HomeMy WebLinkAboutResolution No. 2026-69 | Civic Center Master Plan Resolution | Adopted 10/05/2026 RESOLUTION NO. 2026-69 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GILROY APPROVING THE 2026 UPDATE OF THE GILROY CIVIC CENTER MASTER PLAN AND CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT INCLUDING FINDINGS FOR CERTIFICATION OF AN ENVIRONMENTAL IMPACT REPORT (SCH# 2025091066), FINDINGS ON SIGNIFICANT ENVIRONMENTAL IMPACTS, STATEMENT OF OVERRIDING CONSIDERATIONS, AND A MITIGATION MONITORING AND REPORTING PROGRAM FOR THE GILROY CIVIC CENTER MASTER PLAN WHEREAS, the City of Gilroy City Council adopted the 2002 Gilroy Civic Center Master Plan and determined that the documents need an update to address the increasing demands of the community, underutilized spaces, and aging facilities; and WHEREAS, in fiscal year 2023-24 the City of Gilroy City Council allocated $750,000 towards a future project to begin the comprehensive planning process for the update to the Gilroy Civic Center Master Plan; and WHEREAS, on November 18, 2024, at a regularly scheduled meeting, the City of Gilroy City Council awarded a contract to ELS Architecture and Urban Design to lead the master plan process; and WHEREAS, a community meeting was held to present the draft Gilroy Civic Center Master Plan and draft EIR on February 25, 2026; and WHEREAS, the City of Gilroy hosted three community workshops (March 4, 2025, April 8, 2025, and May 20, 2025) where community members had the opportunity to review concepts, share their ideas, priorities, and concerns; and WHEREAS, the proposed Gilroy Civic Center Master Plan includes demolition of the existing City Hall, Wheeler Auditorium, City Hall Annex, Senior Center, Civic Center parking lot, and Hanna Street, and construction of a new City Hall, multi-generational recreation center with outdoor swimming pool, multi-generational community center, and a paseo and civic park, as well as 425 parking spaces; and WHEREAS, the existing police station and library would remain, on-site trees would be removed, and there would be 206,389 square feet of sidewalks and planting areas; and WHEREAS, the function and intensity of some uses (e.g., City Hall) will not increase even though there will be a net increase in building square footage compared to existing conditions; and Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Resolution No. 2026-69 Civic Center Master Plan EIR City Council Regular Meeting | October 5, 2026 Page 2 of 15 WHEREAS, the Wheeler Auditorium is the only structure on-site that is designated historic (designated historic on August 15, 1983) by the City of Gilroy City Council; and WHEREAS, the City determined that the appropriate level of review for the Gilroy Civic Center Master Plan would be an EIR; and WHEREAS, a Notice of Preparation was circulated to trustee and responsible agencies, members of the public, and other interested parties, the Governor’s Office of Land Use and Climate Innovation, and the State Clearinghouse from September 23, 2025 to October 22, 2025 pursuant to CEQA Guidelines Section 15082, and two comment letters were received from the California Department of Transportation District 4 and the Department of Toxic Substances Control; and WHEREAS, pursuant to CEQA Guidelines Sections 15087(d) and (f), the City posted a Notice of Availability with the Santa Clara County Clerk-Recorder on February 2, 2026, and posted said notice to its website on February 2, 2026, published the Notice of Availability in the San Jose Mercury News on February 2, 2026, submitted a Notice of Completion to the State Clearinghouse on February 3, 2026, and mailed the Notice of Availability to those agencies and organizations on the City’s distribution list believed to potentially have an interest in the proposed Gilroy Civic Center Mater Plan; and WHEREAS, the City prepared the Gilroy Civic Center Master Plan Draft EIR and posted it to the City’s website on February 3, 2026, and made it available for public review at the Gilroy Planning Division counter and the Santa Clara County Public Library – Gilroy Branch, and circulated it for public review with direct mailing and through the State Clearinghouse from February 3, 2026 to March 27, 2026 pursuant to CEQA Guidelines Sections 15087 and 15105; and WHEREAS, the City received thirty-six (36) comment letters from individuals, organizations, and agencies, and responded to those comments in a final environmental impact report dated August 7, 2026, pursuant to CEQA Guidelines Sections 15089 and 15132, and provided a copy of the responses to commenters on September 17, 2026, pursuant to CEQA Guidelines Section 15088(b); and WHEREAS, a Planning Commission meeting was held to present the draft Gilroy Civic Center Master Plan and draft EIR on May 7, 2026 not for any recommendation but as a courtesy review; and WHEREAS, the City Council considered the Gilroy Civic Center Master Plan Final Environmental Impact Report, inclusive of the draft and final volumes, on October 5, 2026; and NOW, THEREFORE, THE CITY OF GILROY CITY COUNCIL DOES HEREBY make the following findings with respect to the significant effects on the environment of the Gilroy Civic Center Master Plan pursuant to CEQA Guidelines Section 15091, and statements of overriding considerations pursuant to CEQA Guidelines Section 15093: Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Resolution No. 2026-69 Civic Center Master Plan EIR City Council Regular Meeting | October 5, 2026 Page 3 of 15 The findings provide the written analysis and conclusions of the City Council in regard to environmental impacts and mitigation measures related to the Gilroy Civic Center Master Plan, and incorporate the draft and final environmental impact report, appendices. The findings represent the independent judgment of the City Council of the City of Gilroy. The City Clerk's office of the City of Gilroy, at 7351 Rosanna Street, Gilroy, California 95020 shall be the custodian of documents and record of proceedings on which the decision is based; The City makes the following findings, pursuant to CEQA Guidelines Section 15091(a)(1), regarding significant impacts that are mitigated to a less-than-significant level; i.e. that changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the final EIR. The following findings relate specifically to the Gilroy Civic Center Master Plan Final Environmental Impact Report: Air Quality Impact: Operation of Construction Equipment Could Expose Sensitive Receptors to Toxic Air Contaminants Mitigation Measure: AQ-1. With each construction project, the City of Gilroy shall prepare a Construction Management Plan to include the following measures to reduce TAC emissions during construction: a. Heavy-duty diesel vehicles will have 2010 or newer model year engines, in compliance with the California Air Resources Board’s Truck and Bus Regulation; b. Idling of construction equipment and heavy-duty diesel trucks will be avoided where feasible, and if idling is necessary, it will not exceed three minutes; c. All construction equipment will be maintained and properly tuned in accordance with manufacturer’s specifications and will be checked by a certified visible emissions evaluator; and d. All non-road diesel construction equipment will, at a minimum, meet Tier 3 emission standards listed in the Code of Federal Regulations Title 40, Part 89, Subpart B, §89.112. Further, where feasible, construction equipment will use alternative fuels such as compressed natural gas, propane, electricity, or biodiesel. Finding: Changes or alterations have been required in the project that avoid or substantially lessen the significant environmental effect as identified in the Draft EIR. Specifically, the abovementioned mitigation measure imposed upon the project mitigates the impact to a less-than-significant level. (Less Than Significant with Mitigation Incorporated) Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Resolution No. 2026-69 Civic Center Master Plan EIR City Council Regular Meeting | October 5, 2026 Page 4 of 15 Facts in Support of Finding: The dust control measures identified in Mitigation Measure AQ-1 have been recommended by the air district over time as best management measures for reducing emissions from diesel equipment used during construction activities. Diesel particulate matter contained in those emissions can be a health risk to nearby sensitive receptors. Imposition of the measures as contractor specifications is a common CEQA mitigation approach. The measures will sufficiently reduce diesel emissions from construction activities such that this potentially significant impact will be reduced to less than significant. Biological Resources Impact: Potential disturbance of Roosting Sites Occupied by Special-Status Bats During Construction Activities Could Results in the Loss or Harm to Species Mitigation Measure: BIO 1. Special-Status Bat Species. Within 14 days prior to tree removal, vegetation clearing, building demolition, grading, or the initiation of any construction activity in any area of the project site, a qualified wildlife biologist shall conduct a habitat assessment for bats and potential roosting sites in trees to be removed, in buildings and trees within 50 feet of the construction footprint, and surrounding structures situated within 50 feet of disturbance activities by the project. In the event that construction activities are suspended for 14 consecutive days or longer, these surveys shall be repeated. Surveys shall include a visual inspection of potential roosting features (bats need not be present) and a search for presence of guano within the project site, construction access routes, and 50 feet around these areas. Cavities, crevices, exfoliating bark, and bark fissures that could provide suitable potential nest or roost habitat for bats shall be surveyed. Assumptions can be made on what species is present due to observed visual characteristics along with habitat use, or the bats can be identified to the species level with the use of a bat echolocation detector such as an “Anabat” unit. Potential roosting features found during the survey shall be flagged or marked. Locations off the site to which access is not available may be surveyed from within the site or from public areas. If no roosting sites or bats are found, a letter report confirming absence shall be submitted by the biologist to the City of Gilroy Community Development Department, Planning Division, where it will be kept on file, and no further mitigation is required. If bats or roosting sites are found, a letter report and supplemental documents shall be provided by the biologist to the City of Gilroy Community Development Department, Planning Division, prior to ground disturbance activities and the following monitoring, exclusion, and habitat replacement measures shall be implemented: a. If bats are found roosting outside of the nursery season (May 1 through October 1), they shall be evicted as described under (b) below. If bats are found roosting during Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Resolution No. 2026-69 Civic Center Master Plan EIR City Council Regular Meeting | October 5, 2026 Page 5 of 15 the nursery season, they shall be monitored to determine if the roost site is a maternal roost. This could occur by either visual inspection of the roost bat pups, if possible, or by monitoring the roost after the adults leave for the night to listen for bat pups. If the roost is determined to not be a maternal roost, then the bats shall be evicted as described under (b) below. Because bat pups cannot leave the roost until they are mature enough, eviction of a maternal roost cannot occur during the nursery season. Therefore, if a maternal roost is present, a 50-foot buffer zone (or different size if determined in consultation with the California Department of Fish and Wildlife) shall be established around the roosting site within which no construction activities including tree removal or structure disturbance shall occur until after the nursery season. b. If a non-breeding bat hibernaculum is found in a tree or snag scheduled for removal or on any structures within 50 feet of project disturbance activities, the individuals shall be safely evicted, under the direction of a qualified bat biologist. If pre- construction surveys determine that there are bats present in any trees or structures to be removed, exclusion structures (e.g., one-way doors or similar methods) shall be installed by a qualified biologist. The exclusion structures shall not be placed until the time of year in which young are able to fly, outside of the nursery season. Information on placement of exclusion structures shall be provided to the California Department of Fish and Wildlife prior to construction. If needed, other removal methods could include: carefully opening the roosting area in a tree or snag by hand to expose the cavity and opening doors/windows on structures, or creating openings in walls to allow light into the structures. Removal of any trees or snags and disturbance within 50 feet of any structures shall be conducted no earlier than the following day (i.e., at least one night shall be provided between initial roost eviction disturbance and tree removal/disturbance activities). This action will allow bats to leave during dark hours, which increases their chance of finding new roosts with a minimum of potential predation. Finding: Changes or alterations have been required in the project that avoid or substantially lessen the significant environmental effect as identified in the EIR. Specifically, the abovementioned mitigation measure imposed upon the project mitigates the impact to a less-than-significant level (Less Than Significant with Mitigation Incorporated) Facts in Support of Finding: If special-status bat species are present during construction activities, including tree or building removal, the project could result in the disturbance of roost sites occupied by special-status bat species if the activities were to occur on or adjacent to the project site. Implementation of this mitigation measure would reduce potential impacts to special-status bat species to less than significant by requiring a habitat assessment for bats and potential roosting sites in trees or buildings within 50 feet of the construction easement within 14 days prior to issuance of tree removal, vegetation clearing, building demolition, grading, or the initiation of any construction activity in any area of the project site. If bats or roosting sites are found, bats shall not be disturbed Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Resolution No. 2026-69 Civic Center Master Plan EIR City Council Regular Meeting | October 5, 2026 Page 6 of 15 and a notice shall be sent to the City of Gilroy Community Development Department, Planning Division as well as a specific notice to, and consultation with, California Department of Fish and Wildlife. Therefore, this impact is less than significant with mitigation incorporated. Impact: Potential disturbance to Nesting Migratory Birds and Raptors During Construction Could Results in the Loss or Harm to Species Mitigation Measure: BIO-2. To avoid impacts to nesting birds during the nesting season (February 1 through September 15), construction activities that include any tree removal, vegetation clearance, or ground disturbance (such as grading or grubbing), shall be conducted between September 16 and January 31, which is outside of the bird nesting season. If construction activities must commence during the bird nesting season, then a qualified biologist shall conduct a pre- construction survey for nesting birds to ensure that no nests would be disturbed during project construction. a. Two surveys for active nests of such birds shall occur within 10 days prior to start of construction, with the second survey conducted within 48 hours prior to start of construction. Appropriate minimum survey radius surrounding the work area is typically 250 feet for passerines, 500 feet for smaller raptors, and 1,000 feet for larger raptors. Surveys shall be conducted at the appropriate times of day to observe nesting activities. Evidence of completion of the preconstruction survey shall be submitted to the Gilroy Community Development Department, Planning Division, where it will be kept on file, prior to initiation of ground disturbing activities. b. If the qualified biologist documents active nests at the project site, an appropriate buffer between each nest and active construction shall be established. The buffer shall be clearly marked and maintained until the young have fledged and are foraging independently. Prior to construction, the qualified biologist shall conduct baseline monitoring of each nest to characterize “normal” bird behavior and establish a buffer distance, which allows the birds to exhibit normal behavior. The qualified biologist shall monitor the nesting birds daily during construction activities and increase the buffer if birds show signs of unusual or distressed behavior (e.g., defensive flights and vocalizations, standing up from a brooding position, and/or flying away from the nest). If buffer establishment is not possible, the qualified biologist shall have the authority to cease all construction work in the area until the young have fledged and the nest is no longer active. This measure shall be implemented by the City of Gilroy prior to initiation of ground disturbing activities. Finding: Changes or alterations have been required in the project that avoid or substantially lessen the significant environmental effect as identified in the EIR. Specifically, the abovementioned mitigation measure imposed upon the project mitigates the impact to a less-than-significant level (Less Than Significant with Mitigation Incorporated) Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Resolution No. 2026-69 Civic Center Master Plan EIR City Council Regular Meeting | October 5, 2026 Page 7 of 15 Facts in Support of the Findings: If nesting birds and raptors protected by state and federal regulations are present during soil- disturbing or construction activities including vegetation removal and site preparation, the proposed project may directly result in loss of active nests, or indirectly result in nest abandonment and thereby cause loss of fertile eggs or nestlings. Implementation of this mitigation measure would reduce potential impacts to nesting birds and raptors to less than significant by requiring preconstruction surveys prior to construction in and adjacent to the project site. If nesting activity is observed, measures to protect the nest(s) shall be implemented. Therefore, this impact is less than significant with mitigation incorporated Impact: The Project May Require Removal of Protected Trees Mitigation Measure: BIO-3. Prior to approval of each construction project, the City of Gilroy shall prepare a Landscape Plan for review and approval by the Community Development Department, Planning Division indicating the location, size and species of existing trees found within the project site boundaries. The plan shall indicate which trees are planned for removal. Based on review of the Landscape Plan, the City shall determine which trees, if any, are “significant.” If significant trees are determined to be located on the project site, they shall be retained, to the greatest extent feasible. The dripline of significant trees to be retained shall be fenced prior to grading activities to prevent root damage. If retention of all significant trees on the project site is infeasible, a written report shall be prepared by a certified arborist including the number and location of each significant tree to be removed, the type and approximate size of each significant tree, the reason for removal, and specifications for replacing significant trees to be removed. The written report shall be prepared prior to the commencement of grading activities, subject to approval by the City of Gilroy Community Development Department, Planning Division, and a tree removal permit shall be obtained if needed. Prior to commencement of construction activities, the protected zone (one to 1.5 times the distance from the trunk to the dripline, depending on the tree species) of any trees or groups of trees to be retained shall be fenced to prevent injury to the trees during construction. Soil compaction, parking of vehicles or heavy equipment, stockpiling of construction materials, and/or dumping of materials shall not be allowed within the protected zone. The fencing shall remain in place until all construction activities are complete. The City of Gilroy shall submit evidence of the locations and extent tree protection measures to the Community Development Department, Planning Division, where it will be kept on file, prior to initiation of ground disturbing activities. Finding: Changes or alterations have been required in the project that avoid or substantially lessen the significant environmental effect as identified in the EIR. Specifically, the abovementioned Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Resolution No. 2026-69 Civic Center Master Plan EIR City Council Regular Meeting | October 5, 2026 Page 8 of 15 mitigation measure imposed upon the project mitigates the impact to a less-than-significant level. (Less Than Significant with Mitigation Incorporated) Facts in Support of the Findings: If there are significant/protected trees on the project site, implementation of the proposed project could result in the loss of said trees. Implementation of this mitigation measure would reduce potential impacts to protected trees to less than significant by requiring the preparation of a landscape plan prior to approval of each construction project. The landscape plan will identify the location, size, and species of existing trees found within the project site boundaries and which are planned for removal. Based upon this plan, the City will determine which trees are considered “significant.” If significant trees are found on the site, the landscape plan will outline the measures to take in order to retain these trees, to the greatest extent feasible. Therefore, this impact is less than significant with mitigation incorporated Cultural Resources Impact: Potential Loss of or Damage to Unique Archaeological Resources During Construction Mitigation Measure: CUL-2. In the event archaeological resources are encountered during ground disturbing activities; contractor shall temporarily halt or divert excavations within a 50 meter (165 feet) of the find until it can be evaluated. All potentially significant archaeological deposits shall be evaluated to demonstrate whether the resource is eligible for inclusion on the California Register of Historic Resources, even if discovered during construction. If archaeological deposits are encountered, they shall be evaluated and mitigated simultaneously in the timeliest manner practicable, allowing for recovery of materials and data by standard archaeological procedures. For precontact and indigenous archaeological sites, this data recovery involves the hand-excavated recovery and non-destructive analysis of a small sample of the deposit. Any previously undiscovered resources found during construction activities shall be recorded on appropriate California Department of Parks and Recreation (DPR) forms and evaluated for significance by a qualified archaeologist. Unique archaeological cultural resources consist of but are not limited to stone (ground and flaked), bone, organic materials, ceramics, fossils, wood, or shell artifacts. Features include hearths, cairns, middens, and postholes. Finding: Changes or alterations have been required in the project that avoid or substantially lessen the significant environmental effect as identified in the EIR. Specifically, the abovementioned mitigation measure imposed upon the project mitigates the impact to a less-than-significant level (Less Than Significant with Mitigation Incorporated) Facts in Support of the Findings: According to General Plan EIR Figure 3.5-1, Archaeological Sensitivity, the project site is in a low archaeological sensitivity zone, which is consistent with a recent review of Northwest Information Center files from previous searches of Gilroy. Nonetheless, Mitigation Measure CUL- 2 is designed to ensure that, if unknown unique archaeological resources are accidentally Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Resolution No. 2026-69 Civic Center Master Plan EIR City Council Regular Meeting | October 5, 2026 Page 9 of 15 uncovered during construction activities, appropriate measures are taken to protect and treat the resources. This is standard mitigation that ensures the potential impact on unique archaeological resources, if present, are reduced to less than significant. Impact: Potential to Disturb Native American Human Remains During Construction Mitigation Measure: CUL-3. In the event that human remains (or remains that may be human) are discovered at the project site, Public Resource Code Section 5097.98 shall be followed. All grading or earthmoving activities shall immediately stop within 50 meters (165 feet) of the find. The Santa Clara County Corner will be notified immediately, and the coroner shall be permitted to examine the remains as required by California Health and Safety Code Section 7050.5(b). Section 7050.5 requires that excavation be stopped in the vicinity of discovered human remains until the coroner can determine whether the remains are those of a Native American. If human remains are determined as those of Native American origin, the City of Gilroy shall comply with the state relating to the disposition of Native American burials that fall within the jurisdiction of the NAHC (Public Resource Code [PRC] § 5097). The coroner shall contact the Native American Heritage Commission (NAHC) to determine the most likely descendant(s) (MLD). The MLD shall complete his or her inspection and make recommendations or preferences for treatment within 48 hours of being granted access to the site. The MLD will determine the most appropriate means of treating the human remains and associated grave artifacts, and shall oversee the disposition of the remains. In the event the NAHC is unable to identify an MLD or the MLD fails to make a recommendation within 48 hours after being granted access to the site, the landowner or his/her authorized representative shall rebury the Native American human remains and associated grave goods with appropriate dignity within the project site in a location not subject to further subsurface disturbance if: a) the Native American Heritage Commission is unable to identify the MLD or the MLD failed to make a recommendation within 48 hours after being allowed access to the site; b) the descendent identified fails to make a recommendation; or c) the landowner or his authorized representative rejects the recommendation of the descendent, and the mediation by the Native American Heritage Commission fails to provide measures acceptable to the landowner. Finding: Changes or alterations have been required in the project that avoid or substantially lessen the significant environmental effect as identified in the EIR. Specifically, the abovementioned mitigation measure imposed upon the project mitigates the impact to a less-than-significant level (Less Than Significant with Mitigation Incorporated) Facts in Support of the Findings: Mitigation Measure CUL-3 is designed specifically to provide direction for actions to be taken if human remains, rather than other cultural resource artifacts, are uncovered during construction. This is standard mitigation that will ensure potential impacts on Native American human remains, if present, are reduced to less than significant. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Resolution No. 2026-69 Civic Center Master Plan EIR City Council Regular Meeting | October 5, 2026 Page 10 of 15 Greenhouse Gas Emissions Impact: Generate Greenhouse Gas Emissions During Operation of the Project Mitigation Measure: GHG-1. The following GHG emissions reduction performance measures shall be incorporated into the final project designs and plans for each development project: a. No permanent natural gas infrastructure shall be permitted; no natural gas shall be made available through permanent natural gas infrastructure. The project shall be all electric; and b. Electric vehicle infrastructure (e.g., elective vehicle parking spaces, charging station infrastructure, chargers, etc.) consistent with the CALGreen Tier 2 standards in effect at the time building permits are issued shall be included in the project. Final plans for the development shall be reviewed by the City of Gilroy Community Development Department, Planning Division Director or his/her designee prior to approval of project entitlements to ensure that all performance standards are incorporated into the project design. Verification of development consistent with the performance standards shall be assured prior to approval of occupancy permits. Finding: Changes or alterations have been required in the project that avoid or substantially lessen the significant environmental effect as identified in the EIR. Specifically, the abovementioned mitigation measure imposed upon the project mitigates the impact to a less-than-significant level. (Less Than Significant with Mitigation Incorporated) Facts in Support of the Findings: The standards for eliminating natural gas infrastructure and implementing electric vehicle (EV) infrastructure are not explicitly stated as part of the proposed project or in other City regulations that apply to future development within the project site. Therefore, Mitigation Measure GHG-1 is required to ensure that all future projects constructed on the project site will be all electric (no natural gas), and parking lots will incorporate EV infrastructure consistent with CALGreen Tier 2 standards. This mitigation ensures that the project’s greenhouse gas emissions are reduced to less than significant. Impact: Conflict with an Applicable Plan, Policy, or Regulation for Reducing Greenhouse Gases Mitigation Measure: GHG-1. See above. Finding: Changes or alterations have been required in the project that avoid or substantially lessen the significant environmental effect as identified in the EIR. Specifically, the abovementioned Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Resolution No. 2026-69 Civic Center Master Plan EIR City Council Regular Meeting | October 5, 2026 Page 11 of 15 mitigation measure imposed upon the project mitigates the impact to a less-than-significant level. (Less Than Significant with Mitigation Incorporated) Facts in Support of the Findings: With implementation of Mitigation Measure GHG-1, the proposed project would meet the four performance standards identified by the air district in the 2022 CEQA Thresholds guidance as necessary to find GHG impacts to be less than significant. Therefore, with mitigation implemented, the project would not conflict with the applicable plan for reducing GHG emissions. Significant and Unavoidable Environmental Impacts The City, pursuant to CEQA Guidelines Section 15091(a)(3), makes the following findings that specific economic, legal, social, technological, and other benefits of the proposed use outweigh significant loss of a historic resource that may not be mitigated to a less-than- significant level: Impact: The Proposed Recreational Center Would Result in the Loss of the Historic Wheeler Auditorium, which is on the City of Gilroy’s List of Historic Resources Mitigation Measure: CUL-1.a. Prior to issuance of any demolition permit, a qualified architectural historian shall document the Wheeler Auditorium at 7377 Church Street in accordance with the guidelines established for the Historic American Building Survey (HABS). Documentation shall consist of the following components: 1. Drawings – Prepare sketch floor plans. 2. Photographs – Digital photographic documentation of the interior, exterior, and setting of the buildings in compliance with the National Register Photo Policy Fact Sheet. Photos must have a permanency rating of approximately 75 years. 3. Written Data – HABS written documentation in short form. An architectural historian meeting the Secretary of the Interior’s Professional Qualification Standards shall oversee the preparation of the sketch plans, photographs and written data. The existing DPR forms shall fulfill the requirements for the written data report. The City of Gilroy’s Historian shall review the documentation, and then file the documentation with the Northwest Information Center at Sonoma State University, the repository for the California Historical Resources Information System. All documentation shall be submitted on archival paper. CUL-1.b. The City shall develop the material prepared in CUL-1 into a public educational display within the new community center. Finding: The proposed project includes the demolition of several of the existing on-site structures, including the Wheeler Auditorium. The Wheeler Auditorium is the only structure on-site that is designated Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Resolution No. 2026-69 Civic Center Master Plan EIR City Council Regular Meeting | October 5, 2026 Page 12 of 15 as historic. Implementation of the following mitigation measures will provide some mitigation relief; however, there are no mitigation measures that would reduce the impact to a less-than- significant level. Therefore, even with the mitigation measures presented above, the impact would be significant and unavoidable. (Significant and Unavoidable) Facts in Support of the Finding: Documentation of the Wheeler Auditorium pursuant to the Historic American Building Survey and displaying this documentation in a public educational display within the new community center would help preserve information about the building but cannot offset or replace the loss of the resource itself. Therefore, the impact is significant and unavoidable. The City makes the following Statement of Overriding Considerations for the significant and unavoidable environmental impact (Loss of a Historic Resource): The City finds and determines that the benefits of the proposed project are sufficient to make a finding that the environmental effect that is not reduced to a level of less than significant is acceptable and justify the adoption of a Statement of Overriding Considerations. The following Findings cite substantial evidence in the record and state the City of Gilroy’s specific reasoning (CEQA Guidelines Section 15093(b). In the event that any finding is declared unenforceable or inadequate as a matter of law, such finding will be considered deleted, and the remaining findings shall remain in full force and effect. The proposed project, as set forth in the City’s Findings, would feasibly and inclusively achieve all of the specific economic, legal, social, technological, or other benefits identified below. In accordance with CEQA Guidelines Section 15093, the City Council finds that the benefits of the proposed project outweigh the unavoidable adverse environmental effects that would result from its implementation, and that the adverse environmental effect listed above is considered acceptable, for the specific reasons set forth below:  Although the Wheeler Auditorium is on the City of Gilroy list of historic resources, it is a stand-alone, individual resource that does not have any direct contextual associations, nor does it appear to have any direct associations to historical events.  The architecture is otherwise and evidently basic, plain and minimal, without a site or site features of historical character. The interior architecture, excluding the minimal extension into the lobby, is architecturally utilitarian.  The original architects and builders, Binder & Curtis and George Renz, respectively, may be noteworthy yet are not of limited historic importance.  The historical association to the Wheelers is supportive yet in name only as that association does not translate into physical forms or features (Preservation Architecture August 2026).  The proposed recreation center would offer more opportunities for youth, adult, and senior programs, include gym facilities, aquatics programming, and arts and crafts workshops for all age groups, than currently available in the Wheeler Auditorium.  The aquatic facility would provide a public aquatic center for the southern and eastern parts of Gilroy, as there is no facility in the immediate area available to the public. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Resolution No. 2026-69 Civic Center Master Plan EIR City Council Regular Meeting | October 5, 2026 Page 13 of 15 The proposed project is anticipated to capably serve the full range of municipal services demanded by the City of Gilroy. As set forth above, the proposed project provides significant benefits to the City and the community of Gilroy as a whole. The City Council has weighed the benefits of the proposed project against the significant and unavoidable impact of the proposed project identified in the Final EIR and listed above. The City Council hereby determines that the benefits of the proposed project outweigh the adverse impacts of the proposed project, and further determines that the significant and unavoidable cultural/historic resources impact is acceptable. Accordingly, the City Council adopts the Statement of Overriding Considerations, recognizing that a significant and unavoidable impact will result from implementation of the proposed project. Having adopted all feasible mitigation measures as discussed in the Draft EIR, Final EIR, and Findings; rejected infeasible alternatives to the proposed project as discussed in the Draft and Final EIR, the Findings, and this Statement of Overriding Considerations; and recognized the significant and unavoidable impact of the proposed project, the City Council hereby finds that each of the separate benefits of the proposed project, as stated herein, is determined to be unto itself an overriding consideration, independent of other benefits, that warrants approval of the proposed project and outweighs and overrides its significant and unavoidable impact, and thereby justifies the approval of the proposed project. NOW, THEREFORE, THE CITY OF GILROY CITY COUNCIL FURTHER RESOLVE to certify the Gilroy Civic Center Master Plan Environmental Impact Report (SCH#2025091066) attached as Exhibit A in its entirety pursuant to CEQA Guidelines Section 15090, and adopts a mitigation monitoring and reporting program, attached at Exhibit B, pursuant to CEQA Guidelines Sections 15091(d) and 15097. NOW, THEREFORE, BE IT RESOLVED. PASSED AND ADOPTED this 5th day of October 2026 by the following roll call vote: AYES: COUNCIL MEMBERS: BRACCO, CLINE, HILTON, FUGAZZI MARQUES, RAMIREZ, BOZZO NOES: COUNCIL MEMBERS: NONE ABSTAIN: COUNCIL MEMBERS: NONE ABSENT: COUNCIL MEMBERS: NONE NOW, THEREFORE, THE CITY OF GILROY CITY COUNCIL DOES FURTHER RESOLVE to approve the 2026 update to the Gilroy Civic Center Master Plan attached as Exhibit C. NOW, THEREFORE, BE IT RESOLVED. PASSED AND ADOPTED this 5th day of October 2026 by the following roll call vote: Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Resolution No. 2026-69 Civic Center Master Plan EIR City Council Regular Meeting | October 5, 2026 Page 14 of 15 AYES: COUNCIL MEMBERS: BRACCO, CLINE, HILTON, MARQUES, RAMIREZ, BOZZO NOES: COUNCIL MEMBERS: FUGAZZI ABSTAIN: COUNCIL MEMBERS: NONE ABSENT: COUNCIL MEMBERS: NONE APPROVED: Greg Bozzo, Mayor ATTEST: Kim Mancera, City Clerk Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Resolution No. 2026-69 Civic Center Master Plan EIR City Council Regular Meeting | October 5, 2026 Page 15 of 15 CERTIFICATE OF THE CLERK I, KIM MANCERA, City Clerk of the City of Gilroy, do hereby certify that the attached Resolution No. 2026-69 is an original resolution, or true and correct copy of a City Resolution, duly adopted by the Council of the City of Gilroy at a Regular Meeting of said Council held on Monday, October 5, 2026, with a quorum present. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the Official Seal of the City of Gilroy this Wednesday, October 7, 2026 Kim Mancera City Clerk of the City of Gilroy Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Final E nvironmental I mpact R eport Gilroy Civic Center Master Plan SCH # 2025091066 August 7, 2026 Prepared by EMC Planning Group Exhibit ADocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB This document was produced on recycled paper. FINAL E NVIRONMENTAL I MPACT R EPORT G ILROY C IVIC C ENTER M ASTER P LAN SCH# 2025091066 PREPARED FOR City of Gilroy Ryan Osenton, Project Manager 7351 Rosanna Street Gilroy, CA 95020 Tel 408.846.0277 Ryan.Osenton@cityofgilroy.org PREPARED BY EMC Planning Group Inc. 601 Abrego Street Monterey, CA 93940 Tel 831.649.1799 Fax 831.649.8399 Shoshana Lutz, Senior Planner lutz@emcplanning.com www.emcplanning.com August 7, 2026 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB EMC Planning Group Inc. Table of Contents 1.0 INTRODUCTION.................................................................................................... 1-1 1.1 CEQA Requirements ....................................................................................................... 1-1 1.2 Purpose of Public Review ............................................................................................... 1-2 1.3 Final EIR ............................................................................................................................ 1-3 2.0 DRAFT EIR COMMENTS AND RESPONSES ........................................................ 2-1 2.1 CEQA Requirements ....................................................................................................... 2-1 2.2 Written Comments on the Draft EIR ........................................................................... 2-1 3.0 CHANGES TO THE DRAFT EIR ........................................................................... 3-1 3.1 CEQA Requirements ....................................................................................................... 3-1 3.2 Changes to Section 1.0 Introduction ............................................................................. 3-1 3.3 Changes to Section 4.0 Project Description ................................................................. 3-2 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 1.0 Introduction 1-1 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 1.0 Introduction 1.1 CEQA Requirements Before approving a project that may cause a significant environmental impact, the California Environmental Quality Act (CEQA) requires the City of Gilroy (“City”), acting as the Lead Agency under CEQA, to prepare and certify a final environmental impact report (“final EIR”). The contents of a final EIR are specified in CEQA Guidelines Section 15132, which states that: The final EIR shall consist of: a) The draft EIR or a revision of the draft; b) Comments and recommendations received on the draft EIR either verbatim or in summary; c) A list of persons, organizations, and public agencies commenting on the draft EIR; d) The responses of the Lead Agency to significant environmental points raised in the review and consultation process; and e) Any other information added by the Lead Agency. All comments addressing environmental issues received on the draft EIR during the public review period from February 3, 2026 to March 27, 2026 have been addressed in this final EIR. The draft EIR is incorporated by reference. CEQA Guidelines section 15204(a) states that in reviewing a draft EIR, persons and public agencies should focus on the sufficiency of the document in identifying and analyzing the possible impacts on the environment and ways in which the significant effects of the project might be avoided or mitigated. Comments are most helpful when they suggest additional specific alternatives or mitigation measures that would provide better ways to avoid or mitigate the significant environmental effects. At the same time, reviewers should be aware that the adequacy of an EIR is determined in terms of what is reasonably feasible, in light of factors such as the magnitude of the project at issue, the severity of its likely environmental impacts, and the geographic scope of the project. Per CEQA Guidelines section15204(a), CEQA does not require a lead agency to conduct every test or perform all research, study, and experimentation recommended or demanded by commenters. Likewise, a lead agency also need not respond to general reference materials submitted in support of comments, comments that repeat those already considered, or comments that are clearly irrelevant. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 1.0 Introduction 1-2 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 According to CEQA Guidelines section 15204(a), when responding to comments, lead agencies need only respond to significant environmental issues and do not need to provide all information requested by reviewers, as long as a good faith effort at full disclosure is made in the EIR, as also described in CEQA Guidelines sections 15088(c) and 15132(d). CEQA Guidelines section 15204(c) states that reviewers should explain the basis for their comments, and should submit data or references offering facts, reasonable assumptions based on facts, or expert opinion supported by facts in support of the comments. Pursuant to section 15064, an effect shall not be considered significant in the absence of substantial evidence. CEQA Guidelines section 15088 requires the lead agency to provide a written proposed response to a public agency on comments made by that public agency at least 10 days prior to certifying an EIR. Written responses to comments have been prepared to address comments on the project and have been sent to the commenting agencies and organizations. CEQA Guidelines 15095(a) also requires that the lead agency file a copy of the final EIR with the appropriate planning agency of any city, county, or city and county where significant effects on the environment may occur. A copy of this final EIR is available for review at the City of Gilroy Planning Department, 7351 Rosanna Street, Gilroy. 1.2 Purpose of Public Review CEQA Guidelines section 15200 indicates that the purposes of the public review process include the following:  sharing expertise;  disclosing agency analysis;  checking for accuracy;  detecting omissions;  discovering public concerns; and  soliciting counter proposals. In compliance with CEQA public noticing requirements, the City prepared a draft EIR for the proposed project that was circulated for public review from February 3, 2026 to March 27, 2026. The City received 36 comment letters/emails from organizations and individuals. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 1.0 Introduction 1-3 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 1.3 Final EIR This final EIR has been prepared to address timely comments received on the draft EIR in the manner specified in the Notice of Completion/Availability and, together with the draft EIR, constitutes the complete Gilroy Civic Center Master Plan Final EIR. This final EIR is organized into the following sections: Section 1 - introduction to the final EIR; Section 2 - list of persons, organizations, and public agencies that commented on the draft EIR, written comments on the draft EIR and the responses to those comments; and Section 3 - changes to the draft EIR made in response to comments on the draft EIR. Such changes clarify, amplify, or otherwise make modifications to the draft. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 1.0 Introduction 1-4 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 This side intentionally left blank. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-1 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 2.0 Draft EIR Comments and Responses 2.1 CEQA Requirements CEQA Guidelines section 15132(c) requires that a final EIR contain a list of persons, organizations, and public agencies that have commented on the draft EIR. A list of the correspondence received during the public review period is presented below. CEQA Guidelines sections 15132(b) and 15132(d) require that a final EIR contain the comments that raise significant environmental points in the review and consultation process, and written responses to those comments. A copy of each comment letter or other form of correspondence received during the public review period is provided, with each letter identified by a number at the top of the first page. Individual comments to which responses are provided are numbered along the left margin in each letter. Responses corresponding to the numbered comments are presented immediately following each letter. Where required, revisions have been made to the text or graphics of the draft EIR in response to comments. Comments that trigger changes to the draft EIR are so noted as part of the response. 2.2 Written Comments on the Draft EIR The City received written comments from the following organizations and individuals during the public review period: 1. Gilroy Bicycle Pedestrian Advisory Committee, February 17, 2026; 2. Chet Kirby, February 20, 2026; 3. Casey Estorga, February 21, 2026; 4. Michael Griffis, March 14, 2026; 5. Gilroy Historical Society, March 23, 2026; 6. Ruben Dario Villa, March 27, 2026; 7. Santa Clara Valley Transportation Authority, March 27, 2026; 8. Rebecca Scheel, February 10, 2026; 9. Wells Wadleigh, February 23, 2026; 10. Gina Johnson, February 24, 2026; Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-2 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 11. Margaret Aron, March 27, 2026; 12. Cynthia Van Laar, Gilroy Gator Swim Team Board President, February 24, 2026; 13. Luis Ramirez, February 25, 2026; 14. Alexis Morales, February 26, 2026; 15. Yolanda Calimpong, March 14, 2026; 16. Peter Van Dyke, March 14, 2026; 17. Frank Sanchez, March 15, 2026; 18. Linda, March 15, 2026; 19. Dr. David Matuszak and Mrs. Maureen M. Hunter, Gilroy Historical Society, March 15, 2026; 20. Maretta Juarez, March 16, 2026; 21. Corina R. Deleon, March 16, 2026; 22. Judy Garcia, March 20, 2026; 23. Edward Aguirre, March 23, 2026; 24. Bernadette Rowlison, March 23, 2026; 25. Pat Reinhart, March 23, 2026; 26. Pamela Salter, Member of Gilroy Historical Society, March 23, 2026; 27. Teddy Goodrich, March 24, 2026; 28. Toby Echelberry, March 25, 2026; 29. Samantha Emburton, March 25, 2026; 30. Christine Flautt, March 25, 2026; 31. Kathi Orlando, March 25, 2026; 32. Conrad Calimpong, March 25, 2026; 33. Len Stimic, March 25, 2026; 34. Phil Stimic, March 26, 2026; 35. Len Stimic, March 26, 2026; and 36. Kathy Sullivan, March 27, 2026. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:Gilroy BPAC To:Ryan Osenton Subject:EXTERNAL - Public Comment for Civic Center Master Plan Draft EIR (CIP 800930) Date:Tuesday, February 17, 2026 7:59:27 AM Attachments:Civic Center Master Plan EIR_GilroyBPAC.pdf Ryan Osenton, Attached is our public comment for Civic Center Master Plan Draft EIR (CIP 800930) 45-day public comment period ending March 27, 2026. https://www.cityofgilroy.org/1063/Civic-Center-Master-Plan We also wanted to ask add the following to the Civic Center Maser Plan webpage to make it more clear how to provide public comment during the CEQA 45-day public period. This info below isn't on there but we saw it on social media and newsletters. How to Participate- Review the DEIR and submit written comments by email to Ryan.Osenton@cityofgilroy.org during the 45-day review period which closes March 27, 2026. Community Meeting- City staff will present the Draft Master Plan and DEIR findings, followed by Q&A and discussion. Date: Wednesday, February 25 Time: 6:00 PM Location: Council Chambers Thank you. Gilroy Bicycle Pedestrian Advisory Committee (Gilroy BPAC) GilroyBPAC@gmail.com &RPPHQW/HWWHU 1 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB February 17, 2026 Re: Civic Center Master Plan Draft EIR Project Number: (CIP 800930) Project Title: Civic Center Master Plan Project Applicant: City of Gilroy Project Location: Spanning approximately 14 acres in central Gilroy, the Civic Center site is bordered by Sixth Street, Seventh Street, Dowdy Street, and Church Street. Assessor Parcel No: N/A Ryan Osenton, Thank you for the opportunity to respond to the Civic Center Master Plan Draft EIR. Comments below are based on the review of the Draft EIR. Additional comments may be forthcoming pending final review. This project will have a direct impact in the City of Gilroy by achieving our goal to reduce air emissions from on-road motor vehicles and future developments. Improve air quality by encouraging our residents, commuters, employees to mode shift from vehicles to cycling, increase walking as alternatives to driving for short and first/last mile trips, and add new riders to the transit system. We are glad to see the inclusion of bike parking to further reduce Vehicle Miles Traveled (VMT) and greenhouse gas (GHG) emissions. With its convenient location to transit, shopping, and bike/ped facilities there are few barriers to reducing VMT at this project. With the recent adoption of our City’s General Plan 2040, we as a community called for bold actions that include continuing to promote cleaner modes of transportation. We encourage existing and proposed development to incorporate Transportation Demand Management (TDM) measures such as car-sharing, transit passes, and unbundling of parking (requiring separate purchase or lease of a parking space) where such measures will result in a reduction in vehicle miles traveled, reduction of required amount of parking or an increase in the use of alternate transportation modes. We suggest all new construction incorporate an all-electric model and be fossil fuel free in order to reduce greenhouse gas emissions. We are actively embracing, advancing ideas, and projects that promote the concept of free- range people in the City of Gilroy. We advocate for building and planning that considers future generations as well as current residents who don’t own cars. Advancing mobility options reflects what we are teaching the youth in our community through Safe Routes to School and why we are nationally recognized as a Bronze Bicycle Friendly Community from the League of American 1  2 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Bicyclists, as well as recognized by the World Health Organization as an Age-Friendly Community. Continuing to leverage our Measure B Education & Encouragement (E&E) funding for established work plans/programs will further enhance Gilroy’s efforts. Measure B E&E Bike to Work Day, Community Bike/Walks Counts, Community Engagement, General, Online Media Campaign, and Safe Routes to School work plans. While there might be portions of our city that are isolated from transit, this development is not in one of those areas. Gilroy has a fully connected bike network and transit options. We have a large population that works, visits, and attends schools in Gilroy that benefits from local transit and rideshare. Gilroy has the vision that the glass is half full, we have the ability to innovate, and adapt to programs that will further reduce our VMT. Providing an incentive that rewards the effort of biking/walking/transit is important. This project connects to 6th St and Church St which are designated by the General Plan 2040 as a Pedestrian-Oriented Street. We thank city staff, consultant, and applicant for always prioritizing short and long term bike parking, transit options, TDM programs, street trees, and sidewalks. We have the following recommendations and comments based on the Civic Center Master Plan Draft EIR and our General Plan 2040 Mobility- Thank you for recognizing Impact 8-1 Generate Greenhouse Gas Emissions GHG-1. The following GHG emissions reduction performance measures shall be incorporated into the final project designs and plans for each development project: Buildings -No permanent natural gas infrastructure shall be permitted; no natural gas shall be made available through permanent natural gas infrastructure. The project shall be all electric. Transportation -Achieve a reduction in project-generated vehicle miles traveled (VMT) below the regional average consistent with the current version of the California Climate Change Scoping Plan (currently 15 percent) or meet a locally adopted Senate Bill 743 VMT target, reflecting the recommendations provided in the Governor’s Office of Planning and Research's Technical Advisory on Evaluating Transportation Impacts in CEQA. -Electric vehicle infrastructure (e.g., elective vehicle parking spaces, charging station infrastructure, chargers, etc.) consistent with the CALGreen Tier 2 standards in effect at the time building permits are issued shall be included in the project. REACH Code for Electric Vehicle (EV)- The adoption of the 2022 California Green Building Standards Code pertaining to electric vehicle (EV) charging for new residential and non-residential construction REACH codes for EV’s applies to this project or CALGreen Tier 2 whichever requires more. Recommend Installation of Electric Vehicle (EV) Charging 2 3 2 cont'd Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Stations as mitigation for the Bay Area Air Quality Management District 2022 Consistency with GHG Reduction Performance Standards Support Staff, Recommend Shower, Locker, & Dressing Facilities- Provide staff showers and dressing areas for each gender. Provide dressing rooms for each gender and one locker for each required long-term bicycle parking space. Required lockers shall be located in relation to required showers and dressing areas to permit access to locker areas by either gender. Recommend a Dero Bike Fixit Station with Air Kit Bike Pump and Public Outdoor Feature- We recommend placing additional bike fixit stations near the required bike parking. This would add to the current network throughout the City. https://www.dero.com/product/fixit/ General Plan 2040 Mobility-The Mobility Element provides the framework for decisions in Gilroy concerning the citywide transportation system. It seeks to create a balanced transportation network that supports and encourages walking, bicycling, and transit ridership. The goals and policies address a variety of topics, including multimodal transportation, complete streets, pedestrian facilities, bikeways, public transit, vehicular transportation, parking, and goods movement. Goal of Mobility M4- Plan for efficient and convenient local and regional transit systems that respond to the changing needs of Gilroy. Mobility 4.2- Transit and Development require new developments to fully accommodate, enhance, and facilitate public transit, including pedestrian and bicycle access to transit. What has this development done to enhance pedestrian and bicycle access to transit? Partnerships with cities are essential for improving access to public transit. Mobility 1.7: Reduce Vehicle Miles Traveled. Reduce VMT and GHG emissions by developing a transportation network that makes it convenient to use transit, ride a bicycle, walk, or use other non-automobile modes of transportation. Support and we are excited to see the City of Gilroy implement their own Bike Parking Ordinance and VMT/TDM Ordinance so that future developments don’t have to continue to rely on VTA. Policy M 4.2. Transit and Development. Require new development to fully accommodate, enhance, and facilitate public transit, including pedestrian and bicycle access to transit. Support Policy M 5.3: Promote Non-Auto Modes of Transportation. Consider offering incentives as part of a multimodal system approach, for projects that incorporate travel demand management techniques and promote transit ridership, biking, and walking in order to reduce air pollution, energy consumption, and GHG emission. Existing Transit Services- The nearest VTA bus stops serving the development are Frequent Route 68 (15 minute headway Monterey Rd/7th Gilroy Transit Center) less than 1/4 mile east of the project site. Local Route 85 (1 hour headway 6th/Rosanna) serves the project site. Route 568 Rapid (30 minute headway) stops located at Gilroy Transit Center. You can take your bike 3   3 cont'd 5 7 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB with you or park it at an e-locker at the Gilroy Transit Center. This is a great opportunity to promote the use of public transit to the residents and visitors through outreach programs established in a Transportation Demand Management (TDM) program. Leverage the Measure B E&E funding the city has and the marketing outreach resources from Valley Transportation Authority (VTA)1. Bus service between Santa Clara County and Monterey County with 4 round trips Mon-Fri on Bus Line 59 running between VTA’s Gilroy Transit Center and Salinas Intermodal Transit Center/AMTRAK.2 Sincerely, Gilroy Bicycle Pedestrian Advisory Committee (Gilroy BPAC) GilroyBPAC@gmail.com https://www.facebook.com/GilroyBPAC We are a community group actively embracing, advancing ideas, and projects that promote the concept of free-range people in Gilroy. We support building projects that are energy resilient and promote the reduction of greenhouse gasses (GHG). We are seeking your input whether you are a BMX rider, trail runner, recreational bike rider, MTB rider, walker, and hiker! #GilroyBPAC 2 https://mst.org/wp-content/media/59.pdf 1 https://www.vta.org/faq/how-do-i-start-riding-vta 4 7 cont'd Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-8 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 1 – Gilroy Bicycle Pedestrian Advisory Committee (BPAC) 1. The commenter requests that language be added to the master plan webpage to make it more clear how to provide public comment during the 45-day public review period. The comment does not raise an environmental issue associated with the adequacy of the draft EIR. Therefore, no response is required. No change to the draft EIR is required. 2. The commenter states that the project will have a direct impact in achieving goals to reduce air emissions and improve air quality as well as encourage residents, commuters, and employees to shift from driving to cycling, walking, and transit use. The commenter notes support for increasing walking for short trips, first/last mile connections, and adding new transit riders. The commenter states that they are glad to see the inclusion of bike parking and that the site’s location near transit and bicycle/pedestrian facilities all reduce vehicle miles traveled (VMT) and greenhouse gas (GHG) emissions. The commenter encourages existing and proposed development to incorporate Transportation Demand Management measures and suggests that all new construction incorporate an all-electric model and be fossil fuel free to reduce GHG emissions. The commenter also notes that the project site is not in an area isolated from transit and discusses the benefits of local transit and rideshare in Gilroy. Refer to Section 9.12, Transportation (beginning on page 9-23), of the draft EIR, which addresses VMT. As described therein, the VMT analysis prepared for the project, and included as Appendix D of the draft EIR, concluded that the proposed uses consist of local- serving public facilities located within an established community. Such uses are expected to result in shorter trips and reduced travel distances, as they provide services that would otherwise be sought elsewhere. Therefore, the project would result in a less than significant VMT impact and no transportation demand management measures are required. Although they cannot be required as mitigation measures, the City could choose to include them in the master plan. Section 8.0, Greenhouse Gases (beginning on page 8-16), of the draft EIR, addresses building energy use and GHG emissions. As described therein, natural gas use is a source of direct GHG emissions, and all-electric development is identified as necessary to support State goals for carbon neutrality. Mitigation Measure GHG-1 requires that no permanent natural gas infrastructure be permitted and that all future development be constructed as all-electric. No change to the draft EIR is required. 3. The commenter references draft EIR Impact 8-1 (GHG emissions) and acknowledges Mitigation Measure GHG-1, which requires the project to be all electric (no natural gas) and requires electric vehicle infrastructure (e.g., elective vehicle parking spaces, charging station infrastructure, chargers, etc.) consistent with the CALGreen Tier 2 standards. The commenter implies that they would also like the following additional mitigation added:  Achieve a reduction in project-generated vehicle miles traveled (VMT) below the regional average consistent with the current version of the California Climate Change Scoping Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-9 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Plan (currently 15 percent) or meet a locally adopted Senate Bill 743 VMT target, reflecting the recommendations provided in the Governor’s Office of Planning and Research's Technical Advisory on Evaluating Transportation Impacts in CEQA. Refer to Section 8.0, Greenhouse Gases (beginning on page 8-16), of the draft EIR, which evaluates operational greenhouse gas (GHG) emissions and concludes that impacts would be less than significant with mitigation. As described therein, project-generated GHG emissions would primarily result from transportation, energy use, water and wastewater, and solid waste. The analysis applies Bay Area Air Quality Management District performance standards, which includes less than significant vehicle miles traveled (VMT) impacts, less than significant energy impacts, elimination of natural gas infrastructure, and incorporation of electric vehicle (EV) infrastructure. The analysis concludes that the project would achieve less than significant impacts related to energy use and VMT, and with implementation of Mitigation Measure GHG-1 (requiring all-electric construction and EV infrastructure consistent with CALGreen Tier 2 standards), the project would meet all applicable performance standards and reduce GHG impacts to a less-than-significant level. Therefore, the commenter’s recommended inclusion of the VMT-related performance standard is not necessary because the project already meets that performance standard. Refer to Section 9.12, Transportation, (as well as Appendix D for the Transportation analysis) for the VMT analysis, which concludes the VMT impact is less than significant. No change to the draft EIR is required. 4. The commenter recommends that the project include staff showers and dressing areas for each gender and one locker for each required long-term bicycle parking space. The commenter also recommends the installation of bicycle repair stations near bicycle parking. In theory, providing staff showers, lockers, and bicycle repair stations could encourage employees and visitors to ride a bicycle instead of driving a car. These measures cannot be added to the EIR as mitigation measures, as the impacts are already mitigated to a less than significant level. However, the City could choose to include them in the master plan. No change to the draft EIR is required. 5. The commenter references the General Plan 2040 Mobility Element and asks what the development has done to enhance pedestrian and bicycle access to transit. As described in Section 9.12, Transportation, page 9-22 of the draft EIR, the proposed project is consistent with General Plan Policy M 4.2, which requires new development to fully accommodate, enhance, and facilitate public transit, including pedestrian and bicycle access to transit. The nearest bus stop is on 6th Street at the northeast corner of the project site. The proposed project would include walkways leading to this bus stop. Additionally, existing bicycle facilities on 6th Street from Dowdy Street and Hanna Street and on Church Street would not be removed or otherwise damaged thereby accommodating access to existing transit facilities. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-10 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 6. The commenter references the General Plan 2040 Mobility Element and includes several policies that they support. The commenter also notes that they’re excited for the City to implement their own Bike Parking Ordinance and VMT/TDM Ordinance so the City doesn’t have to rely on VTA. The comment does not raise an environmental issue associated with the adequacy of the draft EIR and, therefore no response is required. No change to the draft EIR is required. 7. The commenter identifies existing transit services serving the project area and notes proximity to the Gilroy Transit Center. The commenter states that transit access, bicycle accommodations, and connections to regional transit are available and encourages promotion of transit use through outreach and Transportation Demand Management (TDM) programs. The comment does not raise an environmental issue associated with the adequacy of the draft EIR and no response is required. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:krrrbc@charter.net To:Ryan Osenton Subject:EXTERNAL - Civic Center Master Plan Date:Friday, February 20, 2026 8:16:09 AM Do we really need to do this? What is the justification for this plan? What is the estimated cost? Where is the money coming from? How long is the project expected to take once started? What is the proposed start date? What is the anticipated traffic impact during and after the project? Respectfully; Chet Kirby 408-607-2023BBBBBBBBBBBBBBB Comment Letter #2 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-12 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 2 – Chet Kirby 1. The commenter asks what the estimated cost of the project is, the source of funding, and the anticipated project timeline once construction begins. The comment does not raise an environmental issue associated with the adequacy of the draft EIR and, therefore, no response is required. No change to the draft EIR is required. 2. The commenter asks what the anticipated traffic impacts would be during and after the project. Refer to Section 9.12, Transportation (beginning on page 9-22), which addresses transportation impacts. As described therein, the project would not conflict with applicable plans, policies, or programs related to circulation, including transit, roadway, bicycle, and pedestrian facilities. The project primarily consists of local-serving public facilities and does not include substantial roadway modifications, aside from removal of Hanna Street within the project site, and would not introduce new roadway extensions. The VMT analysis concludes that the project would result in a less than significant impact, as the uses would remain local- serving and would support shorter trips within the community. In addition, all site access and circulation improvements would be designed in accordance with City standards and reviewed by applicable departments to ensure safe operation and adequate emergency access. Therefore, transportation impacts associated with the project would be less than significant. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB From:Casey Estorga To:Ryan Osenton Subject:EXTERNAL - Civic Center EIR - Question re: East Block Date:Saturday, February 21, 2026 8:54:50 PM CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. Ryan, I could not find where the EIR considered how saturating the area adjacent to the East Block will impact circulation specifically with respect to the alley between Church Street and Rosanna Street. That alley is a natural outlet as the Church Street at 6th Street intersection already has extensive traffic during its peaks. The alley is already in disrepair and has been for years (maybe decades). This includes damaged curb access on both ends, failing pavement throughout, and unmaintained landscaping in the public right of way. There are also blind spots as vehicles park illegally - both within the alley and on both ends. These concerns do not apply to the Central Block or the West Block as they are not adjacent to an intersection with activity similar to that of Church Street at 6th Street. The alley already gets increased traffic when Wheeler Auditorium is active with events. How does the City plan to mitigate the negative impacts to the alley as it undoubtedly becomes a cut-through (aka a desire path) when the Civic Center is fully built-out, including with a high-traffic Recreation and Aquatics Center at the corner? As the EIR notes, people would be advised to park along 6th Street to access these amenities. Is part of the Civic Center plan to revitalize the alley so it can handle more intensified traffic (of all modes)? Thanks! Truly, Casey 1 Comment Letter #3 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-14 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 3 – Casey Estorga 1. The commenter states that they could not find where the EIR considered circulation impacts adjacent to the East Block, specifically with respect to the alley between Church Street and Rosanna Street. The commenter states that the alley functions as an outlet due to traffic at the Church Street and 6th Street intersection and experiences increased traffic during events at Wheeler Auditorium. The commenter further states that the alley is in disrepair, including damaged curb access, failing pavement, and unmaintained landscaping within the public right- of-way. The commenter also notes blind spots caused by illegal vehicle parking within the alley and at both ends. The commenter clarifies that these concerns do not apply to the Central Block or West Block as they are not adjacent to an intersection with similar activity. The commenter states that the alley would become a cut-through route when the Civic Center is built out, including the Recreation and Aquatics Center, and asks how the City plans to address potential increases in traffic. The commenter references that the draft EIR states that people would be advised to park along 6th Street to access project amenities and questions how this would affect use of the alley and whether the Civic Center plan includes improvements to the alley so it can accommodate increased traffic and use. A vehicle miles traveled analysis was prepared for the project as required per CEQA. The evaluation of traffic operations and vehicular congestion is no longer required under CEQA. However, the City could choose to prepare an operations analysis evaluating off-site facilities at some point, but it is not required for CEQA compliance. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:Mike Griffis To:Ryan Osenton Subject:EXTERNAL - Comments Against the Demolition of Wheeler Auditorium as Part of the Civic Center Master Plan Date:Saturday, March 14, 2026 6:22:56 AM I was appalled to read in a recent Dispatch article that the City was even considering tearing down Wheeler Auditorium. Wheeler Auditorium was constructed in the 1940's, and was designated as a Historic Structure by the City Council in 1983. The City of Gilroy 2040 General Plan calls for public and private efforts for the preservation of historic and architecturally significant buildings. Under the Historic and Cultural Resources section, it states that "The policies in this section strive to preserve Gilroy's historic and cultural resources to preserve its local heritage for future generations. " And lists Goal NCR 5 "Preserve significant historic buildings, sites, and resources to enrich the sense of place and appreciation of the city's history." The above is about complying with the city's 2040 Plan, but what about doing the morally right thing for our community. The Historic Wheeler Auditorium has provided recreational and cultural activities to generations of the people of Gilroy. In my own personal experiences, I have seen my children and grandchildren participate in recreational activities in the Auditorium. Just the thought that our City Council would consider demolishing the Auditorium is beyond belief to me. Don't destroy a part of our history just to provide for some new shiny buildings. Michael Griffis 3/14/2026 Yahoo Mail: Search, Organize, Conquer 1 2 Comment Letter #4 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-16 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 4 – Michael Griffis 1. The commenter states that the Wheeler Auditorium was constructed in the 1940s and was designated as a Historic Structure by the City Council in 1983. The commenter also references the City of Gilroy 2040 General Plan and that it calls for preservation of historic and architecturally significant buildings, including policies and goals related to preserving historic and cultural resources. Preservation Architect prepared a memo on August 6, 2026 providing their historic architectural considerations of the Wheeler Auditorium and concluded that the Wheeler Auditorium is a stand-alone, individual resource as it does not have any direct contextual associations and does not appear to have any direct associations to historical events. While there is an established basis for a finding of historic importance, the architecture is otherwise and evidently basic, plain and minimal, without a site or site features of historical character (Preservation Architect 2026). Also refer to Section 7.0, Cultural Resources, of the draft EIR, which provides an analysis of the project’s impacts to cultural resources. The draft EIR concludes that demolition of the Wheeler Auditorium would result in a significant and unavoidable impact even with implementation of Mitigation Measure CUL-1.a and CUL-1.b, which requires that a qualified architectural historian document the auditorium in accordance with the guidelines established for the Historic American Building Survey; an architectural historian meeting the Secretary of the Interior’s Professional Qualification Standards shall oversee the preparation of the plans, photographs, and written data; the City’s Historian shall review the documentation and file it with the Northwest Information Center at Sonoma State University, the repository for the California Historic Resources Information System; and requires developing all of this material into a public educational display within the new community center. Section 13.0, Alternatives, of the draft EIR discusses Alternative #2, which would retain the historic structure in place and require a redesign of the project. The conclusion states that this alternative is the environmentally superior alternative as it would avoid the significant and unavoidable impact. However, this alternative meets the fundamental project objectives to a lesser degree because the intent of the project is to maximize site uses and meet space needs for applicable City staff and programming at City buildout. As discussed in Section 12.0, Significant and Unavoidable Impacts, of the draft EIR, if the City Council approves the project, they would be required to adopt a Statement of Overriding Considerations, finding that the benefits of the project outweigh the significant and unavoidable impacts. No change to the draft EIR is required. 2. The commenter states that Wheeler Auditorium has provided recreational and cultural activities to generations of the community and references personal experiences associated with the facility. The commenter also states opposition to the potential demolition of Wheeler Auditorium as part of the project. The comment does not raise an environmental issue associated with the adequacy of the draft EIR and, therefore, no response is required. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB From:Steve Brady To:Ryan Osenton; Mayor Greg Bozzo; Council Member Carol Marques; Council Member Dion Bracco; Council Member Tom Cline; Council Member Terence Fugazzi; Council Member Zachary Hilton; Council Member Kelly Ramirez; Matt Morley Cc:Joanie M. Lewis; Connie Rogers; Linda; lcsjr31@garlic.com; johnson95020@yahoo.com; etcavall@hotmail.com; MaureenHunter8@yahoo.com; karenpedigo10@aol.com; dmatuzak2@aol.com; blhmft@gmail.com; sosar@verizon.net Subject:EXTERNAL - GHS Comments to Civic Center Master Plan/Draft EIR - Wheeler Auditorium Date:Monday, March 23, 2026 1:36:31 PM CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. Mr Osenton, City Council Members & City Administrator, See the attached letter containing the Gilroy Historical Society’s comments and position on the subject Master Plan/Draft EIR, particularly regarding the demolition of the historic Wheeler Auditorium. Please do not hesitate to contact our President Ms Joanie Lewis regarding our concerns as expressed in the letter. Hard copies of the letter will be hand carried to the city administration offices today. Sincerely, Steve Brady GHS Vice President $PNNFOU-FUUFS Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB @@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@ Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB @@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@  DPOUhE Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-20 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 5 – Gilroy Historical Society 1. The commenter states that the Draft EIR identifies demolition of Wheeler Auditorium as a significant and unavoidable impact and states that this outcome is unacceptable. The commenter states a preference for Alternative #2, the “Retain Historic Wheeler Auditorium in Place and Redesign the Proposed Project” alternative identified in the draft EIR. The commenter states that Wheeler Auditorium is listed on the City’s Historic Resources list and describes its architectural style as Moderne (also described as Art Deco) and states that while the interior may need renovation, the exterior is worth preserving. The commenter states that Wheeler Auditorium has been used for community events, including plays, dances, concerts, weddings, and classes, and that it is accessible to the community and provides a sense of place. The commenter states that the building can continue to fulfill its purpose if the interior is remodeled to better meet current needs. The commenter further states that demolition of the building would result in a loss of a major part of Gilroy’s history that cannot be retrieved or replaced. See response to letter 4, comment 1. No change to the draft EIR is required. 2. The commenter states that locating an aquatics center in or next to a new recreation building would increase traffic on 6th Street and Church Street and that it would be difficult to accommodate this increase, even with additional parking. The commenter believes that people would rather not swim next to two very busy streets. Refer to Section 9.12, Transportation (beginning on page 9-22), of the draft EIR, which addresses transportation impacts. As described therein, the project would modify site access and circulation but would be designed in accordance with City standards and reviewed by applicable City Departments to ensure safe operation. Additionally, the VMT impacts evaluated in the draft EIR are concluded to be less than significant because although the building square footages would increase compared to existing conditions, the intensity of these uses would not increase and all proposed uses would continue to be local-serving public services. The VMT analysis (Appendix D of the draft EIR) concludes that the project’s public services improve people’s proximity to recreational and other community services resulting in shorter trips and a decrease in VMT (p. 2). Therefore, transportation impacts overall would be less than significant. No change to the draft EIR is required. 3. The commenter states that the recreation/aquatics center facility would result in a negative impact of noise and traffic on the character and quality of life of the surrounding neighborhood. The commenter states opposition to locating the facility at the proposed location and indicates a preference for locating such a facility at other sites, including Christmas Hill Park or Christopher High School. Refer to Section 9.8, Noise (beginning on page 9-17), of the draft EIR, which addresses noise impacts. As described therein, construction noise would be temporary and limited to hours permitted by the City’s General Plan and Municipal Code, and operational noise associated Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-21 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 with the project would be minimal and consistent with existing conditions. The project would also be required to comply with applicable noise standards ensuring that noise levels do not exceed established thresholds. Therefore, construction and operational noise impacts associated with the project would be less than significant. Refer to the response under comment 2 above for a discussion about traffic impacts. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:Ruben Dario Villa To:Ryan Osenton Cc:All Council Members Subject:EXTERNAL - RE: Comments on Public Review Draft EIR – Gilroy Civic Center Master Plan (SCH# 2025091066) Date:Friday, March 27, 2026 12:20:41 AM Dear Mayor, City Council, and Staff, Thank you for the opportunity to comment on the Public Review Draft Environmental Impact Report (Draft EIR) for the Gilroy Civic Center Master Plan. These comments are submitted on behalf of community organizations and stakeholders engaged in arts, culture, and downtown vitality in Gilroy, including SV Creates, Gilroy Foundation, Gilroy Downtown Business Association, Gilroy Arts Alliance, and Gilroy Arts Roundtable among others. We appreciate the City’s effort to plan comprehensively for the future of the Civic Center and downtown. The Civic Center will serve as a defining civic space for Gilroy for decades to come, and thoughtful planning now will help ensure the project successfully supports community use, cultural programming, and downtown vitality. We also note the City Council’s recent approval of the Community Event Support Program. As the number of events continues to grow, it becomes increasingly important that civic spaces like Civic Park are designed to support recurring events efficiently—minimizing cost and logistical barriers while providing consistent, well-designed environments for safe community use. As organizations and community leaders actively involved in arts, culture, and downtown programming in Gilroy, we are particularly interested in how the Civic Center’s design will support public events, cultural programming, and community gatherings over time. Purpose of Comment The purpose of these comments is to help ensure the Final EIR clearly describes how the proposed Civic Center will function once fully activated and to clarify key assumptions related to event programming, the intended role of Civic Park, and peak-use conditions. + + + 1. Civic Park Programming and Performance Infrastructure The Civic Center Master Plan describes Civic Park as a flexible open space capable of hosting community gatherings such as farmers markets, performances, and civic events. However, the plan does not clearly define whether outdoor concerts or amplified music events are intended uses of the park. This creates uncertainty about whether the park’s design is aligned with its intended function. Previous iterations of the Master Plan included a stage or designated performance area within Civic Park. It was only during recent public discussions associated with the Draft EIR that stakeholders became aware this element had been removed, reportedly due to acoustic considerations. In response, we re-engaged with participating organizations and community stakeholders to confirm whether there remains support for outdoor performance infrastructure. 1 2 Comment Letter #6 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB There is strong and consistent support for including a permanent stage or integrated performance platform as part of the park design. If Civic Park is intended to function as a venue for performances, concerts, and cultural events —as described in the Master Plan—then the project should include a permanent stage or integrated performance platform as part of the park design. Purpose-built performance infrastructure would allow the City to orient sound appropriately, reduce repeated temporary stage installations, and lower logistical costs for community event producers. It would also allow acoustic considerations to be addressed proactively through design rather than reactively through temporary solutions. From a practical standpoint, the presence—or absence—of basic performance infrastructure directly affects the feasibility and quality of civic programming. While acoustic considerations present real design challenges, they are commonly addressed through site orientation, sound engineering, and operational guidelines. The removal of performance infrastructure, rather than its thoughtful design, risks limiting the Civic Center’s ability to achieve its stated goals of supporting community programming and cultural activation. A clearly defined program, supported by appropriate infrastructure, will help ensure Civic Park becomes an intentional and well-activated public space. Requested Clarification for the Final EIR The Final EIR should clearly state whether Civic Park is intended to support outdoor performances and, if so, should reflect the inclusion of a permanent stage or integrated performance infrastructure as part of the project design. + + + 2. Operational Noise and Event Programming The Draft EIR concludes that operational noise increases associated with the Civic Center redevelopment would be minimal and generally consistent with existing civic uses. However, the project description anticipates community programming and public gatherings. If the Civic Center is intended to support events such as markets, festivals, and performances, the noise analysis should clearly reflect those uses. Event programming can introduce conditions that differ from typical daytime civic operations, particularly where amplified sound is involved. Requested Clarification for the Final EIR The Final EIR should clearly describe the assumptions used in the noise analysis, including the anticipated frequency, timing, and amplification of community events, to ensure the analysis reflects the reasonably foreseeable use of the civic campus. + + + 3. Transportation and Parking – Peak Use Conditions The Draft EIR relies primarily on a Vehicle Miles Traveled (VMT) screening approach and concludes that the project would not result in significant transportation impacts. While 2 cont'd 3 4 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB consistent with current CEQA practice, this approach does not fully address how the Civic Center campus will function during peak-use conditions. The Master Plan envisions a more active civic campus with expanded programming and community use. However, the analysis does not clearly describe how the site will operate during periods of higher activity, such as evenings, weekends, or special events when multiple uses may occur simultaneously. Requested Clarification for the Final EIR The Final EIR should clarify the assumptions used to conclude that project intensity would not increase and should include a qualitative discussion of how the Civic Center will accommodate peak-use conditions, including overlapping civic uses and community events. + + + Conclusion The Civic Center Master Plan represents a significant opportunity to shape the civic heart of Gilroy. Providing additional clarity around event programming, the intended role of Civic Park, and peak-use conditions will strengthen the Final EIR and help ensure the project’s design aligns with its long-term civic goals. Thank you for your time and consideration. Respectfully submitted, Silicon Valley Creates Alexandra Urbanowski, Executive Director Gilroy Foundation Jaclyn Muro, Executive Director Gilroy Downtown Business Association Amber Attebery, Co-Chair Gilroy Arts Alliance Marianne Eichenbaum, President Sharon Albert, Vice President Gilroy Arts Roundtable Steering Committee La Ofrenda Festival / Casa de Cultura y Arte Ruben Dario Villa, Executive Director MANOS Folklórico Mina Castañeda, Director The Neon Exchange Toni Bowles, CEO Ruben Dario Villa 5 4 cont'd Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Chair, Arts and Culture Commission Luis Ramirez Commissioner, Parks and Recreations Commission Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-26 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 6 – Ruben Dario Villa 1. The commenter acknowledges the opportunity to comment on the draft EIR and states appreciation for the City’s effort to plan for the Civic Center and downtown. The commenter states that the Civic Center will serve as a defining civic space and should support community use, cultural programming, and downtown vitality. The commenter references the City’s Community Event Support Program and states that as events increase, civic spaces should be designed to support recurring events efficiently and reduce logistical barriers. The commenter states that the purpose of the comments is to ensure the Final EIR clearly describes how the Civic Center will function once fully activated, including assumptions related to event programming, the role of Civic Park, and peak-use conditions. The comment is introductory to the comments in the letter and does not raise an environmental issue. Therefore, no response is required. No change to the draft EIR is required. 2. The commenter states that the Master Plan describes Civic Park as a flexible space for community gatherings but does not clearly state whether outdoor concerts or amplified music events are intended uses. The commenter states that previous versions of the Master Plan included a stage or designated performance area, which has been removed. The commenter states that there is support for including a permanent stage or integrated performance platform and requests that the Final EIR clarify whether Civic Park is intended to support outdoor performances and reflect inclusion of performance infrastructure if applicable. The commenter states that if Civic Park is intended to support performances and events, the project design should include appropriate infrastructure and clearly defined programming. While the amphitheater was considered in earlier design options, it is not currently proposed as part of the master plan, and therefore, the noise associated with an amphitheater was not evaluated in the draft EIR. The reference to the amphitheater was inadvertently left in the EIR project description. Section 4.0, Project Description, of the draft EIR has been revised to remove reference to the amphitheater, which is no longer part of the project design. Refer to Section 3.0, Changes to the draft EIR, of this final EIR. If the City does decide to add an amphitheater or music venue to the civic center, supplemental environmental analysis would be required. 3. The commenter states that the draft EIR concludes operational noise would be minimal but that the project anticipates community programming and public gatherings. The commenter states that event programming, including markets, festivals, and performances, may introduce different noise conditions, particularly where amplified sound is involved. The commenter requests that the Final EIR describe the assumptions used in the noise analysis, including frequency, timing, and amplification of community events. The proposed master plan includes a Multigenerational Community Center that would include a community theatre seating up to 200 people for music, drama, dance, and spoken- word performances. The master plan does not contemplate large outdoor music gatherings. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-27 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Refer to Section 9.8, Noise, on page 9-17, of the draft EIR, which discusses operational noise impacts of the proposed project. The proposed project would be subject to compliance with City Municipal Code standards for noise to ensure that events and activities conducted at the site would not exceed such standards. The assumptions for what types of activities and events may occur at the project site are identified within Section 4.0, Project Description, of the draft EIR. Refer also to the response under comment 2, above. No change to the draft EIR is required. 4. The commenter states that the draft EIR relies on a Vehicle Miles Traveled (VMT) screening approach and does not fully address how the Civic Center would function during peak-use conditions. The commenter states that the analysis does not clearly describe how the site would operate during periods of higher activity, such as evenings, weekends, or special events when multiple uses may occur simultaneously. The commenter requests that the Final EIR clarify assumptions related to project intensity and include discussion of how peak-use conditions and overlapping uses would be accommodated. See response to letter 3 regarding traffic operations. No change to the draft EIR is required. 5. The commenter states that additional clarity regarding programming, Civic Park role, and peak-use conditions would help align the project with long-term civic goals. Comment acknowledged. Refer to the response under comment 4, above. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:Crighton, Triana To:Ryan Osenton Cc:Swierk, Robert; plan.review; Bus.Stop Subject:EXTERNAL - VTA Comments on Draft Gilroy Civic Center Master Plan & Draft EIR [GI2601] Date:Friday, March 27, 2026 3:48:28 PM Attachments:Outlook-av2pcmgn.png VTAComments_GI2601_GilCivicCenter_MasterPlan_EIR.pdf Ryan, VTA appreciates the opportunity to comment on the draft Environmental Impact Report (EIR) and public review draft for the Gilroy Civic Center Master Plan. Our formal comment letter is attached. Thank you again for the opportunity to review this plan. If you have any questions, please feel free to contact me if any clarification is needed. Best, Triana K. Crighton (she/her) Senior Transportation Planner || Land Use and Development Review Phone: 408-321-5691 Comment Letter #7 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB March 27, 2026 City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 Attn: Ryan Osenton Dear Ryan, VTA appreciates the opportunity to comment on the draft Environmental Impact Report (EIR) and public review draft for the Gilroy Civic Center Master Plan, shared with VTA staff by City Council Member Zachary Hilton on February 13, 2026. VTA has reviewed the documents and has the following comments: Overall Plan Area Design VTA supports the Master Plan’s intent to strengthen and modernize the public service and recreational uses of the Plan Area. The planned three new civic buildings and the new Civic Center Park will help create an environment that is connected, vibrant, and active – providing green spaces, recreational uses, and public services. With residential areas, downtown Gilroy shops and restaurants, and public transit services nearby, the reimagined Gilroy Civic Center will contribute to the kind of work-live-play environment that VTA encourages and supports. Active Transportation Connectivity to Downtown Gilroy Acknowledging the current Plan Area’s Walk Score of 90, VTA staff still encourages the City to consider what active transportation improvements can be planned and implemented to better connect the new Gilroy Civic Center to downtown Gilroy along 6th Street and 7th Street. For example, intersection improvements at West 7th and Church Street, and dedicated/striped bicycle lanes on either 6th Street or 7th Street would help improve safety and comfort for bicyclists and pedestrians. Community Design and Transportation (CDT) Manual As it applies to the future specific design of the Master Plan Area, VTA encourages the City to utilize VTA’s Community Design and Transportation (CDT) Manual to inform the Plan Area's design. The CDT guidelines provide strategies for shaping the built environment and parking layouts to promote pedestrian activity, support transit, and enhance community character. Transportation Demand Management (TDM) Measures VTA supports the Gilroy Bicycle Pedestrian Advisory Committee’s comment letter regarding incorporating TDM measures within the Master Plan. Acknowledging that the buildout of the Plan Area will not produce significant VMT impacts, VTA still encourages the City consider TDM measures that can enhance and complement non-automobile modes of travel to and around the Plan Area. BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB sd>ĂŶĚhƐĞΘĞǀĞůŽƉŵĞŶƚZĞǀŝĞǁ WĂŐĞϮŽĨϮ Bus Stop Improvements VTA’s Local Bus Route 85 services West 6th Street along the Plan Area. Local Route 85 connects several key areas such as downtown Gilroy and the Gilroy Caltrain Station. VTA has two existing bus stops on the Plan Area frontage: x 6th & Hanna x 6th and Rosanna As specific streetscape design proceeds for the Plan Area, please coordinate with the VTA Passenger Facilities Team via e-mail at Bus.Stop@vta.org. Additionally, VTA would like the opportunity to review future specific site plans to ensure the placement of driveways, landscaping and any other features do not conflict with bus operations. VTA’s Transit Passenger Environment Plan provides design guidelines for bus stops. VTA’s Bus Stop Placement, Closures and Relocations Policy details VTA’s policies for these topics. Proposed Parking Reconfiguration on 7th Street The Gilroy Civic Center Master Plan Civil Conceptual Narrative states (on Appendix B, page 109) that “The existing parallel parking on 7th Street between Church and Hanna however is proposed to be converted to angled parking. This will require the curb to be shifted into the site thereby eliminating the existing planting strip.” VTA recommends that the City carefully consider how this proposed parking reconfiguration would affect safety and comfort of pedestrians and cyclists along 7th Street, as well as pedestrians and cyclists approaching the Civic Center area on Rosanna Street from the south. Thank you again for the opportunity to review this plan. If you have any questions, please do not hesitate to contact me at triana.crighton@vta.org, or the VTA Land Use and Development Review team at plan.review@vta.org Sincerely, Triana Crighton Senior Transportation Planner GI2601 BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-31 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 7 – Santa Clara Valley Transportation Authority 1. The commenter states support for the Master Plan’s intent to strengthen and modernize public service and recreational uses and notes that the project would create a connected and active environment with access to transit, residential areas, and downtown uses. The comment does not raise an environmental issue associated with the adequacy of the draft EIR and, therefore, no response is required. No change to the draft EIR is required. 2. The commenter encourages the City to consider active transportation improvements to better connect the Civic Center to downtown along 6th Street and 7th Street, including intersection improvements and dedicated or striped bicycle lanes. Although active transportation improvements cannot be required as mitigation measures because there is no significant adverse transportation impact, the City could choose to include them in the master plan. No change to the draft EIR is required. 3. The commenter encourages the City to utilize VTA’s Community Design and Transportation Manual to inform future design of the Plan Area, including strategies for pedestrian activity, transit support, and parking layout. Although strategies for pedestrian activity, transit support, and parking layout cannot be required as mitigation measures because there is no significant adverse transportation impact, the City could choose to include them in the master plan. No change to the draft EIR is required. 4. The commenter supports incorporation of Transportation Demand Management (TDM) measures and encourages the City to consider measures that enhance non-automobile modes of travel to and around the Plan Area. Refer to response to letter 1, comment 3. No change to the draft EIR is required. 5. The commenter states that VTA Route 85 serves the project area and identifies existing bus stops along 6th Street. The commenter requests coordination with VTA on future site design to ensure compatibility with bus operations and references applicable VTA design guidelines and policies. The comment does not raise an environmental issue associated with the adequacy of the draft EIR and, therefore, no response is required. No change to the draft EIR is required. 6. The commenter references proposed conversion of parallel parking to angled parking on 7th Street and recommends that the City consider potential effects on safety and comfort for pedestrians and cyclists. The comment does not raise an environmental issue associated with the adequacy of the draft EIR and, therefore, no response is required. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:REBECCA SCHEEL To:Ryan Osenton Subject:EXTERNAL - Gilroy Civic Center questions Date:Tuesday, February 10, 2026 8:19:46 AM Good morning Ryan, I’ve communicated with you before, I’m a Gilroy resident who swims laps regularly, currently at Gavilan College. I’m interested in the Pool options in the Plan. Can you pls tell me how many lanes there will be in the outdoor Pool & the length of the lanes (for lap swimming)? Also, it’s very hard to tell from the photos but it looks like the play area/non-lap area is connected to the Lap Pool without a wall or separation. Is it the same body of water or are there two separate pools? If it’s the same water, I’m concerned about the water temperature & other unpleasant things which little kids do in the water which causes pools to close for cleaning. (It happens at the Morgan Hill YMCA indoor pool regularly.) If the temperature of the play area pool is kept warmer, the lap lanes will be too warm for workouts. Gavilan College has temperature issues since they changed their 2 pools to 1 pool with a swim-way/isle. The lap pool & the lower level pool (for aquatics) are separated by an swim-way/isle. They did it to save money on heating the pool but they have regretted it. Thank you, Rebecca Rebecca Scheel rscheel@verizon.net mobile: 408.930.8805 1 Comment Letter #8 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-33 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 8 – Rebecca Scheel 1. The commenter asks questions about the proposed pool, such as how many lanes will be provided and the length of the lanes for lap swimming. The commenter expresses concern that if the pools are combined, differences in water temperature and maintenance issues could affect lap swimming conditions. The comment is regarding specific pool design and does not raise an environmental issue and, therefore, no response is required. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:Wells Wadleigh To:Ryan Osenton Subject:EXTERNAL - Comments on Civic Center plan Date:Monday, February 23, 2026 8:41:55 AM Hello I am very concerned about the plan for PARKING near the library. The planners seem to be unaware of the location of the main entrance to the library. Please go to the site as it currently exists and look again. The planners have placed a swimming pool east of the library in an area that currently provides a number of parking spots that are essential for library patrons. Seniors will be especially inconvenienced and even discouraged from using the library if they have to walk all the way from the west side. Are you planning to create another entrance for the library? I don't see that in the plans. Users of the pool will be taking many of the parking places that are now used by library patrons. And I suspect that the average pool user will be occupying a parking space much longer than the average library user. Sincerely yours, Wells Wadleigh 2901 Grassland Way Gilroy 1 2 Comment Letter #9 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-35 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 9 – Wells Wadleigh 1. The commenter states concern regarding the location and availability of parking near the library and indicates that the proposed placement of the swimming pool would remove existing parking spaces used by library patrons. The commenter states this may inconvenience users, including seniors. The comment does not raise an environmental issue and, therefore, no response is required. No change to the draft EIR is required. 2. The commenter asks whether a new library entrance is proposed and states that the plans do not appear to show an additional entrance. Additionally, the commenter notes that pool users may occupy parking spaces for longer durations than library users. The comment is on the parking design and does not raise an environmental issue and, therefore, no response is required. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:Gina Johnson To:Ryan Osenton Subject:EXTERNAL - Civic Center master plan Date:Tuesday, February 24, 2026 7:59:54 PM Hi I do not think the Wheeler Civic Center should be torn down. It was built in 1940 and is aesthetically pleasing. Getting rid of older buildings makes cities loose their charm. Plus the buildings on the plan look like the police station which is not very attractive. It would be cheaper to fix the existing buildings rather than to tear them down and build new ones. There is also the debris from the buildings that would fill our land fills. I also don’t think we need another pool. There are 3 in Gilroy plus the aquatic center at Gilroy gardens. There is also the pool center in Morgan Hill and the indoor pool at the CRC. There is also the added cost of maintaining the pool, insurance for liability, and opens the city up to lawsuits. There is also the cost of this project. Where is the money coming from? Wouldn’t it be cheaper to remodel what we have since in the plan it says that the square footage of City Hall would not change much from the current building. Thanks Gina Johnson 1 2 3 4 Comment Letter #10 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-37 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 10 – Gina Johnson 1. The commenter states opposition to the demolition of Wheeler Auditorium, noting its age and aesthetic value, and states a preference for repairing existing buildings rather than constructing new ones. See response to letter 4, comment 1. No change to the draft EIR is required. 2. The commenter states that the debris from the buildings would fill the landfills. Section 9.14, Utilities and Service Systems of the draft EIR beginning on page 9-127, addresses solid waste generation and concludes the project would comply with applicable regulations related to solid waste disposal and recycling, and sufficient landfill capacity exists to accommodate project-generated waste. Therefore, impacts related to solid waste would be less than significant. No change to the draft EIR is required. 3. The commenter states that an additional pool is not needed and expresses concern regarding maintenance costs, insurance, and liability associated with the proposed pool. The comment does not raise an environmental issue and, therefore, no response is required. No change to the draft EIR is required. 4. The commenter asks about the cost of the project, the source of funding, and questions the need for redevelopment given that the plan indicates City Hall square footage would not change substantially. The comment does not raise an environmental issue and, therefore, no response is required. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB From:Margaret Aron To:Ryan Osenton Subject:EXTERNAL - civic center Date:Friday, March 27, 2026 5:54:54 PM CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. Hello, Here are some concerns that I have. The parking garage. It is surrounded by homes and at two stories is too tall. Limited safety at night. The crosswalk at 6th and Hanna is used by children from the elementary school, church goers, and folks going to the senior center and is very busy adding another dirveway would be dangerous. The Wheeler auditorium should be left in place. It is historic. It is listed. It is being used for many activities now so must meet standards to be used. After attending the meetings the design is nice if we were a new city. Gilroy is not and should try and honor the previous civic members who developed the center over time The center was also redesigned during the development of the library and police station. It is wasteful to start all over again even as the new trees and landscaping are still very young. The buildings we have are functional. If the HVAC needs updating do so. Sadly , I do not think we would ever get the pool so please don't use it as a selling point. Thank you for your time. Margaret Aron 1 2 Comment Letter #11 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-39 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 11 – Margaret Aron 1. The commenter states concern regarding the proposed parking garage, including its height, proximity to surrounding homes, and safety, and states that an additional driveway at 6th Street and Hanna Street would be dangerous due to existing pedestrian activity. Refer to Section 9.1, Aesthetics (beginning on page 9-1), which addresses aesthetic impacts including height. As described therein, the proposed two-level parking garage is planned to be 25 feet, which complies with the height limits of the Civic/Cultural Arts Zoning District (minimum of 25 feet at street front and maximum of 50 feet). No change to the draft EIR is required. Refer to Section 9.12, Transportation (beginning on page 9-22), which addresses circulation and hazards. As described therein, all circulation improvements would be designed in accordance with City standard specifications for safe and efficient facility design, including requirements for emergency access, sight distance, and vehicle movement. In addition, circulation improvements would be subject to review by the City’s Public Works, Fire, and Police Departments to ensure safe operation for vehicles, pedestrians, bicyclists, and emergency responders. Therefore, the project would not result in increased hazards and impacts would be less than significant. No change to the draft EIR is required. 2. The commenter states that Wheeler Auditorium should remain in place, identifies it as a historic resource, and states that it is currently used for activities. Additionally, the commenter states that existing buildings are functional and questions the need for redevelopment, including replacement of relatively recent improvements. Lastly, the commenter states that the pool may not be constructed and should not be relied upon as part of the project. Refer to response to letter 4, comment 1. The remainder of the comment does not raise an environmental issue associated with adequacy of the draft EIR and, therefore, no further response is required. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:Cynthia Van Laar To:Ryan Osenton Cc:Parks and Recreation Commissioner Luis Ramirez; Parks and Recreation Commissioner Emily Miller; Parks and Recreation Commissioner Javier Martinez; Parks and Recreation Commissioner Jesse Jimenez; Parks and Recreation Commissioner Greg Felios; Parks and Recreation Commissioner Andrew Brinton; Mayor Greg Bozzo; Council Member Tom Cline; Council Member Dion Bracco; Council Member Terence Fugazzi; Council Member Carol Marques; Council Member Zachary Hilton; Council Member Kelly Ramirez Subject:EXTERNAL - Written Comments Related to DEIR Date:Tuesday, February 24, 2026 8:56:08 PM Hello Mr. Osenton, After reviewing the City of Gilroy DEIR, I’m writing to encourage thoughtful consideration of the long-term benefits of building a larger-scale aquatic center in Gilroy, rather than limiting the project to an 8-lane facility. The proposed facility is substantially smaller than both high school pools, significantly limiting growth and pool-use opportunities for Gilroy. Gilroy High School has an 11- lane competition pool and a 4-lane instructional pool, and Christopher High School has a 14-lane pool with a sloped instructional area. An 8-lane pool significantly limits our ability to host sanctioned swim meets and regional competitions. A 16-lane competition pool (50 meters by 25 yards) and 6-lane instructional pool would position Gilroy to host meets that bring athletes, families, and spectators into our community, generating economic activity for local restaurants, hotels, and businesses while elevating Gilroy’s visibility as a regional destination. In comparison, the Morgan Hill Aquatics Center and the Baler Aquatic Center in Hollister provide recreational programs across the lifespan and host regional short- and long-course meets, generating revenue for their communities while also meeting recreational needs. Beyond economics, a larger pool increases equitable access for our local swim teams, as well as adult and youth programs. Lane availability is already limited in Gilroy. Expanding capacity ensures more opportunities for training, competition, and skill development without overcrowding or restricted schedules. This is not simply a recreational amenity; it is an investment in youth development, public health, and community growth. If we are going to build, we should build with the future in mind. I respectfully urge you to consider the long-term community and economic benefits of a larger aquatic center that fully supports Gilroy’s athletes and families. Thank you for your time and leadership on this important decision. Sincerely, Cynthia Van Laar Gilroy Gator Swim Team Board President 1 Comment Letter #12 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-41 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 12 – Cynthia Van Laar 1. The commenter states that the proposed 8-lane pool is smaller than existing high school pools and would limit pool use and opportunities, including the ability to host swim meets and regional competitions that could generate economic activity and increase visibility. The commenter references aquatic centers in Morgan Hill and Hollister and states that these facilities support recreational programs and host competitions. The commenter states that a larger pool would increase access for swim teams and community programs and address limited lane availability. Lastly, the commenter states that a larger aquatic facility would support youth development, public health, and community growth and encourages consideration of long-term benefits. The comment does not raise an environmental issue and, therefore, no response is required. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:Luis Ramirez To:Ryan Osenton Subject:EXTERNAL - Civic Master Plan Date:Wednesday, February 25, 2026 6:35:39 PM Hello Ryan I am not in favor of retaining Wheeler Auditorium for a variety of reasons. Although it may have historical significance to a minority part of our community, it would severely alter the plan of the civic center and defeat the purpose of creating the plan. Luis Ramirez 1 Comment Letter #13 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-43 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 13 – Luis Ramirez 1. The commenter states opposition to retaining Wheeler Auditorium and indicates that doing so would alter the Civic Center plan and defeat the purpose of the plan. The comment does not raise an environmental issue associated with the adequacy of the draft EIR and, therefore, no response is required. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:Alexis Morales To:Ryan Osenton Subject:EXTERNAL - Civic Center Master Plan Input Date:Thursday, February 26, 2026 12:16:38 AM Hello Mr. Osenton, I would like to submit a recommendation during the Civic Center Master Plan review period. I strongly encourage the city to include a new playground within the proposed civic park with the removal of the existing play structure next to Wheeler Civic Auditorium. The current plan appears to show a large open grass area without a defined recreational use. While open lawn space has value, similar areas at other parks (such as Miller park in front of Brownell Middle School) are not utilized as much as they may have originally been intended. During the summer, families tend to gather under the trees at each end of the park and avoid the open grass field due to the extreme heat for birthdays or casual time together. It shows that having large open space without shade or clear intended use often results in wasted space. This presents an opportunity to create a more functional, family focused area in the new civic park. After speaking with other Gilroy families, it’s clear that a well designed playground is one of the most important missing elements in this remodel. Families in Gilroy are looking for safe, engaging spaces where children of all ages can play, explore, and spend time outdoors together. The collective feedback is that two play areas, one for toddlers and young children, and one for older elementary aged children, would best meet the needs of local families. Given how hot Gilroy’s summers can be, shaded play structures, through trees and/or canopies, would be essential to ensure the space remains functional, safe, and usable throughout the year. Adding a thoughtfully designed playground would turn the civic park into a vibrant, multigenerational destination where families can gather, children can play, and the community can thrive. This is a rare opportunity to make a lasting, positive impact for families in Gilroy, and it’s important to explore all possibilities to make this remodel the best it can be! I look forward to hearing how this community feedback will be weighed into the drafting of the final plan! Sincerely, Alexis 1 Comment Letter #14 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-45 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 14 – Alexis Morales 1. The commenter recommends inclusion of a playground within the proposed civic park and states that the current plan appears to show a large open grass area without defined recreational use. The commenter states that shaded play areas and multiple play areas for different age groups would better serve families and improve usability of the space. The comment does not raise an environmental issue and, therefore, no response is required. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB From:Yolanda Calimpong To:Ryan Osenton Subject:EXTERNAL - Do Not Tear Down Wheeler Auditorium! Date:Saturday, March 14, 2026 12:07:45 PM CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. Please consider every alternative for not tearing down Wheeler Auditorium. What other alternatives can be considered? Could the iconic outside be preserved? 6th & Church facade for example? Inside and other walls & inside could be retrofitted to meet the Civic Center vision & communities needs? Respectfully submitted. Yolanda Calimpong Sent from my iPhone 1 Comment Letter #15 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-47 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 15 – Yolanda Calimpong 1. The commenter requests consideration of alternatives to demolishing Wheeler Auditorium, including preserving portions of the exterior façade and retrofitting the interior to meet project needs. Refer to response to letter 4, comment 1. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:Peter Van Dyke To:Ryan Osenton Subject:EXTERNAL - Wheeler Auditorium Date:Saturday, March 14, 2026 3:16:56 PM You need to come up with a better plan than tearing down the Wheeler Auditorium and replacing it with something that looks like it should be in New Jersey or San jose. The City leadership is and has been ruining the once quaint sustainable town of Gilroy. The rampant poorly planned development, the expansion into the only fertile cropland left in the county, the mowing down of Gilroy's history and the utter disregard for the downtown and the wishes of the inhabitants is not what the people desire. Gilroy used to be a community and we are desperately trying to hold on to that. The city is making that harder by turning us into the kitchen, bedroom and toilet for the "Silicon Valley." The tearing down of Wheeler Auditorium is just another lurch towards the detached internal malignancy that Gilroy leadership has become. Peter Van Dyke. 1 Comment Letter #16 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-49 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 16 – Peter Van Dyke 1. The commenter states opposition to demolishing Wheeler Auditorium and expresses concern regarding the proposed replacement and broader development patterns in the City. Refer to response to letter 4, comment 1. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:franksanchez20.fs To:Ryan Osenton Subject:EXTERNAL - Wheeler Auditorium Date:Sunday, March 15, 2026 6:24:04 PM The Auditorium is more than historical it is part of the fabric of Gilroy. It would be like tearing down Old City Hall, just restructure the existing building and keep the memories alive. If you have a sayso in this project please use your influence to stop the demolition. Thank You Sent from my Galaxy 1 Comment Letter #17 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-51 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 17 – Frank Sanchez 1. The commenter states opposition to demolishing Wheeler Auditorium and recommends restructuring the existing building to retain its historical and community value. Refer to response to letter 4, comment 1. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:Linda To:Ryan Osenton Cc:Mayor Greg Bozzo; Council Member Dion Bracco; Council Member Terence Fugazzi; Council Member Carol Marques; Council Member Tom Cline; kellyramirez@cityofgilroy.org; zacharyhilton@cityofgilroy.org Subject:EXTERNAL - Wheeler auditorium Date:Sunday, March 15, 2026 3:19:34 PM I want to express my disappointment that the auditorium is being considered for demolition. We have lost too many of our historic buildings (the Strand Theater, Dick Bruhn's/Robinson Hardware, Hall's, and likely soon, the Creamery) without giving thought to their still valuable place in our downtown. As shown by the continual use of the Auditorium it is still functional with the possibility/probability to continue. Why spend many dollars to demolish and replace when no good reason exists? When will we start to recognize the value of our historic resources? Sent from my Galaxy 1 Comment Letter #18 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-53 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 18 – Linda 1. The commenter states opposition to demolition of Wheeler Auditorium, references the loss of other historic buildings, and states that the auditorium remains functional and should be retained. Refer to response to letter 4, comment 1. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:Dmatuszak2 To:Ryan Osenton Cc:Connie Rogers; Joanie Lewis; Linda White; karenpedigo10@aol.com; Eileen Cavallaro; Gilroy Museum; Babs Holiday; Dan Donovan; Pam Salter; Steve Brady; Russell Sosa; Diana Johnson; Mayor Greg Bozzo; Council Member Dion Bracco; terrence.fugazzi@cityofgilroy.org; Council Member Carol Marques; Council Member Kelly Ramirez; Council Member Zachary Hilton; Council Member Tom Cline Subject:EXTERNAL - Wheeler Auditorium Date:Sunday, March 15, 2026 3:01:18 PM Mr. Osenton: We are opposed to the demolition of Wheeler Auditorium as part of the City Hall Campus Master Plan. The building has historical significance, is in good condition, and is used for a wide variety of community functions, especially for small and mid-sized events. Wheeler Auditorium is one of the few historic buildings left standing that honors our past and inspires our future. It should be incorporated into the new campus as a revered symbol of the past while the library and police station display our commitment to the present. The new City Hall and other buildings that comprise the new campus will showcase our vision for the future. Linwood Wheeler, highly respected local businessman and philanthropist, donated $60,000 in 1940 to construct a combined assembly hall, civic center, and armory. The completed building was highlighted as an example of the Streamlined style of Architecture by the Pacific Coast Architecture Database. It was a built as a symbol of hope for the future as the City was pulling out of the Great Depression. Wheeler Auditorium is on the National Register of Historic Places because of its contribution to Gilroy's past -- we need to ensure that it is part of Gilroy's future, too! Sincerely, Dr. David J. Matuszak and Mrs. Maureen M. Hunter Gilroy Historical Society Members of the Board of Directors Sent from AOL on Android 1 Comment Letter #19 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-55 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 19 – Dr. David Matuszak and Mrs. Maureen M. Hunter, Gilroy Historical Society 1. The commenter states opposition to demolition of Wheeler Auditorium, noting its historical significance, continued use, and condition, and states that it should be incorporated into the proposed Civic Center plan. Refer to response to letter 4, comment 1. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB From:maretta j To:Ryan Osenton Subject:EXTERNAL - Save Wheeler Auditorium Date:Monday, March 16, 2026 5:47:26 PM CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. Dear Mr. Osenton, I am a lifetime resident of Gilroy. I was born and raised in this beautiful town. I grew up when this town was mostly agricultural lands and orchard groves. Our Downtown Monterey Road was the Highway. I have raised my children here, and my grandchildren have been residents. Wheeler Auditorium is an iconic historical landmark. When I was in my teens, I took recreational classes there. When I had children, my kids were enrolled in the preschool that was operating. My grandchildren went to that preschool. My children also participated in dance classes and played youth league basketball offered by Parks and Rec at the auditorium. I used to sell arts and crafts during the annual Christmas faire. Many wonderful family and community events creating precious generational memories. Save Wheeler Auditorium! Please find an alternative! Respectfully submitted, Maretta Juarez Sent from my iPhone 1 Comment Letter #20 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-57 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 20 – Maretta Juarez 1. The commenter states opposition to demolition of Wheeler Auditorium, identifies it as a historical landmark, and references its use for community and recreational activities. Refer to response to letter 4, comment 1. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:corina deleon To:Ryan Osenton Subject:EXTERNAL - Wheeler Auditorim Date:Monday, March 16, 2026 12:19:10 PM I was raised in Gilroy since 1966 and agree to keep this historical building for our future generations as a historical gem for our youth can learn and enjoy this treasure. I’m suggesting a different location! A concerned citizen. Corina R Deleon MFT 1 Comment Letter #21 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-59 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 21 – Corina R. Deleon 1. The commenter states support for retaining Wheeler Auditorium as a historical building and suggests considering a different location for the proposed project. Refer to response to letter 4, comment 1. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:judy garcia To:Ryan Osenton Subject:EXTERNAL - Wheeler Auditorium Destruction Date:Friday, March 20, 2026 8:37:53 AM Ryan, I know that Wheeler Hospital is on the National Registry of Historical sites. What about the auditorium that will be torn down? Will the hospital be spared? Could the architecture of the new auditorium blend with hospital? Many of the new/old towns I visit integrate the new and old architecture. How will Gilroy blend the new with the existing historical buildings? Thank you, Judy Garcia 7531 Church St 669-205-2697 1 Comment Letter #22 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-61 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 22 – Judy Garcia 1. The commenter states that Wheeler Hospital is on the National Register of Historic Sites and asks whether the auditorium will be torn down and whether the hospital will be spared. The commenter asks whether the architecture of new development will blend with existing historic buildings and references integrating new and old architecture. The Wheeler Hospital is located at 650 5th Street, which is outside of the project boundary. Therefore, the proposed project does not impact the Wheeler Hospital. Refer to response to letter 4, comment 1. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:El Lalo To:Ryan Osenton Subject:EXTERNAL - Demolition of Wheeler Auditorium Date:Monday, March 23, 2026 3:26:00 PM Dear Mr. Osenton, I would hope you would do whatever you can to preserve this one! So many fond memories of Saturday Night Dances, Battle of the Bands, etc. This place has lots of history so why not prevserve it! Spend the money it would take to knock it down, to renovate it instead! Thank you and regards, Concerned Citizen and long time resident Edward Aguirre ... 1 Comment Letter #23 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-63 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 23 – Edward Aguirre 1. The commenter states support for preserving Wheeler Auditorium, references past community uses, and recommends renovating the building instead of demolishing it. Refer to response to letter 4, comment 1. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:Bernadette Rowlison To:Ryan Osenton Subject:EXTERNAL - Please consider saving Wheeler Auditorium from demolition Date:Monday, March 23, 2026 1:14:45 PM Mr. Osenton - City Project Manager, I was a resident of Gilroy from 1972 to 1990 until I moved away to attend a four-year university. Gilroy has a unique history as it sits on the crossroads of California State Route 152 and U.S. Route 101. Gilroy is quintessentially small-town America; it is historically and culturally a farm town. This charm is found in such places as the Carnegie Library, Wheeler Hospital, Wheeler Auditorium, The Grange Hall (whose land was donated by Lin Walker Wheeler, the same philanthropist as the hospital and auditorium are named after) ought to be preserved. For perspective, the U.S. has a penchant for generic building patterns; Walmart the second largest company in the U.S. has built over five thousand "big box" stores. Only one of those (which I have visited while on active duty in the U.S. military) has architecture that is aesthetically pleasing; Woodland Park, Colorado is designed like a Swiss Chalet to blend in with the mountain landscape. Wheeler Auditorium has classy Art Deco design and holds special history for past and present residents. In the 1970's, I took ballet and tap dance lessons at Wheeler Auditorium from Greta Tegel (provenance: Manchester, England) through Gilroy Parks & Recreation. (For the record, Misty Copeland retired American Ballet Theater prima ballerina was discovered at a Parks & Recreation ballet class in southern California.) In the 1980s, I took ballet and jazz lessons at Le Grande E'tage (near historic Strand Theater) on the second floor of a stately building with ornate ceilings in the grand ballroom located on the east side of Monterey Street in Gilroy. (Tragically, it has since burned down in a suspected arson case). In the following years, my mother served on Gilroy City Council and rotated as Mayor Pro Tempore. Additionally, my father was a Gilroy Rotarian and the senior pastor of Gilroy Presbyterian Church for 34 years. He began his pastorate in 1972 at the historic church on 5th & Church streets, but eventually the congregation exceeded the building capacity. The new site at 6000 Miller Avenue was not dedicated until 1988, so in the interim Wheeler Auditorium allowed GPC to hold Easter services. My family was and still is vested in the community and its landmarks. All this is to say that there is economic potential for the Gilroy regarding historic preservation. Please do not let Gilroy turn into a cookie cutter strip mall. If I hold these fond memories, it is highly likely that there will be thousands of more Gilroyans who share my sentiments. Please consider our pleas. 1 Comment Letter #24 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Very Respectfully, Former SSG Rowlison, Bernadette 1363 Woodland Avenue Chico, California 95928 gazellegirl@yahoo.com (530) 897-0226 land line (719) 828-3885 mobile Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-66 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 24 – Bernadette Rowlison 1. The commenter states support for preserving Wheeler Auditorium, references its historical and architectural value, and states that it should be retained as part of the City’s historic resources. The commenter also recounts memories spent at the Wheeler Auditorium. Refer to response to letter 4, comment 1. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:patitipton@aol.com To:Ryan Osenton Subject:EXTERNAL - Wheeler Auditorium Date:Monday, March 23, 2026 1:05:21 PM Having lived in Gilroy for seven years, I realize the historical importance of Wheeler Auditorium. It is a recognized Gilroy landmark! Instead of demolishing it, I'd love to see the exterior maintained, with any necessary improvements made to the interior. Pat Reinhart 1 Comment Letter #25 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-68 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 25 – Pat Reinhart 1. The commenter states that Wheeler Auditorium is a recognized landmark and recommends maintaining the exterior while making improvements to the interior rather than demolishing the building. Refer to response to letter 4, comment 1. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:Pamela Salter To:Ryan Osenton; Mayor Greg Bozzo Subject:EXTERNAL - Wheeler Auditorium Civic Center Date:Monday, March 23, 2026 4:02:25 PM Dear City Project Manager - Ryan Osenton, I would like to express my frustration, anger, and sadness on the master plan proposal for the new Gilroy Civic Center. The Planning Committee has not vetted this enough throughout the Gilroy community, and I believe it to be a huge mistake. Wheeler Auditorium is a landmark in Gilroy. It was constructed in 1940 by William Binder. It was a combined assembly hall, civic center, and armory in 1940. This building has been long treasured by the citizens of Gilroy and on the city’s list of Historic Resources. I do not see why the planning committee is not planning the new center around Wheeler Auditorium. It needs to be saved. It is part of our history. The building has so many memories for many of the community. At one time it hosted craft fairs, local business, tiny tots tumbling, gymnastics, Taekwondo, cooking class, dance and much more. It used to have a day care. It currently is a place where young people can play basketball and other indoor sports. Stop demolishing the historical buildings in Gilroy. Preserve what you can and renovate the interiors. Same goes for the Creamery before we lose it completely. Do something NOW!!!! Pam Salter Resident of Gilroy and member of Gilroy Historical Society 555 5th Street Gilroy, CA 95020 408-406-8954 purrkats@yahoo.com 1 Comment Letter #26 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-70 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 26 – Pamela Salter 1. The commenter states opposition to demolition of Wheeler Auditorium, identifies it as a historic landmark, and states that it should be preserved and incorporated into the Civic Center plan rather than replaced. Refer to response to letter 4, comment 1. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:Teddy Goodrich To:Ryan Osenton; Mayor Greg Bozzo; Council Member Dion Bracco; Council Member Tom Cline; Council Member Terence Fugazzi; zach.hilton@cityofgilroy.org; Council Member Carol Marques; Council Member Kelly Ramirez Subject:EXTERNAL - Wheeler Auditorium Date:Tuesday, March 24, 2026 3:54:07 PM Wheeler Auditorium should be renovated and preserved. Donated by philanthropist Linwood Wheeler in 1940, it is an important part of Gilroy History. It has served the community in countless ways since its construction, and if the inside was repaired and the outside renovated, it could continue to act as a place for community meetings, school plays, and classes. The possibilities are limited only by our imagination. Please preserve this important part of the history of our community. We don't need more "cleaned up, cookie cutter" civic buildings! Teddy Goodrich 1 Comment Letter #27 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-72 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 27 – Teddy Goodrich 1. The commenter states that Wheeler Auditorium should be preserved and renovated, notes its historical significance, and states that it could continue to serve community uses. Refer to response to letter 4, comment 1. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB From:City Historian Toby Echelberry To:Ryan Osenton Cc:Kim Mancera Subject:Civic Center Master Plan and Wheeler Civic Auditorium Date:Wednesday, March 25, 2026 1:15:39 PM Ryan, This email is in response to the Civic Center Master Plan as it relates to the Wheeler Auditorium. As you are quite aware the City of Gilroy has an existing HRI outlining each of the most important existing structures in the city. The Wheeler Auditorium has been recognized as one of those buildings. Wheeler Auditorium may not have fanfare and publicity as many other state HRI properties, but nonetheless the Wheeler Auditorium has been a constant contributor to the community for the past eight decades. This structure was recognized by the Gilroy City Council on August 15, 1983, as local historic building that needs to be protected. In March 1936 the Common Council and Mayor created a special committee to develop plans for the creation of the Armory and Auditorium. This committee by September had determined that there was great public interest and a municipal auditorium was desired for assembly as well as convention hall. On October 27, 1936, a special election was held (by Ordinance No. 419) to raise $31,000 in municipal bonds to pay for the acquisition, construction and completion of the Auditorium. The overall response was favored by 93% of the votes cast. In 1940 L. M. Wheeler, chairman of the Auditorium-Armory Building Committee pushes forward with the construction. At this time, Binder & Curtis were retained to develop the plans and specifications, and the municipal bonds were issued for this $60,000 project. Money was also donated by Linwood Wheeler as well the entire project was supported by a Public Works Administration (PWA) grant as part of the New Deal relief program. Various meetings were held and reported back to Council with updates. An interesting find is in the City Clerk’s minutes of April 19, 1940, where it was approved to add reinforcing steel and concrete floors to put in a rifle range. In July 1940 a communication was read to install floodlighting to the rear of the facility so the grounds can be used as a drill ground and parking area for the National Guard. In the City Clerk’s minutes of October 21, 1940, it had been decided by Council and Captain Cecil Carlyle, chairman of the auditorium dedication committee that the auditorium be redesignated as “Wheeler Civic Auditorium.” At the same meeting the matter of a cornerstone was ordered as well. In November of 1940, is when the lease was finally signed by Adjutant General of the State of California for the National Guard. Mrs. Hall S. Schrader presented the flag to hoist over the Wheeler Civic Auditorium. In December 1940, the Council passed Resolution No. 128 marking the Notice of Completion of the Wheeler Civic Auditorium. 1 Comment Letter #28 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB In the years that followed the property was used as a civic center by the National Guard until they moved to their present location on Wren Street in 1973. The facility has been used for various city meetings and used for special services such as the 1942 Alien registration all the way until recently used for the COVID-19 pandemic support services. As well the City of Gilroy utilized a portion of the facility as an interim City Hall between 1968 to 1980 since the Monterey Street building was too small and in too great of repair and upkeep, until it moved to its present campus. Since 1980 the facility has been used to host meetings but mainly used as a storage facility. Aside from history as a government civic utility, the Wheeler Civic Auditorium was the social center for many decades as well. In 1941 the USO appeared and performed a show for the troops stationed here. For many years the Auditorium was used thousand times by Gilroy High School, various non-profit organizations as well as society groups for meetings, concerts, and award ceremonies. In its heyday there was even a special commission which provided oversight for the Wheeler Civic Auditorium managing the calendar and handling all the maintenance of the facility. This center generated significant amount of income for the city as well over those years especially when managed by these groups. Instead of demolishing this facility, I would recommend looking at any way of providing a bit of upkeep to the facility, create a historical component recognizes its contribution and celebrating it as well marketing it for future growth in the new Civic Center Master Plan. Sincerely, Toby A. Echelberry Gilroy City Historian 1 cont'd Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-75 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 28 – Toby Echelberry 1. The commenter states that Wheeler Auditorium is identified as a historic resource by the City, provides historical background on its development and use, and recommends that the building be preserved, maintained, and incorporated into the Civic Center Master Plan rather than demolished. Refer to response to letter 4, comment 1. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:Samantha Emburton To:Ryan Osenton Subject:EXTERNAL - Possible Demolition of Wheeler Auditorium Date:Wednesday, March 25, 2026 11:05:03 PM Good Evening, I was on facebook this evening and saw a post from the Gilroy Historical Society and Gilroy Museum that the wheeler auditorium is up for possible demolition. Please do not demolish this beautiful landmark. So many Gilroyans have beautiful memories centered around this building and area that is would be a great loss to our community should a demolition occur. Is there any way the community can have input on this? Thank you for your time and consideration. Best Wishes, Samantha Emburton 1 Comment Letter #29 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-77 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 29 – Samantha Emburton 1. The commenter states opposition to demolition of Wheeler Auditorium, references community value and memories associated with the building, and asks whether there is an opportunity for community input. Refer to response to letter 4, comment 1. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB From:Christine Flautt To:Ryan Osenton Subject:EXTERNAL - Wheeler Auditorium Date:Wednesday, March 25, 2026 2:35:09 PM CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. Mayor, City Council Members and staff, Please reconsider the Gilroy Civic Center Master Plan Draft to demolish the Wheeler Auditorium. I do not agree with this plan to demolish this building. I am sure it could be completely redone inside to fit the needs of our City. The Wheeler Auditorium is an historical building in our town. It would be a shame to demolish another historical site in Gilroy. Hopefully the mayor, council members, staff and consultant take into consideration the input of the public response to this demolishing of another historical site and think about keeping the exterior of the building and just retrofit the interior. Thank you for your consideration in this matter. Christine Blaettler Flautt. Resident since 1944 and born in old Wheeler Hospital Sent from my iPad 1 Comment Letter #30 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-79 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 30 – Christine Flautt 1. The commenter states opposition to demolition of Wheeler Auditorium, identifies it as a historical building, and recommends retaining the exterior and renovating the interior to meet City needs. Refer to response to letter 4, comment 1. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:Kathi Orlando To:Ryan Osenton Subject:EXTERNAL - Wheeler Auditorium Date:Wednesday, March 25, 2026 2:01:53 PM Very concerned about the destruction of another Gilroy landmark. What would downtown be without the old City Hall. The council once thought the site would be better served as a parking lot. Watched as ALL the schools were demolished by saying they were an earthquake hazard. Oh, yeah, even the wrecking ball had a tough go of it. Please find a place in your plans thst would spare this significant building. 1 Comment Letter #31 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-81 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 31 – Kathi Orlando 1. The commenter states concern regarding demolition of Wheeler Auditorium, identifies it as a significant building, and requests that it be preserved within the project plans. Refer to response to letter 4, comment 1. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB From:Conrad Calimpong To:Ryan Osenton Subject:EXTERNAL - Wheeler Auditorium Date:Wednesday, March 25, 2026 8:11:38 AM CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. Dear Ryan, I’ve just received word that there are plans to demolish Wheeler Auditorium. Unthinkable. Wheeler Auditorium has played a significant role in so many people’s lives who grew up in Gilroy. It has been an integral part of the community for many decades. It would be a shame to remove this landmark building from the community. So many memories and lives were intertwined in the activities that occurred on those hardwood floors that I swept on occasion. I participated in karate lessons, attended dances, carried drums on stage for my brother in a battle of the bands, and watched as others clapped, cried, hooted and hollered in their celebrations. Wheeler Auditorium was so much a part of the fabric of Gilroy’s community when I grew up there in the 50’s, 60’s, and early 70’s. Let’s not destroy this historic landmark building and the important role it has played in the community. Sincerely, Conrad Calimpong Sent from my iPhone 1 Comment Letter #32 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-83 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 32 – Conrad Calimpong 1. The commenter states opposition to demolition of Wheeler Auditorium, identifies it as a historic landmark, and references its role in community activities and history. Refer to response to letter 4, comment 1. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:len stimac To:Ryan Osenton Subject:EXTERNAL - Wheeler Auditorium Date:Wednesday, March 25, 2026 11:15:21 PM Our alley between Church and Rosanna from 5th street dead ended into 6th street. Bob, Ben and Al Vega were half of a 3 on 3 football game and when Don and Dan Kludt showed up we almost didn't fit a 5 on 5 on the lawn. Sometimes we would pull from the west side of the west of town from the Carmel Street neighborhood and Scott Hager would join and maybe Rick Repetti from the north. During my Gavilan days i performed a couple originals with Jerry Navarro Eric Daum David Porcella John Orca and Chuck Tujillo during a Christmas show. My big story is if i havent told you yet, ill tell you again, in 65' maybe or when the new police station was built at the south side of the auditorium we removed a steel grate . . . you can see in the photo . . . that was covering a 12 x 8 vent in the foundation and fit thru to enter the crawl space. At the south side of the auditorium under the stage was a door we were able to enter into a room. It is where the police were storing stolen property. it was filled with bikes, guns and stuff. No iphones. We did not repurpose anything out onto the streets and we didn't get caught. Climbing on the National Guard tanks parked in the back on their weekends. Who was in the guard in the 60's? Margie Jinks studio for tap Frank and Becki Galvan Frank Galvan. Battle of the bands John Garcia. City league basketball for a while there along with youth sports. Do You think we lose all memory during passage like a building might? This may look profitable, But like the East Wing . . . Gilroy, this is a wrong idea. Len Stimac 1 Comment Letter #33 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-85 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 33 – Len Stimac 1. The commenter appears to share an opposition to the demolition of Wheeler Auditorium and references its role in past community activities and memories associated with the building. Refer to response to letter 4, comment 1. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:Phil Stimac To:Ryan Osenton Subject:EXTERNAL - Save Wheeler Auditorium Date:Thursday, March 26, 2026 10:18:19 PM As a Gilroy native, I think Wheeler Auditorium, like the Old City Hall should be preserved. Phil Stimac1 Comment Letter #34 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-87 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 34 – Phil Stimac 1. The commenter states opposition to demolition of Wheeler Auditorium. Refer to response to letter 4, comment 1. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB From:len stimac To:Ryan Osenton Subject:Re: EXTERNAL - Wheeler Auditorium Date:Thursday, March 26, 2026 1:53:07 PM Attachments:image001.png Ryan As my response is coming to you from a non resident of Gilroy at this time, who understands the effects that progress and modernization presents to the past, our history is what has allowed our present day. My father Leonard Stimac Sr. who was an early occupant at Wheeler Auditorium while stationed in the 40's as a mail sergeant and who's mail route ran from Bradley Ca. to Eureka Ca, would surely have more to say than me. While a resident on Church street in the 1960's he was commissioned for one dollar by the owner Jack Kasanjan (sp} to remove a structure located where the parking lot adjacent to the Presbyterian Church at the corner of 5th street and Church street was located, now the Salvation Army.This was a spiraled stair cased, 3- two storied brick fireplace, first cut Coastal Redwood board including lath structure. Ruth Doan another neighbor to the building identified it as an early stage stop in Gilroy which was reduced by Leonard's five child work crew during multiple months of nail pulling and bundling of lumber for sale to a parking lot. For years the structure was available as rental units to many families that I remember, that have since become well known Gilroy residents. Understanding that progress is always upon us, there are like structures mostly in neighboring city's that are still standing and affordable to keep not only economically but historically. Gilroy has also seen the removal of the F&P Cannery which my mother Eda Bozzo Stimac had grown up living next to on Lewis Street from 1922 upon her migration from Italy to the mid 1940's. Again progress has it's limits and it's ways. This again is understood. I only offer these stories to be a tool for deliberation and consideration as a final decision is shortly upon you. This is not to speak for the generations of families that have been residents long before my family that have their own history. Of course the time and expense for your new civic center looks spectacular, include the expense of the loss of this iconic building to so many. Thanks for the open eyes and ears, Len Stimac On Thursday, March 26, 2026 at 07:58:50 AM MST, Ryan Osenton <ryan.osenton@cityofgilroy.org> wrote: 1 Comment Letter #35 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. Hey Len, Thank you for submitting your comments. I will add these to our list to be reviewed and considered when finalizing both the Civic Center Master Plan and Environmental Impact Report, respectively. Thanks, Ryan Ryan Osenton | Project Manager Public Works | Engineering 7351 Rosanna Street, Gilroy, CA 95020 Direct 408.846.0277 | Cell 669.766.8752 http://www.cityofgilroy.org From: len stimac <stimedia@yahoo.com> Sent: Wednesday, March 25, 2026 11:15 PM To: Ryan Osenton <Ryan.Osenton@cityofgilroy.org> Subject: EXTERNAL - Wheeler Auditorium Our alley between Church and Rosanna from 5th street dead ended into 6th street. Bob, Ben and Al Vega were half of a 3 on 3 football game and when Don and Dan Kludt showed up we almost didn't fit a 5 on 5 on the lawn. Sometimes we would pull from the west side of the west of town from the Carmel Street neighborhood and Scott Hager would join and maybe Rick Repetti from the north. During my Gavilan days i performed a couple originals with Jerry Navarro Eric Daum David Porcella John Orca and Chuck Tujillo during a Christmas show. My big story is if i havent told you yet, ill tell you again, in 65' maybe or when the new police station was built at the south side of the auditorium we removed a steel grate . . . you can see in the photo . . . that was covering a 12 x 8 vent in the foundation and fit thru to enter the crawl space. At the south side of the auditorium under the stage was a door we were able to enter into a room. It is where the police were storing stolen property. it was filled with bikes, guns and stuff. No iphones. We did not repurpose anything out onto the streets and we didn't get caught. Climbing on the National Guard tanks parked in the back on their weekends. Who was in the guard in the 60's? Margie Jinks studio for tap Frank and Becki Galvan Frank Galvan. Battle of the bands John Garcia. City league basketball for a while there along with youth sports. Do You think we lose all memory during passage like a building might? This may look profitable, But like the East Wing . . . Gilroy, this is a wrong idea. Len Stimac Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-90 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 35 – Len Stimac 1. The commenter states opposition to demolition of Wheeler Auditorium, references its historical significance and community history, and expresses concern regarding the loss of the building as part of the proposed project. Refer to response to letter 4, comment 1. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CAUTION: This email originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. From:Kathy Sullivan To:Ryan Osenton Cc:Connie Rogers; Johnson Tere; Knopf Roger Subject:EXTERNAL - Fwd: Save Wheeler Auditorium Date:Friday, March 27, 2026 5:29:35 PM From: Kathy Sullivan <kcks05@aol.com> Date: March 27, 2026 at 12:32:08ௗPM PDT To: Ryan.Osentum@cityofgilroy.org Cc: Rogers Connie <jrogers@garlic.com>, Johnson Tere <terejohnson@morganhillhistoricalsociety.com>, Shepherd Robin <rshepherd@morganhillhistoricalsociety.com> Subject: Save Wheeler Auditorium Dear Ryan, As the former president of the Morgan Hill Historical Society, I became aware of the historical structures that had been demolished in Morgan Hill. It’s easier to tear them down than plan for renovations that bring history to the community. It is a shame to see these noted structures be bulldozed. They help connect us to the past and tell the stories of how we have developed into the beloved communities we are today. As populations expand, newcomers have questions about the who, why and how of their community. These structures bring the answers to life. For the sake of history, I support saving this building and making it another place for at community to enjoy it’s history. Kathy Sullivan Morgan Hill 408-230-7876 1 Comment Letter #36 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 2.0 Draft EIR Comments and Responses 2-92 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Letter 36 – Kathy Sullivan 1. The commenter states support for preserving Wheeler Auditorium, references the importance of historic structures in connecting communities to their history, and recommends retaining the building for community use. Refer to response to letter 4, comment 1. No change to the draft EIR is required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 3.0 Changes to the Draft EIR 3-1 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 3.0 Changes to the Draft EIR 3.1 CEQA Requirements CEQA Guidelines section 15132 requires that a final EIR contain either the draft EIR or a revision of the draft EIR. This final EIR incorporates the draft EIR by reference and includes revisions to the draft EIR made primarily in response to comments included in Section 2.0, Response to Comments. This section contains text from the draft EIR with changes indicated. Additions to the text are shown with underlined text (underline) and deletions are shown with strikethrough text (strikethrough). The changes are described below. 3.2 Changes to Section 1.0 Introduction Page 1-4 The following correction is made: A notice of preparation was prepared for the proposed project and circulated for 30 days from September 23, 2025 to October 22, 2025 June 19, 2025 to July 19, 2025 as required by CEQA, and two responses were received. No responses to the notice of preparation were received. The notice of preparation, along with the responses, is are included in Appendix A. Written responses to the notice of preparation were received from the following: Department of Toxic Substances Control, dated September 26, 2025 The Department of Toxic Substances Control (DTSC) recommended that pre-demolition surveys be conducted to identify the presence of lead-based paint, asbestos-containing materials, mercury, and polychlorinated biphenyls and that any removal or disposal of such materials comply with applicable environmental regulations. Additionally, DTSC recommends sampling be conducted near current and/or former building in accordance with DTSC Preliminary Endangerment Assessment Guidance Manual. DTSC further advises that any imported soil or fill material be tested for contaminants in accordance with DTSC’s Preliminary Endangerment Assessment Guidance Manual and Clean Imported Fill Material Fact Sheet to ensure suitability for intended land use. These recommendations are addressed in Section 9.5 Hazards and Hazardous Materials of the draft EIR. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Section 3.0 Changes to the Draft EIR 3-2 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 California Department of Transportation, dated October 22, 2025 The California Department of Transportation (Caltrans) provided preliminary comments for informational purposes. Caltrans expressed interest in reviewing the draft EIR, particularly the vehicle miles traveled analysis, and also noted that construction activities involving oversized or excessive load vehicles on State roadways will require a transportation permit issued by Caltrans. This comment is acknowledged in Section 9.12 Transportation of the draft EIR. 3.3 Changes to Section 4.0 Project Description Page 4-2 The following clarification is made: Gilroy Civic Park (New)  Features: A large lawn area, walking paths (equivalent to a football field), an amphitheater similar in size to Morgan Hill’s Amphitheater, and a splash pad/interactive water feature.  Events: Designed to accommodate art & wine festivals, farmers' markets and other similar events. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Mitigation Monitoring and Reporting Program 1 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Mitigation Monitoring and Reporting Program 1.1 Introduction CEQA Guidelines section 15097 requires public agencies to adopt reporting or monitoring programs when they approve projects subject to an environmental impact report or a negative declaration that includes mitigation measures to avoid significant adverse environmental effects. The reporting or monitoring program is to be designed to ensure compliance with conditions of project approval during project implementation in order to avoid significant adverse environmental effects. The law was passed in response to historic non-implementation of mitigation measures presented in environmental documents and subsequently adopted as conditions of project approval. In addition, monitoring ensures that mitigation measures are implemented and thereby provides a mechanism to evaluate the effectiveness of the mitigation measures. A definitive set of project conditions would include enough detailed information and enforcement procedures to ensure the measure's compliance. This monitoring program is designed to provide a mechanism to ensure that mitigation measures and subsequent conditions of project approval are implemented. 1.2 Monitoring and Reporting Program The basis for this monitoring program are the mitigation measures included in the project environmental impact report. These mitigation measures are designed to eliminate or reduce significant adverse environmental effects to less than significant levels. These mitigation measures become conditions of project approval, which the City of Gilroy is required to complete before, during and after implementation of the proposed project. The attached checklist is proposed for monitoring the implementation of the mitigation measures. This monitoring checklist contains all appropriate mitigation measures in the environmental impact report. 1.3 Monitoring and Reporting Program Procedures The City of Gilroy shall use the attached monitoring checklist for the proposed project. The monitoring program should be implemented as follows: Exhibit BDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Mitigation Monitoring and Reporting Program 2 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 1. The Gilroy Community Development Department should be responsible for coordination of the monitoring program, including the monitoring checklist. The Community Development Department should be responsible for completing the monitoring checklist and distributing the checklist to the responsible individuals or agencies for their use in monitoring the mitigation measures. 2. Each responsible individual or agency will then be responsible for determining whether the mitigation measures contained in the monitoring checklist have been complied with. Once all mitigation measures have been complied with, the responsible individual or agency should submit a copy of the monitoring checklist to the Community Development Department to be placed in the project file. If the mitigation measure has not been complied with, the monitoring checklist should not be returned to the Community Development Department. 3. The Gilroy Community Development Department will review the checklist to ensure that appropriate mitigation measures and additional conditions of project approval included in the monitoring checklist have been complied with at the appropriate time, e.g. prior to issuance of a use permit, etc. Compliance with mitigation measures is required for project approvals. 4. If a responsible individual or agency determines that a non-compliance has occurred, a written notice should be delivered by certified mail to the City of Gilroy within 10 days, with a copy to the Community Development Department, describing the non-compliance and requiring compliance within a specified period of time. If non-compliance still exists at the expiration of the specified period of time, construction may be halted and fines may be imposed at the discretion of the City of Gilroy. 1.4 Monitoring and Reporting Checklist Step 1 - Prior to Issuance of Ground Disturbing Activities (e.g., Demolition, Grading or Tree Removal Permits) AQ-1 With each construction project, the City of Gilroy shall prepare a Construction Management Plan to include the following measures to reduce toxic air contaminants emissions during construction: a. Heavy-duty diesel vehicles will have 2010 or newer model year engines, in compliance with the California Air Resources Board’s Truck and Bus Regulation; b. Idling of construction equipment and heavy-duty diesel trucks will be avoided where feasible, and if idling is necessary, it will not exceed three minutes; c. All construction equipment will be maintained and properly tuned in accordance with manufacturer’s specifications and will be checked by a certified visible emissions evaluator; and Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Mitigation Monitoring and Reporting Program 3 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 d. All non-road diesel construction equipment will, at a minimum, meet Tier 3 emission standards listed in the Code of Federal Regulations Title 40, Part 89, Subpart B, §89.112. Further, where feasible, construction equipment will use alternative fuels such as compressed natural gas, propane, electricity, or biodiesel. Party Responsible for Implementation: City of Gilroy Party Responsible for Monitoring: Gilroy Community Development Department Monitoring Notes: ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________ BIO-1 Special-Status Bat Species. Within 14 days prior to tree removal, vegetation clearing, building demolition, grading, or the initiation of any construction activity in any area of the project site, a qualified wildlife biologist shall conduct a habitat assessment for bats and potential roosting sites in trees to be removed, in buildings and trees within 50 feet of the construction footprint, and surrounding structures situated within 50 feet of disturbance activities by the project. In the event that construction activities are suspended for 14 consecutive days or longer, these surveys shall be repeated. Surveys shall include a visual inspection of potential roosting features (bats need not be present) and a search for presence of guano within the project site, construction access routes, and 50 feet around these areas. Cavities, crevices, exfoliating bark, and bark fissures that could provide suitable potential nest or roost habitat for bats shall be surveyed. Assumptions can be made on what species is present due to observed visual characteristics along with habitat use, or the bats can be identified to the species level with the use of a bat echolocation detector such as an “Anabat” unit. Potential roosting features found during the survey shall be flagged or marked. Locations off the site to which access is not available may be surveyed from within the site or from public areas. If no roosting sites or bats are found, a letter report confirming absence shall be submitted by the biologist to the City of Gilroy Community Development Department, Planning Division, where it will be kept on file, and no further mitigation is required. If bats or roosting sites are found, a letter report and supplemental documents shall be provided by the biologist to the City of Gilroy Community Development Department, Planning Division, prior to ground disturbance activities and the following monitoring, exclusion, and habitat replacement measures shall be implemented: Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Mitigation Monitoring and Reporting Program 4 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 a. If bats are found roosting outside of the nursery season (May 1 through October 1), they shall be evicted as described under (b) below. If bats are found roosting during the nursery season, they shall be monitored to determine if the roost site is a maternal roost. This could occur by either visual inspection of the roost bat pups, if possible, or by monitoring the roost after the adults leave for the night to listen for bat pups. If the roost is determined to not be a maternal roost, then the bats shall be evicted as described under (b) below. Because bat pups cannot leave the roost until they are mature enough, eviction of a maternal roost cannot occur during the nursery season. Therefore, if a maternal roost is present, a 50-foot buffer zone (or different size if determined in consultation with the California Department of Fish and Wildlife) shall be established around the roosting site within which no construction activities including tree removal or structure disturbance shall occur until after the nursery season. b. If a non-breeding bat hibernaculum is found in a tree or snag scheduled for removal or on any structures within 50 feet of project disturbance activities, the individuals shall be safely evicted, under the direction of a qualified bat biologist. If pre- construction surveys determine that there are bats present in any trees or structures to be removed, exclusion structures (e.g., one-way doors or similar methods) shall be installed by a qualified biologist. The exclusion structures shall not be placed until the time of year in which young are able to fly, outside of the nursery season. Information on placement of exclusion structures shall be provided to the California Department of Fish and Wildlife prior to construction. If needed, other removal methods could include: carefully opening the roosting area in a tree or snag by hand to expose the cavity and opening doors/windows on structures, or creating openings in walls to allow light into the structures. Removal of any trees or snags and disturbance within 50 feet of any structures shall be conducted no earlier than the following day (i.e., at least one night shall be provided between initial roost eviction disturbance and tree removal/disturbance activities). This action will allow bats to leave during dark hours, which increases their chance of finding new roosts with a minimum of potential predation. Party Responsible for Implementation: City of Gilroy Party Responsible for Monitoring: Gilroy Community Development Department Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Mitigation Monitoring and Reporting Program 5 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Monitoring Notes: ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________ BIO-2 To avoid impacts to nesting birds during the nesting season (February 1 through September 15), construction activities that include any tree removal, vegetation clearance, or ground disturbance (such as grading or grubbing), shall be conducted between September 16 and January 31, which is outside of the bird nesting season. If construction activities must commence during the bird nesting season, then a qualified biologist shall conduct a pre-construction survey for nesting birds to ensure that no nests would be disturbed during project construction. a. Two surveys for active nests of such birds shall occur within 10 days prior to start of construction, with the second survey conducted within 48 hours prior to start of construction. Appropriate minimum survey radius surrounding the work area is typically 250 feet for passerines, 500 feet for smaller raptors, and 1,000 feet for larger raptors. Surveys shall be conducted at the appropriate times of day to observe nesting activities. Evidence of completion of the preconstruction survey shall be submitted to the Gilroy Community Development Department, Planning Division, where it will be kept on file, prior to initiation of ground disturbing activities. b. If the qualified biologist documents active nests at the project site, an appropriate buffer between each nest and active construction shall be established. The buffer shall be clearly marked and maintained until the young have fledged and are foraging independently. Prior to construction, the qualified biologist shall conduct baseline monitoring of each nest to characterize “normal” bird behavior and establish a buffer distance, which allows the birds to exhibit normal behavior. The qualified biologist shall monitor the nesting birds daily during construction activities and increase the buffer if birds show signs of unusual or distressed behavior (e.g., defensive flights and vocalizations, standing up from a brooding position, and/or flying away from the nest). If buffer establishment is not possible, the qualified biologist shall have the authority to cease all construction work in the area until the young have fledged and the nest is no longer active. This measure shall be implemented by the City of Gilroy prior to initiation of ground disturbing activities. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Mitigation Monitoring and Reporting Program 6 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Party Responsible for Implementation: City of Gilroy Party Responsible for Monitoring: Gilroy Community Development Department Monitoring Notes: ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________ BIO-3 Prior to approval of each construction project, the City of Gilroy shall prepare a Landscape Plan for review and approval by the Community Development Department, Planning Division indicating the location, size and species of existing trees found within the project site boundaries. The plan shall indicate which trees are planned for removal. Based on review of the Landscape Plan, the City shall determine which trees, if any, are “significant.” If significant trees are determined to be located on the project site, they shall be retained, to the greatest extent feasible. The dripline of significant trees to be retained shall be fenced prior to grading activities to prevent root damage. If retention of all significant trees on the project site is infeasible, a written report shall be prepared by a certified arborist including the number and location of each significant tree to be removed, the type and approximate size of each significant tree, the reason for removal, and specifications for replacing significant trees to be removed. The written report shall be prepared prior to the commencement of grading activities, subject to approval by the City of Gilroy Community Development Department, Planning Division, and a tree removal permit shall be obtained if needed. Prior to commencement of construction activities, the protected zone (one to 1.5 times the distance from the trunk to the dripline, depending on the tree species) of any trees or groups of trees to be retained shall be fenced to prevent injury to the trees during construction. Soil compaction, parking of vehicles or heavy equipment, stockpiling of construction materials, and/or dumping of materials shall not be allowed within the protected zone. The fencing shall remain in place until all construction activities are complete. The City of Gilroy shall submit evidence of the locations and extent tree protection measures to the Community Development Department, Planning Division, where it will be kept on file, prior to initiation of ground disturbing activities. Party Responsible for Implementation: City of Gilroy Party Responsible for Monitoring: Gilroy Community Development Department Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Mitigation Monitoring and Reporting Program 7 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Monitoring Notes: ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________ CUL-1.a Prior to issuance of any demolition permit, a qualified architectural historian shall document the Wheeler Auditorium at 7377 Church Street in accordance with the guidelines established for the Historic American Building Survey (HABS). Documentation shall consist of the following components: 1. Drawings – Prepare sketch floor plans. 2. Photographs – Digital photographic documentation of the interior, exterior, and setting of the buildings in compliance with the National Register Photo Policy Fact Sheet. Photos must have a permanency rating of approximately 75 years. 3. Written Data – HABS written documentation in short form. An architectural historian meeting the Secretary of the Interior’s Professional Qualification Standards shall oversee the preparation of the sketch plans, photographs and written data. The existing DPR forms shall fulfill the requirements for the written data report. The City of Gilroy’s Historian shall review the documentation, and then file the documentation with the Northwest Information Center at Sonoma State University, the repository for the California Historical Resources Information System. All documentation shall be submitted on archival paper. CUL-1.b The City shall develop the material prepared in CUL-1 into a public educational display within the new community center. Party Responsible for Implementation: City of Gilroy Party Responsible for Monitoring: City of Gilroy Historian Monitoring Notes: ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________ Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Mitigation Monitoring and Reporting Program 8 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Step 2 - Prior to Issuance of a Building Permit GHG-1 The following GHG emissions reduction performance measures shall be incorporated into the final project designs and plans for each development project: a. No permanent natural gas infrastructure shall be permitted; no natural gas shall be made available through permanent natural gas infrastructure. The project shall be all electric; and b. Electric vehicle infrastructure (e.g., elective vehicle parking spaces, charging station infrastructure, chargers, etc.) consistent with the CALGreen Tier 2 standards in effect at the time building permits are issued shall be included in the project. Final plans for the development shall be reviewed by the City of Gilroy Community Development Department, Planning Division Director or his/her designee prior to approval of project entitlements to ensure that all performance standards are incorporated into the project design. Verification of development consistent with the performance standards shall be assured prior to approval of occupancy permits. Party Responsible for Implementation: City of Gilroy Party Responsible for Monitoring: Gilroy Community Development Department Monitoring Notes: ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________ Step 3 – During Construction and Ground Disturbing Activities CUL-2 In the event archaeological resources are encountered during ground disturbing activities; contractor shall temporarily halt or divert excavations within a 50 meter (165 feet) of the find until it can be evaluated. All potentially significant archaeological deposits shall be evaluated to demonstrate whether the resource is eligible for inclusion on the California Register of Historic Resources, even if discovered during construction. If archaeological deposits are encountered, they shall be evaluated and mitigated simultaneously in the timeliest manner practicable, allowing for recovery of materials and data by standard archaeological procedures. For precontact and indigenous archaeological sites, this data recovery involves the hand‐excavated recovery and non‐ destructive analysis of a small sample of the deposit. Any previously undiscovered resources found during construction activities shall be recorded on appropriate California Department of Parks and Recreation (DPR) forms and evaluated for Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Mitigation Monitoring and Reporting Program 9 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 significance by a qualified archaeologist. Unique archaeological cultural resources consist of but are not limited to stone (ground and flaked), bone, organic materials, ceramics, fossils, wood, or shell artifacts. Features include hearths, cairns, middens, and postholes. Party Responsible for Implementation: City of Gilroy Party Responsible for Monitoring: Gilroy Community Development Department Monitoring Notes: ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________ CUL-3 In the event that human remains (or remains that may be human) are discovered at the project site, Public Resource Code Section 5097.98 shall be followed. All grading or earthmoving activities shall immediately stop within 50 meters (165 feet) of the find. The Santa Clara County Corner will be notified immediately, and the coroner shall be permitted to examine the remains as required by California Health and Safety Code Section 7050.5(b). Section 7050.5 requires that excavation be stopped in the vicinity of discovered human remains until the coroner can determine whether the remains are those of a Native American. If human remains are determined as those of Native American origin, the City of Gilroy shall comply with the state relating to the disposition of Native American burials that fall within the jurisdiction of the NAHC (Public Resource Code [PRC] § 5097). The coroner shall contact the Native American Heritage Commission (NAHC) to determine the most likely descendant(s) (MLD). The MLD shall complete his or her inspection and make recommendations or preferences for treatment within 48 hours of being granted access to the site. The MLD will determine the most appropriate means of treating the human remains and associated grave artifacts, and shall oversee the disposition of the remains. In the event the NAHC is unable to identify an MLD or the MLD fails to make a recommendation within 48 hours after being granted access to the site, the landowner or his/her authorized representative shall rebury the Native American human remains and associated grave goods with appropriate dignity within the project site in a location not subject to further subsurface disturbance if: a) the Native American Heritage Commission is unable to identify the MLD or the MLD failed to make a recommendation within 48 hours after being allowed access to the site; b) the descendent identified fails to make a recommendation; or c) the landowner or his authorized representative rejects the recommendation of the descendent, and the mediation by the Native American Heritage Commission fails to provide measures acceptable to the landowner. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Mitigation Monitoring and Reporting Program 10 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Party Responsible for Implementation: City of Gilroy Party Responsible for Monitoring: Gilroy Community Development Department Monitoring Notes: ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________ Step 4 – Prior to Issuance of Occupancy Permits CUL-1.a Prior to issuance of any demolition permit, a qualified architectural historian shall document the Wheeler Auditorium at 7377 Church Street in accordance with the guidelines established for the Historic American Building Survey (HABS). Documentation shall consist of the following components: 1. Drawings – Prepare sketch floor plans. 2. Photographs – Digital photographic documentation of the interior, exterior, and setting of the buildings in compliance with the National Register Photo Policy Fact Sheet. Photos must have a permanency rating of approximately 75 years. 3. Written Data – HABS written documentation in short form. An architectural historian meeting the Secretary of the Interior’s Professional Qualification Standards shall oversee the preparation of the sketch plans, photographs and written data. The existing DPR forms shall fulfill the requirements for the written data report. The City of Gilroy’s Historian shall review the documentation, and then file the documentation with the Northwest Information Center at Sonoma State University, the repository for the California Historical Resources Information System. All documentation shall be submitted on archival paper. CUL-1.b The City shall develop the material prepared in CUL-1 into a public educational display within the new community center. Party Responsible for Implementation: City of Gilroy Party Responsible for Monitoring: Gilroy Community Development Department Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Mitigation Monitoring and Reporting Program 11 EMC Planning Group Gilroy Civic Center Master Plan Final EIR August 2026 Monitoring Notes: ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________ GHG-1 The following GHG emissions reduction performance measures shall be incorporated into the final project designs and plans for each development project: a. No permanent natural gas infrastructure shall be permitted; no natural gas shall be made available through permanent natural gas infrastructure. The project shall be all electric; and b. Electric vehicle infrastructure (e.g., elective vehicle parking spaces, charging station infrastructure, chargers, etc.) consistent with the CALGreen Tier 2 standards in effect at the time building permits are issued shall be included in the project. Final plans for the development shall be reviewed by the City of Gilroy Community Development Department, Planning Division Director or his/her designee prior to approval of project entitlements to ensure that all performance standards are incorporated into the project design. Verification of development consistent with the performance standards shall be assured prior to approval of occupancy permits. Party Responsible for Implementation: City of Gilroy Party Responsible for Monitoring: Gilroy Community Development Department Monitoring Notes: ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________ Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Gilroy Civic Center Master Plan CITY OF GILROY August 6, 2025 Exhibit CDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ACKNOWLEDGMENTS City of Gilroy GILROY CITY COUNCIL Greg Bozzo Mayor Carol Marques Mayor Pro Tempore Dion Bracco Council Member Tom Cline Council Member Terence Fugazzi Council Member Zach Hilton Council Member Kelly Ramirez Council Member GILROY COMMISSIONS AND COMMITTEES Planning Commission Library Commission Youth Commission Parks and Recreation Commission Personnel Commission Arts and Culture Commission GILROY CITY STAFF Bryce Atkins Assistant to the City Administrator LeeAnn McPhillips Human Resources Director/Risk Mgr John Doughty Public Works Director Sharon Goei Community Development Director Rachelle Bedell Communication & Engagement Mgr Ryan Osenton Project Manager RETIRED: Jimmy Forbis City Administrator ACKNOWLEDGEMENTS ELS Architecture and Urban Design + EMC Planning Group ELS ARCHITECTURE AND URBAN DESIGN Architecture and Urban Design Clarence D. Mamuyac, Jr., FAIA, LEED AP BD+C Principal for Community Design David Masenten, AIA, AICP, LEED AP BD+C Project Principal Kenneth Hasegawa, AIA Design Principal Susan Vutz, AIA, LEED AP Project Manager Ken Loretto, AIA Design Director Dana Vollmer-Grant, Assoc AIA, WELL AP Community Engagement Specialist Angelo Razo, Architect Project Architect Jose Rodriguez Designer Aylin Casas Mejia Intern Designer EMC PLANNING GROUP CEQA Consulting SWA Landscape Architects Marco Esposito Principal Landscape Architect Xiaomeng Ma Designer Consultants HEXAGON TRANSPORTATION CONSULTANTS, INC. Transportation Consultant BKF ENGINEERS Civil Engineering GUTTMANN & BLAEVOET CONSULTING ENGINEERS, Mechanical, Electrical, Plumbing and Low Voltage FORELL ELSESSER ENGINEERS, INC. Structural Engineering BRIGHTWORKS SUSTAINABILITY LEED and Sustainability Consulting Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Gilroy Civic Center Master Plan TABLE OF CONTENTS I. + Executive Summary ...........................4 II. + Final Concept Design ........................6 A. Renderings ...............................11 B. Site Plan Illustratives and Diagrams ......23 C. Multigenerational Community Center building plans/site sections/elevations ....31 D. Recreation & Aquatic Center building plans/site sections/elevations ....36 E. City Hall building plans/site sections/elevations ....41 III. + Program ....................................46 A. Multigenerational Community Center .......47 B. Recreation & Aquatic Center ..............48 C. City Hall ................................49 IV. + Community Engagement .......................50 A. Community Engagement Process .............51 - Advertising and Engagement .............57 - Workshop #1 – Gallery Walk .............61 - Workshop #2 – Alternate Concepts .......82 - Workshop #3 – Preferred Concept ........89 B. Summary of Feedback ......................91 V. + Technical Memos ............................94 A. Existing Conditions ......................96 B. Traffic and Parking .......................99 C. Civil Engineering .......................108 D. Structural Engineering ..................112 E. Mechanical, Electrical, Plumbing, and Low Voltage ...............114 F. Sustainability and LEED Scorecards .......143 VI. + Schedule ..................................147 VII. + Appendix .................................149 A. City Hall Detailed Program ..............150 - Detailed Program Tabulation ...........151 - Needs Assessment ......................155 B. Survey Responses ........................175 C. Meeting Notes and Presentations .........195 D. Reference Materials .....................251 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB l +executive summary Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 5Gilroy Civic Center Master Plan Executive Summary GILROY CIVIC CENTER MASTER PLAN In November 2024, the City of Gilroy selected ELS Architecture and Urban Design to lead a comprehensive study of its three-block, 14- acre Civic Center. This area—bounded by Sixth Street, Seventh Street, Dowdy Street, and Church Street—holds essential places such as City Hall, Wheeler Center, the Police Headquarters, the Gilroy Library, the Senior Center, and other community-serving facilities. While some Civic Center buildings, like the Gilroy Library and the Police Headquarters, are relatively new and will remain in place, others are aging and no longer meet the city’s evolving needs. Meanwhile, municipal departments are seeing a steady increase in service demands from a population that has grown by 42% in the last 25 years. While these challenges come amid rapidly evolving standards that affect countless social and financial norms, the people of Gilroy and their leaders share a common bond: the timeless desire for gathering around public experiences. In response, city leadership is seizing this opportunity to create a Civic Center that can serve Gilroy’s immediate needs and broader aspirations. This Master Plan is the result of an inclusive, six-month process that has been driven largely by its community—that is, by the people who use the existing site and, in using its successor, will draw profound new benefits from the site’s transformation. Through a series of city council sessions (conducted in accordance with the Brown Act), public workshops, and stakeholder meetings, over 500 community members have contributed their voices and reimagined what this place is capable of. In reflecting the priorities and aspirations of the broadest possible portion of Gilroy residents, this final plan envisions a modern, inclusive, and vibrant hub that honors the city’s heritage while embracing contemporary practices in programming and sustainability. WHY A NEW MASTER PLAN? In 1905, 35 years after its incorporation, the City of Gilroy built its first seat of government at the corner of Monterey Road and West 6th Street. The handsome stone City Hall, which still stands today, housed offices for the mayor and the city clerk, a jail, and the fire department. For a city of less than 2,000 people, the building was likely sufficient to meet all needs. Today, Gilroy’s administrators will make no claims of sufficiency. Amid a generally expanding population now nearing 60,000 and a corresponding expansion of government services, there have been minimal expansions in capacity through new or renovated buildings. The last Civic Center Master Plan was adopted in 2002, when Gilroy had roughly 42% fewer residents. Meanwhile, the land on which the site’s buildings sit is dominated by pavement, the majority of which is dedicated to surface parking. The need for a pedestrian-friendly, modernized civic core is clear. The current Senior Center, Wheeler Center and City Hall are beyond their useful life and capacity, complicating the city’s ability to provide even basic essential services. The new Master Plan addresses these challenges by aligning city infrastructure with the community’s present and future needs, representing a bold and thoughtful investment in the city’s future. A REIMAGINED CIVIC CENTER As envisioned in this master plan, the new Gilroy Civic Center will capably serve the full range of municipal services. It will also set more far-reaching goals, with enticing amenities in wellness, recreation, and cultural programming, among other features. These components will be supported by strategies in architecture and landscape architecture that unite to form a dynamic, pedestrian-friendly campus. The beautifully designed park setting will cohesively integrate government services and innovative, engaging, and personalized civic uses. Key elements include: • Preservation of Existing Assets: The Gilroy Library and Police Headquarters will remain and continue to serve the community for decades to come. • New Civic Facilities: Outdated buildings such as Wheeler Center, City Hall, and the Senior Center will be replaced with modern, sustainable, high-capacity facilities designed to support multigenerational programming and future growth. KEY COMPONENTS OF THE PLAN Gilroy Civic Center Park The most definitive component of the entire plan is a new Civic Center Park. Envisioned as the heart of Gilroy, this central green space connects all civic buildings through two major features: • The East/West Paseo: A pedestrian corridor linking the Police Headquarters, the Library, and the future City Hall. • The Big Green: Flanked on the north by the new Recreation and Aquatics Center and, on the south, the Multigenerational Community Center, this large open lawn space will host picnics, farmers markets, performances, and community gatherings. New Civic Buildings Three new buildings will anchor the reimagined Civic Center: 1. Multigenerational Community Center: Offering programming in theater, the arts, and media, along with dedicated spaces for youth, teens, and seniors. 2. Recreation and Aquatics Center: Featuring competitive and recreational pools, wellness programs, and inclusive sports facilities. 3. New City Hall: Designed to efficiently support the city’s growing needs in administration and public service. COMMUNITY ENGAGEMENT For this planning process, public participation was seen as an essential tool that would help ensure the Civic Center’s success once the site concludes its build-out. In addition to a prominent web presence and consistent outreach by post and email, the city held four bilingual community workshops that included a Spanish-language “Cafecito” event hosted by the Gilroy Police Department. These four sessions, primarily held at Wheeler Center, were each designed to build consistently upon the previous. This process of accrual helped participants to share and refine their vision for the Civic Center by offering residents direct influence over their city’s future. STRUCTURE FOR THE MASTER PLAN REPORT This report describes the Master Plan in detail through the following components: • Final Concept Design • Program • Community Engagement • Technical Memoranda • Construction Cost Estimate • Schedule • Appendices CEQA REVIEW As part of ELS Architecture and Urban Design’s scope of services, the Gilroy Civic Center Master Plan is currently undergoing environmental review in accordance with the California Environmental Quality Act (CEQA). This analysis is being conducted by EMC Planning Group and is anticipated for completion by summer 2026. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ll +final concept design Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 7Gilroy Civic Center Master Plan Final Concept Design Urban Design/Planning and Landscape Since at least 1940, the Gilroy Civic Center site has been gradually pieced together, leading to a patchwork experience characterized primarily by stand-alone facilities, driveways, and large expanses of disconnected surface parking. City staff and stakeholders have now reimagined the Civic Center as cohesive, iconic campus defined by contemporary buildings, vibrant public spaces, and a central downtown park. This Master Plan envisions a unified, walkable, and welcoming destination by consolidating parking, replacing aging single-story facilities with efficient two-story buildings, and eliminating perimeter fencing. The people-first plan increases usable open space, forms new pedestrian connections to the nearby downtown, and dramatically enhances the site’s relationship with the population it serves. This bold vision reflects the transformation of the Civic Center into a truly public amenity and adds new meaning to Gilroy’s public identity. PLAN DESCRIPTION Anchored by three new buildings (City Hall, a Recreation & Aquatics Center, and an Arts & Community Center with a 250-seat theater), the plan weaves these new facilities into the existing Library and Police Headquarters around a central park for events, all of which are connected by a tree-lined paseo. The design adds to Gilroy’s identity as a place that places a high value on inclusion and community-wide connections. In plan view, the edges of each building are often activated where they meet adjacent green space, resulting in a pleasing, site-wide assembly of mutually beneficial indoor-outdoor relationships. These edges have a special vitality: large building doors open onto event terraces; patios invite people to gather, read, and dine; and recreational activities draw energy through their proximity to the park. The plan makes the most of the site’s proximity to downtown Gilroy, just a short walk west along 6th Street or Monterey Street, by reinforcing pedestrian connections and extending the experience of downtown eastward. In so doing, the Civic Center can at last strengthen its relationship with the historic commercial core and play a more important role in the city’s evolving network of public spaces. At its core, the master plan draws from best practices in urban design to establish a sense of place, scale, and connectivity, helping to promote walkability, economic vitality, and a stronger sense of community identity. Buildings are intentionally arranged to frame a central civic park and pedestrian paseo, creating a strong east-west relationship that orients visitors and links to key destinations. The design transforms auto-dominated infrastructure into a pedestrian- prioritized landscape, consolidating numerous scattered driveways into concentrated primary access points to reduce vehicular conflict, improve safety, and reclaim surface area for green space and public use. Generous setbacks, shaded seating, and an intuitive network of pathways make the site inviting and porous, encouraging pedestrian access and impromptu gatherings across all ages and abilities. At the center of the new community buildings is the Civic Park, a two- block green space fronting Church Street, forms the Master Plan’s heart and functions as the literal and symbolic center of Gilroy’s civic life. Encircled by the Community Center, Recreation Center, City Hall, and Library, the park supports both daily use (with shaded paths, picnic lawns, playgrounds, and fitness stations) and large-scale community events. Merging the uses of an amphitheater, community lawn, and event plaza, the park can host concerts, movie nights, markets, and seasonal festivals; its surrounding promenade provides space for markets and outdoor gatherings. To mark a key public confluence— of the park, paseo, and walkway to Rosanna Street—several arcs of fountain jets form a playful focal point and, where adjacent events require additional usable space, can be turned off. CIVIC BUILDINGS The new City Hall, located prominently at the southern edge of the civic park and easily visible from key access points, is designed around notions of contemporaneity, efficiency, and transparency. The building’s easily legible layout includes a welcoming lobby, flexible workspaces, and public meeting rooms that establish this as an approachable, accessible place characterized by open governance. The building design allows a direct visual connection between the adjacent plaza and the council chambers, allowing for larger crowds while reinforcing the community connecting to the seat of government. Its central location reaffirms its role as the symbol and the seat of Gilroy’s public life. The Recreation & Aquatics Center is a wellness hub for all ages. Its design offers indoor courts, fitness studios, swimming pools, and water therapy, in a facility suitable for year-round use. Generous glazing along its primary facades offers a visual connection to the park, showcasing physical activity and encouraging participation. With a similar design intent, the Arts & Community Center supports lifelong curiosity through cultural programming, education, and performance, with spaces adaptable for everything from youth art classes to civic ceremonies. Its 250-seat theater doubles as a venue for local arts and large public gatherings, while the senior dining room has a direct connection to outdoor views of the park and other civic amenities. PASEO The paseo is a tree-lined promenade that, as an interconnecting spine, organizes the broader Civic Center site. It extends the park experience westward, connects Civic Park with the Police Headquarters, library, City Hall and site parking, and promotes a sense of continuity and flow. The paseo is lined with benches and communal tables set beneath large canopy trees selected to match the site’s existing heritage trees and those along nearby streets. The paseo’s axial orientation allows for long views toward Gilroy’s hilly landscape—by turns gold or green—reinforcing the sense of a place that is rooted in the natural environment. The site is further unified by a consistent materials palette and generous landscaping. PARKING To support the site’s transformation, the master plan consolidates 14 scattered driveways into just five primary access points, helping to reduce pavement area and improve public safety. Parking is consolidated into two primary lots occupying the site’s northwest corner. One lot extends from the Library along Sixth Street and the other serves City Hall, the Community Center, and the Police Headquarters. Together, these lots provide 300 on-site spaces, complemented by 125 additional spaces along the site’s frontage facilitated in part by replacing parallel spaces with angled parking. If future needs require it, the larger lot is designed to accommodate structured parking, which will increase capacity without sacrificing open space. BEING A GOOD NEIGHBOR This project’s designers have been mindful of the fact that the Civic Center site occupies a single-family residential neighborhood, with many homes facing directly onto the project’s common access points and gathering areas. The master plan respects this context. The plan’s buildings, driveway locations, and site-edge landscaping have all been sensitively designed to minimize potential negative impacts on the surrounding neighborhood. New buildings step down in mass and in height near adjacent homes, while landscaped buffers and pedestrian-scaled transitions help blend the civic campus into the neighborhood fabric. This edge condition is conceived as a prominent, desirable neighborhood frontage, with pedestrian-scaled lighting, clear sightlines, and walkable connections that welcome residents to stroll, bike, or jog easily and safely into the site without needing to drive. This approach seeks, at its core, to create a pedestrian-oriented site that Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 8Gilroy Civic Center Master Plan extends the surrounding open space network and integrates into the district as if it were just another amenity-rich neighborhood park. SUSTAINABLE, RESILIENT STRATEGIES The Master Plan’s design strategies exemplify the value of resilient, sustainable urban infrastructure. Native landscaping, bioswales, and permeable paving all manage stormwater while reducing the urban heat-island effect. Passive design strategies—such as optimized building orientation and shading devices—minimize energy use and enhance outdoor comfort. In this vision, the Civic Center becomes not only a center of public life but a tool for exploring the teachable values of sustainable planning and design. EQUITY AND INCLUSION Equity and inclusion are core to the plan, with every aspect of the campus—from building entries to playgrounds—designed to welcome the region’s cultures and to embody the principles of universal accessibility. Community input, particularly from historically underrepresented groups, has helped to ensure that the project serves the immediate needs of a diverse spectrum of Gilroy residents. In particular, the park and paseo prioritize multigenerational, multifunctional design strategies and create space for youth, families, and seniors to gather. Pathways and entries will be universally accessible; multilingual signage and culturally inclusive programming will deepen public perceptions of this place as welcome to all. The plan proposes far more than a collection of new buildings. It envisions a civic common for the 21st century, one that can meet the evolving needs of Gilroy’s people and environment. By integrating functional municipal infrastructure with beautiful public space, the plan reflects the pride, aspirations, and diversity of its city’s stakeholders while delivering flexible, future-ready infrastructure that will serve the region for many coming generations. Architecture CAMPUS PLAN A campus can be thought of as any well-defined place where people come to share in a set of common purposes. To envision and articulate a place that helps fulfill those purposes has been one of the primary objectives for this Master Plan. As visitors approach the site, they will see buildings that frame the park and form a clear dialogue between structure and landscape. In plan view, the spaces in between each building offer areas that support civic purpose by enabling informal community gatherings. Each building has two levels, helping to minimize its horizontal footprint while maximizing the available area for outdoor recreation and amenities. The Master Plan gathers the site’s new and existing structures around a strongly linear, east-west gateway known as the Paseo. On its western side, the Paseo extends from the parking lot and existing Police Headquarters towards the large civic park and community-focused buildings on the eastern side, where much of the recreation and leisure activities are concentrated. The Multigenerational Community Center is located along West 7th Street, and the Recreation & Aquatics Center is located to the north, along West 6th Street. The new City Hall is sited along West 7th Street in the central campus block, where the current City Hall is located. These three new buildings, together with the existing Library and the Police Headquarters, help define the overall campus perimeter. When a visitor is at the site’s eastern edge, the eye moves west and toward the central Paseo. The park-facing facades of City Hall, the Community Center, the Recreation and Aquatics Center and the Library all progressively narrow down to frame the park and Paseo, a reduction that helps to concentrate a visitor’s focus and invites them to explore the site’s various civic uses more deeply. Conversely, looking east from the western end of the Paseo frames an extensive view of the Civic Park that expands as one moves down the gateway towards Church Street. This campus plan effectively choreographs the site’s countless civic activities and helps to bridge the official functions of a municipality with everyday experiences related to recreation, wellness, and culture. CIVIC ARCHITECTURAL IDENTITY Already one of the most recognized places in Gilroy, the Civic Center site must now achieve new forms of recognition. The Civic Center master plan envisions a place where people can experience the best of life in the area and, through countless opportunities for engagement, assert their values and civic pride. To seize this site’s enormous potential, the master plan maximizes opportunities for cohesion throughout the three-block campus and among the relationships between its structures and landscape. In so doing, the realized plan will bring contemporary meaning to Gilroy’s established civic architectural identity and create a popular venue for community-building efforts. With those goals in mind, this master plan retains two of the site’s existing buildings (the library and the police headquarters) and calls for three new buildings: the Multigenerational Community Center; the Recreation & Aquatics Center; and City Hall. Each new building follows a design strategy that draws on the site’s existing architectural vocabulary and on its broader context—historical, social, environmental, and functional. Viewed collectively, these five buildings and their supporting landscape form a unified expression that is rooted in three architectural principles: materials and massing, connections through transparency, and operational and environmental resilience. Materials and Massing The master plan’s new buildings draw essential design cues from three of the site’s existing buildings—the library, the police headquarters, and City Hall, all of which share the Mission Revival style that gives the site its common architectural language. By acknowledging and interpreting the architectural style of their existing neighbors, the new facilities translate the Mission Revival style’s simple, relatable materials and forms into a fresh, contemporary architectural response. This stylistic interplay—between familiar and new, existing and contemporary—establishes a formal dialogue across the five-building collective. In addition, the use of materials and massing emphasizes cohesion, providing a sense of unity that effectively balances the unique characteristics and uses that define each building. This balance will help visitors see the site as a cohesive place, despite its diverse program and uses. For this project, the new buildings use a primary exterior material palette of white cement plaster, terracotta tile, wood, and glass. Each building’s massing is composed of sloped gable roofs and rectilinear volumes. Of these volumes, certain facades are defined by wood trellises that offer shade, material warmth, and additional relief and scale. The facades receive further articulation from deep, rhythmically punched openings. These openings are concentrated along the site’s perimeter—Church Street, West 6th Street, and West 7th Street—to create a unified expression along the street frontages. While the new buildings feel connected to and consistent with the familiar Mission Revival style, they avoid merely replicating it. Instead, they offer a contemporary evolution of Gilroy’s civic architecture, one that pays homage to the city’s traditional expressions while looking to the future. Connections Through Transparency Critical to this new civic identity is the idea that transparency can be a tool for creating connection. To that end, expansive glazed openings provide ample views and natural light, even as they are shaded by trellises and awnings to reduce solar gain. These openings afford grand views of the civic park, sky, and lush landscape beyond, enabling building occupants to remain visually connected with the neighborhood and natural environment. From outside each building, people in the park or on the sidewalk can easily see inside various spaces and note the bustling activities within. The plan emphasizes physical transparency in other ways. In plan view, the edges of each building are often activated where they meet adjacent green space, through numerous interconnected plazas and decks that, where applicable, are equipped with bi-fold doors to allow for unobstructed openings. This strategy maximizes the benefits of the plan’s strong indoor-outdoor relationship and helps define the site as a place of seamless transition between the buildings’ countless interior functions and all the uses found just beyond in its exterior Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 9Gilroy Civic Center Master Plan environment, from public events to recreational and leisure activities. Through the transparency that characterizes these indoor-outdoor relationships, the site’s users immediately comprehend the fluid integration of architecture and landscape and experience the two spaces as a unified whole. Access to natural light is crucial to establishing a space that is comfortable, healthy, and inviting. Natural light can also reduce operational costs by minimizing or even eliminating the need for artificial daytime lighting. The plan’s double-height atriums and interior glazing enable visual connections across floor levels and bring natural light into various uses and departments. Natural light and visual connections are often taken for granted but they are essential factors for any project that seeks to promote intermingling and strengthen community interaction. Sustainability and Resiliency The integration of sustainable and resilient strategies is central to the project’s architectural identity and underscore Gilroy’s commitment to climate and environmental action. Prominent design features include: • Use of renewable materials, most notably cross-laminated timber as a primary structural system • Photovoltaic solar arrays atop flat roofs for on-site renewable energy • Daylighting strategies maximize diffuse natural light and minimize reliance on artificial lighting • All-electric HVAC and pool heating systems, eliminating use of natural gas • Passive ventilation via stack effect in double-height spaces for naturally cooled buildings • Use of fire-resistant exterior materials These strategies are critical to embodying the city’s values through a forward-thinking complex. They also serve as public educational tools that help to build community awareness of sustainable and resilient design. MULTIGENERATIONAL COMMUNITY CENTER The Multigenerational Community Center collects diverse program elements into a facility that can adapt to the needs of all users, with spaces for youth and seniors, arts, dining, performance, and recreation. The building’s layered forms help to anchor the site’s southeastern corner and are primarily organized around the program’s two largest spaces: a half-court gymnasium to the east and a 262-seat theater to the west. While these two spaces are distinct volumes, they are uniformly clad in a combination of white cement plaster and terracotta and capped by gable roof forms. The gym’s north and south facades include a series of repeated punched openings that provide views from West 7th Street through to the park. The state-of-the-art, two-level theater will provide a flexible venue supporting a rich variety of uses in community events and the performing arts. Between the gymnasium and theater, a series of rectilinear volumes step (in plan view and in section view) to create an interlocking mass uniting different users and spaces (for Dining, Seniors and Youth as well as Arts and Administration). The Arts and Administrative spaces are organized along the south, street-facing facade, while the Dining, Seniors and Youth programs are located on the north, park-facing facade, where each interior space opens directly onto outdoor spaces. These interior spaces include the Dining Hall, where a bi-fold glass partition system offers visitors the option of eating indoors or at a large outdoor dining terrace. Likewise, the interior spaces for seniors open onto a dedicated outdoor patio, and the second-floor interior spaces for youth have a balcony with views out to Civic Park. These various layered elements are unified by a central double- height atrium that extends from West 7th Street all the way to the park. Two large glass skylights bring daylight into the soaring space, which, as the building’s lobby, serves as a place for the facility’s users to meet and gather. RECREATION AND AQUATICS CENTER The Recreation and Aquatics Center is a dynamic facility that houses programing in indoor sports, fitness, and aquatics. Situated at the civic campus’s prominent northeast corner, the building and its landscape form a key access point from the street and establish a civic sense of arrival. Transparent design elements highlight active uses of the venue and support its integration into the Master Plan. The building is organized around a full-court gymnasium and a series of stacked volumes lining the gym on two sides. The gymnasium occupies the building’s north, street-facing facade, which is articulated to break up its scale. Rhythmic punched openings provide views along West 6th Street and Church Street, while a second-level balcony, with a running track, projects outward to create a ground-level arcade along Church Street. To the south, stacked volumes house the main lobby, administrative offices, weight and cardio rooms, and multi-purpose rooms. The lower volume is clad in cement plaster, while the upper cantilevered gable volume is clad in terracotta roof and wall tiles for a contemporary take on the Mission Revival style. Deeply recessed windows, covered with wood trellises, admit diffuse natural light and remind users of the park setting. At the second level, an offset between the two volumes creates balconies with views to the park. The facility’s western edge holds locker rooms and provides direct access to the outdoor aquatics area—an 8-lane 25-yard competition pool with an attached fun-water pool. The pool deck projects outward towards the park, offering a prominent and lively showcase for the facility’s uses. Inside, a central double-height lobby offers visual continuity to help tie together the building’s uses. The open interior, which allows for intuitive wayfinding, has expansive glazing along the gymnasium’s south wall, providing views directly into the courts and the running track. Extending from the lobby to the aquatics area, a corridor is set slightly askew from the building’s broader axis, offering wide-angle views of the water that highlight the importance of aquatics to the overall facility. CITY HALL City Hall has a unique architectural expression that sets it apart from other facilities in the Master Plan. This distinct quality emphasizes the building’s importance to the entire Civic Center—and to the city that the Civic Center serves. It will replace the existing City Hall, south of the Library, and will occupy the lower half of the plan’s middle block. Its highly central siting puts City Hall at the heart of the plan and uses the building’s northern edge to articulate the Paseo as it leads towards Civic Park. This will be a future-focused seat of government, with a design that prioritizes transparency and adaptability. The building’s mass is organized into three primary volumes. To the north are the Council Chambers and the main lobby; to the south is the administrative wing, which houses various city departments (Public Works, Finance, Community Development, Utilities, Fire Administration, Emergency Services, Human Resources, and Administration). These functions are located within a simple, two-story gable volume, clad in cement plaster with terracotta roof tiles. The ground level holds rhythmic punched openings, with wood trellises that bring in daylight and establish a welcoming civic scale. Atop a more traditional Mission Revival base are second-floor ribbon windows that provide a contemporary counterpoint to the building’s lower level and offer sweeping views of the surrounding context. Visitors seeking to access the City departments will pass through a double-height lobby that serves as the primary public entry and a central access point for administrative functions. This abundantly daylit space will draw its diffuse illumination from a large expanse of north- facing glazing that connects to an adjacent outdoor patio. Adjacent to the Lobby is the Council Chambers, whose distinct architectural presence asserts its unique and symbolic role within the campus and the city. While it has a sloped roof that resonates with the gable roofs found elsewhere in the site’s Mission Revival-style facilities, the Chambers moves away from traditional expressions to introduce a bold and contemporary statement of geometric form that is unique on Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 10Gilroy Civic Center Master Plan the campus. The Chambers’ truncated exterior volume is clad in a red travertine rainscreen system that compliments nearby buildings’ warm terracotta tones and establishes this place as a landmark of special civic value. The proceedings and sessions that fill any Council Chambers lead to meaningful changes for a city and its residents. The space’s interior architecture acknowledges the importance of the Council Chambers by using height and natural light to instill the Chambers’ official functions with the humane, affirmative qualities of a special civic space. A large oculus in the ceiling brings daylight into the Chambers and reminds occupants of their connection to the natural environment. An adjoining Anteroom functions as a secondary public entry and a flexible space for events and overflow. The Chambers’ full-height glazing frames long views of Civic Park and creates a direct visual and emotional connection between civic governance inside and community life outside. The City Hall asserts the importance of tradition and of innovation and, grounded in transparency and civic pride, creates a forward-looking facility for the coming generations of Gilroy’s residents, stakeholders, and leadership. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB MULTIGENERATIONAL COMMUNITY CENTER BUILDING PLANS | SITE SECTIONS | ELEVATIONSRENDERINGS Multigenerational Community Center / Recreation & Aquatic Center / City Hall Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB View Looking West Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB View Looking Northwest Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB View Looking East Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB View Looking Southeast Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB MULTIGENERATIONAL COMMUNITY CENTER Entrance from Big Green Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB MULTIGENERATIONAL COMMUNITY CENTER Lobby at 2nd Floor Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Skylight at Lobby MULTIGENERATIONAL COMMUNITY CENTERDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB RECREATION & AQUATIC CENTER Entrance from Big Green Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB RECREATION & AQUATIC CENTER Pool Deck Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CITY HALL View from Big Green Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB CITY HALL Entrance from Paseo Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB SITE PLAN ILLUSTRATIVES AND DIAGRAMS Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Site Plan Illustrative 6TH STREET 7TH STREETDOWDY CHURCHDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Site Plan Illustrative PARKING DISBURSEMENT 6TH STREET 7TH STREETDOWDY CHURCHDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Site Plan Illustrative FARMER’S MARKET SCENARIO 6TH STREET 7TH STREETDOWDY CHURCHDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB 6TH STREET 7TH STREETDOWDY CHURCHSite Plan Illustrative SCALE COMPARISON, 5 TENNIS COURTS Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Site Plan Illustrative SCALE COMPARISON, FOOTBALL FIELD 6TH STREET 7TH STREETDOWDY CHURCHDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Site Plan Illustrative URBAN DESIGN FEATURES AND OPPORTUNITIES Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Site Plan Illustrative ENVIRONMENTAL FACTORS 6TH STREET 7TH STREETDOWDY CHURCHDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB MULTIGENERATIONAL COMMUNITY CENTER BUILDING PLANS | SITE SECTIONS | ELEVATIONSMULTIGENERATIONAL COMMUNITY CENTER Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 32Gilroy Civic Center Master Plan UP UP 3 4 1 2 AA B B COMMUNITY SENIOR LOUNGE COMMUNITY SENIOR ACTIVITY ROOM WOMEN'SRESTROOM MEN'SRESTROOM RESTROOM RESTROOM OFFICE OFFICE STOR. BREAK ROOMOFFICEOFFICE UTILITY THEATER COMMERCIALKITCHEN DINING/MULTI-PURPOSE ROOM STOR HALF GYM OPEN OFFICEAREA GYM LOBBY PERFORMANCE PLATFORMBACK STAGE B B STORAGE LIGHTLOCK LIGHT LOCK LOADING CONFERENCE/ STOR. RECEPTION 15'30'60'0'N MULTI-GENERATIONAL COMMUNITY CENTER FLOOR PLAN LEVEL 1 MULTIGENERATIONAL COMMUNITY CENTER Floor Plan Level 1 Floor Plan Level 1 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 33Gilroy Civic Center Master Plan DN DN 3 4 1 2 AA B B ART STUDIO ARTMULTI-PURPOSE STOR STOR WOMEN'S RESTROOM MEN'S RESTROOM RESTROOM RESTROOM YOUTH ACTIVITYYOUTH LOUNGE UTILITY OPEN TO BELOW OPEN TO BELOW OPEN TO BELOW OPEN TO BELOW BALCONY CONTROL BOOTH B B LIGHT LOCK LIGHTLOCK GALLERY ACCESS LOBBY ROOF BELOW BALCONY SEATING 15'30'60'0'N MULTI-GENERATIONAL COMMUNITY CENTER FLOOR PLAN LEVEL 2 MULTIGENERATIONAL COMMUNITY CENTER Floor Plan Level 2 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 34Gilroy Civic Center Master Plan LOBBY THEATER ART STUDIO ARTMULTI-PURPOSE UTILITYSTOR.OFFICEOFFICERECEPTIONOPEN OFFICE AREA GYM HALF GYMSTOR LOBBY B TRANSVERSE BUILDING SECTION A LONGITUDINAL BUILDING SECTION 15'30'60'0' MULTI-GENERATIONAL COMMUNITY CENTER BUILDING SECTIONS MULTIGENERATIONAL COMMUNITY CENTER Building Sections Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB 3 EAST 2 NORTH 4 SOUTH 1 WEST 15'30'60'0' MULTI-GENERATIONAL COMMUNITY CENTER EXTERIOR ELEVATIONS MULTIGENERATIONAL COMMUNITY CENTER Elevations Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB MULTIGENERATIONAL COMMUNITY CENTER BUILDING PLANS | SITE SECTIONS | ELEVATIONSRECREATION & AQUATIC CENTER Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 37Gilroy Civic Center Master Plan 1 2 4 3 B B AA GYMNASIUM FLEX ROOM MULTIPURPOSE ROOM ENTRY LOBBY OFFICESTOR.OFFICE BREAK OFFICE STOR.GN FCFC MEN'S LOCKERROOM MECH WOMEN'S LOCKER ROOM GYM STOR. POOL MECH. LIFEG.POOL STORAGE ACID ELEC. LAP POOL OFFICES /RECEPTION ELEV. UP UP ACTIVITY POOL MULTIPURPOSE ROOM AA CHLORINE ELEC. 15'30'60'0'N RECREATION AND AQUATICS CENTER FLOOR PLAN LEVEL 1 RECREATION & AQUATIC CENTER Floor Plan Level 1 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 38Gilroy Civic Center Master Plan 1 2 4 3 B B AA OPEN ADMIN. MEN'S LOCKERROOM FC/RR WOMEN'SLOCKER ROOM FC/RR MECH. STOR. MULTIPURPOSE ROOM FITNESS -CARDIO / WEIGHTS FITNESS CLASSROOM 1 POOL BELOW OFFICE STOR. OFFICE MANAG. OFFICE CONFERENCE/BREAK ROOM GN ELEC. TRACK ELEV. OPEN TO BELOW OPEN TO BELOW DN DN EXTERIORBALCONY AA 15'30'60'0'N RECREATION AND AQUATICS CENTER FLOOR PLAN LEVEL 2 RECREATION & AQUATIC CENTER Floor Plan Level 2 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 39Gilroy Civic Center Master Plan GYMNASIUM ENTRY LOBBY PUBLIC SPACETRACKTRACK PUBLIC SPACE ENTRY LOBBY OFFICE STOR. OFFICE OFFICESTOR.OFFICE FITNESS -CARDIO / WEIGHTS LAP POOL B TRANSVERSE BUILDING SECTION A LONGITUDINAL BUILDING SECTION 15'30'60'0' RECREATION AND AQUATICS CENTER BUILDING SECTIONS RECREATION & AQUATIC CENTER Building Sections Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 40Gilroy Civic Center Master Plan 15'30'60'0' 1 NORTH ELEVATION 4 SOUTH ELEVATION 2 EAST ELEVATION 3 WEST ELEVATION RECREATION AND AQUATICS CENTER ELEVATIONS RECREATION & AQUATIC CENTER Elevations Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB MULTIGENERATIONAL COMMUNITY CENTER BUILDING PLANS | SITE SECTIONS | ELEVATIONS E. City Hall building plans/site sections/elevations CITY HALL Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 42Gilroy Civic Center Master Plan UP UP UP 3 4 1 2 AA B B FINANCEPUBLIC WORKS MECH JAN MECH ELEC COMMUNITYDEVELOPMENT LOBBY/ CHAIR & TABLE STORAGERESTROOM MAIL HUDDLE WOMEN'SRESTROOM MEN'SRESTROOM PUBLIC COUNTER PUBLIC COUNTER PUBLIC COUNTER EQUIPMENT ROOM STAFF CLOSEDSESSION CONFERENCE LOBBY/RECEPTION COUNCILCHAMBERS PRE-FUNCTION AREA 15'30'60'0'N CITY HALL FLOOR PLAN LEVEL 1 CITY HALL Floor Plan Level 1 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 43Gilroy Civic Center Master Plan DN DN DN 3 4 1 2 AA B B EMERGENCYSERVICES CENTER EMERGENCYSERVICES CENTER HUMANRESOURCES ADMINISTRATION BREAK ROOM MEN'SRESTROOM FIRE ADMIN ELEC MECH UTILITIES OPEN TO BELOW OPEN TO BELOW TERRACE PUBLIC COUNTER RECEPTION/WAITING WOMEN'SRESTROOM SHARED CONF /CLASSROOM RECEPTION/WAITING OPEN TO BELOW INTERSTITIAL SPACE CITY HALL FLOOR PLAN LEVEL 2 15'30'60'0'NFloor Plan Level 2 CITY HALLDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 44Gilroy Civic Center Master Plan UTILITIES FIRE ADMIN PUBLIC WORKS MECH MECH FINANCE HUMANRESOURCES ADMINISTRATION COMMUNITYDEVELOPMENT TERRACEMEN'SRESTROOM EMERGENCY SERVICES CENTER MECH LOBBY/RECEPTION A LONGITUDINAL BUILDING SECTION B TRANSVERSE BUILDING SECTION 15'30'60'0' CITY HALL BUILDING SECTIONS CITY HALL Building Sections Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 45Gilroy Civic Center Master Plan 3 EAST2NORTH 4 SOUTH 1 WEST 15'30'60'0' CITY HALL ELEVATIONS CITY HALL Elevations Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB lll +program Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 47Gilroy Civic Center Master Plan Multigenerational Arts and Community Center Space Program Target Plan Area Total Area Remarks Lower Level Lobby 2,500 3,100 Theater (First Level)6,000 6,400 Dining/Multipurpose Room & Chair Storage 2,500 2,700 Seat 150 for meals, 200 to 250 for assembly Commercial Kitchen 1,000 950 1/2 Gym 4,690 4,650 Gym Storage 280 225 Restrooms 700 950 Admin Office 100 100 Office 100 100 Office 100 100 Office 100 100 Open Office Area 250 320 Reception 150 160 Conference/Breakroom 150 160 Storage 100 100 Seniors Community Senior Activity Room 1,200 1,250 Community Senior Lounge 600 720 Storage 120 120 Upper Level Lobby 800 1,550 Theater Second level 1,500 1,450 Upper Level Restrooms 800 930 Youth Youth Activity Room 1,200 1,120 Youth Lounge 600 700 Arts Art Multi-purpose Room 900 1,020 Art Studio 900 950 Total Program Area 27,340 29,925 Circulation, Walls, and Misc.11,679 Total Building Area 41,604 First floor 24,688 Second Floor 16,916 MULTIGENERATIONAL COMMUNITY CENTERDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 48Gilroy Civic Center Master Plan Multigenerational Recreation and Aquatics Center Space Program Target Plan Area Total Area Remarks Lower Level Lobby/Reception 1,000 2,100 Locker Room/Toilets, Mens 1,000 1,280 Locker Room/Toilets, Womens 1,000 1,150 Family Changing Rooms/Toilets 250 320 Mulitpurpose Room 1,000 933 Multipurpose Room 1,000 933 Storage and Mechanical 700 309 Aquatics Open Office 550 570 Office 100 100 Office 100 100 Office 100 180 Staff Breakroom 150 225 Lifeguard 150 127 Pool Mechanical 2,000 1,780 Electrical 120 120 Outdoor Pool Storage 610 - not included in total Recreation Gymnasium - 3 courts with track 12,000 10,900 Gymnasium Storage 500 370 Upper Level Locker Room/Toilets, Mens 600 680 Locker Room/Toilets, Womens 600 680 Family Change Rooms/Toilets 500 400 Recreation Office 100 120 Office 100 90 Manager Office 120 140 Open Administration 240 340 Storage 80 105 Conference/Breakroom 140 240 Fitness Area - Cardio/Weights 2,000 1,850 Multipurpose Room 900 906 Fitness Storage 120 370 Fitness Classroom 1 1,200 1,140 Second Floor Track 5,000 4,710 3 lanes Total Program Area 33,420 33,268 Circulation, Walls, and Misc.9,347 Building Total 42,615 First Floor 26180 Second Floor 16435 RECREATION & AQUATIC CENTERDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 49Gilroy Civic Center Master Plan City Hall Space Target Area Plan Area Total Area Remarks Lower Level Lobby and Reception 1,150 2,050 Huddle and Mail Room 250 220 Council Chambers Chambers 2,500 2,510 Anteroom 1,500 1,240 Closed Session Conference Room 200 350 Equipment Room 100 260 Staff Area 170 Staff Area in Council Chamber Restrooms 120 Storage 200 245 Departments Public Works 3,900 4,433 3, 102 sf net* Finance 3,960 4,607 3,164 sf net* Community Development 5,500 5,860 4,390 sf net* Restrooms 600 720 Mechanical/Misc.600 754 Upper Level Departments Utilities 3,550 3,900 2,828 sf net* Fire Admin 1,000 860 834 sf net* Emergency Operations Center 2,787 2,246 2,230 sf net* Human Resources 2,467 2,658 1,974 sf net* Adminstration 3,257 3,400 2,606 sf net* Training Room / Large Conference Room 900 761 Lunch/Breakroom 400 464 Restrooms/Showers 500 581 Mechanical/Misc.600 530 *Note: Program areas from the detailed program have been increased to allow for circulation and walls within departments Total Program Area 35,921 38,939 Circulation, Walls, and Misc.8,568 Total Building Area 47,507 First floor 28,055 Second Floor 19,452 CITY HALL The new City Hall will combine departments that currently occupy City Hall: Administration, Administrative Services, Community Development, Finance, and Public Works, with departments that are currently housed in other locations: Emergency Operations, Utilities, and Fire Department Administration, to provide these critical city functions and the Council Chambers all under one roof. To determine space needs, ELS distributed questionnaires about space requirements to department heads and team leaders, and conducted a series of follow-up interviews for each department. Detailed notes from these needs assessment interviews and questionnaires are included in the appendix to this report. Information gathered in these interviews and questionnaires provided the basis for a detailed program tabulation (also included in the appendix). This detailed program was then tested in actual plan layouts of city hall, and area was added to allow for circulation within each department resulting in the final program shown here. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB lV +community engagement Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB COMMUNITY ENGAGEMENT PROCESS Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 52Gilroy Civic Center Master Plan Community Engagement Process The engagement process for the Gilroy Civic Center Master Plan sought to encourage participation from the broadest possible range of stakeholders, residents, and city staff in shaping the future of this important public place. The multi-faceted engagement strategies included residents of all ages, community groups, and staff at City entities and agencies. Outreach documentation took the form of surveys, banners, flyers, and mailings; in-person engagement occurred at meetings, and workshops. Advertising and Stakeholder Engagement This process began with the City of Gilroy’s Communication and Engagement Manager, Rachelle Bedell, sending community and civic organizations a brief Engagement Letter outlining the project and asking for community input at a series of workshops over the coming months. The letter was sent in various forms to local organizations including the South County Collaborative, Gilroy Unified School District, Chamber of Commerce, South County Youth Task Force, and Gilroy Police and Fire Departments, among others. The centerpiece of the community engagement process was the Community Workshops. The City and design team conducted six Community Workshops over nearly three months. Each workshop was held at Wheeler Center over three days (Tuesday, March 4, 2025; Tuesday, April 8, 2025; and Tuesday, May 20, 2025), with morning and evening sessions on each day. The structure and content of each meeting built upon the content of the previous meeting, advancing stakeholders towards a preferred concept design for the Gilroy Civic Center. Advertisements for the workshop series were posted on city websites and distributed in the form of flyers; these flyers were also inserted into residential customers’ water bills. Large display boards advertising the workshop series in Spanish and English were also placed in the library, at Wheeler Center, at the Senior Center, and in two locations at City Hall. In addition, prior to the April 8, 2025 Community Workshops, City staff distributed door hangers to each home in an area comprising roughly thirty blocks surrounding the Civic Center, from Tenth Street (on perimeter’s south) to Third Street (on the north) and from Engleberry (on the east) to Princevalle (on the west). Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 53Gilroy Civic Center Master Plan Workshop Series Structure The structure of the workshop series was as follows: WORKSHOP 1 Gallery Walk | Community Open House March 4, 2025, 9AM and 6PM This workshop introduced participants to the concepts and possibilities of a new Civic Center through large display boards addressing relevant topics. These topics included the Community Engagement Process, the Project Site, and the possibilities for potential new facilities such as a Senior Center, an Aquatics Center, a Community Recreation Center, and an Arts Center. Given the workshop’s open house structure, there were no formal presentations and attendees could browse the venue freely to read about the topics presented on each board and ask questions of the project’s design staff, stationed around the room. A board for posting thoughts and comments also provided opportunities for attendees to post additional written comments and notes. Workshop materials in Spanish and English were posted on the City’s website, for those who might not be able to attend the workshop. A survey on the City’s website allowed for further community input. Workshop notes have been included in the appendix to this report. The morning and evening sessions were each well attended, with strong representation from city staff, stakeholders, community groups, and residents. Attendees enthusiastically supported the idea of a new community center and recreation center in the Civic Center that would offer youth programs, address the need for outdoor gathering spaces (for recreation, music, and other forms of cultural expression), and include an indoor venue for the performing arts. Many participants voiced support for an aquatic center, since local options and hours for public swimming are limited. There was also notable support for strengthening the connection between the new Civic Center and the existing historic downtown. Several important topics of concern related to addressing the challenges of parking and traffic. For a detailed compilation of community input, please see the Summary of Feedback later in this report and the March 4th meeting notes in the appendix. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 54Gilroy Civic Center Master Plan WORKSHOP 2 Presentation of Alternate Concepts and Charrette to Select a Preferred Design Direction April 8, 2025, 9AM & 6PM Following the March 4th workshops, the design team developed three alternate concepts for the Civic Center, building on feedback from the first workshop and on needs-assessment interviews with city departments. Each concept included the following: • a large central Civic Park • three new buildings -City Hall -Multigenerational Arts & Community Center -Recreation & Aquatics Center • a central pedestrian promenade connecting the site through the center (from Civic Park on the east to the Police Headquarters and parking lot on the west) After a presentation reviewing the options in detail, workshop participants gathered into small groups around tables and discussed the options; at each table, a facilitator from the design team took notes. Community members then shared their thoughts on the three options, with a designated spokesperson presenting each group’s ideas and preferences to the larger gathering. Through these discussions, the group came to a consensus that represented a hybrid of Concept A and Concept B. Information was made available in Spanish and English, with an interpreter providing simultaneous translation. Following the workshop, all information was posted on the city’s website in both Spanish and English, along with a survey to solicit additional community input. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 55Gilroy Civic Center Master Plan WORKSHOP 3 Presentation of Preferred Concept, Community Charrette, and Collect Final Comments May 20, 2025, 9AM & 6PM Following the April 8th workshops, and after the design team’s review and incorporation of city staff and community feedback, ELS developed a final Preferred Concept. The Preferred Concept was developed through synthesizing stakeholder feedback and organizing elements of Concept A and Concept B into a new plan. Here, two buildings (the Recreation & Aquatics Center and the Multigenerational Arts & Community Center) flank a large civic park on the site’s east side, along Church Street, while the new City Hall is located on 7th Street across from the library. ELS presented the final Preferred Concept and its development to workshop participants who then gathered at tables to consider the new design and provide their feedback. As at the previous workshops, a member of the design team facilitated the discussion and a spokesperson from each table presented their findings to the larger group. Comments and feedback on the Preferred Concept included enthusiastic reviews of the overall design. Some concerns were expressed about parking and accessibility, adequate shade in the park, adequate lighting, and security measures. Like the previous workshops, all materials were posted on the city’s website in Spanish and English, along with a survey to solicit additional community input. More detailed information about the feedback received is included in the Summary of Feedback later in this report and in meeting notes and detailed survey results included in the appendix. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 56Gilroy Civic Center Master Plan Cafecito and Cops Through an invitation from the Gilroy Police Department, the design team participated in the May 9, 2025 Cafecito and Cops event at San Ysidro Park. Held regularly in venues around Gilroy, these sessions are an important forum for discussing topics with the Spanish- speaking community. To encourage the community’s participation and generate interest in the Civic Center master-planning process, the design team gave a bilingual presentation on the project’s progress. This presentation explored the project vision, the results of the workshops to date, upcoming engagement opportunities, and survey links for community feedback. This event gave the design team access to underserved residents that had not attended design workshops, and, in many cases, had not been aware of the chance to participate. City Commissions Outreach efforts for the Civic Center Master Plan included presentations of the three Workshop 2 options to various City Commissions. The City’s Project Manager, Ryan Osenton, met with each of the following seven commissions to discuss goals for the project, review the Civic Center plan alternates, and extend invitations to upcoming community outreach sessions. City Commissions and meeting dates: • Planning Commission, April 3, 2025 • Library Commission, April 9, 2025 • Youth Commission, April 14, 2025 • Parks and Recreation Commission, April 15, 2025 • Personnel Commission, April 28, 2025 • Arts and Culture Commission, May 13, 2025 • Senior Luncheon, May 14, 2025 Meetings with City Council Members At strategic points in the process, city staff and the design team conducted small meetings with City Council members, with one or two council members at a time. These presentations allowed the design team and city staff to update council members on the design process and to obtain their feedback, both of which were important prior to the Workshop 3 presentation of the final Preferred Concept. The presentations provided council members with a preview of material presented at the community workshops, while the small- meeting format avoided any conflict with the Brown Act. It also provided an informal setting where the design team could hear and respond to comments prior to the final workshop. These meetings were held over multiple sessions during the following dates: • After Workshop 1, week of 3/17/25 • After Workshop 2, week of 4/21/25 • Before Workshop 3, week of 5/12/25 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB MULTIGENERATIONAL COMMUNITY CENTER BUILDING PLANS | SITE SECTIONS | ELEVATIONSADVERTISING AND ENGAGEMENT Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 58Gilroy Civic Center Master Plan Help Shape the Future of Gilroy’s Civic Center The City of Gilroy is reimagining the Civic Center and developing a new Master Plan to better serve our growing community and address the increasing demands of our community, underutilized spaces, and aging facilities. To assist with this effort, we’ve contracted with ELS Architecture and Urban Design. Spanning approximately 14 acres in central Gilroy, the Civic Center site is located between Sixth and Seventh Streets. The site currently houses key community facilities, including City Hall, the Police Station, Wheeler Community Center, the Gilroy Library, the Senior Center, and Wheeler Park. While some buildings will remain, others need rethinking to meet the future needs of Gilroy residents. We need your input! Your feedback will shape the future of this important space. Join us at a series of community workshops to share your ideas. Each workshop will be conducted twice. Community Workshop #1: Open House & Gallery Information Walk Tuesday, March 4, 2025 | 9:00 AM or 6:00 PM Wheeler Community Center, 270 W 6th Street Community Workshop #2: Alternative Concepts & Visioning Sessions Tuesday, April 8, 2025 | 9:00 AM or 6:00 PM Wheeler Community Center, 270 W 6th Street Community Workshop #3: Preferred Concept & Visioning Sessions Tuesday, May 20, 2025 | 9:00 AM or 6:00 PM Wheeler Community Center, 270 W 6th Street All meetings and materials will be provided in English and Spanish. Each workshop will provide an opportunity to learn about the project, share your ideas, and collaborate with City staff and the ELS team. After each workshop, an online summary and survey will be available for those who were unable to attend and for those who want to continue the conversation and provide additional input. Visit http://www.cityofgilroy.org/CCMP for project updates and workshop details. For additional questions or information, please email ryan.osenton@cityofgilroy.org. We look forward to seeing you! ENGAGEMENT LETTERDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 59Gilroy Civic Center Master Plan 3’ X 7’ BOARD FOR LOBBY DISPLAY & DOORHANGER Please join us for two community workshop events taking place at the Jerome Center 726 South Center Street Santa Ana, CA 92704 Community Workshop #1 Thursday, August 24, 2023 6:30pm to 8:30pm Open House/Gallery Walk We will share project information and look forward to hearing and discussing your ideas, thoughts and feedback. Community Workshop #2 Thursday, September 14, 2023 6:30pm to 8:30pm Concept Design Charrette We will share initial concept ideas and look forward to your thoughts and feedback in a community design charrette to help us finalize the Master Plan for a reimagined Memorial Park and Pool Please Join Us! Help us reimagine Memorial Park and pool Hope to see you there! Please Join Us! Help us reimagine Memorial Park and Pool Please join us for our final community workshop taking place at the Jerome Center 726 South Center Street Santa Ana, CA 92704 Community Workshop #2 Thursday September 14, 2023 6:30pm to 8:30pm Community Design Charrette Community Workshop #2 Thursday, September 14, 2023 6:30pm to 8:30pm Concept Design Charrette We will share initial concept ideas and look forward to your thoughts and feedback in a community design charrette to help us finalize the Master Plan for a reimagined Memorial Park and Pool. Hope to see you there! A community workshop series presented and facilitated by the City of Santa Ana and their design consultant team, els+swa – architects, landscape architects, designers and community collaborators. Please join us for our final community workshop taking place at the Jerome Center 726 South Center Street Santa Ana, CA 92704 Community Workshop #2 Thursday, September 14, 2023 6:30pm to 8:30pm Concept Design Charrette We will share initial concept ideas and look forward to your thoughts and feedback in a community design charrette to help us finalize the Master Plan for a reimagined Memorial Park and Pool Please Join Us! Help us reimagine Memorial Park and Pool Hope to see you there! Banner or Board for Lobby Display For social media postBOARD FOR LOBBY DISPLAY Please join us! Visioning the Gilroy Civic Center Master Plan Community Workshop Series at the Wheeler Community Center, Main Gym Hope to see you there! Community Workshop #1 Open House & Gallery Information Walk Tuesday, March 4, 2025 9am or 6pm (two sessions) Community Workshop #2 Alternative Concepts & Visioning Sessions Tuesday, April 8, 2025 9am or 6pm (two sessions) Community Workshop #3 Preferred Concept & Visioning Sessions Tuesday, May 20, 2025 9am or 6pm (two sessions) Workshops will be conducted in English and Spanish For additional information, please visit, www.cityofgilroy.org/CCMP or scan QR code. Architects, Designers, and Community Collaborators DOORHANGER Please join us! Visioning the Gilroy Civic Center Master Plan Community Workshop #2 Alternative Concepts & Visioning SessionsTuesday, April 8, 20259am or 6pm (two sessions) Community Workshop #3 Preferred Concept & Visioning SessionsTuesday, May 20, 20259am or 6pm (two sessions) Snacks and childcare will be provided. Community Workshop Series at the Wheeler Center, 270 W 6th Street Ryan Osenton Project Manager Direct: 408.846.0277 ryan.osenton@cityofgilroy.org The City of Gilroy is developing a new Civic Center Master Plan to better serve the growing community, address increasing demands, improve underutilized spaces, and update aging facilities. Community Workshop #1 took place on March 4. Join us for Community Workshop #2 and #3 to provide your input on what a possible future Civic Center could look like. Workshops will be conducted in English and Spanish For additional information, please visit, www.cityofgilroy.org.CCMP or scan the QR code. City of Gilroy (408) 846-0219 www.cityofgilroy.org Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 60Gilroy Civic Center Master Plan Architects, Designers, and Community Collaborators ¡Favor de acompañarnos! Para más información, favor de visitar, www.cityofgilroy.org/CCMP o escanee el código QR. Taller Comunitario #1 Visita Comunitaria y Paseo Informativo por la Galería Martes, marzo 4, 2025 9am o 6pm (dos sesiones) Taller Comunitario #2 Conceptos Alternativos y Sesiones de Visualización Martes, abril 8, 2025 9am o 6pm (dos sesiones) Taller Comunitario #3 Concepto Preferido y Sesiones de Visualización Martes, mayo 20, 2025 9am o 6pm (dos sesiones) Habrá bocadillos y cuidado de niños. Serie de Talleres Comunitarios en el Centro Wheeler, Gimnasio Principal La Ciudad de Gilroy está lanzando un proyecto para modernizar y reimaginar el Centro Cívico mediante el desarrollo de un nuevo Plan Maestro del Centro Cívico. El Plan Maestro actual, adoptado en el 2002, necesita una actualización para hacer frente al aumento de las demandas de la comunidad, a los espacios infrautilizados y al envejecimiento de las instalaciones. Se invita a la comunidad a participar en una serie de talleres para compartir sus ideas y prioridades para un nuevo centro cívico. Ayuntamiento de Gilroy 7351 Rosanna St. Gilroy, CA 95020 408.846.0219 www.cityofgilroy.org Ryan Osenton Gerente del Proyecto Directo: 408.846.0277 ryan.osenton@cityofgilroy.org Los talleres se realizarán en inglés y en español Visualizar el Plan Maestro del Centro Cívico de Gilroy Architects, Designers, and Community Collaborators Please join us! Visioning the Gilroy Civic Center Master Plan For additional information, please visit, www.cityofgilroy.org/CCMP or scan QR code. Community Workshop #1 Open House & Gallery Information Walk Tuesday, March 4, 2025 9am or 6pm (two sessions) Community Workshop #2 Alternative Concepts & Visioning Sessions Tuesday, April 8, 2025 9am or 6pm (two sessions) Community Workshop #3 Preferred Concept & Visioning Sessions Tuesday, May 20, 2025 9am or 6pm (two sessions) Snacks and childcare will be provided. Community Workshop Series at the Wheeler Community Center, Main Gym The City of Gilroy is launching a project to modernize and reimagine the Civic Center by developing a new Civic Center Master Plan. The existing Master Plan, adopted in 2002, needs an update to address the increasing demands of the community, underutilized spaces, and aging facilities. The community is invited to participate in a series of workshops to share your ideas and priorities for a new civic center. Gilroy City Hall 7351 Rosanna St. Gilroy, CA 95020 408.846.0219 www.cityofgilroy.org Ryan Osenton Project Manager Direct: 408.846.0277 ryan.osenton@cityofgilroy.org Workshops will be conducted in English and Spanish FLYER IN ENGLISH AND SPANISHDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB MULTIGENERATIONAL COMMUNITY CENTER BUILDING PLANS | SITE SECTIONS | ELEVATIONS Boards | Spanish Handouts WORKSHOP #1 - GALLERY WALK Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 62Gilroy Civic Center Master Plan What is the Gilroy Civic Center Master Plan? A: The City of Gilroy is launching a project to reimagine the Civic Center by developing a new Master Plan for the site. The existing Master Plan, adopted in 2002, needs an update to address the increasing demands of the community alongside underutilized spaces and aging facilities. What area of Gilroy is the focus of the Civic Center Master Plan? A: Spanning approximately 14 acres in central Gilroy, the Civic Center site is bordered by Sixth Street, Seventh Street, Dowdy Street, and Church Street. This site currently houses key community facilities, including City Hall, the Police Station, Wheeler Center, the Gilroy Library, the Senior Center, and other essential spaces. How much will the Gilroy Civic Center Master Plan cost? A: In Fiscal Year 2023-24, the Gilroy City Council approved a $750,000 budget to begin the comprehensive planning process for this critical project. What are some possible components of the Gilroy Civic Center Master Plan? A: A range of uses are under consideration, including a new senior center, a new recreation center, a new aquatics center, a new youth center and a new city hall, all within a beautiful outdoor space. Who did the City hire to prepare the Master Plan? A: On November 18, 2024, the Council awarded a contract to ELS Architecture and Urban Design to lead the Master Plan process, which will culminate in the design of a Civic Center Master Plan that reflects the aspirations and needs of our community. 02 Gilroy Civic Center Master Plan PROJECT INFORMATION FAQ'S Architects, Designers, and Community Collaborators Please Join Us! The Gilroy Civic Center will be designed for and by the community. The success of the Civic Center Master Plan relies on your input. Public engagement is central to this effort, ensuring that the final plan aligns with the community’s priorities and vision for the future. Please join us at our community workshop series to help shape the future of this important civic space: COMMUNITY WORKSHOP #1 Open House & Gallery Information Walk Tuesday, March 4, 2025 9am or 6pm (two sessions) COMMUNITY WORKSHOP #2 Alternative Concepts & Visioning Sessions Tuesday, April 8, 2025 9am or 6pm (two sessions) COMMUNITY WORKSHOP #3 Preferred Concept & Visioning Sessions Tuesday, May 20, 2025 9am or 6pm (two sessions) Workshops will be conducted in English and Spanish 01 Gilroy Civic Center Master Plan OUR COMMUNITY PROCESS Architects, Designers, and Community Collaborators 6’ X 7’ / 9’ X 7’ GALLERY WALK BOARDSDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 63Gilroy Civic Center Master Plan What the Master Plan Will Deliver? The updated Civic Center Master Plan will give an overview of current facilities and open spaces, evaluate their uses, and identify opportunities for improvement. The Plan will include: Needs Assessment: To identify current and future programming and operational requirements. Civic Center Master Plan Concept Alternatives: To narrow our direction to a single, preferred vision, at least three conceptual design plans will be presented during Workshop #2 (April 8). Preferred Civic Center Master Plan Vision: To establish and present a preferred direction and concept design for community input and review during Workshop #3 (May 20), as based upon community collaboration during Workshop #2 (April 8). Final Civic Center Master Plan + Cost Estimate: To present the preferred vision for the Civic Center Master Plan to a series of commissions, with a final presentation to City Council for adoption following certification of CEQA compliance documents; work is based upon the community’s review and input during Workshop #3 (May 20). Financing Strategies: To recommend ways of funding the redevelopment, including the possibility of a general obligation bond measure. Project Timeline The project initiated in January 2025 and is structured into seven phases over approximately two years: • Project Initiation • Existing Conditions Assessment • Needs Assessment • Master Plan Design • CEQA Compliance • Master Plan Adoption • Project Financing Strategies 03 Gilroy Civic Center Master Plan MORE ABOUT THE CIVIC CENTER MASTER PLAN Architects, Designers, and Community Collaborators Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 64Gilroy Civic Center Master Plan 04 The Context of the Gilroy Civic Center The Gilroy Civic Center, coupled with its proximity to the Downtown, is a bustling zone that serves as the heart of the community. It is home to several key facilities, including the Gilroy Library, the Police Station, City Hall, the Senior Center, and the Wheeler Center, all of which are part of the Gilroy Civic Center. The Civic Center is surrounded by Sixth Street, Seventh Street, Dowdy Street, and Church Street. These facilities are all close to each other, making it convenient for residents to access a variety of services and resources in one central location. The Civic Center Master Plan aims to further enhance this area by modernizing and reimagining the space to better serve our growing community. Public Transportation: The area is well- serviced by public transportation, including the Gilroy Caltrain Station, which provides commuter rail services to San Jose and beyond. Additionally, Greyhound Bus Lines operate in the area, offering long-distance bus travel. Walkability: Downtown Gilroy and the Civic Center area combine to form a walkable community, with many amenities and services within walking distance. The area has a Walk Score of 90 out of 100, indicating that daily errands do not require a car. Bikeability: Gilroy is also a bike-friendly community, with several multi-use bike paths and bike repair stations throughout the city. The city has made efforts to ensure safe and convenient bicycle routes, making it easy for residents to explore the area by bike. Downtown Gilroy's connection to key facilities underscores its importance as a central hub for the community, providing essential services and fostering a sense of community and engagement. Overall, the Gilroy Civic Center and Downtown Gilroy together are a vibrant and accessible community hub, offering a range of services and amenities for residents and visitors alike. Gilroy Civic Center Master Plan GILROY CONTEXT Architects, Designers, and Community Collaborators Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 65Gilroy Civic Center Master Plan LIBRARY W 6 th STREET W 7 th STREET DOWDY STREET CHURCH STREET WHEELER POLICE CITY HAL L Spanning approximately 14 acres in central Gilroy, the Civic Center site is bordered by Sixth Street, Seventh Street, Dowdy Street, and Church Street. This site currently houses key community facilities, including City Hall, the Police Station, Wheeler Center, the Gilroy Library, the Senior Center, and other essential spaces. While some of these buildings, such as the Gilroy Library and Police Station, are relatively new and will be preserved, others are significantly older and less suited to meet current and future demands. With increasing service needs, it is time to thoughtfully transform the Civic Center into a space that balances preservation with modernization, ensuring that it is able to serve a vibrant and growing community for many decades. 05 Gilroy Civic Center Master Plan THE SITE - THREE CITY BLOCKS Architects, Designers, and Community Collaborators Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 66Gilroy Civic Center Master Plan What is a LEED-rated project? A LEED-rated project is one that has been certified under the Leadership in Energy and Environmental Design (LEED) program, which is an internationally recognized green building certification system developed by the U.S. Green Building Council (USGBC). LEED certification provides third-party verification that a building or community was designed and built using strategies aimed at improving performance across key areas such as energy savings, water efficiency, carbon dioxide emissions reduction, and improved indoor environmental quality. LEED certification is based on a points system, and projects can earn different levels of certification based on the number of points they achieve. The levels are: • CERTIFIED: 40-49 points • SILVER: 50-59 points • GOLD: 60-79 points • PLATINUM: 80 points and above Points are awarded for various sustainable practices, including site selection, water efficiency, energy use, materials and resources, and indoor environmental quality. Gilroy Civic Center Master Plan GREEN DESIGN – GUIDED BY USGBC LEED07 Architects, Designers, and Community Collaborators What is Universal Design? Universal design is about creating products, environments, and services that are usable by all people, to the greatest extent possible, without the need for adaptation or specialized design. Here are the key principles that define universal design: Equitable Use: The design is useful and marketable to people with diverse abilities. For example, automatic doors that open for everyone, regardless of mobility. Flexibility in Use: The design accommodates a wide range of individual preferences and abilities. A good example is a multi-functional tool that can be used in different ways. Simple and Intuitive: The design is easy to understand, regardless of the user's experience, knowledge, language skills, or concentration level. Think of a straightforward, easy-to-navigate website. Perceptible Information: The design communicates necessary information effectively to the user, regardless of ambient conditions or the user's sensory abilities. For example, an appliance with both visual and auditory signals. Tolerance for Error: The design minimizes hazards and the adverse consequences of accidental or unintended actions. A self-correcting software that prevents common user errors is a great example. Low Physical Effort: The design can be used efficiently and comfortably with minimal fatigue. Consider door lever handles, which require less grip strength to operate, instead of knobs. Size and Space for Approach and Use: Appropriate size and space are provided for approach, reach, manipulation, and use, regardless of the user's body size, posture, or mobility. For example, a spacious restroom that accommodates wheelchair users. By following these principles, universal design aims to make life easier, healthier, and more inclusive for everyone. Gilroy Civic Center Master Plan APPLYING UNIVERSAL DESIGN 06 Architects, Designers, and Community Collaborators Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 67Gilroy Civic Center Master Plan What could a new Senior Center offer? Senior centers offer a variety of programs designed to enhance the well-being and quality of life for older adults. Here are some key programming components: Health and Wellness Programs: These include fitness classes, health screenings, nutrition workshops, and mental health support. Educational Opportunities: Senior centers often provide classes on topics like technology, arts and crafts, history, and languages. Social Activities: Events such as game nights, movie screenings, and group outings help foster social connections. Support Services: These may include counseling, legal assistance, and help with accessing community resources. Volunteer and Employment Opportunities: Programs that encourage seniors to volunteer or find part-time work can provide a sense of purpose and community engagement. Recreational Activities: Activities like gardening, dancing, and music sessions offer fun and relaxation. These components aim to address the diverse needs and interests of older adults, promoting a holistic approach to aging well. Gilroy Civic Center Master Plan A POSSIBLE NEW SENIOR CENTER09 Architects, Designers, and Community Collaborators What could a new Civic Center Outdoor Space offer? A Civic Center Outdoor Space is a versatile community space that can offer a range of programs and activities to engage residents and visitors. Here are some potential programming components: Community Events: Festivals, farmers' markets, and cultural celebrations that bring the community together. Recreational Activities: Fitness classes, yoga sessions, sports leagues, and outdoor games. Educational Programs: Workshops, lectures, and classes on various topics such as gardening, history, and environmental conservation. Arts and Culture: Public art installations, outdoor concerts, theater performances, and art exhibitions. Youth Programs: Activities for children and teenagers, including summer camps, after-school programs, and youth sports. Senior Programs: Social gatherings, fitness classes, and educational workshops tailored for older adults. Volunteer Opportunities: Programs that encourage community members to get involved with the community through event planning and other volunteer activities . Special Events: Holiday celebrations, movie nights, and themed events that provide entertainment and foster community spirit. These components aim to create a vibrant and inclusive environment that caters to the diverse interests and needs of the community. Gilroy Civic Center Master Plan A POSSIBLE NEW CIVIC CENTER OUTDOOR SPACE08 Architects, Designers, and Community Collaborators Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 68Gilroy Civic Center Master Plan What could a new Youth Center offer? Youth centers provide a variety of programs aimed at promoting the development, well-being, and engagement of young people. Here are some of the key programming components: Educational Support: Tutoring, homework help, and STEAM (science, technology, engineering, art, and math) programs to support academic achievement. Recreational Activities: Sports leagues, fitness classes, and outdoor adventures like hiking and camping to promote physical health. Creative Arts: Opportunities for young people to explore arts and crafts, music, theater, dance, and other creative outlets. Social and Leadership Development: Programs that focus on building social skills, leadership, and teamwork through activities like group projects, peer mentoring, and youth councils. Life Skills Training: Workshops on topics such as financial literacy, cooking, career planning, and job readiness to prepare youth for independent living. Health and Wellness: Services and programs that address mental health, nutrition, and overall well-being, including counseling and peer support groups. Community Engagement: Opportunities for youth to participate in community service projects, volunteer work, and civic engagement activities. Technology and Digital Literacy: Classes and workshops that teach digital skills, coding, and responsible use of technology. These components aim to provide a supportive and enriching environment for young people, helping them develop into well-rounded individuals. 11 Gilroy Civic Center Master Plan A POSSIBLE NEW YOUTH CENTER Architects, Designers, and Community Collaborators What could a new Recreation Center offer? Recreation centers offer a wide range of programs to engage and benefit the community. Here are some key programming components: Fitness and Sports: This includes gym facilities, group exercise classes, and team sports like basketball, soccer, and tennis. Youth Programs: Activities such as after-school programs, summer camps, and youth leagues that focus on physical activity, education, and social skills. Adult Programs: Opportunities for adults to participate in fitness classes, sports leagues, workshops, and social events. Senior Programs: Tailored activities for older adults, including low-impact fitness classes, social gatherings, and educational workshops. Arts and Crafts: Classes and workshops in areas like painting, pottery, and other creative pursuits. Community Events: Events like holiday celebrations, festivals, and cultural activities that bring the community together. Special Interest Groups: Clubs and groups focused on specific hobbies or interests, such as gardening, hiking, or book clubs. These components aim to promote physical health, social interaction, and lifelong learning for individuals of all ages in the community. Gilroy Civic Center Master Plan A POSSIBLE NEW RECREATION CENTER10 Architects, Designers, and Community Collaborators Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 69Gilroy Civic Center Master Plan What could a new Aquatics Center offer? A Community Aquatics Center typically offers a variety of programs to cater to both competitive swimmers and community members looking for recreational activities. Here are some key programming components: Competitive Swimming, Diving, Water Polo and Artistic Swimming: Training programs, tournaments and meets, and competitions for various age groups and skill levels. Recreational Swimming: Open swim times, family swim sessions, and leisure activities like water slides and splash pads. Swim Lessons: Classes for all ages and skill levels, from beginners to advanced swimmers, including specialized lessons like water safety and lifeguard training. Fitness Programs: Water aerobics, aqua Zumba, and other aquatic fitness classes that promote physical health and well-being. Therapeutic Programs: Aquatic therapy sessions for individuals with physical disabilities or injuries, often led by trained professionals. Special Events: Community events, swim-a-thons, and themed swim nights that bring people together and promote community engagement. Youth Programs: Swim teams, junior lifeguard programs, and summer camps that focus on skill development and fun. Senior Programs: Low-impact water exercises and social swim sessions tailored for older adults. These components aim to provide a well- rounded and inclusive environment that supports both competitive and recreational aquatic activities. Gilroy Civic Center Master Plan A POSSIBLE NEW AQUATICS CENTER13 Architects, Designers, and Community Collaborators What could a new Center for the Arts offer? A Center for the Arts typically offers a diverse range of programs designed to foster creativity and appreciation for artistic expression and cultural representation. Here are some key programming components: Performing Arts: Opportunities for participation in theater, dance, music, and other performance arts, including rehearsals, productions, and recitals. Visual Arts: Classes and workshops in painting, drawing, sculpture, ceramics, photography, and other visual media. Exhibitions and Galleries: Spaces for displaying artwork from local artists, students, and touring exhibitions, often accompanied by artist talks and gallery tours. Film and Media Arts: Screenings of independent films, documentaries, and media art, along with workshops in film making, animation, and digital media. Literary Arts: Programs that encourage creative writing, poetry, and literature, including writing workshops, author readings, and book clubs. Community Engagement: Outreach programs that bring arts education to schools, community centers, and under- served populations, as well as public art projects and cultural festivals. Art Education: Classes and workshops for all ages, from children to adults, covering a wide range of artistic disciplines and techniques. These components aim to create a vibrant and inclusive environment that supports artistic expression and community-wide cultural enrichment. Gilroy Civic Center Master Plan A POSSIBLE NEW CENTER FOR THE ARTS 12 Architects, Designers, and Community Collaborators Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 70Gilroy Civic Center Master Plan The Gilroy Library The Gilroy Library is a modern and spacious facility located at 350 W. Sixth Street, and spans approximately 53,000 square feet. It was completed and opened on April 28, 2012. The construction cost for the library was approximately $18.2 million. Regarding renovations, the Gilroy Library is part of the Civic Center Master Plan, which aims to reimagine the Civic Center area. The library is relatively new and in excellent condition, thus will remain in place and serve as one of the anchor community service buildings in the new Civic Center Master Plan. The Gilroy Police Station The Gilroy Police Station is a one-story building atop a platform understory with a total area of approximately 28,000 square feet. It was completed and opened in March 2007. The construction cost for the station was approximately $26.7 million. The Gilroy Police Station is part of the Civic Center Master Plan, which aims to reimagine the Civic Center area. The police station is relatively new and beautifully maintained, thus will remain in place and serve as one of the anchor community service buildings in the new Civic Center Master Plan. 15 Gilroy Civic Center Master Plan YOUR LIBRARY AND POLICE STATION Architects, Designers, and Community Collaborators What could a new City Hall offer? A City Hall serves as the administrative center for local government and offers a range of programs and services to the community. Here are some key programming components: Government Services: Offices for elected officials and various municipal departments. Public Meetings and Hearings: Spaces for city council meetings, community forums, and public hearings where residents can engage with local government and voice concerns. Permits and Licensing: Services for obtaining permits and licenses for businesses, construction, events, and other activities. Community Programs: Initiatives and events that promote civic engagement, such as neighborhood clean-ups, town hall meetings, and cultural celebrations. Support Services: Resources and assistance for residents, including housing support, social services, and legal aid. Public Information: Access to information on city policies, projects, and services through the city’s website, newsletters, and public notices. Elections and Voting: Management of local elections, voter registration, and polling locations to ensure democratic participation. Historical and Cultural Programs: Preservation and promotion of local history and culture through museums, archives, and cultural events. These components help the city operate smoothly and support access to essential services and opportunities for civic engagement. Gilroy Civic Center Master Plan A POSSIBLE NEW CITY HALL14 Architects, Designers, and Community Collaborators Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 71Gilroy Civic Center Master Plan Please let us know your thoughts. What are your thoughts about the Civic Center Master Plan process? What are your thoughts on the site as it currently exists (Gilroy Library, Wheeler Center, and/or the Senior Center)? Which of the new proposed uses (Senior Center, Youth Center, Recreation Center, Aquatic Center, and/or Arts Center) do you like most and why? Which uses (Senior Center, Youth Center, Recreation Center, Aquatic Center, and/or Arts Center) make the most sense? Which make the least sense? What concerns you most about the Civic Center Master Plan project? What excites you most about the Civic Center Master Plan Project? What have we missed? 16 Gilroy Civic Center Master Plan ADDITIONAL THOUGHTS Architects, Designers, and Community Collaborators Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 72Gilroy Civic Center Master Plan SPANISH TRANSLATION GALLERY WALK HANDOUTS ¡Por favor, acompáñenos! El Centro Cívico de Gilroy será diseñado para y por la comunidad. El éxito del Plan Maestro del Centro Cívico depende de su aportación. La participación pública es fundamental para este esfuerzo, asegurando que el plan final se alinee con las prioridades y la visión que la comunidad tiene para el futuro. Por favor, acompáñenos en nuestra serie de Talleres Comunitarios para ayudar a forjar el futuro de este importante espacio cívico: TALLER COMUNITARIO #1 Visita Comunitaria y Paseo Informativo por la Galería Martes, marzo 4, 2025 9am o 6pm (dos sesiones) TALLER COMUNITARIO #2 Conceptos Alternativos y Sesiones de Visualización Martes, abril 8, 2025 9am o 6pm (dos sesiones) TALLER COMUNITARIO #3 Concepto Preferido y Sesiones de Visualización Martes, mayo 20, 2025 9am o 6pm (dos sesiones) Los talleres se realizarán en inglés y en español 01 Centro Cívico de Gilroy Plan Maestro NUESTRO PROCESO COMUNITARIO Architects, Designers, and Community Collaborators ¿Qué es el Plan Maestro del Centro Cívico de Gilroy? R: La Ciudad de Gilroy está lanzando un proyecto para reimaginar el Centro Cívico mediante el desarrollo de un nuevo Plan Maestro para el sitio. El Plan Maestro actual, adoptado en el 2002, necesita una actualización para abordar las crecientes demandas de la comunidad junto con los espacios infrautilizados y las instalaciones obsoletas. ¿En qué área de Gilroy se enfoca el Plan Maestro del Centro Cívico? R: Con una extensión de unos 14 acres en el centro de Gilroy, el recinto del Centro Cívico está delimitado por las calles Sexta, Séptima, Dowdy y Church. En la actualidad, este recinto alberga instalaciones comunitarias clave, que incluyen el Ayuntamiento, la Estación de Policía, el Centro Wheeler, la Biblioteca de Gilroy, el Centro de Adultos Mayores y otros espacios esenciales. ¿Cuánto costará el Plan Maestro del Centro Cívico de Gilroy? R: En el Año Fiscal 2023-24, el Concejo Municipal de Gilroy aprobó un presupuesto de $750,000 para comenzar el proceso de planificación integral de este proyecto crítico. ¿Cuáles son algunos de los posibles componentes del Plan Maestro del Centro Cívico de Gilroy? R: Se están considerando una serie de usos, que incluyen un nuevo centro de adultos mayores, un nuevo centro de recreación, un nuevo centro acuático, un nuevo centro juvenil y un nuevo ayuntamiento, todo ello dentro de un hermoso espacio al aire libre. ¿A quién contrató la Ciudad para preparar el Plan Maestro? R: El 18 de noviembre del 2024, el Concejo adjudicó un contrato a ELS Architecture and Urban Design para dirigir el proceso del Plan Maestro, que culminará con el diseño de un Plan Maestro del Centro Cívico que refleje las aspiraciones y necesidades de nuestra comunidad. 02 Centro Cívico de Gilroy Plan Maestro PREGUNTAS FRECUENTES SOBRE EL PROYECTO Architects, Designers, and Community Collaborators Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 73Gilroy Civic Center Master Plan ¿Qué aportará el Plan Maestro? El Plan Maestro del Centro Cívico actualizado ofrecerá una visión general de las instalaciones y espacios abiertos actuales, la evaluación de sus usos y la identificación de oportunidades de mejora. El Plan incluirá: Evaluación de Necesidades: Para identificar los requisitos operativos y de programas actuales y futuros. Plan Maestro del Centro Cívico Alternativas de Conceptos: Para concretar nuestra dirección hacia una visión única y preferida, se presentarán al menos tres planes de diseño conceptual durante el Taller #2 (8 de abril). Visión Preferida del Plan Maestro del Centro Cívico: Para establecer y presentar una dirección y un diseño conceptual preferidos para la aportación de y revisión por la comunidad durante el Taller #3 (20 de mayo), basados en la colaboración comunitaria durante el Taller #2 (8 de abril). Plan Maestro del Centro Cívico Final + Costo Calculado: Para presentar la visión preferida para el Plan Maestro del Centro Cívico a una serie de comisiones, con una presentación final al Concejo Municipal para su adopción tras la certificación de los documentos de cumplimiento de CEQA; el trabajo se basa en la revisión y los comentarios comunitarios durante el Taller Comunitario #3 (20 de mayo). Estrategias de Financiamiento: Para recomendar formas de financiar la remodelación, incluida la posibilidad de una medida de bonos de obligación general. Cronología del Proyecto El proyecto se inició en enero del 2025 y está estructurado en siete fases a lo largo de aproximadamente dos años: • Inicio del proyecto • Evaluación de las condiciones actuales • Evaluación de Necesidades • Diseño del Plan Maestro • Cumplimiento de CEQA • Adopción del Plan Maestro • Estrategias de financiación del proyecto 03 Centro Cívico de Gilroy Plan Maestro MÁS SOBRE EL PLAN MAESTRO DEL CENTRO CÍVICO Architects, Designers, and Community Collaborators Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 74Gilroy Civic Center Master Plan 04 El Contexto del Centro Cívico de Gilroy El Centro Cívico de Gilroy, junto con su proximidad al Casco Urbano, es una zona bulliciosa que sirve como el corazón de la comunidad. Es el hogar de varias instalaciones clave, incluyendo la Biblioteca de Gilroy, la Estación de Policía, el Ayuntamiento, el Centro de Adultos Mayores y el Centro Wheeler, todos los cuales son parte del Centro Cívico de Gilroy. El Centro Cívico está rodeado por las calles Sexta, Séptima, Dowdy y Church. Todas estas instalaciones están cerca unas de otras, lo que facilita a los residentes el acceso a una variedad de servicios y recursos en una ubicación central. El Plan Maestro del Centro Cívico tiene como objetivo mejorar aún más esta área mediante la modernización y la reimaginación del espacio para servir mejor a nuestra creciente comunidad. Transporte público: El área cuenta con un buen servicio de transporte público, incluida la Estación Caltrain de Gilroy, que brinda servicios de trenes interurbanos a San José y más allá. Además, Greyhound Bus Lines opera en el área, con viajes en autobús de larga distancia. Caminabilidad: El Centro de Gilroy y el área del Centro Cívico se combinan para formar una comunidad caminable, con muchas amenidades y servicios a poca distancia. El área tiene una puntuación de caminabilidad de 90 sobre 100, lo que indica que los quehaceres diarios no requieren un automóvil. Ciclabilidad: Gilroy también es una comunidad favorable a las bicicletas, con varias sendas para bicicletas de usos múltiples y estaciones de reparación de bicicletas en toda la ciudad. La ciudad ha hecho esfuerzos para asegurar rutas de bicicleta seguras y convenientes, lo que facilita a los residentes explorar el área en bicicleta. La conexión del Centro de Gilroy con instalaciones clave subraya su importancia como centro de actividades de la comunidad, ya que proporciona servicios esenciales y fomenta un sentido de comunidad y participación. En general, el Centro Cívico de Gilroy y el Centro de Gilroy juntos son un centro comunitario vibrante y de fácil acceso, que ofrece una gama de servicios y amenidades para residentes y visitantes por igual. Centro Cívico de Gilroy Plan Maestro CONTEXTO DE GILROY (RESIDEN CI A L) (CENTRO ) Architects, Designers, and Community Collaborators Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 75Gilroy Civic Center Master Plan Con una expansión de unos 14 acres en el centro de Gilroy, el recinto del Centro Cívico está delimitado por las calles Sexta, Séptima, Dowdy y Church. Este sitio alberga actualmente instalaciones comunitarias clave, como el Ayuntamiento, la Estación de Policía, el Centro Wheeler, la Biblioteca Gilroy, el Centro de Adultos Mayores y otros espacios esenciales. Aunque algunos de estos edificios, como la Biblioteca Gilroy y la Estación de Policía, son relativamente nuevos y se conservarán, otros son significativamente más antiguos y menos adecuados para satisfacer las demandas actuales y futuras. Con el aumento de las necesidades de servicio, es hora de transformar cuidadosamente el Centro Cívico en un espacio que equilibre la preservación con la modernización, asegurando que sea capaz de servir a una comunidad vibrante y en crecimiento durante muchas décadas. 05 Centro Cívico de Gilroy Plan Maestro EL RECINTO - TRES MANZANAS MUNICIPALES BIBLIOTE C A CALLE 6 O E S T E CALLE 7 O E S T E CALLE DOWDYCALLE CHURCH WHEELER POLICÍA AYUNTAMI E N T O Architects, Designers, and Community Collaborators Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 76Gilroy Civic Center Master Plan ¿Qué es el diseño universal? El diseño universal consiste en la creación de productos, entornos y servicios que puedan ser utilizados por todas las perso-nas, en el mayor grado posible, sin necesi- dad de adaptación o diseño especializado. Aquí están los principios clave que definen el diseño universal: Uso equitativo: El diseño es útil y comercializable para personas con capacidades diversas. Por ejemplo, puertas automáticas que se abren para todos, independi- entemente de la movilidad. Flexibilidad de uso: El diseño se adapta a una amplia gama de prefer- encias y habilidades individuales. Un buen ejem- plo es una herramienta multifuncional que se puede usar de diferentes maneras. Simple e intuitivo: El diseño es fácil de entender, independientemente de la experiencia, conocimientos, habilidades de lenguaje o nivel de concentración del usuario. Imagine un sitio web sencillo y fácil de navegar. Información perceptible: El diseño comunica la información necesaria de manera efectiva al usuario, independientemente de las condiciones ambientales o de las capaci- dades sensoriales del usuario. Por ejemplo, un electrodoméstico con señales tanto visuales como auditivas. Tolerancia al error: El diseño minimiza los peligros y las consecuencias adversas de acciones accidentales o involuntarias. Un software autocorrectivo que evita errores co- munes de los usuarios es un gran ejemplo. Bajo esfuerzo físico: El diseño puede ser usado de manera eficiente y có- moda con una fatiga mínima. Considere las mani- jas de las puertas, que requieren menos fortaleza de empuñadura para operar, en lugar de perillas. Tamaño y espacio para acercarse y usar: Se brindan el tamaño y espacio adecuados para acercarse, alcanzar, manipular y usar, sin importar el tamaño corporal, la postura o la movilidad del usuario. Por ejemplo, un sanitario espacioso que dé cabida a usuarios de sillas de ruedas. Al seguir estos principios, el diseño universal tiene por objeto hacer la vida más fácil, más sa- ludable y más inclusiva para todos. Centro Cívico de Gilroy Plan Maestro SE APLICA EL DISEÑO UNIVERSAL06 Architects, Designers, and Community Collaborators ¿Qué es un proyecto con clasificación LEED? Un proyecto con clasificación LEED es aquel que ha sido certificado bajo el programa Liderazgo en Energía y Diseño Ambiental (LEED, por sus siglas en inglés), que es un sistema de certificación de edificios ecológicos reconocido internacionalmente y desarrollado por el Concejo de Edificios Ecológicos de EE. UU. (USGBC). La certificación LEED proporciona una verificación por parte de terceros de que un edificio o comunidad fue diseñado y construido utilizando estrategias destinadas a mejorar el rendimiento en áreas clave como ahorro de energía, eficiencia en el uso del agua, reducción de emisiones de dióxido de carbono y una mejor calidad ambiental interior. La certificación LEED se basa en un sistema de puntos, y los proyectos pueden obtener diferentes niveles de certificación en función del número de puntos que obtengan. Los niveles son: • CERTIFICADO: 40 a 49 puntos • PLATA: 50 a 59 puntos • ORO: 60 a 79 puntos • PLATINO: 80 puntos o más Se otorgan puntos por diversas prácticas sostenibles, que incluyen la selección del sitio, la eficiencia del agua, el uso de energía, los materiales y recursos, y la calidad ambiental interior. Centro Cívico de Gilroy Plan Maestro DISEÑO ECOLÓGICO – GUIADO POR USGBC LEED07 Architects, Designers, and Community Collaborators Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 77Gilroy Civic Center Master Plan ¿Qué podría ofrecer un nuevo espacio al aire libre en el Centro Cívico? Un espacio al aire libre en el centro cívico es un espacio comunitario versátil que puede ofrecer una serie de programas y actividades para la participación de residentes y visitantes. Aquí encontrará algunos posibles componentes del programa: Eventos comunitarios: Festivales, mercados de agricultores y celebraciones culturales que unen a la comunidad. Actividades recreativas: Clases de condición física, sesiones de yoga, ligas deportivas y juegos al aire libre. Programas educativos: Talleres, conferencias y clases sobre diversos temas como jardinería, historia y conservación del medio ambiente. Arte y cultura: Instalaciones de arte público, conciertos al aire libre, representaciones teatrales y exposiciones de arte. Programas para jóvenes: Actividades para niños y adolescentes, incluyendo campamentos de verano, programas después de clases y deportes juveniles. Programas para adultos mayores: Reuniones sociales, clases de condición física y talleres educativos adaptados para adultos mayores. Oportunidades de voluntariado: Programas que animan a los miembros de la comunidad a involucrarse en la comunidad mediante la planificación de eventos y otras actividades de voluntariado. Eventos especiales: Celebraciones de días festivos, noches de cine y eventos temáticos que brindan entretenimiento y fomentan el espíritu comunitario. Estos componentes tienen por objeto la creación de un entorno vibrante e inclusivo que atienda los diversos intereses y necesidades de la comunidad. Centro Cívico de Gilroy Plan Maestro UN POSIBLE NUEVO ESPACIO AL AIRE LIBRE EN EL CENTRO CÍVICO08 Architects, Designers, and Community Collaborators ¿Qué podría ofrecer un nuevo Centro de Adultos Mayores? Los centros de adultos mayores ofrecen una variedad de programas diseñados para mejorar el bienestar y la calidad de vida de los adultos mayores. Aquí encontrará algunos componentes clave de los programas: Programas de salud y bienestar: Estos incluyen clases de condición física, chequeos de salud, talleres de nutrición y apoyo para la salud mental. Oportunidades educativas: Los centros de adultos mayores suelen ofrecer clases sobre temas como tecnología, artes y manualidades, historia y lenguajes. Actividades sociales: Eventos como noches de juegos, proyecciones de películas y salidas en grupo para ayudar a fomentar conexiones sociales. Servicios de apoyo: Estos pueden incluir consejería, ayuda legal y ayuda para acceder a recursos comunitarios. Oportunidades de voluntariado y empleo: Los programas que animan a los adultos mayores a ser voluntarios o a encontrar trabajo a tiempo parcial pueden brindar un sentido de propósito y participación comunitaria. Actividades recreativas: Actividades como la jardinería, el baile y las sesiones de música ofrecen diversión y relajación. Estos componentes tienen por objeto abordar las diversas necesidades e intereses de las personas mayores, con el fin de promover un enfoque holístico del envejecimiento saludable. Centro Cívico de Gilroy Plan Maestro UN POSIBLE NUEVO CENTRO DE ADULTOS MAYORES09 Architects, Designers, and Community Collaborators Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 78Gilroy Civic Center Master Plan ¿Qué podría ofrecer un nuevo Centro de Recreación? Los centros de recreación ofrecen una amplia gama de programas para la participación y el beneficio de la comunidad. Aquí encontrará algunos componentes clave de los programas: Condición física y deportes: Esto incluye instalaciones de gimnasio, clases de ejercicio en grupo y deportes en equipo como baloncesto, futbol y tenis. Programas para jóvenes: Actividades como programas después de clases, campamentos de verano y ligas juveniles que se enfocan en la actividad física, la educación y las aptitudes sociales. Programas para adultos: Oportunidades para que los adultos participen en clases de condición física, ligas deportivas, talleres y eventos sociales. Programas para adultos mayores: Actividades personalizadas para adultos mayores, que incluyen clases de condición física de bajo impacto, reuniones sociales y talleres educativos. Artes y manualidades: Clases y talleres en áreas como pintura, cerámica y otras actividades creativas. Eventos comunitarios: Eventos como celebraciones de días festivos, festivales y actividades culturales que unen a la comunidad. Grupos de intereses especiales: Clubes y grupos enfocados en pasatiempos o intereses específicos, como jardinería, senderismo o clubes de lectura. Estos componentes tienen por objeto promover la salud física, la interacción social y el aprendizaje vitalicio de las personas de todas las edades en la comunidad. Centro Cívico de Gilroy Plan Maestro UN POSIBLE NUEVO CENTRO DE RECREACIÓN10 Architects, Designers, and Community Collaborators ¿Qué podría ofrecer un nuevo Centro para Jóvenes? Los Centros para Jóvenes brindan una variedad de programas que tienen por objeto promover el desarrollo, el bienestar y la participación de los jóvenes. Aquí encontrará algunos de los componentes clave de los programas: Apoyo educativo: Tutoría, ayuda con las tareas y programas STEAM (ciencia, tecnología, ingeniería, arte y matemáticas) para apoyar el aprovechamiento académico. Actividades recreativas: Ligas deportivas, clases de condición física y aventuras al aire libre como senderismo y acampada para promover la salud física. Artes creativas: Oportunidades para que los jóvenes exploren artes y manualidades, música, teatro, danza y otras formas de expresión creativa. Desarrollo social y de liderazgo: Programas que se centran en el desarrollo de aptitudes sociales, liderazgo y trabajo en equipo mediante actividades como proyectos en grupo, mentoría entre pares y consejos juveniles. Formación en habilidades para la vida: Talleres sobre temas como educación financiera, cocina, planificación de la carrera y preparación para el empleo, con el fin de preparar a los jóvenes para una vida independiente. Salud y bienestar: Servicios y programas que abordan la salud mental, nutrición y bienestar general, incluyendo consejería y grupos de apoyo entre pares. Participación comunitaria: Oportunidades para que los jóvenes participen en proyectos de servicio comunitario, trabajo voluntario y actividades de participación cívica. Tecnología y alfabetización digital: Clases y talleres que enseñan habilidades digitales, codificación y uso responsable de la tecnología. Estos componentes tienen por objeto proporcionar un entorno de apoyo y enriquecimiento para los jóvenes, para ayudarles a convertirse en personas integrales. 11 Centro Cívico de Gilroy Plan Maestro UN POSIBLE NUEVO CENTRO PARA JÓVENES Architects, Designers, and Community Collaborators Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 79Gilroy Civic Center Master Plan ¿Qué podría ofrecer un nuevo Centro de las Artes? Un Centro de las Artes ofrece normalmente una amplia gama de programas diseñados para fomentar la creatividad y la apreciación de la expresión artística y la representación cultural. Aquí están algunos componentes clave de la programación: Artes escénicas: Oportunidades para participar en teatro, danza, música y otras artes escénicas, incluyendo ensayos, producciones y recitales. Artes visuales: Clases y talleres de pintura, dibujo, escultura, cerámica, fotografía y otros medios visuales. Exposiciones y galerías: Espacios para exhibir obras de arte de artistas locales, alumnos y exposiciones itinerantes, a menudo acompañados de charlas de artistas y visitas de galerías. Artes cinematográficas y audiovisuales: Proyecciones de películas independientes, documentales y arte de multimedios, junto con talleres de cine, animación y medios digitales. Artes literarias: Programas que fomentan escritura creativa, poesía y literatura, incluyendo talleres de escritura, lecturas de autores y clubes de lectura. Participación comunitaria: Programas de difusión que llevan la educación artística a escuelas, centros comunitarios y poblaciones desatendidas, así como proyectos de arte público y festivales culturales. Educación artística: Clases y talleres para todas las edades, desde niños hasta adultos, que abarcan una amplia gama de disciplinas y técnicas artísticas. Estos componentes tienen por objeto la creación de un entorno vibrante e inclusivo que apoye la expresión artística y el enriquecimiento cultural de toda la comunidad. Centro Cívico de Gilroy Plan Maestro UN POSIBLE NUEVO CENTRO PARA LAS ARTES12 Architects, Designers, and Community Collaborators ¿Qué podría ofrecer un nuevo Centro Acuático? Un Centro Acuático Comunitario suele ofrecer una variedad de programas para atender tanto a nadadores de competición como a miembros de la comunidad que buscan actividades recreativas. Aquí tiene algunos componentes clave de la programación: Natación de competición, clavados, polo acuático y natación artística: Programas de formación, torneos y encuentros, y competiciones para diversos grupos de edad y niveles de habilidad. Natación recreativa: Horarios de natación abiertos, sesiones de natación en familia y actividades de esparcimiento como toboganes de agua y zonas de chapoteo. Lecciones de natación: Clases para todas las edades y niveles de habilidad, desde principiantes hasta nadadores avanzados, incluyendo lecciones especializadas como seguridad en el agua y formación de socorristas. Programas de condición física: Ejercicios aeróbicos en el agua, aqua Zumba y otras clases de acondicionamiento físico acuático que promueven la salud física y el bienestar. Programas terapéuticos: Sesiones de terapia acuática para personas con discapacidades físicas o lesiones, a menudo dirigidas por profesionales capacitados. Eventos especiales: Eventos comunitarios, maratones de natación y noches temáticas de natación que reúnen a la gente y promueven la participación comunitaria. Programas para jóvenes: Equipos de natación, programas de socorrismo para jóvenes y campamentos de verano que se enfocan en el desarrollo de habilidades y la diversión. Programas para adultos mayores: Ejercicios acuáticos de bajo impacto y sesiones de natación social adaptadas a personas mayores. Estos componentes tienen por objeto proporcionar un entorno completo e inclusivo que apoye tanto las actividades acuáticas competitivas como recreativas. Centro Cívico de Gilroy Plan Maestro UN POSIBLE NUEVO CENTRO ACUÁTICO13 Architects, Designers, and Community Collaborators Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 80Gilroy Civic Center Master Plan ¿Qué podría ofrecer un nuevo Ayuntamiento? Un Ayuntamiento sirve como centro administrativo del gobierno local y ofrece una serie de programas y servicios a la comunidad. Aquí encontrará algunos componentes clave de la programación: Servicios gubernamentales: Oficinas para oficiales electos y varios departamentos municipales. Reuniones y audiencias públicas: Espacios para reuniones del concejo municipal, foros comunitarios y audiencias públicas donde los residentes pueden interactuar con el gobierno local y expresar sus inquietudes. Permisos y licencias: Servicios para la obtención de permisos y licencias para negocios, construcción, eventos y otras actividades. Programas comunitarios: Iniciativas y eventos que promueven la participación cívica, como limpiezas del vecindario, reuniones comunitarias y celebraciones culturales. Servicios de apoyo: Recursos y ayuda para residentes, incluyendo apoyo de vivienda, servicios sociales y asistencia legal. Información pública: Acceso a información sobre normas, proyectos y servicios de la ciudad mediante el sitio web, boletines y avisos públicos de la ciudad. Elecciones y votación: Gestión de elecciones locales, registro de electores y ubicaciones de centros de votación para asegurar la participación democrática. Programas históricos y culturales: Preservación y promoción de la historia y la cultura locales mediante museos, archivos y eventos culturales. Estos componentes ayudan a la ciudad a funcionar sin problemas y apoyan el acceso a servicios esenciales y oportunidades de participación cívica. Centro Cívico de Gilroy Plan Maestro UN POSIBLE NUEVO AYUNTAMIENTO14 Architects, Designers, and Community Collaborators La Biblioteca Gilroy La Biblioteca Gilroy es una instalación moderna y espaciosa ubicada en 350 W. Sixth Street, y abarca aproximadamente 53,000 pies cuadrados. Fue completada e inaugurada el 28 de abril del 2012. El costo de construcción de la biblioteca fue de aproximadamente $18.2 millones. En cuanto a las renovaciones, la Biblioteca Gilroy forma parte del Plan Maestro del Centro Cívico, que tiene como objetivo reimaginar el área del Centro Cívico. La biblioteca es relativamente nueva y está en excelentes condiciones, por lo que permanecerá en su lugar y servirá como uno de los edificios de servicios comunitarios ancla en el nuevo Plan Maestro del Centro Cívico. La Estación de Policía de Gilroy La Estación de Policía de Gilroy es un edificio de un piso sobre una plataforma subterránea con un área total de aproximadamente 28,000 pies cuadrados. Fue terminada e inaugurada en marzo del 2007. El costo de construcción de la estación fue de aproximadamente $26.7 millones. La Estación de Policía de Gilroy forma parte del Plan Maestro del Centro Cívico, que tiene por objeto reimaginar el área del Centro Cívico. La estación de policía es relativamente nueva y está muy bien mantenida, por lo que permanecerá en su lugar y servirá como uno de los edificios de servicios comunitarios de anclaje en el nuevo Plan Maestro del Centro Cívico. 15 Centro Cívico de Gilroy Plan Maestro SU BIBLIOTECA Y ESTACIÓN DE POLICÍA Architects, Designers, and Community Collaborators Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 81Gilroy Civic Center Master Plan Por favor, comparta sus pensamientos. ¿Qué opina del proceso del Plan Maestro del Centro Cívico? ¿Qué opina del recinto en su estado actual (Biblioteca Gilroy, el Centro Wheeler y/o el Centro de Adultos Mayores)? ¿Cuál de los nuevos usos propuestos (Centro de Adultos Mayores, Centro para Jóvenes, Centro de Recreación, Centro Acuático y/o Centro de Arte) le gusta más y por qué? ¿Qué usos (Centro de Adultos Mayores, Centro para Jóvenes, Centro de Recreación, Centro Acuático y/o Centro de Arte) tienen más sentido? ¿Cuáles tienen menos sentido? ¿Cuál es su mayor inquietud con respecto al proyecto del Plan Maestro del Centro Cívico? ¿Qué es lo que más le entusiasma del Proyecto del Plan Maestro del Centro Cívico? ¿Qué nos falta? 16 Centro Cívico de Gilroy Plan Maestro COMENTARIOS ADICIONALES Architects, Designers, and Community Collaborators Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Concept Boards WORKSHOP #2 - ALTERNATE CONCEPTS Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 83Gilroy Civic Center Master Plan Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 84Gilroy Civic Center Master Plan Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 85Gilroy Civic Center Master Plan Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 86Gilroy Civic Center Master Plan Estacionamiento Biblioteca POLICÍA Centro Acuático y Recreativo Multigeneracional Centro Acuático y Recreativo Multigeneracional Centro Comunitario Multigeneracional – Programación para artes/adultos mayores/jóvenes Centro Comunitario Multigeneracional – Programación para artes/adultos mayores/jóvenes PARQUE CÍVICO GILROY AYUNTAMIENTO Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 87Gilroy Civic Center Master Plan Estacionamiento Biblioteca POLICÍA Centro Acuático y Recreativo Multigeneracional Centro Acuático y Recreativo Multigeneracional Centro Comunitario Multigeneracional – Programación para artes/adultos mayores/jóvenes Centro Comunitario Multigeneracional – Programación para artes/adultos mayores/jóvenes PARQUE CÍVICO GILROY AYUNTAMIENTO Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 88Gilroy Civic Center Master Plan Estacionamiento Biblioteca POLICÍA Centro Acuático y Recreativo Multigeneracional Centro Acuático y Recreativo Multigeneracional Centro Comunitario Multigeneracional – Programación para artes/adultos mayores/jóvenes Centro Comunitario Multigeneracional – Programación para artes/adultos mayores/jóvenes AYUNTAMIENTO PARQUE CÍVICO GILROY Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Concept Board WORKSHOP #3 - PREFERRED CONCEPT Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 90Gilroy Civic Center Master Plan LIBRARYPARKING LOT POLICE MULTIGENERATIONAL COMMUNITY CENTER Arts/Seniors/Youth 6th STREET 7th STREET MULTIGENERATIONAL RECREATION & AQUATICS CENTER CITY HALL GILROY CIVIC PARKPASEO DOWDYCHURCHBIBLIOTECAESTACIONAMIENTO POLICÍA CENTRO COMUNITARIO MULTIGENERACIONAL Programación para artes/adultos mayores/jóvenes CENTRO ACUÁTICO Y RECREATIVO MULTIGENERACIONAL AYUNTAMIENTO PARQUE CÍVICO GILROY 0 50’ Gilroy Civic Center Preferred Concept Workshop #3 05/20/2025 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB COMMUNITY ENGAGEMENT FEEDBACK Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 92Gilroy Civic Center Master Plan Summary of Feedback Over the course of three public workshops and multiple online surveys conducted in both English and Spanish, community members were invited to share their perspectives on the proposed Recreation & Aquatic Center, Senior Center, Multigenerational Arts & Community Center, City Hall, and Civic Park. This engagement process provided a rich array of insights, priorities, and aspirations, all of which have been an immense source of inspiration and support for the design team as they refine the proposed plan. Across all three phases of community input, the most consistently voiced priorities centered around the creation of a modern Recreation & Aquatic Center, a facility that received overwhelming stakeholder support. There was a strong desire for year-round indoor aquatic facilities, space for lap swimming and water aerobics, and amenities that support people of all ages and abilities. Many residents cited similar facilities in neighboring cities like Morgan Hill and expressed the need for Gilroy to offer a comparable or more extensive community resource. Equally important to stakeholders was the creation of a flexible and inclusive Arts & Community center that could serve both youth and seniors. Respondents advocated for spaces that could accommodate arts programming, youth activities, and senior services under one roof. Several community members suggested a three-story facility to ensure adequate space for all generations of users, with uses that could include art studios, gathering areas, and various forms of cultural expression. The Civic Park was also seen as a valuable public asset, with clear support for shaded playgrounds, amphitheater space, and pathways connecting to the broader downtown. While the park space was widely embraced, written comments raised concerns about noise, event capacity, and safety—especially near residential streets. Stakeholders suggested design ideas that would allow the park to support lively and popular community gatherings while considering the priorities of adjacent residential properties and maintaining a welcoming atmosphere. Throughout the workshops, certain concerns arose repeatedly. Several related to the challenges of parking and traffic, especially surrounding event coordination, access by seniors, and increased demand over time. Many stakeholders felt that the proposed parking layout was insufficient for the proposed uses and too remote from key facilities. In addition, numerous participants emphasized their desire for a sustainable and environmentally conscious design, expressing the importance of solar panels, EV charging stations, reclaimed water systems, and green infrastructure. Other concerns surfaced related to the area’s architectural heritage. Several residents expressed a desire to retain and adaptively reuse the historic Wheeler Center, citing its longtime significance to the community, and exploring the possibly of integrating the structure into the proposed Civic Center plan. These desires were often supported by broader requests to honor the character of the surrounding neighborhoods and to ensure that the new Civic Center reflect Gilroy’s unique identity. Overall, the feedback shows an active, thoughtful, and engaged community that clearly understands the purpose and value of a civic core and that is deeply invested in the site’s future. Residents are eager to see a well-designed, accessible, multiuse plan that serves the city’s entire population, whether young or old, long-time residents or newcomers, from all walks of life and regardless of background. The process of developing the Civic Center Master Plan has established a strong sense of momentum and shared ownership. As the City moves forward with the plan’s refinement and implementation, new questions and decisions (related to funding, phasing, and design) will require city staff and stakeholders to continue engaging the community through clear communication and a recognition of common priorities. TOP PRIORITIES 1. Recreation & Aquatic Center: High enthusiasm across all workshops for a modern, indoor, multi-use facility. Residents advocated for features like lap pools, water aerobics, and accessible, inclusive recreation. 2. Youth and Senior Services: Strong call for expanded programming and facilities tailored to youth and older adults, including gathering spaces, arts, and sports. 3. Civic Park and Open Space: Envisioned as a flexible, community event space with room for a playground, shade, and possible amphitheater/stage. 4. Multi-purpose Community Center: Recommendations to increase square footage and include floors for youth, seniors, and the arts, with adaptive spaces. 5. Accessibility and Safety: Centralized parking, ADA access, lighting, and secure pathways were emphasized. 6. Environmental Sustainability: Strong interest in solar panels, EV charging, reclaimed water systems, and other green infrastructure. COMMON CONCERNS 1. Location and capacity of the proposed parking area, which was frequently seen as inadequate for the proposed uses. 2. Need for more detailed budget, funding plan, and transparent timeline for refinement and implementation. 3. Potential loss of historic Wheeler Center. 4. Potential impacts of noise and traffic on the character and quality of life of surrounding neighborhoods. 5. Community fragmentation if buildings are too dispersed or if facility access is inconsistent. 6. Optimizing areas of integration with historic downtown, existing and future bike routes, and adjacent pedestrian infrastructure. COMMUNITY RECOMMENDATIONS 1. Begin construction on park areas and recreation facilities to serve families quickly. 2. Preserve and repurpose historic buildings where possible. 3. Expand outreach to Spanish-speaking and underserved residents. 4. Design a flexible master plan that grows with the city and anticipates future needs. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 93Gilroy Civic Center Master Plan SUMMARY OF SURVEY RESULTS Please see the appendix of this report for detailed survey results and responses. All surveys were conducted online. WORKSHOP 1 ONLINE SURVEY Summary of Results Total Responses: 39 (39 English, 0 Spanish) Focus: General feedback on proposed civic facilities and priorities for future development Key Themes: • Strong support for a Recreation & Aquatic Center, particularly with year-round indoor facilities • Residents emphasized the need for: -Youth programs and space for children and teens -A well-equipped Senior Center -Inclusive, multi-generational community access • Community priorities included accessibility, central location, and flexibility of use • Concerns included: -Costs of maintenance and operations -Preserving historic sites (e.g., Wheeler Center) -Insufficient parking -Limited shade opportunities -Equity in outreach and programming WORKSHOP 2 ONLINE SURVEY Summary of Results Total Responses: 56 (54 English, 2 Spanish) Focus: Feedback on three alternative master plan concepts (A, B, C) Community Preferences: • Concept C received the most support overall, followed by Concept B • Favorable features included: -Open space and amphitheater integration -Strategic placement of Civic Park -Grouping of buildings for accessibility • Respondents emphasized: -Balance of park and civic space -Close proximity between parking and civic uses (especially senior/youth areas) -Amphitheater use for events/arts • Spanish-speaking participants supported Concepts B and C, citing benefits to surrounding neighborhoods and youth activities • Disfavored elements related to the following: -Distance between buildings -Visibility and accessibility of City Hall -Design that felt closed-off or disjointed WORKSHOP 3 ONLINE SURVEY Summary of Results Total Responses: 77 (76 English, 1 Spanish) Focus: Final feedback on a preferred draft concept plan. Key Takeaways: • The Recreation & Aquatic Center was the most popular element (52.7% of respondents), followed by Civic Park and the Community Center. • Least liked element: Parking layout (29.6%), followed by City Hall and Community Center configurations. • 65% of respondents felt that no elements needed to be removed • Community members emphasized priorities that included: -Indoor lap pool and improved aquatics for all ages -Expanded parking capacity, especially for seniors and people with disabilities -Multiuse Community Center with more space for youth, arts, and senior services -Playground additions and more shade -Environmental features: solar panels, EV chargers, green infrastructure -Safety and security, especially regarding unhoused presence and access routes • Several called for the preservation or adaptive reuse of the Wheeler Center • Spanish-language respondents again offered positive feedback, though participation was very limited. The respondents liked all ideas and suggested no eliminations Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB V +technical memos Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 95Gilroy Civic Center Master Plan Technical Memos INTRODUCTION The narratives and parking analysis in this section establish a technical foundation for the Civic Center design and provide guidance for future development. They were generated in conjunction with the building and site design to result in a final master plan informed by the technical concerns and constraints inherent in the building process, the site, and the environment. Overall sustainability goals are outlined in the sustainability section, with more detailed descriptions in each separate technical narrative. • Existing Conditions provides background information about the site and existing buildings, their condition, age and history, as well as the planning and zoning context that informed the design, including decisions that were made about which buildings and site features should remain. • Parking Demand Study: This study by Hexagon Transportation Consultants, Inc., based on actual parking counts, provides a basis for determining the number of parking spaces needed onsite for the new master plan. • Civil Engineering: The civil engineering narrative provides the background and basis for utilities serving the civic center and assesses the impact of the project on existing utilities to determine whether existing surrounding utilities will be sufficient to serve the new buildings. It also addresses issues of storm water management. • Structural Engineering: This narrative defines the structural basis of design and structural sustainability goals that inform the design, such as use of mass timber and concrete with low embodied carbon. • Mechanical, Electrical, Plumbing and Low Voltage: This narrative provides the basis for design of essential systems for all buildings, including sustainability goals and recommendations for all-electric buildings. • Sustainability and LEED Scorecards: This section lays out the vision for a sustainable Civic Center and provides a pathway to LEED Platinum (with a minimum rating of LEED Gold) for all three new buildings and the Civic Center campus as a whole. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 96Gilroy Civic Center Master Plan INTRODUCTION The Civic Center has been used as a location for civic activities and city government for many years. Although our research found no definitive history, its first public facility was Wheeler Auditorium in 1940. The old Police Station (now referred to as the Annex Building), was built in 1965 and the current City Hall was built in 1979. In reviewing historic satellite images, we see a pattern of increased public development and a corresponding reduction in the number of single-family homes. (For example, a 1998 image shows homes in the location now occupied by the police facility.) The city now owns this entire three-block area, apart from three residential lots on Dowdy Street. PLANNING AND ZONING The three blocks of the Gilroy Civic Center are bounded by West 6th Street to the north and West 7th Street the south, and by Dowdy Street to the east and Church Street to the west. According to the Gilroy 2040 General Plan Land Use Diagram, adopted in 2020, the land use for this area is “Public and Quasi-Public Facility.” The current zoning map lists the three-block area as “PF – Park/Public Facility,”, a designation that is, according to Article XXV of the city’s zoning ordinance, “intended to provide land for governmental, public utility, educational, and community service or recreational facilities.” The ordinance continues: “Such uses are unique in that their proximity to sensitive land uses is not generally detrimental to the quality of life, and in many cases, is desirable and convenient.” That is, the zoning ordinance promotes the establishment of community services and recreational facilities near existing single-family homes because they are desirable amenities for those residents. The PF – Park/Public Facilities District designation limits building height to 30 feet and sets the maximum building coverage at 30% of the total site area. Parking requirements are outlined in a separate area of this report. EXISTING BUILDINGS The Gilroy Civic Center currently consists of six buildings serving different functions, each built separately across more than 80 years. A brief description of each is below, starting with the most recent: • The Gilroy Library at 350 W. 6th Street, was built in 2012 to replace a library on the same site from 1975. It is part of the Santa Clara County Library District and thus not directly managed by the City of Gilroy. Designed by HED in a modern Mission style, with a stucco exterior, deep arched openings, and tile roof, the 53,000- sf building includes a library and multipurpose rooms for various community functions and is in excellent condition today. In July 2025, the City of Gilroy Public Works Department issued a Request for Proposals for library improvements and renovation to update the building management system and reorganize some of the community spaces. • The Gilroy Police Department, at 7301 Hanna Street, was completed in 2007. This 105,000-sf complex, named after a former police chief, C.J. Laizure, has a 55,000 sf on-grade parking structure with a police station above. The complex replaces the old police department building adjacent to Wheeler Center, which has been repurposed for other city functions and is now called the Annex. The tile-roofed two-story building has an upper level clad in stucco; the ground floor parking garage, constructed of exposed concrete masonry units, has what some describe as a fortress- like appearance. The public entrance is on the second floor, up a monumental flight of concrete steps from Hanna Street. • Gilroy City Hall, at 7351 Rosanna Street, was designed by William W. Hedley, Jr. and built in 1979. The building has been remodeled and expanded over the years, with the most recent expansion and renovation in 1992. Today, it has roughly 27,000 sf of area which houses city departments including Finance, Administrative Services, Public Works, and Community Development. City Council sessions and other regular commission meetings are held in its City Council Chambers. In addition to being too small to meet the city’s current needs, City Hall’s systems are out of date, requiring new mechanical, plumbing, electrical and information technology systems. The building is a single-story, wood framed structure with exposed interior glulam beams and a tile roof. • The Annex, formerly the police department building, currently houses the City’s Utilities Department and Emergency Operations Center. It was constructed in 1965 and has been altered several times since then, with a major addition in 1986. When police department functions were relocated to the new building, the emergency communications infrastructure and equipment remained at the Annex, and are still in use. The single-story wood- framed building is adjacent to Wheeler Center and includes about 17,000 sf of area, with a 5,000 sf basement level that currently A. Existing ConditionsEXISTING CONDITIONS Gilroy Library Plaza Gilroy Library Interior Old City Hall Gilroy City Hall Exterior Annex Exterior Annex Interior Gilroy City Hall Interior Gilroy Police Building Entrance Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 97Gilroy Civic Center Master Plan houses the Emergency Operations Center server rooms, main workroom, and management room. This basement location may put the city’s emergency command center at risk of flooding. • The Senior Center, at 7371 Hanna Street, was expanded and renovated in 1987, but the original construction date is unknown. The renovation included an addition of 5,400 sf, bringing the building’s current area to roughly 10,700 sf. The Senior Center contains flexible meeting spaces, offices of the Recreation Division, and a commercial kitchen, all within a single-story, wood-framed stucco structure with an asphalt shingle roof. The facility serves seniors in the morning, including lunches for up to 150, and it hosts community activities and recreation classes in the afternoon. • Wheeler Center, constructed in 1940, was named after Lin Wheeler, a prominent Gilroy resident and philanthropist who was pivotal to the area’s growth as an agricultural center. With an estimated 17,000 sf of area, this building is currently used as a multifunctional recreation space with a basketball court, pickleball courts, and some smaller multi-purpose spaces and offices. Previously known as Wheeler Auditorium, it is considered a local historic resource and is included on the city’s list of historic sites as “L – Designated Historic”. The building does not appear to have undergone significant upgrades since its construction. Upper-level rooms (including office spaces) are accessible only by stairs, and the original auditorium stage has been blocked off and is no longer in use. SITE The civic center site spans three city blocks, each 300 feet wide and ranging from 543 to 550 feet long, with two streets (75-foot-wide rights-of-way) between the blocks. Assessor’s parcel maps show that each block was further divided into parcels ranging from 50 to 75-feet wide and 140 feet long with a 20-foot alley in between. These alleys, extending north-south down the center, of each block have been abandoned in the civic center, but are still seen in today’s surrounding residential blocks. The site’s available properties and parcels have been consolidated by the City so that only three residential sites along Dowdy Street remain. Rosanna Street, which once ran though the site, has been abandoned, and a traffic island was added on Hanna Street, between the Police Department building and the library to discourage through traffic. The three blocks include multiple parking areas for city and public use. A fenced city lot, adjacent to the Annex at the corner of Church and West 7th Streets, is reserved for City of Gilroy vehicles and had a photovoltaic array added in 2025. 2002 MASTER PLAN In 2002, WLC Architects completed a Civic Center Master Plan that included three options whose primary differences related to potential uses of the Annex area at the corner of Church Street and West 7th Street. One option included the removal of the City Hall Annex and the addition of a new Cultural Arts Center Building and a Civic Center Park. Another kept the City Hall Annex and inserted an amphitheater at the corner. The Master Plan also called for the construction of a new library, a new police facility, a roundabout at Hanna Street, and a central plaza adjacent to the library, with a walkway connecting Hanna Street, the plaza, and the library. It also called for the expansion and renovation of three existing buildings: an addition to Wheeler Center, an addition to the Senior Center, and the renovation and modernization of the existing City Hall, Annex, and Senior Center. The library and police building, with their connecting walkways and roundabout, were eventually built; other elements of the Master Plan have not been realized. NEW MASTER PLAN In October 2024, the City of Gilroy issued an RFP for a new, “updated, comprehensive Civic Center Master Plan to supersede the 2002 adopted plan that will create a clear vision, action plan, timeline, and financial strategy for the re-development of the Gilroy Civic Center.” Now, more than 20 years beyond that original master plan, the Senior Center, Annex, and City Hall have all aged further without the benefit of modernization as recommended in the 2002 plan. The effort and expense required to renovate these buildings is much greater today than it was then, since the buildings have aged and their systems and technologies are now more out of date. They also no longer serve the city’s programmatic needs. For example, the cost to upgrade City Hall’s mechanical system alone was estimated to be nine million dollars in 2020, an investment that the City found difficult to justify given the age of the building and its other outdated systems. In addition, the city has outgrown the current location, with Senior Center Exterior Wheeler Center Exterior Wheeler Center Interior Senior Center Interior Civic Center Site Civic Center Site Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 98Gilroy Civic Center Master Plan city departments divided between the current City Hall and the Annex. Similarly, the Senior Center and Wheeler Center are too small to serve the Recreation Division’s program needs today. Ultimately, City leadership made the decision to retain only the library and the police building. This allows the most flexibility for the master-planning effort by providing a relatively clean slate for the new Civic Center vision. Wheeler Center: During the initial assessment of existing buildings, Wheeler Center—listed on the local historic register and a favorite of some locals—was given additional consideration. However, like City Hall, Wheeler Center no longer meets the needs of the people it serves, since it is not large enough to support the city’s recreation needs. And, given the requirements of a major renovation (including a structural retrofit, major ADA upgrades, and the replacement of mechanical, electrical, and plumbing systems), retaining Wheeler Center would require a significant investment which could instead be applied towards a new, larger facility. Another difficulty is the location of Wheeler Center, which is set back from the street in a large expanse of lawn. This setting, which in 1940 was likely seen as a grand gesture for a civic auditorium, now makes efficient use of the civic center site difficult. Solar Array: As of the beginning of this master planning effort, a new solar array over the city vehicle parking area was under construction at the corner of Church Street and West 7th Street, within the footprint of the master plan area. The array’s structure consists of concrete foundations and steel frames supporting the solar panels, providing shade for the parking area. Because planning for this project began well before the launch of the new master plan process, and because construction on the new master plan is expected to occur well into the future, city leadership has opted to complete the solar array’s construction. In the meantime, the city will benefit from the production of clean energy that the panels provide. The new master plan lays out a vision for sustainability that includes all-electric buildings and rooftop solar panels that will replace and exceed the energy generated by this existing system. Existing Paseo 1998 aerial showing residences along Dowdy Street where the Police Department is today. The Civic Center in 2025 with solar panels at the corner of Church and W. 7th Street. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 99Gilroy Civic Center Master Plan Parking Summary A central goal of the master plan process has been to create a pedestrian-oriented, welcoming, human-centered environment organized around a large public green space. To accomplish this, most parking has been concentrated on the street around the perimeter of the site (where some of the existing parallel parking has been converted to angled parking) and in a lot at the northwest corner of the site. This creates a Civic Center that invites residents to walk from downtown and enjoy activities within the park. In contrast, the current civic center is fragmented by, and dominated by, multiple asphalt parking lots. During the master planning process, we heard comments from some in the community that parking is currently a problem. This perception is heightened by the location of the civic center in a residential neighborhood where residents are concerned about overflow parking impacting neighborhood street parking. However, the parking study in the following pages conducted by Hexagon Transportation Consultants indicates that existing parking is more than sufficient for the current uses and recommends a total of 359 spaces for the new Civic Center Master Plan. The peak demand (assuming all buildings are at peak capacity at the same time) is projected to be 466 spaces. However, this peak demand is unlikely to occur since all buildings do not experience their peak demand at the same time. For example, the recreation center and community center will likely be busiest on weekends when City Hall is closed. The master plan provides a total of 425 parking spaces: 300 spaces on site (including 16 employee parking spaces in a city-owned lot across W. 7th Street), and 125 spaces around the perimeter of the site. Many factors could influence parking demand in the future, and if the need arises for additional parking, for example to accommodate large numbers of people for park events, a one- or two-deck parking structure could be added above the surface lot on the northwest side of the site to provide about 100 additional spaces per level. PARKING DEMAND STUDY Memorandum Date: June 18, 2025 To: Susan Vutz, ELS David Masenten, ELS From: Gicela Del Rio, T.E. Subject: Parking Demand Study for the Proposed Gilroy Civic Center Master Plan Update Hexagon Transportation Consultants, Inc. has completed a parking demand study for the proposed Gilroy Civic Center Master Plan update. The purpose of the parking demand study is to determine the parking needs associated with the Civic Center Master Plan update, based on the existing parking demand at the Civic Center and available parking demand rates information. This report presents the analysis and results of the parking study. Civic Center Master Plan The Civic Center sites comprise approximately 14 acres bordered by Sixth and Seventh Streets to the north and south, respectively, Dowdy Street to the west, and Church Street to the east (see Figure 1.) All sites within this area are City owned with the exception of four single-family homes located at the north-west corner of the Civic Center area (southeast corner of the Dowdy Street/Sixth Street intersection). The Civic Center currently includes the following buildings and areas: City Hall, City Hall Annex (former Police Department headquarters and currently housing the Emergency Operations Center, computer training lab, and other extra office and storage spaces), Wheeler Community Center, library, Senior Center, current Police Headquarters, Wheeler Park, several parking areas, small grassy area and central open area. The current Civic Center Master Plan was adopted in 2002. The existing Civic Center area is shown on Figure 1. To address the aging and underutilized Civic Center facilities and the growing service demand, the City is seeking to modernize and redevelop the City’s Civic Center, requiring the preparation of an updated comprehensive Civic Center Master Plan that would supersede the currently adopted plan. The updated Civic Center Master Plan must meet current and future City and community programming needs, including parking needs. Proposed Improvements With the exception of the existing Police Station headquarters and the library, all other existing buildings and open areas within the Civic Center are planned to be reconstructed and reconfigured to meet the growing community needs. The existing Police Station headquarters and library buildings were opened in 2007 and 2012, respectively, as an expansion of their previous buildings. These two building facilities will remain unchanged with the proposed redevelopment of the Civic Center. Table 1 below summarizes the existing and proposed land use and size within the Civic Center. Figure 2 shows a conceptual site layout of the Civic Center Master Plan update. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 100Gilroy Civic Center Master Plan Civic Center Master Plan Update Parking Demand Study June 18, 2025 Page | 2 Figure 1 Existing Gilroy Civic Center = Gilroy Civic Center LEGEND W 6th StW 6th St Hanna StHanna StHanna StHanna StDowdy StDowdy StChurch StChurch StHanna StHanna StW 7th StW 7th St Rosanna StRosanna StGilroy Police Department Gilroy Police Department City of Gilroy City Hall City of Gilroy City Hall City of Gilroy Gilroy Community Development City of Gilroy Gilroy Community Development City of Gilroy Senior Center City of Gilroy Senior Center Gilroy LibraryGilroy Library Wheeler Community Center Wheeler Community Center City Hall AnnexCity Hall Annex Civic Center Master Plan Update Parking Demand Study June 18, 2025 Page | 3 Figure 2 Civic Center Master Plan – Conceptual Site Layout EXISTING LIBRARY EXISTING POLICESTATION NEW CITY HALL NEWCOMMUNITY/ARTSCENTER NEW RECREATIONCENTER POOL LOCKERROOMS ANDEQUIPMENT NEW PUBLIC PARK POSSIBLE PARKING ABOVE (2 DECKS) Source: ELS Architecture + Urban DesignSource: ELS Architecture + Urban Design Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 101Gilroy Civic Center Master Plan Civic Center Master Plan Update Parking Demand Study June 18, 2025 Page | 4 Table 1 Existing and Proposed Civic Center Land Use Existing Parking Supply and Demand The existing parking supply at the Civic Center was determined with the use of aerial photography and field visits. The parking demand for the existing uses within the Civic Center was determined based on parking occupancy counts. These are described below. Existing Parking Supply Numerous on-site surface parking areas currently serve the existing buildings on site. In addition, a City owned surface parking located across the street from City Hall (on the southwest corner of the Rosanna Street/Seventh Street intersection) is utilized by City employees. Unrestricted on-street parking also is available along both sides of all streets surrounding the Civic Center. All on-site (and on- street) parking, with the exception of the parking lot serving the City Hall Annex building (southwest corner of the Civic Center area), is available for use by all users, visitors, and employees of the Civic Center. The City Hall Annex parking area has restricted access and is used to park and store City owned vehicles. This parking area is not included as part of the existing parking supply. However, it should also be noted that with the Civic Center Master Plan update, these parking spaces would continue to be required, whether on-site or off-site, to continue to provide parking and storage for City vehicles. Land Use Size (s.f.) 2 Land Use Size (s.f.) Existing Buildings to be Reconstructed/Replace City Hall 26,959 City Hall 48,055 Wheeler Gymnasium 18,575 Recreation Center 42,940 Senior Center 11,071 Community/Arts Center 34,354 City Hall Annex 16,919 Wheeler Park Public Park Total Building Square Footage:73,524 125,349 Existing Buildings to Remain Unchanged Police Headquarters 50,000 Police Headquarters 50,000 Library 53,000 Library 53,000 Total Building Square Footage:103,000 103,000 Civic Center Grand Total Building Square Footage:176,524 228,349 Proposed Change in Building Size:51,825 Notes: 1 Existing building size were obtained from available building drawings, published (online) building information, aerial photographs, and field visits. 2 Building size, in square footage, are approximate. ProposedExisting 1 Civic Center Master Plan Update Parking Demand Study June 18, 2025 Page | 5 Additionally, the Police Station headquarters include a parking garage on the first level of the building, which is used by Police personnel and houses all police vehicles. This existing parking supply will remain unchanged and, just like the existing Annex building parking supply, is excluded from the available parking supply for the Civic Center evaluated in this analysis. The available parking areas serving the Civic Center are shown on Figure 3. In total, the Civic Center is currently served by seven on-site parking areas (although parking Area 7 is located across the street from the Civic Center, for the purpose of this analysis, it is also considered an on-site parking area), providing a total of 300 parking spaces. Additionally, there are a total of approximately 75 on-street parking spaces along the Civic Center frontage on 6th Street, 7th Street, Church Street, and Dowdy Street plus an additional 79 on-street parking spaces on the opposite side of these same streets (across the street from the Civic Center.) The total existing parking supply is summarized in Table 2. Table 2 Existing On-Site and On-Street Parking Supply On-Site Parking Area Buildings Serving/Adjacent To 1 Total Parking Spaces 2 Number of Accessible Spaces 1 Library 53 3 2 Library/Wheeler Gym 56 3 3 Library/Senior Center 29 2 4 Senior Center/Police Station 42 3 5 Police Station 12 2 6 City Hall 92 6 7 Off-Site Parking 16 0 Total: 300 19 On-Street Parking Buildings Serving/Adjacent To 1 Total Parking Along Both Sides of the Street 2 Total Parking Along Civic Center Frontage 2 Sixth Street Senior Center, Library, Wheeler Gym 49 25 Seventh Street Police Station, City Hall 44 22 Dowdy Street Police Station, Senior Center 34 17 Church Street Wheeler Gym 27 11 Total: 154 75 1 For the purpose of this analysis, the parking areas were assumed to serve the adjacent buildings (visitors will park next to or as close as possible to the building they are visiting, if parking is available) although parking spaces are not designated for specific buildings. 2 Existing parking supply numbers obtained with the use of aerial photographs and confirmed in the field. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 102Gilroy Civic Center Master Plan Civic Center Master Plan Update Parking Demand Study June 18, 2025 Page | 6 Figure 3 Civic Center Parking Areas 4 = On-site Parking Areas LEGEND = Gated Area, Restricted Access (not part of study) 11 22 33 55 66 77 4 W 6th StW 6th St Hanna StHanna StHanna StHanna StDowdy StDowdy StChurch StChurch StHanna StHanna StW 7th StW 7th St Rosanna StRosanna StGilroy Police Department Gilroy Police Department City of Gilroy City Hall City of Gilroy City Hall City of Gilroy Gilroy Community Development City of Gilroy Gilroy Community Development City of Gilroy Senior Center City of Gilroy Senior Center Gilroy LibraryGilroy Library Wheeler Community Center Wheeler Community Center City Hall AnnexCity Hall Annex Civic Center Master Plan Update Parking Demand Study June 18, 2025 Page | 7 Existing Parking Demand The parking demand for the existing uses within the Civic Center were determined based on parking occupancy counts conducted on Tuesday May 6, 2025, a day considered to be an “average” day at the Civic Center (no untypical events were scheduled to take place at the Civic Center on this day.) The counts were collected every hour from 7:00 AM to 7:00 PM. Both on-site and on-street parking spaces were counted during the 12-hour period. On-Site Parking Counts The results of the parking counts indicate that the Civic Center’s peak parking demand occurs at 11:00 AM. At its peak, the on-site parking demand was observed to be 163 parking spaces, or 54% of the total number of on-site parking spaces available. When evaluating the parking areas separately, the occupancy rate per area are generally higher than the occupancy rate for the entire site since different areas peak at different times. Based on the parking count data, the following can be concluded regarding the existing on-site parking demand: - Overall, the parking counts show that the current Civic Center parking supply exceeds the parking demand. - Parking demand for most of the different parking areas peaks between 10-11 AM, with the exception of Areas 1 and 2 (serving the library and the Wheeler Community Center), which were observed to peak at 7 PM. - Parking Area 3, which mainly serves the Senior Center, was the only parking area that was observed to be 100% occupied. This occurred at 11 AM. After 1 PM, Parking Area 3 was only occupied approximately 10-20% of its capacity. - In average, all parking areas, with the exception of Parking Area 4, had less than 50% of its parking spaces occupied. In average, Parking Area 4 had approximately 66% of its parking spaces occupied, with a peak demand of 98% of the stalls at 10 AM. Area 4 serves the Police Station and the Senior Center. - Less than 50% of the total accessible parking spaces were occupied every hour. - All accessible parking spaces within Parking Areas 3 and 4 were occupied between 9 and 11 AM. All other parking areas had one or more accessible parking spaces available every hour. The hourly parking demand for the entire site and for each parking area separately are summarized in Table 3 below. Table 4 summarizes the hourly demand for accessible parking spaces. Figure 4 show the percent occupancy for each of the surveyed parking spaces, or the ratio between the number of times each space was occupied and the total number of surveys per day. Figure 5 shows the occupied parking spaces during the site’s peak parking demand. On-Street Parking Counts On-street parking counts also were collected during the same 12-hour period in an effort to capture all Civic Center parking demand. Since it was shown by the on-site parking counts that excess parking is currently being provided on-site, on-street parking could be used as a convenient option. However, it is most likely that Civic Center traffic opting to park on the street solely because it is convenient would do so along the Civic Center frontage only, avoiding crossing the street. Therefore, based on this assumption, it is conservatively assumed that all on-street parking along the Civic Center perimeter is Civic Center-generated traffic. The on-street parking counts (summarized in Table 5) show the maximum on-street parking demand along the Civic Center perimeter is 25 parking spaces. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 103Gilroy Civic Center Master Plan Civic Center Master Plan Update Parking Demand Study June 18, 2025 Page | 8 Table 3 Parking Demand Counts – All On-Site Parking Spaces Parking Area Average 7AM 8AM 9AM 10AM 11AM 12PM 1PM 2PM 3PM 4PM 5PM 6PM 7PM All On-Site Parking 300 47 76 131 155 163 133 141 141 140 145 134 123 126 Occupied Number of Spaces 47 76 131 155 163 133 141 141 140 145 134 123 126 127 Percent Occupancy (out of 298)16% 25% 44% 52% 54% 44% 47% 47% 47% 48% 45% 41% 42% 42% Number of Unoccupied Spaces 253 224 169 145 137 167 159 159 160 155 166 177 174 173 Parking Area 1 53 2 6 10 13 20 22 28 36 29 38 43 47 47 Occupied Number of Spaces 2 6 10 13 20 22 28 36 29 38 43 47 47 26 Percent Occupancy (out of 53)4% 11% 19% 25% 38% 42% 53% 68% 55% 72% 81% 89% 89% 49% Number of Unoccupied Spaces 51 47 43 40 33 31 25 17 24 15 10 6 6 27 Parking Area 2 56 0 4 9 10 12 16 17 20 21 22 27 25 36 Occupied Number of Spaces 0 4 9 10 12 16 17 20 21 22 27 25 36 17 Percent Occupancy (out of 56)0% 7% 16% 18% 21% 29% 30% 36% 38% 39% 48% 45% 64% 30% Number of Unoccupied Spaces 56 52 47 46 44 40 39 36 35 34 29 31 20 39 Parking Area 3 29 041527291810576533 Occupied Number of Spaces 0 4 15 27 29 18 10 5 7 6 5 3 3 10 Percent Occupancy (out of 29)0% 14% 52% 93% 100% 62% 34% 17% 24% 21% 17% 10% 10% 35% Number of Unoccupied Spaces 29 25 14 2 0 11 19 24 22 23 24 26 26 19 Parking Area 4 42 22 28 38 41 39 25 25 27 26 27 24 19 18 Occupied Number of Spaces 22 28 38 41 39 25 25 27 26 27 24 19 18 28 Percent Occupancy (out of 42)52% 67% 90% 98% 93% 60% 60% 64% 62% 64% 57% 45% 43% 66% Number of Unoccupied Spaces 20 14 4 1 3 17 17 15 16 15 18 23 24 14 Parking Area 5 12 22791166254276 Occupied Number of Spaces 2 2 7 9 11 6 6 2 5 4 2 7 6 5 Percent Occupancy (out of 12)17% 17% 58% 75% 92% 50% 50% 17% 42% 33% 17% 58% 50% 44% Number of Unoccupied Spaces 10 10 5 3 1 6 6 10 7 8 10 5 6 7 Parking Area 6 92 17 24 42 44 44 39 49 43 44 40 28 19 15 Occupied Number of Spaces 17 24 42 44 44 39 49 43 44 40 28 19 15 34 Percent Occupancy (out of 92)18% 26% 46% 48% 48% 42% 53% 47% 48% 43% 30% 21% 16% 37% Number of Unoccupied Spaces 75 68 50 48 48 53 43 49 48 52 64 73 77 58 Parking Area 7 16 481011876888531 Occupied Number of Spaces 4 8 10 11 8 7 6 8 8 8 5 3 1 7 Percent Occupancy (out of 16)25% 50% 63% 69% 50% 44% 38% 50% 50% 50% 31% 19% 6% 42% Number of Unoccupied Spaces 12 8 6 5 8 9 10 8 8 8 11 13 15 9 Source: Parking counts conducted on May 6, 2025. Box indicates peak parking demand. Total Number of Parking Spaces Hourly Counts Civic Center Master Plan Update Parking Demand Study June 18, 2025 Page | 9 Table 4 Parking Demand Counts – Accessible Parking Spaces Parking Area Average 7AM 8AM 9AM 10AM 11AM 12PM 1PM 2PM 3PM 4PM 5PM 6PM 7PM All On-Site Parking 19 1277856254365 Occupied Number of Spaces 12778562543655 Number of Unoccupied Spaces 18 17 12 12 11 14 13 17 14 15 16 13 14 14 Parking Area 1 3 0000002111122 Occupied Number of Spaces 00000021111221 Number of Unoccupied Spaces 3 3 3 3 3 3 1 2 2 2 2 1 1 2 Parking Area 2 3 0000011000000 Occupied Number of Spaces 00000110000000 Number of Unoccupied Spaces 3 3 3 3 3 2 2 3 3 3 3 3 3 3 Parking Area 3 2 0022210000000 Occupied Number of Spaces 00222100000001 Number of Unoccupied Spaces 2 2 0 0 0 1 2 2 2 2 2 2 2 1 Parking Area 4 3 0133310011011 Occupied Number of Spaces 01333100110111 Number of Unoccupied Spaces 3 2 0 0 0 2 3 3 2 2 3 2 2 2 Parking Area 5 2 0011101010011 Occupied Number of Spaces 00111010100111 Number of Unoccupied Spaces 2 2 1 1 1 2 1 2 1 2 2 1 1 1 Parking Area 6 6 1111222122221 Occupied Number of Spaces 11112221222212 Number of Unoccupied Spaces 5 5 5 5 4 4 4 5 4 4 4 4 5 4 Source: Parking counts conducted on May 6, 2025. Total Number of ADA Parking Spaces Hourly Counts Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 104Gilroy Civic Center Master Plan Civic Center Master Plan Update Parking Demand Study June 18, 2025 Page | 10 Figure 4 Parking Occupancy Rates per Parking Space 10101111121213134141415151616717171818191920201212122222323242425252626727272828448484494954545555565675757585859596868 77373122122139139% Occupancy =Number of Times Occupied Total Number of Surveys LEGEND = 0 - 10% > 10% - 20% > 20% - 30% > 30% - 40% > 40% - 50% > 50% - 60% > 60% - 70% > 70% - 80% > 80% - 90% > 90% - 100%Hanna StHanna StW 6th StW 6th St City of Gilroy Senior Center City of Gilroy Senior Center Gilroy LibraryGilroy Library Civic Center Master Plan Update Parking Demand Study June 18, 2025 Page | 11 Figure 4 (Continued) Parking Occupancy Rates per Parking Space Hanna StHanna StHanna StHanna StW 7th StW 7th St Rosanna StRosanna St181181 192192 207207 1215215 4234234 283283 300300Gilroy Police Department Gilroy Police Department City of Gilroy City Hall City of Gilroy City Hall City of Gilroy Gilroy Community Development City of Gilroy Gilroy Community Development % Occupancy =Number of Times Occupied Total Number of Surveys LEGEND = 0 - 10% > 10% - 20% > 20% - 30% > 30% - 40% > 40% - 50% > 50% - 60% > 60% - 70% > 70% - 80% > 80% - 90% > 90% - 100% Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 105Gilroy Civic Center Master Plan Civic Center Master Plan Update Parking Demand Study June 18, 2025 Page | 12 Figure 5 Peak Parking Occupied Spaces 112233445566778899101011111212131314141515161617171818191920202121222223232424252526262727282829293030313132323333343435353636373738383939404041414242434344444545464647474848494950505151525253535454555556565757585859596060 6161 6262 6363 6464 6565 6666 6767 6868 6969 7070 7171 7272 7373 7474 7575 7676 7777 7878 7979 8080 8181 8282 8383 8484 8585 8686 8787 8888 8989 9090 9191 9292 9393 9494 9595 9696 9797 9898 9999 100100 101101 102102 103103 104104 105105 106106 107107 108108 109109 110110 111111 112112 113113 114114 115115 116116 117117 118118 119119 120120 121121 122122 123123 124124 125125 126126 127127 128128 129129 130130 131131 132132 133133 134134 135135 136136 137137 138138 139139140140141141142142143143144144145145146146147147148148149149150150151151152152153153154154155155156156157157158158159159160160161161162162163163164164165165166166167167168168169169170170171171172172173173174174175175176176177177 178178 179179 180180 LEGEND = Space Occupied Hanna StHanna StW 6th StW 6th St City of Gilroy Senior Center City of Gilroy Senior Center Gilroy LibraryGilroy Library Civic Center Master Plan Update Parking Demand Study June 18, 2025 Page | 13 Figure 5 (Continued) Peak Parking Occupied Spaces Hanna StHanna StHanna StHanna StW 7th StW 7th St Rosanna StRosanna St181181 182182 183183 184184 185185 186186 187187 188188 189189 190190 191191 192192 193193 194194 195195 196196 197197 198198 199199 200200 201201 202202 203203 204204 205205 206206 207207 208208 209209 210210 211211 212212 213213 214214 215215 216216 217217 218218219219220220221221222222223223 224224225225226226227227228228229229230230231231232232 233233 234234 235235 236236 237237 238238 239239 240240 241241 242242 243243 244244 245245246246247247248248249249250250251251252252253253 254254 255255 256256 257257 258258 259259 260260 261261 262262 263263 264264 265265266266267267268268269269270270271271272272273273274274275275276276277277278278279279280280281281282282283283 284284 285285286286287287288288289289290290291291292292293293294294295295296296297297298298299299300300Gilroy Police Department Gilroy Police Department City of Gilroy City Hall City of Gilroy City Hall City of Gilroy Gilroy Community Development City of Gilroy Gilroy Community Development LEGEND = Space Occupied Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 106Gilroy Civic Center Master Plan Civic Center Master Plan Update Parking Demand Study June 18, 2025 Page | 14 Table 5 Parking Demand Counts – On-Street Parking Spaces Total Number of On-Street Parking Spaces Total Demand Along Civic Center Time Frontage 7am 45095101218 21 8am 53095101218 22 9am 8509591215 25 10am 7 5 1 10 4 10 11 14 23 11am 7628471212 25 12pm 6 7 3 10 4 10 12 13 25 1pm 56094101313 22 2pm 6 5 2 10 4 11 12 18 24 3pm 5 5 3 10 4 11 13 15 25 4pm 4 5 3 10 4 11 13 15 24 5pm 3 6 2 10 4 11 11 20 20 6pm 47284121018 20 7pm 4718512920 19 Source: Parking counts conducted on May 6, 2025. 2222 Church Street 7th Street Occupied Spaces Occupied Spaces Occupied Spaces Occupied Spaces 17 17 2425 1611 Civic Center Frontage Opposite Side of Street Civic Center Frontage Opposite Side of Street Dowdy St 6th Street Civic Center Frontage Opposite Side of Street Civic Center Frontage Opposite Side of Street Civic Center Master Plan Update Parking Demand Study June 18, 2025 Page | 15 Civic Center Parking Demand Estimates Based on the on-site and on-street peak parking demand, it is estimated that the total Civic Center peak parking demand is approximately 188 parking spaces. A total of 300 on-site parking spaces plus an additional 75 on-street parking spaces are available to serve the existing demand. When evaluating each of the land uses within the Civic Center separately, their combined peak parking demand is approximately 249 parking spaces. However, this is an extremely conservative scenario that most likely would never happen since, as the parking counts showed, the peak parking demand for the different on-site facilities and services occurs at different times during the day. This maximum parking demand scenario was included for comparison to parking demand calculations based on City of Gilroy off-street parking requirements (City of Gilroy Zoning Ordinance, Chapter 30, Article 31) and the Institute of Transportation Engineers (ITE) Parking Generation Manual, 6th Edition, 2023. When calculating parking demand using adopted rates, each land use is typically evaluated separately without the benefit of the different peak periods or potential share parking between the uses. For this comparison, the following conservative assumptions were made:  It was assumed that all library-generated traffic utilizes Parking Area 1 only and all Police Station traffic utilizes half of Parking Area 4 and all of Parking Area 5.  It was assumed that the existing Wheeler Park generates a neglectable number of vehicular trips.  The parking demand includes both on-site and on-street parking demand. The estimated parking demand for each of the Civic Center land uses are shown on Table 6. The parking demand comparison shows that the observed peak parking demand for the individual land uses is consistent with the parking demand estimated using City of Gilroy and ITE parking demand rates. Estimated Future Parking Demand The future parking demand with the implementation of the Civic Center Master Plan update was estimated based on the proposed land use, building size, and applying the parking demand rates calculated using the parking count data. The Police Station and library were assumed to continue to generate the same parking demand as it was identified by the parking counts. In addition, parking demand for the proposed new public park was estimated based on ITE parking demand rates since the City of Gilroy parking demand rates do not include rates for public parks. However, it should be noted that the ITE parking data associated with public parks is limited and should be used cautiously. Based on the above information, with the Civic Center Master Plan update, the parking demand is estimated to be approximately 359 parking spaces. The future parking demand estimates are summarized on Table 7. For informational purposes, the maximum parking demand (associated with each land use’s peak demand) and the parking demand based on City of Gilroy parking rates also were estimated and are shown on Table 7. Conclusion Based on the parking demand counts, the total Civic Center peak parking demand is approximately 188 parking spaces. A total of 300 on-site parking spaces plus an additional 75 on-street parking spaces are available to serve the existing demand. Based on the existing parking demand count information and the proposed project description, the parking demand for the Civic Center Master Plan update is estimated to be approximately 359 parking spaces. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 107Gilroy Civic Center Master Plan Civic Center Master Plan Update Parking Demand Study June 18, 2025 Page | 16 Table 6 Existing Parkind Demand Comparison Land Use Size (s.f.) 1 Parking Areas Utilized 2 Available # of Spaces 3 Site Peak Parking Demand Specific Use Peak Parking Demand City Rates Required # of Spaces ITE Rates Required # of Spaces Existing Buildings to be Reconstructed/Replace City Hall 26,959 6, 7 122 62 70 3 spaces per 1,000 s.f. 81 73 4.04 per 1,000 s.f. 109 Wheeler Gymnasium 18,575 2 75 18 42 3 spaces per 1,000 s.f. 56 49 2.32 per 1,000 s.f. 44 Senior Center 11,071 3, 1/2 of 4 64 52 53 3 spaces per 1,000 s.f. 34 49 2.32 per 1,000 s.f. 26 City Hall Annex 16,919 Not Included Total: 73,524 261 132 165 171 179 Existing Buildings to Remain Unchanged (for Informational Purposes) Police Headquarters 50,000 1/2 of 4, 5 50 37 38 3 spaces per 1,000 s.f. 150 73 N/A 7 Library 53,000 1 64 20 47 3 spaces per 1,000 s.f. 159 59 4.4 per 1,000 s.f. 234 Total: 103,000 114 57 85 309 234 Total: 176,524 375 188 249 480 413 Notes: 1 Existing building size were obtained from available building drawings, published (online) building information, aerial photographs, and field visits. Building size, in square footage, are approximate. 2 Assumed, based on the parking area location relative to the building. 3 Includes on-street parking spaces along the perimeter of the Civic Center. 4 Based on parking counts conducted on Tuesday May 6, 2025. Includes both on-site and on-street parking demand. Site peak demand represents the total peak demand for the site combined. Specific use peak demand represents the peak demand for each individual land use on site. 5 City of Gilroy Downtown Specific Plan parking requirements apply. Civic uses rates were utilized for all Civic Center land uses. 6 Institute of Transportation Engineers (ITE) Parking Generation Manual, 6th Edition, 2023. Municipal Government Office Building (#730), Recreational Community Center (#495), and Library (#590) parking generation rates were applied. Rates correspond to the 85th percentile peak period parking demand. 7 No parking generation rates specific to this land use are available. Parking Counts 4 City of Gilroy Parking Rates 5 ITE Parking Rates 6 Civic Center Master Plan Update Parking Demand Study June 18, 2025 Page | 17 Table 7 Civic Center Master Plan Parking Demand Estimates Land Use Size (s.f.) Calculated Peak Demand Rate Required # of Spaces Calculated Peak Demand Rate Required # of Spaces City Rates Required # of Spaces City Hall 48,055 1 spaces per 435 s.f. 111 1 spaces per 385 s.f. 125 3 spaces per 1,000 s. 145 73 Recreation Center 42,940 1 spaces per 427 s.f. 101 1 spaces per 314 s.f. 137 3 spaces per 1,000 s. 129 49 Community/Arts Center 34,354 1 spaces per 427 s.f. 81 1 spaces per 314 s.f. 110 3 spaces per 1,000 s. 104 49 Public Park 4 1.5 acre 5.52 per acre 5 9 5.52 per acre 5 9 5.52 per acre 5 9 125,349 302 381 387 Existing Buildings to Remain Unchanged Police Headquarters 50,000 6 37 6 38 6 38 73 Library 53,000 6 20 6 47 6 47 59 103,000 57 85 85 Civic Center Total: 228,349 359 466 472 1 Parking demand rates derived from parking counts conducted on Tuesday May 6, 2025. This parking demand represents the total peak demand for the site combined. 2 Parking demand rates derived from parking counts conducted on Tuesday May 6, 2025. This parking demand represents the peak demand for each individual land use on site. 3 City of Gilroy Downtown Specific Plan parking requirements apply. Civic uses rates were utilized for all Civic Center land uses with the exception of the public park. 4 Based on preliminary conceptual site plans, the proposed public park is assumed to be approximately 1.5 acres. 5 Institute of Transportation Engineers (ITE) Parking Generation Manual , 6th Edition, 2023, was used to estimate the parking demand for the proposed public park. However, ITE parking demand data associated with public parks is limited and should be used cautiously. 6 The parking demand for the Police Station and the library were assumed to remain unchanged from existing conditions. Site Specific Parking Demand 2Civic Center Site Parking Demand 1Proposed City of Gilroy Parking Rates 3 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 108Gilroy Civic Center Master Plan GILROY CIVIC CENTER MASTER PLAN August 1, 2025 BKF ENGINEERS Pleasanton Office: 7901 Stoneridge Drive, Suite 360, Pleasanton, CA 94588 | 925.396.7700 Civil Conceptual Narrative Page 2 of 7 BKF ENGINEERS SECTION 1: SITE DESCRIPTION The Civil Center development site is proposed on the existing City of Gilroy Civic Center in Downtown Gilroy. The approximate 14-acre site occupies three full city blocks and is bordered by 6TH Street to the north, 7th Street to the south, Dowdy Street to the west, and Church Street bordering the east. The site has numerous buildings that were built during different time periods including the Gilroy Police Department, Library, Senior Center, Recreation Center, and Gilroy Civic Building. In addition, there are existing residential single-family homes within the western portion of the site fronting Dowdy Street. Three of the residential parcels will remain and are not part of the proposed Civic Center Master Plan. The Master Plan intends to retain the existing Police Department and City Library Buildings while demolishing and redeveloping the remaining buildings and site infrastructure within the project area. This includes a new recreation building, civic building, community building, civic park, and on-site and off-site parking improvements. The site is largely impervious with buildings, pavement, and other associated hardscape occupying the majority of the development area. Small areas of grass exist around the library plaza as well as within the undeveloped corner parcel at 6th and Dowdy Street. The topography of the Civic Center is relatively flat sloping gently west to east with generally consistent slopes of less than 1%, which equates to approximately 4.5 feet of vertical change over the entire 14-acre development area. Existing Site Topography C. Civil EngineeringCIVIL ENGINEERINGDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 109Gilroy Civic Center Master Plan Page 3 of 7 BKF ENGINEERS SECTION 2: LAND USE The Civil Center development site is located in the Downtown Specific Plan Area within the Civic/Cultural Arts District. This district is intended to provide a regional destination for events and outdoor activities on weekend and evenings with civic campus activities being the primary use during the week. Desirable uses are listed as follows: • Civic • Cultural • Office • Residential • Passive Recreation • Retail Uses that directly serve the Civic Center The Civic/Cultural Arts District also prohibits specific uses such as industrial and manufacturing uses, retail not specifically servicing the Civic Center, and service commercial uses. All of the proposed uses within the Civic Center Master Plan conform to the district’s desired uses and therefore will not require any additional zoning modifications in order to implement. SECTION 3: STREET AND FRONTAGE IMPROVEMENTS The perimeter frontage streets are all within established public rights of way and are paved with asphalt within the vehicular drives and concrete curb, gutter, and sidewalk constructed on both sides. The existing sidewalk is largely configured in a detached configuration with 5’-6’ curb adjacent planter strips along the majority of the 6th Street, 7th Street, and Church Street frontages. Dowdy Street has an attached sidewalk without a planter strip along the western frontage. All of the intersections surrounding the Civic Center are currently stop controlled without the use of signalization. Curb adjacent parallel parking is available on portions of all the frontage streets outside of the designated bus stops and red curbed areas. The Master Plan intends to maintain the majority of the public frontage street curb locations and parking programs that border the project site. The existing parallel parking on 7th Street between church and Hanna however is proposed to be converted to angled parking. This will require the curb to be shifted into the site thereby eliminating the existing planting strip. Public right of way for Hanna Street and Rosanna Street currently extends through the Civic Center in the north south direction. Both of these right of ways between 6th and 7th Street will be vacated as part of the redevelopment with those areas reprogrammed with internal parking and site circulation, plazas, and other associated landscape improvements. Existing Hanna and Rosanna street access from 6th and 7th Streets will be converted to driveway entry points or closed off entirely. SECTION 4: WATER IMPROVEMENTS The City of Gilroy is located in the Santa Clara Valley Water District (SCVWD). The Llagas Groundwater Sub-basin serves as Gilroy’s potable water source for most residential, municipal, and industrial land uses. The municipal water supply comes from ground-water well sources within the Llagas Basin Aquifer. The City is serviced by the Gilroy Community Services Department and currently operates eight water wells that supply the City’s residents and businesses of Gilroy. There are also six storage reservoirs Page 4 of 7 BKF ENGINEERS that serve three water pressure zones. Prior to distribution, the water is treated with chlorine disinfection to remove or reduce potential contaminants from the source water. Existing potable water mains are available within each of the perimeter frontage streets and provide domestic, fire, and irrigation service to the existing Civic Center development. It is our understanding that the existing potable water network is sufficient to support the proposed development without off-site infrastructure upgrades. Existing water mains within the portion of Hanna Street and Rosanna Street that are to be vacated may need to be removed or rerouted if they are in conflict with proposed improvements. Existing water services to the buildings designated for removal will be terminated and new services established per City standards for the Recreation Center, Civic Center, Community Center, and site irrigation. Each new building will require a separate fire service and will by fully sprinklered. SCRWA operates a recycled water facility in partnership with the Santa Clara Valley Water District. This facility produces high-quality recycled water that is used for irrigation, industrial reuse, groundwater recharge, and indirect potable reuse. Recycled water is available within portions of Gilroy, primarily along the southern perimeter of the City. The existing system consists of more than 15 miles of 8-inch to 36-inch recycled water pipelines that extend from the SCRWA waste water treatment plan all the way to the western edge of the City along Hecker Pass Road. The 2020 Urban Water Management Plan identifies future improvements that will further expand the existing recycled water distribution system with additional recycled water mains, storage tanks and booster stations. Although future planned improvements do not currently include extending recycled water facilities to the downtown Civic Center area, the project should consider improvements that can accommodate recycled water in the future. This includes installing irrigation systems that can be converted over to recycled water as well as looking for opportunities within the new buildings for using in flushing toilets and urinals. Figure 6.3 from the City of Gilroy 2020 Urban Water Management Plan Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 110Gilroy Civic Center Master Plan Page 5 of 7 BKF ENGINEERS SECTION 5: WASTEWATER IMPROVEMENTS The City of Gilroy is served by the South County Regional Wastewater Authority (SCRWA), which manages the treatment of wastewater for both Gilroy and Morgan Hill. The SCRWA wastewater treatment plant was built in 1990 and was constructed with state-of-the-art fully automated high efficiency equipment. The City of Gilroy’s Engineering Division is responsible for the oversight and maintenance of the City wastewater treatment system. The City of Gilroy operates a gravity sewer system, with pipes ranging in diameter from 6 inches to 30 inches. The Downtown area is primarily serviced with older, 6-inch diameter clay pipes, many of which are situated in alleys and easements. To the west and north of the city center, pipes tend to be newer and on average 8 inches in diameter. These are pipes typically constructed within public streets and cul-de-sacs. The network of collector sewer pipes discharges into an interceptor sewer trunk line that then carries the wastewater to the SCRWA Wastewater Treatment Plant. Currently the plant receives an average of 3.1 mgd from the entire City of Gilroy. With proposed plant expansions, the future build-out capacity is estimated to be 15 mgd. Proposed Wastewater Conditions Project impacts were evaluated as part of the Downtown Gilroy Specific Plan Mitigated Negative Declaration (MND) and it determined there were no significant regional capacity impacts that would require infrastructure upgrades. Existing clay sewer mains that run through the development parcel are recommended to be replaced with PVC SDR 26 or HDPE pipe per City specifications. Existing sewer laterals serving buildings slated for demolition should be removed and capped in conformance with City requirements. All new City standard sewer laterals will be constructed for each new building. SECTION 6: STORM WATER IMPROVEMENTS The City of Gilroy is situated within two major watersheds: the Uvas Creek and Llagas Creek watersheds. Stormwater is conveyed within the City through surface flow, underground pipe networks, open channels, detention/retention basins, and a series of key water channels that include Uvas Creek, Llagas Creek, Miller Slough, West Branch Llagas Creek, Lions Creek, North Morey Creek, and South Morey Creek. Gilroy’s existing storm drain infrastructure primarily consists of reinforced concrete and corrugated metal pipes that discharge into these channels that eventually discharge into the Monterey Bay. Stormwater management within the city of Gilroy is subject to the National Pollutant Discharge Elimination System (NPDES) regulations that requires the City of Gilroy to implement stormwater management programs in alignment with the Clean Water Act. This includes stormwater management requirements both during and post-construction that include both stormwater quality and quantity measures. Under the NPDES Permit, the City is responsible for implementing measures to regulate the quality of stormwater from private developments that ultimately flow into the ocean. The Gilroy Civic Center development will both reduce stormwater runoff and improve stormwater quality through the reduction of impervious surfaces and implementation of Low Impact Design (LID) measures. Reducing the stormwater runoff will result in a lower stormwater capacity impact to the existing public storm drain infrastructure that currently serves the site. As such, no mitigation of off-site storm drain capacity is anticipated in order to accommodate the proposed Civil Center programming. Page 6 of 7 BKF ENGINEERS All on-site storm water from impervious surfaces such as conventional building roofs, pavements, and other similar hardscape will be collected and conveyed to on-site LID treatment facilities before being discharged off-site. Proposed LID measures include in-ground biofiltration basins, flow-through planters, permeable paving, and on-structure landscaping. Approximately 4% of the newly constructed impervious surfaces will be dedicated to stormwater treatment facilities within the development that will filter site pollutants and reduce pre-development stormwater flow prior to discharging to the frontage stormwater pipes. All site stormwater facilities will be sized to accommodate a 10-year design storm event in conformance with the City of Gilroy’s design standards. Opportunities for on-site storm water collection and treatment for use in gray water applications should also be considered. Stormwater from roof runoff can be collected in stormwater cisterns programmed within the new buildings, treated, and utilized for site irrigation and/or toilet and urinal flushing to help reduce annual potable water demand. SECTION 7: FLOOD PROTECTION The Civic Center development site is located in FEMA’s Zone X, which is outside of a designated FEMA Special Flood Hazard Area. Zone X is defined as an area which is a 0.2% annual chance flood hazard area having 1% annual chance of flooding with average depths of less than one foot. Given this low risk flood designation no specific flood mitigation is required to facilitate this development. Standard best practices for on-site stormwater management and conformance to the City’s requirement to design on- site stormwater facilities to convey a 10-year design storm event will be sufficient to reasonably mitigate storm water flooding potential within the site. FEMA National Flood Hazzard Map Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 111Gilroy Civic Center Master Plan Page 7 of 7 BKF ENGINEERS SECTION 8: GAS AND ELECTRIC IMPROVEMENTS The Pacific Gas and Electric Company (PG&E) provides electric and gas service to customers within the City of Gilroy and is regulated by the California Public Utilities Commission. PG&E owns and operates the Llagas electrical substation located on the east side of Gilroy. 115 KV transmission lines run predominantly around the perimeter of Gilroy and along Highway 101. These transmission lines are located in dedicated PG&E rights-of-way and maintained by PG&E. Electricity is distributed from the transmission lines through local pole mounted overhead electrical wires or via underground trenches within streets. Gas mains are similarly located in underground trenches within City rights of way throughout the City, which also serves the development site. PG&E is required to meet each project electrical and gas demands as part of their franchise agreement with the CPUC. Although off-site electrical and gas infrastructure upgrades are not anticipated to be required to support this development, any regional upgrades required would be the responsibility of PG&E. Electric distribution facilities are located underground within Church Street and Dowdy Street and overhead on the opposite frontage within 6th and 7th Streets. All new electric services to the site will be made with underground services. No New gas service is expected to be needed since the proposed buildings will be all-electric. SECTION 9: SOLID WASTE Residential and commercial solid waste disposal and recycling services provided by the City of Gilroy. The City contracts with Recology South Valley for all of its solid waste, street sweeping, and recycling needs. SVDR transports its waste collection to the San Martin Transfer Station. From the Transfer Station, garbage is taken to Landfill, recyclables are sent to the BFI Waste Systems Recycling facility in San Jose, and clean yard waste is transported to South Valley Organics, a compost facility located at Pacheco Pass Landfill. The City of Gilroy facilitates an expanded recycling program that includes food waste composting, scrap metal, and plastic bags. Yard waste combined with food waste is now collected every week. A waste disposal program will need to be coordinated with Recoogy South Valley for the new building waste management operations. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 112Gilroy Civic Center Master Plan July 14, 2025 Gilroy Civic Center Master Plan ELS Architects Concept Design – Structural Narrative Page 1 160 Pine Street, Suite 600, San Francisco, California, 94111 | 415 837 0700 www.forell.com Forell | Elsesser Engineers July 14, 2025 F/E Job Number: 24-082 By: Allen Nudel & Lindsey Maclise GENERAL: This document is a Concept level structural narrative associated with the Gilroy Civic Center Master Plan Project. The narrative provides a project description, structural criteria, and a description of the structural systems. This narrative is based on ELS’s preliminary building plans provided in June 2025. PROJECT DESCRIPTION: The project site will be located at the existing Gilroy Civic Center and provides an expansion and replacement of the City’s existing facilities. The project consists of three new building structures: a City Hall, a Recreation Center, and a Community Arts Center. The buildings are all two stories in height and will have sloped roofs to mirror the existing architecture on the site. The City Hall will contain spaces for public works, finance, and community development at the ground level with additional public services for utilities, human resources and administration above. Additionally, the council chambers will be located in the building in a double height space. The overall building dimensions are approximately 270 ft by 150 ft. The Recreation Center contains an open-air pool with single-story pool support space, and a double height gym with adjacent locker rooms, offices, and flex rooms. At the second level, there will be cardio and workout spaces, additional locked rooms, and a running track surrounding the gymnasium. The overall building dimensions are approximately 210 ft by 125 ft. The Community Arts Center provides a gymnasium, auditorium, and senior dining facility. The gymnasium and auditorium will be double height spaces, while the senior dining facility will be a single-story portion of the building, with accessible roof above. A central core joins the three main spaces providing offices, restrooms, and activity spaces. The overall building dimensions are approximately 275 ft by 120 ft. BUILDING FRAMING SYSTEM: The proposed structural system for the buildings is assumed to be consistent across all three buildings to allow for a uniform approach and efficiency for the project. To allow for the long spans of the multiple double height spaces that occur in all three buildings, a steel gravity system is proposed. The structural floor and roof will be Cross Laminated Timber (CLT) which will also act as the lateral diaphragm for seismic and wind loads. At the roof, to create the sloped approach, steel gable trusses will be provided. For the pool support structure, the building will be a single-story CMU building with a metal deck roof. The CMU walls will provide both the gravity and seismic support for the building. Steel beams will be provided at approximately 10 feet on center to support the metal deck and allow for attachment of MEP distribution systems. July 14, 2025 Gilroy Civic Center Master Plan ELS Architects Concept Design – Structural Narrative Page 2 160 Pine Street, Suite 600, San Francisco, California, 94111 | 415 837 0700 www.forell.com Based on the review of the available geotechnical information, the building is assumed to be founded on shallow foundations with a reinforced concrete slab on grade. A final foundation system will be confirmed following the geotechnical engineering report and recommendations. LATERAL LOAD RESISTING SYSTEM: The lateral load resisting system for the buildings is proposed to be Buckling Restrained Braced Frames. The floor and roof slabs described above will function as horizontal seismic diaphragms spanning between the braced frame locations. During the schematic design phase additional lateral systems will be explored. STRUCTURAL CRITERIA: The design will conform to the 2025 California Building Code. Vertical and Lateral Loads: Dead Loads: Self-weight. See below for superimposed loading assumptions. Live Loads (From Existing Drawings): a. Typical Floors: 100 psf b. Terrace: 100 psf c. Roof Areas: 20 psf (reducible) Superimposed Dead Loads a. Terrace: 100 psf b. Typical Floor: 15 psf c. Roof: 15 psf + 5 psf PV Cladding: Metal Panel with glazing and curtain wall, 20psf assumed maximum. Deflection Limits: Floor LL L/360 Floor TL L/240 Roof LL L/360 Roof TL L/240 Exterior Beam LL L/360 Elevator Machine Beams L/1666 Floor Flatness: FF=30 FL=20 Overall FF=24 FL=15 Local Wind: Risk Category II Basic Wind Speed: 92 mph Surface Roughness Category: B Exposure Category: B Seismic, based on 2025 CBC/ASCE7-22: Risk Category II V = SDS/(R/I))*W STRUCTURAL ENGINEERINGDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 113Gilroy Civic Center Master Plan July 14, 2025 Gilroy Civic Center Master Plan ELS Architects Concept Design – Structural Narrative Page 3 160 Pine Street, Suite 600, San Francisco, California, 94111 | 415 837 0700 www.forell.com ρ = 1.0 Soil Site Class: D Assumed Seismic Design Category: D SS=1.72g S1=0.63g SDS=1.26g SD1=1.25g I= 1.0 Buckling Restrained Braced Frame: R=8 Ω = 2.5 CD=5 MATERIAL PROPERTIES: Concrete Compression Strength: • Foundations 4,000psi • Slab-on-grade 3,000psi Steel Reinforcement (Deformed): • ASTM A615, Grade 60 Structural Steel: • Wide Flange: ASTM A992, Grade 50 • HSS: ASTM A1085 • Plate: ASTM A572, Grade 36 Wood: • CLT: Grade V2M1.1 • Glulam: Douglas Fir, Grade 24F SUSTAINABILITY GOALS: The structural sustainability goals for the project are focused on the selection of low-embodied carbon materials. The selection of mass timber for the primary floor system provides a low initial embodied carbon number along with the benefits of biogenic carbon due to the stored carbon in the wood. For the concrete embodied carbon, based on market availability, it is recommended that the project target an embodied carbon number of 242 kgCO2e/m3, which is 25% below the Carbon Leadership Baseline for the region which is 323 kgCO2e/m3. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 114Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 2 of 56 TABLE OF CONTENTS • SECTION 1 - GENERAL • SECTION 2 – HEATING, VENTILATION AND AIR CONDITIONING ARTS BUILDING • SECTION 3 – HEATING, VENTILATION AND AIR CONDITIONING CITY HALL • SECTION 4 – HEATING, VENTILATION AND AIR CONDITIONING RECREATIONAL BUILDING • SECTION 5 – PLUMBING • SECTION 6 – ELECTRICAL • SECTION 7 – LOW VOLTAGE ARTS BUILDING • SECTION 8 – LOW VOLTAGE CITY HALL • SECTION 9 – LOW VOLTAGE RECREATION BUILDING 1620 Montgomery Street, Suite 30, San Francisco, CA 94111 p 415.655.4000 SAN FRANCISCO SACRAMENTO www.gb-eng.com Mechanical, Electrical, and Plumbing Conceptual Narrative – Rev-02 Gilroy Civic Center Master Plan MECHANICAL, ELECTRICAL, PLUMBING, AND LOW VOLTAGEDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 115Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 4 of 56 • Minimize pressure drop. • Minimize reheat loads. • Minimize total air movement using point of use techniques such as chilled beams. • Minimize lighting energy use through effective daylighting strategies. • Reduce electrical plug loads as much as possible including the use of demand control. • Employ extremely efficient mechanical systems to handle the remaining loads including: o Natural ventilation where feasible. o Mixed mode ventilation where feasible. o Use of displacement ventilation with destratification fans in spaces with high ceilings. o Use of transfer air from clean to dirty space for additional make up air. o Maximize economizer hours. o Provide energy recovery. • The coefficient of performance of moving energy using a heat pump versus transforming energy by using fossil fuels to create energy through combustion can go from 95% for high efficiency condensing boilers to 500% using efficient heat pump technology. • Develop accurate predictions of annual energy consumption and life cycle cost analysis. • Commission your systems and ensure proper functioning of the system. • Implement a Monitoring Based Commissioning Plan (MBCx) II. CODES Systems will be designed in accordance with the latest edition of the following codes: • California Codes and Regulations. • California Green Building Code – Tier-II. • DSA – Division of the State Architect. • NFPA – National Fire Protection Association. • SMACNA • IAPMO • ANSI • ASHRAE • Local Amendments to above Codes. END OF SECTION-1 GENERAL SECTION 2 – HEATING, VENTILATION AND AIR CONDITIONING ARTS BUILDING I. GENERAL The project shall be all electric with no use of fossil fuels for heating or cooking. There will be no gas service to the buildings. Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 3 of 56 SECTION 1: GENERAL I. PROJECT SCOPE The project consists of master planning services for redevelopment of the existing Civic Center site. The Civic Center site currently contains: City Hall; the City Hall Annex (housing the Emergency Operations Center, computer training lab, and other extra office and storage spaces); Wheeler Gymnasium; Library; Senior Center; current Police Headquarters; seven parking lots of various sizes; four (4) single family residential homes (three (3) are not currently city-owned) that will be demolished; one small grass area; Wheeler Park; and a central open area. This document is a high-level systems narrative for the new proposed buildings: City Hall, Community Center, and Recreation Center with an outdoor pool. The intention is that the project design will exclude the use of fossil fuels, meeting CALGreen Tier-II and LEED Gold minimum with the aim for LEED Platinum if budget allows. To minimize energy use we recommend a passive approach including: • Define sustainability goals. o All electric o Net zero site or source energy; based on past experience we recommend using site energy. o Carbon action plan including scope; based on past experience we recommend Scope-1 and 2 reductions by: ▪ Eliminate the use of fossil fuels. ▪ Eliminate the use of refrigerants in line with California Air Resource Board (CARB) regulations o Energy Use Intensity (EUI) in kBtu/Sqft/Yr. This item requires additional modeling to estimate potential reductions in energy consumption. This should be done before project RFP’s are issued. Based on targets set by other organizations for new projects, being administration type of spaces, we recommend a target of less than 25kBtu/Sqft/Yr. • Understand the microclimate of the project site. o Establish the design criteria for system performance. We recommend using the 20Yr predicted ASHRAE 0.1% extreme ambient design conditions. See HVAC design criteria provided below. o Design the orientation, form, and mass of the building to maximize the use of natural energy flows and reduce external loads to the absolute practical minimum. o The architecture and detailing are key in limiting infiltration such that the envelope is built tight and the building is ventilated as needed for the occupants with minimum external influence. We recommend an air tightness of less than 3 M3/Hr/M2 at 50 Pascals. o Use of strategically placed thermal mass and night flush strategies to offset peak demand. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 116Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 6 of 56 o Where transfer or return air paths are required in full height acoustical partitions, include a sound boot, ideally two 90° elbows separated by a minimum 4’-0” of straight ductwork and fully internally lined, to maintain acoustical sound isolation performance. o Locate volume dampers at least 4’ upstream of diffusers or return grilles; locate farther upstream if possible. o The design will include crosstalk mitigation between spaces with common duct runs. o VAV units should be at least 8’ from diffusers. o Mechanical equipment shall be located above non-noise sensitive areas. o FCUs for conference rooms shall be sized to meet the intended load at medium set point. • Vibration Isolation: o All major pieces of rotating or vibrating equipment shall be supported on vibration isolation mounts. o Vibration isolators shall consist of unhoused helical steel springs in series with neoprene pads, and seismic snubbers. o All vibration isolators shall be sized according to the weight, distribution, static and dynamic loads to be supported. o Vibration isolator ratings shall be expressed as static deflection and sized for at least eight times the static deflection of the supporting structure. o Seismic restraint of equipment will not inhibit vibration isolation. o Multi-fan arrays shall be isolated using neoprene mounts between each motor and frame. • Seismic Control: o Shall meet the requirements of Chapter 16 of the California Building Code. o Force factor of 1.0 will be applied for non-critical facilities. o Force factor of 1.5 will be applied for any critical facility that may require continued operations after an event. III. HVAC ZONING FOR TEMPERATURE CONTROL The project shall be designed such that enough zones are provided to achieve the “Controllability of Systems” credit for LEED. • Perimeter zones shall be separated from interior zones. • Corner rooms shall be on their own zone if they have glazing on a different orientation from other rooms. • Zoning shall be provided as follows o Meet LEED Controllability Credit o Corner offices shall be a dedicated zone o Zones shall be made up of similar use space and on the same orientation o Perimeter zones shall be separated from interior zones. o Conference rooms and meeting rooms shall have their own dedicated zones. o Lobbies and reception shall have dedicated zoning. o MDF/IDF/IT rooms shall have dedicated zone o Restrooms and corridor shall be controlled via adjacent controlled spaces. Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 5 of 56 II. HVAC DESIGN CRITERIA Outdoor Design Criteria • Summer Outdoor Design Conditions 108F DB, 77F WB (ASHRAE 0.1% 20yr Extreme) • Winter Outdoor Design Conditions 32F DB (ASHRAE 0.2%) Indoor Design Criteria • Heating Indoor Design Temperature 68F DB +/- 2 F • Cooling Indoor Design Temperature 72F DB +/- 2 F • Telecommunications Space Colg only 68 to 72F DB • No humidity control will be provided unless specifically required by for operational needs. Outside Air Quantities per California Building Code • Restrooms o Greater of 10 ACH or 50cfm/fixture when occupied. o 4 ACH when unoccupied. • Locker/Shower rooms o 12 ACH when occupied. o 6 ACH when unoccupied • Waiting Rooms - 10 ach/hr • Janitors Closets - 2 CFM per Sqft. • All other spaces, minimum of 30% higher than ASHRAE Standard 62.1 Noise, Vibration, and Seismic Control for Mechanical Systems. • Acoustic treatment o Acoustic treatment shall be provided on AHU’s and exhaust fans o Select AHUs with end discharge and return. o The AHU selection shall be such that an acoustical silencer is not required to meet the noise levels to reduce pressure drop. Coplanar Silencers would be recommended. o All service connections (ducts, piping and conduit) shall be resiliently isolated from oscillating units via flexible connections. o Seismic restraints will be compatible with the vibration isolation equipment. Seismic restraints should not create rigid connections between equipment and structural building elements. o Terminal units shall be located away from noise sensitive spaces such as conference rooms, offices, training rooms, etc. Where such placements cannot be avoided, additional noise control measures may be required to minimize radiated noise levels. o Diffusers and return grilles should be rated at least 5 NC points lower than the target maximum NC of the room in which they are to be located. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 117Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 8 of 56 o Cold Water o Irrigation o Electric • Sub Meters o Domestic Hot Water o Receptacles o Lighting o Equipment • BTU Meters o Chilled Water o Heating Hot Water VI. CENTRAL PLANT The heating and cooling load for the project shall be via the use of Air Sourced Heat Pump (ASHP) technology. The ASHP can be located on grade or at roof level with the following features: • A minimum of two ASHP in parallel, each at 75% duty. • The ASHP shall produce Chilled Water (CHW) and Heating Hot Water (HHW) concurrently. • Primary/Secondary configuration, each loop with three pumps at 50% duty each. • Buffer tanks provided for the CHW and HHW. • Heating element for safe oil return to compressor on emergency power. VII. CUSTOM AIR HANDLING UNITS All administration, and public areas shall be served by high efficiency variable air volume (VAV) custom air handling units. The AHUs shall be provided with: • Low pressure drop. • Maximum 350fpm face velocity. • Economizer • MERV-8 Pre-filters • Stainless steel frames and accessories for coils, and filters. • Energy Recovery with by-pass • Copper/Copper Heating coil with by-pass • Cooling coil with by-pass • Stainless steel drain pans • Stainless steel downstream of the cooling coil • Multi-fan array optimized to run multiple fans for best efficiency to meet demand including N+1 (fan) redundancy. • VFD and local disconnect per fan • Coplanar silencers • MERV-13 Final-filters with Stainless steel frames and accessories. Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 7 of 56 o Rooms that can be divided by operable partitions shall be provided with controls for each divided space. The setpoints shall have adequate adjustable differential to prevent the zones fighting each other. o Electrical and mechanical shall have a dedicated cooling unit. IV. BUILDING AUTOMATION SYSTEM (BAS) The BAS shall compose of direct digital controls (DDC) which shall communicate with the central campus head end computer local area network (LAN) located at the Facilities Operations Office (FOO). In addition to minimizing equipment energy use, the system shall report malfunctions of critical equipment via alarms to the FOO. Environmental controls for the building will be fully DDC, computerized Building Automation System per the standard set for the Gilroy Civic Center. The system will be PC based and will include color graphic representation of mechanical building systems. The BAS software will include scheduling operation of mechanical equipment, alarm and logging (data file and/or printed) of events. Room thermostats will be remotely re-settable and concealed or locking type in public areas. The control system shall be web-enabled to allow remote access with different priorities set for different users. CO2 control shall be provided for each AHU. The sensor shall be space mounted per code. Local supervisory BAS shall be provided with communication back to the Gilroy Civic Center FOO. All Building Controllers installed shall be connecting to the FOO server. All installed energy meters shall be able to communicate over the LAN, either inherently or via an installed gateway, using BACnet IP™. Sequence of Operations shall be per ASHRAE Guideline-36 with trim and response resets for equipment including temperature resets for temporary unoccupied, unoccupied, and night setback. Operable windows will be used where possible including window interlock with the HVAC system. No compressor energy used to cool the supply air if the ambient conditions are =<74F No compressor energy used to heat the supply air if the ambient conditions are =>66F V. METERING All meters shall be mapped to an equipment record created on the FOO server. Meter shall be provided per Title-24, LEED and the following: • Main Meters Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 118Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 10 of 56 • Heating Indoor Design Temperature 68F DB +/- 2 F • Cooling Indoor Design Temperature 72F DB +/- 2 F • Telecommunications Space Clg only 68 to 72F DB • No humidity control will be provided unless specifically required by for operational needs. Outside Air Quantities per California Building Code • Restrooms o Greater of 10 ACH or 50cfm/fixture when occupied. o 4 ACH when unoccupied. • Locker/Shower rooms o 12 ACH when occupied. o 6 ACH when unoccupied • Waiting Rooms - 10 ach/hr • Janitors Closets - 2 CFM per Sqft. • All other spaces, minimum of 30% higher than ASHRAE Standard 62.1 Noise, Vibration, and Seismic Control for Mechanical Systems. • Acoustic treatment o Acoustic treatment shall be provided on AHU’s and exhaust fans o Select AHUs with end discharge and return. o The AHU selection shall be such that an acoustical silencer is not required to meet the noise levels to reduce pressure drop. Coplanar Silencers would be recommended. o All service connections (ducts, piping and conduit) shall be resiliently isolated from oscillating units via flexible connections. o Seismic restraints will be compatible with the vibration isolation equipment. Seismic restraints should not create rigid connections between equipment and structural building elements. o Terminal units shall be located away from noise sensitive spaces such as conference rooms, offices, training rooms, etc. Where such placements cannot be avoided, additional noise control measures may be required to minimize radiated noise levels. o Diffusers and return grilles should be rated at least 5 NC points lower than the target maximum NC of the room in which they are to be located. o Where transfer or return air paths are required in full height acoustical partitions, include a sound boot, ideally two 90° elbows separated by a minimum 4’-0” of straight ductwork and fully internally lined, to maintain acoustical sound isolation performance. o Locate volume dampers at least 4’ upstream of diffusers or return grilles; locate farther upstream if possible. o The design will include crosstalk mitigation between spaces with common duct runs. o VAV units should be at least 8’ from diffusers. o Mechanical equipment shall be located above non-noise sensitive areas. o FCUs for conference rooms shall be sized to meet the intended load at medium set point. Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 9 of 56 • Air flow station. With wildfires becoming a norm each year, we recommend the AHU filter housing is suitable for carbon filters. The fan motors will need to be sized to overcome the pressure drop for these filters when used. In the event of a wild fire the normal MERV-13 filters can be swapped out with the carbon filters. We also recommend: • The carbon filters are used only when needed because they come at a cost and have a higher pressure drop which results in higher running cost. • The carbon filters are purchase ahead of time so that they are available for use when needed. VIII. SPACE CONDITIONING • Auditorium: Dedicated ultra quiet system using displacement ventilation and destratification fans. • Gymnasium: Displacement ventilation with destratification fans. • Kitchen/Dinning: Demand control ventilation using heat and smoke for controlling the exhaust including use of transfer air from the dining room to serve as make up air for the commercial kitchen. The commercial kitchen may have a Type-I and Type-II hood each with dedicated exhaust hood based on demand. The AHU for the Dining area will be having return air capability to recirculate dining room air when used for events. • Equipment room: All equipment rooms such as electrical rooms, MDF/IDF rooms, machine elevator rooms, and mechanical rooms shall have dedicated cooling using Dx- Split units. Critical spaces as required by the Owner will have backup systems. • Other Spaces: The remainder of the building will be served using a dedicated demand control ventilation system. Restrooms, Janitors closets, locker rooms will have dedicated exhaust with transfer air from adjacent space for make air. END OF SECTION-2 HVAC ARTS BUILDING SECTION 3 – HEATING, VENTILATION AND AIR CONDITIONING CITY HALL I. GENERAL The project shall be all electric with no use of fossil fuels for heating or cooking. There will be no gas service to the building. II. HVAC DESIGN CRITERIA Outdoor Design Criteria • Summer Outdoor Design Conditions 108F DB, 77F WB (ASHRAE 0.1% 20yr Extreme) • Winter Outdoor Design Conditions 32F DB (ASHRAE 0.2%) Indoor Design Criteria Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 119Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 10 of 56 • Heating Indoor Design Temperature 68F DB +/- 2 F • Cooling Indoor Design Temperature 72F DB +/- 2 F • Telecommunications Space Clg only 68 to 72F DB • No humidity control will be provided unless specifically required by for operational needs. Outside Air Quantities per California Building Code • Restrooms o Greater of 10 ACH or 50cfm/fixture when occupied. o 4 ACH when unoccupied. • Locker/Shower rooms o 12 ACH when occupied. o 6 ACH when unoccupied • Waiting Rooms - 10 ach/hr • Janitors Closets - 2 CFM per Sqft. • All other spaces, minimum of 30% higher than ASHRAE Standard 62.1 Noise, Vibration, and Seismic Control for Mechanical Systems. • Acoustic treatment o Acoustic treatment shall be provided on AHU’s and exhaust fans o Select AHUs with end discharge and return. o The AHU selection shall be such that an acoustical silencer is not required to meet the noise levels to reduce pressure drop. Coplanar Silencers would be recommended. o All service connections (ducts, piping and conduit) shall be resiliently isolated from oscillating units via flexible connections. o Seismic restraints will be compatible with the vibration isolation equipment. Seismic restraints should not create rigid connections between equipment and structural building elements. o Terminal units shall be located away from noise sensitive spaces such as conference rooms, offices, training rooms, etc. Where such placements cannot be avoided, additional noise control measures may be required to minimize radiated noise levels. o Diffusers and return grilles should be rated at least 5 NC points lower than the target maximum NC of the room in which they are to be located. o Where transfer or return air paths are required in full height acoustical partitions, include a sound boot, ideally two 90° elbows separated by a minimum 4’-0” of straight ductwork and fully internally lined, to maintain acoustical sound isolation performance. o Locate volume dampers at least 4’ upstream of diffusers or return grilles; locate farther upstream if possible. o The design will include crosstalk mitigation between spaces with common duct runs. o VAV units should be at least 8’ from diffusers. o Mechanical equipment shall be located above non-noise sensitive areas. o FCUs for conference rooms shall be sized to meet the intended load at medium set point. Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 9 of 56 • Air flow station. With wildfires becoming a norm each year, we recommend the AHU filter housing is suitable for carbon filters. The fan motors will need to be sized to overcome the pressure drop for these filters when used. In the event of a wild fire the normal MERV-13 filters can be swapped out with the carbon filters. We also recommend: • The carbon filters are used only when needed because they come at a cost and have a higher pressure drop which results in higher running cost. • The carbon filters are purchase ahead of time so that they are available for use when needed. VIII. SPACE CONDITIONING • Auditorium: Dedicated ultra quiet system using displacement ventilation and destratification fans. • Gymnasium: Displacement ventilation with destratification fans. • Kitchen/Dinning: Demand control ventilation using heat and smoke for controlling the exhaust including use of transfer air from the dining room to serve as make up air for the commercial kitchen. The commercial kitchen may have a Type-I and Type-II hood each with dedicated exhaust hood based on demand. The AHU for the Dining area will be having return air capability to recirculate dining room air when used for events. • Equipment room: All equipment rooms such as electrical rooms, MDF/IDF rooms, machine elevator rooms, and mechanical rooms shall have dedicated cooling using Dx- Split units. Critical spaces as required by the Owner will have backup systems. • Other Spaces: The remainder of the building will be served using a dedicated demand control ventilation system. Restrooms, Janitors closets, locker rooms will have dedicated exhaust with transfer air from adjacent space for make air. END OF SECTION-2 HVAC ARTS BUILDING SECTION 3 – HEATING, VENTILATION AND AIR CONDITIONING CITY HALL I. GENERAL The project shall be all electric with no use of fossil fuels for heating or cooking. There will be no gas service to the building. II. HVAC DESIGN CRITERIA Outdoor Design Criteria • Summer Outdoor Design Conditions 108F DB, 77F WB (ASHRAE 0.1% 20yr Extreme) • Winter Outdoor Design Conditions 32F DB (ASHRAE 0.2%) Indoor Design Criteria Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 120Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 12 of 56 In addition to minimizing equipment energy use, the system shall report malfunctions of critical equipment via alarms to the FOO. Environmental controls for the building will be fully DDC, computerized Building Automation System per the standard set for the Gilroy Civic Center. The system will be PC based and will include color graphic representation of mechanical building systems. The BAS software will include scheduling operation of mechanical equipment, alarm and logging (data file and/or printed) of events. Room thermostats will be remotely re-settable and concealed or locking type in public areas. The control system shall be web-enabled to allow remote access with different priorities set for different users. CO2 control shall be provided for each AHU. The sensor shall be space mounted per code. Local supervisory BAS shall be provided with communication back to the Gilroy Civic Center FOO. All Building Controllers installed shall be connecting to the FOO server. All installed energy meters shall be able to communicate over the LAN, either inherently or via an installed gateway, using BACnet IP™. Sequence of Operations shall be per ASHRAE Guideline-36 with trim and response resets for equipment including temperature resets for temporary unoccupied, unoccupied, and night setback. Operable windows will be used where possible including window interlock with the HVAC system. No compressor energy used to cool the supply air if the ambient conditions are =<74F No compressor energy used to heat the supply air if the ambient conditions are =>66F V. METERING All meters shall be mapped to an equipment record created on the FOO server. Meter shall be provided per Title-24, LEED and the following: • Main Meters o Cold Water o Irrigation o Electric • Sub Meters o Domestic Hot Water o Receptacles o Lighting o Equipment • BTU Meters o Chilled Water o Heating Hot Water Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 11 of 56 • Vibration Isolation: o All major pieces of rotating or vibrating equipment shall be supported on vibration isolation mounts. o Vibration isolators shall consist of unhoused helical steel springs in series with neoprene pads, and seismic snubbers. o All vibration isolators shall be sized according to the weight, distribution, static and dynamic loads to be supported. o Vibration isolator ratings shall be expressed as static deflection and sized for at least eight times the static deflection of the supporting structure. o Seismic restraint of equipment will not inhibit vibration isolation. o Multi-fan arrays shall be isolated using neoprene mounts between each motor and frame. • Seismic Control: o Shall meet the requirements of Chapter 16 of the California Building Code. o Force factor of 1.0 will be applied for non-critical facilities. o Force factor of 1.5 will be applied for any critical facility that may require continued operations after an event. III. HVAC ZONING FOR TEMPERATURE CONTROL The project shall be designed such that enough zones are provided to achieve the “Controllability of Systems” credit for LEED. • Perimeter zones shall be separated from interior zones. • Corner rooms shall be on their own zone if they have glazing on a different orientation from other rooms. • Zoning shall be provided as follows o Meet LEED Controllability Credit o Corner offices shall be a dedicated zone o Zones shall be made up of similar use space and on the same orientation o Perimeter zones shall be separated from interior zones. o Conference rooms and meeting rooms shall have their own dedicated zones. o Lobbies and reception shall have dedicated zoning. o MDF/IDF/IT rooms shall have dedicated zone o Restrooms and corridor shall be controlled via adjacent controlled spaces. o Rooms that can be divided by operable partitions shall be provided with controls for each divided space. The setpoints shall have adequate adjustable differential to prevent the zones fighting each other. o Electrical and mechanical shall have a dedicated cooling unit. IV. BUILDING AUTOMATION SYSTEM (BAS) The BAS shall compose of direct digital controls (DDC) which shall communicate with the central campus head end computer local area network (LAN) located at the Facilities Operations Office (FOO). Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 121Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 14 of 56 • Other Spaces: The remainder of the building will be served using a dedicated demand control ventilation system. Restrooms, Janitors closets, locker rooms will have dedicated exhaust with transfer air from adjacent space for make air. END OF SECTION-3 HVAC CITY HALL SECTION 4 – HEATING, VENTILATION AND AIR CONDITIONING RECREATIONAL BUILDING IX. GENERAL The project shall be all electric with no use of fossil fuels for heating or cooking. There will be no gas service to the building. X. HVAC DESIGN CRITERIA Outdoor Design Criteria • Summer Outdoor Design Conditions 108F DB, 77F WB (ASHRAE 0.1% 20yr Extreme) • Winter Outdoor Design Conditions 32F DB (ASHRAE 0.2%) • No compressor energy used to cool the supply air if the ambient conditions are =<74F • No compressor energy used to heat the supply air if the ambient conditions are =>66F Indoor Design Criteria • Heating Indoor Design Temperature 68F DB +/- 2 F • Cooling Indoor Design Temperature 72F DB +/- 2 F • Telecommunications Space Clg only 68 to 72F DB • No humidity control will be provided unless specifically required by for operational needs. Outside Air Quantities per California Building Code • Restrooms o Greater of 10 ACH or 50cfm/fixture when occupied. o 4 ACH when unoccupied. • Locker/Shower rooms o 12 ACH when occupied. o 6 ACH when unoccupied • Waiting Rooms - 10 ach/hr • Janitors Closets - 2 CFM per Sqft. • All other spaces, minimum of 30% higher than ASHRAE Standard 62.1 Noise, Vibration, and Seismic Control for Mechanical Systems. • Acoustic treatment o Acoustic treatment shall be provided on AHU’s and exhaust fans Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 13 of 56 VI. CENTRAL PLANT The heating and cooling load for the project shall be via the use of Air Sourced Heat Pump (ASHP) technology. The ASHP can be located on grade or at roof level with the following features: • A minimum of two ASHP in parallel, each at 75% duty. • The ASHP shall produce Chilled Water (CHW) and Heating Hot Water (HHW) concurrently. • Primary/Secondary configuration, each loop with three pumps at 50% duty each. • Buffer tanks provided for the CHW and HHW. • Heating element for safe oil return to compressor on emergency power. VII. CUSTOM AIR HANDLING UNITS All administration, and public areas shall be served by high efficiency variable air volume (VAV) custom air handling units. The AHUs shall be provided with: • Low pressure drop. • Maximum 350fpm face velocity. • Economizer • Merv-8 Pre-filters • Stainless steel frames and accessories for coils, and filters. • Energy Recovery with by-pass • Copper/Copper Heating coil with by-pass • Cooling coil with by-pass • Stainless steel drain pans • Stainless steel downstream of the cooling coil • Multi-fan array optimized to run multiple fans for best efficiency to meet demand including N+1 (fan) redundancy. • VFD and local disconnect per fan • Coplanar silencers • Merv-13 Final-filters with Stainless steel frames and accessories. • Air flow station. VIII. SPACE CONDITIONING • Counsil Chamber: Dedicated ultra quiet system using displacement ventilation and destratification fans. • Equipment room: All equipment rooms such as electrical rooms, MDF/IDF rooms, machine elevator rooms, and mechanical rooms shall have dedicated cooling using Dx- Split units. Critical spaces as required by the Owner will have backup systems. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 122Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 16 of 56 The project shall be designed such that enough zones are provided to achieve the “Controllability of Systems” credit for LEED. • Perimeter zones shall be separated from interior zones. • Corner rooms shall be on their own zone if they have glazing on a different orientation from other rooms. • Zoning shall be provided as follows o Meet LEED Controllability Credit o Corner offices shall be a dedicated zone o Zones shall be made up of similar use space and on the same orientation o Perimeter zones shall be separated from interior zones. o Conference rooms and meeting rooms shall have their own dedicated zones. o Lobbies and reception shall have dedicated zoning. o MDF/IDF/IT rooms shall have dedicated zone o Restrooms and corridor shall be controlled via adjacent controlled spaces. o Rooms that can be divided by operable partitions shall be provided with controls for each divided space. The setpoints shall have adequate adjustable differential to prevent the zones fighting each other. o Electrical and mechanical shall have a dedicated cooling unit. XII. BUILDING AUTOMATION SYSTEM (BAS) The BAS shall compose of direct digital controls (DDC) which shall communicate with the central campus head end computer local area network (LAN) located at the Facilities Operations Office (FOO). In addition to minimizing equipment energy use, the system shall report malfunctions of critical equipment via alarms to the FOO. Environmental controls for the building will be fully DDC, computerized Building Automation System per the standard set for the Gilroy Civic Center. The system will be PC based and will include color graphic representation of mechanical building systems. The BAS software will include scheduling operation of mechanical equipment, alarm and logging (data file and/or printed) of events. Room thermostats will be remotely re-settable and concealed or locking type in public areas. The control system shall be web-enabled to allow remote access with different priorities set for different users. CO2 control shall be provided for each AHU. The sensor shall be space mounted per code. Local supervisory BAS shall be provided with communication back to the Gilroy Civic Center FOO. All Building Controllers installed shall be connecting to the FOO server. All installed energy meters shall be able to communicate over the LAN, either inherently or via an installed gateway, using BACnet IP™. Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 15 of 56 o Select AHUs with end discharge and return. o The AHU selection shall be such that an acoustical silencer is not required to meet the noise levels to reduce pressure drop. Coplanar Silencers would be recommended. o All service connections (ducts, piping and conduit) shall be resiliently isolated from oscillating units via flexible connections. o Seismic restraints will be compatible with the vibration isolation equipment. Seismic restraints should not create rigid connections between equipment and structural building elements. o Terminal units shall be located away from noise sensitive spaces such as conference rooms, offices, training rooms, etc. Where such placements cannot be avoided, additional noise control measures may be required to minimize radiated noise levels. o Diffusers and return grilles should be rated at least 5 NC points lower than the target maximum NC of the room in which they are to be located. o Where transfer or return air paths are required in full height acoustical partitions, include a sound boot, ideally two 90° elbows separated by a minimum 4’-0” of straight ductwork and fully internally lined, to maintain acoustical sound isolation performance. o Locate volume dampers at least 4’ upstream of diffusers or return grilles; locate farther upstream if possible. o The design will include crosstalk mitigation between spaces with common duct runs. o VAV units should be at least 8’ from diffusers. o Mechanical equipment shall be located above non-noise sensitive areas. o FCUs for conference rooms shall be sized to meet the intended load at medium set point. • Vibration Isolation: o All major pieces of rotating or vibrating equipment shall be supported on vibration isolation mounts. o Vibration isolators shall consist of unhoused helical steel springs in series with neoprene pads, and seismic snubbers. o All vibration isolators shall be sized according to the weight, distribution, static and dynamic loads to be supported. o Vibration isolator ratings shall be expressed as static deflection and sized for at least eight times the static deflection of the supporting structure. o Seismic restraint of equipment will not inhibit vibration isolation. o Multi-fan arrays shall be isolated using neoprene mounts between each motor and frame. • Seismic Control: o Shall meet the requirements of Chapter 16 of the California Building Code. o Force factor of 1.0 will be applied for non-critical facilities. o Force factor of 1.5 will be applied for any critical facility that may require continued operations after an event. XI. HVAC ZONING FOR TEMPERATURE CONTROL Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 123Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 18 of 56 The outdoor pool will be heated using a dedicated ASHP system. Titanium plate and frame Heat Exchangers (HEX) will used between the pool loop and the heat source. Three pumps sized at 50% each will be used to circulated the heating hot water. The pool side of the HEX will also have three pumps sized at 50% each along with a dedicated pool control system to maintain temperature, circulation rate and chemical treatment as required by code and the Health Department. For further pool efficiency measures, if budget allows, we recommend: • Wind effects are minimized on the pool surface. • Pools covers are used, out of hours, when the pool is not being used. • The building ASHP is interconnected with the pool system heating loop for providing heat energy when the building has access available capacity. • A PVT system can be installed to heat the pool when the ambient conditions are suitable. From experience the larger the PVT system, the quicker the return on investment. XV. CUSTOM AIR HANDLING UNITS All administration, and public areas shall be served by high efficiency variable air volume (VAV) custom air handling units. The AHUs shall be provided with: • Low pressure drop. • Maximum 350fpm face velocity. • Economizer • Merv-8 Pre-filters • Stainless steel frames and accessories for coils, and filters. • Energy Recovery with by-pass • Copper/Copper Heating coil with by-pass • Cooling coil with by-pass • Stainless steel drain pans • Stainless steel downstream of the cooling coil • Multi-fan array optimized to run multiple fans for best efficiency to meet demand including N+1 (fan) redundancy. • VFD and local disconnect per fan • Coplanar silencers • Merv-13 Final-filters with Stainless steel frames and accessories. • Air flow station. XVI. SPACE CONDITIONING • Gymnasium: Displacement ventilation with destratification fans. • Equipment room: All equipment rooms such as electrical rooms, MDF/IDF rooms, machine elevator rooms, and mechanical rooms shall have dedicated cooling using Dx- Split units. Critical spaces as required by the Owner will have backup systems. Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 17 of 56 Sequence of Operations shall be per ASHRAE Guideline-36 with trim and response resets for equipment including temperature resets for temporary unoccupied, unoccupied, and night setback. Operable windows will be used where possible including window interlock with the HVAC system. No compressor energy used to cool the supply air if the ambient conditions are =<74F No compressor energy used to heat the supply air if the ambient conditions are =>66F XIII. METERING All meters shall be mapped to an equipment record created on the FOO server. Meter shall be provided per Title-24, LEED and the following: • Main Meters o Cold Water o Irrigation o Electric • Sub Meters o Domestic Hot Water o Receptacles o Lighting o Equipment • BTU Meters o Chilled Water o Heating Hot Water XIV. CENTRAL PLANT The heating and cooling load for the project shall be via the use of Air Sourced Heat Pump (ASHP) technology. The ASHP can be located on grade or at roof level with the following features: • A minimum of two ASHP in parallel, each at 75% duty. • The ASHP shall produce Chilled Water (CHW) and Heating Hot Water (HHW) concurrently. • Primary/Secondary configuration, each loop with three pumps at 50% duty each. • Buffer tanks provided for the CHW and HHW. • Heating element for safe oil return to compressor on emergency power. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 124Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 20 of 56 3. Storm Drain; Based on building square footage four 6” or one 10” storm drain would be required. 4. Domestic Water Heating; Based on the space assumptions above a single roof or grade mounted heat pump water heater combined with a moderately sized (+/-1000 gallons combined) storage and swing tank would be adequate for hot water usage in this building. 5. Based on the anticipated simultaneous usage of fixtures, tank type heat pump water heaters are not able to provide sufficient hot water even if the kitchen utilized a separate water heater from the rest of the building. 6. Fire Sprinkler; Coordination to provide a 6” Fire Service to the building would likely be required until complete calculations are done. II. CITY HALL A. ASSUMPTIONS 1. Water, sewer, and storm utilities in the area are of adequate size, depth and pressure to accommodate the new buildings. 2. No provisions for Essential Facilities or Emergency Operations have been included in these estimates. 3. Water Closets are assumed to be Flush Valve type. B. POTENTIAL SPACES WITH WATER USE 1. Two Public Women’s Restrooms 2. Two Public Men’s Restrooms 3. One Single Occupant Restroom 4. Mechanical Rooms 5. Bar Sinks and/or Drinking Fountains are assumed for each department (Public Works, Human Resources, Admin, etc.) and Common Spaces/Lobbies C. UTILITIES REQUIRED 1. Sewer; A 6” sewer is recommended Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 19 of 56 • Other Spaces: The remainder of the building will be served using a dedicated demand control ventilation system. Restrooms, Chemical rooms, Janitors closets, locker rooms will have dedicated exhaust with transfer air from adjacent space for make air. END OF SECTION-4 HVAC RECREATIONAL BUILDING SECTION 5: PLUMBING I. ART BUILDING A. ASSUMPTIONS 1. Water, sewer, and storm utilities in the area are of adequate size, depth and pressure to accommodate the new buildings. 2. No provisions for Essential Facilities or Emergency Operations have been included in these estimates. 3. Water Closets are assumed to be Flush Valve type. B. POTENTIAL SPACES WITH WATER USE 1. Two Public Women’s Restrooms 2. Two Public Men’s Restrooms 3. Four Gender Neutral Restrooms 4. Utility Rooms 5. Art Rooms 6. A Commercial Kitchen (General Fixtures with 3-Compartment sink, no commercial dishwasher assumed) 7. Bar Sinks and/or Drinking Fountains are assumed for Youth/Elderly Lounge and Activity Rooms and Common Spaces/Lobbies C. UTILITIES REQUIRED 1. Sewer; A 6” sewer is recommended 2. Domestic Water; A 2-1/2” Domestic Water Service would be anticipated. This would be capable of serving all Domestic Water uses in the building as well as make-up water to the HVAC system if required. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 125Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 22 of 56 7. Pool Mechanical Room C. UTILITIES REQUIRED 1. Sewer; An 8” sewer is anticipated due to the impact of the swimming pool drainage. A 6” sewer serving the Recreational Center building only would be adequate. 2. Domestic Water; An 8” Domestic Water Service would be anticipated due to the impact of the pool make-up water required. A 2-1/2” Domestic Water Service serving the Recreational Center building only would be adequate. This would be capable of serving all Domestic Water uses in the building as well as make-up water to the HVAC system if required. 4. A 4” make-up water to the Pool Equipment an a 2” make-up water connection to the Pool Heat Pump system would be anticipated. 5. Storm Drain; Based on building square footage four 6” or one 10” storm drain would be required for the Recreation Center Building and a 4” drain would be required for the Pool Mechanical Building. 6. Domestic Water Heating; Based on the space assumptions above two roof or grade mounted heat pump water heaters combined with storage and a swing tank (+/- 2000 gallons combined) would be adequate for hot water usage in this building. 7. Pool Water Heating; Based on the pool square footage represented space should be allocated to accommodate +/- 30 heat pump chillers for pool heating. 8. Pool Mechanical; Due to chemical storage a safety shower will be required at the Pool Mechanical Building. In order to avoid circulating large hot water supply pipes to the Pool Mechanical Building a dedicated water heater within the building may be recommended. 9. Fire Sprinkler; Coordination to provide a 6” Fire Service to the building would likely be required until complete calculations are done. END OF SECTION-5 PLUMBING SECTION 6: ELECTRICAL I. ELECTRICAL A. DESCRIPTION OF WORK 1. The project scope of work is in accordance with the Project Scope. Power to the site will be a new service by PG&E to a new pad-mounted transformer and will be distributed to the buildings in one of two ways: Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 21 of 56 2. Domestic Water; A 2-1/2” Domestic Water Service would be anticipated. This would be capable of serving all Domestic Water uses in the building as well as make-up water to the HVAC system if required. 3. Storm Drain; Based on building square footage four 6” or one 10” storm drain would be required. 4. Domestic Water Heating Options; Based on the space assumptions above a single roof or grade mounted heat pump water heater combined with a moderately sized (+/-1000 gallons combined) storage and swing tank would be adequate for hot water usage in this building. 5. A single self-contained Tank Type Heat Pump Water Heater may be adequate to serve the building. A room of 3200 square feet minimum and/or louvers to the outside would be required to accommodate the Tank Type Heat Pump Water Heater. 6. Fire Sprinkler; Coordination to provide a 6” Fire Service to the building would likely be required until complete calculations are done. III. RECREATION CENTER A. ASSUMPTIONS 1. Water, sewer, and storm utilities in the area are of adequate size, depth and pressure to accommodate the new buildings. 2. No provisions for Essential Facilities or Emergency Operations have been included in these estimates. 3. Water Closets are assumed to be Flush Valve type. B. POTENTIAL SPACES WITH WATER USE 1. Two Women’s Locker Rooms 2. Two Men’s Locker Rooms 3. Four Family Changing Rooms 4. Two Gender Neutral Restrooms 5. Mechanical Rooms 6. Bar Sinks and/or Drinking Fountains are assumed for Flex Rooms, Break Room, Conference Room and Common Spaces/Lobbies Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 126Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 24 of 56 4. These inverters will feed directly into the main switchboard and shall be located in the main electrical room. A disconnect for each inverter shall be provided in each main electrical room. E. HEATED POOLS 1. Heated pools will be provided in the project. How heating is provided is to be determined it is our understanding the system will be all electric with no use of fossil fuels. F. TELECOM/IDF 1. Telecom/IDF space shall be provided. One or more network switches shall provide all telecom needs for the building, which shall be owner furnished and owner installed. Data ports shall be provided through the building in areas not designated as wet locations. For additional information see low voltage narratives. G. LIGHTING SYSTEMS 1. Interior Lighting: (a) All lighting will utilize high efficacy LED sources. (b) All lighting will be designed to meet or exceed California Title 24 power density and mandatory measure requirements. (c) The standard correlated color temperature (CCT) for LED lighting will be 3500 or 4000K for the Interior spaces and 3000K or 4000K for Exterior. Provide CRI no less than 90 for interior spaces (except utility rooms to have min. 80 CRI) and no less than 70 for exterior. (d) LED (Solid State Lighting) shall be tested to LM 79 and LM 80. (e) Average maintained interior light levels will be as defined in accordance with the IESNA 10th edition. (f) Egress illumination will be connected to the emergency power supply and will extend through the exit discharge which terminates at the exterior exit or public way. Egress illumination will be provided to maintain an average of 1 footcandle (fc) at the center and a minimum of 0.1 fc at the edge measured at the floor. Uniformity ratios of 40 to 1 will not be exceeded. (g) Exit signs will be single circuit LED type and will be located to define the egress pathway through the exit discharge. Exit signage will be illuminated internally and will be connected to the emergency power system. No areas more than 100 ft. to be without exit sign. Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 23 of 56 (a) A single service to an outdoor main switchboard. This switchboard will then feed to each building on site. (b) Three services, one service per building. 2. A new electrical distribution and new lighting system shall be provided within each new building and around the site and pools. B. SERVICE AND DISTRIBUTION SYSTEM EQUIPMENT 1. New Service: A new service and a new pad-mounted transformer will be provided. The Utility shall provide the transformer and cables to the main switchboard(s). This project will provide the required concrete pad and conduit connections. 2. Main Switchboard: A new switchboard will be provided for all distribution for the building and site. The switchboard shall be provided with a utility-provided net- energy meter since PVs will be provided. This allows the owner to sell energy back to the Utility when PV electrical production exceeds building and site electrical loads. 3. Title 24 Separation of Loads for Future Metering: Provisions within the main switchboard shall be provided for se9paration of loads for future metering of the feeders serving lighting, receptacles, plumbing, and HVAC loads. 4. Panelboards: One or more 225A-208/120V panelboards shall be provided for each load type; Equipment, Receptacles, Lighting, etc as required by Title 24. C. EMERGENCY POWER 1. The only loads that require emergency power are code-required egress lighting. An emergency inverter with batteries shall be provided as required. Additional emergency power may be provided depending upon the City’s needs. D. PHOTOVOLTAIC SYSTEMSH 1. A portion of the rooftop areas of the buildings will be designated for photovoltaic (PV) panels. 2. The PV system will feed its power into two (2) inverters. Two inverters are provided for both redundancy and to facilitate maintenance/changeout of an individual inverter without completely removing PV system capability. 3. The inverters shall be “grid-interactive” capable and be able to feed back into the utility electrical grid when power generated exceeds the building loads. This will require “net-energy metering” from service utility so that the client can sell power back to the Utility. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 127Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 26 of 56 (d) Constants such as lumen output per lamp, fixture efficiency, maintenance factor, or coefficient of utilization, shall be shown with the source of the constants identified, such as a product cut sheet. In most cases, the maintenance factors should be chosen on the basis of a medium-intensity maintenance program, full rated voltage applied, no ceiling, and floor reflectance’s with architectural finishes and explain significant excursions from the 80/50/20% standard. (e) Calculate the vertical illumination level for those rooms and spaces where adequate illumination of walls, display cases and boards, or shelves is important to the function of the room. (f) For exterior photometric calculation, use isolux curves to design ground or fence lighting systems to obtain the required minimum foot candle level, horizontal, at ground level. (g) Use the point-by-point method to develop isolux curves for design of parking, ground, flood, or perimeter fence lighting systems to design the required horizontal foot candle levels and uniformities at ground level. Submit the exterior lighting calculations as part of the design package. Commercial software programs explained in the IESNA Handbook are preferred in place of isolux curves method. Identify the program used by trade name and version number. 8. Site Lighting: (a) Pole-mounted site lighting shall be provided as required. The site lighting shall be provided with cutoff to comply with “dark sky” requirements and to reduce glare to neighboring buildings. 9. Lighting Control System: (a) The lighting control system will use a combination of automatic astronomical time clock-controlled relay control panels and local occupancy sensors (ultrasonic/infrared type where appropriate). Automatic daylighting controls will be provided in interior and as required and will automatically either dim or switch off the lighting when sufficient daylight is present. Local wall control will be provided as well. (b) Building mounted and Exterior lighting will be controlled with photocells and by programmable controllable relays and where necessary shall also be equipped with motion sensors. (c) Lighting controls shall be provided to all spaces and comply with current Title- 24 mandatory control requirements. Provide lighting control dashboards that completely shows current plans. Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 25 of 56 2. Main Lobby and Stairs The Lobby area shall have recessed linear lighting that is uniform with the hallway lights. The reception area shall have decorative pendant fixtures for additional illumination. Light fixtures are on the following page. 3. Office: Office lighting shall employ recessed 2’x2’ or 2’x4’. 4. Corridors: Corridor lighting shall employ recessed linear at T-grid ceiling and combination of pendant or wall mounted linear lights when there is no ceiling. 5. Restrooms: These areas will be lit with continuous perimeter linear fixtures at the toilet wall and above sinks. Recessed downlights will be added to fill in light in the other areas. Fixtures rated for wet areas will be used in the showers. The washrooms will employ energy efficient ceiling mounted downlight luminaires in general circulation area and vanity recessed ceiling mount luminaires and linear perimeter ceiling slot lighting fixtures along the walls. 6. Storage, Stairs, MEP rooms, and Other Back-of-House Rooms: Utilitarian inexpensive lighting will be used. Lighting location will be coordinated with equipment location. Lighting will be surface or pendant mounted depending on room height. 7. Lighting documentation/plans: (a) The final construction documents shall show all luminaire, luminaire types and mounting elevations with respect to bottom of fixture from finish floor, lighting symbols showing recessed, circuits, conduits, wires, boxes, homeruns, switches, occupancy sensors, day lighting sensors, dimmers and other controls, notes, lights that are designated as emergency egress per CBC 1006 and the Architect's life safety egress plan, exit signs, multi-level switching designations (a/b) on switches and lights, evening and night lights, manual override switches at building entrances at minimum, and all other applicable items. (b) Coordinate with the Architectural reflected ceiling plan. Provide 3 or 4 way switching for all rooms with more than one door. (c) For interior photometric calculation, calculate the horizontal illumination levels for each room using the zonal cavity method described in the IESNA Handbook 10th Edition. Similar sized rooms may be reported under a single spreadsheet calculation when the illumination level does not vary more than 5%-10% across the group of rooms. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 128Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 28 of 56 (n) All exterior lighting shall be on a programmed time coordinated with the Owner. Provide separate zoning per fixture types and locations. (o) Safety and Security being priority, extended hours for some lights to stay ‘ON’ after the programmed control OFF of most of the exterior lights, particularly at main entry and exit door/areas. (p) Provide a sequence of operation that is coordinated with the Owner (i.e. time scheduling, individual space control functions, remote monitoring, etc.). H. FIRE ALARM SYSTEM (a) A new, automatic, addressable, fire alarm system shall be provided to meet the requirements of the adopted editions of the California Building Code, California Fire Code, National Fire Alarm and Signaling Code (NFPA 72), as well as local requirements by the AHJ. (b) The fire alarm system will provide system alarm, supervisory and trouble signal monitoring, and alarm notification for the building. The system will report to an outside agency through a wireless DACT connection or Cellular DACT. The system will have batteries to provide a secondary power source in case of primary power loss to the control panel or any remote power supply. (c) Activation of any system smoke detectors, heat detectors, manual pull stations, sprinkler water flow switches and suppression systems will initiate alarm signals on the fire alarm control panel (FACP) and fire alarm annunciator (FAA), and activate the audible and visual notification appliances throughout the building(s) per the fire alarm sequence of operations. Activation of sprinkler tamper switches and HVAC duct smoke detectors will initiate supervisory signals, which will annunciate on the FACP and the FAA. (d) The need for automatic smoke detection throughout the space will be determined. In any case, smoke detection will be required in air handling units and at any fire/smoke dampers. (e) Manual pull stations will be provided within 4’ of exits as required by the code. Audible and/or visual alarm devices will be provided throughout the building for ADA compliant notification and signaling. (f) Control outputs will be provided for fire safety functions, such as air handler shut down, fire smoke damper closure and fire door release and elevator control. I. GENERAL Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 27 of 56 (d) Provide pre and post construction commissioning of controls from the manufacturer to assure controls functions are per controls sequence and energy simulation/performance. (e) Provide Owner assistance and control usage on site tutorials. Minimum two site visits. (f) Low voltage wall mounted manual lighting controls will be provided at each area surrounded by floor to ceiling walls. (g) All areas with more than one light fixture installed or exceeds 0.5 watts per sq. ft. will be equipped with local wall mounted Bi-level controls or continuous dimming controls allowing the lighting to be turned off or raised and lowered in an even fashion as desired by the occupant. (h) In areas where effective daylight is available (primary, secondary and skylights) and as required by code, an automatic daylighting sensor will be integrated into the lighting control systems. (i) In areas such as mechanical and electrical space, where local automatic lighting controls may create a hazard by false cycling, automatic controls will not be utilized. (j) Lobbies, corridors and other public circulation spaces will be controlled by low voltage relay panels equipped with an automatic integral digital astronomical timeclock. Local timeclock override will be accomplished by low voltage “on” only signals from wall override push button controls located conveniently to the users at each floor, in the quadrant where the override signal will be applied. The maximum limit of lighting controlled is that installed inside 5,000 square feet. (k) The lighting control system will interface with the fire alarm system. Upon an alarm signal from the fire alarm system, the lighting control system will override the local and overall control inputs and shall turn on the lighting not deactivated by a photocell device. Provide UL-924 devices at light fixtures on emergency branch circuits that are controlled with the normal branch circuit fixtures. (l) Private offices, Staff, Lockers and Multi-purpose room shall be provided with occupancy type sensors. (m) Corridors shall also be provided with occupancy type sensors capable of reducing the lighting power by at least 50% when space is unoccupied. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 129Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 30 of 56 Telecommunication spaces shall be provided with designated electrical power, with emergency and any redundancy requirements taken into consideration. The spaces shall be equipped to provide adequate power for the maximum design load for all equipment as well as a growth factor of 25 percent. Separate convenience receptacles shall be provided on a minimum of two separate walls and shall be on a separate distribution panel. Lighting Provided in telecommunication spaces shall include 24” to 48” linear LED strips located to the front and rear of data racks. Provide minimum 50-foot candles at 36” above finished floor. Provide one fixture within each TR with a battery-operated ballast (or connection to the building emergency generator, if available), locate emergency fixture closest to the door. Fire alarm and detection shall be provided in telecommunication spaces to meet code requirements. Fire suppression system installation shall be performed by a licensed and/or certified fire protection engineer to meet all code, AHJ, and client requirements. Special care shall be taken in coordination to the layout to protect the equipment in the telecom spaces and avoid obstruction to sprinklers and access to the alarm. Equipment that is not directly related to the support of the room shall not be installed or pass through the room. Telecommunication spaces design shall include, room ceilings that shall be open to the underside of the floor above and have a minimum clearance of nine feet, walls of the telecommunication spaces shall extend from the floor to the bottom of deck continuously, rooms shall include ¾” A Grade fire rated plywood wrapped around room, painted, fire-resistant fire inspection stamp shall not be covered by paint to allow easy viewing by inspectors. Minimum clearances shall be 3.28 feet. The rooms shall not include any exterior windows. Door size shall be minimum 36 inches wide and 7 feet high with no window and shall be hinged to open outward if allowed by the AHJ, in not allowed, the door shall be Located at a corner such that the door swings into the adjacent wall, and not into the room’s open space. Access to telecommunication rooms shall be electronically controlled. Door shall be rated the same as walls within the telecommunications space. III. TELECOMMUNICATIONS PATHWAYS Backbone and Horizontal pathways shall include Cable support infrastructure including cable tray, J-Hooks, and conduit systems. Ladder rack systems shall be used within telecom spaces. The system shall be designed to facilitate ongoing maintenance, accommodate future MAC’s and future growth of a minimum of 20%. All pathways shall be installed with clearance and accessibility taken into consideration and be sized appropriately with fill ratios of 50%. Cable trays shall not be placed within 5-inches of any overhead light fixture and within 12-inches of any electrical ballast. Cable Tray shall be installed in accessible ceiling areas only and shall have seismic bracing as designed by a California licensed structural engineer. Conduit shall be sized appropriately for cable fill ratios and used in inaccessible areas and routed to TO’s when necessary. Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 29 of 56 The electrical work shall include all materials, labor, equipment, services and incidentals necessary to install the electrical work complete. END OF SECTION-6 ELECTRICAL SECTION 7: LOW VOLTAGE ARTS BUILDING I. GENERAL Telecommunication structured cabling infrastructure system will include a complete system including but not limited to telecommunication spaces, pathways, firestopping, bonding infrastructure, and media for backbone and horizontal infrastructure. The infrastructure shall support wired and wireless network communication including internet access and facility network applications. II. TELECOMMUNICATIONS SPACES Telecommunication spaces shall meet industry design standards as set forth in the Telecommunication Distribution Methods Manual (TDMM) 15 th Edition. Telecommunications spaces shall provide a location for network hardware and other information, communications, and technology systems including Interbuilding backbone, Intrabuilding backbone and horizontal structured cabling systems, network (LAN) access switches, network routers, wireless access point controllers, power and connectivity accessories providing services to the IT equipment, Mechanical equipment providing services to the IT equipment, UPS and PDU units providing services to the IT equipment, Security video and access control headend equipment, emergency radio communication enhancement systems (ERCES), and two-way communication panel. A Primary telecommunication room(TR) shall be provided on level one of the Arts building and be connected to the Equipment room through interbuilding backbone and act as Intermediate Backbone and Horizontal cross-connect distribution space. This telecom room shall be a minimum size of 10’ X 12’. There shall be a secondary Telecom room on level two for horizontal distribution and shall be sized a minimum of 8’ X 10’. Telecom rooms shall be centrally located within distribution area and vertically aligned whenever possible. TR(s) shall include 2-post equipment racks, 4-post equipment racks (if needed) and overhead cable ladder rack system sized to ensure 40% fill ratio. Telecommunication spaces shall be located to keep separation from elevators, pump motors, generators, radar transmitters, induction heating devices, sources of mechanical vibration, and other potential sources of electromagnetic interference (EMI). Telecommunication spaces shall not have shared wall or be located below any plumbing or water pipes, including restrooms, sinks, etc. Telecommunication space shall maintain continuous and dedicated environmental control 24 hours a day, 365 days a year and shall maintain a positive pressure with a minimum of one air change per hour and shall satisfy all applicable building codes. Temperature and humidity level to the intake of telecommunication equipment shall be as recommended by manufacturer and ASHRAE. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 130Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 32 of 56 A Primary Bonding Busbar (PBB) shall be provided in the Primary Telecom Room and Secondary Bonding busbar (SBB’s) shall be provided in each Telecommunication room and enclosure. The PBB shall connect to the building grounding electrode with a telecommunications Bonding Conductor (TBC). A telecommunications bonding backbone (TBB) shall connect to all SBB’s in telecom spaces. Where multiple telecom rooms occur on the same level, a grounding equalizer (GE) will be provided on every third level, starting from the top floor. PBB/SBB’s shall connect to rack bonding busbar (RBB) which shall connect to telecommunications equipment within the racks. All metal equipment shall connect to the Telecommunications bonding infrastructure. 2 -hole compression ground lugs shall be used. Telecommunications bonding infrastructure shall be bonded to building steel when possible . Bonding conductors shall be green or marked with a distinctive green color, labeled, and routed with minimum bends or changes in direction. Grounding conductors shall not share pathways with communications cabling. The bonding conductors shall be calculated for a size that conforms to the guidelines set by the CEC. Sizing of the TBB TBB length linear m (ft) TBB Size (AWG) Less than 4 (13) 6 4-6 (14-20) 4 6-8 (21-26) 3 8-10 (27-33) 2 10-13 (34-41) 1 13-16 (42-52) 1/0 16-20 (53-66) 2/0 Greater than 20 (66) 3/0 VI. TELECOMMUNICATIONS INTER-BUILDING BACKBONE Inter-building backbone shall be brought into the Primary telecom room through conduits from the Entrance Facility located in the City Hall building and connect to a horizontal cross connect or pass through building pathways to the level two telecom room. VII. TELECOMMUNICATIONS INTRA-BUILDING BACKBONE Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 31 of 56 J-hooks and independent supports shall support horizontal cable in main corridor spaces and shall be spaced no further than 48”- 60” between J-hooks and within six-inches of the conduit stub-in. J-hooks shall be attached using pencil rod or ¼” threaded rod. Data cable shall not sag or rest on any electrical conduit, HVAC duct, water pipes, ceiling supports or other non-cable support systems. Do not use tie-wraps or vinyl tape to secure data cable to j-hook. Refer to manufacturer of J-Hooks to determine quantity data cable per j-hook. Where Pathways extend into the Telecommunication Spaces utilize a manufacturer’s radius drop out (waterfall) to protect station cables. Where conduits drop down onto ladder rack provide plastic spillways to prevent kinking of the installed cable bundle. Provide horizontal sleeves to penetrate Nonrated walls that will protect cabling, which may include bushings. Pathways to telecommunications outlets shall include a 5” square, 2-7/8” deep back box with a single gang ring, 1-1/4” conduit stubbed from back box into accessible space. Data outlet conduits shall have protective bushings on all conduit stubs into accessible ceilings. If a telecommunications outlet location has more than 4 cables, the junction box shall be finished with a double gang mud ring. IV. TELECOMMUNICATIONS FIRESTOP REQUIREMENT Fire rated walls shall require UL listed approved firestop assemblies. Fire stop material s shall meet F and T-rating requirements of building and fire code. Penetrations through firewalls shall allow cable installers to firestop around the cables after they are installed. Tray-based mechanical firestop systems shall be used when a cable tray penetrates a fire barrier. All firestopping installations shall be labeled in accordance with ANSI/TIA 606-C. Provide UL rated firestop systems at each deck and fire-rated wall partition. The UL system must maintain the rating of the deck or partition being penetrated. V. TELECOMMUNICATIONS BONDING INFRASTRUCTURE A telecommunications bonding infrastructure shall be provided to ensure a low impedance path to ground for telecommunications equipment and support systems. The telecommunication bonding infrastructure shall connect to the nearest approved building grounding electrode and the equipment grounding system by exothermic weld by an electrical contractor. Connection point shall be coordinated with electrical engineer. The telecommunications Bonding infrastructure shall meet the standards as set forth by ANSI/TIA-607-D Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 131Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 34 of 56 IX. TELECOMMUNICATION WIRELESS INFRASTRUCTURE The wireless infrastructure will be part of the overall distribution system selected and shall include Cat 6A cable for final connections to wireless access points that will be placed based on coverage criteria per the manufacturer recommendations. X. AUDIO VISUAL SYSTEMS Audio visual systems shall be provided for the Auditorium, Dining room, senior activity room, Gymnasium, youth activity room, Art Multi-purpose room, and Art Studio, as well as a zoned paging/public address systems in public areas and will include Sound, video and display systems as well as assisted listening system where required by ADA. All AV systems shall meet the most current Americans with Disabilities Act (ADA) requirements, including assistive listening systems, visual access, and other accommodations. Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 33 of 56 Intrabuilding Backbone cable within the Arts building shall include copper and fiber optic cable, the backbone that will originate from the Primary Telecom room and connect to the Telecom room located on the second level. The backbone cable will home run to each Telecom room with no splices. VIII. TELECOMMUNICATIONS HORIZONTAL CABLING The horizontal cabling system shall provide connectivity to users, building IP systems and devices, Wi-Fi devices, and other components and systems requiring IP connection. A twisted Pair distribution -Horizontal cabling shall be 4-pair U/UTP Category 6A rated, with cable jacket rating based on application, plenum vs riser vs outside rated. Distribution will come from the horizontal cross-connect at the nearest Telecom space to the TO or device and cable distances shall not exceed 295 feet, channels shall not exceed 328 feet. Consolidation points (CP’s) and multiuser telecommunication outlet assemblies (MUTOAs) shall be considered in the distribution to make future moves and changes easier to accommodate. See below typical horizontal cabling system diagram from the BICSI TDMM 15th edition. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 132Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 36 of 56 The intrusion detection system shall provide protection at locations including, but not limited to: • Perimeter – Doors and windows • Area of space – office space and hallways as well as duress buttons at reception area as deemed appropriate by owner. The system shall include the following components: • Detection sensors – Passive infrared/ultrasonic and door contacts. • Processing and transmitting devices – Control panel and dialer • Annunciators and sounding devices – bells, horns, and strobe lights • Power source – Transformers and batteries XIV. VIDEO SURVEILLANCE SYSTEM (VSS) The Video surveillance system shall be comprised of cameras that will provide security while maintaining reasonable expectations of privacy. The cameras shall be placed in public areas, including lobby, hallways, offices, activity spaces, auditorium, and entrances. No cameras shall be placed in restrooms. Cameras shall be placed in locations that monitor all entrances to the building. It is assumed all cameras will be owner provided and contractor installed to meet the requirements determined in a needs assessment. The designer will determine appropriate camera technology, camera placement, and lens selection. Cameras can be mounted on the wall or ceiling based on the location and need of the space, and should be mounted above 8 ft AFF to prevent tampering. Lighting shall be considered in camera placement to ensure there is enough lighting but no interference. Mounting and housing will be selected based on security needs and may include • Fixed- dedicated to single view. • Pan and tilt – controlled from a remote viewing station to allow for 180 or 360 -degree views. IP based video shall be used and integrate with the structured cabling system so that IP video can be continuously transmitted to any point on the network, and video can be stored on network servers or storage facilities as determined with owner. The IP based system will allow for the support of any number of cameras at one time, limited only by connection speed. XV. TWO-WAY COMMUNICATION SYSTEM- AREA OF REFUGE Per CBC section 1009.6.5 areas of refuge shall be provided with Two -way communication system complying with Section CBC 1009.8.1 and CBC 1009.8.2 Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 35 of 56 The design of the AV system shall be based upon customer requirements as well as the intended room function. The electronic equipment and cabling shall be consistent with industry standards (AVIXA and BICSI) and shall meet minimum performance standards. Sound systems shall be muted during fire alarm. The sound system shall connect to the fire alarm system via dry contact; as acceptable to the Authority Having Jurisdiction (AHJ)/Fire Marshal. XI. SECURITY The electronic security will be a system that is layered to provide protection through access control, intrusion detection, video surveillance, and duress/lock down systems. XII. ACCESS CONTROL SYSTEM Access control shall be provided at select doors where access can be monitored, tracked and controlled per the campus requirements. Card readers are required for main entries, public entries, Telcom and building infrastructure rooms including electrical, mechanical, etc.., door to roof, elevators, and stairwell entry to regulate and manage entry to the campus and specific areas identified through risk assessment. This ensures that only authorized individuals, such as staff, or approved visitors, are allowed to enter certain restricted zones. Manufacturer shall be confirmed with owner and card readers shall be owner furnished and contractor installed. The system shall provide the capability of being controlled remotely, allowing administrators to lock or unlock doors with the click of a button. The system shall provide access for disabled community and shall meet all ADA code requirements System shall be installed by a security vendor that is certified and approved by the manufacturer to install and certify the access control system. XIII. INTRUSION DETECTION AND DURESS An intrusion detection system will be designed to provide visual, audible, and/or electronic notification of the security problem. The system shall be comprised of three common components: • Sensors – shall detect the undesired or desired activity and alarm when certain preset conditions are met. • Sending circuit – Provides power to sensors and monitors the condition of the sensors- monitoring can include o Local alarm – visual or audible devices notifying anyone in the immediate area o Central station – off-site and a contract service monitoring fire and intrusion alarms through a contracted central station location or a fire, emergency medical service, or police dispatch center • Annunciator Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 133Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 38 of 56 SECTION 8: LOW VOLTAGE CITY HALL I. GENERAL Telecommunication structured cabling infrastructure system will include a complete system including but not limited to telecommunication spaces, pathways, firestopping, bonding infrastructure, and media for backbone and horizontal infrastructure. The infrastructure shall support wired and wireless network communication including internet access and facility network applications. II. TELECOMMUNICATIONS SPACES Telecommunication spaces shall meet industry design standards as set forth in the Telecommunication Distribution Methods Manual (TDMM) 15th Edition. Telecommunications spaces shall provide a location for network hardware and other information, communications, and technology systems including Interbuilding backbone, Intrabuilding backbone and horizontal structured cabling systems, network (LAN) access switches, network routers, wireless access point controllers, power and connectivity accessories providing services to the IT equipment, Mechanical equipment providing services to the IT equipment, UPS and PDU units providing services to the IT equipment, Security video and access control headend equipment, emergency radio communication enhancement systems (ERCES), and two -way communication panel. Campus Entrance Facility (EF) (previously called MPOE) shall be provided on level one of the city hall building and shall provide space for containing an entrance for public and private network service media, including wireless. The space shall be sized to meet the known requirements of the campus and main cross connect with future growth. The size of the cabling termination field (ex. Wall-mounted cross connect terminations, size, and quantity of patch panels) is based on the quantity of cable to be terminated which includes incoming SP cables, Protector units, Campus cables, Building/premise EF minimum size shall be 4’ X 6’ An Equipment room (ER) shall support the main cross connect for the campus infrastructure and be located in close proximity to the Entrance facility. The ER shall function as the main backbone cross-connect and provide Horizontal distribution to level one of the City Hall building. The ER shall be minimum size 12’ X 15’ to provide sufficient space for existing requirements and future growth. A Telecommunication room(TR) shall be provided on level two of the city hall building and be connected to the Equipment room through intrabuilding backbone and act as Horizontal cross - connect distribution. This telecom room shall be a minimum size of 9’ X 10’. Telecom rooms shall be centrally located withing distribution area and vertically aligned whenever possible. Equipment in ER and TR(s) include 2 -post equipment racks, 4-post equipment racks (if needed) and overhead cable ladder rack system sized to ensure 40% fill ratio. Telecommunication spaces shall be located to keep separation from elevators, pump motors, generators, radar transmitters, induction heating devices, sources of mechanical vibration, and other potential sources of electromagnetic interference (EMI). Telecommunication spaces shall not have shared wall or be located below any plumbing or water pipes, including restrooms, sinks, etc. Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 37 of 56 The system shall provide devices at the landing serving each elevator or bank of elevators and stairways that are listed as areas of refuge on each accessible floor that is one or more stories above or below the level of discharge. Two -way communication systems shall provide communication between each required location and the fire command center, or an approved control point location approved by the fire department. Both two-way communications systems primary and secondary power supplies along with each two-way communications system circuit shall be monitored by the fire alarm system for failure, open and short circuit conditions, respectively, and report such conditions as trouble alarm. All conductors interconnecting the communications stations and two -way communications control point(s) shall be circuit integrity -rated, cable or circuit integrity in conduit cable to meet the requirements of NFPA 72 that pass the two -hour U.L. 2196 flame test. XVI. EMERGENCY RESPONDER COMMUNICATIONS ENHANCEMENT SYSTEMS (ERCES) Public safety radio coverage infrastructure shall be in accordance with NFPA 1221 and 1225 and sections of CFC 510.5.1 through CFC 510.5.4 per CBC section 918.1. ERCES designer and lead installation personnel shall have minimum qualifications that include: unless adequate skills and experience have been demonstrated and is satisfactory to the AHJ. • Valid FCC -issued general radio operator’s license • Certification of in-building system training issued by an approved organization or school. • Certificate issued by the manufacturer of the equipment being installed. ERCES vendor shall provide full design for review by local agency prior to installation, make any corrections as needed. Resubmit design to local agency for approval prior to work starting. System shall include pathways, rated cable, connectors, splitters, donor antennas, indoor antennas, BDA, power supplies, batteries, interface with fire alarm system and monitoring panel which monitors the following conditions: • AC Input normal. • Loss of normal AC power. • Battery charger failure. • Loss of battery. • Active RF emitting device malfunction. • Donor antenna disconnection. • Donor antenna malfunction. ERCES testing shall comply with CFC 510.5.4. All ERCES system installation and components shall comply with all applicable federal regulations including but not limited to, FCC 47 CFR Part 90.219. END OF SECTION-7 LOW VOLTAGE ARTS BUILDING Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 134Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 40 of 56 All pathways shall be installed with clearance and accessibility taken into consideration and be sized appropriately with fill ratios of 50%. Cable trays shall not be placed within 5 -inches of any overhead light fixture and within 12 -inches of any electrical ballast. Cable Tray shall be installed in accessible ceiling areas only and shall have seismic bracing as designed by a California licensed structural engineer. Conduit shall be sized appropriately for cable fill ratios and used in inaccessible areas and routed to TO’s when necessary. J-hooks and independent supports shall support horizontal cable in main corridor spaces and shall be spaced no further than 48”- 60” between J-hooks and within six-inches of the conduit stub-in. J- hooks shall be attached using pencil rod or ¼” threaded rod. Data cable shall not sag or rest on any electrical conduit, HVAC duct, water pipes, ceiling supports or other non -cable support systems. Do not use tie-wraps or vinyl tape to secure data cable to j -hook. Refer to manufacturer of J-Hooks to determine quantity data cable per j -hook. Where Pathways extend into the Telecommunication Spaces utilize a manufacturer’s radius drop out (waterfall) to protect station cables. Where conduits drop down onto ladder rack provide plastic spillways to prevent kinking of the installed cable bundle. Provide horizontal sleeves to penetrate Nonrated walls that will protect cabling, which may include bushings. Pathways to telecommunications outlets shall include a 5” square, 2 -7/8” deep back box with a single gang ring, 1-1/4” conduit stubbed from back box into accessible space. Data outlet conduits shall have protective bushings on all conduit stubs into accessible ceilings. If a telecommunications outlet location has more than 4 cables, the junction box shall be finished with a double gang mud ring. IV. TELECOMMUNICATIONS FIRESTOP REQUIREMENT Fire rated walls shall require UL listed approved firestop assemblies. Fire stop material s shall meet F and T-rating requirements of building and fire code. Penetrations through firewalls shall allow cable installers to firestop around the cables after they are installed. Tray-based mechanical firestop systems shall be used when a cable tray penetrates a fire barrier. All firestopping installations shall be labeled in accordance with ANSI/TIA 606-C. Provide UL rated firestop systems at each deck and fire-rated wall partition. The UL system must maintain the rating of the deck or partition being penetrated. V. TELECOMMUNICATIONS BONDING INFRASTRUCTURE A telecommunications bonding infrastructure shall be provided to ensure a low impedance path to ground for telecommunications equipment and support systems. The telecommunication bonding infrastructure shall connect to the nearest approved building grounding electrode and the equipment grounding system by exothermic weld by an electrical contractor. Connection point shall be coordinated with electrical engineer. Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 39 of 56 Telecommunication space shall maintain continuous and dedicated environmental control 24 hours a day, 365 days a year and shall maintain a positive pressure with a minimum of one air change per hour and shall satisfy all applicable building codes. Temperature and humidity level to the intake of telecommunication equipment shall be as recommended by manufacturer and ASHRAE. Telecommunication spaces shall be provided with designated electrical power, with emergency and any redundancy requirements taken into consideration. The spaces shall be equipped to provide adequate power for the maximum design load for all equipment as well as a growth factor of 25 percent. Separate convenience receptacles shall be provided on a minimum of two separate walls and shall be on a separate distribution panel. Lighting Provided in telecommunication spaces shall include 24” to 48” linear LED strips located to the front and rear of data racks. Provide minimum 50 -foot candles at 36” above finished floor. Provide one fixture within each TR with a battery-operated ballast (or connection to the building emergency generator, if available), locate emergency fixture closest to the door. Fire alarm and detection shall be provided in telecommunication spaces to meet code requirements. Fire suppression system installation shall be performed by a licensed and/or certified fire protection engineer to meet all code, AHJ, and client requirements. Special care shall be taken in coordination to the layout to protect the equipment in the telecom spaces and avoid obstruction to sprinklers and access to the alarm. Equipment that is not directly related to the support of the room shall not be installed or pass through the room. Telecommunication spaces design shall include, room ceilings that shall be open to the underside of the floor above and have a minimum clearance of nine feet, walls of the telecommunication spaces shall extend from the floor to the bottom of deck continuously, rooms shall include ¾” A Grade fire rated plywood wrapped around room, painted, fire -resistant fire inspection stamp shall not be covered by paint to allow easy viewing by inspectors. Minimum clearances shall be 3.28 feet. The rooms shall not include any exterior windows. Door size shall be minimum 36 inches wide and 7 feet high with no window and shall be hinged to open outward if allowed by the AHJ, in not allowed, the door shall be Located at a corner such that the door swings into the adjacent wall, and not into the room’s open space. Access to telecommunication rooms shall be electronically controlled. Door shall be rated the same as walls within the telecommunications space. III. TELECOMMUNICATIONS PATHWAYS Backbone and Horizontal pathways shall include Cable support infrastructure including cable tray, J-Hooks, and conduit systems. Ladder rack systems shall be used within telecom spaces. The system shall be designed to facilitate ongoing maintenance, accommodate future MAC’s and future growth of a minimum of 20%. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 135Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 42 of 56 The Entrance facility shall receive both a copper and fiber optic cable Backbone that will originate from the Service provider vault, the service provider shall be responsible for the cable up to the demarcation point. The backbone cable will connect at the City Hall Equipment room for main cross connect and home run from the EF to the recreation building and the art buildings primary Telecom rooms with no splices. Fiber optic and copper backbone cable shall terminate onto a rack mounted termination hardware. Fiber optic housing shall be rack mounted and sized to accommodate single and multi -mode fiber optic cable. fiber optic panels shall be LC type couplers. Coordinate with current approved connector types. Shall install building entrance protectors (BEP) at origination point and destination. Include all solid - state fuses. BEP shall be sized to accommodate incoming copper cable. VII. TELECOMMUNICATIONS INTRA-BUILDING BACKBONE Intrabuilding Backbone cable within the City Hall building shall include copper and fiber optic cable, the backbone that will originate from the Equipment room and connect to the Telecom room located on the second level. The backbone cable will home run from the Equipment Room to each Telecom room with no splices. VIII. TELECOMMUNICATIONS HORIZONTAL CABLING The horizontal cabling system shall provide connectivity to users, building IP systems and devices, Wi-Fi devices, and other components and systems requiring IP connection. A twisted Pair distribution -Horizontal cabling shall be 4-pair U/UTP Category 6A rated, with cable jacket rating based on application, plenum vs riser vs outside rated. Distribution will come from the horizontal cross -connect at the nearest Telecom space to the TO or device and cable distances shall not exceed 295 feet, channels shall not exceed 328 feet. Consolidation points (CP’s) and multiuser telecommunication outlet assemblies (MUTOAs) shall be considered in the distribution to make future moves and changes easier to accommodate. See below typical horizontal cabling system diagram from the BICSI TDMM 15th edition. Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 41 of 56 The telecommunications Bonding infrastructure shall meet the standards as set forth by ANSI/TIA-607-D A Primary Bonding Busbar (PBB) shall be provided in the Entrance Facility and Secondary Bonding busbar (SBB’s) shall be provided in each Telecommunication room and enclosure. The PBB shall connect to the building grounding electrode with a telecommunications Bonding Conductor (TBC). A telecommunications bonding backbone (TBB) shall connect to all SBB’s in telecom spaces. Where multiple telecom rooms occur on the same level, a grounding equalizer (GE) will be provided on every third level, starting from the top floor. PBB/SBB’s shall connect to rack bonding busbar (RBB) which shall connect to telecommunications equipment within the racks. All metal equipment shall connect to the Telecommunications bonding infrastructure. 2 -hole compression ground lugs shall be used. Telecommunications bonding infrastructure shall be bonded to building steel when possible . Bonding conductors shall be green or marked with a distinctive green color, labeled, and routed with minimum bends or changes in direction. Grounding conductors shall not share pathways with communications cabling. The bonding conductors shall be calculated for a size that conforms to the guidelines set by the CEC. Sizing of the TBB TBB length linear m (ft) TBB Size (AWG) Less than 4 (13) 6 4-6 (14-20) 4 6-8 (21-26) 3 8-10 (27-33) 2 10-13 (34-41) 1 13-16 (42-52) 1/0 16-20 (53-66) 2/0 Greater than 20 (66) 3/0 VI. TELECOMMUNICATIONS INTER-BUILDING BACKBONE Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 136Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 44 of 56 X. AUDIO VISUAL SYSTEMS Audio visual systems shall be provided for the council chambers, lobby and program spaces as well as a zoned paging/public address systems in public areas and will include Sound, video and display systems as well as assisted listening system where required by ADA. All AV systems shall meet the most current Americans with Disabilities Act (ADA) requirements, including assistive listening systems, visual access, and other accommodations. The design of the AV system shall be based upon customer requirements as well as the intended room function. The electronic equipment and cabling shall be consistent with industry standards (AVIXA and BICSI) and shall meet minimum performance standards. Sound systems shall be muted during fire alarm. The sound system shall connect to the fire alarm system via dry contact; as acceptable to the Authority Having Jurisdiction (AHJ)/Fire Marshal. XI. SECURITY The electronic security will be a system that is layered to provide protection through access control, intrusion detection, video surveillance, and duress/lock down systems. XII. ACCESS CONTROL SYSTEM Access control shall be provided at select doors where access can be monitored, tracked and controlled per the campus requirements. Card readers are required for main entries, public entries, Telcom and building infrastructure rooms including electrical, mechanical, etc.., door to roof, elevators, and stairwell entry to regulate and manage entry to the campus and specific areas identified through risk assessment. This ensures that only authorized individuals, such as students, staff, or approved visitors, are allowed to enter certain restricted zones. Manufacturer shall be confirmed with owner and card readers shall be owner furnished and contractor installed. The system shall provide the capability of being controlled remotely, allowing administrators to lock or unlock doors with the click of a button. The system shall provide access for disabled community and shall meet all ADA code requirements System shall be installed by a security vendor that is certified and approved by the manufacturer to install and certify the access control system. XIII. INTRUSION DETECTION AND DURESS An intrusion detection system will be designed to provide visual, audible, and/or electronic notification of the security problem. The system shall be comprised of three common components: Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 43 of 56 IX. TELECOMMUNICATION WIRELESS INFRASTRUCTURE The wireless infrastructure will be part of the overall distribution system selected and shall include Cat 6A cable for final connections to wireless access points that will be placed based on coverage criteria per the manufacturer recommendations. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 137Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 46 of 56 IP based video shall be used and integrate with the structured cabling system so that IP video can be continuously transmitted to any point on the network, and video can be stored on network servers or storage facilities as determined with owner. The IP based system will allow for the support of any number of cameras at one time, limited only by connection speed. XV. TWO-WAY COMMUNICATION SYSTEM- AREA OF REFUGE Per CBC section 1009.6.5 areas of refuge shall be provided with Two -way communication system complying with Section CBC 1009.8.1 and CBC 1009.8.2 The system shall provide devices at the landing serving each elevator or bank of elevators and stairways that are listed as areas of refuge on each accessible floor that is one or more stories above or below the level of discharge. Two -way communication systems shall provide communication between each required location and the fire command center, or an approved control point location approved by the fire department. Both two-way communications systems primary and secondary power supplies along with each two - way communications system circuit shall be monitored by the fire alarm system for failure, open and short circuit conditions, respectively, and report such conditions as trouble alarm. All conductors interconnecting the communications stations and two -way communications control point(s) shall be circuit integrity-rated, cable or circuit integrity in conduit cable to meet the requirements of NFPA 72 that pass the two -hour U.L. 2196 flame test. XVI. EMERGENCY RESPONDER COMMUNICATIONS ENHANCEMENT SYSTEMS (ERCES) Public safety radio coverage infrastructure shall be in accordance with NFPA 1221 and 1225 and sections of CFC 510.5.1 through CFC 510.5.4 per CBC section 918.1. ERCES designer and lead installation personnel shall have minimum qualifications that include: unless adequate skills and experience have been demonstrated and is satisfactory to the AHJ. • Valid FCC-issued general radio operator’s license • Certification of in-building system training issued by an approved organization or school. • Certificate issued by the manufacturer of the equipment being installed. ERCES vendor shall provide full design for review by local agency prior to installation, make any corrections as needed. Resubmit design to local agency for approval prior to work starting. System shall include pathways, rated cable, connectors, splitters, donor antennas, indoor antennas, BDA, power supplies, batteries, interface with fire alarm system and monitoring panel which monitors the following conditions: Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 45 of 56 • Sensors – shall detect the undesired or desired activity and alarm when certain preset conditions are met. • Sending circuit – Provides power to sensors and monitors the condition of the sensors- monitoring can include o Local alarm – visual or audible devices notifying anyone in the immediate area o Central station – off-site and a contract service monitoring fire and intrusion alarms through a contracted central station location or a fire, emergency medical service, or police dispatch center • Annunciator The intrusion detection system shall provide protection at locations including, but not limited to: • Perimeter – Doors and windows • Area of space – office space and hallways as well as duress buttons at reception area as deemed appropriate by owner. The system shall include the following components: • Detection sensors – Passive infrared/ultrasonic and door contacts. • Processing and transmitting devices – Control panel and dialer • Annunciators and sounding devices – bells, horns, and strobe lights • Power source – Transformers and batteries XIV. VIDEO SURVEILLANCE SYSTEM (VSS) The Video surveillance system shall be comprised of cameras that will provide security while maintaining reasonable expectations of privacy. The cameras shall be placed in public areas, including lobby, hallways, offices, and entrances. No cameras shall be placed in restrooms. Cameras shall be placed in locations that monitor all entrances to the building. It is assumed all cameras will be owner provided and contractor installed to meet the requirements determined in a needs assessment. The designer will determine appropriate camera technology, camera placement, and lens selection. Cameras can be mounted on the wall or ceiling based on the location and need of the space, and should be mounted above 8 ft AFF to prevent tampering. Lighting shall be considered in camera placement to ensure there is enough lighting but no interference. Mounting and housing will be selected based on security needs and may include • Fixed- dedicated to single view • Pan and tilt – controlled from a remote viewing station to allow for 180 or 360-degree views. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 138Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 48 of 56 A Primary telecommunication room (TR) shall be provided on level one of the Recreation building and be connected to the Equipment room through interbuilding backbone and act as Intermediate Backbone and Horizontal cross-connect distribution space. This telecom room shall be a minimum size of 10’ X 12’. There shall be a secondary Telecom room on level two for horizontal distribution and shall be sized a minimum of 8’ X 10’. Telecom rooms shall be centrally located within distribution area and vertically aligned whenever possible. TR(s) shall include 2-post equipment racks, 4-post equipment racks (if needed) and overhead cable ladder rack system sized to ensure 40% fill ratio. Telecommunication spaces shall be located to keep separation from elevators, pump motors, generators, radar transmitters, induction heating devices, sources of mechanical vibration, and other potential sources of electromagnetic interference (EMI). Telecommunication spaces shall not have shared wall or be located below any plumbing or water pipes, including restrooms, sinks, etc. Telecommunication space shall maintain continuous and dedicated environmental control 24 hours a day, 365 days a year and shall maintain a positive pressure with a minimum of one air change per hour and shall satisfy all applicable building codes. Temperature and humidity level to the intake of telecommunication equipment shall be as recommended by manufacturer and ASHRAE. Telecommunication spaces shall be provided with designated electrical power, with emergency and any redundancy requirements taken into consideration. The spaces shall be equipped to provide adequate power for the maximum design load for all equipment as well as a growth factor of 25 percent. Separate convenience receptacles shall be provided on a minimum of two separate walls and shall be on a separate distribution panel. Lighting Provided in telecommunication spaces shall include 24” to 48” linear LED strips located to the front and rear of data racks. Provide minimum 50-foot candles at 36” above finished floor. Provide one fixture within each TR with a battery-operated ballast (or connection to the building emergency generator, if available), locate emergency fixture closest to the door. Fire alarm and detection shall be provided in telecommunication spaces to meet code requirements. Fire suppression system installation shall be performed by a licensed and/or certified fire protection engineer to meet all code, AHJ, and client requirements. Special care shall be taken in coordination to the layout to protect the equipment in the telecom spaces and avoid obstruction to sprinklers and access to the alarm. Equipment that is not directly related to the support of the room shall not be installed or pass through the room. Telecommunication spaces design shall include, room ceilings that shall be open to the underside of the floor above and have a minimum clearance of nine feet, walls of the telecommunication spaces shall extend from the floor to the bottom of deck continuously, rooms shall include ¾” A Grade fire rated plywood wrapped around room, painted, fire-resistant fire inspection stamp shall not be covered by paint to allow easy viewing by inspectors. Minimum clearances shall be 3.28 feet. The rooms shall not include any exterior windows. Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 47 of 56 • AC Input normal. • Loss of normal AC power. • Battery charger failure. • Loss of battery. • Active RF emitting device malfunction. • Donor antenna disconnection. • Donor antenna malfunction. ERCES testing shall comply with CFC 510.5.4. All ERCES system installation and components shall comply with all applicable federal regulations including but not limited to, FCC 47 CFR Part 90.219. XVII. RADIO TOWER The existing radio tower shall remain operational without interruption through demolition of the city hall annex and relocation to the police station. It is recommended that a new tower be provided to meet current FCC and information, communication and technology standards and shall be designed and installed by a qualified Radio Frequency Engineer. END OF SECTION-8 LOW VOLTAGE CITY HALL SECTION 9: LOW VOLTAGE RECREATION BUILDING I. GENERAL Telecommunication structured cabling infrastructure system will include a complete system including but not limited to telecommunication spaces, pathways, firestopping, bonding infrastructure, and media for backbone and horizontal infrastructure. The infrastructure shall support wired and wireless network communication including internet access and facility network applications. II. TELECOMMUNICATIONS SPACES Telecommunication spaces shall meet industry design standards as set forth in the Telecommunication Distribution Methods Manual (TDMM) 15 th Edition. Telecommunications spaces shall provide a location for network hardware and other information, communications, and technology systems including Interbuilding backbone, Intrabuilding backbone and horizontal structured cabling systems, network (LAN) access switches, network routers, wireless access point controllers, power and connectivity accessories providing services to the IT equipment, Mechanical equipment providing services to the IT equipment, UPS and PDU units providing services to the IT equipment, Security video and access control headend equipment, emergency radio communication enhancement systems (ERCES), and two-way communication panel. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 139Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 50 of 56 Provide UL rated firestop systems at each deck and fire-rated wall partition. The UL system must maintain the rating of the deck or partition being penetrated. V. TELECOMMUNICATIONS BONDING INFRASTRUCTURE A telecommunications bonding infrastructure shall be provided to ensure a low impedance path to ground for telecommunications equipment and support systems. The telecommunication bonding infrastructure shall connect to the nearest approved building grounding electrode and the equipment grounding system by exothermic weld by an electrical contractor. Connection point shall be coordinated with electrical engineer. The telecommunications Bonding infrastructure shall meet the standards as set forth by ANSI/TIA-607-D A Primary Bonding Busbar (PBB) shall be provided in the Primary Telecom Room and Secondary Bonding busbar (SBB’s) shall be provided in each Telecommunication room and enclosure. The PBB shall connect to the building grounding electrode with a telecommunications Bonding Conductor (TBC). A telecommunications bonding backbone (TBB) shall connect to all SBB’s in telecom spaces. Where multiple telecom rooms occur on the same level, a grounding equalizer (GE) will be provided on every third level, starting from the top floor. PBB/SBB’s shall connect to rack bonding busbar (RBB) which shall connect to telecommunications equipment within the racks. All metal equipment shall connect to the Telecommunications bonding infrastructure. 2 -hole compression ground lugs shall be used. Telecommunications bonding infrastructure shall be bonded to building steel when possible . Bonding conductors shall be green or marked with a distinctive green color, labeled, and routed with minimum bends or changes in direction. Grounding conductors shall not share pathways with communications cabling. The bonding conductors shall be calculated for a size that conforms to the guidelines set by the CEC. Sizing of the TBB TBB length linear m (ft) TBB Size (AWG) Less than 4 (13) 6 4-6 (14-20) 4 6-8 (21-26) 3 8-10 (27-33) 2 10-13 (34-41) 1 Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 49 of 56 Door size shall be minimum 36 inches wide and 7 feet high with no window and shall be hinged to open outward if allowed by the AHJ, in not allowed, the door shall be Located at a corner such that the door swings into the adjacent wall, and not into the room’s open space. Access to telecommunication rooms shall be electronically controlled. Door shall be rated the same as walls within the telecommunications space. III. TELECOMMUNICATIONS PATHWAYS Backbone and Horizontal pathways shall include Cable support infrastructure including cable tray, J-Hooks, and conduit systems. Ladder rack systems shall be used within telecom spaces. The system shall be designed to facilitate ongoing maintenance, accommodate future MAC’s and future growth of a minimum of 20%. All pathways shall be installed with clearance and accessibility taken into consideration and be sized appropriately with fill ratios of 50%. Cable trays shall not be placed within 5-inches of any overhead light fixture and within 12-inches of any electrical ballast. Cable Tray shall be installed in accessible ceiling areas only and shall have seismic bracing as designed by a California licensed structural engineer. Conduit shall be sized appropriately for cable fill ratios and used in inaccessible areas and routed to TO’s when necessary. J-hooks and independent supports shall support horizontal cable in main corridor spaces and shall be spaced no further than 48”- 60” between J-hooks and within six-inches of the conduit stub-in. J-hooks shall be attached using pencil rod or ¼” threaded rod. Data cable shall not sag or rest on any electrical conduit, HVAC duct, water pipes, ceiling supports or other non-cable support systems. Do not use tie-wraps or vinyl tape to secure data cable to j-hook. Refer to manufacturer of J-Hooks to determine quantity data cable per j-hook. Where Pathways extend into the Telecommunication Spaces utilize a manufacturer’s radius drop out (waterfall) to protect station cables. Where conduits drop down onto ladder rack provide plastic spillways to prevent kinking of the installed cable bundle. Provide horizontal sleeves to penetrate Nonrated walls that will protect cabling, which may include bushings. Pathways to telecommunications outlets shall include a 5” square, 2-7/8” deep back box with a single gang ring, 1-1/4” conduit stubbed from back box into accessible space. Data outlet conduits shall have protective bushings on all conduit stubs into accessible ceilings. If a telecommunications outlet location has more than 4 cables, the junction box shall be finished with a double gang mud ring. IV. TELECOMMUNICATIONS FIRESTOP REQUIREMENT Fire rated walls shall require UL listed approved firestop assemblies. Fire stop material s shall meet F and T-rating requirements of building and fire code. Penetrations through firewalls shall allow cable installers to firestop around the cables after they are installed. Tray-based mechanical firestop systems shall be used when a cable tray penetrates a fire barrier. All firestopping installations shall be labeled in accordance with ANSI/TIA 606-C. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 140Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 52 of 56 IX. TELECOMMUNICATION WIRELESS INFRASTRUCTURE The wireless infrastructure will be part of the overall distribution system selected and shall include Cat 6A cable for final connections to wireless access points that will be placed based on coverage criteria per the manufacturer recommendations. Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 51 of 56 13-16 (42-52) 1/0 16-20 (53-66) 2/0 Greater than 20 (66) 3/0 VI. TELECOMMUNICATIONS INTER-BUILDING BACKBONE Inter-building backbone shall be brought into the Primary telecom room through conduits from the Entrance Facility located in the City Hall building and connect to a horizontal cross connect or pass through building pathways to the level two telecom room. VII. TELECOMMUNICATIONS INTRA-BUILDING BACKBONE Intrabuilding Backbone cable within the Recreation building shall include copper and fiber optic cable, the backbone that will originate from the Primary Telecom room and connect to the Telecom room located on the second level. The backbone cable will home run to each Telecom room with no splices. VIII. TELECOMMUNICATIONS HORIZONTAL CABLING The horizontal cabling system shall provide connectivity to users, building IP systems and devices, Wi-Fi devices, and other components and systems requiring IP connection. A twisted Pair distribution -Horizontal cabling shall be 4-pair U/UTP Category 6A rated, with cable jacket rating based on application, plenum vs riser vs outside rated. Distribution will come from the horizontal cross-connect at the nearest Telecom space to the TO or device and cable distances shall not exceed 295 feet, channels shall not exceed 328 feet. Consolidation points (CP’s) and multiuser telecommunication outlet assemblies (MUTOAs) shall be considered in the distribution to make future moves and changes easier to accommodate. See below typical horizontal cabling system diagram from the BICSI TDMM 15th edition. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 141Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 54 of 56 An intrusion detection system will be designed to provide visual, audible, and/or electronic notification of the security problem. The system shall be comprised of three common components: • Sensors – shall detect the undesired or desired activity and alarm when certain preset conditions are met. • Sending circuit – Provides power to sensors and monitors the condition of the sensors- monitoring can include o Local alarm – visual or audible devices notifying anyone in the immediate area o Central station – off -site and a contract service monitoring fire and intrusion alarms through a contracted central station location or a fire, emergency medical service, or police dispatch center • Annunciator The intrusion detection system shall provide protection at locations including, but not limited to: • Perimeter – Doors and windows • Area of space – office space and hallways as well as duress buttons at reception area as deemed appropriate by owner. The system shall include the following components: • Detection sensors – Passive infrared/ultrasonic and door contacts. • Processing and transmitting devices – Control panel and dialer • Annunciators and sounding devices – bells, horns, and strobe lights • Power source – Transformers and batteries XIV. VIDEO SURVEILLANCE SYSTEM (VSS) The Video surveillance system shall be comprised of cameras that will provide security while maintaining reasonable expectations of privacy. The cameras shall be placed in public areas, including lobby, hallways, offices, activity spaces, auditorium, and entrances. No cameras shall be placed in restrooms. Cameras shall be placed in locations that monitor all entrances to the building. It is assumed all cameras will be owner provided and contractor installed to meet the requirements determined in a needs assessment. The designer will determine appropriate camera technology, camera placement, and lens selection. Cameras can be mounted on the wall or ceiling based on the location and need of the space, and should be mounted above 8 ft AFF to prevent tampering. Lighting shall be considered in camera placement to ensure there is enough lighting but no interference. Mounting and housing will be selected based on security needs and may include • Fixed- dedicated to single view • Pan and tilt – controlled from a remote viewing station to allow for 180 or 360 -degree views. Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 53 of 56 X. AUDIO VISUAL SYSTEMS Audio visual systems shall be provided for the flex rooms, gymnasium, fitness rooms, conference room and pool area, as well as a zoned paging/public address systems in public areas and will include Sound, video and display systems as well as assisted listening system where required by ADA. All AV systems shall meet the most current Americans with Disabilities Act (ADA) requirements, including assistive listening systems, visual access, and other accommodations. The design of the AV system shall be based upon customer requirements as well as the intended room function. The electronic equipment and cabling shall be consistent with industry standards (AVIXA and BICSI) and shall meet minimum performance standards. Sound systems shall be muted during fire alarm. The sound system shall connect to the fire alarm system via dry contact; as acceptable to the Authority Having Jurisdiction (AHJ)/Fire Marshal. XI. SECURITY The electronic security will be a system that is layered to provide protection through access control, intrusion detection, video surveillance, and duress/lock down systems. XII. ACCESS CONTROL SYSTEM Access control shall be provided at select doors where access can be monitored, tracked and controlled per the campus requirements. Card readers are required for main entries, public entries, Telcom and building infrastructure rooms including electrical, mechanical, etc.., door to roof, elevators, and stairwell entry to regulate and manage entry to the campus and specific areas identified through risk assessment. This ensures that only authorized individuals, such as staff, or approved visitors, are allowed to enter certain restricted zones. Manufacturer shall be confirmed with owner and card readers shall be owner furnished and contractor installed. The system shall provide the capability of being controlled remotely, allowing administrators to lock or unlock doors with the click of a button. The system shall provide access for disabled community and shall meet all ADA code requirements System shall be installed by a security vendor that is certified and approved by the manufacturer to install and certify the access control system. XIII. INTRUSION DETECTION AND DURESS Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 142Gilroy Civic Center Master Plan Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 56 of 56 • Donor antenna disconnection. • Donor antenna malfunction. ERCES testing shall comply with CFC 510.5.4. All ERCES system installation and components shall comply with all applicable federal regulations including but not limited to, FCC 47 CFR Part 90.219. END OF SECTION-9 LOW VOLTAGE RECREATION BUILDING Mechanical, Electrical, and Plumbing Narrative Gilroy Civic Center Master Plan Page 55 of 56 IP based video shall be used and integrate with the structured cabling system so that IP video can be continuously transmitted to any point on the network, and video can be stored on network servers or storage facilities as determined with owner. The IP based system will allow for the support of any number of cameras at one time, limited only by connection speed. XV. TWO-WAY COMMUNICATION SYSTEM- AREA OF REFUGE Per CBC section 1009.6.5 areas of refuge shall be provided with Two-way communication system complying with Section CBC 1009.8.1 and CBC 1009.8.2 The system shall provide devices at the landing serving each elevator or bank of elevators and stairways that are listed as areas of refuge on each accessible floor that is one or more stories above or below the level of discharge. Two -way communication systems shall provide communication between each required location and the fire command center, or an approved control point location approved by the fire department. Both two-way communications systems primary and secondary power supplies along with each two-way communications system circuit shall be monitored by the fire alarm system for failure, open and short circuit conditions, respectively, and report such conditions as trouble alarm. All conductors interconnecting the communications stations and two-way communications control point(s) shall be circuit integrity-rated, cable or circuit integrity in conduit cable to meet the requirements of NFPA 72 that pass the two-hour U.L. 2196 flame test. XVI. EMERGENCY RESPONDER COMMUNICATIONS ENHANCEMENT SYSTEMS (ERCES) Public safety radio coverage infrastructure shall be in accordance with NFPA 1221 and 1225 and sections of CFC 510.5.1 through CFC 510.5.4 per CBC section 918.1. ERCES designer and lead installation personnel shall have minimum qualifications that include: unless adequate skills and experience have been demonstrated and is satisfactory to the AHJ. • Valid FCC -issued general radio operator’s license • Certification of in-building system training issued by an approved organization or school. • Certificate issued by the manufacturer of the equipment being installed. ERCES vendor shall provide full design for review by local agency prior to installation, make any corrections as needed. Resubmit design to local agency for approval prior to work starting. System shall include pathways, rated cable, connectors, splitters, donor antennas, indoor antennas, BDA, power supplies, batteries, interface with fire alarm system and monitoring panel which monitors the following conditions: • AC Input normal. • Loss of normal AC power. • Battery charger failure. • Loss of battery. • Active RF emitting device malfunction. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 143Gilroy Civic Center Master Plan   сҞ Gilroy Civic Center Sustainability  o #$)").*'-*)/-*'–$)'0$)"/- ./*'*&.0) o /0-'1 )/$'/$*)/#-*0"#*+ -' *+ )$)".)$)*-+*-/ ./&1 )/$'/$*) / #)$,0 .—0.$)"/'' -+-/.*!/# 0$'$)"/* )#) $-!'*2)- (*1 #*/$-ѵ • /$'$5 .*'-*)0$'$)".Ѹ+*..$'4$)/ "-/ ..# ./-0/0- .!*-/# 0$'$)"*-+-&$)" - . • ' /-$ #$' #-"$)"+*2 - 4.*'- • (+'*4 3/- ( '4 !!$$ )/( #)$'.4./ (./*#)' /# - ($)$)"'*.$)'0$)"ѷ o /0-'1 )/$'/$*)2# - ! .$' ѵ o $3 (* 1 )/$'/$*)2# - ! .$' ѵ o . *!$.+' ( )/1 )/$'/$*)2$/# ./-/$!$/$*)!).$).+ .2$/##$"# $'$)".ѵ o . *!/-).! -$-!-*(' )/*$-/4.+ !*-$/$*)'(& 0+$-ѵ o 3$($5  *)*($5 -#*0-.ѵ o -*1$  ) -"4- *1 -4ѵ Water • /$'$5 - 4' 2/ -!*-$--$"/$*))/*$' /!'0.#$)"Ѹ$/2.)*/ /# $/4*!$'-*4#. ../* - 4' 2/ - • . -*0"#/Ҋ/*' -)/+')/$)") !!$$ )/$--$"/$*) • )" ./*-(2/ -*)Ҋ.$/ /#-*0"#1$.$' ').+ ./-/ "$ .''*2$)"1$.$/*-./*. /#  *)) /$*) /2 )/#  .$"))- .+*).$' 0. *!2/ - Site Access, Public Health and Comfort  • *)) /2$/#/#  3$./$)"$/4"-$)- / . ). *!--$1'/$/4 '' • -$*-$/$5 +  ./-$).! /4).$/ *)) /$1$/4 • 0++*-/$)'0.$1  ../*0$'$)".).$/ ( )$/$ . • -*1$ .# )*(!*-/' *0/**-.+ . • . )/0-'4'$"#/)1 )/$'/$*)2# - ! .$'  • $)$($5  3$./$)"#-.+ !-*(+-&$)")*-$ )/0$'$)"./*) 2+-&.+  •  .$")+0'$- .!*-*((0)$/4!0)/$*).Ѷ.0#.!-( -.(-& /. •  .$")0$'$)".4./ (.2$/# !$'/ -#*0.$)"$..0$/' !*--*)!$'/ -.!*-$/$*)' +-*/ /$*)0-$)"2$'!$- ҝ.(*&  1 )/. Materials and Resources • -$*-$/$5 /# 0. *!'*2-*)(/ -$'./*'*2 -/#  (*$ -*)!**/+-$)/ o ../$( -*)./-0/$*) o *2-*)*)- /  o $*. (/ -$'.җ ѵ"ѵ./-2$).0'/$*)Ҙ • )*-+*-/  *)./-0/$*))(/ -$'.'1" ./-/ "$ ./*- 0.  3$./$)"0$'$)"(/ -$'. *).$/ *-$1 -//# (!-*(')!$''Ѷ- 0$)"2./ ) (*$ -*)ѵ • . '*2Ҋ ($//$)")0-' (/ -$'.    рҞ Gilroy Civic Center Sustainability   цҝсфҝспсф  -#$/ /0-  -$"#/2*-&.0./$)$'$/4 $/4*!$'-*4 $'-*4$1$ )/ -0./$)$'$/4--/$1  -$"#/2*-&.0./$)$'$/4*''*-/ 2$/# )/# -* - .$")/ (/*-!/' - sustainability narrative for the City of Gilroy Civic Center, rooted in the City’s climate commitments and the .0./$)$'$/4+-$*-$/$ .$ )/$!$ 0-$)" -'4 .$")ѵ )+-'' 'Ѷ-$"#/2*-&. 1 '*+    -/$!$/$*)++-*#Ѷ$)'0$)"-!/.*- -./-" /$)" '/$)0(!*-/# $1$ )/ -0$'$)".ѵ *" /# -Ѷ/# .  '$1 -' .2$''# '+/# $/4' -'4)*).$./ )/'4*((0)$/ $/.+-*% /"*'..$/ +0-.0 .!0)$)"*++*-/0)$/$ .)+- +- .!*-+0'$ )"" ( )/)++-*1'.ѵ $'-*4$1$ )/ -0./$)$'$/4--/$1  0-+*.  #$.)--/$1 *0/'$) ./# .0./$)$'$/41$.$*))"0$$)"./-/ "$ .!*-/# $'-*4$1$ )/ - -  1 '*+( )/ѵ /$.$)/ ) /*.0++*-/ .$") $.$*).Ѷ'$")./& #*' -.Ѷ). -1 .!*0)/$*) for communicating the City’s goals to the public, !0)$)"" )$ .Ѷ) ' / *!!$$'.ѵ#  -  1 '*+( )/*!/# .$/ 2$''$)'0 +  ./-$)( )$/$ .Ѷ+-&)/#- ) 20$'$)".ѷ) 2$/4 #''Ѷ) 2-/.)*((0)$/4 )/ -)) 2- - /$*) )/ -2$/#+**'ѵ 0./$)$'$/4$.$*) # $'-*4$1$ )/ -$. )1$.$*) .+ *+' Ҋcentered public campus that reflects the City’s values of )1$-*)( )/'- .+*).$$'$/4Ѷ'*)"Ҋ/ -(- .$'$ ) Ѷ)*((0)$/42 ''Ҋ $)"ѵ# +-*% /2$''+-$*-$/$5  ''Ҋ ' /-$0$'$)".4./ (.Ѷ+..$1  .$")./-/ "$ .—$)'0$)")/0-'1 )/$'/$*)2# - ! .$' —) /#  !!$$ )/0. *! ) -"4)2/ -- .*0- .ѵ0/**-.+ .2$''  .$") !*-*(!*-/$)#*/ 2 /# -Ѷ.0++*-/$)"*/#*((0)$/40. )'$(/ - .$'$ ) ѵ0./$)$'$/4./-/ "$ .2$''  $)/ "-/ $)/*/# 0$'$)".)').+ $)24./#/.0++*-/+ -!*-() Ѷ0-$'$/4Ѷ) . *! ($)/ )) —while also creating opportunities to share the story of the City’s environmental goals /#-*0"#1$.$' Ѷ 0/$*)' .$")! /0- .ѵ 40./$)$'$/4-$*-$/$ . # !*''*2$)"/# ( .- !' / -'4+-$*-$/$ .$.0.. 2$/#/#  .$")/ (Ѷ/# $/4)"' ) /#-*0"# /# *((0)$/4*0/- #+-* ..ѵ# . ./-/ "$ .-  '*-/ *)$)/#  .$")$.$+'$) )--/$1 . ). -1 ./# .$.!*-/#   -/$!$/$*)./-/ "4ѵ Energy and Carbon •  .$"))*)./-0/ ) -"4 !!$$ )/Ѷ''Ҋ ' /-$0$'$)".4./ (.җ$)'0$)"/# +**'Ҙ • -$*-$/$5 +..$1  .$")./-/ "$ ./*- 0 *+ -/$*)*./. o Ҋ0$'$)"*-$ )//$*)/#/*+/$($5 .)/0-'4'$"#/)- 0 ..*'-# /"$) o . *!./-/ "$''4+' /# -('(..))$"#/!'0.#./-/ "$ ./**!!. /+ & ()ѵ SUSTAINABILITY AND LEED SCORECARDSDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 144Gilroy Civic Center Master Plan $'-*4Ҋ-/.)*((0)$/4 )/ - Ҋ1у*- - *'ѷ '/$)0( .#*2)ѷ*'җ/#/*'/$)0(ѷ$ )/$!4ррҊру(4 4 .+*$)/.Ҙ цр рт х сп  -/$!$ упҊуш+*$)/.$'1 -фпҊфш+*$)/.*'хпҊцш+*$)/.'/$)0(чп*-(*- +*$)/.  .ѼѼ* .ѼѼ* р - $/р )/ "-/$1 -* ..р ц с с с / -$'.о .*0- .рт*$)/.*..$' - - ,рҊ ч ч */$*))-).+*-//$*)рх*$)/.*..$' - - ,с Ҋ рх - $/рҊҊҊ рх р р р с - $/р ф р - $/с- 1$*0.'4 1 '*+ р с - $/с с р р - $/т -$*-$/4 .$")/$*)с р р - $/т с т с - $/у '&*- цп ф р р - $/у с ф - $/ф ҊҊҊ ф с - $/ф с р - $/х р р - $/ц тпڿ 0 -&$)"р ш с т с )**-)1$-*)( )/'0'$/4 рх*$)/.*..$' р - $/чѶфڿ.+ .р - - ,рҊ - - ,сҊ ц р р р 0./$)' $/ .рп*$)/.*..$' р - $/рѵр р - - ,рҊ р - $/рѵс р р - $/рр т - $/ст с - $/сҊҊҊ с р - $/т р р - $/тр р р - $/у с р р р - $/у ҊҊҊ т р - $/фр с - $/ф ҊҊҊ с р р - $/х с р - $/х р р р р - $/ц т р - $/ч р х ф / -!!$$ )4 рр*$)/.*..$' р - $/ш р - - ,р Ҋ - - ,с Ҋ х ))*1/$*)о .$")-* ..х*$)/.*..$' - - ,т Ҋ р - $/рѵр $'*/ѷ$-*''$.$*) / -- ) җ*-*/# -Ҙ р р р - $/р  0 фпڿ с р - $/рѵс $'*/ѷ-*0- ( )/*! *2-*)*)./-0/$*)/ -$'.җ*-*/# -Ҙ р у с - $/с 0 упڿ х р - $/рѵт $'*/ѷ'' ) - ./-**(.җ*-*/# -Ҙ р с - $/т ҊҊҊ с р - $/рѵу $'*/ѷ-$+/$('җ*-*/# -Ҙ р р - $/у р р - $/рѵф 3 (+'-4 -!*-() ѷ.җ*-*/# -Ҙ р р - $/сLEED™ Accredited Professional р су ч р ) -"4о/(*.+# - тт*$)/.*..$' - - ,рҊ у  "$*)'-$*-$/4 у*$)/.*..$' - - ,сҊ - - ,тҊ р - $/рѵр +/$($5 ) -"4 -!*-() җрп+/.Ҙр - - ,у Ҋ р - $/рѵс 0/**-/ -.  0/$*)җс+/.Ҙ р ф р - $/р )#ѵ3۔*)$/*-۔)1ѵ х р - $/рѵт  ) 2' ) -"4-*0/$*)җс+/.Ҙ р х т - $/сѵр фпڿ 0/$*)ш р - $/рѵу  0 -&$)"**/+-$)/җр+/Ҙ р х т - $/сѵс хпڿ 0/$*)ш р - $/рѵф )**-/ -.  0/$*)җу+/.Ҙ р р - $/тр р - $/рѵх $)2/ -)" ( )/җт+/.Ҙ р с - $/у *' 3$$'$/4о"(/с ф - $/фспڿ$ -р ф р - $/хр #*' 0$'$)"  цҝсфҝспсф /*-" о*'' /$*)*! 4'' . *)./-0/$*)о (*./ "(/')  $"#*-#** 1 '*+( )/ */$*)0$'$)" $! Ҋ4'  (+/ 0/$*)җ1уѵрҘ  ).$/$1  )-*/ /$*))1$-*)( )/'-*0/ '-/$*).җ1уѵрҘ сп.۔)#)  $"#-$*-$/4$/ *0-$)"*!2/ -$'.җ1уѵрҘ рфڿ4*./ )#)  /-/ "$ .җртѶрпѾѶ 3#0./$.*'/$*)Ҙ 0--*0)$)" ).$/4)$1 -. . ./ -$' )"- $ )/.җ1уѵрҘ сп$.'*.0- .  ../*0'$/4-).$/җ1уѵрҘ*)./-0/$*)о (*'$/$*)./ "(/$1 -/цфڿоу./- (. $4' $'$/$ .  0 -&$)"**/+-$)/җ1уѵрҘ(+0.++-*# ' /-$ #$' .җ1уѵрҘ(+0.++-*#$)$(0(  -!*-() )1$-*)( )/'**(*& *)/-*' $)2/ -)" ( )/җ1уѵрҘ(+0.++-*## -('*(!*-/ *)./-0/$*)/$1$/4*''0/$*)- 1 )/$*))#)  /-/ "$ .җтпڿ$)ѵ1 )/ѵҝс(*)$/*-.Ҙ с ).*-. $/ .. ..( )/(+0.++-*# *2Ҋ($//$)"/ -$'.җ1уѵрҘ у/ "*-$ . -*/ /*- ./*-  $//җ1уѵрҘ(+0.++-*#*)./-0/$*) )**-$-0'$/4"(/ + )+ (+0.++-*# )**-$-0'$/4.. ..( )/'0.#*0/Ҋ !*- ѵ / .') 0/$*)(+0.++-*# )/ -$*- $"#/$)"җ1уѵрҘ $"#/$)"*)/-*'. $"#/*''0/$*) 0/$*)(+0.++-*#4'$"#/җ1уѵрҘ ҊҊҊ шфпсп 0'$/4$ 2. *0./$ -!*-() җ1уѵрҘ 0/**-/ -.  0/$*)Ѷтпڿ )**-/ -.  0/$*)Ѷспڿ 0$'$)"Ҋ 1 '/ - / -$)" 0/**-/ -.  0/$*)ѶфпڿҊрппڿ )**-/ -.  0/$*)ѶсфڿҊфпڿ **'$)"*2 -/ -. / - / -$)" 0)( )/'*(($..$*)$)") -$!$/$*) $)$(0() -"4 -!*-()   () .+*).  ) 2' ) -"4-*0/$*)җ1уѵрҘ )#)  !-$" -)/)" ( )/ 0$'$)"Ҋ 1 ') -"4 / -$)" 0)( )/' !-$" -)/)" ( )/ )#) *(($..$*)$)" +/$($5 ) -"4 -!*-() Ѷ*./ҝ*0- ) -"4 +/$($5 ) -"4 -!*-() Ѷ ($..$*). 1) ) -"4 / -$)" LEED SCORECARD MULTIGENERATIONAL COMMUNITY CENTERDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 145Gilroy Civic Center Master Plan $'-*4Ҋ  )/ - Ҋ1у*- - *'ѷ '/$)0( .#*2)ѷ*'җ/#/*'/$)0(ѷ$ )/$!4рпҊрт(4 4 .+*$)/.Ҙ цт ш х сс  -/$!$ упҊуш+*$)/.$'1 -фпҊфш+*$)/.*'хпҊцш+*$)/.'/$)0(чп*-(*- +*$)/.  .ѼѼ* .ѼѼ* р - $/р )/ "-/$1 -* ..р ц с с с / -$'.о .*0- .рт*$)/.*..$' - - ,рҊ ч ч */$*))-).+*-//$*)рх*$)/.*..$' - - ,с Ҋ рх - $/рҊҊҊ рх р р р с - $/р ф р - $/с- 1$*0.'4 1 '*+ р с - $/с с р р - $/т -$*-$/4 .$")/$*)с р р - $/т с т с - $/у '&*- цп ф р р - $/у с ф - $/ф ҊҊҊ ф с - $/ф с р - $/х р р - $/ц тпڿ 0 -&$)"р рп р т с )**-)1$-*)( )/'0'$/4 рх*$)/.*..$' р - $/чѶфڿ.+ .р - - ,рҊ - - ,сҊ ц р р р 0./$)' $/ .рп*$)/.*..$' р - $/рѵр р - - ,рҊ р - $/рѵс р р - $/рр т - $/ст с - $/сҊҊҊ с р - $/т р р - $/тр р р - $/у с р р р - $/у ҊҊҊ т р - $/фр с - $/ф ҊҊҊ с р р - $/х с р - $/х р р р р - $/ц т р - $/ч р х ф / -!!$$ )4 рр*$)/.*..$' р - $/ш р - - ,р Ҋ - - ,с Ҋ х ))*1/$*)о .$")-* ..х*$)/.*..$' - - ,т Ҋ р - $/рѵр $'*/ѷ$-*''$.$*) / -- ) җ*-*/# -Ҙ р р р - $/р  0 фпڿ с р - $/рѵс $'*/ѷ-*0- ( )/*! *2-*)*)./-0/$*)/ -$'.җ*-*/# -Ҙ р у с - $/с 0 упڿ х р - $/рѵт $'*/ѷ'' ) - ./-**(.җ*-*/# -Ҙ р с - $/т ҊҊҊ с р - $/рѵу $'*/ѷ-$+/$('җ*-*/# -Ҙ р р - $/у р р - $/рѵф 3 (+'-4 -!*-() ѷ.җ*-*/# -Ҙ р р - $/сLEED™ Accredited Professional р сф ф т ) -"4о/(*.+# - тт*$)/.*..$' - - ,рҊ у  "$*)'-$*-$/4 у*$)/.*..$' - - ,сҊ - - ,тҊ р - $/рѵр +/$($5 ) -"4 -!*-() җрп+/.Ҙр - - ,у Ҋ р - $/рѵс 0/**-/ -.  0/$*)җс+/.Ҙ р ф р - $/р )#ѵ3۔*)$/*-۔)1ѵ х р - $/рѵт  ) 2' ) -"4-*0/$*)җс+/.Ҙ р ч р - $/сѵр хпڿ 0/$*)ш р - $/рѵу  0 -&$)"**/+-$)/җр+/Ҙ р ч р - $/сѵс чфڿ 0/$*)ш р - $/рѵф )**-/ -.  0/$*)җу+/.Ҙ р р - $/тр р - $/рѵх $)2/ -)" ( )/җт+/.Ҙ р с - $/у *' 3$$'$/4о"(/с с т - $/фспڿ$ -р ф р - $/хр #*' 0$'$)"  цҝсфҝспсф /*-" о*'' /$*)*! 4'' . *)./-0/$*)о (*./ "(/')  $"#*-#** 1 '*+( )/ */$*)0$'$)" $! Ҋ4'  (+/ 0/$*)җ1уѵрҘ  ).$/$1  )-*/ /$*))1$-*)( )/'-*0/ '-/$*).җ1уѵрҘ сп.۔)#)  $"#-$*-$/4$/ *0-$)"*!2/ -$'.җ1уѵрҘ рфڿ4*./ )#)  /-/ "$ .җртѶрпѾѶ 3#0./$.*'/$*)Ҙ 0--*0)$)" ).$/4)$1 -. . ./ -$' )"- $ )/.җ1уѵрҘ сп$.'*.0- .  ../*0'$/4-).$/җ1уѵрҘ*)./-0/$*)о (*'$/$*)./ "(/$1 -/цфڿоу./- (. $4' $'$/$ .  0 -&$)"**/+-$)/җ1уѵрҘ(+0.++-*# ' /-$ #$' .җ1уѵрҘ(+0.++-*#$)$(0(  -!*-() )1$-*)( )/'**(*& *)/-*' $)2/ -)" ( )/җ1уѵрҘ(+0.++-*## -('*(!*-/ *)./-0/$*)/$1$/4*''0/$*)- 1 )/$*))#)  /-/ "$ .җтпڿ$)ѵ1 )/ѵҝс(*)$/*-.Ҙ с ).*-. $/ .. ..( )/(+0.++-*# *2Ҋ($//$)"/ -$'.җ1уѵрҘ у/ "*-$ . -*/ /*- ./*-  $//җ1уѵрҘ(+0.++-*#*)./-0/$*) )**-$-0'$/4"(/ + )+ (+0.++-*# )**-$-0'$/4.. ..( )/'0.#*0/Ҋ !*- ѵ / .') 0/$*)(+0.++-*# )/ -$*- $"#/$)"җ1уѵрҘ $"#/$)"*)/-*'. $"#/*''0/$*) 0/$*)(+0.++-*#4'$"#/җ1уѵрҘ $(0'/$*)ѷ.упڿ шфпсп 0'$/4$ 2. *0./$ -!*-() җ1уѵрҘ 0/**-/ -.  0/$*)Ѷтпڿ )**-/ -.  0/$*)Ѷспڿ 0$'$)"Ҋ 1 '/ - / -$)" 0/**-/ -.  0/$*)ѶфпڿҊрппڿ )**-/ -.  0/$*)ѶсфڿҊфпڿ **'$)"*2 -/ -. / - / -$)" 0)( )/'*(($..$*)$)") -$!$/$*) $)$(0() -"4 -!*-()   () .+*).  ) 2' ) -"4-*0/$*)җ1уѵрҘ )#)  !-$" -)/)" ( )/ 0$'$)"Ҋ 1 ') -"4 / -$)" 0)( )/' !-$" -)/)" ( )/ )#) *(($..$*)$)" +/$($5 ) -"4 -!*-() Ѷ*./ҝ*0- ) -"4 +/$($5 ) -"4 -!*-() Ѷ ($..$*). 1) ) -"4 / -$)" LEED SCORECARD RECREATION & AQUATIC CENTERDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 146Gilroy Civic Center Master Plan $'-*4Ҋ$/4 '' Ҋ1у*- - *'ѷ '/$)0( .#*2)ѷ*'җ/#/*'/$)0(ѷ$ )/$!4шҊрс(4 4 .+*$)/.Ҙ цф рф т рц  -/$!$ упҊуш+*$)/.$'1 -фпҊфш+*$)/.*'хпҊцш+*$)/.'/$)0(чп*-(*- +*$)/.  .ѼѼ* .ѼѼ* р - $/р )/ "-/$1 -* ..р ч т р р / -$'.о .*0- .рт*$)/.*..$' - - ,рҊ ч ч */$*))-).+*-//$*)рх*$)/.*..$' - - ,с Ҋ рх - $/рҊҊҊ рх с с р - $/р ф р - $/с- 1$*0.'4 1 '*+ р с - $/с с р р - $/т -$*-$/4 .$")/$*)с р р - $/т с т с - $/у '&*- цп ф р р - $/у с ф - $/ф ҊҊҊ ф с - $/ф с р - $/х р р - $/ц тпڿ 0 -&$)"р рс т р )**-)1$-*)( )/'0'$/4 рх*$)/.*..$' р - $/чѶфڿ.+ .р - - ,рҊ - - ,сҊ ц р р р 0./$)' $/ .рп*$)/.*..$' р - $/рѵр р - - ,рҊ р - $/рѵс р р - $/рр т - $/ст с - $/сҊҊҊ с р - $/т р р - $/тр р р - $/у с р р р - $/у ҊҊҊ т р - $/фр с - $/ф ҊҊҊ с р р - $/х с р - $/х р с р - $/ц т р - $/ч р х ф / -!!$$ )4 рр*$)/.*..$' р - $/ш р - - ,р Ҋ - - ,с Ҋ х ))*1/$*)о .$")-* ..х*$)/.*..$' - - ,т Ҋ р - $/рѵр $'*/ѷ$-*''$.$*) / -- ) җ*-*/# -Ҙ р р р - $/р  0 фпڿ с р - $/рѵс $'*/ѷ-*0- ( )/*! *2-*)*)./-0/$*)/ -$'.җ*-*/# -Ҙ р у с - $/с 0 упڿ х р - $/рѵт $'*/ѷ'' ) - ./-**(.җ*-*/# -Ҙ р с - $/т ҊҊҊ с р - $/рѵу $'*/ѷ-$+/$('җ*-*/# -Ҙ р р - $/у р р - $/рѵф 3 (+'-4 -!*-() ѷ.җ*-*/# -Ҙ р р - $/сLEED™ Accredited Professional р су ч р ) -"4о/(*.+# - тт*$)/.*..$' - - ,рҊ у  "$*)'-$*-$/4 у*$)/.*..$' - - ,сҊ - - ,тҊ р - $/рѵр +/$($5 ) -"4 -!*-() җрп+/.Ҙр - - ,у Ҋ р - $/рѵс 0/**-/ -.  0/$*)җс+/.Ҙ р ф р - $/р )#ѵ3۔*)$/*-۔)1ѵ х р - $/рѵт  ) 2' ) -"4-*0/$*)җс+/.Ҙ р х т - $/сѵр фпڿ 0/$*)ш р - $/рѵу  0 -&$)"**/+-$)/җр+/Ҙ р х т - $/сѵс хпڿ 0/$*)ш р - $/рѵф )**-/ -.  0/$*)җу+/.Ҙ р р - $/тр р - $/рѵх $)2/ -)" ( )/җт+/.Ҙ р с - $/у *' 3$$'$/4о"(/с ф - $/фспڿ$ -р ф р - $/хр $)$(0(  -!*-() )1$-*)( )/'**(*& *)/-*' с ).*-. шфпсп $(0'/$*)ѷ.ффڿ у/ "*-$ . '0.#*0/Ҋ !*- ѵ $"#/$)"*)/-*'. )#)  /-/ "$ .җтпڿ$)ѵ1 )/ѵҝс(*)$/*-.Ҙ *2Ҋ($//$)"/ -$'.җ1уѵрҘ *)./-0/$*) )**-$-0'$/4"(/ )**-$-0'$/4.. ..( )/ # -('*(!*-/ )/ -$*- $"#/$)"җ1уѵрҘ )#)  /-/ "$ .җртѶрпѾѶ 3#0./$.*'/$*)Ҙ *)./-0/$*)о (*'$/$*)./ "(/ #*' 0$'$)"  сп.۔)#)  рфڿ4*./ сп$.'*.0- .  ../*0'$/4-).$/җ1уѵрҘ $4' $'$/$ . цҝсфҝспсф $1 -/цфڿоу./- (. ' /-$ #$' .җ1уѵрҘ(+0.++-*#  0 -&$)"**/+-$)/җ1уѵрҘ(+0.++-*#  ).$/$1  )-*/ /$*) $"#-$*-$/4$/   $"#*-#** 1 '*+( )/ */$*) 0--*0)$)" ).$/4)$1 -. . . /*-" о*'' /$*)*! 4'' . *)./-0/$*)о (*./ "(/') 0$'$)" $! Ҋ4'  (+/ 0/$*)җ1уѵрҘ )1$-*)( )/'-*0/ '-/$*).җ1уѵрҘ *0-$)"*!2/ -$'.җ1уѵрҘ / -$' )"- $ )/.җ1уѵрҘ 1) ) -"4 / -$)"  () .+*).  ) 2' ) -"4-*0/$*)җ1уѵрҘ )#)  !-$" -)/)" ( )/ +/$($5 ) -"4 -!*-() Ѷ*./ҝ*0- ) -"4 +/$($5 ) -"4 -!*-() Ѷ ($..$*). )#) *(($..$*)$)" *)./-0/$*)/$1$/4*''0/$*)- 1 )/$*) $/ .. ..( )/(+0.++-*# + )+ (+0.++-*# $)2/ -)" ( )/җ1уѵрҘ(+0.++-*# / .') 0/$*)(+0.++-*# )**-/ -.  0/$*)Ѷспڿ 0$'$)"Ҋ 1 '/ - / -$)" 0)( )/'*(($..$*)$)") -$!$/$*) 0)( )/' !-$" -)/)" ( )/ / - / -$)" **'$)"*2 -/ -. $"#/*''0/$*) 0/$*)(+0.++-*# 0/**-/ -.  0/$*)Ѷтпڿ -*/ /*- ./*-  $//җ1уѵрҘ(+0.++-*# 0/**-/ -.  0/$*)ѶфпڿҊрппڿ )**-/ -.  0/$*)ѶсфڿҊфпڿ $)$(0() -"4 -!*-()  0$'$)"Ҋ 1 ') -"4 / -$)" 4'$"#/җ1уѵрҘ 0'$/4$ 2. *0./$ -!*-() җ1уѵрҘ LEED SCORECARD CITY HALLDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Vl +schedule Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 148Gilroy Civic Center Master Plan 2024 2025 2026 Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar 11-Nov18-Nov25-Nov2-Dec9-Dec16-Dec23-Dec30-Dec6-Jan13-Jan20-Jan27-Jan3-Feb10-Feb17-Feb24-Feb3-Mar10-Mar17-Mar24-Mar31-Mar7-Apr14-Apr21-Apr28-Apr5-May12-May19-May26-May2-Jun9-Jun16-Jun23-Jun30-Jun7-Jul14-Jul21-Jul28-Jul4-Aug11-Aug18-Aug25-Aug1-Sep8-Sep15-Sep22-Sep29-Sep6-Oct13-Oct20-Oct27-Oct3-Nov10-Nov17-Nov24-Nov1-Dec8-Dec15-Dec22-Dec29-Dec5-Jan12-Jan19-Jan26-Jan2-Feb9-Feb16-Feb23-Feb2-Mar9-Mar16-Mar23-Mar30-MarMASTER PLAN Kickoff Meeting November 20, 2024 Existing Conditions Assessment Visit Site, Survey, Review Existing Documentation City Administrator + Department Heads Briefing Approach to Community Engagement + Concept Master Planning Process Needs Assessment Interview Department Heads / Develop Program Facilities Tour - Redwood City and Mountain View 2/27/2025 Master Plan Alternatives andCommunity Engagement COMMUNITY ENGAGEMENT - WORKSHOP #1 Tuesday March 4, 2025 - 9AM OR 6PM Prepare Concept Alternatives for Workshop #2 City Council Check-in COMMUNITY ENGAGEMENT - WORKSHOP #2 Tuesday April 8, 2025 - 9AM OR 6PM Refine Preferred Concept for Workshop #3 City Council Check-in COMMUNITY ENGAGEMENT - CAFECITO May 9, 2025 - 6PM City Council Check-in COMMUNITY ENGAGEMENT - WORKSHOP #3 Tuesday May 20, 2025 - 9AM OR 6PM Commissions - Preferred Concept Presentation Youth Commission - April 14, 2025 Arts and Culture Commission - May 13, 2025 Library Commission - April 9, 2025 Parks and Recreation Commission - April 15, 2025 Planning Commission - April 3, 2025 Personnel Commission - April 28, 2025 Senior Luncheon - May 14, 2025 Update and Refine Preferred Concept City Council Session - Final Concept Presentation June 16, 2025. Prepare Final Report CEQA Tribal Consultation 3 Months Prepare Draft and Final NOP 30 day Review Period Traffic Consultants Prepare VMT Analysis Prepare Administrative Draft EIR City Staff Review and Noticing Public Review Period 45-Days Prepare Final EIR / MMP / NOD PUBLIC HEARINGS February 2, 2026 to February 27, 2026 CITY COUNCIL ADOPTS/CERTIFIES CEQA DOCUMENTS March City Council Session PRELIMINARY PROJECT SCHEDULE May 13, 2025 ELS/SWA SITE VISIT 12/11/24 NEEDS ASSESSMENT MASTER PLAN ALTERNATIVES & COMMUNITY ENGAGEMENT EXISTINGCONDITIONS ASSESSMENT WORKSHOP #3 - 9AM - Present Preferred Concept, Engage in Community Charrette and Collect Final Comments TRIBAL CONSULTATION WORKSHOP #1 - 6PM - Gallery Walk - Community Open House - Project confirmation WORKSHOP #2 - 6PM - Present Concept Alternatives, Engage in Community Charrette and Select a preferred Design Direction/Concept WORKSHOP #3 - 6PM - Present Preferred Concept, Engage in Community Charrette and Collect Final Comments ELS/SWA SITE VISIT01/13/25 FACILITIES TOUR 02/27/25 MASTER PLAN DEVELOPMENT CEQAPROCESS WORKSHOP #1 - 9AM - Gallery Walk - Community Open House - Project Confirmation WORKSHOP #2 - 9AM - Present Concept Alternatives, Engage in Community Charrette and Select a preferred Design Direction/Concept SUBMIT COMPLETED MATERIALS PRIOR TO COUNCIL MEETINGMASTER PLAN COMPLETECEQA COMPLETECIVIC CENTER MASTER PLAN 30-DAYREVIEW PERIOD PREPARE ADMINISTRATIVE DRAFT EIR NOTICING& STAFF REVIEW 45-DAY PUBLICREVIEW PREPAREFINAL EIR PUBLIC HEARINGS VMT ANALYSIS CITY COUNCIL APPROVAL DRAFT & FINAL NOP COMMUNITY ENGAGEMENT - 6PM - Cafecito at San Ysidro Park (Presented in Spanish) 7/22/2025, 2:52 PM Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Vll +appendix Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB City Hall DETAILED PROGRAM Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 151Gilroy Civic Center Master Plan CITY HALL Gilroy Civic Center Master Plan CITY HALL PROGRAM DEPARTMENT/SPACE WORK‐ STATIONS OFFICES AREA (SF)Total Area (SF)Notes RECEPTION / LOBBY Lobby and Waiting Area 1,000 Central Reception/Information Desk 150 All visitors to City Hall check in here. Shipping and Receiving Area 150 Package and mail deliveries and outgoing shipping Huddle Room 100 Space adjacent to the lobby for side conversations with  customers Public Restrooms 600 RECEPTION TOTAL NET AREA 2,000 FINANCE Finance Service Counter 3 550 Bill paying counter with three service positions, cash tills, and  three workstations in area behind counter. Open office area 4 64 256 Net area for four 8x8 workstations. Flex Workstations 2 64 128 Net area for two 8x8 workstations Office 8 100 800 Director's Office 1 200 200 IT Help Desk 150 150 Needs to be centrally located, adjacent to IT storage IT Storage 100 100 Adjacent to IT Help Desk Dedicated Records Storage 200 200 Central Printer and Supplies (dedicated to Finance)80 80 Cash Storage Safe 50 50 Armored car pickup for cash twice per week Network Server Room 400 400 Area based on size of current server room Conference Room 200 200 Staff and/or public meetings Large Conference Room N/A N/A Shared ‐ see Common Areas Coffee Station 50 50 Kitchenette with sink FINANCE DEPARTMENT TOTAL NET AREA 3,164 ADMINISTRATION Mayor's Office 1 200 200 City Administrator's Office 1 200 200 Communications and Engagement Office 1 150 150 Office with space for table and chairs Offices 10 100 1,000 Open Office Area 4 64 256 Net area for four 8x8 workstations. Copier and additional seating (in open office area)100 DETAILED PROGRAM TABULATIONDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 152Gilroy Civic Center Master Plan DEPARTMENT/SPACE WORK‐ STATIONS OFFICES AREA (SF)Total Area (SF)Notes Informal Reception Area with two WS and small waiting  area 200 2 workstations at 64 for Management Analyst and  Management Assistant plus waiting area Conference Room to Seat 20 400 Could be shared, but with Admin priority Copy/Mail/Supplies Storage 50 Coffee Station/Break Area 50 Kitchenette with sink ADMINISTRATION DEPARTMENT TOTAL NET AREA 2,606 HUMAN RESOURCES & RISK MANAGEMENT Director's Office 1 200 200 Offices 4 100 400 Workstations 6 64 384 Net area for six 8x8 workstations Reception/Waiting 120 120 Dedicated waiting area for one to two people adjacent to two  workstations Workroom 200 200 Records Storage 250 250 Coffee Station/Break Area 50 50 Kitchenette with sink Printer Area 50 50 Secure, private, not shared with other departments Interview Room 120 120 Medium Conference Room 200 200 Seat 6‐8 HUMAN RESOURCES & RISK MANAGEMENT TOTAL NET AREA 1,974 UTILITIES DEPARTMENT Director's Office 1 200 200 Business Manager's Office 1 150 150 Office 8 100 800 Workstations 12 64 768 Net area for (12) 8x8 workstations Public Counter with One Service Position 100 Does not need to be near lobby area Plan Review Counter/Work Area 100 File Storage Room 200 200 Library 50 50 Technical reference materials Supply Closet 10 10 Printer Room 100 100 Large format printer can be shared with Community  Development and Public Works Conference Room 150 150 One dedicated conference room to seat 6‐8 Conference Room 150 150 One shared conference room to seat 6‐8 Coffee Station/Break Area 50 50 Kitchenette with sink UTILITIES DEPARTMENT TOTAL NET AREA 2,828 PUBLIC WORKS Gilroy Civic Center Master Plan City Hall Program 2 of 4 4/16/2025 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 153Gilroy Civic Center Master Plan DEPARTMENT/SPACE WORK‐ STATIONS OFFICES AREA (SF)Total Area (SF)Notes Director's Office 200 200 Offices 11 100 1,100 Workstations 18 64 1,152 Net area for (18) 8x8 workstations Open Work Area 150 150 Public Counter with Two Service Stations 100 100 Separate waiting area not required ‐ people wait in lobby Storage 200 200 Coffee/Break Area 50 50 Large Format Printer N/A Shared with Public Utilities Large Conference Room (Seat up to 20)N/A Shared with Other Departments (see Common Areas) Conference Room 150 150 Seat 6‐8 (could be shared?) PUBLIC WORKS TOTAL NET AREA 3,102 COMMUNITY DEVELOPMENT Director's Office 1 200 200 Manager's Office 2 150 300 Office 17 100 1,700 Workstations 20 64 1,280 Net area for (18) 8x8 workstations Permit Counter 600 600 Kiosk 10 10 Coffee/Break Area 50 50 Library 50 50 Book shelves for technical manuals and codes Copier/Supplies 50 50 Conference Room (seat 15)N/A Shared Small/Medium Conference Room 150 150 COMMUNITY DEVELOPMENT TOTAL NET AREA 4,390 FIRE ADMINISTRATION Director's Office 1 200 200 Office 1 100 100 Workstations 6 64 384 Net area for six 8x8 workstations Conference Room 1 150 150 Could be shared? FIRE ADMINISTRATION TOTAL NET AREA 834 EMERGENCY OPERATIONS CENTER Main EOC Workroom 800 800 Computer workstations for up to 25 (current size about 532sf)  Management Room 300 300 Accommodate 8‐10 (current size 352sf) Radio Room 100 100 Server and IT Equipment Room 150 150 Gilroy Civic Center Master Plan City Hall Program 3 of 4 4/16/2025 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 154Gilroy Civic Center Master Plan DEPARTMENT/SPACE WORK‐ STATIONS OFFICES AREA (SF)Total Area (SF)Notes Training Room N/A N/A Accommodate 30 for training, lectures, etc. (Dimensions  assumed: 25' x 36'). Shared room. Included in Common Areas Crash Room 240 240 2 rooms with 2 cots at 120sf each Restrooms with showers N/A Nearby Kitchen Area N/A Nearby Storage for Food and Supplies 500 500 Storage for Educational Materials 80 80 Medication Cache 60 60 CHEMPACK room. Needs HVAC and access controls. 60sf  minimum size EMERGENCY OPERATIONS CENTER TOTAL NET AREA 2,230 COUNCIL CHAMBERS Council Chambers 2500 2500 Lobby/Pre‐function Area 1500 1500 Chair and Table Storage 200 200 Equipment Room 100 100 Conference Room 200 200 For private council meetings COUNCIL CHAMBERS TOTAL NET AREA 4,500 COMMON AREAS Large Training Room/Conference Room/Classroom 900 900 For department‐wide meetings, training, EOC Staff Restrooms and Showers 600 600 Public Restrooms (2nd Floor)500 500 First floor public restrooms included with lobby area Recycling/Trash Room 200 200 Lunch Room 400 400 Mechanical/Electrical Equipment Rooms 1200 1200 Telcom/Data Rooms 300 300 Janitor Closets 100 100 Two closets at 50 sf each COMMON AREA TOTAL NET AREA 3,300 Total NSF 30,928 Circulation and Support Spaces (25%)7,732 TOTAL GROSS SQUARE FEET 38,660 Gilroy Civic Center Master Plan City Hall Program 4 of 4 4/16/2025 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 155Gilroy Civic Center Master Plan CITY HALL NEEDS ASSESSMENT - Needs AssessmentDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 156Gilroy Civic Center Master Plan • • • • • • • Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 157Gilroy Civic Center Master Plan • • • • • • • • • • • • • • • • • • • • • • • • • • Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 158Gilroy Civic Center Master Plan • • • • • • • • • • • • • • • • • • • • • Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 159Gilroy Civic Center Master Plan Gilroy Civic Center Master Plan Needs Assessment Administrative Services Department • • • • • • • • • Gilroy Civic Center Master Plan Needs Assessment Administrative Services Department • • • • • • • Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 160Gilroy Civic Center Master Plan • • • • • • • • • • • • • • • • • • • Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 161Gilroy Civic Center Master Plan • • • • • • • • • • • • Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 162Gilroy Civic Center Master Plan Gilroy Civic Center Master Plan Needs Assessment City Council Chambers • • • • • Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 163Gilroy Civic Center Master Plan Gilroy Civic Center Master Plan Needs Assessment Emergency Operations Center • • • • • • • • • • • • • • Gilroy Civic Center Master Plan Needs Assessment Emergency Operations Center • • • Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 164Gilroy Civic Center Master Plan • • • • • • • • • • • Gilroy Civic Center Master Plan Needs Assessment Finance • • • • • • • • Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 165Gilroy Civic Center Master Plan Gilroy Civic Center Master Plan Needs Assessment Finance • • • • • • • • • • • • • Gilroy Civic Center Master Plan Needs Assessment Finance • • • • • • Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 166Gilroy Civic Center Master Plan Gilroy Civic Center Master Plan Needs Assessment Finance • • • • • • • • • • • Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 167Gilroy Civic Center Master Plan Gilroy Civic Center Master Plan Needs Assessment Public Works • • • • Gilroy Civic Center Master Plan Needs Assessment Public Works • • • • • • • • • Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 168Gilroy Civic Center Master Plan • • • • • • • • • • Gilroy Civic Center Master Plan Needs Assessment Public Utilities • • • • • • • • • • Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 169Gilroy Civic Center Master Plan Gilroy Civic Center Master Plan Needs Assessment Public Utilities • • • Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 170Gilroy Civic Center Master Plan Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 171Gilroy Civic Center Master Plan Gilroy Civic Center Master Plan Needs Assessment VIP 2305 CSO 2025 Investigations Graffitti Investigations CSO 2511 Investigations CSO / VIP 2834 Investigations 1809 Investigations 1811 Investigations SRO (2931)GPOA SRO (1410) Admin Prius ADMIN Sgt ADMIN Sgt Cmd Staff Animal Control Mounted Truck SOG Trailer POV 20 PD Ranger Truck   2404 POV 21 PD Malibu (1221) POV 22 171529271711 2827K920202826160228322825282428232922Elevator CSIVehicle Evidence  Cages Water Filtration    /    Softener System EvidPOV 8EvidPOV 7Transport VaStorage POV 9POV 10POV 11EvidEvidEvidEvidEvidEvidPOV 2POV 3POV 4On DutyOn DutyOn DutyOn DutyPOV 6Electrical Room / PG&E meter BEARCAT DSO TahoCmd Staff POV 1Cmd Staff Cmd Staff Hanna Street PT CruiserTrafficTrafficElevator ACT ACT ACTACTACTACTACTACTACTPOV 5No Parking2713283129262925292327192727272828122822 Sally PortJail No Parking Gilroy Police Building Parking Diagram Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 172Gilroy Civic Center Master Plan Gilroy Civic Center Master Plan Needs Assessment Recreation Division • • • • • • • • • • • • • • Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 173Gilroy Civic Center Master Plan 314.32 sf HR & RISK MANAGEMENT IT OFFICES AND SERVER ROOM break rm. counter/ reception - 2 work stations work/team room lobby/waiting (on deck area) for HR and Admin barricade/employee access HR storage low & high counter + 2 work stations Director's office analyst offices too small finance counter info desk waiting area 4 cubicles 3 ws 2 ws city hall employee breakroom 2 accountants finance conference office 6 counterwsws ws conf. IT IT Office IT Open Office IT Office IT Office wall removed office 5 office 4 office 3 office 2 office 1 office public counter part time admin staff + inspector 2 env. staff printer area large format and regular IT closet storage conf. Project Manager shared office (2ws) Admin PW director office office office office open office area with 4 WS and table permit tech permit counter 3 technicians office supplies copier planner conf. (too small) bullpen area central table kitchen cubicles (2) storage +technician copy and mail room paper storage city administrator flex space counsel office Mayor ED Manager shared: Emergency management communications and engagement office supplies and records city clerk (former reception area): 2 staff: management analyst and management asst. Bryce Asst. City Admin Admin. Conf. Needs to be larger Seat 20--Could be shared, but with admin. priority break area supply storage - refreshments, utensils, etc. vacant open office 4 cubicles copier seating ADMINISTRATION FINANCE PUBLIC WORKS & ENGINEERING COMMUNITY DEVELOPMENT GILROY CITY HALL EXISTING FACILITIES AS REVIEWED IN NEEDS ASSESSMENT MEETINGS February , 2025 staff table AV room Electrical/HVAC Phone 553.48 sf 240.02 sf 369.65 sf 2,908.01 sf 193.08 sf 195.11 sf 127.15 sf 240.13 sf 102.41 sf 195.45 sf 225.2 sfvault - records storage 342.7 sf 2,190.19 sf794.47 sf 80.53 sf COUNCIL CHAMBERS IT Server Room Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 174Gilroy Civic Center Master Plan 367.51 sf 99.49 sf 531.56 sf 352.09 sf 221.48 sf 636.44 sf Main EOC Workroom 25 max. Radio Room Management Room (activated for major events) 8-10 People Shared Training Room (If training room is shared, it should not be located withinthe EOC.) NEEDS: Radio Room Conference roomServer/IT Room Crash Room for key personnel during emergencies Supplies Incl. food, water and other supplies Need more space Server Room IT Equipment 94.17 sf 257.36 sf 12'-4 1/4" 54'-11 1/4"GILROY ANNEX OLD POLICE BUILDING EMERGENCY OPERATIONS CENTER EXISTING FACILITIES AS REVIEWED IN NEEDS ASSESSMENT MEETING February, 25, 2025 emergency preparedness outreach materials/ education resources Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB MULTIGENERATIONAL COMMUNITY CENTER BUILDING PLANS | SITE SECTIONS | ELEVATIONSSURVEY RESPONSES B. Survey ResponsesDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 176Gilroy Civic Center Master Plan Civic Center M aster Plan <br>Community Workshop #1 Online Survey 2 / 13 23 Taking on too muc h...no room for rec/swim, arts , new city hall and senior expansion at this location 3/7/2025 11:58 AM 24 With the growing population, this is a great way to bring people together and c reate soc ial groups! 3/7/2025 11:31 AM 25 The Civic center master plan proces s seems fine. The hardes t part will be getting input from various types of users so we c an be all inclusive. 3/7/2025 10:48 AM 26 Seems like this will c ost a ton of money. Who will pay for this and how much?3/7/2025 8:42 AM 27 It seems to be tak ing a l ong time since the 750,000 was pass ed.3/7/2025 8:31 AM 28 I appreciate the city sharing the possibilities for the site and getting input from the citizens of their priorities. 3/7/2025 7:41 AM 29 It’s a great idea and a must for Gilroy 3/7/2025 7:29 AM 30 It's about time! The following facilities (City Hall, Wheeler Community Center & Senior Center) are completely outdated and look terrible especially when compared to the giant PD building and s tate of the art library. 3/7/2025 7:29 AM 31 I’m ex cited about the potential to dev elop this area further. As a res ident living les s than two block s away, I frequently us e the space, but I’ve noticed that it feels underutilized. I appreciate the city ’s efforts to c reate a thoughtful master plan, and I hope the process prioritiz es acc ess ibility, c ommunity engagement, and vibrant public spaces that benefit residents and vis itors alike. 3/4/2025 10:19 PM 32 Please send out surv eys to all res idents , linking a s urvey to the water bills .3/4/2025 7:55 PM 33 We need to be as transparent as possible, ens uring that immediate neighbors are involved or hav e a c hance to voice their needs, wants and c onc erns . I attended the 3/4/25 event, and lined that I was able to speak to both consultants and city staff about my interest and ideas for this plan. 3/4/2025 10:20 AM 34 Very happy we are moving toward a community center. Critical to build it right and make it part of our his tory and future. Need to garner as much input as pos sible. Communication across all Gilroy is v ital. 3/4/2025 10:02 AM 35 The proces s seems ok. The challenge is to reach more people. There are too many for whom “online” is an obs tacle. 3/4/2025 9:51 AM Q2 What are you thoughts on the site as it currently exists (the three-city block area and including buildings housing the Gilroy Library, Wheeler Center, and/or Senior Center)? Answered: 35 Skipped: 4 #RESPONSES DATE 1 I love the open spaces. People are out there doing tai c hi. I love the murals. It feels welcoming and safe because there’s no hidden open spac es. 4/8/2025 2:14 AM 2 It makes sense to build on this site sinc e the c ity owns it and it's c entrally located and accessible by public transit. 3/25/2025 9:53 AM 3 I think the s ite is located in a good spot and many can acces s it.3/24/2025 8:37 AM 4 If designed appropriately it c ould become the nexis for our c ity. It would be great to place city s ervices (offic es) and City Hall by the PD s o this would the c iv ic area for Gilroy and dev elop the remaining space with Art, Recreation and Aquatic Center whic h would be inclus ive of the existing library. 3/17/2025 2:32 PM 5 old but paid for 3/17/2025 12:30 PM Civic Center Master Plan <br>Community Workshop #1 Online Survey 1 / 13 Q1 What are your thoughts about the Civic Center Master Plan process? Ans wered: 35 Skipped: 4 #RESPONSES DATE 1 It seems fantas tic and well thought out so far.4/8/2025 2:14 AM 2 It seems to be working fine.3/25/2025 9:53 AM 3 Look great but I still consider about the plants and shade for the aquatic s wimming pool and outdoor space. The mos t obs tacles that people don't want to come on summer when exces s heat becaus e there's no shade. 3/19/2025 9:04 PM 4 In conc ept, this is a fabulous addition to the Gilroy community. It would afford our citizens many opportunities for tapping into healthy activ ities to enhanc e their mental and physic al health. 3/17/2025 2:32 PM 5 swim center at the ball fields 3/17/2025 12:30 PM 6 LETS BUILD IT AT THE SPORTS CENTER. CURRENT LOCATION IS NOT THE BEST FOR TRAFFIC AND LOCAL SAFETY 3/17/2025 9:07 AM 7 I appreciate that there is a focus on the Civic Center Master Plan. I truly do hope that you listen to the communities' needs and engage the most v ulnerable populations in various ways and not just by promoting these s essions online. Underserved communities quite often don't understand what a master plan is and how they can contribute. 3/17/2025 8:00 AM 8 I’m glad we’re thoughtfully planning it.3/16/2025 9:04 AM 9 A rec center like the CRC would be a great addition to our community.3/15/2025 9:17 PM 10 I love the idea of hav ing youth/community programs all av ailable in one central area!3/14/2025 4:58 PM 11 I lov e the plan for aquatic c enter however it has to be a year around facility ie c overed. There is high demand in a recreation facility here in Gilroy considering the population increase of families. 3/14/2025 8:34 AM 12 It's ex citing!3/14/2025 7:27 AM 13 Solar is great, but maybe the solar projec t on 7th street should have waited for the new cos tly master plan? 3/13/2025 9:36 AM 14 Exc ited to see the process begin 3/11/2025 10:38 AM 15 That it good that there will be a place for high schoolers and middle schoolers 3/10/2025 5:52 PM 16 I think that the plan is good and it is going the correct way that it should go 3/10/2025 5:50 PM 17 It sounds interesting, it is also kind of exc iting that there c ould be more to do in gilroy if the civic center is built. 3/10/2025 5:45 PM 18 I think this is a great idea with diffrent things for youth and ev eryone in the community 3/10/2025 5:45 PM 19 I believe this is a good idea for the community 3/10/2025 5:45 PM 20 Our city needs to offer nicer public fac ilities focused on families . Downtown is a bar joint not a family friendly area. You get what you attract. 3/8/2025 3:42 PM 21 Should have more outreach, perhaps by mail, to let c itiz ens know about the proces s. Public meetings need a "hook" to get citizens engage. Website and QR codes are not enough outreac h. 3/7/2025 10:33 PM 22 You are making an effort to gather all community input. To pas s a GO bond you will need to have "buy in" from the community big time - Gilroy hates tax increases but with proper leadership it might pass like the library bonds did. 3/7/2025 6:07 PM SURVEY RESPONSESWORKSHOP #1 - ENGLISHDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 177Gilroy Civic Center Master Plan Civic Center M aster Plan <br>Community Workshop #1 Online Survey 4 / 13 center dangerous, complic ated, and often uncomfortable due to the frequent vehicle cros sings. Prioritizing pedestrian-friendly design s hould be a key consideration. In terms of architec ture and lay out, new development should follow the example of the Wheeler Center, which is well- integrated with both the street and the central plaza. Its acc ess ibility on all sides enhances permeability and encourages interaction with public spaces. In c ontrast, too many buildings in the area are oriented toward parking lots, whic h diminis hes the quality and vibranc y of public spaces . Future planning s hould prioritize designs that engage with the street and c entral gathering areas rather than being dominated by parking. 32 Love the library and historical features of the Wheeler Center. Consider upgrading the building while preserving historical value. 3/4/2025 7:55 PM 33 Ex cept for the PD and library buildings , the site is dated and spread out. The available open space is disjointed and does not s eem usable for large gatherings. There does not feel like there is a central outside meeting place. 3/4/2025 10:20 AM 34 Excellent site! City owns the land and c entrally located. Park ing is critical so design has to address this . 3/4/2025 10:02 AM 35 I agree that the Library and Police Station are too new to mes s with. Ev erything else should be replaced. The c urrent s ite is well loc ated and large enough to work with. 3/4/2025 9:51 AM Q3 Which of the new proposed uses (Senior Center, Youth Center, Recreation Center, Aquatic Center, and/or Arts Center) do you like most and why? Answered: 38 Skipped: 1 #RESPONSES DATE 1 I like the amphitheater. I lik e the recreation center. I used to go to the YMCA on the was t coast and they had an indoor walk ing path. I loved that for safety reasons. My partner would love the pool as he likes to swim. I would too. 4/8/2025 2:14 AM 2 Recreation Center sinc e it c an used to serve the mos t people, regardless of age or interest.3/25/2025 9:53 AM 3 Youth center and recreation center- we need more positive things for y outh to do 3/24/2025 8:37 AM 4 I like the outdoor space. However, need to c hoose the plants that give the romantic theme. Example, in Korea, they plant the ginkgo plants , cherry bloss om and other plants that made the unique look. 3/19/2025 9:04 PM 5 I believ e we could have one large building that could house Youth, Senior and Rec reation needs while building an Aquatic and Art Center for a Performing Arts venue. 3/17/2025 2:32 PM 6 build by the freeway not in the city 3/17/2025 12:30 PM 7 what a waste of time and money .3/17/2025 9:07 AM 8 I like the Youth Center and Rec reation Center and outdoor spac e. Gilroy does not have a v ibrant sports park like the Morgan Hill Outdoor Sports Complex. Our Sports Park has very limited space. Many families and sports leagues prefer to go to Morgan Hill to utilize the MHOSC, which means the money/funds don't stay here in town. We have a lot of soccer teams that struggle trying to s tay here, in Gilroy. A recreation center would also be great bec aus e it would allow for a number of div erse activities to be housed there. It would prov ide equitable opportunities. The youth center would allow for y outh to have s omething to do, something to look forward to, which could potentially reduc e crime. 3/17/2025 8:00 AM 9 An events center-not dedicated to s eniors or youth, but for everyone. Run all the classes out of there so that it’s alway s in use and bustling. Make it a plac e to hang out, with cafes/s nacks , local maker s paces , etc, not jus t a place to take a class and leave. Make a Central Park as well for farmers markets, yoga clas ses , cultural events, music in the park, etc . My second choice to add is an aquatic center with spaces for the whole family and a laz y riv er that can 3/16/2025 9:04 AM Civic Center Master Plan <br>Community Workshop #1 Online Survey 3 / 13 6 bad idea 3/17/2025 9:07 AM 7 The Wheeler Center and the Senior Center are very old buildings. They need to be remodeled or upgraded. We have a beautiful library. 3/17/2025 8:00 AM 8 It needs more signage and more green space that can be used for various things (farmers markets, c ultural gatherings, meetings, people playing ches s, yoga c las ses, etc) 3/16/2025 9:04 AM 9 I’ve only ev er been to the library so not sure but s eems to be ce ntrally located 3/15/2025 9:17 PM 10 It's fine, the playground can use some updating and shade for c hildren to play. I am happy to hear of the library updating an interac tive children's area inside. 3/14/2025 4:58 PM 11 It is a great location and ac ces sible. Will bring more foot traffic to downtown.3/14/2025 8:34 AM 12 Site makes sense.3/14/2025 7:27 AM 13 Good as is . Utilize the old PD for the City Hall anex as was planned, and take care of the ex isting buildings. Bring back the farmers market. Bring bac k a USPS drop box. 3/13/2025 9:36 AM 14 We need to tak e down every thing except the Library and Policy Station 3/11/2025 10:38 AM 15 We're are you guys putting and is eny building that is getting demolition 3/10/2025 5:52 PM 16 I think that the wheeler center should be improved or taken down and add it to the c ivic center plan 3/10/2025 5:50 PM 17 I think it is a good location becaus e it would be nex t to downtown 3/10/2025 5:45 PM 18 I think it is great however there is not enough youth areas to hang out or to learn 3/10/2025 5:45 PM 19 I think this location is a good place 3/10/2025 5:45 PM 20 Wheels center is so ugly and uninv iting. The mini park is so ugly needs updating.3/8/2025 3:42 PM 21 Lov e our new library, po lic e building look s like a fortress , not welc oming. Wheeler Center is good art dec o architecture, inside needs remodeling for recreation & youth center. 3/7/2025 10:33 PM 22 Obvious ly y ou need to demolish the Wheeler Center, the old police building, the City Hall, and the senior center. The library and new police building are fine and should remain. 3/7/2025 6:07 PM 23 Currently s everely underused 3/7/2025 11:58 AM 24 Love the Gilroy Library. The space it beautiful and the librarians are so welcoming and fun to talk to. Love the idea that new buildings will bring more people to the area. 3/7/2025 11:31 AM 25 City of Gilroy lacks so many places for ac tivities that many are going outside of Gilroy for recreation and Senior. As our nation is aging, we need to provide more senior services and more services for the disabled. The Wheeler center is very old and not very well used. I've lived in Palo Alto and the avenitas Senior center is top notch. If we could get something like that going in South county, specifically in Gilroy, it'd be a win-win. 3/7/2025 10:48 AM 26 Need to figure out how to better connect to downtown.3/7/2025 8:42 AM 27 I think this is a great location for a civic center. But what about park ing?3/7/2025 8:31 AM 28 I would lik e the city to try to purchase the properties of the three private houses in an owner friendly manner. No eminent domain. Owning that whole block would provide larger options. 3/7/2025 7:41 AM 29 Yes, location for such c enters has to be central! Town centers should look more appealing and pedestrian friendly as in Morgan Hill. 3/7/2025 7:29 AM 30 It's about time! The following facilities (City Hall, Wheeler Community Center & Senior Center) are completely outdated and look terrible espec ially when compared to the giant PD building and s tate of the art library. 3/7/2025 7:29 AM 31 The site currently has too muc h parking spread across multiple areas, creating unneces sary pedestrian-vehic le interactions . Consolidating parking into a s ingle loc ation would improve safety and wa lkability, making it easier for people to mov e through the space without c onstant vehicle traffic. The mention of ‘univers al design’ in the plan is critical, and one of the most fundamental aspects of acc essibility is the ability to walk s afely and comfortably. As a parent of young children, one with spec ial needs , I find the current layout mak es travel within the civic 3/4/2025 10:19 PM Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 178Gilroy Civic Center Master Plan Civic Center Master Plan <br>Community Workshop #1 Online Survey 5 / 13 also be us ed for resistance training, senior walking, etc. It could have gras s areas for parties or families, s wim class es, lap c las ses, but don’t mak e it just a concrete box (lik e the pools we all s aw through the 80s and 90s). Lastly, I’d like to have an updated arts c enter for mus ic and gallery space. Maybe we could even have an artist in residence. 10 Rec center because we use the CRC almost daily and would be great to hav e a c loser option too 3/15/2025 9:17 PM 11 I love the idea of the aquatic center because we don't have that av ailable and need to drive out of town. I also think it's important to offer programs for our y outh to develop interests and s ocialize in safe places . 3/14/2025 4:58 PM 12 Aquatic center and recreation c enter, there is huge demand for this in the community with all the new housing and move of the families . 3/14/2025 8:34 AM 13 Hard to c hoose! The aquatic center appeals; cu rrently our only public pool at Christopher High is only accessible by acc ess ible by car, and only open limited hours. Kids of color need to be able to learn how to swim! 3/14/2025 7:27 AM 14 I lik e the aquatic center because it would provide an opportunity for more children and teenager to learn how to swim as well as swim for fun or sport 3/11/2025 7:25 PM 15 I feel like the land can be multi use combini ng Senior Center, Youth Center, Recreation Center, Aquatic Center all in one like the morgan hill CRC. 3/11/2025 10:38 AM 16 Youth center Because there will be a plac e to hangout with friends 3/10/2025 5:52 PM 17 I think the recreation and youth center is the bes t since there is not a lot of places youth go go 3/10/2025 5:50 PM 18 I like the idea of a Recreation or aquatic center because it would give peopl e something to do.3/10/2025 5:45 PM 19 Youth center because I feel like the other areas exists already and a youth center does n’t at the moment and a youth center c an have stem a thatc her a gym and different things for ev eryone of desperate interests 3/10/2025 5:45 PM 20 I like the arts center bec ause it’s beautiful 3/10/2025 5:45 PM 21 Aquatic center 3/8/2025 3:42 PM 22 Senior c enter needs remodeling, expans i on and more recreation uses. It really needs a new building! 3/7/2025 10:33 PM 23 Aquatic c enter: I think Gilroy is long ov erdue for a s wimming rec reation c enter in the middle of town where mos t children and adults can easily ac cess it. 3/7/2025 8:30 PM 24 1. Recreation Center - has been needed for a long time. 2. Senior Center - with increasing aging population will have increased demand. 3. Arts Center - should be built on land already owned by City on Eigleberry between 6th and 7th. No room in Civic center for this large project with every thing else proposed. 4. Youth Center - the old PG&E building on 6th is a disgrace and too s mall. 5. Aquatic Center - nice idea but already have a s hared fac ility at Christopher High. No room on land av ailable with every thing else proposed. 3/7/2025 6:07 PM 25 Arts Center...the c urrent art c enter is underperforming. Maybe sell the current center and us e proceeds to build a performing arts center 3/7/2025 11:58 AM 26 Rec Center will be a great way to bring people together and are multius e spaces. Gymnas ium type facilities are much eas ier to maintain and will c ost much less than an aquatic center. Aquatic c enter will only be us ed in the summer and the ongoing maintenanc e will be much more. 3/7/2025 11:31 AM 27 I have two that I would highly rec ommend. The senior center and the recreation center recreation center can provide a y outh center and an art center within it. The senior center will help with the demographics as we continue to hav e a older generation. 3/7/2025 10:48 AM 28 Senior center and youth center. We need to help prepare our y outh and take care of thos e tha t took care of us. 3/7/2025 8:42 AM 29 I love the idea of a gym, pool and multi use property and for youth organization. I currently belong to CRC in Morgan hill and I’d rather give me Monthy dues to Gilroy. I do like that the CRC is affiliated with the YMCA at a larger sc ale. I think you could add bas ketball hoops and pickle ball courts. We need both of these things. 3/7/2025 8:31 AM Civic Center M aster Plan <br>Community Workshop #1 Online Survey 6 / 13 30 My first priority would be a performing arts center. The c ity does not have any facility for this at the time. Second, I think it would be good to have a new city hall that is set up for the 2030s. I do not see the need for green s pace in this area is there are many parks throughout the c ity. 3/7/2025 7:41 AM 31 Recreation Center, Aquatic Center and youth center 3/7/2025 7:29 AM 32 You could combine the needs by having a multi-generational center that can serve, youth, teens and older adults. Most cities hav e moved away from recreational facilities that are s olely dedic ated to one age group to maximize usage while being more self-sus taining. 3/7/2025 7:29 AM 33 Recreation center / Youth Ctr 3/6/2025 9:16 PM 34 All of the proposed us es s eem like valuable additions. Ultimately, the dec is ion should be guided by ec onomic feasibility, but if the budget allows, there’s no reason the s ite c ouldn’t acc ommodate most—or even all—of these uses. A well-balanced mix of amenities will make the civ ic c enter a more dynamic and inclusive space for the community. 3/4/2025 10:19 PM 35 It would depend on the features of each c enter. Gilroy needs all of them, aquatic center, youth center, recreation, arts and senior. 3/4/2025 7:55 PM 36 The rec and aquatic c enters are mos t appealing to me. Gikroy needs more recreational opportunities for the public, es pecially youth. In about 19 years, I’ll be very interes ted in us ing the senior c enter. 3/4/2025 10:20 AM 37 All of them if pos sible without reduc ing the effectiveness of their purpose. Gilroy has a more senior adult population. Youth activities are important to growing cities li ke Gilroy. A rec and aquatic c enter serves all of the population. Lastly, Gilroy does have a vibrant art c ulture whic h would be well served with a theatre. 3/4/2025 10:02 AM 38 Senior Center, because I am one. Recreation Center, because it would serv e a more general audience. 3/4/2025 9:51 AM Q4 Which possible future uses for the Civic Center area (Senior Center, Youth Center, Recreation Center, Aquatic Center, and/or Arts Center) make the most sense? Which make the least sense? Answered: 38 Skipped: 1 #RESPONSES DATE 1 I love all these ideas. I think if we can do it well, do all of them.4/8/2025 2:14 AM 2 Mos t, Recreation Center...least, a stand-alone y outh center since that could be housed in the Recreation Cent er (but jus t not dedicated for it). 3/25/2025 9:53 AM 3 Leas t sense- aquatic c enter bas ed on the siz e We have sev eral arts centers downtown Most sense: youth center, rec center, and then senior c enter 3/24/2025 8:37 AM 4 The mos t sense is aquatic center and y outh center. The least s ens e is recreation center 3/19/2025 9:04 PM 5 Gilroy could become the hub for Performing Arts if we were to build a Art Center. As stated abov e a large building des igned for multi us e (Seniors, Youth and other Rec reation uses ) might be able to be multi us e. Gilroy is great need of an Aquatic Center for all c itizens us e but I am not sure if this is the best space for it. 3/17/2025 2:32 PM 6 ice rink and more baseball for girls 3/17/2025 12:30 PM 7 The most bang for the buck is a new, master plan for the sports park and ic e rink.3/17/2025 9:07 AM 8 In my opinion, the Civic Center area could be used for various services , but I think a youth center and recreation center would be the best fit. These centers would attrac t members from the community of all ages and ethnic bac kgrounds. It would be located within walk ing distance for some, biking for others, and public transportation would also be an option to getting to 3/17/2025 8:00 A M Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 179Gilroy Civic Center Master Plan Civic Center Master Plan <br>Community Workshop #1 Online Survey 7 / 13 thes e centers . I love art; howev er, I am not sure that many would be interested in an Art Center ov er a diverse y outh/recreation center. 9 We need multifunctional spaces. The c ity is growing and we hav e a diverse population, so hav ing spaces that only get used sometimes isn’t effic ient. For example, having the senior center is important but it’s c losed a lot of the time, so that space is was ted at those times. Having a multi us e center means those spac es c ould be put to use for evening clas ses (learning gardening after work, analyzing mov ies, learning languages , art classes, etc ). I want s pac e that I c an take a class, my kid can tak e a clas s and my mom c an take a class, whether thos e are art, science or workouts, it’s all important. All of the options (senior stuff, youth, aquatic, art and rec ) are also good, we need all of those things for our community ! 3/16/2025 9:04 AM 10 An arts center since gavilan c ollege is where we usually attend theater events 3/15/2025 9:17 PM 11 The youth center, recreation center and aquatics center make the mos t sense to me. Although I lov e art, the art center is the leas t important if it's just visual and not interac tive. 3/14/2025 4:58 PM 12 All are great use and very useful to the community. By prov iding a space for seniors and y outh, art center that c an be rented for events ( and thus bring revenue and traffic to downtown and the city ). Also love the idea of an outdoor space for farmers market and festivals . 3/14/2025 8:34 AM 13 Least sense probably art center, since we already have sev eral in that area.3/14/2025 7:27 AM 14 Land was purchased and a plan developed for an Arts c enter at Monterey at 7th s t. Follow through with that plan. A plan for the next phas e of the Senior Center was completed many years ago for the and that was nev er followed through on. If an Aquatic center is desired, find appropriate land for it. Do not try and squeeze that in here. 3/13/2025 9:36 AM 15 I 3/11/2025 7:25 PM 16 Recreation Center + Arts Center -3/11/2025 10:38 AM 17 Aquatic center 3/10/2025 5:52 PM 18 I think that the art center is n’t that important compared to others s in ce I think it would be better if we used it to benefit more youth and as a rec center as well as making a public pool 3/10/2025 5:50 PM 19 The recreation center makes the mos t s ense. The senior c enter makes the least sens e.3/10/2025 5:45 PM 20 Most sense is the youth and aquatic c enter since those don’t really exsis t in Gilroy and the one that makes les s sense is pos sibly senior c enter s ince one exis t however I think all should be area created or renov ated since all serve different great purposes 3/10/2025 5:45 PM 21 Aquatic c enter for the s ummer 3/10/2025 5:45 PM 22 Mos t s ense aquatic c enter-it would be for every one Least sense arts c enter. Art is a shame now. Ridiculous what some c all art. 3/8/2025 3:42 PM 23 Aquatic Center and Arts Center make the least s ense. Senior center, Recreation Center and Youth Center mak e the most s ense. 3/7/2025 10:33 PM 24 Recreation Center, Senior Center, Youth Center mak e the most s ens e. Arts Center is badly needed and should be built on the land already owned by the City on Eigleberry in lieu of the parking lot that no one uses - what a waste of 1.7 million. The Aquatic Center is a great idea but needs a lot of room. 3/7/2025 6:07 PM 25 Least sense: rec and swim because of pa rking and amount of land needed 3/7/2025 11:58 AM 26 Senior Center and Recreation Center. We s hould always take care of our aging population. Rec Center will be a great way to bring people together, are multiuse spaces and can be used year round. Gymnasium type facilities are much eas ier to maintain and will c ost much less than an aquatic center. Aquatic c enter will only be used in the summer and the on going maintenanc e will be much more. 3/7/2025 11:31 AM 27 Senior center makes the most sense for future use. The aquatic c enter makes the least sense for future use. There's already an aquatic c enter in Morgan Hill which is close enough. 3/7/2025 10:48 AM 28 Youth, senior, rec reation make the most sense. Aquatic and arts make the least (we have els ewhere) 3/7/2025 8:42 AM 29 See comments above 3/7/2025 8:31 AM Civic Center M aster Plan <br>Community Workshop #1 Online Survey 8 / 13 30 See the above ans wer.3/7/2025 7:41 AM 31 Recreation Center 3/7/2025 7:29 AM 32 Multi-generational center with a large banquet room to generate revenue. A large banquet room could have a stage to serve performanc es and there could be also a gallery eliminating the need for a s tand alone art center. Performing Art Centers us ually require a huge subsidy to operate mak ing them a huge drain on the general fund budget. Aquatic Centers are als o very expens ive to operate and staff and do not generate a lot of rev enue creating an impac t on the general fund as well. 3/7/2025 7:29 AM 33 Youth & rec reation & Aquatic Mos t Sense Arts Leas t sense.3/6/2025 9:16 PM 34 A recreation/aquatic center would likely be well-utilized and provide a strong community benefit, especially if des igned to acc ommodate a wide range of ages and abilities . An arts c enter is more uncertain—it depends on how it is executed. If it includes flexible, multi-use spaces that can host a v ariety of programs and events, it could be a great addition. Howev er, if it’s too specialized or lacks community engagement, it may struggle to justify the investment. 3/4/2025 10:19 PM 35 None of them. All are needed.3/4/2025 7:55 PM 36 I think a rec center that c ombines uses for all ages and abilities mak es most s ens e.3/4/2025 10:20 AM 37 Senior physic al c lasses (chair aerobics and stretching). Rec and summer s wims with lifeguard clas ses . Loc al theater productions . Youth recreation classes that could tie into local high school’s exc ellent sports programs (Gilroy High is CCS wres tling champions for 22 consecutive years) 3/4/2025 10:02 AM 38 Unfortunately, an Aquat ic Center. It would be very expensive to maintain. I would rather see the other us es fully dev eloped. 3/4/2025 9:51 AM Q5 What concerns you most about the Civic Center Master Plan project? Answered: 37 Skipped: 2 #RESPONSES DATE 1 It seems like s ome building would need to be multi us e. Nothing wrong with that, but hoping it doesn’t cut down on the functionality of the building. I don’t see ADA parking on the map throughout the site. It’s a long way to walk for some older folks or folks with needs from the parking area to the s enior center. I see a lot of landscaped areas that might be able to be inc orporated into places with a bench/table for people to enjoy lunches outside. I understand that this is a 10k foot view of the project with details to come. I love the beautiful old 4/8/2025 2:14 AM 2 Money...this is going to be very expens ive and I'm not s ure residents will be willing to open up their wallets to pay for it. 3/25/2025 9:53 AM 3 I really hope that all youth will hav e ac cess to the youth and rec centers if they are made. Not all extracurricular ac tivities are acc ess ible for a great part of our youth in gilroy due to financ ials. The time it will take and c ons truction is also a concern. 3/24/2025 8:37 AM 4 Again the shade. When the center has enough indoor shade, the people will come more. Example, compare to Gilroy outlet mall and Milpitas outlet mall. Gilroy outlet nowsaday is les s people coming. 3/19/2025 9:04 PM 5 Cos t!! Who bears the burden of the costs; property owners or all citizens? How will the cos ts be sus tainable over time? 3/17/2025 2:32 PM 6 waste of money for the old part of town 3/17/2025 12:30 PM 7 old roads with lots of stop signs and homes nearby, I'm guessing old underground plumbing 3/17/2025 9:07 AM 8 What concerns me is that you capture all of this data and then nothing will happen. The community has been ask ing for either a youth center or recreation center for a long time (years) and don't see the city making it happen. 3/17/2025 8:00 AM Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 180Gilroy Civic Center Master Plan Civic Center Master Plan <br>Community Workshop #1 Online Survey 9 / 13 9 That it will tak e forev er, won’t be useful and does n’t make the best us e of parking or acc ess . Once we have thes e beautiful s paces, I hope they get used well-for ex ample the current senior c enter has very limited offerings for more v ibrant seniors. My mom would love to meet more seniors and take classes like Zumba or pick leball or Art but she feels the offerings are “too old”. She’s still got mobility and the photos of senior lunch in wheelchairs doesn’t attract her. 3/16/2025 9:04 AM 10 The c ost and increase on local taxes .3/14/2025 4:58 PM 11 I feel the city hall is not as much as priority as what we hav e now is serv ing the c ommunity well. 3/14/2025 8:34 AM 12 Seniors hav ing ac ces s to a place to gather while construc tion is going on.3/14/2025 7:27 AM 13 The old polic e station was identified as the City Hall Anex. Money was spent to des ign a new public entrance. The city spends money on plans but does not follow through. 3/13/2025 9:36 AM 14 lack of funding 3/11/2025 10:38 AM 15 That it will take lot of time to build 3/10/2025 5:52 PM 16 Nothing 3/10/2025 5:50 PM 17 How the construction will affect traffic around thos e streets.3/10/2025 5:45 PM 18 That it would take a long time to complete the plan 3/10/2025 5:45 PM 19 How long it could actually take to build 3/10/2025 5:45 PM 20 Gilroy is s o ghett o compared to the updates Morgan hill has done to its little town. Wis h Gilroy would make an effort to build buildings that are appealing to look at and that provide public s paces that are kept up. 3/8/2025 3:42 PM 21 There is a lot of local sentiment for preserving Wheeler Center which is on the city 's list of historic buildings. Interior definitely needs remodeling/reimagining. Thoughts of demolition are scary! 3/7/2025 10:33 PM 22 How the c ost will be funded.3/7/2025 8:30 PM 23 Getting the voters of Gilroy to approve it - need a persuadable advocate to convince the voters to approv e this projec t. I do not think prov iding offic es for elected officials is a very motivating idea to win votes. The mayor has an office there now that is empty mos t of the month. Maybe one office for all counc il members c ould be justified but not a separate one for each one of them. Hav ing the City Hall closed on Fridays, having to check in to s ee anyone and having all doors to the City Hall closed but one is not customer servic e oriented and should be discontinued immediately. It feels like a pris on jus t to enter. Instead of being public serv ants the current arrangement s mells of elitis m. Continuing such policies will not garner votes from the public . Remember Measure C did not get the required votes and that was for a good c aus e - public s afety. New digs for the City bureaucrats with an unwelcoming (don't bother me) attitude will not motiv ate the public to vote for increasing taxes. An open-door policy and a customer serv ic e spirit is what's needed now whether or not a new City Hall is built. 3/7/2025 6:07 PM 24 Is it poss ible to c ombine the PD and City Offices so as to free up some funds to purchas e better technology for both PD and City...invest in c apabilities not buildings 3/7/2025 11:58 AM 25 Aquatic Center 3/7/2025 11:31 AM 26 What conc erns me the mos t about the Civic center master plan projec t is the cost and how it will be funded. I'm on a limited income and having a forced increase would impact me negativ ely. 3/7/2025 10:48 AM 27 Cost to me. The tax pay er. And the inability for government to do things efficiently and cost effective with a good result. Gourmet Alley is not a good prev iew. 3/7/2025 8:42 AM 28 How long ev erything is taking. Too much red tape.3/7/2025 8:31 AM 29 Coming up with the funds to build, staff and maintain these facilities and prov ide park ing.3/7/2025 7:41 AM 30 Gilroy may take forever to complete it and may nev er get deliver 3/7/2025 7:29 AM 31 The on-going operational c ost of s ustaining thes e facilities. The City of Gilroy has reduced their general fund for parks and recreation (fac ilities, programming and staff) dramatically since 3/7/2025 7:29 AM Civic Center M aster Plan <br>Community Workshop #1 Online Survey 10 / 13 2008. I would encourage the City to do a feasibility study for the facilities and amenities being cons idered before proc eeding. 32 Parking 3/6/2025 9:16 PM 33 My biggest c onc ern is that this plan will continue to suburbanize the neighborhood by orienting everything inward toward the c ivic center rather than integrating it with the surrounding c ommunity. A well-designed civic center should enhanc e the neighborhood, not is olate its elf from it. The Wheeler Center is a great example of success ful integrat ion, while the police s tation demonstrates the opposite—it feels completely disconnected, almos t lik e a fortress. Another major concern is that the needs of people driving in from farther away could outweigh the needs of residents who live c loses t to the c ivic center. While the space s hould abs olutely be welc oming to all residents, planning decisions s hould not prioritize car access at the ex pense of thos e of us who live here and navigate the area on foot. A truly suc ces sful mas ter plan will focus on walkability, connectiv ity, and a design that strengthens the fabric of the neighborhood. 3/4/2025 10:19 PM 34 Was ting tax payer money, going over budget and not stay ing with in timeline. City needs to look at downsiz ing city hall, making use of modernized work spaces , with technology mos t busines ses are downsizing their footprints . 3/4/2025 7:55 PM 35 Whatever we end up with should be sustainable (energy, maintenanc e, us e, and financ ial)3/4/2025 10:20 AM 36 Parking and lack of green space 3/4/2025 10:02 AM 37 Expense money for staff and other ongoing expens es.3/4/2025 9:51 AM Q6 What excites you most about the Civic Center Master Plan project? Answered: 36 Skipped: 3 #RESPONSES DATE 1 All of it!4/8/2025 2:14 AM 2 Hav ing a Community Center. It's badly needed in a town of this s ize.3/25/2025 9:53 AM 3 We will be able to use space in a better way.3/24/2025 8:37 AM 4 Aquatic but pleas e have a shade 3/19/2025 9:04 PM 5 This plan is conceptually mov ing us c loser to a 21s t Century model that c ould meet the needs of all citizens of Gilroy. 3/17/2025 2:32 PM 6 to get a big pool in town lik e morgan hill 3/17/2025 12:30 PM 7 how muc h it cost to do this study 3/17/2025 9:07 AM 8 I get excited that we c ould actually have a youth/recreation or aquatic c enter and that we won't have to go to Morgan Hill. I prefer to pay for serv ices here and keep the money in Gilroy. 3/17/2025 8:00 AM 9 The poss ibility of having all of those things in town for us to use!3/16/2025 9:04 AM 10 Having opportunities for our youth in the c ommunity 3/15/2025 9:17 PM 11 Expanding ex periences for our y outh and families! We are so far from resources and fun plac es s o having this in town is exc iting! 3/14/2025 4:58 PM 12 The aquatic center but it has to be year around not just summer.3/14/2025 8:34 AM 13 It will be an attractive and beautiful space to gather.3/14/2025 7:27 AM 14 The possibility of our c ity providing a heart to our community 3/11/2025 10:38 AM 15 A place for the youth 3/10/2025 5:52 PM 16 Knowing that there is going to be a place that people are going to be able to use and have fun at 3/10/2025 5:50 PM Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 181Gilroy Civic Center Master Plan Civic Center Master Plan <br>Community Workshop #1 Online Survey 11 / 13 17 It will be something new to gilroy 3/10/2025 5:45 PM 18 That there more youth s paces with diffrent pos sibilities 3/10/2025 5:45 PM 19 That there is finally going to be a place for the hope c ommunity 3/10/2025 5:45 PM 20 That it c an become a beautiful spac e for the public 3/8/2025 3:42 PM 21 New rec reation c enter which c an be us ed by seniors also!3/7/2025 10:33 PM 22 That you are address ing thes e very important is sues is exiting. You do need a new City Hall as that one was built in 1980 and has outlasted the 40 years it was expected to last. The air c onditioning/heating sys tem is constantly failing, and the electrical s ystem shuts down when space heaters are used to offset the cold in the offices. An updated electric al s ystem and more continent outlets are needed in our computer dominated environment. Nobody thought of laptops, cell phones , and desk top c omputers in every offic e in 1980 - they weren't ev en invented. 3/7/2025 6:07 PM 23 Art Center with both indoor and outdoor facilities...Park ing on Eigleberry lot 3/7/2025 11:58 AM 24 Updated City Center that will bring the community together. Every one is isolated in their homes and then go to Morgan Hill or San J ose for fun. We s hould have fun in our own backy ard! 3/7/2025 11:31 AM 25 Getting something on par with the Avenidas in Palo Alto would be awesome.3/7/2025 10:48 AM 26 The hope that community will engage. Whether or not it ev er happens.3/7/2025 8:42 AM 27 To be able to work out, s wim, and play pickle ball on Gilroy !3/7/2025 8:31 AM 28 I am exc ited that the city is creating a vision for a c iv ic c enter and inv olving the citizens in its vis ion. 3/7/2025 7:41 AM 29 A space for young generation to come together with s tate of the art fac ilities. We must have multiple conference rooms and halls to acc ommodate big gatherings while offering all the facilities lik e gy m, aquatic center etc 3/7/2025 7:29 AM 30 Everything! The City's city hall and recreational facilities are antiquated. It's about time that they are considered. 3/7/2025 7:29 AM 31 Finally a projec t al l families & abilities can take adv antage of without having to driv e out of town for it 3/6/2025 9:16 PM 32 What exc ites me most about the Civic Center Master Plan is the opportunity to improve and revitalize the space—making it more walk able, accessible, and better integrated with the surrounding neighborhood. Enhancing connectivity and prov iding more services will not only benefit those of us who live nearby but also create a more welcoming and functional destination for the entire city. 3/4/2025 10:19 PM 33 Having s omething accessible and affordable to all members. A centralized gathering plac e.3/4/2025 7:55 PM 34 I see this as a future public meeting area for events, while also providing recreational space. The site can be helpful in addressing future c limate events (ie giv ing the public a place to s wim and cool down during high heat events) 3/4/2025 10:20 AM 35 The community aspect, es thetics and s ervices provided to citizens.3/4/2025 10:02 AM 36 It’s time for s ome serious remodeling.3/4/2025 9:51 AM Q7 What have we missed? Or any additional comments you would like to share? Ans wered: 31 Skipped: 8 #RESPONSES DATE 1 Will the new solar panels be re-purpos ed? I lov e the antique look of the Wheeler Center on the 4/8/2025 2:14 AM Civic Center M aster Plan <br>Community Workshop #1 Online Survey 12 / 13 corner of 6tha nd Cheurch, but I understand that it will need to be removed. Jus t s aying it might be nice to get s ome good photos of it before. 2 Great job. Thanks!3/25/2025 9:53 AM 3 Theater ///3/19/2025 9:04 PM 4 If there was/is deeper outreach to all segments of our community I believ e we can have better conc ept of the benefits to our local citizens. 3/17/2025 2:32 PM 5 the study is alot of money just build it big and right like Morgan hill 3/17/2025 12:30 PM 6 May be think about the off-ramps nearby for swim events and hotels within walking distance 3/17/2025 9:07 AM 7 I think that more efforts are needed to engage our monolingual populations. They not k now that these s ess ions are happening. They also may not unders tand what this master plan is and how they play a role as community residents. Quite often they are not inv olv ed in decision making. Perhaps, connecting with local non-profits to s pread awareness . 3/17/2025 8:00 AM 8 Parking is important. But we don’t need to be limited to a giant flat lot or tall structure. Small lots tucked around the neighborhood or corners of the master area would be good. I don’t mind walking a block . 3/16/2025 9:04 AM 9 Would the gy m offer c hildc are because that would be something to add to the list of pros on why to bring a rec center to town 3/15/2025 9:17 PM 10 I like the idea of having a s pac e for fes tivals , farmers markets, and local vendors to encourage community unity. 3/14/2025 4:58 PM 11 The picture of aquatic c enter s hows it outdoor which would be not effic ient, as of now we have Chris topher high for s ummer but we NEED indoor pool facilities. 3/14/2025 8:34 AM 12 How about a community garden? The Gilroy Gardening Group is a very active group here and was involved in our previous garden until it was paved ov er for a parking lot...just like the song... Community gardens bring the community together in very healthy ways. 3/14/2025 7:27 AM 13 We should look at us ing the Parking s tructure money to prov ide a single area for all parking. Also, we s hould look at moving all the public s ervices to a second floor ie. city hall, c ity s taff and counc il c hambers . 3/11/2025 10:38 AM 14 Shere to youth 3/10/2025 5:52 PM 15 Nothing 3/10/2025 5:45 PM 16 I would like there to be some studying rooms or areas for youth to go study and some rooms students can book to study or hang out 3/10/2025 5:45 PM 17 I think this plan could be more effective if more people find out 3/10/2025 5:45 PM 18 Refreshing the library would be nice 3/8/2025 3:42 PM 19 Recreation Dept. needs more funding and more ac tivities. City Hall is a nice building but has heating and AC problems and Council meeting room has very poor acoustics . Council members are in an auditory "cave". 3/7/2025 10:33 PM 20 What about the 4 houses on Dowdy St - renew efforts to buy these houses and inc orporate the land into the Master Plan. What about the over $5,000,000 left over from the library projec t bond that should have gone to pa rtially pay for building a parking structure (4 story) to be used by library patrons and City Hall employees and visitors. That s hould hav e been built where you have now put solar panal structures over the ground level park ing spaces. The arts center is a great idea, but you have the property to build it on Eigleberry between 6th and 7th - instead y ou built a parking lot that nobody uses. That art center should be built there. There is simply not enough space to build all the necessary struc tures mentioned in your master plan. 3/7/2025 6:07 PM 21 1. Combine PD and City Offices 2. Move Rec /Swim to Sports park and/or Easts ide location and/or Gilroy Gardens 3. Rework P&R department to better serve City 3/7/2025 11:58 AM 22 I didn't see a lot about inclusion. I saw one mention. We need places for disabled to recreate, ranging in age from infants to s eniors. Well I'm going to go away for 3/7/2025 10:48 AM 23 Connec tion to downtown through a pedestrian paseo through acquisition of some homes to the 3/7/2025 8:42 AM Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 182Gilroy Civic Center Master Plan Civic Center Master Plan <br>Community Workshop #1 Online Survey 13 / 13 east. 24 Thanks for including me in the proces s.3/7/2025 7:41 AM 25 Please don’t make it an other promis e as commercial center in Glen Loma/Fire Station, Shark Stadium or better roads while main entry road from and to the city are brok en ! 3/7/2025 7:29 AM 26 The on-going operational c ost of s ustaining thes e facilities. The City of Gilroy has reduced their general fund for parks and recreation (fac ilities, programming and staff) dramatically since 2008. I would encourage the City to do a feasibility study for the facilities and amenities being c onsidered before proceeding. 3/7/2025 7:29 AM 27 We should plan for retail space. If a park ing struc ture is built, that is a great place to incorporate retail. It can be done similarly to other projects where the space is all built as parking, and s pac es c an be conv erted ov er time to retail as demand increases. This is important because hav ing thoroughly mixed use will be the best way to keep the public s pac e occ upied and well used. This approach is ideal because it can be done gradually. Even if there is never demand for retail, it would be better to have the available space and never use it, rather than plan on 0 retail and then we are stuck with that decis ion for generations. 3/4/2025 10:19 PM 28 Please c ons ider how thes e services , buildings will be us ed and who will staff them. City should return to staffing their own rec reation department. 3/4/2025 7:55 PM 29 None at this time 3/4/2025 10:20 AM 30 History and beautiful hills surrounding our city 3/4/2025 10:02 AM 31 Find a way to reac h more people. Keep encouraging them to get informed and to participate.3/4/2025 9:51 AM Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 183Gilroy Civic Center Master Plan <strong><span style="c olor: #3f 6011;">CIVIC CENTER MASTER PL AN</span><br></strong><br><strong><span style="c olor: #3f 6011;">Community Workshop</span> <span style="c olor:#1b1d5a;">#2 </span><span style="c olor: #3f 6011;">Online Survey</span><br><spanstyle="c olor: #3f 6011;">Three Concept M aster Plan Alternatives</span></strong> 2 / 10 7 A-becaus e the lay out is much more balanced 4/22/2025 5:12 PM 8 Conc ept C seems like a great design with welcoming features throughout. I lik e the idea of the amphitheater stage area on the green because it welcomes more concert/s hows/markets and things like that to Gilroy. 4/22/2025 10:12 AM 9 B. Easier access to City Hall and all rec reation facilities are close together.4/21/2025 8:27 PM 10 Overall layout is nice, footprint of City Hall is the best of the 3.4/21/2025 6:19 PM 11 B 4/21/2025 4:48 PM 12 B 4/21/2025 2:57 PM 13 Concept C, the larger open space/park area is more appealing.4/21/2025 11:21 AM 14 B - (1) Nice balance and flow of Hards cape and landscape. (2) Large area for concerts with stage framed from behind with the new City Hall...great ongoing marketing opportunity. (3) Max flex for events . (4) Much easier to secure in providing safe ev ents . 4/21/2025 9:47 AM 15 C. I like the larger, circular park area. I als o like the park being in the corner.4/21/2025 9:39 AM 16 My firs t concern is the large parking lot being so far from es sential bldgs . , s pecifically the bldg that will include senior c enter. in comparing the 3 drawings , “B” is providing street parking in clos e proximity to the senior center and hopefully plenty of “Acces sible” marked spots. 4/21/2025 8:02 AM 17 I like A, it looks nicer to have the buildings spread out but the square shape als o maximizes the green space. This also allows more even rows for farmers markets or craft fairs, as opposed to a rounded shape. 4/20/2025 11:07 PM 18 B, bec aus e parking is closer to City Hall. And, more importantly, the park is bookended by two city buildings. Parks that are pushed out to the edge or c orner tend t o have more vagrant issues and other s afety issues. 4/20/2025 6:35 PM 19 I lik e the balanced architec ture that Concept A brings , while also integrating pedestrian sidewalk ac cess at the corner of 6th St & Churc h. Moreover, the concept integrates well with downtown activities extending potential venues or k ick off ev ents in the civic park and then continuing downtown (example: Christmas tree lighting and d isplay in the Civic Park with the procession down Monterey). 4/20/2025 5:46 PM 20 Concept C. I prefer the location and circular des ign of the Civ ic Park and the locations of City Hall & the Community Center. 4/19/2025 8:41 PM 21 C. This c onc ept has all the major c ons truction s ite on one side while Amphitheater is a huge plus for the outdoor activ ities 4/18/2025 11:21 PM 22 C as I think the lay out is better and park appears area is larger.4/18/2025 3:03 PM 23 C - I lik e the two fac ilities on the same s ide with the green space open to 6th street with unobs tructed view. Being open rather than between buildings makes the green s pace less private/unobs ervable from the street. This makes it less likely to become used by homeless. 4/18/2025 2:50 PM 24 The flow of keeping the community c enter and city hall ac ross from each other with the s eparation of the civic park seems to flow nic er. 4/18/2025 11:20 AM 25 C - I really lik e the open space and jus t hav ing the buildings be out of site, out of mind for an ev ent. It also feels the most open and most in nature. The lack of building to the north also opens the ingress / egress points for parking. However, A is the most prac tical as noise from events / conc ert would could be aimed using the buildings away from the the majority of the residential area surrounding. If there was a need/desire, the expansion acros s could still occur. Howev er, A is also the most utilitarian and feels more like placing blocks on the ground and has much les s feeling. 4/18/2025 7:14 AM 26 I'm leaning towards C as I'm hoping City Hall and Rec c enter staff will park c loser to 7th st as oppos ed t o flooding the parking in front of the library. Library park ing is already used by their staff and those eating at the Senior Center. It would als o provide more visibility to events going on in the green from those driv ing by. 4/17/2025 2:04 PM 27 C is my favorite because the civic park is more exposed to the surrounding neighborhood and feels more welcoming and is directly adjac ent to the library which gives it more open v iews makes it stand out better and the two together I feel go hand in hand. 4/17/2025 1:29 PM <strong><span style="c olor: #3f 6011;">CIVIC CENTER M ASTER PLAN</span><br></strong><br><strong><span style="c olor: #3f6011;">Community Workshop</span> <span style="c olor:#1b1d5a;">#2 </span><span style="c olor: #3f6011;">Online Survey</span><br><spanstyle="c olor: #3f 6011;">Three Conc ept Master Plan Alternatives</span></strong> 1 / 10 17.24%5 37.93%11 44.83%13 Q1 SELECT your favorite Civic Center Master Plan concept by clicking on the image of your preferred concept. Answered: 29 Sk ipped: 25 TOTAL 29 0%10%20%30%40%50%60%70%80%90%100% Concept A Concept B Concept C ANSWER CHOICES RESPONSES Conc ept A Conc ept B Conc ept C Q2 Which is your favorite concept and why? Ans wered: 52 Skipped: 2 #RESPONSES DATE 1 None. but if I have to choose, I go for Concept A The square green area allows for more us e as in game area. There is s till plenty of green area surrounding it. 5/20/2025 4:06 PM 2 B i think why i should b it cause there a lot of little kids who live here i think it pails be better if 5/9/2025 6:39 PM 3 I like that all the "business " buildings are close to one another. IT would make more sense to design the city hall to the corner of dowdy and 6th street, next to the police department to keep them together. Then move the aquatics c enter and multigenerational community c enter to be next to each other on the c orner of 7th and c hurc h. Have the parking central, loc ated on 7th s treet next to the polic e station and the library. Central parking is the mos t functional as families and the elderly will now hav e to walk from one corner to the next (most likely with swimming gear, etc). That's a long walk with children and for the elderly. 5/1/2025 9:21 AM 4 A 4/28/2025 3:38 PM 5 B having the amphitheater somewhat enclosed by the two buildings on eac h end.4/25/2025 11:25 AM 6 C, I like that the civic park is on the c orner of sixth and churc h 4/24/2025 1:14 PM SURVEY RESPONSESWORKSHOP #2 - ENGLISHDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 184Gilroy Civic Center Master Plan <strong><span style="c olor: #3f 6011;">CIVIC CENTER MASTER PL AN</span><br></strong><br><strong><span style="c olor: #3f 6011;">Community Workshop</span> <span style="c olor:#1b1d5a;">#2 </span><span style="c olor: #3f 6011;">Online Survey</span><br><spanstyle="c olor: #3f 6011;">Three Concept M aster Plan Alternatives</span></strong> 4 / 10 52 B is favored concept with a hy brid of A regarding change in park s tyle as a rectangle. City Council Chambers included within City Hall. 4/8/2025 10:45 AM Q3 Which is your least favorite concept and why? Answered: 47 Skipped: 7 #RESPONSES DATE 1 Concept B. Too muc h open c ement area.5/20/2025 4:06 PM 2 a and c 5/9/2025 6:39 PM 3 Although I c hos e concept C, I do hav e hesitiations with the layout as the amphitheater (when in use) would cause noise pollution to the hous ing nearby, as well as the library which is considered a quiet study area. Also, having a huge open grass area doesn't make muc h us e of the space and func tionality. It would be best to make a children's park for families to enjoy. Bec ause there are no trees in the middle, families could not enjoy that space due to the heat in Gilroy. 5/1/2025 9:21 AM 4 Honestly I’m surprised that the Wheeler Auditorium won’t be repurpos ed. With that thought I guess they all miss the mark. Also is there really a need for a new c ity hall? Seems there is plenty of room to expand if needed 4/25/2025 11:25 AM 5 B, I don't lik e where the park is placed.4/24/2025 1:14 PM 6 C- it's too similar to the Christmas hill park amphitheater area. Not balanced to reflect c ivic duty offices 4/22/2025 5:12 PM 7 My least fav orite concept is A bec ause I don’t lik e the placement of City Hall. I personally feel as though city hall s hould be seen from 5th & c hurc h street unlik e it is now 4/22/2025 10:12 AM 8 C. I don't like that the amphitheater is so clos e to the street.4/21/2025 8:27 PM 9 Concept C - Buildings too crowded 4/21/2025 6:19 PM 10 c 4/21/2025 4:48 PM 11 C City hall will be more visible on 6th and church s treet then on 7th and c hurc h street 4/21/2025 2:57 PM 12 A. Hav ing the c ommunity center s o far away from the rec center does not make much s ense.4/21/2025 11:21 AM 13 C - (1) very tough to secure this area for downtown ev ents . (2) site lacks balance between Lands cape and Hardscape. 4/21/2025 9:47 AM 14 C. It feels lik e those 2 bldgs both being near 7th st will be competing for a small amount of street parking s ince lg lot is far away. 4/21/2025 8:02 AM 15 C. The c ommunity center and c ity hall look s crunched together and there’s no flexibility a round them 4/20/2025 11:07 PM 16 C. A Park on the corner is not well placed. It will lack acc ountability and puts all the buildings tight together. 4/20/2025 6:35 PM 17 Concept B, while similar to Conc ept A, except it does not s eem to welcome those who opt to ride their bikes to this part of town. 6th street from old town to the 4/20/2025 5:46 PM 18 Concept B. I do not like the encroachment of City Hall & the Community Center on both s ides of the Civic Park. 4/19/2025 8:41 PM 19 A, Rec reational facility is oddly in between two government buildings, which may mos tly s tay close or least activ ities during weekends or holiday periods . 4/18/2025 11:21 PM 20 A, I lik e the open space at the c orner of 6th and Churc h above the other options.4/18/2025 3:03 PM 21 A & B are identical except that the buildings are on opposi te sides of the park . There is no difference. The park is less visible from 6th street in these models . A large open park will be 4/18/2025 2:50 PM <strong><span style="c olor: #3f 6011;">CIVIC CENTER M ASTER PLAN</span><br></strong><br><strong><span style="c olor: #3f6011;">Community Workshop</span> <span style="c olor:#1b1d5a;">#2 </span><span style="c olor: #3f6011;">Online Survey</span><br><spanstyle="c olor: #3f 6011;">Three Conc ept Master Plan Alternatives</span></strong> 3 / 10 28 C! I prefer the large open space on the corner of 6th and Church.4/16/2025 7:53 PM 29 C - the park design 4/16/2025 5:25 AM 30 B - good balance of green space along with facilities fir all groups to inc lude new city hall. Lik e outdoor Amphitheatre. Appears to be adequate parking. 4/15/2025 11:07 PM 31 C 4/15/2025 5:49 PM 32 None. All three are basically the same lay out except for the rightmost third. All th ree feature a pool. All three show a new city hall in a different location. 4/15/2025 6:55 AM 33 Concept C is best for two reas ons . One, it does not encourage visitors to park near the library, unless that’s where they’re going. This is important because there often isn’t enough open spaces near the library as it is. Two, it brings community members near city hall, which will help them be more familiar with the area and a c rucially important part of our town. 4/14/2025 12:09 PM 34 Concept B. City Hall location is better viewed and parking location more accessible for City Staff that s tay late. Es pecially during the fall when day light saving s tart. 4/14/2025 10:48 AM 35 A. The multigenerational community center s hould be large and spacious .4/14/2025 8:39 AM 36 C, jus t looks better visually the way buildings are struc tured nex t to each other.4/13/2025 3:15 PM 37 Concept B. City hall on c orner of 6th & Church.4/13/2025 10:43 AM 38 Round Park====It is IMPORTANT THAT THE SWIMMING POOL BE YEAR ROUND AND PROVIDE INSTRUCTIONS FOR THE EASTSIDE CHILDREN. WATER AERBOICS AND LAP SWIM TOO! 4/12/2025 4:51 PM 39 Provides a balanced aesthetic and maximizes green space while allowing for gras s areas that are efficient and remov ing often underutilized corners whic h will s ave water 4/11/2025 7:04 PM 40 I like the park in the c enter and could be convenient to have the c ommunity center next to the library. Great for family friendly ev ents . 4/11/2025 2:38 PM 41 Park appears large so better space c ons umption.4/11/2025 2:37 PM 42 C - the circular park is prettiest and having the buildings together rather than s eparated by the park will make bus iness more c onducive for both staff and citizens . BUT I would revers e the park with the buildings, so there is clos er parking for seniors and those with dis abilities to have eas ier access to the multigenerational community center 4/11/2025 9:35 AM 43 B - offers a better layout of the area allowing for plenty of spac e between buildings for the city hall and community c enter while als o integrating the council chambers into city hall versus keeping it separated. 4/11/2025 9:31 AM 44 A. Having the community center adjacent to the library makes the most sense to me as I sus pect the library will serve a central role in the civic enter 4/11/2025 9:16 AM 45 Concept C. Like the access from corner of 6th and Church whic h is direction our our downtown. The park on 6th k eeps a nice open green s pace inste ad of being hidden by buildings but… I do like B s ince open space is protected by buildings 4/11/2025 9:11 AM 46 C, the park appears to be the largest 4/11/2025 8:17 AM 47 Plan B 4/11/2025 7:45 AM 48 Concept A is the best because it provides the largest green play space I would use with my k ids. The other shapes are pretty but lessen the amount of play space. 4/9/2025 2:54 PM 49 Orientation of the elements and n on-square park space.4/9/2025 9:49 AM 50 None of the abov e. I would prefer using the exterior shell of wheeler auditorium as part of the recreation complex and replacing the current senior center with a modern multifunctional building to round out the recreational needs. 4/8/2025 6:16 PM 51 A with c ity hall and the c ommunity center flipped. The city hall having the chambers attached to it instead of s eparate on 6th st. The Community center on 7th s t. Having large concrete planter barricades along c hurc h for security for events. 4/8/2025 10:53 AM Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 185Gilroy Civic Center Master Plan <strong><span style="c olor: #3f 6011;">CIVIC CENTER M ASTER PLAN</span><br></strong><br><strong><span style="c olor: #3f6011;">Community Workshop</span> <span style="c olor:#1b1d5a;">#2 </span><span style="c olor: #3f6011;">Online Survey</span><br><spanstyle="c olor: #3f 6011;">Three Conc ept Master Plan Alternatives</span></strong> 5 / 10 lovely to look at while driv ing through the neighborhood so closing it off between 2 buildings is my least favorite c hoice. 22 C - I think keeping the c ivic park "behind" the building, mak es it seem separate and less inviting 4/18/2025 11:20 AM 23 B - I don't really like the sandwic h of buildings on either side. The s tage lay out is much nicer, but just feels a little c lausterphobic . 4/18/2025 7:14 AM 24 B is my least favorite as there is only one entranc e from the street to the park. Although have the rec and arts buildings next to each other is nice. 4/17/2025 1:29 PM 25 A. While I lik e keeping with history and having the rec c enter on 6th, I feel if at all. City Hall s hould be on 6th and Churc h. 4/16/2025 7:53 PM 26 B - center on 7th street 4/16/2025 5:25 AM 27 A - building footprints seems crowded and forced into space without consideration for s urrounding neighborhood and homes. 4/15/2025 11:07 PM 28 All. This is a failed process as there is not enough variety and not enough information. You have sent us shopping g for a new car in a Mercedes dealers hip but with no budget. 4/15/2025 6:55 AM 29 Concept A is my least favorite. I think it will cause the most issues of people competing for parking between the library and the community center. 4/14/2025 12:09 PM 30 Concept C. City Hall seems less s ecure being s o c lose to 2 corners. I guess I am always thinking of active s hooter res ponse. Conc ept A and C don't seem as safe. 4/14/2025 10:48 AM 31 C. The multigenerational community center would be the smalles t. Followed by B.4/14/2025 8:39 AM 32 A, makes sense to have both the rec and c ommunity center near each other.4/13/2025 3:15 PM 33 Concept C. Do not need amphitheater.4/13/2025 10:43 AM 34 C does n’t allow the p aseo to integrate with the grass areas as well 4/11/2025 7:04 PM 35 C becaus e city hall and c ommunity center s eemed s quished together.4/11/2025 2:38 PM 36 B not sure what the large area behind the amphitheater will be us ed for and it right against City Hall 4/11/2025 2:37 PM 37 B - the multigenerational community c enter should be c loser to the parking lot 4/11/2025 9:35 AM 38 C - the buildings seem too conden sed and close together 4/11/2025 9:31 AM 39 B. Wors t c ommunity center location 4/11/2025 9:16 AM 40 A - too boxy 4/11/2025 9:11 AM 41 that parking is only on the far northwest c orner of the s ite.4/11/2025 8:17 AM 42 I lik e the flow of it. I like that the pool and multi generational area is near the polic e dept 4/11/2025 7:45 AM 43 C is my least fav orite bec aus e it is surrounded on two sides by roads and seems m ore surrounded by traffic than the first two c onc epts . 4/9/2025 2:54 PM 44 A feels like a Lego map.4/9/2025 9:49 AM 45 Amphitheater s hould not fac e Church Street as it is very busy with traffic and noisy.4/8/2025 6:16 PM 46 C 4/8/2025 10:53 AM 47 C. Park area unprotected and do not like s eparate Council Chambers.4/8/2025 10:45 AM Q4 What is your favorite feature of the civic master plan? Ans wered: 46 Skipped: 8 <strong><span style="c olor: #3f 6011;">CIVIC CENTER MASTER PL AN</span><br></strong><br><strong><span style="c olor: #3f 6011;">Community Workshop</span> <span style="c olor:#1b1d5a;">#2 </span><span style="c olor: #3f 6011;">Online Survey</span><br><spanstyle="c olor: #3f 6011;">Three Concept Master Plan Alternatives</span></strong> 6 / 10 #RESPONSES DATE 1 Nothinq, especially since you haven't detailed that s ome things, lik e City Hall, and the Senior Center could be 2 story, thereby providing more space in a limited area. Also, WE DON'T have to be like Morgan Hill! Instead of a s mall swimming pool, put one at San Ys idro park , and c oordinate with Gavilan College for recreational swim, which could be all y ear round! 5/20/2025 4:06 PM 2 My favorite feature is the pas eo walkway as a means for holding events like farmer's markets, etc. 5/1/2025 9:21 AM 3 Hav ing basketball courts and recreation for the y outh of the inner city. They is not one ac cessible basketball court now that the public schools are fenced. 4/25/2025 11:25 AM 4 recreation and aquatic centers 4/24/2025 1:14 PM 5 The Fitnes s center!4/22/2025 5:12 PM 6 I love the Aquatic center and multicultural cen ter as well, it will bring the community together for all different types of events. 4/22/2025 10:12 AM 7 Recreation building 4/21/2025 8:27 PM 8 A 4/21/2025 4:48 PM 9 Aquatic center 4/21/2025 2:57 PM 10 The new aquatic center.4/21/2025 11:21 AM 11 Masterplan considered as a whole.4/21/2025 9:47 AM 12 The addition of aquatic and rec reation area. Also the amphitheater.4/21/2025 8:02 AM 13 I’m exc ited to have the aquatic center, art/community c enter and amphitheater! So many c ommunity events can be here! 4/20/2025 11:07 PM 14 Nice park.4/20/2025 6:35 PM 15 The Civ ic Park. We are bless ed with the weather and c limate for many outdoor activities (movies in the park , Police Night Out, Poppy Jas per Film Fes tival), which can take full adv antage for suc h a large inc lusiv e open s pace. 4/20/2025 5:46 PM 16 The Civ ic Park.4/19/2025 8:41 PM 17 recreation and aquatic center 4/18/2025 11:21 PM 18 Rec reation c enter/aquatic center.4/18/2025 3:03 PM 19 The outdoor Amphitheatre and community pool. These will bring opportunities for the c ommunity to come together which I lov e. 4/18/2025 2:50 PM 20 I lik e that there are community buidlings and offices in one s pac e 4/18/2025 11:20 AM 21 1. The 200 seat theater 2. Amphitheater 3. Rehearsal spaces / dance s tudios etc. for theater 4. The pool facilities 4/18/2025 7:14 AM 22 an outdoor green space and amphitheater.4/17/2025 2:04 PM 23 The outdoor amphitheater and park as well as the arts center having a dinning hall and theater.4/17/2025 1:29 PM 24 Aquatic s center!!!4/16/2025 7:53 PM 25 Balance of park s pac e and fac ilities.4/15/2025 11:07 PM 26 None.4/15/2025 6:55 AM 27 I have two fav orites, the natural feel of the space and the community pool space. I look forward to swimming in a masters program there. It’s also great for families who need affordable ac cess to s wim les sons and c ooling off in the s ummer. Christopher high school has been doing that, but is not centrally located in our town. 4/14/2025 12:09 PM 28 Favorite feature is the landsc aping.4/14/2025 10:48 AM 29 Aquatic Center 4/14/2025 8:39 AM Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 186Gilroy Civic Center Master Plan <strong><span style="c olor: #3f 6011;">CIVIC CENTER M ASTER PLAN</span><br></strong><br><strong><span style="c olor: #3f6011;">Community Workshop</span> <span style="c olor:#1b1d5a;">#2 </span><span style="c olor: #3f6011;">Online Survey</span><br><spanstyle="c olor: #3f 6011;">Three Conc ept Master Plan Alternatives</span></strong> 7 / 10 30 The rec center, it would be nice to have one s imilar to Morgan Hill’s rec center.4/13/2025 3:15 PM 31 Park ing 4/13/2025 10:43 AM 32 PARK, RECREATION BUILDING INCLUDING POOL 4/12/2025 4:51 PM 33 Open spac e 4/11/2025 7:04 PM 34 Community center and fitnes s center.4/11/2025 2:38 PM 35 Recreational and aquatic center.4/11/2025 2:37 PM 36 The park in Plan C 4/11/2025 9:35 AM 37 multigenerational recreation and aquatic center 4/11/2025 9:31 AM 38 Lot of family activ ities available out of a single area 4/11/2025 9:16 AM 39 The paseo and swim c enter 4/11/2025 9:11 AM 40 the park and pas eo 4/11/2025 8:17 AM 41 I like that each plan has an open area of lawn in s pac e 4/11/2025 7:45 AM 42 I lov e the multigenerational building idea. It's so hard to find places and ac tivities that will allow my kids and their grandparents to interact together. I think kids benefit from s pending time with older people. 4/9/2025 2:54 PM 43 Multigenerational center 4/9/2025 9:49 AM 44 The green space in the middle.4/8/2025 6:16 PM 45 The multigenerational community c enter.4/8/2025 10:53 AM 46 New multigenerational community centers and future multigenerational recreation & aquatics center 4/8/2025 10:45 AM Q5 What would you like to see built first? Ans wered: 47 Skipped: 7 #RESPONSES DATE 1 Not sure. It depends on how it would impact community serv ices.5/20/2025 4:06 PM 2 The multigenerational recreation c enter s hould be prioritized along with the c ommunity center, then the aquatics center. 5/1/2025 9:21 AM 3 The recreation area 4/25/2025 11:25 AM 4 recreation and aquatic centers 4/24/2025 1:14 PM 5 Fitness center 4/22/2025 5:12 PM 6 A new green area, the civic center and park that are there now are hardly ev er in use.4/22/2025 10:12 AM 7 Recreational building and theater.4/21/2025 8:27 PM 8 Any 4/21/2025 4:48 PM 9 City hall 4/21/2025 2:57 PM 10 Aquatic/rec center.4/21/2025 11:21 AM 11 (1) New Library Annex (2) City Hall and Civic Park (3) Community Center (4) Rec reational Center 4/21/2025 9:47 AM 12 The multi gen c ommunity center 4/21/2025 8:02 AM 13 Tough call, maybe the aquatic/rec center or the community center.4/20/2025 11:07 PM <strong><span style="c olor: #3f 6011;">CIVIC CENTER MASTER PL AN</span><br></strong><br><strong><span style="c olor: #3f 6011;">Community Workshop</span> <span style="c olor:#1b1d5a;">#2 </span><span style="c olor: #3f 6011;">Online Survey</span><br><spanstyle="c olor: #3f 6011;">Three Concept M aster Plan Alternatives</span></strong> 8 / 10 14 Does n't matter. Should be based on use of existing buildings, the scheduled calendar of events, and least impact to the newly installed solar panels. 4/20/2025 6:35 PM 15 Multigenerational community center with the Civ ic Park.4/20/2025 5:46 PM 16 The Multi Generational Community Center.4/19/2025 8:41 PM 17 recreation center 4/18/2025 11:21 PM 18 Recreation Center 4/18/2025 3:03 PM 19 Community pool and buildi ng.4/18/2025 2:50 PM 20 The aquatics c enter 4/18/2025 11:20 AM 21 Multi-generational Rec building with theater.4/18/2025 7:14 AM 22 parking 4/17/2025 2:04 PM 23 The civ ic park would likely be the fastest, and could be in us e while the other facilities are being built, or the rec fac ilities since Gilroy lacks thes e. 4/17/2025 1:29 PM 24 Aquatics c enter!!!4/16/2025 7:53 PM 25 Gym 4/16/2025 5:25 AM 26 Multi-generationa l center.4/15/2025 11:07 PM 27 Youth center.4/15/2025 6:55 AM 28 I would like to see this projec t built in a way that is leas t dis ruptive to the important ac tivities and class es c urrently being offered at the wheeler center and the senior center. People who utilize these buildings and the programs housed in them rely on them for healthy ac tivity and pos itive ways for people to spend their time. 4/14/2025 12:09 PM 29 City Hall 4/14/2025 10:48 AM 30 I go to Wheeler 5x a week for ac tivities. I would lik e the new c ommunity center and aquatic center firs t. 4/14/2025 8:39 AM 31 The rec center!4/13/2025 3:15 PM 32 Community center 4/13/2025 10:43 AM 33 RECREATION BUILDING AND COMMUNITY CENTER PLUS NEW CITY HALL.4/12/2025 4:51 PM 34 City hall 4/11/2025 7:04 PM 35 Community center but fitnes s center is a v ery clos e second.4/11/2025 2:38 PM 36 Recreational/aquatic center.4/11/2025 2:37 PM 37 The rec reation and aquatic center. These are much needed by our community.4/11/2025 9:35 AM 38 multigenerational recreation and aquatic center 4/11/2025 9:31 AM 39 Community center s ince gilroy already has a aquatic center out of christopher high school 4/11/2025 9:16 AM 40 All of it!4/11/2025 9:11 AM 41 the recreation center 4/11/2025 8:17 AM 42 I’d like to see the senior center built first. And the pool.4/11/2025 7:45 AM 43 I'd like to multigenerational c ommunity center to be firs t as it will allow my k ids to take class es there through GIlroy Rec. 4/9/2025 2:54 PM 44 No preference. Whatever is cheapest and leas t dis ruptive.4/9/2025 9:49 AM 45 Recreation center inside Wheeler, auditorium, then replace current s enior center.4/8/2025 6:16 PM 46 The m ultigenerational community c enter.4/8/2025 10:53 AM 47 Multigenerational Community Center and then new City Hall, followed by recreation & aquatics 4/8/2025 10:45 AM Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 187Gilroy Civic Center Master Plan <strong><span style="c olor: #3f 6011;">CIVIC CENTER M ASTER PLAN</span><br></strong><br><strong><span style="c olor: #3f6011;">Community Workshop</span> <span style="c olor:#1b1d5a;">#2 </span><span style="c olor: #3f6011;">Online Survey</span><br><spanstyle="c olor: #3f 6011;">Three Conc ept Master Plan Alternatives</span></strong> 9 / 10 center Q6 Any additional comments you would like to share? Answered: 35 Sk ipped: 19 #RESPONSES DATE 1 Nothing has been said as to how BIG the bond issue would have to be, and therefore how it would impact folks' property taxes, and for how long. 5/20/2025 4:06 PM 2 See above regarding placement of all the "busines s" buildings together and the family recreational c enters together, also having a central parking lot as the ir will be elderly, families with children who will be forced to walk across the c ivic c enter if the parking remains on the corner of dowdy and 6th street. Replac e that parking and put the city hall in that c orner. 5/1/2025 9:21 AM 3 As a resident of Dowdy s treet we were informed of the parking on the corner of 6th and Dowdy but the plans the c ity gave to me ass ured us that the traffic from the parking lot would not empty onto our residential street. All the concept drawings appear to s how an exit onto Dowdy instead of 6th. The exit onto 6th would be more logical and preserv e our neighborhood 4/25/2025 11:25 AM 4 Gilroy has been missing something like this! Morgan hill has one with great succ ess and now it's our turn 4/22/2025 5:12 PM 5 I’d like to thank the City of Gilroy for finally doing something for the community’s environment.4/22/2025 10:12 AM 6 This would be nic e to have in our community. There is a need for rec reation for all ages. There isn't much more they c an do now without any facilities . 4/21/2025 8:27 PM 7 Senior c enter and pool 4/21/2025 4:48 PM 8 None 4/21/2025 2:57 PM 9 Make s ure there a ample plac es on this site fore hook-ups to power and water to s upport events. Us e the new City Hall as a marketing opportunity for the City... "Gilroy a city with Spice for Life". 4/21/2025 9:47 AM 10 What type of events will be allowed at Amphitheater since so c lose to housing? In other words , will there be liv e music and how late in night will they be allowed to play? 4/21/2025 8:02 AM 11 What’s the time estimate to c omplete the whole plan?4/20/2025 11:07 PM 12 Police have a large building. Fire will be losi ng its training room and s torage. Being a central location to serv e the city, it would be nic e to k eep a space for fire to hold classes and park apparatus . 4/20/2025 6:35 PM 13 My hope is that the plan also integrates c oncepts of "Complete Streets" in and around the civic complex. The city uses a s hared lane approac h for bicyclists and v ehicles between downtown and this part of town, but also incorporates traffic calming measures that make biking challenging when competing with v ehicles in the shared lane. Dedicated bik e lanes through 6th street c onnecting to bike lanes on Church will welcome those patrons wishing to bike to the Civic complex. 4/20/2025 5:46 PM 14 I think the Multi Generational Recreational & Aquatic Center should be built at the same time as the Community Center if pos sible. 4/19/2025 8:41 PM 15 Pleas e allow some big halls, of 300+ people s o a large events c an be organized inside. A big hall should have a commerc ial kitchen attached. 4/18/2025 11:21 PM 16 As a longtime Gilroy resident (45+ years) it is sad to see that Wheeler Auditorium could not be updated and reused in any plan. 4/18/2025 3:03 PM 17 I s ee a lot of great features in the community building (bas ketball, pool, etc ). I’m the principal of a private sc hool in Gilroy. What kind of access will my students hav e to these facilities? I’m assuming public s chools will have access and I’d lik e city managers to make the protoc ol for priv ate s chools (fees and acc ess) identical to GUSD. 4/18/2025 2:50 PM <strong><span style="c olor: #3f 6011;">CIVIC CENTER MASTER PL AN</span><br></strong><br><strong><span style="c olor: #3f 6011;">Community Workshop</span> <span style="c olor:#1b1d5a;">#2 </span><span style="c olor: #3f 6011;">Online Survey</span><br><spanstyle="c olor: #3f 6011;">Three Concept M aster Plan Alternatives</span></strong> 10 / 10 18 NA 4/18/2025 11:20 AM 19 will people be able to drive from the front library parking to the larger parking lot and polic e park ing? It's not clear with the green fuz ziness. Als o, police parking lot should connect to provide more egress from the lot. 4/17/2025 2:04 PM 20 Let's do it! Our city needs the update and capacity for the future.4/16/2025 7:53 PM 21 Outdoor park space with playground and rock climbi ng 4/16/2025 5:25 AM 22 Thank you for all of the information and outreach efforts. It is appreciated.4/15/2025 11:07 PM 23 The process is flawed. We know how much money we MAYBE can spend - there should be a low budget. Mid budget. And top budget set of options . 4/15/2025 6:55 AM 24 I’m s ure it’s much too late, but I would like to see a little more parking remain clos e to the library, on the east side of the building. I look forward to seeing this v ision come to life. 4/14/2025 12:09 PM 25 I am concerned about parking. Also concerned about how police vehic les would be able to go north in an emergenc y if Hanna is closed off for a parking lot. Also c oncerned about what would happen to Wheeler Center. Look, it's old and gros s. I don't mind a new building, I just wonder how much negative feedback the City wil l get for tearing it down. 4/14/2025 8:39 AM 26 Love that we’re doing this!4/13/2025 3:15 PM 27 Eliminate aquatic center 4/13/2025 10:43 AM 28 I love that this is being done. Reminds me of the Morgan Hill Centennial Rec reation Center. We need this in Gilroy. 4/11/2025 2:38 PM 29 To repeat myself, I believe the park and the buildings should be on opposite sides as to what is shown in plan C. Park ing should be as c lose as possible for seniors and those with dis abilities to us e the community center and City Hall. 4/11/2025 9:35 AM 30 The paseo should be a plac e of pass ion, place to honor our his tory and gather as community. Friendly and inviting so landscaping and light is critical 4/11/2025 9:11 AM 31 spread out parking or do a parking garage to make best use of the spac e av ailable 4/11/2025 8:17 AM 32 Main park ing lot is not central and is a long walk to the other side for seniors and families with toddlers, especially in rain, heat, and at night. 4/9/2025 9:49 AM 33 I do not think this is a good loc ation for swimming pools. They should be built at the sports park. Pools are especially ex pensive to maintain year-round and I doubt the city would be able to take on that expense. They already share an excellent new pool with Christopher high s chool and als o Gilroy high school in the summer. 4/8/2025 6:16 PM 34 Hav ing the entire area be dog friendly with dog poop bag/trashcan stations throughout. Public Restrooms available throughout the whole s pace. Lots of trees and greenery. 4/8/2025 10:53 AM 35 Now to figure out how to fund it 4/8/2025 10:45 AM Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 188Gilroy Civic Center Master Plan SURVEY RESPONSESWORKSHOP #2 - SPANISH <span style="c olor: #3f 6011;"><strong>Centro Cívic o de Gilroy Plan Maestro</strong></span><br><br><strong><span style="c olor: #3f 6011;">Taller Comunitario <span style="c olor:#1b1d5a;">#2</span> Enc uesta en L ínea</span></strong><br><strong><span style="c olor:#3f 6011;">Tres alternativas del Conc epto del Plan Maestro</span></strong> 1 / 2 0.00%0 50.00%1 50.00%1 Q1 SELECCIONE su concepto favorito del Plan Maestro del Centro Cívico al hacer clic en la imagen de su concepto preferido. Ans wered: 2 Sk ipped: 0 TOTAL 2 0%10%20%30%40%50%60%70%80%90%100% El Concepto A El Concepto B El Concepto C ANSWER CHOICES RESPONSES El Concepto A El Concepto B El Concepto C Q2 ¿Cuál es su concepto favorito y por qué? Ans wered: 2 Sk ipped: 0 #RESPONSES DATE 1 El diseño es mejor por qué también c reo que no se afec taría a los v ecinos de enfrente 5/9/2025 6:46 PM 2 El conc epto C 5/9/2025 6:40 PM Q3 ¿Cuál es el concepto que menos le gusta y por qué? Ans wered: 2 Sk ipped: 0 #RESPONSES DATE 1 El que es más abierto el 3 ya que hay cas as a su alrededor 5/9/2025 6:46 PM 2 Porque la vista es mejor 5/9/2025 6:40 PM <span style="c olor: #3f 6011;"><strong>Centro Cívico de Gilroy Plan M aestro</strong></span><br><br><strong><span style="c olor: #3f 6011;">Taller Comunitario <span style="c olor:#1b1d5a;">#2</span> Enc uesta en L ínea</span></strong><br><strong><span style="c olor:#3f 6011;">Tres alternativas del Conc epto del Plan M aestro</span></strong> 2 / 2 Q4 ¿Cuál es su característica favorita del Plan Maestro del Centro Cívico? Answered: 2 Skipped: 0 #RESPONSES DATE 1 Que queda en el centro y 2 edific ios pueden cubrir a los vec inos 5/9/2025 6:46 PM 2 Que haya espac ios recreativ os para activ idades para nuestros jóvenes 5/9/2025 6:40 PM Q5 ¿Qué le gustaría ver construido primero? Answered: 2 Skipped: 0 #RESPONSES DATE 1 El Gilroy c ivic park 5/9/2025 6:46 PM 2 Primero los parques c on entrenamiento deportiv o 5/9/2025 6:40 PM Q6 ¿Algún comentario adicional que le gustaría compartir? Answered: 1 Skipped: 1 #RESPONSES DATE 1 Me encanta la idea 5/9/2025 6:46 PM Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 189Gilroy Civic Center Master Plan SURVEY RESPONSESWORKSHOP #3 - ENGLISH <strong><span style="c olor: #3f 6011;">CIVIC CENTER MASTER PL AN </span></strong><br><span style="c olor: #3f 6011;">Community Workshop #3 Online Survey </span><br><spanstyle="c olor: #3f 6011;">Pref erred Conc ept Presented f or Feedbac k</span> 1 / 8 8.11%6 52.70%39 20.27%15 12.16%9 1.35%1 0.00%0 5.41%4 Q1 What is your FAVORITE element of the plan? Ans wered: 74 Skipped: 2 TOTAL 74 0%10%20%30%40%50%60%70%80%90%100% None of the above Recreation & Aquatic Cent er Gilr oy Civic Park Community Center City Hall Parking Layout Paseo ANSWER CHOICES RESPONSES None of the abov e Recreation & Aquatic Center Gilroy Civ ic Park Community Center City Hall Parking Lay out Pas eo Q2 What is your LEAST favorite element of the plan? Ans wered: 71 Skipped: 5 <strong><span style="c olor: #3f 6011;">CIVIC CENTER M ASTER PLAN </span></strong><br><span style="color: #3f6011;">Community Workshop #3 Online Survey </span><br><spanstyle="c olor: #3f 6011;">Pref erred Conc ept Presented for Feedbac k</span> 2 / 8 36.62%26 7.04%5 8.45%6 7.04%5 9.86%7 29.58%21 1.41%1 TOTAL 71 0%1 0%20%30%40%50%60%70%80%90%100% None of the above Recreation & Aquatic Center Gilroy Civic Par k Community Center City Hall Parking Layout Paseo ANSWER CHOICES RESPONSES None of the above Rec reation & Aquatic Center Gilroy Civic Park Community Center City Hall Parking Layout Paseo Q3 Should any of the plan elements be REMOVED? Answered: 69 Skipped: 7 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 190Gilroy Civic Center Master Plan <strong><span style="c olor: #3f 6011;">CIVIC CENTER MASTER PL AN </span></strong><br><span style="c olor: #3f 6011;">Community Workshop #3 Online Survey </span><br><spanstyle="c olor: #3f 6011;">Pref erred Conc ept Presented f or Feedbac k</span> 3 / 8 65.22%45 10.14%7 7.25%5 1.45%1 5.80%4 8.70%6 1.45%1 TOTAL 69 0%10%20%30%40%50%60%70%80%90%100% None of the above Recreation & Aquatic Cent er Gilr oy Civic Park Community Center City Hall Parking Layout Paseo ANSWER CHOICES RESPONSES None of the abov e Recreation & Aquatic Center Gilroy Civ ic Park Community Center City Hall Parking Lay out Pas eo Q4 Are there any MISSING ELEMENTS we should try to add to the plan? Answered: 44 Sk ipped: 32 #RESPONSES DATE 1 Connection to downtown with green belt walkway which extends from the Gilroy Civic park to the green s pac e next to the Gilroy Center for the arts. Additionally, may be a large parking garage between Churc h and Eigleberry for both the c iv c area and downtown. 6/7/2025 12:20 PM 2 Solar/battery bac k-up to model to the community bes t practices to decrease c arbon footprint. Elec tric vehicle charging s tations. Deciduous s hade trees, rec laimed H2O for landscape irrigation. City Center should have a bus stop too. I believe Gilroy could/should be a leader in environmental protections Sugges t do not duplicate what library already provided.... unless more study areas are needed. Secure place to park bikes. Wel l lit 6/5/2025 4:51 PM 3 Playground please.6/5/2025 10:01 AM <strong><span style="c olor: #3f 6011;">CIVIC CENTER M ASTER PLAN </span></strong><br><span style="color: #3f6011;">Community Workshop #3 Online Survey </span><br><spanstyle="c olor: #3f 6011;">Pref erred Conc ept Presented for Feedbac k</span> 4 / 8 4 Unclear why this is a priority. Downtown needs attention that is far pas t due.6/3/2025 6:24 AM 5 The Civic Park s hould be moved to a different site in the city. Large ev ents dis tract from the "community " part of the plan. This site is too small for concerts and festivals. A good siz ed flea mark et or smaller events are more appropriate for the space. 6/2/2025 9:37 AM 6 Enough parking would be nice 6/1/2025 6:27 PM 7 Remove three private homes on Dowdy street, add to complete the look.6/1/2025 6:42 AM 8 Make sure to put no loitering s igns, homeles s sleeping there, no RV’s park ed all over the area 5/31/2025 6:54 AM 9 Pleas e make a big Lap Pool for swimmers because the pool the City built at CHS is unavailable during the school year. The Civ ic Park c ould be smaller then all the Rec Center facilities can be larger. We need more spac e for Senior activities . 5/30/2025 1:31 PM 10 Just making sure the aquatic center is indoor not outdoor.5/30/2025 1:09 PM 11 Bring back s enior craft s tore.5/30/2025 12:31 PM 12 More park ing, current park ing is n't sufficient especially when events oc cur at the same time at the library and Wheeler Center 5/30/2025 9:27 AM 13 Community center preference giv en to youth activities . I doubt the need for senior dining at 400 people. Seems exc ess iv e for the demand and could be better uti liz ed for youth ac tivities . 5/30/2025 8:44 AM 14 Enough parking in general but plenty of disabled parking to s erve this community. Will ADA parking be close enough? 5/30/2025 8:33 AM 15 I am a member of Morgan hill cRC, there is two sets of bas ketball courts, and they is alway s busy with two! I rec ommend the decisions makers visit Morgan Hill CRC. 5/30/2025 8:33 AM 16 No 5/30/2025 8:27 AM 17 Separated s mall/large dog park .5/30/2025 8:07 AM 18 Basket ball / tennis courts - city fenced in schools removing courts and rec s pac e.5/30/2025 7:16 AM 19 More lighting around 6th& 7th, for the center.5/27/2025 5:01 PM 20 Miss ing from the pres entation is an entire floor and larger footprint for the Community Center. With the 1st floor for Seniors, and 2nd for youth, the 3rd floor would be for the arts. This would encompas s s tudio and class rooms, materials s torage, and flexible gallery space. The ELS team member ex pres sed concern that a 3rd floor would be incongruent with the ov erall Civic Center silhouette, and that windows would overlook homes on 7th Street. I dis agree on both counts. And windows on that face could be above eye level, or not on the gallery wall at all. Furthermore, what a stunning view overlooking the whole Civ ic Center it could be! Careful thought should to be given to provide ample space for each of the three components: Seniors, Youth , and Arts. For instance, the Seniors us ed to have a store dedicated to selling their handcrafts . Is there s pace in the current proposal? Parks & Rec us ed to hos t Kids Discover Arts in Wheeler Center, a one-day free art ev ent. Is there room for such in the Community Center plan? Such an ample Community Center could truly grow as our city does, rather than carv ing up a too-s mall space into limiting pieces . Final thought— the current Art Center in Monterey & 7th could be raz ed and rebuilt as a dedicated large theater/auditorium, and would anchor the Civ ic Center to the Downtown Dis trict. 5/27/2025 4:12 PM 21 Please do not tear down the Wheeler Bu i’ll ding built in 1929! Should be treated as an Historical Landmark ! 5/27/2025 1:28 PM 22 I hope there will be a permanent s tage built in the c ivic park for live mus ic performanc es, etc., like they have in many other downtown parks. 5/26/2025 3:18 PM 23 Hello, I am c oncerned that the pool is not big enough for the amount of Lap Swimmers that will want to use the Pool. There are a lot of Gilroy people who s wim in Morgan Hil l Aquatic Center & some ev en in the Adaptiv e Program at Gavilan College, who will want & need to use the new Gilroy Pool. Your diagram looks lik e the pool is very SHORT for lap s wimmers . It will be us eless unless you really are serious about meeting their needs. Pls look into it further or c ontact me. Thank you, Rebecc a Sc heel, rsc heel@verizon.net 5/26/2025 10:57 AM 24 Where would delivery truck s and dum pster/ garbage truc ks have acc ess?5/26/2025 8:16 AM Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 191Gilroy Civic Center Master Plan <strong><span style="c olor: #3f 6011;">CIVIC CENTER MASTER PL AN </span></strong><br><span style="c olor: #3f 6011;">Community Workshop #3 Online Survey </span><br><spanstyle="c olor: #3f 6011;">Pref erred Conc ept Presented f or Feedbac k</span> 5 / 8 25 struc ture for k ids to play. morgan hill has a play ground next to the farmers market. think about who will c ome to events. 5/26/2025 7:07 AM 26 Senior Center 5/25/2025 8:24 PM 27 Something that would inspire youth to play at the park (I.e playground, soccer shaped field, s occer net, pic kleball,etc). 5/24/2025 7:13 AM 28 A huge exerc ise without proper information how this project will be funded and what are the timelines. It can be another Gilroy Sports Park like master plan whic h ex ist s inc e decades however never gets materialized! 5/23/2025 9:10 PM 29 Is there a gym for clas ses ?5/23/2025 6:36 PM 30 Gym for bas ketball, indoor s occer. Make it ac cessible for public to use 5/23/2025 3:14 PM 31 Outdoor pic kleball the half gy m in the community center is n't enough. It should also be a full gym and not a half gym. 5/23/2025 10:12 AM 32 The park should have a playground. That way the library can free up s ome space c urrently allocated for its play ground. 5/23/2025 10:07 AM 33 25 yard by 25 meter pool that can hav e lane lines go in eac h direction.5/23/2025 9:28 AM 34 A playground for children in the park (with trees for shade).5/23/2025 8:13 AM 35 Plan should not be dic tated by GPD into a closed in California high sc hool c ampus design with buildings surrounding a quad - from the 1960s. Initial open concepts to the park area were critical to make this plac e feel like an open space to enter as opposed to a courtyard of city buildings . Parking will be overwhelmingly inadequate. Especially during daytime M-F hours with 100+ s taff for all these buildings as well as library and all the ac tivities they are s upposed to create. On top of this, location of parking, especially for a facility that feeds 200-300 senior citiz ens, is far too remote. This is a disaster in the mak ing. 5/23/2025 7:42 AM 36 Larger performing arts theater. More s pac e for the Youth Centerand Art Center.5/21/2025 4:55 PM 37 Since sometimes a community center will hav e preschool class es, maybe a tas teful struc ture or arrangement of swings/slide/monkey bars could be cons idered s omewhere? There is plenty of room for children's trikes / scooters, s occ er games etc, and the water feature will be an at trac tion, but maybe a feature for when it is too cold to run through the water, but nice enough to play outs ide, would be nice. Many children liv ing close to this wonderful civic center would lov e to play outs ide, and don't hav e the easy/walk-able access to play ground s tructures that newer neighborhoods hav e. 5/21/2025 9:19 AM 38 The play ground and places that people can be able to sit down 5/20/2025 7:30 PM 39 I think a playground loc ated bes ide the water splash area would be perfect for children.5/20/2025 7:29 PM 40 Community garden, playground, local art, 2 story park ing with green roof: garden, play area, etc 5/20/2025 6:14 PM 41 Pleas e keep the historical Wheeler Auditorium. The facade can be kept intact and the rest of the building could be remodeled to s erve the aquatic c enter with the us es planne d for. 5/20/2025 2:45 PM 42 Connecting walk way s with walking path around park 5/20/2025 2:43 PM 43 Integrate the s idewalks into the flow so they ’re essentially a big walking path or train around the three bloc ks, not just around the main park. Also, public art- mak e sure there are walls dedicated to murals , places we c an put statues , etc. Let’s also be mindful of water and s unshine with c limate c hange-maxi mize solar by cov ering some of the parking lots with solar panels, and poss ibly rethinking the splash pad. Is it drought friendly? Is the plumbing system for that hearty or finicky ? Just a cons ideration. 5/20/2025 10:28 AM 44 Special access zones for s enior vans and trucks for kitchen, bands , theatre 5/20/2025 10:16 AM Q5 Any additional thoughts, comments or suggestions? Answered: 48 Sk ipped: 28 <strong><span style="c olor: #3f 6011;">CIVIC CENTER M ASTER PLAN </span></strong><br><span style="color: #3f6011;">Community Workshop #3 Online Survey </span><br><spanstyle="c olor: #3f 6011;">Pref erred Conc ept Presented for Feedbac k</span> 6 / 8 #RESPONSES DATE 1 Thank s for easy way to giv e feedback!6/5/2025 4:51 PM 2 I lik e how city hall is symmetrical to the library. Will the pool be cov ered to prevent unwanted people from staring? 6/5/2025 10:01 AM 3 These elements try to ac complish too much in a single space without regard to the small neighborhoods surrounding the sugges ted c ivic center. My s ugges tion would be to build the aquatics center at the loc ation of the gilroy sports complex on Monterey. And to loc ate buildings specific to art, culture and performance activity in the current art c enter on Monterey. Building struc tures specifically to ac commodate parking is problematic for the surrounding neighborhoods . A he c ity has already made a commitment to biking and should develop greater biking infrastructure encouraging those using the compl ex to bik e and walk to thes e areas (not to drive through the surrounding neighborhoods on the way to park their cars). Pleas e provide information regarding impacts to the impac ted neighborhoods loc ated on s ixth and s eventh s treets and on dowdy, c hurc h, hanna, and Ros anna streets. concept A is the least cluttered and appears to utilize the spac e in keeping with the historical intentions. Please k eep in mind the s chools and senior residences located on hanna and s ixth streets and the way in which the community c urrently use the library and senior s ervices. A report on traffic flow and impacts to s urrounding neighborhoods is necess ary. 6/4/2025 8:47 AM 4 Do we have a c ity master plan? How are we attracting people in Gilroy to stay in Gilroy and spend their money here vs going to Morgan Hill? 6/3/2025 6:2 4 AM 5 Not sure why an indoor running trac k is needed. There are two High Sc hools in the area with outdoor tracks and we live in a beautiful climate where y ou c an be outdoor mos t of the y ear. 6/2/2025 3:09 PM 6 A general sugges tion: Please consider a city transportation s ervice for seniors in addition to VTA. Gilroy is growing and too spread out. 6/2/2025 9:37 AM 7 why did they put up solar panels if they will be tak ing them down along 7th st?6/1/2025 2:54 PM 8 Remove the three private home (buy them) on Dowdy street.6/1/2025 6:42 AM 9 Looks nic e 5/31/2025 6:54 AM 10 adding a stage in the park for local performances and fes tival 5/30/2025 1:09 PM 11 Consider at leas t a two-s tory parking garage to ac commodate activities that may be occurring at once in all of those buildings. 5/30/2025 9:27 AM 12 I would like bett er messaging on the principles behind the plans development. Who is this targeted to? Youth, Community, or seniors . Reading through the plan it appears to me that seniors are overweighted in the decision on layout. 5/30/2025 8:44 AM 13 The parking with the solar array was just finished and that’s going to be removed???5/30/2025 8:33 AM 14 Need a large work out area with filled equipments. There will be l ots of members when Gilroy CRC is open. 5/30/2025 8:33 AM 15 No 5/30/2025 8:27 AM 16 Will there be sufficient lighting? Cameras? Water fountains? WiFi?5/30/2025 8:07 AM 17 Traffic Hanna in particular is a s hort c ut from 3rd to 6th and acc idents frequently on 4& hanna. Police speed north over 59 miles hour and so do drivers. School drop/pic kup and peak traffic times it’s an unsafe s treet. Consider tattoo c alm ing structures on 6th, slight himp/plateau where cros s walks are. Not round but rais ed platform or out them middle of the road to phy sically deter s peeding. Cars can and do blow by stop signs . Or add small roundabouts. City of Mountain View has to use these tactics in their old downtown area. We can learn a lot by looking around. It’s a growth, friendly family, friendly city with a vibrant downtown in Parking away from the core. Inves t in a park ing struc ture Nearby rather than using the space near the revisioned city core. 5/30/2025 7:16 AM 18 Pleas e make s ure the parking spaces are large enough to accommodate larger vehicles. Like vans. Many mothers and families like to carpool. Other people just have large families . Please 5/29/2025 9:24 PM Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 192Gilroy Civic Center Master Plan <strong><span style="c olor: #3f 6011;">CIVIC CENTER MASTER PL AN </span></strong><br><span style="c olor: #3f 6011;">Community Workshop #3 Online Survey </span><br><spanstyle="c olor: #3f 6011;">Pref erred Conc ept Presented f or Feedbac k</span> 7 / 8 mak e them large enough. Also, loc ker rooms are frequent places of sexual abus e. Pleas e be aware and make s afety adjustments if needed. Pleas e and thank y ou. 19 recreation center and aquatic center should not be part of civic center. Its a waste of money to tear down what is there and build new, Wheeler Auditorium s hould be a his toric al building and should be remodeled but not removed. The whole area could be moderniz ed but not torn down and rebuilt. The park ing lot that was just fitted with solar panels- is that going to be removed? what a waste of money! In this economy the c ity c ould be updating but not s pending on a fancy redo' 5/29/2025 4:59 PM 20 Where will the EOC and communic ations equipment be mov ed to? The city has land at 6th x Railroad for a youth c enter. Put the aquatic center there. Follow through on your other mas ter plans. Plans were paid for to begin upgrading the old PD. T here was an old plan for another wing to the senior center. 5/29/2025 12:45 PM 21 If you were to move the city hall it would allow more spac e for more recreational ac tivities or outdoor space where children and youth can play s occer or football while perhaps waiting for family members conduc ting other indoor activ ities. 5/28/2025 7:28 AM 22 Making s ure that all buildings are handicap ac ces sible.5/27/2025 5:01 PM 23 The overall presentation and artists ’ renderings were attrac tive and well coordinated.5/27/2025 4:12 PM 24 I think there needs to be more parking built into the plan. Maybe a multi-lev el s tructure. People won't want to vis it downtown if they hav e to circle for 30 minutes to find a parking. 5/26/2025 3:18 PM 25 I think the Recreation Center AND the Pool should be larger. Our population is aging and needs all us able spac e. Thank you. 5/26/2025 10:57 AM 26 Connect the park ing lot in front of the police department to the parking lot north of the polic e department and delete the Paseo in that area. A parking structure would be needed with all the additions. Emergency traffic leav ing the PD could be a problem with conges tion with only one access point to the front of the PD that also c onnects to the front of city hall. 5/26/2025 8:16 AM 27 need to think about young adults with children and families .5/26/2025 7:07 AM 28 Beautiful design. Considering the large number of youths that go to the library, keep them in mind for the park . Kids need/want play -focus ac tivities at a park. 5/24/2025 7:13 AM 29 Anything kid friendly would be great, espec ially the older they get 5/23/2025 6:36 PM 30 Great plan and it will increase participation of Gilroy residents. The Recreation Department and Aquatic Center will bless this community. 5/23/2025 5:44 PM 31 There is a lot of community sentiment in favor of Wheeler Auditorium. It is on the City's lis t of his toric buildings and is good Art Deco architec ture. The interior could be renovated to provide better recreation fac ilities. Former police station s outh of Wheeler s hould be demolished. The rec reation c enter and community center are very nice but would require more funding to s taff them and provide programming. 5/23/2025 3:41 PM 32 Looks good.....allow more food venders 5/23/2025 3:14 PM 33 I think removing the grass area on the corner of 6h and Dowdy for parking is a mistake. There s hould be more encouragement for biking or walk ing to the civ ic center as opposed to ad ditional parking stalls. 5/23/2025 11:15 AM 34 Not sure the purpos e of the pool. I would recommend the building of a true aquatic center (25 y d x 50m) as a part of the Sports Park. 5/23/2025 10:18 AM 35 Park ing garage in lieu of parking lot.5/23/2025 10:12 AM 36 Community and aquatic centers s hould be switched so that community c enter is c los er to the library. 5/23/2025 10:07 AM 37 The city hall would best be fit a the corner of dowdy and 6th street to max imize parking where the lay out c urrent has the city hall placed. The city hall does not need to be centralized. Parking is too far on the corner of dowdy and 6th and will impact elderly. Although there has been changes to add parking closer, it is still forcing families and elderly to walk from dowdy/6th s treet corner to the other side on Church street when there is overflow. Which most likely there will be as city hall workers will park nearest to the city hall. Please reconsider. 5/23/2025 8:13 AM <strong><span style="c olor: #3f 6011;">CIVIC CENTER M ASTER PLAN </span></strong><br><span style="color: #3f6011;">Community Workshop #3 Online Survey </span><br><spanstyle="c olor: #3f 6011;">Pref erred Conc ept Presented for Feedbac k</span> 8 / 8 38 Reduce one building. Go back to one of the last designs. Figure out parking with subterranean down and one lev el up - more conveniently located to the activity buildings. If not possible then the design is infeasible. 5/23/2025 7:42 AM 39 I am for the “potential” two level parking. For sure the new facilities will bring LOTS of people.5/23/2025 7:21 AM 40 This whole project needs to be approved up front and built as fas t as poss ible. Trying to spread this across multiple bond meas ures would result in extra delay and probable failure of the ov erall project as getting 2/3 approval is ex tremely diffic ult. 5/21/2025 4:55 PM 41 Pleas e choos e Sycamores (not crepe myrtles or Chines e pistache) for the street trees and parking lot trees to match 6th Street in front of the library and downtown. They provide a nice shade canopy in s ummer and are dec iduous for winter. Als o a nice-to-have would be a c ommunity garden on the roof of the 2nd story of the park ing garage :-D. I wouldn't want the park ing lot to be without the large trees on the ground level. Lov e the trees! Thank s for the opportunity to c hime in. 5/21/2025 9:19 AM 42 Jus t places to sit down 5/20/2025 7:30 PM 43 Nothing else but I think they should really make a playground 5/20/2025 7:29 PM 44 I appreciate the process 5/20/2025 6:14 PM 45 I marked the “least” favorite as the parking configuration. There doesn’t seem to be enough and the loc ation is too far from the Aquatics Center and Multigenerational Community Center where more parking would be required. It seems like the area of the ‘Civ ic Park’ would be a better loc ation for parking and would be less visible from 6th Street and more accessible to the buildings most used by the public. A s maller Civic Park could be loc ated on 6th Street where the parking is shown in this plan. 5/20/2025 2:45 PM 46 Possibly include c hargers for electric c ars , spaces for van drop off of seniors or k ids, water and power throughout the green spaces for pop up cafes, farmers markets, etc. Also, is the only place to get food here in the senior center dining room? 5/20/2025 10:28 AM 47 Live the windows and paseo concept 5/20/2025 10:16 AM 48 Doggy s tations, ballards for safety as part of the design 5/20/2025 10:10 AM Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 193Gilroy Civic Center Master Plan SURVEY RESPONSESWORKSHOP #3 - SPANISH Centro Cívic o de Gilroy Plan M aestro<br><br>Taller Comunitario #3 Enc uesta enLínea<br>Conc epto Preferido Presentado para Retroalimentac ión 1 / 4 0.00%0 100.00%1 0.00%0 0.00%0 0.00%0 0.00%0 0.00%0 Q1 ¿Cuál es tu elemento FAVORITO del plan? Ans wered: 1 Sk ipped: 0 TOTAL 1 0%10%20%30%40%50%60%70%80%90%100% Ninguno de los anteriores Centr o Recr eativo y Acuático Par que Cívico de Gilr oy Centr o Comunitario Ayuntamiento Disposición del estacionamiento Paseo ANSWER CHOICES RESPONSES Ninguno de los anteriores Centro Recreativo y Acuático Parque Cív ico de Gilroy Centro Comunitario Ayuntamiento Dis posic ión del estacionamiento Paseo Q2 ¿Cuál es el elemento que MENOS te gusta del plan? Ans wered: 1 Sk ipped: 0 Centro Cívic o de Gilroy Plan Maestro<br><br>Taller Comunitario #3 Enc uesta enLínea<br>Conc epto Pref erido Presentado para Retroalimentac ión 2 / 4 0.00%0 0.00%0 0.00%0 0.00%0 0.00%0 0.00%0 100.00%1 TOTAL 1 0%1 0%20%30%40%50%60%70%80%90%100% Ninguno de los anterior es Centro Recreativo y Acuático Parque Cívico de Gilroy Centro Comunitar io Ayuntamiento Disposición del estacionamiento Paseo ANSWER CHOICES RESPONSES Ninguno de los anteriores Centro Recreativo y Acuático Parque Cívico de Gilroy Centro Comunitario Ay untamiento Disposición del estac ionamiento Paseo Q3 ¿Debería ELIMINARSE alguno de los elementos del plan? Answered: 1 Skipped: 0 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 194Gilroy Civic Center Master Plan Centro Cívic o de Gilroy Plan M aestro<br><br>Taller Comunitario #3 Enc uesta enLínea<br>Conc epto Preferido Presentado para Retroalimentac ión 3 / 4 100.00%1 0.00%0 0.00%0 0.00%0 0.00%0 0.00%0 0.00%0 TOTAL 1 0%10%20%30%40%50%60%70%80%90%100% Ninguno de los anteriores Centr o Recr eativo y Acuático Par que Cívico de Gilr oy Centr o Comunitario Ayuntamiento Disposición del estacionamiento Paseo ANSWER CHOICES RESPONSES Ninguno de los anteriores Centro Recreativo y Acuático Parque Cív ico de Gilroy Centro Comunitario Ayuntamiento Dis posic ión del estacionamiento Paseo Q4 ¿Hay algún ELEMENTO FALTANTE que deberíamos intentar agregar al plan? Ans wered: 1 Sk ipped: 0 #RESPONSES DATE 1 Ahorita todavía no 5/20/2025 6:16 PM Q5 ¿Tiene alguna idea, comentario o sugerencia adicional? Ans wered: 1 Sk ipped: 0 Centro Cívic o de Gilroy Plan Maestro<br><br>Taller Comunitario #3 Enc uesta enLínea<br>Conc epto Pref erido Presentado para Retroalimentac ión 4 / 4 #RESPONSES DATE 1 Me gustan todas la s ideas ..5/20/2025 6:16 PM Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB MULTIGENERATIONAL COMMUNITY CENTER BUILDING PLANS | SITE SECTIONS | ELEVATIONSMEETING NOTES AND PRESENTATIONS C. Meeting Notes and PresentationsDocusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 196Gilroy Civic Center Master Plan 6. Building and Needs Assessments • The Library and Police Station are both about ten years old (built in 2012) and can be excluded from the assessments. They will remain largely as is. • A $5MM bond is due to be released shortly for improvements to the library. • The Wheeler Center is under the jurisdiction of Parks and Recreation, and their input will be important in determining what happens with the building. There has been some desire expressed for a swimming pool. • Existing Parking Areas: A large portion of the existing parking area at the southeast corner of the Civic Center is for City vehicles and storage. Public Works and Engineering have jurisdiction over parking. • The Annex building (adjacent to the Wheeler Center) could be replaced. • There are five existing single-family properties on Dowdy Street near 6th Street: Two lots at 7380 and 7390 Dowdy are owned by the City, one is an empty lot and the other has a single- family house on it. The remaining three homes are privately owned. • Building Assessments: Site walks for Building Assessments will probably take a day, and should include facilities and building department personnel (Hipolito and Walter). • Needs assessment: The City will work on identifying department heads and other personnel for the needs assessment discussions with ELS. They will set up meetings (typically via Zoom) with various facilities and departments that will be affected by the master plan. These meetings will consist of a series of interviews to discuss space needs and desires. 7. Community Outreach • Potential Venues for Community Meetings: Spaces that could be available include the Library, Council Chambers, Senior Center, and the Wheeler Center. • The team could consider having a Spanish First meeting. • Translations: A large proportion of the population is Spanish speaking. The City Council uses AI translation. There are other services as well. • The community meeting process typically consists of three meetings, including an initial “Gallery Walk” informational session, a second working session, and third meeting for presentation of the final concepts. • Additional outreach will be done via social media, electronic surveys and web pages. The City can host web pages on the City web site, or they can be hosted separately. 8. Next Meeting • 12/4/2024 at 3 PM END OF NOTES GILROY CIVIC CENTER MASTER PLAN November 20, 2024 MEETING NOTES Attendees: City of Gilroy: ELS: Ryan Osenton Daniel Padilla Cindy McCormick Dana Grant David Masenten Clarence Mamuyac Susan Vutz Discussion was as follows: 1. Point of Contact Main points of contact will be: For ELS: Susan Vutz and David Masenten For Gilroy: Ryan Osenton 2. Contract • ELS W9/COI have been issued • Estimated date of contract completion expected by end of the week 3. Consultant Team • ELS is on-boarding technical team now 4. Schedule • Kick-off meeting, 11/22/24 • Building assessment and needs assessment can happen concurrently. The tentative date for facilities assessments is the week of 12/9 to 12/13. City and ELS to confirm. • ELS will refine the schedule to shorten the overall community process. Public sessions might begin in February. • Regular team meetings will start on December 4 and recur weekly at 3PM. As the project progresses, the team will evaluate whether to meet every week or every two weeks. 5. Background Materials • Existing building drawings/reports: Ryan has provided available as-builts to the design team, and will continue to track down additional information regarding utilities, etc. • Planning documents: Ryan will send whatever documents are available. In addition, Cindy provided website addresses for Downtown Specific Plan (https://www.cityofgilroy.org/271/Downtown-Specific-Plan) and DSP Amendment 2018 (https://www.cityofgilroy.org/DocumentCenter/View/1276/Chapter-V-Districts-Land-Use- and-Development-Standards-PDF) . KICK-OFF MEETING - 11.20.24Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 197Gilroy Civic Center Master Plan • Maintain a “risk management/safety mindset.” Security planning needs to account for the different user groups: city employees and public visitors, and their differing security requirements. • A larger space for big events with associated parking is desirable. • Three existing residential properties at the northwest corner of the site are privately owned. The City has tried to purchase these in the past but the cost was prohibitive. For now, the assumption is that these parcels can be incorporated into the master plan. • The existing parking lot for city vehicles will be relocated elsewhere as part of the master plan. The solar panel system currently under construction is intended to be relocated when the master plan is implemented. 2. Precedents: What other cities have done – Civic and Community Facilities (see presentation attached) • ELS presented some precedents for other facilities, including the following: o South San Francisco Civic Complex* o South San Francisco Orange Memorial Park Aquatic Center o Newark Civic Center o Dublin Civic Center o Redwood City Hall o Redwood City Veterans Memorial Senior and Recreation Center * o Rengstorff Aquatic Center, City of Mountain View* o Elk Grove Civic Center and Aquatics Center (near Sacramento) • City of Gilroy leadership would like to tour some of these sites. A potential tour date in mid-February is TBD. Leading candidates for the site visit are noted with an asterisk, but the tour itinerary has not yet been determined. Part 2 - Scope and Timeline 1. Question: With the understanding that the Police and Library buildings are relatively new and will service Gilroy for the next 3 to 5 decades, should the new master planning and visioning consider a new City Hall, a new Senior and Community Center and a new Recreation, Wellness and Aquatic Center? Should Wheeler be renovated, or demolished? • The consensus is that Wheeler should be demolished unless there is a significant economic advantage to keeping it and repurposing the building. As it is, Wheeler is not adequate to serve the community’s needs. Since the building is more than fifty years old, investigation of the historic status of Wheeler might need to be part of the EIR. • The City currently has a joint use agreement with the School District to share their pool facilities. However, there are no City-owned pool facilities in the City of Gilroy, and no pools on this side of the city. 2. Question: If this new community infrastructure is envisioned for the Gilroy Civic Center, then what is your imagined timeline for the vision? • The timeline for the master plan will be driven by the November 2026 election; proposed project funding needs to be included on the ballot in the form on a bond measure or sales tax increase. 3. First thoughts: A launch pad for community engagement (see attached presentation). • ELS presented some rough diagrams for the site. The Components of the master plan can be configured in different ways with different implications for how the Civic Center relates to downtown Gilroy. GILROY CIVIC CENTER MASTER PLAN Preparing for the Community Engagement Process January 13, 2025 MEETING NOTES Attendees: City of Gilroy: Design Team: Jimmy Forbis, City Administrator Bryce Atkins, Assistant to the City Administrator Sharon Goei, Community Development Director LeeAnn McPhillips, Human Resources Director/Risk Manager Harjot Sangha, Finance Director Ryan Osenton, Project Manager Walter Dunckel, Fleet & Facilities Superintendent Luke Powell, Police Captain Raul Razo, Police Sergeant, Traffic Unit David Masenten, ELS Clarence Mamuyac, ELS Susan Vutz, ELS Marco Esposito, SWA Larry Tramutola, Tramutola Political Strategists The purpose of the meeting was to establish some basic parameters for the Civic Center Master Plan to prepare for the Community Engagement process moving forward. Discussion was as follows: Part 1 - Outcomes, Vision, Goals and a Snapshot of other Cities 1. Vision and Goals Discussion • The city’s vision for the project includes the following components: o Intergenerational Community Center and Aquatic Center (with youth center and amenities). o Senior Center (new center to replace existing, could be combined with Community Center) o City Hall o Library and Police Buildings will remain. Everything else can be removed. • The City understands that the City Hall might be more difficult to fund in a bond election than community-oriented projects; getting support from the community will be a challenge. The support of seniors can help significantly. Community members need to know how they will benefit from the proposed project. Recent elections to raise funds for civic projects have not been successful (for example, a proposed ¼-cent increase in sales tax failed in the last election). • Parking is a challenge. There needs to be sufficient parking so that employees and visitors do not park in the neighborhood. Library parking and seniors at lunch can sometimes overflow into the surrounding streets. COMMUNITY ENGAGEMENT PREP - 01.13.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 198Gilroy Civic Center Master Plan • Maintain a “risk management/safety mindset.” Security planning needs to account for the different user groups: city employees and public visitors, and their differing security requirements. • A larger space for big events with associated parking is desirable. • Three existing residential properties at the northwest corner of the site are privately owned. The City has tried to purchase these in the past but the cost was prohibitive. For now, the assumption is that these parcels can be incorporated into the master plan. • The existing parking lot for city vehicles will be relocated elsewhere as part of the master plan. The solar panel system currently under construction is intended to be relocated when the master plan is implemented. 2. Precedents: What other cities have done – Civic and Community Facilities (see presentation attached) • ELS presented some precedents for other facilities, including the following: o South San Francisco Civic Complex* o South San Francisco Orange Memorial Park Aquatic Center o Newark Civic Center o Dublin Civic Center o Redwood City Hall o Redwood City Veterans Memorial Senior and Recreation Center * o Rengstorff Aquatic Center, City of Mountain View* o Elk Grove Civic Center and Aquatics Center (near Sacramento) • City of Gilroy leadership would like to tour some of these sites. A potential tour date in mid-February is TBD. Leading candidates for the site visit are noted with an asterisk, but the tour itinerary has not yet been determined. Part 2 - Scope and Timeline 1. Question: With the understanding that the Police and Library buildings are relatively new and will service Gilroy for the next 3 to 5 decades, should the new master planning and visioning consider a new City Hall, a new Senior and Community Center and a new Recreation, Wellness and Aquatic Center? Should Wheeler be renovated, or demolished? • The consensus is that Wheeler should be demolished unless there is a significant economic advantage to keeping it and repurposing the building. As it is, Wheeler is not adequate to serve the community’s needs. Since the building is more than fifty years old, investigation of the historic status of Wheeler might need to be part of the EIR. • The City currently has a joint use agreement with the School District to share their pool facilities. However, there are no City-owned pool facilities in the City of Gilroy, and no pools on this side of the city. 2. Question: If this new community infrastructure is envisioned for the Gilroy Civic Center, then what is your imagined timeline for the vision? • The timeline for the master plan will be driven by the November 2026 election; proposed project funding needs to be included on the ballot in the form on a bond measure or sales tax increase. 3. First thoughts: A launch pad for community engagement (see attached presentation). • ELS presented some rough diagrams for the site. The Components of the master plan can be configured in different ways with different implications for how the Civic Center relates to downtown Gilroy. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 199Gilroy Civic Center Master Plan 7/11/2025 1 Gilroy Civic Master Plan Preparing for Community Engagement January 13, 2025 For Today….. Part 1 - Outcomes, Vision, Goals + A Snapshot of other Cities 35 minutes What are some of the key outcomes from the community engagement process that you hope to achieve? What is your vision for the new Gilroy Civic Center Master Plan? What are some of your key goals? What other cities have done -Comparison of Civic Facilities by Population (Brief Presentation) Part 2 -Scope and Timeline 35 minutes With the understanding that the Police and Library buildings are relatively new and will service Gilroy for the next 3 to 5 decades, should the new master planning and visioning consider a new City Hall, a new Senior and Community Center and a new Recreation, Wellness and Aquatic Center? Should Wheeler be renovated, or demolished? If this new community infrastructure is envisioned for the Gilroy Civic Center, then what is your imagined timeline for the vision First thoughts: A launch pad for community engagement (Brief Presentation) Part 3 - Budget Sketch and Tax Election Strategy 35 minutes Development Cost: Hard + Soft……A budget sketch How to Finance the Vison - Tax Election Strategy o November 2026 -Possible Bond Measure o Next Steps for Tramutola and Gilroy Wrap-up Part 1 - Outcomes, Vision, Goals + A Snapshot of other Cities 35 minutes What are some of the key outcomes from the community engagement process that you hope to achieve? What is your vision for the new Gilroy Civic Center Master Plan? What are some of your key goals? What other cities have done - Comparison of Civic Facilities by Population (Brief Presentation) Part 2 -Scope and Timeline 35 minutes With the understanding that the Police and Library buildings are relatively new and will service Gilroy for the next 3 to 5 decades, should the new master planning and visioning consider a new City Hall, a new Senior and Community Center and a new Recreation, Wellness and Aquatic Center? Should Wheeler be renovated, or demolished? If this new community infrastructure is envisioned for the Gilroy Civic Center, then what is your imagined timeline for the vision First thoughts: A launch pad for community engagement (Brief Presentation) Part 3 - Budget Sketch and Tax Election Strategy 35 minutes Development Cost: Hard + Soft……A budget sketch How to Finance the Vison - Tax Election Strategy o November 2026 -Possible Bond Measure o Next Steps for Tramutola and Gilroy Wrap-up Civic Center Precedents South San Francisco Civic Complex City Population: 62,000 Program: Library, Council Chambers, Parks and Recreation Center Classrooms, Community Theater. Building Area: 83,000 sf, Three Stories Construction Cost: $101MM Completed: 2024 Parking: 200 spaces Amenities: 1.3-Acre Park South San Francisco Civic Complex South San Francisco Civic Complex South San Francisco Orange Memorial Park Aquatic Center South San Francisco Orange Memorial Park Aquatic Center 123 456 789 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 200Gilroy Civic Center Master Plan c. City of Gilroy: City will provide refreshments for the meetings. Rachelle is looking into the possibility of partnering with the Y to provide childcare during the meetings. 2. Programming and Needs Analysis a. Ryan will set up meetings for the week of 2/10 to 2/14, with the goal of being complete by mid-February. For the meetings, departments will tentatively be grouped as follows (assume 90 minutes for each meeting): i. Administrative Services and Finance (first meeting—this discussion can inform subsequent meetings) ii. Public Utilities, Public Works, Community Development iii. Library leadership, Fire Department (need for administrative space), Parks and Recreation 3. City Tasks a. Utilities and Structures in the Civic Center Area: Ryan will see if he can locate documentation b. Traffic and Parking: There was a recent traffic study completed for the intersection of 6th and Church Streets. Ryan will see if he can find a copy for ELS. 4. Schedule a. ELS will develop an updated schedule once proposed dates (provided last week) are approved for the Community Engagement Series, Commission Reviews and City Council (targeting Council presentation on July 28. ELS will also review the timeline for the EIR. Tentatively the EIR process can start in May. b. Possible P3 (public-private partnership) Presentation: The firm of Hayat Brown has offered to make a presentation to the City in case there is interest in this delivery method. CM will forward information to RO. c. Bond Election Strategy: The City will work with their current bond partners. GILROY CIVIC CENTER MASTER PLAN January 29, 2025 MEETING NOTES Attendees: City of Gilroy: ELS: Ryan Osenton Dana Grant David Masenten Clarence Mamuyac Susan Vutz 1. Community Engagement Process – Status a. Community Workshop Dates and Times: Approximate dates proposed by the City are as follows: i. Part I (two meetings): Week of March 3 ii. Part II (two meetings): Week of April 1, April 8 or April 19 iii. Part III (two meetings): Week of May 20 or 27 The design team needs to have the two meetings on the same day for each of the three parts. They can be a morning and afternoon session, separated by a lunch break, or an afternoon and evening session separated by a break. Weekdays are preferred. RO to review internally and propose dates and times. b. Workshop Materials and Preparation: i. Advertisement Boards and Banners – English and Spanish: ELS presented the most recent version of boards and banners which have been updated using the Gilroy style guide and images provided by the city. RO will review this internally and provide feedback at next week’s meeting ii. Engagement Letter Draft – English and Spanish (2/17): ELS will draft a letter for City review by next week. The letter will go live on 2/17. iii. Target Display Day – February 17th: Ideally boards and banners will be up three weeks prior to the first meeting. iv. City Website Interface – The City has provided a dedicated web page for Civic Center Master Plan Information. Address is: https://www.cityofgilroy.org/1063/Civic-Center-Master-Plan v. Gallery Boards: ELS will have drafts of gallery boards for review at next week’s meeting. TEAM MEETING - 01.29.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 201Gilroy Civic Center Master Plan GILROY CIVIC CENTER MASTER PLAN February 5, 2025 MEETING NOTES Attendees: City of Gilroy: ELS: Ryan Osenton Rachelle Bedell Bryce Atkins Daniel Padilla Dana Grant David Masenten Clarence Mamuyac Susan Vutz 1. Community Engagement Process – Status a. Community Workshop Dates and Times: • Part 1 - Tuesday March 4, 9am and 6pm • Part 2 – Tuesday April 8, 9am and 6pm • Part 3 – Tuesday May 20, 9am and 6pm The city feels the 9 and 6 times will work best for community members. They can provide space in the library for the ELS team to work during the time between meetings. b. Boards and Banners: i. Advertisement Boards and Banners review of draft: 1. Rachelle has sent her comments in a separate email. Title should be changed to remove the word “Park”. Refer to the email for additional comments. 2. People may not know what the term “charrette” means—ELS will find an alternate term. 3. Do not include Ryan’s cell phone number on flyer. Include City main line. 4. City is targeting the week of 2/17 to hit all the media. Rachelle will send a “save the date” message next week. 5. ELS will revise Ad Graphics and return to the city as soon as possible. Need any final city review comments by Monday for revisions and final signoff on Wednesday 2/12. Spanish translations will be done after Monday’s review. 6. ELS to send an editable (InDesign file) of the final version to Rachelle. 7. ELS will obtain quotes from printers based on five boards and banners. The banner size can be reduced if desired. ii. Engagement Letter Draft: ELS is working on a draft, to be provided to the team next week. iii. Gallery Boards: CM presented a first draft of the boards. Discussion was as follows: 1. Since the first Community Meeting is March 4, boards and other materials will need to be printed the 3rd week in April. 2. Gilroy will provide names for team members to be included on the first board. 3. Residential Parcels: The city wants to review the pros and cons of including the residential parcels at the corner of 6th and Dowdy Street. It is not clear at this point whether they should be included as a part of the master plan. Ryan will review with Jimmy. 4. For the boards, features such as Community Recreation Center, Aquatics Center, etc. should be qualified as “possible” elements of the Master Plan so people don’t have unrealistic expectations. 5. ELS will review text and backgrounds for contrast issues. 6. CM will make some basic updates to the boards and send to the city for review next week. 7. Spanish translations of the boards will be in the form of separate 11x17 handouts. 8. Translators for Community Meetings: ELS has two bilingual staff members that can attend meetings to help with translation. The city will also provide staff to help with this. 2. Programming and Needs Assessment a. Meetings have been scheduled as follows: i. Administrative Services and Finance, scheduled for Monday 2/10 at 12:30. ii. Public Utilities, Public Works and Community Development, Tuesday 2/11 at 3:30 iii. Library, Fire Department Admin., Parks and Recreation, Thursday 2/13 at 8:30am ELS provided a list of discussion prompts to Ryan to distribute prior to the meetings 3. City Information: a. Note from last meeting: Utilities and Structures in the Civic Center Area: Ryan will check to see what information is available. 4. Schedule a. Note from last meeting: ELS will develop an updated schedule pending confirmation of dates for Community Engagement Series, Commission Reviews and City Council. Targeting City Council presentation on July 28. TEAM MEETING - 02.05.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 202Gilroy Civic Center Master Plan i. ELS will have one or two Spanish speakers at the community meetings and the city will provide three Spanish speakers in addition. ii. For the 11x17 version of the boards in Spanish, assume 25 sets to start. 2. Programming and Needs Analysis a. Meetings: i. Administrative Services and Finance, scheduled for Monday 2/10 at 12:30. Completed. ii. Public Utilities, Public Works and Community Development, Completed iii. Library, Fire Department Admin., Parks and Recreation, Thursday 8:30 to 9:30. Completed iv. Finance/IT follow-up: Thursday 2-2:30. Completed. v. Administration: Monday 12:30 to 1:30. 3. City Information: a. Utilities and Structures in the Civic Center Area: Ryan has checked on this, and no additional information is available. 4. Schedule a. ELS will develop an updated schedule pending confirmation of dates for Community Engagement Series, Commission Reviews and City Council. Targeting City Council presentation on July 28. b. 8/14 and 8/18 are possible alternate council meeting dates if 7/28 is too tight. All information to go to council would need to be finalized by July 10-15 in order to make the July 28 date. GILROY CIVIC CENTER MASTER PLAN February 12, 2025 MEETING NOTES Attendees: City of Gilroy: ELS: Ryan Osenton Rachelle Bedell Dana Grant David Masenten Clarence Mamuyac Susan Vutz 1. Community Engagement Process – Status a. Community Workshop Dates and Times have been confirmed, as follows: • Part 1 - Tuesday March 4, 9am & 6pm • Part 2 – Tuesday April 8, 9am & 6pm • Part 3 – Tuesday May 20, 9am & 6pm All meetings will be held in Wheeler Auditorium. Note: there will be a jiujitsu class in the afternoon on March 4, but it will be over before 6pm. b. Boards and Banners: i. Advertisement Boards and Banners – English and Spanish – the city has decided to use only standalone vertical boards (no banners). ELS will have 5 English and 3 Spanish boards printed. City will print 8 ½ x 11 flyers in-house. ELS will provide artwork as well as updated ID files to Rachelle. Boards and feet will be sent to Ryan’s attention. ii. Engagement Letter Draft: ELS sent a draft to the City for review and the City will edit and translate it. No further input required from ELS. iii. Target Display Day for engagement letter and advertisements: February 17th iv. Gallery Boards – Review Current Draft: • Board 1: ELS needs input on who to list for the project team on the city side. CM will send a copy of this board to Ryan for review with city leaders. • Boards should indicate that all proposed projects are “possibilities”—this message should be reinforced on all boards. • City Hall board: the city would like a more reserved, less ostentatious image for this board. • ELS will provide a draft of text for the boards by Friday. c. Interpreters and Spanish translation: TEAM MEETING - 02.12.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 203Gilroy Civic Center Master Plan 2. Programming and Needs Analysis Meetings: a. Administrative Services and Finance, scheduled for Monday 2/10 at 12:30. Completed. b. Public Utilities, Public Works and Community Development, Completed c. Library, Fire Department Admin., Parks and Recreation, Thursday 8:30 to 9:30. Completed d. Finance/IT follow-up: Thursday 2-2:30. Completed. e. Administration: Monday 12:30 to 1:30. Completed. f. Council Chambers and EOC: Scheduled for Tuesday 2/25 at 1:00. 3. Schedule a. ELS will develop an updated schedule pending confirmation of dates for Community Engagement Series, Commission Reviews and City Council. Targeting City Council presentation on July 28. ELS plans to have a draft for review next week. b. 8/14 and 8/18 are possible alternate council meeting dates if 7/28 is too tight. All information to go to council would need to be finalized by July 10-15 in order to make the July 28 date. 4. New Business a. Site visit to Redwood City on 2/27: i. ELS suggested stopping by the new Mountain View Aquatic Center, scheduled to open on March 1. This is a similar size facility to that envisioned for the Master Plan. ii. SV will send images of the design for the Redwood City Veteran’s Memorial Building to Ryan for review before the site visit. iii. CM also suggested visiting the Redwood City Hall (built in the 90’s) as a possible addition to the tour. iv. Ryan to review internally and let the team know what the City wants to do, and confirm times. b. Reimbursable Expenses: The city has made $25k available in a separate fund for reimbursables to cover costs of printing and mileage. These cost should be invoiced separately from the monthly project invoices. GILROY CIVIC CENTER MASTER PLAN February 19, 2025 MEETING NOTES Attendees: City of Gilroy: ELS: Ryan Osenton Rachelle Bedell Bryce Atkins Dana Grant David Masenten Clarence Mamuyac Susan Vutz 1. Community Engagement Process – Status a. Community Workshop Dates and Times have been confirmed, as follows: • Part 1 - Tuesday March 4, 9am & 6pm • Part 2 – Tuesday April 8, 9am & 6pm • Part 3 – Tuesday May 20, 9am & 6pm All meetings will be held in Wheeler Center. Note: there will be a jiujitsu class in the afternoon on March 4, but it will be over before 6pm. b. Boards and Banners: i. Advertisement Boards – English and Spanish: Boards and stands were delivered to Ryan. However, the city wants to change the language from “Wheeler Community Center” to “Wheeler Center” and reprint the boards. ELS will revise the text and re-send for printing. ii. 8 ½ x 11 flyer: ELS will provide InDesign file and Spanish translation today. iii. Gallery Boards – Review of Current Draft: • Delete Board 1. • Change language to Wheeler Center (instead of Wheeler Community Center) • Remove Well board. ELS will review and possibly include some language on the LEED board. • Combine Library and Police Station boards. Ryan is working on the text for this (combined) board. • See additional comments sent by Ryan. • ELS will review, make updates, and send revised boards to Ryan for review TEAM MEETING - 02.19.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 204Gilroy Civic Center Master Plan • Advocates flexible spaces that allow buildings to be utilized throughout different seasons. • Points out the presence of nearby parking lots and mentions that people are willing to walk a few blocks if the destination is appealing • Another workshop attendee hopes to see downtown integrated into the site's master plan. • Many residents travel to Morgan Hill or Gavilan College for aquatic facilities. • A heated pool would be beneficial for use during colder months. • Wants clarification on how supportive structures and storage areas will be safeguarded against vandalism. • Community meeting attendee hopes programs will include necessary equipment for activities and services. • Mentions having to travel to Morgan Hill to access an aquatic center. • Workshop attendees are an advocate for design and construction of a city hall, senior center, and youth center. They also note the need for large gathering spaces as well as multifunction spaces. • The individual also states that he currently travels to Galvin College to use aquatic facilities • Two individuals would like to see the new civic master plan integrate with the downtown. • They are advocates for a youth center and senior center. • A different community member would like to see a connection of programs/buildings. • They are worried about the time and cost required to complete a project of this magnitude and suggest that making improvements could be a viable alternative. • One senior resident would like to see improvement of sidewalks • Two different community members would like outdoor spaces designed to host concerts. • They envision a plaza, citing the Mexican Heritage Plaza in San Jose as an example. • They emphasize the need for safe walking spaces, noting that many sidewalks in Gilroy are disrupted by tree roots, causing uneven surfaces. • They support the idea of a parking structure to accommodate downtown and civic center visitors. • They believe a youth center at this location could also benefit the east Gilroy community and view this site as the heart of Gilroy. • One parent that approached Angelo commented on how he would like to see an enhanced outdoor space that creates a central gathering place. • He questions the current library entrance and believes there should be a stronger connection between the library and the plaza. • While not a strong advocate for parking structures, he sees the corner of 7th Street and Church Street as an ideal location for one. If built, he prefers a well-designed structure with an appealing aesthetic rather than a purely functional look. He supports incorporating ground-level retail with parking above to activate the site. • He also notes that the existing parking lots on this site fragment the outdoor space and buildings, making them less accessible to visitors. There is no designated pathway for residents to reach these buildings without walking through a parking lot. • Another community member suggests a single building with a senior center on the ground floor and city hall on the upper levels. • He also supports the creation of an outdoor community space and a youth recreation center. • A senior resident would like to see an indoor aquatic center, including a shared pool designed for all age groups. GILROY CIVIC CENTER MASTER PLAN March 4, 2025 MEETING NOTES – WORKSHOP #1 – 9AM and 6PM Facilitators: City of Gilroy: ELS & SWA : Ryan Osenton Rachelle Bedell Dana Grant David Masenten Clarence Mamuyac Susan Vutz Angelo Razo Aylin Casas Mejia Marco Esposito Meeting Overview: The first community workshop for the Gilroy Civic Center Master Plan was held at the Wheeler Center in Gilroy in morning and evening sessions. The workshop format was an open house, or “Gallery Walk,” where community members could view large informational boards discussing various topics related to the Civic Center Master Plan, and share comments or questions with design team representatives stationed around the room. The boards featured different aspects and features of a possible future master plan for the civic center. Both morning and evening sessions were attended by a wide cross section of residents and City employees. Comments from attendees, as noted by each design team member, are summarized below. Notes by Angelo Razo: • Existing pools are only accessible during the summer; having a year-round pool would be ideal. • Support for the inclusion of an art and crafts space where seniors can gather. • Desires a venue for special events. • Prefers a variety of activities, as the current senior center primarily offers lunch, but some seniors seek more engaging options. • Emphasizes the need for spaces that are accessible to individuals with disabilities. • Community members appreciate the concept of open space and enhancing walkability, noting that this part of Gilroy lacks sufficient green spaces for the community. • Workshop attendees believe the pool would take up excessive space and notes that the east side of Gilroy has requested a youth center. Placing one on the west side might cause dissatisfaction among east-side residents. • Prefers an outdoor area with seating and performance platforms. • Considers the site a prime location and the historical center of downtown Gilroy. • Observes that many visitors from neighboring cities come to Gilroy and suggests the city should create more spaces that attract both residents and tourists. • Suggests designing multilevel structures to accommodate parking needs. WORKSHOP 1 MEETING - 03.04.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 205Gilroy Civic Center Master Plan • Cross-generational interaction would be a benefit to a new community center. • Provide athletics programs in the new community center for kids of younger ages that would feed into high school sports programs, such as wrestling. The high school wrestling team has been CCS champions for 20 years. • Theater: o There should be more prominence of arts in the community. A new theater could attract performing artists. There is also a new arts center at 7th and Monterey. o A sense of community has been missing. People love the theater—there could be music, maybe dinner and a show or dinner theater? o Very supportive of the idea of a theater. Could it be a separate building? • Wheeler could be changed into an art center; however the space was offered to the Arts Alliance, but they said no. • Would it be possible to have a bus trip to Redwood City to see the new senior/community center there? It might be beneficial for community members. • Could Wheeler be refurbished? If not, maybe the elements of the existing building could be reused. • Provide multi-purposed spaces in the new community center that are designed with intention and that can be expanded and upgraded easily. • How will parking and traffic be handled? • A community pool would be good. • Provide youth programs such as electronics • Combine community center functions into one building • Desire for weight room/gym for youth • The outdoor amphitheater would be beautiful. • Provide outdoor game area such as for chess • Provide arts studios for art and ceramic classes • Provide cooking classes • Provide areas for sports leagues—more opportunities for kids sports and a youth center. • Attendees feel strongly about a center for the arts. Provide a place for the South Valley Symphony to perform and for a film festival. • Provide a performance center, recreation center and senior center. Rec Center and Senior Center should be multi-generational. • Recreation is important. • Planning commission has limited Gilroy’s growth to 1,000 additional homes, so population growth may be limited. • The Y currently runs the programs in the senior center, five days a week with lunches and home delivery. • At the time of the library bond, there was money earmarked for a parking structure that was never built. Could these funds be used towards a new parking structure as part of the Civic Center? • She also envisions a senior center offering a variety of classes, such as yoga and Pilates, tailored to different skill levels. • A different community member would like to see topographic variation incorporated into the landscape. • She also supports the development of a program that provides legal services to residents. • She envisions a space that can accommodate a wider range of activities, such as dancing. Noting a disparity in available activities for men and women, she advocates for more physically engaging programs for senior citizens. • One woman would like to see a greater variety of sports leagues, including options like table tennis and badminton. • She believes a transportation program should be available for senior citizens to access the civic center, as some can no longer drive. • They are strong supporters of an aquatic center. Notes by Susan Vutz: • There is a need for a venue for performing arts • Swimming: o There is currently no pool available for lap swim. o Christopher lap pool and play pool are not affordable, and there is a lack of transportation available. o There are limited swimming offerings at Gavilan, and folks need to be enrolled in a class to swim there • The effort to draw the community downtown has not been successful. Perhaps the Civic Center can help with that. • Library bond passed with 78% approval—investigate how that was done because getting voters to pass a bond for the Civic Center could be a challenge. • Need recreation places where kids can play to keep them off the streets. Currently school properties are locked, so they can’t be used by the public outside of school use. • The library bond had extra money for a parking garage that was not built. Is it possible that those funds might be able to be applied to a parking structure for the Civic Center Project? • Would it be possible to build a car park off-site? • The community might not want to pay for new facilities –need to reach out to people who are not online with mailers and Spanish language information. • Wheeler Center is a local historic resource. Could it be retrofitted? • Need childcare as a part of the Community Center • A new Community Center should bring in Cultural events and the Arts. Provide a place for people to hang out, rather than just leave after their class or event. Provide a place to buy and sell for local artisans and/or a food concession. • Need more parks—Gilroy has a smaller, slower relaxing vibe and that should be reflected in the new center. • Don’t want a giant parking structure—would be willing to walk a little further from remote parking areas. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 206Gilroy Civic Center Master Plan • People believed the recreation center should have a minimum of two gyms. • A different individual expressed that he thinks the aquatic center is a big need. Morgan Hill has one, and our community needs one, too. Maybe not as big, but one of our very own. • One attendee commented that there is a vibrant, creative scene in Gilroy that needs a home. They were then very happy to see that we might get our very own Arts Center. • Other questions that arose were: Why do we need a City Hall? • Seniors and other community leaders spoke up about their belief that the Senior Center is key to the success of the master plan - please make sure it is safe and well lighted. • There were also comments about the aquatic center containing an Olympic size pool. • Groups asked us to make sure the gymnasium or rec center can accommodate silk acrobatics. Notes by Aylin Casas Mejia: • Two residents believe that an aquatic center is low priority (as compared to the other programming on site), and if site square footage is a concern they suggest prioritizing the Amphitheater. • Other residents believed the rec center and the Amphitheater were of high importance • There was some concern over implementing the youth center on the site, as Gilroy's east side has been in dire need (and has asked) for a youth center in the neighborhood and has received little recognition for their proposal from the city. • Suggestion for rooftop garden spaces to prevent dead space in areas such as parking lots o Compensation for the community garden removal near the site • A couple of members seemed concerned about pushing beyond basic ADA guidelines such as including: o Sound implementation for the deaf community o Different textured pathways for the blind community • There were some questions about our landscaping philosophy, I think community members were really interested in our big ideas/concepts • Concern for the displacement of current community programs taking place on the site, o Need more specification about whether community activities or work will be able to continue • Desires the community had that are not currently integrated into the program: o Indoor/outdoor soccer fields o Cultural center o Handball court o Blackbox theater • There was an overall emphasis on: o Safe walkways throughout the site o Inclusion of green space but making sure that space is programmed/useful • Community members would love to see a combined senior/youth/community center. • More classes and programs • Provide daycare/childcare • Build retail into the plan. Perhaps a sub shop. • Provide a community park with outdoor amphitheater. • Provide transportation for seniors Notes by Clarence Mamuyac: • Community meeting attendees would like to see more advance notice of meetings. Perhaps via direct mail. • Attendees were also wondering if it was possible to do an additional Zoom session for the community workshops • Possible consideration for a downtown park where events such as “Pub in the Park” could take place • Attendees also believed the Morgan Hill Arts Center and Café was a good model for our project to consider. • There were several questions pertaining to: how much will the project cost to be constructed? And how will it be financed? • There was a general enthusiasm for the proposed collection of possible ideas, especially the theater, aquatic center and recreation • center. • Community expressed a need for a downtown park. Additionally, it would be great if the new park had an amphitheater. • Several questions regarding how long the vision will take to realize rose, as well as if it will be paid for by the residents of Gilroy? • Request for the inclusion of a new modernized Senior Center with new dining facility. • Residents asked us to consider bike parking and bike safety as it relates to pedestrians using the park. • Attendees wanted clarification as to where parking will be located. • People were interested in what will happen to the solar collectors currently being installed. • Other attendees were wondering if we (ELS/city) could find a way to reuse Wheeler Center, or is it better to rebuild? • Other workshop attendees were hoping everything would get rebuilt, except for the library. They believed the police building seems to be high above the sidewalk and has no windows. Making the building seem unwelcoming. They later asked if there were any plans to improve it. • People also inquired about the incorporation of public art in the master plan. • An individual commented on the youth needing a “Gym Night”……a place to meet and gather. • Community members hope the park will accommodate a farmers’ market and/or crafts festival on a regular basis. • Along with the top comment, attendees commented on including outdoor spaces for music and entertainment. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 207Gilroy Civic Center Master Plan • A few people wondered about how to strengthen the connection to Downtown; one person wondered about creating a greenway between the Civic Center and Monterey • Several people asked about a more significant Outdoor People Place, larger than the existing plaza • Several people asked about an Amphitheater, potentially like the one at Morgan Hill’s Community Cultural Center --- www.morganhill.ca.gov/221/Community-Cultural-Center • A few people asked about lots of Trees, potentially in strong Allies, as well as around the Civic Center’s perimeter; nearby Miller is a nice Gilroy example • The idea of a New Multigenerational Community Center and a New City Hall was widely supported; One attendee mentioned combining both • The idea of a new cohesive Civic Center was widely supported • Attendees I talked with are OK replacing Wheeler • Several people mentioned consolidating parking; Several people wondered about garages or underground parking [note that the mixed-use building at Monterey & Lewis has underground parking] END OF NOTES ▪ Avoiding random green strips o Shaded seating areas o Getting teens involved • One resident suggested making the city hall more pronounced, the entry way should face the busier streets as opposed to facing away from. (*should be noted the previous city hall was designed to face a road that ran through the middle of the site but has since been removed.) Notes by Marco Esposito: • Asked most people that stopped by Boards 4 and 5 (Context and Site) whether they go to the Civic Center, and most mentioned going to the library, a few to Wheeler (for example basketball and martial arts; and teen dances a long time ago) and fewer to the Senior Center; several neighbors and city staff stroll through the civic center, from either home or city offices • Asked most people how they get to the Civic Center, and about 1/2 walk and 1/2 drive • Asked drivers where they park, and most park alongside the library, starting in the lot parallel to the library, and if full then west or east around the library, and then if full on street along 6th • Asked drivers whether they can find parking, and all said they can . . sometimes not right at the library entrance • A few people, especially with small children, mentioned that walking in the existing layout is interrupted by drives and parking • One attendee mentioned that a handful of homeless people alongside the library make early morning and evening walks less comfortable • Many people asked whether the PV canopies being installed are a long-term obstacle, and I shared that the city is OK with moving. • Many people asked whether the city is interested in purchasing the three homes on Dowdy • A few people mentioned that the Police building feels a bit fort-like • One person asked whether existing trees, for example around City Hall, would be kept going forward • One person mentioned that the area where Wheeler is used to be a lumber yard • A few people mentioned that the parking zone south of the City Hall Annex used to include a county building and 1-2 homes (visible in 1998 and 2002 Google Earth aerials) • One person mentioned that a parking garage was planned as part of the library project [not sure if true] • One person mentioned that the YMCA operates certain Rec programs for the city, maybe including at Wheeler [not sure if true] • A few people noted that the city owns the small parking lot (and maybe a house) south of 7th St [we should tint that as well when showing the site] • Several people mentioned going to Camino Coffee, either from City offices or nearby homes • A few people mentioned that parking for special events Downtown can overflow in the Civic Center area Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 208Gilroy Civic Center Master Plan GILROY CIVIC CENTER MASTER PLAN March 17, 2025 MEETING AGENDA COUNCILMEMBER UPDATES Community Engagement Process - Three Step Community Process o Gallery Walk ▪ City Council Check In #1 o Alternative Concept Master Plans ▪ City Council Check In #2 o Preferred Concept Master Plan - Commissions Input - City Council Final Review before CEQA Effort Concept Design Process - 4 to 6 Civic Master Plan Ideas - Program o New Community Functions ▪ Seniors ▪ Recreation/Wellness ▪ Aquatics ▪ Arts/Theater o New City Hall o Parking o New Downtown Civic Park - Big Moves – Civic Park + New Buildings + Existing Buildings - Initial Floor Plan Exploration - Establishing ROM Development Cost COUNCIL MEMBER UPDATES - 03.16.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 209Gilroy Civic Center Master Plan 7/11/2025 1 Gilroy Civic Master Plan Community Engagement + Concept Design March 2025 City Councilmember Update Sessions Community Engagement Process •Three Step Community Process Concept Design Process -4 to 6 Civic Master Plan Ideas •Approach •Program •Big Moves – First Thoughts •Budget Sketch AIMING FOR CITY COUNCIL APPROVAL IN JULY/AUGUST COMMUNITY ENGAGEMENT PROCESS CITY COUNCIL UPDATECITY COUNCIL UPDATECOMMISSION HEARINGSCITY COUNCIL APPROVALWORKSHOP 1 GALLERY WALK ISSUES TOPICS INFORMATION SHARING TUESDAY MARCH 4TH WORKSHOP 2 PRESENTATION CHARRETTE CONCEPT ALTERNATIVES TUESDAY APRIL 8TH WORKSHOP 3 PRESENTATION PREFERRED CONCEPT DESIGN TUESDAY MAY 20TH COMMUNITY WORKSHOP #1 Gallery Walk/Open House Tuesday, March 4th CHARRETTE –ALTERNATE CONCEPTS COMMUNITY WORKSHOP #2 Tuesday, April 8th COMMUNITY WORKSHOP #3 PREFERRED CONCEPT Tuesday, May 20th Gilroy Civic Master Plan Approach Civic Center Precedents South San Francisco Civic Complex 123 456 789 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 210Gilroy Civic Center Master Plan 7/11/2025 2 Newark Civic Center Redwood City Veterans Memorial Senior and Recreation Center Redwood City Veterans Memorial Senior and Recreation Center Redwood City YMCA and Aquatic Center Redwood City Veterans Memorial Senior and Recreation Center Rengstorff Aquatic Center City of Mountainview Rengstorff Aquatic Center City of Mountainview Elk Grove Civic Center City of Elk Grove Elk Grove Civic Center City of Elk Grove 10 11 12 13 14 15 16 17 18 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 211Gilroy Civic Center Master Plan 7/11/2025 3 Elk Grove Civic Center City of Elk Grove Elk Grove Civic Center City of Elk Grove Elk Grove Civic Center City of Elk Grove Elk Grove Civic Center City of Elk Grove Gilroy Civic Master Plan Program –What’s in the Civic Master Plan? Community Center Functions Performing Arts City Hall City Hall Focus Community Center Focus Gilroy Civic Master Plan First Thoughts 19 20 21 22 23 24 25 26 27 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 212Gilroy Civic Center Master Plan 7/11/2025 4 City Hall Focus Community Center Focus 1 1 CHURCHDOWDY7TH LIBRARY CIVIC PARK COMMUNITY CITY HALL PARKING 2 2 CIVIC PARK CHURCHDOWDY7TH LIBRARY COMMUNITY CITY HALL PARKING 28 29 30 31 32 33 34 35 36 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 213Gilroy Civic Center Master Plan 7/11/2025 5 3 3 CHURCHDOWDY7TH LIBRARY CIVIC PARK COMMUNITY CITY HALL PARKING Below Grade 4 CHURCHDOWDY7TH LIBRARY 4 CIVIC PARK COMMUNITY CITY HALL PARKING X X CHURCHDOWDY7TH LIBRARY CIVIC PARK COMMUNITY CITY HALL PARKING Gilroy Civic Master Plan Budget Sketch -What will it cost? The New Gilroy Civic Center Components Recreation Center $64.5 MM 37,900 sf Seniors Center $34.1 MM 20,000 sf Youth Center $24.4 MM 14,300 sf Performing Arts Center $43.2 MM 25,400 sf Aquatics Center $26.2 MM 10,000 sf + Two Community Pools City Hall $68.1 MM 40,000 sf Parking Structure @ 400 Spaces $21.8 MM 3 Levels (Grade + 2 Levels Above Grade –Two Story Height Equivalent) Redeveloped Site Area $35.7 MM 7 Acres of Redeveloped Area 2025 Dollars –escalation not included Budget Sketch Projected Development Cost Gilroy Civic Master Plan March 19, 2025 City Councilmember Update Sessions 37 38 39 40 41 42 43 44 45 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 214Gilroy Civic Center Master Plan Option C • There is concern about the park's security due to the adjacency to 6th Street; including children running into the streets or cars easily accessing the site. General Comments • Provide sufficient outdoor electrical outlets to support outdoor events. • Will the park include elevation changes: berms, planters, etc. • Identify key bus stops or propose bus stops for access to the site. • Can the Council Chambers be more flexible in use? Evening Session- Option A • The orientation of the amphitheater is a noise concern. Option B • The position of the park set between the Community Center and the City Hall is favorable in addressing security and noise concerns. However, the orientation of the amphitheater is still a concern for noise towards buildings located along Church Street. Option C – Preferred Option • Geometric form is appealing. General Comments • Identify key features of the park. Will it include a children’s playground, splash zones, etc. • Will the park include elevation changes: berms, planters, etc. • How will traffic be assessed? What streets will be impacted going to the Civic Center? • Would prefer to see the City Hall built first to allow the Aquatic Center to be built sooner. Notes by Susan Vutz Morning Session- Option C – Preferred Option • The park is more prominent, therefore option C is preferred • This option also includes a heavier mass of buildings • Paseo inclusion is appreciated • Seems more welcoming-it’s more inviting Option B • A positive statement for the city of Gilroy • Hardens the corner at Church and 6th streets Option A GILROY CIVIC CENTER MASTER PLAN April 8, 2025 MEETING NOTES – WORKSHOP #2 – 9AM AND 6PM Facilitators: City of Gilroy: ELS & SWA : Ryan Osenton Rachelle Bedell David Masenten Clarence Mamuyac Susan Vutz Angelo Razo Aylin Casas Mejia Kenneth Lorreto Marco Esposito Meeting Overview: The second community workshop for the Gilroy Civic Center Master Plan was held at the Wheeler Center in Gilroy with morning and evening sessions. Attendees were seated at round tables. The session began with a slideshow presentation outlining the master plan process to date and showcasing three different proposed schemes. Each table was provided with boards containing the three plans and attendees were invited to discuss the plans with others at the table. Each table included a facilitator from the design team to answer questions. Finally, each group selected a spokesperson who presented the table’s findings to the larger group. Both morning and evening sessions were attended by residents and city employees. Comments from attendees, as noted by each design team member are summarized below. Comments are organized into two sections, morning and evening workshops, as each workshop group responded differently to the three schemes presented. Notes by Angelo Razzo: Morning Session- Option A – Preferred Option • The location of the amphitheater is a cause for noise concern. Reorienting the stage and direction of sound would be ideal. • The position of the park set between the Community Center and the City Hall is favorable in addressing security and noise concerns. The large public space also makes the City Hall and Community Center more accessible. • The Council Chamber should be relocated to the west of City Hall to make the park more open towards Church Street. Option B • The position of the park set between the Community Center and the City Hall is favorable in addressing security and noise concerns. However, the orientation of the amphitheater is still a concern for noise towards buildings located along Church Street. • Ideal to have the Council Chambers attached to the City Hall. WORKSHOP 2 MEETING - 04.08.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 215Gilroy Civic Center Master Plan General Comments • Excited to have the swimming pools. • Greater interest in building the Rec Center and swimming pools first. Current options for swimming are limited. Keep the community here in Gilroy. • Amphitheater and City Hall would be the priorities. • The Community Center and Rec Center would provide places for the younger generation to go, which we never had growing up as a kid in Gilroy. • Like the Paseo and the idea of farmer’s markets. • Is there too much parking? People who live close by can ride bikes or walk. • Like the amphitheater and rec center. • Build the Community Center first. • Provide dog stations in the park, with poop bags. • Integrate this project with community spaces that already exist in the police station and library. • There should be no single-use spaces. • Be aware of the requirements for barricades and security during daily activities and special events. • There is a concern about the possibility of building City Hall before the Rec Center or pool. • The City could have the option to rent space elsewhere during construction of City Hall. • All spaces should be multi-purpose. • Build City Hall and Community Center first. • The aquatic center is not a priority. The Community Center is a greater priority since 38% of the community is under 24. • Like swimming pools. The City needs to offer swimming lessons to people on the east side of the city. • Build the community center first, then City Hall Notes by Kenneth Loretto: Morning Session- Option A &* B– Preferred Option combined with Option B • Council chambers should be integrated into the City Hall building, not detached. • All the schemes have multiple exits in the event of a wildfire which is good. • Options A and B have buildings which bracket the park which is a nice idea. The buildings provide security and create a ‘civic’ space. • Option A but with the council chamber integrated with City Hall. • Option B but re-orient the amphitheater aligned with the paseo. • City Hall is better located at the south side of the park. • Community Center is best located at the north side of the park • There is a problem with the orientation of the amphitheater because of the western sun. The amphitheater needs to be oriented north-south rather than east-west because otherwise the late afternoon sun will be a problem for either the performers or the audi ence. Option A is out because of the orientation of the amphitheater General Comments • Need to Provide lighting and power for lots of vendors. • For the amphitheater, shading for the audience is needed, but there are line of site considerations. Provide shade for performers. • Buildings can have overlap in terms of their use—multi-purpose spaces. • It would be nice to have a bubbler fountain/ splash pad • Provide a dog park • Mixed reviews on the separate council chambers. Glass council chambers could symbolize transparent government. • Pools: Consider whether a lap pool is needed. I like the splash pad and kiddie pool. • Where will money come from to run the pool? • Build the City Hall and Community Center first. • Provide outside restrooms and a dog park. • No pools. • Why aren’t we acquiring the three residential properties along Dowdy Street? • Overall, the preference was for Option C (5 people) and Option B (one person) Evening Session- Option B – Preferred Option • Like the paseo and the idea of a farmer’s market • Don’t like separate council chambers. It would be more cohesive to keep it as a part of City Hall. • Good to have the library on 6th St. and the Community Center on 7th to balance activity. • Gallery space Option A • Prefer separate council chambers • We liked Option A with the buildings flipped—preferred the park in Option A. • We preferred the shape of the park in A, and liked the idea of the City Hall as a stage. • Like a hybrid of A and B • Like the park from C and would reorient it like A. • Would take City Hall from Option A and flip it. Option C • Like this option due to access from downtown Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 216Gilroy Civic Center Master Plan Notes by Aylin Casas Mejia: Morning Session- Option C – Preferred Option • 5/6 of group members preferred option C Option A • 5/6 of group members preferred detachment of city hall meeting room • Appreciated the idea of a “Transparent Government” Option B • Approve of amphitheater placement • Bridges the gap between government and the community General Comments • Concern over the sun facing guests during a performance for scheme A • Need for the placement of lights around the park and plaza space o Importance of light fixtures each with their own individual outlets • Slight confusion in the topography of the amphitheater and whether or not there would be gentle hill or slope on site • Overall need for shade coverage near/around the stage (while still ensuring no views are blocked) • Proposal for: the community center to be reserved for seniors in the first level and then occupied by the youth on the second level • Proposal for: dog park • Desire for: creating a line of site from the dining hall into the park, and minimizing trees to prevent any obstruction of views • Condensing Program: condensing the program to only include splash pads (fun water) focusing on the younger kids, as opposed to maintaining the fun and still water. o Christopher High School was mentioned as a reference point to how hard it has been to hire and upkeep the facility due to monetary issues • Passing comments about relocating the city hall to 6th street, ensuring there was a continued access point for the senior center. Evening Session- Option A & B - Preferred Option • Appreciate the community center being in close proximity to the library. • Well balanced but prefer circular park space as opposed to a rectangular one • Well balanced with the city hall and community center bordering the civic park space. • Prefer A&B hybrid because the buildings bracket the park, create a civic space, provide security. Option C • Large park for Option C is nice. • Others thought Option C is the least favorite. The park is too open. General Comments • Build the Community Center first. • Not enthusiastic about locating City Hall at the north side of the park. • First built should be the Community Center – Senior Center. • Some concerns about restroom locations. Where are they? Porta-potties would be provided for large events. • Provide for event loading at the park. • The downtown needs work. Park proximity to downtown is important so the location at east end of the plan is preferred. • Multi-use green spaces should be provided. • Park the east side edge. • The library is a primary draw for the existing campus. • Short walkable distances along the accessible Paseo are a nice feature. • Indoor/ outdoor green spaces would be a nice amenity. Evening Session- Option D (Ryan Osenton’s Proposal) • Locate City Hall adjacent the Police Depart. It makes sense for “Administrative” functions to be in close proximity. Option B • The buildings at north and south side of the park would buffer the neighbors. Option C • The park is too open to neighbors. • Options A & B bracket the park and would buffer acoustics. • Acoustics are a concern w event noise being an issue for neighbors. • Be mindful of the orientation of the amphitheater and mitigate acoustic issues for the neighbors. • The Council Chambers may be in conflict with an active park setting. Evening activity in the park would be distracting for meetings in the chambers. • Theater loading is required for the Community Center. Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 217Gilroy Civic Center Master Plan • Community Center should be Phase 1. About 38% of City's population is under 24 years old—providing community functions first makes sense. • Phasing: Existing school pools are sufficient for now in general; the Aquatic Center can come later. • Attendees want to have gallery space. We have a lot of local artists. Could be on the second floor of the Community Center. Outdoor art along the paseo and sculpture areas are also appreciated • Suggestion for a dinner theater/dining terrace? • Underground parking that serves city staff during the day and the public during festivals/events works well—Sunnyvale? was mentioned as a good example. • Green space should offer more than just lawn, lawn is boring; the reference image from #1 Workshop Board 08 shows the right feeling • Questions arose concerning the capacity of park's event space—how many people can it accommodate? • No need for a pool; a splash pad or simple water feature is sufficient. • Necessary inclusion of Electrical plug-ins/power access is important. • Restrooms with outdoor access is important. • Desired Dog park • Switch the Community Center to 7th for easier parking access • Opposed to a separate Council Chamber building. • Love to have pools; could offer swim classes to East Gilroy residents. • Overall walkability is appreciated. • Like the Paseo • Like the idea of parks framed by buildings on both sides • Interest in dog stations and making the site dog-friendly (on leash). • Concern that a stand-alone Council Chamber with only single use is inefficient • The Community and Rec Centers should be the first phase. If in the future City Hall is replaced at its current location, City staff could temporarily relocate to leased office space Evening Session- Option A • We like a two-story parking structure to ensure sufficient parking. • Strong support for an aquatic center --- we now go to other towns to swim • Prefer amphitheater stage facing inward, rather than toward the neighborhood (as in Concept A). • Amphitheater in Concept A faces the wrong direction for sunlight • Amphitheater noise conflicts with Library use Option B • Buildings can serve as sound buffers for nearby residential areas • Preferred in terms of ample parking for city hall. Option C • Suggestion to reduce greenery around city hall to include some parking. • Concern for parking to building connection (for city hall and community building). General Comments • The youth wanted to prioritize the community center along with the city hall, they did not want the city hall to have to rent a temporary space and allocate more money in finding the space. • They were also conflicted on the city hall meeting room being attached or unattached but ultimately agreed for it to be disconnected (in a circular shape). • In all schemes in the evening meeting, the group wanted to maximize parking • Youth wanted to maintain the aquatic center (both pool and splash pad) • It was mentioned that Christopher High Pool center is often unavailable when they would like to occupy the facilities and is typically only available during the summer. Notes by SWA: Morning Session- Option A • In A, people coming down the paseo can distract from performances. • The sun orientation is important! Concept A has poor sun direction for the park; a north- south orientation is preferred. • Preference for a hybrid of Concepts A and B • In Concept A, suggest flipping the City Hall and Community Center so City Hall feels more inclusive, it’s part of us Option B • Concept B’s amphitheater setting is better with City Hall building as backdrop • B’s elliptical park feels smaller than A’s square layout. We want more open park space • Overall layout creates opportunity for Movie nights Option C • Prefer parks framed by buildings, C is too open to the street, with noise, not safe for children • C was the least favorite. • Concerns about sun orientation for the park General Comments Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 218Gilroy Civic Center Master Plan Option C • Concepts A and C, due to the separated Council Chamber. We have meetings after 5pm. Evening meetings conflict with park activity • We like the park layout in Concept C, with City Hall and Community Center buildings buffer the south edge, helping to block heat and sound • Appreciated that all building components are close together General Comments • Suggested layout: business functions on the left side of the campus, “parties” on the right • Recommend Community Center + Youth Center as Phase 1 • Parking location is difficult/far for seniors. • Suggested layout: centralized parking (where the Aquatic Center is located). • Parking is stressful for seniors, especially angled street parking—feels exposed and stressful to backup. • Consider a parking lot in the middle, on the existing City Hall site • Want City Hall to be built first (maybe to get pools sooner, since shown on City Hall site?) • Consider the playground • Consider the newly built solar panels structure to be reused • Recreation and Youth center could share some programs and be phase 1 END OF NOTES Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 219Gilroy Civic Center Master Plan 7/11/2025 1 Gilroy Civic Master Plan Plan Maestro Cívico de Gilroy April 8, 2025 Community Workshop #2 Welcome! / ¡Bienvenido! Community Engagement + Concept Design I. Welcome + Opening Remarks II. Concept Design -3 Civic Master Plan Ideas •What is being considered? •A, B, C III. Your thoughts….your reactions, your ideas! •Review in teams •Report your findings IV. Next Steps… 20 Minutes 50 Minutes 10 Minutes 10 Minutes 90 Minutes AIMING FOR CITY COUNCIL APPROVAL IN JULY/AUGUST COMMUNITY ENGAGEMENT PROCESS COMMISSION HEARINGSCITY COUNCIL APPROVALWORKSHOP 1 GALLERY WALK ISSUES TOPICS INFORMATION SHARING TUESDAY MARCH 4TH WORKSHOP 2 PRESENTATION CHARRETTE CONCEPT ALTERNATIVES TUESDAY APRIL 8TH WORKSHOP 3 PRESENTATION PREFERRED CONCEPT DESIGN TUESDAY MAY 20TH Gilroy Civic Master Plan Program –What’s in the Civic Master Plan? Plan Maestro Cívico de Gilroy Programa – ¿Qué hay en el Plan Maestro Cívico? Civic Park Parque Cívico Civic Park Parque Cívico Seniors Center Centro de día Seniors Center Centro de día Youth Center Centro de Juventud 123 456 789 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 220Gilroy Civic Center Master Plan 7/11/2025 2 Youth Center Centro de Juventud Arts Center Centro de Artes Arts Center Centro de Artes Recreation Center Centro de Recreación Recreation Center Centro de Recreación AquaticsCenter Centro Acuático AquaticsCenter Centro Acuático AquaticsCenter Centro Acuático City Hall Ayuntamiento 10 11 12 13 14 15 16 17 18 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 221Gilroy Civic Center Master Plan 7/11/2025 3 City Hall Ayuntamiento Civic Center Park….Bringing it all together Parque del Centro Cívico.... Reuniendo todo Elk Grove Civic Center City of Elk Grove Elk Grove Civic Center City of Elk Grove Elk Grove Civic Center City of Elk Grove Elk Grove Civic Center City of Elk Grove Elk Grove Civic Center City of Elk Grove Gilroy Civic Master PlanThree Concepts…..A, B and C Plan Maestro Cívico de GilroyTres conceptos..... A, B y C 19 20 21 22 23 24 25 26 27 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 222Gilroy Civic Center Master Plan 7/11/2025 3 City Hall Ayuntamiento Civic Center Park….Bringing it all together Parque del Centro Cívico.... Reuniendo todo Elk Grove Civic Center City of Elk Grove Elk Grove Civic Center City of Elk Grove Elk Grove Civic Center City of Elk Grove Elk Grove Civic Center City of Elk Grove Elk Grove Civic Center City of Elk Grove Gilroy Civic Master PlanThree Concepts…..A, B and C Plan Maestro Cívico de GilroyTres conceptos..... A, B y C 19 20 21 22 23 24 25 26 27 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 223Gilroy Civic Center Master Plan 7/11/2025 5 P A S E O GILROY CIVIC PARK COMMUNITY CENTER CITY HALLREC + AQUATICS PARKING MULTIGENERATIONAL COMMUNITY CENTER ARTS/SENIORS/YOUTH PROGRAMMING MULTIGENERATIONAL RECREATION AND AQUATICS CENTER Morgan Hill Amphitheater (Approx Size) Potential Parking Garage 180 Cars P A S E O COMMUNITY CENTER CITY HALL REC + AQUATICS GILROY CIVIC PARK PARKING MULTIGENERATIONAL COMMUNITY CENTER ARTS/SENIORS/YOUTH PROGRAMMING MULTIGENERATIONAL RECREATION AND AQUATICS CENTER Morgan Hill Amphitheater (Approx Size) Potential Parking Garage 180 Cars P A S E O COMMU- NITY CENTER CITY HALLREC + AQUATICS GILROY CIVIC PARK PARKING MULTIGENERATIONAL COMMUNITY CENTER ARTS/SENIORS/YOUTH PROGRAMMING MULTIGENERATIONAL RECREATION AND AQUATICS CENTER Morgan Hill Amphitheater (Approx Size) Potential Parking Garage 180 Cars Your turn……su turno….. Questions: Which is your favorite concept and why? Which is least favorite concept and why? What is your favorite feature of the civic master plan? What would you like to see built first? 37 38 39 40 41 42 43 44 45 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 224Gilroy Civic Center Master Plan 7/11/2025 6 25 Minutes:Review and Discuss Three ConceptsElect a Team Presenter 25 minutos Revisar y discutir tres conceptosElegir un presentador de equipo 25 Minutes:Team Presenters give a 2-to-3-minute recap of their table’s findings 25 minutos Los presentadores del equipo hacen un resumen de 2 a 3 minutos de los hallazgos de su mesa Next Steps •Narrow to a preferred concept direction •Refine to a Final Draft Concept •Present the Final Draft Concept at Community Workshop #3 on May 20th •Refine Final Draft for presentation to Commissions •Prepare Final Concept Master Plan for City Council Approval in July/August 2025 •Initiate CEQA process and complete by Spring 2026 •Goal: Phase One Ballot Measure in November 2026 Thank you! / ¡Gracias! We hope to see you again on Tuesday, May 20th for Workshop #3 46 47 48 49 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 225Gilroy Civic Center Master Plan 7/10/2025 April 21, 2025 Council Member Updates -Post Workshop 2 1 Gilroy Civic Master Plan Plan Maestro Cívico de Gilroy Week of April 21, 2025 Mayor and Councilmember Updates, Post-Community Workshop #2 Welcome! / ¡Bienvenido! Community Engagement + Concept Design I. Welcome + Opening Remarks II. Concept Design -3 Civic Master Plan Ideas •What is being considered? •A, B, C III. Your thoughts….your reactions, your ideas! •Review in teams •Report your findings IV. Next Steps… 20 Minutes 50 Minutes 10 Minutes 10 Minutes 90 Minutes AIMING FOR CITY COUNCIL APPROVAL IN JULY/AUGUST COMMUNITY ENGAGEMENT PROCESS COMMISSION HEARINGSCITY COUNCIL APPROVALWORKSHOP 1 GALLERY WALK ISSUES TOPICS INFORMATION SHARING TUESDAY MARCH 4TH WORKSHOP 2 PRESENTATION CHARRETTE CONCEPT ALTERNATIVES TUESDAY APRIL 8TH WORKSHOP 3 PRESENTATION PREFERRED CONCEPT DESIGN TUESDAY MAY 20TH Gilroy Civic Master Plan Program –What’s in the Civic Master Plan? Plan Maestro Cívico de Gilroy Programa – ¿Qué hay en el Plan Maestro Cívico? Civic Park Parque Cívico Civic Park Parque Cívico 123 456 789 COUNCIL MEMBER UPDATES - 04.21.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 226Gilroy Civic Center Master Plan 7/10/2025 April 21, 2025 Council Member Updates -Post Workshop 2 2 Seniors Center Centro de día Seniors Center Centro de día Youth Center Centro de Juventud Youth Center Centro de Juventud Arts Center Centro de Artes Arts Center Centro de Artes Recreation Center Centro de Recreación Recreation Center Centro de Recreación AquaticsCenter Centro Acuático 10 11 12 13 14 15 16 17 18 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 227Gilroy Civic Center Master Plan 7/10/2025 April 21, 2025 Council Member Updates -Post Workshop 2 3 AquaticsCenter Centro Acuático AquaticsCenter Centro Acuático City Hall Ayuntamiento City Hall Ayuntamiento Civic Center Park….Bringing it all together Parque del Centro Cívico.... Reuniendo todo Elk Grove Civic Center City of Elk Grove Elk Grove Civic Center City of Elk Grove Elk Grove Civic Center City of Elk Grove 19 20 21 22 23 24 25 26 27 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 228Gilroy Civic Center Master Plan 7/10/2025 April 21, 2025 Council Member Updates -Post Workshop 2 4 Elk Grove Civic Center City of Elk Grove Elk Grove Civic Center City of Elk Grove Gilroy Civic Master PlanThree Concepts…..A, B and C Plan Maestro Cívico de GilroyTres conceptos..... A, B y C ONLY 10%+/- GREEN PARKING PARKING PARKINGSENIORS LIBRARY POLICE CITY HALL WHEELER LIBRARY & POLICE REMAIN LIBRARY POLICE WHEELER PHASE 1 ? PHASE 1 ?PHASE 1 ? 28 29 30 31 32 33 34 35 36 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 229Gilroy Civic Center Master Plan 7/10/2025 April 21, 2025 Council Member Updates -Post Workshop 2 5 P A S E O GILROY CIVIC PARK COMMUNITY CENTER CITY HALLREC + AQUATICS PARKING MULTIGENERATIONAL COMMUNITY CENTER ARTS/SENIORS/YOUTH PROGRAMMING MULTIGENERATIONAL RECREATION AND AQUATICS CENTER Morgan Hill Amphitheater (Approx Size) Potential Parking Garage 180 Cars P A S E O COMMUNITY CENTER CITY HALL REC + AQUATICS GILROY CIVIC PARK PARKING MULTIGENERATIONAL COMMUNITY CENTER ARTS/SENIORS/YOUTH PROGRAMMING MULTIGENERATIONAL RECREATION AND AQUATICS CENTER Morgan Hill Amphitheater (Approx Size) Potential Parking Garage 180 Cars P A S E O COMMU- NITY CENTER CITY HALLREC + AQUATICS GILROY CIVIC PARK PARKING MULTIGENERATIONAL COMMUNITY CENTER ARTS/SENIORS/YOUTH PROGRAMMING MULTIGENERATIONAL RECREATION AND AQUATICS CENTER Morgan Hill Amphitheater (Approx Size) Potential Parking Garage 180 Cars 37 38 39 40 41 42 43 44 45 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 230Gilroy Civic Center Master Plan 7/10/2025 April 21, 2025 Council Member Updates -Post Workshop 2 6 Your turn……su turno….. Questions: Which is your favorite concept and why? Which is least favorite concept and why? What is your favorite feature of the civic master plan? What would you like to see built first? Next Steps •Narrow to a preferred concept direction •Refine to a Final Draft Concept •Present the Final Draft Concept at Community Workshop #3 on May 20th •Refine Final Draft for presentation to Commissions •Prepare Final Concept Master Plan for City Council Approval in July/August 2025 •Initiate CEQA process and complete by Spring 2026 •Goal: Phase One Ballot Measure in November 2026 Thank you! / ¡Gracias! Next up…… Tuesday, May 20th Workshop #3 46 47 48 49 50 51 52 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 231Gilroy Civic Center Master Plan 7/11/2025 1 Gilroy Civic Master Plan Plan Maestro Cívico de Gilroy May 14, 15, and 16, 2025 City Council Updates, Pre-Community Workshop #3 Welcome! / ¡Bienvenido! Community Engagement + Concept Design COMMUNITY ENGAGEMENT PROCESS CITY COUNCIL APPROVALWORKSHOP 1 GALLERY WALK ISSUES TOPICS INFORMATION SHARING TUESDAY MARCH 4TH WORKSHOP 2 PRESENTATION CHARRETTE CONCEPT ALTERNATIVES TUESDAY APRIL 8TH WORKSHOP 3 PRESENTATION PREFERRED CONCEPT DESIGN TUESDAY MAY 20TH Aiming for City Council Approval on June 16th CAFECITO PRESENTATION FRIDAY MAY 9 Gilroy Civic Master Plan Program –What’s in the Civic Master Plan? Plan Maestro Cívico de Gilroy Programa – ¿Qué hay en el Plan Maestro Cívico? Civic Center Park….Bringing it all together Parque del Centro Cívico.... Reuniendo todo Civic Park Parque Cívico Civic Park Parque Cívico Elk Grove Civic Center City of Elk Grove Civic Park Parque Cívico Elk Grove Civic Center City of Elk Grove Civic Park Parque Cívico Elk Grove Civic Center City of Elk Grove Civic Park Parque Cívico 123 456 789 CITY COUNCIL UPDATES - 05.14.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 232Gilroy Civic Center Master Plan 7/11/2025 2 Elk Grove Civic Center City of Elk Grove Civic Park Parque Cívico Elk Grove Civic Center City of Elk Grove Civic Park Parque Cívico Seniors Center Centro de día Seniors Center Centro de día Youth Center Centro de Juventud Youth Center Centro de Juventud Arts Center Centro de Artes Arts Center Centro de Artes Recreation Center Centro de Recreación 10 11 12 13 14 15 16 17 18 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 233Gilroy Civic Center Master Plan 7/11/2025 3 Recreation Center Centro de Recreación AquaticsCenter Centro Acuático AquaticsCenter Centro Acuático AquaticsCenter Centro Acuático City Hall Ayuntamiento City Hall Ayuntamiento Gilroy Civic Master Plan Community Engagement + Concept Design RECAP 19 20 21 22 23 24 25 26 27 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 234Gilroy Civic Center Master Plan 7/11/2025 4 ONLY 10%+/- GREEN PARKING PARKING PARKINGSENIORS LIBRARY POLICE CITY HALL WHEELER LIBRARY & POLICE REMAIN LIBRARY POLICE WHEELER City Hall Focus Community Center Focus 6 CONCEPT IDEAS: Post Workshop #1 1 2 3 4 X 5 CONCEPT IDEAS: Post Workshop #1 ABC 3 CONCEPT IDEAS –Workshop #2 28 29 30 31 32 33 34 35 36 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 235Gilroy Civic Center Master Plan 7/11/2025 5 Gilroy Civic Master Plan Preferred Direction Gilroy Civic Master Plan Today…..Preferred Concept WEST BLOCK POLICE + PARKING CENTRAL BLOCK LIBRARY + CITY HALL EAST BLOCK PARK + RECREATION GILROY CIVIC PARKPASEO 6TH Street 7TH StreetChurch StreetDowdy StreetNORTH Elk Grove Civic Center City of Elk Grove WEST BLOCK POLICE + PARKING CENTRAL BLOCK LIBRARY + CITY HALL WEST BLOCK PARK + RECREATION GILROY CIVIC PARKPASEO 6TH Street 7TH StreetChurch StreetDowdy StreetNORTH WEST BLOCK POLICE + PARKING CENTRAL BLOCK LIBRARY + CITY HALL WEST BLOCK PARK + RECREATION 6TH Street 7TH StreetChurch StreetDowdy StreetNORTH GILROY CIVIC PARKPASEO 37 38 39 40 41 42 43 44 45 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 236Gilroy Civic Center Master Plan 7/11/2025 6 GILROY CIVIC PARKPASEO 6TH Street 7TH Street Church StreetDowdy StreetRECREATION & AQUATICS CENTER GYMNASIUM/TRACK WELLNESS/FITNESS POOLS MULTIGENERATIONAL COMMUNITY CENTER THEATER/ARTS/SENIORS/YOUTH GILROY CIVIC PARK PARKING PARKING 6TH Street 7TH Street Church StreetDowdy StreetNORTH RECREATION & AQUATICS CENTER GYMNASIUM/TRACK WELLNESS/FITNESS POOLS MULTIGENERATIONAL COMMUNITY CENTER THEATER/ARTS/SENIORS/YOUTH GILROY CIVIC PARK PARKING PARKING 6TH Street 7TH Street Church StreetDowdy StreetNORTH RECREATION & AQUATICS CENTER GYMNASIUM/TRACK WELLNESS/FITNESS POOLS MULTIGENERATIONAL COMMUNITY CENTER THEATER/ARTS/SENIORS/YOUTH GILROY CIVIC PARK PARKING PARKING 6TH Street 7TH Street Church StreetDowdy StreetNORTH LIBRARY PASEO CITY HALL PARKING PARKING PARKING PARKING 6TH Street 7TH Street Church StreetDowdy StreetNORTH PASEO POLICE PARKING PARKING PARKING 6TH Street 7TH Street Church StreetDowdy StreetNORTH 46 47 48 49 50 51 52 53 54 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 237Gilroy Civic Center Master Plan 7/11/2025 7 RECREATION AND AQUATICS CENTER First Floor RECREATION AND AQUATICS CENTER Second Floor MULTIGENERATIONAL COMMUNITY CENTER First Floor MULTIGENERATIONAL COMMUNITY CENTER Second Floor CITY HALL First Floor CITY HALL Second Floor Thank you! / ¡Gracias! Next up…… Tuesday, May 20th Workshop #3 55 56 57 58 59 60 61 62 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 238Gilroy Civic Center Master Plan Evening Session- • Concerned about privacy from the second level into neighboring homes. • Adress the safety of transparent walls with reflective glass or ballistic glass. • Consider coordinating with downtown merchants, referring to the Downtown Business Organization. • Will the park require a fee for food trucks and farmers’ market? • Implement the design of the library façade into adjacent buildings. • Apply solar panels on the police department building • Provide sufficient security lighting • Senior Center area appears too small. Provide more square footage. • Provide a senior store for selling community crafts. • Provide accessible paths for seniors. • Consider curb less curbs – easy transitions between different elevations. • How will parking for seniors be managed? • Provide tall trees with large canopies for shading. • Design cool gardens if trees are overly expensive. • Support the idea of a communal space. • Provide ramps for accessibility. • Enjoy the implementation of large openings allowing natural light into buildings • Provide a parking garage. • Include seating along the paseo. • Include space for food trucks along the paseo. • Could the pool be indoors? • Provide terraced landscape, berms and swales. • Support the multigenerational spaces for people to engage in enlightening conversations. • Provide 2 level parking. • Include emergency call boxes throughout the park. • Include a community garden. • Design a playground to further encourage children and parents to use the park. • Include “garlic chairs” or furniture symbolic of Gilroy Notes by Aylin Casas Mejia: Morning Session- • Concern over accumulated traffic existing and entering from Dowdy st. • Redesign of parking lot so that it is more distributed throughout the site, as opposed to accumulated in one corner • Appreciated the parking designated for both the police building and the city hall • Replace some parking with tree coverage and more green space opportunities • Attendee mentioned outlet inclusion for night lights along the open space • Concern over light and noise pollution onto neighbors of the site Evening Session- GILROY CIVIC CENTER MASTER PLAN May 20, 2025 MEETING NOTES – WORKSHOP #3 – 9AM AND 6PM Facilitators: City of Gilroy: ELS & SWA : Ryan Osenton Rachelle Bedell Clarence Mamuyac Angelo Razo Aylin Casas Mejia Kenneth Lorreto Marco Esposito Meeting Overview: The final community workshop was held at the same location as the previous workshops, Wheeler Center in Gilroy, with morning and evening sessions. The workshop format similar to Workshop #2, in that community members were seating around several round tables. The session began with a slideshow a slideshow outlining the master plan process to date and the evolution of one preferred concept design. Attendees were then asked to critique and discuss the preferred concept within their table groups, before presenting their findings to the larger group. Both morning and evening sessions were attended by residents and city employees. Comments from attendees, as noted by each design team member, are summarized below. Comments are organized into two sections for morning and evening workshops, as each workshop group responded differently to the preferred concept. Notes by Angelo Razzo: Morning Session Comments- • There are concerns about traffic along Church St. • Consider the strategic location of electrical outlets and drinking fountains throughout the park for public use and for events. • Consider shading devices placed over the proposed outdoor amphitheater area. • Explore different elevations for landscape, particularly along Church St. where berms or swales can serve as safety features. • Can entry into the park include an archway or signage? • Provide van parking for seniors. • Support the idea of “porosity” – connection between indoor and outdoor • Confirm there is ample room for food trucks and delivery trucks for farmers’ market. • Consolidate the theater and council chamber into one room. • Provide truck access to the theater for delivery of equipment • Conduct a traffic study. • Include public art. Confirm with the city if there are any public art requirements WORKSHOP 3 - 05.20.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 239Gilroy Civic Center Master Plan • Individuals expressed a desire for incorporated art work onto the public open space • Some want to keep the council chamber and city hall separate • Appreciated the separation of more recreational services on the right most part of the site, and civil services reserved to the left more part of the site • Excited about the pool incorporation to the Master Site Plan • Proposed blue emergency phones throughout the site to ensure safety • Curious about potential seating areas around the paseo and open space • Too few parking spots near the senior center • Potential to reserve parking sports for seniors, near the senior center • Minimize some trees so that the dining room would have direct eye access to the civic park • Activate larger green spaces by incorporating play structures • Move the current solar panels to the rooftop of the police station Notes by Kenneth Loretto: Morning Session- • As the group listened to community comments. They expressed: We like what we see. • The central space (paseo?) would be good for farmers markets and community gatherings. Suggest – power and data for market vendors. • Lots of glass makes it feel inviting and open. • Suggest perimeter bollards for security. • Consider for traffic flow is needed. • Consider the neighbors surrounding the site • Suggest outdoor activities, courts. • Consider adding in art in the park. Make it integral to the park, not an afterthought. • Good walkable pedestrian access to the park from downtown and vice versa. • We anticipate 2-3k people at amphitheater events. • The park is at the threshold between east side and west side Gilroy. • Consider parking for seniors and accessibility • Overall groups seemed to like the scheme presented. • Farmers market might also be located offsite. o Consider access for trucks along the market route. • Consider theater loading and access. • Might the council chambers and theater be dual purpose? • Consider sound and odors when planning for kitchen/ auditorium adjacency. • Consider a bandshell at amphitheater in the park. • Consider wide stepped terraces with park like seating for the amphitheater. Evening Session- • Dual, multi-purpose spaces, such as the amphitheater, works for performance and picnicking, community gatherings, and see you Thursdays. • Consider sight lines for tables and chairs on terraced amphitheater seating. • Is the senior dining area bigger than the existing? • Consider an indoor/ outdoor pool. • Parking – may need additional levels at the assigned parking area. • Need to keep in mind that street parking fills up. • Consider lighting along the paseo. • Mitigate heat island effect of parking. • Manage parking to make the most efficient use of spaces. • Consider a garden like feel for the paseo. • Consider solar panels for parking areas – energy generation and shade over the lot. • Community gardens, playgrounds, and Garlic chairs! END OF NOTES Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 240Gilroy Civic Center Master Plan 7/18/2025 1 Gilroy Civic Master Plan Plan Maestro Cívico de Gilroy May 20, 2025 Welcome! / ¡Bienvenido! COMMUNITY WORKSHOP #3 COMMUNITY ENGAGEMENT PROCESS CITY COUNCIL APPROVALWORKSHOP 1 GALLERY WALK ISSUES TOPICS INFORMATION SHARING TUESDAY MARCH 4TH WORKSHOP 2 PRESENTATION CHARRETTE CONCEPT ALTERNATIVES TUESDAY APRIL 8TH WORKSHOP 3 PRESENTATION PREFERRED CONCEPT DESIGN TUESDAY MAY 20TH Aiming for City Council Approval on June 16th CAFECITO PRESENTATION FRIDAY MAY 9 Looking ahead….. •Refine and Finalize Preferred Concept + Cost Estimate for City Council Direction •Present to City Council in June; Seek Approval to Advance to CEQA process •Initiate CEQA process and complete by Spring 2026 I. Welcome + Opening Remarks II. Recap of Workshop #2 + Preferred Concept Design III. Your thoughts….your reactions, your ideas! •Review in teams •Report your findings IV. Next Steps… 20 Minutes 50 Minutes 10 Minutes 10 Minutes 90 Minutes FOR TODAY… 123 456 789 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 241Gilroy Civic Center Master Plan 7/18/2025 2 Gilroy Civic Master Plan Program –What’s in the Civic Master Plan? Plan Maestro Cívico de Gilroy Programa – ¿Qué hay en el Plan Maestro Cívico? Civic Center Park….Bringing it all together Parque del Centro Cívico.... Reuniendo todo Civic Park Parque Cívico Civic Park Parque Cívico Elk Grove Civic Center City of Elk Grove Civic Park Parque Cívico Elk Grove Civic Center City of Elk Grove Civic Park Parque Cívico Elk Grove Civic Center City of Elk Grove Civic Park Parque Cívico Elk Grove Civic Center City of Elk Grove Civic Park Parque Cívico Elk Grove Civic Center City of Elk Grove Civic Park Parque Cívico 10 11 12 13 14 15 16 17 18 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 242Gilroy Civic Center Master Plan 7/18/2025 3 Seniors Center Centro de día Seniors Center Centro de día Youth Center Centro de Juventud Youth Center Centro de Juventud Arts Center Centro de Artes Arts Center Centro de Artes Recreation Center Centro de Recreación Recreation Center Centro de Recreación AquaticsCenter Centro Acuático 19 20 21 22 23 24 25 26 27 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 243Gilroy Civic Center Master Plan 7/18/2025 4 AquaticsCenter Centro Acuático City Hall Ayuntamiento City Hall Ayuntamiento Gilroy and Morgan Hill……Neighbors MORGAN HILL POPULATION 45,500 LAND AREA 8,200 ACRES GILROY POPULATION 58,100 LAND AREA 10,350 ACRES MORGAN HILL COMMUNITY CULTURAL CENTER & AMPHITHEATRE CENTENNIAL RECREATION CENTER MORGAN HILL AQUATIC CENTER 12 miles from Gilroy Civic Center MORGAN HILL AMPHITHEATRE COMMUNITY AND CULTURAL CENTER CENTENNIAL RECREATION CENTER MORGAN HILL AQUATIC CENTER MORGAN HILL DOWNTOWN AMPHITHEATRE + CULTURAL CENTER 25,500 sf Amphitheater 35,000 sf Cultural Center MORGAN HILL CENTENNIAL RECREATION CENTER 66,000 sf Gym Pool Multipurpose Seniors Teen 28 29 30 31 32 33 34 35 36 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 244Gilroy Civic Center Master Plan 7/18/2025 5 MORGAN HILL AQUATICS CENTER 21,000 sf of Water •50m Pool •6 lane x 25-yard Pool •Fun Water Pool •Splash Pad MORGAN HILL COMMUNITY CENTER 37,000 sf RECREATION CENTER 66,000 sf AQUATICS 25,000 sf GILROY SENIOR CENTER 12,000 sf WHEELER CENTER 15,000 sf AQUATICS 0 sf TODAY MORGAN HILL COMMUNITY CENTER 37,000sf RECREATION CENTER 66,000sf AQUATICS 25,000sf GILROY COMMUNITY CENTER 35,000sf RECREATION CENTER 42,000sf AQUATICS 6,000sf CIVIC MASTER PLAN Gilroy Civic Master Plan Community Engagement + Concept Design -The Site -Concepts A, B & C -Preferred Concept ONLY 10%+/- GREEN PARKING PARKING PARKINGSENIORS LIBRARY POLICE CITY HALL WHEELER ANNEX LIBRARY & POLICE REMAIN LIBRARY POLICE WHEELER ANNEX 37 38 39 40 41 42 43 44 45 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 245Gilroy Civic Center Master Plan 7/18/2025 6 Gilroy Civic Master Plan Today…..Preferred Concept WEST BLOCK CENTRAL BLOCK EAST BLOCK GILROY CIVIC PARKPASEO 6TH Street 7TH StreetChurch StreetDowdy StreetNORTH RECREATION + AQUATICS COMMUNITY SENIORS, YOUTH, ARTS CITY HALL LIBRARY POLICE GILROY CIVIC PARKPASEO 6TH Street 7TH StreetChurch StreetDowdy StreetNORTH WEST BLOCK CENTRAL BLOCK EAST BLOCK RECREATION + AQUATICS COMMUNITY SENIORS, YOUTH, ARTS CITY HALL LIBRARY POLICE 6TH Street 7TH StreetChurch StreetDowdy StreetNORTH GILROY CIVIC PARKPASEO WEST BLOCK CENTRAL BLOCK EAST BLOCK RECREATION + AQUATICS COMMUNITY SENIORS, YOUTH, ARTS CITY HALL LIBRARY POLICE GILROY CIVIC PARKPASEO 6TH Street 7TH Street Church StreetDowdy StreetRECREATION + AQUATICS COMMUNITY SENIORS, YOUTH, ARTS CITY HALL LIBRARY POLICE 46 47 48 49 50 51 52 53 54 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 246Gilroy Civic Center Master Plan 7/18/2025 7 RECREATION & AQUATICS CENTER GYMNASIUM/TRACK WELLNESS/FITNESS POOLS MULTIGENERATIONAL COMMUNITY CENTER THEATER/ARTS/SENIORS/YOUTH GILROY CIVIC PARK PARKING PARKING 6TH Street 7TH Street Church StreetDowdy StreetNORTH RECREATION & AQUATICS CENTER GYMNASIUM/TRACK WELLNESS/FITNESS POOLS MULTIGENERATIONAL COMMUNITY CENTER THEATER/ARTS/SENIORS/YOUTH GILROY CIVIC PARK PARKING PARKING 6TH Street 7TH Street Church StreetDowdy StreetNORTH RECREATION AND AQUATICS CENTER First Floor 42,500 sf 6,000sf RECREATION AND AQUATICS CENTER Second Floor 42,500 sf RECREATION & AQUATICS CENTER GYMNASIUM/TRACK WELLNESS/FITNESS POOLS MULTIGENERATIONAL COMMUNITY CENTER THEATER/ARTS/SENIORS/YOUTH GILROY CIVIC PARK PARKING PARKING 6TH Street 7TH Street Church StreetDowdy StreetNORTH MULTIGENERATIONAL COMMUNITY CENTER First Floor 35,000 sf 55 56 57 58 59 60 61 62 63 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 247Gilroy Civic Center Master Plan 7/18/2025 8 MULTIGENERATIONAL COMMUNITY CENTER Second Floor 35,000 sf LIBRARY PASEO CITY HALL PARKING PARKING PARKING PARKING 6TH Street 7TH Street Church StreetDowdy StreetNORTH CITY HALL First Floor 48,000 sf TODAY – 40,000 sf CITY HALL Second Floor 48,000 sf TODAY – 40,000 sf PASEO POLICE PARKING PARKING PARKING 6TH Street 7TH Street Church StreetDowdy StreetNORTH MORGAN HILL COMMUNITY AND CULTURAL CENTER CENTENNIAL RECREATION CENTER MORGAN HILL AQUATIC CENTER PASEO POLICE PARKING PARKING PARKING 6TH Street 7TH Street Church StreetDowdy StreetNORTH RECREATION & AQUATICS CENTER GYMNASIUM/TRACK WELLNESS/FITNESS POOLS MULTIGENERATIONAL COMMUNITY CENTER THEATER/ARTS/SENIORS/YOUTH LIBRARY CITY HALL Average 60-year old person walks 4.25 feet/secondAverage 60-year old person walks 4.25 feet/second 64 65 66 67 68 69 70 71 72 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 248Gilroy Civic Center Master Plan 7/18/2025 9 25 Minutes:Review and Discuss Preferred ConceptElect a Team Presenter 25 minutos Revisar y discutir tres conceptosElegir un presentador de equipo 25 Minutes:Team Presenters give a 2-to-3-minute recap of their table’s findings 25 minutos Los presentadores del equipo hacen un resumen de 2 a 3 minutos de los hallazgos de su mesa 73 74 75 76 77 78 79 80 81 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 249Gilroy Civic Center Master Plan 7/18/2025 10 Next Steps •Refine and Finalize Preferred Concept + Cost Estimate •Prepare Final Concept Master Plan for City Council Approval in June 2025 •Initiate CEQA process and complete by Spring 2026 Thank you! / ¡Gracias! 82 83 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 250Gilroy Civic Center Master Plan GILROY CIVIC CENTER MASTER PLAN June 11, 2025 MEETING AGENDA/NOTES Via ZOOM – In attendance: Ryan Osenton, Sharon Goei, Clarence Mamuyac 1. EIR Status – Provided by Shoshana Lutz, EMC a. EMC Update i. Draft NOP went to Susan Vutz (ELS) and Ryan Osenton (City) on 5/30. When I receive comments back, I can incorporate and finalize the NOP for the City to post with the County Clerk, upload to the State Clearinghouse, and send copies to those on the City’s distribution list. The City will provide feedback by early next week. ii. Tribal consultation offer letters were signed by Ryan and sent out by the City on April 10th. The tribes had 30 days to respond, which ended in mid-May. If any responses were received by the City please send them my way. The city received one request from the tribal consultation offer letter period via email for a map, which he responded to directly. The requester had an issue with the distribution of the mail, as they did not receive their notice letter until May 24th. Does this glitch in the US Mail process require us to extend the 30- day window? iii. The VMT study and parking analysis by Hexagon Transportation Consultants should be done by the end of July. On track, no comment iv. Current schedule has the admin draft EIR being complete at the end of August. The draft EIR is underway. On track, no comment 2. Model a. ELS advised that the model is coming in between $45K and $50K b. ELS will produce buildings via 3D printer. The model base and trees will be produced by a third-party model maker. c. The City wants to re-evaluate the need for the model, as the cost are exceeding their anticipated expenditure. The model is on HOLD until further direction is provided by the City. If the model moves forward, it will be needed in early September. 3. Draft Report – ELS gave a summary of the items below, essentially stating all is progressing as planned. The final report is targeted at the end of July. a. Technical reports from consultants in progress b. Parking counts pending from Hexagon c. Additional drawings and renderings d. Additional text in progress End of Meeting Notes TEAM MEETING - 06.11.25Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB REFERENCE MATERIALS Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB ELS | 252Gilroy Civic Center Master Plan List of Reference Drawings and Documents The following information was provided to the design team for use in preparing this report: DOCUMENTS AND REPORTS 1. City of Gilroy Civic Center Master Plan, Draft, WLC Architects, April 25, 2002 2. Gilroy Recreation Facility & Program Needs Assessment, Pros Consulting and ETC Institute, 2020 3. City of Gilroy 2040 General Plan Land Use Map 4. Gilroy City Code, Chapter 30, Zoning Ordinance and Zoning Map DRAWINGS 1. City Hall: a. Irrigation Plan, January 28, 1975 by John Blevins & Assoc. b. Original building plans by the Architectural Office of William W. Hedley Jr, Morris Arthur Stark Associate Architect, 8/1/76 c. Expansion of Gilroy City Hall, plans by the Hawley, Peterson & Snyder Architects, 3/19/90 d. Electrical as-built drawings, 1/15/91 e. Expansion of Gilroy City Hall, plans by CSS Associates Architects, 2/1/92 f. Planting and Irrigation plans, Aitken Associates Landscape Architects, 10/1/93 g. Landscape Plans, Aitken Associates Landscape Architects, July 1994 h. Mechanical Modifications, Parks & Rec Dept., McCracken & Woodman Consulting Mechanical Engineers, 9/19/95 i. Accessibility upgrades, Harris & Associates Architects, 1997 j. Gilroy City Hall HVAC Assessment, Turley & Associates Mechanical Engineering, 1/26/2020 2. Old Police Department Building a. Jail and Police Facility original building plans, Akol and Associates Architects & Engineers and Hughan and Hughan Architects, 2/25/65 b. Gilroy Police Facility Remodel, Hughan & Hughan Architects and Planners, 8/25/76 c. Emergency Generator drawings, Fehr Engineering Company, 1/16/83 d. Front Desk Remodel, Duerr Architect, 4/16/84 e. Mechanical and Structural modifications, Hughan & Hughan Architects and Planners, 9/3/85 f. City of Gilroy Police Department Addition, Clark, Stromquist & Sandstrom Architects 2/10/86 g. Mechanical modifications, McCracken & Woodman Consulting Mechanical Engineers, 1995 and 1996 h. Dog kennel drawings, 2015 3. Old City Hall, renovation dated 10/26/92 by Architectural Resources Group 4. Senior Center a. Gilroy Senior Center Expansion Project, Duerr Architect, 1/22/87 b. ADA Improvements, 4/30/96 Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB Docusign Envelope ID: 40C5B758-1B34-8887-8298-2A3A06DC09CB