Loading...
HomeMy WebLinkAboutAli Sapirman 5.1.pdf October 14, 2026 Honorable Mayor and Members of the City Council City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 Re: 2480 & 2740 Hecker Pass Road Residential Project (AS 23-19, TM 23-03), Draft Environmental Impact Report Dear Mayor and Councilmembers: On behalf of the Housing Action Coalition (HAC), I write regarding the City's processing of the 2480 & 2740 Hecker Pass Road Residential Project (the Project) and its Draft Environmental Impact Report (EIR). The Project, proposed by Mana Camden Fund, LLC, would build 116 single-family homes on 24.3 acres, including nine extremely low income units. HAC is a member-supported nonprofit that advocates for more housing at all levels of affordability across California, and we closely track local compliance with state housing law. The Project is a Builder's Remedy application under the Housing Accountability Act (HAA), Government Code section 65589.5, as amended by AB 1893 (2024). State law limits the City's discretion over this Project, and the EIR must reflect those limits. As detailed below, the City's handling of the Project and the Draft EIR do not. We urge the City to correct these issues in the Final EIR and before the Project goes to hearing. The City has repeatedly delayed the Project and its EIR. The City has continually, and seemingly intentionally, delayed processing of the Project and preparation of its EIR. The applicant submitted an SB 330 preliminary application on May 17, 2023. The City initially resisted the Project's Builder's Remedy status until the Department of Housing and Community Development confirmed it on October 17, 2023. Reaching completeness under the Permit Streamlining Act then took roughly ten months. The City also required an entirely new EIR rather than allowing the Project to tier off the existing Hecker Pass Specific Plan EIR, even though a previously approved project on this same site proceeded with a Mitigated Negative Declaration. The EIR consultant delivered an administrative draft to staff on September 18, 2025. The applicant was told in January 2026 to expect hearings in March or April 2026. The Draft EIR was not released until August 21, 2026, and more than three years after the preliminary application, the Project has yet to reach a decision. Delay of this kind undermines the purpose of the HAA, which the Legislature directs to be interpreted and implemented to afford the fullest possible weight to the approval and provision of housing. The City should commit to a firm schedule for finalizing the EIR and bringing the Project to a decision. The City continues to apply standards that state law overrides.The City's comment letters on the Project continually rely on requirements drawn from the General Plan, the Hecker Pass Specific Plan, and the Zoning Ordinance. Under the Builder's Remedy, Government Code section 65589.5(d)(5), and related housing law protections, the City may not use inconsistency with these standards to disapprove the Project or to condition it in a way that renders it infeasible. Continuing to cite them as if they govern the Project misstates the City's authority and creates confusion for the applicant and the public. The City's review letters of October 2, 2025, February 12, 2026, and April 15, 2026 all follow this pattern. For example, the City's April 15, 2026 letter rejected the Project's proposed sound wall as inconsistent with Specific Plan Policies 4-5 and 5-68, standards the City cannot use to deny or condition a Builder's Remedy project. The EIR improperly converts Specific Plan guidelines into mitigation. Many of the same Specific Plan guidelines the City cites in its comment letters now appear as the basis for mitigation measures in the EIR. This violates both state housing law and the limits CEQA places on mitigation. In Tiburon Open Space Committee v. County of Marin (2022) 78 Cal.App.5th 700, 732, the First District Court of Appeal explained: "Where a lead agency's discretion already is limited by legal obligations, therefore, the scope of environmental review adjusts in relation to the amount of discretion.… Accordingly, an EIR must reflect any applicable legal obligations that limit the agency's discretionary authority, and thus the scope of review. And while CEQA imposes a duty on lead agencies to avoid or mitigate significant environmental impacts caused by projects, such duty exists only to the extent feasible.… Mitigation measures that conflict with legal obligations are legally infeasible and 'need not be proposed or analyzed.'" (See also CEQA Guidelines, § 15126.4, subd. (a)(5); Pub. Resources Code, § 21004.) The City cannot use the EIR to reimpose, through mitigation, standards that the HAA bars it from applying directly. The EIR ignores the HAA's limits on the City's discretion. Contrary to Tiburon, the EIR contains almost no discussion of the HAA or the limits state housing law places on the City's authority over this Project. Without that analysis, the EIR cannot accurately define the scope of the City's discretion or identify which mitigation measures are legally feasible. The applicant has raised these concerns for years, yet the City has refused to remove the measures that conflict with state law. In a July 16, 2026 email, the City Attorney took the position that infeasible measures need not be removed at the draft EIR stage. Leaving legally infeasible mitigation in the EIR confuses the public, risks recirculation and further delay, and creates a pretextual basis for later denying or conditioning the Project in ways the HAA prohibits. The Final EIR should include a clear discussion of the HAA, the Builder's Remedy, and their effect on the scope of review and mitigation. Where the City lacks authority to impose a measure, the EIR should say so, as CEQA Guidelines section 15126.4(a)(5) allows. Several mitigation measures must be removed or modified. Multiple mitigation measures in the EIR are legally and practically infeasible, would reduce the Project's density, or both, and must be removed. The applicant identified each one as inapplicable in its responses to the City's April 26, 2024 inconsistency analysis, and again after reviewing the administrative draft EIR: ● MM 6-1 (agricultural mitigation): Requires mitigating the conversion of 5.42 acres of Prime Farmland under the City's Agricultural Mitigation Policy. Compliance would require purchasing a significant amount of land and is not economically feasible. ● MM 6-3 (agricultural buffer): Imposes buffers from Specific Plan Policies 3-12 and 5-12 and the Agricultural Mitigation Policy. The applicant's site exhibit shows this would eliminate at least eight lots, and the applicant has requested a State Density Bonus Law waiver of the requirement. ● MM 9-2a, 9-2b, and 9-2c (South Hoey Barn): Require retaining the barn in place, relocating it on site, or moving it onto a neighboring private property. Keeping it on site reduces density, relocation is prohibitively costly, the barn has no foundation and substantial rot, and the applicant cannot compel another landowner to accept it. ● MM 15-1 (traffic noise): Requires an earthen berm, a 145-foot setback, or reoriented homes along Hecker Pass Highway, each of which reduces density or requires costly redesign. The Project's proposed six-foot solid wood wall already achieves a 6 dBA reduction according to a May 7, 2026 FCS noise report, and is prohibited only by Specific Plan Policy 4-5, which cannot be applied here. Measures that reduce density are independently barred. The City may apply its standards only in a way that facilitates development at the density the Project proposes (Gov. Code § 65589.5(f)(1)), and may impose a condition resulting in lower density only with written findings, supported by a preponderance of the evidence, of a specific, adverse impact on public health or safety that cannot be feasibly mitigated another way (§ 65589.5(j)(1)). The City has made no such findings. Where a measure cannot legally be imposed, the EIR should say so and treat the impact as significant and unavoidable. Other measures hold this Project to a stricter standard than comparable projects. The HAA bars the City from imposing any requirement, process, or course of conduct that applies to a project solely or partially because it is a Builder's Remedy project (Gov. Code § 65589.5(f)(6)(E)). Yet the Mitigated Negative Declaration for an earlier, non-Builder's Remedy project on this same site required none of the following measures, or far less: ● MM 8-2a and 8-2b (Swainson's hawk): The prior MND identified no Swainson's hawk mitigation. ● MM 8-3 (Crotch's bumblebee): The prior MND did not identify the species. ● MM 8-4 (special-status bats): The prior MND did not identify bats. ● MM 8-5 (nesting birds): The prior MND included a much less stringent measure. Nothing in the record suggests these species have become more likely to occur on the site. These measures should be removed or revised to match the treatment of comparable projects. HAC respectfully asks the City to remove the legally infeasible mitigation measures, modify the measures that hold this Project to a heightened standard, add a full discussion of the HAA and the Builder's Remedy to the EIR, and move the Project to a decision without further delay. The applicant has already served formal notice that the City's conduct amounts to an effective disapproval under Government Code section 65589.5(h)(6)(E), and resolving these issues now is in everyone's interest. Gilroy needs more homes, and state law is clear about how projects like this one must be reviewed. We welcome the chance to discuss these concerns with you and City staff. Sincerely, Ali Sapirman Advocacy & Policy Manager Housing Action Coalition