PM
7 what a waste of time and money .3/17/2025 9:07 AM
8 I like the Youth Center and Rec reation Center and outdoor spac e. Gilroy does not have a
v ibrant sports park like the Morgan Hill Outdoor Sports Complex. Our Sports Park has very
limited space. Many families and sports leagues prefer to go to Morgan Hill to utilize the
MHOSC, which means the money/funds don't stay here in town. We have a lot of soccer
teams that struggle trying to s tay here, in Gilroy. A recreation center would also be great
bec aus e it would allow for a number of div erse activities to be housed there. It would prov ide
equitable opportunities. The youth center would allow for y outh to have s omething to do,
something to look forward to, which could potentially reduc e crime.
3/17/2025 8:00 AM
9 An events center-not dedicated to s eniors or youth, but for everyone. Run all the classes out
of there so that it’s alway s in use and bustling. Make it a plac e to hang out, with cafes/s nacks ,
local maker s paces , etc, not jus t a place to take a class and leave. Make a Central Park as
well for farmers markets, yoga clas ses , cultural events, music in the park, etc . My second
choice to add is an aquatic center with spaces for the whole family and a laz y riv er that can
3/16/2025 9:04 AM
Civic Center Master Plan <br>Community Workshop #1 Online Survey
3 / 13
6 bad idea 3/17/2025 9:07 AM
7 The Wheeler Center and the Senior Center are very old buildings. They need to be remodeled
or upgraded. We have a beautiful library.
3/17/2025 8:00 AM
8 It needs more signage and more green space that can be used for various things (farmers
markets, c ultural gatherings, meetings, people playing ches s, yoga c las ses, etc)
3/16/2025 9:04 AM
9 I’ve only ev er been to the library so not sure but s eems to be ce ntrally located 3/15/2025 9:17 PM
10 It's fine, the playground can use some updating and shade for c hildren to play. I am happy to
hear of the library updating an interac tive children's area inside.
3/14/2025 4:58 PM
11 It is a great location and ac ces sible. Will bring more foot traffic to downtown.3/14/2025 8:34 AM
12 Site makes sense.3/14/2025 7:27 AM
13 Good as is . Utilize the old PD for the City Hall anex as was planned, and take care of the
ex isting buildings. Bring back the farmers market. Bring bac k a USPS drop box.
3/13/2025 9:36 AM
14 We need to tak e down every thing except the Library and Policy Station 3/11/2025 10:38 AM
15 We're are you guys putting and is eny building that is getting demolition 3/10/2025 5:52 PM
16 I think that the wheeler center should be improved or taken down and add it to the c ivic center
plan
3/10/2025 5:50 PM
17 I think it is a good location becaus e it would be nex t to downtown 3/10/2025 5:45 PM
18 I think it is great however there is not enough youth areas to hang out or to learn 3/10/2025 5:45 PM
19 I think this location is a good place 3/10/2025 5:45 PM
20 Wheels center is so ugly and uninv iting. The mini park is so ugly needs updating.3/8/2025 3:42 PM
21 Lov e our new library, po lic e building look s like a fortress , not welc oming. Wheeler Center is
good art dec o architecture, inside needs remodeling for recreation & youth center.
3/7/2025 10:33 PM
22 Obvious ly y ou need to demolish the Wheeler Center, the old police building, the City Hall, and
the senior center. The library and new police building are fine and should remain.
3/7/2025 6:07 PM
23 Currently s everely underused 3/7/2025 11:58 AM
24 Love the Gilroy Library. The space it beautiful and the librarians are so welcoming and fun to
talk to. Love the idea that new buildings will bring more people to the area.
3/7/2025 11:31 AM
25 City of Gilroy lacks so many places for ac tivities that many are going outside of Gilroy for
recreation and Senior. As our nation is aging, we need to provide more senior services and
more services for the disabled. The Wheeler center is very old and not very well used. I've
lived in Palo Alto and the avenitas Senior center is top notch. If we could get something like
that going in South county, specifically in Gilroy, it'd be a win-win.
3/7/2025 10:48 AM
26 Need to figure out how to better connect to downtown.3/7/2025 8:42 AM
27 I think this is a great location for a civic center. But what about park ing?3/7/2025 8:31 AM
28 I would lik e the city to try to purchase the properties of the three private houses in an owner
friendly manner. No eminent domain. Owning that whole block would provide larger options.
3/7/2025 7:41 AM
29 Yes, location for such c enters has to be central! Town centers should look more appealing and
pedestrian friendly as in Morgan Hill.
3/7/2025 7:29 AM
30 It's about time! The following facilities (City Hall, Wheeler Community Center & Senior Center)
are completely outdated and look terrible espec ially when compared to the giant PD building
and s tate of the art library.
3/7/2025 7:29 AM
31 The site currently has too muc h parking spread across multiple areas, creating unneces sary
pedestrian-vehic le interactions . Consolidating parking into a s ingle loc ation would improve
safety and wa lkability, making it easier for people to mov e through the space without c onstant
vehicle traffic. The mention of ‘univers al design’ in the plan is critical, and one of the most
fundamental aspects of acc essibility is the ability to walk s afely and comfortably. As a parent
of young children, one with spec ial needs , I find the current layout mak es travel within the civic
3/4/2025 10:19 PM
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 178Gilroy Civic Center Master Plan
Civic Center Master Plan <br>Community Workshop #1 Online Survey
5 / 13
also be us ed for resistance training, senior walking, etc. It could have gras s areas for parties
or families, s wim class es, lap c las ses, but don’t mak e it just a concrete box (lik e the pools we
all s aw through the 80s and 90s). Lastly, I’d like to have an updated arts c enter for mus ic and
gallery space. Maybe we could even have an artist in residence.
10 Rec center because we use the CRC almost daily and would be great to hav e a c loser option
too
3/15/2025 9:17 PM
11 I love the idea of the aquatic center because we don't have that av ailable and need to drive out
of town. I also think it's important to offer programs for our y outh to develop interests and
s ocialize in safe places .
3/14/2025 4:58 PM
12 Aquatic center and recreation c enter, there is huge demand for this in the community with all
the new housing and move of the families .
3/14/2025 8:34 AM
13 Hard to c hoose! The aquatic center appeals; cu rrently our only public pool at Christopher High
is only accessible by acc ess ible by car, and only open limited hours. Kids of color need to be
able to learn how to swim!
3/14/2025 7:27 AM
14 I lik e the aquatic center because it would provide an opportunity for more children and teenager
to learn how to swim as well as swim for fun or sport
3/11/2025 7:25 PM
15 I feel like the land can be multi use combini ng Senior Center, Youth Center, Recreation Center,
Aquatic Center all in one like the morgan hill CRC.
3/11/2025 10:38 AM
16 Youth center Because there will be a plac e to hangout with friends 3/10/2025 5:52 PM
17 I think the recreation and youth center is the bes t since there is not a lot of places youth go go 3/10/2025 5:50 PM
18 I like the idea of a Recreation or aquatic center because it would give peopl e something to do.3/10/2025 5:45 PM
19 Youth center because I feel like the other areas exists already and a youth center does n’t at
the moment and a youth center c an have stem a thatc her a gym and different things for
ev eryone of desperate interests
3/10/2025 5:45 PM
20 I like the arts center bec ause it’s beautiful 3/10/2025 5:45 PM
21 Aquatic center 3/8/2025 3:42 PM
22 Senior c enter needs remodeling, expans i on and more recreation uses. It really needs a new
building!
3/7/2025 10:33 PM
23 Aquatic c enter: I think Gilroy is long ov erdue for a s wimming rec reation c enter in the middle of
town where mos t children and adults can easily ac cess it.
3/7/2025 8:30 PM
24 1. Recreation Center - has been needed for a long time. 2. Senior Center - with increasing
aging population will have increased demand. 3. Arts Center - should be built on land already
owned by City on Eigleberry between 6th and 7th. No room in Civic center for this large project
with every thing else proposed. 4. Youth Center - the old PG&E building on 6th is a disgrace
and too s mall. 5. Aquatic Center - nice idea but already have a s hared fac ility at Christopher
High. No room on land av ailable with every thing else proposed.
3/7/2025 6:07 PM
25 Arts Center...the c urrent art c enter is underperforming. Maybe sell the current center and us e
proceeds to build a performing arts center
3/7/2025 11:58 AM
26 Rec Center will be a great way to bring people together and are multius e spaces. Gymnas ium
type facilities are much eas ier to maintain and will c ost much less than an aquatic center.
Aquatic c enter will only be us ed in the summer and the ongoing maintenanc e will be much
more.
3/7/2025 11:31 AM
27 I have two that I would highly rec ommend. The senior center and the recreation center
recreation center can provide a y outh center and an art center within it. The senior center will
help with the demographics as we continue to hav e a older generation.
3/7/2025 10:48 AM
28 Senior center and youth center. We need to help prepare our y outh and take care of thos e tha t
took care of us.
3/7/2025 8:42 AM
29 I love the idea of a gym, pool and multi use property and for youth organization. I currently
belong to CRC in Morgan hill and I’d rather give me Monthy dues to Gilroy. I do like that the
CRC is affiliated with the YMCA at a larger sc ale. I think you could add bas ketball hoops and
pickle ball courts. We need both of these things.
3/7/2025 8:31 AM
Civic Center M aster Plan <br>Community Workshop #1 Online Survey
6 / 13
30 My first priority would be a performing arts center. The c ity does not have any facility for this at
the time. Second, I think it would be good to have a new city hall that is set up for the 2030s. I
do not see the need for green s pace in this area is there are many parks throughout the c ity.
3/7/2025 7:41 AM
31 Recreation Center, Aquatic Center and youth center 3/7/2025 7:29 AM
32 You could combine the needs by having a multi-generational center that can serve, youth,
teens and older adults. Most cities hav e moved away from recreational facilities that are s olely
dedic ated to one age group to maximize usage while being more self-sus taining.
3/7/2025 7:29 AM
33 Recreation center / Youth Ctr 3/6/2025 9:16 PM
34 All of the proposed us es s eem like valuable additions. Ultimately, the dec is ion should be
guided by ec onomic feasibility, but if the budget allows, there’s no reason the s ite c ouldn’t
acc ommodate most—or even all—of these uses. A well-balanced mix of amenities will make
the civ ic c enter a more dynamic and inclusive space for the community.
3/4/2025 10:19 PM
35 It would depend on the features of each c enter. Gilroy needs all of them, aquatic center, youth
center, recreation, arts and senior.
3/4/2025 7:55 PM
36 The rec and aquatic c enters are mos t appealing to me. Gikroy needs more recreational
opportunities for the public, es pecially youth. In about 19 years, I’ll be very interes ted in us ing
the senior c enter.
3/4/2025 10:20 AM
37 All of them if pos sible without reduc ing the effectiveness of their purpose. Gilroy has a more
senior adult population. Youth activities are important to growing cities li ke Gilroy. A rec and
aquatic c enter serves all of the population. Lastly, Gilroy does have a vibrant art c ulture whic h
would be well served with a theatre.
3/4/2025 10:02 AM
38 Senior Center, because I am one. Recreation Center, because it would serv e a more general
audience.
3/4/2025 9:51 AM
Q4 Which possible future uses for the Civic Center area (Senior Center,
Youth Center, Recreation Center, Aquatic Center, and/or Arts Center)
make the most sense? Which make the least sense?
Answered: 38 Skipped: 1
#RESPONSES DATE
1 I love all these ideas. I think if we can do it well, do all of them.4/8/2025 2:14 AM
2 Mos t, Recreation Center...least, a stand-alone y outh center since that could be housed in the
Recreation Cent er (but jus t not dedicated for it).
3/25/2025 9:53 AM
3 Leas t sense- aquatic c enter bas ed on the siz e We have sev eral arts centers downtown Most
sense: youth center, rec center, and then senior c enter
3/24/2025 8:37 AM
4 The mos t sense is aquatic center and y outh center. The least s ens e is recreation center 3/19/2025 9:04 PM
5 Gilroy could become the hub for Performing Arts if we were to build a Art Center. As stated
abov e a large building des igned for multi us e (Seniors, Youth and other Rec reation uses ) might
be able to be multi us e. Gilroy is great need of an Aquatic Center for all c itizens us e but I am
not sure if this is the best space for it.
3/17/2025 2:32 PM
6 ice rink and more baseball for girls 3/17/2025 12:30 PM
7 The most bang for the buck is a new, master plan for the sports park and ic e rink.3/17/2025 9:07 AM
8 In my opinion, the Civic Center area could be used for various services , but I think a youth
center and recreation center would be the best fit. These centers would attrac t members from
the community of all ages and ethnic bac kgrounds. It would be located within walk ing distance
for some, biking for others, and public transportation would also be an option to getting to
3/17/2025 8:00 A M
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 179Gilroy Civic Center Master Plan
Civic Center Master Plan <br>Community Workshop #1 Online Survey
7 / 13
thes e centers . I love art; howev er, I am not sure that many would be interested in an Art
Center ov er a diverse y outh/recreation center.
9 We need multifunctional spaces. The c ity is growing and we hav e a diverse population, so
hav ing spaces that only get used sometimes isn’t effic ient. For example, having the senior
center is important but it’s c losed a lot of the time, so that space is was ted at those times.
Having a multi us e center means those spac es c ould be put to use for evening clas ses
(learning gardening after work, analyzing mov ies, learning languages , art classes, etc ). I want
s pac e that I c an take a class, my kid can tak e a clas s and my mom c an take a class, whether
thos e are art, science or workouts, it’s all important. All of the options (senior stuff, youth,
aquatic, art and rec ) are also good, we need all of those things for our community !
3/16/2025 9:04 AM
10 An arts center since gavilan c ollege is where we usually attend theater events 3/15/2025 9:17 PM
11 The youth center, recreation center and aquatics center make the mos t sense to me. Although
I lov e art, the art center is the leas t important if it's just visual and not interac tive.
3/14/2025 4:58 PM
12 All are great use and very useful to the community. By prov iding a space for seniors and
y outh, art center that c an be rented for events ( and thus bring revenue and traffic to downtown
and the city ). Also love the idea of an outdoor space for farmers market and festivals .
3/14/2025 8:34 AM
13 Least sense probably art center, since we already have sev eral in that area.3/14/2025 7:27 AM
14 Land was purchased and a plan developed for an Arts c enter at Monterey at 7th s t. Follow
through with that plan. A plan for the next phas e of the Senior Center was completed many
years ago for the and that was nev er followed through on. If an Aquatic center is desired, find
appropriate land for it. Do not try and squeeze that in here.
3/13/2025 9:36 AM
15 I 3/11/2025 7:25 PM
16 Recreation Center + Arts Center -3/11/2025 10:38 AM
17 Aquatic center 3/10/2025 5:52 PM
18 I think that the art center is n’t that important compared to others s in ce I think it would be better
if we used it to benefit more youth and as a rec center as well as making a public pool
3/10/2025 5:50 PM
19 The recreation center makes the mos t s ense. The senior c enter makes the least sens e.3/10/2025 5:45 PM
20 Most sense is the youth and aquatic c enter since those don’t really exsis t in Gilroy and the
one that makes les s sense is pos sibly senior c enter s ince one exis t however I think all should
be area created or renov ated since all serve different great purposes
3/10/2025 5:45 PM
21 Aquatic c enter for the s ummer 3/10/2025 5:45 PM
22 Mos t s ense aquatic c enter-it would be for every one Least sense arts c enter. Art is a shame
now. Ridiculous what some c all art.
3/8/2025 3:42 PM
23 Aquatic Center and Arts Center make the least s ense. Senior center, Recreation Center and
Youth Center mak e the most s ense.
3/7/2025 10:33 PM
24 Recreation Center, Senior Center, Youth Center mak e the most s ens e. Arts Center is badly
needed and should be built on the land already owned by the City on Eigleberry in lieu of the
parking lot that no one uses - what a waste of 1.7 million. The Aquatic Center is a great idea
but needs a lot of room.
3/7/2025 6:07 PM
25 Least sense: rec and swim because of pa rking and amount of land needed 3/7/2025 11:58 AM
26 Senior Center and Recreation Center. We s hould always take care of our aging population. Rec
Center will be a great way to bring people together, are multiuse spaces and can be used year
round. Gymnasium type facilities are much eas ier to maintain and will c ost much less than an
aquatic center. Aquatic c enter will only be used in the summer and the on going maintenanc e
will be much more.
3/7/2025 11:31 AM
27 Senior center makes the most sense for future use. The aquatic c enter makes the least sense
for future use. There's already an aquatic c enter in Morgan Hill which is close enough.
3/7/2025 10:48 AM
28 Youth, senior, rec reation make the most sense. Aquatic and arts make the least (we have
els ewhere)
3/7/2025 8:42 AM
29 See comments above 3/7/2025 8:31 AM
Civic Center M aster Plan <br>Community Workshop #1 Online Survey
8 / 13
30 See the above ans wer.3/7/2025 7:41 AM
31 Recreation Center 3/7/2025 7:29 AM
32 Multi-generational center with a large banquet room to generate revenue. A large banquet room
could have a stage to serve performanc es and there could be also a gallery eliminating the
need for a s tand alone art center. Performing Art Centers us ually require a huge subsidy to
operate mak ing them a huge drain on the general fund budget. Aquatic Centers are als o very
expens ive to operate and staff and do not generate a lot of rev enue creating an impac t on the
general fund as well.
3/7/2025 7:29 AM
33 Youth & rec reation & Aquatic Mos t Sense Arts Leas t sense.3/6/2025 9:16 PM
34 A recreation/aquatic center would likely be well-utilized and provide a strong community
benefit, especially if des igned to acc ommodate a wide range of ages and abilities . An arts
c enter is more uncertain—it depends on how it is executed. If it includes flexible, multi-use
spaces that can host a v ariety of programs and events, it could be a great addition. Howev er, if
it’s too specialized or lacks community engagement, it may struggle to justify the investment.
3/4/2025 10:19 PM
35 None of them. All are needed.3/4/2025 7:55 PM
36 I think a rec center that c ombines uses for all ages and abilities mak es most s ens e.3/4/2025 10:20 AM
37 Senior physic al c lasses (chair aerobics and stretching). Rec and summer s wims with lifeguard
clas ses . Loc al theater productions . Youth recreation classes that could tie into local high
school’s exc ellent sports programs (Gilroy High is CCS wres tling champions for 22
consecutive years)
3/4/2025 10:02 AM
38 Unfortunately, an Aquat ic Center. It would be very expensive to maintain. I would rather see
the other us es fully dev eloped.
3/4/2025 9:51 AM
Q5 What concerns you most about the Civic Center Master Plan project?
Answered: 37 Skipped: 2
#RESPONSES DATE
1 It seems like s ome building would need to be multi us e. Nothing wrong with that, but hoping it
doesn’t cut down on the functionality of the building. I don’t see ADA parking on the map
throughout the site. It’s a long way to walk for some older folks or folks with needs from the
parking area to the s enior center. I see a lot of landscaped areas that might be able to be
inc orporated into places with a bench/table for people to enjoy lunches outside. I understand
that this is a 10k foot view of the project with details to come. I love the beautiful old
4/8/2025 2:14 AM
2 Money...this is going to be very expens ive and I'm not s ure residents will be willing to open up
their wallets to pay for it.
3/25/2025 9:53 AM
3 I really hope that all youth will hav e ac cess to the youth and rec centers if they are made. Not
all extracurricular ac tivities are acc ess ible for a great part of our youth in gilroy due to
financ ials. The time it will take and c ons truction is also a concern.
3/24/2025 8:37 AM
4 Again the shade. When the center has enough indoor shade, the people will come more.
Example, compare to Gilroy outlet mall and Milpitas outlet mall. Gilroy outlet nowsaday is les s
people coming.
3/19/2025 9:04 PM
5 Cos t!! Who bears the burden of the costs; property owners or all citizens? How will the cos ts
be sus tainable over time?
3/17/2025 2:32 PM
6 waste of money for the old part of town 3/17/2025 12:30 PM
7 old roads with lots of stop signs and homes nearby, I'm guessing old underground plumbing 3/17/2025 9:07 AM
8 What concerns me is that you capture all of this data and then nothing will happen. The
community has been ask ing for either a youth center or recreation center for a long time
(years) and don't see the city making it happen.
3/17/2025 8:00 AM
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 180Gilroy Civic Center Master Plan
Civic Center Master Plan <br>Community Workshop #1 Online Survey
9 / 13
9 That it will tak e forev er, won’t be useful and does n’t make the best us e of parking or acc ess .
Once we have thes e beautiful s paces, I hope they get used well-for ex ample the current senior
c enter has very limited offerings for more v ibrant seniors. My mom would love to meet more
seniors and take classes like Zumba or pick leball or Art but she feels the offerings are “too
old”. She’s still got mobility and the photos of senior lunch in wheelchairs doesn’t attract her.
3/16/2025 9:04 AM
10 The c ost and increase on local taxes .3/14/2025 4:58 PM
11 I feel the city hall is not as much as priority as what we hav e now is serv ing the c ommunity
well.
3/14/2025 8:34 AM
12 Seniors hav ing ac ces s to a place to gather while construc tion is going on.3/14/2025 7:27 AM
13 The old polic e station was identified as the City Hall Anex. Money was spent to des ign a new
public entrance. The city spends money on plans but does not follow through.
3/13/2025 9:36 AM
14 lack of funding 3/11/2025 10:38 AM
15 That it will take lot of time to build 3/10/2025 5:52 PM
16 Nothing 3/10/2025 5:50 PM
17 How the construction will affect traffic around thos e streets.3/10/2025 5:45 PM
18 That it would take a long time to complete the plan 3/10/2025 5:45 PM
19 How long it could actually take to build 3/10/2025 5:45 PM
20 Gilroy is s o ghett o compared to the updates Morgan hill has done to its little town. Wis h Gilroy
would make an effort to build buildings that are appealing to look at and that provide public
s paces that are kept up.
3/8/2025 3:42 PM
21 There is a lot of local sentiment for preserving Wheeler Center which is on the city 's list of
historic buildings. Interior definitely needs remodeling/reimagining. Thoughts of demolition are
scary!
3/7/2025 10:33 PM
22 How the c ost will be funded.3/7/2025 8:30 PM
23 Getting the voters of Gilroy to approve it - need a persuadable advocate to convince the voters
to approv e this projec t. I do not think prov iding offic es for elected officials is a very motivating
idea to win votes. The mayor has an office there now that is empty mos t of the month. Maybe
one office for all counc il members c ould be justified but not a separate one for each one of
them. Hav ing the City Hall closed on Fridays, having to check in to s ee anyone and having all
doors to the City Hall closed but one is not customer servic e oriented and should be
discontinued immediately. It feels like a pris on jus t to enter. Instead of being public serv ants
the current arrangement s mells of elitis m. Continuing such policies will not garner votes from
the public . Remember Measure C did not get the required votes and that was for a good c aus e
- public s afety. New digs for the City bureaucrats with an unwelcoming (don't bother me)
attitude will not motiv ate the public to vote for increasing taxes. An open-door policy and a
customer serv ic e spirit is what's needed now whether or not a new City Hall is built.
3/7/2025 6:07 PM
24 Is it poss ible to c ombine the PD and City Offices so as to free up some funds to purchas e
better technology for both PD and City...invest in c apabilities not buildings
3/7/2025 11:58 AM
25 Aquatic Center 3/7/2025 11:31 AM
26 What conc erns me the mos t about the Civic center master plan projec t is the cost and how it
will be funded. I'm on a limited income and having a forced increase would impact me
negativ ely.
3/7/2025 10:48 AM
27 Cost to me. The tax pay er. And the inability for government to do things efficiently and cost
effective with a good result. Gourmet Alley is not a good prev iew.
3/7/2025 8:42 AM
28 How long ev erything is taking. Too much red tape.3/7/2025 8:31 AM
29 Coming up with the funds to build, staff and maintain these facilities and prov ide park ing.3/7/2025 7:41 AM
30 Gilroy may take forever to complete it and may nev er get deliver 3/7/2025 7:29 AM
31 The on-going operational c ost of s ustaining thes e facilities. The City of Gilroy has reduced
their general fund for parks and recreation (fac ilities, programming and staff) dramatically since
3/7/2025 7:29 AM
Civic Center M aster Plan <br>Community Workshop #1 Online Survey
10 / 13
2008. I would encourage the City to do a feasibility study for the facilities and amenities being
cons idered before proc eeding.
32 Parking 3/6/2025 9:16 PM
33 My biggest c onc ern is that this plan will continue to suburbanize the neighborhood by orienting
everything inward toward the c ivic center rather than integrating it with the surrounding
c ommunity. A well-designed civic center should enhanc e the neighborhood, not is olate its elf
from it. The Wheeler Center is a great example of success ful integrat ion, while the police
s tation demonstrates the opposite—it feels completely disconnected, almos t lik e a fortress.
Another major concern is that the needs of people driving in from farther away could outweigh
the needs of residents who live c loses t to the c ivic center. While the space s hould abs olutely
be welc oming to all residents, planning decisions s hould not prioritize car access at the
ex pense of thos e of us who live here and navigate the area on foot. A truly suc ces sful mas ter
plan will focus on walkability, connectiv ity, and a design that strengthens the fabric of the
neighborhood.
3/4/2025 10:19 PM
34 Was ting tax payer money, going over budget and not stay ing with in timeline. City needs to
look at downsiz ing city hall, making use of modernized work spaces , with technology mos t
busines ses are downsizing their footprints .
3/4/2025 7:55 PM
35 Whatever we end up with should be sustainable (energy, maintenanc e, us e, and financ ial)3/4/2025 10:20 AM
36 Parking and lack of green space 3/4/2025 10:02 AM
37 Expense money for staff and other ongoing expens es.3/4/2025 9:51 AM
Q6 What excites you most about the Civic Center Master Plan project?
Answered: 36 Skipped: 3
#RESPONSES DATE
1 All of it!4/8/2025 2:14 AM
2 Hav ing a Community Center. It's badly needed in a town of this s ize.3/25/2025 9:53 AM
3 We will be able to use space in a better way.3/24/2025 8:37 AM
4 Aquatic but pleas e have a shade 3/19/2025 9:04 PM
5 This plan is conceptually mov ing us c loser to a 21s t Century model that c ould meet the needs
of all citizens of Gilroy.
3/17/2025 2:32 PM
6 to get a big pool in town lik e morgan hill 3/17/2025 12:30 PM
7 how muc h it cost to do this study 3/17/2025 9:07 AM
8 I get excited that we c ould actually have a youth/recreation or aquatic c enter and that we won't
have to go to Morgan Hill. I prefer to pay for serv ices here and keep the money in Gilroy.
3/17/2025 8:00 AM
9 The poss ibility of having all of those things in town for us to use!3/16/2025 9:04 AM
10 Having opportunities for our youth in the c ommunity 3/15/2025 9:17 PM
11 Expanding ex periences for our y outh and families! We are so far from resources and fun
plac es s o having this in town is exc iting!
3/14/2025 4:58 PM
12 The aquatic center but it has to be year around not just summer.3/14/2025 8:34 AM
13 It will be an attractive and beautiful space to gather.3/14/2025 7:27 AM
14 The possibility of our c ity providing a heart to our community 3/11/2025 10:38 AM
15 A place for the youth 3/10/2025 5:52 PM
16 Knowing that there is going to be a place that people are going to be able to use and have fun
at
3/10/2025 5:50 PM
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 181Gilroy Civic Center Master Plan
Civic Center Master Plan <br>Community Workshop #1 Online Survey
11 / 13
17 It will be something new to gilroy 3/10/2025 5:45 PM
18 That there more youth s paces with diffrent pos sibilities 3/10/2025 5:45 PM
19 That there is finally going to be a place for the hope c ommunity 3/10/2025 5:45 PM
20 That it c an become a beautiful spac e for the public 3/8/2025 3:42 PM
21 New rec reation c enter which c an be us ed by seniors also!3/7/2025 10:33 PM
22 That you are address ing thes e very important is sues is exiting. You do need a new City Hall as
that one was built in 1980 and has outlasted the 40 years it was expected to last. The air
c onditioning/heating sys tem is constantly failing, and the electrical s ystem shuts down when
space heaters are used to offset the cold in the offices. An updated electric al s ystem and
more continent outlets are needed in our computer dominated environment. Nobody thought of
laptops, cell phones , and desk top c omputers in every offic e in 1980 - they weren't ev en
invented.
3/7/2025 6:07 PM
23 Art Center with both indoor and outdoor facilities...Park ing on Eigleberry lot 3/7/2025 11:58 AM
24 Updated City Center that will bring the community together. Every one is isolated in their homes
and then go to Morgan Hill or San J ose for fun. We s hould have fun in our own backy ard!
3/7/2025 11:31 AM
25 Getting something on par with the Avenidas in Palo Alto would be awesome.3/7/2025 10:48 AM
26 The hope that community will engage. Whether or not it ev er happens.3/7/2025 8:42 AM
27 To be able to work out, s wim, and play pickle ball on Gilroy !3/7/2025 8:31 AM
28 I am exc ited that the city is creating a vision for a c iv ic c enter and inv olving the citizens in its
vis ion.
3/7/2025 7:41 AM
29 A space for young generation to come together with s tate of the art fac ilities. We must have
multiple conference rooms and halls to acc ommodate big gatherings while offering all the
facilities lik e gy m, aquatic center etc
3/7/2025 7:29 AM
30 Everything! The City's city hall and recreational facilities are antiquated. It's about time that
they are considered.
3/7/2025 7:29 AM
31 Finally a projec t al l families & abilities can take adv antage of without having to driv e out of
town for it
3/6/2025 9:16 PM
32 What exc ites me most about the Civic Center Master Plan is the opportunity to improve and
revitalize the space—making it more walk able, accessible, and better integrated with the
surrounding neighborhood. Enhancing connectivity and prov iding more services will not only
benefit those of us who live nearby but also create a more welcoming and functional
destination for the entire city.
3/4/2025 10:19 PM
33 Having s omething accessible and affordable to all members. A centralized gathering plac e.3/4/2025 7:55 PM
34 I see this as a future public meeting area for events, while also providing recreational space.
The site can be helpful in addressing future c limate events (ie giv ing the public a place to s wim
and cool down during high heat events)
3/4/2025 10:20 AM
35 The community aspect, es thetics and s ervices provided to citizens.3/4/2025 10:02 AM
36 It’s time for s ome serious remodeling.3/4/2025 9:51 AM
Q7 What have we missed? Or any additional comments you would like to
share?
Ans wered: 31 Skipped: 8
#RESPONSES DATE
1 Will the new solar panels be re-purpos ed? I lov e the antique look of the Wheeler Center on the 4/8/2025 2:14 AM
Civic Center M aster Plan <br>Community Workshop #1 Online Survey
12 / 13
corner of 6tha nd Cheurch, but I understand that it will need to be removed. Jus t s aying it
might be nice to get s ome good photos of it before.
2 Great job. Thanks!3/25/2025 9:53 AM
3 Theater ///3/19/2025 9:04 PM
4 If there was/is deeper outreach to all segments of our community I believ e we can have better
conc ept of the benefits to our local citizens.
3/17/2025 2:32 PM
5 the study is alot of money just build it big and right like Morgan hill 3/17/2025 12:30 PM
6 May be think about the off-ramps nearby for swim events and hotels within walking distance 3/17/2025 9:07 AM
7 I think that more efforts are needed to engage our monolingual populations. They not k now that
these s ess ions are happening. They also may not unders tand what this master plan is and
how they play a role as community residents. Quite often they are not inv olv ed in decision
making. Perhaps, connecting with local non-profits to s pread awareness .
3/17/2025 8:00 AM
8 Parking is important. But we don’t need to be limited to a giant flat lot or tall structure. Small
lots tucked around the neighborhood or corners of the master area would be good. I don’t mind
walking a block .
3/16/2025 9:04 AM
9 Would the gy m offer c hildc are because that would be something to add to the list of pros on
why to bring a rec center to town
3/15/2025 9:17 PM
10 I like the idea of having a s pac e for fes tivals , farmers markets, and local vendors to encourage
community unity.
3/14/2025 4:58 PM
11 The picture of aquatic c enter s hows it outdoor which would be not effic ient, as of now we have
Chris topher high for s ummer but we NEED indoor pool facilities.
3/14/2025 8:34 AM
12 How about a community garden? The Gilroy Gardening Group is a very active group here and
was involved in our previous garden until it was paved ov er for a parking lot...just like the
song... Community gardens bring the community together in very healthy ways.
3/14/2025 7:27 AM
13 We should look at us ing the Parking s tructure money to prov ide a single area for all parking.
Also, we s hould look at moving all the public s ervices to a second floor ie. city hall, c ity s taff
and counc il c hambers .
3/11/2025 10:38 AM
14 Shere to youth 3/10/2025 5:52 PM
15 Nothing 3/10/2025 5:45 PM
16 I would like there to be some studying rooms or areas for youth to go study and some rooms
students can book to study or hang out
3/10/2025 5:45 PM
17 I think this plan could be more effective if more people find out 3/10/2025 5:45 PM
18 Refreshing the library would be nice 3/8/2025 3:42 PM
19 Recreation Dept. needs more funding and more ac tivities. City Hall is a nice building but has
heating and AC problems and Council meeting room has very poor acoustics . Council
members are in an auditory "cave".
3/7/2025 10:33 PM
20 What about the 4 houses on Dowdy St - renew efforts to buy these houses and inc orporate the
land into the Master Plan. What about the over $5,000,000 left over from the library projec t
bond that should have gone to pa rtially pay for building a parking structure (4 story) to be used
by library patrons and City Hall employees and visitors. That s hould hav e been built where you
have now put solar panal structures over the ground level park ing spaces. The arts center is a
great idea, but you have the property to build it on Eigleberry between 6th and 7th - instead y ou
built a parking lot that nobody uses. That art center should be built there. There is simply not
enough space to build all the necessary struc tures mentioned in your master plan.
3/7/2025 6:07 PM
21 1. Combine PD and City Offices 2. Move Rec /Swim to Sports park and/or Easts ide location
and/or Gilroy Gardens 3. Rework P&R department to better serve City
3/7/2025 11:58 AM
22 I didn't see a lot about inclusion. I saw one mention. We need places for disabled to recreate,
ranging in age from infants to s eniors. Well I'm going to go away for
3/7/2025 10:48 AM
23 Connec tion to downtown through a pedestrian paseo through acquisition of some homes to the 3/7/2025 8:42 AM
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 182Gilroy Civic Center Master Plan
Civic Center Master Plan <br>Community Workshop #1 Online Survey
13 / 13
east.
24 Thanks for including me in the proces s.3/7/2025 7:41 AM
25 Please don’t make it an other promis e as commercial center in Glen Loma/Fire Station, Shark
Stadium or better roads while main entry road from and to the city are brok en !
3/7/2025 7:29 AM
26 The on-going operational c ost of s ustaining thes e facilities. The City of Gilroy has reduced
their general fund for parks and recreation (fac ilities, programming and staff) dramatically since
2008. I would encourage the City to do a feasibility study for the facilities and amenities being
c onsidered before proceeding.
3/7/2025 7:29 AM
27 We should plan for retail space. If a park ing struc ture is built, that is a great place to
incorporate retail. It can be done similarly to other projects where the space is all built as
parking, and s pac es c an be conv erted ov er time to retail as demand increases. This is
important because hav ing thoroughly mixed use will be the best way to keep the public s pac e
occ upied and well used. This approach is ideal because it can be done gradually. Even if there
is never demand for retail, it would be better to have the available space and never use it,
rather than plan on 0 retail and then we are stuck with that decis ion for generations.
3/4/2025 10:19 PM
28 Please c ons ider how thes e services , buildings will be us ed and who will staff them. City should
return to staffing their own rec reation department.
3/4/2025 7:55 PM
29 None at this time 3/4/2025 10:20 AM
30 History and beautiful hills surrounding our city 3/4/2025 10:02 AM
31 Find a way to reac h more people. Keep encouraging them to get informed and to participate.3/4/2025 9:51 AM
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 183Gilroy Civic Center Master Plan
<strong><span style="c olor: #3f 6011;">CIVIC CENTER MASTER PL AN</span><br></strong><br><strong><span style="c olor: #3f 6011;">Community Workshop</span> <span style="c olor:#1b1d5a;">#2 </span><span style="c olor: #3f 6011;">Online Survey</span><br><spanstyle="c olor: #3f 6011;">Three Concept M aster Plan Alternatives</span></strong>
2 / 10
7 A-becaus e the lay out is much more balanced 4/22/2025 5:12 PM
8 Conc ept C seems like a great design with welcoming features throughout. I lik e the idea of the
amphitheater stage area on the green because it welcomes more concert/s hows/markets and
things like that to Gilroy.
4/22/2025 10:12 AM
9 B. Easier access to City Hall and all rec reation facilities are close together.4/21/2025 8:27 PM
10 Overall layout is nice, footprint of City Hall is the best of the 3.4/21/2025 6:19 PM
11 B 4/21/2025 4:48 PM
12 B 4/21/2025 2:57 PM
13 Concept C, the larger open space/park area is more appealing.4/21/2025 11:21 AM
14 B - (1) Nice balance and flow of Hards cape and landscape. (2) Large area for concerts with
stage framed from behind with the new City Hall...great ongoing marketing opportunity. (3) Max
flex for events . (4) Much easier to secure in providing safe ev ents .
4/21/2025 9:47 AM
15 C. I like the larger, circular park area. I als o like the park being in the corner.4/21/2025 9:39 AM
16 My firs t concern is the large parking lot being so far from es sential bldgs . , s pecifically the bldg
that will include senior c enter. in comparing the 3 drawings , “B” is providing street parking in
clos e proximity to the senior center and hopefully plenty of “Acces sible” marked spots.
4/21/2025 8:02 AM
17 I like A, it looks nicer to have the buildings spread out but the square shape als o maximizes
the green space. This also allows more even rows for farmers markets or craft fairs, as
opposed to a rounded shape.
4/20/2025 11:07 PM
18 B, bec aus e parking is closer to City Hall. And, more importantly, the park is bookended by two
city buildings. Parks that are pushed out to the edge or c orner tend t o have more vagrant
issues and other s afety issues.
4/20/2025 6:35 PM
19 I lik e the balanced architec ture that Concept A brings , while also integrating pedestrian
sidewalk ac cess at the corner of 6th St & Churc h. Moreover, the concept integrates well with
downtown activities extending potential venues or k ick off ev ents in the civic park and then
continuing downtown (example: Christmas tree lighting and d isplay in the Civic Park with the
procession down Monterey).
4/20/2025 5:46 PM
20 Concept C. I prefer the location and circular des ign of the Civ ic Park and the locations of City
Hall & the Community Center.
4/19/2025 8:41 PM
21 C. This c onc ept has all the major c ons truction s ite on one side while Amphitheater is a huge
plus for the outdoor activ ities
4/18/2025 11:21 PM
22 C as I think the lay out is better and park appears area is larger.4/18/2025 3:03 PM
23 C - I lik e the two fac ilities on the same s ide with the green space open to 6th street with
unobs tructed view. Being open rather than between buildings makes the green s pace less
private/unobs ervable from the street. This makes it less likely to become used by homeless.
4/18/2025 2:50 PM
24 The flow of keeping the community c enter and city hall ac ross from each other with the
s eparation of the civic park seems to flow nic er.
4/18/2025 11:20 AM
25 C - I really lik e the open space and jus t hav ing the buildings be out of site, out of mind for an
ev ent. It also feels the most open and most in nature. The lack of building to the north also
opens the ingress / egress points for parking. However, A is the most prac tical as noise from
events / conc ert would could be aimed using the buildings away from the the majority of the
residential area surrounding. If there was a need/desire, the expansion acros s could still occur.
Howev er, A is also the most utilitarian and feels more like placing blocks on the ground and
has much les s feeling.
4/18/2025 7:14 AM
26 I'm leaning towards C as I'm hoping City Hall and Rec c enter staff will park c loser to 7th st as
oppos ed t o flooding the parking in front of the library. Library park ing is already used by their
staff and those eating at the Senior Center. It would als o provide more visibility to events going
on in the green from those driv ing by.
4/17/2025 2:04 PM
27 C is my favorite because the civic park is more exposed to the surrounding neighborhood and
feels more welcoming and is directly adjac ent to the library which gives it more open v iews
makes it stand out better and the two together I feel go hand in hand.
4/17/2025 1:29 PM
<strong><span style="c olor: #3f 6011;">CIVIC CENTER M ASTER PLAN</span><br></strong><br><strong><span style="c olor: #3f6011;">Community Workshop</span> <span style="c olor:#1b1d5a;">#2 </span><span style="c olor: #3f6011;">Online Survey</span><br><spanstyle="c olor: #3f 6011;">Three Conc ept Master Plan Alternatives</span></strong>
1 / 10
17.24%5
37.93%11
44.83%13
Q1 SELECT your favorite Civic Center Master Plan concept by clicking on
the image of your preferred concept.
Answered: 29 Sk ipped: 25
TOTAL 29
0%10%20%30%40%50%60%70%80%90%100%
Concept A
Concept B
Concept C
ANSWER CHOICES RESPONSES
Conc ept A
Conc ept B
Conc ept C
Q2 Which is your favorite concept and why?
Ans wered: 52 Skipped: 2
#RESPONSES DATE
1 None. but if I have to choose, I go for Concept A The square green area allows for more us e
as in game area. There is s till plenty of green area surrounding it.
5/20/2025 4:06 PM
2 B i think why i should b it cause there a lot of little kids who live here i think it pails be better if 5/9/2025 6:39 PM
3 I like that all the "business " buildings are close to one another. IT would make more sense to
design the city hall to the corner of dowdy and 6th street, next to the police department to keep
them together. Then move the aquatics c enter and multigenerational community c enter to be
next to each other on the c orner of 7th and c hurc h. Have the parking central, loc ated on 7th
s treet next to the polic e station and the library. Central parking is the mos t functional as
families and the elderly will now hav e to walk from one corner to the next (most likely with
swimming gear, etc). That's a long walk with children and for the elderly.
5/1/2025 9:21 AM
4 A 4/28/2025 3:38 PM
5 B having the amphitheater somewhat enclosed by the two buildings on eac h end.4/25/2025 11:25 AM
6 C, I like that the civic park is on the c orner of sixth and churc h 4/24/2025 1:14 PM
SURVEY RESPONSESWORKSHOP #2 - ENGLISHDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 184Gilroy Civic Center Master Plan
<strong><span style="c olor: #3f 6011;">CIVIC CENTER MASTER PL AN</span><br></strong><br><strong><span style="c olor: #3f 6011;">Community Workshop</span> <span style="c olor:#1b1d5a;">#2 </span><span style="c olor: #3f 6011;">Online Survey</span><br><spanstyle="c olor: #3f 6011;">Three Concept M aster Plan Alternatives</span></strong>
4 / 10
52 B is favored concept with a hy brid of A regarding change in park s tyle as a rectangle. City
Council Chambers included within City Hall.
4/8/2025 10:45 AM
Q3 Which is your least favorite concept and why?
Answered: 47 Skipped: 7
#RESPONSES DATE
1 Concept B. Too muc h open c ement area.5/20/2025 4:06 PM
2 a and c 5/9/2025 6:39 PM
3 Although I c hos e concept C, I do hav e hesitiations with the layout as the amphitheater (when
in use) would cause noise pollution to the hous ing nearby, as well as the library which is
considered a quiet study area. Also, having a huge open grass area doesn't make muc h us e of
the space and func tionality. It would be best to make a children's park for families to enjoy.
Bec ause there are no trees in the middle, families could not enjoy that space due to the heat in
Gilroy.
5/1/2025 9:21 AM
4 Honestly I’m surprised that the Wheeler Auditorium won’t be repurpos ed. With that thought I
guess they all miss the mark. Also is there really a need for a new c ity hall? Seems there is
plenty of room to expand if needed
4/25/2025 11:25 AM
5 B, I don't lik e where the park is placed.4/24/2025 1:14 PM
6 C- it's too similar to the Christmas hill park amphitheater area. Not balanced to reflect c ivic
duty offices
4/22/2025 5:12 PM
7 My least fav orite concept is A bec ause I don’t lik e the placement of City Hall. I personally feel
as though city hall s hould be seen from 5th & c hurc h street unlik e it is now
4/22/2025 10:12 AM
8 C. I don't like that the amphitheater is so clos e to the street.4/21/2025 8:27 PM
9 Concept C - Buildings too crowded 4/21/2025 6:19 PM
10 c 4/21/2025 4:48 PM
11 C City hall will be more visible on 6th and church s treet then on 7th and c hurc h street 4/21/2025 2:57 PM
12 A. Hav ing the c ommunity center s o far away from the rec center does not make much s ense.4/21/2025 11:21 AM
13 C - (1) very tough to secure this area for downtown ev ents . (2) site lacks balance between
Lands cape and Hardscape.
4/21/2025 9:47 AM
14 C. It feels lik e those 2 bldgs both being near 7th st will be competing for a small amount of
street parking s ince lg lot is far away.
4/21/2025 8:02 AM
15 C. The c ommunity center and c ity hall look s crunched together and there’s no flexibility a round
them
4/20/2025 11:07 PM
16 C. A Park on the corner is not well placed. It will lack acc ountability and puts all the buildings
tight together.
4/20/2025 6:35 PM
17 Concept B, while similar to Conc ept A, except it does not s eem to welcome those who opt to
ride their bikes to this part of town. 6th street from old town to the
4/20/2025 5:46 PM
18 Concept B. I do not like the encroachment of City Hall & the Community Center on both s ides
of the Civic Park.
4/19/2025 8:41 PM
19 A, Rec reational facility is oddly in between two government buildings, which may mos tly s tay
close or least activ ities during weekends or holiday periods .
4/18/2025 11:21 PM
20 A, I lik e the open space at the c orner of 6th and Churc h above the other options.4/18/2025 3:03 PM
21 A & B are identical except that the buildings are on opposi te sides of the park . There is no
difference. The park is less visible from 6th street in these models . A large open park will be
4/18/2025 2:50 PM
<strong><span style="c olor: #3f 6011;">CIVIC CENTER M ASTER PLAN</span><br></strong><br><strong><span style="c olor: #3f6011;">Community Workshop</span> <span style="c olor:#1b1d5a;">#2 </span><span style="c olor: #3f6011;">Online Survey</span><br><spanstyle="c olor: #3f 6011;">Three Conc ept Master Plan Alternatives</span></strong>
3 / 10
28 C! I prefer the large open space on the corner of 6th and Church.4/16/2025 7:53 PM
29 C - the park design 4/16/2025 5:25 AM
30 B - good balance of green space along with facilities fir all groups to inc lude new city hall. Lik e
outdoor Amphitheatre. Appears to be adequate parking.
4/15/2025 11:07 PM
31 C 4/15/2025 5:49 PM
32 None. All three are basically the same lay out except for the rightmost third. All th ree feature a
pool. All three show a new city hall in a different location.
4/15/2025 6:55 AM
33 Concept C is best for two reas ons . One, it does not encourage visitors to park near the library,
unless that’s where they’re going. This is important because there often isn’t enough open
spaces near the library as it is. Two, it brings community members near city hall, which will
help them be more familiar with the area and a c rucially important part of our town.
4/14/2025 12:09 PM
34 Concept B. City Hall location is better viewed and parking location more accessible for City
Staff that s tay late. Es pecially during the fall when day light saving s tart.
4/14/2025 10:48 AM
35 A. The multigenerational community center s hould be large and spacious .4/14/2025 8:39 AM
36 C, jus t looks better visually the way buildings are struc tured nex t to each other.4/13/2025 3:15 PM
37 Concept B. City hall on c orner of 6th & Church.4/13/2025 10:43 AM
38 Round Park====It is IMPORTANT THAT THE SWIMMING POOL BE YEAR ROUND AND
PROVIDE INSTRUCTIONS FOR THE EASTSIDE CHILDREN. WATER AERBOICS AND LAP
SWIM TOO!
4/12/2025 4:51 PM
39 Provides a balanced aesthetic and maximizes green space while allowing for gras s areas that
are efficient and remov ing often underutilized corners whic h will s ave water
4/11/2025 7:04 PM
40 I like the park in the c enter and could be convenient to have the c ommunity center next to the
library. Great for family friendly ev ents .
4/11/2025 2:38 PM
41 Park appears large so better space c ons umption.4/11/2025 2:37 PM
42 C - the circular park is prettiest and having the buildings together rather than s eparated by the
park will make bus iness more c onducive for both staff and citizens . BUT I would revers e the
park with the buildings, so there is clos er parking for seniors and those with dis abilities to have
eas ier access to the multigenerational community center
4/11/2025 9:35 AM
43 B - offers a better layout of the area allowing for plenty of spac e between buildings for the city
hall and community c enter while als o integrating the council chambers into city hall versus
keeping it separated.
4/11/2025 9:31 AM
44 A. Having the community center adjacent to the library makes the most sense to me as I
sus pect the library will serve a central role in the civic enter
4/11/2025 9:16 AM
45 Concept C. Like the access from corner of 6th and Church whic h is direction our our
downtown. The park on 6th k eeps a nice open green s pace inste ad of being hidden by
buildings but… I do like B s ince open space is protected by buildings
4/11/2025 9:11 AM
46 C, the park appears to be the largest 4/11/2025 8:17 AM
47 Plan B 4/11/2025 7:45 AM
48 Concept A is the best because it provides the largest green play space I would use with my
k ids. The other shapes are pretty but lessen the amount of play space.
4/9/2025 2:54 PM
49 Orientation of the elements and n on-square park space.4/9/2025 9:49 AM
50 None of the abov e. I would prefer using the exterior shell of wheeler auditorium as part of the
recreation complex and replacing the current senior center with a modern multifunctional
building to round out the recreational needs.
4/8/2025 6:16 PM
51 A with c ity hall and the c ommunity center flipped. The city hall having the chambers attached
to it instead of s eparate on 6th st. The Community center on 7th s t. Having large concrete
planter barricades along c hurc h for security for events.
4/8/2025 10:53 AM
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 185Gilroy Civic Center Master Plan
<strong><span style="c olor: #3f 6011;">CIVIC CENTER M ASTER PLAN</span><br></strong><br><strong><span style="c olor: #3f6011;">Community Workshop</span> <span style="c olor:#1b1d5a;">#2 </span><span style="c olor: #3f6011;">Online Survey</span><br><spanstyle="c olor: #3f 6011;">Three Conc ept Master Plan Alternatives</span></strong>
5 / 10
lovely to look at while driv ing through the neighborhood so closing it off between 2 buildings is
my least favorite c hoice.
22 C - I think keeping the c ivic park "behind" the building, mak es it seem separate and less
inviting
4/18/2025 11:20 AM
23 B - I don't really like the sandwic h of buildings on either side. The s tage lay out is much nicer,
but just feels a little c lausterphobic .
4/18/2025 7:14 AM
24 B is my least favorite as there is only one entranc e from the street to the park. Although have
the rec and arts buildings next to each other is nice.
4/17/2025 1:29 PM
25 A. While I lik e keeping with history and having the rec c enter on 6th, I feel if at all. City Hall
s hould be on 6th and Churc h.
4/16/2025 7:53 PM
26 B - center on 7th street 4/16/2025 5:25 AM
27 A - building footprints seems crowded and forced into space without consideration for
s urrounding neighborhood and homes.
4/15/2025 11:07 PM
28 All. This is a failed process as there is not enough variety and not enough information. You
have sent us shopping g for a new car in a Mercedes dealers hip but with no budget.
4/15/2025 6:55 AM
29 Concept A is my least favorite. I think it will cause the most issues of people competing for
parking between the library and the community center.
4/14/2025 12:09 PM
30 Concept C. City Hall seems less s ecure being s o c lose to 2 corners. I guess I am always
thinking of active s hooter res ponse. Conc ept A and C don't seem as safe.
4/14/2025 10:48 AM
31 C. The multigenerational community center would be the smalles t. Followed by B.4/14/2025 8:39 AM
32 A, makes sense to have both the rec and c ommunity center near each other.4/13/2025 3:15 PM
33 Concept C. Do not need amphitheater.4/13/2025 10:43 AM
34 C does n’t allow the p aseo to integrate with the grass areas as well 4/11/2025 7:04 PM
35 C becaus e city hall and c ommunity center s eemed s quished together.4/11/2025 2:38 PM
36 B not sure what the large area behind the amphitheater will be us ed for and it right against City
Hall
4/11/2025 2:37 PM
37 B - the multigenerational community c enter should be c loser to the parking lot 4/11/2025 9:35 AM
38 C - the buildings seem too conden sed and close together 4/11/2025 9:31 AM
39 B. Wors t c ommunity center location 4/11/2025 9:16 AM
40 A - too boxy 4/11/2025 9:11 AM
41 that parking is only on the far northwest c orner of the s ite.4/11/2025 8:17 AM
42 I lik e the flow of it. I like that the pool and multi generational area is near the polic e dept 4/11/2025 7:45 AM
43 C is my least fav orite bec aus e it is surrounded on two sides by roads and seems m ore
surrounded by traffic than the first two c onc epts .
4/9/2025 2:54 PM
44 A feels like a Lego map.4/9/2025 9:49 AM
45 Amphitheater s hould not fac e Church Street as it is very busy with traffic and noisy.4/8/2025 6:16 PM
46 C 4/8/2025 10:53 AM
47 C. Park area unprotected and do not like s eparate Council Chambers.4/8/2025 10:45 AM
Q4 What is your favorite feature of the civic master plan?
Ans wered: 46 Skipped: 8
<strong><span style="c olor: #3f 6011;">CIVIC CENTER MASTER PL AN</span><br></strong><br><strong><span style="c olor: #3f 6011;">Community Workshop</span> <span style="c olor:#1b1d5a;">#2 </span><span style="c olor: #3f 6011;">Online Survey</span><br><spanstyle="c olor: #3f 6011;">Three Concept Master Plan Alternatives</span></strong>
6 / 10
#RESPONSES DATE
1 Nothinq, especially since you haven't detailed that s ome things, lik e City Hall, and the Senior
Center could be 2 story, thereby providing more space in a limited area. Also, WE DON'T have
to be like Morgan Hill! Instead of a s mall swimming pool, put one at San Ys idro park , and
c oordinate with Gavilan College for recreational swim, which could be all y ear round!
5/20/2025 4:06 PM
2 My favorite feature is the pas eo walkway as a means for holding events like farmer's markets,
etc.
5/1/2025 9:21 AM
3 Hav ing basketball courts and recreation for the y outh of the inner city. They is not one
ac cessible basketball court now that the public schools are fenced.
4/25/2025 11:25 AM
4 recreation and aquatic centers 4/24/2025 1:14 PM
5 The Fitnes s center!4/22/2025 5:12 PM
6 I love the Aquatic center and multicultural cen ter as well, it will bring the community together
for all different types of events.
4/22/2025 10:12 AM
7 Recreation building 4/21/2025 8:27 PM
8 A 4/21/2025 4:48 PM
9 Aquatic center 4/21/2025 2:57 PM
10 The new aquatic center.4/21/2025 11:21 AM
11 Masterplan considered as a whole.4/21/2025 9:47 AM
12 The addition of aquatic and rec reation area. Also the amphitheater.4/21/2025 8:02 AM
13 I’m exc ited to have the aquatic center, art/community c enter and amphitheater! So many
c ommunity events can be here!
4/20/2025 11:07 PM
14 Nice park.4/20/2025 6:35 PM
15 The Civ ic Park. We are bless ed with the weather and c limate for many outdoor activities
(movies in the park , Police Night Out, Poppy Jas per Film Fes tival), which can take full
adv antage for suc h a large inc lusiv e open s pace.
4/20/2025 5:46 PM
16 The Civ ic Park.4/19/2025 8:41 PM
17 recreation and aquatic center 4/18/2025 11:21 PM
18 Rec reation c enter/aquatic center.4/18/2025 3:03 PM
19 The outdoor Amphitheatre and community pool. These will bring opportunities for the
c ommunity to come together which I lov e.
4/18/2025 2:50 PM
20 I lik e that there are community buidlings and offices in one s pac e 4/18/2025 11:20 AM
21 1. The 200 seat theater 2. Amphitheater 3. Rehearsal spaces / dance s tudios etc. for theater
4. The pool facilities
4/18/2025 7:14 AM
22 an outdoor green space and amphitheater.4/17/2025 2:04 PM
23 The outdoor amphitheater and park as well as the arts center having a dinning hall and theater.4/17/2025 1:29 PM
24 Aquatic s center!!!4/16/2025 7:53 PM
25 Balance of park s pac e and fac ilities.4/15/2025 11:07 PM
26 None.4/15/2025 6:55 AM
27 I have two fav orites, the natural feel of the space and the community pool space. I look
forward to swimming in a masters program there. It’s also great for families who need
affordable ac cess to s wim les sons and c ooling off in the s ummer. Christopher high school has
been doing that, but is not centrally located in our town.
4/14/2025 12:09 PM
28 Favorite feature is the landsc aping.4/14/2025 10:48 AM
29 Aquatic Center 4/14/2025 8:39 AM
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 186Gilroy Civic Center Master Plan
<strong><span style="c olor: #3f 6011;">CIVIC CENTER M ASTER PLAN</span><br></strong><br><strong><span style="c olor: #3f6011;">Community Workshop</span> <span style="c olor:#1b1d5a;">#2 </span><span style="c olor: #3f6011;">Online Survey</span><br><spanstyle="c olor: #3f 6011;">Three Conc ept Master Plan Alternatives</span></strong>
7 / 10
30 The rec center, it would be nice to have one s imilar to Morgan Hill’s rec center.4/13/2025 3:15 PM
31 Park ing 4/13/2025 10:43 AM
32 PARK, RECREATION BUILDING INCLUDING POOL 4/12/2025 4:51 PM
33 Open spac e 4/11/2025 7:04 PM
34 Community center and fitnes s center.4/11/2025 2:38 PM
35 Recreational and aquatic center.4/11/2025 2:37 PM
36 The park in Plan C 4/11/2025 9:35 AM
37 multigenerational recreation and aquatic center 4/11/2025 9:31 AM
38 Lot of family activ ities available out of a single area 4/11/2025 9:16 AM
39 The paseo and swim c enter 4/11/2025 9:11 AM
40 the park and pas eo 4/11/2025 8:17 AM
41 I like that each plan has an open area of lawn in s pac e 4/11/2025 7:45 AM
42 I lov e the multigenerational building idea. It's so hard to find places and ac tivities that will allow
my kids and their grandparents to interact together. I think kids benefit from s pending time with
older people.
4/9/2025 2:54 PM
43 Multigenerational center 4/9/2025 9:49 AM
44 The green space in the middle.4/8/2025 6:16 PM
45 The multigenerational community c enter.4/8/2025 10:53 AM
46 New multigenerational community centers and future multigenerational recreation & aquatics
center
4/8/2025 10:45 AM
Q5 What would you like to see built first?
Ans wered: 47 Skipped: 7
#RESPONSES DATE
1 Not sure. It depends on how it would impact community serv ices.5/20/2025 4:06 PM
2 The multigenerational recreation c enter s hould be prioritized along with the c ommunity center,
then the aquatics center.
5/1/2025 9:21 AM
3 The recreation area 4/25/2025 11:25 AM
4 recreation and aquatic centers 4/24/2025 1:14 PM
5 Fitness center 4/22/2025 5:12 PM
6 A new green area, the civic center and park that are there now are hardly ev er in use.4/22/2025 10:12 AM
7 Recreational building and theater.4/21/2025 8:27 PM
8 Any 4/21/2025 4:48 PM
9 City hall 4/21/2025 2:57 PM
10 Aquatic/rec center.4/21/2025 11:21 AM
11 (1) New Library Annex (2) City Hall and Civic Park (3) Community Center (4) Rec reational
Center
4/21/2025 9:47 AM
12 The multi gen c ommunity center 4/21/2025 8:02 AM
13 Tough call, maybe the aquatic/rec center or the community center.4/20/2025 11:07 PM
<strong><span style="c olor: #3f 6011;">CIVIC CENTER MASTER PL AN</span><br></strong><br><strong><span style="c olor: #3f 6011;">Community Workshop</span> <span style="c olor:#1b1d5a;">#2 </span><span style="c olor: #3f 6011;">Online Survey</span><br><spanstyle="c olor: #3f 6011;">Three Concept M aster Plan Alternatives</span></strong>
8 / 10
14 Does n't matter. Should be based on use of existing buildings, the scheduled calendar of
events, and least impact to the newly installed solar panels.
4/20/2025 6:35 PM
15 Multigenerational community center with the Civ ic Park.4/20/2025 5:46 PM
16 The Multi Generational Community Center.4/19/2025 8:41 PM
17 recreation center 4/18/2025 11:21 PM
18 Recreation Center 4/18/2025 3:03 PM
19 Community pool and buildi ng.4/18/2025 2:50 PM
20 The aquatics c enter 4/18/2025 11:20 AM
21 Multi-generational Rec building with theater.4/18/2025 7:14 AM
22 parking 4/17/2025 2:04 PM
23 The civ ic park would likely be the fastest, and could be in us e while the other facilities are
being built, or the rec fac ilities since Gilroy lacks thes e.
4/17/2025 1:29 PM
24 Aquatics c enter!!!4/16/2025 7:53 PM
25 Gym 4/16/2025 5:25 AM
26 Multi-generationa l center.4/15/2025 11:07 PM
27 Youth center.4/15/2025 6:55 AM
28 I would like to see this projec t built in a way that is leas t dis ruptive to the important ac tivities
and class es c urrently being offered at the wheeler center and the senior center. People who
utilize these buildings and the programs housed in them rely on them for healthy ac tivity and
pos itive ways for people to spend their time.
4/14/2025 12:09 PM
29 City Hall 4/14/2025 10:48 AM
30 I go to Wheeler 5x a week for ac tivities. I would lik e the new c ommunity center and aquatic
center firs t.
4/14/2025 8:39 AM
31 The rec center!4/13/2025 3:15 PM
32 Community center 4/13/2025 10:43 AM
33 RECREATION BUILDING AND COMMUNITY CENTER PLUS NEW CITY HALL.4/12/2025 4:51 PM
34 City hall 4/11/2025 7:04 PM
35 Community center but fitnes s center is a v ery clos e second.4/11/2025 2:38 PM
36 Recreational/aquatic center.4/11/2025 2:37 PM
37 The rec reation and aquatic center. These are much needed by our community.4/11/2025 9:35 AM
38 multigenerational recreation and aquatic center 4/11/2025 9:31 AM
39 Community center s ince gilroy already has a aquatic center out of christopher high school 4/11/2025 9:16 AM
40 All of it!4/11/2025 9:11 AM
41 the recreation center 4/11/2025 8:17 AM
42 I’d like to see the senior center built first. And the pool.4/11/2025 7:45 AM
43 I'd like to multigenerational c ommunity center to be firs t as it will allow my k ids to take class es
there through GIlroy Rec.
4/9/2025 2:54 PM
44 No preference. Whatever is cheapest and leas t dis ruptive.4/9/2025 9:49 AM
45 Recreation center inside Wheeler, auditorium, then replace current s enior center.4/8/2025 6:16 PM
46 The m ultigenerational community c enter.4/8/2025 10:53 AM
47 Multigenerational Community Center and then new City Hall, followed by recreation & aquatics 4/8/2025 10:45 AM
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 187Gilroy Civic Center Master Plan
<strong><span style="c olor: #3f 6011;">CIVIC CENTER M ASTER PLAN</span><br></strong><br><strong><span style="c olor: #3f6011;">Community Workshop</span> <span style="c olor:#1b1d5a;">#2 </span><span style="c olor: #3f6011;">Online Survey</span><br><spanstyle="c olor: #3f 6011;">Three Conc ept Master Plan Alternatives</span></strong>
9 / 10
center
Q6 Any additional comments you would like to share?
Answered: 35 Sk ipped: 19
#RESPONSES DATE
1 Nothing has been said as to how BIG the bond issue would have to be, and therefore how it
would impact folks' property taxes, and for how long.
5/20/2025 4:06 PM
2 See above regarding placement of all the "busines s" buildings together and the family
recreational c enters together, also having a central parking lot as the ir will be elderly, families
with children who will be forced to walk across the c ivic c enter if the parking remains on the
corner of dowdy and 6th street. Replac e that parking and put the city hall in that c orner.
5/1/2025 9:21 AM
3 As a resident of Dowdy s treet we were informed of the parking on the corner of 6th and Dowdy
but the plans the c ity gave to me ass ured us that the traffic from the parking lot would not
empty onto our residential street. All the concept drawings appear to s how an exit onto Dowdy
instead of 6th. The exit onto 6th would be more logical and preserv e our neighborhood
4/25/2025 11:25 AM
4 Gilroy has been missing something like this! Morgan hill has one with great succ ess and now
it's our turn
4/22/2025 5:12 PM
5 I’d like to thank the City of Gilroy for finally doing something for the community’s environment.4/22/2025 10:12 AM
6 This would be nic e to have in our community. There is a need for rec reation for all ages. There
isn't much more they c an do now without any facilities .
4/21/2025 8:27 PM
7 Senior c enter and pool 4/21/2025 4:48 PM
8 None 4/21/2025 2:57 PM
9 Make s ure there a ample plac es on this site fore hook-ups to power and water to s upport
events. Us e the new City Hall as a marketing opportunity for the City... "Gilroy a city with
Spice for Life".
4/21/2025 9:47 AM
10 What type of events will be allowed at Amphitheater since so c lose to housing? In other words ,
will there be liv e music and how late in night will they be allowed to play?
4/21/2025 8:02 AM
11 What’s the time estimate to c omplete the whole plan?4/20/2025 11:07 PM
12 Police have a large building. Fire will be losi ng its training room and s torage. Being a central
location to serv e the city, it would be nic e to k eep a space for fire to hold classes and park
apparatus .
4/20/2025 6:35 PM
13 My hope is that the plan also integrates c oncepts of "Complete Streets" in and around the
civic complex. The city uses a s hared lane approac h for bicyclists and v ehicles between
downtown and this part of town, but also incorporates traffic calming measures that make
biking challenging when competing with v ehicles in the shared lane. Dedicated bik e lanes
through 6th street c onnecting to bike lanes on Church will welcome those patrons wishing to
bike to the Civic complex.
4/20/2025 5:46 PM
14 I think the Multi Generational Recreational & Aquatic Center should be built at the same time
as the Community Center if pos sible.
4/19/2025 8:41 PM
15 Pleas e allow some big halls, of 300+ people s o a large events c an be organized inside. A big
hall should have a commerc ial kitchen attached.
4/18/2025 11:21 PM
16 As a longtime Gilroy resident (45+ years) it is sad to see that Wheeler Auditorium could not be
updated and reused in any plan.
4/18/2025 3:03 PM
17 I s ee a lot of great features in the community building (bas ketball, pool, etc ). I’m the principal
of a private sc hool in Gilroy. What kind of access will my students hav e to these facilities? I’m
assuming public s chools will have access and I’d lik e city managers to make the protoc ol for
priv ate s chools (fees and acc ess) identical to GUSD.
4/18/2025 2:50 PM
<strong><span style="c olor: #3f 6011;">CIVIC CENTER MASTER PL AN</span><br></strong><br><strong><span style="c olor: #3f 6011;">Community Workshop</span> <span style="c olor:#1b1d5a;">#2 </span><span style="c olor: #3f 6011;">Online Survey</span><br><spanstyle="c olor: #3f 6011;">Three Concept M aster Plan Alternatives</span></strong>
10 / 10
18 NA 4/18/2025 11:20 AM
19 will people be able to drive from the front library parking to the larger parking lot and polic e
park ing? It's not clear with the green fuz ziness. Als o, police parking lot should connect to
provide more egress from the lot.
4/17/2025 2:04 PM
20 Let's do it! Our city needs the update and capacity for the future.4/16/2025 7:53 PM
21 Outdoor park space with playground and rock climbi ng 4/16/2025 5:25 AM
22 Thank you for all of the information and outreach efforts. It is appreciated.4/15/2025 11:07 PM
23 The process is flawed. We know how much money we MAYBE can spend - there should be a
low budget. Mid budget. And top budget set of options .
4/15/2025 6:55 AM
24 I’m s ure it’s much too late, but I would like to see a little more parking remain clos e to the
library, on the east side of the building. I look forward to seeing this v ision come to life.
4/14/2025 12:09 PM
25 I am concerned about parking. Also concerned about how police vehic les would be able to go
north in an emergenc y if Hanna is closed off for a parking lot. Also c oncerned about what
would happen to Wheeler Center. Look, it's old and gros s. I don't mind a new building, I just
wonder how much negative feedback the City wil l get for tearing it down.
4/14/2025 8:39 AM
26 Love that we’re doing this!4/13/2025 3:15 PM
27 Eliminate aquatic center 4/13/2025 10:43 AM
28 I love that this is being done. Reminds me of the Morgan Hill Centennial Rec reation Center. We
need this in Gilroy.
4/11/2025 2:38 PM
29 To repeat myself, I believe the park and the buildings should be on opposite sides as to what
is shown in plan C. Park ing should be as c lose as possible for seniors and those with
dis abilities to us e the community center and City Hall.
4/11/2025 9:35 AM
30 The paseo should be a plac e of pass ion, place to honor our his tory and gather as community.
Friendly and inviting so landscaping and light is critical
4/11/2025 9:11 AM
31 spread out parking or do a parking garage to make best use of the spac e av ailable 4/11/2025 8:17 AM
32 Main park ing lot is not central and is a long walk to the other side for seniors and families with
toddlers, especially in rain, heat, and at night.
4/9/2025 9:49 AM
33 I do not think this is a good loc ation for swimming pools. They should be built at the sports
park. Pools are especially ex pensive to maintain year-round and I doubt the city would be able
to take on that expense. They already share an excellent new pool with Christopher high
s chool and als o Gilroy high school in the summer.
4/8/2025 6:16 PM
34 Hav ing the entire area be dog friendly with dog poop bag/trashcan stations throughout. Public
Restrooms available throughout the whole s pace. Lots of trees and greenery.
4/8/2025 10:53 AM
35 Now to figure out how to fund it 4/8/2025 10:45 AM
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 188Gilroy Civic Center Master Plan
SURVEY RESPONSESWORKSHOP #2 - SPANISH
<span style="c olor: #3f 6011;"><strong>Centro Cívic o de Gilroy Plan Maestro</strong></span><br><br><strong><span style="c olor: #3f 6011;">Taller Comunitario <span style="c olor:#1b1d5a;">#2</span> Enc uesta en L ínea</span></strong><br><strong><span style="c olor:#3f 6011;">Tres alternativas del Conc epto del Plan Maestro</span></strong>
1 / 2
0.00%0
50.00%1
50.00%1
Q1 SELECCIONE su concepto favorito del Plan Maestro del Centro Cívico
al hacer clic en la imagen de su concepto preferido.
Ans wered: 2 Sk ipped: 0
TOTAL 2
0%10%20%30%40%50%60%70%80%90%100%
El Concepto A
El Concepto B
El Concepto C
ANSWER CHOICES RESPONSES
El Concepto A
El Concepto B
El Concepto C
Q2 ¿Cuál es su concepto favorito y por qué?
Ans wered: 2 Sk ipped: 0
#RESPONSES DATE
1 El diseño es mejor por qué también c reo que no se afec taría a los v ecinos de enfrente 5/9/2025 6:46 PM
2 El conc epto C 5/9/2025 6:40 PM
Q3 ¿Cuál es el concepto que menos le gusta y por qué?
Ans wered: 2 Sk ipped: 0
#RESPONSES DATE
1 El que es más abierto el 3 ya que hay cas as a su alrededor 5/9/2025 6:46 PM
2 Porque la vista es mejor 5/9/2025 6:40 PM
<span style="c olor: #3f 6011;"><strong>Centro Cívico de Gilroy Plan M aestro</strong></span><br><br><strong><span style="c olor: #3f 6011;">Taller Comunitario <span style="c olor:#1b1d5a;">#2</span> Enc uesta en L ínea</span></strong><br><strong><span style="c olor:#3f 6011;">Tres alternativas del Conc epto del Plan M aestro</span></strong>
2 / 2
Q4 ¿Cuál es su característica favorita del Plan Maestro del Centro Cívico?
Answered: 2 Skipped: 0
#RESPONSES DATE
1 Que queda en el centro y 2 edific ios pueden cubrir a los vec inos 5/9/2025 6:46 PM
2 Que haya espac ios recreativ os para activ idades para nuestros jóvenes 5/9/2025 6:40 PM
Q5 ¿Qué le gustaría ver construido primero?
Answered: 2 Skipped: 0
#RESPONSES DATE
1 El Gilroy c ivic park 5/9/2025 6:46 PM
2 Primero los parques c on entrenamiento deportiv o 5/9/2025 6:40 PM
Q6 ¿Algún comentario adicional que le gustaría compartir?
Answered: 1 Skipped: 1
#RESPONSES DATE
1 Me encanta la idea 5/9/2025 6:46 PM
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 189Gilroy Civic Center Master Plan
SURVEY RESPONSESWORKSHOP #3 - ENGLISH
<strong><span style="c olor: #3f 6011;">CIVIC CENTER MASTER PL AN </span></strong><br><span style="c olor: #3f 6011;">Community Workshop #3 Online Survey </span><br><spanstyle="c olor: #3f 6011;">Pref erred Conc ept Presented f or Feedbac k</span>
1 / 8
8.11%6
52.70%39
20.27%15
12.16%9
1.35%1
0.00%0
5.41%4
Q1 What is your FAVORITE element of the plan?
Ans wered: 74 Skipped: 2
TOTAL 74
0%10%20%30%40%50%60%70%80%90%100%
None of the
above
Recreation &
Aquatic Cent er
Gilr oy Civic
Park
Community
Center
City Hall
Parking Layout
Paseo
ANSWER CHOICES RESPONSES
None of the abov e
Recreation & Aquatic Center
Gilroy Civ ic Park
Community Center
City Hall
Parking Lay out
Pas eo
Q2 What is your LEAST favorite element of the plan?
Ans wered: 71 Skipped: 5
<strong><span style="c olor: #3f 6011;">CIVIC CENTER M ASTER PLAN </span></strong><br><span style="color: #3f6011;">Community Workshop #3 Online Survey </span><br><spanstyle="c olor: #3f 6011;">Pref erred Conc ept Presented for Feedbac k</span>
2 / 8
36.62%26
7.04%5
8.45%6
7.04%5
9.86%7
29.58%21
1.41%1
TOTAL 71
0%1 0%20%30%40%50%60%70%80%90%100%
None of the
above
Recreation &
Aquatic Center
Gilroy Civic
Par k
Community
Center
City Hall
Parking Layout
Paseo
ANSWER CHOICES RESPONSES
None of the above
Rec reation & Aquatic Center
Gilroy Civic Park
Community Center
City Hall
Parking Layout
Paseo
Q3 Should any of the plan elements be REMOVED?
Answered: 69 Skipped: 7
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 190Gilroy Civic Center Master Plan
<strong><span style="c olor: #3f 6011;">CIVIC CENTER MASTER PL AN </span></strong><br><span style="c olor: #3f 6011;">Community Workshop #3 Online Survey </span><br><spanstyle="c olor: #3f 6011;">Pref erred Conc ept Presented f or Feedbac k</span>
3 / 8
65.22%45
10.14%7
7.25%5
1.45%1
5.80%4
8.70%6
1.45%1
TOTAL 69
0%10%20%30%40%50%60%70%80%90%100%
None of the
above
Recreation &
Aquatic Cent er
Gilr oy Civic
Park
Community
Center
City Hall
Parking Layout
Paseo
ANSWER CHOICES RESPONSES
None of the abov e
Recreation & Aquatic Center
Gilroy Civ ic Park
Community Center
City Hall
Parking Lay out
Pas eo
Q4 Are there any MISSING ELEMENTS we should try to add to the plan?
Answered: 44 Sk ipped: 32
#RESPONSES DATE
1 Connection to downtown with green belt walkway which extends from the Gilroy Civic park to
the green s pac e next to the Gilroy Center for the arts. Additionally, may be a large parking
garage between Churc h and Eigleberry for both the c iv c area and downtown.
6/7/2025 12:20 PM
2 Solar/battery bac k-up to model to the community bes t practices to decrease c arbon footprint.
Elec tric vehicle charging s tations. Deciduous s hade trees, rec laimed H2O for landscape
irrigation. City Center should have a bus stop too. I believe Gilroy could/should be a leader in
environmental protections Sugges t do not duplicate what library already provided.... unless
more study areas are needed. Secure place to park bikes. Wel l lit
6/5/2025 4:51 PM
3 Playground please.6/5/2025 10:01 AM
<strong><span style="c olor: #3f 6011;">CIVIC CENTER M ASTER PLAN </span></strong><br><span style="color: #3f6011;">Community Workshop #3 Online Survey </span><br><spanstyle="c olor: #3f 6011;">Pref erred Conc ept Presented for Feedbac k</span>
4 / 8
4 Unclear why this is a priority. Downtown needs attention that is far pas t due.6/3/2025 6:24 AM
5 The Civic Park s hould be moved to a different site in the city. Large ev ents dis tract from the
"community " part of the plan. This site is too small for concerts and festivals. A good siz ed
flea mark et or smaller events are more appropriate for the space.
6/2/2025 9:37 AM
6 Enough parking would be nice 6/1/2025 6:27 PM
7 Remove three private homes on Dowdy street, add to complete the look.6/1/2025 6:42 AM
8 Make sure to put no loitering s igns, homeles s sleeping there, no RV’s park ed all over the area 5/31/2025 6:54 AM
9 Pleas e make a big Lap Pool for swimmers because the pool the City built at CHS is
unavailable during the school year. The Civ ic Park c ould be smaller then all the Rec Center
facilities can be larger. We need more spac e for Senior activities .
5/30/2025 1:31 PM
10 Just making sure the aquatic center is indoor not outdoor.5/30/2025 1:09 PM
11 Bring back s enior craft s tore.5/30/2025 12:31 PM
12 More park ing, current park ing is n't sufficient especially when events oc cur at the same time at
the library and Wheeler Center
5/30/2025 9:27 AM
13 Community center preference giv en to youth activities . I doubt the need for senior dining at
400 people. Seems exc ess iv e for the demand and could be better uti liz ed for youth ac tivities .
5/30/2025 8:44 AM
14 Enough parking in general but plenty of disabled parking to s erve this community. Will ADA
parking be close enough?
5/30/2025 8:33 AM
15 I am a member of Morgan hill cRC, there is two sets of bas ketball courts, and they is alway s
busy with two! I rec ommend the decisions makers visit Morgan Hill CRC.
5/30/2025 8:33 AM
16 No 5/30/2025 8:27 AM
17 Separated s mall/large dog park .5/30/2025 8:07 AM
18 Basket ball / tennis courts - city fenced in schools removing courts and rec s pac e.5/30/2025 7:16 AM
19 More lighting around 6th& 7th, for the center.5/27/2025 5:01 PM
20 Miss ing from the pres entation is an entire floor and larger footprint for the Community Center.
With the 1st floor for Seniors, and 2nd for youth, the 3rd floor would be for the arts. This would
encompas s s tudio and class rooms, materials s torage, and flexible gallery space. The ELS
team member ex pres sed concern that a 3rd floor would be incongruent with the ov erall Civic
Center silhouette, and that windows would overlook homes on 7th Street. I dis agree on both
counts. And windows on that face could be above eye level, or not on the gallery wall at all.
Furthermore, what a stunning view overlooking the whole Civ ic Center it could be! Careful
thought should to be given to provide ample space for each of the three components: Seniors,
Youth , and Arts. For instance, the Seniors us ed to have a store dedicated to selling their
handcrafts . Is there s pace in the current proposal? Parks & Rec us ed to hos t Kids Discover
Arts in Wheeler Center, a one-day free art ev ent. Is there room for such in the Community
Center plan? Such an ample Community Center could truly grow as our city does, rather than
carv ing up a too-s mall space into limiting pieces . Final thought— the current Art Center in
Monterey & 7th could be raz ed and rebuilt as a dedicated large theater/auditorium, and would
anchor the Civ ic Center to the Downtown Dis trict.
5/27/2025 4:12 PM
21 Please do not tear down the Wheeler Bu i’ll ding built in 1929! Should be treated as an
Historical Landmark !
5/27/2025 1:28 PM
22 I hope there will be a permanent s tage built in the c ivic park for live mus ic performanc es, etc.,
like they have in many other downtown parks.
5/26/2025 3:18 PM
23 Hello, I am c oncerned that the pool is not big enough for the amount of Lap Swimmers that will
want to use the Pool. There are a lot of Gilroy people who s wim in Morgan Hil l Aquatic Center
& some ev en in the Adaptiv e Program at Gavilan College, who will want & need to use the new
Gilroy Pool. Your diagram looks lik e the pool is very SHORT for lap s wimmers . It will be
us eless unless you really are serious about meeting their needs. Pls look into it further or
c ontact me. Thank you, Rebecc a Sc heel, rsc heel@verizon.net
5/26/2025 10:57 AM
24 Where would delivery truck s and dum pster/ garbage truc ks have acc ess?5/26/2025 8:16 AM
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 191Gilroy Civic Center Master Plan
<strong><span style="c olor: #3f 6011;">CIVIC CENTER MASTER PL AN </span></strong><br><span style="c olor: #3f 6011;">Community Workshop #3 Online Survey </span><br><spanstyle="c olor: #3f 6011;">Pref erred Conc ept Presented f or Feedbac k</span>
5 / 8
25 struc ture for k ids to play. morgan hill has a play ground next to the farmers market. think about
who will c ome to events.
5/26/2025 7:07 AM
26 Senior Center 5/25/2025 8:24 PM
27 Something that would inspire youth to play at the park (I.e playground, soccer shaped field,
s occer net, pic kleball,etc).
5/24/2025 7:13 AM
28 A huge exerc ise without proper information how this project will be funded and what are the
timelines. It can be another Gilroy Sports Park like master plan whic h ex ist s inc e decades
however never gets materialized!
5/23/2025 9:10 PM
29 Is there a gym for clas ses ?5/23/2025 6:36 PM
30 Gym for bas ketball, indoor s occer. Make it ac cessible for public to use 5/23/2025 3:14 PM
31 Outdoor pic kleball the half gy m in the community center is n't enough. It should also be a full
gym and not a half gym.
5/23/2025 10:12 AM
32 The park should have a playground. That way the library can free up s ome space c urrently
allocated for its play ground.
5/23/2025 10:07 AM
33 25 yard by 25 meter pool that can hav e lane lines go in eac h direction.5/23/2025 9:28 AM
34 A playground for children in the park (with trees for shade).5/23/2025 8:13 AM
35 Plan should not be dic tated by GPD into a closed in California high sc hool c ampus design with
buildings surrounding a quad - from the 1960s. Initial open concepts to the park area were
critical to make this plac e feel like an open space to enter as opposed to a courtyard of city
buildings . Parking will be overwhelmingly inadequate. Especially during daytime M-F hours with
100+ s taff for all these buildings as well as library and all the ac tivities they are s upposed to
create. On top of this, location of parking, especially for a facility that feeds 200-300 senior
citiz ens, is far too remote. This is a disaster in the mak ing.
5/23/2025 7:42 AM
36 Larger performing arts theater. More s pac e for the Youth Centerand Art Center.5/21/2025 4:55 PM
37 Since sometimes a community center will hav e preschool class es, maybe a tas teful struc ture
or arrangement of swings/slide/monkey bars could be cons idered s omewhere? There is plenty
of room for children's trikes / scooters, s occ er games etc, and the water feature will be an
at trac tion, but maybe a feature for when it is too cold to run through the water, but nice enough
to play outs ide, would be nice. Many children liv ing close to this wonderful civic center would
lov e to play outs ide, and don't hav e the easy/walk-able access to play ground s tructures that
newer neighborhoods hav e.
5/21/2025 9:19 AM
38 The play ground and places that people can be able to sit down 5/20/2025 7:30 PM
39 I think a playground loc ated bes ide the water splash area would be perfect for children.5/20/2025 7:29 PM
40 Community garden, playground, local art, 2 story park ing with green roof: garden, play area,
etc
5/20/2025 6:14 PM
41 Pleas e keep the historical Wheeler Auditorium. The facade can be kept intact and the rest of
the building could be remodeled to s erve the aquatic c enter with the us es planne d for.
5/20/2025 2:45 PM
42 Connecting walk way s with walking path around park 5/20/2025 2:43 PM
43 Integrate the s idewalks into the flow so they ’re essentially a big walking path or train around
the three bloc ks, not just around the main park. Also, public art- mak e sure there are walls
dedicated to murals , places we c an put statues , etc. Let’s also be mindful of water and
s unshine with c limate c hange-maxi mize solar by cov ering some of the parking lots with solar
panels, and poss ibly rethinking the splash pad. Is it drought friendly? Is the plumbing system
for that hearty or finicky ? Just a cons ideration.
5/20/2025 10:28 AM
44 Special access zones for s enior vans and trucks for kitchen, bands , theatre 5/20/2025 10:16 AM
Q5 Any additional thoughts, comments or suggestions?
Answered: 48 Sk ipped: 28
<strong><span style="c olor: #3f 6011;">CIVIC CENTER M ASTER PLAN </span></strong><br><span style="color: #3f6011;">Community Workshop #3 Online Survey </span><br><spanstyle="c olor: #3f 6011;">Pref erred Conc ept Presented for Feedbac k</span>
6 / 8
#RESPONSES DATE
1 Thank s for easy way to giv e feedback!6/5/2025 4:51 PM
2 I lik e how city hall is symmetrical to the library. Will the pool be cov ered to prevent unwanted
people from staring?
6/5/2025 10:01 AM
3 These elements try to ac complish too much in a single space without regard to the small
neighborhoods surrounding the sugges ted c ivic center. My s ugges tion would be to build the
aquatics center at the loc ation of the gilroy sports complex on Monterey. And to loc ate
buildings specific to art, culture and performance activity in the current art c enter on Monterey.
Building struc tures specifically to ac commodate parking is problematic for the surrounding
neighborhoods . A he c ity has already made a commitment to biking and should develop
greater biking infrastructure encouraging those using the compl ex to bik e and walk to thes e
areas (not to drive through the surrounding neighborhoods on the way to park their cars).
Pleas e provide information regarding impacts to the impac ted neighborhoods loc ated on s ixth
and s eventh s treets and on dowdy, c hurc h, hanna, and Ros anna streets. concept A is the
least cluttered and appears to utilize the spac e in keeping with the historical intentions. Please
k eep in mind the s chools and senior residences located on hanna and s ixth streets and the
way in which the community c urrently use the library and senior s ervices. A report on traffic
flow and impacts to s urrounding neighborhoods is necess ary.
6/4/2025 8:47 AM
4 Do we have a c ity master plan? How are we attracting people in Gilroy to stay in Gilroy and
spend their money here vs going to Morgan Hill?
6/3/2025 6:2 4 AM
5 Not sure why an indoor running trac k is needed. There are two High Sc hools in the area with
outdoor tracks and we live in a beautiful climate where y ou c an be outdoor mos t of the y ear.
6/2/2025 3:09 PM
6 A general sugges tion: Please consider a city transportation s ervice for seniors in addition to
VTA. Gilroy is growing and too spread out.
6/2/2025 9:37 AM
7 why did they put up solar panels if they will be tak ing them down along 7th st?6/1/2025 2:54 PM
8 Remove the three private home (buy them) on Dowdy street.6/1/2025 6:42 AM
9 Looks nic e 5/31/2025 6:54 AM
10 adding a stage in the park for local performances and fes tival 5/30/2025 1:09 PM
11 Consider at leas t a two-s tory parking garage to ac commodate activities that may be occurring
at once in all of those buildings.
5/30/2025 9:27 AM
12 I would like bett er messaging on the principles behind the plans development. Who is this
targeted to? Youth, Community, or seniors . Reading through the plan it appears to me that
seniors are overweighted in the decision on layout.
5/30/2025 8:44 AM
13 The parking with the solar array was just finished and that’s going to be removed???5/30/2025 8:33 AM
14 Need a large work out area with filled equipments. There will be l ots of members when Gilroy
CRC is open.
5/30/2025 8:33 AM
15 No 5/30/2025 8:27 AM
16 Will there be sufficient lighting? Cameras? Water fountains? WiFi?5/30/2025 8:07 AM
17 Traffic Hanna in particular is a s hort c ut from 3rd to 6th and acc idents frequently on 4& hanna.
Police speed north over 59 miles hour and so do drivers. School drop/pic kup and peak traffic
times it’s an unsafe s treet. Consider tattoo c alm ing structures on 6th, slight himp/plateau
where cros s walks are. Not round but rais ed platform or out them middle of the road to
phy sically deter s peeding. Cars can and do blow by stop signs . Or add small roundabouts. City
of Mountain View has to use these tactics in their old downtown area. We can learn a lot by
looking around. It’s a growth, friendly family, friendly city with a vibrant downtown in Parking
away from the core. Inves t in a park ing struc ture Nearby rather than using the space near the
revisioned city core.
5/30/2025 7:16 AM
18 Pleas e make s ure the parking spaces are large enough to accommodate larger vehicles. Like
vans. Many mothers and families like to carpool. Other people just have large families . Please
5/29/2025 9:24 PM
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 192Gilroy Civic Center Master Plan
<strong><span style="c olor: #3f 6011;">CIVIC CENTER MASTER PL AN </span></strong><br><span style="c olor: #3f 6011;">Community Workshop #3 Online Survey </span><br><spanstyle="c olor: #3f 6011;">Pref erred Conc ept Presented f or Feedbac k</span>
7 / 8
mak e them large enough. Also, loc ker rooms are frequent places of sexual abus e. Pleas e be
aware and make s afety adjustments if needed. Pleas e and thank y ou.
19 recreation center and aquatic center should not be part of civic center. Its a waste of money to
tear down what is there and build new, Wheeler Auditorium s hould be a his toric al building and
should be remodeled but not removed. The whole area could be moderniz ed but not torn down
and rebuilt. The park ing lot that was just fitted with solar panels- is that going to be removed?
what a waste of money! In this economy the c ity c ould be updating but not s pending on a
fancy redo'
5/29/2025 4:59 PM
20 Where will the EOC and communic ations equipment be mov ed to? The city has land at 6th x
Railroad for a youth c enter. Put the aquatic center there. Follow through on your other mas ter
plans. Plans were paid for to begin upgrading the old PD. T here was an old plan for another
wing to the senior center.
5/29/2025 12:45 PM
21 If you were to move the city hall it would allow more spac e for more recreational ac tivities or
outdoor space where children and youth can play s occer or football while perhaps waiting for
family members conduc ting other indoor activ ities.
5/28/2025 7:28 AM
22 Making s ure that all buildings are handicap ac ces sible.5/27/2025 5:01 PM
23 The overall presentation and artists ’ renderings were attrac tive and well coordinated.5/27/2025 4:12 PM
24 I think there needs to be more parking built into the plan. Maybe a multi-lev el s tructure. People
won't want to vis it downtown if they hav e to circle for 30 minutes to find a parking.
5/26/2025 3:18 PM
25 I think the Recreation Center AND the Pool should be larger. Our population is aging and needs
all us able spac e. Thank you.
5/26/2025 10:57 AM
26 Connect the park ing lot in front of the police department to the parking lot north of the polic e
department and delete the Paseo in that area. A parking structure would be needed with all the
additions. Emergency traffic leav ing the PD could be a problem with conges tion with only one
access point to the front of the PD that also c onnects to the front of city hall.
5/26/2025 8:16 AM
27 need to think about young adults with children and families .5/26/2025 7:07 AM
28 Beautiful design. Considering the large number of youths that go to the library, keep them in
mind for the park . Kids need/want play -focus ac tivities at a park.
5/24/2025 7:13 AM
29 Anything kid friendly would be great, espec ially the older they get 5/23/2025 6:36 PM
30 Great plan and it will increase participation of Gilroy residents. The Recreation Department and
Aquatic Center will bless this community.
5/23/2025 5:44 PM
31 There is a lot of community sentiment in favor of Wheeler Auditorium. It is on the City's lis t of
his toric buildings and is good Art Deco architec ture. The interior could be renovated to provide
better recreation fac ilities. Former police station s outh of Wheeler s hould be demolished. The
rec reation c enter and community center are very nice but would require more funding to s taff
them and provide programming.
5/23/2025 3:41 PM
32 Looks good.....allow more food venders 5/23/2025 3:14 PM
33 I think removing the grass area on the corner of 6h and Dowdy for parking is a mistake. There
s hould be more encouragement for biking or walk ing to the civ ic center as opposed to
ad ditional parking stalls.
5/23/2025 11:15 AM
34 Not sure the purpos e of the pool. I would recommend the building of a true aquatic center (25
y d x 50m) as a part of the Sports Park.
5/23/2025 10:18 AM
35 Park ing garage in lieu of parking lot.5/23/2025 10:12 AM
36 Community and aquatic centers s hould be switched so that community c enter is c los er to the
library.
5/23/2025 10:07 AM
37 The city hall would best be fit a the corner of dowdy and 6th street to max imize parking where
the lay out c urrent has the city hall placed. The city hall does not need to be centralized.
Parking is too far on the corner of dowdy and 6th and will impact elderly. Although there has
been changes to add parking closer, it is still forcing families and elderly to walk from
dowdy/6th s treet corner to the other side on Church street when there is overflow. Which most
likely there will be as city hall workers will park nearest to the city hall. Please reconsider.
5/23/2025 8:13 AM
<strong><span style="c olor: #3f 6011;">CIVIC CENTER M ASTER PLAN </span></strong><br><span style="color: #3f6011;">Community Workshop #3 Online Survey </span><br><spanstyle="c olor: #3f 6011;">Pref erred Conc ept Presented for Feedbac k</span>
8 / 8
38 Reduce one building. Go back to one of the last designs. Figure out parking with subterranean
down and one lev el up - more conveniently located to the activity buildings. If not possible then
the design is infeasible.
5/23/2025 7:42 AM
39 I am for the “potential” two level parking. For sure the new facilities will bring LOTS of people.5/23/2025 7:21 AM
40 This whole project needs to be approved up front and built as fas t as poss ible. Trying to
spread this across multiple bond meas ures would result in extra delay and probable failure of
the ov erall project as getting 2/3 approval is ex tremely diffic ult.
5/21/2025 4:55 PM
41 Pleas e choos e Sycamores (not crepe myrtles or Chines e pistache) for the street trees and
parking lot trees to match 6th Street in front of the library and downtown. They provide a nice
shade canopy in s ummer and are dec iduous for winter. Als o a nice-to-have would be a
c ommunity garden on the roof of the 2nd story of the park ing garage :-D. I wouldn't want the
park ing lot to be without the large trees on the ground level. Lov e the trees! Thank s for the
opportunity to c hime in.
5/21/2025 9:19 AM
42 Jus t places to sit down 5/20/2025 7:30 PM
43 Nothing else but I think they should really make a playground 5/20/2025 7:29 PM
44 I appreciate the process 5/20/2025 6:14 PM
45 I marked the “least” favorite as the parking configuration. There doesn’t seem to be enough
and the loc ation is too far from the Aquatics Center and Multigenerational Community Center
where more parking would be required. It seems like the area of the ‘Civ ic Park’ would be a
better loc ation for parking and would be less visible from 6th Street and more accessible to the
buildings most used by the public. A s maller Civic Park could be loc ated on 6th Street where
the parking is shown in this plan.
5/20/2025 2:45 PM
46 Possibly include c hargers for electric c ars , spaces for van drop off of seniors or k ids, water
and power throughout the green spaces for pop up cafes, farmers markets, etc. Also, is the
only place to get food here in the senior center dining room?
5/20/2025 10:28 AM
47 Live the windows and paseo concept 5/20/2025 10:16 AM
48 Doggy s tations, ballards for safety as part of the design 5/20/2025 10:10 AM
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 193Gilroy Civic Center Master Plan
SURVEY RESPONSESWORKSHOP #3 - SPANISH
Centro Cívic o de Gilroy Plan M aestro<br><br>Taller Comunitario #3 Enc uesta enLínea<br>Conc epto Preferido Presentado para Retroalimentac ión
1 / 4
0.00%0
100.00%1
0.00%0
0.00%0
0.00%0
0.00%0
0.00%0
Q1 ¿Cuál es tu elemento FAVORITO del plan?
Ans wered: 1 Sk ipped: 0
TOTAL 1
0%10%20%30%40%50%60%70%80%90%100%
Ninguno de los
anteriores
Centr o
Recr eativo y
Acuático
Par que Cívico
de Gilr oy
Centr o
Comunitario
Ayuntamiento
Disposición
del
estacionamiento
Paseo
ANSWER CHOICES RESPONSES
Ninguno de los anteriores
Centro Recreativo y Acuático
Parque Cív ico de Gilroy
Centro Comunitario
Ayuntamiento
Dis posic ión del estacionamiento
Paseo
Q2 ¿Cuál es el elemento que MENOS te gusta del plan?
Ans wered: 1 Sk ipped: 0
Centro Cívic o de Gilroy Plan Maestro<br><br>Taller Comunitario #3 Enc uesta enLínea<br>Conc epto Pref erido Presentado para Retroalimentac ión
2 / 4
0.00%0
0.00%0
0.00%0
0.00%0
0.00%0
0.00%0
100.00%1
TOTAL 1
0%1 0%20%30%40%50%60%70%80%90%100%
Ninguno de los
anterior es
Centro
Recreativo y
Acuático
Parque Cívico
de Gilroy
Centro
Comunitar io
Ayuntamiento
Disposición
del
estacionamiento
Paseo
ANSWER CHOICES RESPONSES
Ninguno de los anteriores
Centro Recreativo y Acuático
Parque Cívico de Gilroy
Centro Comunitario
Ay untamiento
Disposición del estac ionamiento
Paseo
Q3 ¿Debería ELIMINARSE alguno de los elementos del plan?
Answered: 1 Skipped: 0
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 194Gilroy Civic Center Master Plan
Centro Cívic o de Gilroy Plan M aestro<br><br>Taller Comunitario #3 Enc uesta enLínea<br>Conc epto Preferido Presentado para Retroalimentac ión
3 / 4
100.00%1
0.00%0
0.00%0
0.00%0
0.00%0
0.00%0
0.00%0
TOTAL 1
0%10%20%30%40%50%60%70%80%90%100%
Ninguno de los
anteriores
Centr o
Recr eativo y
Acuático
Par que Cívico
de Gilr oy
Centr o
Comunitario
Ayuntamiento
Disposición
del
estacionamiento
Paseo
ANSWER CHOICES RESPONSES
Ninguno de los anteriores
Centro Recreativo y Acuático
Parque Cív ico de Gilroy
Centro Comunitario
Ayuntamiento
Dis posic ión del estacionamiento
Paseo
Q4 ¿Hay algún ELEMENTO FALTANTE que deberíamos intentar agregar
al plan?
Ans wered: 1 Sk ipped: 0
#RESPONSES DATE
1 Ahorita todavía no 5/20/2025 6:16 PM
Q5 ¿Tiene alguna idea, comentario o sugerencia adicional?
Ans wered: 1 Sk ipped: 0
Centro Cívic o de Gilroy Plan Maestro<br><br>Taller Comunitario #3 Enc uesta enLínea<br>Conc epto Pref erido Presentado para Retroalimentac ión
4 / 4
#RESPONSES DATE
1 Me gustan todas la s ideas ..5/20/2025 6:16 PM
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
MULTIGENERATIONAL COMMUNITY CENTER
BUILDING PLANS | SITE SECTIONS | ELEVATIONSMEETING NOTES AND PRESENTATIONS
C. Meeting Notes and PresentationsDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 196Gilroy Civic Center Master Plan
6. Building and Needs Assessments
• The Library and Police Station are both about ten years old (built in 2012) and can be
excluded from the assessments. They will remain largely as is.
• A $5MM bond is due to be released shortly for improvements to the library.
• The Wheeler Center is under the jurisdiction of Parks and Recreation, and their input will be
important in determining what happens with the building. There has been some desire
expressed for a swimming pool.
• Existing Parking Areas: A large portion of the existing parking area at the southeast corner of
the Civic Center is for City vehicles and storage. Public Works and Engineering have
jurisdiction over parking.
• The Annex building (adjacent to the Wheeler Center) could be replaced.
• There are five existing single-family properties on Dowdy Street near 6th Street: Two lots at
7380 and 7390 Dowdy are owned by the City, one is an empty lot and the other has a single-
family house on it. The remaining three homes are privately owned.
• Building Assessments: Site walks for Building Assessments will probably take a day, and
should include facilities and building department personnel (Hipolito and Walter).
• Needs assessment: The City will work on identifying department heads and other personnel
for the needs assessment discussions with ELS. They will set up meetings (typically via
Zoom) with various facilities and departments that will be affected by the master plan.
These meetings will consist of a series of interviews to discuss space needs and desires.
7. Community Outreach
• Potential Venues for Community Meetings: Spaces that could be available include the
Library, Council Chambers, Senior Center, and the Wheeler Center.
• The team could consider having a Spanish First meeting.
• Translations: A large proportion of the population is Spanish speaking. The City Council
uses AI translation. There are other services as well.
• The community meeting process typically consists of three meetings, including an initial
“Gallery Walk” informational session, a second working session, and third meeting for
presentation of the final concepts.
• Additional outreach will be done via social media, electronic surveys and web pages. The
City can host web pages on the City web site, or they can be hosted separately.
8. Next Meeting
• 12/4/2024 at 3 PM
END OF NOTES
GILROY CIVIC CENTER MASTER PLAN
November 20, 2024
MEETING NOTES
Attendees:
City of Gilroy: ELS:
Ryan Osenton
Daniel Padilla
Cindy McCormick
Dana Grant
David Masenten
Clarence Mamuyac
Susan Vutz
Discussion was as follows:
1. Point of Contact
Main points of contact will be:
For ELS: Susan Vutz and David Masenten
For Gilroy: Ryan Osenton
2. Contract
• ELS W9/COI have been issued
• Estimated date of contract completion expected by end of the week
3. Consultant Team
• ELS is on-boarding technical team now
4. Schedule
• Kick-off meeting, 11/22/24
• Building assessment and needs assessment can happen concurrently. The tentative date
for facilities assessments is the week of 12/9 to 12/13. City and ELS to confirm.
• ELS will refine the schedule to shorten the overall community process. Public sessions
might begin in February.
• Regular team meetings will start on December 4 and recur weekly at 3PM. As the project
progresses, the team will evaluate whether to meet every week or every two weeks.
5. Background Materials
• Existing building drawings/reports: Ryan has provided available as-builts to the design
team, and will continue to track down additional information regarding utilities, etc.
• Planning documents: Ryan will send whatever documents are available. In addition, Cindy
provided website addresses for Downtown Specific Plan
(https://www.cityofgilroy.org/271/Downtown-Specific-Plan) and DSP Amendment 2018
(https://www.cityofgilroy.org/DocumentCenter/View/1276/Chapter-V-Districts-Land-Use-
and-Development-Standards-PDF) .
KICK-OFF MEETING - 11.20.24Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 197Gilroy Civic Center Master Plan
• Maintain a “risk management/safety mindset.” Security planning needs to account for the
different user groups: city employees and public visitors, and their differing security
requirements.
• A larger space for big events with associated parking is desirable.
• Three existing residential properties at the northwest corner of the site are privately owned.
The City has tried to purchase these in the past but the cost was prohibitive. For now, the
assumption is that these parcels can be incorporated into the master plan.
• The existing parking lot for city vehicles will be relocated elsewhere as part of the master
plan. The solar panel system currently under construction is intended to be relocated
when the master plan is implemented.
2. Precedents: What other cities have done – Civic and Community Facilities (see presentation
attached)
• ELS presented some precedents for other facilities, including the following:
o South San Francisco Civic Complex*
o South San Francisco Orange Memorial Park Aquatic Center
o Newark Civic Center
o Dublin Civic Center
o Redwood City Hall
o Redwood City Veterans Memorial Senior and Recreation Center *
o Rengstorff Aquatic Center, City of Mountain View*
o Elk Grove Civic Center and Aquatics Center (near Sacramento)
• City of Gilroy leadership would like to tour some of these sites. A potential tour date in
mid-February is TBD. Leading candidates for the site visit are noted with an asterisk, but
the tour itinerary has not yet been determined.
Part 2 - Scope and Timeline
1. Question: With the understanding that the Police and Library buildings are relatively new and
will service Gilroy for the next 3 to 5 decades, should the new master planning and visioning
consider a new City Hall, a new Senior and Community Center and a new Recreation, Wellness
and Aquatic Center? Should Wheeler be renovated, or demolished?
• The consensus is that Wheeler should be demolished unless there is a significant
economic advantage to keeping it and repurposing the building. As it is, Wheeler is not
adequate to serve the community’s needs. Since the building is more than fifty years old,
investigation of the historic status of Wheeler might need to be part of the EIR.
• The City currently has a joint use agreement with the School District to share their pool
facilities. However, there are no City-owned pool facilities in the City of Gilroy, and no
pools on this side of the city.
2. Question: If this new community infrastructure is envisioned for the Gilroy Civic Center, then
what is your imagined timeline for the vision?
• The timeline for the master plan will be driven by the November 2026 election; proposed
project funding needs to be included on the ballot in the form on a bond measure or
sales tax increase.
3. First thoughts: A launch pad for community engagement (see attached presentation).
• ELS presented some rough diagrams for the site. The Components of the master plan
can be configured in different ways with different implications for how the Civic Center
relates to downtown Gilroy.
GILROY CIVIC CENTER MASTER PLAN
Preparing for the Community Engagement Process
January 13, 2025
MEETING NOTES
Attendees:
City of Gilroy: Design Team:
Jimmy Forbis, City Administrator
Bryce Atkins, Assistant to the City Administrator
Sharon Goei, Community Development Director
LeeAnn McPhillips, Human Resources Director/Risk
Manager
Harjot Sangha, Finance Director
Ryan Osenton, Project Manager
Walter Dunckel, Fleet & Facilities Superintendent
Luke Powell, Police Captain
Raul Razo, Police Sergeant, Traffic Unit
David Masenten, ELS
Clarence Mamuyac, ELS
Susan Vutz, ELS
Marco Esposito, SWA
Larry Tramutola, Tramutola
Political Strategists
The purpose of the meeting was to establish some basic parameters for the Civic Center Master
Plan to prepare for the Community Engagement process moving forward. Discussion was as
follows:
Part 1 - Outcomes, Vision, Goals and a Snapshot of other Cities
1. Vision and Goals Discussion
• The city’s vision for the project includes the following components:
o Intergenerational Community Center and Aquatic Center (with youth center and
amenities).
o Senior Center (new center to replace existing, could be combined with Community
Center)
o City Hall
o Library and Police Buildings will remain. Everything else can be removed.
• The City understands that the City Hall might be more difficult to fund in a bond election
than community-oriented projects; getting support from the community will be a
challenge. The support of seniors can help significantly. Community members need to
know how they will benefit from the proposed project. Recent elections to raise funds for
civic projects have not been successful (for example, a proposed ¼-cent increase in sales
tax failed in the last election).
• Parking is a challenge. There needs to be sufficient parking so that employees and visitors
do not park in the neighborhood. Library parking and seniors at lunch can sometimes
overflow into the surrounding streets.
COMMUNITY ENGAGEMENT PREP - 01.13.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 198Gilroy Civic Center Master Plan
• Maintain a “risk management/safety mindset.” Security planning needs to account for the
different user groups: city employees and public visitors, and their differing security
requirements.
• A larger space for big events with associated parking is desirable.
• Three existing residential properties at the northwest corner of the site are privately owned.
The City has tried to purchase these in the past but the cost was prohibitive. For now, the
assumption is that these parcels can be incorporated into the master plan.
• The existing parking lot for city vehicles will be relocated elsewhere as part of the master
plan. The solar panel system currently under construction is intended to be relocated
when the master plan is implemented.
2. Precedents: What other cities have done – Civic and Community Facilities (see presentation
attached)
• ELS presented some precedents for other facilities, including the following:
o South San Francisco Civic Complex*
o South San Francisco Orange Memorial Park Aquatic Center
o Newark Civic Center
o Dublin Civic Center
o Redwood City Hall
o Redwood City Veterans Memorial Senior and Recreation Center *
o Rengstorff Aquatic Center, City of Mountain View*
o Elk Grove Civic Center and Aquatics Center (near Sacramento)
• City of Gilroy leadership would like to tour some of these sites. A potential tour date in
mid-February is TBD. Leading candidates for the site visit are noted with an asterisk, but
the tour itinerary has not yet been determined.
Part 2 - Scope and Timeline
1. Question: With the understanding that the Police and Library buildings are relatively new and
will service Gilroy for the next 3 to 5 decades, should the new master planning and visioning
consider a new City Hall, a new Senior and Community Center and a new Recreation, Wellness
and Aquatic Center? Should Wheeler be renovated, or demolished?
• The consensus is that Wheeler should be demolished unless there is a significant
economic advantage to keeping it and repurposing the building. As it is, Wheeler is not
adequate to serve the community’s needs. Since the building is more than fifty years old,
investigation of the historic status of Wheeler might need to be part of the EIR.
• The City currently has a joint use agreement with the School District to share their pool
facilities. However, there are no City-owned pool facilities in the City of Gilroy, and no
pools on this side of the city.
2. Question: If this new community infrastructure is envisioned for the Gilroy Civic Center, then
what is your imagined timeline for the vision?
• The timeline for the master plan will be driven by the November 2026 election; proposed
project funding needs to be included on the ballot in the form on a bond measure or
sales tax increase.
3. First thoughts: A launch pad for community engagement (see attached presentation).
• ELS presented some rough diagrams for the site. The Components of the master plan
can be configured in different ways with different implications for how the Civic Center
relates to downtown Gilroy.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 199Gilroy Civic Center Master Plan
7/11/2025
1
Gilroy Civic Master Plan
Preparing for Community Engagement
January 13, 2025
For Today…..
Part 1 - Outcomes, Vision, Goals + A Snapshot of other Cities
35 minutes
What are some of the key outcomes from the community engagement process that you hope to achieve?
What is your vision for the new Gilroy Civic Center Master Plan?
What are some of your key goals?
What other cities have done -Comparison of Civic Facilities by Population (Brief Presentation)
Part 2 -Scope and Timeline
35 minutes
With the understanding that the Police and Library buildings are relatively new and will service Gilroy for the next 3 to 5
decades, should the new master planning and visioning consider a new City Hall, a new Senior and Community Center and a
new Recreation, Wellness and Aquatic Center? Should Wheeler be renovated, or demolished?
If this new community infrastructure is envisioned for the Gilroy Civic Center, then what is your imagined timeline for the vision
First thoughts: A launch pad for community engagement (Brief Presentation)
Part 3 - Budget Sketch and Tax Election Strategy
35 minutes
Development Cost: Hard + Soft……A budget sketch
How to Finance the Vison - Tax Election Strategy
o November 2026 -Possible Bond Measure
o Next Steps for Tramutola and Gilroy
Wrap-up
Part 1 - Outcomes, Vision, Goals + A Snapshot of other Cities
35 minutes
What are some of the key outcomes from the community engagement process that you hope to achieve?
What is your vision for the new Gilroy Civic Center Master Plan?
What are some of your key goals?
What other cities have done - Comparison of Civic Facilities by Population (Brief Presentation)
Part 2 -Scope and Timeline
35 minutes
With the understanding that the Police and Library buildings are relatively new and will service Gilroy for the next 3 to 5 decades, should the new master planning and visioning
consider a new City Hall, a new Senior and Community Center and a new Recreation, Wellness and Aquatic Center? Should Wheeler be renovated, or demolished?
If this new community infrastructure is envisioned for the Gilroy Civic Center, then what is your imagined timeline for the vision
First thoughts: A launch pad for community engagement (Brief Presentation)
Part 3 - Budget Sketch and Tax Election Strategy
35 minutes
Development Cost: Hard + Soft……A budget sketch
How to Finance the Vison - Tax Election Strategy
o November 2026 -Possible Bond Measure
o Next Steps for Tramutola and Gilroy
Wrap-up
Civic Center Precedents
South San Francisco
Civic Complex
City Population: 62,000
Program: Library, Council Chambers, Parks and Recreation Center Classrooms,
Community Theater.
Building Area: 83,000 sf, Three Stories
Construction Cost: $101MM
Completed: 2024
Parking: 200 spaces
Amenities: 1.3-Acre Park
South San Francisco
Civic Complex
South San Francisco
Civic Complex
South San Francisco
Orange Memorial Park
Aquatic Center
South San Francisco
Orange Memorial Park
Aquatic Center
123
456
789
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 200Gilroy Civic Center Master Plan
c. City of Gilroy: City will provide refreshments for the meetings. Rachelle is looking
into the possibility of partnering with the Y to provide childcare during the meetings.
2. Programming and Needs Analysis
a. Ryan will set up meetings for the week of 2/10 to 2/14, with the goal of being
complete by mid-February. For the meetings, departments will tentatively be
grouped as follows (assume 90 minutes for each meeting):
i. Administrative Services and Finance (first meeting—this discussion can
inform subsequent meetings)
ii. Public Utilities, Public Works, Community Development
iii. Library leadership, Fire Department (need for administrative space), Parks
and Recreation
3. City Tasks
a. Utilities and Structures in the Civic Center Area: Ryan will see if he can locate
documentation
b. Traffic and Parking: There was a recent traffic study completed for the intersection of
6th and Church Streets. Ryan will see if he can find a copy for ELS.
4. Schedule
a. ELS will develop an updated schedule once proposed dates (provided last week) are
approved for the Community Engagement Series, Commission Reviews and City
Council (targeting Council presentation on July 28. ELS will also review the timeline
for the EIR. Tentatively the EIR process can start in May.
b. Possible P3 (public-private partnership) Presentation: The firm of Hayat Brown has
offered to make a presentation to the City in case there is interest in this delivery
method. CM will forward information to RO.
c. Bond Election Strategy: The City will work with their current bond partners.
GILROY CIVIC CENTER MASTER PLAN
January 29, 2025
MEETING NOTES
Attendees:
City of Gilroy: ELS:
Ryan Osenton
Dana Grant
David Masenten
Clarence Mamuyac
Susan Vutz
1. Community Engagement Process – Status
a. Community Workshop Dates and Times:
Approximate dates proposed by the City are as follows:
i. Part I (two meetings): Week of March 3
ii. Part II (two meetings): Week of April 1, April 8 or April 19
iii. Part III (two meetings): Week of May 20 or 27
The design team needs to have the two meetings on the same day for each of the
three parts. They can be a morning and afternoon session, separated by a lunch
break, or an afternoon and evening session separated by a break. Weekdays are
preferred. RO to review internally and propose dates and times.
b. Workshop Materials and Preparation:
i. Advertisement Boards and Banners – English and Spanish: ELS presented
the most recent version of boards and banners which have been updated
using the Gilroy style guide and images provided by the city. RO will review
this internally and provide feedback at next week’s meeting
ii. Engagement Letter Draft – English and Spanish (2/17): ELS will draft a letter
for City review by next week. The letter will go live on 2/17.
iii. Target Display Day – February 17th: Ideally boards and banners will be up
three weeks prior to the first meeting.
iv. City Website Interface – The City has provided a dedicated web page for
Civic Center Master Plan Information. Address is:
https://www.cityofgilroy.org/1063/Civic-Center-Master-Plan
v. Gallery Boards: ELS will have drafts of gallery boards for review at next
week’s meeting.
TEAM MEETING - 01.29.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 201Gilroy Civic Center Master Plan
GILROY CIVIC CENTER MASTER PLAN
February 5, 2025
MEETING NOTES
Attendees:
City of Gilroy: ELS:
Ryan Osenton
Rachelle Bedell
Bryce Atkins
Daniel Padilla
Dana Grant
David Masenten
Clarence Mamuyac
Susan Vutz
1. Community Engagement Process – Status
a. Community Workshop Dates and Times:
• Part 1 - Tuesday March 4, 9am and 6pm
• Part 2 – Tuesday April 8, 9am and 6pm
• Part 3 – Tuesday May 20, 9am and 6pm
The city feels the 9 and 6 times will work best for community members. They can
provide space in the library for the ELS team to work during the time between
meetings.
b. Boards and Banners:
i. Advertisement Boards and Banners review of draft:
1. Rachelle has sent her comments in a separate email. Title should be
changed to remove the word “Park”. Refer to the email for additional
comments.
2. People may not know what the term “charrette” means—ELS will find
an alternate term.
3. Do not include Ryan’s cell phone number on flyer. Include City main
line.
4. City is targeting the week of 2/17 to hit all the media. Rachelle will send
a “save the date” message next week.
5. ELS will revise Ad Graphics and return to the city as soon as possible.
Need any final city review comments by Monday for revisions and final
signoff on Wednesday 2/12. Spanish translations will be done after
Monday’s review.
6. ELS to send an editable (InDesign file) of the final version to Rachelle.
7. ELS will obtain quotes from printers based on five boards and banners.
The banner size can be reduced if desired.
ii. Engagement Letter Draft: ELS is working on a draft, to be provided to the
team next week.
iii. Gallery Boards: CM presented a first draft of the boards. Discussion was as
follows:
1. Since the first Community Meeting is March 4, boards and other
materials will need to be printed the 3rd week in April.
2. Gilroy will provide names for team members to be included on the first
board.
3. Residential Parcels: The city wants to review the pros and cons of
including the residential parcels at the corner of 6th and Dowdy Street. It
is not clear at this point whether they should be included as a part of
the master plan. Ryan will review with Jimmy.
4. For the boards, features such as Community Recreation Center,
Aquatics Center, etc. should be qualified as “possible” elements of the
Master Plan so people don’t have unrealistic expectations.
5. ELS will review text and backgrounds for contrast issues.
6. CM will make some basic updates to the boards and send to the city for
review next week.
7. Spanish translations of the boards will be in the form of separate 11x17
handouts.
8. Translators for Community Meetings: ELS has two bilingual staff
members that can attend meetings to help with translation. The city will
also provide staff to help with this.
2. Programming and Needs Assessment
a. Meetings have been scheduled as follows:
i. Administrative Services and Finance, scheduled for Monday 2/10 at 12:30.
ii. Public Utilities, Public Works and Community Development, Tuesday 2/11 at
3:30
iii. Library, Fire Department Admin., Parks and Recreation, Thursday 2/13 at
8:30am
ELS provided a list of discussion prompts to Ryan to distribute prior to the meetings
3. City Information:
a. Note from last meeting: Utilities and Structures in the Civic Center Area: Ryan will
check to see what information is available.
4. Schedule
a. Note from last meeting: ELS will develop an updated schedule pending confirmation
of dates for Community Engagement Series, Commission Reviews and City Council.
Targeting City Council presentation on July 28.
TEAM MEETING - 02.05.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 202Gilroy Civic Center Master Plan
i. ELS will have one or two Spanish speakers at the community meetings and
the city will provide three Spanish speakers in addition.
ii. For the 11x17 version of the boards in Spanish, assume 25 sets to start.
2. Programming and Needs Analysis
a. Meetings:
i. Administrative Services and Finance, scheduled for Monday 2/10 at 12:30.
Completed.
ii. Public Utilities, Public Works and Community Development, Completed
iii. Library, Fire Department Admin., Parks and Recreation, Thursday 8:30 to
9:30. Completed
iv. Finance/IT follow-up: Thursday 2-2:30. Completed.
v. Administration: Monday 12:30 to 1:30.
3. City Information:
a. Utilities and Structures in the Civic Center Area: Ryan has checked on this, and no
additional information is available.
4. Schedule
a. ELS will develop an updated schedule pending confirmation of dates for Community
Engagement Series, Commission Reviews and City Council. Targeting City Council
presentation on July 28.
b. 8/14 and 8/18 are possible alternate council meeting dates if 7/28 is too tight. All
information to go to council would need to be finalized by July 10-15 in order to make
the July 28 date.
GILROY CIVIC CENTER MASTER PLAN
February 12, 2025
MEETING NOTES
Attendees:
City of Gilroy: ELS:
Ryan Osenton
Rachelle Bedell
Dana Grant
David Masenten
Clarence Mamuyac
Susan Vutz
1. Community Engagement Process – Status
a. Community Workshop Dates and Times have been confirmed, as follows:
• Part 1 - Tuesday March 4, 9am & 6pm
• Part 2 – Tuesday April 8, 9am & 6pm
• Part 3 – Tuesday May 20, 9am & 6pm
All meetings will be held in Wheeler Auditorium. Note: there will be a jiujitsu
class in the afternoon on March 4, but it will be over before 6pm.
b. Boards and Banners:
i. Advertisement Boards and Banners – English and Spanish – the city has
decided to use only standalone vertical boards (no banners). ELS will have 5
English and 3 Spanish boards printed. City will print 8 ½ x 11 flyers in-house.
ELS will provide artwork as well as updated ID files to Rachelle. Boards and
feet will be sent to Ryan’s attention.
ii. Engagement Letter Draft: ELS sent a draft to the City for review and the City
will edit and translate it. No further input required from ELS.
iii. Target Display Day for engagement letter and advertisements: February 17th
iv. Gallery Boards – Review Current Draft:
• Board 1: ELS needs input on who to list for the project team on the city
side. CM will send a copy of this board to Ryan for review with city
leaders.
• Boards should indicate that all proposed projects are “possibilities”—this
message should be reinforced on all boards.
• City Hall board: the city would like a more reserved, less ostentatious
image for this board.
• ELS will provide a draft of text for the boards by Friday.
c. Interpreters and Spanish translation:
TEAM MEETING - 02.12.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 203Gilroy Civic Center Master Plan
2. Programming and Needs Analysis Meetings:
a. Administrative Services and Finance, scheduled for Monday 2/10 at 12:30.
Completed.
b. Public Utilities, Public Works and Community Development, Completed
c. Library, Fire Department Admin., Parks and Recreation, Thursday 8:30 to 9:30.
Completed
d. Finance/IT follow-up: Thursday 2-2:30. Completed.
e. Administration: Monday 12:30 to 1:30. Completed.
f. Council Chambers and EOC: Scheduled for Tuesday 2/25 at 1:00.
3. Schedule
a. ELS will develop an updated schedule pending confirmation of dates for Community
Engagement Series, Commission Reviews and City Council. Targeting City Council
presentation on July 28. ELS plans to have a draft for review next week.
b. 8/14 and 8/18 are possible alternate council meeting dates if 7/28 is too tight. All
information to go to council would need to be finalized by July 10-15 in order to make
the July 28 date.
4. New Business
a. Site visit to Redwood City on 2/27:
i. ELS suggested stopping by the new Mountain View Aquatic Center,
scheduled to open on March 1. This is a similar size facility to that
envisioned for the Master Plan.
ii. SV will send images of the design for the Redwood City Veteran’s Memorial
Building to Ryan for review before the site visit.
iii. CM also suggested visiting the Redwood City Hall (built in the 90’s) as a
possible addition to the tour.
iv. Ryan to review internally and let the team know what the City wants to do,
and confirm times.
b. Reimbursable Expenses: The city has made $25k available in a separate fund for
reimbursables to cover costs of printing and mileage. These cost should be invoiced
separately from the monthly project invoices.
GILROY CIVIC CENTER MASTER PLAN
February 19, 2025
MEETING NOTES
Attendees:
City of Gilroy: ELS:
Ryan Osenton
Rachelle Bedell
Bryce Atkins
Dana Grant
David Masenten
Clarence Mamuyac
Susan Vutz
1. Community Engagement Process – Status
a. Community Workshop Dates and Times have been confirmed, as follows:
• Part 1 - Tuesday March 4, 9am & 6pm
• Part 2 – Tuesday April 8, 9am & 6pm
• Part 3 – Tuesday May 20, 9am & 6pm
All meetings will be held in Wheeler Center. Note: there will be a jiujitsu class
in the afternoon on March 4, but it will be over before 6pm.
b. Boards and Banners:
i. Advertisement Boards – English and Spanish: Boards and stands were
delivered to Ryan. However, the city wants to change the language from
“Wheeler Community Center” to “Wheeler Center” and reprint the boards.
ELS will revise the text and re-send for printing.
ii. 8 ½ x 11 flyer: ELS will provide InDesign file and Spanish translation today.
iii. Gallery Boards – Review of Current Draft:
• Delete Board 1.
• Change language to Wheeler Center (instead of Wheeler Community
Center)
• Remove Well board. ELS will review and possibly include some language
on the LEED board.
• Combine Library and Police Station boards. Ryan is working on the text for
this (combined) board.
• See additional comments sent by Ryan.
• ELS will review, make updates, and send revised boards to Ryan for
review
TEAM MEETING - 02.19.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 204Gilroy Civic Center Master Plan
• Advocates flexible spaces that allow buildings to be utilized throughout different seasons.
• Points out the presence of nearby parking lots and mentions that people are willing to walk
a few blocks if the destination is appealing
• Another workshop attendee hopes to see downtown integrated into the site's master plan.
• Many residents travel to Morgan Hill or Gavilan College for aquatic facilities.
• A heated pool would be beneficial for use during colder months.
• Wants clarification on how supportive structures and storage areas will be safeguarded
against vandalism.
• Community meeting attendee hopes programs will include necessary equipment for
activities and services.
• Mentions having to travel to Morgan Hill to access an aquatic center.
• Workshop attendees are an advocate for design and construction of a city hall, senior
center, and youth center. They also note the need for large gathering spaces as well as
multifunction spaces.
• The individual also states that he currently travels to Galvin College to use aquatic facilities
• Two individuals would like to see the new civic master plan integrate with the downtown.
• They are advocates for a youth center and senior center.
• A different community member would like to see a connection of programs/buildings.
• They are worried about the time and cost required to complete a project of this magnitude
and suggest that making improvements could be a viable alternative.
• One senior resident would like to see improvement of sidewalks
• Two different community members would like outdoor spaces designed to host concerts.
• They envision a plaza, citing the Mexican Heritage Plaza in San Jose as an example.
• They emphasize the need for safe walking spaces, noting that many sidewalks in Gilroy are
disrupted by tree roots, causing uneven surfaces.
• They support the idea of a parking structure to accommodate downtown and civic center
visitors.
• They believe a youth center at this location could also benefit the east Gilroy community
and view this site as the heart of Gilroy.
• One parent that approached Angelo commented on how he would like to see an enhanced
outdoor space that creates a central gathering place.
• He questions the current library entrance and believes there should be a stronger
connection between the library and the plaza.
• While not a strong advocate for parking structures, he sees the corner of 7th Street and
Church Street as an ideal location for one. If built, he prefers a well-designed structure with
an appealing aesthetic rather than a purely functional look. He supports incorporating
ground-level retail with parking above to activate the site.
• He also notes that the existing parking lots on this site fragment the outdoor space and
buildings, making them less accessible to visitors. There is no designated pathway for
residents to reach these buildings without walking through a parking lot.
• Another community member suggests a single building with a senior center on the ground
floor and city hall on the upper levels.
• He also supports the creation of an outdoor community space and a youth recreation
center.
• A senior resident would like to see an indoor aquatic center, including a shared pool
designed for all age groups.
GILROY CIVIC CENTER MASTER PLAN
March 4, 2025
MEETING NOTES – WORKSHOP #1 – 9AM and 6PM
Facilitators:
City of Gilroy: ELS & SWA :
Ryan Osenton
Rachelle Bedell
Dana Grant
David Masenten
Clarence Mamuyac
Susan Vutz
Angelo Razo
Aylin Casas Mejia
Marco Esposito
Meeting Overview:
The first community workshop for the Gilroy Civic Center Master Plan was held at the Wheeler
Center in Gilroy in morning and evening sessions. The workshop format was an open house, or
“Gallery Walk,” where community members could view large informational boards discussing
various topics related to the Civic Center Master Plan, and share comments or questions with
design team representatives stationed around the room. The boards featured different aspects and
features of a possible future master plan for the civic center. Both morning and evening sessions
were attended by a wide cross section of residents and City employees. Comments from
attendees, as noted by each design team member, are summarized below.
Notes by Angelo Razo:
• Existing pools are only accessible during the summer; having a year-round pool would be
ideal.
• Support for the inclusion of an art and crafts space where seniors can gather.
• Desires a venue for special events.
• Prefers a variety of activities, as the current senior center primarily offers lunch, but some
seniors seek more engaging options.
• Emphasizes the need for spaces that are accessible to individuals with disabilities.
• Community members appreciate the concept of open space and enhancing walkability,
noting that this part of Gilroy lacks sufficient green spaces for the community.
• Workshop attendees believe the pool would take up excessive space and notes that the
east side of Gilroy has requested a youth center. Placing one on the west side might cause
dissatisfaction among east-side residents.
• Prefers an outdoor area with seating and performance platforms.
• Considers the site a prime location and the historical center of downtown Gilroy.
• Observes that many visitors from neighboring cities come to Gilroy and suggests the city
should create more spaces that attract both residents and tourists.
• Suggests designing multilevel structures to accommodate parking needs.
WORKSHOP 1 MEETING - 03.04.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 205Gilroy Civic Center Master Plan
• Cross-generational interaction would be a benefit to a new community center.
• Provide athletics programs in the new community center for kids of younger ages that would
feed into high school sports programs, such as wrestling. The high school wrestling team
has been CCS champions for 20 years.
• Theater:
o There should be more prominence of arts in the community. A new theater could
attract performing artists. There is also a new arts center at 7th and Monterey.
o A sense of community has been missing. People love the theater—there could be
music, maybe dinner and a show or dinner theater?
o Very supportive of the idea of a theater. Could it be a separate building?
• Wheeler could be changed into an art center; however the space was offered to the Arts
Alliance, but they said no.
• Would it be possible to have a bus trip to Redwood City to see the new senior/community
center there? It might be beneficial for community members.
• Could Wheeler be refurbished? If not, maybe the elements of the existing building could be
reused.
• Provide multi-purposed spaces in the new community center that are designed with
intention and that can be expanded and upgraded easily.
• How will parking and traffic be handled?
• A community pool would be good.
• Provide youth programs such as electronics
• Combine community center functions into one building
• Desire for weight room/gym for youth
• The outdoor amphitheater would be beautiful.
• Provide outdoor game area such as for chess
• Provide arts studios for art and ceramic classes
• Provide cooking classes
• Provide areas for sports leagues—more opportunities for kids sports and a youth center.
• Attendees feel strongly about a center for the arts. Provide a place for the South Valley
Symphony to perform and for a film festival.
• Provide a performance center, recreation center and senior center. Rec Center and Senior
Center should be multi-generational.
• Recreation is important.
• Planning commission has limited Gilroy’s growth to 1,000 additional homes, so population
growth may be limited.
• The Y currently runs the programs in the senior center, five days a week with lunches and
home delivery.
• At the time of the library bond, there was money earmarked for a parking structure that was
never built. Could these funds be used towards a new parking structure as part of the Civic
Center?
• She also envisions a senior center offering a variety of classes, such as yoga and Pilates,
tailored to different skill levels.
• A different community member would like to see topographic variation incorporated into
the landscape.
• She also supports the development of a program that provides legal services to residents.
• She envisions a space that can accommodate a wider range of activities, such as dancing.
Noting a disparity in available activities for men and women, she advocates for more
physically engaging programs for senior citizens.
• One woman would like to see a greater variety of sports leagues, including options like table
tennis and badminton.
• She believes a transportation program should be available for senior citizens to access the
civic center, as some can no longer drive.
• They are strong supporters of an aquatic center.
Notes by Susan Vutz:
• There is a need for a venue for performing arts
• Swimming:
o There is currently no pool available for lap swim.
o Christopher lap pool and play pool are not affordable, and there is a lack of
transportation available.
o There are limited swimming offerings at Gavilan, and folks need to be enrolled in a
class to swim there
• The effort to draw the community downtown has not been successful. Perhaps the Civic
Center can help with that.
• Library bond passed with 78% approval—investigate how that was done because getting
voters to pass a bond for the Civic Center could be a challenge.
• Need recreation places where kids can play to keep them off the streets. Currently school
properties are locked, so they can’t be used by the public outside of school use.
• The library bond had extra money for a parking garage that was not built. Is it possible that
those funds might be able to be applied to a parking structure for the Civic Center Project?
• Would it be possible to build a car park off-site?
• The community might not want to pay for new facilities –need to reach out to people who
are not online with mailers and Spanish language information.
• Wheeler Center is a local historic resource. Could it be retrofitted?
• Need childcare as a part of the Community Center
• A new Community Center should bring in Cultural events and the Arts. Provide a place for
people to hang out, rather than just leave after their class or event. Provide a place to buy
and sell for local artisans and/or a food concession.
• Need more parks—Gilroy has a smaller, slower relaxing vibe and that should be reflected in
the new center.
• Don’t want a giant parking structure—would be willing to walk a little further from remote
parking areas.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 206Gilroy Civic Center Master Plan
• People believed the recreation center should have a minimum of two gyms.
• A different individual expressed that he thinks the aquatic center is a big need. Morgan Hill
has one, and our community needs one, too. Maybe not as big, but one of our very own.
• One attendee commented that there is a vibrant, creative scene in Gilroy that needs a
home. They were then very happy to see that we might get our very own Arts Center.
• Other questions that arose were: Why do we need a City Hall?
• Seniors and other community leaders spoke up about their belief that the Senior Center is
key to the success of the master plan - please make sure it is safe and well lighted.
• There were also comments about the aquatic center containing an Olympic size pool.
• Groups asked us to make sure the gymnasium or rec center can accommodate silk
acrobatics.
Notes by Aylin Casas Mejia:
• Two residents believe that an aquatic center is low priority (as compared to the
other programming on site), and if site square footage is a concern they suggest
prioritizing the Amphitheater.
• Other residents believed the rec center and the Amphitheater were of high
importance
• There was some concern over implementing the youth center on the site, as Gilroy's
east side has been in dire need (and has asked) for a youth center in the
neighborhood and has received little recognition for their proposal from the city.
• Suggestion for rooftop garden spaces to prevent dead space in areas such as
parking lots
o Compensation for the community garden removal near the site
• A couple of members seemed concerned about pushing beyond basic ADA
guidelines such as including:
o Sound implementation for the deaf community
o Different textured pathways for the blind community
• There were some questions about our landscaping philosophy, I think community
members were really interested in our big ideas/concepts
• Concern for the displacement of current community programs taking place on the
site,
o Need more specification about whether community activities or work will be
able to continue
• Desires the community had that are not currently integrated into the program:
o Indoor/outdoor soccer fields
o Cultural center
o Handball court
o Blackbox theater
• There was an overall emphasis on:
o Safe walkways throughout the site
o Inclusion of green space but making sure that space is programmed/useful
• Community members would love to see a combined senior/youth/community center.
• More classes and programs
• Provide daycare/childcare
• Build retail into the plan. Perhaps a sub shop.
• Provide a community park with outdoor amphitheater.
• Provide transportation for seniors
Notes by Clarence Mamuyac:
• Community meeting attendees would like to see more advance notice of meetings. Perhaps
via direct mail.
• Attendees were also wondering if it was possible to do an additional Zoom session for the
community workshops
• Possible consideration for a downtown park where events such as “Pub in the Park” could
take place
• Attendees also believed the Morgan Hill Arts Center and Café was a good model for our
project to consider.
• There were several questions pertaining to: how much will the project cost to be
constructed? And how will it be financed?
• There was a general enthusiasm for the proposed collection of possible ideas, especially
the theater, aquatic center and recreation
• center.
• Community expressed a need for a downtown park. Additionally, it would be great if the new
park had an amphitheater.
• Several questions regarding how long the vision will take to realize rose, as well as if it will be
paid for by the residents of Gilroy?
• Request for the inclusion of a new modernized Senior Center with new dining facility.
• Residents asked us to consider bike parking and bike safety as it relates to pedestrians
using the park.
• Attendees wanted clarification as to where parking will be located.
• People were interested in what will happen to the solar collectors currently being installed.
• Other attendees were wondering if we (ELS/city) could find a way to reuse Wheeler Center,
or is it better to rebuild?
• Other workshop attendees were hoping everything would get rebuilt, except for the library.
They believed the police building seems to be high above the sidewalk and has no windows.
Making the building seem unwelcoming. They later asked if there were any plans to improve
it.
• People also inquired about the incorporation of public art in the master plan.
• An individual commented on the youth needing a “Gym Night”……a place to meet and
gather.
• Community members hope the park will accommodate a farmers’ market and/or crafts
festival on a regular basis.
• Along with the top comment, attendees commented on including outdoor spaces for music
and entertainment.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 207Gilroy Civic Center Master Plan
• A few people wondered about how to strengthen the connection to Downtown; one person
wondered about creating a greenway between the Civic Center and Monterey
• Several people asked about a more significant Outdoor People Place, larger than the
existing plaza
• Several people asked about an Amphitheater, potentially like the one at Morgan Hill’s
Community Cultural Center --- www.morganhill.ca.gov/221/Community-Cultural-Center
• A few people asked about lots of Trees, potentially in strong Allies, as well as around the
Civic Center’s perimeter; nearby Miller is a nice Gilroy example
• The idea of a New Multigenerational Community Center and a New City Hall was widely
supported; One attendee mentioned combining both
• The idea of a new cohesive Civic Center was widely supported
• Attendees I talked with are OK replacing Wheeler
• Several people mentioned consolidating parking; Several people wondered about garages
or underground parking [note that the mixed-use building at Monterey & Lewis has
underground parking]
END OF NOTES
▪ Avoiding random green strips
o Shaded seating areas
o Getting teens involved
• One resident suggested making the city hall more pronounced, the entry way
should face the busier streets as opposed to facing away from. (*should be noted
the previous city hall was designed to face a road that ran through the middle of the
site but has since been removed.)
Notes by Marco Esposito:
• Asked most people that stopped by Boards 4 and 5 (Context and Site) whether they go to
the Civic Center, and most mentioned going to the library, a few to Wheeler (for example
basketball and martial arts; and teen dances a long time ago) and fewer to the Senior
Center; several neighbors and city staff stroll through the civic center, from either home or
city offices
• Asked most people how they get to the Civic Center, and about 1/2 walk and 1/2 drive
• Asked drivers where they park, and most park alongside the library, starting in the lot
parallel to the library, and if full then west or east around the library, and then if full on street
along 6th
• Asked drivers whether they can find parking, and all said they can . . sometimes not right at
the library entrance
• A few people, especially with small children, mentioned that walking in the existing layout is
interrupted by drives and parking
• One attendee mentioned that a handful of homeless people alongside the library make
early morning and evening walks less comfortable
• Many people asked whether the PV canopies being installed are a long-term obstacle, and I
shared that the city is OK with moving.
• Many people asked whether the city is interested in purchasing the three homes on Dowdy
• A few people mentioned that the Police building feels a bit fort-like
• One person asked whether existing trees, for example around City Hall, would be kept going
forward
• One person mentioned that the area where Wheeler is used to be a lumber yard
• A few people mentioned that the parking zone south of the City Hall Annex used to include a
county building and 1-2 homes (visible in 1998 and 2002 Google Earth aerials)
• One person mentioned that a parking garage was planned as part of the library project [not
sure if true]
• One person mentioned that the YMCA operates certain Rec programs for the city, maybe
including at Wheeler [not sure if true]
• A few people noted that the city owns the small parking lot (and maybe a house) south of
7th St [we should tint that as well when showing the site]
• Several people mentioned going to Camino Coffee, either from City offices or nearby homes
• A few people mentioned that parking for special events Downtown can overflow in the Civic
Center area
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 208Gilroy Civic Center Master Plan
GILROY CIVIC CENTER MASTER PLAN
March 17, 2025
MEETING AGENDA
COUNCILMEMBER UPDATES
Community Engagement Process
- Three Step Community Process
o Gallery Walk
▪ City Council Check In #1
o Alternative Concept Master Plans
▪ City Council Check In #2
o Preferred Concept Master Plan
- Commissions Input
- City Council Final Review before CEQA Effort
Concept Design Process - 4 to 6 Civic Master Plan Ideas
- Program
o New Community Functions
▪ Seniors
▪ Recreation/Wellness
▪ Aquatics
▪ Arts/Theater
o New City Hall
o Parking
o New Downtown Civic Park
- Big Moves – Civic Park + New Buildings + Existing Buildings
- Initial Floor Plan Exploration
- Establishing ROM Development Cost
COUNCIL MEMBER UPDATES - 03.16.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 209Gilroy Civic Center Master Plan
7/11/2025
1
Gilroy Civic Master Plan
Community Engagement + Concept Design
March 2025
City Councilmember Update Sessions
Community Engagement Process
•Three Step Community Process
Concept Design Process -4 to 6 Civic Master Plan Ideas
•Approach
•Program
•Big Moves – First Thoughts
•Budget Sketch
AIMING FOR CITY COUNCIL APPROVAL IN JULY/AUGUST
COMMUNITY ENGAGEMENT PROCESS
CITY COUNCIL UPDATECITY COUNCIL UPDATECOMMISSION HEARINGSCITY COUNCIL APPROVALWORKSHOP 1
GALLERY WALK
ISSUES
TOPICS
INFORMATION SHARING
TUESDAY
MARCH 4TH
WORKSHOP 2
PRESENTATION
CHARRETTE
CONCEPT
ALTERNATIVES
TUESDAY
APRIL 8TH
WORKSHOP 3
PRESENTATION
PREFERRED
CONCEPT
DESIGN
TUESDAY
MAY 20TH
COMMUNITY WORKSHOP #1
Gallery Walk/Open House
Tuesday, March 4th
CHARRETTE –ALTERNATE CONCEPTS
COMMUNITY WORKSHOP #2
Tuesday, April 8th
COMMUNITY WORKSHOP #3
PREFERRED CONCEPT
Tuesday, May 20th
Gilroy Civic Master Plan
Approach Civic Center Precedents
South San Francisco
Civic Complex
123
456
789
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 210Gilroy Civic Center Master Plan
7/11/2025
2
Newark Civic Center Redwood City Veterans Memorial
Senior and Recreation Center
Redwood City Veterans
Memorial Senior and
Recreation Center
Redwood City YMCA and Aquatic Center Redwood City Veterans
Memorial Senior and
Recreation Center
Rengstorff Aquatic Center
City of Mountainview
Rengstorff Aquatic Center
City of Mountainview
Elk Grove Civic Center
City of Elk Grove
Elk Grove Civic Center
City of Elk Grove
10 11 12
13 14 15
16 17 18
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 211Gilroy Civic Center Master Plan
7/11/2025
3
Elk Grove Civic Center
City of Elk Grove
Elk Grove Civic Center
City of Elk Grove
Elk Grove Civic Center
City of Elk Grove
Elk Grove Civic Center
City of Elk Grove Gilroy Civic Master Plan
Program –What’s in the Civic Master Plan?
Community Center Functions
Performing Arts City Hall City Hall Focus Community Center Focus
Gilroy Civic Master Plan
First Thoughts
19 20 21
22 23 24
25 26 27
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 212Gilroy Civic Center Master Plan
7/11/2025
4
City Hall Focus Community Center Focus
1
1 CHURCHDOWDY7TH
LIBRARY CIVIC PARK
COMMUNITY CITY
HALL
PARKING
2 2
CIVIC PARK CHURCHDOWDY7TH
LIBRARY
COMMUNITY
CITY
HALL
PARKING
28 29 30
31 32 33
34 35 36
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 213Gilroy Civic Center Master Plan
7/11/2025
5
3 3 CHURCHDOWDY7TH
LIBRARY CIVIC PARK
COMMUNITY
CITY
HALL
PARKING
Below Grade
4
CHURCHDOWDY7TH
LIBRARY
4
CIVIC PARK
COMMUNITY
CITY
HALL
PARKING
X X CHURCHDOWDY7TH
LIBRARY CIVIC
PARK
COMMUNITY CITY
HALL
PARKING
Gilroy Civic Master Plan
Budget Sketch -What will it cost?
The New Gilroy Civic Center Components
Recreation Center $64.5 MM
37,900 sf
Seniors Center $34.1 MM
20,000 sf
Youth Center $24.4 MM
14,300 sf
Performing Arts Center $43.2 MM
25,400 sf
Aquatics Center $26.2 MM
10,000 sf + Two Community Pools
City Hall $68.1 MM
40,000 sf
Parking Structure @ 400 Spaces $21.8 MM
3 Levels (Grade + 2 Levels Above Grade –Two Story Height Equivalent)
Redeveloped Site Area $35.7 MM
7 Acres of Redeveloped Area
2025 Dollars –escalation not included
Budget Sketch
Projected Development Cost
Gilroy Civic Master Plan
March 19, 2025
City Councilmember Update Sessions
37 38 39
40 41 42
43 44 45
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 214Gilroy Civic Center Master Plan
Option C
• There is concern about the park's security due to the adjacency to 6th Street; including
children running into the streets or cars easily accessing the site.
General Comments
• Provide sufficient outdoor electrical outlets to support outdoor events.
• Will the park include elevation changes: berms, planters, etc.
• Identify key bus stops or propose bus stops for access to the site.
• Can the Council Chambers be more flexible in use?
Evening Session-
Option A
• The orientation of the amphitheater is a noise concern.
Option B
• The position of the park set between the Community Center and the City Hall is favorable in
addressing security and noise concerns. However, the orientation of the amphitheater is
still a concern for noise towards buildings located along Church Street.
Option C – Preferred Option
• Geometric form is appealing.
General Comments
• Identify key features of the park. Will it include a children’s playground, splash zones, etc.
• Will the park include elevation changes: berms, planters, etc.
• How will traffic be assessed? What streets will be impacted going to the Civic Center?
• Would prefer to see the City Hall built first to allow the Aquatic Center to be built sooner.
Notes by Susan Vutz
Morning Session-
Option C – Preferred Option
• The park is more prominent, therefore option C is preferred
• This option also includes a heavier mass of buildings
• Paseo inclusion is appreciated
• Seems more welcoming-it’s more inviting
Option B
• A positive statement for the city of Gilroy
• Hardens the corner at Church and 6th streets
Option A
GILROY CIVIC CENTER MASTER PLAN
April 8, 2025
MEETING NOTES – WORKSHOP #2 – 9AM AND 6PM
Facilitators:
City of Gilroy: ELS & SWA :
Ryan Osenton
Rachelle Bedell
David Masenten
Clarence Mamuyac
Susan Vutz
Angelo Razo
Aylin Casas Mejia
Kenneth Lorreto
Marco Esposito
Meeting Overview:
The second community workshop for the Gilroy Civic Center Master Plan was held at the Wheeler
Center in Gilroy with morning and evening sessions. Attendees were seated at round tables. The
session began with a slideshow presentation outlining the master plan process to date and
showcasing three different proposed schemes. Each table was provided with boards containing the
three plans and attendees were invited to discuss the plans with others at the table. Each table
included a facilitator from the design team to answer questions. Finally, each group selected a
spokesperson who presented the table’s findings to the larger group. Both morning and evening
sessions were attended by residents and city employees. Comments from attendees, as noted by
each design team member are summarized below. Comments are organized into two sections,
morning and evening workshops, as each workshop group responded differently to the three
schemes presented.
Notes by Angelo Razzo:
Morning Session-
Option A – Preferred Option
• The location of the amphitheater is a cause for noise concern. Reorienting the stage and
direction of sound would be ideal.
• The position of the park set between the Community Center and the City Hall is favorable in
addressing security and noise concerns. The large public space also makes the City Hall
and Community Center more accessible.
• The Council Chamber should be relocated to the west of City Hall to make the park more
open towards Church Street.
Option B
• The position of the park set between the Community Center and the City Hall is favorable in
addressing security and noise concerns. However, the orientation of the amphitheater is
still a concern for noise towards buildings located along Church Street.
• Ideal to have the Council Chambers attached to the City Hall.
WORKSHOP 2 MEETING - 04.08.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 215Gilroy Civic Center Master Plan
General Comments
• Excited to have the swimming pools.
• Greater interest in building the Rec Center and swimming pools first. Current options for
swimming are limited. Keep the community here in Gilroy.
• Amphitheater and City Hall would be the priorities.
• The Community Center and Rec Center would provide places for the younger generation to
go, which we never had growing up as a kid in Gilroy.
• Like the Paseo and the idea of farmer’s markets.
• Is there too much parking? People who live close by can ride bikes or walk.
• Like the amphitheater and rec center.
• Build the Community Center first.
• Provide dog stations in the park, with poop bags.
• Integrate this project with community spaces that already exist in the police station and
library.
• There should be no single-use spaces.
• Be aware of the requirements for barricades and security during daily activities and special
events.
• There is a concern about the possibility of building City Hall before the Rec Center or pool.
• The City could have the option to rent space elsewhere during construction of City Hall.
• All spaces should be multi-purpose.
• Build City Hall and Community Center first.
• The aquatic center is not a priority. The Community Center is a greater priority since 38% of
the community is under 24.
• Like swimming pools. The City needs to offer swimming lessons to people on the east side
of the city.
• Build the community center first, then City Hall
Notes by Kenneth Loretto:
Morning Session-
Option A &* B– Preferred Option combined with Option B
• Council chambers should be integrated into the City Hall building, not detached.
• All the schemes have multiple exits in the event of a wildfire which is good.
• Options A and B have buildings which bracket the park which is a nice idea. The buildings
provide security and create a ‘civic’ space.
• Option A but with the council chamber integrated with City Hall.
• Option B but re-orient the amphitheater aligned with the paseo.
• City Hall is better located at the south side of the park.
• Community Center is best located at the north side of the park
• There is a problem with the orientation of the amphitheater because of the western sun. The
amphitheater needs to be oriented north-south rather than east-west because otherwise
the late afternoon sun will be a problem for either the performers or the audi ence. Option A
is out because of the orientation of the amphitheater
General Comments
• Need to Provide lighting and power for lots of vendors.
• For the amphitheater, shading for the audience is needed, but there are line of site
considerations. Provide shade for performers.
• Buildings can have overlap in terms of their use—multi-purpose spaces.
• It would be nice to have a bubbler fountain/ splash pad
• Provide a dog park
• Mixed reviews on the separate council chambers. Glass council chambers could symbolize
transparent government.
• Pools: Consider whether a lap pool is needed. I like the splash pad and kiddie pool.
• Where will money come from to run the pool?
• Build the City Hall and Community Center first.
• Provide outside restrooms and a dog park.
• No pools.
• Why aren’t we acquiring the three residential properties along Dowdy Street?
• Overall, the preference was for Option C (5 people) and Option B (one person)
Evening Session-
Option B – Preferred Option
• Like the paseo and the idea of a farmer’s market
• Don’t like separate council chambers. It would be more cohesive to keep it as a part of City
Hall.
• Good to have the library on 6th St. and the Community Center on 7th to balance activity.
• Gallery space
Option A
• Prefer separate council chambers
• We liked Option A with the buildings flipped—preferred the park in Option A.
• We preferred the shape of the park in A, and liked the idea of the City Hall as a stage.
• Like a hybrid of A and B
• Like the park from C and would reorient it like A.
• Would take City Hall from Option A and flip it.
Option C
• Like this option due to access from downtown
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 216Gilroy Civic Center Master Plan
Notes by Aylin Casas Mejia:
Morning Session-
Option C – Preferred Option
• 5/6 of group members preferred option C
Option A
• 5/6 of group members preferred detachment of city hall meeting room
• Appreciated the idea of a “Transparent Government”
Option B
• Approve of amphitheater placement
• Bridges the gap between government and the community
General Comments
• Concern over the sun facing guests during a performance for scheme A
• Need for the placement of lights around the park and plaza space
o Importance of light fixtures each with their own individual outlets
• Slight confusion in the topography of the amphitheater and whether or not there would be
gentle hill or slope on site
• Overall need for shade coverage near/around the stage (while still ensuring no views are
blocked)
• Proposal for: the community center to be reserved for seniors in the first level and then
occupied by the youth on the second level
• Proposal for: dog park
• Desire for: creating a line of site from the dining hall into the park, and minimizing trees to
prevent any obstruction of views
• Condensing Program: condensing the program to only include splash pads (fun water)
focusing on the younger kids, as opposed to maintaining the fun and still water.
o Christopher High School was mentioned as a reference point to how hard it has
been to hire and upkeep the facility due to monetary issues
• Passing comments about relocating the city hall to 6th street, ensuring there was a
continued access point for the senior center.
Evening Session-
Option A & B - Preferred Option
• Appreciate the community center being in close proximity to the library.
• Well balanced but prefer circular park space as opposed to a rectangular one
• Well balanced with the city hall and community center bordering the civic park space.
• Prefer A&B hybrid because the buildings bracket the park, create a civic space, provide
security.
Option C
• Large park for Option C is nice.
• Others thought Option C is the least favorite. The park is too open.
General Comments
• Build the Community Center first.
• Not enthusiastic about locating City Hall at the north side of the park.
• First built should be the Community Center – Senior Center.
• Some concerns about restroom locations. Where are they? Porta-potties would be provided
for large events.
• Provide for event loading at the park.
• The downtown needs work. Park proximity to downtown is important so the location at east
end of the plan is preferred.
• Multi-use green spaces should be provided.
• Park the east side edge.
• The library is a primary draw for the existing campus.
• Short walkable distances along the accessible Paseo are a nice feature.
• Indoor/ outdoor green spaces would be a nice amenity.
Evening Session-
Option D (Ryan Osenton’s Proposal)
• Locate City Hall adjacent the Police Depart. It makes sense for “Administrative” functions to
be in close proximity.
Option B
• The buildings at north and south side of the park would buffer the neighbors.
Option C
• The park is too open to neighbors.
• Options A & B bracket the park and would buffer acoustics.
• Acoustics are a concern w event noise being an issue for neighbors.
• Be mindful of the orientation of the amphitheater and mitigate acoustic issues for the
neighbors.
• The Council Chambers may be in conflict with an active park setting. Evening activity in the
park would be distracting for meetings in the chambers.
• Theater loading is required for the Community Center.
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 217Gilroy Civic Center Master Plan
• Community Center should be Phase 1. About 38% of City's population is under 24 years
old—providing community functions first makes sense.
• Phasing: Existing school pools are sufficient for now in general; the Aquatic Center can
come later.
• Attendees want to have gallery space. We have a lot of local artists. Could be on the second
floor of the Community Center. Outdoor art along the paseo and sculpture areas are also
appreciated
• Suggestion for a dinner theater/dining terrace?
• Underground parking that serves city staff during the day and the public during
festivals/events works well—Sunnyvale? was mentioned as a good example.
• Green space should offer more than just lawn, lawn is boring; the reference image from #1
Workshop Board 08 shows the right feeling
• Questions arose concerning the capacity of park's event space—how many people can it
accommodate?
• No need for a pool; a splash pad or simple water feature is sufficient.
• Necessary inclusion of Electrical plug-ins/power access is important.
• Restrooms with outdoor access is important.
• Desired Dog park
• Switch the Community Center to 7th for easier parking access
• Opposed to a separate Council Chamber building.
• Love to have pools; could offer swim classes to East Gilroy residents.
• Overall walkability is appreciated.
• Like the Paseo
• Like the idea of parks framed by buildings on both sides
• Interest in dog stations and making the site dog-friendly (on leash).
• Concern that a stand-alone Council Chamber with only single use is inefficient
• The Community and Rec Centers should be the first phase. If in the future City Hall is
replaced at its current location, City staff could temporarily relocate to leased office space
Evening Session-
Option A
• We like a two-story parking structure to ensure sufficient parking.
• Strong support for an aquatic center --- we now go to other towns to swim
• Prefer amphitheater stage facing inward, rather than toward the neighborhood (as in
Concept A).
• Amphitheater in Concept A faces the wrong direction for sunlight
• Amphitheater noise conflicts with Library use
Option B
• Buildings can serve as sound buffers for nearby residential areas
• Preferred in terms of ample parking for city hall.
Option C
• Suggestion to reduce greenery around city hall to include some parking.
• Concern for parking to building connection (for city hall and community building).
General Comments
• The youth wanted to prioritize the community center along with the city hall, they did not
want the city hall to have to rent a temporary space and allocate more money in finding the
space.
• They were also conflicted on the city hall meeting room being attached or unattached but
ultimately agreed for it to be disconnected (in a circular shape).
• In all schemes in the evening meeting, the group wanted to maximize parking
• Youth wanted to maintain the aquatic center (both pool and splash pad)
• It was mentioned that Christopher High Pool center is often unavailable when they would
like to occupy the facilities and is typically only available during the summer.
Notes by SWA:
Morning Session-
Option A
• In A, people coming down the paseo can distract from performances.
• The sun orientation is important! Concept A has poor sun direction for the park; a north-
south orientation is preferred.
• Preference for a hybrid of Concepts A and B
• In Concept A, suggest flipping the City Hall and Community Center so City Hall feels more
inclusive, it’s part of us
Option B
• Concept B’s amphitheater setting is better with City Hall building as backdrop
• B’s elliptical park feels smaller than A’s square layout. We want more open park space
• Overall layout creates opportunity for Movie nights
Option C
• Prefer parks framed by buildings, C is too open to the street, with noise, not safe for children
• C was the least favorite.
• Concerns about sun orientation for the park
General Comments
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 218Gilroy Civic Center Master Plan
Option C
• Concepts A and C, due to the separated Council Chamber. We have meetings after 5pm.
Evening meetings conflict with park activity
• We like the park layout in Concept C, with City Hall and Community Center buildings buffer
the south edge, helping to block heat and sound
• Appreciated that all building components are close together
General Comments
• Suggested layout: business functions on the left side of the campus, “parties” on the right
• Recommend Community Center + Youth Center as Phase 1
• Parking location is difficult/far for seniors.
• Suggested layout: centralized parking (where the Aquatic Center is located).
• Parking is stressful for seniors, especially angled street parking—feels exposed and
stressful to backup.
• Consider a parking lot in the middle, on the existing City Hall site
• Want City Hall to be built first (maybe to get pools sooner, since shown on City Hall site?)
• Consider the playground
• Consider the newly built solar panels structure to be reused
• Recreation and Youth center could share some programs and be phase 1
END OF NOTES
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 219Gilroy Civic Center Master Plan
7/11/2025
1
Gilroy Civic Master Plan
Plan Maestro Cívico de Gilroy
April 8, 2025
Community Workshop #2
Welcome! / ¡Bienvenido!
Community Engagement + Concept Design
I. Welcome + Opening Remarks
II. Concept Design -3 Civic Master Plan Ideas
•What is being considered?
•A, B, C
III. Your thoughts….your reactions, your ideas!
•Review in teams
•Report your findings
IV. Next Steps…
20 Minutes
50 Minutes
10 Minutes
10 Minutes
90
Minutes
AIMING FOR CITY COUNCIL APPROVAL IN JULY/AUGUST
COMMUNITY ENGAGEMENT PROCESS
COMMISSION HEARINGSCITY COUNCIL APPROVALWORKSHOP 1
GALLERY WALK
ISSUES
TOPICS
INFORMATION SHARING
TUESDAY
MARCH 4TH
WORKSHOP 2
PRESENTATION
CHARRETTE
CONCEPT
ALTERNATIVES
TUESDAY
APRIL 8TH
WORKSHOP 3
PRESENTATION
PREFERRED
CONCEPT
DESIGN
TUESDAY
MAY 20TH
Gilroy Civic Master Plan
Program –What’s in the Civic Master Plan?
Plan Maestro Cívico de Gilroy
Programa – ¿Qué hay en el Plan Maestro Cívico?
Civic Park
Parque Cívico
Civic Park
Parque Cívico
Seniors Center
Centro de día
Seniors Center
Centro de día
Youth Center
Centro de Juventud
123
456
789
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 220Gilroy Civic Center Master Plan
7/11/2025
2
Youth Center
Centro de Juventud
Arts Center
Centro de Artes
Arts Center
Centro de Artes
Recreation Center
Centro de Recreación
Recreation Center
Centro de Recreación
AquaticsCenter
Centro Acuático
AquaticsCenter
Centro Acuático
AquaticsCenter
Centro Acuático
City Hall
Ayuntamiento
10 11 12
13 14 15
16 17 18
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 221Gilroy Civic Center Master Plan
7/11/2025
3
City Hall
Ayuntamiento
Civic Center Park….Bringing it all together
Parque del Centro Cívico.... Reuniendo todo Elk Grove Civic Center
City of Elk Grove
Elk Grove Civic Center
City of Elk Grove
Elk Grove Civic Center
City of Elk Grove
Elk Grove Civic Center
City of Elk Grove
Elk Grove Civic Center
City of Elk Grove
Gilroy Civic Master PlanThree Concepts…..A, B and C
Plan Maestro Cívico de GilroyTres conceptos..... A, B y C
19 20 21
22 23 24
25 26 27
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 222Gilroy Civic Center Master Plan
7/11/2025
3
City Hall
Ayuntamiento
Civic Center Park….Bringing it all together
Parque del Centro Cívico.... Reuniendo todo Elk Grove Civic Center
City of Elk Grove
Elk Grove Civic Center
City of Elk Grove
Elk Grove Civic Center
City of Elk Grove
Elk Grove Civic Center
City of Elk Grove
Elk Grove Civic Center
City of Elk Grove
Gilroy Civic Master PlanThree Concepts…..A, B and C
Plan Maestro Cívico de GilroyTres conceptos..... A, B y C
19 20 21
22 23 24
25 26 27
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 223Gilroy Civic Center Master Plan
7/11/2025
5
P A S E O GILROY CIVIC
PARK
COMMUNITY
CENTER
CITY HALLREC + AQUATICS
PARKING
MULTIGENERATIONAL COMMUNITY CENTER
ARTS/SENIORS/YOUTH PROGRAMMING
MULTIGENERATIONAL RECREATION AND
AQUATICS CENTER
Morgan Hill
Amphitheater
(Approx Size)
Potential
Parking Garage
180 Cars
P A S E O
COMMUNITY
CENTER
CITY HALL
REC + AQUATICS
GILROY
CIVIC PARK
PARKING
MULTIGENERATIONAL COMMUNITY CENTER
ARTS/SENIORS/YOUTH PROGRAMMING
MULTIGENERATIONAL RECREATION AND
AQUATICS CENTER
Morgan Hill
Amphitheater
(Approx Size)
Potential
Parking Garage
180 Cars
P A S E O
COMMU-
NITY
CENTER CITY HALLREC + AQUATICS
GILROY
CIVIC
PARK
PARKING
MULTIGENERATIONAL COMMUNITY CENTER
ARTS/SENIORS/YOUTH PROGRAMMING
MULTIGENERATIONAL RECREATION AND
AQUATICS CENTER
Morgan Hill
Amphitheater
(Approx Size)
Potential
Parking Garage
180 Cars
Your turn……su turno…..
Questions:
Which is your favorite concept and why?
Which is least favorite concept and why?
What is your favorite feature of the civic master plan?
What would you like to see built first?
37 38 39
40 41 42
43 44 45
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 224Gilroy Civic Center Master Plan
7/11/2025
6
25 Minutes:Review and Discuss Three ConceptsElect a Team Presenter
25 minutos Revisar y discutir tres conceptosElegir un presentador de equipo
25 Minutes:Team Presenters give a 2-to-3-minute recap of their table’s findings
25 minutos Los presentadores del equipo hacen un resumen de 2 a 3 minutos de los hallazgos de su mesa
Next Steps
•Narrow to a preferred concept direction
•Refine to a Final Draft Concept
•Present the Final Draft Concept at Community Workshop #3 on
May 20th
•Refine Final Draft for presentation to Commissions
•Prepare Final Concept Master Plan for City Council Approval in
July/August 2025
•Initiate CEQA process and complete by Spring 2026
•Goal: Phase One Ballot Measure in November 2026
Thank you! / ¡Gracias!
We hope to see you again on
Tuesday, May 20th for
Workshop #3
46 47 48
49
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 225Gilroy Civic Center Master Plan
7/10/2025
April 21, 2025 Council Member Updates -Post Workshop 2 1
Gilroy Civic Master Plan
Plan Maestro Cívico de Gilroy
Week of April 21, 2025
Mayor and Councilmember Updates, Post-Community Workshop #2
Welcome! / ¡Bienvenido!
Community Engagement + Concept Design
I. Welcome + Opening Remarks
II. Concept Design -3 Civic Master Plan Ideas
•What is being considered?
•A, B, C
III. Your thoughts….your reactions, your ideas!
•Review in teams
•Report your findings
IV. Next Steps…
20 Minutes
50 Minutes
10 Minutes
10 Minutes
90
Minutes
AIMING FOR CITY COUNCIL APPROVAL IN JULY/AUGUST
COMMUNITY ENGAGEMENT PROCESS
COMMISSION HEARINGSCITY COUNCIL APPROVALWORKSHOP 1
GALLERY WALK
ISSUES
TOPICS
INFORMATION SHARING
TUESDAY
MARCH 4TH
WORKSHOP 2
PRESENTATION
CHARRETTE
CONCEPT
ALTERNATIVES
TUESDAY
APRIL 8TH
WORKSHOP 3
PRESENTATION
PREFERRED
CONCEPT
DESIGN
TUESDAY
MAY 20TH
Gilroy Civic Master Plan
Program –What’s in the Civic Master Plan?
Plan Maestro Cívico de Gilroy
Programa – ¿Qué hay en el Plan Maestro Cívico?
Civic Park
Parque Cívico
Civic Park
Parque Cívico
123
456
789
COUNCIL MEMBER UPDATES - 04.21.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 226Gilroy Civic Center Master Plan
7/10/2025
April 21, 2025 Council Member Updates -Post Workshop 2 2
Seniors Center
Centro de día
Seniors Center
Centro de día
Youth Center
Centro de Juventud
Youth Center
Centro de Juventud
Arts Center
Centro de Artes
Arts Center
Centro de Artes
Recreation Center
Centro de Recreación
Recreation Center
Centro de Recreación
AquaticsCenter
Centro Acuático
10 11 12
13 14 15
16 17 18
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 227Gilroy Civic Center Master Plan
7/10/2025
April 21, 2025 Council Member Updates -Post Workshop 2 3
AquaticsCenter
Centro Acuático
AquaticsCenter
Centro Acuático
City Hall
Ayuntamiento
City Hall
Ayuntamiento
Civic Center Park….Bringing it all together
Parque del Centro Cívico.... Reuniendo todo Elk Grove Civic Center
City of Elk Grove
Elk Grove Civic Center
City of Elk Grove
Elk Grove Civic Center
City of Elk Grove
19 20 21
22 23 24
25 26 27
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 228Gilroy Civic Center Master Plan
7/10/2025
April 21, 2025 Council Member Updates -Post Workshop 2 4
Elk Grove Civic Center
City of Elk Grove
Elk Grove Civic Center
City of Elk Grove
Gilroy Civic Master PlanThree Concepts…..A, B and C
Plan Maestro Cívico de GilroyTres conceptos..... A, B y C
ONLY
10%+/-
GREEN
PARKING
PARKING
PARKINGSENIORS
LIBRARY
POLICE CITY HALL
WHEELER
LIBRARY
&
POLICE
REMAIN
LIBRARY
POLICE
WHEELER
PHASE 1 ?
PHASE 1 ?PHASE 1
?
28 29 30
31 32 33
34 35 36
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 229Gilroy Civic Center Master Plan
7/10/2025
April 21, 2025 Council Member Updates -Post Workshop 2 5
P A S E O GILROY CIVIC
PARK
COMMUNITY
CENTER
CITY HALLREC + AQUATICS
PARKING
MULTIGENERATIONAL COMMUNITY CENTER
ARTS/SENIORS/YOUTH PROGRAMMING
MULTIGENERATIONAL RECREATION AND
AQUATICS CENTER
Morgan Hill
Amphitheater
(Approx Size)
Potential
Parking Garage
180 Cars
P A S E O
COMMUNITY
CENTER
CITY HALL
REC + AQUATICS
GILROY
CIVIC PARK
PARKING
MULTIGENERATIONAL COMMUNITY CENTER
ARTS/SENIORS/YOUTH PROGRAMMING
MULTIGENERATIONAL RECREATION AND
AQUATICS CENTER
Morgan Hill
Amphitheater
(Approx Size)
Potential
Parking Garage
180 Cars
P A S E O
COMMU-
NITY
CENTER CITY HALLREC + AQUATICS
GILROY
CIVIC
PARK
PARKING
MULTIGENERATIONAL COMMUNITY CENTER
ARTS/SENIORS/YOUTH PROGRAMMING
MULTIGENERATIONAL RECREATION AND
AQUATICS CENTER
Morgan Hill
Amphitheater
(Approx Size)
Potential
Parking Garage
180 Cars
37 38 39
40 41 42
43 44 45
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 230Gilroy Civic Center Master Plan
7/10/2025
April 21, 2025 Council Member Updates -Post Workshop 2 6
Your turn……su turno…..
Questions:
Which is your favorite concept and why?
Which is least favorite concept and why?
What is your favorite feature of the civic master plan?
What would you like to see built first?
Next Steps
•Narrow to a preferred concept direction
•Refine to a Final Draft Concept
•Present the Final Draft Concept at Community Workshop #3 on
May 20th
•Refine Final Draft for presentation to Commissions
•Prepare Final Concept Master Plan for City Council Approval in
July/August 2025
•Initiate CEQA process and complete by Spring 2026
•Goal: Phase One Ballot Measure in November 2026
Thank you! / ¡Gracias!
Next up……
Tuesday, May 20th
Workshop #3
46 47 48
49 50 51
52
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 231Gilroy Civic Center Master Plan
7/11/2025
1
Gilroy Civic Master Plan
Plan Maestro Cívico de Gilroy
May 14, 15, and 16, 2025
City Council Updates, Pre-Community Workshop #3
Welcome! / ¡Bienvenido!
Community Engagement + Concept Design
COMMUNITY ENGAGEMENT PROCESS
CITY COUNCIL APPROVALWORKSHOP 1
GALLERY WALK
ISSUES
TOPICS
INFORMATION SHARING
TUESDAY
MARCH 4TH
WORKSHOP 2
PRESENTATION
CHARRETTE
CONCEPT
ALTERNATIVES
TUESDAY
APRIL 8TH
WORKSHOP 3
PRESENTATION
PREFERRED
CONCEPT
DESIGN
TUESDAY
MAY 20TH
Aiming
for
City Council
Approval on
June 16th
CAFECITO
PRESENTATION
FRIDAY
MAY 9
Gilroy Civic Master Plan
Program –What’s in the Civic Master Plan?
Plan Maestro Cívico de Gilroy
Programa – ¿Qué hay en el Plan Maestro Cívico?
Civic Center Park….Bringing it all together
Parque del Centro Cívico.... Reuniendo todo
Civic Park
Parque Cívico
Civic Park
Parque Cívico
Elk Grove Civic Center
City of Elk Grove
Civic Park
Parque Cívico Elk Grove Civic Center
City of Elk Grove
Civic Park
Parque Cívico Elk Grove Civic Center
City of Elk Grove
Civic Park
Parque Cívico
123
456
789
CITY COUNCIL UPDATES - 05.14.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 232Gilroy Civic Center Master Plan
7/11/2025
2
Elk Grove Civic Center
City of Elk Grove
Civic Park
Parque Cívico Elk Grove Civic Center
City of Elk Grove
Civic Park
Parque Cívico
Seniors Center
Centro de día
Seniors Center
Centro de día
Youth Center
Centro de Juventud
Youth Center
Centro de Juventud
Arts Center
Centro de Artes
Arts Center
Centro de Artes
Recreation Center
Centro de Recreación
10 11 12
13 14 15
16 17 18
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 233Gilroy Civic Center Master Plan
7/11/2025
3
Recreation Center
Centro de Recreación
AquaticsCenter
Centro Acuático
AquaticsCenter
Centro Acuático
AquaticsCenter
Centro Acuático
City Hall
Ayuntamiento
City Hall
Ayuntamiento
Gilroy Civic Master Plan
Community Engagement + Concept Design
RECAP
19 20 21
22 23 24
25 26 27
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 234Gilroy Civic Center Master Plan
7/11/2025
4
ONLY
10%+/-
GREEN
PARKING
PARKING
PARKINGSENIORS
LIBRARY
POLICE CITY HALL
WHEELER
LIBRARY
&
POLICE
REMAIN
LIBRARY
POLICE
WHEELER
City Hall Focus Community Center Focus
6 CONCEPT IDEAS: Post Workshop #1
1 2 3
4 X
5 CONCEPT IDEAS: Post Workshop #1
ABC
3 CONCEPT IDEAS –Workshop #2
28 29 30
31 32 33
34 35 36
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 235Gilroy Civic Center Master Plan
7/11/2025
5
Gilroy Civic Master Plan
Preferred Direction
Gilroy Civic Master Plan
Today…..Preferred Concept
WEST BLOCK
POLICE + PARKING
CENTRAL BLOCK
LIBRARY + CITY HALL
EAST BLOCK
PARK + RECREATION
GILROY CIVIC PARKPASEO
6TH Street
7TH StreetChurch StreetDowdy StreetNORTH
Elk Grove Civic Center
City of Elk Grove
WEST BLOCK
POLICE + PARKING
CENTRAL BLOCK
LIBRARY + CITY HALL
WEST BLOCK
PARK + RECREATION
GILROY CIVIC PARKPASEO
6TH Street
7TH StreetChurch StreetDowdy StreetNORTH
WEST BLOCK
POLICE + PARKING
CENTRAL BLOCK
LIBRARY + CITY HALL
WEST BLOCK
PARK + RECREATION 6TH Street
7TH StreetChurch StreetDowdy StreetNORTH
GILROY CIVIC PARKPASEO
37 38 39
40 41 42
43 44 45
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 236Gilroy Civic Center Master Plan
7/11/2025
6
GILROY CIVIC PARKPASEO
6TH Street
7TH Street Church StreetDowdy StreetRECREATION & AQUATICS
CENTER
GYMNASIUM/TRACK
WELLNESS/FITNESS
POOLS
MULTIGENERATIONAL
COMMUNITY CENTER
THEATER/ARTS/SENIORS/YOUTH
GILROY CIVIC PARK
PARKING
PARKING
6TH Street
7TH Street Church StreetDowdy StreetNORTH
RECREATION & AQUATICS
CENTER
GYMNASIUM/TRACK
WELLNESS/FITNESS
POOLS
MULTIGENERATIONAL
COMMUNITY CENTER
THEATER/ARTS/SENIORS/YOUTH
GILROY CIVIC PARK
PARKING
PARKING
6TH Street
7TH Street Church StreetDowdy StreetNORTH
RECREATION & AQUATICS
CENTER
GYMNASIUM/TRACK
WELLNESS/FITNESS
POOLS
MULTIGENERATIONAL
COMMUNITY CENTER
THEATER/ARTS/SENIORS/YOUTH
GILROY CIVIC PARK
PARKING
PARKING
6TH Street
7TH Street Church StreetDowdy StreetNORTH
LIBRARY
PASEO
CITY HALL
PARKING
PARKING
PARKING
PARKING
6TH Street
7TH Street Church StreetDowdy StreetNORTH
PASEO
POLICE
PARKING
PARKING
PARKING
6TH Street
7TH Street Church StreetDowdy StreetNORTH
46 47 48
49 50 51
52 53 54
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 237Gilroy Civic Center Master Plan
7/11/2025
7
RECREATION AND AQUATICS CENTER
First Floor
RECREATION AND AQUATICS CENTER
Second Floor
MULTIGENERATIONAL COMMUNITY CENTER
First Floor
MULTIGENERATIONAL COMMUNITY CENTER
Second Floor
CITY HALL
First Floor
CITY HALL
Second Floor
Thank you! / ¡Gracias!
Next up……
Tuesday, May 20th
Workshop #3
55 56 57
58 59 60
61 62
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 238Gilroy Civic Center Master Plan
Evening Session-
• Concerned about privacy from the second level into neighboring homes.
• Adress the safety of transparent walls with reflective glass or ballistic glass.
• Consider coordinating with downtown merchants, referring to the Downtown Business
Organization.
• Will the park require a fee for food trucks and farmers’ market?
• Implement the design of the library façade into adjacent buildings.
• Apply solar panels on the police department building
• Provide sufficient security lighting
• Senior Center area appears too small. Provide more square footage.
• Provide a senior store for selling community crafts.
• Provide accessible paths for seniors.
• Consider curb less curbs – easy transitions between different elevations.
• How will parking for seniors be managed?
• Provide tall trees with large canopies for shading.
• Design cool gardens if trees are overly expensive.
• Support the idea of a communal space.
• Provide ramps for accessibility.
• Enjoy the implementation of large openings allowing natural light into buildings
• Provide a parking garage.
• Include seating along the paseo.
• Include space for food trucks along the paseo.
• Could the pool be indoors?
• Provide terraced landscape, berms and swales.
• Support the multigenerational spaces for people to engage in enlightening conversations.
• Provide 2 level parking.
• Include emergency call boxes throughout the park.
• Include a community garden.
• Design a playground to further encourage children and parents to use the park.
• Include “garlic chairs” or furniture symbolic of Gilroy
Notes by Aylin Casas Mejia:
Morning Session-
• Concern over accumulated traffic existing and entering from Dowdy st.
• Redesign of parking lot so that it is more distributed throughout the site, as opposed to
accumulated in one corner
• Appreciated the parking designated for both the police building and the city hall
• Replace some parking with tree coverage and more green space opportunities
• Attendee mentioned outlet inclusion for night lights along the open space
• Concern over light and noise pollution onto neighbors of the site
Evening Session-
GILROY CIVIC CENTER MASTER PLAN
May 20, 2025
MEETING NOTES – WORKSHOP #3 – 9AM AND 6PM
Facilitators:
City of Gilroy: ELS & SWA :
Ryan Osenton
Rachelle Bedell
Clarence Mamuyac
Angelo Razo
Aylin Casas Mejia
Kenneth Lorreto
Marco Esposito
Meeting Overview:
The final community workshop was held at the same location as the previous workshops, Wheeler
Center in Gilroy, with morning and evening sessions. The workshop format similar to Workshop #2,
in that community members were seating around several round tables. The session began with a
slideshow a slideshow outlining the master plan process to date and the evolution of one preferred
concept design. Attendees were then asked to critique and discuss the preferred concept within
their table groups, before presenting their findings to the larger group. Both morning and evening
sessions were attended by residents and city employees. Comments from attendees, as noted by
each design team member, are summarized below. Comments are organized into two sections for
morning and evening workshops, as each workshop group responded differently to the preferred
concept.
Notes by Angelo Razzo:
Morning Session Comments-
• There are concerns about traffic along Church St.
• Consider the strategic location of electrical outlets and drinking fountains throughout the
park for public use and for events.
• Consider shading devices placed over the proposed outdoor amphitheater area.
• Explore different elevations for landscape, particularly along Church St. where berms or
swales can serve as safety features.
• Can entry into the park include an archway or signage?
• Provide van parking for seniors.
• Support the idea of “porosity” – connection between indoor and outdoor
• Confirm there is ample room for food trucks and delivery trucks for farmers’ market.
• Consolidate the theater and council chamber into one room.
• Provide truck access to the theater for delivery of equipment
• Conduct a traffic study.
• Include public art. Confirm with the city if there are any public art requirements
WORKSHOP 3 - 05.20.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 239Gilroy Civic Center Master Plan
• Individuals expressed a desire for incorporated art work onto the public open space
• Some want to keep the council chamber and city hall separate
• Appreciated the separation of more recreational services on the right most part of the site,
and civil services reserved to the left more part of the site
• Excited about the pool incorporation to the Master Site Plan
• Proposed blue emergency phones throughout the site to ensure safety
• Curious about potential seating areas around the paseo and open space
• Too few parking spots near the senior center
• Potential to reserve parking sports for seniors, near the senior center
• Minimize some trees so that the dining room would have direct eye access to the civic park
• Activate larger green spaces by incorporating play structures
• Move the current solar panels to the rooftop of the police station
Notes by Kenneth Loretto:
Morning Session-
• As the group listened to community comments. They expressed: We like what we see.
• The central space (paseo?) would be good for farmers markets and community gatherings.
Suggest – power and data for market vendors.
• Lots of glass makes it feel inviting and open.
• Suggest perimeter bollards for security.
• Consider for traffic flow is needed.
• Consider the neighbors surrounding the site
• Suggest outdoor activities, courts.
• Consider adding in art in the park. Make it integral to the park, not an afterthought.
• Good walkable pedestrian access to the park from downtown and vice versa.
• We anticipate 2-3k people at amphitheater events.
• The park is at the threshold between east side and west side Gilroy.
• Consider parking for seniors and accessibility
• Overall groups seemed to like the scheme presented.
• Farmers market might also be located offsite.
o Consider access for trucks along the market route.
• Consider theater loading and access.
• Might the council chambers and theater be dual purpose?
• Consider sound and odors when planning for kitchen/ auditorium adjacency.
• Consider a bandshell at amphitheater in the park.
• Consider wide stepped terraces with park like seating for the amphitheater.
Evening Session-
• Dual, multi-purpose spaces, such as the amphitheater, works for performance and
picnicking, community gatherings, and see you Thursdays.
• Consider sight lines for tables and chairs on terraced amphitheater seating.
• Is the senior dining area bigger than the existing?
• Consider an indoor/ outdoor pool.
• Parking – may need additional levels at the assigned parking area.
• Need to keep in mind that street parking fills up.
• Consider lighting along the paseo.
• Mitigate heat island effect of parking.
• Manage parking to make the most efficient use of spaces.
• Consider a garden like feel for the paseo.
• Consider solar panels for parking areas – energy generation and shade over the lot.
• Community gardens, playgrounds, and Garlic chairs!
END OF NOTES
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 240Gilroy Civic Center Master Plan
7/18/2025
1
Gilroy Civic Master Plan
Plan Maestro Cívico de Gilroy
May 20, 2025
Welcome! / ¡Bienvenido!
COMMUNITY WORKSHOP #3
COMMUNITY ENGAGEMENT PROCESS
CITY COUNCIL APPROVALWORKSHOP 1
GALLERY WALK
ISSUES
TOPICS
INFORMATION SHARING
TUESDAY
MARCH 4TH
WORKSHOP 2
PRESENTATION
CHARRETTE
CONCEPT
ALTERNATIVES
TUESDAY
APRIL 8TH
WORKSHOP 3
PRESENTATION
PREFERRED
CONCEPT
DESIGN
TUESDAY
MAY 20TH
Aiming
for
City Council
Approval on
June 16th
CAFECITO
PRESENTATION
FRIDAY
MAY 9
Looking ahead…..
•Refine and Finalize Preferred Concept + Cost Estimate for City Council Direction
•Present to City Council in June; Seek Approval to Advance to CEQA process
•Initiate CEQA process and complete by Spring 2026
I. Welcome + Opening Remarks
II. Recap of Workshop #2 +
Preferred Concept Design
III. Your thoughts….your reactions, your ideas!
•Review in teams
•Report your findings
IV. Next Steps…
20 Minutes
50 Minutes
10 Minutes
10 Minutes
90
Minutes
FOR TODAY…
123
456
789
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 241Gilroy Civic Center Master Plan
7/18/2025
2
Gilroy Civic Master Plan
Program –What’s in the Civic Master Plan?
Plan Maestro Cívico de Gilroy
Programa – ¿Qué hay en el Plan Maestro Cívico?
Civic Center Park….Bringing it all together
Parque del Centro Cívico.... Reuniendo todo
Civic Park
Parque Cívico
Civic Park
Parque Cívico Elk Grove Civic Center
City of Elk Grove
Civic Park
Parque Cívico Elk Grove Civic Center
City of Elk Grove
Civic Park
Parque Cívico
Elk Grove Civic Center
City of Elk Grove
Civic Park
Parque Cívico Elk Grove Civic Center
City of Elk Grove
Civic Park
Parque Cívico Elk Grove Civic Center
City of Elk Grove
Civic Park
Parque Cívico
10 11 12
13 14 15
16 17 18
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 242Gilroy Civic Center Master Plan
7/18/2025
3
Seniors Center
Centro de día
Seniors Center
Centro de día
Youth Center
Centro de Juventud
Youth Center
Centro de Juventud
Arts Center
Centro de Artes
Arts Center
Centro de Artes
Recreation Center
Centro de Recreación
Recreation Center
Centro de Recreación
AquaticsCenter
Centro Acuático
19 20 21
22 23 24
25 26 27
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 243Gilroy Civic Center Master Plan
7/18/2025
4
AquaticsCenter
Centro Acuático
City Hall
Ayuntamiento
City Hall
Ayuntamiento
Gilroy and Morgan Hill……Neighbors
MORGAN HILL
POPULATION
45,500
LAND AREA
8,200 ACRES
GILROY
POPULATION
58,100
LAND AREA
10,350 ACRES
MORGAN HILL
COMMUNITY
CULTURAL CENTER
&
AMPHITHEATRE
CENTENNIAL
RECREATION
CENTER
MORGAN HILL
AQUATIC
CENTER
12 miles from
Gilroy Civic Center
MORGAN HILL
AMPHITHEATRE
COMMUNITY
AND
CULTURAL CENTER
CENTENNIAL
RECREATION
CENTER
MORGAN HILL
AQUATIC
CENTER
MORGAN HILL DOWNTOWN AMPHITHEATRE + CULTURAL CENTER
25,500 sf
Amphitheater
35,000 sf
Cultural Center
MORGAN HILL CENTENNIAL RECREATION CENTER
66,000 sf
Gym
Pool
Multipurpose
Seniors
Teen
28 29 30
31 32 33
34 35 36
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 244Gilroy Civic Center Master Plan
7/18/2025
5
MORGAN HILL AQUATICS CENTER
21,000 sf of Water
•50m Pool
•6 lane x 25-yard Pool
•Fun Water Pool
•Splash Pad
MORGAN HILL
COMMUNITY CENTER
37,000 sf
RECREATION CENTER
66,000 sf
AQUATICS
25,000 sf
GILROY
SENIOR CENTER
12,000 sf
WHEELER CENTER
15,000 sf
AQUATICS
0 sf
TODAY
MORGAN HILL
COMMUNITY CENTER
37,000sf
RECREATION CENTER
66,000sf
AQUATICS
25,000sf
GILROY
COMMUNITY CENTER
35,000sf
RECREATION CENTER
42,000sf
AQUATICS
6,000sf
CIVIC MASTER PLAN
Gilroy Civic Master Plan
Community Engagement + Concept Design
-The Site
-Concepts A, B & C
-Preferred Concept
ONLY
10%+/-
GREEN
PARKING
PARKING
PARKINGSENIORS
LIBRARY
POLICE CITY HALL
WHEELER
ANNEX
LIBRARY
&
POLICE
REMAIN
LIBRARY
POLICE
WHEELER
ANNEX
37 38 39
40 41 42
43 44 45
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 245Gilroy Civic Center Master Plan
7/18/2025
6
Gilroy Civic Master Plan
Today…..Preferred Concept
WEST BLOCK CENTRAL BLOCK EAST BLOCK
GILROY CIVIC PARKPASEO
6TH Street
7TH StreetChurch StreetDowdy StreetNORTH
RECREATION
+
AQUATICS
COMMUNITY
SENIORS, YOUTH, ARTS
CITY HALL
LIBRARY
POLICE
GILROY CIVIC PARKPASEO
6TH Street
7TH StreetChurch StreetDowdy StreetNORTH
WEST BLOCK CENTRAL BLOCK EAST BLOCK
RECREATION
+
AQUATICS
COMMUNITY
SENIORS, YOUTH, ARTS
CITY HALL
LIBRARY
POLICE
6TH Street
7TH StreetChurch StreetDowdy StreetNORTH
GILROY CIVIC PARKPASEO
WEST BLOCK CENTRAL BLOCK EAST BLOCK
RECREATION
+
AQUATICS
COMMUNITY
SENIORS, YOUTH, ARTS
CITY HALL
LIBRARY
POLICE
GILROY CIVIC PARKPASEO
6TH Street
7TH Street Church StreetDowdy StreetRECREATION
+
AQUATICS
COMMUNITY
SENIORS, YOUTH, ARTS
CITY HALL
LIBRARY
POLICE
46 47 48
49 50 51
52 53 54
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 246Gilroy Civic Center Master Plan
7/18/2025
7
RECREATION & AQUATICS
CENTER
GYMNASIUM/TRACK
WELLNESS/FITNESS
POOLS
MULTIGENERATIONAL
COMMUNITY CENTER
THEATER/ARTS/SENIORS/YOUTH
GILROY CIVIC PARK
PARKING
PARKING
6TH Street
7TH Street Church StreetDowdy StreetNORTH
RECREATION & AQUATICS
CENTER
GYMNASIUM/TRACK
WELLNESS/FITNESS
POOLS
MULTIGENERATIONAL
COMMUNITY CENTER
THEATER/ARTS/SENIORS/YOUTH
GILROY CIVIC PARK
PARKING
PARKING
6TH Street
7TH Street Church StreetDowdy StreetNORTH
RECREATION AND AQUATICS CENTER
First Floor
42,500 sf
6,000sf
RECREATION AND AQUATICS CENTER
Second Floor
42,500 sf
RECREATION & AQUATICS
CENTER
GYMNASIUM/TRACK
WELLNESS/FITNESS
POOLS
MULTIGENERATIONAL
COMMUNITY CENTER
THEATER/ARTS/SENIORS/YOUTH
GILROY CIVIC PARK
PARKING
PARKING
6TH Street
7TH Street Church StreetDowdy StreetNORTH
MULTIGENERATIONAL COMMUNITY CENTER
First Floor
35,000 sf
55 56 57
58 59 60
61 62 63
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 247Gilroy Civic Center Master Plan
7/18/2025
8
MULTIGENERATIONAL COMMUNITY CENTER
Second Floor
35,000 sf
LIBRARY
PASEO
CITY HALL
PARKING
PARKING
PARKING
PARKING
6TH Street
7TH Street Church StreetDowdy StreetNORTH
CITY HALL
First Floor
48,000 sf
TODAY – 40,000 sf
CITY HALL
Second Floor
48,000 sf
TODAY – 40,000 sf
PASEO
POLICE
PARKING
PARKING
PARKING
6TH Street
7TH Street Church StreetDowdy StreetNORTH
MORGAN HILL
COMMUNITY
AND
CULTURAL CENTER
CENTENNIAL
RECREATION
CENTER
MORGAN HILL
AQUATIC
CENTER
PASEO
POLICE
PARKING
PARKING
PARKING
6TH Street
7TH Street Church StreetDowdy StreetNORTH
RECREATION & AQUATICS
CENTER
GYMNASIUM/TRACK
WELLNESS/FITNESS
POOLS
MULTIGENERATIONAL
COMMUNITY CENTER
THEATER/ARTS/SENIORS/YOUTH
LIBRARY
CITY HALL
Average 60-year old person walks 4.25 feet/secondAverage 60-year old person walks 4.25 feet/second
64 65 66
67 68 69
70 71 72
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 248Gilroy Civic Center Master Plan
7/18/2025
9
25 Minutes:Review and Discuss Preferred ConceptElect a Team Presenter
25 minutos Revisar y discutir tres conceptosElegir un presentador de equipo
25 Minutes:Team Presenters give a 2-to-3-minute recap of their table’s findings
25 minutos Los presentadores del equipo hacen un resumen de 2 a 3 minutos de los hallazgos de su mesa
73 74 75
76 77 78
79 80 81
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 249Gilroy Civic Center Master Plan
7/18/2025
10
Next Steps
•Refine and Finalize Preferred Concept + Cost Estimate
•Prepare Final Concept Master Plan for City Council Approval in
June 2025
•Initiate CEQA process and complete by Spring 2026
Thank you! / ¡Gracias!
82 83
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 250Gilroy Civic Center Master Plan
GILROY CIVIC CENTER MASTER PLAN
June 11, 2025
MEETING AGENDA/NOTES
Via ZOOM – In attendance: Ryan Osenton, Sharon Goei, Clarence Mamuyac
1. EIR Status – Provided by Shoshana Lutz, EMC
a. EMC Update
i. Draft NOP went to Susan Vutz (ELS) and Ryan Osenton (City) on 5/30. When I
receive comments back, I can incorporate and finalize the NOP for the City
to post with the County Clerk, upload to the State Clearinghouse, and send
copies to those on the City’s distribution list. The City will provide feedback
by early next week.
ii. Tribal consultation offer letters were signed by Ryan and sent out by the City
on April 10th. The tribes had 30 days to respond, which ended in mid-May. If
any responses were received by the City please send them my way. The city
received one request from the tribal consultation offer letter period via email
for a map, which he responded to directly. The requester had an issue with
the distribution of the mail, as they did not receive their notice letter until
May 24th. Does this glitch in the US Mail process require us to extend the 30-
day window?
iii. The VMT study and parking analysis by Hexagon Transportation Consultants
should be done by the end of July. On track, no comment
iv. Current schedule has the admin draft EIR being complete at the end of
August. The draft EIR is underway. On track, no comment
2. Model
a. ELS advised that the model is coming in between $45K and $50K
b. ELS will produce buildings via 3D printer. The model base and trees will be
produced by a third-party model maker.
c. The City wants to re-evaluate the need for the model, as the cost are exceeding their
anticipated expenditure. The model is on HOLD until further direction is provided by
the City. If the model moves forward, it will be needed in early September.
3. Draft Report – ELS gave a summary of the items below, essentially stating all is progressing
as planned. The final report is targeted at the end of July.
a. Technical reports from consultants in progress
b. Parking counts pending from Hexagon
c. Additional drawings and renderings
d. Additional text in progress
End of Meeting Notes
TEAM MEETING - 06.11.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
REFERENCE MATERIALS
Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB
ELS | 252Gilroy Civic Center Master Plan
List of Reference Drawings and Documents
The following information was provided to the design team for use in preparing this report:
DOCUMENTS AND REPORTS
1. City of Gilroy Civic Center Master Plan, Draft, WLC Architects, April
25, 2002
2. Gilroy Recreation Facility & Program Needs Assessment, Pros
Consulting and ETC Institute, 2020
3. City of Gilroy 2040 General Plan Land Use Map
4. Gilroy City Code, Chapter 30, Zoning Ordinance and Zoning Map
DRAWINGS
1. City Hall:
a. Irrigation Plan, January 28, 1975 by John Blevins & Assoc.
b. Original building plans by the Architectural Office of William W.
Hedley Jr, Morris Arthur Stark Associate Architect, 8/1/76
c. Expansion of Gilroy City Hall, plans by the Hawley, Peterson &
Snyder Architects, 3/19/90
d. Electrical as-built drawings, 1/15/91
e. Expansion of Gilroy City Hall, plans by CSS Associates
Architects, 2/1/92
f. Planting and Irrigation plans, Aitken Associates Landscape
Architects, 10/1/93
g. Landscape Plans, Aitken Associates Landscape Architects,
July 1994
h. Mechanical Modifications, Parks & Rec Dept., McCracken &
Woodman Consulting Mechanical Engineers, 9/19/95
i. Accessibility upgrades, Harris & Associates Architects, 1997
j. Gilroy City Hall HVAC Assessment, Turley & Associates
Mechanical Engineering, 1/26/2020
2. Old Police Department Building
a. Jail and Police Facility original building plans, Akol and
Associates Architects & Engineers and Hughan and Hughan
Architects, 2/25/65
b. Gilroy Police Facility Remodel, Hughan & Hughan Architects
and Planners, 8/25/76
c. Emergency Generator drawings, Fehr Engineering Company,
1/16/83
d. Front Desk Remodel, Duerr Architect, 4/16/84
e. Mechanical and Structural modifications, Hughan & Hughan
Architects and Planners, 9/3/85
f. City of Gilroy Police Department Addition, Clark, Stromquist &
Sandstrom Architects 2/10/86
g. Mechanical modifications, McCracken & Woodman Consulting
Mechanical Engineers, 1995 and 1996
h. Dog kennel drawings, 2015
3. Old City Hall, renovation dated 10/26/92 by Architectural
Resources Group
4. Senior Center
a. Gilroy Senior Center Expansion Project, Duerr Architect,
1/22/87
b. ADA Improvements, 4/30/96