HomeMy WebLinkAboutAMENDED 11/02/2026 City Council Regular Meeting | Published 10/30/2026November 2, 2026 | 6:00 PM Page 1 of 7 City Council
Regular Meeting
CITY COUNCIL
REGULAR MEETING
AGENDA
COUNCIL CHAMBERS, CITY HALL
7351 ROSANNA STREET, GILROY, CA
95020
AMENDED AGENDA
MONDAY, NOVEMBER 2, 2026 | 6:00 PM
MAYOR
Greg Bozzo
COUNCIL MEMBERS
Dion Bracco
Tom Cline
Terence Fugazzi
Zach Hilton
Carol Marques
Kelly Ramirez
CITY COUNCIL PACKET MATERIALS ARE AVAILABLE ONLINE AT www.cityofgilroy.org
AGENDA CLOSING TIME IS 5:00 P.M. THE FRIDAY PRIOR TO THE MEETING
Remote Participation
Gilroy City Council meetings are held in person. The community may attend in person or via Zoom
(video/teleconference). The meetings are also live-streamed on the City's website and YouTube.
Those wishing to participate in the meetings remotely may join using the following link:
https://bit.ly/GilroyCityCouncilMeetings. Additionally, Zoom participants must be
running the latest version or will be required to update to it before joining the meeting
remotely.
Remote participation is also available by calling (669) 900-6833 and entering webinar
ID: 930 2066 6240#. Dial *9 to raise your hand, and be called upon to speak for up to 3
minutes. Dial *6 to unmute.
Public Comment
COMMENTS BY THE PUBLIC WILL BE TAKEN ON AGENDA ITEMS BEFORE ACTION IS TAKEN BY THE CITY
COUNCIL. Public testimony is subject to reasonable regulations, including but not limited to time restrictions
for each individual speaker. **Please limit your comments to 3 minutes.** The amount of time allowed per
speaker may vary at the Mayor’s discretion depending on the number of speakers and length of the agenda.
Public comment will be heard first from those attending in person, with the submission
of a speaker card. Once that is complete, we will move to those on Zoom who have
their virtual hand raised. Following public comment from Zoom, we will close the public
comment period for that item.
Please note: Once the third speaker has provided comment on an item, there will be no further speaker cards or
virtual raised hands taken for that item.
Written comments on any agenda item may be emailed to the City Clerk’s Office at
publiccomment@cityofgilroy.org or mailed to the Gilroy City Clerk’s Office at City Hall, 7351 Rosanna Street,
Gilroy, CA 95020. Comments received by the City Clerk’s Office by 1 p.m. on the day of a Council meeting will
be distributed to the City Council prior to or at the meeting and available for public inspection with the agenda
Page 1 of 211
November 2, 2026 | 6:00 PM Page 2 of 7 City Council
Regular Meeting
packet located in the lobby of Administration at City Hall, 7351 Rosanna Street prior to the meeting. Any
correspondence received will be incorporated into the meeting record. Items received after the 1 p.m. deadline
will be provided to the City Council as soon as practicable. Written comments are also available on the City’s
Public Records Portal at bit.ly/3NuS1IN.
Written comments will not be read aloud during the meeting. They will be provided to the City Council, included
in the meeting record, and posted on the City’s website as submitted. Communications sent to the City Council
are public records and may be disclosed pursuant to the California Public Records Act and the Ralph M. Brown
Act, unless exempt from disclosure under applicable law. Personal information, including email addresses,
telephone numbers, home addresses, and other contact information, is not required to be included with your
public comments. Please do not include any information that you do not want to be made public.
In compliance with the Americans with Disabilities Act, the City will make reasonable
arrangements to ensure accessibility to this meeting. If you need special assistance to participate
in this meeting, please contact the City Clerk’s Office at least 72 hours prior to the meeting at
(408) 846-0204 or cityclerk@cityofgilroy.org to help ensure that reasonable arrangements can be
made.
If you challenge any planning or land use decision made at this meeting in court, you may be limited to raising
only those issues you or someone else raised at the public hearing held at this meeting, or in written
correspondence delivered to the City Council at, or prior to, the public hearing. Please take notice that the time
within which to seek judicial review of any final administrative determination reached at this meeting is governed
by Section 1094.6 of the California Code of Civil Procedure.
A Closed Session may be called during this meeting pursuant to Government Code Section 54956.9 (d)(2) if a
point has been reached where, in the opinion of the legislative body of the City on the advice of its legal counsel,
based on existing facts and circumstances, there is a significant exposure to litigation against the City.
Materials related to an item on this agenda submitted to the City Council after distribution of the agenda packet
are available with the agenda packet on the City website at www.cityofgilroy.org subject to the Staff’s ability to
post the documents before the meeting.
KNOW YOUR RIGHTS UNDER THE GILROY OPEN GOVERNMENT ORDINANCE
Government's duty is to serve the public, reaching its decisions in full view of the
public. Commissions, task forces, councils and other agencies of the City exist to conduct
the people's business. This ordinance assures that deliberations are conducted before the
people and that City operations are open to the people's review.
FOR MORE INFORMATION ON YOUR RIGHTS UNDER THE OPEN GOVERNMENT
ORDINANCE, TO RECEIVE A FREE COPY OF THE ORDINANCE OR TO REPORT A
VIOLATION OF THE ORDINANCE, CONTACT THE OPEN GOVERNMENT COMMISSION
STAFF AT (408) 846-0204.
If you need assistance with translation and would like to speak during public comment,
please contact the City Clerk a minimum of 72 hours prior to the meeting at 408-846-0204 or
e-mail the City Clerk’s Office at cityclerk@cityofgilroy.org.
Si necesita un intérprete durante la junta y gustaría dar un comentario público,
comuníquese con el Secretario de la Ciudad un mínimo de 72 horas antes de la junta al 408-
846-0204 o envíe un correo electrónico a la Oficina del Secretario de la Ciudad
a cityclerk@cityofgilroy.org.
Page 2 of 211
November 2, 2026 | 6:00 PM Page 3 of 7 City Council
Regular Meeting
To access written translation during the meeting, please
scan the QR Code or click this link:
Para acceder a la traducción durante la reunión, por
favor escanee el código QR o haga clic en el enlace:
www.cityofgilroy.org/translate
Choose Language and Click Attend | Seleccione su
lenguaje y haga clic en asistir
Use a headset on your phone for audio or read the
transcript on your device.
Use sus auriculares para escuchar el audio o leer la
transcripción en el dispositivo.
The agenda for this regular meeting is outlined as follows:
1. OPENING
1.1. Call to Order
1.2. Roll Call
1.3. City Clerk's Report on Posting the Agenda
1.4. Pledge of Allegiance
1.5. Invocation
1.6. Orders of the Day
1.7. Employee Introductions
2. PRESENTATIONS TO THE COUNCIL
2.1. Planning Commission Annual Presentation
2.2. PUBLIC COMMENT BY MEMBERS OF THE PUBLIC ON ITEMS NOT ON THE
AGENDA BUT WITHIN THE SUBJECT MATTER JURISDICTION OF THE CITY
COUNCIL
This portion of the meeting is reserved for persons desiring to address the
Council on matters within the Gilroy City Council’s jurisdiction but not on the
agenda. Persons wishing to address the Council are requested to complete a
Speaker’s Card located at the entrances and handed to the City Clerk. Speakers
are limited to 1 to 3 minutes each, varying at the Mayor’s discretion depending
on the number of speakers and length of the agenda. The law does not permit
Council action or extended discussion of any item not on the agenda except
under special circumstances. If Council action is requested, the Council may
place the matter on a future agenda.
Page 3 of 211
November 2, 2026 | 6:00 PM Page 4 of 7 City Council
Regular Meeting
Written comments to address the Council on matters not on this agenda may be
e-mailed to the City Clerk’s Office at publiccomment@cityofgilroy.org or mailed
to the Gilroy City Clerk’s Office at City Hall, 7351 Rosanna Street, Gilroy, CA
95020. Comments received by the City Clerk’s Office by 1:00 pm on the day of a
Council meeting will be distributed to the City Council prior to or at the meeting
and available for public inspection with the agenda packet located in the lobby
of Administration at City Hall, 7351 Rosanna Street, prior to the meeting. Any
correspondence received will be incorporated into the meeting record. Items
received after the 1:00pm deadline will be provided to the City Council as soon
as practicable. Written material provided by public members under this section
of the agenda will be limited to 10 pages in hard copy. An unlimited amount of
material may be provided electronically.
3. REPORTS OF COUNCIL MEMBERS
Council Member Bracco – Santa Clara County Library Joint Powers Authority, Santa Clara
Water Commission, Santa Clara Valley Water Joint Water Resources Committee, SCRWA
Council Member Fugazzi – Santa Clara Water Commission (alternate), Silicon Valley
Regional Interoperability Authority Board (alternate), SCRWA, Visit Gilroy California
Welcome Center, VTA Mobility Partnership Committee
Council Member Marques – Gilroy Sister Cities, Santa Clara County Library Joint Powers
Authority (alternate), Santa Clara Valley Habitat Agency Governing Board, Santa Clara
Valley Habitat Agency Implementation Board, SCRWA (alternate)
Council Member Hilton – ABAG, CalTrain Policy Group (alternate), Santa Clara County
Expressway Plan 2040 Advisory Board (alternate), Silicon Valley Clean Energy Authority JPA
Board, South County Youth Task Force Policy Team, VTA Policy Advisory Committee
Council Member Ramirez – ABAG (alternate), Gilroy Gardens Board of Directors
(alternate), Cities Association of Santa Clara County, Gilroy Youth Task Force (alternate),
Santa Clara Valley Habitat Agency Governing Board, Santa Clara Valley Habitat Agency
Implementation Board, SCRWA, Santa Clara Housing and Community Development
Advisory Committee
Council Member Cline – CalTrain Policy Group (alternate), Gilroy Sister Cities (alternate),
Gilroy Youth Task Force, Santa Clara County Expressway Plan 2040 Advisory Board, Silicon
Valley Clean Energy Authority JPA Board (alternate), Silicon Valley Regional Interoperability
Authority Board, Visit Gilroy California Welcome Center (alternate), VTA Mobility Partnership
Committee, VTA Policy Advisory Committee (alternate)
Mayor Bozzo – Gilroy Gardens Board of Directors, Santa Clara Valley Water Joint Water
Resources Committee, South County Youth Task Force Policy Team, VTA Board of
Directors (alternate), Santa Clara Housing and Community Development Advisory
Committee (alternate), Cities Association of Santa Clara County (alternate)
4. CONSENT CALENDAR
Page 4 of 211
November 2, 2026 | 6:00 PM Page 5 of 7 City Council
Regular Meeting
All matters listed under the Consent Calendar are considered by the City Council to be
routine and will be enacted by one motion. There will be no separate discussion of these
items unless a request is made by a member of the City Council or a member of the public.
Any person desiring to speak on any item on the consent calendar should ask to have that
item removed from the consent calendar prior to the time the City Council votes to approve. If
removed, the item will be discussed in the order in which it appears.
4.1. Approve the October 10, 2026 Coffee with the Mayor and the October 19, City
Council Regular Meeting Minutes
4.2. Approve the Sole-Source Purchase of Water Meters and Transmitters from
Aqua-Metric Sales Company for an Amount Not-to-Exceed $400,000
4.3. Receive Report Regarding Upcoming 2027 Board and Commission Vacancies
per Maddy Act
4.4. Adopt a Resolution to Change the Water Supply Shortage from Level 2 to Level
0
4.5. Adopt a Resolution for the Interim City Attorney Appointment and Approve a
Legal Services Agreement with Burke, Williams & Sorensen, LLP
4.6. Claim of Kenneth Michael Ellis (The City Administrator recommends a "yes"
vote under the Consent Calendar shall constitute denial of the claim)
4.7. Claim of Michelle Fullerton (The City Administrator recommends a "yes" vote
under the Consent Calendar shall constitute denial of the claim)
5. PUBLIC HEARINGS
5.1. Ordinance Amending Article II Chapter 16A of the Gilroy Municipal Code
regarding Mobile Vending
1. Staff Report:
Raissa de la Rosa, Economic Development Director
2. Open Public Hearing
3. Close Public Hearing
4. Recommended Action:
1. Direct the City Clerk to read the ordinance by title only and waiving
further reading; and
2. Introduce an ordinance amending Article II, Chapter 16A, combining
§§16A.13–15 into a new §16A.13 establishing permanent mobile
vending regulations and consolidating permit procedures, prohibited
locations, and operational standards.
5.2. Introduce an Ordinance Amending Municipal Code Chapter 27, Water, Article
VI (Water Supply Shortage Regulations), and Chapter 30, Zoning Ordinance,
Page 5 of 211
November 2, 2026 | 6:00 PM Page 6 of 7 City Council
Regular Meeting
Article XXXVIII (Landscaping, Water Efficiency, and Storm Water Retention and
Treatment) to Prohibit the Use of Potable Water for Irrigating Nonfunctional Turf,
as Required by Assembly Bill 1572
1. Staff Report:
Derek Cray, Utilities Director
2. Open Public Hearing
3. Close Public Hearing
4. Recommended Action:
1. Motion to read the ordinance by title only and waive further reading of
the ordinance; and
2. Introduce the ordinance amending Municipal Code Chapter 27 ,
Water, Article VI (Water Supply Shortage Regulations), and Chapter
30 , Zoning Ordinance, Article XXXVIII (Landscaping, Water
Efficiency, and Storm Water Retention and Treatment), to prohibit the
use of potable water for irrigating nonfunctional turf, as required by
Assembly Bill 1572.
5.3. Consider Extending the Urgency Interim Ordinance Imposing a Temporary
Moratorium on the Filing, Acceptance, Processing, and Approval of Applications
and Entitlements for Detention and Custodial Facilities on Private Property and
Public Property to the Extent Permitted by Law, Citywide, for a Period of Ten
(10) Months and Fifteen (15) Days
1. Staff Report:
Sharon Goei, Community Development Director
2. Open Public Hearing
3. Close Public Hearing
4. Recommended Action:
1. Determine that the action is exempt from, the California
Environmental Quality Act (CEQA) pursuant to CEQA Guidelines
Sections 15378, 15060(c)(2), and 15061(b)(3);
2. Direct the City Clerk to read the ordinance extending the Urgency
Interim Ordinance by title only and to waive further reading;
3. Adopt an extension of the Urgency Interim Ordinance No. 2026-10 to
continue the temporary moratorium on the filing, acceptance,
processing, and approval of applications and entitlements for the
establishment, expansion, or change of use of Detention and
Custodial Facilities on private property, and on public property to the
extent permitted by federal and state law, for an additional ten
months and 15 days, through October 4, 2027; and
Page 6 of 211
November 2, 2026 | 6:00 PM Page 7 of 7 City Council
Regular Meeting
4. Review, approve, and issue the 10-day report as required by
Government Code Section 65858(d) for the extension of the Urgency
Interim Ordinance.
6. UNFINISHED BUSINESS
6.1. Homeless Ad Hoc Committee Update
1. Staff Report:
Matt Morley, City Administrator
2. Public Comment
3. Recommended Action:
Review the work of the Ad Hoc Committee on Homelessness, consider
recommendations, and provide further direction.
6.2. Update on Homeless Encampment at Sixth Street and Camino Arroyo Drive
1. Staff Report:
Matt Morley, City Administrator
2. Public Comment
3. Recommended Action:
Receive an update on the homeless encampment at Sixth Street and
Camino Arroyo Drive and provide input on next steps to staff.
7. CITY ADMINISTRATOR'S REPORTS
8. CITY ATTORNEY'S REPORTS
9. ADJOURNMENT
Page 7 of 211
October 10, 2026 | 9:30 AM Page 1 of 1 City Council
Minutes
City of Gilroy
City Council
DRAFT
Minutes
Saturday, October 10, 2026 | 9:30 AM
1. OPENING
1. Call to Order
The meeting was called to order by Mayor Bozzo at 9:33 AM.
Attendance Attendee Name
Present Council Member Dion Bracco
Council Member Tom Cline
Council Member Zach Hilton
Council Member Kelly Ramirez
Mayor Greg Bozzo
2. COFFEE WITH THE MAYOR
1. Parks and Recreation Programs
3. ADJOURNMENT
The Coffee with the Mayor event was adjourned at 10:33 AM.
I HEREBY CERTIFY that the foregoing minutes were duly and regularly adopted at a regular
meeting of the City Council of the City of Gilroy on XXXXXXX, 20XX.
Kim Mancera
City Clerk
Page 8 of 211
October 19, 2026 | 6:00 PM Page 1 of 11 City Council
Minutes
City of Gilroy
City Council
DRAFT
Minutes
Monday, October 19, 2026 | 6:00 PM
1. CLOSED SESSION - 5:00 PM
1. Call to Order
The closed session was called to order by Mayor Bozzo at 5:00 PM.
2. Roll Call
Attendance Attendee Name
Present Council Member Dion Bracco
Council Member Tom Cline
Council Member Terence Fugazzi
Council Member Zach Hilton
Council Member Carol Marques
Council Member Kelly Ramirez
Mayor Greg Bozzo
3. PUBLIC APPOINTMENT / PUBLIC PERFORMANCE EVALUATION
Government Code section 54957(b)(1); Gilroy City Code Section 17A.11(2)
Title: City Attorney
City Attorney Andy Faber announced the closed session items.
City Attorney Faber opened public comment at 5:01 P.M.
With no speakers, City Attorney Faber closed public comment.
Motion
Remain in closed session.
RESULT: Passed
MOVER: None
SECONDER: None
AYES: Council Member Dion Bracco, Council Member Tom Cline, Council
Member Terence Fugazzi, Council Member Zach Hilton, Council
Member Carol Marques, Council Member Kelly Ramirez, Mayor
Greg Bozzo
NAYS: None
ABSENT: None
2. ADJOURN TO OPEN SESSION
Closed session adjourned at 5:43 P.M. There was no reportable action.
3. REGULAR MEETING - 6:00 PM
Page 9 of 211
October 19, 2026 | 6:00 PM Page 2 of 11 City Council
Minutes
1. Call to Order
The meeting was called to order by Mayor Bozzo at 6:04 PM.
2. Roll Call
Attendance Attendee Name
Present Council Member Dion Bracco
Council Member Tom Cline
Council Member Terence Fugazzi
Council Member Zach Hilton
Council Member Carol Marques
Council Member Kelly Ramirez
Mayor Greg Bozzo
3. City Clerk's Report on Posting the Agenda
City Clerk Kim Mancera reported on the Posting of the Agenda.
4. Pledge of Allegiance
Council Member Hilton led the Pledge of Allegiance.
5. Invocation
None.
6. Orders of the Day
7. Employee Introductions
Community Development Director Sharon Goei introduced Housing and Community
Services Manager Anastacia Wyatt.
4. CEREMONIAL ITEMS - Proclamations and Awards
1. United Against Hate Proclamation
Mayor Bozzo presented the Stand United Against Hate Proclamation to Noshaba
Afzal.
2. Recognition of Fire Captain Casey Main
Mayor Bozzo and Chief Fleeup recognized Fire Captain Casey Main with an award
of commendation.
5. PRESENTATIONS TO THE COUNCIL
1. PUBLIC COMMENT BY MEMBERS OF THE PUBLIC ON ITEMS NOT ON THE
AGENDA BUT WITHIN THE SUBJECT MATTER JURISDICTION OF THE CITY
COUNCIL
Mayor Bozzo opened public comment at 6:17 P.M.
Page 10 of 211
October 19, 2026 | 6:00 PM Page 3 of 11 City Council
Minutes
Lauren Howsman requested that the data center moratorium and detention center
items be listed first on the agenda.
Julie Della Maggiora spoke regarding artists being unable to pay rent and requested
support for the La Ofrenda festival.
Alicia questioned why the no-staging ordinance for an ICE detention center failed to
advance.
Julianne Saenz requested transparency, accountability, and representation of the
community.
Gerardo L. requested exploring every legal option to support the community in
opposing an ICE detention center.
Ashley Antonich Sarabia spoke regarding the lack of action on the no-staging
ordinance for an ICE detention center.
Adam Charvez spoke in support of passing a no-staging ordinance for ICE.
Uriel Magdaleno spoke in support of passing a no-staging ordinance for ICE.
Jonathan Gonzales spoke in support of passing a no-staging ordinance for ICE.
Kyle spoke in support of passing a no-staging ordinance for ICE.
Brian Tatsuta (Zoom) spoke in support of passing a no-staging ordinance for ICE.
Catwoman (Zoom) spoke in support of updating the format of the public comment
period.
With no further speakers, Mayor Bozzo closed public comment.
6. REPORTS OF COUNCIL MEMBERS
1. Council Member Bracco – Santa Clara County Library Joint Powers Authority,
Santa Clara Water Commission, Santa Clara Valley Water Joint Water
Resources Committee, SCRWA
Council Member Fugazzi – Santa Clara Water Commission (alternate), Silicon
Valley Regional Interoperability Authority Board (alternate), SCRWA, Visit
Gilroy California Welcome Center, VTA Mobility Partnership Committee
Council Member Marques – Gilroy Sister Cities, Santa Clara County Library
Joint Powers Authority (alternate), Santa Clara Valley Habitat Agency
Governing Board, Santa Clara Valley Habitat Agency Implementation Board,
SCRWA (alternate)
Council Member Hilton – ABAG, CalTrain Policy Group (alternate), Santa Clara
Page 11 of 211
October 19, 2026 | 6:00 PM Page 4 of 11 City Council
Minutes
County Expressway Plan 2040 Advisory Board (alternate), Silicon Valley Clean
Energy Authority JPA Board, South County Youth Task Force Policy Team,
VTA Policy Advisory Committee
Council Member Ramirez – ABAG (alternate), Gilroy Gardens Board of
Directors (alternate), Cities Association of Santa Clara County, Gilroy Youth
Task Force (alternate), Santa Clara Valley Habitat Agency Governing Board,
Santa Clara Valley Habitat Agency Implementation Board, SCRWA, Santa
Clara Housing and Community Development Advisory Committee
Council Member Cline – CalTrain Policy Group (alternate), Gilroy Sister Cities
(alternate), Gilroy Youth Task Force, Santa Clara County Expressway Plan
2040 Advisory Board, Silicon Valley Clean Energy Authority JPA Board
(alternate), Silicon Valley Regional Interoperability Authority Board, Visit
Gilroy California Welcome Center (alternate), VTA Mobility Partnership
Committee, VTA Policy Advisory Committee (alternate)
Mayor Bozzo – Gilroy Gardens Board of Directors, Santa Clara Valley Water
Joint Water Resources Committee, South County Youth Task Force Policy
Team, VTA Board of Directors (alternate), Santa Clara Housing and
Community Development Advisory Committee (alternate), Cities Association
of Santa Clara County (alternate)
Council Member Bracco - No report.
Council Member Fugazzi - Reported on Coffee with the Mayor.
Council Member Marques - No report.
Council Member Hilton - Reported on the La Ofrenda Festival.
Council Member Ramirez - Reported on Cities Association of Santa Clara County
Meeting.
Council Member Cline - No report.
Mayor Bozzo - Reported on a Valley Transportation Authority special session, a
ribbon cutting at Birria Coalcoman and the Ag Advisory Committee.
7. CONSENT CALENDAR
Council Member Fugazzi pulled items 7.3, 7.8, and 7.9.
Council Member Marques pulled items 7.6 and 7.7.
Mayor Bozzo opened public comment at 6:46 P.M.
With no speakers, Mayor Bozzo closed public comment.
Page 12 of 211
October 19, 2026 | 6:00 PM Page 5 of 11 City Council
Minutes
Motion
Approve consent calendar items 7.1, 7.2, 7.4, and 7.5
RESULT: Passed
MOVER: Council Member Tom Cline
SECONDER: Council Member Zach Hilton
AYES: Council Member Dion Bracco, Council Member Tom Cline, Council
Member Terence Fugazzi, Council Member Zach Hilton, Council Member
Carol Marques, Council Member Kelly Ramirez, Mayor Greg Bozzo
NAYS: None
ABSENT: None
1. Approved the October 5, 2026 City Council Regular Meeting Minutes
2. Approve an Amendment for a One-Year Extension Option to Swimming Swan
LLC in the Amount of $274,662 to serve as the Christopher High School
Aquatics Center Operator in 2027
4. Approve Notice of Acceptance of Completion and Reduction of the Faithful
Performance and Payment Bonds for Property Improvement Agreement No.
2023-02, Heritage Tract 10594
5. Approve Notice of Acceptance of Completion and Reduction of the Faithful
Performance and Payment Bonds for Property Improvement Agreement No.
2023-03, Glen Loma Ranch McCutchin Creek Palomino Development, Tract
10472
7. ITEMS PULLED FOR DISCUSSION
3. Adopt a resolution to Amend the FY 2026-2027 Budget for Community
Facilities District (CFD) Fund (Fund 260) Increasing Appropriations in the
Amount of $123,222, and Approve a First Amendment to the Agreement with
Silicon Valley Paving, Inc. for the Precast Concrete Fence Replacement
Project (No. 801240)
Public Works Director John Doughty provided a report.
Motion
Approve consent calender item 7.3
RESULT: Passed
MOVER: Council Member Terence Fugazzi
SECONDER: Council Member Zach Hilton
AYES: Council Member Dion Bracco, Council Member Tom Cline, Council
Member Terence Fugazzi, Council Member Zach Hilton, Council
Member Carol Marques, Council Member Kelly Ramirez, Mayor
Greg Bozzo
NAYS: None
ABSENT: None
Page 13 of 211
October 19, 2026 | 6:00 PM Page 6 of 11 City Council
Minutes
6. Approve An Amendment To The Agreement With Youth Alliance For The
South County Youth Task Force School-Based Youth Services Through June
30, 2027, And Increase The Contract Funding By $74,499.48, From The
Original $130,105.14 To A Revised Not-To-Exceed Amount Of $204,604.62
Police Chief Brandon Sanchez provided a report on items 7.6 and 7.7.
Motion
Approve consent calendar items 7.6 and 7.7
RESULT: Passed
MOVER: Council Member Carol Marques
SECONDER: Council Member Kelly Ramirez
AYES: Council Member Dion Bracco, Council Member Tom Cline, Council
Member Terence Fugazzi, Council Member Zach Hilton, Council
Member Carol Marques, Council Member Kelly Ramirez, Mayor
Greg Bozzo
NAYS: None
ABSENT: None
7. Approve an Addendum to the Agreement with Catholic Charities of Santa
Clara County for South County Youth Task Force Community-Based Youth
Services Through June 30, 2027, Expand Late-Night Gym Programming, and
Increase the Contract Amount to a Not-to-Exceed $220,654
8. Annual Review and Adoption of the City's Investment Policy
Finance Director Cindy Murphy provided a report.
Motion
Approve consent calendar item 7.8
RESULT: Passed
MOVER: Council Member Tom Cline
SECONDER: Council Member Dion Bracco
AYES: Council Member Dion Bracco, Council Member Tom Cline, Council
Member Terence Fugazzi, Council Member Zach Hilton, Council
Member Carol Marques, Council Member Kelly Ramirez, Mayor
Greg Bozzo
NAYS: None
ABSENT: None
9. Resolution Authorizing the City Administrator to Execute the Donation
Acceptance Agreement for Rehabilitation of Two Parking Lots within Las
Animas Veterans Park
Public Works Director John Doughty provided a report.
Motion
Approve consent calendar item 7.9
RESULT: Passed
Page 14 of 211
October 19, 2026 | 6:00 PM Page 7 of 11 City Council
Minutes
MOVER: Council Member Zach Hilton
SECONDER: Council Member Terence Fugazzi
AYES: Council Member Dion Bracco, Council Member Tom Cline, Council
Member Terence Fugazzi, Council Member Zach Hilton, Council
Member Carol Marques, Council Member Kelly Ramirez, Mayor
Greg Bozzo
NAYS: None
ABSENT: None
8. PUBLIC HEARINGS
Council Member Bracco left the meeting at 7:15 P.M.
1. Ordinance Amending Article II Chapter 16A of the Gilroy Municipal Code
regarding Mobile Vending
Economic Development Director Raissa de la Rosa provided a report and
presentation.
Mayor Bozzo opened public comment at 7:28 P.M.
With no speakers, Mayor Bozzo closed public comment.
Motion
Continue item 8.1 to a date certain, November 2, 2026 Regular City Council
Meeting.
RESULT: Passed
MOVER: Mayor Greg Bozzo
SECONDER: Council Member Zach Hilton
AYES: Council Member Tom Cline, Council Member Terence Fugazzi,
Council Member Zach Hilton, Council Member Carol Marques,
Council Member Kelly Ramirez, Mayor Greg Bozzo
NAYS: None
ABSENT: Council Member Dion Bracco
2. Consider Extending the Urgency Interim Ordinance of a Temporary
Moratorium on the Acceptance, Processing, and Approval of Applications and
Entitlements for New Data Center Facilities Citywide, for a Period of Ten (10)
Months and Fifteen (15) Days
Community Development Director Sharon Goei provided a report.
Mayor Bozzo opened public comment at 7:41 P.M.
Lauren Howsman spoke in support of the moratorium.
Armando Benavides spoke in support of the moratorium.
Landon Sepulveda spoke in support of the moratorium.
Page 15 of 211
October 19, 2026 | 6:00 PM Page 8 of 11 City Council
Minutes
Connie Rogers spoke in support of the moratorium.
Justin Sweatt spoke in support of the moratorium.
Linda Berti spoke in support of the moratorium.
Britt Smith spoke in support of the moratorium.
Gondie Chavez spoke in support of the moratorium.
Gina Johnson spoke in support of the moratorium.
Annedore Kushner spoke in support of the moratorium.
Dianne Eidson spoke in support of the moratorium.
Gerardo L. spoke in support of the moratorium.
Karina Cruz spoke in support of the moratorium.
Dashiell Leeds (Zoom) spoke in support of the moratorium.
Noah (Zoom) spoke in support of the moratorium.
Brian Tatsuta (Zoom) spoke in support of the moratorium.
With no further speakers, Mayor Bozzo closed public comment.
Motion
Determine the action is exempt from environmental review under the California
Environmental Quality Act (CEQA) pursuant to Section 15061(b)(3) of the CEQA
Guidelines.
RESULT: Passed
MOVER: Council Member Tom Cline
SECONDER: Council Member Kelly Ramirez
AYES: Council Member Tom Cline, Council Member Terence Fugazzi,
Council Member Zach Hilton, Council Member Carol Marques,
Council Member Kelly Ramirez, Mayor Greg Bozzo
NAYS: None
ABSENT: Council Member Dion Bracco
Motion
Direct the City Clerk to read the ordinance extending the Urgency Interim Ordinance
by title only and to waive further reading.
RESULT: Passed
MOVER: Council Member Carol Marques
Page 16 of 211
October 19, 2026 | 6:00 PM Page 9 of 11 City Council
Minutes
SECONDER: Council Member Tom Cline
AYES: Council Member Tom Cline, Council Member Terence Fugazzi,
Council Member Zach Hilton, Council Member Carol Marques,
Council Member Kelly Ramirez, Mayor Greg Bozzo
NAYS: None
ABSENT: Council Member Dion Bracco
Motion
Adopt an extension of the Urgency Interim Ordinance to prohibit the acceptance,
processing, and approval of applications and entitlements for new Data Center
facilities, for an additional ten months and 15 days, with the associated findings.
RESULT: Passed
MOVER: Council Member Zach Hilton
SECONDER: Council Member Kelly Ramirez
AYES: Council Member Tom Cline, Council Member Terence Fugazzi,
Council Member Zach Hilton, Council Member Carol Marques,
Council Member Kelly Ramirez, Mayor Greg Bozzo
NAYS: None
ABSENT: Council Member Dion Bracco
Motion
Review, approve, and issue the 10-day report as required by Government Code
Section 65858(d) for the extension of the Urgency Interim Ordinance.
RESULT: Passed
MOVER: Council Member Zach Hilton
SECONDER: Council Member Tom Cline
AYES: Council Member Tom Cline, Council Member Terence Fugazzi,
Council Member Zach Hilton, Council Member Carol Marques,
Council Member Kelly Ramirez, Mayor Greg Bozzo
NAYS: None
ABSENT: Council Member Dion Bracco
The meeting recessed at 8:10 P.M. and reconvened at 8:28 P.M.
9. INTRODUCTION OF NEW BUSINESS
1. Receive Preliminary Fiscal Year 2025-26 Year-End Financial Report, Approve
the Pension and Other Post-Employment Benefits Section 115 Trust
Contributions and the Capital Infrastructure Reserve Fund Contribution, and
Adopt Resolutions Amending the Budget and Updating the Position Control
List
Finance Director Cindy Murphy provided a report and presentation.
Mayor Bozzo opened public comment at 8:52 P.M.
Page 17 of 211
October 19, 2026 | 6:00 PM Page 10 of 11 City Council
Minutes
With no speakers, Mayor Bozzo closed public comment.
Motion
Receive the preliminary Fiscal Year 2025-26 (FY26) year-end financial report and
approve the Pension and Other Post-Employment Benefits (OPEB) Section 115
Trust contributions, and the Capital Infrastructure Reserve Fund contribution,
pursuant to the Council adopted policies.
RESULT: Passed
MOVER: Council Member Zach Hilton
SECONDER: Council Member Terence Fugazzi
AYES: Council Member Tom Cline, Council Member Terence Fugazzi,
Council Member Zach Hilton, Council Member Carol Marques,
Council Member Kelly Ramirez, Mayor Greg Bozzo
NAYS: None
ABSENT: Council Member Dion Bracco
Motion
Adopt a resolution approving the updated Position Control List for Fiscal Year 2025-
26 (FY26) and Fiscal Year 2026-27 (FY27).
RESULT: Passed
MOVER: Council Member Tom Cline
SECONDER: Council Member Kelly Ramirez
AYES: Council Member Tom Cline, Council Member Terence Fugazzi,
Council Member Zach Hilton, Council Member Carol Marques,
Council Member Kelly Ramirez, Mayor Greg Bozzo
NAYS: None
ABSENT: Council Member Dion Bracco
Motion
Adopt a budget amendment resolution for Fiscal Year 2026-27 (FY27).
RESULT: Passed
MOVER: Council Member Tom Cline
SECONDER: Council Member Kelly Ramirez
AYES: Council Member Tom Cline, Council Member Terence Fugazzi,
Council Member Zach Hilton, Council Member Carol Marques,
Council Member Kelly Ramirez, Mayor Greg Bozzo
NAYS: None
ABSENT: Council Member Dion Bracco
2. Discussion and Direction Regarding Establishing a Legislative Action
Committee (FAIR Memo – Council Member Ramirez)
Assistant City Administrator Harjot Sangha provided a report.
Council provided direction to staff to explore Option 3 – Delegated Authority with
Report-Back to Council: Authorize the Mayor and/or City Administrator to
Page 18 of 211
October 19, 2026 | 6:00 PM Page 11 of 11 City Council
Minutes
communicate City positions on time-sensitive legislation, with a written report to the
Council at its next meeting.
3. Discussion and Direction Regarding a Free Community-Wide Infant Swimming
Resource (ISR) Pilot Program (FAIR Memo – Council Member Ramirez)
Assistant City Administrator Harjot Sangha provided a report.
Mayor Bozzo opened public comment at 9:17 P.M.
Greg Felios spoke in support of a free community-wide Infant Swimming Resource
pilot program.
With no further speakers, Mayor Bozzo closed public comment.
Council provided direction to staff to explore Option 4 – Partnering with Gavilan
College to certify instructors and the cost associated with that.
10. CITY ADMINISTRATOR'S REPORTS
City Administrator Matt Morley provided updates on Camp Hope and Valley Transportation
Authority's Board meeting.
11. CITY ATTORNEY'S REPORTS
City Attorney Andy Faber discussed a CEQA item on the upcoming ballot.
12. ADJOURNMENT
With no additional business before the Council, the meeting was adjourned at 9:34 P.M.
I HEREBY CERTIFY that the foregoing minutes were duly and regularly adopted at a regular
meeting of the City Council of the City of Gilroy on XXXXXXX, 20XX.
Kim Mancera
City Clerk
Page 19 of 211
4.2.
City of Gilroy
STAFF REPORT
Agenda Item Title: Approve the Sole-Source Purchase of Water Meters and
Transmitters from Aqua-Metric Sales Company for an
Amount Not-to-Exceed $400,000
Meeting Date: November 2, 2026
From: Matt Morley, City Administrator
Department: Utilities
Submitted by: Derek Cray, Utilities Director
Prepared by: Tyson Enzweiler, Utilities Operations Manager
STRATEGIC PLAN GOALS: Maintain and Improve City Infrastructure
RECOMMENDATION
1. Approve the sole-source purchase of water meters and transmitters from Aqua-
Metric Sales Company for an amount not to exceed $400,000 for Fiscal Year 27;
and
2. Authorize the City Administrator to approve the purchase and execute any
necessary documents to effect the purchase.
EXECUTIVE SUMMARY
The Utilities Department needs to purchase a large stock of meters to replenish its
current inventory. The meter purchase would allow continued installation of meters for
the Meter Replacement Capital Improvement Project, developer infill, and general
replacement of meters that fail. The current approved budget is $400,000 for meters, so
no new appropriations are needed.
BACKGROUND
The City is nearing completion of the citywide Automated Meter Infrastructure (AMI)
Page 20 of 211
4.2.
project, which replaces aging manual-read and radio-read water meters with meters that
report usage remotely. As of June 2026, more than 95 percent of the City’s 16,005
active meter accounts have been converted to AMI technology. Utilities staff are
completing this project in-house with an estimated completion date of December 2027.
Additionally, the City needs meter stock for developer infill projects. Staff estimates that
150 meters will be needed by the end of the fiscal year to support development.
Developers ultimately pay the City for the meters once they request a meter to be set.
This mechanism allows the City to maintain control of the meter to ensure all items are
finalized by the developer before the City releases the meter to be set.
Lastly, the City keeps a stock of meters for normal replacement when meters fail. This
stock allows for rapid replacement when a meter fails.
ANALYSIS
The current standard meter and supporting infrastructure are Sensus-brand meters.
These meters transmit real-time usage data remotely via Automated Metering
Infrastructure (AMI) technology. AMI technology improves leak detection, increases
billing accuracy, enhances customer service, and reduces staff time required for meter
reading. The meters have a twenty-year battery warranty and provide high-accuracy
results at high and low flow ranges.
Currently, Aqua-Metrics is the sole distributor of Sensus meters within the City's
territory. Staff recommends purchasing the meters and transmitters from Aqua-Metric
Sales Company as a sole-source procurement method to ensure continued
compatibility with the City's existing network and software.
ALTERNATIVES
The Council could not approve the purchase. This alternative is not recommended, as
the meters are needed to support the CIP project, developer requests, and general
meter replacements.
FISCAL IMPACT/FUNDING SOURCE
The FY 2027 budget includes $400,000 in the Water Fund (Fund 705) for meter
purchases. Staff will use these funds to make the appropriate purchases. Staff will
coordinate any future purchases with the next approved two-year fiscal budget.
PUBLIC OUTREACH
Page 21 of 211
4.2.
N/A
NEXT STEPS
Upon Council approval, staff will purchase the meters and transmitters and continue
implementation of the AMI program.
Attachments:
None
Page 22 of 211
4.3.
City of Gilroy
STAFF REPORT
Agenda Item Title: Receive Report Regarding Upcoming 2027 Board and
Commission Vacancies per Maddy Act
Meeting Date: November 2, 2026
From: Kim Mancera, City Clerk
Department: Administration
Submitted by: Kim Mancera, City Clerk
Prepared by: Kim Mancera, City Clerk
STRATEGIC PLAN GOALS:
RECOMMENDATION
Accept report.
EXECUTIVE SUMMARY
BACKGROUND
California Government Code Section 54972 (Maddy Act) requires that on or before
December 31st of each year, each legislative body shall prepare an appointments list of
all regular and ongoing boards, commissions, and committees which are appointed by
the legislative body of the local agency. This list is compiled by the City Clerk and is
posted on the City’s website and outside of City Hall Chambers.
ANALYSIS
The attached "Local Appointments List" highlights the Boards and Commissions whose
terms expire in 2027. The Arts and Culture Commission will have 4 members, the
Building Board of Appeals will have 3 members, the Library Commission will have 3
members, the Open Government Commission will have 2 members, the Parks and
Page 23 of 211
4.3.
Recreation Commission will have 3 members, the Personnel Commission will have 2
members, the Physically Challenged Board of Appeals will have 3 members, and the
Planning Commission will have 4 members whose terms expire on December 31, 2027.
Additionally, the Youth Commission will have 6 members whose terms expire on June
30, 2027.
ALTERNATIVES
Not Applicable.
FISCAL IMPACT/FUNDING SOURCE
None. The task is accommodated within existing resources and is an annual workplan
within the City Clerk's office, which is funded by the General Fund.
PUBLIC OUTREACH
This report serves to inform the public of the upcoming board, commission, and
committee vacancies.
NEXT STEPS
Attachments:
1. Maddy Act Terms Ending 2027
Page 24 of 211
Published per California GC Section 54970 | Updated October 14, 2026
LOCAL APPOINTMENTS LIST OF BOARD / COMMISSION
TERMS EXPIRING IN 2027
NECESSARY QUALIFICATIONS FOR ALL BOARDS AND COMMISSIONS:
Must be a qualified registered Elector of the City of Gilroy (except Youth Commission)
PROPOSED APPOINTMENT DATE FOR TERMS EXPIRING December 31, 2027:
(except Youth Commission, which expires June 2027)
ARTS AND CULTURE COMMISSION | 4-Year Terms
Seven (7) Member Body Commission. Regular Meetings are held 2nd Tuesday of each month at 6:30 p.m.
Commissioner Term Start Term Expires
Ruben Dario Villa 01/09/2023 12/31/2027
Subul Siddiqui 03/16/2026 12/31/2027
Meena Vijaykar 06/01/2026 12/31/2027
Rabia Shahid 06/02/2026 12/31/2027
BUILDING BOARD OF APPEALS | 4-Year Terms
Five (5) Member Body Board. Regular Meetings are held when necessary. The Board comprises four persons qualified
by experience and training, and one public member.
Commissioner Term Start Term Expires
Zhuoyuan Zhang 01/23/2023 12/31/2027
Ronald Robinson Jr. 01/09/2023 12/31/2027
Vacant 12/31/2027
LIBRARY COMMISSION | 4-Year Terms
Five (5) Member Commission. Regular Meetings are held on the 2nd Wednesday of each month at 7:00 p.m.
Commissioner Term Start Term Expires
Saeid Nooshabadi 02/07/2022 12/31/2027
Joseph Coughlan 01/26/2026 12/31/2027
Christina Tovar 01/26/2026 12/31/2027
OPEN GOVERNMENT COMMISSION | 4-Year Terms
Five (5) Member Commission. Regular Meetings are held quarterly on the second Thursday of the month at 6:00 p.m.
Commissioner Term Start Term Expires
Shayne Somavia 01/09/2023 12/31/2027
Diana Sanchez Bentz 01/07/2019 12/31/2027
PARKS AND RECREATION COMMISSION | 4-Year Terms
Seven (7) Member Commission. Regular Meetings are held on the 3rd Tuesday of each month at 6:00 p.m.
Commissioner Term Start Term Expires
Luis Ramirez 01/09/2023 12/31/2027
Salvatore Bozzo 01/08/2024 12/31/2027
Greg Felios 01/26/2026 12/31/2027
PERSONNEL COMMISSION | 4-Year Terms
Five (5) Member Commission. Regular Meetings are held on the 4th Monday of each month at 5:30 p.m.
Commissioner Term Start Term Expires
Marissa Haro 02/07/2022 12/31/2027
Nita Edde-Mitchell 01/18/2018 12/31/2027
PHYSICALLY CHALLENGED BOARD OF APPEALS | 4-Year Terms
Five (5) Member Board. Regular Meetings are held when necessary at 10:00 a.m.
Board Member Term Start Term Expires
Vacant 12/31/2027
Vacant 12/31/2027
Vacant 12/31/2027
PLANNING COMMISSION | 4-Year Terms
Seven (7) Member Commission. Regular Meetings are held on the 1st Thursday of each month at 6:00 p.m.
Commissioner Term Start Term Expires
Manny Bhandal 01/09/2023 12/31/2027
Patricia Bentson 02/03/2025 12/31/2027
Stefanie Elle 09/20/2021 12/31/2027
Monica Valdez 01/08/2024 12/31/2027
YOUTH COMMISSION | 2-Year Terms
11-Member Commission. Regular Meetings are held on the 2nd Monday of each month of the school year at 6:00 p.m.
Commissioner Term Start Term Expires
Biruh Abaneh 01/08/2024 06/30/2027
Diana Diakova 08/04/2025 06/30/2027
Alazander Cruz Bermudez 08/04/2025 06/30/2027
Logan Gill 08/04/2025 06/30/2027
Ashleen Bhandal 08/04/2025 06/30/2027
Sophia Gutierrez 08/04/2025 06/30/2027
Page 25 of 211
4.4.
City of Gilroy
STAFF REPORT
Agenda Item Title: Adopt a Resolution to Change the Water Supply Shortage
from Level 2 to Level 0
Meeting Date: November 2, 2026
From: Matt Morley, City Administrator
Department: Utilities
Submitted by: Derek Cray, Utilities Director
Prepared by: Izabela Cirloganu, Sr. Management Analyst
STRATEGIC PLAN GOALS: Maintain and Improve City Infrastructure
RECOMMENDATION
Adopt a Resolution declaring Level 0 Water Supply Shortage conditions pursuant to
Chapter 27, Article VI, of the Gilroy Municipal Code, and keep all permanent mandatory
water conservation measures in place.
EXECUTIVE SUMMARY
The current local and State water supply conditions support reducing the City of Gilroy’s
(City) water shortage level from Level 2 to the recommended Level 0.
As of October 13, 2026, Santa Clara Valley is at a 0% drought level index. Additionally,
Valley Water projects no water shortages from July 2026 through June 2027, and the
Llagas Subbasin, Gilroy’s sole water supply source, has fully recovered from the 2020–
2022 drought. Despite these improved conditions, the City has remained at a Level 2
Water Supply Shortage since August 2, 2021, while Valley Water lifted its countywide
water shortage emergency on April 11, 2023.
Further supporting this outlook, the State Water Resources Control Board, in an
October 9, 2026 communication, advised water providers to prepare for possible above-
average rainfall statewide, as a Super El Niño weather event is trending toward
extremely high rainfall within the Santa Clara County region.
Page 26 of 211
4.4.
Based on these findings and current water supply conditions, staff recommends
returning the City to Level 0. This change would not eliminate mandatory permanent
water conservation requirements. Level 0 maintains the permanent mandatory water
conservation measures established under the City’s 2025 Water Shortage Contingency
Plan (WSCP), along with Valley Water’s existing water-waste prohibitions.
BACKGROUND
The City provides potable water to Gilroy’s residents and businesses through its
municipal water distribution system. Gilroy’s primary water supply comes from
groundwater extraction from the Llagas Subbasin. The City also uses recycled water to
offset potable water use through agreements with Valley Water.
In response to two years of drought conditions, the City Council declared a Level 2
Water Supply Shortage on August 2, 2021. This action followed Valley Water’s June
2021 water shortage emergency and its call for a 15% countywide reduction in water
use. Level 2 limits landscape irrigation to two days per week from April to October and
one day per week from November to March, along with other Level 2 measures
imposed by the 2020 Water Shortage Contingency Plan, which was in effect at the time.
As of early 2023, water supply conditions had improved significantly, and in response,
the State and regional agencies have updated their drought response actions as
follows:
• On March 24, 2023, Governor Newsom issued Executive Order N-5-23,
removing key water conservation mandates, including the requirement that
agencies implement the Level 2 Water Shortage Contingency Plan.
• On April 11, 2023, the Valley Water Board of Directors (Board) voted to rescind
its Water Shortage Emergency Condition. At the same time, the Board voted to
maintain a 15% voluntary conservation requirement and a two-day limit on
residential nonfunctional turf irrigation.
Although the State and Valley Water eased drought-related restrictions in 2023, the City
of Gilroy has remained at Level 2 since August 2021.
ANALYSIS
Staff’s recommendation to return to Level 0 is based on the following data points:
current water supply conditions, improving and stable groundwater levels, long-term
water supply projections, and actions taken by Valley Water and neighboring water
agencies.
Valley Water's 2026 Annual Water Supply and Demand Assessment, submitted to the
Page 27 of 211
4.4.
California Department of Water Resources on June 24, 2026, projects no water
shortage from July 2026 through June 2027. The assessment shows that available
water supplies are sufficient to meet projected demand throughout the year, including
the summer months when water use is highest. The assessment also finds that
groundwater levels in the Llagas Subbasin are stable and that the basin has sustainable
groundwater supply conditions. Valley Water's October 1, 2026, Monthly Water Tracker
projects groundwater storage to remain within the normal range through the end of
2026. Valley Water has assigned a State Standard Shortage Level of 0, indicating
normal water supply conditions.
Returning to Level 0 does not eliminate water conservation requirements. The City's
permanent mandatory conservation measures would remain in effect. These include
restrictions on water waste, washing paved surfaces, watering after rainfall, and other
activities identified in the City's WSCP and Chapter 27 (Article VI) of Gilroy’s Municipal
Code. The City would continue its water conservation outreach and coordinate with
Valley Water on available conservation programs and rebates.
The water supply shortage level should be set based on current and projected future
water supply levels, evaluated regularly, and adjusted accordingly. Staff will continue
monitoring groundwater conditions and annual water supply assessments. If conditions
change and additional conservation measures become necessary, staff will return to the
City Council with a recommendation to adjust the City's water shortage level
accordingly.
Based on these findings and current water supply conditions, staff recommends
returning the City to Level 0 while maintaining the permanent mandatory water
conservation measures established under the City's 2025 WSCP and Valley Water's
existing water-waste prohibitions.
ALTERNATIVES
The City Council may choose not to adopt the resolution and maintain the current Level
2 Water Supply Shortage conditions.
FISCAL IMPACT/FUNDING SOURCE
Returning to Level 0 would remove the additional mandatory water-use restrictions
currently in place under Level 2, which could increase water use and revenue. However,
it's too early to forecast changes, and staff will monitor future water usage.
PUBLIC OUTREACH
Staff will update the City’s website and public communications to inform residents and
businesses of the change and clarify that:
Page 28 of 211
4.4.
1. Permanent mandatory water conservation measures will remain in effect; and
2. Landscape watering days will be recommended, not mandatory, under Level 0
conditions.
Existing water conservation programs, public outreach efforts, and water supply
monitoring activities will continue.
NEXT STEPS
If the City Council adopts the resolution, the City will transition from Level 2 to Level 0
Water Supply Shortage conditions.
Staff will continue to monitor water supply conditions and stay up to date with any
updates from Valley Water and other regulatory agencies. If conditions change and
additional conservation measures become necessary, staff will return to the City Council
with recommendations for appropriate action.
Attachments:
1. Level 0 Resolution_Final
Page 29 of 211
RESOLUTION NO. 2026-XX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF GILROY CHANGING WATER SUPPLY SHORTAGE
CONDITIONS FROM LEVEL 2 TO LEVEL 0
WHEREAS the City of Gilroy (“City”) relies on groundwater managed and recharged by
the Santa Clara Valley Water District (“Valley Water”) for its potable water supply; and
WHEREAS, Chapter 27, Article VI of the Gilroy City Code establishes water supply
shortage levels and associated conservation measures, ranging from Level 0 (Normal
Conditions) to Level 5, pursuant to Section 27.98; and
WHEREAS, on August 2, 2021, the City Council adopted Resolution No. 2021-42
declaring a Level 2 Water Supply Shortage in response to drought conditions and Valley Water’s
June 2021 water shortage emergency; and
WHEREAS, in 2023, Governor Newsom removed the statewide requirement to
implement Level 2 water shortage measures, and Valley Water rescinded its water shortage
emergency declaration on April 11, 2023; and
WHEREAS, Valley Water’s 2026 Annual Water Supply and Demand Assessment
projects sufficient water supplies to meet demand from July 2026 through June 2027, with
no anticipated water shortage or need for additional shortage response measures; and
WHEREAS, much of the State of California is projected to experience above-
average, significant rainfall this winter due to atmospheric conditions causing a Super El
Niño weather event; and
WHEREAS, based on current water supply conditions, groundwater recovery, and long-
term supply projections, City staff recommends returning to Level 0 (Normal Conditions); and
WHEREAS, Level 0 maintains permanent mandatory water conservation measures
under the Gilroy Municipal Code and the City’s 2025 Water Shortage Contingency Plan.
NOW, THEREFORE, BE IT RESOLVED.
1. The Level 2 Water Supply Shortage declaration established by Resolution No. 2021-42 no
longer exists.
2. The City hereby declares Level 0 (Normal Conditions) pursuant to Section 27.98 of the
Gilroy Municipal Code.
3. All permanent mandatory water conservation measures established under Chapter 27 of the
Gilroy’s Municipal Code and the City’s 2025 Water Shortage Contingency Plan shall remain in
effect.
Page 30 of 211
Resolution No. 2026-XX
Changing Level 2 Water Supply Shortage; Declaring Level 0
City Council Regular Meeting | November 2nd, 2026
Page 2 of 3
4. This Resolution shall take effect immediately upon adoption.
PASSED AND ADOPTED this XX day of MONTH 2025 by the following roll call vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
APPROVED:
___________________
Greg Bozzo, Mayor
ATTEST:
_______________________
Kim Mancera, City Clerk
Page 31 of 211
Resolution No. 2026-XX
Changing Level 2 Water Supply Shortage; Declaring Level 0
City Council Regular Meeting | November 2nd, 2026
Page 3 of 3
CERTIFICATE OF THE CLERK
I, KIM MANCERA, City Clerk of the City of Gilroy, do hereby certify that the attached
Resolution No. 2026-XX is an original resolution, or true and correct copy of a City Resolution,
duly adopted by the Council of the City of Gilroy at a Regular Meeting of said Council held on
Monday, Date, with a quorum present.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the Official Seal of
the City of Gilroy this Tuesday, XXXXX
____________________________________
Kim Mancera
City Clerk of the City of Gilroy
Page 32 of 211
4.5.
City of Gilroy
STAFF REPORT
Agenda Item Title: Adopt a Resolution for the Interim City Attorney Appointment
and Approve a Legal Services Agreement with Burke,
Williams & Sorensen, LLP
Meeting Date: November 2, 2026
From: Matt Morley, City Administrator
Department: Administration
Submitted by: Matt Morley, City Administrator
Prepared by: Harjot Sangha, Assistant City Administrator
STRATEGIC PLAN GOALS:
RECOMMENDATION
1. Adopt a resolution appointing Donald A. Larkin of Burke, Williams & Sorensen,
LLP as Interim City Attorney.
2. Approve the Consultant Agreement for Legal Services with Burke, Williams &
Sorensen, LLP and authorize the City Administrator to execute it.
EXECUTIVE SUMMARY
City Attorney Andrew L. Faber of Berliner Cohen LLP is retiring after more than 30
years of service. To maintain uninterrupted legal services, staff recommends that the
City Council appoint Donald A. Larkin of Burke, Williams & Sorensen, LLP (BWS) as
Interim City Attorney and approve an hourly agreement with BWS through June 30,
2027. The interim arrangement provides the City with an experienced municipal
attorney while the City Council considers the long-term structure of City Attorney
services. In the interim, Berliner Cohen will continue to provide Assistant City Attorney
support, including Planning Commission coverage, and will retain specified pending
matters identified in a transition memorandum.
Page 33 of 211
4.5.
BACKGROUND
Berliner Cohen LLP has provided City Attorney services to the City under contract since
1991. The current contract is the Amended and Restated Agreement for Legal Services
effective July 1, 1999, amended in 2015 (hourly rate) and 2017 (naming Mr. Faber as
City Attorney upon Linda Callon’s retirement).
Under Section 801 of the City Charter, the City Attorney is an officer of the City
appointed by, and serving at the pleasure of, the City Council.
ANALYSIS
Mr. Larkin is a partner in BWS’s Public Law practice group with more than 25 years of
experience representing public agencies, including as Morgan Hill’s City Attorney from
2016 to 2025 and then as its Interim City Attorney through BWS under a similar
arrangement.
The proposed agreement is BWS’s standard public-agency legal services agreement,
reviewed by the outgoing City Attorney. The term runs through June 30, 2027; any
extension requires Council approval, and the Council’s Charter authority to appoint or
remove the City Attorney is preserved. Mr. Larkin may not be substituted without
Council consent. In the interim, Berliner Cohen will continue as Assistant City Attorney
for the Planning Commission and retain pending matters identified in the transition.
Either party may terminate on 30 days’ notice.
ALTERNATIVES
1. Do not approve the appointment. Not recommended; the City would have no
designated City Attorney upon Mr. Faber’s retirement.
2. Direct staff to solicit proposals for permanent City Attorney services now; an
interim appointment is still needed for continuity during any solicitation.
FISCAL IMPACT/FUNDING SOURCE
Services are billed hourly at $360 (partners), $285 (associates), $175 (paralegals), and
$425/$350 for litigation designated by the City Administrator. The City primarily funds
City Attorney services through the General Fund (100).
PUBLIC OUTREACH
Page 34 of 211
4.5.
This item is included on the publicly posted agenda for this meeting.
NEXT STEPS
Mr. Larkin will assume the role effective November 16, 2026. Staff will return in early
2027 to discuss the long-term structure of City Attorney services.
Attachments:
1. Resolution
2. Standard Consultant Agreement-Attorney--BWS and Gilroy
Page 35 of 211
RESOLUTION NO. 2026-XX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF GILROY APPOINTING DONALD A. LARKIN AS
INTERIM CITY ATTORNEY AND APPROVING A
CONSULTANT AGREEMENT FOR LEGAL SERVICES
WITH BURKE, WILLIAMS & SORENSEN, LLP
WHEREAS, City Attorney services have been performed for the City of Gilroy (“City”) by
Berliner Cohen LLP (“Berliner Cohen”) since 1991 under the Amended and Restated Agreement for Legal
Services effective July 1, 1999, as amended; and
WHEREAS, Andrew L. Faber, Esq., a partner in Berliner Cohen, has served the City as City
Attorney since 2017 and has recently announced his upcoming retirement; and
WHEREAS, Section 801 of the City Charter provides that the City Attorney is an officer of the
City appointed by and serving at the pleasure of the City Council; and
WHEREAS, Donald A. Larkin, Esq., a partner in Burke, Williams & Sorensen, LLP (“BWS”),
has more than 25 years of experience representing public agencies, including service as City Attorney and
Interim City Attorney for the City of Morgan Hill, and BWS and Mr. Larkin have agreed to accept
appointment as Interim City Attorney; and
WHEREAS, the City and BWS have negotiated a Consultant Agreement for Legal Services (the
“Agreement”) for Interim City Attorney services for a term through June 30, 2027, at the hourly rates set
forth therein; and
WHEREAS, the City Council desires to appoint Mr. Larkin as Interim City Attorney and approve
the Agreement to ensure continuity of legal services while the City Council considers the long-term
structure of City Attorney services.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Gilroy
that:
Section 1. The foregoing recitals are true and correct and are incorporated herein by
reference.
Section 2. Effective November 16, 2026 (the “Effective Date”), Andrew L. Faber, Esq.,
shall cease to serve as City Attorney and as an officer of the City. The City Council expresses its
sincere appreciation to Mr. Faber for his dedicated service to the City of Gilroy.
Section 3. Pursuant to Section 801 of the City Charter, the City Council hereby appoints
Donald A. Larkin, Esq., as Interim City Attorney, effective on the Effective Date, to serve as an
officer of the City at the pleasure of the City Council until a successor City Attorney is appointed.
Section 4. The City Council hereby approves the Consultant Agreement for Legal Services
with Burke, Williams & Sorensen, LLP, in substantially the form presented to the City Council,
and authorizes the City Administrator to execute the Agreement and any non-substantive
amendments thereto, in a form approved by the City Administrator.
Section 5. This Resolution shall take effect immediately upon adoption.
PASSED AND ADOPTED by the City Council of the City of Gilroy at a regular
Page 36 of 211
Resolution No. 2026-XX
Interim City Attorney Appointment and Legal Services Agreement
City Council Regular Meeting | November 2, 2026
Page 2 of 2
1
7
3
2
meeting duly held on the 2nd day of November 2026, by the following roll call vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
APPROVED:
Greg Bozzo, Mayor
ATTEST:
_______________________
Kim Mancera, City Clerk
Page 37 of 211
1
July 2020
CONSULTANT AGREEMENT FOR LEGAL SERVICES
BURKE, WILLIAMS, & SORENSEN, LLP
THIS AGREEMENT is made and entered into as of this November 16, 2026, ("Effective
Date"), by and between the CITY OF GILROY, a chartered municipal corporation, ("CITY"), and
Burke, Williams & Sorensen, LLP a limited liability partnership, ("CONSULTANT"). CITY and
CONSULTANT may sometimes be referred to collectively herein as the "Parties" and individually
as a "Party."
RECITALS
The following recitals are a substantive part of this Agreement:
1. This Agreement is entered into pursuant to the authority of the action of the Gilroy City
Council taken on November 2, 2026.
2. CONSULTANT is qualified by virtue of experience, training, education, and expertise to
accomplish these services. Services shall be performed by CONSULTANT in accordance with
professional practices in a manner consistent with a level of care, competence and skill exercised
by qualified members of the CONSULTANT’S profession. By delivery of completed work,
CONSULTANT certifies that the work conforms to the requirements of this Agreement and all
applicable federal, state and local laws.
AGREEMENT
THE PARTIES MUTUALLY AGREE AS FOLLOWS:
1. Term of Agreement. This Agreement shall cover services rendered from the Effective
Date until June 30, 2027, subject to the provisions of Section 3 [Services Previously Rendered]
and the provisions of Section 5.4 [Termination] of this Agreement. Any extension of the term shall
be approved by the City Council. Any such extension shall be in writing and signed by both parties
to this Agreement. Nothing in this Agreement limits the authority of the City Council under the City
Charter to appoint or remove the City Attorney.
2. Services to be Provided. The services to be performed by CONSULTANT shall consist
of the following: General Legal Advice, Counsel and Litigation Services, as needed and requested
by CITY, as outlined in EXHIBIT “C” (Scope of Services). Donald A. Larkin is appointed by the
City Council as Interim City Attorney and will serve as an officer of the City under the Charter;
CONSULTANT and Mr. Larkin accept the appointment; Mr. Larkin will personally perform or
directly supervise the services; CONSULTANT will not substitute the Interim City Attorney without
CITY consent; other BWS attorneys may be assigned as Assistant or Deputy City Attorneys with
the City Administrator’s concurrence.
3. Services Previously Rendered. It is understood and acknowledged by the Parties hereto
that CONSULTANT may have commenced providing the services described in this Agreement to
CITY in anticipation of the full execution of this Agreement by the Parties. CITY agrees to
compensate CONSULTANT pursuant to the terms set forth in this Agreement for those services
previously performed by CONSULTANT that CITY determines are wholly consistent with the
Page 38 of 211
2
July 2020
services that are to be performed and provided by CONSULTANT under this Agreement and that
CITY has accepted and approved.
4. Compliance with Outside Counsel Retention and Billing Policy. CONSULTANT
agrees that it will abide by the Outside Counsel Retention and Billing Policy attached hereto and
incorporated herein as Exhibit "A."
5. Compensation: CONSULTANT shall be compensated as follows:
5.1. Amount. Compensation shall be on an hourly billing rate, which rates are set forth
in Exhibit "B," attached hereto and incorporated herein by reference. No rate
changes shall be made during the term of this agreement without prior written
approval from the CITY.
5.2. Payment. For work under this Agreement, payment shall be made per monthly
invoice. For extra work not a part of this Agreement, written authorization by CITY
will be required. Payment shall be based on hourly rates in Exhibit "B".
5.3. Records of Expenses. CONSULTANT shall keep accurate records of payroll,
travel, and expenses. These records will be made available to CITY.
5.4. Termination. CITY or CONSULTANT shall have the right to terminate this
Agreement, without cause, by giving thirty (30) days' written notice or less under
urgent circumstances. Upon such termination, CONSULTANT shall submit to
CITY an itemized statement of services performed for which compensation has not
been paid. CITY may require CONSULTANT to complete certain work product or
documents and CONSULTANT shall deliver to CITY all documents in its
possession without additional compensation to CONSULTANT. The City
Administrator of CITY is authorized to terminate this AGREEMENT, in whole or in
part, on behalf of CITY. Both parties will cooperate to achieve an orderly transition
and assumption of duties by any succeeding city attorney, and all City files and
property will be returned in good order.
5.5. Non-appropriations. Notwithstanding anything contained in this Agreement to the
contrary, if insufficient funds are appropriated, or funds are otherwise unavailable
in the budget for CITY for any reason whatsoever in any fiscal year, for payments
due under this Agreement, CITY will immediately notify CONSULTANT of such
occurrence, and this Agreement shall terminate after the last day during the fiscal
year for which appropriations shall have been budgeted for CITY or are otherwise
available for payments.
6. Insurance Requirements.
6.1. Commencement of Work. CONSULTANT shall not commence work under this
Agreement until it has obtained CITY approved insurance as outlined below.
Insurance coverages shall remain in full force and effect at all times during the
period covered by this Agreement. Any deductibles or self-insured retentions must
be declared to and approved by CITY. CONSULTANT shall furnish CITY with
copies of all certificates subject to this Agreement, whether new or modified,
promptly upon receipt. In the event of a claim or legal action, CONSULTANT shall
promptly furnish CITY of Gilroy with copies of all policies outlined herein. No policy
Page 39 of 211
3
July 2020
subject to this Agreement shall be canceled or materially changed except after
thirty (30) days' notice by the insurer to CITY by certified mail.
6.1.1 Insurance Types and Amounts. If CONSULTANT maintains broader
coverage or higher limits than the minimums outlined below, the City is entitled to
the broader coverage and higher limits.
a. Commercial general liability. CONSULTANT shall maintain insurance
against claims and liabilities for personal injury, death, or property
damage, providing protection of at least $2,000,000 combined single
limit. Further, CONSULTANT shall provide proof of the following
separate endorsements:
• The CITY, its elected officials, officers, employees, agents and
representatives are named as additional insureds; and,
• the insurer waives the right of subrogation against CITY and
CITY'S elected officials, officers, employees, agents, and
representatives; and,
• insurance shall be primary non-contributing.
b. Automobile liability. CONSULTANT shall maintain insurance covering
all owned, non-owned and hired automobiles against claims and
liabilities for personal injury, death, or property damage, providing
protection of at least $1,000,000 combined single limit.
c. Workers Compensation. CONSULTANT and all subcontractors shall
maintain Workers’ Compensation Insurance, as required by law, with
limit of no less than $1,000,000 per accident of bodily injury or disease.
Further, if the performance of CONSULTANT’s work or service under
this Agreement involves access to or activity on any property or
premises owned or occupied by the CITY, including, but not limited to,
CONSULTANT’s presence during site visits and meetings, then
CONSULTANT shall provide CITY, prior to commencement of work,
with the following separate endorsement:
• The insurer waives the right of subrogation against CITY and
CITY'S elected officials, officers, employees, agents, and
representatives.
d. Professional liability. CONSULTANT shall maintain either a claims-
made or occurrence liability insurance in the minimum amount of
$2,000,000.00 each claim. Further, if CONSULTANT maintains a
claims-made policy, CONSULTANT shall provide written evidence of
such insurance to CITY for at least five (5) years after the completion
of work performed under this Agreement.
6.1.2 Acceptability of Insurers. All insurance required by this Agreement shall be
carried only by responsible insurance companies licensed to do business in
Page 40 of 211
4
July 2020
California. Insurance is to be placed with insurers with a current A.M. Best's rating
of no less than A:VII.
6.1.3 Provision of Agreement to Insurers. CONSULTANT represents and
warrants that they have provided a copy of this Agreement to their respective
insurers, and the insurers are aware of all obligations pertaining to CONSULTANT
as stated in this Agreement.
7. Non-Liability of Officials and Employees of the City. No official or employee of CITY
shall be personally liable for any default or liability under this Agreement.
8. Independent Contractor. It is agreed to that CONSULTANT shall act and be an
independent contractor and not an employee of CITY. CONSULTANT shall be solely responsible
for the performance of its employees, agents or subcontractors under this agreement.
9. Compliance with Law.
9.1 CONSULTANT and its officers, employees, agents, and subcontractors shall
comply with all applicable laws, ordinances, administrative regulations, and
permitting requirements in carrying out their obligations under this Agreement.
CONSULTANT and its officers, employees, agents, and subcontractors covenant
there shall be no discrimination based upon race, color, creed, religion, gender,
marital status, age, sexual orientation, national origin, mental disability, physical
disability, medical condition, or ancestry, in any activity pursuant to this Agreement.
9.2 Compliance with Wage and Hour Laws: Consultant, and any subcontractor it
employs to complete work under this Agreement, shall comply with all applicable
federal, state and local wage and hour laws. Applicable laws may include, but are
not limited to, the Federal Fair Labor Standards Act and the California Labor Code.
Final Judgments, Decisions, and Orders: For purposes of this Section, a “final
judgment, decision, or order” refers to one for which all appeals have been
exhausted or the time to appeal has expired. Relevant investigatory government
agencies include: the federal Department of Labor, the California Division of Labor
Standards Enforcement, or any other governmental entity or division tasked with
the investigation and enforcement of wage and hour laws.
Prior Judgments against CONSULTANT and/or its Subcontractors: BY SIGNING
THIS AGREEMENT, CONSULTANT AFFIRMS THAT IT HAS DISCLOSED ANY
FINAL JUDGMENTS, DECISIONS OR ORDERS FROM A COURT OR
INVESTIGATORY GOVERNMENT AGENCY FINDING – IN THE FIVE (5) YEARS
PRIOR TO EXECUTING THIS AGREEMENT – THAT CONSULTANT OR ITS
SUBCONTRACTOR(S) HAS VIOLATED ANY APPLICABLE WAGE AND HOUR
LAWS. CONSULTANT FURTHER AFFIRMS THAT IT OR ITS
SUBCONTRACTOR(S) HAS SATISFIED AND COMPLIED WITH – OR HAS
REACHED AGREEMENT WITH THE CITY REGARDING THE MANNER IN
WHICH IT WILL SATISFY – ANY SUCH JUDGMENTS, DECISIONS OR
ORDERS.
Judgments or Decisions During Term of Contract: If at any time during the term of
this Agreement, a court or investigatory government agency issues a final
Page 41 of 211
5
July 2020
judgment, decision or order finding that CONSULTANT or an subcontractor it
employs to perform work under this Agreement has violated any applicable wage
and hour law, or CONSULTANT learns of such a judgment, decision, or order that
was not previously disclosed, CONSULTANT shall inform the City Administrator,
no more than fifteen (15) days after the judgment, decision or order becomes final
or of learning of the final judgment, decision or order. CONSULTANT and its
subcontractors shall promptly satisfy and comply with any such judgment,
decision, or order, and shall provide the City Administrator with documentary
evidence of compliance with the final judgment, decision or order within five (5)
days of satisfying the final judgment, decision or order. The CITY reserves the
right to require CONSULTANT to enter into an agreement with the CITY regarding
the manner in which any such final judgment, decision, or order will be satisfied.
City’s Right to Withhold Payment: Where CONSULTANT or any subcontractor it
employs to perform work under this Agreement has been found in violation of any
applicable wage and hour law by a final judgment, decision or order of a court or
government agency, the CITY reserves the right to withhold payment to
CONSULTANT until such judgment, decision or order has been satisfied in full.
Material Breach: Failure to comply with any part of this Section constitutes a
material breach of this Agreement. Such breach may serve as a basis for
immediate termination of this Agreement and/or any other remedies available
under this Agreement and/or law.
Notice to City Related to Wage Theft Prevention: Notice provided to the City
Administrator as required under this Section shall be addressed to: City
Administrator, City of Gilroy, 7351 Rosanna Street, Gilroy, CA 95020. The Notice
provisions of this Section are separate from any other notice provisions in this
Agreement and, accordingly, only notice provided to the above address satisfies
the notice requirements in this Section.
10. Maintenance of Records.
10.1. Maintenance. CONSULTANT shall prepare, maintain, and preserve all reports
and records that may be required by federal, state, and CITY rules and ordinances
related to services provided under this Agreement. CONSULTANT shall maintain
records for a period of at least 3 years after receipt of final payment under this
Agreement. If any litigation, claim, negotiation, audit exception, or other action
relating to this Agreement is pending at the end of the 3-year period, then
CONSULTANT shall retain said records until such action is resolved.
10.2. Access to and Audit of Records. The CITY shall have the right to examine, monitor
and audit all records, documents, conditions, and activities of the CONSULTANT
and its subcontractors related to services under this Agreement. Pursuant to
Government Code Section 8546.7, if this Agreement involves the expenditure of
public funds in excess of $10,000, the Parties to this Agreement may be subject,
at the request of the CITY or as part of any audit of the CITY, to the examination
and audit of the State Auditor pertaining to matters connected with the
performance of this Agreement for a period of three years after final payment under
the Agreement.
Page 42 of 211
6
July 2020
10.3. Ownership of Work Product. All documents or other information developed or
received by CONSULTANT for work performed under this Agreement shall be the
property of CITY. CONSULTANT shall provide CITY with copies of these items
upon demand or upon termination of this Agreement.
10.4. TECHNOLOGY. CONSULTANT uses artificial intelligence tools known as
CoCounsel Legal in the representation of the CITY. The tools do not permit the
vendor (Thomson Reuters) to acquire ownership or control or to use information
for the vendor’s purposes outside the protection of the attorney-client privilege or
the attorney work product doctrine. CONSULTANT continues to maintain control
over CITY’s confidential information during the use of the tools mentioned here.
11. Confidentiality. All data, documents, or other information received by CONSULTANT
from CITY or prepared in connection with CONSULTANT’S services under this Agreement are
deemed confidential and shall not be disclosed to any third party by CONSULTANT without prior
written consent by CITY. The confidentiality obligation shall survive the termination of the
Agreement.
12. Conflict of Interest and Reporting.
12.1. CONSULTANT states that it does not represent clients with adverse interests to
the CITY.
12.2. CONSULTANT shall at all times avoid conflict of interest or appearance of conflict
of interest in performance of this Agreement including, without limitation, complying
with California Government Code section 1090 et seq., the California Political
Reform Act California Government Code section 87100 et seq.) and the
regulations of the Fair Political Practices Commission concerning disclosure and
disqualification ( 2 California Code of Regulations section 18700 et seq.).
12.3. CONSULTANT will further comply and will ensure that its agents and its
subcontractors comply, with California Government Code section 84308 ("Levine
Act") and the applicable regulations of the Fair Political Practices Commission
concerning campaign disclosure (2 California Code of Regulations sections
18438.1 - 18438.8).
13. Notices. All notices shall be personally delivered or mailed, via first-class mail, to the
below-listed addresses. These addresses shall be used for delivery of service of process.
Address of CONSULTANT is as follows:
Burke, Williams & Sorensen, LLP
60 S. Market Street, Suite 1000
San Jose, CA 95113
Address of CITY is as follows:
Page 43 of 211
7
July 2020
City Administrator
City of Gilroy
7351 Rosanna Street
Gilroy, CA 95020
with a copy to:
City Clerk
7351 Rosanna Street
Gilroy, CA 95020
14. Licenses, Permits and Fees. CONSULTANT shall obtain all permits and licenses to the
extent required by ordinances, codes and regulations of the federal, state and local government.
15. Familiarity with Work. By executing this Agreement, CONSULTANT warrants that: (1)
it has investigated the work to be performed, (2) it has the skills, knowledge and experience to
perform this work competently and fulfill all professional and ethical obligation of attorneys at law
in the State of California; and (3) it understands the difficulties, and restrictions of the work under
this Agreement. Should CONSULTANT discover any conditions materially differing from those
inherent in the work or as represented by CITY, it shall immediately inform CITY and shall not
proceed, except at CONSULTANT'S risk, until written instructions are received from CITY.
16. Time of Essence. Time is of the essence in the performance of this Agreement.
17. Limitations Upon Subcontracting and Assignment. Neither this Agreement nor any
portion shall be assigned by CONSULTANT without prior written consent of CITY. Any attempted
assignment not first approved by CITY shall be void and, at CITY's option, shall terminate this
Agreement effective as of the date of such attempted assignment.
18. Authority to Execute. The persons executing this Agreement on behalf of the parties
warrant that they are duly authorized to execute this Agreement.
19. Indemnification. CONSULTANT agrees to protect, defend, and hold harmless CITY and
its elective or appointive boards, officers, agents, and employees from any and all claims,
liabilities, expenses, or damages of any nature, including attorneys' fees, for injury or death of any
person, or damage to property, or interference with use of property, arising out of, or in any way
connected with negligent performance of the Agreement by CONSULTANT, CONSULTANT'S
agents, officers, employees, subcontractors, or independent contractors hired by CONSULTANT.
The only exception to CONSULTANT'S responsibility to protect, defend, and hold
harmless CITY, is due to the sole negligence of CITY. This hold harmless agreement shall apply
to all liability regardless of whether any insurance policies are applicable. The policy limits do not
act as a limitation upon the amount of indemnification to be provided by CONSULTANT.
This Section shall constitute an agreement or contract of indemnity, incorporating the
interpretations under California Civil Code Section 2778. It is expressly understood and agreed
that the obligation of the CONSULTANT to indemnify the CITY and its elective or appointive
boards, officers, agents and employees shall be as broad and inclusive as permitted by the laws
of the State of California and shall survive termination of this Agreement.
20. Entire Agreement; Modification Conflicting Provisions. This Agreement constitutes
the entire agreement between the parties and supersedes any previous agreements, oral or
written. This Agreement may be modified or provisions waived only by subsequent mutual written
agreement executed by CITY and CONSULTANT. If the provisions contained in the main body of
this Agreement conflict with any provision contained in an exhibit to this Agreement, the provisions
Page 44 of 211
8
July 2020
of the main body of this Agreement shall govern and control over any provision contained in an
exhibit to this Agreement.
21. Governing Law and Venue. This Agreement shall be construed in accordance with the
laws of the State of California. This Agreement was entered into and is to be performed in the
County of Santa Clara. Any action or dispute arising out of this Agreement shall only be brought
in Santa Clara County.
22. Interpretation. This Agreement is a negotiated document and shall be deemed to have
been drafted jointly by the Parties, and no rule of construction or interpretation shall apply against
any particular Party based on a contention that the Agreement was drafted by one of the Parties
including, but not limited to, California Civil Code § 1654, the provisions of which are hereby
waived. This Agreement shall be construed and interpreted in a neutral manner.
23. Preservation of Agreement. Should any provision of this Agreement be found invalid or
unenforceable, the decision shall affect only the provision interpreted, and all remaining provisions
shall remain enforceable.
24. Binding Agreement. Notwithstanding the provisions of Section 17 above, this Agreement
shall bind any and all successors in interest, legal representatives and/or other permitted
assignees or transferees of CONSULTANT in the same manner as if those successors in interest,
legal representatives or other permitted assignees or transferees had entered into this Agreement
originally.
IN WITNESS THEREOF, these parties have executed this Agreement on the day and
year shown below.
[TWO SIGNATURES ARE REQUIRED FOR CORPORATIONS: (1) CHAIRPERSON OF THE
BOARD, PRESIDENT, OR VICE PRESIDENT; AND (2) SECRETARY, ASSISTANT
SECRETARY, CHIEF FINANCIAL OFFICER OR ASSISTANT TREASURER.]
ATTEST: THE CITY OF GILROY
Kim Mancera, City Clerk Matt Morley, City Administrator
Date: Date:
BURKE, WILLIAMS & SORENSEN, LLP.
By: John Welsh
Title: Managing Partner
Date:
By:
Title:
Date:
Page 45 of 211
9
July 2020
Page 46 of 211
Exhibit A
10
EXHIBIT A
CITY OF GILROY
OUTSIDE COUNSEL BILLING
Billing Requirements
Retained counsel’s services must be itemized individually and billed monthly. Each
monthly statement must include 1) the name and billing rate of each attorney and paralegal who
worked on the matter; 2) the date each service was performed; 3) a brief description of each
service performed; 4) itemized costs; and 5) subtotal of fees and costs billed for the month and
total for the matter to date.
Retained counsel will be reimbursed customary costs. When authorized, telephone,
photocopy, electronic research and expedited delivery charges may be billed at the actual net
cost to retained counsel or a rate approved in advance by the retaining attorney. Charges for
approved travel will be at coach rates and automobile mileage will be reimbursed at the CITY’s
current rate (reflects IRS).
Costs for the following items will not be reimbursed unless approved in advance by the
City Administrator:
Electronic research (Lexis, Westlaw, etc.)
Word processing and photocopying
Secretarial time
Secretarial and paralegal overtime
Express mail and messenger delivery
Travel time in excess of 3 hours per trip
Bills must be submitted to the attention of the City Administrator, 7351 Rosanna Street,
Gilroy, CA 95020.
Page 47 of 211
Exhibit C
11
EXHIBIT B
HOURLY BILLING RATES
Basic Services: Basic services include providing advice to the Council and staff, maintaining
office hours, overseeing outside counsel, and preparing agendas and attending meetings.
$360—Partners
$285—Associates
$175—Paralegals
Specialized Services: Specialized services include litigation and administrative proceedings.
Specialized Services rates apply only to matters the City Administrator designates in writing as
litigation or adversarial administrative proceedings at the time the matter is opened.
$425—Partners
$350—Associates
Cost Recovery Matters: BWS will charge its current standard private client rates (as opposed to
the public entity client rates provided in this Agreement) for work that is reimbursed by private
parties pursuant to litigation, conditions of approval, pass-through agreements, or other
authorization. Private-client rates apply only where a third-party reimbursement or deposit
agreement is in place for the matter; and if the third party fails to pay, the City’s obligation is
limited to the public-entity rates outlined in Basic Services and Specialized Services above.
Page 48 of 211
Exhibit C
12
EXHIBIT C
SCOPE OF SERVICES
1. DESIGNATION AND APPOINTMENT OF INTERIM CITY ATTORNEY
1.1 Donald A. Larkin, a Partner of CONSULTANT, shall be appointed by the City Council as
Interim City Attorney of the City of Gilroy, effective November 16, 2026, and shall serve
as an officer of CITY pursuant to the City Charter Section 801, at the pleasure of the City
Council. CONSULTANT and Mr. Larkin accept the appointment and agree to faithfully
represent the legal interests of CITY during the term of this Agreement.
1.2 Mr. Larkin shall personally perform or directly supervise all services under this Agreement
and shall be CITY’s primary point of contact for legal matters. CONSULTANT shall not
substitute another attorney as Interim City Attorney without the express consent of the City
Council.
1.3 CONSULTANT may assign other attorneys to serve as Assistant or Deputy City Attorneys
with the prior concurrence of the City Administrator. CONSULTANT shall provide CITY
with a list of assigned attorneys and paralegals and their billing rates under Exhibit “B,”
and shall update the list as assignments change. CONSULTANT shall designate a backup
attorney, approved by the City Administrator, to cover the Interim City Attorney’s planned
absences.
1.4 Transition. CONSULTANT shall coordinate with the outgoing City Attorney (Andy Faber
of Berliner Cohen LLP) to effect an orderly transition. Matters to be retained by Berliner
Cohen, and the Interim City Attorney’s role in overseeing them, shall be identified in a
transition memorandum approved by the City Administrator within thirty (30) days after the
Effective Date.
2. BASIC SERVICES (billed at the Basic Services rates in Exhibit “B”)
2.1 Meetings. Attend in person all regular and special meetings of the City Council, including
closed sessions, unless excused by the Mayor or the City Administrator. Attend meetings
of other boards, commissions, and committees when requested by the City Administrator.
Attend the weekly Council agenda-review and Executive Team meetings.
2.2 Office Hours and Availability. Maintain regular in-person office hours at City Hall on a
schedule agreed upon with the City Administrator, and be available by telephone, email,
and video conference during CITY business hours. Provide an after-hours contact for
urgent matters.
2.3 Legal Advice. Furnish legal advice and opinions to the City Council, City Administrator,
Assistant City Administrator, department heads, and other staff designated by the City
Administrator. CONSULTANT shall acknowledge requests within one (1) business day,
respond to routine requests within five (5) business days or as otherwise agreed with the
requestor, and respond to urgent requests the same business day.
2.4 Agenda and Document Review. Review for legal sufficiency, and approve as to form, all
staff reports, resolutions, ordinances, agreements, and other documents presented for
action by the City Council, or other boards and commissions; prepare or review closed-
session agenda descriptions and reports of action; and participate in agenda-setting and
agenda-review meetings.
Page 49 of 211
Exhibit C
13
2.5 Drafting. Research, prepare, and review ordinances, resolutions, agreements, leases, real
property instruments, memoranda of understanding, notices, findings, decisions, legal
opinions, and other documents pertaining to City business.
2.6 Open Government and Ethics. Advise the City Council and staff on the Ralph M. Brown
Act, the California Public Records Act, the Political Reform Act, Government Code Section
1090, the Levine Act (Government Code Section 84308), Statement of Economic Interests
(Form 700) obligations, and related ethics requirements; review Public Records Act
responses and exemption determinations as requested; and provide AB 1234 ethics and
Brown Act training as requested.
2.7 Council Transition Support. Advise on and support the onboarding of newly elected
Councilmembers, the process for filling any Council vacancy under the City Charter, and
related procedural matters.
2.8 Legislation. Monitor and advise the City Council and staff of state and federal legislation
and case law affecting CITY, and support CITY’s legislative review process as requested.
2.9 Outside and Special Counsel. Advise CITY when special counsel should be retained;
assist in selecting and engaging special counsel; monitor the activities, budgets, and
invoices of special counsel; and report to the City Administrator on the status of matters
handled by special counsel, including matters retained by Berliner Cohen during the
transition.
2.10 Claims and Litigation Management. Coordinate with CITY’s risk-sharing pool and third-
party claims administrator on tort claims; recommend action on claims; and provide
periodic litigation and claims status reports to the City Council in closed session as
requested by the City Administrator.
2.11 Personnel and Labor. Provide day-to-day advice on personnel matters in coordination with
CITY’s labor and employment counsel, if any.
2.12 Land Use and Development. As requested, advise the Community Development
Department and Planning Commission on land use, housing law, the California
Environmental Quality Act, subdivision, development agreements, and conditions of
approval; and review development-related agreements and findings.
2.13 Code Enforcement. Advise on administrative citations, nuisance abatement, cost
recovery, and license and permit enforcement; and advise hearing officers and hearing
bodies in an advisory (non-advocacy) capacity.
2.14 Representation Before Other Agencies. Represent CITY before other public agencies on
legal matters as requested.
2.15 Other Services. Perform such other legal services consistent with the City Charter as may
be requested by the City Council or the City Administrator.
3. SPECIALIZED SERVICES (billed at the Specialized Services rates in Exhibit “B”)
3.1 Specialized Services rates apply only to matters designated in writing by the City
Administrator, at the time the matter is opened, as (a) litigation in any court or arbitral
forum in which CITY, or a CITY officer or employee in an official capacity, is a party; (b)
code enforcement prosecutions; or (c) adversarial administrative proceedings in which
CONSULTANT acts and participates as advocate for CITY (for example, personnel
disciplinary appeals, and proceedings before the Public Employment Relations Board).
Absent such designation, services are Basic Services.
Page 50 of 211
Exhibit C
14
3.2 Litigation services include representation of CITY in the administration and defense of
claims and actions against it that are not accepted for defense by CITY’s risk-sharing pool
or assigned to special counsel; prosecution of actions on behalf of CITY as authorized by
the City Council; and legal proceedings to enforce CITY’s ordinances.
4. REPORTING AND ADMINISTRATION
4.1 With each monthly invoice, provide a summary of fees and costs for the month and for the
term to date, by matter and by category (Basic Services, Specialized Services, and Cost
Recovery).
4.2 Maintain CITY files and records in a manner that permits their prompt transfer to CITY or
to successor counsel, and identify and preserve records subject to litigation holds.
4.3 The Interim City Attorney shall file assuming-office, annual, and leaving-office Statements
of Economic Interests (Form 700) as a designated official under CITY’s Conflict of Interest
Code, and shall complete the ethics (AB 1234), harassment-prevention, and other training
required of CITY officials.
5. RESOURCES PROVIDED BY CITY
5.1 Office space at City Hall during scheduled office hours.
5.2 A CITY email account and network access for the Interim City Attorney and for assigned
attorneys approved by the City Administrator, to be used for CITY business, with CITY
retaining custody of records created in CITY systems; and access to CITY’s agenda
management, records, and other systems as needed to perform the services.
5.3 Access to CITY records, officers, and employees as reasonably necessary to perform the
services.
Page 51 of 211
4.6.
City of Gilroy
STAFF REPORT
Agenda Item Title: Claim of Kenneth Michael Ellis (The City Administrator
recommends a "yes" vote under the Consent Calendar shall
constitute denial of the claim)
Meeting Date: November 2, 2026
From: Matt Morley, City Administrator
Department: Human Resources/Risk Management
Submitted by: Michael Horta, Human Resources Director/Risk Manager.
Prepared by: Michael Horta, Human Resources Director/Risk Manager.
STRATEGIC PLAN GOALS: Not Applicable
RECOMMENDATION
Based on the recommendation from the Municipal Pooling Authority (MPA) and/or legal
counsel, this claim is recommended for rejection.
EXECUTIVE SUMMARY
Based on the recommendation from the Municipal Pooling Authority (MPA) and/or legal
counsel, the following claim is submitted to the City Council for rejection at the
November 2, 2026 meeting:
• Claim of Kenneth Michael Ellis
BACKGROUND
n/a
ANALYSIS
Page 52 of 211
4.6.
n/a
ALTERNATIVES
n/a
FISCAL IMPACT/FUNDING SOURCE
n/a
PUBLIC OUTREACH
n/a
NEXT STEPS
n/a
Attachments:
1. Claim of Kenneth Michael Ellis
Page 53 of 211
Page 54 of 211
Page 55 of 211
Page 56 of 211
Page 57 of 211
Page 58 of 211
Page 59 of 211
Page 60 of 211
Page 61 of 211
4.7.
City of Gilroy
STAFF REPORT
Agenda Item Title: Claim of Michelle Fullerton (The City Administrator
recommends a "yes" vote under the Consent Calendar shall
constitute denial of the claim)
Meeting Date: November 2, 2026
From: Matt Morley, City Administrator
Department: Human Resources/Risk Management
Submitted by: Michael Horta, Human Resources Director/Risk Manager.
Prepared by: Michael Horta, Human Resources Director/Risk Manager.
STRATEGIC PLAN GOALS: Not Applicable
RECOMMENDATION
Based on the recommendation from the Municipal Pooling Authority (MPA) and/or legal
counsel, this claim is recommended for rejection.
EXECUTIVE SUMMARY
Based on the recommendation from the Municipal Pooling Authority (MPA) and/or legal
counsel, the following claim is submitted to the City Council for rejection at the
November 2, 2026 meeting:
• Claim of Michelle Fullerton
BACKGROUND
n/a
ANALYSIS
Page 62 of 211
4.7.
ALTERNATIVES
n/a
FISCAL IMPACT/FUNDING SOURCE
n/a
PUBLIC OUTREACH
n/a
NEXT STEPS
n/a
Attachments:
1. Claim for Michelle Fullerton
Page 63 of 211
Page 64 of 211
Page 65 of 211
5.1.
City of Gilroy
STAFF REPORT
Agenda Item Title: Ordinance Amending Article II Chapter 16A of the Gilroy
Municipal Code regarding Mobile Vending
Meeting Date: November 2, 2026
From: Matt Morley, City Administrator
Department: Economic Development
Submitted by: Raissa de la Rosa, Economic Development Director
Prepared by: Raissa de la Rosa, Economic Development Director
STRATEGIC PLAN GOALS: Promote Economic Development Activities
RECOMMENDATION
1. Direct the City Clerk to read the ordinance by title only and waiving further
reading; and
2. Introduce an ordinance amending Article II, Chapter 16A, combining §§16A.13–
15 into a new §16A.13 establishing permanent mobile vending regulations and
consolidating permit procedures, prohibited locations, and operational standards.
EXECUTIVE SUMMARY
The proposed ordinance amending Article II, Chapter 16A, §§16A.13–15, transitions the
Mobile Vending Pilot Program outlined in Resolution No. 2026-05 to a permanent
regulatory framework. It modernizes and consolidates requirements, integrating existing
pilot provisions into one chapter, establishes the vending zones and no-vending areas,
and streamlines permitting. Adoption will provide consistency, transparency, and
improved management of mobile vending within commercial and public areas.
BACKGROUND
The City launched the Mobile Vending Pilot Program in June 2025 (Resolution 2025-26)
Page 66 of 211
5.1.
to provide a framework to assess feasibility and public response to food trucks in
various city locations, ensure compatibility with nearby land uses and businesses,
evaluate impacts on traffic, parking and pedestrian flow, and support economic activity
and place-making efforts. This resolution was informed by a downtown ad hoc
committee, feedback from downtown businesses, comparative analysis of regional
mobile vending programs, and modern standards.
In January 2026, Council extended the Pilot Program and incorporated enforcement
tools such as permit suspension and revocation (Attachment 1 - Resolution 2026-05).
Section I of Resolution 2026-05 extends the Pilot Program through October 31, 2026, or
until adoption of a revised Mobile Vending Ordinance, whichever comes first. Section I
also allows the City Administrator to extend the Pilot Program pending final action of the
City Council on a revised Mobile Vending Ordinance.
Previous Council direction supports permanently codifying the Pilot Program
regulations.
ANALYSIS
The proposed ordinance establishes §16A.13 as a comprehensive framework that
replaces previously distributed and outdated sections of the Municipal Code. It
consolidates definitions, permit requirements, operational standards, enforcement
mechanisms, and designated vending and no-vending locations into a single chapter for
improved clarity.
A key modernization in the ordinance is the transition of permit authority from the Chief
of Police to the Office of the City Administrator or their designee. Per the current code,
mobile vending permits are to be reviewed and issued by the Police Department, with
applicants required to submit forms, occupant information, and insurance
documentation under §16A.14. This ordinance relocates permitting to an administrative
function, aligning mobile vending with other business-related City approvals and
reducing unnecessary reliance on law enforcement resources. This shift is consistent
with statewide changes in sidewalk and mobile vending laws; State legislation, including
SB 946 (2018) and SB 972 (2022), restricts cities from requiring police-based
registration. These laws emphasize administrative permitting, time-place-manner
regulation, and public health compliance. Compliance enforcement of food safety
standards and the vending facility (i.e. the food truck) is within the jurisdictional authority
of the County of Santa Clara's Department of Public Health, Environmental Health
Division. The City's Code Enforcement Team enforces location, hours, and operational
standards, hence the more robust sections on standards and consequences in the
proposed ordinance.
Integrating all requirements into a single chapter simplifies administration, clarifies
vendor compliance expectations, enhances transparency, and ensures that vending in
designated locations aligns with public safety, ADA accessibility, sanitation standards,
Page 67 of 211
5.1.
and neighborhood compatibility. The ordinance also ensures continuity by automatically
converting existing pilot permits to new §16A.13 permits upon adoption.
As Section I of Resolution 2026-05 allows for the extension of the Pilot Program at the
discretion of the City Administrator pending final action of the City Council on a revised
Mobile Vending Ordinance, the provisions outlined in Resolution 2026-05 will remain in
effect until the Ordinance takes effect, estimated to be December 2, 2026 (30 days after
the November 2, 2026, second reading and adoption of the Ordinance).
Approved Mobile Vendors - as of October 5, 2026(Attachment 2 – Approved Mobile
Vendors):
• 23 applications have been received
o 7 applications are incomplete; applicants have been contacted for
additional information
o 16 applications have been approved and are permitted
▪ 9 are approved to operate at specific locations, 4 of which are
located within the downtown footprint on Monterey Road between
1st and 10th Street
▪ 7 are approved to operate but do not have a set location. They may
participate in special events or on private property that meets the
criteria of the Pilot Program, with explicit written permission by the
property owner
Code Enforcement Activity:
• Since the pilot program began, Code Enforcement has contacted 31 mobile
vendors (food trucks) and issued 7 citations.
o January – October 2026 – 7 mobile vendors were contacted; 2 citations
were issued.
o June – December 2025 – 24 mobile vendors were contacted; 5 citations
were issued
• All mobile food vendors were cooperative when informed they lacked required
permits or were in unapproved locations. Some operators lacked official
identification, making it difficult to issue citations or verify repeat contacts.
ALTERNATIVES
1. Maintain the pilot program without adopting permanent regulations. This would
prolong temporary rules, create ambiguity for vendors, and delay the benefits of
a unified chapter.
2. Adopt only partial revisions to existing sections. This approach would preserve
Page 68 of 211
5.1.
inconsistent and outdated provisions scattered across multiple chapters,
increasing administrative complexity
FISCAL IMPACT/FUNDING SOURCE
Adopting the ordinance is not expected to create significant new costs for the City.
There may be some shifts in staff workload related to permit administration, but no
increase in overall staffing needs is anticipated. Administrative processing, such as
reviewing applications, monitoring compliance, and issuing permits, has already been
absorbed by existing staff using standard business-permit workflows.
The ordinance may generate modest revenue through permit fees, which help offset
administrative costs. Eliminating the Police Department’s role in permit issuance may
reduce time spent on non-law-enforcement duties, providing a small operational
efficiency gain. No major capital purchases or new enforcement programs are required,
and existing enforcement mechanisms (such as suspensions and revocations) are
handled using current City processes.
PUBLIC OUTREACH
Throughout the Pilot Program, staff has worked with downtown businesses and mobile
vendors to shape the program.
NEXT STEPS
If approved, a second reading of the ordinance is required.
Attachments:
1. Reso 2026-05 - Food Truck Pilot Program Extension
2. Approved Mobile Vendor List
3. Current City Code Article II Chapter 16A §§16A.13-15
4. Mobile Vending Ordinance
Page 69 of 211
Page 70 of 211
Page 71 of 211
Page 72 of 211
Page 73 of 211
Page 74 of 211
Page 75 of 211
Page 76 of 211
§ 16A.13. Mobile vending permit required.
A mobile vending facility, that is, any portable container, pushcart, stand, vehicle or
wagon used for displaying, selling or offering for sale any food, goods or services, shall
be prohibited from operating in commercial zoning districts known as C1 Neighborhood
Commercial, C2 Central Commercial and C3 Shopping Center Commercial. No person
shall place, maintain conduct, park or allow to stand or remain any mobile vending
facility within the city limits without first obtaining a written mobile vending permit to
do so, as well as any required identity permits under Article I of this chapter, from the
chief of police. No mobile vending facility shall display any sign, flag, banner, whether
attached or on a separate structure, except such signs as may be painted thereon in
compliance with the city zoning ordinance.
The following uses shall not be considered as mobile vending facilities, and are thus not
required to obtain a mobile vending permit hereunder:
(Ord. No. 97-10, § I, 11-5-1997)
§ 16A.14. Permit procedure.
(1) Vehicles or trucks used for catering or vending prepared foodstuffs and located
upon private property at the invitation of the property owner, solely for the use of
the owner or said owner’s tenants or employees and not for the use of the general
public.
(2) Any nonmotorized pushcart or stand selling food on a paved private sidewalk (not
a parking lot) in a commercial zone, provided that permanent restroom facilities
(both men’s and women’s) are located on the same parcel of land, are open for
public use for all hours that the pushcart or stand is open, and that the owner or
operator of the pushcart or stand has written permission from the owner of the
restrooms for his customers to use them. Such permission shall be produced and
shown on the demand of any person solicited or of any police officer or official of
the city.
(3) Temporary fireworks stands, pumpkin patches, Christmas tree lots, or such other
seasonal temporary vendors as may be defined by the chief of police. No such
vendor shall commence operation more than thirty (30) days in advance of the date
of the applicable seasonal holiday.
(4) Temporary vending facilities owned and operated by a nonprofit or charitable
organization and conducting sales for an event or occasion not to exceed three (3)
consecutive days within any six-month time period.
(a) Each application for a mobile vending permit shall be on a form provided by the
chief of police, shall be accompanied by an application fee established by the city
council, shall be signed by the applicant, and shall include the following:
(1) The names and addresses of each person who will occupy or use the mobile
vending facility for purposes of exercising said permit;
(2) A certificate of insurance, stating the insurer’s name, policy terms, and
City of Gilroy, CA
Downloaded from https://ecode360.com/GI4458 on 2026-09-29
Page 77 of 211
(Ord. No. 97-10, § I, 11-5-1997)
§ 16A.15. Prohibited locations; prohibition against loitering.
No person required to obtain a mobile vending permit hereunder shall place, park
or allow to stand the portable container, pushcart, stand, vehicle or wagon used for
displaying, selling or offering for sale any food, goods or services in any of the following
places within the city.
Regardless of whether on public or private property, no person required to obtain
a mobile vending permit hereunder shall place, park or allow to stand the portable
container, pushcart, stand, vehicle or wagon at any one place except at the request of
a bona fide purchaser for a reasonable period of time, not to exceed ten (10) minutes,
provided that when such person thereafter moves any such portable container, pushcart,
stand, vehicle or wagon, it shall be moved a minimum distance of one hundred (100) feet
before again being stopped.
(Ord. No. 97-10, § I, 11-5-1997)
principal amounts, not less than a combined single limit, established annually
by the city council, of a policy of insurance against public liability, bodily
injury, and property damage arising from the permitted activity. Each such
policy shall be amendable only upon thirty (30) days’ advance notice to the
city and shall name the city as an additional insured; and
(3) Such additional information as may be required by the city administrator.
(b) The chief of police shall grant a mobile vending permit, based upon the information
contained in the application, public records, and the recommendations of
departmental staff, if he concludes that the granting of such a permit would be in
compliance with all of the provisions of this chapter and the intent of this article,
and it appears that no undue traffic safety, litter, parking, or other health and safety
consequences would result from exercise thereof. Any such permit may be
suspended, modified, or revoked by the chief of police when he finds a violation of
or noncompliance with the terms of such permit, or with other applicable laws or
regulations.
(1) Upon private property, except with the written permission of the owner of the
property. Such permission shall be produced and shown on the demand of any
person solicited or of any police officer or official of the city.
(2) In or upon any street within three hundred (300) feet of the nearest property line of
any elementary or junior high school property.
City of Gilroy, CA
§ 16A.14 § 16A.15
Downloaded from https://ecode360.com/GI4458 on 2026-09-29
Page 78 of 211
ORDINANCE 2026-XX
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY
OF GILROY AMENDING ARTICLE II SECTIONS 16A.13,
16A.14, AND 16A.15 OF CHAPTER 16A OF THE GILROY
MUNICIPAL CODE REGARDING MOBILE VENDING
WHEREAS, on June 2, 2025, Council adopted Resolution 2025-26 establishing a Mobile
Vending Pilot Program to regulate mobile vending in designated locations while enabling staff to
develop permanent code amendments, and;
WHEREAS, on January 26, 2026, Council adopted Resolution No. 2026-05 extending the
pilot to October 31, 2026, adding enhanced enforcement provisions including permit suspension
and revocation, and;
WHEREAS, evaluation of the pilot program has demonstrated strong community benefit,
enhanced economic development, and manageable operational impacts, and;
WHEREAS, the City Council now intends to permanently adopt and codify the mobile
vending regulations.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF GILROY DOES
HEREBY ORDAIN AS FOLLOWS:
SECTION I
The forgoing recitals are true and correct and are incorporated herein by this reference.
SECTION II
§16A.13 of Chapter 16A Article II of the Gilroy City Code is amended to read as follows:
SECTION 16A.13 – MOBILE VENDING
16A.13.010 – Purpose and Scope
To regulate mobile vending in the public interest, balancing health, safety, economic development,
and community standards by establishing definitions, permit requirements, operational standards,
and enforcement mechanisms.
16A.13.020 – Definitions
For the purposes of this Chapter, the following definitions shall apply:
• Downtown Vending Zone: Designated public parking lots or zones as described in
§16A.13.080(A).
• Mobile Vending Facility: A motorized vehicle or motorized trailer from which food,
beverage, or retail goods are sold or displayed.
• Mobile Vending Permit: Permit as defined by the City application requirements.
• No Vending Zone: Areas where vending is prohibited under §16A.13.090.
• Special Event an event permitted by the City requiring coordination with organizers for
vending activities.
Page 79 of 211
Ordinance No. 2026-XX
Ordinance Amending Article II, Chapter 16A of the Gilroy Municipal Code Regarding Mobile Vending
City Council Regular Meeting | November 2, 2026
Page 2 of 5
• Mobile Vendor: A person who sells food or merchandise from a Mobile Vending Facility
and operating from a nonpermanent location. This term is inclusive of all mobile vendors,
peddlers, solicitors, transient businesses, and any other traveling merchant operating in the
designated locations as described in §16A.13.080(A). This Chapter does not apply to those
Mobile Vendors regulated under Chapter 16B – Sidewalk Vending.
16A.13.030 – Permit Requirements
A Vendor shall not operate a Mobile Vending Facility without a valid City-issued Mobile Vending
Permit. Requirements include:
1. City of Gilroy Business License
2. Santa Clara County Public Health Permit for food and beverage vendors.
3. A Certificate of Insurance identifying the insurer, policy terms, and coverage limits of not
less than a combined single limit of $1 million, or as otherwise established by City Council
resolution. The policy must cover public liability, bodily injury, and property damage
arising from the permitted activity, name the City as an additional insured, and provide the
City with at least thirty (30) days’ advance written notice prior to any amendment or
cancellation.
4. Proof of restroom access for vendors operating for longer than one hour.
5. Display of a City-issued Mobile Vending Permit.
6. Payment of all applicable permit fees.
7. Such additional information as may be required by the City Administrator.
8. If vending on private property, Vendor must additionally provide:
a. Proof host business hours align with vending (6 am–12 am max).
b. Confirmation of no impact on required parking.
c. Confirmation not on undeveloped/vacant parcels.
16A.13.040 – Permit Application Procedures
A. Applications, signed by the applicant, shall be submitted to the Office of the City
Administrator or as designated by the City Administrator.
B. Each application shall be accompanied by an application fee established by the City
Council.
C. Applications shall be reviewed for compliance with all regulatory requirements based upon
the information contained in the application, public records, and the recommendations of
departmental staff.
D. If granting a Mobile Vending Permit would be in compliance with all provisions of this
Chapter and the intent of this Article, and it appears that no undue traffic safety, litter,
parking, or other health and safety consequences would result from exercise thereof,
approved Vendors shall receive a permit for display.
E. Mobile Vending Permits may be transferred to a replacement vehicle operated by the same
Vendor upon proof of a Mobile Food Facility Permit from the Santa Clara County
Department of Public Health.
F. A Mobile Vending Permit may be suspended, modified, or revoked by the City should a
violation of or noncompliance with the terms of such permit, or with other applicable laws
or regulations be found.
G. Mobile Vending Permits are valid for one year from issuance and must be renewed on an
annual basis as outlined in this Section.
Page 80 of 211
Ordinance No. 2026-XX
Ordinance Amending Article II, Chapter 16A of the Gilroy Municipal Code Regarding Mobile Vending
City Council Regular Meeting | November 2, 2026
Page 3 of 5
16A.13.050 – Suspension and Revocation
A. The City may suspend permits for violations including but not limited to operating without
required permits, creating public nuisances, violating any provisions of this Chapter, or of
any other law or ordinance relating to the business of the licensee. Violations may result in
the following consequences, at the discretion of the City:
1. An administrative fine and written notice.
2. Suspension of the Mobile Vending Permit for sixty days up to one year, or
permanent revocation.
B. The City may issue immediate suspensions in cases of threats to public health or safety.
C. Vendors shall have the right to a hearing as set forth in Article IV – Revocation and
Suspension of the Gilroy City Code.
16A.13.060 – Operational Standards
A. General Requirements
1. Vendors shall not be subject to relocation rules formerly mandated under Chapter
16A Article II (relocation every 10 minutes).
2. Vendors shall maintain sanitary operations and comply with all state and local food
safety laws.
3. ADA pathways shall not be obstructed. At no time may a vendor operate in such a
fashion that would violate or cause a violation of the Americans with Disabilities
Act or state law on accessibility.
4. No tents, tables, canopies, or other temporary structures are allowed.
5. No generators exceeding acceptable noise levels limited to a maximum of 70 dBA
(L10) measured at the property line, or as otherwise updated and outlined in
§30.41.31(b) (Special Provisions – Noise).
6. Vendors must provide a trash receptacle for customers and employ good faith
efforts to ensure proper disposal of customer trash. Vendors are responsible for
properly disposing of waste and grease associated with their business and may not
use city receptacles for this purpose.
7. When not in use, mobile vending facilities, equipment, supplies, or any other
objects associated with the business shall not be left or stored on public property or
within the public right-of-way, nor in areas and locations identified in §16A.13.090
(No Vending Zones).
8. Vendors must adhere to the display and signage regulations outlined under
§16A.13.070 (Displays and Signage).
9. Vendors must visibly display a valid Santa Clara County Mobile Food Facility
(MFF) Permit, and Gilroy Mobile Vending Permit. The Vendor’s Gilroy Business
License and California Seller’s Permit (if applicable) must be available for review
upon request.
10. Vendors shall not connect to city-owned utilities such as but not limited to electric
boxes, water lines, and gas lines.
11. Vendors shall not operate or vend in a way that violates the terms or conditions of
their mobile vending permit.
12. Vendors may operate only within City-approved designated areas as outlined in
§16A.13.080.
Page 81 of 211
Ordinance No. 2026-XX
Ordinance Amending Article II, Chapter 16A of the Gilroy Municipal Code Regarding Mobile Vending
City Council Regular Meeting | November 2, 2026
Page 4 of 5
B. Hours of Operation
1. Fifth Street Public Parking Lot: Thursday – Sunday, 4:00 PM to 2:00 AM.
2. Eigleberry Street Designated Parking Areas: Daily, 2:00 PM to 10:00 PM.
3. Gourmet Alley Parking Lots: Daily, 2:00 PM to 10:00 PM.
4. Eigleberry Street from 4th-7th Street, in spaces parallel to the curb: Daily, 2:00 PM
to 10:00 PM.
5. Private Commercial Property: Daily, 6:00 AM to midnight, with written property
owner consent.
16A.13.070 – Displays and Signage
A. Signage shall be located and erected only upon the Mobile Vending Facility.
B. The maximum permissible total sign area for any signage not painted or applied as a wrap
directly onto the Mobile Vending Facility but attached to or extending beyond the main
body of the Facility is 2 square feet for each lineal foot of the length of the Mobile Vending
Facility.
C. Menu displays shall be neat and securely attached.
D. Lighting of all signs should be directional to illuminate the sign without producing glare
on pedestrians or autos.
E. The following are prohibited:
1. Animated LED signs or other types of electronic or digital signs and displays that
show moving graphics, logos, texts or other effects.
2. Signs that are designed to rotate, move, or flash.
3. Lighted signs whose surface brightness is a detriment to surrounding property,
prevents the peaceful enjoyment of life, or presents a conflict with safe traffic
movement; or advertising displays which emit audible sound, odor, or visible
matter.
4. Freestanding signage, sidewalk displays and balloons.
16A.13.080 – Authorized Vending Locations
A. Authorized Downtown Mobile Vending Locations : Mobile Vending within the Downtown
Area is permitted only in locations designated by the City. The City Administrator, or their
designee, may add, remove, or modify authorized Downtown Mobile Vending Locations,
including operating hours, based on operational needs, public safety, community feedback,
economic development goals, or program performance. The following locations are
initially designated as authorized Downtown Mobile Vending locations:
1. P3 - Fifth Street Public Parking Lot (Thursday – Sunday, 4:00 PM–2:00 AM)
2. P7 - Eigleberry Street Public Parking Lot (Daily, 2:00 PM to 10:00 PM)
3. P2 + P4 - Gourmet Alley/Paseo Parking Lots (Daily, 2:00 PM to 10:00 PM)
4. Eigleberry Street from 4th-7th Street, in spaces parallel to the curb (Daily, 2:00 PM
to 10:00 PM)
B. Private Property
1. Mobile vending shall be permitted on commercially zoned private property as
defined in and consistent with Chapter 30 (Zoning Ordinance) of the Gilroy City
Code, with written permission of the property owner, and except as restricted in §
16A.13.090.A – Authorized Downtown Mobile Vending Locations.
Page 82 of 211
Ordinance No. 2026-XX
Ordinance Amending Article II, Chapter 16A of the Gilroy Municipal Code Regarding Mobile Vending
City Council Regular Meeting | November 2, 2026
Page 5 of 5
16A.13.090 – No Vending Zones
Mobile vending is expressly prohibited in:
A. Areas visible from the property frontage along Monterey Road from Leavesley Road
to Luchessa Avenue; and side streets between 4th Street and 7th Street between
Railroad Street south to Eigleberry Street except as allowed in the Downtown Mobile
Vending Locations as defined in §16A.13.080 – Authorized Vending Locations.
B. City parks unless with exclusive concessionaire agreement or as an allowed vendor
during a permitted special event.
C. Within 300 ft of a permitted farmers’ market or special event during operation.
D. Within 400 ft of a school between 7 am–4 pm on school days.
E. Historic District sidewalks, and as restricted or excluded or otherwise regulated under
Chapter 16B – Sidewalk Vending.
F. Any area where mobile vending is prohibited due to objective public health, safety, or
welfare concerns, or as disallowed by private property owner(s), or as established by
City Council Resolution.
G. Bus stops, school zones, fire lanes, or any other location prohibited by state law or as
identified as prohibited locations elsewhere within the Gilroy City Code.
H. Upon private property, except with the written permission of the owner of the property.
Such permission shall be produced and shown on the demand of any person solicited
or of any police officer or official of the City.
16A.13.100 – Special Event Vending
A Mobile Vending Permit authorizes a Mobile Vendor to operate at City-approved Special Events,
provided the Vendor coordinates with the event organizer and complies with all event specific
rules or requirements.
16A.13.110 – Activities Not Considered Mobile Vending Under This Chapter
The following are not regulated under this chapter and do not require a Mobile Vending Permit:
A. Farmers’ markets or street fairs permitted by the City.
B. Vendors operating entirely within licensed brick-and-mortar premises or patios or other
outdoor extension of a brick-and-mortar premises.
C. Vendors operating exclusively as temporary concessions under a City issued Special Event
Permit (regulated under Chapter 13A of the Gilroy City Code) and not acting as Mobile
Vendors.
D. Sidewalk vending, which is regulated separately under Chapter 16B – Sidewalk Vending.
SECTION III
Section 16A Chapter 16A.14 - Permit Procedures of the Gilroy City Code has been updated and
integrated into the new Article II Chapter 16A.13, allowing for the elimination of Chapter
16A.14.
Page 83 of 211
Ordinance No. 2026-XX
Ordinance Amending Article II, Chapter 16A of the Gilroy Municipal Code Regarding Mobile Vending
City Council Regular Meeting | November 2, 2026
Page 6 of 5
SECTION IV
Section 16A Chapter 16A.15 - Prohibited Locations and Prohibition Against Loitering of the
Gilroy City Code has been updated and integrated into the new Article II Chapter 16A.13,
allowing for the elimination of Chapter 16A.15.
SECTION V
Except as set forth in this Ordinance, all other provisions of the Gilroy Charter and City Code
shall remain in full force and effect.
SECTION VI
This Ordinance is not intended to and shall not be construed or given effect in a manner that
imposes upon the City or any officer or employee thereof a mandatory duty of care towards
persons and property within or without the City, so as to provide a basis of civil liability for
damages, except as otherwise imposed by law.
SECTION VII
If any section, subsection, sentence, clause or phrase of this Ordinance is for any reason held to
be invalid or unconstitutional, such decision shall not affect the validity of the remaining
portions of this ordinance. The City Council of the City of Gilroy hereby declares that it would
have passed and adopted this ordinance, and each section, subsection, sentence, clause or phrase
hereof, irrespective of the fact that any one or more sections, subsections, sentences, clauses or
phrases may be declared invalid or unconstitutional.
SECTION VIII
This Ordinance shall take effect thirty (30) days after its adoption. The City Clerk is hereby
directed to publish this Ordinance or a summary thereof pursuant to Government Code Section
36933.
Page 84 of 211
Ordinance No. 2026-XX
Ordinance Amending Article II, Chapter 16A of the Gilroy Municipal Code Regarding Mobile Vending
City Council Regular Meeting | November 2, 2026
Page 7 of 5
PASSED AND ADOPTED by the City Council of the City of Gilroy this 16th day of
November 2026 by the following vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
APPROVED:
___________________
Greg Bozzo, Mayor
ATTEST:
Kim Mancera, City Clerk
CERTIFICATE OF THE CLERK
I, KIM MANCERA, City Clerk of the City of Gilroy, do hereby certify that the
attached Ordinance No. 2026-XX is an original resolution, or true and correct copy of a City
Resolution, duly adopted by the Council of the City of Gilroy at a Regular Meeting of
said Council held on Monday, Date, with a quorum present.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the Official Seal of
the City of Gilroy this Tuesday, XXXXX
____________________________________
Kim Mancera
City Clerk of the City of Gilroy
Page 85 of 211
5.2.
City of Gilroy
STAFF REPORT
Agenda Item Title: Introduce an Ordinance Amending Municipal Code Chapter
27, Water, Article VI (Water Supply Shortage Regulations),
and Chapter 30, Zoning Ordinance, Article XXXVIII
(Landscaping, Water Efficiency, and Storm Water Retention
and Treatment) to Prohibit the Use of Potable Water for
Irrigating Nonfunctional Turf, as Required by Assembly Bill
1572
Meeting Date: November 2, 2026
From: Matt Morley, City Administrator
Department: Utilities
Submitted by: Derek Cray, Utilities Director
Prepared by: Izabela Cirloganu, Sr. Management Analyst
STRATEGIC PLAN GOALS: Maintain and Improve City Infrastructure
RECOMMENDATION
1. Motion to read the ordinance by title only and waive further reading of the
ordinance; and
2. Introduce the ordinance amending Municipal Code Chapter 27 , Water, Article VI
(Water Supply Shortage Regulations), and Chapter 30 , Zoning Ordinance,
Article XXXVIII (Landscaping, Water Efficiency, and Storm Water Retention and
Treatment), to prohibit the use of potable water for irrigating nonfunctional turf, as
required by Assembly Bill 1572.
EXECUTIVE SUMMARY
The proposed ordinance amends the City of Gilroy’s (City) water-use restrictions to
strengthen water conservation measures and align with mandatory State water-
efficiency regulations. The ordinance retains the City’s existing framework for preventing
Page 86 of 211
5.2.
water shortages while adding new mandatory restrictions on potable water use for non-
functional turf, with a phased-in approach. The restriction for non-functional turf would
apply to government, local agencies, commercial, industrial, institutional, and
Homeowners Associations (HOAs). This State mandate, however, exempts single-
family homes and other non-functional uses, such as cemeteries. The ban would not
apply to potable water used to irrigate trees, shrubs, or perennials, and it does not
lessen or restrict the use of recycled water.
The proposed ordinance amends Chapters 27 and 30 of the Gilroy Municipal Code to
align with AB 1572 by incorporating the State’s definitions and phased compliance
deadlines for prohibiting potable water irrigation of nonfunctional turf, beginning January
1, 2027. The amendments also extend existing enforcement provisions to apply year-
round, establish requirements for new, rehabilitated, and existing landscapes, transfer
administrative authority from the Public Works Director to the Utilities Director, and
extend prohibited watering hours from 9:00 a.m. to 6:00 p.m. to align with Valley
Water’s schedule.
These updates are intended to reduce water waste and support the City’s compliance
with evolving State water conservation laws.
BACKGROUND
As California continues to mitigate the impacts of climate change, particularly longer
periods of drought, the State has implemented regulations to protect drinking
water supplies and prepare for a drier future.
On May 24, 2022, the State Water Resources Control Board (State Water Board)
adopted a statewide emergency water conservation regulation prohibiting the use of
potable water to irrigate decorative or non-functional turf at commercial, industrial, and
institutional (CII) properties, including common areas maintained by homeowners'
associations (HOAs). The emergency regulation, which became effective on June 10,
2022, was subsequently extended to 2023 and expired on June 5, 2024.
On October 13, 2023, Governor Gavin Newsom signed Assembly Bill (AB) 1572 into
law, adding Section 10608.14 to the California Water Code. Effective January 1, 2024,
AB 1572 established a permanent statewide prohibition on using potable water to
irrigate non-functional turf at specified properties, with phased-in compliance deadlines
beginning January 1, 2027.
ANALYSIS
Page 87 of 211
5.2.
AB 1572 requires that urban water suppliers, including the City of Gilroy, revise
their ordinances or policies governing water service to prohibit irrigation of nonfunctional
turf on CII properties, and on common areas of homeowners’ associations, common
interest developments, and community service organizations or similar entities, with
exceptions for cemeteries, and as needed to ensure the health of trees and other
perennial non-turf plantings.
Under AB 1572, nonfunctional turf is defined as grass that serves no practical purpose
for human activity or recreation. This includes, but is not limited to, ornamental grass
strips along roadways (streetscapes), expansive lawns at corporate parks, unused
patches of grass in front of commercial buildings, and other similar areas that are
not regularly used for sports, play, or social gatherings. AB 1572 only affects CII
properties and does not impact single-family residential customers.
To mitigate issues with compliance with AB 1572, the State is proceeding with a gradual
rollout. This phased implementation approach will take place over five years to allow
customers to transition their landscapes to meet compliance. AB 1572 sets specific
compliance dates for prohibiting irrigation of nonfunctional turf with potable water. The
adopted schedule is as follows:
• January 1, 2027: The water supplier (City) must submit a copy of their ordinance
or policy governing water service that shows the supplier’s compliance with
Water Code Section 10608.14 as part of their Urban Water Objective Annual
Reporting.
• January 1, 2027: Irrigation of nonfunctional turf with potable water will
be prohibited on State and most local government/public agency properties.
• January 1, 2028: Irrigation of nonfunctional turf with potable water will be
prohibited on all commercial, industrial, and remaining institutional properties.
• January 1, 2029: Irrigation of nonfunctional turf with potable water will be
prohibited on homeowners’ associations, common interest developments, and
community service organizations (common areas).
• The State Board will require self-certification of CII properties with more than
5,000 square feet of irrigated landscape starting June 30, 2030.
• January 1, 2031 (or on the date upon which state funding is made available):
Irrigation on nonfunctional turf with potable water will be prohibited on public
agency properties in disadvantaged communities* (AB 1572 defines a
disadvantaged community as a community with an annual median household
income that is less than 80% of the statewide annual median household
income).
• The State Water Resources Control Board also has the authority to extend
Page 88 of 211
5.2.
compliance deadlines by up to three years in cases of economic hardship, critical
business needs, or public health and safety concerns.
Staff plans to enforce all water-waste measures using an education-first approach, with
outreach to all who may be affected by the ban.
ALTERNATIVES
The City Council may introduce the ordinance as proposed, request changes and
consider it at a future meeting, or choose not to introduce it. If the ordinance is not
adopted, the City would not meet AB 1572 requirements by the January 1, 2027,
reporting deadline.
FISCAL IMPACT/FUNDING SOURCE
As government agencies are the first to be impacted by AB 1572, the City may incur
costs to modify or replace landscaping at City-owned properties affected by AB 1572.
As part of a coordinated effort with the Public Works Department, staff is currently
reviewing affected City properties to determine the extent of the work needed and to
identify potential costs.
Furthermore, the City recognizes that AB 1572 may create financial challenges for
some CII customers. The prohibition on watering nonfunctional turf with potable water
will take effect in phases between 2027 and 2031. While some property owners may
choose to replace their turf with drought-tolerant landscaping, AB 1572 does not require
turf removal or replacement. It only prohibits the use of potable water to irrigate
nonfunctional turf.
To help property owners who choose to replace their turf, City of Gilroy’s customers can
access two rebate programs offered through Valley Water: the Landscape Conversion
Program and the Large Landscape Lawn-to-Mulch Program. These programs are
subject to program eligibility and available funding. The Landscape Conversion Program
offers $2 per square foot, while the Lawn-to-Mulch Program offers $1 per square foot,
with a combined lifetime rebate limit of $100,000 per site. These programs can help
offset the cost of replacing turf with water-efficient landscaping.
The Utilities Department will continue to explore grant funding opportunities and work
with Valley Water to identify additional resources to help City of Gilroy property owners
meet the requirements of AB 1572. Staff will also review and evaluate internal
resources, if appropriate, to support the City's customers.
Page 89 of 211
5.2.
PUBLIC OUTREACH
To prepare for the first compliance deadline of January 1, 2027, the Utilities Department
worked with the Gilroy Unified School District and the City of Gilroy Streets and Parks
Division to review properties that may be affected by AB 1572. Staff reviewed aerial
imagery and conducted on-site walkthroughs to identify nonfunctional turf and
distinguish ornamental grass from functional turf used for recreation, sports, and other
community activities.
This review helped identify areas where changes to irrigation practices or landscaping
may be needed. It also provided an opportunity to discuss alternative water sources,
such as recycled water, explore funding opportunities, and coordinate next steps.
Building on this initial work, the Utilities Department plans to develop an AB 1572
Outreach Plan following adoption of the ordinance. The plan will focus on reaching CII
customers, explaining the requirements, and helping property owners prepare for
upcoming compliance deadlines. Staff will also review GIS data and aerial imagery to
identify affected properties and create a database that includes property ownership,
location, and estimated square footage of nonfunctional turf. This information will help
staff prioritize outreach, monitor compliance, and plan future implementation efforts.
NEXT STEPS
If introduced, the ordinance will return to the City Council at the next meeting for
adoption. The ordinance would then take effect 30 days after adoption.
Attachments:
1. Bill Text - AB-1572
2. Chapter 30, Article 28_Redlined
3. Chapter 27, Article 6_Redlined
4. Ordinance No2026_xxx_NoRedline
Page 90 of 211
SHARE THIS: Date Published: 10/16/2023 02:00 PM
AB -15 72 Potab le wa ter: nonf unctio nal tur f.(202 3-2024 )
Assembly Bill No. 1572
CHAPTER 849
An act to amend Sections 10540, 10608.12, and 10608.22 of, to add Section 110 to, and to add Chapter
2.5 (commencing with Section 10608.14) to Part 2.55 of Division 6 of, the Water Code, relating to water.
[ Approved by Governor October 13, 2023. Filed with Secretary of State
October 13, 2023. ]
LEGISLATIVE COUNSEL'S DIGEST
AB 1572, Friedman. Potable water: nonfunctional turf.
(1) Existing law establishes various state water policies, including the policy that the use of water for domestic
purposes is the highest use of water.
This bill would make legislative findings and declarations concerning water use, including that the use of potable
water to irrigate nonfunctional turf is wasteful and incompatible with state policy relating to climate change,
water conservation, and reduced reliance on the Sacramento-San Joaquin Delta ecosystem. The bill would direct
all appropriate state agencies to encourage and support the elimination of irrigation of nonfunctional turf with
potable water.
(2) Existing law, the Integrated Regional Water Management Planning Act, authorizes a regional water
management group to prepare and adopt an integrated regional water management plan in accordance with
specified requirements, including, among other things, the identification and consideration of the water-related
needs of disadvantaged communities in the area within the boundaries of the plan.
This bill would additionally require an integrated regional water management plan to address the identification
and consideration of the water-related needs of owners and occupants of affordable housing, including the
removal and replacement of nonfunctional turf.
(3) Existing law provides various findings and declarations of the Legislature related to sustainable water use and
demand reduction. Existing law imposes various water use reduction requirements that apply to urban retail
water suppliers, including a requirement that the state achieve a 20% reduction in urban per capita water use by
December 31, 2020.
This bill would prohibit the use of potable water, as defined, for the irrigation of nonfunctional turf located on
commercial, industrial, and institutional properties, other than a cemetery, and on properties of homeowners’
associations, common interest developments, and community service organizations or similar entities, as
specified. The bill would authorize the State Water Resources Control Board to create a form for compliance
certification and would require owners of covered properties to certify their compliance, as specified. The bill
would authorize a public water system, city, county, or city and county to enforce these provisions, as specified.
The bill would require the Governor’s Office of Business and Economic Development to support small and
minority-owned businesses that provide services that advance compliance with these provisions.
Vote: majority Appropriation: no Fiscal Committee: yes Local Program: no
THE PEOPLE OF THE STATE OF CALIFORNIA DO ENACT AS FOLLOWS:
SECTION 1. Section 110 is added to the Water Code, to read:
110. (a) The Legislature hereby finds and declares all of the following:
Home Bill Information California Law Publications Other Resources My Subscriptions My Favorites
9/22/26, 1:24 PM Bill Text - AB-1572 Potable water: nonfunctional turf.
https://leginfo.legislature.ca.gov/faces/billTextClient.xhtml?bill_id=202320240AB1572 1/5Page 91 of 211
(1) The use of potable water to irrigate nonfunctional turf is wasteful and incompatible with state policy
relating to climate change, water conservation, and reduced reliance on the Sacramento-San Joaquin Delta
ecosystem.
(2) The Governor reported in August 2022 that climate change will bring significant enduring reductions in
California’s water supply and that the state must take steps to respond to this reality.
(3) The State of Nevada enacted AB 356 in 2021 to prohibit the use of Colorado River water to irrigate
nonfunctional turf on all properties except single-family residences by January 1, 2027.
(b) It is the intent of the Legislature that the irrigation of grasses for agricultural production shall not be limited
by requirements to eliminate the use of potable water to irrigate nonfunctional turf.
(c) The Legislature hereby directs all appropriate state agencies to encourage and support the elimination of
irrigation of nonfunctional turf with potable water.
SEC. 2. Section 10540 of the Water Code is amended to read:
10540. (a) A regional water management group may prepare and adopt an integrated regional water
management plan in accordance with this part.
(b) A regional water management group may coordinate its planning activities to address or incorporate all or
part of any of the following actions of its members into its plan:
(1) Groundwater management planning pursuant to Part 2.75 (commencing with Section 10750), groundwater
sustainability planning pursuant to Part 2.74 (commencing with Section 10720), or other specific groundwater
management authority.
(2) Urban water management planning pursuant to Part 2.6 (commencing with Section 10610).
(3) The preparation of a water supply assessment required pursuant to Part 2.10 (commencing with Section
10910).
(4) Agricultural water management planning pursuant to Part 2.8 (commencing with Section 10800).
(5) City and county general planning pursuant to Section 65350 of the Government Code.
(6) Stormwater resource planning that is undertaken pursuant to Part 2.3 (commencing with Section 10560).
(7) Other water resource management planning, including flood protection, watershed management planning,
and multipurpose program planning.
(c) At a minimum, all plans shall address all of the following:
(1) Protection and improvement of water supply reliability, including identification of feasible agricultural and
urban water use efficiency strategies.
(2) Identification and consideration of the drinking water quality of communities within the area of the plan.
(3) Protection and improvement of water quality within the area of the plan, consistent with the relevant basin
plan.
(4) Identification of any significant threats to groundwater resources from overdrafting.
(5) Protection, restoration, and improvement of stewardship of aquatic, riparian, and watershed resources
within the region.
(6) Protection of groundwater resources from contamination.
(7) Identification and consideration of the water-related needs of disadvantaged communities and owners and
occupants of affordable housing, including the removal and replacement of nonfunctional turf, as defined in
Section 10608.12, in the area within the boundaries of the plan.
(d) This section does not obligate a local agency to fund the implementation of any project or program.
SEC. 3. Section 10608.12 of the Water Code is amended to read:
10608.12. Unless the context otherwise requires, the following definitions govern the construction of this part:
(a) “Affordable housing” has the same meaning as defined in Section 34191.30 of the Health and Safety Code.
(b) “Agricultural water supplier” means a water supplier, either publicly or privately owned, providing water to
10,000 or more irrigated acres, excluding recycled water. “Agricultural water supplier” includes a supplier or
contractor for water, regardless of the basis of right, that distributes or sells water for ultimate resale to
customers. “Agricultural water supplier” does not include the department.
(c) “Base daily per capita water use” means any of the following:
(1) The urban retail water supplier’s estimate of its average gross water use, reported in gallons per capita per
day and calculated over a continuous 10-year period ending no earlier than December 31, 2004, and no later
9/22/26, 1:24 PM Bill Text - AB-1572 Potable water: nonfunctional turf.
https://leginfo.legislature.ca.gov/faces/billTextClient.xhtml?bill_id=202320240AB1572 2/5Page 92 of 211
than December 31, 2010.
(2) For an urban retail water supplier that meets at least 10 percent of its 2008 measured retail water demand
through recycled water that is delivered within the service area of an urban retail water supplier or its urban
wholesale water supplier, the urban retail water supplier may extend the calculation described in paragraph (1)
up to an additional five years to a maximum of a continuous 15-year period ending no earlier than December
31, 2004, and no later than December 31, 2010.
(3) For the purposes of Section 10608.22, the urban retail water supplier’s estimate of its average gross water
use, reported in gallons per capita per day and calculated over a continuous five-year period ending no earlier
than December 31, 2007, and no later than December 31, 2010.
(d) “Baseline commercial, industrial, and institutional water use” means an urban retail water supplier’s base
daily per capita water use for commercial, industrial, and institutional users.
(e) “CII water use” means water used by commercial water users, industrial water users, institutional water
users, and large landscape water users.
(f ) “Commercial water user” means a water user that provides or distributes a product or service.
(g) “Common area” means that portion of a common interest development or of a property owned or managed
by a homeowners’ association or a community service organization or similar entity that is not assigned or
allocated to the exclusive use of the occupants of an individual dwelling unit within the property.
(h) “Common interest development” has the same meaning as in Section 4100 of the Civil Code.
(i) “Community service organization or similar entity” has the same meaning as in Section 4110 of the Civil
Code.
(j) “Community space” means an area designated by a property owner or a governmental agency to
accommodate human foot traffic for civic, ceremonial, or other community events or social gatherings.
(k) “Compliance daily per capita water use” means the gross water use during the final year of the reporting
period, reported in gallons per capita per day.
(l) “Disadvantaged community” means a community with an annual median household income that is less than
80 percent of the statewide annual median household income.
(m) “Functional turf” means a ground cover surface of turf located in a recreational use area or community
space. Turf enclosed by fencing or other barriers to permanently preclude human access for recreation or
assembly is not functional turf.
(n) “Gross water use” means the total volume of water, whether treated or untreated, entering the distribution
system of an urban retail water supplier, excluding all of the following:
(1) Recycled water that is delivered within the service area of an urban retail water supplier or its urban
wholesale water supplier.
(2) The net volume of water that the urban retail water supplier places into long-term storage.
(3) The volume of water the urban retail water supplier conveys for use by another urban water supplier.
(4) The volume of water delivered for agricultural use, except as otherwise provided in subdivision (f ) of
Section 10608.24.
(o) “Homeowners’ association” means an “association” as defined in Section 4080 of the Civil Code.
(p) “Industrial water user” means a water user that is primarily a manufacturer or processor of materials as
defined by the North American Industry Classification System code sectors 31 to 33, inclusive, or an entity that
is a water user primarily engaged in research and development.
(q) “Institutional water user” means a water user dedicated to public service. This type of user includes, among
other users, higher education institutions, schools, courts, churches, hospitals, government facilities, and
nonprofit research institutions.
(r) “Interim urban water use target” means the midpoint between the urban retail water supplier’s base daily per
capita water use and the urban retail water supplier’s urban water use target for 2020.
(s) “Large landscape” means a nonresidential landscape as described in the performance measures for CII water
use adopted pursuant to Section 10609.10.
(t) “Locally cost effective” means that the present value of the local benefits of implementing an agricultural
efficiency water management practice is greater than or equal to the present value of the local cost of
implementing that measure.
(u) “Nonfunctional turf” means any turf that is not functional turf, and includes turf located within street rights-
of-way and parking lots.
9/22/26, 1:24 PM Bill Text - AB-1572 Potable water: nonfunctional turf.
https://leginfo.legislature.ca.gov/faces/billTextClient.xhtml?bill_id=202320240AB1572 3/5Page 93 of 211
(v) “Performance measures” means actions to be taken by urban retail water suppliers that will result in
increased water use efficiency by CII water users. Performance measures may include, but are not limited to,
educating CII water users on best management practices, conducting water use audits, and preparing water
management plans. Performance measures do not include process water.
(w) “Potable reuse” means direct potable reuse, indirect potable reuse for groundwater recharge, and reservoir
water augmentation as those terms are defined in Section 13561.
(x) “Potable water” means water that is suitable for human consumption.
(y) “Process water” means water used by industrial water users for producing a product or product content or
water used for research and development. Process water includes, but is not limited to, continuous
manufacturing processes, and water used for testing, cleaning, and maintaining equipment. Water used to cool
machinery or buildings used in the manufacturing process or necessary to maintain product quality or chemical
characteristics for product manufacturing or control rooms, data centers, laboratories, clean rooms, and other
industrial facility units that are integral to the manufacturing or research and development process is process
water. Water used in the manufacturing process that is necessary for complying with local, state, and federal
health and safety laws, and is not incidental water, is process water. Process water does not mean incidental
water uses.
(z) “Public water system” has the same meaning as defined in Section 116275 of the Health and Safety Code.
(aa) “Recreational use area” means an area designated by a property owner or a governmental agency to
accommodate human foot traffic for recreation, including, but not limited to, sports fields, golf courses,
playgrounds, picnic grounds, or pet exercise areas. This recreation may be either formal or informal.
(ab) “Recycled water” means recycled water, as defined in subdivision (n) of Section 13050.
(ac) “Regional water resources management” means sources of supply resulting from watershed-based planning
for sustainable local water reliability or any of the following alternative sources of water:
(1) The capture and reuse of stormwater or rainwater.
(2) The use of recycled water.
(3) The desalination of brackish groundwater.
(4) The conjunctive use of surface water and groundwater in a manner that is consistent with the safe yield of
the groundwater basin.
(ad) “Reporting period” means the years for which an urban retail water supplier reports compliance with the
urban water use targets.
(ae) “Turf ” has the same meaning as defined in Section 491 of Title 23 of the California Code of Regulations.
(af ) “Urban retail water supplier” means a water supplier, either publicly or privately owned, that directly
provides potable municipal water to more than 3,000 end users or that supplies more than 3,000 acre-feet of
potable water annually at retail for municipal purposes.
(ag) “Urban water supplier” has the same meaning as defined in Section 10617.
(ah) “Urban water use objective” means an estimate of aggregate efficient water use for the previous year based
on adopted water use efficiency standards and local service area characteristics for that year, as described in
Section 10609.20.
(ai) “Urban water use target” means the urban retail water supplier’s targeted future daily per capita water use.
(aj) “Urban wholesale water supplier” means a water supplier, either publicly or privately owned, that provides
more than 3,000 acre-feet of water annually at wholesale for potable municipal purposes.
SEC. 4. Chapter 2.5 (commencing with Section 10608.14) is added to Part 2.55 of Division 6 of the Water Code,
to read:
CHAPTER 2.5. Nonfunctional Turf
10608.14. (a) The use of potable water for the irrigation of nonfunctional turf located on commercial, industrial,
and institutional properties, other than a cemetery, and on properties of homeowners’ associations, common
interest developments, and community service organizations or similar entities is prohibited as of the following
dates:
(1) All properties owned by the Department of General Services, beginning January 1, 2027.
(2) All properties owned by local governments, local or regional public agencies, and public water systems,
except those specified in paragraph (5), beginning January 1, 2027.
(3) All other institutional properties and all commercial and industrial properties, beginning January 1, 2028.
(4) All common areas of properties of homeowners’ associations, common interest developments, and
community service organizations or similar entities, beginning January 1, 2029.
9/22/26, 1:24 PM Bill Text - AB-1572 Potable water: nonfunctional turf.
https://leginfo.legislature.ca.gov/faces/billTextClient.xhtml?bill_id=202320240AB1572 4/5Page 94 of 211
(5) All properties owned by local governments, local public agencies, and public water systems in a
disadvantaged community, beginning January 1, 2031, or the date upon which a state funding source is made
available to fund conversion of nonfunctional turf on these properties to climate-appropriate landscapes,
whichever is later.
(b) Notwithstanding subdivision (a), the use of potable water is not prohibited by this section to the extent
necessary to ensure the health of trees and other perennial nonturf plantings, or to the extent necessary to
address an immediate health and safety need.
(c) The board may, upon a showing of good cause for reasons including economic hardship, critical business
need, and potential impacts to human health or safety, postpone a compliance deadline in subdivision (a) by up
to three years for certain persons, institutions, and businesses, and may create a form to be used for compliance
certification to the board by property owners.
(d) Public water systems shall, by no later than January 1, 2027, revise their regulations, ordinances, or policies
governing water service to include the requirements of subdivisions (a) and (b), as revised by the board
pursuant to subdivision (c), and shall communicate the requirements to their customers on or before that date.
(e) (1) An owner of commercial, industrial, or institutional property with more than 5,000 square feet of irrigated
area other than a cemetery shall certify to the board, commencing June 30, 2030, and every three years
thereafter through 2039, that their property is in compliance with the requirements of this chapter.
(2) An owner of a property with more than 5,000 square feet of irrigated common area that is a homeowners’
association, common interest development, or community service organization or similar entity shall certify to
the board, commencing June 30, 2031, and every three years thereafter through 2040, that their property is in
compliance with the requirements of this chapter.
(f ) Noncompliance by a person or entity with this chapter or regulations adopted thereunder shall be subject to
civil liability and penalties set forth in Section 1846, or to civil liability and penalties imposed by an urban retail
water supplier pursuant to a locally adopted ordinance or policy.
(g) (1) A public water system, city, county, or city and county may enforce the provisions of this chapter.
(2) To avoid duplication of enforcement, any entity identified in paragraph (1) that is not a retail public water
system shall notify the retail public water system 30 days prior to enforcement of the provisions of this chapter
against a property served by such system.
(3) Nothing in paragraph (2) shall preclude enforcement by any entity identified in paragraph (1) once
adequate notice is given.
(h) The department shall, when using funds appropriated for water conservation for turf replacement, prioritize
financial assistance for nonfunctional turf replacement to public water systems serving disadvantaged
communities and to owners of affordable housing.
(i) The department shall utilize the saveourwater.com internet website and outreach campaign to provide
information and resources on converting nonfunctional turf to native vegetation.
(j) The Governor’s Office of Business and Economic Development shall support small and minority-owned
businesses that provide services that advance compliance with this chapter.
SEC. 5. Section 10608.22 of the Water Code is amended to read:
10608.22. Notwithstanding the method adopted by an urban retail water supplier pursuant to Section 10608.20,
an urban retail water supplier’s per capita daily water use reduction shall be no less than 5 percent of base daily
per capita water use as defined in paragraph (3) of subdivision (c) of Section 10608.12. This section does not
apply to an urban retail water supplier with a base daily per capita water use at or below 100 gallons per capita
per day.
9/22/26, 1:24 PM Bill Text - AB-1572 Potable water: nonfunctional turf.
https://leginfo.legislature.ca.gov/faces/billTextClient.xhtml?bill_id=202320240AB1572 5/5Page 95 of 211
Bold Text = Proposed Additions
Struck Text= Proposed Deletions
Plain text = Existing Code
Proposed Title: Ordinance of the City Council of the City of Gilroy amending Chapter 27,
Article VI, “Water Supply Shortage Regulations” and Chapter 30, Article XXXVIII,
“Landscaping, Water Efficiency, and Storm Water Retention and Treatment” to prohibit
the use of potable water for the irrigation of nonfunctional turf in compliance with AB 1572.
ARTICLE XXXVIII
LANDSCAPING, WATER EFFICIENCY, AND STORM WATER RETENTION
AND TREATMENT
§ 30.38.10. Purpose.
The city promotes the value and benefits of landscapes while recognizing the need to use
limited water resources as efficiently as possible. In compliance with applicable state
standards and guidelines, and to promote the city’s goals and standards regarding
sustainable development, this article establishes minimum landscape standards for all
uses for enhancing the appearance of developments, reducing heat and glare, controlling
soil erosion, enhancing on-site storm water management, conserving water, establishing
a buffer and/or screen between residential and nonresidential land uses, and ensuring the
ongoing maintenance of landscaped areas. Water conservation measures shall be
addressed through landscape and irrigation design.
(Ord. No. 2018-06, § 1, 3-19-2018)
§ 30.38.20. Applicability.
(a) The provisions of this article shall apply to all of the following landscape projects
installed after December 1, 2015:
(1) Projects requiring a building permit or architectural and site permit that include
the addition of an aggregate landscape area of five hundred (500) square feet
or more;
(2) Projects requiring a building permit or architectural and site permit that include
the rehabilitation of an aggregate landscape area of two thousand five hundred
(2,500) square feet or more;
(3) Existing landscaped areas shall comply with the provisions specified in
section
30.38.240 (Provisions for existing landscapes);
(4) Cemeteries.
a. New and rehabilitated cemeteries shall comply with the provisions
specified in sections 30.38.170 (Landscape and irrigation
maintenance schedule) and Page 96 of 211
30.38.180 (Irrigation audit, irrigation survey, and irrigation water use
analysis).
b. Existing cemeteries shall comply with the provisions specified in
section
30.38.240 (Provisions for existing landscapes).
(b) Projects using treated or untreated graywater (see section 30.38.210) or rainwater
captured on site, any parcel within the project that has less than two thousand five
hundred (2,500) square feet of landscape area and meets the parcel’s landscape
water requirement (estimated total water use) entirely with treated or untreated
graywater or through stored rainwater captured on site is subject only to Appendix D
(Prescriptive Compliance Option), Section (5) of state law.
(c) This article does not apply to:
(1) Registered local, state or federal historical sites;
(2) Ecological restoration projects that do not require a permanent irrigation
system;
(3) Mined-land reclamation projects that do not require a permanent irrigation system; or
(4) Existing plant collections, as part of botanical gardens and arboretums open
to the public.
(Ord. No. 2018-06, § 1, 3-19-2018)
§ 30.38.30. Definitions.
“Applied water” means the portion of water supplied by the irrigation system to the landscape.
“Arborist report” means a report prepared by an arborist certified by the International
Society of Arboriculture (ISA) or equivalent organization acceptable to the community
development director containing specific information on the location, condition,
structure, potential impacts of development, and recommended actions and mitigation
measures regarding one (1) or more trees on an individual lot or project site.
“Automatic irrigation controller” means a timing device used to remotely control valves
that operate an irrigation system. Automatic irrigation controllers are able to self-adjust
and schedule irrigation events using either evapotranspiration (weather-based) or soil
moisture data.
“Backflow prevention device” means a safety device used to prevent pollution or
contamination of the water supply due to the reverse flow of water from the irrigation
system.
“Certificate of completion” means the document required under section 30.38.150
(Certificate of completion).
“Certified irrigation designer” means a person certified to design irrigation systems by
an accredited academic institution, a professional trade organization or other program
such as the
U.S. Environmental Protection Agency’s WaterSense irrigation designer certification
program and Irrigation Association’s certified irrigation designer program.
“Certified landscape irrigation auditor” means a person certified to perform landscape
irrigation audits by an accredited academic institution, a professional trade organization
Page 97 of 211
or other program such as the U.S. Environmental Protection Agency’s WaterSense
irrigation auditor certification program and Irrigation Association’s certified landscape
irrigation auditor program.
“Check valve or anti-drain valve” means a valve located under a sprinkler head, or other
location in the irrigation system, to hold water in the system to prevent drainage from
sprinkler heads when the sprinkler is off.
“Common interest developments” means community apartment projects, condominium
projects, planned developments, and stock cooperatives per Civil Code Section 1351.
“Community development director” means the City of Gilroy community development
director or designee.
“Compost” means a safe and stable product of controlled biologic decomposition of
organic materials that is beneficial to plant growth.
“Conversion factor (0.62)” means the number that converts acre-inches per acre per year
to gallons per square foot per year.
“Distribution uniformity” means a measure of the uniformity of irrigation water over a
defined area.
“Drip irrigation” means any nonspray low volume irrigation system utilizing emission
devices with a flow rate measured in gallons per hour. Low volume irrigation systems
are specifically
designed to apply small volumes of water slowly at or near the root zone of plants.
“Dripline” means the outermost edge of the tree’s canopy. When depicted on a map or
plan, the dripline is the irregular shaped circle that follows the contour of the tree’s
branches as seen from overhead.
“Ecological restoration project” means a project where the site is intentionally altered to
establish a defined, indigenous, historic ecosystem.
“Effective precipitation or useful rainfall (Eppt)” means the portion of total precipitation
which becomes available for plant growth.
“Emitter” means a drip irrigation emission device that delivers water slowly from the
system to the soil.
“Established landscape” means the point at which plants in the landscape have developed
significant root growth into the soil. Typically, most plants are established after one (1)
or two
(2) years of growth.
“Established period of the plants” means the first year after installing the plant in the
landscape or the first two (2) years if irrigation will be terminated after establishment.
Typically, most plants are established after one (1) or two (2) years of growth. Native
habitat mitigation areas and trees may need three (3) to five (5) years for establishment.
“Estimated total water use (ETWU)” means total water used for the landscape as
described in section 30.38.100 (water efficient landscape work-sheet).
“ET adjustment factor (ETAF)” means a factor of 0.55 for residential areas and 0.45 for
nonresidential areas, that, when applied to reference evapotranspiration, adjusts for plant
factors and irrigation efficiency, two (2) major influences upon the amount of water that
needs to be applied to the landscape. The ETAF for new and existing (nonrehabilitated)
Page 98 of 211
special landscape areas shall not exceed 1.0. The ETAF for existing nonrehabilitated
landscapes is 0.8.
“Evapotranspiration rate” means the quantity of water evaporated from adjacent soil and
other surfaces and transpired by plants during a specified time.
“Flow rate” means the rate at which water flows through pipes, valves and emission
devices, measured in gallons per minute, gallons per hour, or cubic feet per second.
“Flow sensor” means an inline device installed at the supply point of the irrigation system
that produces a repeatable signal proportional to flow rate. Flow sensors must be
connected to an automatic irrigation controller or flow monitor capable of receiving flow
signals and operating master valves. This combination flow sensor/controller may also
function as a landscape water meter or submeter.
“Friable” means a soil condition that is easily crumbled or loosely compacted down to a
minimum depth per planting material requirements, whereby the root structure of newly
planted material will be allowed to spread unimpeded.
“Fuel modification plan guideline” means guidelines from a local fire authority to assist
residents and businesses that are developing land or building structures in a fire hazard
severity zone.
“Functional Turf” meaning set forth in Chapter 27, Section 27.97.
“Graywater” means untreated wastewater that has not been contaminated by any toilet
discharge, has not been affected by infectious, contaminated, or unhealthy bodily wastes,
and does not present a threat from contamination by unhealthful processing,
manufacturing, or operating wastes. “Graywater” includes, but is not limited to,
wastewater from bathtubs, showers, bathroom washbasins, clothes washing machines,
and laundry tubs, but does not include
wastewater from kitchen sinks or dish-washers. Health and Safety Code Section
17922.12. “Hardscaped” means any durable material (pervious and nonpervious).
“Hydrozone” means a portion of the landscaped area having plants with similar
water needs and rooting depth. A hydrozone may be irrigated or nonirrigated.
“Infiltration rate” means the rate of water entry into the soil expressed as a depth of
water per unit of time (e.g., inches per hour).
“Invasive plant species” means species of plants not historically found in California
that spread outside cultivated areas and can damage environmental or economic
resources. Invasive species may be regulated by county agricultural agencies as
noxious species. Lists of invasive plants are maintained at the California Invasive
Plant Inventory and USDA invasive and noxious weeds database.
“Irrigation audit” means an in-depth evaluation of the performance of an irrigation
system conducted by a certified landscape irrigation auditor. An irrigation audit
includes, but is not limited to: inspection, system tune-up, system test with
distribution uniformity or emission uniformity, reporting overspray or runoff that
causes overland flow, and preparation of an irrigation schedule. The audit must be
conducted in a manner consistent with the Irrigation Association’s landscape
irrigation auditor certification program or other U.S. Environmental Protection
Agency “WaterSense” labeled auditing program.
“Irrigation efficiency (IE)” means measurement of the amount of water beneficially
used divided by the amount of water applied. Irrigation efficiency is derived from Page 99 of 211
measurements and estimates of irrigation system characteristics and management
practices. The irrigation efficiency factors for purposes of this article are 0.75 for
overhead spray devices and 0.81 for drip systems.
“Irrigation survey” means evaluation of an irrigation system that is less detailed
than an irrigation audit. An irrigation survey includes, but is not limited to:
inspection, system test, and written recommendations to irrigation water use
analysis. Analysis of water use data based on meter readings and billing data.
“Landscape architect” means a person who holds a license to practice landscape
architecture in the State of California Business and Professions Code, Section 5615.
“Landscape area” means all planting areas, turf areas, and water features in a
landscape design plan subject to the maximum applied water allowance calculation.
The landscape area does not include footprints of buildings or structures, sidewalks,
driveways, parking lots, decks, patios, gravel or stone walks, other pervious or
nonpervious hardscapes, and other nonirrigated areas designated for
nondevelopment (e.g., open spaces and existing native vegetation).
“Landscape contractor” means a person licensed by the State of California to
construct, maintain, repair, install, or subcontract the development of landscape
systems.
“Landscape documentation package” means documents required under section
30.38.90 (Elements of the landscape documentation package).
“Landscape project” means the total area of landscape in a project as defined in
“landscape area” for the purposes of this article, meeting requirements under
section 30.38.20 (Applicability).
“Landscape water meter” means an incline device installed at the irrigation supply
point that measures the flow of water into the irrigation system and is connected to
a totalizer to record water use.
“Lateral line” means a water delivery pipeline that supplies water to the emitters or
sprinklers
from the valve.
“Local agency” means a city or county, including a charter city or charter county, that is
responsible for adopting and implementing the ordinance codified in this article. The
local agency is also responsible for the enforcement of this article, including, but not
limited to, approval of a permit and plan check or design review of a project.
“Local LAN purveyor” means any entity, including a public agency, city, county, or
private water company, that provides retail water service.
“Low volume irrigation” means application of irrigation water at low pressure through a
system of tubing or lateral lines and low volume emitters such as drip, driplines, and
bubblers. Low volume irrigation systems are specifically designed to apply small volumes
of water slowly at or near the root zone of plants.
“Low water plant use” means plant species whose demonstrated water needs are
compatible with local climate and soil conditions such that regular supplemental
irrigation is not required to sustain the plant after it has become established. Species
classified as “very low water use” and “low water use” by WUCOLS, having a regionally
adjusted plant factor of 0.0 through 0.3, shall be considered low water use plants.
Page 100 of 211
“Main line” means a pressurized pipeline that delivers water from the water source to the
valve or outlet.
“Master shut-off valve” means automatic valve installed at the irrigation supply point
which controls water flow into the irrigation system. When this valve is closed, water
will not be supplied to the irrigation system. A master valve will greatly reduce any water
loss due to a leaky station valve.
“Maximum applied water allowance (MAWA)” means the upper limit of annual applied
water for the established landscaped area as specified in section 30.38.100 (water
efficient landscape work-sheet). It is based upon the area’s reference evapotranspiration,
the ET adjustment factor, and the size of the landscape area. The estimated total water
use shall not exceed the maximum applied water allowance. Special landscape areas,
including recreation areas, areas permanently and solely dedicated to edible plants such
as orchards and vegetable gardens, and areas irrigated with recycled water are subject to
the MAWA with an ETAF not to exceed 1.0. MAWA = (ETo) (0.62) [(ETAF x LA) +
((1-ETAF) x SLA)].
“Median” means the area between opposing lanes of traffic that may be unplanted or
planted with trees, shrubs, perennials, and ornamental grasses.
“Microclimate” means the climate of a small, specific area that may contrast with the
climate of the overall landscape area due to factors such as wind, sun exposure, plant
density, or proximity to reflective surfaces.
“Mined-land reclamation projects” means any surface mining operation with a
reclamation plan approved in accordance with the Surface Mining and Reclamation Act
of 1975.
“Mulch” means any organic material such as leaves, bark, straw, compost, or inorganic
mineral materials such as rocks, gravel, or decomposed granite left loose and applied to
the soil surface for the beneficial purposes of reducing evaporation, suppressing weeds,
moderating soil temperature, and preventing soil erosion.
“New construction” means a new building with a landscape or other new landscape, such
as a park, playground, or greenbelt without an associated building.
“Nonfunctional turf” meaning set forth in Chapter 27, Section 27.97.
“Nonresidential landscape” means landscapes in commercial, institutional,
industrial and public settings that may have areas designated for recreation or public
assembly. It also includes portions of common areas of common interest
developments with designated recreational areas.
“Operating pressure” means the pressure at which the parts of an irrigation system
are designed by the manufacturer to operate.
“Overhead sprinkler irrigation systems or over-head spray irrigation systems”
means systems that deliver water through the air (e.g., spray heads and rotors).
“Overspray” means irrigation water which is delivered beyond the target area.
“Parkway” means the area between a sidewalk and the curb or traffic lane. It may
be planted or unplanted, and with or without pedestrian egress.
“Permit” means the authorizing document issued by local agencies for new
construction or rehabilitated landscapes.
“Pervious” means any surface or material that allows the passage of water through Page 101 of 211
the material and into the underlying soil.
“Plant factor or plant water use factor” means a factor that, when multiplied by
ETo, estimates the amount of water needed by plants. For purposes of this article,
the plant factor range for very low water use plants is 0 to 0.1, the plant factor
range for low water use plants is 0.1 to 0.3, the plant factor range for moderate
water use plants is 0.4 to 0.6, and the plant factor range for high water use plants is
0.7 to 1.0. Plant factors cited in this article are derived from the publication “Water
Use Classification of Landscape Species.” Plant factors may also be obtained from
horticultural researchers from academic institutions or professional associations as
approved by the California Department of Water Resources (DWR).
“Planting hole” means a hole in the ground that is dug for landscaping materials
such as trees or shrubs.
“Project applicant” means an individual or entity submitting a landscape
documentation package required under Section 492.3 of Title 23 of the California
Code of Regulations, to request a permit, plan check, or design review from the
local agency. A project applicant may be the property owner or his or her designee.
“Public works director” means the City of Gilroy public works director or designee.
“Rain sensor or rain sensing shutoff device” means a component which
automatically suspends an irrigation event when it rains.
“Record drawing or as-builts” means a set of reproducible drawings which show
significant changes in the work made during construction and which are usually
based on drawings marked up in the field and other data furnished by the contractor.
“Recreational area” means areas, excluding private single-family residential areas,
designated for active play, recreation or public assembly in parks, sports fields,
picnic grounds, amphitheaters or golf course tees, fairways, roughs, surrounds and
greens.
“Recycled water, reclaimed water, or treated sewage effluent water” means treated
or recycled waste water of a quality suitable for nonpotable uses such as landscape
irrigation and water features. This water is not intended for human consumption.
“Reference evapotranspiration (ETo)” means the standard measurement of
environmental parameters which affect the water use of plants. ETo is expressed
in inches per day, month,
or year as represented in Appendix A, and is an estimate of the evapotranspiration of a
large field of four (4) to seven (7) inch tall, cool-season grass that is well watered.
Reference evapotranspiration is used as the basis of determining the maximum applied
water allowances so that regional differences in climate can be accommodated.
“Regional water efficient landscape ordinance” means a local ordinance adopted by
two (2) or more local agencies, water suppliers and other stakeholders for implementing
a consistent set of landscape provisions throughout a geographical region. Regional
ordinances are strongly encouraged to provide a consistent framework for the landscape
industry and applicants to adhere to.
“Rehabilitated landscapes” means any re-landscaping project that requires a permit, plan
check, or design review, meets the requirements of section 30.38.20 (Applicability), and
the modified landscape area is equal to or greater than two thousand five hundred (2,500)
square feet. Page 102 of 211
“Residential landscape” means landscapes surrounding single- or multifamily homes.
“Root zone” means a specifically defined area commencing at the trunk and moving
outward to form an irregularly shaped circle that follows the contour of the tree canopy
and extending beyond the dripline of the tree by five (5) feet or such greater distance
determined by the arborist report.
“Runoff” means water which is not absorbed by the surface to which it is applied and flows
from the area to a drain, sewer, or stream. For example, runoff may result from water that
is applied to landscaping at too great a rate (application rate exceeds infiltration rate) or
when there is a slope.
“Soil moisture sensing device or soil moisture sensor” means a device that measures the
amount of water in the soil. The device may also suspend or initiate an irrigation event.
“Soil texture” means classification of soil based on its percentage of sand, silt, and clay.
“Special landscape area (SLA)” means an area of the landscape dedicated solely to edible
plants, recreational areas, areas irrigated with recycled water, or water features using
recycled water.
“Sprinkler head or spray head” means a device which delivers water through a nozzle.
“Static water pressure” means pipeline or municipal water supply pressure when water
is not flowing.
“Station” means area served by one (1) valve or by a set of valves that operate
simultaneously.
“Swing joint” means an irrigation component that provides a flexible, leak-free
connection between the emission device and lateral pipeline to allow movement in any
direction and to prevent equipment damage.
“Submeter” means a metering device to measure water applied to the landscape that is
installed after the primary utility water meter.
“Turf” means a groundcover surface of ornamental grass, or a ground cover surface
of mowed grass only. Annual bluegrass, Kentucky bluegrass, perennial ryegrass, red
fescue and tall fescue are cool-season grasses. Bermuda grass, Kikuyu grass, seashore
paspalum, St. Augustine grass, zoysia grass, and buffalo grass are warm-season grasses.
“Valve” means a device used to control the flow of water in the irrigation system.
“Water conserving plant species” means plant species identified as having a very low or
low plant factor.
“Water feature” means a design element where open water performs an aesthetic or
recreational
function. Water features include ponds, lakes, waterfalls, fountains, artificial
streams, spas, and swimming pools (where water is artificially supplied). The
surface area of water features is included in the high water use hydrozone of the
landscape area. Constructed wetlands used for on-site wastewater treatment or
storm water best management practices that are not irrigated and used solely for
water treatment or storm water retention are not water features and, therefore, are
not subject to the water budget calculation.
“Watering window” means the time of day irrigation is allowed.
“WUCOLS” means Water Use Classification of Landscape Species published by Page 103 of 211
the University of California Cooperative Extension and the Department of Water
Resources 2014.
(Ord. No. 2018-06, § 1, 3-19-2018)
§ 30.38.40. General landscape standards.
(a) General Landscape Design Standards. Landscaping shall be a positive element of
the project design. The landscaping shall be designed to protect storm water quality
and enhance the aesthetic quality of the development by using the following design
standards:
(1) Landscaping shall be used to manage and treat storm water to the maximum
extent feasible;
(2) All plant materials shall be installed in compliance with an approved landscape
design plan (see section 30.38.120);
(3) Only healthy, well-formed, and vigorous plant materials may be used;
(4) Landscaping shall be located in all yard areas that are not specifically used for
parking, driveways, patios, or similar purposes, unless otherwise specified in
this article. Sidewalks, pedestrian walks and pathways are permitted in
landscaped areas;
(5) Landscape areas shall incorporate varieties of plant textures, colors,
geometries, and leaf densities. Year-round visual interest shall be introduced
through an appropriate balance of evergreen/deciduous and flowering
perennials. Architectural depth and character shall be incorporated through a
variety of plant sizes, shapes, and heights;
(6) Dense landscaping shall be incorporated to provide a visual screen from less
pleasing features of a development (i.e., around trash enclosures, carports, pool
equipment, electric transformers, cable boxes, etc.); however, landscaping
shall not be placed to interfere with the accessibility to and maintenance of the
structures and/or equipment;
(7) Landscaping shall screen parking areas from adjacent streets;
(8) Landscaping shall be incorporated to reduce monotony of long expanses of
building, fence or other structures;
(9) The density and placement of plants are to be determined by the plant size at
maturity. When initially installed, groundcover shall give enough coverage for
a pleasing appearance on all landscaped areas;
(10) A minimum of fifty percent (50%) of the landscape area shall consist of plant
materials consistent with section 30.38.120(b), Landscape Design
Requirements. Portions of the landscape area not planted shall be covered with
permeable ground coverings, e.g., rock, bark, decomposed granite or similar
materials;
(11) Sturdy raised curbs shall protect all landscape areas from driveways and
parking areas. Cutouts in curbs may be incorporated when surrounding
vegetative drainage swales, storm water retention features and/or other
Page 104 of 211
treatment features;
(12) Wheel stops need not be provided in parking areas where the front two (2) feet
of the landscape area is planted with low groundcover to accommodate car
overhang;
(13) Trees of varieties with broad canopies shall be provided to shade walkways
and parking areas to temper heat from paved areas, and to screen long structure
frontages;
(14) Existing on-site vegetation shall be preserved, unless determined otherwise by
the community development director, to maintain on-site water quality and
sediment control;
(15) New plant materials requiring permanent irrigation shall not be placed under
existing oak trees;
(16) All trees shall be a minimum size of fifteen (15) gallons when initially installed;
(17) Protected trees shall be preserved and enhanced by structure site design, in
compliance with subsection (d) of this section;
(18) Deep root irrigation shall be provided to prevent pavement damage where trees
are planted within three (3) feet of city pavement or sidewalks. Deep root
irrigation is strongly encouraged in similar situations in all private
development. When required, deep root irrigation shall be installed in
compliance with city standards;
(19) Roof-top runoff shall be directed to vegetated areas;
(20) Landscaping is allowed within cul-de-sacs in conformance with all other city
codes;
(21) All plant materials within the city right-of-way (e.g., medians, sound walls, etc.)
shall be approved by the director of public works for minimum size and species
type;
(22) Green roofs are allowed in conformance to all requirements of city code;
(23) All plant materials shall be maintained in a live and healthy condition, and free
of weeds. Except for owners of properties in the R1 zoning district, property
owners shall be required to remove weeds and maintain the landscaping in
accordance with the approved landscape plan for the life of the property.
(b) New Plant Material. New plant material shall be carefully selected to comply
with the following standards:
(1) The overall compatibility of the ultimate form, size, density, and color of trees,
shrubs, and groundcover at maturity;
(2) The tolerance of the plant materials to existing physical conditions, and
resistance to insect pests, and disease; and
(3) The intended use (i.e., shade screening, windbreak, erosion control, storm
water treatment and management, etc.) as well as the ease of maintenance.
Page 105 of 211
(4) Indigenous trees and other plant materials are encouraged.
(c) City Street Trees.
(1) In all zones, the developer or applicant shall install street trees in the public
right-of-way, in compliance with city street tree standards. A properly licensed
landscape contractor shall install the street tree. A street tree permit shall be
obtained by the applicant and/or developer prior to issuance of the building
permit.
(2) An inspection of the placement and tree type is required when a new tree is
either planted or replaced.
(3) Street trees are not required in the RH (residential hillside) zone.
(4) Street trees shall be selected and installed in compliance with the following standards:
a. Street trees shall be planted in the public right-of-way in compliance with
a city standard detail plan;
b. Street trees shall be a minimum of fifteen (15) gallons when initially
installed. Where an existing street tree must be removed to accommodate
development, a replacement tree of similar size as that removed shall be
planted;
c. All street trees shall be irrigated with an automatic irrigation system;
d. The developer and/or applicant shall use the tree species as designated by
the city’s master street tree planting plan (as authorized under section
26.5-1). The developer and/or applicant may request in writing a
substitution of the designated tree species, subject to approval by the
director of public works;
e. Spacing of trees shall be thirty (30) feet on center, unless otherwise
approved by the director of public works;
f. Street trees shall be spaced at least ten (10) feet from sewer laterals and
street lights, and at least five feet from water laterals, gas laterals, fire
hydrants, driveway aprons, and telephone/cable/electrical junction boxes;
g. When required, the developer and/or applicant shall install street trees
adjacent to sound walls and in medians;
h. Deep root irrigation shall be provided for street trees in sidewalk cutouts.
When required, deep root irrigation and tree well coverings shall be
installed in compliance with city standard detail plans;
i. No person shall construct or place any concrete, brick, asphalt, wood
product, plastic sheeting, or other material impervious to air and water
around the base of any street tree or within three (3) feet. In addition, no
excess soil, mulch, or other organic/inorganic material shall be placed
above a tree’s root crown within three (3) feet; and
j. Street trees planted by the developer and/or applicant shall be guaranteed
to remain healthy and grow for a minimum of one (1) year. All
Page 106 of 211
workmanship on irrigation systems shall be guaranteed for one (1) year
after final acceptance by the city.
(d) Protected Trees.
(1) The community development director shall determine if existing trees qualify
as protected trees, a community of protected trees or heritage trees. Refer to
section 30.38.270, Protected Tree Removal, for the definitions of “protected
trees,” “a community of protected trees” or “heritage trees.”
(2) An arborist report shall be required for any application for discretionary
development approval for which the project site includes existing protected
trees, as defined in section 30.38.270(b). The arborist report shall include all
information specified in section 30.38.270(d). The arborist report shall specify
all necessary measures to ensure that protected trees identified to remain are
protected throughout the construction process. The cost for preparation of the
arborist report and city review of it shall be at the sole expense of the applicant.
All arborist recommendations shall be listed on the final landscape plans.
(3) The arborist shall sign the final landscape plans certifying that the plan is
consistent with the recommendations made in the arborist report.
(4) At least three (3) scheduled inspections shall be made by the city and/or the
arborist, at the direction of the city, to ensure compliance with the
recommendations of the arborist report. The inspections shall, at a minimum,
include the following: (a) initial inspection prior to any construction or grading,
(b) after completion of rough grading and/or trenching, and (c) completion of
all work including planting and irrigation system installation. Other inspections
may be conducted as required by the community development director.
(5) Unless otherwise permitted by the city, no structure, excavation, or impervious
surface areas of any kind shall be constructed or installed within the root zone
of any protected tree or heritage tree without mitigating special design, such as
post and beam footings that bridge roots. No parking, storing vehicles
equipment or other materials shall be permitted within the dripline of any
protected tree without special design considerations approved by the
community development director.
(6) All protected trees, community of protected trees or heritage tree(s) shall be
maintained in good health by the property owner, applicant and/or developer
until approved for removal by an approved protected tree removal permit or
other discretionary planning department application.
(Ord. No. 2018-06, § 1, 3-19-2018)
§ 30.38.50. Residential zone landscape standards.
(a) General Residential Zone Landscape Standards. Residential development located in
the R1, R2, R3, R4 zones, planned development zones and downtown specific plan
zones (and excluding the RH zone) shall incorporate landscaping in all yard areas
that are not specifically used for driveways, walkways, patios, or similar purposes.
In the R-2, R-3, R-4 and planned development zones and specific plan areas, at least
thirty-five percent (35%) of the required landscaped area shall be designed to be
usable as open recreational area. Landscaping shall be used to manage and treat
Page 107 of 211
storm water to the maximum extent feasible.
(b) RH Residential Hillside Zone. Areas within the residential hillside zoning district
are designated as the “City of Gilroy Wildland-Urban Fire Interface Area” under the
city code. Residential development in the RH zone shall provide landscaping
consistent with the
following standards:
(1) Development in forested areas shall be carefully designed to minimize
removal or damage to existing trees and to allow their continued healthy
existence;
(2) New landscaping placed within fifteen (15) feet from any structure shall
consist of selected vegetation with low-growing characteristics; and
(3) A landscape design plan for projects in the RH residential hillside zone
shall incorporate all requirements of Chapter 10, Fire Protection, as amended.
(Ord. No. 2018-06, § 1, 3-19-2018)
§ 30.38.60. Commercial zone landscape standards.
Landscaping in commercial zones shall be designed using the following standards
and shall enhance the aesthetic quality of the development by using the following
requirements:
(a) All development in commercial and mixed use zones shall provide a minimum of
twenty-one (21) feet of landscaping, measured from face of curb, adjacent to public
streets (public sidewalks may be permitted in the landscape area);
(b) At least eight percent (8%) of the gross total land area of the site, outside of the
public right-of-way, shall be landscaped, except in the downtown specific plan zones
where there are typically no front and side yard setbacks;
(c) All portions of a site over forty (40) square feet in area not specifically used for
buildings, parking, driveways, walkways, or similar uses shall be landscaped;
(d) In all landscaped areas, trees shall be planted on average every twenty (20) feet on
center or with a greater spacing as appropriate to maintain proper tree health as
determined by a licensed landscape architect; clustering of trees may be permitted
with the approval of the director of public works;
(e) Parking lot landscape islands with a minimum of fifty (50) square feet in area, and
including a tree, shall be located in parking lots every twelve (12) stalls, and shall be
evenly distributed throughout the parking area;
(f) All landscape areas shall be at least five (5) feet wide, except as approved by the
community development director due to specific site situations where the minimum
width is impractical;
(g) Parking lot landscape areas containing trees shall be a minimum of eight (8) feet
wide, except as approved by the community development director due to specific
site situations where the minimum width is impractical;
(h) Parking areas shall be screened from view from adjacent residential areas and
Page 108 of 211
streets, except at driveways and street corners where visibility is needed;
(i) Landscaping shall be used to manage and treat storm water to the maximum extent feasible;
(j) Three (3) foot high screening shall be located where necessary in commercial
parking lots and drive-through uses to block headlights from shining into adjacent
residential areas.
(Ord. No. 2018-06, § 1, 3-19-2018)
(k) Landscaping required by this section, should not include nonfunctional turf irrigated
with potable water.
§ 30.38.70. Industrial zone landscape standards.
Landscaping in industrial zones shall be designed using the following standards and
shall enhance the aesthetic quality of the development by using the following
requirements:
(a) Landscape the front and side yard areas adjacent to streets, as required by this article,
which are not specifically used for parking, driveways, walkways, loading areas, or
similar paved access areas;
(b) Landscaping areas located adjacent to the street right-of-way shall be a minimum of
twenty-one (21) feet wide (measured from the face of curb);
(c) Paved areas shall not exceed fifty percent (50%) of the total area of setbacks;
(d) All industrial zones shall provide landscape areas that are a minimum of five (5)
feet in width along the entire perimeter of the site;
(e) A minimum eight (8) foot wide landscaped buffer is required adjacent to
commercial or residential uses;
(f) Fences and walls shall complement the structure architecture and landscaping. Long
structure expanse shall be architecturally designed or landscaped to prevent
monotony;
(g) Outdoor use areas and loading areas shall be screened by landscaping and/or
materials integral with the structure design;
(h) Industrial development visible from US 101 shall be screened from view with dense
landscaping;
(i) Three (3) foot high screening shall be located where necessary in industrial parking
lots and drive-through uses to block headlights from shining into adjacent residential
areas.
(Ord. No. 2018-06, § 1, 3-19-2018)
(j) Landscaping required by this section should not include nonfunctional turf
irrigated with potable water.
§ 30.38.80. Landscape documentation review process.
(a) Landscape Documentation Package Required. The project developer and/or
applicant shall submit a landscape documentation package, in compliance with
section 30.38.90 (Elements of the landscape documentation package), to the
community development director for approval.
(b) Landscape Documentation Package Submittal. The landscape documentation
Page 109 of 211
package shall be submitted in conjunction with the building permit for the project
and shall be approved prior to issuance of the building permit.
(c) Following Completion of Installation. Following final approval of the installation
of landscaping by the city, the project developer and/or applicant shall:
(1) Receive documentation of the approval in a form provided by the community
development director and shall record the date of the permit in the certificate
of completion;
(2) Submit a copy of the approved landscape documentation package along with
the record drawings and any other information to the property owner or his/her
designee; and
(3) Submit a copy of the water efficient landscape worksheet to the local water
purveyor. (Ord. No. 2018-06, § 1, 3-19-2018)
§ 30.38.90. Elements of the landscape documentation package.
At a minimum, the landscape documentation package shall be provided in a form required
by the community development director and shall include the following components, as
described in this article: water efficient landscape worksheet, soil management report,
landscape design plan, irrigation design plan, and grading design plan.
(Ord. No. 2018-06, § 1, 3-19-2018)
§ 30.38.100. Water efficient landscape worksheet – Completion of worksheet.
Project applicants and/or developers shall complete the water efficient landscape
worksheet which contains information on the plant factor, irrigation method, irrigation
efficiency, and area associated with each hydrozone. The estimated total adjustment
factor (ETAF) for a landscape project is based on the plant factors and irrigation methods
selected. In calculating the maximum applied water allowance and estimated total water
use, a project developer/applicant shall use the ETo values for Gilroy.
(a) Evapotranspiration (ETo). The community development director shall provide and
annually update the evapotranspiration rate for the city using the rates provided by
the California Irrigation Management Information System (CIMIS).
(b) Water Budget Calculations. Water budget calculations shall adhere to all of the
following requirements:
(1) The plant factor used shall be from the Water Use Classification of Landscape
Species (WUCOLS) or from horticultural researchers with academic
institutions or professional associations as approved by the California
Department of Water Resources (DWR). The plant factor ranges from 0 to 0.1
for very low water using plants, 0.1 to 0.3 for low water use plants, from 0.4 to
0.6 for moderate water use plants, and from 0.7 to 1.0 for high water use plants.
(2) All water features shall be included in the high water use hydrozone and
temporarily irrigated areas shall be included in the low water use hydrozone.
(3) All special landscape areas shall be identified and their water use calculated as
shown below.
Page 110 of 211
(4) ETAF for new and existing (nonrehabilitated) special landscape areas shall not
exceed 1.0.
(c) Maximum Applied Water Allowance Calculation. The maximum applied water
allowance is calculated based on the maximum ETAF allowed (0.55 for residential
areas and 0.45 for nonresidential areas) and expressed as annual gallons required,
exclusive of special landscape areas.
MAWA (Annual Gallons Allowed) = (ETo) (0.62) [(ETAF x LA) + ((1-ETAF) x SLA)]
Residential Areas:
MAWA (Annual Gallons Allowed) = (ETo) (0.62) [(0.55 x LA) + ((1-0.55) x SLA)]
Nonresidential Areas:
MAWA (Annual Gallons Allowed) = (ETo) (0.62) [(0.45 x LA) + ((1-0.45) x SLA)]
Where:
MAWA = Maximum Applied Water Allowance (Annual Gallons
Allowed)
ETo = Reference Evapotranspiration (inches per year)
0.62 = Conversion Factor (to gallons)
0.55 = ET Residential Adjustment Factor (ETAF)
0.45 = ET Nonresidential Adjustment Factor (ETAF)
SLA = Special Landscape Area (square feet)
(d) Estimated Total Water Use Calculation. The estimated total water use (ETWU) is
calculated based on the plants used and irrigation method selected for the landscape
design. The sum of the ETWU shall not exceed the MAWA.
Wher
e:
ETW
U
ETo
=
=
Estimated Total Water Use per year (gallons)
Reference Evapotranspiration (inches per
year)
PF = Plant Factor from WUCOLS
HA = Hydrozone Area [high, medium, and low water use areas]
(square feet)
SLA = Special Landscape Area (square feet)
0.62 = Conversion Factor (to gallons)
IE = Irrigation Efficiency 0.75 for spray head, and 0.81 for drip
Page 111 of 211
(e) Effective Precipitation (EPPT). The director may consider effective precipitation
(twenty-five percent (25%) of annual precipitation) in tracking water use and may
use the following equation to calculate MAWA:
Residential Areas:
MAWA (Annual Gallons Allowed) = (ETo-EPPT) (0.62) [(0.55 x LA) + ((1-0.55) x
SLA)]
Nonresidential Areas:
MAWA (Annual Gallons Allowed) = (ETo-EPPT) (0.62) [(0.45 x LA) + ((1-0.45) x
SLA)]
(Ord. No. 2018-06, § 1, 3-19-2018)
§ 30.38.110. Soil management report.
In order to reduce runoff and encourage healthy plant growth, a soil management report
shall be
completed by the project developer/applicant, or his/her designee, as follows:
(a) Soil samples shall be submitted to a laboratory for analysis and recommendations.
(1) Soil sampling shall be conducted in compliance with laboratory protocol,
including protocols regarding adequate sampling depth for the intended plants.
(2) The soil analysis shall include:
a. Soil texture;
b. Infiltration rate determined by laboratory test or soil texture
infiltration rate table;
c. pH;
d. Total soluble salts;
e. Sodium;
f. Percent organic matter; and
g. Recommendations.
(3) In projects with multiple landscape installations (i.e., production home
developments) a soil sampling rate of one (1) in seven (7) lots or approximately
fifteen percent (15%) will satisfy this requirement. Large landscape projects
shall sample at a rate equivalent to one (1) in seven (7) parcels.
(b) The project applicant and/or developer, or his/her designee, shall comply with one
(1) of the following:
(1) If significant mass grading is not planned, the soil analysis report shall be
submitted as part of the landscape documentation package; or
(2) If significant mass grading is planned, the soil analysis report shall be
Page 112 of 211
submitted as part of the certificate of completion.
(c) The soil analysis report shall be made available, in a timely manner, to the
professionals preparing the water plans and irrigation design plans to make any
necessary adjustments to the design plans.
(d) The project developer/applicant, or his/her designee, shall submit documentation
verifying implementation of soil analysis report recommendations with the
certificate of completion.
(Ord. No. 2018-06, § 1, 3-19-2018)
§ 30.38.120. Landscape design plan.
(a) Landscape Design Plan Details Required. A landscape design plan at a minimum
shall be required and shall specify the items detailed below. Special design attributes
may require detail drawing and/or the submittal of manufacturer’s literature.
(1) Locate and identify all landscaping planting material, including trees, shrubs,
groundcover, and turf. Planting symbols shall be clearly drawn. Tree staking,
installation, soil preparation details, and any other applicable planting and
installation
details shall be provided;
(2) Reference planting symbols, specifying botanical name, common name,
container size, spacing, and quantities;
(3) Locate all existing mature trees, noting biological name, common name, and
approximate trunk size, measured at four (4) feet above existing grade. Note
trees to be removed, relocated on site, and/or maintained in place;
(4) Delineate and label each hydrozone by number, letter, or other method;
(5) Identify each hydrozone as low, moderate, high water, or mixed use water.
Temporarily irrigated areas of the landscape shall be included in the low water
use hydrozone for the water budget calculation;
(6) Identify recreational areas;
(7) Identify areas permanently and solely dedicated to edible plants;
(8) Identify areas irrigated with recycled water;
(9) Identify type of mulch and application depth;
(10) Identify soil amendments, type, and quantity;
(11) Identify type and surface area of water features;
(12) Identify all paving and hardscapes (pervious and nonpervious);
(13) Locate and identify the height of all walls, fences, and gates;
(14) Locate and identify all outdoor amenity features, including but not limited to
trellises, gazebos, play equipment, picnic tables, and benches;
(15) Locate and identify property lines, streets, street names, driveways, walkways,
Page 113 of 211
and other paved areas;
(16) Identify existing and proposed structures, including pad elevations, if
applicable;
(17) Identify natural features including but not limited to rock outcroppings, existing
trees and shrubs that will remain;
(18) Identify location, installation details, and twenty-four (24) hour retention or
infiltration capacity of any applicable storm water best management practices
(BMP) that encourage on-site retention and infiltration of storm water.
Applicants shall refer to the city or regional water quality control board for
information on any applicable storm water technical requirements. Storm water
BMPs shall be incorporated into the landscape design plan to the maximum
extent practicable. Examples shall include, but are not limited to:
a. Infiltration beds, swales, and basins that allow water to collect and soak
into the ground;
b. Constructed wetlands and retention ponds that retain water, handle
excess flow, and filter pollutants; or
c. Pervious or porous surfaces (e.g., permeable pavers or blocks, pervious or
porous concrete, etc.) that minimize runoff;
(19) Identify any applicable rain harvesting or catchment technologies, and their
twenty-four (24) hour retention or infiltration capacity;
(20) Contain the following statement: “I have complied with the standards of the
Chapter and applied them for the efficient use of water in the landscape
design plan”; and
(21) Bear the signature of a licensed landscape architect, licensed landscape
contractor, or any other person authorized to design a landscape.
(b) Landscape Design Requirements. For the efficient use of water, a landscape shall
be carefully designed and planned for the intended function of the project. A
landscape design plan, at a minimum, shall meet the following design standards and
shall be submitted as part of the landscape documentation package:
(1) Plant Material.
a. Any plant may be selected for the landscape, providing the estimated total
water use in the landscape area does not exceed the maximum applied
water allowance. Methods to achieve water efficiency may include one
(1) or more of the following:
1. Protection and preservation of native species and natural vegetation;
2. Selection of water-conserving plant, tree and turf species, especially
local native plants;
3. Selection of plants based on local climate suitability, disease, and
pest resistance;
4. Selection of trees as specified in section 30.38.40 (General landscape
Page 114 of 211
standards);
5. Selection of plants from the approved city plant list.
b. Each hydrozone shall have plant materials with similar water use, except
for hydrozones with plants of mixed water use.
c. Plants may be selected and planted appropriately based upon their
adaptability to the climatic, geologic, and topographical conditions of the
project site. Methods to achieve water efficiency shall include one (1) or
more of the following:
1. Plant selection shall be from the Sunset Western Climate Zone
System which considers temperature, humidity, elevation, terrain,
latitude, and varying degrees of continental and marine influence on
local climate; or
2. Recognize the horticultural attributes of plants (i.e., mature plant
size, invasive surface roots) to minimize damage to property or
infrastructure (e.g., structures, sidewalks, power lines); allow for
adequate soil volume for healthy root growth; or
3. Consider the solar orientation for plant placement to maximize
summer shade and winter solar gain.
d. Turf is not allowed on slopes greater than twenty-five percent (25%)
where the toe of the slope is adjacent to an impermeable hardscape and
where twenty-five percent (25%) means one (1) foot of vertical elevation
change for every four (4) feet of horizontal length (rise divided by run
times one hundred (100) equals slope percent).
e. High water use plants, characterized by a plant factor of 0.7 to 1.0, are
prohibited in street medians.
f. The use of invasive plant species (i.e., those listed by the California
Invasive Plant Council) is strongly discouraged.
g. The architectural guidelines of a common interest development, which
include community apartment projects, condominiums, planned
developments, and stock cooperatives, shall not prohibit, or include
conditions that have the effect of prohibiting, the use of low water use
plants.
g.h. New and rehabilitated landscapes on commercial, industrial, and
institutional properties, and in common areas of homeowners’
associations, common interest developments, and community service
organizations or similar entities, should not include nonfunctional
turf unless it will be irrigated exclusively with recycled water. Turf
proposed on these properties shall be shown as functional turf on the
landscape design plan, with its recreational or community use.
(2) Water Features.
a. Recirculating water systems shall be used for all water features.
Page 115 of 211
b. Where available, recycled water shall be used as a source for decorative
water features.
c. Surface area of a water feature shall be included in the high water use
hydrozone area of the water budget calculation.
d. Pool and spa covers are highly recommended.
(3) Soil Preparation, Mulch and Amendments.
a. Prior to the planting of any materials, compacted soils shall be
transformed to a friable condition. On engineered slopes, only amended
planting holes need meet this requirement.
b. Soil amendments shall be incorporated according to recommendations of
the soil report and what is appropriate for the plants selected.
c. For landscape installations, compost at a minimum rate of four (4) cubic
yards per one thousand (1,000) square feet of permeable area shall be
incorporated to a minimum depth of six (6) inches into the soil. Soils with
greater than six percent (6%) organic matter in the top six (6) inches of
soil are exempt from adding compost and tilling.
d. A minimum three (3) inch layer of mulch shall be applied on all exposed
soil surfaces of planting areas except in turf areas, creeping or rooting
groundcovers, or direct seeding applications where mulch is
contraindicated. To provide habitat for beneficial insects and other
wildlife, up to five percent (5%) of the landscape area may be left without
mulch. Designated insect habitat must be included in the landscape design
plan.
e. Stabilizing mulching products shall be used on all slopes that meet current
engineering standards.
f. The mulching portion of the seed/mulch slurry in hydro-seeded
applications shall meet the mulching requirement.
g. Organic mulch materials made from recycled or post-consumer processes
shall take precedence over inorganic materials or virgin forest products
unless the recycled post-consumer organic products are not locally
available. Organic mulches are not required where prohibited by local fuel
modification plan guidelines or other applicable local ordinances.
(Ord. No. 2018-06, § 1, 3-19-2018)
§ 30.38.130. Irrigation design plan.
(a) Irrigation Design Plan Details Required. An irrigation design plan is required and
shall include all of the information detailed below. It shall be separate from but use
the same format and scale as the landscape design plan.
(1) Location and size of separate water meters for landscape;
(2) Location, type, and size of all components of the irrigation system, including
controllers, main and lateral lines, valves, sprinkler heads, moisture sensing
devices, rain switches, quick couplers, pressure regulators, and backflow
Page 116 of 211
prevention devices;
(3) Static water pressure at the point of connection to the public water supply;
(4) Flow rate (gallons per minute), application rate (inches per hour), and design
operating pressure (pressure per square inch) for each station;
(5) Recycled water irrigation systems;
(6) The following statement: “I have complied with the standards of this Chapter
and applied them accordingly for the efficient use of water in the irrigation
design plan”; and
(7) The signature of a licensed landscape architect, certified irrigation designer,
licensed landscape contractor, or any other person authorized to design an
irrigation system.
(b) Irrigation Design Requirements. This section applies to landscaped areas requiring
permanent irrigation, not areas that require temporary irrigation solely for the plant
establishment period. For the efficient use of water, an irrigation system shall meet
the requirements listed in this section and the manufacturers’ recommendations. The
irrigation system and its related components shall be planned and designed to allow
for proper installation, management, and maintenance. An irrigation design plan
meeting the following design standards shall be submitted as part of the landscape
documentation package.
(1) System.
a. Landscape water meters shall be installed for all nonresidential irrigated
landscapes of at least one thousand (1,000) square feet but not more than
five thousand (5,000) square feet (the level at which Water Code
Section 535
applies) and residential irrigated landscapes of five thousand (5,000)
square feet or greater. A landscape water meter may be either:
1. A customer service meter dedicated to landscape use provided by the
local water purveyor; or
2. A privately owned meter or submeter.
b. Automatic irrigation controllers using either evapotranspiration or soil
moisture sensor data utilizing nonvolatile memory shall be required for
irrigation scheduling in all irrigation systems.
c. If the water pressure is below or exceeds the recommended pressure of
the specified irrigation devices, the installation of a pressure regulating
device is required to ensure that the dynamic pressure at each emission
device is within the manufacturer’s recommended pressure range for
optimal performance.
1. If the static pressure is above or below the required dynamic pressure
of the irrigation system, pressure-regulating devices (i.e., inline
pressure regulators, booster pumps), or other devices shall be
installed to meet the required dynamic pressure of the irrigation
Page 117 of 211
system.
2. Static water pressure, dynamic or operating pressure, and flow
reading of the water supply shall be measured at the point of
connection. These pressure and flow measurements shall be
conducted at the design stage. If the measurements are not available
at the design stage, the measurements shall be conducted at
installation.
d. Sensors (i.e., rain, freeze, wind, etc.), either integral or auxiliary, that
suspend or alter irrigation operation during unfavorable weather
conditions shall be required on all irrigation systems, as appropriate for
local climatic conditions. Irrigation shall be prohibited during windy or
freezing weather or during rain.
e. Manual shut-off valves (i.e., a gate valve, ball valve, or butterfly valve)
shall be required, as close as possible to the point of connection of the
water supply, to minimize water loss in case of an emergency (i.e., a main
line break) or routine repair.
f. Backflow prevention devices shall be required to protect the water supply
from contamination by the irrigation system. Project applicants and/or
developers shall refer to the applicable city code (i.e., public health) for
additional backflow prevention requirements.
g. Flow sensors that detect high flow conditions created by system damage
or malfunction are required for all on nonresidential landscapes and
residential landscapes of five thousand (5,000) square feet or larger.
h. Master shut-off valves are required on all projects except landscapes that
make use of technologies that allow for the individual control of sprinklers
that are individually pressurized in a system equipped with low pressure
shut-down features.
i. The irrigation system shall be designed to prevent runoff, low head
drainage,
overspray, or other similar conditions where irrigation water flows onto
nontargeted areas (i.e., adjacent property, nonirrigated areas, hardscapes,
roadways, or structures).
j. Relevant information from the soil management plan (i.e., soil type and
infiltration rate) shall be used when designing irrigation systems.
k. The design of the irrigation system shall conform to the hydrozones of the
landscape design plan.
l. The irrigation system shall be designed and installed to meet, at a
minimum, the irrigation efficiency criteria as described in section
30.38.100 (water efficient landscape worksheet) regarding the maximum
applied water allowance.
m. All irrigation emission devices shall meet the requirements specified in
the American National Standards Institute (ANSI) standard, American
Page 118 of 211
Society of Agricultural and Biological Engineers’/International Code
Council’s (ASABE/ ICC) 802-2014 Landscape Irrigation Sprinkler and
Emitter Standard. All sprinkler heads installed in the landscape shall
document a distribution uniformity low quarter of 0.65 or higher using the
protocol defined in ASABE/ ICC 802-2014.
n. The project applicants and/or developers shall inquire with the local water
purveyor about peak water operating demands (on the water supply
system) or water restrictions that may impact the effectiveness of the
irrigation system.
o. In mulched planting areas, the use of low volume irrigation is required to
maximize water infiltration into the root zone.
p. Sprinkler heads and other emission devices shall have matched
precipitation rates, unless otherwise directed by the manufacturer’s
recommendations.
q. Head to head coverage is recommended. However, sprinkler spacing shall
be designed to achieve the highest possible distribution uniformity using
the manufacturer’s recommendations.
r. Swing joints or other riser-protection components are required on all risers
subject to damage that are adjacent to hardscapes or in high traffic areas
of turf-grass.
s. Check valves or anti-drain valves are required on all sprinkler heads
where low point drainage could occur.
t. Landscape areas less than ten (10) feet in width in any direction shall be
irrigated with subsurface irrigation or other means that produces no runoff
or overspray.
u. Overhead irrigation shall not be permitted within twenty-four (24) inches
of any nonpermeable surface. Allowable irrigation within the setback
from nonpermeable surfaces may include drip, dripline, or other low flow
nonspray technology. The setback area may be planted or unplanted. The
surfacing of the setback may be mulch, gravel, or other porous material.
These restrictions may be modified by the director if:
1. The landscape area is adjacent to permeable surfacing and no runoff
occurs; or
2. The adjacent nonpermeable surfaces are designed and constructed to
drain entirely to landscaping; or
3. The irrigation designer specifies an alternative design or technology,
as part of the landscape documentation package, and clearly
demonstrates strict adherence to irrigation system design. Prevention
of overspray and runoff shall be confirmed during the irrigation
audit.
v. Slopes greater than twenty-five percent (25%) shall not be irrigated with an
irrigation system with an application rate exceeding 0.75 inches per hour.
Page 119 of 211
This restriction may be modified by the director if the landscape designer
specifies an alternative design or technology, as part of the landscape
documentation package, and clearly demonstrates no runoff or erosion will
occur. Prevention of runoff and erosion shall be confirmed during the
irrigation audit.
(2) Hydrozone.
a. Each valve shall irrigate a hydrozone with similar site, slope, sun
exposure, soil conditions, and plant materials with similar water use.
b. Sprinkler heads and other emission devices shall be selected based on
what is appropriate for the plant type within that hydrozone.
c. Trees shall be placed on separate valves from shrubs, groundcovers, and
turf to facilitate the appropriate irrigation of trees. The mature size and
extent of the root zone shall be considered when designing irrigation for
the tree.
d. Individual hydrozones that mix plants of moderate and low water use, or
moderate and high water use, may be allowed if:
1. Plant factor calculation is based on the proportions of the respective
plant water uses and their plant factor; or
2. The plant factor of the higher water using plant is used for
calculations.
e. Individual hydrozones that mix high and low water use plants shall not be
permitted.
f. On the landscape design plan and irrigation design plan, hydrozone areas
shall be designated by number, letter, or other designation. On the
irrigation design plan, designate the areas irrigated by each valve, and
assign a number to each valve. Use this valve number in the hydrozone
information table located on the water efficient landscape worksheet. This
table can also assist with the irrigation audit and programming the
controller.
(Ord. No. 2018-06, § 1, 3-19-2018)
§ 30.38.140. Grading design plan.
For the efficient use of water, grading of a project site shall be designed to minimize soil
erosion, runoff, and water waste. A comprehensive grading plan, prepared by a civil
engineer, shall be
submitted as part of the landscape documentation package.
(a) Grading Design Plan Details Required. The project applicants and/or developers
shall submit a landscape grading plan that indicates finished configurations and
elevations of the landscape area including:
(1) Height of graded slopes;
(2) Drainage patterns;
Page 120 of 211
(3) Pad elevations;
(4) Finish grade; and
(5) Storm water retention improvements, if applicable.
(6) The grading design plan shall contain the following statement:
I have complied with the requirements of this Chapter and applied
them accordingly for the efficient use of water in the grading design plan
and shall bear the signature of a licensed professional as authorized by law.
(b) Erosion and Runoff Best Management Practices. To prevent excessive erosion and
runoff, project developers/applicants shall:
(1) Grade so that all irrigation and normal rainfall remains within property lines
and does not drain on to nonpermeable hardscapes;
(2) Avoid disruption of natural drainage patterns and undisturbed soil; and
(3) Avoid soil compaction in landscape
areas. (Ord. No. 2018-06, § 1, 3-19-2018)
§ 30.38.150. Certificate of completion.
Upon receipt of the permit for the landscape documentation package and completion of
the landscaping and irrigation system, the applicants and/or developers shall submit a
certificate of completion to the director for review and shall ensure that copies of the
approved certificate of completion are submitted to the local water purveyor and property
owner or his or her designee. The following details shall apply to the certificate of
completion:
(a) The certificate of completion shall be on a standard form approved by the director;
(b) The certificate of completion shall be certified by either the signer of the landscape
design plan, the signer of the irrigation design plan, or the licensed landscape
contractor that the landscape project has been installed according to the approved
landscape documentation package.
(1) Where there are significant changes made in the field during construction,
these “as-built” or record drawings shall be included with the certification;
and
(2) A diagram of the irrigation plan showing hydrozones shall be kept with the
irrigation controller for subsequent irrigation management purposes;
(c) The certificate of completion shall include irrigation scheduling parameters used to
set the controller in compliance with section 30.38.160 (Irrigation scheduling);
(d) The certificate of completion shall include landscape and irrigation maintenance
schedules in compliance with section 30.38.170 (Landscape and irrigation
maintenance schedule);
(e) The certificate of completion shall include an irrigation audit report in compliance
with section 30.38.180 (Irrigation audit, irrigation survey, and irrigation water use Page 121 of 211
analysis); and
(f) The certificate of completion shall include a soil analysis report, if not submitted
with the landscape documentation package, and documentation verifying
implementation of soil report recommendations in compliance with section
30.38.110 (Soil management report).
(Ord. No. 2018-06, § 1, 3-19-2018)
§ 30.38.160. Irrigation scheduling.
For the efficient use of water, all irrigation schedules shall be developed, managed, and
evaluated to use the minimum amount of water required to maintain plant health.
Irrigation schedules shall meet the following standards:
(a) Irrigation scheduling shall be regulated by automatic irrigation controllers.
(b) Overhead irrigation shall only be scheduled between 68:00 p.m. and 910:00 a.m.
unless weather conditions prevent it. If allowable hours of irrigation differ from the
local water purveyor, the stricter of the two (2) shall apply. Operation of the
irrigation system outside the normal watering window is allowed for auditing and
system maintenance only.
(c) For implementation of the irrigation schedule, attention shall be paid to irrigation run
times, emission device, flow rate, and current reference evapotranspiration, so that
applied water meets the estimated total water use. Total annual applied water shall
be less than or equal to maximum applied water allowance (MAWA). Actual
irrigation schedules shall be regulated by automatic irrigation controllers using
current reference evapotranspiration data (e.g., CIMIS) or soil moisture sensor data.
(d) Parameters used to set the automatic controller shall be developed and submitted for
each of the following:
(1) The plant establishment period;
(2) The established landscape; and
(3) Temporarily irrigated areas.
(e) Each irrigation schedule shall consider for each station all of the following that
apply:
(1) Irrigation interval (days between irrigation);
(2) Irrigation run times (hours or minutes per irrigation event to avoid runoff);
(3) Number of cycle starts required for each irrigation event to avoid runoff;
(4) Amount of applied water scheduled to be applied on a monthly basis;
(5) Application rate setting;
(6) Root depth setting;
(7) Plant type setting;
(8) Soil type;
Page 122 of 211
(9) Slope factor setting;
(10) Shade factor setting; and
(11) Irrigation uniformity or efficiency
setting. (Ord. No. 2018-06, § 1, 3-19-2018)
§ 30.38.170. Landscape and irrigation maintenance schedule.
(a) Landscapes shall be maintained to ensure water use efficiency. A regular
maintenance schedule shall be submitted with the certificate of completion.
(b) A regular maintenance schedule shall include, but not be limited to, routine
inspection; auditing, adjustment and repair of the irrigation system and its
components; aerating and dethatching turf areas; topdressing with compost,
replenishing mulch; fertilizing; pruning; weeding in all landscape areas, and
removing obstructions to emission devices. Operation of the irrigation system
outside the normal watering window is allowed for auditing and system
maintenance only.
(c) Repair of all irrigation equipment shall be done with the originally installed
components or their equivalents or with components with greater efficiency.
(d) Project applicants and/or developers are encouraged to implement established
landscape industry sustainable best practices for all landscape maintenance
activities.
(Ord. No. 2018-06, § 1, 319-18)
§ 30.38.180. Irrigation audit, irrigation survey, and irrigation water use analysis.
(a) All landscape irrigation audits shall be conducted by a certified landscape irrigation
auditor. Landscape audits shall not be conducted by the person who designed the
landscape or installed the landscape.
(b) In large projects or projects with multiple landscape installations (i.e., production
home developments) an auditing rate of one (1) in seven (7) parcels or
approximately fifteen percent (15%) will satisfy this requirement.
(c) For new construction and rehabilitated landscape projects installed after December
1, 2015, the following shall apply:
(1) The project applicants and/or developers shall submit an irrigation audit report
with the certificate of completion, including inspection, system tune-up, system
test with distribution uniformity, reporting overspray or run off that causes
overland flow, and preparation of an irrigation schedule, including configuring
irrigation controllers with application rate, soil types, plant factors, slope,
exposure and any other factors necessary for accurate programming;
(2) The city may require an irrigation water use analysis, irrigation audits, and
irrigation surveys to ensure compliance with the maximum applied water
allowance.
(Ord. No. 2018-06, § 1, 3-19-2018)
Page 123 of 211
§ 30.38.190. Irrigation efficiency.
For the purpose of determining estimated total water use, average irrigation efficiency is
assumed to be 0.75 for overhead spray devices and 0.81 for drip system devices.
(Ord. No. 2018-06, § 1, 3-19-2018)
§ 30.38.200. Recycled water.
(a) The installation of water irrigation systems shall allow for the current and future use
of recycled water.
(b) All recycled water irrigation systems shall be designed and operated in compliance
with all applicable local and state laws.
(c) Landscapes using recycled water are considered special landscape areas. The ETAF
for new and existing (nonrehabilitated) special landscape areas shall not exceed 1.0.
(Ord. No. 2018-06, § 1, 3-19-2018)
§ 30.38.210. Graywater systems.
Graywater systems promote the efficient use of water and are encouraged to assist in on-
site landscape irrigation. All graywater systems shall conform to the California Plumbing
Code (Title 24, Part 5, Chapter 16) and any applicable local standards.
(Ord. No. 2018-06, § 1, 3-19-2018)
§ 30.38.220. Storm water management and rainwater retention.
(a) Storm water management practices minimize runoff and increase infiltration which
recharges groundwater and improves water quality. Implementing storm water best
management practices in the landscape and grading design plans to minimize runoff
and to increase on-site rainwater retention and infiltration is required.
(b) Project applicants and/or developers shall refer to the following references for
information on low impact development (LID) standards, including storm water
management, operations and maintenance:
(1) Chapter 27D (Post Construction Storm Water Pollution Prevention); and
(2) South Santa Clara County Regional Stormwater Management Guidance
Manual for Low Impact Development and Post-Construction Requirements
Project applicants and/or developers shall refer to the city or regional water
quality control board for information on any applicable storm water technical
requirements.
(c) All planted landscape areas shall have friable soil to maximize water retention and
infiltration in compliance with section 30.38.120 (Landscape design plan).
(d) Landscape areas shall be designed for capture and infiltration capacity that is
sufficient to prevent runoff from impervious surfaces (i.e. roof and paved areas) from
either: (1) twenty-four (24) hour rain event or (2) the eighty-fifth percentile, twenty-
four (24) hour rain event, and/or additional capacity as required by any applicable
local, regional, state and/or federal regulations.
(e) Storm water projects shall incorporate any of the following elements to improve on-
Page 124 of 211
site storm water and dry weather runoff capture and use:
(1) Grade impervious surfaces (i.e., driveways) during construction to drain to
vegetated areas.
(2) Minimize the area of impervious surfaces (i.e., paved areas, roof, and
concrete driveways).
(3) Incorporate pervious or porous surfaces (e.g., gravel, permeable pavers or
blocks, pervious or porous concrete) that minimize runoff.
(4) Direct runoff from paved surfaces and roof areas into planting beds or
landscaped areas to maximize site water capture and reuse.
(5) Incorporate rain gardens, cisterns, and other rain harvesting or catchment systems.
(6) Incorporate infiltration beds, swales, basins, and drywells to capture storm
water and dry weather runoff and increase percolation into the soil.
(7) Consider constructed wetlands and ponds that retain water, equalize excess
flow, and filter pollutants.
(Ord. No. 2018-06, § 1, 3-19-2018)
§ 30.38.230. Public education.
(a) Publications. The city shall provide information to owners of permitted renovations
and new, single-family residential homes regarding the design, installation,
management, and maintenance of water efficient landscapes based on a water
budget.
(b) Model Homes. All model homes that are landscaped shall use signs and written
information to demonstrate the principles of water efficient landscapes described in
this article.
(1) Signs shall identify the following:
a. The model as an example of a water efficient landscape featuring elements
like hydrozones, irrigation equipment, and others that contribute to the
overall water efficient theme; and
b. Information about the site’s water use as designed in compliance with the
local ordinances; specify who designed and installed the water efficient
landscape; and demonstrate low water use approaches to landscaping like
using native plants, graywater systems, and rainwater catchment systems.
(2) Developers/applicants shall provide information about designing,
installing, managing, and maintaining water efficient landscapes to home
buyers.
(Ord. No. 2018-06, § 1, 3-19-2018)
§ 30.38.240. Provisions for existing landscapes.
(a) This section shall apply to all existing landscape areas that were installed before
December 1, 2015, and are over one (1) acre in size.
Page 125 of 211
(1) For all landscape areas that have a water meter, the city shall administer programs
that may include, but not be limited to, irrigation water use analyses, irrigation
surveys, and irrigation audits to evaluate water use and provide
recommendations as necessary to reduce landscape water use to a level that
does not exceed the maximum applied water allowance for existing landscapes.
The maximum applied water allowance for existing landscapes shall be
calculated as: MAWA = (0.8) (ETo) (LA) (0.62).
(2) For all landscape areas that do not have a water meter, the city shall administer
programs that may include, but not be limited to, irrigation surveys and
irrigation audits to evaluate water use and provide recommendations as
necessary in order to prevent water waste.
(b) All landscape irrigation audits shall be conducted by a certified landscape irrigation
auditor.
(Ord. No. 2018-06, § 1, 3-19-2018)
( c) Regardless of size or date of installation, existing landscapes on properties shall
comply with Chapter 27. Section 27.98 (b)(2)(o)(M-0.34).
§ 30.38.250. Water waste prevention.
(a) Project applicants and/or developers shall prevent water waste resulting from
inefficient landscape irrigation by prohibiting runoff from leaving the target
landscape areas due to low head drainage, overspray, or other similar conditions
where water flows onto adjacent property, nonirrigated areas, walks, roadways,
parking lots, or structures. Penalties for violating these prohibitions shall be enforced
in compliance with Article LIII of this chapter (Enforcement of the Zoning
Ordinance).
(b) Restrictions regarding overspray and runoff may be modified if:
(1) The landscape area is adjacent to permeable surfacing and no runoff occurs; or
(2) The adjacent nonpermeable surfaces are designed and constructed to drain
entirely to landscaping.
(Ord. No. 2018-06, § 1, 3-19-2018)
§ 30.38.260. Penalties.
Noncompliance with the applicable provision of this article shall be subject to
enforcement action, as provided in Article LIII of this chapter (Enforcement of the
Zoning Ordinance).
(Ord. No. 2018-06, § 1, 3-19-2018)
§ 30.38.270. Protected tree removal.
(a) Purpose. The city recognizes that existing and future trees and tree communities
located in the city are a valuable and distinctive resource. These trees and tree
communities augment the economic base of the city through encouragement of
tourism and enhancement of the living environment. The removal of protected trees
and diminishing of tree communities would reduce property values and the scenic
beauty and attractiveness of the city to residents and visitors.
Page 126 of 211
In order to protect this resource, it is the intent of this section to regulate the removal
or destruction of protected trees and tree communities on private property within the
city.
(b) Definitions.
(1) Community of Protected Trees. Any grouping of protected trees which are
ecologically or aesthetically related to each other such that the loss of several
of them would cause a protected ecological, aesthetic or environmental impact
in the immediate area, as determined by a certified arborist. In subsections (d),
(e), (g), and
(h) of this section, the term “tree” shall refer to each and every tree in the
community of protected trees that is proposed for removal.
(2) Heritage Tree. A tree of any species with a single trunk of ninety (90) inches
in circumference or more at a point four and one-half (4-1/2) feet above the
ground or with multiple trunks, two (2) of which collectively measure seventy-
two (72) inches in circumference or more at a point four and one-half (4-1/2)
feet above the ground.
(3) Indigenous Tree. A tree which is native to the Gilroy region, including oaks
(all types), California bay (Umbellularia californica), big leaf maple (Acer
macrophyllum), madrone (Arbutus menziesii), California sycamore (Platanus
racemosa), California buckeye (Aesculus californica) and alder (Alnus
glutinosa).
(4) Protected Tree. Any indigenous tree characterized by having a single trunk of
thirty-eight (38) inches in circumference or more at a point four and one-half
(4-1/2) feet above the ground. Nonindigenous tree species and orchards
(including individual fruit and nut trees) are exempt from this definition for the
purpose of this section.
(5) Tree. A woody perennial plant characterized by having a main stem or trunk,
or a multistemmed trunk system with a more or less definitely formed crown,
and is usually over ten (10) feet high at maturity. This definition shall not
include trees planted, grown and held for sale by licensed nurseries or the first
removal or transplanting of such trees pursuant to and as a part of operation of
a licensed nursery business.
(c) Permit Required. It is unlawful for any person to cut down, remove, poison or
otherwise damage, kill or destroy or cause to be removed any of the following on any
private property without first securing a permit as provided in this section:
(1) A protected tree.
(2) Greater than twenty-five percent (25%) of the trees within the outermost
dripline of a community of protected trees.
(3) A heritage tree.
A separate tree removal permit shall not be required for projects which have been
approved through a discretionary process by the planning division, planning
commission or city council and the removal of protected trees or community of
trees were reviewed to ensure compliance with all requirements of this section and
authorized by that approval. Trimming, removal and other activities related to trees Page 127 of 211
in the public right-of-way are regulated by Chapter 26.
(d) Application. Any person desiring to cut down, remove, destroy or cause to be
removed any protected tree, community of protected trees, or heritage tree shall
apply to the planning division for a tree removal permit on forms provided by the
division. The application shall include information to describe and justify the
removal request and a report from an arborist certified by the International Society
of Aboriculture (ISA) or other equivalent organization acceptable to the planning
manager. The aborist report shall include all of the
following, unless otherwise approved by the planning manager:
(1) Site plan showing location of the tree (including buildings, driveways, etc.).
(2) Clear pictures of the tree indicating location, details and signs of failure or
disease.
(3) Description of species of the tree.
(4) Estimated height of the tree.
(5) Circumference or diameter at breast height of the tree.
(6) Discussion of the general health of the tree.
(7) Value of the tree according to the ISA tree valuation formula.
(8) Discussion of the tree’s risk.
(9) Discussion of why the tree cannot be saved, including consideration of the
following techniques:
a. Discussion of risk management pruning.
b. Discussion of installation of structural support system.
c. Discussion of improving site conditions/cultural conditions.
d. Discussion of implementing integrated pest management programs.
(10) Description of the method to be used for removal of the tree.
(11) Reason for removal of the tree.
(12) Proposed replacement tree, including species, size, location.
(e) Public Notice. The applicant shall cause a notice of the proposed removal to be
posted on the affected tree and in at least two (2) conspicuous locations on the site
clearly visible to and readable from public property on a form provided by the
planning division. The notices shall be a minimum of eight and one-half (8-1/2) by
eleven (11) inches in size. In addition, the notice shall be mailed to the owners of
record of all properties which are immediately adjacent to and directly across the
street from the property on which the tree is located. The notice shall include the
application number, a description of the proposal, including the location of the tree
to be removed, contact information for the planning division from which additional
information may be obtained and the final date for receipt of comments. A minimum
of ten (10) days from the date of posting shall be given for comments to be received.
Page 128 of 211
No action shall be taken on any application until the applicant has filed an affidavit
that such posting has been accomplished and the review period has expired.
Emergency situations, as described below, are not subject to this provision.
(f) Application Review and Approval. The planning division shall review the
application for removal of protected tree, community of protected trees or heritage
tree and shall determine on the basis of the information provided and the findings
listed in subsection (g) of this section whether to approve, approve with conditions
or deny the request.
(g) In order to approve an application for tree removal, the following findings must be
made:
(1) At least one (1) of the following findings must be made:
a. The tree is dead, diseased or in danger of falling.
b. The tree is determined to be an immediate threat to life or property.
c. The tree is determined to be causing damage or reasonably expected to
cause damage to existing buildings or interfere with utility services.
d. The retention of the tree restricts the economic enjoyment of the property
or creates an unusual hardship for the property owner by severely limiting
the use of the property in a manner not typically experienced by owners
of similarly situated properties, and the applicant has demonstrated to the
satisfaction of the community development director that there are no
reasonable alternatives to preserve the tree.
e. Retention of the tree would result in reduction of the permissible building
envelope by more than twenty-five percent (25%); and
(2) None of the tree management techniques referenced in subsection (d) of this
section are deemed feasible to save the tree.
In granting any permit pursuant to this section, the community development director
may attach reasonable conditions to ensure compliance with the intent and purpose
of this section including, but not limited to, planting of replacement trees, mitigation
of visual impacts and control of erosion.
(h) Replacement. Any tree approved for removal under this section shall be replaced.
Replacement trees shall be of the same species as the tree that was removed unless
otherwise approved by the community development director. Replacement tree shall
be planted on the same site as the removed tree; however, if the site is inadequate in
size to accommodate the replacement tree, the replacement tree may be planted on
public property with the approval of the director of public works. Alternatively, the
director of public works, at his/her discretion, may accept an in-lieu payment equal
to the value of the replacement trees required by Table 1, below. The in-lieu
payment shall include funds sufficient for the care of the replacement trees during
their establishment period as determined by the director of public works. The
number and size of replacement trees shall be based on the number and size of trees
approved for removal, as indicated in Table 1, below. If the tree being replaced is a
tree that was required as a part of an approved landscaping plan, the replacement
species must be consistent with the landscaping plan. Otherwise, the replacement
tree may be of any species included on the city’s master tree planting plan. Page 129 of 211
Table 1
REPLACEMENT TREE
REQUIREMENTS
Trunk Size of Removed
Tree (measured at 4-1/2
feet above grade)
Replacement Ratio Required (per tree
removed)
Circumference (inches)
Number of
Replacement
Trees
Minimum Size
38 to 75 2 24 inch box
Greater than 75 2 36 inch box
Heritage Trees 2 48 inch box
If a mitigation measure for removal of a protected tree, community of protected trees
or a heritage tree contained in a certified environmental document requires greater
numbers or size of replacement trees than specified in Table 1, above, that
requirement shall supersede the requirements of this section.
(i) Emergency Situations. In emergency situations caused by the hazardous or
dangerous condition of a tree that poses an immediate threat to the safety of life or
property, the minimum necessary actions may be taken to reduce or eliminate the
hazard without complying with the other provisions of this section, except that the
person responsible for actions taken to reduce the hazard or to remove the tree shall
report such action to the community development department within five (5)
working days of that action. Photographs thoroughly documenting the hazardous or
dangerous condition of the tree shall be taken prior to any action to reduce the
immediate threat. A tree removal permit, as specified in this section, shall be
submitted prior to removal of the tree. The required arborist report shall document
the conditions that warrant removal of the tree, including the photographs referenced
above.
(j) Appeal. Anyone so desiring may appeal the decision of the community development
director by written request to the planning commission and payment of the appeal
fee within twenty (20) days after the date of the decision of the community
development director.
(k) Enforcement—Remedies for Violation. In addition to all other civil remedies set
forth in this Code or otherwise provided by law, the following remedies shall be
available to the city for violation of this section:
(1) Administrative Penalties. Whenever an enforcement officer charged with the
enforcement of this Code determines that a violation of this section has
occurred, the enforcement officer shall have the authority to issue an
administrative citation to any person, firm, or corporation responsible for
causing, committing, allowing, or maintaining the violation, pursuant to
Chapter 6A, and in accordance with the notice requirements and hearing
procedure contained therein. The administrative citation shall impose a penalty
in an amount set forth in the schedule of penalties established by resolution of
Page 130 of 211
the city council.
(2) Civil Penalties. As part of a civil action brought by the city, a court may assess
against any person who causes, commits, allows, or maintains a violation of
any provision of
this section a civil penalty in an amount not to exceed five thousand dollars
($5,000) per violation.
(3) Injunctive Relief. Any violation of this section shall constitute a public
nuisance, and a civil action may be commenced to abate, enjoin, or otherwise
compel the cessation of such violation. Summary abatement of any violation
of this section shall be at the expense of the person, firm, or corporation
causing, committing, allowing, or maintaining the violation. The city may
make the expense of abatement a lien against the property on which it is
maintained and a personal obligation against the property owner.
(4) Costs. To the extent the city prosecutes a violation of this section through a
nuisance abatement action, the prevailing party shall be entitled to reasonable
attorneys’ fees, and the city if it prevails shall be entitled to all costs of
investigation and preparation for trial, the costs of trial, reasonable expenses
including overhead and administrative costs incurred in abating the violation
and/or in prosecuting the action. In all other civil actions brought pursuant to
this section in which the city prevails, the court shall award to the city
reasonable attorneys’ fees.
(Ord. No. 2018-15, § 1, 11-5-2018)
§ 30.49.31. Committee membership.
The historic heritage committee shall consist of five (5) members, each appointed by the
city council. Terms shall be for two (2) years, and shall be staggered. Members may serve
up to a maximum of three (3) consecutive terms. The members shall consist of:
(a) One (1) member of the planning commission.
(b) One (1) member of the city council.
(c) One (1) citizen member with training or experience in structural rehabilitation.
(d) Two (2) citizen members knowledgeable in local history or
architecture. (Ord. No. 2013-08, § 2 (Exh. A), 8-5-2013)
§ 30.49.32. Committee powers.
The historic heritage committee shall have the following powers and duties:
(a) To recommend to the planning commission and council any building, structure or
other physical object or group of buildings, structures or other physical objects that
it has determined from review and investigation should be designated as a historic
site or neighborhood combining district. The recommendation shall contain a brief
written description of the building, structure or other physical object, and the reasons
for the recommendation, drawn from the criteria specified by section 30.27.30.
(b) To maintain and update a local register of historic neighborhoods and historic sites
within the city.
Page 131 of 211
(c) To review and investigate architectural and site review requests for property located
within a historic site or neighborhood combining district, as specified by section
30.27.40.
(d) To review and investigate requests for demolition permits for any building, structure
or other physical object in the city, as specified by section 30.27.50.
(e) To review all applications for permits, environmental assessments, environmental
impact reports and other similar documents pertaining to historic sites and historic
neighborhoods.
(f) To make recommendations to the city’s street naming committee regarding possible
new street names from Gilroy’s cultural and historical past.
(g) To institute and support such programs and projects as will help make the citizens
of the city and its visitors aware of its origin, development, and historic significance.
(h) To perform such other duties relating to city history and historic sites and
neighborhoods as the city council requires.
(Ord. No. 2013-08, § 2 (Exh. A), 8-5-2013)
Page 132 of 211
Bold Text = Proposed Additions
Struck Text= Proposed Deletions
Plain text = Existing Code
Proposed Title: Ordinance of the City Council of the City of Gilroy amending
Chapter 27, Article VI, “Water Supply Shortage Regulations” and Chapter 30,
Article XXXVIII, “Landscaping, Water Efficiency, and Storm Water Retention
and Treatment” to prohibit the use of potable water for the irrigation of
nonfunctional turf in compliance with AB 1572.
ARTICLE VI
WATER SUPPLY SHORTAGE REGULATIONS
§ 27.95. Findings.
(a) A reliable minimum supply of potable water is essential to the public health, safety
and welfare of the people and economy of the city.
(b) The city is located in a semi-arid region and is dependent upon local surface water,
groundwater, and imported water supplies. A growing population, climate change,
environmental concerns, and other factors in other parts of the state and western
United States make the region highly susceptible to water supply reliability issues.
(c) There is a need for water conservation and regulations because there is a limited
supply of water available to serve the residents and businesses of the city.
(d) Careful water management that includes water conservation measures to ensure a
reliable minimum supply of water to meet current and future water supply needs.
(e) Article X, Section 2 of the California Constitution declares that the general welfare
requires that water resources be put to beneficial use, waste or unreasonable use or
unreasonable method of use of water be prevented, and conservation of water be
fully exercised with a view to the reasonable and beneficial use thereof.
(f) Article XI, Section 7 of the California Constitution declares that a city or county
may make and enforce within its limits all local, police, sanitary and other
ordinances and regulations not in conflict with general laws.
(g) California Water Code Section 375 et seq. authorizes water suppliers to adopt and
enforce a comprehensive water conservation program to reduce water consumption
and conserve supplies.
(h) The adoption and enforcement of permanent water conservation measures and a
temporary water supply shortage program is necessary to manage the city’s potable
water supply and to avoid or minimize the effects of drought and shortage within
the city. The adoption of voluntary and mandatory water conservation measures is
necessary to manage the city’s potable water supply in the long term. Such programs
are essential to ensure a reliable and sustainable minimum supply of water for the
public health, safety and welfare.
Page 133 of 211
(Ord. No. 2014-11, § 1, 8-4-2014; Ord. No. 2015-04, § 1, 5-18-2015; Ord. No.
2016-15, § 1, 8-1-2016)
i) Water Code Section 10608.14 requires public water systems to prohibit the use
of potable water to irrigate non-functional turf on commercial, industrial, and
institutional properties other than a cemetery and on common areas of
homeowners’ associations, common interest developments, and community
service organizations or similar entities.
§ 27.96. Declaration of purpose and intent.
(a) The purpose of this article is to establish voluntary water conservation measures and
a water supply shortage program that will reduce water consumption within the city
through conservation, enable effective water supply planning, assure reasonable and
beneficial use of water, prevent waste of water, and maximize the efficient use of
water within the City of Gilroy to avoid and minimize the effect and hardship of
water shortage.
Page 134 of 211
(b) This article establishes voluntary water conservation measures and temporary water
conservation standards intended to alter behavior related to water use efficiency to
be implemented during times of declared water shortage or declared water shortage
emergency.
(c) This article also establishes permanent mandatory water conservation measures
intended to safeguard a reliable and sustainable minimum supply of water for the
public health, safety, and welfare.
(Ord. No. 2014-11, § 1, 8-4-2014; Ord. No. 2016-15, § 2, 8-1-2016)
§ 27.97. Definitions.
For the purposes of this article, unless otherwise apparent from the context, certain words
and phrases used in this article are defined as follows:
“CII water use” means water used by commercial water users, industrial water
users, institutional water users. It does not include a cemetery.
“Commercial water user” means a water user that provides or distributes a product
or service.
“Common area” means that portion of common interest development or of a
property owned or managed by a homeowners’ association or a community service
organization or similar entity that is not assigned or allocated to the exclusive use
of the occupants of an individual dwelling unit within the property.”
“Common interest developments” means community apartment projects,
condominium projects, planned developments, and stock cooperatives per Civil
Code Section 4100.
“Community service organization or similar entity” has the same meaning as in
section 4100 of the Civil Code.
“Community space” means an area designated by a property owner or a
governmental agency to accommodate human foot traffic for civic, ceremonial, or
other community events or social gatherings.
“Homeowners’ Association” means an “association” as defined in Section 4080 of
the Civil Code.
“Functional Turf” means a ground cover surface of turf located in a recreational
use area or community space. Turf enclosed by fencing or other barriers to
permanently preclude human access for recreation or assembly is not functional
turf.
“Industrial water user” means a water user that is primarily a manufacturer or
processor of materials as defined by the North American Industry Classification
System code sectors 31 to 33, inclusive, or an entity that is a water user primarily
engaged in research and development.
“Institutional water user” means a water user dedicated to public service. This
type of user includes, among other users, higher education institutions, schools,
courts, churches, hospitals, government facilities, and nonprofit research
institutions
Page 135 of 211
“Landscape irrigation system” means an irrigation system with pipes, hoses, spray heads,
or sprinkling devices that are operated by hand or through an automated system.
“Nonfunctional Turf” - means any turf that is not functional turf, and includes turf
located within street rights-of-way and parking lots.
“Multifamily residential property” means a property that includes a building
containing more than four dwelling units.
“Person” means any natural person or persons, corporation, public or private entity,
governmental agency or institution, or any other user of water provided by the city.
“Potable water” means water which is suitable for drinking.
“Recreational use area” means an area designated by a property owner or a governmental
agency to accommodate human foot traffic for recreation, including, but not limited to,
sports fields, golf courses, playgrounds, picnic grounds, or pet exercise areas. This recreation
may be either formal or informal.”
“Public works Utilities Department Ddirector” means the city’s utilities director or
such of public works department of the city, and any act in this article required or
authorized to be done by the public works director as the city administrator designates to
manage the city’s water and wastewater utility. may be done on behalf of the public
works director by an authorized officer or employee of the public works department.
“Recycled water” means the reclamation and reuse of non-potable water for beneficial
use as defined in Title 22 of the California Code of Regulations.
“Single pass cooling systems” means equipment where water is circulated only once to
cool equipment before being disposed.
“Station” means an area of irrigated landscape controlled by a single irrigation valve.
(Ord. No. 2014-11, § 1, 8-4-2014; Ord. No. 2015-04, § 2, 5-18-2015)
“Turf” means a groundcover surface of ornamental grass, or a ground cover
surface of mowed grass only. Annual bluegrass, Kentucky bluegrass, perennial
ryegrass, red fescue and tall fescue are cool-season grasses. Bermuda grass, Kikuyu
grass, seashore paspalum, St. Augustine grass, zoysia grass, and buffalo grass are
warm-season grasses.
§ 27.98. Wasting of water and drought emergencies.
(a) Applicability.
(1) The provisions of this article apply to any person in the use of any potable
water provided by the city.
(2) The provisions of this article do not apply to uses of water necessary to protect
public health and safety or for essential government services, such as police,
fire and other similar emergency services.
(3) The provisions of this article do not apply to the use of water by commercial
nurseries and commercial growers to sustain plants, trees, shrubs, crops or
other vegetation intended for commercial sale.
Page 136 of 211
(4) The provisions of this article do not apply to the use of water by city facilities
Page 137 of 211
to sustain plants, trees, shrubs, or recreational functional turf.
(5) This article is intended solely to further the conservation of water. It is not
intended to implement any provision of federal, state, or local statutes,
resolutions, or regulations relating to protection of water quality or control of
drainage or runoff.
(b) Saving Water—Level 0 (Zero Percent (0%) to Ten Percent (10%) Reduction). Level
0 is in effect at all times, and does not need to be declared by council. Level 0 is
divided into voluntary and mandatory measures to comply with the State of
California Governor’s executive order B-37-16.consistent with state law.
(1) Voluntary. The following voluntary (as indicated with a “V”) water
conservation measures are encouraged at all times. Following these measures
will help save water, and water users are encouraged to save water year round.
a. V-0.1 Recommended Watering Hours. Watering or irrigating of lawn,
landscape or other vegetated area with potable water is discouraged
between the hours of 9:00 a.m. and 5:00 6 p.m. Pacific Standard/Daylight
Savings Time.
b. V-0.2 Recommended Limit on Watering Duration. Watering or irrigating
of lawn, landscape or other vegetated area with potable water using a
landscape irrigation system or a watering device that is not continuously
attended is recommended to be limited to no more than three (3) days a
week with a duration of fifteen (15) minutes watering per water day per
station. This subsection does not apply to landscape irrigation systems that
exclusively use very low-flow drip type irrigation systems when no
emitter produces more than two (2) gallons of water per hour and weather
based controllers or stream rotor sprinklers that meet a seventy percent
(70%) efficiency standard.
c. V-0.3 Fix Leaks, Breaks or Malfunctions. Excessive use, loss or escape
of water through breaks, leaks or other malfunctions in the water user’s
plumbing or distribution system for any period of time after such escape
of water should have reasonably been discovered should be corrected as
soon as practical.
d. V-0.4. Washing vehicles at commercial conveyor car wash systems with
recirculating water systems is recommended.
e. V-0.5 Filling Ornamental Lakes or Ponds. Filling or refilling ornamental
lakes or ponds with potable water is encouraged only to the extent needed
to sustain aquatic life.
f. V-0.6 through 0.19 Reserved.
(2) Mandatory. The following mandatory (as indicated with an “M”) water
conservation measures are in effect at all times. Following these measures will
help save water, and water users are encouraged to save water year round.
Page 138 of 211
a. M-0.20 Washing Vehicles. Using water to wash or clean a vehicle,
including but not limited to any automobile, truck, van, bus, motorcycle,
boat or trailer, whether motorized or not is prohibited, except by use of a
hand-held bucket or similar container or a hand-held hose equipped with
a positive self-closing water shut-off nozzle or device.
b. M-0.21 Washing Down Hard or Paved Surfaces. Washing down hard or
paved surfaces, including but not limited to sidewalks, walkways,
driveways, parking areas, tennis courts, patios or alleys, is prohibited
except for health and safety reasons by use of a hand-held bucket or
similar container, a hand-held hose equipped with a positive self-closing
water shut-off device, a low-volume, high-pressure cleaning machine
equipped to recycle any water used, or a low-volume high-pressure water
broom. This prohibition does not apply to pressure washing a wall when
necessary for preparation prior to painting or repainting.
c. M-0.22 Recirculating Water for Water Fountains and Decorative Water
Features. Operating a water fountain or other decorative water features
that use non-recirculated water is prohibited.
d. M-0.23 Eliminate Excessive Water Flow or Runoff. Using water in any
manner or irrigating of any lawn, landscape or other vegetated area in a
manner that causes or allows excessive water flow or runoff onto an
adjoining sidewalk, driveway, street, alley, gutter or ditch is prohibited.
e. M-0.24 Irrigating within Forty-Eight (48) Hours of Rainfall. The
applications of potable water to outdoor landscapes during or within forty-
eight (48) hours following measurable rainfall is prohibited.
f. M-0.25 Prohibition against Watering Turf in Medians. The irrigation with
potable water of ornamental turf on public street medians, including
roundabouts, is prohibited.
g. M-0.26 Irrigation outside Newly Constructed Homes. The irrigation with
potable water outside of homes and buildings constructed after May 18,
2015, in a manner inconsistent with regulations or other requirements
established by the California Building Standards Commission is
prohibited.
h. M-0.27 Drinking Water Served upon Request Only. Eating or drinking
establishments, including but not limited to a restaurant, hotel, cafe,
cafeteria, bar, or other public place where food or drinks are sold, served,
or offered for sale, are prohibited from providing drinking water to any
person unless expressly requested.
i. M-0.28 Commercial Lodging Establishments Must Provide Guests
Option to Decline Daily Linen Services. Hotels, motels and other
commercial lodging establishments must provide customers the option of
not having towels and linen laundered daily. Commercial lodging
Page 139 of 211
establishments must prominently display notice of this option in each
bathroom using clear and easily understood language.
j. M-0.29 Installation of Single Pass Cooling Systems. Installation of single
pass cooling systems is prohibited in buildings requesting new water
service.
k. M-0.30 Installation of Non-recirculating Water System in Commercial
Car Wash and Laundry Systems. Installation of non-recirculating water
systems is prohibited in commercial conveyor car wash and new
commercial laundry systems.
l. M-0.31 Pool Covers. It is required that all new and existing pools use a
pool cover or solar blanket to reduce water loss due to evaporation.
m. M-0.32 Use of Recycled Water for Construction. When directed by the
public works director and or Utilities Department Director, recycled
water fill stations shall be made available for construction water for
purposes including dust control. Recycled water fill stations may be
removed upon completion of construction activities in the area.
n. M-0.33 Restaurants Required to Use Water Conserving Dish Wash Spray
Valves. Food preparation establishments, such as restaurants or cafes, are
prohibited from using non-water conserving dish wash spray valves.
o. M-0.34 Irrigation of Non-Functional Turf. The use of potable water
for the irrigation of nonfunctional turf located at commercial,
industrial, and institutional properties, other than a cemetery, and on
properties of homeowners’ associations, common interest
developments, and community service organizations or similar
entities is prohibited by the following dates:
1.All properties owned by local governments, local or regional
public agencies, and public water systems, including the city, except
those specified in paragraph 4, beginning January 1, 2027.
2. All other institutional properties and all commercial and
industrial properties, beginning January 1, 2028
3. All common areas of properties of homeowners’ associations,
common interest developments, and community service organizations
or similar entities, beginning January 1, 2029
4. All properties owned by local governments, local public agencies,
and public water systems in a disadvantaged community, beginning
January 1, 2031, or the date upon which a state funding source is
made available to fund conversion of nonfunctional turf on these
properties to climate appropriate landscapes, whichever is later.
The use of potable water is not prohibited to the extent necessary to ensure the
health of trees and other perennial non-turf plantings, or to the extent necessary
to address an immediate health and safety need.
Page 140 of 211
Any compliance date postponed by the State Water Resources Control Board
pursuant with the Water Code 10608.14 (c) for a specific property shall apply.
This measure does not restrict the use of recycled water.
n.
(c) Level 1 Water Supply Shortage (Eleven Percent (11%) to Twenty Percent (20%)
Reduction). A Level 1 water supply shortage exists when the city council
determines, in its sole discretion, that due to drought or other water supply
conditions, a water supply shortage or threatened shortage exists and an eleven
percent (11%) to twenty percent (20%) consumer demand reduction is necessary to
make more efficient use of water and appropriately respond to existing water
conditions. Upon the declaration by the city council of a Level 1 water supply
shortage condition, the following mandatory water conservation requirements shall
apply during such time that the Level 1 water supply shortage is in effect:
(1) Limits on Watering Hours. Watering or irrigating of lawn, landscape or other
vegetated area with potable water is prohibited between the hours of 9:00 a.m.
and 5:00 p.m. 6 p.m. Pacific Standard/Daylight Savings Time on any day,
except by use of a hand-held bucket or similar container, a hand-held hose
equipped with a positive self-closing water shut-off nozzle or device, or for very
short periods of time for the express purpose of adjusting or repairing an
irrigation system. The use of recycled water is exempt from this prohibition.
(2) Limit on Watering Duration. Watering or irrigating of lawn, landscape or other
vegetated area with potable water using a landscape irrigation system or a
watering device that is not continuously attended is limited to no more than
fifteen (15) minutes watering per designated water day per station. This
subsection does not apply to land-scape irrigation systems that exclusively use
very low-flow drip type irrigation systems when no emitter produces more
Page 141 of 211
than two (2) gallons of water per hour and weather based controllers or stream
rotor sprinklers that meet a seventy percent (70%) efficiency standard. The use
of recycled water is exempt from this prohibition.
(3) Limits on Watering Days. Watering or irrigating of lawn, landscape or other
vegetated area with potable water is limited to three (3) days per week from
April through October. The watering days are designated depending upon
house address and are to be determined by the public works director. During
the months of November through March, watering or irrigating of lawn,
landscape or other vegetated area with potable water is limited to no more than
one (1) day per week to be determined by the public works director.
(4) Obligation to Fix Leaks, Breaks or Malfunctions. All leaks, breaks, or other
malfunctions in the water user’s plumbing or distribution system must be
repaired within seventy-two (72) hours of notification by the city unless other
arrangements are made with the city.
(d) Level 2 Water Supply Shortage (Twenty-One Percent (21%) to Thirty-Five Percent
(35%) Reduction). A Level 2 water supply shortage exists when the city council
declares, in its sole discretion, that due to drought or other water supply conditions,
a water supply shortage or threatened shortage exists and a twenty-one percent
(21%) to thirty-five percent (35%) consumer demand reduction is necessary to make
more efficient use of water and appropriately respond to existing water conditions.
Upon the declaration of a Level 2 water supply shortage condition, the more
restrictive of the prohibited or limited uses of water set forth in subsection (c) of this
section, and the following mandatory water conservation requirements shall apply
during such time that the Level 2 water supply shortage is in effect:
(1) Limits on Watering Days. Watering or irrigating of lawn, landscape or other
vegetated area with potable water is limited to two (2) days per week from
April through October. The watering days are designated depending upon
house address and are to be determined by the public works directorthe
Utilities Department Director. During the months of November through
March, watering or irrigating of lawn, landscape or other vegetated area with
potable water is limited to no more than one (1) day per week to be determined
by the public works director.
(2) Obligation to Fix Leaks, Breaks or Malfunctions. All leaks, breaks, or other
malfunctions in the water user’s plumbing or distribution system must be
repaired within forty-eight (48) hours of notification by the city unless other
arrangements are made with the city.
(3) Limits on Filling Ornamental Lakes or Ponds. Filling or refilling ornamental
lakes or ponds with potable water is prohibited, except to the extent needed to
sustain aquatic life; provided, that such animals are of significant value and
have been actively managed within the water feature prior to declaration of a
supply shortage level under this section.
(4) Drought Water Rates. City council may consider adopting rate structures and
other pricing mechanisms to maximize water conservation.
Page 142 of 211
(e) Level 3 Water Supply Shortage—Emergency Condition (Thirty-Six Percent (36%)
to Fifty Percent (50%) Reduction). A Level 3 water supply shortage shall be referred
to as a water shortage emergency. A Level 3 condition exists when the city council
declares, in its sole discretion, a water shortage emergency and notifies its residents
and businesses that a greater than thirty-five percent (35%) reduction in consumer
demand is necessary to maintain sufficient water supplies for public health and
safety, pursuant to Water Code Section 350 et seq. Upon the declaration of a Level
3 water supply shortage condition, the more restrictive of the prohibited or limited
uses of water set forth in subsections (c) and (d) of this section and the following
mandatory water conservation requirements shall apply during such time that the
Level 3 water supply shortage is in effect:
(1) No Watering or Irrigating. Watering or irrigating of lawn, landscape or other
vegetated area with potable water is prohibited. This restriction does not apply
to the following categories of use, unless the city has determined that recycled
water is available and may be applied to the use:
a. Maintenance of vegetation, including trees and shrubs, that are watered
using a hand-held bucket or similar container, hand-held hose equipped
with a positive self-closing water shut-off nozzle or device;
b. Maintenance of existing landscape necessary for fire protection;
c. Maintenance of existing landscape for soil erosion control;
d. Maintenance of plant materials identified to be rare or essential to the
well-being of protected species;
e. Maintenance of landscape within active public parks and playing fields,
day care centers, golf course greens, and school grounds; provided, that
such irrigation does not exceed two (2) days per week for no more than
fifteen (15) minutes watering per designated water day per station and is
prohibited between the hours of 9:00 a.m. and 5:00 p.m.6 p.m. Pacific
Standard/ Daylight Savings Time, according to the schedule established
in subsection (d)(1) of this section;
f. Actively irrigated environmental mitigation projects.
(2) Obligation to Fix Leaks, Breaks or Malfunctions. All leaks, breaks, or other
malfunctions in the water user’s plumbing or distribution system must be
repaired within twenty-four (24) hours of notification by the city unless other
arrangements are made with the city.
(3) Limits on New Potable Water Service. Upon declaration of a Level 3 water
shortage emergency condition, the city may limit the issuance of new potable
water services, temporary meters and/or statements of immediate ability to
serve or provide potable water service (such as can and will serve letters,
certificates, or letters of availability), except under the following
circumstances:
Page 143 of 211
a. A valid, unexpired building permit has been issued for the project; or
b. The project is necessary to protect the public health, safety, and welfare;
or
c. The applicant provides substantial evidence of an enforceable
commitment that water demands for the project will be offset prior to the
provision of a new water meter(s) to the satisfaction of the city.
d. This provision does not preclude the resetting or turn-on of meters to
provide continuation of water service or the restoration of service that has
been interrupted for a period of one (1) year or less.
(4) Limits on Building Permits. Upon declaration of a Level 3 water supply
shortage emergency condition, the city administrator is authorized to
implement a program in his or her discretion to limit or withhold the issuance
of building permits which require new or expanded water service, except to
protect the public health, safety and welfare, or in cases which meet the city’s
adopted conservation offset requirements.
(5) No New Annexations. Upon the declaration of a Level 3 water supply shortage
condition, the city may suspend consideration of annexations to its service area.
This subsection does not apply to boundary corrections and annexations that
will not result in any immediate increased use of water.
(f) Procedures for Determination/Notification of Water Supply Shortage. The existence
of Level 1, 2, or 3 water supply shortage conditions may be declared by resolution
of the city council adopted at a regular or special public meeting held in accordance
with state law. The mandatory conservation requirements applicable to the level of
water supply shortage conditions declared by the city council will take effect
immediately after the shortage level is declared. Within ten (10) days following the
declaration of the shortage level, the resolution shall be published pursuant to Water
Code Section 376.
(g) Hardship Waiver. If, due to unique circumstances, such as a fire, a specific
requirement of this article would result in undue hardship to a person using water or
to property upon which water is used, that is disproportionate to the impacts to water
users generally or to similar property or classes of water users, then the person may
apply for a waiver to the requirement as provided in this section.
(1) Request. A written request for a hardship waiver must be submitted to the
public works Utilities Department Ddirector.
(2) Supporting Documentation. The request for waiver must be accompanied by
photographs, maps, drawings, and any other information as appropriate the
applicant wishes to be used in reviewing the request.
(3) Required Findings for Waiver. The waiver may be granted or conditionally
granted only upon a written finding of the existence of facts demonstrating an
undue hardship to a person using water or to property upon which water is
Page 144 of 211
used, that is disproportionate to the impacts to water users generally or to
similar property or classes of water use due to specific and unique
circumstances of the user or the user’s property. An application for a waiver
will be denied unless the public works director finds, based on the information
provided in the application, supporting documents, or such additional
information as may be requested, and on water use information for the property
as shown by the records of the city or its agent, all of the following:
a. That the waiver does not constitute a grant of special privilege
inconsistent with the limitations upon other residents and businesses;
b. That, because of special circumstances applicable to the property or its
use, the strict application of this article would have a disproportionate
impact on the property or use that exceeds the impacts to residents and
businesses generally;
c. That the authorizing of such waiver will not be of substantial detriment to
adjacent properties, and will not materially affect the ability of the city to
effectuate the purpose of this article and will not be detrimental to the
public interest; and
d. That the condition or situation of the subject property or the intended use
of the property for which the waiver is sought is not common, recurrent
or general in nature.
(4) Approval Authority. The Utilities public works Department Ddirector must
act upon any completed application no later than ten (10) days after submittal
and may approve, conditionally approve, or deny the waiver. The applicant
requesting the waiver must be promptly notified in writing of any action taken.
Unless specified otherwise at the time a waiver is approved, the waiver will
apply to the subject property during the period of the mandatory water supply
shortage condition.
(5) A waiver granted under this subsection does not authorize any use of
water prohibited by Water Code Section 10608.14.
Page 145 of 211
(4)
(h) Mandatory Metering of Water Use at All City Hydrants. For uses other than fire
suppression, all water delivered through city hydrants will require the use of meters
in order to more accurately track the use of city water.
(Ord. No. 2016-15, § 3, 8-1-2016; Ord. No. 2021-05, 12-6-2021)
§ 27.99. Enforcement.
If a water supply shortage is declared by council, Iit shall be the duty of all city employees
to give vigilant aid to the Utilities public worksDepartment Ddirector in the
enforcement of the provisions of this chapter article, whether or not a water supply
shortage has been declared, and to this end they shall report all violations thereof which
shall come to their knowledge to the office of the Utilities Department public works
director.
(Ord. No. 2014-11, § 1, 8-4-2014)
§ 27.100. Violation penalty.
(a) Penalty. Any person violating, or causing or permitting to be violated, any of the
provisions of this article may be deemed guilty of a misdemeanor. Upon conviction
Page 146 of 211
thereof, such person shall be punished by a fine not exceeding one thousand dollars
($1,000), or by imprisonment in the county jail for not more than thirty (30) days.
Every such person shall be deemed to be guilty of a separate offense for every
day during any portion of which any violation of any provision of this article is
committed, continued or permitted by such person, and shall be punishable therefore
as provided in this section.
(b) Notwithstanding any other provision of this article, whenever a violation of any
section contained in this article is punishable as a misdemeanor, the city attorney
may specify that the offense is an infraction, and proceed with prosecution as an
infraction, unless the defendant objects to the offense being made an infraction, in
which event the court may elect to have the complaint amended to charge as a
misdemeanor, and the case shall proceed on a misdemeanor charge.
(1) First Violation. The city will issue a written warning and deliver a copy of the
ordinance codified in this article by mail.
(2) Second Violation. A second violation within any consecutive twelve (12)
month period is punishable by a fine not to exceed one hundred dollars
($100.00).
(3) Third Violation. A third violation within any consecutive twelve (12) month
period is punishable by a fine not to exceed two hundred dollars ($200.00).
(4) Subsequent Violations. Any subsequent violations within any consecutive
twelve (12) month period are punishable by a fine not to exceed five hundred
dollars ($500.00).
(5) Separate Offenses. Each day that a person violated provisions of this article
shall constitute a separate violation or offense.
(6) Willful Violations. In addition to fines, the city, after written notice, may install
a flow restrictor device or discontinue service to consumers who willfully
violate provisions of this section.
(c) All remedies provided for herein shall be cumulative and not exclusive.
(Ord. No. 2014-11, § 1, 8-4-2014; Ord. No. 2015-04, § 4, 5-18-2015; Ord. No.
2016-15, § 4, 8-1-2016)
Page 147 of 211
1 | P a g e
ORDINANCE NO. 2026-XX
AN ORDINANCE OF THE CITY OF COUNCIL OF THE
CITY OF GILROY AMENDING SPECIFIED PROVISIONS
OF CHAPTER 27, ARTICLE VI AND CHAPTER 30,
ARTICLE XXXVIII OF THE GILROY CITY CODE TO
PROHIBIT THE USE OF POTABLE WATER FOR
IRRIGATING NONFUNCTIONAL TURF, AS REQUIRED
BY ASSEMBLY BILL 1572
WHEREAS, the City of Gilroy recognizes the importance of conserving water and
maintaining a reliable water supply to protect public health, safety, and welfare; and
WHEREAS, Chapter 27, Article VI of the City of Gilroy Municipal Code establishes
voluntary and permanent water conservation measures and water supply shortage regulations to
promote efficient water use and reduce water waste; and
WHEREAS, Chapter 30, Article XXXVIII of the City of Gilroy Municipal Code
establishes landscaping and water efficiency standards for new, rehabilitated, and existing
landscapes; and
WHEREAS, on October 13, 2023, the Governor signed Assembly Bill 1572 (AB 1572),
which amended California Water Code 10608.14 to prohibit the use of potable water to irrigate
nonfunctional turf on governmental, special districts, commercial, industrial, institutional
properties and common areas of homeowners’ associations and similar developments, subject to
phased implementation dates, and
WHEREAS, the City Council desires to amend Chapter 27 and Chapter 30 of the Gilroy’s
Municipal Code to comply with AB 1572 by incorporating the State’s definitions and phased
compliance deadlines for prohibiting potable water irrigation of nonfunctional turf, beginning
January 1, 2027. The amendments also extend existing enforcement provisions to apply year-
around, establish requirements for new, rehabilitated, and existing landscapes, transfer
administrative authority from the Public Works Director to Utilities Director, and extend
prohibited watering hours from 9 a.m. to 6 p.m. to align with Valley Water’s schedule; and
WHEREAS, the City Council finds that these amendments will support compliance withs
state law, reduce unnecessary potable water use, and promote long-term water conservation within
the City.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF GILROY DOES
HEREBY ORDAIN AS FOLLOWS:
Section I: Recitals
The City Council has dully considered the full record before it, which may include but is not
limited to the staff report, testimony by staff and the public, and other materials and evidence
Page 148 of 211
2 | P a g e
submitted or provided to the City Council. The recitals set forth above are found to be true and
correct and are incorporated herein by reference.
Section II: Amendment for the City of Gilroy Municipal Code Section 27.95 Findings
Section 27.95 (Findings) of Chapter 27, Article VI is hereby amended by adding Subsection (i.)
that reads as follows:
“Water Code Section 10608.14 requires public water systems to prohibit the use of potable water to
irrigate non-functional turf on commercial, industrial, and institutional properties other than a
cemetery and on common areas of homeowners’ associations, common interest developments, and
community service organizations or similar entities.”
Section III: Amendment for the City of Gilroy Municipal Code Section 27.97 Definitions
Section 27.97 (Definitions) of Chapter 27, Article VI of the City of Gilroy Municipal Code is
hereby amended by adding the definitions of: “CII water use”, “Commercial water user”,
“Common area”, “Common interest developments”, “Community service organizations or similar
entity”, “Community space”, “Homeowners’ Association”, “Functional turf”, “Industrial water
user”, Institutional water user”, “Nonfunctional turf”, “Multifamily residential property”,
“Recreational use area”, “Utilities Department Director”, and “Turf” to read as follows:
“CII water use” means water used by commercial water users, industrial water users,
institutional water users. It does not include a cemetery.
“Commercial water user” means a water user that provides or distributes a product or
service.
“Common area” means that portion of common interest development or of a property
owned or managed by a homeowners’ association or a community service organization
or similar entity that is not assigned or allocated to the exclusive use of the occupants of
an individual dwelling unit within the property.”
“Common interest developments” means community apartment projects, condominium
projects, planned developments, and stock cooperatives per Civil Code Section 4100.
“Community service organization or similar entity” has the same meaning as in section
4100 of the Civil Code.
“Community space” means an area designated by a property owner or a governmental
agency to accommodate human foot traffic for civic, ceremonial, or other community
events or social gatherings.
“Homeowners’ Association” means an “association” as defined in Section 4080 of the
Civil Code.
Page 149 of 211
3 | P a g e
“Functional Turf” means a ground cover surface of turf located in a recreational use area
or community space. Turf enclosed by fencing or other barriers to permanently preclude
human access for recreation or assembly is not functional turf.
“Industrial water user” means a water user that is primarily a manufacturer or processor
of materials as defined by the North American Industry Classification System code
sectors 31 to 33, inclusive, or an entity that is a water user primarily engaged in research
and development.
“Institutional water user” means a water user dedicated to public service. This type of
user includes, among other users, higher education institutions, schools, courts, churches,
hospitals, government facilities, and nonprofit research institutions.
“Nonfunctional Turf” - means any turf that is not functional turf, and includes turf located
within street rights-of-way and parking lots.
“Multifamily residential property” means a property that includes a building containing
more than four dwelling units.
“Recreational use area” means an area designated by a property owner or a governmental
agency to accommodate human foot traffic for recreation, including, but not limited to,
sports fields, golf courses, playgrounds, picnic grounds, or pet exercise areas. This
recreation may be either formal or informal.”
“Utilities Department Director” means the city’s utilities director or such department
director as the city administrator designates to manage the city’s water and wastewater
utility.”
“Turf” means a groundcover surface of ornamental grass, or a ground cover surface of
mowed grass only. Annual bluegrass, Kentucky bluegrass, perennial ryegrass, red fescue
and tall fescue are cool-season grasses. Bermuda grass, Kikuyu grass, seashore paspalum,
St. Augustine grass, zoysia grass, and buffalo grass are warm-season grasses.”
SECTION IV: Amendment for the City of Gilroy Municipal Code Section 27.98
Wasting of water and drought emergencies
Section 27.98 (Wasting of Water and Drought Emergencies) of Chapter 27, Article VI is
hereby amended to read as follows:
(a) Applicability (4) The provisions of this article do not apply to the use of water by city
facilities to sustain plants, trees, shrubs, or functional turf.
(b) Saving Water—Level 0 (Zero Percent (0%) to Ten Percent (10%) Reduction). Level 0 is in
effect at all times and does not need to be declared by council. Level 0 is divided into voluntary
and mandatory measures consistent with state law.
(b) a. V-01. Recommended Watering Hours. Watering or irrigating of lawn, landscape or other
vegetated area with potable water is discouraged between the hours of 9:00 a.m. and 6 p.m.
Pacific Standard/Daylight Savings Time.
Page 150 of 211
4 | P a g e
m. M-0.32 Use of Recycled Water for Construction. When directed by the public works director
and or Utilities Department Director recycled water fill stations shall be made available for
construction water for purposes including dust control. Recycled water fill stations may be
removed upon completion of construction activities in the area.
(c) (1) Limits on Watering Hours. Watering or irrigating of lawn, landscape or other vegetated
area with potable water is prohibited between the hours of 9:00 a.m. and 6 p.m. Pacific
Standard/Daylight Savings Time on any day, except by use of a hand-held bucket or similar
container, a hand-held hose equipped with a positive self-closing water shut-off nozzle or device,
or for very short periods of time for the express purpose of adjusting or repairing an irrigation
system. The use of recycled water is exempt from this prohibition.
(d) (1) Limits on Watering Days. Watering or irrigating of lawn, landscape or other vegetated area
with potable water is limited to two (2) days per week from April through October. The watering
days are designated depending upon house address and are to be determined by the Utilities
Department Director. During the months of November through March, watering or irrigating of
lawn, landscape or other vegetated area with potable water is limited to no more than one (1) day
per week to be determined by the public works director.
(e) e. Maintenance of landscape within active public parks and playing fields, day care centers,
golf course greens, and school grounds; provided, that such irrigation does not exceed two (2)
days per week for no more than fifteen (15) minutes watering per designated water day per station
and is prohibited between the hours of 9:00 a.m. and 6 p.m. Pacific Standard/ Daylight Savings
Time, according to the schedule established in subsection (d)(1) of this section;
(g) Hardship Waiver (1) Request. A written request for a hardship waiver must be submitted to
the Utilities Department director.
(4) Approval Authority. The Utilities Department Director must act upon any completed
application no later than ten (10) days after submittal and may approve, conditionally approve,
or deny the waiver. The applicant requesting the waiver must be promptly notified in writing of
any action taken. Unless specified otherwise at the time a waiver is approved, the waiver will
apply to the subject property during the period of the mandatory water supply shortage condition.
SECTION V: Amendment for the City of Gilroy Municipal Code Section 27.98 Wasting of
water and drought emergencies
Section 27.98 (Wasting of Water and Drought Emergencies) of Chapter 27, Article VI is
hereby amended by adding new subsections (M-0.34) and (5).
o.M-0.34 Irrigation of Non-Functional Turf. The use of potable water for the irrigation of
nonfunctional turf located at commercial, industrial, and institutional properties, other than a
cemetery, and on properties of homeowners’ associations, common interest developments, and
community service organizations or similar entities is prohibited by the following dates:
Page 151 of 211
5 | P a g e
1.All properties owned by local governments, local or regional public agencies, and
public water systems, including the city, except those specified in paragraph 4, beginning
January 1, 2027.
2. All other institutional properties and all commercial and industrial properties,
beginning January 1, 2028.
3. All common areas of properties of homeowners’ associations, common interest
developments, and community service organizations or similar entities, beginning
January 1, 2029.
4. All properties owned by local governments, local public agencies, and public water
systems in a disadvantaged community, beginning January 1, 2031, or the date upon
which a state funding source is made available to fund conversion of nonfunctional turf
on these properties to climate appropriate landscapes, whichever is later.
The use of potable water is not prohibited to the extent necessary to ensure the health of trees
and other perennial non-turf plantings, or to the extent necessary to address an immediate health
and safety need.
Any compliance date postponed by the State Water Resources Control Board pursuant with the
Water Code 10608.14 (c) for a specific property shall apply.
This measure does not restrict the use of recycled water.
(5) A waiver granted under this subsection does not authorize any use of water prohibited by
Water Code Section 10608.14.
SECTION VI: Amendment for the City of Gilroy Municipal Code Section 27.99
Enforcement
Section 27.99 (Enforcement) of Chapter 27, Article VI is hereby amended to read as
follows:
It shall be the duty of all city employees to give vigilant aid to the Utilities Director in the
enforcement of the provisions of this article, whether or not a water supply shortage has been
declared, and to this end they shall report all violations thereof which shall come to their
knowledge to the office of the Utilities Department director.
(Ord. No. 2014-11, § 1, 8-4-2014)
SECTION VII: Amendment of the City of Gilroy Municipal Code, CHAPTER 30,
ARTICLE XXXVIII, Section 30.38.30 Definitions
Section 30.38.30 (Definitions) of Chapter 30, Article XXXVIII of the City of Gilroy Municipal
Code is hereby amended by adding the definitions of:
“Functional Turf” meaning set forth in Chapter 27, Section 27.97.
“Nonfunctional turf” meaning set forth in Chapter 27, Section 27.97.
Page 152 of 211
6 | P a g e
“Turf” means a groundcover surface of ornamental grass, or a ground cover surface of mowed
grass only. Annual bluegrass, Kentucky bluegrass, perennial ryegrass, red fescue and tall fescue
are cool-season grasses. Bermuda grass, Kikuyu grass, seashore paspalum, St. Augustine grass,
zoysia grass, and buffalo grass are warm-season grasses.
SECTION VIII: Amendment of the City of Gilroy Municipal Code, CHAPTER 30,
ARTICLE XXXVIII, Section 30.38.60 Commercial Zone Standards
Section 30.38.60 (Commercial Zone Standards) of Chapter 30, Article XXXVIII of the City of
Gilroy Municipal Code is hereby amended by adding subsection (k):
(k) Landscaping required by this section, should not include nonfunctional turf irrigated with potable
water.
SECTION IX: Amendment of the City of Gilroy Municipal Code, CHAPTER 30, ARTICLE
XXXVIII, Section 30.38.70 Industrial Zone Landscape Standards
Section 30.38.70 (Industrial Zone Landscape Standards) of Chapter 30, Article XXXVIII of the
City of Gilroy Municipal Code is hereby amended by adding subsection (j):
(j) Landscaping required by this section, should not include nonfunctional turf irrigated with potable
water.
SECTION X: Amendment of the City of Gilroy Municipal Code, CHAPTER 30, ARTICLE
XXXVIII, Section 30.38.120 Landscape Design Plan
Section 30.38.120 (Landscape Design Plan) of Chapter 30, Article XXXVIII of the City of Gilroy
Municipal Code is hereby amended by adding subsection (h):
(h) New and rehabilitated landscapes on commercial, industrial, and institutional properties, and
in common areas of homeowners’ associations, common interest developments, and community
service organizations or similar entities, should not include nonfunctional turf unless it will be
irrigated exclusively with recycled water. Turf proposed on these properties shall be shown as
functional turf on the landscape design plan, with its recreational or community use.
SECTION XI: Amendment of the City of Gilroy Municipal Code, CHAPTER 30, ARTICLE
XXXVIII, Section 30.38.160 Irrigation Scheduling
Page 153 of 211
7 | P a g e
Section 30.38.160 (Irrigation Scheduling) of Chapter 30, Article XXXVIII of the City of Gilroy
Municipal Code is hereby amended to read as follows:
30.38.160. Irrigation Scheduling (b) Overhead irrigation shall only be scheduled between 6:00
p.m. and 9:00 a.m. unless weather conditions prevent it. If allowable hours of irrigation differ from
the local water purveyor, the stricter of the two (2) shall apply. Operation of the irrigation system
outside the normal watering window is allowed for auditing and system maintenance only
SECTION XII: Amendment of the City of Gilroy Municipal Code, CHAPTER 30,
ARTICLE XXXVIII, Section 30.38.240 Provisions for Existing Landscapes
Section 30.38.240 (Provisions for existing landscapes) of Chapter 30, Article XXXVIII of the City
of Gilroy Municipal Code is hereby amended by adding subsection (c):
(c) Regardless of size or date of installation, existing landscapes on properties shall comply with
Chapter 27. Section 27.98 (b)(2)(o) (M-0.34).
Page 154 of 211
8 | P a g e
Page 155 of 211
City of Gilroy
STAFF REPORT
Agenda Item Title: Consider Extending the Urgency Interim Ordinance Imposing
a Temporary Moratorium on the Filing, Acceptance,
Processing, and Approval of Applications and Entitlements
for Detention and Custodial Facilities on Private Property and
Public Property to the Extent Permitted by Law, Citywide, for
a Period of Ten (10) Months and Fifteen (15) Days
Meeting Date: November 2, 2026
From: Matt Morley, City Administrator
Department: Community Development
Submitted by: Sharon Goei, Community Development Director
Prepared by: Michael Fossati, Planning Manager
STRATEGIC PLAN GOALS: Not Applicable
RECOMMENDATION
1. Determine that the action is exempt from, the California Environmental Quality
Act (CEQA) pursuant to CEQA Guidelines Sections 15378, 15060(c)(2), and
15061(b)(3);
2. Direct the City Clerk to read the ordinance extending the Urgency Interim
Ordinance by title only and to waive further reading;
3. Adopt an extension of the Urgency Interim Ordinance No. 2026-10 to continue
the temporary moratorium on the filing, acceptance, processing, and approval of
applications and entitlements for the establishment, expansion, or change of use
of Detention and Custodial Facilities on private property, and on public property
to the extent permitted by federal and state law, for an additional ten months and
15 days, through October 4, 2027; and
4. Review, approve, and issue the 10-day report as required by Government Code
Section 65858(d) for the extension of the Urgency Interim Ordinance.
Page 156 of 211
EXECUTIVE SUMMARY
On June 1, 2026, the City Council unanimously adopted Resolution No. 2026-34,
opposing the development of a federal detention facility in South Santa Clara County.
The facility was deemed incompatible with the region’s agriculture, tourism, economic
development, planning goals and community values.
On October 5, 2026, the City Council unanimously adopted Urgency Interim Ordinance
No. 2026-10, creating a temporary 45-day moratorium on the filing, acceptance,
processing, and approval of applications and entitlements for establishing, expanding,
or changing the use of Detention and Custodial Facilities on private property and on
public property as permitted by law. The moratorium expires on November 19, 2026.
Staff recommends extending the ordinance for ten months and 15 days, through
October 4, 2027, to allow time to study and align the City Code with Senate Bill 1367,
effective January 1, 2027.
An extension requires a noticed public hearing and a four-fifths vote of the City Council.
BACKGROUND
In January 2025, the U.S. General Services Administration (GSA) signed a 20-year
lease with a property owner, ECG6 LLC, to develop a land parcel into a detention
facility for use by the U.S. Immigration and Customs Enforcement (ICE) Agency. The
site that was leased is known as the “Holsclaw Property,” a 25-acre site in
unincorporated Santa Clara County, adjacent to the City of Gilroy. On April 23, 2026,
ECG6 began developing the Holsclaw Property in coordination with GSA.
On June 10, 2026, the State of California and the County of Santa Clara filed suit in
federal court (County of Santa Clara, et al. v. United States Immigration & Customs
Enforcement, et al., Case No. 26-cv-05604-EKL). The case questioned whether the
federal government and a private developer could convert a former agricultural-
research property near Gilroy into an ICE immigration-enforcement and short-term
detainee holding facility without completing adequate environmental review first.
On September 11, 2026, U.S. District Judge Hon. Eumi K. Lee granted a preliminary
injunction (Attachment 3) finding that federal agencies and the private developer
improperly relied on a categorical exclusion under the National Environmental Policy
Act (NEPA). The judge also found that construction and use of the site would likely
cause irreparable environmental harm. The injunction paused the construction,
demolition, and development at the Holsclaw Property pending further court order.
On September 29, 2026, Governor Newsom signed Senate Bill 1367 (Cervantes),
adding Section 65850.05 to the Government Code. Starting January 1, 2027, the
statute prohibits a city or county from approving new land use authorizing construction
of a detention facility or a change of use allowing an existing building to be used as
Page 157 of 211
one. The statute defines a “detention facility” as a structure operated by a private entity
on behalf of a governmental entity for temporarily holding persons charged with a
criminal offense or detained for civil or administrative purposes.
On October 5, 2026, the City Council unanimously adopted Urgency Interim Ordinance
No. 2026-10 under Government Code Section 65858 to temporarily prohibit the
development of detention facilities. The ordinance took effect immediately and expires
November 19, 2026. It directs the Community Development Department and Planning
Commission to evaluate and propose land use zoning regulations within the City Code,
which include the following:
• Define “Detention and Custodial Facility” as a distinct land use;
• Identify the zoning districts, if any, where the use may be appropriately
located and the level of discretionary review and public hearing required;
• Establish siting, separation, development, operational, security, water and
wastewater, traffic, emergency-response, and community-impact standards;
and
• Clarify that the “Public Facility,” “Publicly Owned Building or Facility,” and PF-
district governmental-facility classifications, along with similar-use
determination procedures, prohibit “Detention and Custodial Facilities.”
San José, Los Altos, Mountain View, San Mateo County, and Monterey County have
adopted interim urgency moratoriums restricting new or expanded detention-related
facilities while evaluating longer-term land-use regulations.
ANALYSIS
The order issued in Case No. 26-cv-05604-EKL (Attachment 3) confirms several
conditions that led to the adoption of the Urgency Interim Ordinance. Although the order
is associated with land under County jurisdiction, it raises concerns Gilroy might have if
such a use were proposed within city limits. These concerns involve land use,
infrastructure, and public safety impacts.
On February 13, 2026, the U.S. Department of Homeland Security (DHS) circulated a
directive titled the “ICE Detention Reengineering Initiative,” (Attachment 4) outlining the
acquisition and development of eight large-scale detention centers, sixteen processing
sites, and ten turnkey facilities nationwide, all to be active by November 30, 2026.
ICE has described California detention centers as “crucial to ICE's detention network on
the West Coast.” Its recent acquisition of two facilities in southern California and its
plans for the Holsclaw Property reflect the implementation of that broader initiative at
the regional and local levels. The September 11, 2026 injunction is significant but
preliminary. It may be narrowed or modified and does not prevent federal agencies,
their private landlords, or contractors from pursuing alternative sites in the region.
Page 158 of 211
Gilroy’s proximity to the Holsclaw Property and its inventory of industrial and warehouse
properties similar to those converted elsewhere make a proposal within City limits more
than hypothetical. Experience in other jurisdictions shows such proposals can move
forward with little or no notice to local government, leaving cities and counties to litigate
after construction has begun. In the litigation over the Holsclaw Property facility, an ICE
official stated under penalty of perjury that, following a multi-year search in and around
Santa Clara County, federal officials selected the property because of Gilroy’s central
location within the San Francisco Field Office’s area of responsibility. Gilroy is about
one and a half to two hours from four other Enforcement and Removal Operations
(ERO) offices. This allows those offices to assist one another more efficiently and
reduces travel time for emergency response, routine transportation, and the movement
of individuals in ERO custody. These statements suggest ICE could pursue another site
within City limits if the Holsclaw Property facility does not proceed or faces continued
delays.
The Gilroy Zoning Ordinance does not define “detention and custodial facility,” “jail,” or
“correctional facility.” No such use appears in the residential, commercial, or industrial
use tables. The Code includes broad, undefined classifications that may categorize a
detention center as a government-operated facility. This would make it a permitted use,
not requiring a conditional use permit or hearing. “Public Facility” is permitted by right in
the PO, C1, C3, and CM commercial districts. “Publicly Owned Building or Facility” is
permitted by right in every residential district. In the PF Park/Public Facilities District,
“all facilities owned or leased, and operated or used, by . . . the government of the
United States . . . or any other governmental agency” are permitted uses (Section
30.25.20(a)(1)).
The City Attorney was asked to evaluate intergovernmental-immunity exposure arising
from the broader definition, in light of GEO Group v. Newsom (9th Cir. 2022), which
struck California's ban on private detention as applied to ICE contractors, and GEO
Group v. City of Tacoma (W.D. Wash. 2019), which upheld generally applicable local
zoning of detention facilities.
Furthermore, Senate Bill 1367 is a significant development associated with the way the
state manages detention facilities, which will not come into effect until January 1, 2027.
Secondly, it only applies to facilities operated by a private entity on behalf of a
governmental entity which is not in line with the City moratorium. Staff need time to
evaluate the standards with Senate Bill 1367 and confirm how the use classifications,
siting, infrastructure, and operational standards will be impacted by the new Senate Bill.
It is for these reasons that staff is requesting an extension of the urgency ordinance.
California Government Code Section 65858 authorizes the City Council to adopt, as an
urgency measure, an interim ordinance prohibiting uses that may conflict with a
contemplated general plan, specific plan, or zoning proposal the City is considering,
studying, or intending to study within a reasonable time. An urgency ordinance is
permitted to be extended twice, with the first extension being no longer than ten months
Page 159 of 211
and 15 days, and the second extension no longer than one year. For the City Council
to approve such an ordinance, the City must find that a current and immediate threat to
public health, safety, or welfare exists. The findings were established as part of the
Urgency Interim Ordinance adopted on October 5, 2026. They can also be found in the
proposed extension attached to this staff report (Attachment 1).
Pursuant to Government Code section 65858(d), the City must issue a written report at
least ten days before the initial 45-day temporary moratorium expires. The report must
describe actions taken to address the conditions that led to the adoption of the urgency
ordinance. Staff has prepared the required 10-Day Report, which is included as
Attachment 2 to this staff report.
ALTERNATIVES
1. Allow the Urgency Interim Ordinance to expire on November 19, 2026.
2. Extend the Urgency Interim Ordinance to private property only, omitting the
public-property provision.
3. Provide alternative direction to staff.
FISCAL IMPACT/FUNDING SOURCE
Studying and drafting the zoning provisions associated with detention facilities will
require staff time and potentially consultant resources.
PUBLIC OUTREACH
The notice for the City Council meeting was published in the San Jose Mercury
News. Public hearing packets with this staff report are available on the City’s website
for viewing.
NEXT STEPS
If approved, the new ordinance will take effect immediately. It will extend Ordinance No.
2026-10 by ten months and 15 days, until October 4, 2027.
Attachments: 1. Proposed Extension of Urgency Interim Ordinance
2. 10-Day Report
3. Court Order Granting Preliminary Injunction
4. ICE Detention Reengineering Initiative
Page 160 of 211
ORDINANCE 2026-XX
AN EXTENSION OF AN URGENCY INTERIM
ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
GILROY IMPOSING A TEMPORARY MORATORIUM ON
THE FILING, ACCEPTANCE, PROCESSING, AND
APPROVAL OF APPLICATIONS AND ENTITLEMENTS
FOR THE ESTABLISHMENT, EXPANSION, OR CHANGE
OF USE OF DETENTION AND CUSTODIAL FACILITIES
ON PRIVATE PROPERTY, AND ON PUBLIC PROPERTY
TO THE EXTENT PERMITTED BY FEDERAL AND STATE
LAW, CITYWIDE, WITH CERTAIN EXEMPTIONS, FOR
AN ADDITIONAL PERIOD OF TEN (10) MONTHS AND
FIFTEEN (15) DAYS
WHEREAS, the City of Gilroy (“City”) is a municipal corporation duly organized as a
Charter City under the California Constitution and laws of the State of California; and
WHEREAS, the City Council has broad discretion pursuant to the California Constitution
Article XI, Section 5 and 7, and the general laws of the State, including, but not limited to, the
California Planning and Zoning Law (Gov. Code section 65000 et seq.), to legislate for public
purposes and for the general welfare, including, but not limited to, matters of public health and
safety; and
WHEREAS, on October 5, 2026, the City Council, by a unanimous vote, adopted Urgency
Interim Ordinance No. 2026-10 pursuant to California Government Code Section 65858, imposing
a temporary moratorium, citywide, for a period not to exceed forty-five (45) days, on the filing,
acceptance, processing, and approval of applications and entitlements for the establishment,
expansion, or change of use of Detention and Custodial Facilities on Private Property, and on
Public Property to the extent permitted by federal and state law, with certain exemptions, while
the City studies and adopts standards involving land use, infrastructure, and public safety impacts
described therein. Ordinance No. 2026-10 took effect immediately upon adoption and is scheduled
to expire on November 19, 2026; and
WHEREAS, California Government Code Section 65858, subdivision (a), provides that,
after notice pursuant to Government Code Section 65090 and a public hearing, the legislative body
may extend an interim ordinance for ten (10) months and fifteen (15) days and subsequently extend
the interim ordinance for one (1) year, and that any such extension shall require a four-fifths vote
for adoption; and
WHEREAS, California Government Code Section 65858, subdivision (c), provides that
the City Council shall not adopt or extend an interim ordinance under that section unless the
ordinance contains legislative findings that there is a current and immediate threat to the public
health, safety, or welfare, and that the approval of additional subdivisions, use permits, variances,
building permits, or any other applicable entitlement for use which is required in order to comply
with a zoning ordinance would result in that threat to the public health, safety, or welfare; and
Page 161 of 211
Ordinance No. 2026-XX
Detention and Custodial Facility Urgency Interim Ordinance Extension
City Council Regular Meeting | November 2, 2026
Page 2 of 12
WHEREAS, pursuant to California Government Code Section 65858, subdivision (d), on
November 2, 2026, at least ten (10) days prior to the expiration of Ordinance No. 2026-10, the
City issued a written report describing the measures taken to alleviate the conditions which led to
the adoption of Ordinance No. 2026-10 (the “10-Day Report”), which is incorporated herein by
reference; and
WHEREAS, on February 13, 2026, the United States Department of Homeland Security
(“DHS”) circulated a directive entitled the “ICE Detention Reengineering Initiative,” outlining the
acquisition and development by United States Immigration and Customs Enforcement (“ICE”) of
eight large-scale detention centers, sixteen processing sites, and ten turnkey facilities nationwide,
and stating ICE’s intention to have all such facilities active by November 30, 2026, a date that falls
after the scheduled expiration of Ordinance No. 2026-10; and
WHEREAS, in January 2025, the United States General Services Administration (“GSA”)
entered into a twenty-year lease with a private landowner, ECG6 LLC (“ECG6”), for an
approximately 25-acre former agricultural research site in unincorporated Santa Clara County
immediately adjacent to the City, known as the “Holsclaw Property,” for development and use by
the U.S. Immigration and Customs Enforcement (“ICE”) Enforcement and Removal Operations
(“ERO”) division as an immigration enforcement and detainee holding facility, and construction
and demolition activity commenced at the Holsclaw Property on or about April 23, 2026; and
WHEREAS, in the litigation titled County of Santa Clara, et al. v. United States
Immigration & Customs Enforcement, et al., United States District Court for the Northern District
of California Case No. 26-cv-05604-EKL, the Acting Deputy Field Office Director for the ICE
San Francisco Field Office declared under penalty of perjury that the Holsclaw Property was
selected because of its central location within the San Francisco Field Office’s area of
responsibility, approximately one and a half to two hours from four other ERO offices; and
WHEREAS, on September 11, 2026, the Honorable Eumi K. Lee, United States District
Judge, issued an Order Granting Preliminary Injunction (the “Order”), finding that the plaintiffs
are likely to succeed on their claim that the responsible federal agencies acted arbitrarily and
capriciously in relying on an improper categorical exclusion under the National Environmental
Policy Act, and that construction and use of the Holsclaw Property creates a likelihood of
irreparable environmental harm; and
WHEREAS, the Order found, among other things, that (i) GSA did not prepare an
environmental impact statement or environmental assessment and instead invoked a categorical
exclusion through a one-page form, which the Court found “facially implausible”; (ii) the project
had been contemplated since a GSA pre-solicitation notice posted in December 2020, although the
public only recently learned of it; and (iii) the federal defendants argued that conversion of the
agricultural research facility to an ICE holding facility was not a change in use because both
include office space, an argument the Court rejected; and
Page 162 of 211
Ordinance No. 2026-XX
Detention and Custodial Facility Urgency Interim Ordinance Extension
City Council Regular Meeting | November 2, 2026
Page 3 of 12
WHEREAS, the Order further found that (i) ICE expects at least 120 people to be present
at the facility over the course of a normal day, approximately three times the prior occupancy of
40 daytime staff, and ICE “will not be able to determine the maximum occupancy for the Gilroy
facility hold room until work is completed and inspected”; (ii) construction plans include six
concrete-reinforced holding rooms, detainee processing areas, interview and visitation rooms, an
armory for weapons and ammunition, and a tactical equipment storage room; (iii) the site’s septic
system was designed for approximately 40 people and would be overburdened by the increased
occupancy, creating a risk of surfacing sewage and contamination of groundwater and surface
water; (iv) demolition and construction are likely to disturb hazardous materials remaining from
the site’s prior use as a hazardous waste generator facility, and the property owner refused the
County access to inspect the site; and (v) the developer has not applied for or obtained necessary
permits to complete the work; and
WHEREAS, the Order further reflects that ICE stated that, without the Holsclaw Property
facility, it would have to rely on existing facilities that are farther away, and that ICE has continued
to operate its Morgan Hill facility after that lease expired in August 2026, demonstrating a
continuing federal operational need for a facility in the South Santa Clara County area; and
WHEREAS, the Order is provisional, applies only to the Holsclaw Property, and remains
in effect pending further order of the Court. The litigation remains pending. The Order does not
resolve the underlying litigation and does not prevent federal agencies, or private landlords,
developers, or contractors working with them, from identifying and pursuing alternative sites for
detention and processing facilities elsewhere in the region, including within the City of Gilroy;
and
WHEREAS, on September 29, 2026, the Governor signed Senate Bill 1367 (Chapter 758,
Statutes of 2026), adding Section 65850.05 to the Government Code, which, beginning January 1,
2027, prohibits a city or county from approving a new land use in a manner that authorizes
construction of a detention facility, or a change of use that permits use of an existing building as a
detention facility, where the facility is “operated by a private entity on behalf of a governmental
entity”; and
WHEREAS, Government Code Section 65850.05 does not take effect until after the
scheduled expiration of Ordinance No. 2026-10. Furthermore, Senate Bill 1367 may not apply to
a facility that is privately owned and leased to, but operated by, a governmental agency, as the
Holsclaw Property, and does not amend the Gilroy City Code’s use classifications or establish
siting, infrastructure, operational, security, or emergency-response standards for facilities outside
its scope; and
WHEREAS, the Gilroy City Code (Chapter 30, Zoning Ordinance) continues not to define
“Detention and Custodial Facility,” “jail,” “correctional facility,” or any similar term, and
continues to contain broad, undefined classifications under which a detention and custodial facility
could potentially be processed as a permitted use without a conditional use permit or public
hearing, including “Public Facility” (Section 30.19.10(c)), “Publicly Owned Building or Facility”
Page 163 of 211
Ordinance No. 2026-XX
Detention and Custodial Facility Urgency Interim Ordinance Extension
City Council Regular Meeting | November 2, 2026
Page 4 of 12
(Section 30.11.10(c)), and the PF Park/Public Facilities District governmental-facility provision
(Section 30.25.20(a)(1)), together with administrative similar-use determination procedures
(Sections 30.11.10(b), 30.19.10(b), 30.23.10(b), and 30.25.20); and
WHEREAS, since the adoption of Ordinance No. 2026-10, as described in the 10-Day
Report, the City has formed an interdepartmental team, completed an initial audit of the Zoning
Ordinance, begun drafting definitions and change-of-use provisions for Detention and Custodial
Facilities, reviewed the findings of the Order, begun reviewing Government Code Section
65850.05 and intergovernmental-immunity considerations, and reviewed regulations adopted by
other jurisdictions; and
WHEREAS, updating the Gilroy City Code and Zoning Ordinance will require further
research, coordination with City departments and service providers, legal review, environmental
review under the California Environmental Quality Act, public outreach, and public hearings
before the Planning Commission and City Council, which cannot be completed before Ordinance
No. 2026-10 expires on November 19, 2026; and
WHEREAS, absent an extension of the temporary moratorium, the City may be required
to accept, process, and approve applications and entitlements for the establishment, expansion, or
change of use of detention and custodial facilities within the City under regulations that do not
define or address such uses, before the City has had the opportunity to study and adopt appropriate
standards; and
WHEREAS, this Ordinance is a generally applicable land use regulation adopted in the
exercise of the City’s police power and its authority over the issuance of City permits and
entitlements; it does not regulate or discriminate against the United States, the State of California,
or their agencies, and applies to both private property and public property owned or occupied by a
governmental agency only to the extent permitted by federal and state law; and
WHEREAS, the City Council finds, based on the evidence in the record — including the
ICE statements described above, the development activity at and litigation concerning the
Holsclaw Property, the findings of the Order, the 10-Day Report, and the staff report
accompanying this Ordinance — that there continues to be a current and immediate threat to the
public health, safety, and welfare of the City and its residents arising from the potential
establishment, expansion, or change of use of detention and custodial facilities within the City
under the City’s current regulations, and that the approval of applications and entitlements for such
uses under the City’s current regulations would result in that threat; and
WHEREAS, notice of the public hearing on this Ordinance was published in the San Jose
Mercury News, a newspaper of general circulation, in accordance with Government Code Sections
65858(a) and 65090; and
WHEREAS, on November 2, 2026, in accordance with State law, the City Council
provided due consideration of all evidence presented and provided in the entire administrative
Page 164 of 211
Ordinance No. 2026-XX
Detention and Custodial Facility Urgency Interim Ordinance Extension
City Council Regular Meeting | November 2, 2026
Page 5 of 12
record and held a duly noticed public hearing and took testimony regarding this urgency interim
Ordinance.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF GILROY DOES
HEREBY ORDAIN AS FOLLOWS:
SECTION I. Recitals.
The above recitals are true and correct and hereby adopted as the City Council’s findings.
SECTION II. Purpose and Authority.
In the interest of protecting the health, safety, and welfare of the residents of the City of Gilroy,
it is the purpose and intent of this urgency interim Ordinance to extend the temporary
moratorium imposed by Ordinance No. 2026-10 on the filing, acceptance, processing, and
approval of any application or entitlement for the establishment, expansion, or change of use of a
Detention and Custodial Facility on Private Property, and on Public Property to the extent
permitted by federal and state law, citywide, while the City studies and adopts a zoning
amendment. The City Council has authority to adopt this Ordinance pursuant to California
Government Code Section 65858, subdivision (a), as an urgency measure extending an interim
ordinance prohibiting any use that may be in conflict with an update of the Gilroy City Code that
the City is considering or studying, and pursuant to its police power under Article XI, Section 7
of the California Constitution.
SECTION III. Findings.
Pursuant to California Government Code Section 65858, subdivision (c), the City Council hereby
finds and determines that there continues to be a current and immediate threat to the public health,
safety, and welfare of the City of Gilroy that warrants the extension of this temporary moratorium,
and that the approval of applications and entitlements for Detention and Custodial Facilities under
the City’s current regulations would result in that threat. The following findings are based upon
the recitals included herein, the findings of Ordinance No. 2026-10, which are incorporated herein
by reference, as well as the following:
(a) The continued proliferation of detention and custodial facilities across the nation with
limited or no notice to, or collaboration with, local governments, as reflected in DHS’s
February 13, 2026 “ICE Detention Reengineering Initiative” directive calling for eight
large-scale detention centers, sixteen processing sites, and ten turnkey facilities to be active
by November 30, 2026, a date after the scheduled expiration of Ordinance No. 2026-10.
(b) The federal court found that the Holsclaw Property facility proceeded under a one-page
categorical exclusion, without an environmental assessment, impact statement, or public
oversight. This approach is inconsistent with the National Environmental Policy Act
(NEPA), whose foundational principle is to provide the public with environmental
information. As a result, such facilities may advance with little or no opportunity for local
review.
Page 165 of 211
Ordinance No. 2026-XX
Detention and Custodial Facility Urgency Interim Ordinance Extension
City Council Regular Meeting | November 2, 2026
Page 6 of 12
(c) The federal court’s rejection of the argument that converting an existing agricultural
research facility to an ICE holding facility was not a change in use because both include
office space, which demonstrates that, absent a definition based on the function of the
facility, a Detention and Custodial Facility could be characterized under the Gilroy City
Code as an office, “Public Facility,” or similar use and approved without a public hearing.
(d) The federal court’s findings that occupancy and holding capacity at the Holsclaw Property
facility are uncertain, could be at least three times the prior occupancy of the site, and
cannot be determined until work is completed, and that the facility is designed with
concrete-reinforced holding rooms, detainee processing areas, an armory, and tactical
equipment storage, demonstrating the need for occupancy, capacity, security, and
emergency-response standards.
(e) The federal court’s findings that increased occupancy would overburden the site’s
wastewater system, creating a risk of surfacing sewage and contamination of groundwater
and surface water, and that construction is likely to disturb hazardous materials from prior
uses, while the property owner refused local inspection access and had not obtained
necessary permits, demonstrating the need for water, wastewater, environmental site
assessment, and inspection-access standards.
(f) Information in the public record continues to suggest that an application to build a detention
facility within the Gilroy city limits is of major concern. An ICE official stated under
penalty of perjury that Gilroy’s central location offers significant operational advantages
within the San Francisco Field Office’s area of responsibility, and ICE has stated that,
without the Holsclaw Property facility, it would have to rely on existing facilities that are
farther away. Because the federal court’s preliminary injunction continues to delay the
Holsclaw Property facility, ICE, or a private landlord or developer working with it, may
submit an application to establish a detention or processing facility within the City at any
time.
(g) Government Code Section 65850.05, added by Senate Bill 1367, does not take effect until
January 1, 2027, may not apply to facilities that are privately owned and leased to, but
operated by, a governmental agency, and does not establish local zoning classifications or
siting, infrastructure, operational, security, or emergency-response standards, such that a
zoning ordinance amendment remains necessary.
(h) The severe impacts that detention and custodial facilities can have on surrounding
communities and local resources, including water supply, wastewater capacity, traffic and
street conditions, law enforcement, traffic and crowd management, and emergency
response, and the documented history of overcrowding, poor living conditions, and
substandard medical care at detention facilities in California.
Page 166 of 211
Ordinance No. 2026-XX
Detention and Custodial Facility Urgency Interim Ordinance Extension
City Council Regular Meeting | November 2, 2026
Page 7 of 12
(i) The continued absence in the Gilroy City Code of any definition of, or zoning, siting,
development, or operational standards for, Detention and Custodial Facilities, combined
with the presence of broad, undefined “Public Facility,” “Publicly Owned Building or
Facility,” and PF-district governmental-facility classifications and administrative similar-
use determination procedures, such that applications for such uses could be processed and
approved — potentially without a conditional use permit or any public hearing — before
the City completes a zoning amendment.
(j) Any such zoning amendment cannot be completed within the initial forty-five (45) day
term of Ordinance No. 2026-10, and without an extension of the moratorium while these
issues are examined and appropriate regulations developed, there remains a current and
immediate threat that such uses will be established within the City and will result in the
harms to the public health, safety, and welfare described herein.
SECTION IV. Extension of Urgency Interim Ordinance.
Pursuant to California Government Code Section 65858, subdivision (a), Ordinance No. 2026-10
is hereby extended for an additional period of ten (10) months and fifteen (15) days, from
November 19, 2026 through and including October 4, 2027. During the term of this extension, all
provisions of Ordinance No. 2026-10 shall remain in full force and effect. In the event of any
conflict between Ordinance No. 2026-10 and this Ordinance, this Ordinance shall control.
SECTION V. Definitions.
For purposes of this Ordinance, the following definitions shall apply:
(a) “Detention and Custodial Facility” means a temporary or permanent building, structure,
set of buildings, or portion thereof that is designed, constructed, converted, or used to
detain, confine, process, or house persons in custody, including without limitation persons
detained or held in connection with the enforcement of the civil provisions of federal
immigration law. A facility is a Detention and Custodial Facility regardless of whether it
is owned, leased, operated, or managed by a private person or entity, or by or on behalf of
a governmental agency pursuant to a lease, contract, or other arrangement with a private
property owner, developer, or contractor, and regardless of whether the facility also
includes office, administrative, or other accessory space.
(b) “Establishment, Expansion, or Change of Use” means (i) the construction, conversion,
tenant improvement, occupancy, or commencement of operation of a Detention and
Custodial Facility that was not lawfully established and in operation as of October 5, 2026,
the effective date of Ordinance No. 2026-10; (ii) any enlargement of the floor area, site
area, holding capacity, or intensity of an existing Detention and Custodial Facility; or (iii)
the conversion of any existing building, structure, or use, in whole or in part, to a Detention
and Custodial Facility.
Page 167 of 211
Ordinance No. 2026-XX
Detention and Custodial Facility Urgency Interim Ordinance Extension
City Council Regular Meeting | November 2, 2026
Page 8 of 12
(c) “Application or Entitlement” means any application for, or the issuance of, any permit,
license, approval, or entitlement, whether ministerial or discretionary, that would
authorize, facilitate, or be required for the Establishment, Expansion, or Change of Use of
a Detention and Custodial Facility, including without limitation any general plan
amendment, zoning amendment, specific plan, conditional use permit, architectural and
site review, variance, subdivision map, grading permit, demolition permit, building permit,
electrical, plumbing, or mechanical permit, encroachment permit, certificate of occupancy,
business license, or City utility service connection.
(d) “Private Property” means real property within the City that is not owned by a governmental
agency, including real property that is owned by a private person or entity and leased,
licensed, or otherwise made available to a governmental agency.
(e) “Public Property” means real property within the City that is owned by a governmental
agency, including the City, the County of Santa Clara, the State of California, the United
States, and any of their respective agencies, districts, or instrumentalities.
SECTION VI. Moratorium Continued
The temporary moratorium established by Ordinance No. 2026-10 is hereby continued, citywide,
on the filing, acceptance, processing, and approval of any Application or Entitlement for the
Establishment, Expansion, or Change of Use of a Detention and Custodial Facility on Private
Property. During the term of this Ordinance, no City officer, employee, board, commission, or
the City Council shall accept, process, or approve any such Application or Entitlement, except as
provided in Sections VII and VIII of this Ordinance. This moratorium applies notwithstanding
any provision of Chapter 30 of the Gilroy City Code under which such a facility might otherwise
be classified as a permitted or conditional use, including without limitation the “Public Facility”
classification in Section 30.19.10(c), the “Publicly Owned Building or Facility” classification in
Section 30.11.10(c), and Section 30.25.20(a)(1), and during the term of this Ordinance no
determination shall be made under Section 30.11.10(b), 30.19.10(b), 30.23.10(b), or 30.25.20
that a Detention and Custodial Facility is similar in character to any listed use, including any
office, administrative, warehouse, or industrial use.
SECTION VII. Application to Public Property
To the fullest extent permitted by federal and state law, the moratorium continued by Section VI
shall apply equally to any Application or Entitlement for the Establishment, Expansion, or Change
of Use of a Detention and Custodial Facility on Public Property. This Ordinance is a generally
applicable land use regulation and does not purport to regulate, and shall not be construed as
regulating or discriminating against, the United States, the State of California, or any of their
agencies in the performance of governmental functions. Nothing in this Ordinance shall be
construed to apply to any such agency, or to any property owned or occupied by any such agency,
to the extent such application is preempted or prohibited by the Supremacy Clause of the United
States Constitution, the doctrine of intergovernmental immunity, or the laws of the State of
California. In all other respects this Ordinance shall apply to the fullest extent permitted by law.
Page 168 of 211
Ordinance No. 2026-XX
Detention and Custodial Facility Urgency Interim Ordinance Extension
City Council Regular Meeting | November 2, 2026
Page 9 of 12
SECTION VIII. Exemptions.
The moratorium continued by this Ordinance shall not apply to the following:
(a) Any facility providing rehabilitative, counseling, treatment, mental health, educational, or
medical services to a juvenile that is under the jurisdiction of the juvenile court.
(b) Any facility providing evaluation or treatment services to a person who has been detained
or is subject to an order of commitment by a court.
(c) Any facility providing educational, vocational, medical, or other ancillary services to an
inmate in the custody of, and under the direct supervision of, the State Department of
Corrections and Rehabilitation or a county sheriff or other law enforcement agency.
(d) A residential care facility licensed under state law.
(e) Any school facility used for the disciplinary detention of a pupil.
(f) Any facility used for the quarantine or isolation of persons for public health reasons under
state law.
(g) Any facility for the purposes of execution of a punitive sentence imposed by a court.
(h) The continued operation, maintenance, and repair of any temporary holding facility
existing as of October 5, 2026.
(i) The continued operation, maintenance, and repair, without Expansion or Change of Use,
of any Detention and Custodial Facility lawfully established and in operation within the
City as of October 5, 2026.
SECTION IX. Relationship to State Law
This Ordinance is in addition to, not in lieu of, Senate Bill 1367 (Chapter 758, Statutes of 2026)
that added Government Code Section 65850.05 and any other applicable state law. Nothing in this
Ordinance, including the exemptions in Section VIII, shall be construed to authorize approval of
any new land use or change of use prohibited by Government Code Section 65850.05 on or after
its effective date of January 1, 2027.
SECTION X. Violation.
Except as otherwise permitted under this urgency interim Ordinance, the Establishment,
Expansion, or Change of Use of a Detention and Custodial Facility in violation of this Ordinance
is declared to be a public nuisance. Violations of this urgency interim Ordinance may be enforced
by any applicable laws or ordinances, including, but not limited to, injunctions or administrative
or criminal penalties under the Gilroy City Code.
Page 169 of 211
Ordinance No. 2026-XX
Detention and Custodial Facility Urgency Interim Ordinance Extension
City Council Regular Meeting | November 2, 2026
Page 10 of 12
SECTION XI. Report.
Pursuant to California Government Code Section 65858, subdivision (d), the City Administrator,
or designee, has prepared a written report describing the measures taken to alleviate the conditions
which led to the adoption of Ordinance No. 2026-10, for issuance no later than ten (10) days prior
to its expiration (on or before November 19, 2026). The City Administrator, or designee, is
authorized and directed to prepare a written report describing the measures taken to alleviate the
conditions which led to the adoption of this urgency interim Ordinance, for issuance no later than
ten (10) days prior its expiration (on or before October 4, 2027).
SECTION XII. Term of Ordinance.
This urgency interim Ordinance shall be in effect from the date of adoption and shall extend the
term of Ordinance No. 2026-10 for a period of ten (10) months and fifteen (15) days, expiring on
October 4, 2027, unless it is further extended for one (1) year pursuant to California Government
Code Section 65858, subdivision (a), as approved by at least a four-fifths vote of the City Council
following notice and public hearing, or is terminated earlier by the City Council upon the adoption
of permanent regulations via a zoning amendment.
SECTION XIII. Severability.
If any section, subsection, subdivision, sentence, clause, or phrase of this urgency interim
Ordinance, or its application to any person, property, or circumstance, is for any reason held to be
unconstitutional or otherwise void or invalid by any court of competent jurisdiction, such decision
shall not affect the validity of the remaining portions of this urgency interim Ordinance or its
application to other persons, properties, or circumstances. The City Council hereby declares that
it would have passed this urgency interim Ordinance and each section, subsection, subdivision,
sentence, clause, or phrase thereof, irrespective of the fact that any one or more sections,
subsections, subdivisions, sentences, clauses, or phrases may be declared unconstitutional or
otherwise invalid by a court of competent jurisdiction, and in particular declares that it would have
adopted the extension of the moratorium as applied to Private Property irrespective of the validity
of its application to Public Property.
SECTION XIV. CEQA Determination.
This urgency interim Ordinance is not a “project” within the meaning of the California
Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines Section 15378, and is in any
event exempt from environmental review under CEQA Guidelines Sections 15060(c)(2) and
15061(b)(3), because it can be seen with certainty that this Ordinance has no possibility of having
a significant effect on the environment, as it merely extends and preserves the status quo in
accordance with Government Code Section 65858 in the interest of evaluating and preventing
potential harms related to detention and custodial facility land uses. This Ordinance does not
authorize any development, approve any land-use entitlement, or result in any physical change to
the environment.
Page 170 of 211
Ordinance No. 2026-XX
Detention and Custodial Facility Urgency Interim Ordinance Extension
City Council Regular Meeting | November 2, 2026
Page 11 of 12
SECTION XV. Effective Date.
The extension of the urgency interim Ordinance, passed by at least a four-fifths vote of the City
Council, is declared to be an urgency interim Ordinance for preserving the public health, safety,
and welfare and shall take effect and be enforced immediately upon adoption pursuant to
Government Code Sections 65858(a) and 36937(b).
SECTION XII. Publication.
The City Clerk shall cause this Ordinance, or summary thereof, to be published one time within
fifteen (15) days upon passage and adoption in a newspaper of general circulation, such as the
Gilroy Dispatch.
PASSED AND ADOPTED by the City Council of the City of Gilroy this 2nd day of November
2026 by the following roll call vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
APPROVED:
___________________
Greg Bozzo, Mayor
ATTEST:
_______________________
Kim Mancera, City Clerk
Page 171 of 211
Ordinance No. 2026-XX
Detention and Custodial Facility Urgency Interim Ordinance Extension
City Council Regular Meeting | November 2, 2026
Page 12 of 12
CERTIFICATE OF THE CLERK
I, KIM MANCERA, City Clerk of the City of Gilroy, do hereby certify that the
attached Ordinance No. 2026-XX is an original ordinance, or true and correct copy of a City
Ordinance, duly adopted by the Council of the City of Gilroy at a Regular Meeting of
said Council held on Monday, November 2, 2026 with a quorum present.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the Official Seal of
the City of Gilroy this Tuesday, November 3, 2026.
____________________________________
Kim Mancera
City Clerk of the City of Gilroy
Page 172 of 211
10-Day Report
on the City of Gilroy 45-day Urgency Interim Ordinance imposing a temporary
moratorium on the acceptance, processing, and approval of applications and
entitlements for detention and custodial facilities citywide pending the study and
development of reasonable regulations pursuant to Government Code Section 65858(d)
BACKGROUND
On October 5, 2026, pursuant to Government Code Section 65858, the Gilroy City
Council unanimously adopted Ordinance No. 2026-10, a 45-day urgency interim
ordinance. The ordinance addresses an immediate threat to public health, safety, and
welfare from the potential establishment, expansion, or change of use of detention and
custodial facilities under undefined regulations. It establishes a 45-day citywide
moratorium on filing, accepting, processing, and approving applications and
entitlements for Detention and Custodial Facilities on private property, and on public
property as permitted by federal and state law.
The ordinance was adopted in response to the proposed U.S. Immigration and Customs
Enforcement (ICE) immigration enforcement and detainee holding facility on the
Holsclaw Property, an approximately 25-acre site in unincorporated Santa Clara County
immediately adjacent to the City, the Department of Homeland Security (DHS) “ICE
Detention Reengineering Initiative,” which calls for a nationwide network of new
detention and processing facilities to be active by November 30, 2026, and the sworn
statement of an ICE official that Gilroy was selected because its central location offers
operational advantages within ICE’s San Francisco Field Office area of responsibility.
The Gilroy City Code does not define “Detention and Custodial Facility,” but contains
broad “Public Facility,” “Publicly Owned Building or Facility,” and PF-district
governmental-facility classifications and administrative similar-use procedures under
which such a facility could potentially be approved without a conditional use permit or
public hearing.
Under Government Code Section 65858(d), and consistent with Section IX of
Ordinance No. 2026-10, the City is to issue a written report describing the measures
taken to alleviate the conditions which led to the adoption of the moratorium at least 10
days prior to the expiration of the 45-day ordinance. Issuance of this report satisfies the
requirements of Government Code Section 65858(d). The 45-day moratorium is set to
expire on November 19, 2026.
Measures taken to alleviate the conditions that led to the adoption of the urgency
ordinance:
1. The City has formed an interdepartmental team to discuss and develop definitions
and distinct land use zoning regulations. The team includes Community
Development (Planning), the City Attorney’s Office, the Police Department, and the
City Administrator’s Office. The team will define the use, identify if and where it may
be appropriate, establish review procedures, and develop siting, operational,
Page 173 of 211
infrastructure, security, and emergency-response standards.
2. Planning staff completed an audit of Chapter 30 (Zoning Ordinance) of the Gilroy
City Code. The audit confirmed the provisions that could allow a Detention and
Custodial Facility to be processed without a public hearing: the “Public Facility”
classification (Section 30.19.10(c)), the “Publicly Owned Building or Facility”
classification (Section 30.11.10(c)), the PF-district governmental-facility provision
(Section 30.25.20(a)(1)), the similar-use determination procedures (Sections
30.11.10(b), 30.19.10(b), 30.23.10(b), and 30.25.20), and plan approval by the
Director of Planning (Section 30.45.10). Staff has begun drafting a definition of
“Detention and Custodial Facility” and change-of-use provisions based on the
function of the facility (detaining, confining, processing, or housing persons in
custody), regardless of whether it also includes office or administrative space.
3. Staff reviewed the September 11, 2026 Order Granting Preliminary Injunction in
County of Santa Clara, et al. v. United States Immigration & Customs Enforcement,
et al., Case No. 26-cv-05604-EKL (N.D. Cal.), to identify the land-use,
infrastructure, and public-safety impacts that the Gilroy City Code must address.
The relevant findings are summarized under “Continued Need for the Moratorium”
below. Based on that review, staff may evaluate application requirements and
standards for maximum occupancy and holding capacity, water and sewer capacity,
environmental site assessment for sites with prior hazardous-materials use, City
inspection access, security and emergency-response plans, and traffic from staff,
detainee transport, and visitors.
4. Staff and the City Attorney’s Office began reviewing Senate Bill 1367 (Chapter 758,
Statutes of 2026), signed by the Governor on September 29, 2026, which adds
Government Code Section 65850.05 effective January 1, 2027. The review will
determine how the statute’s prohibition on approving privately operated detention
facilities should be incorporated into the City Code, and which facilities and
standards remain for the City to address locally.
5. The City Attorney’s Office is evaluating intergovernmental-immunity and preemption
considerations for regulating facilities on public property, and on private property
leased to governmental agencies, in light of GEO Group v. Newsom (9th Cir. 2022)
and GEO Group v. City of Tacoma (W.D. Wash. 2019).
6. City staff has begun reviewing interim and permanent regulations from other
California jurisdictions to identify best practices, including San José, Los Altos,
Mountain View, San Mateo County, and Monterey County.
7. Planning staff will begin mapping industrial, warehouse, large-format commercial,
PF-district, and publicly owned properties within the City that have characteristics of
sites converted to detention or processing use elsewhere. This information will
inform the identification of appropriate zoning districts, if any, and separation
Page 174 of 211
standards from sensitive uses such as residences, schools, and parks.
8. Planning, Building, and permit-intake staff have been directed to identify and route
to the Community Development Director any pre-application, application, building
permit, tenant improvement, business license, or utility connection request that may
involve a Detention and Custodial Facility, consistent with the moratorium.
The above reflects actions taken during this short period. Conditions still require
extending the urgency interim ordinance to give staff time to complete the analysis and
research in order to ensure the protection of the public health, safety, and welfare for all
residents in the City of Gilroy.
CONTINUED NEED FOR THE MORATORIUM
Actions addressing the underlying need for the moratorium are ongoing. Specifically, at
the direction of Council, staff is studying and will develop a zoning amendment, which
will (i) define “Detention and Custodial Facility” as a distinct land use; (ii) identify the
zoning districts, if any, in which such a use may be appropriately located and the level
of discretionary review and public hearing that should apply; (iii) establish siting,
separation, development, operational, security, water and wastewater, traffic,
emergency-response, and community-impact standards; and (iv) clarify that the “Public
Facility,” “Publicly Owned Building or Facility,” and PF-district governmental-facility
classifications, and the similar-use determination procedures, do not encompass
Detention and Custodial Facilities.
State law changes
SB 1367 does not eliminate the need for the moratorium. The statute does not take
effect until January 1, 2027, after the initial moratorium expires and after the November
30, 2026 target date in the DHS directive. By its terms, it applies to facilities operated
by a private entity on behalf of a governmental entity, and it may not reach a facility
that is privately owned and leased to, but operated by, a federal agency, which is the
arrangement at the Holsclaw Property. The statute also does not amend the City
Code’s classifications or establish local siting, infrastructure, or operational standards,
which are of direct concern.
The proposed regulatory changes will require further research, coordination with City
departments, legal review, environmental review under the California Environmental
Quality Act (CEQA), and public outreach, as well as public hearings before the
Planning Commission and City Council.
These tasks cannot be completed within the initial 45-day period which ends on
November 19, 2026. Therefore, the need for the moratorium remains and staff
recommends the City Council adopt an ordinance extending the current moratorium for
Page 175 of 211
a period of 10 months and 15 days, through October 4, 2027.
Unless extended by Council, the moratorium would automatically expire on November
19, 2026.
Pursuant to Government Code Section 65858(a), an extension requires a four-fifths
vote of the City Council and must include the findings required by Government Code
Section 65858(c). Staff intends to return to Council with code amendments either prior
to or alongside the comprehensive zoning update.
OPPORTUNITY FOR PUBLIC COMMENT
Members of the public will have the opportunity to comment on the extension of the
Urgency Interim Ordinance at the City Council hearing to be held on November 2,
2026. The City will publish the required notice for this meeting pursuant to Government
Code Section 65090.
Page 176 of 211
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 United States District Court Northern District of California
UNITED STATES DISTRICT COURT
NORTHERN DISTRICT OF CALIFORNIA
COUNTY OF SANTA CLARA, et al.,
Plaintiffs,
v.
UNITED STATES IMMIGRATION &
CUSTOMS ENFORCEMENT, et al.,
Defendants.
Case No. 26-cv-05604-EKL
ORDER GRANTING PRELIMINARY
INJUNCTION
Re: Dkt. No. 24
Plaintiffs the State of California and the County of Santa Clara bring this action to require
the Federal Government and a private developer to halt construction of an immigration
enforcement and detainee holding facility in Gilroy, California – an agricultural hub known as the
“garlic capital of the world.” Among other claims, Plaintiffs contend that Defendants failed to
analyze the potential environmental consequences of the construction and future use of the facility.
Plaintiffs submit that environmental harms are likely because the site of the proposed holding
facility was used for 30 years to conduct agricultural research that resulted in known hazardous
waste violations. Plaintiffs seek a preliminary injunction to pause construction of the holding
facility, thereby providing enough time to conduct a proper environmental review. See Mot. for
Prelim. Inj., ECF No. 24 (“Mot.”). Defendants oppose the motion. Although Defendants offer no
proof that they conducted a meaningful environmental analysis before starting construction, they
assert that the environmental risks are exaggerated and outweighed by the Federal Government’s
mission to enforce its immigration laws.
The Court reviewed the entire record and relevant legal authorities and heard argument on
September 8, 2026. For the following reasons, the Court GRANTS Plaintiffs’ motion for a
preliminary injunction as set forth below.
Case 5:26-cv-05604-EKL Document 66 Filed 09/11/26 Page 1 of 23
Page 663 of 685Page 177 of 211
2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 United States District Court Northern District of California I. BACKGROUND
Although the public has only recently learned of it, the project challenged by this lawsuit
has been contemplated for years. On December 22, 2020, the Government Services
Administration (“GSA”) – an agency responsible for managing and acquiring property for use by
the Federal Government – posted a “pre-solicitation” notice indicating that GSA sought to lease
office and detention space near San Jose, California. Zeligman Decl. Ex. A, ECF No. 54-3.
Similar notices were published in 2021 and 2022, see Zeligman Decl. Ex. B, but the project was
put on hold due to lack of funding, Larson Decl. Ex. 3 at 1, ECF No. 57-3. After funds became
available, GSA posted a solicitation notice on August 9, 2024. Murillo Decl. Ex. 12, ECF
No. 29-12. Through this process, GSA identified three properties as candidates for the facility,
which would be operated by U.S. Immigration and Customs Enforcement (“ICE”) – specifically,
its Enforcement and Removal Operations (“ERO”) division. Larson Decl. Ex. 3 at 3. One of the
three properties, the Holsclaw Property in Gilroy, California, was ultimately selected as the site for
ICE’s immigrant detainee holding facility (“Gilroy Holding Facility”).
Defendant ECG6 LLC (“ECG6”) is the “corporate entity that holds and operates the
Holsclaw Property.” ECG6 Opp. at 6, ECF No. 54. ECG6 is an investment vehicle of Elmwood
Capital Group, “a Beverly Hills-based real estate investment firm consisting of three friends
whose business is to procure and lease properties (sometimes after modifying them to meet
government requirements) to federal agencies.” Id. Relevant here, ECG6 acquired the Holsclaw
Property and entered into a lease with GSA in January 2025. Zeligman Decl. ¶ 5, ECF No. 54-2.
Over the 20-year lease term, ECG6 may receive up to $26,551,532.00 in rent payments from
GSA. Id. ¶ 21; see also Tsang Decl. Ex. 1 at 1, 5, ECF No. 32-1 (“GSA Lease”). The lease was
amended in March 2026 to approve certain construction costs, for which ECG6 will be reimbursed
$8,656,150.69 “once the property is turned over to the government and is inspected.” Zeligman
Decl. ¶ 23. The lease term begins once ECG6 completes this work to GSA’s satisfaction. Id.
¶ 24; GSA Lease §§ 3.07(a), 4.11. On April 23, 2026, ECG6 began developing the Holsclaw
Property. See Notice, ECF No. 65. ECG6 planned to complete work by January 2027, Zeligman
Decl. ¶ 32, but it has not submitted any evidence that it can meet this target.
Case 5:26-cv-05604-EKL Document 66 Filed 09/11/26 Page 2 of 23
Page 664 of 685Page 178 of 211
3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 United States District Court Northern District of California ICE plans to use the Holsclaw Property in part as a holding facility. A holding facility
“contains hold rooms that are primarily used for the short-term confinement of individuals who
have recently been detained, or are being transferred to or from a court, detention facility, other
holding facility, or other agency.” Arzy Decl. Ex. 3 § 3.2, ECF No. 34-3. Based on site plans
obtained by the San José Spotlight, Plaintiffs allege that the facility will contain four small hold
rooms and two larger ones that could hold up to 150 detainees in total. Compl. ¶¶ 132-133, ECF
No. 1. Figures 1 and 2 are excerpts of ICE’s facility design guide showing that the rooms feature
benches and a lavatory with a “suicide resistant grab bar.” Arzy Decl. Ex. 5, ECF No. 34-5.
Figure 1: Small Holding Room
Case 5:26-cv-05604-EKL Document 66 Filed 09/11/26 Page 3 of 23
Page 665 of 685Page 179 of 211
4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 United States District Court Northern District of California Figure 2: Large Holding Room
The ICE facility would host personnel, contractors, “individuals temporarily held in the
hold room area, and members of the public who come to the site for interviews, check-ins, bond-
related matters, attorney or family visits, or to deliver medication, property, or other necessary
items.” Bayardo Decl. ¶ 13, ECF No. 56. Defendants dispute that the facility could detain up to
150 people, but their counter-estimates are inconsistent and non-committal. ICE initially told
ECG6 that the maximum detention capacity would be “fewer than 100” people, and that typically
“fewer than 5” people would be detained on site. Zeligman Decl. ¶ 25 & Ex. F at 32-33, ECF
No. 54-3. But now, ICE’s “best current estimate” is that 60 members of the public, 50 personnel,
Case 5:26-cv-05604-EKL Document 66 Filed 09/11/26 Page 4 of 23
Page 666 of 685Page 180 of 211
5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 United States District Court Northern District of California and approximately ten detainees might be present at the Gilroy Holding Facility “over the course
of the day during normal operations.” Bayardo Decl. ¶ 13. In sum, ICE expects the Gilroy
Holding Facility to host at least 120 people over the course of a normal day once operations begin.
However, the ICE representative who offers this estimate has “not personally visited the Gilroy
site,” and she concedes that ICE “will not be able to determine the maximum occupancy for the
Gilroy facility hold room until work is completed and inspected.” Id. ¶¶ 7, 13. Thus, the number
of detainees may be higher than currently estimated.
The Holsclaw Property was never previously used to hold immigrant detainees. Instead,
the site was used to conduct agricultural research. See Zeligman Decl. ¶ 11 (explaining that the
Holsclaw Property contains a “laboratory building, warehouse, and chemical storage building, as
well as several greenhouses”). From 1993 to 2023, several agricultural research companies
operated on the site, including Syngenta Seeds and its affiliates. Pierce Decl. ¶ 9, ECF No. 30;
Gutierrez Decl. ¶ 8, ECF No. 26; see Gutierrez Decl. Ex. B at 2-3, ECF No. 26-2 (agricultural
research permit). These agricultural research companies were permitted by the County as
“hazardous waste generator facilities” due to their management of toxic chemicals including
“pesticides such as thiram and Physan, chemicals used in DNA sequencing and extraction such as
Puregene and ethidium bromide, calcium hypochlorite, solvents, acids, alkaline cleaners, and other
laboratory reagents.” Pierce Decl. ¶¶ 10, 14-15 & Ex. D, ECF No. 30-4 (manifests of hazardous
materials).
The County has documented numerous instances of hazardous material mismanagement at
the Holsclaw Property. Balliet Decl. ¶ 7, ECF No. 25; Pierce Decl. ¶¶ 16-19. Inspections of the
Holsclaw Property conducted by the County’s Public Health Department revealed “multiple
violations indicating a release or threat of release of hazardous materials or waste.” Balliet Decl.
¶¶ 2, 6, 7. These violations included “unpermitted discharges of laboratory and process wastes
into sinks and drains connected to the onsite septic system.” Id. ¶ 7. Syngenta Seeds
acknowledged that a “key problem” affecting its compliance with hazardous waste laws at the
Holsclaw Property was the “lack of internal training on the handling and disposal of hazardous
Case 5:26-cv-05604-EKL Document 66 Filed 09/11/26 Page 5 of 23
Page 667 of 685Page 181 of 211
6
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 United States District Court Northern District of California waste.”1 Balliet Decl. Ex. C, ECF No. 25-3. In 2023, the County discovered that the agricultural
research companies operating at the Holsclaw Property had “vacated the site.” Pierce Decl. ¶ 22.
The companies failed to complete facility closure requirements that are “necessary to ensure that
all remaining equipment, structures, and soil were properly decontaminated and that all hazardous
wastes and hazardous waste contaminants were properly removed.” Id. ¶¶ 11, 21.
In late April and early May 2026, a County investigator observed demolition and
construction work at the Holsclaw Property. Murillo Decl. ¶¶ 9-10, 14-23, ECF No. 29. On June
10, 2026, after learning that the Holsclaw Property was being developed into an immigrant
detainee holding facility, the County “attempted to access the Holsclaw Property for an
inspection” given the site’s history of hazardous waste violations. Pierce Decl. ¶ 27. ECG6
refused access “and referred [County] staff to the federal General Services [Administration] and
Department of Homeland Security to coordinate any inspection.” Id.; see also Pierce Decl. Ex. I,
ECF No. 30-9 (correspondence from ECG6 denying the County permission to enter); Murillo
Decl. ¶¶ 9, 21, 30 (explaining that ECG6 used privacy fences to block access to the Holsclaw
Property). To date, Defendants have not allowed Plaintiffs to inspect the Holsclaw Property.
Based on known hazardous waste violations at the Holsclaw Property, and the agricultural
research companies’ failure to complete site closure requirements, the County’s Public Health
Department has concluded that “the contamination of structures, soils, the septic system, and
groundwater at the Holsclaw Property is likely if construction continues before the hazards are
assessed and/or addressed.” Balliet Decl. ¶ 8; see also Pierce Decl. ¶ 28. Specifically,
construction activities such as “demolition, interior gutting, excavation, and rebuilding” are “likely
to disturb potentially contaminated structures, concrete foundations, soils, and septic components,
creating a risk of hazardous substance releases at a facility that handled numerous hazardous
materials for decades.” Balliet Decl. ¶ 11.
1 In connection with another facility in Gilroy, Syngenta Seeds was prosecuted for various
hazardous waste violations, including illegal disposal “of more than 70,000 pounds of pesticide
treated seeds” and “failure to train employees.” Balliet Decl. ¶ 9. Syngenta Seeds stipulated to a
judgment and paid a fine to resolve the charges. Balliet Decl. Ex. E at 5, 12-17, ECF No. 25-5.
Case 5:26-cv-05604-EKL Document 66 Filed 09/11/26 Page 6 of 23
Page 668 of 685Page 182 of 211
7
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 United States District Court Northern District of California On June 10, 2026, Plaintiffs filed the complaint in this action against ECG6, as well as ICE
and its acting Director, the U.S. Department of Homeland Security (“DHS”) and its Secretary, and
GSA and its Administrator (together, “Federal Defendants”). Compl. ¶¶ 25-31. Plaintiffs assert
violations of the National Environmental Policy Act (“NEPA”), 42 U.S.C. § 4321 et seq.; the
Immigration and Nationality Act, 8 U.S.C. § 1231(g)(1)-(2); the Intergovernmental Cooperation
Act (“ICA”), 31 U.S.C. § 6506(c); and the Williamson Act, Cal. Gov’t Code § 51200 et seq.
Compl. ¶¶ 170-223. On June 24, 2026, Plaintiffs moved for a preliminary injunction on their
NEPA and ICA claims. The parties agreed to an extended briefing schedule and Defendants
paused “construction, demolition, and development activities, except for such activities necessary
to address immediate safety concerns, at the Holsclaw Property until September 9, 2026 or until
further order from the Court.” Stip. & Order at 3, ECF No. 41. At the preliminary injunction
hearing, the parties extended the pause through September 15, 2026. Min. Entry, ECF No. 64.
II. LEGAL STANDARD
In order to obtain a preliminary injunction, a plaintiff must establish that: (1) “he is likely
to succeed on the merits,” (2) “he is likely to suffer irreparable harm in the absence of preliminary
relief,” (3) the “balance of equities tips in his favor,” and (4) the “injunction is in the public
interest.” Winter v. Nat. Res. Def. Council, Inc., 555 U.S. 7, 20 (2008); All. for the Wild Rockies v.
Cottrell, 632 F.3d 1127, 1131 (9th Cir. 2011). “Where, as here, the party opposing the injunctive
relief is a government entity, the third and fourth factors – the balance of equities and the public
interest – merge.” Hubbard v. City of San Diego, 139 F.4th 843, 854 (9th Cir. 2025) (citation
modified).
III. DISCUSSION
Based on the record before the Court, Plaintiffs are likely to succeed on the merits of their
claim that the Federal Defendants failed to conduct the required environmental analysis under
NEPA before undertaking the Gilroy Holding Facility project.2 Plaintiffs have also shown that
2 Because Plaintiffs have shown that they are likely to succeed on their NEPA claim, the Court
does not reach the ICA claim at this stage. See Museum of Handcar Tech. LLC v. Transp. Agency
for Monterey Cnty., 778 F. Supp. 3d 1065, 1079 n.8 (N.D. Cal. 2025) (A plaintiff “does not need
to show a likelihood of success on every claim in order to obtain a preliminary injunction.”).
Case 5:26-cv-05604-EKL Document 66 Filed 09/11/26 Page 7 of 23
Page 669 of 685Page 183 of 211
8
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 United States District Court Northern District of California irreparable environmental harms are likely to result if construction proceeds without considering
the environmental risks. Because Plaintiffs have identified specific irreparable environmental
harms, and Defendants have not shown how a delay of construction would materially impede
immigration enforcement or cause substantial economic hardship, the balance of the equities and
the public interest also favor an injunction.
A. Likelihood of Success
1. Statutory Framework
NEPA requires “the Federal Government, in cooperation with State and local governments,
and other concerned public and private organizations, to use all practicable means and measures
. . . to create and maintain conditions under which man and nature can exist in productive
harmony.” 42 U.S.C. § 4331. “NEPA’s dual mission is thus to generate federal attention to
environmental concerns and to reveal that federal consideration for public scrutiny.” Churchill
County v. Norton, 276 F.3d 1060, 1072 (9th Cir. 2001) (citation modified). “NEPA facilitates
informed decisionmaking by requiring agencies to consider the environmental impacts of
their actions.” Friends of Animals v. Burgum, 164 F.4th 738, 749-50 (9th Cir. 2026); see also Ctr.
for Biological Diversity v. U.S. Bureau of Land Mgmt., 141 F.4th 976, 993 (9th Cir. 2025) (NEPA
“requires the federal government to take a hard look at the environmental consequences before
acting.” (citation modified)). “Informed public participation in reviewing environmental impacts
is essential to the proper functioning of NEPA.” League of Wilderness Defs./Blue Mountains
Biodiversity Project v. Connaughton, 752 F.3d 755, 761 (9th Cir. 2014).
Before undertaking a “major Federal action,”3 an agency must follow one of three paths to
comply with NEPA: (1) prepare a robust environmental impact statement (“EIS”); (2) prepare a
more streamlined environmental assessment (“EA”); or (3) invoke a categorical exclusion. See
42 U.S.C. § 4336; Dep’t of Transp. v. Pub. Citizen, 541 U.S. 752, 757 (2004). Where a proposed
action would have a “reasonably foreseeable significant effect on the quality of the human
3 It is presently uncontested that the Gilroy Holding Facility constitutes a “major Federal action”
that triggers NEPA’s requirements. See 42 U.S.C. § 4336e(10)(A) (defining “major Federal
action” as an action “subject to substantial Federal control and responsibility”). The parties
instead dispute the degree of environmental review that was required for the project.
Case 5:26-cv-05604-EKL Document 66 Filed 09/11/26 Page 8 of 23
Page 670 of 685Page 184 of 211
9
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 United States District Court Northern District of California environment,” the agency proposing the action must prepare an EIS. 42 U.S.C. § 4336(b)(1). An
EIS is a “detailed statement” analyzing the action’s potentially significant environmental effects as
well as a “reasonable range of alternatives” to the action. Id. §§ 4332(C), 4336(b)(1). By contrast,
an EA is required when there is not a reasonably foreseeable significant effect on the quality of the
human environment, or if the significance of the effect is unknown. 42 U.S.C. § 4336(b)(2). An
EA is a “concise public document” that provides evidence that helps determine whether an EIS is
ultimately necessary. Id.; Env’t Def. Ctr. v. Bureau of Ocean Energy Mgmt., 36 F.4th 850, 872
(9th Cir. 2022). Regardless of whether the agency prepares an EIS or an EA, the document must:
(1) be made publicly available; (2) be conducted prior to undertaking the action; and (3) consider
alternatives to the proposed action. 42 U.S.C. §§ 4336(b), 4332(C); see also Native Ecosystems
Council v. U.S. Forest Serv., 428 F.3d 1233, 1245 (9th Cir. 2005) (“The alternatives provision of
NEPA applies whether an agency is preparing an EIS or an EA.”).
An agency may forgo preparation of an EIS or EA if it invokes a valid categorical
exclusion before undertaking the proposed action. See 42 U.S.C. § 4336(a)(2). A categorical
exclusion is “a category of actions that a Federal agency has determined normally does not
significantly affect the quality of the human environment within the meaning of [NEPA].” Id.
§ 4336e(1). “Categorical exclusions, by definition, are limited to situations where there is an
insignificant or minor effect on the environment.” Alaska Ctr. for Env’t v. U.S. Forest Serv.,
189 F.3d 851, 859 (9th Cir. 1999). Therefore, invoking a categorical exclusion is not proper if
there are “extraordinary circumstances” indicating that a particular proposed action “may have a
significant environmental effect, necessitating further environmental impact analysis.” Ctr. for
Biological Diversity v. Ilano, 928 F.3d 774, 781 (9th Cir. 2019) (citation modified); see also Arzy
Decl. Ex. 4 § 5.2, ECF No. 34-4 (“GSA NEPA Desk Guide”) (providing that some categorical
exclusions cannot be applied where “extraordinary circumstances” exist). Ultimately, “[w]hen an
agency decides to proceed with an action in the absence of an EA or EIS” by applying a
categorical exclusion, “the agency must adequately explain its decision.” Alaska Ctr. for Env’t,
189 F.3d at 859.
Case 5:26-cv-05604-EKL Document 66 Filed 09/11/26 Page 9 of 23
Page 671 of 685Page 185 of 211
10
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 United States District Court Northern District of California Courts review an agency’s compliance with NEPA under the standards set forth in the
Administrative Procedure Act (“APA”). Friends of Animals, 164 F.4th at 746. Under the APA,
an agency action must be set aside if it is “arbitrary, capricious, an abuse of discretion, or
otherwise not in accordance with law.” 5 U.S.C. § 706(2)(A). “Agency action is arbitrary and
capricious if the agency has relied on factors which Congress has not intended it to consider,
entirely failed to consider an important aspect of the problem, offered an explanation for its
decision that runs counter to the evidence before the agency, or is so implausible that it could not
be ascribed to a difference in view or the product of agency expertise.” Friends of Animals,
164 F.4th at 746 (citation modified). Ultimately, the question is “whether the agency action was
reasonable and reasonably explained.” Seven Cnty. Infrastructure Coal. v. Eagle County, 605
U.S. 168, 180 (2025).
2. Application to the Gilroy Holding Facility
Here, Plaintiffs are likely to succeed on their claim that the Federal Defendants’ conduct
was arbitrary and capricious. The Federal Defendants did not prepare an EIS or an EA to comply
with NEPA. Instead, GSA – the agency that leased the Holsclaw Property – merely completed a
one-page “GSA Form 4002 (Automatic Categorical Exclusion NEPA Memo to File)” to invoke a
categorical exclusion for the project. Larson Decl. ¶ 8, ECF No. 57. The only categorical
exclusion that GSA invoked applies to the “[1] acquisition of space within an existing structure,
either by purchase or lease, [2] where no change in the general type of use and [3] only minimal
change from previous occupancy level is proposed.” Id. ¶ 14; see also Larson Decl. Ex. 2, ECF
No. 57-2. The one-page standard form does not explain how the Gilroy Holding Facility project
satisfies these conditions, and it is facially implausible that the categorical exclusion applies here.
First, the Gilroy Holding Facility project is not an acquisition of space within an existing
structure, but rather a substantial demolition and construction project to create a new space. The
scope of the contemplated demolition and construction work is discussed in greater detail below.
See infra Section III.B.1. Second, the use of the Holsclaw Property for “office and detention”
purposes is a change in its general type of use given that it was previously used for agricultural
Case 5:26-cv-05604-EKL Document 66 Filed 09/11/26 Page 10 of 23
Page 672 of 685Page 186 of 211
11
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 United States District Court Northern District of California research and hazardous waste storage for 30 years.4 Third, the planned occupancy of the Gilroy
Holding Facility – now estimated at 120 people each day, on average – is a significant change
compared to its prior occupancy of just 40 daytime staff. Reply at 11, ECF No. 60. ICE produced
no evidence to support its implicit position that a threefold increase is the type of “minimal
change” in occupancy level contemplated by the categorical exclusion.5 The arbitrary and
capricious standard of review is “deferential.” Env’t Def. Ctr., 36 F.4th at 871; see also Seven
Cnty. Infrastructure Coal., 605 U.S. at 179 (“[T]he central principle of judicial review in NEPA
cases is deference.”). But here, the record is devoid of evidence that the Federal Defendants
engaged in any reasoned decision-making or considered material facts necessary to invoke the
categorical exclusion. Therefore, based on the dearth of the agency record alone, Plaintiffs are
likely to succeed on the merits of their NEPA claim.
Even if the Gilroy Holding Facility project theoretically fit within this categorical
exclusion, Plaintiffs are likely to establish that extraordinary circumstances precluded the Federal
Defendants from relying on the exclusion. See Ilano, 928 F.3d at 781. Both DHS and GSA
recognize that “potentially significant effect[s] on public health or safety” and compliance with
“requirements to control hazardous or toxic substances” are extraordinary circumstances that
preclude invocation of a categorical exclusion. Arzy Decl. Ex. 2 at V-5 to V-6, ECF No. 34-2
(“DHS NEPA Manual”); see also GSA NEPA Desk Guide §§ 5.2, 5.9. Plaintiffs have shown a
4 Construction plans for the Gilroy Holding Facility include “six concrete-reinforced holding
rooms for detainees with concrete benches, detainee processing areas, interview and visitation
rooms, an armory for weapons and ammunition, and a tactical equipment storage room.” Mot. at
14-15; see Haghighi Decl. Ex. A, ECF No. 27-1. The agricultural research facility did not have
these types of rooms. At the preliminary injunction hearing, Defendants asserted that the
construction plans are not final, but they did not identify any specific inaccuracy.
5 The categorical exclusion form states that the proposed site was expected to host 75 personnel; it
does not reflect the expected total occupancy of the site. Larson Decl. Ex. 2. The GSA
representative who approved the categorical exclusion relied on this estimate to conclude that the
project would not result in a “significant change from previous occupancy limits.” Larson Decl.
¶ 12. But GSA fails to explain how the initial estimate of 75 personnel is an insignificant change
compared to the prior occupancy of 40 staff. Moreover, according to the Federal Defendants’
representations in this litigation, that estimate significantly understates the expected typical
occupancy of the Gilroy Holding Facility. See Fed. Defs. Opp. at 1, 18, ECF No. 55; see also
Bayardo Decl. ¶ 13 (ICE “will not be able to determine the maximum occupancy for the Gilroy
facility hold room until work is completed and inspected.”).
Case 5:26-cv-05604-EKL Document 66 Filed 09/11/26 Page 11 of 23
Page 673 of 685Page 187 of 211
12
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 United States District Court Northern District of California likelihood that these extraordinary circumstances are present here, but the Federal Defendants
failed to consider them. For example, construction activities such as “land clearing, grading,
vegetation removal, soil compaction, and new areas of concrete and asphalt” “will increase
erosion, sedimentation, and runoff in Llagas Creek and significantly impact sensitive species.”
Yap Decl. ¶ 12, ECF No. 36; see also Hamilton Decl. ¶ 4, ECF No. 28; Env’t Amici Br. at 9, ECF
No. 47-1 (“Encroachment and over-aggressive removal and degradation of riparian areas have
been identified as major drivers of declines in California’s freshwater and anadromous fish.”).
The intensified use of the Holsclaw Property at the scale currently contemplated “could also strain
the wastewater treatment infrastructure that is currently on site for existing agricultural operations,
causing an increase in the potential for sewage overflows and wastewater runoff.” Yap Decl. ¶ 14.
“Sewage overflows pose a threat to human health and ecosystems. They can lead to increases in
the presence of dangerous bacteria or pathogens, harsh chemicals used in cleaning and sanitation,
nutrients like phosphorous and nitrogen (as ammonia) that can create conditions for eutrophication
and harmful algal blooms, and other pollutant discharges.” Env’t Amici Br. at 9; see also
Haghighi Decl. ¶ 12.
The Federal Defendants argue that they “reasonably determined that no extraordinary
circumstances exist” because the lease requires ECG6 to “remove any hazardous waste
encountered during demolition or construction ‘in accordance with Federal and state laws and
requirements concerning hazardous waste.’” Fed. Defs. Opp. at 9 (referencing ECG6’s
obligations under the Comprehensive Environmental Response, Compensation and Liability Act
(“CERCLA”)). But at most this lease provision addresses potential mitigation of environmental
risk; it does not satisfy NEPA’s core requirement of assessing environmental risk before
undertaking a project. Moreover, Defendants cite no authority for the proposition that a federal
agency can fully outsource its NEPA compliance to a private developer. Cf. DHS NEPA Manual
at IV-11 (“DHS remains fully responsible for NEPA activities performed by contractors[.]”). Nor
is there any support for the proposition that a federal agency can determine that “no extraordinary
circumstances exist” merely by imposing contractual obligations on a developer. See Fed. Defs.
Case 5:26-cv-05604-EKL Document 66 Filed 09/11/26 Page 12 of 23
Page 674 of 685Page 188 of 211
13
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 United States District Court Northern District of California Opp. at 9.6 In any event, ECG6 disavows any involvement in the NEPA process. Zeligman Decl.
¶ 6 (“We have not for this lease or any of our previous leases participated in GSA’s [NEPA]
process.”). Thus, the Federal Defendants have no legal or factual support for abdicating their
NEPA compliance obligations.
In sum, Plaintiffs will likely succeed on their NEPA claim because the Federal Defendants
invoked an inapposite categorical exclusion and failed to consider whether extraordinary
circumstances required a more robust environmental review.
B. Irreparable Harm
To be irreparable, harm must be “imminent and not remote or speculative.” Boardman v.
Pac. Seafood Grp., 822 F.3d 1011, 1022 (9th Cir. 2016). Typically, irreparable harms are not
quantifiable, and thus “cannot be fully remedied with a financial award.” See Novedades Y
Servicios, Inc. v. Fin. Crimes Enf. Network, 181 F.4th 961, 977 (9th Cir. 2026). By contrast,
“[t]he possibility that adequate compensatory or other corrective relief will be available at a later
date, in the ordinary course of litigation, weighs heavily against a claim of irreparable harm.”
Sampson v. Murray, 415 U.S. 61, 90 (1974). “Environmental injury, by its nature, can seldom be
adequately remedied by money damages and is often permanent or at least of long duration, i.e.,
irreparable.” Amoco Prod. Co. v. Vill. of Gambell, 480 U.S. 531, 545 (1987). However, “there is
nothing in NEPA that allows courts considering injunctive relief to put their ‘thumb on the
scales’” in finding irreparable harm; rather, a plaintiff must still “demonstrate that irreparable
injury is likely in the absence of an injunction” even if a NEPA violation is likely. Cottonwood
Env’t L. Ctr. v. U.S. Forest Serv., 789 F.3d 1075, 1089 (9th Cir. 2015) (first quoting Winter, 555
U.S. at 22; and then quoting Monsanto Co. v. Geertson Seed Farms, 561 U.S. 139, 157 (2010)).
6 The Federal Defendants rely upon City of Oberlin v. Federal Energy Regulatory Commission,
937 F.3d 599, 610 (D.C. Cir. 2019). That case does not suggest that a federal agency may
delegate NEPA compliance to a private developer. In City of Oberlin, one federal agency
conducted a “thorough analysis” of a project’s risks by considering another agency’s relevant
safety standards. Id. Here, the Federal Defendants have not conducted any analysis of
environmental risks under NEPA. Instead, they rely on a contractual provision that requires
ECG6 to comply with another environmental law (CERCLA), and there is no record that ECG6
has done so.
Case 5:26-cv-05604-EKL Document 66 Filed 09/11/26 Page 13 of 23
Page 675 of 685Page 189 of 211
14
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 United States District Court Northern District of California Here, Plaintiffs submitted extensive and largely unrebutted evidence identifying irreparable
harms arising from both the construction of the Gilroy Holding Facility and its subsequent use by
ICE. First, Plaintiffs have shown that hazardous materials are likely present on the Holsclaw
Property, and ECG6’s construction is likely to disturb these materials and cause them to spread
into the environment. Second, Plaintiffs have established a likelihood of environmental harm
because the existing septic system would be overburdened by the threefold increase in occupancy
of the Holsclaw Property, which may result in toxic backflow or dispersal of hazardous materials
into the environment.7
1. Construction
The record reflects many instances of mismanagement of hazardous waste at the Holsclaw
Property. See supra Section I. Despite this troubling record, the Holsclaw Property never
underwent the closure procedure required for facilities that store hazardous materials that is
intended to minimize or eliminate the “threat to public safety” posed by “residual hazardous
materials.” Pierce Decl. ¶ 21. The closure process at Syngenta’s other nearby facility was
extensive, “including decontamination and decommissioning of the warehouse building,
laboratory, seed wash area, the [above ground storage tank], and underground piping from the
seed wash area to the [above ground storage tank],” but it still left behind residual contamination.
Balliet Decl. ¶ 10. Because this process was never completed at the Holsclaw Property, “the
County is unable to confirm the extent of contamination that may remain . . . and serious questions
exist as to whether hazardous materials and hazardous wastes remain on site.” Pierce Decl. ¶ 23.
These questions persist to this day. The County, aware of the construction of the Gilroy Holding
Facility and the long history of hazardous material mismanagement, attempted to inspect the
Holsclaw Property on June 10, 2026, but was denied access. Pierce Decl. ¶ 27; Pierce Decl. Ex. I
(reflecting that ECG6 denied access due to the pendency of this litigation). Accordingly, nothing
in the record indicates that hazardous material concerns have abated.
7 Given the risk to human health, Plaintiffs need not establish that the spread of hazardous
materials may also harm sensitive species in the area. See Mot. at 29-30; see also Chappell Decl.
¶¶ 10-13 (identifying a series of sensitive and protected species that may be present within two
miles of the Holsclaw Property); Hamilton Decl. ¶¶ 4-7 (same); Yap Decl. ¶¶ 5-6, 8-11 (same).
Case 5:26-cv-05604-EKL Document 66 Filed 09/11/26 Page 14 of 23
Page 676 of 685Page 190 of 211
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 United States District Court Northern District of California The record also reflects that ECG6’s construction and demolition work, which was only
temporarily paused due to this litigation, increases the risk of releasing hazardous materials into
the environment. See Mot. at 28; Balliet Decl. ¶¶ 11-12; Pierce Decl. ¶ 28. Construction activities
may include “land clearing, grading, vegetation removal, soil compaction, and new areas of
concrete and asphalt, which will increase erosion, sedimentation, and runoff.” Yap Decl. ¶ 12.
Moreover, “demolition, interior gutting, excavation, and rebuilding” are “likely to disturb
potentially contaminated structures, concrete foundations, soils, and septic components, creating a
risk of hazardous substance releases.” Balliet Decl. ¶ 11. It appears that construction has already
begun in the same areas of the Holsclaw Property where hazardous materials were previously
handled and improperly disposed. Pierce Decl. ¶¶ 26-27; see also Murillo Decl. ¶¶ 8-17, 22-23.
Defendants argue that the scope of construction work is limited, and they characterize the
project as a simple “office move.” This assertion is absurd and contradicted by the record.8
Plaintiffs submitted evidence from a County investigator who observed heavy machinery on site,
including a bulldozer moving concrete and other materials, and debris piles that are “consistent
with demolition and construction work.” Murillo Decl. ¶¶ 12, 15 & Exs. D-E, ECF Nos. 29-4,
29-5. Additionally, ICE’s declarant concedes that “[t]he project is expected to involve renovation
of some existing structures, demolition of some structures, and new construction to make the
property suitable for ERO’s intended use.” Bayardo Decl. ¶ 15. ECG6 also acknowledges that the
work includes “interior demolition and the removal of greenhouse space and addition of
approximately 28 parking spaces.” Zeligman Decl. ¶ 29. Finally, the fact that the lease
amendment provides for an $8.6 million payment to ECG6 for “tenant improvement construction
costs” further undermines any suggestion that construction work will be minimal. See id. ¶ 23.
Defendants also contend that the presence of hazardous materials at the Holsclaw Property
is speculative. See Fed. Defs. Opp. at 15. This argument is unpersuasive. The Federal
Defendants have no factual basis to contest Plaintiffs’ evidence because they failed to conduct an
8 Incredibly, the Federal Defendants also argued that the development of the Gilroy Holding
Facility is not a change in use of the Holsclaw Property because the existing agricultural research
facility and the planned ICE facility both include “office” space. See Fed. Defs. Opp. at 8-9.
Case 5:26-cv-05604-EKL Document 66 Filed 09/11/26 Page 15 of 23
Page 677 of 685Page 191 of 211
16
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 United States District Court Northern District of California environmental review before undertaking the project. It is true that Plaintiffs have not presented
recent test results confirming the presence of hazardous materials. But the absence of more
definitive evidence is due to Defendants’ refusal to allow the County to inspect the Holsclaw
Property. See Pierce Decl. ¶ 5 & Ex. I. In any event, Plaintiffs offer unrebutted circumstantial
evidence of contamination based on a history of repeated hazardous material violations. The
agricultural research companies’ failure to complete the mandatory closure process before
vacating the Holsclaw Property further indicates that hazardous materials likely remain on site.
Plaintiffs have also submitted declarations from County officials who specialize in hazardous
materials compliance explaining that construction and demolition work is likely to disturb these
materials and endanger the environment. See Balliet Decl. ¶¶ 11-12; Pierce Decl. ¶ 28.
ECG6 represents that it hired a consultancy to “conduct studies analyzing the condition of
the property,” which resulted in a 1,000-page report that “found that all chemicals were within the
applicable regulatory limits for non-residential use.” Zeligman Decl. ¶ 17. This study purportedly
“assured [ECG6] and [its] lender that the property complied with all relevant environmental
regulations and that there were no environmentally related transaction risks.” Id. ¶ 18. But the
Court cannot credit these supposed findings because ECG6 inexplicably declined to submit the
report as part of the preliminary injunction record. ECG6’s conclusory description of the contents
of the report is no substitute for the report itself.
As the record stands, Defendants have not submitted evidence that undermines the
extensive history of hazardous material production, storage, and mismanagement at the Holsclaw
Property.
2. Increased Occupancy
The primary environmental risk posed by the use and increased occupancy of the Holsclaw
Property arises from the unavoidable strain on the septic system. The Holsclaw Property utilizes a
septic system to manage its wastewater because there is no available sewer connection due to its
rural location. Mot. at 10; Haghighi Decl. ¶ 6, ECF No. 27. Septic systems function by collecting
raw wastewater through drains, separating solids from liquids in a septic tank, and then dispersing
the liquid effluent into a designated underground area known as a dispersal field. Id. ¶ 6. There
Case 5:26-cv-05604-EKL Document 66 Filed 09/11/26 Page 16 of 23
Page 678 of 685Page 192 of 211
17
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 United States District Court Northern District of California are three septic systems on-site, but only one system serves the main building. Haghighi Decl. ¶ 7.
This septic system “consists of a 1,500-gallon two-compartment septic tank discharging to a
[dispersal field] comprising a 500-linear-foot primary field and a 500-linear food secondary field.”
Id.
Concerningly, County inspections found that hazardous materials were discharged to the
Holsclaw Property’s septic system during Syngenta Seeds’ occupancy. Balliet Decl. ¶ 7; Pierce
Decl. ¶¶ 16-17. For example, in 2005, a County inspection found that hazardous materials,
including DNA sequencing and extraction waste, were being disposed of in the facility drains that
were connected to the septic tank. Balliet Decl. ¶ 7 & Ex. A. Additionally, in 2002, 2003, and
2005, sampling of septic system effluent detected the presence of hazardous materials such as
formaldehyde and volatile organic compounds. Pierce Decl. ¶ 17 & Ex. F. In 2020, inspectors
similarly observed hazardous materials such as bleach and acidic wash water being discharged to
the septic system. Pierce Decl. ¶ 16. Because the septic system discharges this hazardous-
material-containing liquid into the underground dispersal field, there is a risk that these
underground toxic chemicals will migrate to groundwater, surface water, or the soil due to
increased usage of the septic system beyond capacity. See Haghighi Decl. ¶¶ 6, 12-13; Pierce
Decl. ¶¶ 16-17, 23; Balliet Decl. ¶ 8; Yap Decl. ¶¶ 14, 16.
The existing septic system was designed for a daytime workforce of approximately 40
people. Haghighi Decl. ¶ 7. Though the ultimate capacity of the Gilroy Holding Facility is
disputed and unknown, the Federal Defendants assume that the main building will have a typical
capacity of 120 people during normal operations. See Fed. Defs. Opp. at 6; Bayardo Decl.
¶¶ 13-14 (estimating 50 staff, 60 members of the public, and an average of 10 detainees). Because
of this threefold increase in average occupancy, the septic system will become overburdened if it
is not expanded; however, the size of an expanded dispersal field may be too large to be
accommodated on the Holsclaw Property. Haghighi Decl. ¶¶ 9-11.
Either overburdening the existing septic system or constructing a new system pose a risk of
irreparable environmental harm. An overburdened septic system presents “serious public health,
safety, and environmental risks” because it can cause untreated sewage to “surface or back up into
Case 5:26-cv-05604-EKL Document 66 Filed 09/11/26 Page 17 of 23
Page 679 of 685Page 193 of 211
18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 United States District Court Northern District of California structures” and can oversaturate the soil, causing the migration of pathogen-containing effluent
beyond the dispersion field. Id. ¶ 12. Therefore, overburdening creates a risk that humans or
wildlife could be directly exposed to the raw or partially treated effluent and that adjacent
groundwater or surface water could become contaminated, harming all who rely on nearby
groundwater wells (including the Holsclaw Property) and the quality of local aquatic
environments. Id. The construction or expansion of the septic system to accommodate the
increased flow – which requires a permitting process that has not been completed – poses the
previously discussed risk of disturbing and disseminating the likely present hazardous materials
within the septic system components. Id. ¶¶ 14-16; Balliet Decl. ¶ 11.
The Federal Defendants argue that concerns about overburdening the septic system are
based on overestimates of the occupancy of the Gilroy Holding Facility. See Fed. Defs. Opp. at
16; ECG6 Opp. at 10. However, Defendants’ own estimate of 120 people places the occupancy at
a minimum of three times the previous level of 40. See Bayardo Decl. ¶¶ 13-14; Haghighi Decl.
¶ 7. Based on the analysis of a County septic system official, even a far less substantial increase in
occupancy would overwhelm the septic system. See Haghighi Decl. ¶ 11. Therefore, the record
reflects that the existing septic system is insufficient even under Defendants’ estimate of future
occupancy.
ECG6 argues that any required changes to the construction plan “to ensure that the
wastewater treatment system operates within all regulatory limits can be easily accommodated,
and will be.” ECG6 Opp. at 10. But it appears that ECG6 has already begun construction of the
septic system, and it has not complied with the mandatory pre-construction permitting process.
See Haghighi Reply Decl. ¶ 3 (describing June 10, 2026 images of trenches that appear to be for
the purpose of septic system piping); Haghighi Decl. ¶¶ 14-16 (describing pre-construction septic
system permitting procedures that have not been undertaken). These actions present imminent risk
of disturbing hazardous materials within the septic system. See Haghighi Reply Decl. ¶ 3; Balliet
Decl. ¶¶ 11-12; Pierce Decl. ¶ 28. Ultimately, concerns about overburdening the septic system
and releasing hazardous waste should have been addressed before construction began, not in
response to litigation.
Case 5:26-cv-05604-EKL Document 66 Filed 09/11/26 Page 18 of 23
Page 680 of 685Page 194 of 211
19
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 United States District Court Northern District of California ***
Defendants contend that the environmental risks are overstated and unlikely to materialize.
But “[p]art of the harm NEPA attempts to prevent in requiring an EIS is that, without one, there
may be little if any information about prospective environmental harms and potential mitigating
measures.” Winter, 555 U.S. at 23. Here, the Federal Defendants declined to prepare an EIS or an
EA, and thereby avoided the process designed to identify potential environmental risks from the
construction and use of the Gilroy Holding Facility. Moreover, Defendants have blocked
Plaintiffs from accessing the Holsclaw Property to conduct their own environmental analysis.
Given that Defendants’ conduct is responsible for the state of the record, Plaintiffs cannot be
faulted for relying on known information and making reasonable inferences based on their
experience in regulating hazardous materials.
C. Balance of Equities and Public Interest
Courts must “balance the competing claims of injury and must consider the effect on each
party of the granting or withholding of the requested relief.” Amoco Prod. Co., 480 U.S. at 542.
“Both the economic and environmental interests are relevant factors, and both carry weight in this
analysis.” Connaughton, 752 F.3d at 765. Courts “must consider only the portion of the harm that
would occur while the preliminary injunction is in place.” Id.
Here, as discussed above, Plaintiffs face likely irreparable environmental harm in the
absence of a preliminary injunction. These injuries are imminent because they would be triggered
by construction of the Gilroy Holding Facility, which may resume as soon as September 16, 2026,
absent an injunction. See ECF Nos. 41, 64. The environmental harms triggered by use of the
Gilroy Holding Facility are also imminent based on ECG6’s current plan to turn the property over
to the Federal Defendants in January 2027. Zeligman Decl. ¶ 32. Under this timeline, the
Holsclaw Property will be subject to a significant increase in occupancy and use before an
environmental assessment or impact statement can be prepared.
The Federal Defendants emphasize that “there is a public interest in efficiently enforcing
immigration laws.” Fed. Defs. Opp. at 18. However, the Federal Defendants fail to substantiate
how the temporary delay of constructing one facility will materially impede their immigration
Case 5:26-cv-05604-EKL Document 66 Filed 09/11/26 Page 19 of 23
Page 681 of 685Page 195 of 211
20
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 United States District Court Northern District of California enforcement efforts. The Federal Defendants state generally that, without the Gilroy Holding
Facility, they “would have to rely on existing facilities that are farther away and already
supporting other operational needs.” Bayardo Decl. ¶ 16 (explaining that the Gilroy location
“provides a closer alternative office” compared to others in the area). This would in turn “strain”
ICE’s operations, “reduce” its ability to enforce immigration laws, and burden “individuals in
removal proceedings who are out of custody and have reporting requirements.” Id. But ICE was
already prepared to carry out its enforcement efforts for at least five months without the Gilroy
Holding Facility, given that the lease on its current Morgan Hill facility expired in August 2026,
and ECG6 does not expect to complete construction until January 2027. Larson Decl. ¶ 9. In fact,
the Federal Defendants revealed at the preliminary injunction hearing that ICE has continued to
operate the Morgan Hill facility despite the lease expiring, and it could possibly renegotiate a lease
for that space. Moreover, the Gilroy Holding Facility project has been contemplated for years, so
there was ample time to complete the required environmental review under NEPA without
delaying construction. See Bayardo Decl. ¶¶ 8-9. Finally, there is significant tension between the
Federal Defendants’ argument that the Gilroy Holding Facility will be used to temporarily hold a
minimal number of detainees and their assertion that any delay in construction would jeopardize
enforcement efforts more broadly. In sum, the record reflects that ICE can draw from other
resources to carry out its duties, and a preliminary injunction would impose temporary logistical
burdens at most.
ECG6 also identifies short-term financial hardship that it may face if an injunction is
entered. ECG6 Opp. at 14-15. As explained below, the Court doubts that the financial hardship
can be fairly attributed to an injunction. But even if ECG6’s financial hardship is fully credited, it
is outweighed by the risk of irreparable harm to humans and the environment that may result
absent preliminary relief. Environmental harms are more durable and broader in scope than the
financial harm to ECG6, as exposure to hazardous materials and contamination could affect the
health and welfare of many members of the public, detainees, and even ICE agents.9 Ultimately,
9 ECG6 also argues that it cannot be held directly liable for a NEPA violation because it is not a
federal agency. See ECG6 Opp. at 7-8. At this stage, the relevant question is whether ECG6 can
Case 5:26-cv-05604-EKL Document 66 Filed 09/11/26 Page 20 of 23
Page 682 of 685Page 196 of 211
21
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 United States District Court Northern District of California the “balance of equities tips toward . . . [P]laintiffs, because the harms they face are permanent,
while the [Defendants] face temporary delay.” Connaughton, 752 F.3d at 765; see also Amoco
Prod. Co., 480 U.S. at 545 (“If such [irreparable environmental] injury is sufficiently likely,
therefore, the balance of harms will usually favor the issuance of an injunction to protect the
environment.”).
D. Bond
In general, a court may issue a preliminary injunction only if the party requesting relief
“gives security in an amount that the court considers proper to pay the costs and damages
sustained by any party found to have been wrongfully enjoined or restrained.” Fed. R. Civ.
P. 65(c). Federal Rule of Civil Procedure 65(c) confers upon district courts “discretion as to the
amount of security required, if any.” Barahona-Gomez v. Reno, 167 F.3d 1228, 1237
(9th Cir. 1999). A movant’s strong likelihood of success on the merits may counsel “in favor of a
minimal bond or no bond at all.” Cal. ex rel. Van De Kamp v. Tahoe Reg’l Plan. Agency, 766
F.2d 1319, 1326 (9th Cir.), amended by, 775 F.2d 998 (9th Cir. 1985). The party affected by the
injunction bears the “obligation of presenting evidence that a bond is needed.” Conn. Gen. Life
Ins. Co. v. New Images of Beverly Hills, 321 F.3d 878, 883 (9th Cir. 2003).
Here, ECG6 asks the Court to impose a bond of $790,308.00 to compensate it for the
“substantial costs and damages it will suffer if its project is wrongfully enjoined” for an estimated
six-month period. ECG6 Opp. at 14-15. ECG6 contends that the injunction would delay its
ability to collect rent under the lease because rent is not due until the lease term begins – i.e., when
ICE takes over the Gilroy Holding Facility – and in the meantime ECG6 must pay interest on the
loan it used to finance the project. Zeligman Decl. ¶¶ 34-35 (explaining that ECG6 stands to earn
be enjoined, and the answer is yes. Federal Rule of Civil Procedure 65(d) provides that an
injunction may bind not only a party to the litigation, but also their “agents” and “other persons
who are in active concert or participation” with the party. Thus, a developer may be enjoined
regardless of its direct liability for a NEPA violation. Save Our Sonoran, Inc. v. Flowers, 408
F.3d 1113, 1117-19 (9th Cir. 2005) (affirming preliminary injunction entered against a private
developer that “suspend[ed] development during the pendency of the litigation”). Here, ECG6
may be enjoined because its construction work is performed subject to a GSA lease for the benefit
of ICE. See Zeligman Decl. ¶¶ 3, 24, 29 (“The lease requires that ECG6 is responsible for
building the project to GSA’s specifications.”); see also Tsang Decl. Ex. 1.
Case 5:26-cv-05604-EKL Document 66 Filed 09/11/26 Page 21 of 23
Page 683 of 685Page 197 of 211
22
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 United States District Court Northern District of California $101,718 in rent each month). Although hardships may be relevant when setting a bond, courts
are not “required to set bonds that approximate actual damages.” Save Our Sonoran, Inc., 408
F.3d at 1126. To the contrary, the Ninth Circuit’s “long-standing precedent [is] that requiring
nominal bonds is perfectly proper in public interest litigation.” Id.; see also California v. Azuma
Corp., No. 2:23-cv-00743-KJM-DB, 2023 WL 5835794, at *14 (E.D. Cal. Sep. 8, 2023) (granting
a preliminary injunction sought by the State of California and setting a nominal bond of $1,000
given “the strong public interest implicated” in the case), aff’d, No. 23-16200, 2024 WL 4131831
(9th Cir. Sep. 10, 2024).
Here, setting a bond based on delayed completion of the project is not appropriate for two
reasons. First, ECG6 has not shown that it can complete construction and satisfy the preconditions
of the lease by January 2027 even in the absence of an injunction. Instead, the record shows that
parts of the construction plan are unsettled, and ECG6 has not applied for or obtained necessary
permits to complete the work. See, e.g., Tsang Decl. ¶¶ 5-7, ECF No. 32; Haghighi Decl. ¶ 17.
Therefore, the Court cannot conclude that an injunction – rather than typical construction delays or
lack of planning diligence – will delay the start of the lease term. Second, the lease states that the
project is subject to NEPA requirements, and that GSA may determine that environmental
mitigation measures are required. See GSA Lease § 3.52. The lease further provides that “[a]ll
costs and expenses” for such measures “are the sole responsibility” of ECG6. Id. Therefore,
ECG6 expressly accepted the risk of incurring costs associated with NEPA compliance. It is
unfortunate for ECG6 that the Federal Defendants did not take greater care in evaluating
environmental consequences before breaking ground, but their failure is no reason to require
Plaintiffs to post a bond.
For these reasons, the Court will require Plaintiffs to post a nominal bond of $1,000.
IV. INJUNCTION
For the foregoing reasons, the Court GRANTS Plaintiffs’ motion for a preliminary
injunction. At the hearing, Defendants requested an opportunity to meet and confer with Plaintiffs
regarding the scope of the injunction based on the Court’s findings in this order. Accordingly, the
parties shall meet and confer and file a joint proposed preliminary injunction order by September
Case 5:26-cv-05604-EKL Document 66 Filed 09/11/26 Page 22 of 23
Page 684 of 685Page 198 of 211
23
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28United States District CourtNorthern District of California30, 2026. If the parties cannot agree, then by the same deadline the parties shall file a joint status
report, not to exceed five pages, explaining the areas of disagreement and attaching the proposals.
While the parties confer, the Court enters the following provisional preliminary injunction
based on the terms of the parties’ stipulated stay, ECF No. 41:
1. Defendants and their agents, and all persons in active concert or participation with any
of them, shall pause construction, demolition, and development activities, except for
such activities necessary to address immediate safety concerns, at the Holsclaw
Property.
2. Defendants are not enjoined from engaging in the preparation of an environmental
impact statement or an environmental assessment, or from soliciting regional, state,
and local viewpoints with respect to their plans for the Holsclaw Property.
3. This order remains in effect pending further order of this Court.
4. Pursuant to Federal Rule of Civil Procedure 65(c), Plaintiffs shall post a bond in the
amount of $1,000 with the Clerk of Court, and must file proof of the bond by
September 18, 2026.
IT IS SO ORDERED.
Dated: September 11, 2026
Eumi K. Lee
United States District Judge
E i KL
Case 5:26-cv-05604-EKL Document 66 Filed 09/11/26 Page 23 of 23
Page 685 of 685Page 199 of 211
U.S. IMMIGRATION AND CUSTOMS ENFORCEMENT
1
FOR OFFICIAL USE ONLY
2/13/2026 3:29:07 PM
ICE Detention Reengineering Initiative
Overview
Under the Detention Reengineering Initiative (DRI), U.S. Immigration and Customs Enforcement
(ICE) Enforcement and Removal Operations (ERO) will fully implement a new detention model by the
end of Fiscal Year 2026. This effort aims to meet the growing demand for bedspace and streamline the
detention and removal process, focusing on non-traditional facilities built specifically to support ICE’s
needs. This model includes the acquisition and renovation of eight large-scale detention centers and 16
processing sites, as well as the acquisition of 10 existing “turnkey” facilities where ICE ERO already
operates.
The estimated total cost for the new detention center model is $38.3 billion and will be funded through
Congress’ allocation of funds through the One Big Beautiful Bill Act. This new model will allow ICE
to create an efficient detention network by reducing the total number of contracted detention facilities
in use while increasing total bed capacity, enhancing custody management, and streamlining removal
operations.
Discussion
ICE is advancing the DRI with the goal of fully implementing a new detention model by the end of
FY26. The new model is designed to strategically increase bed capacity to 92,600 beds. ICE’s surge
hiring effort has resulted in the addition of 12,000 new law enforcement officers. For ICE to sustain
the anticipated increase in enforcement operations and arrests in 2026, an increase in detention
capacity will be a necessary downstream requirement. ICE plans to activate all facilities by November
30, 2026, ensuring the timely expansion of detention capacity.
The objective of this contract is to secure comprehensive services for the design, renovation, and
operation of ICE-owned permanent structures, transforming them into processing and detention
facilities exclusively for ICE. These facilities will ensure the safe and humane civil detention of aliens
in ICE custody, while helping ICE effectuate mass deportations. The facilities will also incorporate a
standardized layout and new features for both illegal alien detainees and the ICE/contractor staff that
work at these sites. Facilities will be built to handle the immediate surge capacity and sustained long-
term operations, providing a unified, scalable solution that delivers continuity, safety, compliance, and
control - built to scale, and committed to supporting our mission.
Facility Design, Renovation, and Delivery
Contractors will design and renovate existing structures to meet ICE’s detention and design standards,
and the requirements of the Architectural Barriers Act of 1968 (ABA). Delivered facilities will be safe,
energy efficient, and compliant with all relevant federal, state, and local laws. The scope includes:
• Regional Processing Centers housing an average daily population of 1,000 to 1,500 detainees for
average stays of 3–7 days. These will serve as staging locations for transfers or removals.
• Large-Scale Detention Facilities are capable of securely and humanely housing 7,000 to 10,000
detainees for periods averaging less than 60 days. These sites will serve as the primary locations
for international removals.
Page 200 of 211
U.S. IMMIGRATION AND CUSTOMS ENFORCEMENT
2
FOR OFFICIAL USE ONLY
2/13/2026 3:29:07 PM
• These sites will incorporate design build services, construction management, facility and
programmatic operations and services, and program management functions to ensure the
renovation and commission process is conducted diligently.
Detention Operations and Wraparound Services
This model will incorporate all existing detention standards and will maximize operational efficiency,
minimize costs, shorten processing times, and promote the safety, dignity, and respect of all aliens in
ICE custody. Key responsibilities include:
• Providing basic needs such as food, clothing, hygiene products, bedding, and recreation.
• In coordination with ICE Health Services Corps., ensuring medical, dental, mental health care, and
emergency services.
• Facilitating legal access through visitation spaces, law libraries, and necessary resources.
• Providing religious spaces in compliance with the Religious Freedom Restoration Act of 1993.
• Supporting communication needs, including scheduled phone calls and mail services.
• Facilities will include a variety of program operations to include but not limited to; food services,
security & detention, medical services, transportation services, detainee processing, legal services
& case processing, custodial and laundry services, IT services, and facility management.
• These sites will also include lobbies, recreational space, dormitories, courtroom spaces, intake and
processing zones, cafeterias, as well as amenities for ICE and contractor staff like office spaces and
exercise facilities.
Compliance and Standards
All detention infrastructure will comply with the latest ICE National Detention Standards (NDS),
relevant federal regulations, environmental regulations, and industry best practices. ICE is complying
with the National Environmental Policy Act (NEPA) to evaluate the impacts of proposed actions and
their reasonable alternatives. The purpose of this analysis is to assess the environmental implications of
acquiring property to house a processing facility, as well as the feasibility of alternative options.
The identification and fit for purpose of each facility included an engineering review of the existing
utilities and facility infrastructure. The engineering team reviewed the proposed use and capacities for
electricity, water usage, waste exportation, and water capacities for life safety building systems (fire
protection systems). Once these capacities were identified, an engineered solution was developed,
using standard code compliant methodologies within the design of the facility. The final selection of a
facility was predicated on a “No Detrimental Effect” determination.
Life Safety Building Systems
Each facility selection study identified if there was a need for additional fire protection water supply
which would exceed the capacities currently in place at the site. While the new building configurations
will require additional sprinkler distribution, the general determination was the existing capacities are
sufficient to address this minimal new demand.
Domestic Water Supply
Page 201 of 211
U.S. IMMIGRATION AND CUSTOMS ENFORCEMENT
3
FOR OFFICIAL USE ONLY
2/13/2026 3:29:07 PM
As with the fire protection supply, our team reviewed the additional capacities for domestic water
supply within each facility, and the engineering assessment indicated the capacities currently at the
sites are sufficient to support the new facilities.
Waste Water Exportation
Our team reviewed the current site wastewater piping and systems at each facility. The engineering
solution does require additional infrastructure to support the larger detention facilities (processing
facilities do not need these upgrades). There are numerous solutions which will be implemented to
utilize the existing infrastructure without creating an adverse impact to the water authority
infrastructure. To engineer these plans, the design builder will require the engagement and
data/capacities from the water authority.
Power Systems
The power capacities for each facility were reviewed. Our team of engineers determined that the
capacity existed at the facility or regionally to support the new uses. As a contingency, alternative
power supplies were reviewed. These would be supplemental to the existing infrastructure. These
systems include micro-grid, battery storage and generation which are widely used and available if
required.
Our engineers believe the proposed solutions listed above, and the contingencies, will provide no
adverse effect on the community and surrounding properties for each facility identified.
FAQs
1. What is the average length of stay for the aliens?
a. Mega-center: 60 days on average.
b. Processing site: 3-7 days on average
2. Are these sites going to be used long-term?
a. Yes. The new sites will serve as ICE’s long-term detention solution.
3. This site is close to a church or daycare. How are we ensuring these sites are operated safely and do
not pose a risk to the community?
a. All detention sites will be constructed and operated in a manner consistent with ICE’s national
detention standards. ICE and all contractors involved in the design, build, and operations of the
site will adhere to strict safety and security protocols.
4. How are we ensuring these sites do not overwhelm city utilities, resources, and existing
infrastructure?
a. ICE conducted a thorough due diligence process prior to purchasing each facility. The due
diligence review included thorough site inspections, analysis of utility services, and testing and
inspection of mechanical and electrical systems. Our teams also reviewed zoning reports,
conducted site fit testing, and reviewed power supply systems, water supply infrastructure, and
wastewater exportation based on estimated usage. NEPA surveys were also conducted for each
site.
Page 202 of 211
U.S. IMMIGRATION AND CUSTOMS ENFORCEMENT
4
FOR OFFICIAL USE ONLY
2/13/2026 3:29:07 PM
Attachment(s)
Merrimack, NH
50 Robert Milligan Parkway
324,395 sq ft.
Projected bed capacity: 400-600
Page 203 of 211
6.1.
City of Gilroy
STAFF REPORT
Agenda Item Title: Homeless Ad Hoc Committee Update
Meeting Date: November 2, 2026
From: Matt Morley, City Administrator
Department: Administration
Submitted by: Matt Morley, City Administrator
Prepared by: Matt Morley, City Administrator
STRATEGIC PLAN GOALS: Promote Safe and Affordable Housing for All
RECOMMENDATION
Review the work of the Ad Hoc Committee on Homelessness, consider
recommendations, and provide further direction.
EXECUTIVE SUMMARY
This report provides a summary of the work of the Ad Hoc Committee on Homelessness
over six meetings. The Committee conducted the work with assistance from Homebase
and staff coordination and input. Ultimately the committee resolved that providing a
stable, consistent location for an encampment while individuals wait for longer-term
housing would carry a positive impact.
BACKGROUND
In 2026, the City Council formed an Ad Hoc Committee on Homelessness
(“Committee”) to align the City of Gilroy’s homelessness response efforts and goals with
the current need and experience of homelessness in Gilroy, and with the Santa Clara
County Community Plan to End Homelessness. The Committee's members include
Mayor Greg Bozzo, Councilmember Dion Bracco, Councilmember Kelly Ramirez, Ann
Marie McCauley, Aubrey Tasby, Chris Vanni, TJ Napihaa, Vanessa Ashford, and Vicky
Martin, with participation from City staff and technical assistance from Homebase and
Page 204 of 211
6.1.
Destination: Home. The Committee held six meetings between June and September
2026. A subset of the Committee also visited a facility in Tulare to understand the
evolution of the approach in that city. Each meeting built on the last, moving from a
broad understanding of homelessness in Gilroy toward an increasingly specific
diagnosis of where the City's current response would benefit from significant change.
ANALYSIS
At its June 9, 2026 kick-off meeting, the Committee grounded itself in a shared
understanding of its purpose and the state of homelessness in Gilroy, and began
surfacing the challenges, resources, and opportunities that would frame the rest of its
work.
On June 23, 2026, the Committee turned to prevention and to the perspective of people
with lived experience of homelessness. Panelists Aubrey Tasby, TJ Napihaa, and
Vanessa Ashford described what makes participation meaningful versus tokenistic, and
the Committee reviewed Gilroy-specific prevention data: South County Community
Services assisted roughly 275 households (488 individuals) in the past year; about
16.9% of Gilroy's population received rental assistance last year; 95% of assisted
households remained housed two years later; and the prevention model was estimated
to generate $2.50 in value for every $1 spent. The conversation also surfaced real
capacity gap. As an example, Gilroy has only one part-time psychiatrist and one part-
time therapist serving roughly 30,000 Valley Medical Center patients. This led the
Committee to an early, important distinction: prevention keeps housed people housed
and is worth strengthening, but it does not by itself help someone who is already
unsheltered and encamped in Gilroy today.
The Committee then spent two meetings (July 28 and August 11, 2026) on how other
California communities respond once someone is already unsheltered. It reviewed
managed and sanctioned encampment programs in Rohnert Park, the City of Napa, and
San Jose, alongside Gilroy's own Quality of Life (QOL) Officer program, discussed with
Police Chief Brandon Sanchez. Gilroy funds two QOL officers at roughly $750,000 per
year, but they can reach only one site at a time, and the tools available to them –
outreach, and ultimately trespass or citation – were shown, through local experience, to
mostly move an individual to a new location rather than resolve their homelessness,
often causing them to lose IDs, medication, and survival gear in the process. By
contrast, the cities the Committee studied that had built an actual managed site –
(Rohnert Park's HomeFirst-operated encampment (about 90% positive exits as
residents transitioned to a tiny-home site) and San Jose's own shelter-based managed
encampment) showed a more durable path off the street, even where citywide impact
was not fully tracked. The City of Napa, which never built a sanctioned site and instead
relied on a temporary motel program, offered a parallel lesson: durable progress
required a City “champion,” clear Council backing, and strong interdepartmental
relationships, the same ingredients, the Committee noted, that a managed site would
require in Gilroy.
Page 205 of 211
6.1.
Gilroy has some limited experience to add to the conversation specific to the current
encampment on 6th Street. The expectation that this camp would self-manage resulted
in mixed results. Generally, the camp requires modest oversight by the Police
Department, with few calls for service for activities within the camp. Trash, on the other
hand, continues to require assistance from the City to manage. Staff expects that a
more structured camp would require additional resources, including security, to maintain
habitability.
On August 25, 2026, the Committee heard directly from the City of Tulare's Mayor and
Housing & Grants Manager on Tulare's 2-acre, City-staffed managed encampment (up
to 150 campsites, with storage, showers, and food service, operated by City employees
rather than a contractor). Tulare's experience reinforced the pattern seen elsewhere:
clear rules reviewed with every resident before entry, a camping ban that reinforced
participation, and direct City ownership of the site together produced measurable
results, including a drop in calls for service from 192 to 38 in the program's first nine
months and the eventual closure of the original encampment that had prompted the
program. Tulare envisioned their encampment filling a need for a stable location and as
a foothold for connecting the homeless to interim or longer-term housing. This
connection to longer-term housing was seen as a core element of the Tulare effort. One
of the goals of the City led effort was to fill the gap that exists for the homeless prior to
placement in housing.
Taken together, these meetings led the Committee to a specific conclusion: Gilroy's
current homelessness response has basic prevention and quality-of-life/enforcement
components, but is missing a piece those other efforts cannot provide, namely a
managed location where an unsheltered person can stabilize while pursuing a pathway
to interim or longer-term housing. Without it, Gilroy's complaint-driven process, however
well-staffed, tends to move individuals from one location to another rather than resolve
their homelessness. This is the same limitation the Committee saw described in cities
without a managed site, and the same gap that a managed site appeared to close in
Rohnert Park, San Jose, and Tulare. The Committee identified this as a genuine gap in
the City's response system.
Having identified a managed encampment as the piece missing from Gilroy's
homelessness response, the Committee crafted a program with a central goal to
provide a managed location where unhoused individuals can reside while awaiting
interim or longer-term housing, reducing the dispersal of unsanctioned encampments
across the city. The Committee's concept for reaching that goal is a single managed-
encampment site operated under defined on-site rules, paired with a citywide policy of
zero tolerance for the unhoused camping outside that site, the same combination that,
in Tulare, kept residents engaged with the program, and that, in Rohnert Park,
coincided with no observed “magnet effect” drawing more people to the area than the
site was built to serve.
Page 206 of 211
6.1.
Site selection would be driven by the estimated size of Gilroy's on-street unhoused
population, informed by the same kind of planning that produced Tulare's 2-acre, 150-
campsite program. A Gilroy site would need to be purchased or leased, and would need
direct access to basic services such as restrooms, showers, dining area, and meeting
space, along with transit access so that participants can reach jobs, medical
appointments, and service providers. Consistent with the business-community concerns
raised throughout the Committee's meetings, the site would be located where it
minimizes impact on surrounding residents and businesses, for example, in a low-use
industrial area, rather than simply displacing that impact onto a new neighborhood.
On governance, the Committee's preference is for a City department and City staff to
serve as site manager, with the Police Department in a supporting rather than leading
role. The City's own role would be limited to facilitating the site, its infrastructure, and
top-level oversight; other agencies and nonprofit partners, in roles similar to those
Homebase, Destination: Home, and HomeFirst played in the peer-city programs the
Committee studied, would provide services, counseling, medical care, and food on site.
Consistent with the boundaries Napa and Tulare drew around their own programs, the
City would not take on the obligation of directly placing or providing interim or longer-
term housing. That responsibility would remain with other service providers.
Funding opportunities could originate from General Fund contributions offset by
spending reductions from, for example, encampment cleanups. This would likely involve
a small portion of the currently committed funds (see Fiscal Impact section below).
Funding for Quality of Life Officers would likely still be necessary, especially in the near
term. Grant funds might be an additional source, although the Statewide approach has
changed to a focus on prevention, meaning funds may not be as available.
ALTERNATIVES
The work produced to date is high level in nature. The Council may desire additional
information. The Council could also consider the information provided as it explores
priorities in advance of the next bi-annual budget cycle (beginning in February 2027).
Staff seeks direction from the Council based on the work of the Committee.
FISCAL IMPACT/FUNDING SOURCE
Minimal direct funding has been utilized for the ad hoc committee, relying on staff time
and a grant for services from Destination: Home.
For homeless services, staff estimates current annual expenditures of between
$800,000 and $1,000,000. Including the following costs:
Page 207 of 211
6.1.
Police Department Quality of Life
Officers
$600,000
Community Development Staff Time $120,000
Public Works Staff Time $80,000
Encampment Cleanup $75,000
TOTAL ESTIMATED $875,000
Potential future program costs depend significantly on services provided. Utilizing costs
from similar programs, operations could run between $1M and $2M per year. This
factors in costs such as security, trash, showers and restrooms, and custodial. These
costs do not include costs for social services, food, or other ancillary services.
Start-up costs would likely require site acquisition through lease or purchase. Industrial
land values could exceed $6M per acre. Additional startup costs may include utility
connections, paving, fencing, etc.
PUBLIC OUTREACH
The Committee conducted six meetings on this topic and the agenda has been
advertised and posted ahead of this meeting.
NEXT STEPS
The Council may want to consider several questions as sources of conversation during
deliberation:
• What is the end goal of the managed encampment? Centralized location?
Moving people off the street to improved destinations (housing and shelter)?
• What resources do we have in the community to fund and offset costs to the City
of the managed encampment site? Public? Private? Business? Philanthropy?
• What would the City role be? What role could other agencies or non-profit
partners play?
As the planning continues to evolve, the Committee recommends continued
engagement with people with lived experience. Their input provides valuable guidance
on where programming can be most successful and can help in avoiding obstacles.
Attachments:
None
Page 208 of 211
City of Gilroy
STAFF REPORT
Agenda Item Title: Update on Homeless Encampment at Sixth Street and
Camino Arroyo Drive
Meeting Date: November 2, 2026
From: Matt Morley, City Administrator
Department: Administration
Submitted by: Matt Morley, City Administrator
Prepared by: Matt Morley, City Administrator
STRATEGIC PLAN GOALS: Promote Safe and Affordable Housing for All
RECOMMENDATION
Receive an update on the homeless encampment at Sixth Street and Camino Arroyo
Drive and provide input on next steps to staff.
EXECUTIVE SUMMARY
This report provides an update on the status of the homeless encampment. Staff
anticipates continued monitoring and cleanups about every two months unless provided
other direction.
BACKGROUND
At the February 9, 2026 City Council meeting, the Council discussed and heard public
testimony with respect to the encampment on city-owned property near Sixth Street and
Camino Arroyo Drive. On a vote of 5-2, the Council directed a 90-day suspension to
encampment enforcement for this location. Staff has continued to monitor and provide
services, including Quality of Life officer visits, portable toilet service, and trash service.
Volunteer agencies have supported the site with other services, including food and
connections to social services.
The Council discussed the encampment again at the May 4, 2026 City Council meeting,
just ahead of the planned abatement of the encampment. At that meeting the Council
Page 209 of 211
provided direction to continue allowing the encampment barring issues at the site, with
the expectation that services would continue and the encampment would self-manage
to ensure the burden on the community did not grow.
On September 14, 2026 the City Council received an update from staff. Council
directed staff to conduct a clean-up of the camp, provide a monthly update on camp
status, and to bring this item back in November subsequent to the recommendation
from the Ad Hoc Committee on Homelessness.
ANALYSIS
Subsequent to the September discussion, two cleanups have occurred at the camp.
The first cleanup removed accumulated debris, an abandoned tent site, and various
other items. The second cleanup followed a walkthrough of the site to describe
expectations of the footprint of camp sites, identify additional debris for removal, and to
generally establish control over the natural sprawl that occurs with each camp.
Since the last report out, there has been one arrest of an individual at the camp. Other
police activity has involved regular site visits. Arrests and citations remain minimal.
Staff also ran a report of homeless Fire Department responses citywide. The data show
two calls to the Sixth Street Encampment over the last year and a half. The Fire
Department has begun tracking calls where homeless are involved and have identified
in excess of 700 last fiscal year and in excess of 200 this fiscal year. Data collection
processes continue to be honed, however these numbers give a perspective on the
volume of associated calls annually as well as those attributed to this one location.
Staff observations at the camp include the following:
• The homeless see value in accumulating items that have little apparent value.
The camp will continue to need cleanups on a cadence of every two months to
manage this. This occurs in dispersed encampments as well.
• Tents are wear items and are reinforced with tarps that also wear. This creates a
disheveled appearance at the site. A site that utilizes tents of consistent size and
style that are replaced on a four-to-five-month cycle would improve the
appearance. The cost for these tents could be approximately $8,000 for all camp
members. This is an item where supporters could fundraise and procure tents.
• Outside of the debris accumulation, the camp remains fairly well managed.
Volunteer service providers are familiar with the residents, know them by name,
and understand and encourage them to follow through on seeking interim
housing.
• The number of individuals at the site seems to be consistent at around 20.
Staff also notes that a recent cleanup of creeks near Welburn Ave and Church Street
resulted in the relocation of a number of homeless. Subsequently a small camp of
Page 210 of 211
several individuals materialized at Las Animas Park, demonstrating the challenge of
relocation.
Given previous conversations with the City Council, staff intends to continue monitoring
this camp with increased cleanups and intervention as needed. Staff will continue
reporting status to the Council on a regular basis.
ALTERNATIVES
The City Council may wish to provide alternate direction to staff, including the option of
dismantling this camp.
FISCAL IMPACT/FUNDING SOURCE
Costs associated with this site are included in the General Fund operating budget.
PUBLIC OUTREACH
This item is posted on the City website with the agenda.
NEXT STEPS
City staff will continue management and oversight of the encampment and will adjust
based on Council direction.
Attachments:
None
Page 211 of 211