Loading...
HomeMy WebLinkAboutAMENDED 11/16/2026 City Council Regular Meeting | Published 11/13/2026November 16, 2026 | 6:00 PM Page 1 of 6 City Council Regular Meeting CITY COUNCIL REGULAR MEETING AGENDA COUNCIL CHAMBERS, CITY HALL 7351 ROSANNA STREET, GILROY, CA 95020 AMENDED AGENDA Added Closed Session Item and Item 9.1 5:00 CLOSED SESSION 6:00 REGULAR MEETING MONDAY, NOVEMBER 16, 2026 | 6:00 PM MAYOR Greg Bozzo COUNCIL MEMBERS Dion Bracco Tom Cline Terence Fugazzi Zach Hilton Carol Marques Kelly Ramirez CITY COUNCIL PACKET MATERIALS ARE AVAILABLE ONLINE AT www.cityofgilroy.org AGENDA CLOSING TIME IS 5:00 P.M. THE FRIDAY PRIOR TO THE MEETING Remote Participation Gilroy City Council meetings are held in person. The community may attend in person or via Zoom (video/teleconference). The meetings are also live-streamed on the City's website and YouTube. Those wishing to participate in the meetings remotely may join using the following link: https://bit.ly/GilroyCityCouncilMeetings. Additionally, Zoom participants must be running the latest version or will be required to update to it before joining the meeting remotely. Remote participation is also available by calling (669) 900-6833 and entering webinar ID: 930 2066 6240#. Dial *9 to raise your hand, and be called upon to speak for up to 3 minutes. Dial *6 to unmute. Public Comment COMMENTS BY THE PUBLIC WILL BE TAKEN ON AGENDA ITEMS BEFORE ACTION IS TAKEN BY THE CITY COUNCIL. Public testimony is subject to reasonable regulations, including but not limited to time restrictions for each individual speaker. **Please limit your comments to 3 minutes.** The amount of time allowed per speaker may vary at the Mayor’s discretion depending on the number of speakers and length of the agenda. Public comment will be heard first from those attending in person, with the submission of a speaker card. Once that is complete, we will move to those on Zoom who have their virtual hand raised. Following public comment from Zoom, we will close the public Page 1 of 232 November 16, 2026 | 6:00 PM Page 2 of 6 City Council Regular Meeting comment period for that item. Please note: Once the third speaker has provided comment on an item, there will be no further speaker cards or virtual raised hands taken for that item. Written comments on any agenda item may be emailed to the City Clerk’s Office at publiccomment@cityofgilroy.org or mailed to the Gilroy City Clerk’s Office at City Hall, 7351 Rosanna Street, Gilroy, CA 95020. Comments received by the City Clerk’s Office by 1 p.m. on the day of a Council meeting will be distributed to the City Council prior to or at the meeting and available for public inspection with the agenda packet located in the lobby of Administration at City Hall, 7351 Rosanna Street prior to the meeting. Any correspondence received will be incorporated into the meeting record. Items received after the 1 p.m. deadline will be provided to the City Council as soon as practicable. Written comments are also available on the City’s Public Records Portal at bit.ly/3NuS1IN. Written comments will not be read aloud during the meeting. They will be provided to the City Council, included in the meeting record, and posted on the City’s website as submitted. Communications sent to the City Council are public records and may be disclosed pursuant to the California Public Records Act and the Ralph M. Brown Act, unless exempt from disclosure under applicable law. Personal information, including email addresses, telephone numbers, home addresses, and other contact information, is not required to be included with your public comments. Please do not include any information that you do not want to be made public. In compliance with the Americans with Disabilities Act, the City will make reasonable arrangements to ensure accessibility to this meeting. If you need special assistance to participate in this meeting, please contact the City Clerk’s Office at least 72 hours prior to the meeting at (408) 846-0204 or cityclerk@cityofgilroy.org to help ensure that reasonable arrangements can be made. If you challenge any planning or land use decision made at this meeting in court, you may be limited to raising only those issues you or someone else raised at the public hearing held at this meeting, or in written correspondence delivered to the City Council at, or prior to, the public hearing. Please take notice that the time within which to seek judicial review of any final administrative determination reached at this meeting is governed by Section 1094.6 of the California Code of Civil Procedure. A Closed Session may be called during this meeting pursuant to Government Code Section 54956.9 (d)(2) if a point has been reached where, in the opinion of the legislative body of the City on the advice of its legal counsel, based on existing facts and circumstances, there is a significant exposure to litigation against the City. Materials related to an item on this agenda submitted to the City Council after distribution of the agenda packet are available with the agenda packet on the City website at www.cityofgilroy.org subject to the Staff’s ability to post the documents before the meeting. KNOW YOUR RIGHTS UNDER THE GILROY OPEN GOVERNMENT ORDINANCE Government's duty is to serve the public, reaching its decisions in full view of the public. Commissions, task forces, councils and other agencies of the City exist to conduct the people's business. This ordinance assures that deliberations are conducted before the people and that City operations are open to the people's review. FOR MORE INFORMATION ON YOUR RIGHTS UNDER THE OPEN GOVERNMENT ORDINANCE, TO RECEIVE A FREE COPY OF THE ORDINANCE OR TO REPORT A VIOLATION OF THE ORDINANCE, CONTACT THE OPEN GOVERNMENT COMMISSION STAFF AT (408) 846-0204. If you need assistance with translation and would like to speak during public comment, please contact the City Clerk a minimum of 72 hours prior to the meeting at 408-846-0204 or e-mail the City Clerk’s Office at cityclerk@cityofgilroy.org. Page 2 of 232 November 16, 2026 | 6:00 PM Page 3 of 6 City Council Regular Meeting Si necesita un intérprete durante la junta y gustaría dar un comentario público, comuníquese con el Secretario de la Ciudad un mínimo de 72 horas antes de la junta al 408- 846-0204 o envíe un correo electrónico a la Oficina del Secretario de la Ciudad a cityclerk@cityofgilroy.org. To access written translation during the meeting, please scan the QR Code or click this link: Para acceder a la traducción durante la reunión, por favor escanee el código QR o haga clic en el enlace: www.cityofgilroy.org/translate Choose Language and Click Attend | Seleccione su lenguaje y haga clic en asistir Use a headset on your phone for audio or read the transcript on your device. Use sus auriculares para escuchar el audio o leer la transcripción en el dispositivo. 1. CLOSED SESSION - 5:00 PM 1.1. Call to Order 1.2. Roll Call 1.3. Opportunity for Public Comment on Closed Session 1.4. CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION Pursuant to Paragraph (1) of Subdivision (d) of Government Code Section 54956.9, Gilroy Code Section 17A.11(3)(a). Name of Case: Law Foundation of Silicon Valley v. City of Gilroy Santa Clara County Superior Court Case No. 20CV362347 1.5. CONFERENCE WITH LEGAL COUNSEL – ANTICIPATED LITIGATION – Significant exposure to litigation pursuant to Paragraph (2) of Subdivision (d) of Government Code Section 54956.9 and Gilroy City Code Section 17A.11 Subdivision (3); Two Cases 2. ADJOURN TO OPEN SESSION Report of any action taken in Closed Session and vote or abstention of each Council Member if required by Government Code Section 54957.1 and GCC Section 17A.13(b); Public Report of the vote to continue in closed session if required under GCC Section 17A.11(5). The agenda for this regular meeting is outlined as follows: Page 3 of 232 November 16, 2026 | 6:00 PM Page 4 of 6 City Council Regular Meeting 3. REGULAR MEETING - 6:00 PM 3.1. Call to Order 3.2. Roll Call 3.3. City Clerk's Report on Posting the Agenda 3.4. Pledge of Allegiance 3.5. Invocation 3.6. Orders of the Day 3.7. Employee Introductions 4. CEREMONIAL ITEMS - Proclamations and Awards 4.1. Open Government Week Proclamation 4.2. Andy Faber Retirement Proclamation 5. COUNCIL CORRESPONDENCE (Informational Only) 6. PRESENTATIONS TO THE COUNCIL 6.1. Open Government Commission Annual Presentation 6.2. PUBLIC COMMENT BY MEMBERS OF THE PUBLIC ON ITEMS NOT ON THE AGENDA BUT WITHIN THE SUBJECT MATTER JURISDICTION OF THE CITY COUNCIL This portion of the meeting is reserved for persons desiring to address the Council on matters within the Gilroy City Council’s jurisdiction but not on the agenda. Persons wishing to address the Council are requested to complete a Speaker’s Card located at the entrances and handed to the City Clerk. Speakers are limited to 1 to 3 minutes each, varying at the Mayor’s discretion depending on the number of speakers and length of the agenda. The law does not permit Council action or extended discussion of any item not on the agenda except under special circumstances. If Council action is requested, the Council may place the matter on a future agenda. Written comments to address the Council on matters not on this agenda may be e-mailed to the City Clerk’s Office at publiccomment@cityofgilroy.org or mailed to the Gilroy City Clerk’s Office at City Hall, 7351 Rosanna Street, Gilroy, CA 95020. Comments received by the City Clerk’s Office by 1:00 pm on the day of a Council meeting will be distributed to the City Council prior to or at the meeting and available for public inspection with the agenda packet located in the lobby of Administration at City Hall, 7351 Rosanna Street, prior to the meeting. Any correspondence received will be incorporated into the meeting record. Items received after the 1:00pm deadline will be provided to the City Council as soon as practicable. Written material provided by public members under this section Page 4 of 232 November 16, 2026 | 6:00 PM Page 5 of 6 City Council Regular Meeting of the agenda will be limited to 10 pages in hard copy. An unlimited amount of material may be provided electronically. 7. REPORTS OF COUNCIL MEMBERS Council Member Bracco – Santa Clara County Library Joint Powers Authority, Santa Clara Valley Water Commission, Santa Clara Valley Water Joint Water Resources Committee, SCRWA Council Member Fugazzi – Santa Clara Valley Water Commission (alternate), Silicon Valley Regional Interoperability Authority Board (alternate), SCRWA, Visit Gilroy California Welcome Center, VTA Mobility Partnership Committee Council Member Marques – Gilroy Sister Cities, Santa Clara County Library Joint Powers Authority (alternate), Santa Clara Valley Habitat Agency Governing Board, Santa Clara Valley Habitat Agency Implementation Board, SCRWA (alternate) Council Member Hilton – ABAG, Caltrain Policy Group (alternate), Santa Clara County Expressway Plan 2040 Advisory Board (alternate), Silicon Valley Clean Energy Authority JPA Board, South County Youth Task Force Policy Team, VTA Policy Advisory Committee Council Member Ramirez – ABAG (alternate), Gilroy Gardens Board of Directors (alternate), Cities Association of Santa Clara County, Gilroy Youth Task Force (alternate), Santa Clara Valley Habitat Agency Governing Board, Santa Clara Valley Habitat Agency Implementation Board, SCRWA, Santa Clara Housing and Community Development Advisory Committee Council Member Cline – Caltrain Policy Group (alternate), Gilroy Sister Cities (alternate), Gilroy Youth Task Force, Santa Clara County Expressway Plan 2040 Advisory Board, Silicon Valley Clean Energy Authority JPA Board (alternate), Silicon Valley Regional Interoperability Authority Board, Visit Gilroy California Welcome Center (alternate), VTA Mobility Partnership Committee, VTA Policy Advisory Committee (alternate) Mayor Bozzo – Gilroy Gardens Board of Directors, Santa Clara Valley Water Joint Water Resources Committee, South County Youth Task Force Policy Team, VTA Board of Directors (alternate), Santa Clara Housing and Community Development Advisory Committee (alternate), Cities Association of Santa Clara County (alternate) 8. CONSENT CALENDAR All matters listed under the Consent Calendar are considered by the City Council to be routine and will be enacted by one motion. There will be no separate discussion of these items unless a request is made by a member of the City Council or a member of the public. Any person desiring to speak on any item on the consent calendar should ask to have that item removed from the consent calendar prior to the time the City Council votes to approve. If removed, the item will be discussed in the order in which it appears. 8.1. Approve the November 2, 2026 City Council Regular Meeting Minutes Page 5 of 232 November 16, 2026 | 6:00 PM Page 6 of 6 City Council Regular Meeting 8.2. Notice of Completion for the FY26 Sidewalk Replacement Program Project No. 26-PW-299 and Approval of a Final Contract Amount of $1,091,833.75 8.3. 2026-2027 Winter Storm Preparedness Update 8.4. Acceptance of an Office of Traffic Safety Selective Traffic Enforcement Program Grant in the Amount $86,500 and a Motorcyclist Safety Education and Training Program Grant in the Amount of $16,400 and Adoption of a Resolution of the City Council of the City of Gilroy Approving Fiscal Year 2026-2027 Budget Amendment 8.5. Adopt a Resolution Appropriating VRF ITS Cycle 5 Grant Funds to the FY27 Capital Improvement Program Budget and Authorizing the City Administrator to Enter into a Funding Agreement with VTA 8.6. Adopt the Ordinance Amending Municipal Code Chapter 27, Water, Article VI (Water Supply Shortage Regulations) and Chapter 30, Zoning Ordinance, Article XXXVIII (Landscaping, Water Efficiency and Storm Water Retention and Treatment) to Prohibit the Use of Potable Water for Irrigating Non-Functional Turf As Required by Assembly Bill 1572 8.7. Approval of a Water Conservation Cost-Sharing Agreement between the City of Gilroy and Santa Clara Valley Water for the Advanced Water Metering, Water Use Reports Program, and Valley Water Rebate Programs, effective July 1, 2026, through June 30, 2033 which Supersedes Agreement No. A4323S as Amended 8.8. Adopt an Ordinance Amending Article II Chapter 16A of the Gilroy Municipal Code Regarding Mobile Vending 9. UNFINISHED BUSINESS 9.1. Receive an Update on the Council Legislative Agenda and Department Work Plan 10. CITY ADMINISTRATOR'S REPORTS 11. CITY ATTORNEY'S REPORTS 12. ADJOURNMENT Page 6 of 232 November 2, 2026 | 6:00 PM Page 1 of 9 City Council Minutes City of Gilroy City Council Draft Minutes Monday, November 2, 2026 | 6:00 PM 1. OPENING 1. Call to Order The meeting was called to order by Mayor Bozzo at 6:00 PM. 2. Roll Call Attendance Attendee Name Present Council Member Dion Bracco Council Member Tom Cline Council Member Terence Fugazzi Council Member Zach Hilton Council Member Carol Marques Council Member Kelly Ramirez Mayor Greg Bozzo 3. City Clerk's Report on Posting the Agenda City Clerk Kim Mancera reported on the Posting of the Agenda. 4. Pledge of Allegiance Council Member Kelly Ramirez led the Pledge of Allegiance. 5. Invocation None 6. Orders of the Day Item 6.1 will be moved and heard after the Consent Calendar. 7. Employee Introductions Public Works Director John Doughty introduced Management Assistant Joanna Saucedo. 2. PRESENTATIONS TO THE COUNCIL 1. Planning Commission Annual Presentation Planning Commission Chair Manny Bhandal provided a presentation and report. 2. PUBLIC COMMENT BY MEMBERS OF THE PUBLIC ON ITEMS NOT ON THE AGENDA BUT WITHIN THE SUBJECT MATTER JURISDICTION OF THE CITY COUNCIL Page 7 of 232 November 2, 2026 | 6:00 PM Page 2 of 9 City Council Minutes Mayor Bozzo opened public comment at 6:10 P.M. Robert Butler requested monetary support for the unhoused. Elena Dominguez spoke regarding park renovations. Jorge Mendoza spoke in support of the La Ofrenda Festival, Tamal Festival and Garlic Festival. Debi Kerrick spoke regarding immigration concerns. Airam Coronado spoke regarding protecting the community. Edwin Salazar spoke in support of a no staging policy. Sana spoke in support of public safety and a no staging ordinance. Ashley Sarabia spoke regarding ICE activity. Silvia Andrade spoke regarding concerns about industrial projects in neighborhoods. Victoria Maya spoke regarding park playground equipment. Mary Yates spoke regarding the ordinance on Data Centers. Eladia Cortes spoke regarding ICE activity. Florencia Santiago spoke regarding La Ofrenda festival. Ron Kirkish spoke in support of ICE. With no further speakers, Mayor Bozzo closed public comment. 3. REPORTS OF COUNCIL MEMBERS 1. Council Member Bracco – Santa Clara County Library Joint Powers Authority, Santa Clara Valley Water Commission, Santa Clara Valley Water Joint Water Resources Committee, SCRWA Council Member Fugazzi – Santa Clara Valley Water Commission (alternate), Silicon Valley Regional Interoperability Authority Board (alternate), SCRWA, Visit Gilroy California Welcome Center, VTA Mobility Partnership Committee Council Member Marques – Gilroy Sister Cities, Santa Clara County Library Joint Powers Authority (alternate), Santa Clara Valley Habitat Agency Governing Board, Santa Clara Valley Habitat Agency Implementation Board, SCRWA (alternate) Page 8 of 232 November 2, 2026 | 6:00 PM Page 3 of 9 City Council Minutes Council Member Hilton – ABAG, Caltrain Policy Group (alternate), Santa Clara County Expressway Plan 2040 Advisory Board (alternate), Silicon Valley Clean Energy Authority JPA Board, South County Youth Task Force Policy Team, VTA Policy Advisory Committee Council Member Ramirez – ABAG (alternate), Gilroy Gardens Board of Directors (alternate), Cities Association of Santa Clara County, Gilroy Youth Task Force (alternate), Santa Clara Valley Habitat Agency Governing Board, Santa Clara Valley Habitat Agency Implementation Board, SCRWA, Santa Clara Housing and Community Development Advisory Committee Council Member Cline – Caltrain Policy Group (alternate), Gilroy Sister Cities (alternate), Gilroy Youth Task Force, Santa Clara County Expressway Plan 2040 Advisory Board, Silicon Valley Clean Energy Authority JPA Board (alternate), Silicon Valley Regional Interoperability Authority Board, Visit Gilroy California Welcome Center (alternate), VTA Mobility Partnership Committee, VTA Policy Advisory Committee (alternate) Mayor Bozzo – Gilroy Gardens Board of Directors, Santa Clara Valley Water Joint Water Resources Committee, South County Youth Task Force Policy Team, VTA Board of Directors (alternate), Santa Clara Housing and Community Development Advisory Committee (alternate), Cities Association of Santa Clara County (alternate) Council Member Bracco - No report. Council Member Fugazzi - Reported on Visit Gilroy. Council Member Marques - No report. Council Member Hilton - Reported on the Valley Transportation Authority and Silicon Valley Clean Energy. He also thanked VTA, SVCE, Parks and Recreation Commission, Arts & Culture Commission and City staff that assisted with the La Ofrenda Festival. Council Member Ramirez - Reported on Spirit night at San Ysidro Park and La Ofrenda Festival. She also reminded the community to go out and vote. Council Member Cline - No report. Mayor Bozzo - Reported on Spirit night at San Ysidro Park and Bay Area Air District. He also reported that he gave the students visiting from Takko-machi, Japan a tour of City Hall. 4. CONSENT CALENDAR Council Member Fugazzi pulled item 4.5. Mayor Bozzo opened public comment at 6:40 P.M. Page 9 of 232 November 2, 2026 | 6:00 PM Page 4 of 9 City Council Minutes With no speakers, Mayor Bozzo closed public comment. Motion Approve consent calendar items 4.1 through 4.4, 4.6 and 4.7. RESULT: Passed MOVER: Council Member Tom Cline SECONDER: Council Member Zach Hilton AYES: Council Member Dion Bracco, Council Member Tom Cline, Council Member Terence Fugazzi, Council Member Zach Hilton, Council Member Carol Marques, Council Member Kelly Ramirez, Mayor Greg Bozzo NAYS: None ABSENT: None 1. Approve the October 10, 2026 Coffee with the Mayor and the October 19, City Council Regular Meeting Minutes 2. Approve the Sole-Source Purchase of Water Meters and Transmitters from Aqua-Metric Sales Company for an Amount Not-to-Exceed $400,000 3. Receive Report Regarding Upcoming 2027 Board and Commission Vacancies per Maddy Act 4. Adopt a Resolution to Change the Water Supply Shortage from Level 2 to Level 0 6. Claim of Kenneth Michael Ellis (The City Administrator recommends a "yes" vote under the Consent Calendar shall constitute denial of the claim) 7. Claim of Michelle Fullerton (The City Administrator recommends a "yes" vote under the Consent Calendar shall constitute denial of the claim) 4. ITEM PULLED FOR DISCUSSION 5. Adopt a Resolution for the Interim City Attorney Appointment and Approve a Legal Services Agreement with Burke, Williams & Sorensen, LLP Motion Approve consent calendar item 4.5 amending section 5.4 Termination on behalf of the City, to be authorized by City Council action only. RESULT: Passed MOVER: Council Member Terence Fugazzi SECONDER: Council Member Zach Hilton AYES: Council Member Dion Bracco, Council Member Tom Cline, Council Member Terence Fugazzi, Council Member Zach Hilton, Council Member Carol Marques, Council Member Kelly Ramirez, Mayor Greg Bozzo NAYS: None ABSENT: None Page 10 of 232 November 2, 2026 | 6:00 PM Page 5 of 9 City Council Minutes 6. UNFINISHED BUSINESS 1. Homeless Ad Hoc Committee Update City Administrator Matt Morley provided a report. Mayor Bozzo opened public comment at 7:15 P.M. John Kent spoke in support of the Unhoused Ad Hoc committee. Ann Marie McCauley spoke in support of continued involvement of the Unhoused Ad Hoc committee. Chris Vanni spoke in support of continued involvement of the Unhoused Ad Hoc committee. Vanessa Ashford recommended creating a dedicated staff position for the Unhoused. Ron Kirkish spoke regarding the cost of the Unhoused. Justin Sweatt spoke regarding the barriers to gaining statistical information about the Unhoused. With no further speakers, Mayor Bozzo closed public comment. Council provided direction to staff to return with a business plan at a future study session with the Unhoused Ad Hoc committee. 5. PUBLIC HEARINGS 1. Ordinance Amending Article II Chapter 16A of the Gilroy Municipal Code regarding Mobile Vending Economic Development Director Raissa de la Rosa provided a report and presentation. Mayor Bozzo opened public comment at 8:08 P.M. Ron Kirkish attempted to speak regarding another item. With no further speakers, Mayor Bozzo closed public comment. Motion Direct the City Clerk to read the ordinance by title only and waive further reading. RESULT: Passed MOVER: Council Member Dion Bracco Page 11 of 232 November 2, 2026 | 6:00 PM Page 6 of 9 City Council Minutes SECONDER: Council Member Terence Fugazzi AYES: Council Member Dion Bracco, Council Member Tom Cline, Council Member Terence Fugazzi, Council Member Zach Hilton, Council Member Carol Marques, Council Member Kelly Ramirez, Mayor Greg Bozzo NAYS: None ABSENT: None Motion Introduce an ordinance amending Article II, Chapter 16A, combining §§16A.13–15 into a new §16A.13 establishing permanent mobile vending regulations and consolidating permit procedures, prohibited locations, and operational standards. RESULT: Passed MOVER: Council Member Zach Hilton SECONDER: Council Member Tom Cline AYES: Council Member Dion Bracco, Council Member Tom Cline, Council Member Terence Fugazzi, Council Member Zach Hilton, Council Member Carol Marques, Council Member Kelly Ramirez, Mayor Greg Bozzo NAYS: None ABSENT: None The meeting recessed at 8:12 P.M. and reconvened at 8:22 P.M. 2. Introduce an Ordinance Amending Municipal Code Chapter 27, Water, Article VI (Water Supply Shortage Regulations), and Chapter 30, Zoning Ordinance, Article XXXVIII (Landscaping, Water Efficiency, and Storm Water Retention and Treatment) to Prohibit the Use of Potable Water for Irrigating Nonfunctional Turf, as Required by Assembly Bill 1572 Utilities Director Derek Cray provided a report and presentation. Mayor Bozzo opened public comment at 8:38 P.M. Mary Yates spoke in opposition to the ordinance. With no further speakers, Mayor Bozzo closed public comment. Motion Read the ordinance by title only and waive further reading of the ordinance. RESULT: Passed MOVER: Council Member Zach Hilton SECONDER: Council Member Tom Cline AYES: Council Member Dion Bracco, Council Member Tom Cline, Council Member Terence Fugazzi, Council Member Zach Hilton, Council Member Carol Marques, Council Member Kelly Ramirez, Mayor Greg Bozzo Page 12 of 232 November 2, 2026 | 6:00 PM Page 7 of 9 City Council Minutes NAYS: None ABSENT: None Motion Introduce the ordinance amending Municipal Code Chapter 27, Water, Article VI (Water Supply Shortage Regulations), and Chapter 30, Zoning Ordinance, Article XXXVIII (Landscaping, Water Efficiency, and Storm Water Retention and Treatment), to prohibit the use of potable water for irrigating nonfunctional turf, as required by Assembly Bill 1572 with the following changes, update sections 30.38.60(k), 30.38.70(j), and 30.38.120(b)(1)(j) to replace should with shall, and direct city staff to not enforce this ordinance. RESULT: Passed MOVER: Council Member Zach Hilton SECONDER: Council Member Terence Fugazzi AYES: Council Member Dion Bracco, Council Member Tom Cline, Council Member Terence Fugazzi, Council Member Zach Hilton, Council Member Carol Marques, Council Member Kelly Ramirez, Mayor Greg Bozzo NAYS: None ABSENT: None 3. Consider Extending the Urgency Interim Ordinance Imposing a Temporary Moratorium on the Filing, Acceptance, Processing, and Approval of Applications and Entitlements for Detention and Custodial Facilities on Private Property and Public Property to the Extent Permitted by Law, Citywide, for a Period of Ten (10) Months and Fifteen (15) Days Planning Manager Michael Fossati provided a report. Mayor Bozzo opened public comment at 8:56 P.M. Ashley Sarabia spoke in support of extending the ordinance. With no further speakers, Mayor Bozzo closed public comment. Motion Determine that the action is exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Sections 15378, 15060(c)(2), and 15061(b)(3). RESULT: Passed MOVER: Council Member Dion Bracco SECONDER: Council Member Kelly Ramirez AYES: Council Member Dion Bracco, Council Member Tom Cline, Council Member Terence Fugazzi, Council Member Zach Hilton, Council Member Carol Marques, Council Member Kelly Ramirez, Mayor Greg Bozzo NAYS: None Page 13 of 232 November 2, 2026 | 6:00 PM Page 8 of 9 City Council Minutes ABSENT: None Motion Direct the City Clerk to read the ordinance extending the Urgency Interim Ordinance by title only and to waive further reading. RESULT: Passed MOVER: Council Member Tom Cline SECONDER: Council Member Kelly Ramirez AYES: Council Member Dion Bracco, Council Member Tom Cline, Council Member Terence Fugazzi, Council Member Zach Hilton, Council Member Carol Marques, Council Member Kelly Ramirez, Mayor Greg Bozzo NAYS: None ABSENT: None Motion Adopt an extension of the Urgency Interim Ordinance No. 2026-10 to continue the temporary moratorium on the filing, acceptance, processing, and approval of applications and entitlements for the establishment, expansion, or change of use of Detention and Custodial Facilities on private property, and on public property to the extent permitted by federal and state law, for an additional ten months and 15 days, through October 4, 2027. RESULT: Passed MOVER: Council Member Carol Marques SECONDER: Council Member Kelly Ramirez AYES: Council Member Dion Bracco, Council Member Tom Cline, Council Member Terence Fugazzi, Council Member Zach Hilton, Council Member Carol Marques, Council Member Kelly Ramirez, Mayor Greg Bozzo NAYS: None ABSENT: None Motion Review, approve, and issue the 10-day report as required by Government Code Section 65858(d) for the extension of the Urgency Interim Ordinance. RESULT: Passed MOVER: Council Member Kelly Ramirez SECONDER: Council Member Tom Cline AYES: Council Member Dion Bracco, Council Member Tom Cline, Council Member Terence Fugazzi, Council Member Zach Hilton, Council Member Carol Marques, Council Member Kelly Ramirez, Mayor Greg Bozzo NAYS: None ABSENT: None 6. UNFINISHED BUSINESS Page 14 of 232 November 2, 2026 | 6:00 PM Page 9 of 9 City Council Minutes 2. Update on Homeless Encampment at Sixth Street and Camino Arroyo Drive City Administrator Matt Morley provided a report. Mayor Bozzo opened public comment at 9:07 P.M. Aubrey T. spoke in appreciation of the homeless encampment. Julie Della Maggiora spoke in support of the homeless encampment. With no further speakers, Mayor Bozzo closed public comment. Motion Direct staff to close the 6th St encampment by December 15, 2026, with written notice and with shelter and services offered in coordination with providers and restore and secure the channel bank with Valley Water. RESULT: Passed MOVER: Council Member Terence Fugazzi SECONDER: Council Member Zach Hilton AYES: Council Member Tom Cline, Council Member Terence Fugazzi, Council Member Zach Hilton, Council Member Carol Marques NAYS: Council Member Dion Bracco, Council Member Kelly Ramirez, Mayor Greg Bozzo ABSENT: None 7. CITY ADMINISTRATOR'S REPORTS City Administrator Matt Morley provided updates highlighting the opening and ribbon cutting of pickleball courts at Las Animas Park on November 10, 2026, at 2 P.M., and provided an Economic Development update on attendance numbers for the Tamal and La Ofrenda festivals. 8. CITY ATTORNEY'S REPORTS No report. 9. ADJOURNMENT With no additional business before the Council, the meeting was adjourned at 9:29 P.M. I HEREBY CERTIFY that the foregoing minutes were duly and regularly adopted at a regular meeting of the City Council of the City of Gilroy on XXXXXXX, 20XX. Kim Mancera City Clerk Page 15 of 232 8.2. City of Gilroy STAFF REPORT Agenda Item Title: Notice of Completion for the FY26 Sidewalk Replacement Program Project No. 26-PW-299 and Approval of a Final Contract Amount of $1,091,833.75 Meeting Date: November 16, 2026 From: Matt Morley, City Administrator Department: Public Works Submitted by: Nisha Patel, City Engineer Prepared by: Ryan Osenton, Project Manager STRATEGIC PLAN GOALS: Maintain and Improve City Infrastructure RECOMMENDATION 1. Approve the Notice of Completion for the FY26 Sidewalk Replacement Program Project No. 26-PW-299, and 2. Approve a final contract amount of $1,091,833.75 for the FY26 Sidewalk Replacement Program Project No. 26-PW-299. EXECUTIVE SUMMARY Construction of the FY26 Sidewalk Replacement Program Project (Project) was completed by McKim Corporation, and Public Works staff have reviewed and approved the performed work. The project consisted of performing repairs or replacement of damaged sidewalks, curb and gutter, driveway approaches, street asphalt repair, tree removal, tree installation, and associated work at 87 locations throughout Gilroy under the City Council approved sidewalk cost-share policy. Staff recommends the City Council approve the Notice of Completion and approve a final contract in the amount of $1,091,833.75 with McKim Corporation for the FY26 Sidewalk Replacement Program Project No. 26-PW-299. Page 16 of 232 8.2. BACKGROUND On October 20, 2025, City Council awarded the contract to McKim Corporation for construction of the FY26 Sidewalk Replacement Program Project in the amount of $1,009,759, with a project contingency of $100,976 for a total allocation of $1,110,735. The project started construction on January 26, 2026. The project has been completed. Staff is now seeking to closeout the project by filing a Notice of Completion of construction with the County of Santa Clara. ANALYSIS The project scope of work included performing repairs/replacement of damaged sidewalks, curb and gutter, driveway approaches, street asphalt repair, tree removal, tree installation, and associated work at 87 different locations throughout Gilroy. Construction change orders resulted in a net increase of $82,074.75 to the Project. This increase was covered using the project contingency and resulted in a final contract amount of $1,091,833.75. Contract work was performed primarily between late January 2026 and May 2026. Following completion of change order work and punch list items, the project was deemed complete. Project documentation has been finalized, and all punch list items have been dressed by the contractor. Staff recommends the City Council approve the Notice of Completion and the final contract in the amount of $1,091,833.75 with McKim Corporation for the FY26 Sidewalk Replacement Program Project No. 26-PW-299. ALTERNATIVES The City Council could choose not to approve the Notice of Completion of construction for the FY26 Sidewalk Replacement Program Project, but this would delay closeout of the project. FISCAL IMPACT/FUNDING SOURCE Construction of the project was funded from the Sidewalk Repair Reserve (200) Fund which is derived from the General Fund. There were no additional impacts to the City's General Fund. The total project construction cost was $1,091,833.75. The remaining balance of $18,901.25 will go back into the City's Sidewalk Repair Reserve (200) Fund. The City has invoiced property owners in accordance with the cost-share policy a total Page 17 of 232 8.2. of $260,769 for the work completed. PUBLIC OUTREACH N/A NEXT STEPS If the City Council approves the attached Notice of Completion, staff will file the Notice of Completion with the County of Santa Clara, and then release the contract payment retention of $54,671.48 to MCkim Corporation. Attachments: 1. Notice of Completion 2. FY26 Sidewalk Warranty Form Page 18 of 232 Page 19 of 232 Page 20 of 232 Page 21 of 232 FY26 Sidewalk Replacement Program Project Project No. 26-PW-299 SECTION 01700-154 WARRANTY FORM Warranty For City of Gilroy We hereby guarantee the FY26 Sidewalk Replacement Program Project No. 26 -PW-299 that we have constructed for a period of one (1) year from the date of acceptance of the work/substantial completion by the (City of Gilroy) . The following are excluded from the provisions of this warranty: We agree that if any of the equipment should fail due to any reason other than improper maintenance or improper operation, if any pipe or appurtenances should develop leakage, or if any settlement of fill or backfill occurs, or should any portion of the work fail to fulfill any of the requirements of the Specifications, we will, within ten days after written notice of such defects, commence to repair or replace the same together with any other work which may be damaged or displaced in so doing. In the event of our failure to comply with the above mentioned conditions within ten (10) days after being notified, or should the exigencies of the case require repairs or replacements to be made before we can be notified or respond to notification, we do hereby authorize the (City of Gilroy) to proceed to have the defect repaired and made good at our expense, and we will pay the cost therefor upon demand. The warranty provided herein shall not be in lieu of, but shall be in addition to any warranties or other obligations otherwise imposed by the Contract Documents and by law. Contractor: Signed: Title: Date: ***END OF SECTION*** MCKIM CORPORATION PRESIDENT 10/28/2026 Page 22 of 232 8.3. City of Gilroy STAFF REPORT Agenda Item Title: 2026-2027 Winter Storm Preparedness Update Meeting Date: November 16, 2026 From: Matt Morley, City Administrator Department: Administration Submitted by: Matt Morley, City Administrator Prepared by: Andrew Young, Emergency Services & Volunteer Coordinator STRATEGIC PLAN GOALS: Not Applicable RECOMMENDATION Receive the informational report on the City’s preparedness for the 2026–27 winter storm season. EXECUTIVE SUMMARY NOAA’s October 15 outlook favors a wetter-than-average winter across much of California. In Gilroy, Uvas Creek flooding and localized drainage problems could close roads and limit emergency access. Power and communications outages could disrupt essential services. Staff will use National Weather Service forecasts, Valley Water creek levels and field reports to guide staffing, road closures and public warnings. City departments are inspecting drainage trouble spots and maintaining the Corporation Yard sandbag station. Staff have tested generators, exercised the Uvas Creek flood response with Valley Water, updated staff and volunteer notification lists, and expanded public outreach through the City’s storm safety webpage and weekly preparedness messages. At the October 22 coordination meeting, City departments reviewed winter storm readiness and identified gaps that could affect essential services and community safety. Throughout the winter, the Office of Emergency Management will work with Page 23 of 232 8.3. departments to address those gaps and coordinate with regional partners and local partners as conditions change. BACKGROUND Gilroy-area flood records extend to 1889. Past events have affected homes, agricultural land, and transportation routes within the city and in nearby unincorporated areas. Historical flood information The examples below show where flooding affected the Gilroy area. Development and flood protection have changed over time, which limits direct comparisons between events. Period Documented Flooding January 1982 Uvas Creek flooded Christmas Hill Park, properties near US 101, and agricultural areas south of Gilroy. Erosion affected bridge abutments at Highway 152 and the levee between Miller and Luchessa avenues. Prior to the 1982-1983 Very Strong El Niño winter. February 1986 Uvas Creek overtopped its bank upstream of Luchessa Avenue. Floodwater reached approximately 170 homes in Gilroy. Moderate El Niño winter. January 1997 Uvas overflow briefly closed US 101 in south Gilroy. Prior to the 1997-1998 Very Strong El Niño winter. Winter 1997–98 Uvas overflow briefly closed US 101 in south Gilroy and agricultural flooding near the confluence of Uvas Creek and the Pajaro River. Very Strong El Niño winter. January 2017 Flooding affected properties along Monterey Frontage Road and closed US 101 overnight. The winter began during La Niña and transitioned toward neutral conditions. January and March Flooding affected a property along Monterey Frontage Road and disrupted travel near US 101 and the SR 25 interchange. The winter began during La Page 24 of 232 8.3. 2023 Niña and transitioned toward neutral conditions. Flood preparedness remains necessary during El Niño, La Niña and neutral conditions. State, Regional, and City Preparedness The Governor’s September 21 proclamation directed state agencies to stage supplies and prepare infrastructure for winter storms. Valley Water’s interim chief executive declared a district emergency on October 7 to expedite preparations. Gilroy’s Office of Emergency Management (OEM) will continue to coordinate winter storm preparedness with City departments and regional partners. OEM will monitor National Weather Service forecasts, creek levels reported by Valley Water, and field reports to guide the City’s response. Under Chapter 9 of the Gilroy City Code, the City will consider proclaiming a local emergency when an actual or threatened disaster or extreme danger to people and property creates conditions that exceed, or are likely to exceed, the City’s response capacity and require assistance from other jurisdictions. ANALYSIS Seasonal outlook and Gilroy climatology Information Meaning for Gilroy Appropriate use Climatology The long-term pattern of seasonal rainfall and temperature. It is a baseline, not this winter’s prediction. Set routine maintenance, staffing and outreach schedules. Seasonal climate outlook Probabilities that seasonal totals or average temperatures fall above, near or below normal. Prepare for plausible impacts and resource demands; update as outlooks change. Storm and flood forecasts Evolving rainfall, wind, runoff, creek- level and impact forecasts for a specific event. Adjust staffing, staging, closures, notifications, evacuation and EOC coordination. Observed Rainfall, soil wetness, creek trends, Confirm impacts and take protective action as conditions Page 25 of 232 8.3. conditions blockages, and field reports. warrant. October 2026 seasonal outlook NOAA’s Climate Prediction Center (CPC) maintained its El Niño Advisory on October 8, 2026, forecasting a greater than 83% likelihood of strong to very strong El Niño conditions through January–March 2027. The October 15 seasonal outlook favored above-average precipitation across much of California. During a regional winter storm preparedness briefing, the National Weather Service (NWS) indicated a stronger likelihood of wetter conditions during December–February and January–March compared with November–January. Recent climate observations show that weekly sea surface temperatures in the central equatorial Pacific increased slightly, from 3.3°C above average on October 14 to 3.4°C above average on October 21, remaining at that level through October 28. These observations are consistent with the ongoing strong El Niño but do not independently predict rainfall amounts or flood impacts for any specific region. NOAA's next ENSO discussion is scheduled for November 12, followed by an updated seasonal outlook on November 19. Local interpretation Despite the strength of the developing El Niño, uncertainty remains regarding its potential impacts on Gilroy. Very strong El Niño events are relatively rare, limiting historical comparisons, while atmospheric rivers and other weather patterns can significantly influence seasonal rainfall. Seasonal outlooks indicate the likelihood of wetter conditions but do not predict specific rainfall amounts, storm timing, or flood impacts. Local flood risk depends on rainfall intensity and duration, soil saturation, reservoir and tributary conditions, and drainage system capacity. Staff will continue using seasonal outlooks to inform advanced preparedness while monitoring shorter-range NWS forecasts, Valley Water stream gauge trends, and field observations to assess approaching storms and guide operational decisions. NOAA winter outlook maps Page 26 of 232 8.3. Page 27 of 232 8.3. Gilroy risk and community impacts Local planning will focus on potential Uvas Creek flooding, drainage system limitations, and low-lying neighborhoods susceptible to flooding. Flooding can disrupt roadways, travel, and emergency access within Gilroy and surrounding areas. High winds, fallen trees, and power or communications outages may also disrupt essential services, even in areas not directly affected by flooding. Preparedness efforts will consider residents and people experiencing homelessness in Special Flood Hazard Areas (SFHAs) and other flood-prone locations, recognizing that flooding can also occur outside mapped flood zones. These efforts will address access and functional needs, including those of people with disabilities, households without reliable transportation, and people with limited English proficiency. Public information, evacuation planning, transportation assistance, and shelter coordination will incorporate these considerations before worsening conditions restrict safe access. Departments also identified operational vulnerabilities that could affect multiple City services, including road closures that may prevent personnel from reporting to work and outages that may disrupt public warning systems or utility monitoring capabilities. South County Flood Coordination National Weather Service: City staff participated in regional winter storm preparedness briefings and will continue coordinating with NWS to monitor forecasts, anticipated rainfall, potential flooding, and other severe weather hazards. NWS forecasts, briefings, and decision-support information will help guide City preparedness activities, operational coordination, and the timing of protective actions as storm conditions develop. Valley Water: City staff participated in Valley Water's Uvas Creek Emergency Action Plan update and subsequent tabletop exercise. Coordination priorities ahead of significant storms include confirming after-hours procedures for communicating creek and reservoir conditions, reporting debris or obstructions along Uvas Creek between Luchessa Avenue and U.S. Highway 101, and coordinating closures and reopening notifications for Silva's Crossing. Staff will also confirm sandbag resupply contacts and lead times. Santa Clara County Office of Emergency Management: County OEM coordinates Operational Area emergency management activities, including coordination with unincorporated communities surrounding Gilroy. Continued coordination will focus on emergency alerting responsibilities, evacuation planning, accessible transportation, sheltering resources, and regional resource needs. If Gilroy requires assistance beyond local capacity, OEM will coordinate requests through established Operational Area procedures, including the County duty officer or activated Operational Area Emergency Operations Center (EOC), as appropriate. Page 28 of 232 8.3. City of Morgan Hill: Continued coordination with Morgan Hill will focus on shared winter storm preparedness priorities, including potential cross-jurisdictional flooding impacts, roadway closures, emergency access, evacuation coordination, and public notifications. Both cities will work to maintain situational awareness and identify opportunities for mutual support during significant storm events. Gilroy Unified School District: Continued coordination with the District will focus on winter storm preparedness, potential flooding and roadway impacts affecting school operations, student and staff safety, transportation, and school closure notifications. Coordination will also address family reunification considerations and the potential availability of school facilities for emergency sheltering, recognizing that facilities may be unavailable during instructional hours or when needed for District operations. Readiness before, during and after storms The following phases organize City preparedness, response and recovery. Actions should reflect current forecasts, observed conditions and established City procedures, including coordination with Valley Water. Departments will act earlier when local conditions or the time needed for protective actions warrant it. Phase Citywide focus and expected outputs Seasonal preparation Inspect priority sites, verify staffing and vendor contacts, prepare accessible messages in English and Spanish, and confirm shelter arrangements. Credible storm signal Review NWS and Valley Water briefings. Confirm after-hours alert coverage, recheck drainage trouble spots, stage equipment and notify at- risk facilities. Threat increasing Review watches, warnings, creek trends and field reports. Evaluate EOC activation, closures and protective actions. Confirm transportation, shelter and public information support. Active impacts Protect life safety and maintain essential services. Issue timely alerts, warnings, and community updates, including evacuation information and road closures. Coordinate damage and safety assessments. Request resources early and document decisions, damage, and costs. Keep the City Council informed. Recovery Verify safety before reopening roads or facilities. Document public and Page 29 of 232 8.3. and reset private impacts separately, coordinate debris removal and service restoration, and preserve cost records. Replenish supplies and prepare equipment for the next storm. Departmental Preparedness Updates Fire Department Completed activities to date • Conducted a pre-planning meeting with Gilroy’s Office of Emergency Management (OEM). • Discussed next steps for a stakeholder planning meeting. • Identified potential access choke points and waterways susceptible to flooding based on historical data. • Established lines of succession for Emergency Operations Center (EOC) assignments and briefed newly appointed fire captains on their roles. Ongoing activities • Continue planning and coordination with City, County, and regional partners. • Conduct EOC preparedness and activation training. • Established lines of succession and provided orientation to newly appointed Fire Captains. • Continue monitoring National Weather Service (NWS) forecasts and updates ahead of anticipated rainfall. • Maintain operational readiness to support winter storm response efforts. Planned activities • Conduct additional coordination meetings with Santa Clara County Fire Operations. Gaps and vulnerabilities • Specific operational needs will be further assessed as precipitation occurs and storm conditions develop. • Potential staffing and personnel shortages during extended operations, particularly if flooding limits access to areas in the southern portion of the city. Page 30 of 232 8.3. • Mutual aid resources may be limited or unavailable during widespread regional storm impacts. • Fire Operations does not maintain dedicated water-rescue watercraft. However, Cal OES may preposition specialized resources in the region to support swift water response operations. • Prolonged emergency operations may strain available resources and affect the Department's ability to maintain service levels throughout the city. Coordination and action items • Fire Administration and Operations will continue following established operational policies and procedures for flooding, earthquakes, and other natural disasters. • Strengthen coordination with neighboring agencies to support resource sharing, mutual aid, and incident management. • Coordinate logistical needs and support for personnel conducting field operations. • Utilize the Incident Command System (ICS) to manage incidents and maintain coordinated communications. • In the event of an EOC activation, assign a Fire Division Chief and/or Fire Captain to staff and manage the Fire and Rescue Branch. Police Department Completed activities to date • Confirmed emergency contact lists are current. • Personnel are familiar with historically flood-prone areas and associated public safety concerns. Ongoing activities • Maintain operational readiness to support storm-related incidents and public safety needs. • Continue monitoring weather-related conditions and potential impacts to police operations. • Maintain coordination between Patrol, the Communications Center, and command staff regarding emerging public safety concerns. Page 31 of 232 8.3. Planned activities • Conduct patrol and Communications Center briefings covering storm-response procedures, equipment readiness, staffing considerations, and public safety responsibilities. • The Community Engagement Coordinator will participate in relevant briefings and maintain communication with Patrol and the Communications Center during and following weather-related incidents. • Coordinate with the City's Communications and Engagement Division and Office of Emergency Management (OEM) to support timely and consistent public safety messaging. Gaps and vulnerabilities • Limited temporary lodging accommodations for personnel unable to travel home during severe weather. • Additional sleeping bags, cots, and other supplies may be needed to support extended operations. • Limited availability of portable generators to support critical operations during power outages. • Need to clarify departmental roles and responsibilities for establishing and operating a reunification center. • Additional non-perishable food and supplies may be needed to sustain personnel during extended operations. • Limited portable hotspots and backup connectivity options for patrol personnel during internet or network outages. Coordination and action items • Reinforce storm-response procedures through patrol and Communications Center briefings, including flood-prone areas, road closures, evacuation support, and incident reporting. • Confirm vehicle and equipment readiness and identify any additional resources needed to support storm operations. • Review staffing plans, alternate schedules, and personnel call-out procedures to maintain operational coverage during prolonged incidents. • Coordinate with appropriate City departments to address personnel lodging, extended-operation supplies, backup power, and connectivity needs. • Clarify responsibilities and coordination procedures for activating and operating a reunification center. Page 32 of 232 8.3. • The Communications Center will notify the watch commander of weather alerts and conditions that may pose a threat to public safety, with information subsequently shared with command staff and the Community Engagement Coordinator. • The Community Engagement Coordinator will work with the City's Communications and Engagement Division and OEM to coordinate public safety messaging related to storm preparedness, alerts and warnings, flooding, road closures, evacuations, utility outages, and available assistance. Utilities Department Completed activities to date • Conducted proactive hydro-cleaning of sewer mains throughout the City, including monthly maintenance of historically problematic areas. • Performed monthly generator testing and fuel inspections to maintain backup power readiness. • Conducted daily inspections of well sites and water reservoirs. • Performed weekly inventories of essential water treatment chemicals. • Cleared debris and maintained drainage ditches and stormwater systems at pump stations. Ongoing activities • Complete generator and automatic transfer switch repairs at two water booster stations to improve backup power reliability. • Continue routine maintenance and repairs of water infrastructure, including an ongoing well replacement project. • Work toward restoring two additional wells to service to improve water supply redundancy and operational reliability. • Maintain and prepare newly acquired sewer bypass pumping equipment for emergency use. Planned activities • Replenish generator fuel supplies ahead of the winter storm season. • Conduct additional hydro-cleaning of sewer mains in flood-prone areas along Uvas Creek in late November or early December. • Update the Emergency Notification Plan (ENP) for submission to the State Water Resources Control Board. Page 33 of 232 8.3. • Inspect sanitary vents and seals at well sites to ensure water system integrity. • Develop public notification templates for boil water, do not drink, and do not use advisories to support timely communication during water emergencies. • Implement phased improvements to Supervisory Control and Data Acquisition (SCADA) systems, prioritizing communication redundancy at critical facilities beginning in November or December. • Maintain reservoir storage levels and ensure equipment readiness ahead of forecasted significant storm events. • Coordinate with the City of Morgan Hill regarding potential wastewater system impacts and response procedures associated with the Joint Trunk Line. Gaps and vulnerabilities • Existing telemetry communications systems may present challenges during outages or disruptions. • Potential staffing limitations if severe weather or flooding restricts access to Gilroy, particularly for personnel commuting from outside the City. Public Works Department Ongoing activities • Conduct pre-storm inspections and cleaning of drainage inlets, catch basins, channels, culverts, and other City drainage facilities, prioritizing areas with known drainage issues, localized flooding concerns, or damage from previous storms. • Maintain a free, publicly accessible sandbag station at the City's Corporation Yard to support residential flood protection. Approximately 2,000 sandbags are available, with additional supplies planned for procurement. • Inspect City facility roofs, clear gutters and roof drains, and perform necessary maintenance and repairs ahead of the winter storm season. • Continue the City's annual leaf pickup program, allowing residents to request collection of bagged leaves to help reduce debris accumulation in streets and storm drains. Planned activities • Clean an existing drainage culvert at Carriage Hill Park and a drainage ditch along the western portion of Gilroy Sports Park to improve stormwater flow and reduce potential blockages. • Advance planned drainage improvements at Los Arroyos Park, including Page 34 of 232 8.3. replacing an existing multi-tube drainage configuration with a single-tube system and installing a drainage outlet near the basketball and handball courts. • Continue planning and implementation of funded storm drain improvement projects, including the Monterey and Luchessa Storm Drain Modifications and Miller and Third Storm Drain Rehabilitation projects. • Acquire a new regenerative street sweeper equipped with a detachable hose to enhance debris removal and storm drain inlet cleaning capabilities. • Conduct post-storm inspections of known problem areas to identify necessary repairs and maintenance ahead of subsequent storms. Gaps and vulnerabilities • Reduced staffing availability for extended storm operations following the transfer of Maintenance Worker I/II positions to the Utilities Department. • Additional interdepartmental coordination and staff training are needed to support extended operations following the separation of Public Works and Utilities. Coordination and action items • Coordinate with the Utilities Department to establish extended-shift staffing arrangements and identify available personnel and resources during prolonged storm events. • Review staffing assignments, training needs, and operational responsibilities to support coordinated storm response across both departments. Community Development Department Completed activities to date • Two staff members completed American Red Cross Care and Shelter Fundamentals and Shelter Supervisor training in June 2026 to strengthen the City's shelter coordination capabilities. Planned activities • Participate in the citywide Emergency Operations Center (EOC) winter storm planning to ensure roles and responsibilities are aligned. • Explore opportunities to include winter storm preparedness materials with the Fire Page 35 of 232 8.3. Prevention Division’s 2027 annual program mailings, reaching regulated businesses and facilities, including retail stores, gas stations, industrial facilities, apartment complexes, schools, hotels, and motels. • Conduct resident preparedness outreach in coordination with community service provider partners. Gaps and vulnerabilities • Limited staffing capacity to conduct timely post-storm building inspections during prolonged or severe weather events. • Additional training and access to mobile assessment tools are needed to support rapid field evaluations, hazard identification, and prioritization of damaged structures. Coordination and action items • Coordinate with Information Technology to improve access to mobile inspection tools and GIS data to support field-based storm damage assessments. Administration Department Office of Emergency Management Completed activities to date • The City Council adopted the City's Emergency Operations Plan in 2024. OEM completed the Uvas Creek Flood Emergency Response Plan, and developed guidance outlining elected officials' roles during emergencies. • Participated in Valley Water's update of the Uvas Creek Emergency Action Plan and subsequent tabletop exercise to strengthen flood response coordination. • Convened a citywide winter storm preparedness coordination meeting on October 22, 2026, to assess departmental readiness, identify gaps, and establish priorities. Department-specific action items were subsequently distributed for follow-up. • Participated in regional winter storm preparedness meetings and workshops with key partners, including Santa Clara County, the National Weather Service, Valley Water, the City of Morgan Hill, and Gilroy Unified School District, to strengthen inter-agency coordination and response readiness. • Updated the City's Storm & Cold Weather Safety webpage to consolidate preparedness, safety, and recovery resources. Developed a severe storm Page 36 of 232 8.3. preparedness flyer and launched the Winter Storms 2026 campaign in coordination with Communications & Engagement, promoting preparedness and registration for Nixle and AlertSCC. • Updated emergency notification lists for staff and volunteers and provided priority calling capabilities to personnel in key positions to support communications during network congestion. • Filled the Community Resilience Coordinator position on August 31, 2026, restoring dedicated staffing to support community preparedness, outreach, and engagement. Ongoing activities • Continue coordinating winter storm preparedness with City departments, Santa Clara County OEM, Valley Water, neighboring jurisdictions, school districts, and community organizations. Priorities include flood response, evacuation coordination, road closures, sheltering, transportation, and public information. • Review Uvas Creek flood response procedures with Fire, Police, Public Works, Utilities, and Valley Water, including water-level triggers, monitoring responsibilities, notifications, and coordination of protective actions. • Review contractual, accessibility, and implementation requirements for an evacuation management platform to support future evacuation planning and public information. The platform is not anticipated to be operational in early 2027. • Coordinate with volunteer program leads to confirm availability, review activation procedures, and identify appropriate winter storm assignments, including community outreach, field observations, and logistical support. Assess associated training, equipment, and supervision needs. • Coordinate with Information Technology to evaluate backup internet and communications capabilities following recent service disruptions. Satellite phones are available to personnel in key positions, and upgrades to the City's AM 1610 emergency broadcast system are being pursued. • Continue tracking departmental preparedness action items, operational readiness, and resource needs throughout the winter storm season. Planned activities • Confirm inter-agency coordination procedures and operational responsibilities ahead of significant forecasted rainfall, particularly for flooding, evacuation, road closures, and public notifications. • Coordinate additional departmental preparedness meetings, training, and exercises as needed to strengthen response readiness and continuity of essential services. Page 37 of 232 8.3. • Review sheltering and transportation arrangements, including available City facilities, staffing, volunteer support, equipment, and supplies. Gaps and vulnerabilities • After-hours warning coverage needs confirmation, including who can issue an alert if the primary contact is unavailable. • Road closures could prevent primary or relief staff from reaching their assignments. Departments still need to confirm alternate coverage for extended operations. • Shelter staffing, supplies and accessible transportation arrangements need confirmation before flooding restricts access. Coordination and action items • Continue working with City departments to confirm primary and alternate emergency assignments, maintain staff notification procedures, and provide refresher training for personnel with emergency responsibilities. • Coordinate with County OEM, Communications & Engagement, and City departments to strengthen AlertSCC access, emergency notification procedures, and primary and backup alerting capabilities. • Reinforce departmental procedures for incident reporting, resource requests, damage assessments, and documentation of emergency-related costs to support potential reimbursement, where eligible. Communication and Engagement Division Completed activities to date • Conducted a National Preparedness Month campaign, distributing three preparedness messages through the City's e-newsletter and social media channels encouraging residents to register for emergency alerts, develop family emergency plans, and maintain emergency supply kits. Ongoing activities • In coordination with OEM, launched the Winter Storm Preparedness messaging campaign in October 2026, focusing on household preparedness, flood-prone Page 38 of 232 8.3. areas, and registration for emergency alerts. • Develop a bilingual Winter Storm Preparedness information sheet for inclusion in December utility bills, with additional distribution through the South County Youth Task Force (SCYTF) and community promotores, including outreach at San Ysidro Park. • Review Nixle and AlertSCC protocols to support coordinated public notifications and emergency messaging. Planned activities • Coordinate with OEM to distribute timely public safety messaging ahead of and during significant weather events, including extreme cold, winter storms, warming centers, sandbag availability, flood zones, and other community resources. • Prepare public messaging templates and graphics for winter storms, road closures, and other weather-related impacts to support timely and consistent communication. Coordination and action items • Coordinate with OEM and the Police Department's Communications Center to clarify notification procedures for closures and reopening of Silva's Crossing. • Continue coordinating with OEM and other City departments to maintain consistent public information and timely communication of emergency alerts, protective actions, and available community resources. ALTERNATIVES Council may receive this informational report or request a follow-up on specific readiness gaps or resource needs. FISCAL IMPACT/FUNDING SOURCE Receiving this report has no direct fiscal impact. Storm preparations and response may involve overtime, equipment, supplies, contractors, shelter operations and repairs. Departments will document costs by event and funding source. Any request for additional appropriations will be presented separately. Potential reimbursement will be tracked separately from confirmed funding. Page 39 of 232 8.3. PUBLIC OUTREACH Public outreach on winter storm preparedness is underway. OEM and Communications and Engagement staff are sharing preparedness messages through the City’s e- newsletter and social media. These messages direct residents to the City’s Storm & Cold Weather Safety webpage for preparedness guidance, sandbag information, and links to sign up for Nixle and AlertSCC. The City plans to extend this outreach by including a preparedness insert in English and Spanish with upcoming utility bills and distributing copies through community partners and volunteers. When forecasts indicate a storm could affect Gilroy, the City will share information about expected local impacts and steps residents can take before the storm arrives. As conditions change, public updates will identify significant impacts and recommended protective actions. Updates will also remind how and where residents can report storm- related problems, such as street flooding, blocked storm drains, or downed trees, and how to request assistance. NEXT STEPS Throughout the winter, OEM will track action items from the October 22 meeting and subsequent coordination meetings, and work with City departments and external partners to address readiness gaps. Before significant rainfall, staff will confirm who is authorized to issue after-hours alerts and warnings and who serves as backup. Staff will also review relief staffing with department leads, verify shelter contacts and staffing arrangements with care and shelter partners, and confirm who reports closures and reopenings at Silva’s Crossing and how neighboring jurisdictions and the public receive those updates. OEM will brief the City Administrator on material changes in readiness, significant storm impacts, and any need for additional funding or policy direction. The City Administrator will determine when and how to update Council. Staff will escalate urgent operational needs as they arise. Attachments: None Page 40 of 232 8.4. City of Gilroy STAFF REPORT Agenda Item Title: Acceptance of an Office of Traffic Safety Selective Traffic Enforcement Program Grant in the Amount $86,500 and a Motorcyclist Safety Education and Training Program Grant in the Amount of $16,400 and Adoption of a Resolution of the City Council of the City of Gilroy Approving Fiscal Year 2026- 2027 Budget Amendment Meeting Date: November 16, 2026 From: Matt Morley, City Administrator Department: Police Submitted by: Brandon Sanchez, Police Chief Prepared by: Patricia Vigil, Management Analyst STRATEGIC PLAN GOALS: Develop a Financially Resilient Organization RECOMMENDATION 1. Accept the Office of Traffic Safety Selective Traffic Enforcement Program Grant for $86,500; 2. Accept the Office of Traffic Safety Motorcyclist Safety Education and Training Program Grant for $16,400; and 3. Adopt a resolution of the City Council of the City of Gilroy amending the budget for FY27 and appropriating proposed revenue and expenditure amendments. EXECUTIVE SUMMARY The City of Gilroy has been the recipient of the Office of Traffic Safety (OTS) Grants for several years. The Police Department applied for and was awarded two separate OTS grants, $86,500 for traffic enforcement operations and $16,400 for motorcyclist safety, education and training programs. Page 41 of 232 8.4. BACKGROUND The California Highway Safety Program is a partnership effort between the National Highway Traffic Safety Administration and California. The Office of Traffic Safety (OTS) is designated by the Governor to receive federal traffic safety funds for coordinating California’s highway safety programs. Each year the Office of Traffic Safety develops a Highway Safety Plan identifying the key highway safety problems in the State and the most effective countermeasures to address them. The Office of Traffic Safety then solicits proposals statewide to address the identified problems and allocates funds to state and local governmental agencies to implement traffic safety programs and grants. Through these solicitations, the Police Department applied and was awarded two OTS grants. ANALYSIS California Office of Traffic Safety Selective Traffic Enforcement Program (STEP) Grant $86,500 The Police Department has received an award for $86,500 for use between October 2026 and September 2027. Police Officers will conduct three DUI checkpoints and ten DUI saturation patrols provided by overtime funded by the grant. Police Officers will also attempt to reduce injury and fatal collisions by conducting six traffic enforcement operations and five distracted driver operations. Acceptance of the grant requires the Police Department to provide training in DUI enforcement to Police Officers and traffic safety training to members of the community. The Police Department hosts a DUI training class taught by CHP so Gilroy Police Officers can attend without additional costs and the Traffic Unit provides bicycle and pedestrian classes for school children during their normal workdays. California Office of Traffic Safety Motorcyclist Safety Education and Training Program Grant $16,400 The Police Department has received an award for $16,400 for use between October 2026 and September 2027. The funded strategies will include two hands-on motorcyclist safety and training courses, including motorcyclist helmet usage training, classroom, education and community outreach and public awareness campaigns. ALTERNATIVES Council may amend or reject the budget amendment resolution. This is not recommended as these funds will be placed into use for the public’s benefit and are offset by the grant revenue being received that would otherwise not be available to the City. FISCAL IMPACT/FUNDING SOURCE Page 42 of 232 8.4. Additional expenditures and offsetting revenue in the amount of $102,900 are proposed. The expenditures and grant revenue will be appropriated to the Police Department’s Office of Traffic Safety Fund (223) per the attached budget resolution. $102,900 – 2233010-52610 $102,900 – 2233010-43120 PUBLIC OUTREACH The Police Department will conduct a public engagement campaign via our digital media platforms prior to each scheduled DUI checkpoint and participation of national campaigns in addition to the grant required “Kickoff” press release. NEXT STEPS N/A Attachments: 1. OTS Budget Resolution 2. Grant Agreement - PT27067 - signed 3. Grant Agreement - MC27004 - signed Page 43 of 232 RESOLUTION NO. 2026-XX A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GILROY AMENDING THE BUDGET FOR THE CITY OF GILROY FOR 2026-2027 IN THE POLICE DEPARTMENT OFFICE OF TRAFFIC SAFETY GRANTS FUND AND APPROPRIATING PROPOSED REVENUE AND EXPENDITURE AMENDMENTS WHEREAS, the City Administrator prepared and submitted to the City Council a budget for the City of Gilroy for Fiscal Years 2025-2026 and 2026-2027, and the City Council carefully examined, considered and adopted the same on June 2, 2025; and WHEREAS, City Staff has prepared and submitted to the City Council proposed amendments to said budget for Fiscal Year 2026-2027 for the City of Gilroy in the staff report dated November 16, 2026 for the Police Department’s Office of Traffic Safety Grants Funds, appropriating funding received from the California Office of Traffic Safety; and NOW, THEREFORE, BE IT RESOLVED THAT the revenue and expenditure appropriations for Fiscal Year 2026-2027 shall be increased by $102,900 in the Police Department Office of Traffic Safety Fund, Fund 223. PASSED AND ADOPTED this 16th day of November 2026 by the following roll call vote: AYES: COUNCIL MEMBERS: NOES: COUNCIL MEMBERS: ABSTAIN: COUNCIL MEMBERS: ABSENT: COUNCIL MEMBERS: APPROVED: ___________________ Greg Bozzo, Mayor ATTEST: _______________________ Kim Mancera, City Clerk Page 44 of 232 Resolution No. 2026-XX Accept OTS Grants City Council Regular Meeting | November 16, 2025 Page 2 of 2 CERTIFICATE OF THE CLERK I, KIM MANCERA, City Clerk of the City of Gilroy, do hereby certify that the attached Resolution No. 2026-XX is an original resolution, or true and correct copy of a City Resolution, duly adopted by the Council of the City of Gilroy at a Regular Meeting of said Council held on Monday, Date, with a quorum present. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the Official Seal of the City of Gilroy this Tuesday, XXXXX ____________________________________ Kim Mancera City Clerk of the City of Gilroy Page 45 of 232 9/16/2026 8:03:28 AM Page 1 of 21 State of California – Office of Traffic Safety GRANT AGREEMENT GRANT NUMBER PT27067 1. GRANT TITLE Selective Traffic Enforcement Program (STEP) 2. NAME OF AGENCY 3. Grant Period Gilroy From: To: 10/01/2026 09/30/2027 4. AGENCY UNIT TO ADMINISTER GRANT Gilroy Police Department 5. GRANT DESCRIPTION Best practice strategies will be conducted to reduce the number of persons killed and injured in crashes involving alcohol and other primary crash factors. The funded strategies may include impaired driving enforcement, enforcement operations focusing on primary crash factors, distracted driving, night-time seat belt enforcement, special enforcement operations encouraging motorcycle safety, enforcement and public awareness in areas with a high number of bicycle and pedestrian crashes, and educational programs. These strategies are designed to earn media attention thus enhancing the overall deterrent effect. In addition, the department will participate in community collaboration and engagement activities to engage in conversations regarding traffic safety with community members. 6. Federal Funds Allocated Under This Agreement Shall Not Exceed: Allocation is contingent upon availability of federal funds. $86,500.00 7. TERMS AND CONDITIONS: The parties agree to comply with the terms and conditions of the following which are by this reference made a part of the Agreement: • Schedule A – Problem Statement, Goals and Objectives and Method of Procedure • Schedule B – Detailed Budget Estimate and Sub-Budget Estimate (if applicable) • Schedule B-1 – Budget Narrative and Sub-Budget Narrative (if applicable) • Exhibit A – Certifications and Assurances • Exhibit B* – OTS Grant Program Manual • Exhibit C – Grant Electronic Management System (GEMS) Access *The item shown with an asterisk (*), is hereby incorporated by reference and made a part of this agreement as if attached hereto. This document can be viewed at the OTS home web page under Grants: www.ots.ca.gov. Use of OTS Grant Agreement template in lieu of the California Model Agreement (CMA) The California Office of Traffic Safety (OTS) utilizes its standardized OTS Grant Agreement template for awards. The format, structure, and uniformity of the OTS Grant Agreement template allows for processing through Grant Electronic Management System (GEMS). OTS’s approach to using the OTS Grant Agreement template is consistent with the California Model Agreement (CMA) developed by University of California Office of the President (UCOP) and directed by the Department of General Service (DGS). For more information, please review the OTS Grant Program Manual. Pre-Agreement Work No work shall commence and no costs shall be incurred prior to the grant start date or the grant agreement being fully signed and executed. Any such costs are incurred at the grantee’s own risk and may not be reimbursed. Page 46 of 232 9/16/2026 8:03:28 AM Page 2 of 21 8. Approval Signatures We, the officials named below, hereby swear under penalty of perjury under the laws of the State of California that we are duly authorized to legally bind the Grant recipient to the grant terms and conditions described herein. IN WITNESS WHEREOF, this Agreement has been executed by the parties hereto. A. GRANT DIRECTOR B. AUTHORIZING OFFICIAL NAME: TITLE: EMAIL: PHONE: ADDRESS: Raul Razo Sergeant raul.razo@cityofgilroy.org (408) 846-0521 7301 Hanna St. Gilroy, CA 95020 NAME: TITLE: EMAIL: PHONE: ADDRESS: Brandon Sanchez Police Chief brandon.sanchez@cityofgilroy.org (408) 846-0350 7301 Hanna St. Gilroy, CA 95020 {{_es_signer2_signature}} {{_es_signer2_date}} {{_es_signer4_signature}} {{_es_signer4_date}} (Signature) (Date) (Signature) (Date) C. FISCAL OFFICIAL D. AUTHORIZING OFFICIAL OF OFFICE OF TRAFFIC SAFETY NAME: TITLE: EMAIL: PHONE: ADDRESS: Cindy Murphy Finance Director cindy.murphy@cityofgilroy.org (408) 846-0350 7301 Hanna St. Gilroy, CA 95020 NAME: TITLE: EMAIL: PHONE: ADDRESS: Stephanie Dougherty Director stephanie.dougherty@ots.ca.gov (916) 509-3030 2208 Kausen Drive, Suite 300 Elk Grove, CA 95758 {{_es_signer3_signature}} {{_es_signer3_date}} {{_es_signer6_signature}} {{_es_signer6_date}} (Signature) (Date) (Signature) (Date) E. ACCOUNTING OFFICER OF OFFICE OF TRAFFIC SAFETY 9. SAM INFORMATION NAME: Mary Khang SAM #: REGISTERED ADDRESS: CITY: ZIP+4: DEQCXJFEJMN8 7301 Hanna Street Gilroy 95020-6129 ADDRESS: 2208 Kausen Drive Suite 300 Sacramento, CA 95758 Raul Razo (Sep 20, 2026 19:33:13 PDT) Raul Razo Sep 20, 2026 Sep 20, 2026 Brandon Sanchez (Sep 21, 2026 06:48:38 PDT)Sep 21, 2026 Sep 30, 2026 Page 47 of 232 9/16/2026 8:03:28 AM Page 3 of 21 10. PROJECTED EXPENDITURES FUND CFDA ITEM/APPROPRIATION F.Y. CHAPTER STATUTE PROJECTED EXPENDITURES 405e DDA- 27 20.616 0521-0890-101 2026 19/26 BA/26 $10,000.00 402PT-27 20.600 0521-0890-101 2026 19/26 BA/26 $19,000.00 1906-27 20.611 0521-0890-101 2026 19/26 BA/26 $8,000.00 164ID-27 20.608 0521-0890-101 2026 19/26 BA/26 $49,500.00 AGREEMENT TOTAL $86,500.00 AMOUNT ENCUMBERED BY THIS DOCUMENT I CERTIFY upon my own personal knowledge that the budgeted funds for the current budget year are available for the period and purpose of the expenditure stated above, notwithstanding allocations contingent on availability of federal funds. $86,500.00 PRIOR AMOUNT ENCUMBERED FOR THIS AGREEMENT $ 0.00 OTS ACCOUNTING OFFICER’S SIGNATURE DATE SIGNED TOTAL AMOUNT ENCUMBERED TO DATE {{_es_signer5_signature}} {{_es_signer5_date}} $86,500.00 Sep 21, 2026 Page 48 of 232 9/16/2026 8:03:28 AM Page 4 of 21 State of California – Office of Traffic Safety GRANT AGREEMENT Schedule A GRANT NUMBER PT27067 1. PROBLEM STATEMENT Describe the city, county, or jurisdiction this grant will impact. The City of Gilroy is one of the last “affordable” housing areas in Santa Clara County and serves as a home for many of the tech workers from Silicon Valley. The City of Gilroy is in southern Santa Clara County at the intersection of US-101, CA 152, and CA 156. We experience a large volume of commute traffic coming through the city during the daily commute. The last US Census Bureau statistics available are from 2024 and show that the City of Gilroy population estimation is 60,390 people. The City of Gilroy has also approved more low- and moderate-income housing, commercial warehouse space, which has seen an increase in the amount of traffic in our region. Describe the problem(s) to be addressed, supported by current and relevant crash data. (most recent calendar year data/stats). While reviewing crash data, The Gilroy Police Department (GPD) recognized the following trends within the city limit. Using Crossroads Analytics for 2025, GPD reported 453 total crashes on our roadways. Of the 453 crashes, 169 crashes involved injuries with a total of 238 victims. 78 of the 169 injury crashes involved alcohol, 42 of those were injury crashes affecting 59 victims. GPD reported 2 fatal crashes with a total of 2 fatalities. Pedestrians were victims in both fatal crashes. One pedestrian was lawfully crossing in the crosswalk during daytime hours, and one pedestrian in the second crash was walking in the roadway during nighttime. Using Crossroads Analytics for 2024, GPD reported 504 total crashes on our roadways. Of the 504 crashes, 222 crashes involved injuries with a total of 316 victims. 30 of the 222 injury crashes involved alcohol, affecting 40 victims. 10 crashes were motorcycle related, one of which was a fatality. The driver responsible in this crash was impaired by drugs. 198 of the crashes in 2024 occurred during nighttime hours. In 2024, GPD proactively arrested 125 motorists for driving under the influence of alcohol, drugs, or a combination of both. To lower the number of victims of vehicle crashes, GPD has made it a priority to conduct directed enforcement for PCF violations, education of motorists, DUI/DUID saturation patrols and DUI checkpoints. In 2025, GPD issued 1,819 traffic citations. Using Crossroads Analytics, GPD recognized an increase in total injury crashes year over year since 2021 with a 24% decrease from 2024. A continued increase is seen with alcohol involved injury crashes with the data revealing 21 in 2022, 28 in 2023, 30 in 2024, and 42 in 2025. Our goal is to lower the number of injury crashes, injury victims, and impaired driving. Most of the fatal crashes in 2022, 2023, and 2024 occurred during the nighttime hours. One half of the fatal crashes in 2025 were at nighttime. GPD routinely deploys saturation patrols to coincide with major holidays (Winter Mobilization, St. Patrick's Day, Labor Day, Memorial Day, etc.) to identify impaired drivers and remove them from our roads. Our proposed solution for the issue of impaired drivers in our jurisdiction is to continue deploying saturation patrols and checkpoints. The Gilroy Police Department Traffic Unit consists of three traffic officers and one sergeant. The Gilroy Police Department does not have the rank of lieutenant, so the Traffic Sergeant has a significant number of administrative duties. The Traffic Sergeant works part-time enforcement due to these administrative duties. The three Traffic Officers have various responsibilities which include, but not limited to: Traffic enforcement, traffic education, crash investigation and reporting, DUI enforcement operations, special event support, community engagement, respond to traffic complaints, provide traffic related training, and complete traffic related projects. The Gilroy PD continues to use the OTS funded electronic citation system, which was purchased in 2021 to write citations and collect statistics. The Department also provides training in the system to new officers with a “traffic week” during Field Training. We continue to work towards a more data driven approach to enforcement. Gilroy PD has an established partnership with the City of Gilroy Engineers and meets monthly to address engineering issues on roadways throughout the city. The Gilroy PD also collaborates heavily with the Gilroy Unified School District to mitigate traffic issues around our 12 schools within the city. Page 49 of 232 9/16/2026 8:03:28 AM Page 5 of 21 The Gilroy Police Department has a dedicated team of "Volunteers in Policing" (VIP's) that deploy radar trailers throughout the city in response to traffic complaints, through communication at community events, and these trailers are deployed during OTS campaigns. Through a combined effort of deploying messaging radar trailers, education, community collaboration events, and enforcement, the Gilroy Police Department's goal is to reduce crashes and impaired driving. Define the target population the grant intends to serve and how they are affected by the problem(s). The target population for this traffic-related grant includes all road users within the community, with a particular focus on vulnerable groups such as pedestrians, cyclists, senior citizens, individuals with disabilities, and low-income drivers. This diverse group is impacted by traffic-related problems, including high crash rates, unsafe road conditions, and inadequate traffic safety awareness, which disproportionately affect certain demographics. This grant will serve the community by promoting road safety through a combination of education and enforcement, ensuring that traffic laws are upheld fairly and consistently. The educational efforts will target both drivers and pedestrians, focusing on responsible behavior and safe road usage, while enforcement will be carried out in a manner that is equitable and inclusive, with particular attention to ensuring that historically marginalized communities are not unfairly penalized. By addressing these issues through a balanced approach, the grant will help reduce traffic-related injuries and fatalities, improve overall road safety, and foster a culture of respect and responsibility on the roads for all users. We continue to focus our Traffic Enforcement efforts on unsafe speed, improper turning, vehicle right of way violations, DUI Enforcement, Bike and Pedestrian Enforcement and Distracted Drivers to reduce our injury and fatal crash rate. The Gilroy PD continues to host the SFST/ARIDE course in partnership with CHP. We conduct this training without grant assistance to help our Department and those Departments within our region to receive this valuable training. The classes are well attended. 2. PERFORMANCE MEASURES A. Goals: 1. Reduce the number of persons killed in traffic crashes. 2. Reduce the number of persons injured in traffic crashes. 3. Reduce the number of pedestrians killed in traffic crashes. 4. Reduce the number of pedestrians injured in traffic crashes. 5. Reduce the number of bicyclists killed in traffic crashes. 6. Reduce the number of bicyclists injured in traffic crashes. 7. Reduce the number of persons killed in alcohol-involved crashes. 8. Reduce the number of persons injured in alcohol-involved crashes. 9. Reduce the number of persons killed in drug-involved crashes. 10. Reduce the number of persons injured in drug-involved crashes. 11. Reduce the number of persons killed in alcohol/drug combo-involved crashes. 12. Reduce the number of persons injured in alcohol/drug combo-involved crashes. 13. Reduce the number of motorcyclists killed in traffic crashes. 14. Reduce the number of motorcyclists injured in traffic crashes. 15. Reduce hit & run fatal crashes. 16. Reduce hit & run injury crashes. 17. Reduce nighttime (2100 - 0259 hours) fatal crashes. 18. Reduce nighttime (2100 - 0259 hours) injury crashes. B. Objectives: Target Number 1. Issue a news release announcing the kick-off of the grant by December 31st. The kick-off news releases and media advisories, alerts, and materials must be emailed to the OTS Public Information Officer at pio@ots.ca.gov, and copied to your OTS Coordinator, for approval 7 days prior to the issuance date of the release. 1 2. Participate and report data (as required) in the following campaigns; Quarter 1: National Pedestrian Safety Month, National Walk to School Day, National Teen Driver Safety Week, NHTSA Winter Mobilization; Quarter 3: National Distracted Driving Awareness Month, National Motorcycle Safety Month, National Bicycle Safety Month, National Click it or Ticket Mobilization; Quarter 4: National Speed 12 Page 50 of 232 9/16/2026 8:03:28 AM Page 6 of 21 Prevention Campaigns, NHTSA Summer Mobilization, National Child Passenger Safety Week, and California's Pedestrian Safety Month. 3. Develop (by December 31) and/or maintain a “DUI BOLO” program to notify patrol and traffic officers to be on the lookout for identified repeat DUI offenders with a suspended or revoked license as a result of DUI convictions. Updated DUI BOLOs should be distributed to patrol and traffic officers monthly. Report on the outcomes of the “DUI BOLO” program. 12 4. Send law enforcement personnel to the NHTSA Standardized Field Sobriety Testing (SFST) (minimum 16 hours) POST-certified training. 2 5. Send law enforcement personnel to the NHTSA Advanced Roadside Impaired Driving Enforcement (ARIDE) 16 hour POST-certified training. 2 6. Conduct DUI/DL Checkpoints. A minimum of 1 checkpoint should be conducted during the NHTSA Winter Mobilization and 1 during the Summer Mobilization. To enhance the overall deterrent effect and promote high visibility, it is recommended the grantee issue an advance press release and conduct social media activity for each checkpoint. For combination DUI/DL checkpoints, departments should issue press releases that mention DL's will be checked at the DUI/DL checkpoint. Signs for DUI/DL checkpoints should read "DUI/Driver's License Checkpoint Ahead." OTS does not fund or support independent DL checkpoints. Only on an exception basis and with OTS pre-approval will OTS fund checkpoints that begin prior to 1800 hours. When possible, DUI/DL Checkpoint screeners should be DRE- or ARIDE-trained. 3 7. Conduct DUI Saturation Patrol operation(s). 10 8. Conduct Traffic Enforcement operation(s), including but not limited to, primary crash factor violations. 6 9. Conduct highly publicized Distracted Driving enforcement operation(s) targeting drivers using hand held cell phones and texting. 5 10. Conduct highly publicized pedestrian and/or bicycle enforcement operation(s) in areas or during events with a high number of pedestrian and/or bicycle crashes resulting from violations made by pedestrians, bicyclists, and drivers. 2 11. Conduct Traffic Safety educational presentation(s) with an effort to reach community members. Note: Presentation(s) may include topics such as distracted driving, DUI, speed, bicycle and pedestrian safety, seat belts and child passenger safety. 2 12. Send law enforcement personnel to DUI Checkpoint Planning and Management training. 1 13. Participate in community collaboration and engagement activities to engage in conversations regarding traffic safety to both share information and receive input from the community members. 5 3. METHOD OF PROCEDURE A. Phase 1 – Program Preparation (1st Quarter of Grant Year) • The department will develop operational plans to implement the “best practice” strategies outlined in the objectives section. • Conduct all training needed to implement the program, in the first quarter. • Purchase all grant related supplies and materials to implement the program, in the first quarter. • Items with a unit cost of $5,000 more (including tax and shipping) must comply with the Buy America Act. • In order to develop/maintain the “DUI BOLOs,” research will be conducted to identify repeat DUI offenders with a suspended or revoked license as a result of DUI convictions. The DUI BOLO may include the driver’s name, last known address, DOB, description, current license status, and the number of times suspended or revoked for DUI. DUI BOLOs should be updated and distributed to traffic and patrol officers at least monthly. • Implementation of the STEP grant activities will be accomplished by deploying personnel at high crash locations. Media Requirements Issue a news release approved by the OTS PIO announcing the kick-off of the grant by December 31 and after the grant is signed and executed, but no sooner than October 1, the start of the grant year. The Page 51 of 232 9/16/2026 8:03:28 AM Page 7 of 21 kick-off release must be approved by the OTS PIO. If you are unable to meet the December 31 deadline to issue a kick-off press release, communicate the reasons to your OTS grant coordinator and OTS PIO. B. Phase 2 – Program Operations (Throughout Grant Year) Media Requirements The following requirements are for all grant-related activities: • Send all media advisories, alerts, videos, graphics, artwork, posters, radio/PSA/video scripts, storyboards, digital and/or print educational materials for grant-related activities to the OTS PIO at pio@ots.ca.gov for approval and copy your OTS grant coordinator. Optimum lead time would be 7 days before the scheduled release but at least 3 business days prior to the scheduled release date for review and approval is appreciated. • Send all PowerPoint presentations, online presentations and trainings for grant-related activities to the OTS PIO at pio@ots.ca.gov for approval and copy your OTS grant coordinator. Certified training courses are EXEMPT from the approval process. • The OTS PIO is responsible for the approval of the design and content of materials. The agency understands OTS PIO approval is not authorizing approval of budget expenditure or cost. Any cost approvals must come from the OTS grant coordinator. • Pre-approval is not required when using any OTS-supplied template for media advisories, news releases, social media graphics, videos or posts, or any other OTS-supplied educational material. However, copy the OTS PIO at pio@ots.ca.gov and your OTS grant coordinator when any material is distributed to the media and public, such as a news release, educational material, or link to social media post. • If an OTS-supplied template, educational material, social media graphic, post or video is substantially changed, the changes shall be sent to the OTS PIO at pio@ots.ca.gov for approval and copy your OTS grant coordinator. • News releases, social media posts and alerts on platforms such as NextDoor and Nixle reporting immediate and time-sensitive grant activities (e.g. enforcement operations, day of event highlights or announcements, event invites) are EXEMPT from the OTS PIO approval process. The OTS PIO and your OTS grant coordinator should still be notified when the grant-related activity is happening (e.g. car seat checks, bicycle rodeos, community presentations, DUI checkpoints, etc.). • Enforcement activities such as warrant and probation sweeps, court stings, etc. that are embargoed or could impact operations by publicizing in advance are EXEMPT from the PIO approval process. However, announcements and results of activities should still be copied to the OTS PIO at pio@ots.ca.gov and your OTS grant coordinator with the embargoed date and time or with “INTERNAL ONLY: DO NOT RELEASE” message in subject line of email. • Any earned or paid media campaigns for TV, radio, digital or social media that are part of a specific grant objective, using OTS grant funds, or designed and developed using contractual services by a subgrantee, requires prior approval. • Social media posts highlighting state or national traffic safety campaigns (Distracted Driving Month, Motorcycle Safety Awareness Month, etc.), enforcement operations (DUI checkpoints, etc.), or any other grant-related activity such as Bicycle rodeos, presentations, or events, are highly encouraged but do not require prior approval. • Submit a draft or rough-cut of all digital, printed, recorded or video material (brochures, posters, scripts, artwork, trailer graphics, digital graphics, social posts connected to an earned or paid media campaign grant objective) to the OTS PIO at pio@ots.ca.gov and copy your OTS grant coordinator for approval prior to the production or duplication. • Use the following standard language in all press, media, and printed materials, space permitting: Funding for this program was provided by a grant from the California Office of Traffic Safety, through the National Highway Traffic Safety Administration. • Space permitting, include the OTS logo on all grant-funded print materials, graphics and paid or earned social media campaign grant objective; consult the OTS PIO and copy your OTS grant coordinator for specifics, format-appropriate logos, or if space does not permit the use of the OTS logo. • Email the OTS PIO at pio@ots.ca.gov and copy your OTS grant coordinator at least 21 days in advance, or when first confirmed, a short description of any significant grant-related traffic safety Page 52 of 232 9/16/2026 8:03:28 AM Page 8 of 21 event or program, particularly events that are highly publicized beforehand with anticipated media coverage so the OTS has sufficient notice to arrange for attendance and/or participation in the event. If unable to attend, email the OTS PIO at pio@ots.ca.gov and your OTS grant coordinator brief highlights and/or results, including any media coverage (broadcast, digital, print) of the event within 7 days following significant grant-related event or program. The OTS PIO and your OTS grant coordinator should still be notified in advance when the grant-related activity is happening (e.g. car seat checks, bicycle rodeos, community presentations, DUI checkpoints, etc.). • Any news releases, work plans, scripts, storyboards, artwork, graphics, videos or any educational or informational materials that received OTS PIO approval in a prior grant year must be resubmitted for approval in the current grant year. • For additional guidance, refer to the OTS Grants Materials Approval Process Guidelines and FAQs . • Email the OTS PIO at pio@ots.ca.gov or your OTS grant coordinator for consultation when changes from any of the above requirements might be warranted. C. Phase 3 – Data Collection & Reporting (Throughout Grant Year) 1. Prepare and submit grant claim invoices (due January 30, April 30, July 30, and October 30) 2. Prepare and submit Quarterly Performance Reports (QPR) (due January 30, April 30, July 30, and October 30) • Collect and report quarterly, appropriate data that supports the progress of goals and objectives. • Provide a brief list of activity conducted, procurement of grant-funded items, and significant media activities. Include status of grant-funded personnel, status of contracts, challenges, or special accomplishments. • Provide a brief summary of quarterly accomplishments and explanations for objectives not completed or plans for upcoming activities. • Collect, analyze and report statistical data relating to the grant goals and objectives. 4. METHOD OF EVALUATION Using the data compiled during the grant, the Grant Director will complete the “Final Evaluation” section in the fourth/final Quarterly Performance Report (QPR). The Final Evaluation should provide a brief summary of the grant’s accomplishments, challenges and significant activities. This narrative should also include whether goals and objectives were met, exceeded, or an explanation of why objectives were not completed. 5. ADMINISTRATIVE SUPPORT This program has full administrative support, and every effort will be made to continue the grant activities after grant conclusion. Page 53 of 232 9/16/2026 8:03:28 AM Page 9 of 21 State of California – Office of Traffic Safety GRANT AGREEMENT Schedule B GRANT NUMBER PT27067 FUND NUMBER CATALOG NUMBER (CFDA) FUND DESCRIPTION TOTAL AMOUNT 1906-27 20.611 Racial Profiling Prohibition Grants $8,000.00 405e DDA-27 20.616 Distracted Driving Awareness $10,000.00 402PT-27 20.600 State and Community Highway Safety $19,000.00 164ID-27 20.608 Minimum Penalties for Repeat Offenders for Driving While Intoxicated $49,500.00 COST CATEGORY FUND NUMBER UNIT COST OR RATE UNITS TOTAL COST TO GRANT A. PERSONNEL COSTS Straight Time $0.00 Overtime DUI/DL Checkpoints 164ID-27 $9,500.00 3 $28,500.00 DUI Saturation Patrols 164ID-27 $1,900.00 10 $19,000.00 Traffic Enforcement 402PT-27 $1,700.00 6 $10,200.00 Pedestrian and Bicycle Enforcement 402PT-27 $1,650.00 2 $3,300.00 Traffic Safety Educational Presentations 402PT-27 $750.00 2 $1,500.00 Distracted Driving Enforcement 405e DDA- 27 $2,000.00 5 $10,000.00 Community Collaboration Engagement 1906-27 $1,600.00 5 $8,000.00 Category Sub-Total $80,500.00 B. TRAVEL EXPENSES In State Travel 402PT-27 $4,000.00 1 $4,000.00 $0.00 Category Sub-Total $4,000.00 C. CONTRACTUAL SERVICES $0.00 Category Sub-Total $0.00 D. EQUIPMENT $0.00 Category Sub-Total $0.00 E. OTHER DIRECT COSTS DUI Checkpoint Supplies 164ID-27 $2,000.00 1 $2,000.00 Category Sub-Total $2,000.00 F. INDIRECT COSTS $0.00 Category Sub-Total $0.00 GRANT TOTAL $86,500.00 Page 54 of 232 9/16/2026 8:03:28 AM Page 10 of 21 State of California – Office of Traffic Safety GRANT AGREEMENT Schedule B-1 GRANT NUMBER PT27067 BUDGET NARRATIVE PERSONNEL COSTS DUI/DL Checkpoints - Overtime for grant funded law enforcement operations conducted by appropriate department personnel. DUI Saturation Patrols - Overtime for grant funded law enforcement operations conducted by appropriate department personnel. Traffic Enforcement - Overtime for grant funded law enforcement operations conducted by appropriate department personnel. Pedestrian and Bicycle Enforcement - Overtime for grant funded law enforcement operations conducted by appropriate department personnel. Traffic Safety Educational Presentations - Overtime for grant funded traffic safety educational presentations conducted by appropriate department personnel. Distracted Driving Enforcement - Overtime for grant funded law enforcement operations conducted by appropriate department personnel. Community Collaboration Engagement - Overtime for grant funded community collaborative engagement conducted by appropriate department personnel. TRAVEL EXPENSES In State Travel - Costs are included for appropriate staff to attend conferences and training events supporting the grant goals and objectives and/or traffic safety. Anticipated travel may include the OTS Traffic Safety Summit – November 2026 – San Diego, CA, OTS Traffic Safety Law Enforcement Forum, and GHSA Annual Meeting – August 2027 – Anaheim, CA. Local mileage for grant activities and meetings is included. Local mileage for grant activities and meetings is included. All conferences, seminars or training not specifically identified in the Budget Narrative must be approved by OTS. All travel claimed must be at the agency approved rate. Per Diem may not be claimed for meals provided at conferences when registration fees are paid with OTS grant funds. CONTRACTUAL SERVICES - EQUIPMENT - OTHER DIRECT COSTS DUI Checkpoint Supplies - On-scene supplies needed to conduct sobriety checkpoints. Costs may include 28" traffic cones, MUTCD compliant traffic signs, MUTCD compliant high visibility vests (maximum of 10), traffic counters (maximum of 2), generator, gas for generators, lighting, r eflective banners, electronic flares, PAS Device Supplies, PAS Calibration Supplies, heater, propane for heaters, fan, anti-fatigue mats, and canopies. Additional items may be purchased if approved by OTS. The cost of food and beverages will not be reimbursed. INDIRECT COSTS - STATEMENTS/DISCLAIMERS There will be no program income generated from this grant. Salaries may include wages, salaries, special compensations, or authorized absences such as annual leave and sick leave provided the cost for the individual employee is (a) reasonable for the services rendered, and (b) follows an appointment made in accordance with state or local laws and rules and meets federal requirements. Any non-grant funded vacancies created by reassignment to a grant-funded position must be filled at the expense of the grantee agency. Page 55 of 232 9/16/2026 8:03:28 AM Page 11 of 21 Nothing in this agreement shall be interpreted as a requirement, formal or informal, that a particular law enforcement officer issue a specified or predetermined number of citations in pursuance of the goals and objectives here under. The OTS grant funded activities must be separate from other grant funded program activities and maintained under separate accounting tracking codes (example: the same DUI checkpoint may not be funded by both the CHP Cannabis Tax Fund and the OTS). Benefits for personnel costs can only be applied to straight time or overtime hours charged to the grant. Page 56 of 232 9/16/2026 8:03:28 AM Page 12 of 21 Appendix A to Part 1300—Certifications and Assurances for Highway Safety Grants (23 U.S.C. Chapter 4 or Section 1906, Public Law 109-59, as amended by Section 25024, Public Law 117- 58) The officials named on the grant agreement, certify by way of signature on the grant agreement signature page, that the Grantee Agency complies with all applicable Federal statutes, regulations, and directives and State rules, guidelines, policies, and laws in effect with respect to the periods for which it receives grant funding. Applicable provisions include, but are not limited to, the following: GENERAL REQUIREMENTS The State will comply with applicable statutes and regulations, including but not limited to: • 23 U.S.C. Chapter 4—Highway Safety Act of 1966, as amended; • Sec. 1906, Public Law 109-59, as amended by Sec. 25024, Public Law 117-58; • 23 CFR part 1300—Uniform Procedures for State Highway Safety Grant Programs; • 2 CFR part 200—Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards; • 2 CFR part 1201—Department of Transportation, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards. NONDISCRIMINATION (applies to subrecipients as well as States) The State highway safety agency [and its subrecipients] will comply with all Federal statutes and implementing regulations relating to nondiscrimination (“Federal Nondiscrimination Authorities”). These include but are not limited to: • Title VI of the Civil Rights Act of 1964 (42 U.S.C. 2000d et seq., 78 stat. 252), (prohibits discrimination on the basis of race, color, national origin); • 49 CFR part 21 (entitled Non-discrimination in Federally-Assisted Programs of the Department of Transportation—Effectuation of Title VI of the Civil Rights Act of 1964); • 28 CFR 50.3 (U.S. Department of Justice Guidelines for Enforcement of Title VI of the Civil Rights Act of 1964); • The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. 4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects); • Federal-Aid Highway Act of 1973, (23 U.S.C. 324 et seq.), and Title IX of the Education Amendments of 1972, as amended (20 U.S.C. 1681-1683 and 1685-1686) (prohibit discrimination on the basis of sex); • Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. 794 et seq.), as amended, (prohibits discrimination on the basis of disability) and 49 CFR part 27; • The Age Discrimination Act of 1975, as amended, (42 U.S.C. 6101 et seq.), (prohibits discrimination on the basis of age); • The Civil Rights Restoration Act of 1987, (Pub. L. 100-209), (broadens scope, coverage, and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms “programs or activities” to include all of the programs or activities of the Federal aid recipients, subrecipients and contractors, whether such programs or activities are Federally- funded or not); • Titles II and III of the Americans with Disabilities Act (42 U.S.C. 12131-12189) (prohibits discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing) and 49 CFR parts 37 and 38 State of California – Office of Traffic Safety GRANT AGREEMENT Exhibit A GRANT NUMBER PT27067 Page 57 of 232 9/16/2026 8:03:28 AM Page 13 of 21 The preceding statutory and regulatory cites hereinafter are referred to as the “Acts” and “Regulations,” respectively. GENERAL ASSURANCES In accordance with the Acts, the Regulations, and other pertinent directives, circulars, policy, memoranda, and/or guidance, the Recipient hereby gives assurance that it will promptly take any measures necessary to ensure that: “No person in the United States shall, on the grounds of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity, for which the Recipient receives Federal financial assistance from DOT, including NHTSA.” The Civil Rights Restoration Act of 1987 clarified the original intent of Congress, with respect to Title VI of the Civil Rights Act of 1964 and other non-discrimination requirements (the Age Discrimination Act of 1975, and Section 504 of the Rehabilitation Act of 1973), by restoring the broad, institutional-wide scope and coverage of these nondiscrimination statutes and requirements to include all programs and activities of the Recipient, so long as any portion of the program is Federally assisted. SPECIFIC ASSURANCES More specifically, and without limiting the above general Assurance, the Recipient agrees with and gives the following Assurances with respect to its Federally assisted Highway Safety Grant Program: 1. The Recipient agrees that each “activity,” “facility,” or “program,” as defined in 49 CFR part 21 will be (with regard to an “activity”) facilitated, or will be (with regard to a “facility”) operated, or will be (with regard to a “program”) conducted in compliance with all requirements imposed by, or pursuant to the Acts and the Regulations. 2. The Recipient will insert the following notification in all solicitations for bids, Requests For Proposals for work, or material subject to the Acts and the Regulations made in connection with all Highway Safety Grant Programs and, in adapted form, in all proposals for negotiated agreements regardless of funding source: “The [name of Recipient], in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.” 3. The Recipient will insert the clauses of appendix A and E of this Assurance (also referred to as DOT order 1050.2A) [1] in every contract or agreement subject to the Acts and the Regulations. 4. The Recipient will insert the clauses of appendix B of DOT Order 1050.2A, as a covenant running with the land, in any deed from the United States effecting or recording a transfer of real property, structures, use, or improvements thereon or interest therein to a Recipient. 5. That where the Recipient receives Federal financial assistance to construct a facility, or part of a facility, the Assurance will extend to the entire facility and facilities operated in connection therewith. 6. That where the Recipient receives Federal financial assistance in the form of, or for the acquisition of, real property or an interest in real property, the Assurance will extend to rights to space on, over, or under such property. 7. That the Recipient will include the clauses set forth in appendix C and appendix D of this DOT Order 1050.2A, as a covenant running with the land, in any future deeds, leases, licenses, permits, or similar instruments entered into by the Recipient with other parties: a. for the subsequent transfer of real property acquired or improved under the applicable activity, project, or program; and b. for the construction or use of, or access to, space on, over, or under real property acquired or improved under the applicable activity, project, or program. 8. That this Assurance obligates the Recipient for the period during which Federal financial assistance is extended to the program, except where the Federal financial assistance is to provide, or is in the Page 58 of 232 9/16/2026 8:03:28 AM Page 14 of 21 form of, personal property, or real property, or interest therein, or structures or improvements thereon, in which case the Assurance obligates the Recipient, or any transferee for the longer of the following periods: a. the period during which the property is used for a purpose for which the Federal financial assistance is extended, or for another purpose involving the provision of similar services or benefits; or b. the period during which the Recipient retains ownership or possession of the property. 9. The Recipient will provide for such methods of administration for the program as are found by the Secretary of Transportation or the official to whom he/she delegates specific authority to give reasonable guarantee that it, other recipients, sub-recipients, sub- grantees, contractors, subcontractors, consultants, transferees, successors in interest, and other participants of Federal financial assistance under such program will comply with all requirements imposed or pursuant to the Acts, the Regulations, and this Assurance. 10. The Recipient agrees that the United States has a right to seek judicial enforcement with regard to any matter arising under the Acts, the Regulations, and this Assurance. By signing this ASSURANCE, the State highway safety agency also agrees to comply (and require any sub- recipients, sub-grantees, contractors, successors, transferees, and/or assignees to comply) with all applicable provisions governing NHTSA's access to records, accounts, documents, information, facilities, and staff. You also recognize that you must comply with any program or compliance reviews, and/or complaint investigations conducted by NHTSA. You must keep records, reports, and submit the material for review upon request to NHTSA, or its designee in a timely, complete, and accurate way. Additionally, you must comply with all other reporting, data collection, and evaluation requirements, as prescribed by law or detailed in program guidance. The State highway safety agency gives this ASSURANCE in consideration of and for obtaining any Federal grants, loans, contracts, agreements, property, and/or discounts, or other Federal-aid and Federal financial assistance extended after the date hereof to the recipients by the U.S. Department of Transportation under the Highway Safety Grant Program. This ASSURANCE is binding on the State highway safety agency, other recipients, sub-recipients, sub-grantees, contractors, subcontractors and their subcontractors', transferees, successors in interest, and any other participants in the Highway Safety Grant Program. The person(s) signing below is/are authorized to sign this ASSURANCE on behalf of the Recipient. THE DRUG-FREE WORKPLACE ACT OF 1988 (41 U.S.C. 8103) The Subgrantee will provide a drug-free workplace by: a. Publishing a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession or use of a controlled substance is prohibited in the grantee's workplace, and specifying the actions that will be taken against employees for violation of such prohibition; b. Establishing a drug-free awareness program to inform employees about: 1. The dangers of drug abuse in the workplace; 2. The grantee's policy of maintaining a drug-free workplace; 3. Any available drug counseling, rehabilitation, and employee assistance programs; 4. The penalties that may be imposed upon employees for drug violations occurring in the workplace; 5. Making it a requirement that each employee engaged in the performance of the grant be given a copy of the statement required by paragraph (a); c. Notifying the employee in the statement required by paragraph (a) that, as a condition of employment under the grant, the employee will— 1. Abide by the terms of the statement; 2. Notify the employer of any criminal drug statute conviction for a violation occurring in the workplace no later than five days after such conviction; d. Notifying the agency within ten days after receiving notice under subparagraph (c)(2) from an employee or otherwise receiving actual notice of such conviction; e. Taking one of the following actions, within 30 days of receiving notice under subparagraph (c)(2), with respect to any employee who is so convicted— 1. Taking appropriate personnel action against such an employee, up to and including termination; 2. Requiring such employee to participate satisfactorily in a drug abuse assistance or Page 59 of 232 9/16/2026 8:03:28 AM Page 15 of 21 rehabilitation program approved for such purposes by a Federal, State, or local health, law enforcement, or other appropriate agency; f. Making a good faith effort to continue to maintain a drug-free workplace through implementation of all of the paragraphs above. POLITICAL ACTIVITY (HATCH ACT) (applies to subrecipients as well as States) The State will comply with provisions of the Hatch Act (5 U.S.C. 1501-1508), which limits the political activities of employees whose principal employment activities are funded in whole or in part with Federal funds. CERTIFICATION REGARDING FEDERAL LOBBYING (applies to subrecipients as well as States) CERTIFICATION FOR CONTRACTS, GRANTS, LOANS, AND COOPERATIVE AGREEMENTS The undersigned certifies, to the best of his or her knowledge and belief, that: 1. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement; 2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions; 3. The undersigned shall require that the language of this certification be included in the award documents for all sub-awards at all tiers (including subcontracts, subgrants, and contracts under grant, loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by section 1352, title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. RESTRICTION ON STATE LOBBYING (applies to subrecipients as well as States) None of the funds under this program will be used for any activity specifically designed to urge or influence a State or local legislator to favor or oppose the adoption of any specific legislative proposal pending before any State or local legislative body. Such activities include both direct and indirect (e.g., “grassroots”) lobbying activities, with one exception. This does not preclude a State official whose salary is supported with NHTSA funds from engaging in direct communications with State or local legislative officials, in accordance with customary State practice, even if such communications urge legislative officials to favor or oppose the adoption of a specific pending legislative proposal. CERTIFICATION REGARDING DEBARMENT AND SUSPENSION (applies to subrecipients as well as States) INSTRUCTIONS FOR PRIMARY TIER PARTICIPANT CERTIFICATION (STATES) Page 60 of 232 9/16/2026 8:03:28 AM Page 16 of 21 1. By signing and submitting this proposal, the prospective primary tier participant is providing the certification set out below and agrees to comply with the requirements of 2 CFR parts 180 and 1200. 2. The inability of a person to provide the certification required below will not necessarily result in denial of participation in this covered transaction. The prospective primary tier participant shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective primary tier participant to furnish a certification or an explanation shall disqualify such person from participation in this transaction. 3. The certification in this clause is a material representation of fact upon which reliance was placed when the department or agency determined to enter into this transaction. If it is later determined that the prospective primary tier participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the department or agency may terminate this transaction for cause or default or may pursue suspension or debarment. 4. The prospective primary tier participant shall provide immediate written notice to the department or agency to which this proposal is submitted if at any time the prospective primary tier participant learns its certification was erroneous when submitted or has become erroneous by reason of changed circumstances. 5. The terms covered transaction, civil judgment, debarment, suspension, ineligible, participant, person, principal, and voluntarily excluded, as used in this clause, are defined in 2 CFR parts 180 and 1200. You may contact the department or agency to which this proposal is being submitted for assistance in obtaining a copy of those regulations. 6. The prospective primary tier participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is proposed for debarment under 48 CFR part 9, subpart 9.4, debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency entering into this transaction. 7. The prospective primary tier participant further agrees by submitting this proposal that it will include the clause titled “Instructions for Lower Tier Participant Certification” including the “Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion—Lower Tier Covered Transaction,” provided by the department or agency entering into this covered transaction, without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions and will require lower tier participants to comply with 2 CFR parts 180 and 1200. 8. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that it is not proposed for debarment under 48 CFR part 9, subpart 9.4, debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant is responsible for ensuring that its principals are not suspended, debarred, or otherwise ineligible to participate in covered transactions. To verify the eligibility of its principals, as well as the eligibility of any prospective lower tier participants, each participant may, but is not required to, check the System for Award Management Exclusions website ( https://www.sam.gov/). 9. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of a participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. 10. Except for transactions authorized under paragraph 6 of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is proposed for debarment under 48 CFR part 9, subpart 9.4, suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency may terminate the transaction for cause or default. CERTIFICATION REGARDING DEBARMENT, SUSPENSION, AND OTHER RESPONSIBILITY MATTERS—PRIMARY TIER COVERED TRANSACTIONS 1. The prospective primary tier participant certifies to the best of its knowledge and belief, that it and Page 61 of 232 9/16/2026 8:03:28 AM Page 17 of 21 its principals: a. Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participating in covered transactions by any Federal department or agency; b. Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; c. Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State, or local) with commission of any of the offenses enumerated in paragraph (1)(b) of this certification; and d. Have not within a three-year period preceding this application/proposal had one or more public transactions (Federal, State, or local) terminated for cause or default. 2. Where the prospective primary tier participant is unable to certify to any of the Statements in this certification, such prospective participant shall attach an explanation to this proposal. INSTRUCTIONS FOR LOWER TIER PARTICIPANT CERTIFICATION 1. By signing and submitting this proposal, the prospective lower tier participant is providing the certification set out below and agrees to comply with the requirements of 2 CFR parts 180 and 1200. 2. The certification in this clause is a material representation of fact upon which reliance was placed when this transaction was entered into. If it is later determined that the prospective lower tier participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the department or agency with which this transaction originated may pursue available remedies, including suspension or debarment. 3. The prospective lower tier participant shall provide immediate written notice to the person to which this proposal is submitted if at any time the prospective lower tier participant learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances. 4. The terms covered transaction, civil judgment, debarment, suspension, ineligible, participant, person, principal, and voluntarily excluded, as used in this clause, are defined in 2 CFR parts 180 and 1200. You may contact the person to whom this proposal is submitted for assistance in obtaining a copy of those regulations. 5. The prospective lower tier participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is proposed for debarment under 48 CFR part 9, subpart 9.4, debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency with which this transaction originated. 6. The prospective lower tier participant further agrees by submitting this proposal that it will include the clause titled “Instructions for Lower Tier Participant Certification” including the “Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion—Lower Tier Covered Transaction,” without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions and will require lower tier participants to comply with 2 CFR parts 180 and 1200. 7. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that it is not proposed for debarment under 48 CFR part 9, subpart 9.4, debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant is responsible for ensuring that its principals are not suspended, debarred, or otherwise ineligible to participate in covered transactions. To verify the eligibility of its principals, as well as the eligibility of any prospective lower tier participants, each participant may, but is not required to, check the System for Award Management Exclusions website ( https://www.sam.gov/). 8. Nothing contained in the foregoing shall be construed to require establishment of a system of Page 62 of 232 9/16/2026 8:03:28 AM Page 18 of 21 records in order to render in good faith the certification required by this clause. The knowledge and information of a participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. 9. Except for transactions authorized under paragraph 5 of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is proposed for debarment under 48 CFR part 9, subpart 9.4, suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency with which this transaction originated may pursue available remedies, including suspension or debarment. CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION—LOWER TIER COVERED TRANSACTIONS 1. The prospective lower tier participant certifies, by submission of this proposal, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participating in covered transactions by any Federal department or agency. 2. Where the prospective lower tier participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. BUY AMERICA (applies to subrecipients as well as States) The State and each subrecipient will comply with the Buy America requirement (23 U.S.C. 313) when purchasing items using Federal funds. Buy America requires a State, or subrecipient, to purchase with Federal funds only steel, iron and manufactured products produced in the United States, unless the Secretary of Transportation determines that such domestically produced items would be inconsistent with the public interest, that such materials are not reasonably available and of a satisfactory quality, or that inclusion of domestic materials will increase the cost of the overall project contract by more than 25 percent. In order to use Federal funds to purchase foreign produced items, the State must submit a waiver request that provides an adequate basis and justification for approval by the Secretary of Transportation. CERTIFICATION ON CONFLICT OF INTEREST (applies to subrecipients as well as States) GENERAL REQUIREMENTS No employee, officer, or agent of a State or its subrecipient who is authorized in an official capacity to negotiate, make, accept, or approve, or to take part in negotiating, making, accepting, or approving any subaward, including contracts or subcontracts, in connection with this grant shall have, directly or indirectly, any financial or personal interest in any such subaward. Such a financial or personal interest would arise when the employee, officer, or agent, any member of his or her immediate family, his or her partner, or an organization which employs or is about to employ any of the parties indicated herein, has a financial or personal interest in or a tangible personal benefit from an entity considered for a subaward. Based on this policy: 1. The recipient shall maintain a written code or standards of conduct that provide for disciplinary actions to be applied for violations of such standards by officers, employees, or agents. a. The code or standards shall provide that the recipient's officers, employees, or agents may neither solicit nor accept gratuities, favors, or anything of monetary value from present or potential subawardees, including contractors or parties to subcontracts. b. The code or standards shall establish penalties, sanctions, or other disciplinary actions for violations, as permitted by State or local law or regulations. 2. The recipient shall maintain responsibility to enforce the requirements of the written code or standards of conduct. DISCLOSURE REQUIREMENTS Page 63 of 232 9/16/2026 8:03:28 AM Page 19 of 21 No State or its subrecipient, including its officers, employees, or agents, shall perform or continue to perform under a grant or cooperative agreement, whose objectivity may be impaired because of any related past, present, or currently planned interest, financial or otherwise, in organizations regulated by NHTSA or in organizations whose interests may be substantially affected by NHTSA activities. Based on this policy: 1. The recipient shall disclose any conflict of interest identified as soon as reasonably possible, making an immediate and full disclosure in writing to NHTSA. The disclosure shall include a description of the action which the recipient has taken or proposes to take to avoid or mitigate such conflict. 2. NHTSA will review the disclosure and may require additional relevant information from the recipient. If a conflict of interest is found to exist, NHTSA may (a) terminate the award, or (b) determine that it is otherwise in the best interest of NHTSA to continue the award and include appropriate provisions to mitigate or avoid such conflict. 3. Conflicts of interest that require disclosure include all past, present, or currently planned organizational, financial, contractual, or other interest(s) with an organization regulated by NHTSA or with an organization whose interests may be substantially affected by NHTSA activities, and which are related to this award. The interest(s) that require disclosure include those of any recipient, affiliate, proposed consultant, proposed subcontractor, and key personnel of any of the above. Past interest shall be limited to within one year of the date of award. Key personnel shall include any person owning more than a 20 percent interest in a recipient, and the officers, employees or agents of a recipient who are responsible for making a decision or taking an action under an award where the decision or action can have an economic or other impact on the interests of a regulated or affected organization. PROHIBITION ON USING GRANT FUNDS TO CHECK FOR HELMET USAGE (applies to subrecipients as well as States) The State and each subrecipient will not use 23 U.S.C. Chapter 4 grant funds for programs to check helmet usage or to create checkpoints that specifically target motorcyclists. POLICY ON SEAT BELT USE In accordance with Executive Order 13043, Increasing Seat Belt Use in the United States, dated April 16, 1997, the Grantee is encouraged to adopt and enforce on-the-job seat belt use policies and programs for its employees when operating company-owned, rented, or personally-owned vehicles. The National Highway Traffic Safety Administration (NHTSA) is responsible for providing leadership and guidance in support of this Presidential initiative. For information and resources on traffic safety programs and policies for employers, please contact the Network of Employers for Traffic Safety (NETS), a public-private partnership dedicated to improving the traffic safety practices of employers and employees. You can download information on seat belt programs, costs of motor vehicle crashes to employers, and other traffic safety initiatives at www.trafficsafety.org. The NHTSA website ( www.nhtsa.gov) also provides information on statistics, campaigns, and program evaluations and references. POLICY ON BANNING TEXT MESSAGING WHILE DRIVING In accordance with Executive Order 13513, Federal Leadership On Reducing Text Messaging While Driving, and DOT Order 3902.10, Text Messaging While Driving, States are encouraged to adopt and enforce workplace safety policies to decrease crashes caused by distracted driving, including policies to ban text messaging while driving company-owned or rented vehicles, Government-owned, leased or rented vehicles, or privately-owned vehicles when on official Government business or when performing any work on or behalf of the Government. States are also encouraged to conduct workplace safety initiatives in a manner commensurate with the size of the business, such as establishment of new rules and programs or re- evaluation of existing programs to prohibit text messaging while driving, and education, awareness, and other outreach to employees about the safety risks associated with texting while driving. Page 64 of 232 9/16/2026 8:03:28 AM Page 20 of 21 INSTRUCTIONS FOR ADDING OR UPDATING GEMS USERS 1. Each agency is allowed a total of FIVE (5) GEMS Users. 2. GEMS Users listed on this form will be authorized to login to GEMS to complete and submit Quarterly Performance Reports (QPRs) and reimbursement claims. 3. Complete the form if adding, removing or editing a GEMS user(s). 4. The Grant Director must sign this form and return it with the Grant Agreement. CURRENT GEMS USER(S) 1. Carolina Hudson Title: Media Contact: No Phone: 408-846-0525 Email: carolina.hudson@cityofgilroy.org 2. Cindy Murphy Title: Finance Director Media Contact: No Phone: (408) 846-0350 Email: cindy.murphy@cityofgilroy.org 3. Raul Razo Title: Sergeant Media Contact: Yes Phone: (408) 846-0521 Email: raul.razo@cityofgilroy.org 4. Julio Romero Title: Officer Media Contact: No Phone: (408) 846-0350 Email: julio.romero@cityofgilroy.org 5. Brandon Sanchez Title: Police Chief Media Contact: No Phone: (408) 846-0350 Email: brandon.sanchez@cityofgilroy.org 6. Patricia Vigil Title: Management Analyst Media Contact: No Phone: (408) 846-0316 Email: patricia.vigil@cityofgilroy.org State of California – Office of Traffic Safety OTS-55 Grant Electronic Management System (GEMS) Access Exhibit C GRANT NUMBER PT27067 GRANT DETAILS Grant Number: PT27067 Agency Name: Gilroy Police Department Grant Title: Selective Traffic Enforcement Program (STEP) Agreement Total: $86,500.00 Authorizing Official: Brandon Sanchez Fiscal Official: Cindy Murphy Grant Director: Raul Razo Page 65 of 232 9/16/2026 8:03:28 AM Page 21 of 21 Complete the below information if adding, removing or editing a GEMS user(s) GEMS User 1 Add/Change {{[]c11_es_:signer1}} Remove Access {{[] c12_es_:signer1}} Add as a media contact? Yes {{[]c1_es_:signer1}} No{{[]c2_es_:signer1}} {{UserName1_es_:signer1 }} {{UserTitle1_es_:signer1 }} Name Job Title {{UserEmail1_es_:signer1 }} {{UserPhone1_es_:signer1 }} Email address Phone number GEMS User 2 Add/Change {{[]c13_es_:signer1}} Remove Access {{[]c14_es_:signer1}} Add as a media contact? Yes {{[]c3_es_:signer1}}No {{[]c4_es_:signer1}} {{UserName2_es_:signer1 }} {{UserTitle2_es_:signer1 }} Name Job Title {{UserEmail2_es_:signer1 }} {{UserPhone2_es_:signer1 }} Email address Phone number GEMS User 3 Add/Change {{[]c15_es_:signer1}} Remove Access {{[]c16_es_:signer1}} Add as a media contact? Yes {{[]c5_es_:signer1}}No {{[]c6_es_:signer1}} {{UserName3_es_:signer1 }} {{UserTitle3_es_:signer1 }} Name Job Title {{UserEmail3_es_:signer1 }} {{UserPhone3_es_:signer1 }} Email address Phone number GEMS User 4 Add/Change {{[]c17_es_:signer1}} Remove Access {{[]c18_es_:signer1}} Add as a media contact? Yes {{[]c8_es_:signer1}}No {{[]c7_es_:signer1}} {{UserName4_es_:signer1 }} {{UserTitle4_es_:signer1 }} Name Job Title {{UserEmail4_es_:signer1 }} {{UserPhone4_es_:signer1 }} Email address Phone number GEMS User 5 Add/Change {{[]c19_es_:signer1}} Remove Access {{[]c20_es_:signer1}} Add as a media contact? Yes {{[]c9_es_:signer1}}No {{[]c10_es_:signer1}} {{UserName5_es_:signer1 }} {{UserTitle5_es_:signer1 }} Name Job Title {{UserEmail5_es_:signer1 }} {{UserPhone5_es_:signer1 }} Email address Phone number Form completed by: {{Sig_es_:signer1:signature}} Date: {{Dte1_es_:signer1:date}} As a signatory I hereby authorize the listed individual(s) to represent and have GEMS user access. {{Sig_es_:signer2:signature}} {{Name1_es_:signer2:fullname }} Signature Name {{Dte2_es_:signer2:date}} Grant Director Date Title Sep 20, 2026 Raul Razo (Sep 20, 2026 19:33:13 PDT) Raul Razo Raul Razo Sep 20, 2026 Page 66 of 232 Grant Agreement - PT27067 Final Audit Report 2026-09-30 Created:2026-09-16 By:David Cabrera (david.cabrera@ots.ca.gov) Status:Signed Transaction ID:CBJCHBCAABAAwM2nzgsAi09p3DaCdlx40yRoaGxsEq9Q "Grant Agreement - PT27067" History Document created by David Cabrera (david.cabrera@ots.ca.gov) 2026-09-16 - 3:03:40 PM GMT Document emailed to Raul Razo (raul.razo@cityofgilroy.org) for signature 2026-09-16 - 3:03:48 PM GMT Email viewed by Raul Razo (raul.razo@cityofgilroy.org) 2026-09-16 - 8:33:28 PM GMT Document e-signed by Raul Razo (raul.razo@cityofgilroy.org) Signature Date: 2026-09-21 - 2:32:12 AM GMT - Time Source: server - Signature Appearance Selected: IMAGE Document emailed to raul.razo@cityofgilroy.org for signature 2026-09-21 - 2:32:14 AM GMT Email viewed by raul.razo@cityofgilroy.org 2026-09-21 - 2:32:18 AM GMT Signer raul.razo@cityofgilroy.org entered name at signing as Raul Razo 2026-09-21 - 2:33:11 AM GMT Document e-signed by Raul Razo (raul.razo@cityofgilroy.org) Signature Date: 2026-09-21 - 2:33:13 AM GMT - Time Source: server - Signature Appearance Selected: TYPE Document emailed to Cindy Murphy (cindy.murphy@cityofgilroy.org) for signature 2026-09-21 - 2:33:16 AM GMT Email viewed by Cindy Murphy (cindy.murphy@cityofgilroy.org) 2026-09-21 - 2:39:52 AM GMT Document e-signed by Cindy Murphy (cindy.murphy@cityofgilroy.org) Signature Date: 2026-09-21 - 4:43:08 AM GMT - Time Source: server - Signature Appearance Selected: MOBILE_IMAGE Page 67 of 232 Document emailed to Brandon Sanchez (brandon.sanchez@cityofgilroy.org) for signature 2026-09-21 - 4:43:10 AM GMT Email viewed by Brandon Sanchez (brandon.sanchez@cityofgilroy.org) 2026-09-21 - 4:51:29 AM GMT Document e-signed by Brandon Sanchez (brandon.sanchez@cityofgilroy.org) Signature Date: 2026-09-21 - 1:48:38 PM GMT - Time Source: server - Signature Appearance Selected: MOBILE_DRAW Document emailed to Mary Khang (mary.khang@ots.ca.gov) for signature 2026-09-21 - 1:48:40 PM GMT Document e-signed by Mary Khang (mary.khang@ots.ca.gov) Signature Date: 2026-09-21 - 4:32:28 PM GMT - Time Source: server - Signature Appearance Selected: IMAGE Document emailed to Stephanie Dougherty (stephanie.dougherty@ots.ca.gov) for signature 2026-09-21 - 4:32:30 PM GMT Document e-signed by Stephanie Dougherty (stephanie.dougherty@ots.ca.gov) Signature Date: 2026-09-30 - 6:05:50 PM GMT - Time Source: server - Signature Appearance Selected: IMAGE Agreement completed. 2026-09-30 - 6:05:50 PM GMT Page 68 of 232 9/25/2026 11:07:47 AM Page 1 of 19 State of California – Office of Traffic Safety GRANT AGREEMENT GRANT NUMBER MC27004 1. GRANT TITLE Motorcyclist Safety Education and Training Program 2. NAME OF AGENCY 3. Grant Period Gilroy From: To: 10/01/2026 09/30/2027 4. AGENCY UNIT TO ADMINISTER GRANT Gilroy Police Department 5. GRANT DESCRIPTION Best practice strategies will be conducted to reduce the number of persons killed and injured in crashes involving motorcycles. The funded strategies may include hands-on motorcyclist safety courses, motorcyclist helmet usage training, classroom education, community outreach and public awareness campaigns, educational presentations, and workshops. These countermeasures should be conducted in communities with a high number of motorcycle related crashes. 6. Federal Funds Allocated Under This Agreement Shall Not Exceed: Allocation is contingent upon availability of federal funds. $16,400.00 7. TERMS AND CONDITIONS: The parties agree to comply with the terms and conditions of the following which are by this reference made a part of the Agreement: • Schedule A – Problem Statement, Goals and Objectives and Method of Procedure • Schedule B – Detailed Budget Estimate and Sub-Budget Estimate (if applicable) • Schedule B-1 – Budget Narrative and Sub-Budget Narrative (if applicable) • Exhibit A – Certifications and Assurances • Exhibit B* – OTS Grant Program Manual • Exhibit C – Grant Electronic Management System (GEMS) Access *The item shown with an asterisk (*), is hereby incorporated by reference and made a part of this agreement as if attached hereto. This document can be viewed at the OTS home web page under Grants: www.ots.ca.gov. Use of OTS Grant Agreement template in lieu of the California Model Agreement (CMA) The California Office of Traffic Safety (OTS) utilizes its standardized OTS Grant Agreement template for awards. The format, structure, and uniformity of the OTS Grant Agreement template allows for processing through Grant Electronic Management System (GEMS). OTS’s approach to using the OTS Grant Agreement template is consistent with the California Model Agreement (CMA) developed by University of California Office of the President (UCOP) and directed by the Department of General Service (DGS). For more information, please review the OTS Grant Program Manual. Pre-Agreement Work No work shall commence and no costs shall be incurred prior to the grant start date or the grant agreement being fully signed and executed. Any such costs are incurred at the grantee’s own risk and may not be reimbursed. Page 69 of 232 9/25/2026 11:07:47 AM Page 2 of 19 8. Approval Signatures We, the officials named below, hereby swear under penalty of perjury under the laws of the State of California that we are duly authorized to legally bind the Grant recipient to the grant terms and conditions described herein. IN WITNESS WHEREOF, this Agreement has been executed by the parties hereto. A. GRANT DIRECTOR B. AUTHORIZING OFFICIAL NAME: TITLE: EMAIL: PHONE: ADDRESS: Raul Razo Sergeant raul.razo@cityofgilroy.org (408) 846-0521 7301 Hanna St. Gilroy, CA 95020 NAME: TITLE: EMAIL: PHONE: ADDRESS: Brandon Sanchez Police Chief brandon.sanchez@cityofgilroy.org (408) 846-0350 7301 Hanna St. Gilroy, CA 95020 {{_es_signer2_signature}} {{_es_signer2_date}} {{_es_signer4_signature}} {{_es_signer4_date}} (Signature) (Date) (Signature) (Date) C. FISCAL OFFICIAL D. AUTHORIZING OFFICIAL OF OFFICE OF TRAFFIC SAFETY NAME: TITLE: EMAIL: PHONE: ADDRESS: Cindy Murphy Finance Director cindy.murphy@cityofgilroy.org (408) 846-0350 7301 Hanna St. Gilroy, CA 95020 NAME: TITLE: EMAIL: PHONE: ADDRESS: Stephanie Dougherty Director stephanie.dougherty@ots.ca.gov (916) 509-3030 2208 Kausen Drive, Suite 300 Elk Grove, CA 95758 {{_es_signer3_signature}} {{_es_signer3_date}} {{_es_signer6_signature}} {{_es_signer6_date}} (Signature) (Date) (Signature) (Date) E. ACCOUNTING OFFICER OF OFFICE OF TRAFFIC SAFETY 9. SAM INFORMATION NAME: Mary Khang SAM #: REGISTERED ADDRESS: CITY: ZIP+4: DEQCXJFEJMN8 7301 Hanna Street Gilroy 95020-6129 ADDRESS: 2208 Kausen Drive Suite 300 Sacramento, CA 95758 Raul Razo (Sep 25, 2026 13:21:48 PDT) Raul Razo Sep 25, 2026 Sep 26, 2026 Brandon Sanchez (Oct 1, 2026 10:29:35 PDT)Oct 1, 2026 Oct 1, 2026 Page 70 of 232 9/25/2026 11:07:47 AM Page 3 of 19 10. PROJECTED EXPENDITURES FUND CFDA ITEM/APPROPRIATION F.Y. CHAPTER STATUTE PROJECTED EXPENDITURES 405f MC-27 20.616 0521-0890-101 2026 19/26 BA/26 $16,400.00 AGREEMENT TOTAL $16,400.00 AMOUNT ENCUMBERED BY THIS DOCUMENT I CERTIFY upon my own personal knowledge that the budgeted funds for the current budget year are available for the period and purpose of the expenditure stated above, notwithstanding allocations contingent on availability of federal funds. $16,400.00 PRIOR AMOUNT ENCUMBERED FOR THIS AGREEMENT $ 0.00 OTS ACCOUNTING OFFICER’S SIGNATURE DATE SIGNED TOTAL AMOUNT ENCUMBERED TO DATE {{_es_signer5_signature}} {{_es_signer5_date}} $16,400.00 Oct 1, 2026 Page 71 of 232 9/25/2026 11:07:47 AM Page 4 of 19 State of California – Office of Traffic Safety GRANT AGREEMENT Schedule A GRANT NUMBER MC27004 1. PROBLEM STATEMENT Describe the city, county, or jurisdiction this grant will impact. The City of Gilroy and Southern Santa Clara County is a unique area with mixed jurisdictions and a large commuter population with many rural ranches and farms. The City of Gilroy is at the intersection of US-101, CA-152, and CA-156. We have a large commute population that travels through the City from regions south of the City, Hollister, CA, east of the City, Los Banos, CA and the Central Valley, and west of the City, Watsonville, CA and Santa Cruz, CA. The Southern Santa Clara Valley area consists of about 117 square miles and has an estimated population of 115,759 people. The Gilroy Police Department was awarded an OTS Motorcycle Safety Course Grant for the 2024-2025 grant period and 2025-2026 grant period to reduce injury and fatal injury motorcycle crashes. The Motorcycle Safety Course, “Ride to Live” will focus on riders that are already experienced but could benefit from the techniques taught to law enforcement traffic officers to improve their skills and enhance their safety. This a regional effort to reduce injury and fatal motorcycle crashes focused on the southern area of Santa Clara County including Morgan Hill and the unincorporated areas. Describe the problem(s) to be addressed, supported by current and relevant crash data. (most recent calendar year data/stats). A review of the City of Gilroy’s Motorcycle Crash data available on the UC Berkley TIMS site shows we have experienced a slight decrease in injury motorcycle crashes from 2024 to 2025. The motorcycle crash injury rate was two in 2020. The motorcycle crash rate for each subsequent year was eight (2021), thirteen (2022), fourteen (2023), and twenty (2024) . In 2025 the City of Gilroy investigated one fatal motorcycle crash during daytime hours. From 2021 through 2023, TIMS shows that we have experienced one fatal crash, nine severe injury crashes, 13 visible injury crashes and seven crashes with complaint of pain. In 2024 TIMS shows that Gilroy, CA and the surrounding county jurisdiction outside the city limits shows 21 total motorcycle crashes, 1 killed, and 27 motorcycle crash victims. A free, advanced, one day Motorcycle course for the public will help licensed riders develop new skills and reinforce correct riding habits. A course like this will also help the Department reach our citizens on another level of engagement and allow them to interact in a positive way with Police Officers. The course will be taught by instructors from the Gilroy Police Department and the Morgan Hill Police Department as a regional effort. Surrounding communities such as the City of Morgan Hill will have the opportunity to participate in this course as the City of Morgan Hill, according to TIMS has experienced a total of 16 motorcycle crashes, and 17 injured victims from 2023 through 2024. Define the target population the grant intends to serve and how they are affected by the problem(s). The Gilroy Police Department intends to serve the motorcycle riding community within the following cities: The City of Gilroy, The City of Morgan Hill, The City of Hollister, The City of Watsonville, The City of Santa Cruz, and The City of Los Banos. The target population will be diverse and inclusive. The Gilroy Police Department will promote the Motorcycle Training Course on social media, through The City of Gilroy newsletters, through local police departments, local motorcycle shops, and local news agencies. The Gilroy Police Department is targeting individuals who have a California M1 endorsement, own a motorcycle, have some experience riding the motorcycle, are willing to use their motorcycle during the training, and willing to learn advanced riding techniques to be a safer motorcycle rider. 2. PERFORMANCE MEASURES A. Goals: 1. Reduce the number of persons killed in traffic crashes. 2. Reduce the number of persons injured in traffic crashes. 3. Reduce the number of motorcyclists killed in traffic crashes. 4. Reduce the number of motorcyclists injured in traffic crashes. B. Objectives: Target Number 1. Issue a news release announcing the kick-off of the grant by December 31st. The kick-off news releases and media advisories, alerts, and materials must be emailed to the OTS Public Information Officer at pio@ots.ca.gov, and copied to 1 Page 72 of 232 9/25/2026 11:07:47 AM Page 5 of 19 your OTS Coordinator, for approval 7 days prior to the issuance date of the release. 2. Conduct free to the public motorcyclist safety and training courses throughout the grant year. 2 3. Update and maintain Department website and/or Social Media platforms to further promote motorcyclist safety to the public and to promote educational goals of safe motorcycle riding. 4 4. Send law enforcement personnel to advanced motorcycle training. 2 5. Participate in Motorcycle Safety Month in May. 1 3. METHOD OF PROCEDURE A. Phase 1 – Program Preparation (1st Quarter of Grant Year) • Develop operational plans to implement the “best practice” strategies outlined in the objectives section. • Conduct all training needed to implement the program, in the first quarter. • Purchase all grant related supplies and materials to implement the program, in the first quarter. • Items with a unit cost of $5,000 or more (including tax and shipping) must comply with the Buy America Act. Media Requirements • Issue a news release approved by the OTS PIO announcing the kick-off of the grant by December 31 and after the grant is signed and executed, but no sooner than October 1, the start of the grant year. The kick-off release must be approved by the OTS PIO. If you are unable to meet the December 31 deadline to issue a kick-off press release, communicate the reasons to your OTS grant coordinator and OTS PIO. B. Phase 2 – Program Operations (Throughout Grant Year) Media Requirements The following requirements are for all grant-related activities: • Send all media advisories, alerts, videos, graphics, artwork, posters, radio/PSA/video scripts, storyboards, digital and/or print educational materials for grant-related activities to the OTS PIO at pio@ots.ca.gov for approval and copy your OTS grant coordinator. Optimum lead time would be 7 days before the scheduled release but at least 3 business days prior to the scheduled release date for review and approval is appreciated. • Send all PowerPoint presentations, online presentations and trainings for grant-related activities to the OTS PIO at pio@ots.ca.gov for approval and copy your OTS grant coordinator. Certified training courses are EXEMPT from the approval process. • The OTS PIO is responsible for the approval of the design and content of materials. The agency understands OTS PIO approval is not authorizing approval of budget expenditure or cost. Any cost approvals must come from the OTS grant coordinator. • Pre-approval is not required when using any OTS-supplied template for media advisories, news releases, social media graphics, videos or posts, or any other OTS-supplied educational material. However, copy the OTS PIO at pio@ots.ca.gov and your OTS grant coordinator when any material is distributed to the media and public, such as a news release, educational material, or link to social media post. • If an OTS-supplied template, educational material, social media graphic, post or video is substantially changed, the changes shall be sent to the OTS PIO at pio@ots.ca.gov for approval and copy your OTS grant coordinator. • News releases, social media posts and alerts on platforms such as NextDoor and Nixle reporting immediate and time-sensitive grant activities (e.g. enforcement operations, day of event highlights or announcements, event invites) are EXEMPT from the OTS PIO approval process. The OTS PIO and your OTS grant coordinator should still be notified when the grant-related activity is happening (e.g. car seat checks, bicycle rodeos, community presentations, DUI checkpoints, etc.). • Enforcement activities such as warrant and probation sweeps, court stings, etc. that are embargoed or could impact operations by publicizing in advance are EXEMPT from the PIO approval process. However, announcements and results of activities should still be copied to the Page 73 of 232 9/25/2026 11:07:47 AM Page 6 of 19 OTS PIO at pio@ots.ca.gov and your OTS grant coordinator with the embargoed date and time or with “INTERNAL ONLY: DO NOT RELEASE” message in subject line of email. • Any earned or paid media campaigns for TV, radio, digital or social media that are part of a specific grant objective, using OTS grant funds, or designed and developed using contractual services by a subgrantee, requires prior approval. • Social media posts highlighting state or national traffic safety campaigns (Distracted Driving Month, Motorcycle Safety Awareness Month, etc.), enforcement operations (DUI checkpoints, etc.), or any other grant-related activity such as Bicycle rodeos, presentations, or events, are highly encouraged but do not require prior approval. • Submit a draft or rough-cut of all digital, printed, recorded or video material (brochures, posters, scripts, artwork, trailer graphics, digital graphics, social posts connected to an earned or paid media campaign grant objective) to the OTS PIO at pio@ots.ca.gov and copy your OTS grant coordinator for approval prior to the production or duplication. • Use the following standard language in all press, media, and printed materials, space permitting: Funding for this program was provided by a grant from the California Office of Traffic Safety, through the National Highway Traffic Safety Administration. • Space permitting, include the OTS logo on all grant-funded print materials, graphics and paid or earned social media campaign grant objective; consult the OTS PIO and copy your OTS grant coordinator for specifics, format-appropriate logos, or if space does not permit the use of the OTS logo. • Email the OTS PIO at pio@ots.ca.gov and copy your OTS grant coordinator at least 21 days in advance, or when first confirmed, a short description of any significant grant-related traffic safety event or program, particularly events that are highly publicized beforehand with anticipated media coverage so the OTS has sufficient notice to arrange for attendance and/or participation in the event. If unable to attend, email the OTS PIO at pio@ots.ca.gov and your OTS grant coordinator brief highlights and/or results, including any media coverage (broadcast, digital, print) of the event within 7 days following significant grant-related event or program. The OTS PIO and your OTS grant coordinator should still be notified in advance when the grant-related activity is happening (e.g. car seat checks, bicycle rodeos, community presentations, DUI checkpoints, etc.). • Any news releases, work plans, scripts, storyboards, artwork, graphics, videos or any educational or informational materials that received OTS PIO approval in a prior grant year must be resubmitted for approval in the current grant year. • For additional guidance, refer to the OTS Grants Materials Approval Process Guidelines and FAQs . • Email the OTS PIO at pio@ots.ca.gov or your OTS grant coordinator for consultation when changes from any of the above requirements might be warranted. C. Phase 3 – Data Collection & Reporting (Throughout Grant Year) 1. Prepare and submit grant claim invoices (due January 30, April 30, July 30, and October 30) 2. Prepare and submit Quarterly Performance Reports (QPR) (due January 30, April 30, July 30, and October 30) • Collect and report quarterly, appropriate data that supports the progress of goals and objectives. • Provide a brief list of activity conducted, procurement of grant-funded items, and significant media activities. Include status of grant-funded personnel, status of contracts, challenges, or special accomplishments. • Provide a brief summary of quarterly accomplishments and explanations for objectives not completed or plans for upcoming activities. • Collect, analyze and report statistical data relating to the grant goals and objectives. 4. METHOD OF EVALUATION Using the data compiled during the grant, the Grant Director will complete the “Final Evaluation” section in the fourth/final Quarterly Performance Report (QPR). The Final Evaluation should provide a brief summary of the grant’s accomplishments, challenges and significant activities. This narrative should also include whether goals and objectives were met, exceeded, or an explanation of why objectives were not completed. 5. ADMINISTRATIVE SUPPORT Page 74 of 232 9/25/2026 11:07:47 AM Page 7 of 19 This program has full administrative support, and every effort will be made to continue the grant activities after grant conclusion. Page 75 of 232 9/25/2026 11:07:47 AM Page 8 of 19 State of California – Office of Traffic Safety GRANT AGREEMENT Schedule B GRANT NUMBER MC27004 FUND NUMBER CATALOG NUMBER (CFDA) FUND DESCRIPTION TOTAL AMOUNT 405f MC-27 20.616 Motorcyclist Safety Grants $16,400.00 COST CATEGORY FUND NUMBER UNIT COST OR RATE UNITS TOTAL COST TO GRANT A. PERSONNEL COSTS Straight Time $0.00 Overtime Motorcyclist Training Instruction 405f MC- 27 $6,300.00 2 $12,600.00 Category Sub-Total $12,600.00 B. TRAVEL EXPENSES In State Travel 405f MC- 27 $1,800.00 1 $1,800.00 $0.00 Category Sub-Total $1,800.00 C. CONTRACTUAL SERVICES $0.00 Category Sub-Total $0.00 D. EQUIPMENT $0.00 Category Sub-Total $0.00 E. OTHER DIRECT COSTS Motor Officer Instructors 405f MC- 27 $2,000.00 1 $2,000.00 Category Sub-Total $2,000.00 F. INDIRECT COSTS $0.00 Category Sub-Total $0.00 GRANT TOTAL $16,400.00 Page 76 of 232 9/25/2026 11:07:47 AM Page 9 of 19 State of California – Office of Traffic Safety GRANT AGREEMENT Schedule B-1 GRANT NUMBER MC27004 BUDGET NARRATIVE PERSONNEL COSTS Motorcyclist Training Instruction - Overtime for grant funded Motorcyclist safety education classes conducted by appropriate department personnel. TRAVEL EXPENSES In State Travel - Costs are included for appropriate staff to attend conferences and training events supporting the grant goals and objectives and/or traffic safety. Local mileage for grant activities and meetings is included. All conferences, seminars or training not specifically identified in the Budget Narrative must be approved by OTS. All travel claimed must be at the agency approved rate. Per Diem may not be claimed for meals provided at conferences when registration fees are paid with OTS grant funds. CONTRACTUAL SERVICES - EQUIPMENT - OTHER DIRECT COSTS Motor Officer Instructors - To assist with conducting motorcycle safety training to accomplish the grant goals and objectives (instructors may include Lieutenants, Sergeants, and Officers). INDIRECT COSTS - STATEMENTS/DISCLAIMERS There will be no program income generated from this grant. Salaries may include wages, salaries, special compensations, or authorized absences such as annual leave and sick leave provided the cost for the individual employee is (a) reasonable for the services rendered, and (b) follows an appointment made in accordance with state or local laws and rules and meets federal requirements. Any non-grant funded vacancies created by reassignment to a grant-funded position must be filled at the expense of the grantee agency. Nothing in this agreement shall be interpreted as a requirement, formal or informal, that a particular law enforcement officer issue a specified or predetermined number of citations in pursuance of the goals and objectives here under. The OTS grant funded activities must be separate from other grant funded program activities and maintained under separate accounting tracking codes (example: the same DUI checkpoint may not be funded by both the CHP Cannabis Tax Fund and the OTS). Benefits for personnel costs can only be applied to straight time or overtime hours charged to the grant. Page 77 of 232 9/25/2026 11:07:47 AM Page 10 of 19 Appendix A to Part 1300—Certifications and Assurances for Highway Safety Grants (23 U.S.C. Chapter 4 or Section 1906, Public Law 109-59, as amended by Section 25024, Public Law 117- 58) The officials named on the grant agreement, certify by way of signature on the grant agreement signature page, that the Grantee Agency complies with all applicable Federal statutes, regulations, and directives and State rules, guidelines, policies, and laws in effect with respect to the periods for which it receives grant funding. Applicable provisions include, but are not limited to, the following: GENERAL REQUIREMENTS The State will comply with applicable statutes and regulations, including but not limited to: • 23 U.S.C. Chapter 4—Highway Safety Act of 1966, as amended; • Sec. 1906, Public Law 109-59, as amended by Sec. 25024, Public Law 117-58; • 23 CFR part 1300—Uniform Procedures for State Highway Safety Grant Programs; • 2 CFR part 200—Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards; • 2 CFR part 1201—Department of Transportation, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards. NONDISCRIMINATION (applies to subrecipients as well as States) The State highway safety agency [and its subrecipients] will comply with all Federal statutes and implementing regulations relating to nondiscrimination (“Federal Nondiscrimination Authorities”). These include but are not limited to: • Title VI of the Civil Rights Act of 1964 (42 U.S.C. 2000d et seq., 78 stat. 252), (prohibits discrimination on the basis of race, color, national origin); • 49 CFR part 21 (entitled Non-discrimination in Federally-Assisted Programs of the Department of Transportation—Effectuation of Title VI of the Civil Rights Act of 1964); • 28 CFR 50.3 (U.S. Department of Justice Guidelines for Enforcement of Title VI of the Civil Rights Act of 1964); • The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. 4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects); • Federal-Aid Highway Act of 1973, (23 U.S.C. 324 et seq.), and Title IX of the Education Amendments of 1972, as amended (20 U.S.C. 1681-1683 and 1685-1686) (prohibit discrimination on the basis of sex); • Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. 794 et seq.), as amended, (prohibits discrimination on the basis of disability) and 49 CFR part 27; • The Age Discrimination Act of 1975, as amended, (42 U.S.C. 6101 et seq.), (prohibits discrimination on the basis of age); • The Civil Rights Restoration Act of 1987, (Pub. L. 100-209), (broadens scope, coverage, and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms “programs or activities” to include all of the programs or activities of the Federal aid recipients, subrecipients and contractors, whether such programs or activities are Federally- funded or not); • Titles II and III of the Americans with Disabilities Act (42 U.S.C. 12131-12189) (prohibits discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing) and 49 CFR parts 37 and 38 State of California – Office of Traffic Safety GRANT AGREEMENT Exhibit A GRANT NUMBER MC27004 Page 78 of 232 9/25/2026 11:07:47 AM Page 11 of 19 The preceding statutory and regulatory cites hereinafter are referred to as the “Acts” and “Regulations,” respectively. GENERAL ASSURANCES In accordance with the Acts, the Regulations, and other pertinent directives, circulars, policy, memoranda, and/or guidance, the Recipient hereby gives assurance that it will promptly take any measures necessary to ensure that: “No person in the United States shall, on the grounds of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity, for which the Recipient receives Federal financial assistance from DOT, including NHTSA.” The Civil Rights Restoration Act of 1987 clarified the original intent of Congress, with respect to Title VI of the Civil Rights Act of 1964 and other non-discrimination requirements (the Age Discrimination Act of 1975, and Section 504 of the Rehabilitation Act of 1973), by restoring the broad, institutional-wide scope and coverage of these nondiscrimination statutes and requirements to include all programs and activities of the Recipient, so long as any portion of the program is Federally assisted. SPECIFIC ASSURANCES More specifically, and without limiting the above general Assurance, the Recipient agrees with and gives the following Assurances with respect to its Federally assisted Highway Safety Grant Program: 1. The Recipient agrees that each “activity,” “facility,” or “program,” as defined in 49 CFR part 21 will be (with regard to an “activity”) facilitated, or will be (with regard to a “facility”) operated, or will be (with regard to a “program”) conducted in compliance with all requirements imposed by, or pursuant to the Acts and the Regulations. 2. The Recipient will insert the following notification in all solicitations for bids, Requests For Proposals for work, or material subject to the Acts and the Regulations made in connection with all Highway Safety Grant Programs and, in adapted form, in all proposals for negotiated agreements regardless of funding source: “The [name of Recipient], in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.” 3. The Recipient will insert the clauses of appendix A and E of this Assurance (also referred to as DOT order 1050.2A) [1] in every contract or agreement subject to the Acts and the Regulations. 4. The Recipient will insert the clauses of appendix B of DOT Order 1050.2A, as a covenant running with the land, in any deed from the United States effecting or recording a transfer of real property, structures, use, or improvements thereon or interest therein to a Recipient. 5. That where the Recipient receives Federal financial assistance to construct a facility, or part of a facility, the Assurance will extend to the entire facility and facilities operated in connection therewith. 6. That where the Recipient receives Federal financial assistance in the form of, or for the acquisition of, real property or an interest in real property, the Assurance will extend to rights to space on, over, or under such property. 7. That the Recipient will include the clauses set forth in appendix C and appendix D of this DOT Order 1050.2A, as a covenant running with the land, in any future deeds, leases, licenses, permits, or similar instruments entered into by the Recipient with other parties: a. for the subsequent transfer of real property acquired or improved under the applicable activity, project, or program; and b. for the construction or use of, or access to, space on, over, or under real property acquired or improved under the applicable activity, project, or program. 8. That this Assurance obligates the Recipient for the period during which Federal financial assistance is extended to the program, except where the Federal financial assistance is to provide, or is in the Page 79 of 232 9/25/2026 11:07:47 AM Page 12 of 19 form of, personal property, or real property, or interest therein, or structures or improvements thereon, in which case the Assurance obligates the Recipient, or any transferee for the longer of the following periods: a. the period during which the property is used for a purpose for which the Federal financial assistance is extended, or for another purpose involving the provision of similar services or benefits; or b. the period during which the Recipient retains ownership or possession of the property. 9. The Recipient will provide for such methods of administration for the program as are found by the Secretary of Transportation or the official to whom he/she delegates specific authority to give reasonable guarantee that it, other recipients, sub-recipients, sub- grantees, contractors, subcontractors, consultants, transferees, successors in interest, and other participants of Federal financial assistance under such program will comply with all requirements imposed or pursuant to the Acts, the Regulations, and this Assurance. 10. The Recipient agrees that the United States has a right to seek judicial enforcement with regard to any matter arising under the Acts, the Regulations, and this Assurance. By signing this ASSURANCE, the State highway safety agency also agrees to comply (and require any sub- recipients, sub-grantees, contractors, successors, transferees, and/or assignees to comply) with all applicable provisions governing NHTSA's access to records, accounts, documents, information, facilities, and staff. You also recognize that you must comply with any program or compliance reviews, and/or complaint investigations conducted by NHTSA. You must keep records, reports, and submit the material for review upon request to NHTSA, or its designee in a timely, complete, and accurate way. Additionally, you must comply with all other reporting, data collection, and evaluation requirements, as prescribed by law or detailed in program guidance. The State highway safety agency gives this ASSURANCE in consideration of and for obtaining any Federal grants, loans, contracts, agreements, property, and/or discounts, or other Federal-aid and Federal financial assistance extended after the date hereof to the recipients by the U.S. Department of Transportation under the Highway Safety Grant Program. This ASSURANCE is binding on the State highway safety agency, other recipients, sub-recipients, sub-grantees, contractors, subcontractors and their subcontractors', transferees, successors in interest, and any other participants in the Highway Safety Grant Program. The person(s) signing below is/are authorized to sign this ASSURANCE on behalf of the Recipient. THE DRUG-FREE WORKPLACE ACT OF 1988 (41 U.S.C. 8103) The Subgrantee will provide a drug-free workplace by: a. Publishing a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession or use of a controlled substance is prohibited in the grantee's workplace, and specifying the actions that will be taken against employees for violation of such prohibition; b. Establishing a drug-free awareness program to inform employees about: 1. The dangers of drug abuse in the workplace; 2. The grantee's policy of maintaining a drug-free workplace; 3. Any available drug counseling, rehabilitation, and employee assistance programs; 4. The penalties that may be imposed upon employees for drug violations occurring in the workplace; 5. Making it a requirement that each employee engaged in the performance of the grant be given a copy of the statement required by paragraph (a); c. Notifying the employee in the statement required by paragraph (a) that, as a condition of employment under the grant, the employee will— 1. Abide by the terms of the statement; 2. Notify the employer of any criminal drug statute conviction for a violation occurring in the workplace no later than five days after such conviction; d. Notifying the agency within ten days after receiving notice under subparagraph (c)(2) from an employee or otherwise receiving actual notice of such conviction; e. Taking one of the following actions, within 30 days of receiving notice under subparagraph (c)(2), with respect to any employee who is so convicted— 1. Taking appropriate personnel action against such an employee, up to and including termination; 2. Requiring such employee to participate satisfactorily in a drug abuse assistance or Page 80 of 232 9/25/2026 11:07:47 AM Page 13 of 19 rehabilitation program approved for such purposes by a Federal, State, or local health, law enforcement, or other appropriate agency; f. Making a good faith effort to continue to maintain a drug-free workplace through implementation of all of the paragraphs above. POLITICAL ACTIVITY (HATCH ACT) (applies to subrecipients as well as States) The State will comply with provisions of the Hatch Act (5 U.S.C. 1501-1508), which limits the political activities of employees whose principal employment activities are funded in whole or in part with Federal funds. CERTIFICATION REGARDING FEDERAL LOBBYING (applies to subrecipients as well as States) CERTIFICATION FOR CONTRACTS, GRANTS, LOANS, AND COOPERATIVE AGREEMENTS The undersigned certifies, to the best of his or her knowledge and belief, that: 1. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement; 2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions; 3. The undersigned shall require that the language of this certification be included in the award documents for all sub-awards at all tiers (including subcontracts, subgrants, and contracts under grant, loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by section 1352, title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. RESTRICTION ON STATE LOBBYING (applies to subrecipients as well as States) None of the funds under this program will be used for any activity specifically designed to urge or influence a State or local legislator to favor or oppose the adoption of any specific legislative proposal pending before any State or local legislative body. Such activities include both direct and indirect (e.g., “grassroots”) lobbying activities, with one exception. This does not preclude a State official whose salary is supported with NHTSA funds from engaging in direct communications with State or local legislative officials, in accordance with customary State practice, even if such communications urge legislative officials to favor or oppose the adoption of a specific pending legislative proposal. CERTIFICATION REGARDING DEBARMENT AND SUSPENSION (applies to subrecipients as well as States) INSTRUCTIONS FOR PRIMARY TIER PARTICIPANT CERTIFICATION (STATES) Page 81 of 232 9/25/2026 11:07:47 AM Page 14 of 19 1. By signing and submitting this proposal, the prospective primary tier participant is providing the certification set out below and agrees to comply with the requirements of 2 CFR parts 180 and 1200. 2. The inability of a person to provide the certification required below will not necessarily result in denial of participation in this covered transaction. The prospective primary tier participant shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective primary tier participant to furnish a certification or an explanation shall disqualify such person from participation in this transaction. 3. The certification in this clause is a material representation of fact upon which reliance was placed when the department or agency determined to enter into this transaction. If it is later determined that the prospective primary tier participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the department or agency may terminate this transaction for cause or default or may pursue suspension or debarment. 4. The prospective primary tier participant shall provide immediate written notice to the department or agency to which this proposal is submitted if at any time the prospective primary tier participant learns its certification was erroneous when submitted or has become erroneous by reason of changed circumstances. 5. The terms covered transaction, civil judgment, debarment, suspension, ineligible, participant, person, principal, and voluntarily excluded, as used in this clause, are defined in 2 CFR parts 180 and 1200. You may contact the department or agency to which this proposal is being submitted for assistance in obtaining a copy of those regulations. 6. The prospective primary tier participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is proposed for debarment under 48 CFR part 9, subpart 9.4, debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency entering into this transaction. 7. The prospective primary tier participant further agrees by submitting this proposal that it will include the clause titled “Instructions for Lower Tier Participant Certification” including the “Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion—Lower Tier Covered Transaction,” provided by the department or agency entering into this covered transaction, without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions and will require lower tier participants to comply with 2 CFR parts 180 and 1200. 8. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that it is not proposed for debarment under 48 CFR part 9, subpart 9.4, debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant is responsible for ensuring that its principals are not suspended, debarred, or otherwise ineligible to participate in covered transactions. To verify the eligibility of its principals, as well as the eligibility of any prospective lower tier participants, each participant may, but is not required to, check the System for Award Management Exclusions website ( https://www.sam.gov/). 9. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of a participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. 10. Except for transactions authorized under paragraph 6 of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is proposed for debarment under 48 CFR part 9, subpart 9.4, suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency may terminate the transaction for cause or default. CERTIFICATION REGARDING DEBARMENT, SUSPENSION, AND OTHER RESPONSIBILITY MATTERS—PRIMARY TIER COVERED TRANSACTIONS 1. The prospective primary tier participant certifies to the best of its knowledge and belief, that it and Page 82 of 232 9/25/2026 11:07:47 AM Page 15 of 19 its principals: a. Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participating in covered transactions by any Federal department or agency; b. Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; c. Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State, or local) with commission of any of the offenses enumerated in paragraph (1)(b) of this certification; and d. Have not within a three-year period preceding this application/proposal had one or more public transactions (Federal, State, or local) terminated for cause or default. 2. Where the prospective primary tier participant is unable to certify to any of the Statements in this certification, such prospective participant shall attach an explanation to this proposal. INSTRUCTIONS FOR LOWER TIER PARTICIPANT CERTIFICATION 1. By signing and submitting this proposal, the prospective lower tier participant is providing the certification set out below and agrees to comply with the requirements of 2 CFR parts 180 and 1200. 2. The certification in this clause is a material representation of fact upon which reliance was placed when this transaction was entered into. If it is later determined that the prospective lower tier participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the department or agency with which this transaction originated may pursue available remedies, including suspension or debarment. 3. The prospective lower tier participant shall provide immediate written notice to the person to which this proposal is submitted if at any time the prospective lower tier participant learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances. 4. The terms covered transaction, civil judgment, debarment, suspension, ineligible, participant, person, principal, and voluntarily excluded, as used in this clause, are defined in 2 CFR parts 180 and 1200. You may contact the person to whom this proposal is submitted for assistance in obtaining a copy of those regulations. 5. The prospective lower tier participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is proposed for debarment under 48 CFR part 9, subpart 9.4, debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency with which this transaction originated. 6. The prospective lower tier participant further agrees by submitting this proposal that it will include the clause titled “Instructions for Lower Tier Participant Certification” including the “Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion—Lower Tier Covered Transaction,” without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions and will require lower tier participants to comply with 2 CFR parts 180 and 1200. 7. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that it is not proposed for debarment under 48 CFR part 9, subpart 9.4, debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant is responsible for ensuring that its principals are not suspended, debarred, or otherwise ineligible to participate in covered transactions. To verify the eligibility of its principals, as well as the eligibility of any prospective lower tier participants, each participant may, but is not required to, check the System for Award Management Exclusions website ( https://www.sam.gov/). 8. Nothing contained in the foregoing shall be construed to require establishment of a system of Page 83 of 232 9/25/2026 11:07:47 AM Page 16 of 19 records in order to render in good faith the certification required by this clause. The knowledge and information of a participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. 9. Except for transactions authorized under paragraph 5 of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is proposed for debarment under 48 CFR part 9, subpart 9.4, suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency with which this transaction originated may pursue available remedies, including suspension or debarment. CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION—LOWER TIER COVERED TRANSACTIONS 1. The prospective lower tier participant certifies, by submission of this proposal, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participating in covered transactions by any Federal department or agency. 2. Where the prospective lower tier participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. BUY AMERICA (applies to subrecipients as well as States) The State and each subrecipient will comply with the Buy America requirement (23 U.S.C. 313) when purchasing items using Federal funds. Buy America requires a State, or subrecipient, to purchase with Federal funds only steel, iron and manufactured products produced in the United States, unless the Secretary of Transportation determines that such domestically produced items would be inconsistent with the public interest, that such materials are not reasonably available and of a satisfactory quality, or that inclusion of domestic materials will increase the cost of the overall project contract by more than 25 percent. In order to use Federal funds to purchase foreign produced items, the State must submit a waiver request that provides an adequate basis and justification for approval by the Secretary of Transportation. CERTIFICATION ON CONFLICT OF INTEREST (applies to subrecipients as well as States) GENERAL REQUIREMENTS No employee, officer, or agent of a State or its subrecipient who is authorized in an official capacity to negotiate, make, accept, or approve, or to take part in negotiating, making, accepting, or approving any subaward, including contracts or subcontracts, in connection with this grant shall have, directly or indirectly, any financial or personal interest in any such subaward. Such a financial or personal interest would arise when the employee, officer, or agent, any member of his or her immediate family, his or her partner, or an organization which employs or is about to employ any of the parties indicated herein, has a financial or personal interest in or a tangible personal benefit from an entity considered for a subaward. Based on this policy: 1. The recipient shall maintain a written code or standards of conduct that provide for disciplinary actions to be applied for violations of such standards by officers, employees, or agents. a. The code or standards shall provide that the recipient's officers, employees, or agents may neither solicit nor accept gratuities, favors, or anything of monetary value from present or potential subawardees, including contractors or parties to subcontracts. b. The code or standards shall establish penalties, sanctions, or other disciplinary actions for violations, as permitted by State or local law or regulations. 2. The recipient shall maintain responsibility to enforce the requirements of the written code or standards of conduct. DISCLOSURE REQUIREMENTS Page 84 of 232 9/25/2026 11:07:47 AM Page 17 of 19 No State or its subrecipient, including its officers, employees, or agents, shall perform or continue to perform under a grant or cooperative agreement, whose objectivity may be impaired because of any related past, present, or currently planned interest, financial or otherwise, in organizations regulated by NHTSA or in organizations whose interests may be substantially affected by NHTSA activities. Based on this policy: 1. The recipient shall disclose any conflict of interest identified as soon as reasonably possible, making an immediate and full disclosure in writing to NHTSA. The disclosure shall include a description of the action which the recipient has taken or proposes to take to avoid or mitigate such conflict. 2. NHTSA will review the disclosure and may require additional relevant information from the recipient. If a conflict of interest is found to exist, NHTSA may (a) terminate the award, or (b) determine that it is otherwise in the best interest of NHTSA to continue the award and include appropriate provisions to mitigate or avoid such conflict. 3. Conflicts of interest that require disclosure include all past, present, or currently planned organizational, financial, contractual, or other interest(s) with an organization regulated by NHTSA or with an organization whose interests may be substantially affected by NHTSA activities, and which are related to this award. The interest(s) that require disclosure include those of any recipient, affiliate, proposed consultant, proposed subcontractor, and key personnel of any of the above. Past interest shall be limited to within one year of the date of award. Key personnel shall include any person owning more than a 20 percent interest in a recipient, and the officers, employees or agents of a recipient who are responsible for making a decision or taking an action under an award where the decision or action can have an economic or other impact on the interests of a regulated or affected organization. PROHIBITION ON USING GRANT FUNDS TO CHECK FOR HELMET USAGE (applies to subrecipients as well as States) The State and each subrecipient will not use 23 U.S.C. Chapter 4 grant funds for programs to check helmet usage or to create checkpoints that specifically target motorcyclists. POLICY ON SEAT BELT USE In accordance with Executive Order 13043, Increasing Seat Belt Use in the United States, dated April 16, 1997, the Grantee is encouraged to adopt and enforce on-the-job seat belt use policies and programs for its employees when operating company-owned, rented, or personally-owned vehicles. The National Highway Traffic Safety Administration (NHTSA) is responsible for providing leadership and guidance in support of this Presidential initiative. For information and resources on traffic safety programs and policies for employers, please contact the Network of Employers for Traffic Safety (NETS), a public-private partnership dedicated to improving the traffic safety practices of employers and employees. You can download information on seat belt programs, costs of motor vehicle crashes to employers, and other traffic safety initiatives at www.trafficsafety.org. The NHTSA website ( www.nhtsa.gov) also provides information on statistics, campaigns, and program evaluations and references. POLICY ON BANNING TEXT MESSAGING WHILE DRIVING In accordance with Executive Order 13513, Federal Leadership On Reducing Text Messaging While Driving, and DOT Order 3902.10, Text Messaging While Driving, States are encouraged to adopt and enforce workplace safety policies to decrease crashes caused by distracted driving, including policies to ban text messaging while driving company-owned or rented vehicles, Government-owned, leased or rented vehicles, or privately-owned vehicles when on official Government business or when performing any work on or behalf of the Government. States are also encouraged to conduct workplace safety initiatives in a manner commensurate with the size of the business, such as establishment of new rules and programs or re- evaluation of existing programs to prohibit text messaging while driving, and education, awareness, and other outreach to employees about the safety risks associated with texting while driving. Page 85 of 232 9/25/2026 11:07:47 AM Page 18 of 19 INSTRUCTIONS FOR ADDING OR UPDATING GEMS USERS 1. Each agency is allowed a total of FIVE (5) GEMS Users. 2. GEMS Users listed on this form will be authorized to login to GEMS to complete and submit Quarterly Performance Reports (QPRs) and reimbursement claims. 3. Complete the form if adding, removing or editing a GEMS user(s). 4. The Grant Director must sign this form and return it with the Grant Agreement. CURRENT GEMS USER(S) 1. Carolina Hudson Title: Media Contact: No Phone: 408-846-0525 Email: carolina.hudson@cityofgilroy.org 2. Cindy Murphy Title: Finance Director Media Contact: No Phone: (408) 846-0350 Email: cindy.murphy@cityofgilroy.org 3. Raul Razo Title: Sergeant Media Contact: Yes Phone: (408) 846-0521 Email: raul.razo@cityofgilroy.org 4. Julio Romero Title: Officer Media Contact: No Phone: (408) 846-0350 Email: julio.romero@cityofgilroy.org 5. Brandon Sanchez Title: Police Chief Media Contact: No Phone: (408) 846-0350 Email: brandon.sanchez@cityofgilroy.org 6. Patricia Vigil Title: Management Analyst Media Contact: No Phone: (408) 846-0316 Email: patricia.vigil@cityofgilroy.org State of California – Office of Traffic Safety OTS-55 Grant Electronic Management System (GEMS) Access Exhibit C GRANT NUMBER MC27004 GRANT DETAILS Grant Number: MC27004 Agency Name: Gilroy Police Department Grant Title: Motorcyclist Safety Education and Training Program Agreement Total: $16,400.00 Authorizing Official: Brandon Sanchez Fiscal Official: Cindy Murphy Grant Director: Raul Razo Page 86 of 232 9/25/2026 11:07:47 AM Page 19 of 19 Complete the below information if adding, removing or editing a GEMS user(s) GEMS User 1 Add/Change {{[]c11_es_:signer1}} Remove Access {{[] c12_es_:signer1}} Add as a media contact? Yes {{[]c1_es_:signer1}} No{{[]c2_es_:signer1}} {{UserName1_es_:signer1 }} {{UserTitle1_es_:signer1 }} Name Job Title {{UserEmail1_es_:signer1 }} {{UserPhone1_es_:signer1 }} Email address Phone number GEMS User 2 Add/Change {{[]c13_es_:signer1}} Remove Access {{[]c14_es_:signer1}} Add as a media contact? Yes {{[]c3_es_:signer1}}No {{[]c4_es_:signer1}} {{UserName2_es_:signer1 }} {{UserTitle2_es_:signer1 }} Name Job Title {{UserEmail2_es_:signer1 }} {{UserPhone2_es_:signer1 }} Email address Phone number GEMS User 3 Add/Change {{[]c15_es_:signer1}} Remove Access {{[]c16_es_:signer1}} Add as a media contact? Yes {{[]c5_es_:signer1}}No {{[]c6_es_:signer1}} {{UserName3_es_:signer1 }} {{UserTitle3_es_:signer1 }} Name Job Title {{UserEmail3_es_:signer1 }} {{UserPhone3_es_:signer1 }} Email address Phone number GEMS User 4 Add/Change {{[]c17_es_:signer1}} Remove Access {{[]c18_es_:signer1}} Add as a media contact? Yes {{[]c8_es_:signer1}}No {{[]c7_es_:signer1}} {{UserName4_es_:signer1 }} {{UserTitle4_es_:signer1 }} Name Job Title {{UserEmail4_es_:signer1 }} {{UserPhone4_es_:signer1 }} Email address Phone number GEMS User 5 Add/Change {{[]c19_es_:signer1}} Remove Access {{[]c20_es_:signer1}} Add as a media contact? Yes {{[]c9_es_:signer1}}No {{[]c10_es_:signer1}} {{UserName5_es_:signer1 }} {{UserTitle5_es_:signer1 }} Name Job Title {{UserEmail5_es_:signer1 }} {{UserPhone5_es_:signer1 }} Email address Phone number Form completed by: {{Sig_es_:signer1:signature}} Date: {{Dte1_es_:signer1:date}} As a signatory I hereby authorize the listed individual(s) to represent and have GEMS user access. {{Sig_es_:signer2:signature}} {{Name1_es_:signer2:fullname }} Signature Name {{Dte2_es_:signer2:date}} Grant Director Date Title Sep 25, 2026 Raul Razo (Sep 25, 2026 13:21:48 PDT) Raul Razo Raul Razo Sep 25, 2026 Page 87 of 232 Grant Agreement - MC27004 Final Audit Report 2026-10-01 Created:2026-09-25 By:David Cabrera (david.cabrera@ots.ca.gov) Status:Signed Transaction ID:CBJCHBCAABAAOKAgpHCP93M0DXN3PSt_KVb3R9l_6yqX "Grant Agreement - MC27004" History Document created by David Cabrera (david.cabrera@ots.ca.gov) 2026-09-25 - 6:07:59 PM GMT Document emailed to Raul Razo (raul.razo@cityofgilroy.org) for signature 2026-09-25 - 6:08:09 PM GMT Email viewed by Raul Razo (raul.razo@cityofgilroy.org) 2026-09-25 - 8:09:40 PM GMT Document e-signed by Raul Razo (raul.razo@cityofgilroy.org) Signature Date: 2026-09-25 - 8:19:24 PM GMT - Time Source: server - Signature Appearance Selected: IMAGE Document emailed to raul.razo@cityofgilroy.org for signature 2026-09-25 - 8:19:26 PM GMT Email viewed by raul.razo@cityofgilroy.org 2026-09-25 - 8:21:01 PM GMT Signer raul.razo@cityofgilroy.org entered name at signing as Raul Razo 2026-09-25 - 8:21:46 PM GMT Document e-signed by Raul Razo (raul.razo@cityofgilroy.org) Signature Date: 2026-09-25 - 8:21:48 PM GMT - Time Source: server - Signature Appearance Selected: TYPE Document emailed to Cindy Murphy (cindy.murphy@cityofgilroy.org) for signature 2026-09-25 - 8:21:50 PM GMT Email viewed by Cindy Murphy (cindy.murphy@cityofgilroy.org) 2026-09-26 - 8:22:51 PM GMT Document e-signed by Cindy Murphy (cindy.murphy@cityofgilroy.org) Signature Date: 2026-09-26 - 8:23:17 PM GMT - Time Source: server - Signature Appearance Selected: IMAGE Page 88 of 232 Document emailed to Brandon Sanchez (brandon.sanchez@cityofgilroy.org) for signature 2026-09-26 - 8:23:19 PM GMT Email viewed by Brandon Sanchez (brandon.sanchez@cityofgilroy.org) 2026-09-26 - 8:26:30 PM GMT Document e-signed by Brandon Sanchez (brandon.sanchez@cityofgilroy.org) Signature Date: 2026-10-01 - 5:29:35 PM GMT - Time Source: server - Signature Appearance Selected: DRAW Document emailed to Mary Khang (mary.khang@ots.ca.gov) for signature 2026-10-01 - 5:29:37 PM GMT Document e-signed by Mary Khang (mary.khang@ots.ca.gov) Signature Date: 2026-10-01 - 6:37:56 PM GMT - Time Source: server - Signature Appearance Selected: IMAGE Document emailed to Stephanie Dougherty (stephanie.dougherty@ots.ca.gov) for signature 2026-10-01 - 6:37:58 PM GMT Email viewed by Stephanie Dougherty (stephanie.dougherty@ots.ca.gov) 2026-10-01 - 6:38:08 PM GMT Document e-signed by Stephanie Dougherty (stephanie.dougherty@ots.ca.gov) Signature Date: 2026-10-01 - 8:25:47 PM GMT - Time Source: server - Signature Appearance Selected: IMAGE Agreement completed. 2026-10-01 - 8:25:47 PM GMT Page 89 of 232 8.5. City of Gilroy STAFF REPORT Agenda Item Title: Adopt a Resolution Appropriating VRF ITS Cycle 5 Grant Funds to the FY27 Capital Improvement Program Budget and Authorizing the City Administrator to Enter into a Funding Agreement with VTA Meeting Date: November 16, 2026 From: Matt Morley, City Administrator Department: Public Works Submitted by: John Doughty, Public Works Director Prepared by: Julie Oates, Engineer STRATEGIC PLAN GOALS: Maintain and Improve City Infrastructure RECOMMENDATION 1. Adopt a Resolution amending the FY26-27 Budget to appropriate $101,336 of Santa Clara Valley Transportation Authority (VTA) Vehicle Registration Fee (VRF) Intelligent Transportation Systems (ITS) Cycle 5 Grant Program funds to the Transportation/Mobility Grant Fund (Fund 215), and expenditures; and 2. Authorize the City Administrator, or designee, to execute a funding agreement, and any subsequent amendments, with VTA for the receipt of these grant funds on a reimbursement basis. EXECUTIVE SUMMARY City staff recently secured a grant in the amount of $101,336 through the VTA VRF ITS Cycle 5 Grant Program. The grant funding will be used to modernize traffic signal equipment at up to five key intersections along the Tenth Street corridor (from Princevalle Street to Chestnut Street- Automall Parkway). The scope of work includes installing updated traffic signal Page 90 of 232 8.5. controllers, controller software, and conflict monitors to improve safety, reliability, and traffic flow. Additionally, if the project budget permits after competitive bidding, a new video detection system for one intersection will be included in the project scope of work. The location for the new video detection system will be determined based on the City’s needs at the time of contract award. There is no impact to the City's General Fund by accepting the grant and moving forward with the signal improvements. The grant covers 100% of eligible project costs on a reimbursement basis with no local matching funds required. BACKGROUND The VTA administers the VRF ITS program, which funds local technology projects designed to improve traffic flow, enhance safety, and reduce emissions. The City successfully secured $101,336 in grant funds through the VRF ITS Cycle 5 competitive grant process. Approval of this item will add these grant funds to the existing CIP Project 800410 (Citywide Traffic Signal Upgrades) to modernize aging infrastructure along Tenth Street, a critical commercial and commuter arterial corridor. The project will deploy advanced traffic technology at up to five key intersections along Tenth Street, from Princevalle Street to Chestnut Street-Automall Parkway. The planned scope of work of the project includes: • Traffic Signal Controllers & Software: Replacing older equipment with modern, high- performance controllers and updated software to optimize signal timing, reduce vehicle idling, and improve overall traffic flow. • Conflict Monitors: Installing upgraded conflict monitors at all five intersections to enhance intersection safety by preventing conflicting signal indications (such as accidental simultaneous green lights). • Video Detection System: If the competitive bidding process and overall budget allow, a modern video detection system will be installed at one intersection. The location for the new video detection system will be determined based on the City’s needs at the time of contract award. Emergency vehicle preemption is currently installed on two or more approaches at all five project intersections. The project does not include installation of additional emergency vehicle preemption or transit signal priority equipment. Transit signal priority equipment is proposed to be installed along the VTA Rapid 568 and Route 68 bus routes along Monterey Road under a separate project. By integrating these funds into CIP Project 800410, the City can maximize its traffic management capabilities along the Tenth Street corridor without any impact on the City’s General Fund. Page 91 of 232 8.5. ANALYSIS The proposed project targets Tenth Street, one of the City’s critical commercial and commuter arterials. The current traffic signal equipment at the five designated intersections is approaching the end of its useful life. Aging hardware increases the risk of component failures, which can lead to unexpected signal blackouts or all-way flashing red scenarios that disrupt traffic and require emergency maintenance responses. Installing modern traffic signal equipment improves operational reliability. If bids are favorable, a modern video detection system will be installed at one intersection. This technology allows the traffic signal to dynamically adjust its timing based on real-time vehicle arrivals, improving intersection efficiency. Utilizing external grant funds furthers the City's goals of maintaining safe and sustainable infrastructure. By adding the $101,336 in VTA VRF ITS Cycle 5 funds to CIP Project 800410 (Citywide Traffic Signal Upgrades), the City leverages regional revenue to complete necessary capital maintenance. This preserves local gas tax and General Fund revenues for other critical, non-grant-eligible infrastructure needs throughout the community. ALTERNATIVES The City Council could decline to adopt the resolution and reject the grant funding. If the Council chooses this alternative, the City will not receive the $101,336 from VTA. Consequently, the traffic signal upgrades along the Tenth Street corridor will either remain unfunded or will require future funding from local gas tax or VRF revenues. Staff does not recommend this option as it forfeits external regional grant funds earmarked for local infrastructure improvement. FISCAL IMPACT/FUNDING SOURCE The VTA VRF ITS Cycle 5 Grant Program will provide reimbursement to fund the project. There is no impact to the City’s General Fund, as this project requires no local matching funds. The Transportation/Mobility Grant Fund (Fund 215) will be used to pay for eligible project expenses. Staff will subsequently invoice VTA for full reimbursement (up to the grant maximum of $101,336). PUBLIC OUTREACH N/A Page 92 of 232 8.5. NEXT STEPS Following City Council approval of the resolution, staff will coordinate with VTA to execute the funding agreement, develop the project construction documents, and proceed with the competitive bidding process. The project is expected to be completed in summer 2027. Attachments: 1. Resolution 2. Draft Funding Agreement VRF ITS -26VRF07 Page 93 of 232 RESOLUTION NO. 2026-XX A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GILROY AMENDING THE BUDGET FOR FISCAL YEAR 2026-27 TO APPROPRIATE VRF ITS CYCLE 5 GRANT FUNDS TO THE TRANSPORTATION/ MOBILITY GRANT FUND (FUND 215) AND FOR THE CITYWIDE TRAFFIC SIGNAL UPGRADES PROJECT, AND APPROPRIATE THE PROPOSED EXPENDITURE AMENDMENTS WHEREAS, the City Council adopted the Fiscal Year 2026-27 Budget for the City of Gilroy; and WHEREAS, the Santa Clara Valley Transportation Authority (VTA) administers the Vehicle Registration Fee (VRF) Intelligent Transportation Systems (ITS) Program funded through the regional portion of the Santa Clara County voter-approved Measure B, which levies a $10 annual vehicle registration fee on motor vehicles owned/registered by county residents; and WHEREAS, the City of Gilroy was awarded $101,336 in VRF ITS Cycle 5 grant funds to modernize traffic signal equipment along the Tenth Street corridor from Princevalle Street to Chestnut St/Automall Parkway; and WHEREAS, the VRF ITS Cycle 5 grant will provide reimbursement funding for eligible project costs in an amount not to exceed $101,336 and does not require a local match; and WHEREAS, the grant amount of $101,336 was not included in the adopted Fiscal Year 2026-27 Budget for CIP Project 800410, Citywide Traffic Signal Upgrades; and WHEREAS, appropriating the grant funds will allow the City to proceed with traffic signal equipment upgrades along the Tenth Street corridor. NOW, THEREFORE, IT IS HEREBY RESOLVED, by the City Council of the City of Gilroy, as follows: 1. The revenue and expenditure appropriations in the Transportation/Mobility Grant Fund (Fund 215) are hereby increased by $101,3336 for Fiscal Year 2026-27, and 2. The City Administrator, or designee, is authorized to execute a funding agreement, and any subsequent amendments, with the Santa Clara Valley Transportation Authority for the receipt of these grant funds on a reimbursement basis. PASSED AND ADOPTED this 16th day of November 2026, by the following roll call vote: Page 94 of 232 Resolution No. 2026-XX Budget Amendment for the Tenth Street Corridor Traffic Signal Upgrades Project City Council Regular Meeting | November 16, 2026 Page 2 of 3 AYES: COUNCIL MEMBERS: NOES: COUNCIL MEMBERS: ABSTAIN: COUNCIL MEMBERS: ABSENT: COUNCIL MEMBERS: APPROVED: ___________________ Greg Bozzo, Mayor ATTEST: _______________________ Kim Mancera, City Clerk Page 95 of 232 Resolution No. 2026-XX Budget Amendment for the Tenth Street Corridor Traffic Signal Upgrades Project City Council Regular Meeting | November 16, 2026 Page 3 of 3 CERTIFICATE OF THE CLERK I, KIM MANCERA, City Clerk of the City of Gilroy, do hereby certify that the attached Resolution No. 2026-XX is an original resolution, or true and correct copy of a City Resolution, duly adopted by the Council of the City of Gilroy at a Regular Meeting of said Council held on Monday, November 16, 2026, with a quorum present. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the Official Seal of the City of Gilroy this Tuesday, November 17, 2026. ____________________________________ Kim Mancera City Clerk of the City of Gilroy Page 96 of 232 Page 1 of 18 FUNDING AGREEMENT BETWEEN THE CITY OF GILROY AND THE SANTA CLARA VALLEY TRANSPORTATION AUTHORITY FOR 2010 MEASURE B VEHICLE REGISTRATION FEE COUNTYWIDE PROGRAM This Agreement (“Funding Agreement”) between the City of Gilroy, a California municipal corporation, (“City”), and the SANTA CLARA VALLEY TRANSPORTATION AUTHORITY, a California special district, ("VTA") is made as of the date of final execution by each party hereto. I. Recitals A. Whereas, in November of 2010, the voters of Santa Clara County authorized a TEN DOLLAR ($10) increase in the Vehicle Registration Fee (“VRF”), referred to hereinafter as the “Program,” for transportation-related projects and adopted an expenditure plan which allocates the revenue to transportation-related programs and projects that have a relationship or benefit to the persons who pay the fee; and B. Whereas, the VTA Board of Directors has adopted administrative procedures for the Program; and C. Whereas, these administrative procedures state that VTA will execute program funding agreements with project sponsors; and D. Whereas, the Program includes a “Countywide Program” that includes Intelligent Transportation System (“ITS”) technologies as an eligible project category; and E. Whereas, on May 7, 2026, the VTA Board approved VRF ITS funds for the Santa Teresa & Tenth Traffic Signal Upgrades project (“Project”); and F. Whereas, each party hereto (“Party”) desires to specify the terms and conditions under which VRF- ITS project grants are conducted and financed. NOW, THEREFORE, in consideration of the mutual promises contained herein, each Party (collectively referred to as the “Parties”) agrees as follows: Page 97 of 232 Page 2 of 18 II. Agreement A. Project Description The proposed project will upgrade traffic signal equipment along one of the City’s highest volume arterials: 1. 5 intersections along Tenth Street (between Princevalle Street and Chestnut Street- Automall Parkway). The improvements will include upgrades to traffic signal controllers, conflict monitors, software packages, and one video detection system (as a bid alternate if budget allows). The Project details are attached hereto as Exhibit A. B. Term of Agreement The term of this Funding Agreement shall be deemed to have commenced retroactively as of May 9, 2026 and shall continue until the earlier of: (i) the date that the Project is completed or terminated; or (ii) the close of business on December 31, 2028. Any requests for additional time to complete Project beyond December 31, 2028 must be submitted in writing to VTA no later than October 1, 2028 and document that significant progress has been made on the Project. VTA may approve or deny such requests in its sole discretion. Documentation by VTA approving any extensions for the Project shall be sufficient approval to extend the term of this Agreement. C. Grant of VRF Funds VTA hereby agrees to allocate to City, a grant (“Grant”) in an amount not to exceed $101,336 (“Maximum Grant Amount”). Said Grant is provided to City in return for City’s agreement to implement the Project. D. Reimbursement 1. VTA will reimburse City in the amount of: (i) Eligible Costs, as defined in Paragraph E.1., submitted to VTA; or (ii) the Maximum Grant Amount, whichever is less. VTA will reimburse City based on receipt of invoices showing Eligible Costs incurred and paid by City. VTA will not reimburse City for any costs that are not Eligible Costs. Page 98 of 232 Page 3 of 18 2. If this Agreement is terminated, as set forth in Paragraph O, VTA will not be responsible for reimbursing any costs or expenses City incurs after the effective date of termination. E. Eligible Use of Funds 1. Eligible Costs. VTA will only reimburse City for actual costs directly related to performance of the Project. For purposes of this Agreement, “Eligible Costs” are shown in Table 1 of Attachment A. No other expenses will be subject to reimbursement as Eligible Costs without the prior written approval of VTA. 2. Ineligible Costs. Ineligible costs are costs not specifically identified as “Eligible Costs.” Specific “Ineligible Costs” include, but are not limited to, the following: a. Expenses for organizational functions excepting those described as “indirect costs” above, businesses services, and information technology including, but not limited to telephone charges, computer costs, CAD machine charges, in- house copying charges, and facsimile charges will not be reimbursed as other direct costs; b. Travel upgrades, fines, memberships, loss of personal property or cash, alcohol, “no shows,” or personal itinerary changes. 3. If the City is unsure about the eligibility of a cost, then the City must seek and obtain written VTA approval of the cost before the City incurs it. Failure to obtain VTA’s prior approval of potentially ineligible costs may result in non-reimbursement of the cost. F. Invoicing to VTA. 1. City must submit invoices to VTA.AccountsPayable@vta.org for reimbursement of work completed on the Project. Invoices may not be submitted more frequently than monthly and must be submitted within one year of City incurring the cost(s). 2. All invoices must follow VTA invoice template and detail: a. Project name and ID; b. Eligible Costs actually incurred and paid by City; c. Total reimbursement amount (in dollars) requested; d. Total amount reimbursed by VTA to date; Page 99 of 232 Page 4 of 18 e. Summary of activities being reimbursed during the relevant billing cycle; and f. all records, including staff hours, contractors’ invoices, miscellaneous invoices, force account charges, and any other documentation requested by VTA. 3. VTA will remit the amount due to City within 30 calendar days of receipt of a complete, fully documented (time sheets, bills, etc.) invoice. G. Return of Funds. In the event that VTA reimburses costs that it later learns are not Eligible Costs, City must, no later than fifteen (15) business days after receipt of written notice thereof from VTA, return the full amount of the funding received for such costs to VTA. The provisions set forth in this Paragraph G will survive the termination or expiration of this Agreement. H. City’s Responsibilities. 1. Implementing Agency Tasks. City will be the sponsor and implementing agency for the Project. In its role as sponsor and implementing agency under this Agreement, City must perform the following tasks: a. Procure professional services, as needed, for the Project including, but not limited to, the following activities: advertising the work via a public solicitation, opening bids in response to the public solicitation, awarding a contract, approving contract documents, and administering the awarded contract in accordance with all applicable laws, regulations, and codes including, but not limited to, the California Public Contract Code and the California Labor Code; b. Obtaining all necessary permits for performance of the Project, as applicable; c. Performing community engagement activities for the Project, as applicable; d. Make staff available to present on the Project at VTA committee meetings, as needed; and e. Conducting standard close-out activities for the Project including, but not limited to, performing final accounting review and reviewing all contractual requirements. Page 100 of 232 Page 5 of 18 2. Other Project Management Duties. City must also perform the following duties: a. Actively monitor actual Project expenditures to ensure that the funds are used to reimburse Eligible Costs only; b. Provide VTA with written bi-annual progress reports including, but not limited to, updates on Project expenditures, any changes in schedule, and Project status in a format previously provided by VTA to City. Reports are due from City to VTA no later than April 15 and October 15 of each year as a condition of receiving funds. Each report shall cover activities and expenditures incurred through March 31 (for the April 15 report) and September 30 (for the October 15 report); and c. Provide VTA copies of Project deliverables including, but not limited to, reports, designs, drawings, plans, specifications, schedules, and other materials, as requested. I. Indemnification. Neither VTA nor any officer or employee thereof will be responsible for any damage or liability arising out of or relating to City’s negligence, recklessness, or willful misconduct under or in connection with any work, authority, or jurisdiction associated with the Agreement. City shall immediately and fully indemnify and hold VTA harmless from any liability imposed for injury (as defined by Government Code §810.8) arising out of or relating to City’s negligence, recklessness, or willful misconduct under or in connection with any work, authority or jurisdiction delegated to City under this Agreement. Neither City nor any officer or employee thereof will be responsible for any damage or liability arising out of or relating to VTA’s negligence, recklessness, or willful misconduct under or in connection with any work, authority, or jurisdiction associated with the Agreement. VTA shall immediately and fully indemnify and hold City harmless from any liability imposed for injury (as defined by Government Code §810.8) arising out of or relating to VTA’s negligence, recklessness, or willful misconduct under or in connection with any work, authority, or jurisdiction delegated to VTA under this Agreement. These provisions shall survive the termination of this Agreement. J. Insurance. At all times during this Agreement, City must comply with the insurance requirements and specifications of the attached Attachment B, Insurance Requirements. City may, in its discretion, elect to self-insure, but any such self-insurance must meet the requirements and specifications in Attachment B. Page 101 of 232 Page 6 of 18 K. Additional Insured and Indemnity Provision. In any agreement executed between the City and a third party for purposes related in any way to the subject matter of this Agreement (“Third Party Contract”), City must require that VTA be named as (i) an additional insured on a primary and non-contributory basis with separation of insureds and waiver of subrogation on all policies of insurance, except when not applicable and (ii) an indemnified party in any indemnity provision contained in the Third Party Contract. Third Party Contracts must contain insurance requirements with coverages at least as broad as, and limits at least as great as, the requirements of Attachment B. L. Public Works. If City awards a contract to a third party for the performance of a public work, as defined in California Labor Code Sections 1720 through 1720.6 (“Public Works Contract”), in connection with this Agreement, City must comply, and must require such third party to comply, with the requirements of California Labor Code Sections 1720 et seq. If the Public Works Contract is funded in whole or in part with federal funds, City must also comply, and must require such third party to also comply, with the requirements of the Davis Bacon Act (40 U.S.C. Sections 3141-3144 and 3146-3148). M. Compliance with Applicable Law. In the execution of the Project and performance of its responsibilities under this Agreement, City must comply with all applicable requirements of local, state, and federal laws. N. Audit and Records. 1. City must maintain, and must require their contractors to maintain, in accordance with generally accepted accounting principles and practices, complete books, accounts, records, and data pertaining to services performed under this Agreement, including the costs of contract administration. Such documentation must be supported by properly executed payrolls, invoices, contracts, and vouchers evidencing in detail the nature and propriety of any charges and must be sufficient to allow a proper audit of services. All checks, payrolls, invoices, contracts, and other accounting documents pertaining in whole or in part to the services must be clearly identified and readily accessible. 2. For the duration of the Agreement, and for a period of five years after final payment, VTA and its representatives must have access during normal business hours to any books, accounts, records, data, and other relevant documents (“Records”) of the City that are pertinent to this Agreement for audits, examinations, excerpts, and transactions. The other Party must furnish copies of the Records upon request. Page 102 of 232 Page 7 of 18 3. VTA, at its discretion, may perform audits of the Project and related Records upon providing at least 30 calendar days’ written notice to City. O. Notices / Authorized Representatives. 1. Notices must be in writing and addressed to the other Party’s Authorized Representative (“Recipient”) and will be deemed delivered or received on the date personally delivered to the Recipient or when deposited by registered or certified mail with postage and charges prepaid. 2. The Parties Authorized Representatives are as follows: VTA: Marcella Rensi Deputy Director, Grants Santa Clara Valley Transportation Authority 3331 N First Street San Jose, CA 95134 Email: marcella.rensi@vta.org City: Nisha Patel, PE City Engineer City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 Email: nisha.patel@cityofgilroy.org 3. Written notification to the other Party must be provided, in advance, for changes in the name or address of an Authorized Representative stated above. P. General Terms and Conditions. 1. Headings. The subject headings of the articles and paragraphs in this Agreement are included for convenience only and will not affect the construction or interpretation of any of its provisions. 2. Incorporation of Exhibits and Attachments. All exhibits and attachments referenced in this Contract are incorporated into it by this reference. Page 103 of 232 Page 8 of 18 3. Construction and Interpretation of Agreement. The Parties hereto acknowledge and agree that, although this Agreement was originally drafted by VTA’s legal counsel, City and its legal counsel have reviewed and negotiated the terms of this Agreement with the VTA. Accordingly, each Party expressly acknowledges and agrees that (i) this Agreement will not be deemed to have been authored, prepared, or drafted by any particular Party and (ii) the rule of construction to the effect that ambiguities are to be resolved against the drafting party will not be employed in the interpretation of this Agreement or in the resolution of disputes. 4. Amendment. Except as expressly provided in this Agreement, including but not limited to extending the Project Term as specified in Paragraph B, its provisions cannot be altered, modified, or amended except through the execution of a written amendment executed by the Parties. 5. Entire Agreement. This Agreement constitutes the entire agreement between the Parties relating to the subject matter and supersedes all prior negotiations, contracts, agreements, or understandings, whether oral or written, of the Parties regarding the subject matter. 6. No Waiver. The failure of either Party to insist upon the strict performance of any of the terms, covenants, or conditions of this Agreement will not be deemed a waiver of (i) any right or remedy that either Party may have or (ii) either Party’s right to require strict performance of all of the terms, covenants, and conditions of this Agreement. 7. Dispute Resolution. a. If a question or allegation arises regarding (i) interpretation of this Agreement or its performance, or (ii) the alleged failure of a Party to perform, the Party raising the question or making the allegation must give written notice thereof to the other Party. The Parties must promptly meet in an effort to resolve the issues raised. If the Parties fail to resolve the issues raised, alternative forms of dispute resolution, including mediation, may be pursued by mutual agreement. It is the intent of the Parties to the greatest extent possible to avoid litigation as a method of dispute resolution. b. Notwithstanding the foregoing, nothing in this Paragraph II.P.7 will be deemed to prevent a Party from filing suit or an administrative action to preserve its right to assert a claim within any applicable statute of limitations. To the extent practicable, the Parties will negotiate in good faith to create a tolling agreement to toll such statute(s) of limitations to allow for the Parties to engage in dispute resolution provisions of this Agreement prior to the filing of such actions. 8. Severability. If any provisions of this Agreement (or portions or applications of it) are held to be unenforceable or invalid by any court of competent jurisdiction, (a) the Parties will Page 104 of 232 Page 9 of 18 negotiate in good faith to make an equitable adjustment to the Agreement provisions with a view toward effecting the Agreement’s purpose, and (b) the remaining provisions (or portions or applications of them) will remain valid and enforceable. 9. Governing Law. The laws of the State of California will govern this Agreement and any claim that might arise between City and VTA without regard to conflict of law provisions. 10. Venue. Any lawsuit or legal action arising from this Agreement must be commenced and prosecuted in the courts of Santa Clara County, California. City agrees to submit to the personal jurisdiction of the courts located in Santa Clara County, California for the purpose of litigating all such claims. 11. Ownership of Work. All reports, designs, drawings, plans, specifications, schedules, studies, memoranda, and other documents assembled for or prepared by or for the City relative to the Project are the sole property of the City unless otherwise agreed upon by the City. 12. Attribution to VTA. City must include attribution to VTA that indicates part of the work was funded by VTA on all signage, electronic or printed materials related to the Project that are distributed to the public. VTA will provide a copy of VTA logos to City for this purpose. 13. Non-discrimination. The Parties and any contractors performing services on behalf of the Parties (“Contractors”) will not unlawfully discriminate or permit discrimination, harass, or allow harassment against any person or group of persons because of race, color, religious creed, national origin, ancestry, age (over 40), sex, gender, gender identity, gender expression, sexual orientation, marital status, pregnancy, childbirth or related conditions, medical condition (including cancer), mental disability, physical disability (including HIV and AIDS), genetic information, or military and veteran’s status, or in any manner prohibited by federal, state, or local laws. In addition, the Parties and Contractors must not unlawfully deny any of their employees family care leave or discriminate against such employees on the basis of having to use family care leave. The Parties and Contractors must ensure that the evaluation and treatment of their employees and applicants for employment is free of such discrimination and harassment. 14. Public Records. The Parties recognize and acknowledge that each Party is subject to the California Public Records Act, California Government Code Section 7920 et seq. Public Records are subject to disclosure. 15. Relationship of the Parties. It is understood that this is an Agreement by and between independent parties and does not create the relationship of agent, servant, employee, partnership, joint venture or association, or any other relationship other than that of independent contractor. Page 105 of 232 Page 10 of 18 16. Counterparts; Electronic Signatures. This Agreement may be executed in one or more counterparts, each of which will be deemed an original but all of which will constitute one and the same instrument. Unless otherwise prohibited by law, VTA policy, or City ordinance or policy, the Parties agree that an electronic copy of a signed contract, or an electronically signed contract, has the same force and legal effect as a contract executed with an original ink signature. The term “electronic copy of a signed contract” refers to a writing as set forth in Evidence Code Section 1550. The term “electronically signed contract” means a contract that is executed by applying an electronic signature using technology approved by each of the Parties. 17. Authority to Execute Agreement. Each Party to this Agreement represents and warrants that each person whose signature appears below is authorized and has the full authority to execute this Agreement on behalf of the entity that is a Party to this Agreement. Page 106 of 232 Page 11 of 18 The Parties have caused their undersigned, duly authorized signatories to execute this Agreement on the dates set forth below. Santa Clara Valley Transportation Authority City Carolyn M. Gonot General Manager/CEO Matt Morley City Administrator Date Date Approved as to Form: Approved as to Form: Yue-Han Chow Senior Assistant Counsel Andy Faber City Attorney Date Date Page 107 of 232 Page 12 of 18 ATTACHMENT A VRF Countywide Program Fund Project Elements & Costs The project will provide the following new traffic signal equipment: 1. 5 each McCain 2070LX traffic signal controllers. 2. 5 each McCain 2033 software packages. 3. 5 each EDI 2010 conflict monitors. 4. 1 each Flir Traficon video detection system (as a bid alternate if budget allows). Tasks to complete the project include: 1. Field verification of existing traffic signal equipment. 2. Preparation of bid documents and advertising for bids. 3. Pre-Bid Meeting/Site Walk. 4. Evaluating bids. 5. Preparing staff report and presenting project to City Council to award contract. 6. Issuance of Notice to Proceed for construction. 7. Reviewing and approving equipment submittals. 8. Equipment procurement. 9. Construction/installation of new equipment. 10. Testing and acceptance. 11. Project closeout, warranties, manuals, license documentation, etc. 12. Submitting final report to VTA. 13. Prepare and present staff report for acceptance by City Council. Description Cost Mobilization $5,636.00 Controller, Software, CMU $60,000.00 Video Detection System $27,000.00 Contingency $8,700.00 Total $101,336.00 Page 108 of 232 Page 13 of 18 Project Corridor Tenth Street from Princevalle Street to Chestnut Street/Automall Parkway Page 109 of 232 Page 14 of 18 Attachment B INSURANCE REQUIREMENTS ATTENTION IS DIRECTED TO THE INSURANCE REQUIREMENTS BELOW. IT IS HIGHLY RECOMMENDED THAT THE CITY CONFER WITH THEIR INSURANCE CARRIERS OR BROKERS TO DETERMINE THE AVAILABILITY OF INSURANCE CERTIFICATES AND ENDORSEMENTS REQUIRED BY THIS AGREEMENT. INSURANCE (Required for ALL agreements) Without limiting City’s indemnification and defense of claims obligations to VTA, City must procure and maintain for the duration of the Agreement insurance against claims for injuries to persons or damages to property which may arise under or in connection with any work, authority, or jurisdiction associated with the Agreement. The cost of such insurance must be borne by City. City must furnish complete copies of all insurance policies within three (3) business days of any request for such by VTA. A. MINIMUM SCOPE OF INSURANCE Coverage must be at least as broad as: 1. Insurance Services Office General Liability coverage (“occurrence” form CG 0001). General Liability insurance written on a “claims made” basis is not acceptable. 2. Business Auto Coverage, Insurance Services Office form number CA 0001, covering Automobile Liability, code 1 “any auto.” Auto Liability written on a “claims-made” basis is not acceptable. 3. Workers’ Compensation insurance as required by the Labor Code of the State of California and Employer’s Liability insurance. B. MINIMUM LIMITS OF INSURANCE a. City must maintain limits no less than: 1. General Liability: $1,000,000 limit per occurrence for bodily injury, personal injury, and property damage. If General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit must apply separately to this project/location or the general aggregate limit must be twice the required occurrence limit. 2. Automobile Liability (including umbrella/excess liability): $1,000,000 limit per accident for bodily injury and property damage. Page 110 of 232 Page 15 of 18 3. Workers’ Compensation and Employer’s Liability: Workers’ compensation limits as required by the Labor Code of the State of California and Employer’s Liability limits of $1,000,000 per accident. 4. Notwithstanding any language in this Lease to the contrary, if City carries insurance limits exceeding the minima stated in Paragraph B(a)(1)-(3) immediately above, such greater limits will apply to this Agreement. C. SELF-INSURED RETENTION The certificate of insurance must disclose the actual amount of any deductible or self-insured retention, or lack thereof, for all coverages required herein. Any self-insured retention or deductible in excess of $50,000 ($100,000 if City is a publicly-traded company) must be declared to and approved by VTA. If City is a governmental authority such as a state, municipality or special district, self-insurance is permitted. To apply for approval for a level of retention or deductible in excess of $50,000, City must provide a current financial report including balance sheets and income statements for the past three years, so that VTA can assess City’s ability to pay claims falling within the self-insured retention or deductible. Upon review of the financial report, if deemed necessary by VTA in its sole discretion, VTA may elect one of the following options: to accept the existing self-insured retention or deductible; require the insurer to reduce or eliminate the self-insured retention or deductible as respects VTA, its directors, officers, officials, employees and volunteers; or to require City to procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses. Applicable costs resulting therefrom will be borne solely by City. City may request execution of a nondisclosure agreement prior to submission of financial reports. D. CLAIMS MADE PROVISIONS (NOT APPLICABLE TO GENERAL LIABILITY OR AUTO LIABILITY) Claims-made coverage is never acceptable for General Liability or Auto Liability. Claims-made may be considered for Professional, Environmental/Pollution, or Cyber Liability. If coverage is written on a claims-made basis, the Certificate of Insurance must clearly state so. In addition to all other coverage requirements, such policy must comply with the following: 1. The policy retroactive date must be no later than the date of this Agreement. 2. If any policy is not renewed or the retroactive date of such policy is to be changed, City must obtain or cause to be obtained the broadest extended reporting period coverage available in the commercial insurance market. This extended reporting provision must cover at least two (2) years. 3. No prior acts exclusion may be added to the policy during the Agreement period. Page 111 of 232 Page 16 of 18 4. The policy must allow for reporting of circumstances or incidents that might give rise to future claims. E. OTHER INSURANCE PROVISIONS The policies must contain, or be endorsed to contain, the following provisions: 1. General Liability and Automobile Liability a. VTA, its directors, officers, officials, employees, and volunteers must be named as additional insureds as respects: liability arising out of City’s performance under this Agreement. The coverage must contain no special limitations on the scope of protection afforded to VTA, its directors, officers, officials, employees, or volunteers. Additional Insured endorsements must provide coverage at least as broad as afforded by the combination of ISO CG 20 10 10 01 and CG 20 37 10 01. b. Any failure to comply with reporting provisions of the policies may not affect coverage provided to VTA, its directors, officers, officials, employees, or volunteers. c. Coverage must state that Lessee’s insurance applies separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability. d. The General Liability General Aggregate limit must apply per project, not per policy. e. The General Liability policy must be endorsed to remove the exclusion for railroad liabilities, with coverage at least as broad as afforded by ISO CG 24 17. 2. All Coverages a. City must agree to waive all rights of subrogation against VTA, its directors, officers, officials, employees, and volunteers for losses arising under or in connection with any work, authority, or jurisdiction associated with the Agreement. b. City’s insurance coverage must be primary insurance as respects VTA, its directors, officers, officials, employees, and volunteers. Self-insurance or insurance that may be maintained by VTA, its directors, officers, officials, employees, or volunteers may apply only as excess to City’s insurance. City’s insurance must not seek contribution from VTA’s insurance program. Page 112 of 232 Page 17 of 18 3. Other Insurance Provisions a. The Certificate must disclose the actual amount of the Deductible or Self-Insured Retention. b. If any coverage forms or endorsements required by this Agreement are updated by their publishers, whether they be the insurance carrier(s), the Insurance Services office, or the American Association of Insurance Services, during the duration of this Agreement, VTA reserves the rights to require City to procure said coverage forms or endorsements using the updated versions upon the next renewal cycle. F. ACCEPTABILITY OF INSURERS Insurance must be placed with insurers with an A.M. Best’s rating of no less than A VII (financial strength rating of no less than A and financial size category of no less than VII), unless specific prior written approval has been granted by VTA. G. CERTIFICATES OF INSURANCE City must furnish VTA with a Certificate of Insurance. The certificates for each insurance policy must be signed by an authorized representative of that insurer. The certificates must be issued on a standard ACORD Form. City must instruct their insurance broker/agent to submit all insurance certificates and required notices electronically in PDF format to real.estate@vta.org. All endorsements must be attached to the ACORD certificate in a single PDF document. The certificates must (1) identify the insurers, the types of insurance, the insurance limits, the deductibles, and the policy term, (2) include copies of all the actual policy endorsements required herein, and (3) in the “Certificate Holder” box include: Santa Clara Valley Transportation Authority (“VTA”) 3331 North First Street San Jose, CA 95134-1906 In the Description of Operations/Locations/Vehicles/Special Items Box, the VTA property leased must appear, the list of policies scheduled as underlying on the Umbrella/Excess policy must be listed, Certificate Holder must be named as additional insured, and Waiver of Subrogation must be indicated as endorsed to all policies as stated in the Agreement documents. It is a condition precedent to granting of this Agreement that all insurance certificates and endorsements be received and approved by VTA before Agreement execution. No occupancy may be taken until insurance is in full compliance. VTA reserves the rights to require complete, certified copies of all required insurance policies, at any time. Page 113 of 232 Page 18 of 18 If City receives notice that any of the insurance policies required by this Exhibit may be cancelled or coverage reduced for any reason whatsoever, City must immediately provide written notice to VTA that such insurance policy required by this Exhibit is canceled or coverage is reduced. H. MAINTENANCE OF INSURANCE If City fails to maintain insurance as required herein, VTA, at its option, may suspend the Agreement until a new policy of insurance is in effect. Page 114 of 232 8.6. City of Gilroy STAFF REPORT Agenda Item Title: Adopt the Ordinance Amending Municipal Code Chapter 27, Water, Article VI (Water Supply Shortage Regulations) and Chapter 30, Zoning Ordinance, Article XXXVIII (Landscaping, Water Efficiency and Storm Water Retention and Treatment) to Prohibit the Use of Potable Water for Irrigating Non- Functional Turf As Required by Assembly Bill 1572 Meeting Date: November 16, 2026 From: Matt Morley, City Administrator Department: Utilities Submitted by: Derek Cray, Utilities Director Prepared by: Izabela Cirloganu, Sr. Management Analyst STRATEGIC PLAN GOALS: Maintain and Improve City Infrastructure RECOMMENDATION 1. Adopt the ordinance amending Chapters 27 and 30 of the Gilroy Municipal Code to comply with Assembly Bill 1572. 2. Staff to provide outreach and defer enforcement until such time the City Council directs enforcement to begin. EXECUTIVE SUMMARY The proposed ordinance amends Chapters 27 and 30 of the Gilroy Municipal Code to align with AB 1572 by incorporating the State’s definitions and phased compliance deadlines for prohibiting potable water irrigation of nonfunctional turf, beginning January 1, 2027. The amendments also extend existing enforcement provisions to apply year-round, establish requirements for new, rehabilitated, and existing landscapes, transfer Page 115 of 232 8.6. administrative authority from the Public Works Director to the Utilities Director, and extend prohibited watering hours from 9:00 a.m. to 6:00 p.m. to align with Valley Water’s schedule. Staff will rely solely on educational outreach on AB1572 requirements to achieve compliance. BACKGROUND On October 13, 2023, the Governor signed Assembly Bill (AB) 1572 into law, adding Section 10608.14 to the California Water Code. AB 1572 establishes a permanent statewide prohibition on using potable water to irrigate non-functional turf at government, local agency, commercial, industrial, and institutional properties, as well as common areas and Homeowners Associations (HOAs). The law sets phased compliance deadlines beginning January 1, 2027. The state mandate exempts single-family homes and certain non-functional uses, such as cemeteries. The ban does not apply to using potable water to irrigate trees, shrubs, or perennials, and it does not restrict the use of recycled water. At the November 2 Council Meeting, Utilities staff introduced the ordinance amending Chapter 27, Water, Article VI (Water Supply Shortage Regulations) and Chapter 30, Zoning, Article XXXVIII (Landscaping, Water Efficiency, and Storm Water Retention and Treatment) of Gilroy’s Municipal Code to align with state-mandated regulations under AB 1572. During the staff report presentation, staff added language to Chapter 30, Article XXXVIII, Sections 60(k), 70(j), and 120(b)(1)(h), replacing “should” with “shall” to establish mandatory requirements. ANALYSIS AB 1572 requires that urban water suppliers, including the City of Gilroy, revise their ordinances or policies governing water service to prohibit irrigation of nonfunctional turf on CII properties and on common areas of homeowners’ associations, common interest developments, and community service organizations or similar entities, with exceptions for cemeteries, and as needed to ensure the health of trees and other perennial non-turf plantings Under AB 1572, nonfunctional turf is defined as grass that serves no practical purpose for human activity or recreation. This includes, but is not limited to, ornamental grass strips along roadways (streetscapes), expansive lawns at corporate parks, unused patches of grass in front of commercial buildings, and similar areas not regularly used for sports, play, or social gatherings. AB 1572 applies to government and CII properties and does not affect single-family homes. Page 116 of 232 8.6. AB 1572 sets specific compliance dates for prohibiting irrigation of nonfunctional turf with potable water as follows: • January 1, 2027: The water supplier (City) must submit a copy of their ordinance or policy governing water service that shows the supplier’s compliance with Water Code Section 10608.14 as part of their Urban Water Objective Annual Reporting. • January 1, 2027: State and most local government/public agency properties. • January 1, 2028: All commercial, industrial, and remaining institutional properties. • January 1, 2029: Homeowners’ associations, common interest developments, and community service organizations (common areas). • January 1, 2031 (or on the date upon which state funding is made available): Public agency properties in disadvantaged communities. ALTERNATIVES The City Council may adopt the ordinance as presented or decline to adopt it. Failure to adopt the ordinance would leave the City without the Municipal Code amendments necessary to comply with AB 1572 by the January 1, 2027, deadline, potentially exposing the City to penalties and jeopardizing its eligibility for future state loans, grants, and other funding opportunities. FISCAL IMPACT/FUNDING SOURCE The amendment to the ordinance will have a small amount of expenses to perform outreach to the City’s customers per the requirements of AB 1572. Further expenditures beyond outreach are expected to be minimal, and staff will evaluate any future fiscal impacts as necessary during future budget adoptions. PUBLIC OUTREACH After adopting the ordinance, the Utilities Department plans to develop an AB 1572 Outreach Plan. The plan will focus on informing commercial, industrial, and institutional (CII) customers about AB 1572 requirements, providing educational resources, and helping property owners make informed decisions about nonfunctional turf and water- efficient landscaping alternatives. NEXT STEPS Following adoption, the ordinance will take effect 30 days later. Utilities staff will submit the ordinance as part of the annual Water Use Objective Report due on Dec 31st, Page 117 of 232 8.6. 2026. Attachments: 1. Chapter 27, Article 6_Redlined 2. Chapter 30, Article 28_Redlined 3. Ordinance No2026_xxx_NoRedline Page 118 of 232 Bold Text = Proposed Additions Struck Text= Proposed Deletions Plain text = Existing Code Proposed Title: Ordinance of the City Council of the City of Gilroy amending Chapter 27, Article VI, “Water Supply Shortage Regulations” and Chapter 30, Article XXXVIII, “Landscaping, Water Efficiency, and Storm Water Retention and Treatment” to prohibit the use of potable water for the irrigation of nonfunctional turf in compliance with AB 1572. ARTICLE VI WATER SUPPLY SHORTAGE REGULATIONS § 27.95. Findings. (a) A reliable minimum supply of potable water is essential to the public health, safety and welfare of the people and economy of the city. (b) The city is located in a semi-arid region and is dependent upon local surface water, groundwater, and imported water supplies. A growing population, climate change, environmental concerns, and other factors in other parts of the state and western United States make the region highly susceptible to water supply reliability issues. (c) There is a need for water conservation and regulations because there is a limited supply of water available to serve the residents and businesses of the city. (d) Careful water management that includes water conservation measures to ensure a reliable minimum supply of water to meet current and future water supply needs. (e) Article X, Section 2 of the California Constitution declares that the general welfare requires that water resources be put to beneficial use, waste or unreasonable use or unreasonable method of use of water be prevented, and conservation of water be fully exercised with a view to the reasonable and beneficial use thereof. (f) Article XI, Section 7 of the California Constitution declares that a city or county may make and enforce within its limits all local, police, sanitary and other ordinances and regulations not in conflict with general laws. (g) California Water Code Section 375 et seq. authorizes water suppliers to adopt and enforce a comprehensive water conservation program to reduce water consumption and conserve supplies. (h) The adoption and enforcement of permanent water conservation measures and a temporary water supply shortage program is necessary to manage the city’s potable water supply and to avoid or minimize the effects of drought and shortage within the city. The adoption of voluntary and mandatory water conservation measures is necessary to manage the city’s potable water supply in the long term. Such programs are essential to ensure a reliable and sustainable minimum supply of water for the public health, safety and welfare. Page 119 of 232 (Ord. No. 2014-11, § 1, 8-4-2014; Ord. No. 2015-04, § 1, 5-18-2015; Ord. No. 2016-15, § 1, 8-1-2016) i) Water Code Section 10608.14 requires public water systems to prohibit the use of potable water to irrigate non-functional turf on commercial, industrial, and institutional properties other than a cemetery and on common areas of homeowners’ associations, common interest developments, and community service organizations or similar entities. § 27.96. Declaration of purpose and intent. (a) The purpose of this article is to establish voluntary water conservation measures and a water supply shortage program that will reduce water consumption within the city through conservation, enable effective water supply planning, assure reasonable and beneficial use of water, prevent waste of water, and maximize the efficient use of water within the City of Gilroy to avoid and minimize the effect and hardship of water shortage. Page 120 of 232 (b) This article establishes voluntary water conservation measures and temporary water conservation standards intended to alter behavior related to water use efficiency to be implemented during times of declared water shortage or declared water shortage emergency. (c) This article also establishes permanent mandatory water conservation measures intended to safeguard a reliable and sustainable minimum supply of water for the public health, safety, and welfare. (Ord. No. 2014-11, § 1, 8-4-2014; Ord. No. 2016-15, § 2, 8-1-2016) § 27.97. Definitions. For the purposes of this article, unless otherwise apparent from the context, certain words and phrases used in this article are defined as follows: “CII water use” means water used by commercial water users, industrial water users, institutional water users. It does not include a cemetery. “Commercial water user” means a water user that provides or distributes a product or service. “Common area” means that portion of common interest development or of a property owned or managed by a homeowners’ association or a community service organization or similar entity that is not assigned or allocated to the exclusive use of the occupants of an individual dwelling unit within the property.” “Common interest developments” means community apartment projects, condominium projects, planned developments, and stock cooperatives per Civil Code Section 4100. “Community service organization or similar entity” has the same meaning as in section 4100 of the Civil Code. “Community space” means an area designated by a property owner or a governmental agency to accommodate human foot traffic for civic, ceremonial, or other community events or social gatherings. “Homeowners’ Association” means an “association” as defined in Section 4080 of the Civil Code. “Functional Turf” means a ground cover surface of turf located in a recreational use area or community space. Turf enclosed by fencing or other barriers to permanently preclude human access for recreation or assembly is not functional turf. “Industrial water user” means a water user that is primarily a manufacturer or processor of materials as defined by the North American Industry Classification System code sectors 31 to 33, inclusive, or an entity that is a water user primarily engaged in research and development. “Institutional water user” means a water user dedicated to public service. This type of user includes, among other users, higher education institutions, schools, courts, churches, hospitals, government facilities, and nonprofit research institutions Page 121 of 232 “Landscape irrigation system” means an irrigation system with pipes, hoses, spray heads, or sprinkling devices that are operated by hand or through an automated system. “Nonfunctional Turf” - means any turf that is not functional turf, and includes turf located within street rights-of-way and parking lots. “Multifamily residential property” means a property that includes a building containing more than four dwelling units. “Person” means any natural person or persons, corporation, public or private entity, governmental agency or institution, or any other user of water provided by the city. “Potable water” means water which is suitable for drinking. “Recreational use area” means an area designated by a property owner or a governmental agency to accommodate human foot traffic for recreation, including, but not limited to, sports fields, golf courses, playgrounds, picnic grounds, or pet exercise areas. This recreation may be either formal or informal.” “Public works Utilities Department Ddirector” means the city’s utilities director or such of public works department of the city, and any act in this article required or authorized to be done by the public works director as the city administrator designates to manage the city’s water and wastewater utility. may be done on behalf of the public works director by an authorized officer or employee of the public works department. “Recycled water” means the reclamation and reuse of non-potable water for beneficial use as defined in Title 22 of the California Code of Regulations. “Single pass cooling systems” means equipment where water is circulated only once to cool equipment before being disposed. “Station” means an area of irrigated landscape controlled by a single irrigation valve. (Ord. No. 2014-11, § 1, 8-4-2014; Ord. No. 2015-04, § 2, 5-18-2015) “Turf” means a groundcover surface of ornamental grass, or a ground cover surface of mowed grass only. Annual bluegrass, Kentucky bluegrass, perennial ryegrass, red fescue and tall fescue are cool-season grasses. Bermuda grass, Kikuyu grass, seashore paspalum, St. Augustine grass, zoysia grass, and buffalo grass are warm-season grasses. § 27.98. Wasting of water and drought emergencies. (a) Applicability. (1) The provisions of this article apply to any person in the use of any potable water provided by the city. (2) The provisions of this article do not apply to uses of water necessary to protect public health and safety or for essential government services, such as police, fire and other similar emergency services. (3) The provisions of this article do not apply to the use of water by commercial nurseries and commercial growers to sustain plants, trees, shrubs, crops or other vegetation intended for commercial sale. Page 122 of 232 (4) The provisions of this article do not apply to the use of water by city facilities Page 123 of 232 to sustain plants, trees, shrubs, or recreational functional turf. (5) This article is intended solely to further the conservation of water. It is not intended to implement any provision of federal, state, or local statutes, resolutions, or regulations relating to protection of water quality or control of drainage or runoff. (b) Saving Water—Level 0 (Zero Percent (0%) to Ten Percent (10%) Reduction). Level 0 is in effect at all times, and does not need to be declared by council. Level 0 is divided into voluntary and mandatory measures to comply with the State of California Governor’s executive order B-37-16.consistent with state law. (1) Voluntary. The following voluntary (as indicated with a “V”) water conservation measures are encouraged at all times. Following these measures will help save water, and water users are encouraged to save water year round. a. V-0.1 Recommended Watering Hours. Watering or irrigating of lawn, landscape or other vegetated area with potable water is discouraged between the hours of 9:00 a.m. and 5:00 6 p.m. Pacific Standard/Daylight Savings Time. b. V-0.2 Recommended Limit on Watering Duration. Watering or irrigating of lawn, landscape or other vegetated area with potable water using a landscape irrigation system or a watering device that is not continuously attended is recommended to be limited to no more than three (3) days a week with a duration of fifteen (15) minutes watering per water day per station. This subsection does not apply to landscape irrigation systems that exclusively use very low-flow drip type irrigation systems when no emitter produces more than two (2) gallons of water per hour and weather based controllers or stream rotor sprinklers that meet a seventy percent (70%) efficiency standard. c. V-0.3 Fix Leaks, Breaks or Malfunctions. Excessive use, loss or escape of water through breaks, leaks or other malfunctions in the water user’s plumbing or distribution system for any period of time after such escape of water should have reasonably been discovered should be corrected as soon as practical. d. V-0.4. Washing vehicles at commercial conveyor car wash systems with recirculating water systems is recommended. e. V-0.5 Filling Ornamental Lakes or Ponds. Filling or refilling ornamental lakes or ponds with potable water is encouraged only to the extent needed to sustain aquatic life. f. V-0.6 through 0.19 Reserved. (2) Mandatory. The following mandatory (as indicated with an “M”) water conservation measures are in effect at all times. Following these measures will help save water, and water users are encouraged to save water year round. Page 124 of 232 a. M-0.20 Washing Vehicles. Using water to wash or clean a vehicle, including but not limited to any automobile, truck, van, bus, motorcycle, boat or trailer, whether motorized or not is prohibited, except by use of a hand-held bucket or similar container or a hand-held hose equipped with a positive self-closing water shut-off nozzle or device. b. M-0.21 Washing Down Hard or Paved Surfaces. Washing down hard or paved surfaces, including but not limited to sidewalks, walkways, driveways, parking areas, tennis courts, patios or alleys, is prohibited except for health and safety reasons by use of a hand-held bucket or similar container, a hand-held hose equipped with a positive self-closing water shut-off device, a low-volume, high-pressure cleaning machine equipped to recycle any water used, or a low-volume high-pressure water broom. This prohibition does not apply to pressure washing a wall when necessary for preparation prior to painting or repainting. c. M-0.22 Recirculating Water for Water Fountains and Decorative Water Features. Operating a water fountain or other decorative water features that use non-recirculated water is prohibited. d. M-0.23 Eliminate Excessive Water Flow or Runoff. Using water in any manner or irrigating of any lawn, landscape or other vegetated area in a manner that causes or allows excessive water flow or runoff onto an adjoining sidewalk, driveway, street, alley, gutter or ditch is prohibited. e. M-0.24 Irrigating within Forty-Eight (48) Hours of Rainfall. The applications of potable water to outdoor landscapes during or within forty- eight (48) hours following measurable rainfall is prohibited. f. M-0.25 Prohibition against Watering Turf in Medians. The irrigation with potable water of ornamental turf on public street medians, including roundabouts, is prohibited. g. M-0.26 Irrigation outside Newly Constructed Homes. The irrigation with potable water outside of homes and buildings constructed after May 18, 2015, in a manner inconsistent with regulations or other requirements established by the California Building Standards Commission is prohibited. h. M-0.27 Drinking Water Served upon Request Only. Eating or drinking establishments, including but not limited to a restaurant, hotel, cafe, cafeteria, bar, or other public place where food or drinks are sold, served, or offered for sale, are prohibited from providing drinking water to any person unless expressly requested. i. M-0.28 Commercial Lodging Establishments Must Provide Guests Option to Decline Daily Linen Services. Hotels, motels and other commercial lodging establishments must provide customers the option of not having towels and linen laundered daily. Commercial lodging Page 125 of 232 establishments must prominently display notice of this option in each bathroom using clear and easily understood language. j. M-0.29 Installation of Single Pass Cooling Systems. Installation of single pass cooling systems is prohibited in buildings requesting new water service. k. M-0.30 Installation of Non-recirculating Water System in Commercial Car Wash and Laundry Systems. Installation of non-recirculating water systems is prohibited in commercial conveyor car wash and new commercial laundry systems. l. M-0.31 Pool Covers. It is required that all new and existing pools use a pool cover or solar blanket to reduce water loss due to evaporation. m. M-0.32 Use of Recycled Water for Construction. When directed by the public works director and or Utilities Department Director, recycled water fill stations shall be made available for construction water for purposes including dust control. Recycled water fill stations may be removed upon completion of construction activities in the area. n. M-0.33 Restaurants Required to Use Water Conserving Dish Wash Spray Valves. Food preparation establishments, such as restaurants or cafes, are prohibited from using non-water conserving dish wash spray valves. o. M-0.34 Irrigation of Non-Functional Turf. The use of potable water for the irrigation of nonfunctional turf located at commercial, industrial, and institutional properties, other than a cemetery, and on properties of homeowners’ associations, common interest developments, and community service organizations or similar entities is prohibited by the following dates: 1.All properties owned by local governments, local or regional public agencies, and public water systems, including the city, except those specified in paragraph 4, beginning January 1, 2027. 2. All other institutional properties and all commercial and industrial properties, beginning January 1, 2028 3. All common areas of properties of homeowners’ associations, common interest developments, and community service organizations or similar entities, beginning January 1, 2029 4. All properties owned by local governments, local public agencies, and public water systems in a disadvantaged community, beginning January 1, 2031, or the date upon which a state funding source is made available to fund conversion of nonfunctional turf on these properties to climate appropriate landscapes, whichever is later. The use of potable water is not prohibited to the extent necessary to ensure the health of trees and other perennial non-turf plantings, or to the extent necessary to address an immediate health and safety need. Page 126 of 232 Any compliance date postponed by the State Water Resources Control Board pursuant with the Water Code 10608.14 (c) for a specific property shall apply. This measure does not restrict the use of recycled water. n. (c) Level 1 Water Supply Shortage (Eleven Percent (11%) to Twenty Percent (20%) Reduction). A Level 1 water supply shortage exists when the city council determines, in its sole discretion, that due to drought or other water supply conditions, a water supply shortage or threatened shortage exists and an eleven percent (11%) to twenty percent (20%) consumer demand reduction is necessary to make more efficient use of water and appropriately respond to existing water conditions. Upon the declaration by the city council of a Level 1 water supply shortage condition, the following mandatory water conservation requirements shall apply during such time that the Level 1 water supply shortage is in effect: (1) Limits on Watering Hours. Watering or irrigating of lawn, landscape or other vegetated area with potable water is prohibited between the hours of 9:00 a.m. and 5:00 p.m. 6 p.m. Pacific Standard/Daylight Savings Time on any day, except by use of a hand-held bucket or similar container, a hand-held hose equipped with a positive self-closing water shut-off nozzle or device, or for very short periods of time for the express purpose of adjusting or repairing an irrigation system. The use of recycled water is exempt from this prohibition. (2) Limit on Watering Duration. Watering or irrigating of lawn, landscape or other vegetated area with potable water using a landscape irrigation system or a watering device that is not continuously attended is limited to no more than fifteen (15) minutes watering per designated water day per station. This subsection does not apply to land-scape irrigation systems that exclusively use very low-flow drip type irrigation systems when no emitter produces more Page 127 of 232 than two (2) gallons of water per hour and weather based controllers or stream rotor sprinklers that meet a seventy percent (70%) efficiency standard. The use of recycled water is exempt from this prohibition. (3) Limits on Watering Days. Watering or irrigating of lawn, landscape or other vegetated area with potable water is limited to three (3) days per week from April through October. The watering days are designated depending upon house address and are to be determined by the public works director. During the months of November through March, watering or irrigating of lawn, landscape or other vegetated area with potable water is limited to no more than one (1) day per week to be determined by the public works director. (4) Obligation to Fix Leaks, Breaks or Malfunctions. All leaks, breaks, or other malfunctions in the water user’s plumbing or distribution system must be repaired within seventy-two (72) hours of notification by the city unless other arrangements are made with the city. (d) Level 2 Water Supply Shortage (Twenty-One Percent (21%) to Thirty-Five Percent (35%) Reduction). A Level 2 water supply shortage exists when the city council declares, in its sole discretion, that due to drought or other water supply conditions, a water supply shortage or threatened shortage exists and a twenty-one percent (21%) to thirty-five percent (35%) consumer demand reduction is necessary to make more efficient use of water and appropriately respond to existing water conditions. Upon the declaration of a Level 2 water supply shortage condition, the more restrictive of the prohibited or limited uses of water set forth in subsection (c) of this section, and the following mandatory water conservation requirements shall apply during such time that the Level 2 water supply shortage is in effect: (1) Limits on Watering Days. Watering or irrigating of lawn, landscape or other vegetated area with potable water is limited to two (2) days per week from April through October. The watering days are designated depending upon house address and are to be determined by the public works directorthe Utilities Department Director. During the months of November through March, watering or irrigating of lawn, landscape or other vegetated area with potable water is limited to no more than one (1) day per week to be determined by the public works director. (2) Obligation to Fix Leaks, Breaks or Malfunctions. All leaks, breaks, or other malfunctions in the water user’s plumbing or distribution system must be repaired within forty-eight (48) hours of notification by the city unless other arrangements are made with the city. (3) Limits on Filling Ornamental Lakes or Ponds. Filling or refilling ornamental lakes or ponds with potable water is prohibited, except to the extent needed to sustain aquatic life; provided, that such animals are of significant value and have been actively managed within the water feature prior to declaration of a supply shortage level under this section. (4) Drought Water Rates. City council may consider adopting rate structures and other pricing mechanisms to maximize water conservation. Page 128 of 232 (e) Level 3 Water Supply Shortage—Emergency Condition (Thirty-Six Percent (36%) to Fifty Percent (50%) Reduction). A Level 3 water supply shortage shall be referred to as a water shortage emergency. A Level 3 condition exists when the city council declares, in its sole discretion, a water shortage emergency and notifies its residents and businesses that a greater than thirty-five percent (35%) reduction in consumer demand is necessary to maintain sufficient water supplies for public health and safety, pursuant to Water Code Section 350 et seq. Upon the declaration of a Level 3 water supply shortage condition, the more restrictive of the prohibited or limited uses of water set forth in subsections (c) and (d) of this section and the following mandatory water conservation requirements shall apply during such time that the Level 3 water supply shortage is in effect: (1) No Watering or Irrigating. Watering or irrigating of lawn, landscape or other vegetated area with potable water is prohibited. This restriction does not apply to the following categories of use, unless the city has determined that recycled water is available and may be applied to the use: a. Maintenance of vegetation, including trees and shrubs, that are watered using a hand-held bucket or similar container, hand-held hose equipped with a positive self-closing water shut-off nozzle or device; b. Maintenance of existing landscape necessary for fire protection; c. Maintenance of existing landscape for soil erosion control; d. Maintenance of plant materials identified to be rare or essential to the well-being of protected species; e. Maintenance of landscape within active public parks and playing fields, day care centers, golf course greens, and school grounds; provided, that such irrigation does not exceed two (2) days per week for no more than fifteen (15) minutes watering per designated water day per station and is prohibited between the hours of 9:00 a.m. and 5:00 p.m.6 p.m. Pacific Standard/ Daylight Savings Time, according to the schedule established in subsection (d)(1) of this section; f. Actively irrigated environmental mitigation projects. (2) Obligation to Fix Leaks, Breaks or Malfunctions. All leaks, breaks, or other malfunctions in the water user’s plumbing or distribution system must be repaired within twenty-four (24) hours of notification by the city unless other arrangements are made with the city. (3) Limits on New Potable Water Service. Upon declaration of a Level 3 water shortage emergency condition, the city may limit the issuance of new potable water services, temporary meters and/or statements of immediate ability to serve or provide potable water service (such as can and will serve letters, certificates, or letters of availability), except under the following circumstances: Page 129 of 232 a. A valid, unexpired building permit has been issued for the project; or b. The project is necessary to protect the public health, safety, and welfare; or c. The applicant provides substantial evidence of an enforceable commitment that water demands for the project will be offset prior to the provision of a new water meter(s) to the satisfaction of the city. d. This provision does not preclude the resetting or turn-on of meters to provide continuation of water service or the restoration of service that has been interrupted for a period of one (1) year or less. (4) Limits on Building Permits. Upon declaration of a Level 3 water supply shortage emergency condition, the city administrator is authorized to implement a program in his or her discretion to limit or withhold the issuance of building permits which require new or expanded water service, except to protect the public health, safety and welfare, or in cases which meet the city’s adopted conservation offset requirements. (5) No New Annexations. Upon the declaration of a Level 3 water supply shortage condition, the city may suspend consideration of annexations to its service area. This subsection does not apply to boundary corrections and annexations that will not result in any immediate increased use of water. (f) Procedures for Determination/Notification of Water Supply Shortage. The existence of Level 1, 2, or 3 water supply shortage conditions may be declared by resolution of the city council adopted at a regular or special public meeting held in accordance with state law. The mandatory conservation requirements applicable to the level of water supply shortage conditions declared by the city council will take effect immediately after the shortage level is declared. Within ten (10) days following the declaration of the shortage level, the resolution shall be published pursuant to Water Code Section 376. (g) Hardship Waiver. If, due to unique circumstances, such as a fire, a specific requirement of this article would result in undue hardship to a person using water or to property upon which water is used, that is disproportionate to the impacts to water users generally or to similar property or classes of water users, then the person may apply for a waiver to the requirement as provided in this section. (1) Request. A written request for a hardship waiver must be submitted to the public works Utilities Department Ddirector. (2) Supporting Documentation. The request for waiver must be accompanied by photographs, maps, drawings, and any other information as appropriate the applicant wishes to be used in reviewing the request. (3) Required Findings for Waiver. The waiver may be granted or conditionally granted only upon a written finding of the existence of facts demonstrating an undue hardship to a person using water or to property upon which water is Page 130 of 232 used, that is disproportionate to the impacts to water users generally or to similar property or classes of water use due to specific and unique circumstances of the user or the user’s property. An application for a waiver will be denied unless the public works director finds, based on the information provided in the application, supporting documents, or such additional information as may be requested, and on water use information for the property as shown by the records of the city or its agent, all of the following: a. That the waiver does not constitute a grant of special privilege inconsistent with the limitations upon other residents and businesses; b. That, because of special circumstances applicable to the property or its use, the strict application of this article would have a disproportionate impact on the property or use that exceeds the impacts to residents and businesses generally; c. That the authorizing of such waiver will not be of substantial detriment to adjacent properties, and will not materially affect the ability of the city to effectuate the purpose of this article and will not be detrimental to the public interest; and d. That the condition or situation of the subject property or the intended use of the property for which the waiver is sought is not common, recurrent or general in nature. (4) Approval Authority. The Utilities public works Department Ddirector must act upon any completed application no later than ten (10) days after submittal and may approve, conditionally approve, or deny the waiver. The applicant requesting the waiver must be promptly notified in writing of any action taken. Unless specified otherwise at the time a waiver is approved, the waiver will apply to the subject property during the period of the mandatory water supply shortage condition. (5) A waiver granted under this subsection does not authorize any use of water prohibited by Water Code Section 10608.14. Page 131 of 232 (4) (h) Mandatory Metering of Water Use at All City Hydrants. For uses other than fire suppression, all water delivered through city hydrants will require the use of meters in order to more accurately track the use of city water. (Ord. No. 2016-15, § 3, 8-1-2016; Ord. No. 2021-05, 12-6-2021) § 27.99. Enforcement. If a water supply shortage is declared by council, Iit shall be the duty of all city employees to give vigilant aid to the Utilities public worksDepartment Ddirector in the enforcement of the provisions of this chapter article, whether or not a water supply shortage has been declared, and to this end they shall report all violations thereof which shall come to their knowledge to the office of the Utilities Department public works director. (Ord. No. 2014-11, § 1, 8-4-2014) § 27.100. Violation penalty. (a) Penalty. Any person violating, or causing or permitting to be violated, any of the provisions of this article may be deemed guilty of a misdemeanor. Upon conviction Page 132 of 232 thereof, such person shall be punished by a fine not exceeding one thousand dollars ($1,000), or by imprisonment in the county jail for not more than thirty (30) days. Every such person shall be deemed to be guilty of a separate offense for every day during any portion of which any violation of any provision of this article is committed, continued or permitted by such person, and shall be punishable therefore as provided in this section. (b) Notwithstanding any other provision of this article, whenever a violation of any section contained in this article is punishable as a misdemeanor, the city attorney may specify that the offense is an infraction, and proceed with prosecution as an infraction, unless the defendant objects to the offense being made an infraction, in which event the court may elect to have the complaint amended to charge as a misdemeanor, and the case shall proceed on a misdemeanor charge. (1) First Violation. The city will issue a written warning and deliver a copy of the ordinance codified in this article by mail. (2) Second Violation. A second violation within any consecutive twelve (12) month period is punishable by a fine not to exceed one hundred dollars ($100.00). (3) Third Violation. A third violation within any consecutive twelve (12) month period is punishable by a fine not to exceed two hundred dollars ($200.00). (4) Subsequent Violations. Any subsequent violations within any consecutive twelve (12) month period are punishable by a fine not to exceed five hundred dollars ($500.00). (5) Separate Offenses. Each day that a person violated provisions of this article shall constitute a separate violation or offense. (6) Willful Violations. In addition to fines, the city, after written notice, may install a flow restrictor device or discontinue service to consumers who willfully violate provisions of this section. (c) All remedies provided for herein shall be cumulative and not exclusive. (Ord. No. 2014-11, § 1, 8-4-2014; Ord. No. 2015-04, § 4, 5-18-2015; Ord. No. 2016-15, § 4, 8-1-2016) Page 133 of 232 Bold Text = Proposed Additions Struck Text= Proposed Deletions Plain text = Existing Code Proposed Title: Ordinance of the City Council of the City of Gilroy amending Chapter 27, Article VI, “Water Supply Shortage Regulations” and Chapter 30, Article XXXVIII, “Landscaping, Water Efficiency, and Storm Water Retention and Treatment” to prohibit the use of potable water for the irrigation of nonfunctional turf in compliance with AB 1572. ARTICLE XXXVIII LANDSCAPING, WATER EFFICIENCY, AND STORM WATER RETENTION AND TREATMENT § 30.38.10. Purpose. The city promotes the value and benefits of landscapes while recognizing the need to use limited water resources as efficiently as possible. In compliance with applicable state standards and guidelines, and to promote the city’s goals and standards regarding sustainable development, this article establishes minimum landscape standards for all uses for enhancing the appearance of developments, reducing heat and glare, controlling soil erosion, enhancing on-site storm water management, conserving water, establishing a buffer and/or screen between residential and nonresidential land uses, and ensuring the ongoing maintenance of landscaped areas. Water conservation measures shall be addressed through landscape and irrigation design. (Ord. No. 2018-06, § 1, 3-19-2018) § 30.38.20. Applicability. (a) The provisions of this article shall apply to all of the following landscape projects installed after December 1, 2015: (1) Projects requiring a building permit or architectural and site permit that include the addition of an aggregate landscape area of five hundred (500) square feet or more; (2) Projects requiring a building permit or architectural and site permit that include the rehabilitation of an aggregate landscape area of two thousand five hundred (2,500) square feet or more; (3) Existing landscaped areas shall comply with the provisions specified in section 30.38.240 (Provisions for existing landscapes); (4) Cemeteries. a. New and rehabilitated cemeteries shall comply with the provisions specified in sections 30.38.170 (Landscape and irrigation maintenance schedule) and Page 134 of 232 30.38.180 (Irrigation audit, irrigation survey, and irrigation water use analysis). b. Existing cemeteries shall comply with the provisions specified in section 30.38.240 (Provisions for existing landscapes). (b) Projects using treated or untreated graywater (see section 30.38.210) or rainwater captured on site, any parcel within the project that has less than two thousand five hundred (2,500) square feet of landscape area and meets the parcel’s landscape water requirement (estimated total water use) entirely with treated or untreated graywater or through stored rainwater captured on site is subject only to Appendix D (Prescriptive Compliance Option), Section (5) of state law. (c) This article does not apply to: (1) Registered local, state or federal historical sites; (2) Ecological restoration projects that do not require a permanent irrigation system; (3) Mined-land reclamation projects that do not require a permanent irrigation system; or (4) Existing plant collections, as part of botanical gardens and arboretums open to the public. (Ord. No. 2018-06, § 1, 3-19-2018) § 30.38.30. Definitions. “Applied water” means the portion of water supplied by the irrigation system to the landscape. “Arborist report” means a report prepared by an arborist certified by the International Society of Arboriculture (ISA) or equivalent organization acceptable to the community development director containing specific information on the location, condition, structure, potential impacts of development, and recommended actions and mitigation measures regarding one (1) or more trees on an individual lot or project site. “Automatic irrigation controller” means a timing device used to remotely control valves that operate an irrigation system. Automatic irrigation controllers are able to self-adjust and schedule irrigation events using either evapotranspiration (weather-based) or soil moisture data. “Backflow prevention device” means a safety device used to prevent pollution or contamination of the water supply due to the reverse flow of water from the irrigation system. “Certificate of completion” means the document required under section 30.38.150 (Certificate of completion). “Certified irrigation designer” means a person certified to design irrigation systems by an accredited academic institution, a professional trade organization or other program such as the U.S. Environmental Protection Agency’s WaterSense irrigation designer certification program and Irrigation Association’s certified irrigation designer program. “Certified landscape irrigation auditor” means a person certified to perform landscape irrigation audits by an accredited academic institution, a professional trade organization Page 135 of 232 or other program such as the U.S. Environmental Protection Agency’s WaterSense irrigation auditor certification program and Irrigation Association’s certified landscape irrigation auditor program. “Check valve or anti-drain valve” means a valve located under a sprinkler head, or other location in the irrigation system, to hold water in the system to prevent drainage from sprinkler heads when the sprinkler is off. “Common interest developments” means community apartment projects, condominium projects, planned developments, and stock cooperatives per Civil Code Section 1351. “Community development director” means the City of Gilroy community development director or designee. “Compost” means a safe and stable product of controlled biologic decomposition of organic materials that is beneficial to plant growth. “Conversion factor (0.62)” means the number that converts acre-inches per acre per year to gallons per square foot per year. “Distribution uniformity” means a measure of the uniformity of irrigation water over a defined area. “Drip irrigation” means any nonspray low volume irrigation system utilizing emission devices with a flow rate measured in gallons per hour. Low volume irrigation systems are specifically designed to apply small volumes of water slowly at or near the root zone of plants. “Dripline” means the outermost edge of the tree’s canopy. When depicted on a map or plan, the dripline is the irregular shaped circle that follows the contour of the tree’s branches as seen from overhead. “Ecological restoration project” means a project where the site is intentionally altered to establish a defined, indigenous, historic ecosystem. “Effective precipitation or useful rainfall (Eppt)” means the portion of total precipitation which becomes available for plant growth. “Emitter” means a drip irrigation emission device that delivers water slowly from the system to the soil. “Established landscape” means the point at which plants in the landscape have developed significant root growth into the soil. Typically, most plants are established after one (1) or two (2) years of growth. “Established period of the plants” means the first year after installing the plant in the landscape or the first two (2) years if irrigation will be terminated after establishment. Typically, most plants are established after one (1) or two (2) years of growth. Native habitat mitigation areas and trees may need three (3) to five (5) years for establishment. “Estimated total water use (ETWU)” means total water used for the landscape as described in section 30.38.100 (water efficient landscape work-sheet). “ET adjustment factor (ETAF)” means a factor of 0.55 for residential areas and 0.45 for nonresidential areas, that, when applied to reference evapotranspiration, adjusts for plant factors and irrigation efficiency, two (2) major influences upon the amount of water that needs to be applied to the landscape. The ETAF for new and existing (nonrehabilitated) Page 136 of 232 special landscape areas shall not exceed 1.0. The ETAF for existing nonrehabilitated landscapes is 0.8. “Evapotranspiration rate” means the quantity of water evaporated from adjacent soil and other surfaces and transpired by plants during a specified time. “Flow rate” means the rate at which water flows through pipes, valves and emission devices, measured in gallons per minute, gallons per hour, or cubic feet per second. “Flow sensor” means an inline device installed at the supply point of the irrigation system that produces a repeatable signal proportional to flow rate. Flow sensors must be connected to an automatic irrigation controller or flow monitor capable of receiving flow signals and operating master valves. This combination flow sensor/controller may also function as a landscape water meter or submeter. “Friable” means a soil condition that is easily crumbled or loosely compacted down to a minimum depth per planting material requirements, whereby the root structure of newly planted material will be allowed to spread unimpeded. “Fuel modification plan guideline” means guidelines from a local fire authority to assist residents and businesses that are developing land or building structures in a fire hazard severity zone. “Functional Turf” meaning set forth in Chapter 27, Section 27.97. “Graywater” means untreated wastewater that has not been contaminated by any toilet discharge, has not been affected by infectious, contaminated, or unhealthy bodily wastes, and does not present a threat from contamination by unhealthful processing, manufacturing, or operating wastes. “Graywater” includes, but is not limited to, wastewater from bathtubs, showers, bathroom washbasins, clothes washing machines, and laundry tubs, but does not include wastewater from kitchen sinks or dish-washers. Health and Safety Code Section 17922.12. “Hardscaped” means any durable material (pervious and nonpervious). “Hydrozone” means a portion of the landscaped area having plants with similar water needs and rooting depth. A hydrozone may be irrigated or nonirrigated. “Infiltration rate” means the rate of water entry into the soil expressed as a depth of water per unit of time (e.g., inches per hour). “Invasive plant species” means species of plants not historically found in California that spread outside cultivated areas and can damage environmental or economic resources. Invasive species may be regulated by county agricultural agencies as noxious species. Lists of invasive plants are maintained at the California Invasive Plant Inventory and USDA invasive and noxious weeds database. “Irrigation audit” means an in-depth evaluation of the performance of an irrigation system conducted by a certified landscape irrigation auditor. An irrigation audit includes, but is not limited to: inspection, system tune-up, system test with distribution uniformity or emission uniformity, reporting overspray or runoff that causes overland flow, and preparation of an irrigation schedule. The audit must be conducted in a manner consistent with the Irrigation Association’s landscape irrigation auditor certification program or other U.S. Environmental Protection Agency “WaterSense” labeled auditing program. “Irrigation efficiency (IE)” means measurement of the amount of water beneficially used divided by the amount of water applied. Irrigation efficiency is derived from Page 137 of 232 measurements and estimates of irrigation system characteristics and management practices. The irrigation efficiency factors for purposes of this article are 0.75 for overhead spray devices and 0.81 for drip systems. “Irrigation survey” means evaluation of an irrigation system that is less detailed than an irrigation audit. An irrigation survey includes, but is not limited to: inspection, system test, and written recommendations to irrigation water use analysis. Analysis of water use data based on meter readings and billing data. “Landscape architect” means a person who holds a license to practice landscape architecture in the State of California Business and Professions Code, Section 5615. “Landscape area” means all planting areas, turf areas, and water features in a landscape design plan subject to the maximum applied water allowance calculation. The landscape area does not include footprints of buildings or structures, sidewalks, driveways, parking lots, decks, patios, gravel or stone walks, other pervious or nonpervious hardscapes, and other nonirrigated areas designated for nondevelopment (e.g., open spaces and existing native vegetation). “Landscape contractor” means a person licensed by the State of California to construct, maintain, repair, install, or subcontract the development of landscape systems. “Landscape documentation package” means documents required under section 30.38.90 (Elements of the landscape documentation package). “Landscape project” means the total area of landscape in a project as defined in “landscape area” for the purposes of this article, meeting requirements under section 30.38.20 (Applicability). “Landscape water meter” means an incline device installed at the irrigation supply point that measures the flow of water into the irrigation system and is connected to a totalizer to record water use. “Lateral line” means a water delivery pipeline that supplies water to the emitters or sprinklers from the valve. “Local agency” means a city or county, including a charter city or charter county, that is responsible for adopting and implementing the ordinance codified in this article. The local agency is also responsible for the enforcement of this article, including, but not limited to, approval of a permit and plan check or design review of a project. “Local LAN purveyor” means any entity, including a public agency, city, county, or private water company, that provides retail water service. “Low volume irrigation” means application of irrigation water at low pressure through a system of tubing or lateral lines and low volume emitters such as drip, driplines, and bubblers. Low volume irrigation systems are specifically designed to apply small volumes of water slowly at or near the root zone of plants. “Low water plant use” means plant species whose demonstrated water needs are compatible with local climate and soil conditions such that regular supplemental irrigation is not required to sustain the plant after it has become established. Species classified as “very low water use” and “low water use” by WUCOLS, having a regionally adjusted plant factor of 0.0 through 0.3, shall be considered low water use plants. Page 138 of 232 “Main line” means a pressurized pipeline that delivers water from the water source to the valve or outlet. “Master shut-off valve” means automatic valve installed at the irrigation supply point which controls water flow into the irrigation system. When this valve is closed, water will not be supplied to the irrigation system. A master valve will greatly reduce any water loss due to a leaky station valve. “Maximum applied water allowance (MAWA)” means the upper limit of annual applied water for the established landscaped area as specified in section 30.38.100 (water efficient landscape work-sheet). It is based upon the area’s reference evapotranspiration, the ET adjustment factor, and the size of the landscape area. The estimated total water use shall not exceed the maximum applied water allowance. Special landscape areas, including recreation areas, areas permanently and solely dedicated to edible plants such as orchards and vegetable gardens, and areas irrigated with recycled water are subject to the MAWA with an ETAF not to exceed 1.0. MAWA = (ETo) (0.62) [(ETAF x LA) + ((1-ETAF) x SLA)]. “Median” means the area between opposing lanes of traffic that may be unplanted or planted with trees, shrubs, perennials, and ornamental grasses. “Microclimate” means the climate of a small, specific area that may contrast with the climate of the overall landscape area due to factors such as wind, sun exposure, plant density, or proximity to reflective surfaces. “Mined-land reclamation projects” means any surface mining operation with a reclamation plan approved in accordance with the Surface Mining and Reclamation Act of 1975. “Mulch” means any organic material such as leaves, bark, straw, compost, or inorganic mineral materials such as rocks, gravel, or decomposed granite left loose and applied to the soil surface for the beneficial purposes of reducing evaporation, suppressing weeds, moderating soil temperature, and preventing soil erosion. “New construction” means a new building with a landscape or other new landscape, such as a park, playground, or greenbelt without an associated building. “Nonfunctional turf” meaning set forth in Chapter 27, Section 27.97. “Nonresidential landscape” means landscapes in commercial, institutional, industrial and public settings that may have areas designated for recreation or public assembly. It also includes portions of common areas of common interest developments with designated recreational areas. “Operating pressure” means the pressure at which the parts of an irrigation system are designed by the manufacturer to operate. “Overhead sprinkler irrigation systems or over-head spray irrigation systems” means systems that deliver water through the air (e.g., spray heads and rotors). “Overspray” means irrigation water which is delivered beyond the target area. “Parkway” means the area between a sidewalk and the curb or traffic lane. It may be planted or unplanted, and with or without pedestrian egress. “Permit” means the authorizing document issued by local agencies for new construction or rehabilitated landscapes. “Pervious” means any surface or material that allows the passage of water through Page 139 of 232 the material and into the underlying soil. “Plant factor or plant water use factor” means a factor that, when multiplied by ETo, estimates the amount of water needed by plants. For purposes of this article, the plant factor range for very low water use plants is 0 to 0.1, the plant factor range for low water use plants is 0.1 to 0.3, the plant factor range for moderate water use plants is 0.4 to 0.6, and the plant factor range for high water use plants is 0.7 to 1.0. Plant factors cited in this article are derived from the publication “Water Use Classification of Landscape Species.” Plant factors may also be obtained from horticultural researchers from academic institutions or professional associations as approved by the California Department of Water Resources (DWR). “Planting hole” means a hole in the ground that is dug for landscaping materials such as trees or shrubs. “Project applicant” means an individual or entity submitting a landscape documentation package required under Section 492.3 of Title 23 of the California Code of Regulations, to request a permit, plan check, or design review from the local agency. A project applicant may be the property owner or his or her designee. “Public works director” means the City of Gilroy public works director or designee. “Rain sensor or rain sensing shutoff device” means a component which automatically suspends an irrigation event when it rains. “Record drawing or as-builts” means a set of reproducible drawings which show significant changes in the work made during construction and which are usually based on drawings marked up in the field and other data furnished by the contractor. “Recreational area” means areas, excluding private single-family residential areas, designated for active play, recreation or public assembly in parks, sports fields, picnic grounds, amphitheaters or golf course tees, fairways, roughs, surrounds and greens. “Recycled water, reclaimed water, or treated sewage effluent water” means treated or recycled waste water of a quality suitable for nonpotable uses such as landscape irrigation and water features. This water is not intended for human consumption. “Reference evapotranspiration (ETo)” means the standard measurement of environmental parameters which affect the water use of plants. ETo is expressed in inches per day, month, or year as represented in Appendix A, and is an estimate of the evapotranspiration of a large field of four (4) to seven (7) inch tall, cool-season grass that is well watered. Reference evapotranspiration is used as the basis of determining the maximum applied water allowances so that regional differences in climate can be accommodated. “Regional water efficient landscape ordinance” means a local ordinance adopted by two (2) or more local agencies, water suppliers and other stakeholders for implementing a consistent set of landscape provisions throughout a geographical region. Regional ordinances are strongly encouraged to provide a consistent framework for the landscape industry and applicants to adhere to. “Rehabilitated landscapes” means any re-landscaping project that requires a permit, plan check, or design review, meets the requirements of section 30.38.20 (Applicability), and the modified landscape area is equal to or greater than two thousand five hundred (2,500) square feet. Page 140 of 232 “Residential landscape” means landscapes surrounding single- or multifamily homes. “Root zone” means a specifically defined area commencing at the trunk and moving outward to form an irregularly shaped circle that follows the contour of the tree canopy and extending beyond the dripline of the tree by five (5) feet or such greater distance determined by the arborist report. “Runoff” means water which is not absorbed by the surface to which it is applied and flows from the area to a drain, sewer, or stream. For example, runoff may result from water that is applied to landscaping at too great a rate (application rate exceeds infiltration rate) or when there is a slope. “Soil moisture sensing device or soil moisture sensor” means a device that measures the amount of water in the soil. The device may also suspend or initiate an irrigation event. “Soil texture” means classification of soil based on its percentage of sand, silt, and clay. “Special landscape area (SLA)” means an area of the landscape dedicated solely to edible plants, recreational areas, areas irrigated with recycled water, or water features using recycled water. “Sprinkler head or spray head” means a device which delivers water through a nozzle. “Static water pressure” means pipeline or municipal water supply pressure when water is not flowing. “Station” means area served by one (1) valve or by a set of valves that operate simultaneously. “Swing joint” means an irrigation component that provides a flexible, leak-free connection between the emission device and lateral pipeline to allow movement in any direction and to prevent equipment damage. “Submeter” means a metering device to measure water applied to the landscape that is installed after the primary utility water meter. “Turf” means a groundcover surface of ornamental grass, or a ground cover surface of mowed grass only. Annual bluegrass, Kentucky bluegrass, perennial ryegrass, red fescue and tall fescue are cool-season grasses. Bermuda grass, Kikuyu grass, seashore paspalum, St. Augustine grass, zoysia grass, and buffalo grass are warm-season grasses. “Valve” means a device used to control the flow of water in the irrigation system. “Water conserving plant species” means plant species identified as having a very low or low plant factor. “Water feature” means a design element where open water performs an aesthetic or recreational function. Water features include ponds, lakes, waterfalls, fountains, artificial streams, spas, and swimming pools (where water is artificially supplied). The surface area of water features is included in the high water use hydrozone of the landscape area. Constructed wetlands used for on-site wastewater treatment or storm water best management practices that are not irrigated and used solely for water treatment or storm water retention are not water features and, therefore, are not subject to the water budget calculation. “Watering window” means the time of day irrigation is allowed. “WUCOLS” means Water Use Classification of Landscape Species published by Page 141 of 232 the University of California Cooperative Extension and the Department of Water Resources 2014. (Ord. No. 2018-06, § 1, 3-19-2018) § 30.38.40. General landscape standards. (a) General Landscape Design Standards. Landscaping shall be a positive element of the project design. The landscaping shall be designed to protect storm water quality and enhance the aesthetic quality of the development by using the following design standards: (1) Landscaping shall be used to manage and treat storm water to the maximum extent feasible; (2) All plant materials shall be installed in compliance with an approved landscape design plan (see section 30.38.120); (3) Only healthy, well-formed, and vigorous plant materials may be used; (4) Landscaping shall be located in all yard areas that are not specifically used for parking, driveways, patios, or similar purposes, unless otherwise specified in this article. Sidewalks, pedestrian walks and pathways are permitted in landscaped areas; (5) Landscape areas shall incorporate varieties of plant textures, colors, geometries, and leaf densities. Year-round visual interest shall be introduced through an appropriate balance of evergreen/deciduous and flowering perennials. Architectural depth and character shall be incorporated through a variety of plant sizes, shapes, and heights; (6) Dense landscaping shall be incorporated to provide a visual screen from less pleasing features of a development (i.e., around trash enclosures, carports, pool equipment, electric transformers, cable boxes, etc.); however, landscaping shall not be placed to interfere with the accessibility to and maintenance of the structures and/or equipment; (7) Landscaping shall screen parking areas from adjacent streets; (8) Landscaping shall be incorporated to reduce monotony of long expanses of building, fence or other structures; (9) The density and placement of plants are to be determined by the plant size at maturity. When initially installed, groundcover shall give enough coverage for a pleasing appearance on all landscaped areas; (10) A minimum of fifty percent (50%) of the landscape area shall consist of plant materials consistent with section 30.38.120(b), Landscape Design Requirements. Portions of the landscape area not planted shall be covered with permeable ground coverings, e.g., rock, bark, decomposed granite or similar materials; (11) Sturdy raised curbs shall protect all landscape areas from driveways and parking areas. Cutouts in curbs may be incorporated when surrounding vegetative drainage swales, storm water retention features and/or other Page 142 of 232 treatment features; (12) Wheel stops need not be provided in parking areas where the front two (2) feet of the landscape area is planted with low groundcover to accommodate car overhang; (13) Trees of varieties with broad canopies shall be provided to shade walkways and parking areas to temper heat from paved areas, and to screen long structure frontages; (14) Existing on-site vegetation shall be preserved, unless determined otherwise by the community development director, to maintain on-site water quality and sediment control; (15) New plant materials requiring permanent irrigation shall not be placed under existing oak trees; (16) All trees shall be a minimum size of fifteen (15) gallons when initially installed; (17) Protected trees shall be preserved and enhanced by structure site design, in compliance with subsection (d) of this section; (18) Deep root irrigation shall be provided to prevent pavement damage where trees are planted within three (3) feet of city pavement or sidewalks. Deep root irrigation is strongly encouraged in similar situations in all private development. When required, deep root irrigation shall be installed in compliance with city standards; (19) Roof-top runoff shall be directed to vegetated areas; (20) Landscaping is allowed within cul-de-sacs in conformance with all other city codes; (21) All plant materials within the city right-of-way (e.g., medians, sound walls, etc.) shall be approved by the director of public works for minimum size and species type; (22) Green roofs are allowed in conformance to all requirements of city code; (23) All plant materials shall be maintained in a live and healthy condition, and free of weeds. Except for owners of properties in the R1 zoning district, property owners shall be required to remove weeds and maintain the landscaping in accordance with the approved landscape plan for the life of the property. (b) New Plant Material. New plant material shall be carefully selected to comply with the following standards: (1) The overall compatibility of the ultimate form, size, density, and color of trees, shrubs, and groundcover at maturity; (2) The tolerance of the plant materials to existing physical conditions, and resistance to insect pests, and disease; and (3) The intended use (i.e., shade screening, windbreak, erosion control, storm water treatment and management, etc.) as well as the ease of maintenance. Page 143 of 232 (4) Indigenous trees and other plant materials are encouraged. (c) City Street Trees. (1) In all zones, the developer or applicant shall install street trees in the public right-of-way, in compliance with city street tree standards. A properly licensed landscape contractor shall install the street tree. A street tree permit shall be obtained by the applicant and/or developer prior to issuance of the building permit. (2) An inspection of the placement and tree type is required when a new tree is either planted or replaced. (3) Street trees are not required in the RH (residential hillside) zone. (4) Street trees shall be selected and installed in compliance with the following standards: a. Street trees shall be planted in the public right-of-way in compliance with a city standard detail plan; b. Street trees shall be a minimum of fifteen (15) gallons when initially installed. Where an existing street tree must be removed to accommodate development, a replacement tree of similar size as that removed shall be planted; c. All street trees shall be irrigated with an automatic irrigation system; d. The developer and/or applicant shall use the tree species as designated by the city’s master street tree planting plan (as authorized under section 26.5-1). The developer and/or applicant may request in writing a substitution of the designated tree species, subject to approval by the director of public works; e. Spacing of trees shall be thirty (30) feet on center, unless otherwise approved by the director of public works; f. Street trees shall be spaced at least ten (10) feet from sewer laterals and street lights, and at least five feet from water laterals, gas laterals, fire hydrants, driveway aprons, and telephone/cable/electrical junction boxes; g. When required, the developer and/or applicant shall install street trees adjacent to sound walls and in medians; h. Deep root irrigation shall be provided for street trees in sidewalk cutouts. When required, deep root irrigation and tree well coverings shall be installed in compliance with city standard detail plans; i. No person shall construct or place any concrete, brick, asphalt, wood product, plastic sheeting, or other material impervious to air and water around the base of any street tree or within three (3) feet. In addition, no excess soil, mulch, or other organic/inorganic material shall be placed above a tree’s root crown within three (3) feet; and j. Street trees planted by the developer and/or applicant shall be guaranteed to remain healthy and grow for a minimum of one (1) year. All Page 144 of 232 workmanship on irrigation systems shall be guaranteed for one (1) year after final acceptance by the city. (d) Protected Trees. (1) The community development director shall determine if existing trees qualify as protected trees, a community of protected trees or heritage trees. Refer to section 30.38.270, Protected Tree Removal, for the definitions of “protected trees,” “a community of protected trees” or “heritage trees.” (2) An arborist report shall be required for any application for discretionary development approval for which the project site includes existing protected trees, as defined in section 30.38.270(b). The arborist report shall include all information specified in section 30.38.270(d). The arborist report shall specify all necessary measures to ensure that protected trees identified to remain are protected throughout the construction process. The cost for preparation of the arborist report and city review of it shall be at the sole expense of the applicant. All arborist recommendations shall be listed on the final landscape plans. (3) The arborist shall sign the final landscape plans certifying that the plan is consistent with the recommendations made in the arborist report. (4) At least three (3) scheduled inspections shall be made by the city and/or the arborist, at the direction of the city, to ensure compliance with the recommendations of the arborist report. The inspections shall, at a minimum, include the following: (a) initial inspection prior to any construction or grading, (b) after completion of rough grading and/or trenching, and (c) completion of all work including planting and irrigation system installation. Other inspections may be conducted as required by the community development director. (5) Unless otherwise permitted by the city, no structure, excavation, or impervious surface areas of any kind shall be constructed or installed within the root zone of any protected tree or heritage tree without mitigating special design, such as post and beam footings that bridge roots. No parking, storing vehicles equipment or other materials shall be permitted within the dripline of any protected tree without special design considerations approved by the community development director. (6) All protected trees, community of protected trees or heritage tree(s) shall be maintained in good health by the property owner, applicant and/or developer until approved for removal by an approved protected tree removal permit or other discretionary planning department application. (Ord. No. 2018-06, § 1, 3-19-2018) § 30.38.50. Residential zone landscape standards. (a) General Residential Zone Landscape Standards. Residential development located in the R1, R2, R3, R4 zones, planned development zones and downtown specific plan zones (and excluding the RH zone) shall incorporate landscaping in all yard areas that are not specifically used for driveways, walkways, patios, or similar purposes. In the R-2, R-3, R-4 and planned development zones and specific plan areas, at least thirty-five percent (35%) of the required landscaped area shall be designed to be usable as open recreational area. Landscaping shall be used to manage and treat Page 145 of 232 storm water to the maximum extent feasible. (b) RH Residential Hillside Zone. Areas within the residential hillside zoning district are designated as the “City of Gilroy Wildland-Urban Fire Interface Area” under the city code. Residential development in the RH zone shall provide landscaping consistent with the following standards: (1) Development in forested areas shall be carefully designed to minimize removal or damage to existing trees and to allow their continued healthy existence; (2) New landscaping placed within fifteen (15) feet from any structure shall consist of selected vegetation with low-growing characteristics; and (3) A landscape design plan for projects in the RH residential hillside zone shall incorporate all requirements of Chapter 10, Fire Protection, as amended. (Ord. No. 2018-06, § 1, 3-19-2018) § 30.38.60. Commercial zone landscape standards. Landscaping in commercial zones shall be designed using the following standards and shall enhance the aesthetic quality of the development by using the following requirements: (a) All development in commercial and mixed use zones shall provide a minimum of twenty-one (21) feet of landscaping, measured from face of curb, adjacent to public streets (public sidewalks may be permitted in the landscape area); (b) At least eight percent (8%) of the gross total land area of the site, outside of the public right-of-way, shall be landscaped, except in the downtown specific plan zones where there are typically no front and side yard setbacks; (c) All portions of a site over forty (40) square feet in area not specifically used for buildings, parking, driveways, walkways, or similar uses shall be landscaped; (d) In all landscaped areas, trees shall be planted on average every twenty (20) feet on center or with a greater spacing as appropriate to maintain proper tree health as determined by a licensed landscape architect; clustering of trees may be permitted with the approval of the director of public works; (e) Parking lot landscape islands with a minimum of fifty (50) square feet in area, and including a tree, shall be located in parking lots every twelve (12) stalls, and shall be evenly distributed throughout the parking area; (f) All landscape areas shall be at least five (5) feet wide, except as approved by the community development director due to specific site situations where the minimum width is impractical; (g) Parking lot landscape areas containing trees shall be a minimum of eight (8) feet wide, except as approved by the community development director due to specific site situations where the minimum width is impractical; (h) Parking areas shall be screened from view from adjacent residential areas and Page 146 of 232 streets, except at driveways and street corners where visibility is needed; (i) Landscaping shall be used to manage and treat storm water to the maximum extent feasible; (j) Three (3) foot high screening shall be located where necessary in commercial parking lots and drive-through uses to block headlights from shining into adjacent residential areas. (Ord. No. 2018-06, § 1, 3-19-2018) (k) Landscaping required by this section, shall not include nonfunctional turf irrigated with potable water. § 30.38.70. Industrial zone landscape standards. Landscaping in industrial zones shall be designed using the following standards and shall enhance the aesthetic quality of the development by using the following requirements: (a) Landscape the front and side yard areas adjacent to streets, as required by this article, which are not specifically used for parking, driveways, walkways, loading areas, or similar paved access areas; (b) Landscaping areas located adjacent to the street right-of-way shall be a minimum of twenty-one (21) feet wide (measured from the face of curb); (c) Paved areas shall not exceed fifty percent (50%) of the total area of setbacks; (d) All industrial zones shall provide landscape areas that are a minimum of five (5) feet in width along the entire perimeter of the site; (e) A minimum eight (8) foot wide landscaped buffer is required adjacent to commercial or residential uses; (f) Fences and walls shall complement the structure architecture and landscaping. Long structure expanse shall be architecturally designed or landscaped to prevent monotony; (g) Outdoor use areas and loading areas shall be screened by landscaping and/or materials integral with the structure design; (h) Industrial development visible from US 101 shall be screened from view with dense landscaping; (i) Three (3) foot high screening shall be located where necessary in industrial parking lots and drive-through uses to block headlights from shining into adjacent residential areas. (Ord. No. 2018-06, § 1, 3-19-2018) (j) Landscaping required by this section shall not include nonfunctional turf irrigated with potable water. § 30.38.80. Landscape documentation review process. (a) Landscape Documentation Package Required. The project developer and/or applicant shall submit a landscape documentation package, in compliance with section 30.38.90 (Elements of the landscape documentation package), to the community development director for approval. (b) Landscape Documentation Package Submittal. The landscape documentation Page 147 of 232 package shall be submitted in conjunction with the building permit for the project and shall be approved prior to issuance of the building permit. (c) Following Completion of Installation. Following final approval of the installation of landscaping by the city, the project developer and/or applicant shall: (1) Receive documentation of the approval in a form provided by the community development director and shall record the date of the permit in the certificate of completion; (2) Submit a copy of the approved landscape documentation package along with the record drawings and any other information to the property owner or his/her designee; and (3) Submit a copy of the water efficient landscape worksheet to the local water purveyor. (Ord. No. 2018-06, § 1, 3-19-2018) § 30.38.90. Elements of the landscape documentation package. At a minimum, the landscape documentation package shall be provided in a form required by the community development director and shall include the following components, as described in this article: water efficient landscape worksheet, soil management report, landscape design plan, irrigation design plan, and grading design plan. (Ord. No. 2018-06, § 1, 3-19-2018) § 30.38.100. Water efficient landscape worksheet – Completion of worksheet. Project applicants and/or developers shall complete the water efficient landscape worksheet which contains information on the plant factor, irrigation method, irrigation efficiency, and area associated with each hydrozone. The estimated total adjustment factor (ETAF) for a landscape project is based on the plant factors and irrigation methods selected. In calculating the maximum applied water allowance and estimated total water use, a project developer/applicant shall use the ETo values for Gilroy. (a) Evapotranspiration (ETo). The community development director shall provide and annually update the evapotranspiration rate for the city using the rates provided by the California Irrigation Management Information System (CIMIS). (b) Water Budget Calculations. Water budget calculations shall adhere to all of the following requirements: (1) The plant factor used shall be from the Water Use Classification of Landscape Species (WUCOLS) or from horticultural researchers with academic institutions or professional associations as approved by the California Department of Water Resources (DWR). The plant factor ranges from 0 to 0.1 for very low water using plants, 0.1 to 0.3 for low water use plants, from 0.4 to 0.6 for moderate water use plants, and from 0.7 to 1.0 for high water use plants. (2) All water features shall be included in the high water use hydrozone and temporarily irrigated areas shall be included in the low water use hydrozone. (3) All special landscape areas shall be identified and their water use calculated as shown below. Page 148 of 232 (4) ETAF for new and existing (nonrehabilitated) special landscape areas shall not exceed 1.0. (c) Maximum Applied Water Allowance Calculation. The maximum applied water allowance is calculated based on the maximum ETAF allowed (0.55 for residential areas and 0.45 for nonresidential areas) and expressed as annual gallons required, exclusive of special landscape areas. MAWA (Annual Gallons Allowed) = (ETo) (0.62) [(ETAF x LA) + ((1-ETAF) x SLA)] Residential Areas: MAWA (Annual Gallons Allowed) = (ETo) (0.62) [(0.55 x LA) + ((1-0.55) x SLA)] Nonresidential Areas: MAWA (Annual Gallons Allowed) = (ETo) (0.62) [(0.45 x LA) + ((1-0.45) x SLA)] Where: MAWA = Maximum Applied Water Allowance (Annual Gallons Allowed) ETo = Reference Evapotranspiration (inches per year) 0.62 = Conversion Factor (to gallons) 0.55 = ET Residential Adjustment Factor (ETAF) 0.45 = ET Nonresidential Adjustment Factor (ETAF) SLA = Special Landscape Area (square feet) (d) Estimated Total Water Use Calculation. The estimated total water use (ETWU) is calculated based on the plants used and irrigation method selected for the landscape design. The sum of the ETWU shall not exceed the MAWA. Wher e: ETW U ETo = = Estimated Total Water Use per year (gallons) Reference Evapotranspiration (inches per year) PF = Plant Factor from WUCOLS HA = Hydrozone Area [high, medium, and low water use areas] (square feet) SLA = Special Landscape Area (square feet) 0.62 = Conversion Factor (to gallons) IE = Irrigation Efficiency 0.75 for spray head, and 0.81 for drip Page 149 of 232 (e) Effective Precipitation (EPPT). The director may consider effective precipitation (twenty-five percent (25%) of annual precipitation) in tracking water use and may use the following equation to calculate MAWA: Residential Areas: MAWA (Annual Gallons Allowed) = (ETo-EPPT) (0.62) [(0.55 x LA) + ((1-0.55) x SLA)] Nonresidential Areas: MAWA (Annual Gallons Allowed) = (ETo-EPPT) (0.62) [(0.45 x LA) + ((1-0.45) x SLA)] (Ord. No. 2018-06, § 1, 3-19-2018) § 30.38.110. Soil management report. In order to reduce runoff and encourage healthy plant growth, a soil management report shall be completed by the project developer/applicant, or his/her designee, as follows: (a) Soil samples shall be submitted to a laboratory for analysis and recommendations. (1) Soil sampling shall be conducted in compliance with laboratory protocol, including protocols regarding adequate sampling depth for the intended plants. (2) The soil analysis shall include: a. Soil texture; b. Infiltration rate determined by laboratory test or soil texture infiltration rate table; c. pH; d. Total soluble salts; e. Sodium; f. Percent organic matter; and g. Recommendations. (3) In projects with multiple landscape installations (i.e., production home developments) a soil sampling rate of one (1) in seven (7) lots or approximately fifteen percent (15%) will satisfy this requirement. Large landscape projects shall sample at a rate equivalent to one (1) in seven (7) parcels. (b) The project applicant and/or developer, or his/her designee, shall comply with one (1) of the following: (1) If significant mass grading is not planned, the soil analysis report shall be submitted as part of the landscape documentation package; or (2) If significant mass grading is planned, the soil analysis report shall be Page 150 of 232 submitted as part of the certificate of completion. (c) The soil analysis report shall be made available, in a timely manner, to the professionals preparing the water plans and irrigation design plans to make any necessary adjustments to the design plans. (d) The project developer/applicant, or his/her designee, shall submit documentation verifying implementation of soil analysis report recommendations with the certificate of completion. (Ord. No. 2018-06, § 1, 3-19-2018) § 30.38.120. Landscape design plan. (a) Landscape Design Plan Details Required. A landscape design plan at a minimum shall be required and shall specify the items detailed below. Special design attributes may require detail drawing and/or the submittal of manufacturer’s literature. (1) Locate and identify all landscaping planting material, including trees, shrubs, groundcover, and turf. Planting symbols shall be clearly drawn. Tree staking, installation, soil preparation details, and any other applicable planting and installation details shall be provided; (2) Reference planting symbols, specifying botanical name, common name, container size, spacing, and quantities; (3) Locate all existing mature trees, noting biological name, common name, and approximate trunk size, measured at four (4) feet above existing grade. Note trees to be removed, relocated on site, and/or maintained in place; (4) Delineate and label each hydrozone by number, letter, or other method; (5) Identify each hydrozone as low, moderate, high water, or mixed use water. Temporarily irrigated areas of the landscape shall be included in the low water use hydrozone for the water budget calculation; (6) Identify recreational areas; (7) Identify areas permanently and solely dedicated to edible plants; (8) Identify areas irrigated with recycled water; (9) Identify type of mulch and application depth; (10) Identify soil amendments, type, and quantity; (11) Identify type and surface area of water features; (12) Identify all paving and hardscapes (pervious and nonpervious); (13) Locate and identify the height of all walls, fences, and gates; (14) Locate and identify all outdoor amenity features, including but not limited to trellises, gazebos, play equipment, picnic tables, and benches; (15) Locate and identify property lines, streets, street names, driveways, walkways, Page 151 of 232 and other paved areas; (16) Identify existing and proposed structures, including pad elevations, if applicable; (17) Identify natural features including but not limited to rock outcroppings, existing trees and shrubs that will remain; (18) Identify location, installation details, and twenty-four (24) hour retention or infiltration capacity of any applicable storm water best management practices (BMP) that encourage on-site retention and infiltration of storm water. Applicants shall refer to the city or regional water quality control board for information on any applicable storm water technical requirements. Storm water BMPs shall be incorporated into the landscape design plan to the maximum extent practicable. Examples shall include, but are not limited to: a. Infiltration beds, swales, and basins that allow water to collect and soak into the ground; b. Constructed wetlands and retention ponds that retain water, handle excess flow, and filter pollutants; or c. Pervious or porous surfaces (e.g., permeable pavers or blocks, pervious or porous concrete, etc.) that minimize runoff; (19) Identify any applicable rain harvesting or catchment technologies, and their twenty-four (24) hour retention or infiltration capacity; (20) Contain the following statement: “I have complied with the standards of the Chapter and applied them for the efficient use of water in the landscape design plan”; and (21) Bear the signature of a licensed landscape architect, licensed landscape contractor, or any other person authorized to design a landscape. (b) Landscape Design Requirements. For the efficient use of water, a landscape shall be carefully designed and planned for the intended function of the project. A landscape design plan, at a minimum, shall meet the following design standards and shall be submitted as part of the landscape documentation package: (1) Plant Material. a. Any plant may be selected for the landscape, providing the estimated total water use in the landscape area does not exceed the maximum applied water allowance. Methods to achieve water efficiency may include one (1) or more of the following: 1. Protection and preservation of native species and natural vegetation; 2. Selection of water-conserving plant, tree and turf species, especially local native plants; 3. Selection of plants based on local climate suitability, disease, and pest resistance; 4. Selection of trees as specified in section 30.38.40 (General landscape Page 152 of 232 standards); 5. Selection of plants from the approved city plant list. b. Each hydrozone shall have plant materials with similar water use, except for hydrozones with plants of mixed water use. c. Plants may be selected and planted appropriately based upon their adaptability to the climatic, geologic, and topographical conditions of the project site. Methods to achieve water efficiency shall include one (1) or more of the following: 1. Plant selection shall be from the Sunset Western Climate Zone System which considers temperature, humidity, elevation, terrain, latitude, and varying degrees of continental and marine influence on local climate; or 2. Recognize the horticultural attributes of plants (i.e., mature plant size, invasive surface roots) to minimize damage to property or infrastructure (e.g., structures, sidewalks, power lines); allow for adequate soil volume for healthy root growth; or 3. Consider the solar orientation for plant placement to maximize summer shade and winter solar gain. d. Turf is not allowed on slopes greater than twenty-five percent (25%) where the toe of the slope is adjacent to an impermeable hardscape and where twenty-five percent (25%) means one (1) foot of vertical elevation change for every four (4) feet of horizontal length (rise divided by run times one hundred (100) equals slope percent). e. High water use plants, characterized by a plant factor of 0.7 to 1.0, are prohibited in street medians. f. The use of invasive plant species (i.e., those listed by the California Invasive Plant Council) is strongly discouraged. g. The architectural guidelines of a common interest development, which include community apartment projects, condominiums, planned developments, and stock cooperatives, shall not prohibit, or include conditions that have the effect of prohibiting, the use of low water use plants. g.h. New and rehabilitated landscapes on commercial, industrial, and institutional properties, and in common areas of homeowners’ associations, common interest developments, and community service organizations or similar entities, shall not include nonfunctional turf unless it will be irrigated exclusively with recycled water. Turf proposed on these properties shall be shown as functional turf on the landscape design plan, with its recreational or community use. (2) Water Features. a. Recirculating water systems shall be used for all water features. Page 153 of 232 b. Where available, recycled water shall be used as a source for decorative water features. c. Surface area of a water feature shall be included in the high water use hydrozone area of the water budget calculation. d. Pool and spa covers are highly recommended. (3) Soil Preparation, Mulch and Amendments. a. Prior to the planting of any materials, compacted soils shall be transformed to a friable condition. On engineered slopes, only amended planting holes need meet this requirement. b. Soil amendments shall be incorporated according to recommendations of the soil report and what is appropriate for the plants selected. c. For landscape installations, compost at a minimum rate of four (4) cubic yards per one thousand (1,000) square feet of permeable area shall be incorporated to a minimum depth of six (6) inches into the soil. Soils with greater than six percent (6%) organic matter in the top six (6) inches of soil are exempt from adding compost and tilling. d. A minimum three (3) inch layer of mulch shall be applied on all exposed soil surfaces of planting areas except in turf areas, creeping or rooting groundcovers, or direct seeding applications where mulch is contraindicated. To provide habitat for beneficial insects and other wildlife, up to five percent (5%) of the landscape area may be left without mulch. Designated insect habitat must be included in the landscape design plan. e. Stabilizing mulching products shall be used on all slopes that meet current engineering standards. f. The mulching portion of the seed/mulch slurry in hydro-seeded applications shall meet the mulching requirement. g. Organic mulch materials made from recycled or post-consumer processes shall take precedence over inorganic materials or virgin forest products unless the recycled post-consumer organic products are not locally available. Organic mulches are not required where prohibited by local fuel modification plan guidelines or other applicable local ordinances. (Ord. No. 2018-06, § 1, 3-19-2018) § 30.38.130. Irrigation design plan. (a) Irrigation Design Plan Details Required. An irrigation design plan is required and shall include all of the information detailed below. It shall be separate from but use the same format and scale as the landscape design plan. (1) Location and size of separate water meters for landscape; (2) Location, type, and size of all components of the irrigation system, including controllers, main and lateral lines, valves, sprinkler heads, moisture sensing devices, rain switches, quick couplers, pressure regulators, and backflow Page 154 of 232 prevention devices; (3) Static water pressure at the point of connection to the public water supply; (4) Flow rate (gallons per minute), application rate (inches per hour), and design operating pressure (pressure per square inch) for each station; (5) Recycled water irrigation systems; (6) The following statement: “I have complied with the standards of this Chapter and applied them accordingly for the efficient use of water in the irrigation design plan”; and (7) The signature of a licensed landscape architect, certified irrigation designer, licensed landscape contractor, or any other person authorized to design an irrigation system. (b) Irrigation Design Requirements. This section applies to landscaped areas requiring permanent irrigation, not areas that require temporary irrigation solely for the plant establishment period. For the efficient use of water, an irrigation system shall meet the requirements listed in this section and the manufacturers’ recommendations. The irrigation system and its related components shall be planned and designed to allow for proper installation, management, and maintenance. An irrigation design plan meeting the following design standards shall be submitted as part of the landscape documentation package. (1) System. a. Landscape water meters shall be installed for all nonresidential irrigated landscapes of at least one thousand (1,000) square feet but not more than five thousand (5,000) square feet (the level at which Water Code Section 535 applies) and residential irrigated landscapes of five thousand (5,000) square feet or greater. A landscape water meter may be either: 1. A customer service meter dedicated to landscape use provided by the local water purveyor; or 2. A privately owned meter or submeter. b. Automatic irrigation controllers using either evapotranspiration or soil moisture sensor data utilizing nonvolatile memory shall be required for irrigation scheduling in all irrigation systems. c. If the water pressure is below or exceeds the recommended pressure of the specified irrigation devices, the installation of a pressure regulating device is required to ensure that the dynamic pressure at each emission device is within the manufacturer’s recommended pressure range for optimal performance. 1. If the static pressure is above or below the required dynamic pressure of the irrigation system, pressure-regulating devices (i.e., inline pressure regulators, booster pumps), or other devices shall be installed to meet the required dynamic pressure of the irrigation Page 155 of 232 system. 2. Static water pressure, dynamic or operating pressure, and flow reading of the water supply shall be measured at the point of connection. These pressure and flow measurements shall be conducted at the design stage. If the measurements are not available at the design stage, the measurements shall be conducted at installation. d. Sensors (i.e., rain, freeze, wind, etc.), either integral or auxiliary, that suspend or alter irrigation operation during unfavorable weather conditions shall be required on all irrigation systems, as appropriate for local climatic conditions. Irrigation shall be prohibited during windy or freezing weather or during rain. e. Manual shut-off valves (i.e., a gate valve, ball valve, or butterfly valve) shall be required, as close as possible to the point of connection of the water supply, to minimize water loss in case of an emergency (i.e., a main line break) or routine repair. f. Backflow prevention devices shall be required to protect the water supply from contamination by the irrigation system. Project applicants and/or developers shall refer to the applicable city code (i.e., public health) for additional backflow prevention requirements. g. Flow sensors that detect high flow conditions created by system damage or malfunction are required for all on nonresidential landscapes and residential landscapes of five thousand (5,000) square feet or larger. h. Master shut-off valves are required on all projects except landscapes that make use of technologies that allow for the individual control of sprinklers that are individually pressurized in a system equipped with low pressure shut-down features. i. The irrigation system shall be designed to prevent runoff, low head drainage, overspray, or other similar conditions where irrigation water flows onto nontargeted areas (i.e., adjacent property, nonirrigated areas, hardscapes, roadways, or structures). j. Relevant information from the soil management plan (i.e., soil type and infiltration rate) shall be used when designing irrigation systems. k. The design of the irrigation system shall conform to the hydrozones of the landscape design plan. l. The irrigation system shall be designed and installed to meet, at a minimum, the irrigation efficiency criteria as described in section 30.38.100 (water efficient landscape worksheet) regarding the maximum applied water allowance. m. All irrigation emission devices shall meet the requirements specified in the American National Standards Institute (ANSI) standard, American Page 156 of 232 Society of Agricultural and Biological Engineers’/International Code Council’s (ASABE/ ICC) 802-2014 Landscape Irrigation Sprinkler and Emitter Standard. All sprinkler heads installed in the landscape shall document a distribution uniformity low quarter of 0.65 or higher using the protocol defined in ASABE/ ICC 802-2014. n. The project applicants and/or developers shall inquire with the local water purveyor about peak water operating demands (on the water supply system) or water restrictions that may impact the effectiveness of the irrigation system. o. In mulched planting areas, the use of low volume irrigation is required to maximize water infiltration into the root zone. p. Sprinkler heads and other emission devices shall have matched precipitation rates, unless otherwise directed by the manufacturer’s recommendations. q. Head to head coverage is recommended. However, sprinkler spacing shall be designed to achieve the highest possible distribution uniformity using the manufacturer’s recommendations. r. Swing joints or other riser-protection components are required on all risers subject to damage that are adjacent to hardscapes or in high traffic areas of turf-grass. s. Check valves or anti-drain valves are required on all sprinkler heads where low point drainage could occur. t. Landscape areas less than ten (10) feet in width in any direction shall be irrigated with subsurface irrigation or other means that produces no runoff or overspray. u. Overhead irrigation shall not be permitted within twenty-four (24) inches of any nonpermeable surface. Allowable irrigation within the setback from nonpermeable surfaces may include drip, dripline, or other low flow nonspray technology. The setback area may be planted or unplanted. The surfacing of the setback may be mulch, gravel, or other porous material. These restrictions may be modified by the director if: 1. The landscape area is adjacent to permeable surfacing and no runoff occurs; or 2. The adjacent nonpermeable surfaces are designed and constructed to drain entirely to landscaping; or 3. The irrigation designer specifies an alternative design or technology, as part of the landscape documentation package, and clearly demonstrates strict adherence to irrigation system design. Prevention of overspray and runoff shall be confirmed during the irrigation audit. v. Slopes greater than twenty-five percent (25%) shall not be irrigated with an irrigation system with an application rate exceeding 0.75 inches per hour. Page 157 of 232 This restriction may be modified by the director if the landscape designer specifies an alternative design or technology, as part of the landscape documentation package, and clearly demonstrates no runoff or erosion will occur. Prevention of runoff and erosion shall be confirmed during the irrigation audit. (2) Hydrozone. a. Each valve shall irrigate a hydrozone with similar site, slope, sun exposure, soil conditions, and plant materials with similar water use. b. Sprinkler heads and other emission devices shall be selected based on what is appropriate for the plant type within that hydrozone. c. Trees shall be placed on separate valves from shrubs, groundcovers, and turf to facilitate the appropriate irrigation of trees. The mature size and extent of the root zone shall be considered when designing irrigation for the tree. d. Individual hydrozones that mix plants of moderate and low water use, or moderate and high water use, may be allowed if: 1. Plant factor calculation is based on the proportions of the respective plant water uses and their plant factor; or 2. The plant factor of the higher water using plant is used for calculations. e. Individual hydrozones that mix high and low water use plants shall not be permitted. f. On the landscape design plan and irrigation design plan, hydrozone areas shall be designated by number, letter, or other designation. On the irrigation design plan, designate the areas irrigated by each valve, and assign a number to each valve. Use this valve number in the hydrozone information table located on the water efficient landscape worksheet. This table can also assist with the irrigation audit and programming the controller. (Ord. No. 2018-06, § 1, 3-19-2018) § 30.38.140. Grading design plan. For the efficient use of water, grading of a project site shall be designed to minimize soil erosion, runoff, and water waste. A comprehensive grading plan, prepared by a civil engineer, shall be submitted as part of the landscape documentation package. (a) Grading Design Plan Details Required. The project applicants and/or developers shall submit a landscape grading plan that indicates finished configurations and elevations of the landscape area including: (1) Height of graded slopes; (2) Drainage patterns; Page 158 of 232 (3) Pad elevations; (4) Finish grade; and (5) Storm water retention improvements, if applicable. (6) The grading design plan shall contain the following statement: I have complied with the requirements of this Chapter and applied them accordingly for the efficient use of water in the grading design plan and shall bear the signature of a licensed professional as authorized by law. (b) Erosion and Runoff Best Management Practices. To prevent excessive erosion and runoff, project developers/applicants shall: (1) Grade so that all irrigation and normal rainfall remains within property lines and does not drain on to nonpermeable hardscapes; (2) Avoid disruption of natural drainage patterns and undisturbed soil; and (3) Avoid soil compaction in landscape areas. (Ord. No. 2018-06, § 1, 3-19-2018) § 30.38.150. Certificate of completion. Upon receipt of the permit for the landscape documentation package and completion of the landscaping and irrigation system, the applicants and/or developers shall submit a certificate of completion to the director for review and shall ensure that copies of the approved certificate of completion are submitted to the local water purveyor and property owner or his or her designee. The following details shall apply to the certificate of completion: (a) The certificate of completion shall be on a standard form approved by the director; (b) The certificate of completion shall be certified by either the signer of the landscape design plan, the signer of the irrigation design plan, or the licensed landscape contractor that the landscape project has been installed according to the approved landscape documentation package. (1) Where there are significant changes made in the field during construction, these “as-built” or record drawings shall be included with the certification; and (2) A diagram of the irrigation plan showing hydrozones shall be kept with the irrigation controller for subsequent irrigation management purposes; (c) The certificate of completion shall include irrigation scheduling parameters used to set the controller in compliance with section 30.38.160 (Irrigation scheduling); (d) The certificate of completion shall include landscape and irrigation maintenance schedules in compliance with section 30.38.170 (Landscape and irrigation maintenance schedule); (e) The certificate of completion shall include an irrigation audit report in compliance with section 30.38.180 (Irrigation audit, irrigation survey, and irrigation water use Page 159 of 232 analysis); and (f) The certificate of completion shall include a soil analysis report, if not submitted with the landscape documentation package, and documentation verifying implementation of soil report recommendations in compliance with section 30.38.110 (Soil management report). (Ord. No. 2018-06, § 1, 3-19-2018) § 30.38.160. Irrigation scheduling. For the efficient use of water, all irrigation schedules shall be developed, managed, and evaluated to use the minimum amount of water required to maintain plant health. Irrigation schedules shall meet the following standards: (a) Irrigation scheduling shall be regulated by automatic irrigation controllers. (b) Overhead irrigation shall only be scheduled between 68:00 p.m. and 910:00 a.m. unless weather conditions prevent it. If allowable hours of irrigation differ from the local water purveyor, the stricter of the two (2) shall apply. Operation of the irrigation system outside the normal watering window is allowed for auditing and system maintenance only. (c) For implementation of the irrigation schedule, attention shall be paid to irrigation run times, emission device, flow rate, and current reference evapotranspiration, so that applied water meets the estimated total water use. Total annual applied water shall be less than or equal to maximum applied water allowance (MAWA). Actual irrigation schedules shall be regulated by automatic irrigation controllers using current reference evapotranspiration data (e.g., CIMIS) or soil moisture sensor data. (d) Parameters used to set the automatic controller shall be developed and submitted for each of the following: (1) The plant establishment period; (2) The established landscape; and (3) Temporarily irrigated areas. (e) Each irrigation schedule shall consider for each station all of the following that apply: (1) Irrigation interval (days between irrigation); (2) Irrigation run times (hours or minutes per irrigation event to avoid runoff); (3) Number of cycle starts required for each irrigation event to avoid runoff; (4) Amount of applied water scheduled to be applied on a monthly basis; (5) Application rate setting; (6) Root depth setting; (7) Plant type setting; (8) Soil type; Page 160 of 232 (9) Slope factor setting; (10) Shade factor setting; and (11) Irrigation uniformity or efficiency setting. (Ord. No. 2018-06, § 1, 3-19-2018) § 30.38.170. Landscape and irrigation maintenance schedule. (a) Landscapes shall be maintained to ensure water use efficiency. A regular maintenance schedule shall be submitted with the certificate of completion. (b) A regular maintenance schedule shall include, but not be limited to, routine inspection; auditing, adjustment and repair of the irrigation system and its components; aerating and dethatching turf areas; topdressing with compost, replenishing mulch; fertilizing; pruning; weeding in all landscape areas, and removing obstructions to emission devices. Operation of the irrigation system outside the normal watering window is allowed for auditing and system maintenance only. (c) Repair of all irrigation equipment shall be done with the originally installed components or their equivalents or with components with greater efficiency. (d) Project applicants and/or developers are encouraged to implement established landscape industry sustainable best practices for all landscape maintenance activities. (Ord. No. 2018-06, § 1, 319-18) § 30.38.180. Irrigation audit, irrigation survey, and irrigation water use analysis. (a) All landscape irrigation audits shall be conducted by a certified landscape irrigation auditor. Landscape audits shall not be conducted by the person who designed the landscape or installed the landscape. (b) In large projects or projects with multiple landscape installations (i.e., production home developments) an auditing rate of one (1) in seven (7) parcels or approximately fifteen percent (15%) will satisfy this requirement. (c) For new construction and rehabilitated landscape projects installed after December 1, 2015, the following shall apply: (1) The project applicants and/or developers shall submit an irrigation audit report with the certificate of completion, including inspection, system tune-up, system test with distribution uniformity, reporting overspray or run off that causes overland flow, and preparation of an irrigation schedule, including configuring irrigation controllers with application rate, soil types, plant factors, slope, exposure and any other factors necessary for accurate programming; (2) The city may require an irrigation water use analysis, irrigation audits, and irrigation surveys to ensure compliance with the maximum applied water allowance. (Ord. No. 2018-06, § 1, 3-19-2018) Page 161 of 232 § 30.38.190. Irrigation efficiency. For the purpose of determining estimated total water use, average irrigation efficiency is assumed to be 0.75 for overhead spray devices and 0.81 for drip system devices. (Ord. No. 2018-06, § 1, 3-19-2018) § 30.38.200. Recycled water. (a) The installation of water irrigation systems shall allow for the current and future use of recycled water. (b) All recycled water irrigation systems shall be designed and operated in compliance with all applicable local and state laws. (c) Landscapes using recycled water are considered special landscape areas. The ETAF for new and existing (nonrehabilitated) special landscape areas shall not exceed 1.0. (Ord. No. 2018-06, § 1, 3-19-2018) § 30.38.210. Graywater systems. Graywater systems promote the efficient use of water and are encouraged to assist in on- site landscape irrigation. All graywater systems shall conform to the California Plumbing Code (Title 24, Part 5, Chapter 16) and any applicable local standards. (Ord. No. 2018-06, § 1, 3-19-2018) § 30.38.220. Storm water management and rainwater retention. (a) Storm water management practices minimize runoff and increase infiltration which recharges groundwater and improves water quality. Implementing storm water best management practices in the landscape and grading design plans to minimize runoff and to increase on-site rainwater retention and infiltration is required. (b) Project applicants and/or developers shall refer to the following references for information on low impact development (LID) standards, including storm water management, operations and maintenance: (1) Chapter 27D (Post Construction Storm Water Pollution Prevention); and (2) South Santa Clara County Regional Stormwater Management Guidance Manual for Low Impact Development and Post-Construction Requirements Project applicants and/or developers shall refer to the city or regional water quality control board for information on any applicable storm water technical requirements. (c) All planted landscape areas shall have friable soil to maximize water retention and infiltration in compliance with section 30.38.120 (Landscape design plan). (d) Landscape areas shall be designed for capture and infiltration capacity that is sufficient to prevent runoff from impervious surfaces (i.e. roof and paved areas) from either: (1) twenty-four (24) hour rain event or (2) the eighty-fifth percentile, twenty- four (24) hour rain event, and/or additional capacity as required by any applicable local, regional, state and/or federal regulations. (e) Storm water projects shall incorporate any of the following elements to improve on- Page 162 of 232 site storm water and dry weather runoff capture and use: (1) Grade impervious surfaces (i.e., driveways) during construction to drain to vegetated areas. (2) Minimize the area of impervious surfaces (i.e., paved areas, roof, and concrete driveways). (3) Incorporate pervious or porous surfaces (e.g., gravel, permeable pavers or blocks, pervious or porous concrete) that minimize runoff. (4) Direct runoff from paved surfaces and roof areas into planting beds or landscaped areas to maximize site water capture and reuse. (5) Incorporate rain gardens, cisterns, and other rain harvesting or catchment systems. (6) Incorporate infiltration beds, swales, basins, and drywells to capture storm water and dry weather runoff and increase percolation into the soil. (7) Consider constructed wetlands and ponds that retain water, equalize excess flow, and filter pollutants. (Ord. No. 2018-06, § 1, 3-19-2018) § 30.38.230. Public education. (a) Publications. The city shall provide information to owners of permitted renovations and new, single-family residential homes regarding the design, installation, management, and maintenance of water efficient landscapes based on a water budget. (b) Model Homes. All model homes that are landscaped shall use signs and written information to demonstrate the principles of water efficient landscapes described in this article. (1) Signs shall identify the following: a. The model as an example of a water efficient landscape featuring elements like hydrozones, irrigation equipment, and others that contribute to the overall water efficient theme; and b. Information about the site’s water use as designed in compliance with the local ordinances; specify who designed and installed the water efficient landscape; and demonstrate low water use approaches to landscaping like using native plants, graywater systems, and rainwater catchment systems. (2) Developers/applicants shall provide information about designing, installing, managing, and maintaining water efficient landscapes to home buyers. (Ord. No. 2018-06, § 1, 3-19-2018) § 30.38.240. Provisions for existing landscapes. (a) This section shall apply to all existing landscape areas that were installed before December 1, 2015, and are over one (1) acre in size. Page 163 of 232 (1) For all landscape areas that have a water meter, the city shall administer programs that may include, but not be limited to, irrigation water use analyses, irrigation surveys, and irrigation audits to evaluate water use and provide recommendations as necessary to reduce landscape water use to a level that does not exceed the maximum applied water allowance for existing landscapes. The maximum applied water allowance for existing landscapes shall be calculated as: MAWA = (0.8) (ETo) (LA) (0.62). (2) For all landscape areas that do not have a water meter, the city shall administer programs that may include, but not be limited to, irrigation surveys and irrigation audits to evaluate water use and provide recommendations as necessary in order to prevent water waste. (b) All landscape irrigation audits shall be conducted by a certified landscape irrigation auditor. (Ord. No. 2018-06, § 1, 3-19-2018) ( c) Regardless of size or date of installation, existing landscapes on properties shall comply with Chapter 27. Section 27.98 (b)(2)(o)(M-0.34). § 30.38.250. Water waste prevention. (a) Project applicants and/or developers shall prevent water waste resulting from inefficient landscape irrigation by prohibiting runoff from leaving the target landscape areas due to low head drainage, overspray, or other similar conditions where water flows onto adjacent property, nonirrigated areas, walks, roadways, parking lots, or structures. Penalties for violating these prohibitions shall be enforced in compliance with Article LIII of this chapter (Enforcement of the Zoning Ordinance). (b) Restrictions regarding overspray and runoff may be modified if: (1) The landscape area is adjacent to permeable surfacing and no runoff occurs; or (2) The adjacent nonpermeable surfaces are designed and constructed to drain entirely to landscaping. (Ord. No. 2018-06, § 1, 3-19-2018) § 30.38.260. Penalties. Noncompliance with the applicable provision of this article shall be subject to enforcement action, as provided in Article LIII of this chapter (Enforcement of the Zoning Ordinance). (Ord. No. 2018-06, § 1, 3-19-2018) § 30.38.270. Protected tree removal. (a) Purpose. The city recognizes that existing and future trees and tree communities located in the city are a valuable and distinctive resource. These trees and tree communities augment the economic base of the city through encouragement of tourism and enhancement of the living environment. The removal of protected trees and diminishing of tree communities would reduce property values and the scenic beauty and attractiveness of the city to residents and visitors. Page 164 of 232 In order to protect this resource, it is the intent of this section to regulate the removal or destruction of protected trees and tree communities on private property within the city. (b) Definitions. (1) Community of Protected Trees. Any grouping of protected trees which are ecologically or aesthetically related to each other such that the loss of several of them would cause a protected ecological, aesthetic or environmental impact in the immediate area, as determined by a certified arborist. In subsections (d), (e), (g), and (h) of this section, the term “tree” shall refer to each and every tree in the community of protected trees that is proposed for removal. (2) Heritage Tree. A tree of any species with a single trunk of ninety (90) inches in circumference or more at a point four and one-half (4-1/2) feet above the ground or with multiple trunks, two (2) of which collectively measure seventy- two (72) inches in circumference or more at a point four and one-half (4-1/2) feet above the ground. (3) Indigenous Tree. A tree which is native to the Gilroy region, including oaks (all types), California bay (Umbellularia californica), big leaf maple (Acer macrophyllum), madrone (Arbutus menziesii), California sycamore (Platanus racemosa), California buckeye (Aesculus californica) and alder (Alnus glutinosa). (4) Protected Tree. Any indigenous tree characterized by having a single trunk of thirty-eight (38) inches in circumference or more at a point four and one-half (4-1/2) feet above the ground. Nonindigenous tree species and orchards (including individual fruit and nut trees) are exempt from this definition for the purpose of this section. (5) Tree. A woody perennial plant characterized by having a main stem or trunk, or a multistemmed trunk system with a more or less definitely formed crown, and is usually over ten (10) feet high at maturity. This definition shall not include trees planted, grown and held for sale by licensed nurseries or the first removal or transplanting of such trees pursuant to and as a part of operation of a licensed nursery business. (c) Permit Required. It is unlawful for any person to cut down, remove, poison or otherwise damage, kill or destroy or cause to be removed any of the following on any private property without first securing a permit as provided in this section: (1) A protected tree. (2) Greater than twenty-five percent (25%) of the trees within the outermost dripline of a community of protected trees. (3) A heritage tree. A separate tree removal permit shall not be required for projects which have been approved through a discretionary process by the planning division, planning commission or city council and the removal of protected trees or community of trees were reviewed to ensure compliance with all requirements of this section and authorized by that approval. Trimming, removal and other activities related to trees Page 165 of 232 in the public right-of-way are regulated by Chapter 26. (d) Application. Any person desiring to cut down, remove, destroy or cause to be removed any protected tree, community of protected trees, or heritage tree shall apply to the planning division for a tree removal permit on forms provided by the division. The application shall include information to describe and justify the removal request and a report from an arborist certified by the International Society of Aboriculture (ISA) or other equivalent organization acceptable to the planning manager. The aborist report shall include all of the following, unless otherwise approved by the planning manager: (1) Site plan showing location of the tree (including buildings, driveways, etc.). (2) Clear pictures of the tree indicating location, details and signs of failure or disease. (3) Description of species of the tree. (4) Estimated height of the tree. (5) Circumference or diameter at breast height of the tree. (6) Discussion of the general health of the tree. (7) Value of the tree according to the ISA tree valuation formula. (8) Discussion of the tree’s risk. (9) Discussion of why the tree cannot be saved, including consideration of the following techniques: a. Discussion of risk management pruning. b. Discussion of installation of structural support system. c. Discussion of improving site conditions/cultural conditions. d. Discussion of implementing integrated pest management programs. (10) Description of the method to be used for removal of the tree. (11) Reason for removal of the tree. (12) Proposed replacement tree, including species, size, location. (e) Public Notice. The applicant shall cause a notice of the proposed removal to be posted on the affected tree and in at least two (2) conspicuous locations on the site clearly visible to and readable from public property on a form provided by the planning division. The notices shall be a minimum of eight and one-half (8-1/2) by eleven (11) inches in size. In addition, the notice shall be mailed to the owners of record of all properties which are immediately adjacent to and directly across the street from the property on which the tree is located. The notice shall include the application number, a description of the proposal, including the location of the tree to be removed, contact information for the planning division from which additional information may be obtained and the final date for receipt of comments. A minimum of ten (10) days from the date of posting shall be given for comments to be received. Page 166 of 232 No action shall be taken on any application until the applicant has filed an affidavit that such posting has been accomplished and the review period has expired. Emergency situations, as described below, are not subject to this provision. (f) Application Review and Approval. The planning division shall review the application for removal of protected tree, community of protected trees or heritage tree and shall determine on the basis of the information provided and the findings listed in subsection (g) of this section whether to approve, approve with conditions or deny the request. (g) In order to approve an application for tree removal, the following findings must be made: (1) At least one (1) of the following findings must be made: a. The tree is dead, diseased or in danger of falling. b. The tree is determined to be an immediate threat to life or property. c. The tree is determined to be causing damage or reasonably expected to cause damage to existing buildings or interfere with utility services. d. The retention of the tree restricts the economic enjoyment of the property or creates an unusual hardship for the property owner by severely limiting the use of the property in a manner not typically experienced by owners of similarly situated properties, and the applicant has demonstrated to the satisfaction of the community development director that there are no reasonable alternatives to preserve the tree. e. Retention of the tree would result in reduction of the permissible building envelope by more than twenty-five percent (25%); and (2) None of the tree management techniques referenced in subsection (d) of this section are deemed feasible to save the tree. In granting any permit pursuant to this section, the community development director may attach reasonable conditions to ensure compliance with the intent and purpose of this section including, but not limited to, planting of replacement trees, mitigation of visual impacts and control of erosion. (h) Replacement. Any tree approved for removal under this section shall be replaced. Replacement trees shall be of the same species as the tree that was removed unless otherwise approved by the community development director. Replacement tree shall be planted on the same site as the removed tree; however, if the site is inadequate in size to accommodate the replacement tree, the replacement tree may be planted on public property with the approval of the director of public works. Alternatively, the director of public works, at his/her discretion, may accept an in-lieu payment equal to the value of the replacement trees required by Table 1, below. The in-lieu payment shall include funds sufficient for the care of the replacement trees during their establishment period as determined by the director of public works. The number and size of replacement trees shall be based on the number and size of trees approved for removal, as indicated in Table 1, below. If the tree being replaced is a tree that was required as a part of an approved landscaping plan, the replacement species must be consistent with the landscaping plan. Otherwise, the replacement tree may be of any species included on the city’s master tree planting plan. Page 167 of 232 Table 1 REPLACEMENT TREE REQUIREMENTS Trunk Size of Removed Tree (measured at 4-1/2 feet above grade) Replacement Ratio Required (per tree removed) Circumference (inches) Number of Replacement Trees Minimum Size 38 to 75 2 24 inch box Greater than 75 2 36 inch box Heritage Trees 2 48 inch box If a mitigation measure for removal of a protected tree, community of protected trees or a heritage tree contained in a certified environmental document requires greater numbers or size of replacement trees than specified in Table 1, above, that requirement shall supersede the requirements of this section. (i) Emergency Situations. In emergency situations caused by the hazardous or dangerous condition of a tree that poses an immediate threat to the safety of life or property, the minimum necessary actions may be taken to reduce or eliminate the hazard without complying with the other provisions of this section, except that the person responsible for actions taken to reduce the hazard or to remove the tree shall report such action to the community development department within five (5) working days of that action. Photographs thoroughly documenting the hazardous or dangerous condition of the tree shall be taken prior to any action to reduce the immediate threat. A tree removal permit, as specified in this section, shall be submitted prior to removal of the tree. The required arborist report shall document the conditions that warrant removal of the tree, including the photographs referenced above. (j) Appeal. Anyone so desiring may appeal the decision of the community development director by written request to the planning commission and payment of the appeal fee within twenty (20) days after the date of the decision of the community development director. (k) Enforcement—Remedies for Violation. In addition to all other civil remedies set forth in this Code or otherwise provided by law, the following remedies shall be available to the city for violation of this section: (1) Administrative Penalties. Whenever an enforcement officer charged with the enforcement of this Code determines that a violation of this section has occurred, the enforcement officer shall have the authority to issue an administrative citation to any person, firm, or corporation responsible for causing, committing, allowing, or maintaining the violation, pursuant to Chapter 6A, and in accordance with the notice requirements and hearing procedure contained therein. The administrative citation shall impose a penalty in an amount set forth in the schedule of penalties established by resolution of Page 168 of 232 the city council. (2) Civil Penalties. As part of a civil action brought by the city, a court may assess against any person who causes, commits, allows, or maintains a violation of any provision of this section a civil penalty in an amount not to exceed five thousand dollars ($5,000) per violation. (3) Injunctive Relief. Any violation of this section shall constitute a public nuisance, and a civil action may be commenced to abate, enjoin, or otherwise compel the cessation of such violation. Summary abatement of any violation of this section shall be at the expense of the person, firm, or corporation causing, committing, allowing, or maintaining the violation. The city may make the expense of abatement a lien against the property on which it is maintained and a personal obligation against the property owner. (4) Costs. To the extent the city prosecutes a violation of this section through a nuisance abatement action, the prevailing party shall be entitled to reasonable attorneys’ fees, and the city if it prevails shall be entitled to all costs of investigation and preparation for trial, the costs of trial, reasonable expenses including overhead and administrative costs incurred in abating the violation and/or in prosecuting the action. In all other civil actions brought pursuant to this section in which the city prevails, the court shall award to the city reasonable attorneys’ fees. (Ord. No. 2018-15, § 1, 11-5-2018) § 30.49.31. Committee membership. The historic heritage committee shall consist of five (5) members, each appointed by the city council. Terms shall be for two (2) years, and shall be staggered. Members may serve up to a maximum of three (3) consecutive terms. The members shall consist of: (a) One (1) member of the planning commission. (b) One (1) member of the city council. (c) One (1) citizen member with training or experience in structural rehabilitation. (d) Two (2) citizen members knowledgeable in local history or architecture. (Ord. No. 2013-08, § 2 (Exh. A), 8-5-2013) § 30.49.32. Committee powers. The historic heritage committee shall have the following powers and duties: (a) To recommend to the planning commission and council any building, structure or other physical object or group of buildings, structures or other physical objects that it has determined from review and investigation should be designated as a historic site or neighborhood combining district. The recommendation shall contain a brief written description of the building, structure or other physical object, and the reasons for the recommendation, drawn from the criteria specified by section 30.27.30. (b) To maintain and update a local register of historic neighborhoods and historic sites within the city. Page 169 of 232 (c) To review and investigate architectural and site review requests for property located within a historic site or neighborhood combining district, as specified by section 30.27.40. (d) To review and investigate requests for demolition permits for any building, structure or other physical object in the city, as specified by section 30.27.50. (e) To review all applications for permits, environmental assessments, environmental impact reports and other similar documents pertaining to historic sites and historic neighborhoods. (f) To make recommendations to the city’s street naming committee regarding possible new street names from Gilroy’s cultural and historical past. (g) To institute and support such programs and projects as will help make the citizens of the city and its visitors aware of its origin, development, and historic significance. (h) To perform such other duties relating to city history and historic sites and neighborhoods as the city council requires. (Ord. No. 2013-08, § 2 (Exh. A), 8-5-2013) Page 170 of 232 1 | P a g e ORDINANCE NO. 2026-XX AN ORDINANCE OF THE CITY OF COUNCIL OF THE CITY OF GILROY AMENDING SPECIFIED PROVISIONS OF CHAPTER 27, ARTICLE VI AND CHAPTER 30, ARTICLE XXXVIII OF THE GILROY CITY CODE TO PROHIBIT THE USE OF POTABLE WATER FOR IRRIGATING NONFUNCTIONAL TURF, AS REQUIRED BY ASSEMBLY BILL 1572 WHEREAS, the City of Gilroy recognizes the importance of conserving water and maintaining a reliable water supply to protect public health, safety, and welfare; and WHEREAS, Chapter 27, Article VI of the City of Gilroy Municipal Code establishes voluntary and permanent water conservation measures and water supply shortage regulations to promote efficient water use and reduce water waste; and WHEREAS, Chapter 30, Article XXXVIII of the City of Gilroy Municipal Code establishes landscaping and water efficiency standards for new, rehabilitated, and existing landscapes; and WHEREAS, on October 13, 2023, the Governor signed Assembly Bill 1572 (AB 1572), which amended California Water Code 10608.14 to prohibit the use of potable water to irrigate nonfunctional turf on governmental, special districts, commercial, industrial, institutional properties and common areas of homeowners’ associations and similar developments, subject to phased implementation dates, and WHEREAS, the City Council desires to amend Chapter 27 and Chapter 30 of the Gilroy’s Municipal Code to comply with AB 1572 by incorporating the State’s definitions and phased compliance deadlines for prohibiting potable water irrigation of nonfunctional turf, beginning January 1, 2027. The amendments also extend existing enforcement provisions to apply year- around, establish requirements for new, rehabilitated, and existing landscapes, transfer administrative authority from the Public Works Director to Utilities Director, and extend prohibited watering hours from 9 a.m. to 6 p.m. to align with Valley Water’s schedule; and WHEREAS, the City Council finds that these amendments will support compliance withs state law, reduce unnecessary potable water use, and promote long-term water conservation within the City. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF GILROY DOES HEREBY ORDAIN AS FOLLOWS: Section I: Recitals The City Council has dully considered the full record before it, which may include but is not limited to the staff report, testimony by staff and the public, and other materials and evidence Page 171 of 232 2 | P a g e submitted or provided to the City Council. The recitals set forth above are found to be true and correct and are incorporated herein by reference. Section II: Amendment for the City of Gilroy Municipal Code Section 27.95 Findings Section 27.95 (Findings) of Chapter 27, Article VI is hereby amended by adding Subsection (i.) that reads as follows: “Water Code Section 10608.14 requires public water systems to prohibit the use of potable water to irrigate non-functional turf on commercial, industrial, and institutional properties other than a cemetery and on common areas of homeowners’ associations, common interest developments, and community service organizations or similar entities.” Section III: Amendment for the City of Gilroy Municipal Code Section 27.97 Definitions Section 27.97 (Definitions) of Chapter 27, Article VI of the City of Gilroy Municipal Code is hereby amended by adding the definitions of: “CII water use”, “Commercial water user”, “Common area”, “Common interest developments”, “Community service organizations or similar entity”, “Community space”, “Homeowners’ Association”, “Functional turf”, “Industrial water user”, Institutional water user”, “Nonfunctional turf”, “Multifamily residential property”, “Recreational use area”, “Utilities Department Director”, and “Turf” to read as follows: “CII water use” means water used by commercial water users, industrial water users, institutional water users. It does not include a cemetery. “Commercial water user” means a water user that provides or distributes a product or service. “Common area” means that portion of common interest development or of a property owned or managed by a homeowners’ association or a community service organization or similar entity that is not assigned or allocated to the exclusive use of the occupants of an individual dwelling unit within the property.” “Common interest developments” means community apartment projects, condominium projects, planned developments, and stock cooperatives per Civil Code Section 4100. “Community service organization or similar entity” has the same meaning as in section 4100 of the Civil Code. “Community space” means an area designated by a property owner or a governmental agency to accommodate human foot traffic for civic, ceremonial, or other community events or social gatherings. “Homeowners’ Association” means an “association” as defined in Section 4080 of the Civil Code. Page 172 of 232 3 | P a g e “Functional Turf” means a ground cover surface of turf located in a recreational use area or community space. Turf enclosed by fencing or other barriers to permanently preclude human access for recreation or assembly is not functional turf. “Industrial water user” means a water user that is primarily a manufacturer or processor of materials as defined by the North American Industry Classification System code sectors 31 to 33, inclusive, or an entity that is a water user primarily engaged in research and development. “Institutional water user” means a water user dedicated to public service. This type of user includes, among other users, higher education institutions, schools, courts, churches, hospitals, government facilities, and nonprofit research institutions. “Nonfunctional Turf” - means any turf that is not functional turf, and includes turf located within street rights-of-way and parking lots. “Multifamily residential property” means a property that includes a building containing more than four dwelling units. “Recreational use area” means an area designated by a property owner or a governmental agency to accommodate human foot traffic for recreation, including, but not limited to, sports fields, golf courses, playgrounds, picnic grounds, or pet exercise areas. This recreation may be either formal or informal.” “Utilities Department Director” means the city’s utilities director or such department director as the city administrator designates to manage the city’s water and wastewater utility.” “Turf” means a groundcover surface of ornamental grass, or a ground cover surface of mowed grass only. Annual bluegrass, Kentucky bluegrass, perennial ryegrass, red fescue and tall fescue are cool-season grasses. Bermuda grass, Kikuyu grass, seashore paspalum, St. Augustine grass, zoysia grass, and buffalo grass are warm-season grasses.” SECTION IV: Amendment for the City of Gilroy Municipal Code Section 27.98 Wasting of water and drought emergencies Section 27.98 (Wasting of Water and Drought Emergencies) of Chapter 27, Article VI is hereby amended to read as follows: (a) Applicability (4) The provisions of this article do not apply to the use of water by city facilities to sustain plants, trees, shrubs, or functional turf. (b) Saving Water—Level 0 (Zero Percent (0%) to Ten Percent (10%) Reduction). Level 0 is in effect at all times and does not need to be declared by council. Level 0 is divided into voluntary and mandatory measures consistent with state law. (b) a. V-01. Recommended Watering Hours. Watering or irrigating of lawn, landscape or other vegetated area with potable water is discouraged between the hours of 9:00 a.m. and 6 p.m. Pacific Standard/Daylight Savings Time. Page 173 of 232 4 | P a g e m. M-0.32 Use of Recycled Water for Construction. When directed by the public works director and or Utilities Department Director recycled water fill stations shall be made available for construction water for purposes including dust control. Recycled water fill stations may be removed upon completion of construction activities in the area. (c) (1) Limits on Watering Hours. Watering or irrigating of lawn, landscape or other vegetated area with potable water is prohibited between the hours of 9:00 a.m. and 6 p.m. Pacific Standard/Daylight Savings Time on any day, except by use of a hand-held bucket or similar container, a hand-held hose equipped with a positive self-closing water shut-off nozzle or device, or for very short periods of time for the express purpose of adjusting or repairing an irrigation system. The use of recycled water is exempt from this prohibition. (d) (1) Limits on Watering Days. Watering or irrigating of lawn, landscape or other vegetated area with potable water is limited to two (2) days per week from April through October. The watering days are designated depending upon house address and are to be determined by the Utilities Department Director. During the months of November through March, watering or irrigating of lawn, landscape or other vegetated area with potable water is limited to no more than one (1) day per week to be determined by the public works director. (e) e. Maintenance of landscape within active public parks and playing fields, day care centers, golf course greens, and school grounds; provided, that such irrigation does not exceed two (2) days per week for no more than fifteen (15) minutes watering per designated water day per station and is prohibited between the hours of 9:00 a.m. and 6 p.m. Pacific Standard/ Daylight Savings Time, according to the schedule established in subsection (d)(1) of this section; (g) Hardship Waiver (1) Request. A written request for a hardship waiver must be submitted to the Utilities Department Director. (4) Approval Authority. The Utilities Department Director must act upon any completed application no later than ten (10) days after submittal and may approve, conditionally approve, or deny the waiver. The applicant requesting the waiver must be promptly notified in writing of any action taken. Unless specified otherwise at the time a waiver is approved, the waiver will apply to the subject property during the period of the mandatory water supply shortage condition. SECTION V: Amendment for the City of Gilroy Municipal Code Section 27.98 Wasting of water and drought emergencies Section 27.98 (Wasting of Water and Drought Emergencies) of Chapter 27, Article VI is hereby amended by adding new subsections (M-0.34) and (5). o.M-0.34 Irrigation of Non-Functional Turf. The use of potable water for the irrigation of nonfunctional turf located at commercial, industrial, and institutional properties, other than a cemetery, and on properties of homeowners’ associations, common interest developments, and community service organizations or similar entities is prohibited by the following dates: Page 174 of 232 5 | P a g e 1.All properties owned by local governments, local or regional public agencies, and public water systems, including the city, except those specified in paragraph 4, beginning January 1, 2027. 2. All other institutional properties and all commercial and industrial properties, beginning January 1, 2028. 3. All common areas of properties of homeowners’ associations, common interest developments, and community service organizations or similar entities, beginning January 1, 2029. 4. All properties owned by local governments, local public agencies, and public water systems in a disadvantaged community, beginning January 1, 2031, or the date upon which a state funding source is made available to fund conversion of nonfunctional turf on these properties to climate appropriate landscapes, whichever is later. The use of potable water is not prohibited to the extent necessary to ensure the health of trees and other perennial non-turf plantings, or to the extent necessary to address an immediate health and safety need. Any compliance date postponed by the State Water Resources Control Board pursuant with the Water Code 10608.14 (c) for a specific property shall apply. This measure does not restrict the use of recycled water. (5) A waiver granted under this subsection does not authorize any use of water prohibited by Water Code Section 10608.14. SECTION VI: Amendment for the City of Gilroy Municipal Code Section 27.99 Enforcement Section 27.99 (Enforcement) of Chapter 27, Article VI is hereby amended to read as follows: It shall be the duty of all city employees to give vigilant aid to the Utilities Director in the enforcement of the provisions of this article, whether or not a water supply shortage has been declared, and to this end they shall report all violations thereof which shall come to their knowledge to the office of the Utilities Department Director. (Ord. No. 2014-11, § 1, 8-4-2014) SECTION VII: Amendment of the City of Gilroy Municipal Code, CHAPTER 30, ARTICLE XXXVIII, Section 30.38.30 Definitions Section 30.38.30 (Definitions) of Chapter 30, Article XXXVIII of the City of Gilroy Municipal Code is hereby amended by adding the definitions of: “Functional Turf” meaning set forth in Chapter 27, Section 27.97. “Nonfunctional turf” meaning set forth in Chapter 27, Section 27.97. Page 175 of 232 6 | P a g e “Turf” means a groundcover surface of ornamental grass, or a ground cover surface of mowed grass only. Annual bluegrass, Kentucky bluegrass, perennial ryegrass, red fescue and tall fescue are cool-season grasses. Bermuda grass, Kikuyu grass, seashore paspalum, St. Augustine grass, zoysia grass, and buffalo grass are warm-season grasses. SECTION VIII: Amendment of the City of Gilroy Municipal Code, CHAPTER 30, ARTICLE XXXVIII, Section 30.38.60 Commercial Zone Standards Section 30.38.60 (Commercial Zone Standards) of Chapter 30, Article XXXVIII of the City of Gilroy Municipal Code is hereby amended by adding subsection (k): (k) Landscaping required by this section, shall not include nonfunctional turf irrigated with potable water. SECTION IX: Amendment of the City of Gilroy Municipal Code, CHAPTER 30, ARTICLE XXXVIII, Section 30.38.70 Industrial Zone Landscape Standards Section 30.38.70 (Industrial Zone Landscape Standards) of Chapter 30, Article XXXVIII of the City of Gilroy Municipal Code is hereby amended by adding subsection (j): (j) Landscaping required by this section, shall not include nonfunctional turf irrigated with potable water. SECTION X: Amendment of the City of Gilroy Municipal Code, CHAPTER 30, ARTICLE XXXVIII, Section 30.38.120 Landscape Design Plan Section 30.38.120 (Landscape Design Plan) of Chapter 30, Article XXXVIII of the City of Gilroy Municipal Code is hereby amended by adding subsection (h): (h) New and rehabilitated landscapes on commercial, industrial, and institutional properties, and in common areas of homeowners’ associations, common interest developments, and community service organizations or similar entities, shall not include nonfunctional turf unless it will be irrigated exclusively with recycled water. Turf proposed on these properties shall be shown as functional turf on the landscape design plan, with its recreational or community use. SECTION XI: Amendment of the City of Gilroy Municipal Code, CHAPTER 30, ARTICLE XXXVIII, Section 30.38.160 Irrigation Scheduling Page 176 of 232 7 | P a g e Section 30.38.160 (Irrigation Scheduling) of Chapter 30, Article XXXVIII of the City of Gilroy Municipal Code is hereby amended to read as follows: 30.38.160. Irrigation Scheduling (b) Overhead irrigation shall only be scheduled between 6:00 p.m. and 9:00 a.m. unless weather conditions prevent it. If allowable hours of irrigation differ from the local water purveyor, the stricter of the two (2) shall apply. Operation of the irrigation system outside the normal watering window is allowed for auditing and system maintenance only SECTION XII: Amendment of the City of Gilroy Municipal Code, CHAPTER 30, ARTICLE XXXVIII, Section 30.38.240 Provisions for Existing Landscapes Section 30.38.240 (Provisions for existing landscapes) of Chapter 30, Article XXXVIII of the City of Gilroy Municipal Code is hereby amended by adding subsection (c): (c) Regardless of size or date of installation, existing landscapes on properties shall comply with Chapter 27. Section 27.98 (b)(2)(o) (M-0.34). Page 177 of 232 8 | P a g e Page 178 of 232 8.7. City of Gilroy STAFF REPORT Agenda Item Title: Approval of a Water Conservation Cost-Sharing Agreement between the City of Gilroy and Santa Clara Valley Water for the Advanced Water Metering, Water Use Reports Program, and Valley Water Rebate Programs, effective July 1, 2026, through June 30, 2033 which Supersedes Agreement No. A4323S as Amended Meeting Date: November 16, 2026 From: Matt Morley, City Administrator Department: Utilities Submitted by: Derek Cray, Utilities Director Prepared by: Izabela Cirloganu, Sr. Management Analyst STRATEGIC PLAN GOALS: Develop a Financially Resilient Organization RECOMMENDATION 1. Approve the Water Conservation Programs Cost Share Agreement (Agreement) between the City of Gilroy (City) and Santa Clara Valley Water District (Valley Water), effective July 1, 2026, through June 30, 2033; and 2. Authorize the City Administrator to execute the Agreement and approve minor, mutually agreed non-substantive adjustments. EXECUTIVE SUMMARY The proposed seven-year Water Conservation Programs Cost Share Agreement will replace the City’s current cost-sharing agreement with Valley Water. In 2019, the City and Valley Water entered into agreement A4323S to share the cost of Water Use Reports. These reports informed customers about their water use, highlighted usage patterns, and encouraged conservation. The proposed Agreement Page 179 of 232 8.7. retains provisions for Water Use Reports and the Landscape Rebate Program, adds Graywater and Submeter rebates, and introduces Valley Water funding for the City's Advanced Metering Infrastructure (AMI) installation. The key benefit of the new Agreement is $1.3 million in revenue to the City over seven years to support the City’s AMI program. This funding applies to both installed and remaining AMI meter conversions, supporting the City’s AMI investment and helping offset ongoing maintenance and future replacement costs. BACKGROUND Since December 1, 2019, the City and Valley Water have jointly funded water conservation programs through a cost-sharing agreement amended three times. These programs support both agencies’ Urban Water Management Plans, Valley Water’s 2021 Water Conservation Strategic Plan, and the State’s Making Water Conservation a California Way of Life policy. The original agreement set an annual funding cap of $35,000 and included only residential Water Use Reports. The Water Use Reports are mailed to the City’s customers and include information on their water consumption and conservation measures. However, the City could not fully access these funds in the past because it lacked a reporting system to capture accurate water-consumption data. Since then, the City has remedied the deficiency in water use reports and can now produce these reports as required to receive the funding. In addition to the Water Use Reports, the City during its last amendment (the third amendment) added Landscape Rebate Program. Recently, Utilities and Valley Water staff negotiated a replacement Agreement that expands the existing agreement to include AMI funding to the City at nearly $1.3 million. This additional revenue supports Gilroy’s strategic goals of developing a financially resilient organization by utilizing outside resources and maintaining and improving the City's infrastructure. ANALYSIS The current agreement (A4323S) funds two programs and expires on June 30, 2027: 1. Water Use Reports – The City sends water-use reports to residents to inform them of their water consumption. The agreement sets the cost at $35,000 per year and caps total rebate funds at $70,000 for the contract term. 2. Landscape Rebate – The City adds $1.00 per square foot for turf and pool conversions, up to $1,000 per residential site or small multifamily property (four units or fewer), to Valley Water's standard rebate of $2 per square foot. City payments to Valley Water are capped at $10,000 per year. Page 180 of 232 8.7. The proposed Agreement replaces A4323S for a seven-year term, from July 1, 2026, to June 30, 2033, and adds the following: Valley Water to City of Gilroy – City Receives Under the proposed Agreement, the City of Gilroy will receive up to $1,290,450 from Valley Water over seven fiscal years, with a maximum annual reimbursement of $184,350. The new AMI program provides $10 per eligible AMI meter annually, including previously converted meters, with a maximum annual reimbursement of $159,350. The Agreement also continues funding for the Water Use Reports program, providing up to $2.25 per connection annually, with a maximum annual reimbursement of $25,000 and a total of $175,000 over the contract term. City of Gilroy to Valley Water – City Pays Under the proposed Agreement, the City will contribute up to $25,000 annually, or $175,000 over seven years, to support water conservation rebate programs administered by Valley Water. The Agreement introduces two new rebate programs: a Graywater Rebate, providing $200 per eligible site, capped at $2,500 annually, and a Submeter Rebate, providing $150 per submeter, also capped at $2,500 annually. Additionally, the Agreement continues and expands the Landscape Conversion Rebate Program from $10,000 to $20,000. The City will contribute $1.00 per square foot of eligible landscape conversion, up to $1,000 per residential or small multifamily property with four or fewer units. Under the proposed seven-year Agreement, the City of Gilroy will receive up to $1,290,450 from Valley Water and contribute up to $175,000 toward water conservation rebate programs. This results in a net financial benefit of up to $1,115,450 over seven years, or $159,350 annually. Under the proposed agreement, the City will provide Valley Water with information needed to monitor AMI implementation and assess water conservation efforts. Required reports include an AMI implementation plan, annual meter counts, water consumption and savings data, monthly Water Use Report activity, and semi-annual leak and high- usage alert information. The new Agreement funds AMI reimbursement and Water Use Reports independently. The City will remain eligible for AMI funding regardless of whether it continues to distribute Water Use Reports to customers. The Agreement includes provisions to protect customer privacy. The utility will identify customer-level data by unique identifiers and will not disclose customer names. Service addresses and other personally identifiable information may only be shared with Valley Water with the customer's written authorization provided to the City. Valley Water will Page 181 of 232 8.7. use the information only for authorized program purposes, such as evaluating water savings and cost-effectiveness. Staff negotiated these safeguards to ensure privacy and confidentiality. ALTERNATIVES The City Council may choose not to approve the proposed agreement. In that case, Agreement No. A4323S would remain in effect until its expiration on June 30, 2027. Staff does not recommend this alternative, as the City would lose approximately $1.3 million in revenue that would help offset the costs of installing and maintaining AMI technology. FISCAL IMPACT/FUNDING SOURCE The City of Gilroy’s annual contribution of up to $25,000 under the proposed Agreement has been budgeted in Fund 705 (Water Conservation). The additional $159,350 of revenue will offset some of the existing cost of running the rebate program which are already appropriated. PUBLIC OUTREACH Once the agreement is executed, staff will conduct various forms of outreach (in-person at various community events, web postings, mailers) to inform the community about available resources and how to access them. NEXT STEPS If the City Council approves the agreement, staff will coordinate with Valley Water to finalize and execute it. Staff will continue implementing the AMI program, including converting the remaining meters, and will administer the reimbursement process in accordance with the agreement's terms. Attachments: 1. Cost Share Agreement_VW_Signed Page 182 of 232 Agreement Between Valley Water and Gilroy for AMI Water Conservation Program 1 WATER CONSERVATION PROGRAMS COST SHARE AGREEMENT BETWEEN SANTA CLARA VALLEY WATER DISTRICT AND CITY OF GILROY This Cost Share Agreement (AGREEMENT) between Santa Clara Valley Water District, a special district created by the California Legislature (hereinafter referred to as VALLEY WATER), and the City of Gilroy, a municipal corporation (hereinafter referred to as GILROY), sets forth the respective roles of VALLEY WATER and GILROY in regard to sharing in the cost of certain WATER CONSERVATION PROGRAMS (PROGRAMS). As set forth below, this AGREEMENT shall be deemed effective beginning July 1, 2026 (“Effective Date”) upon its execution by VALLEY WATER and GILROY (individually as a "PARTY" or collectively as the "PARTIES"). RECITALS WHEREAS, VALLEY WATER administers several water conservation programs identified in EXHIBIT A, including for programs for persons or businesses located within GILROY, namely, a Landscape Rebate Program, a Graywater Rebate Program, and a Submeter Rebate Program; and WHEREAS, GILROY administers an AMI and WATER USE REPORTS PROGRAM per the AMI Guidelines specified in EXHIBIT B; and this program educates customers about water conservation, drought, and water demand management within GILROY’s service area; and WHEREAS, all of these water conservation related programs or services shall hereafter be referred to as “PROGRAMS”; and WHEREAS , the PROGRAMS are consistent with VALLEY WATER’s and GILROY’s Urban Water Management Planning Act requirements; and WHEREAS, the PROGRAMS are consistent with VALLEY WATER’s 2040 and 2050 Water Supply Master Plans, 2021 Water Conservation Strategic Plan, and Board Policy Calling for Water Conservation as a Way of Life in Santa Clara County (Resolution No. 23 -52); and WHEREAS, the PROGRAMS goals are to save water and provide information on how to use water most efficiently; and WHEREAS, VALLEY WATER and GILROY wish to collaborate to implement the PROGRAMS and the AMI and WATER USE REPORTS PROGRAM in the service area as described in this AGREEMENT; and WHEREAS, both PARTIES wish to cost share with each other on each of these PROGRAMS; and WHEREAS, both PARTIES are currently parties to Agreement A4323S for water conservation programs. Upon the execution of this Agreement by both PARTIES, this Agreement shall supersede Agreement A4323S, and that Agreement shall no longer have effect. NOW, THEREFORE, in consideration of the recitals and mutual obligations of the PARTIES expressed in this AGREEMENT, VALLEY WATER and GILROY agree as follows: 1) Gilroy’s Responsibilities a. Administration of the AMI and WATER USE REPORTS PROGRAM per the AMI Guidelines (EXHIBIT B), including any administrative updates implemented by VALLEY WATER thereto. 1) Considering, however, VALLEY WATER acknowledges that adjustments to, or variances from, the AMI Guidelines limited to meter-age and leak-alert requirements or thresholds may be implemented by mutual agreement of the PARTIES. Docusign Envelope ID: 88BCCD53-57CF-8A38-8277-E3A70739D567 Page 183 of 232 Agreement Between Valley Water and Gilroy for AMI Water Conservation Program 2 2) Any such adjustment will be documented by email or other written communication between authorized representatives of the PARTIES and shall be deemed incorporated into EXHIBIT B without the need for a formal amendment to this AGREEMENT. b. Identify and provide data on GILROY’s AMI implementation plan, including timeline, number of active meters and their AMI status. c. Collection and analysis of data to determine water savings. d. Administration of all funds for the AMI and WATER USE REPORTS PROGRAM. e. Provide water usage records and other data to VALLEY WATER to determine savings and cost effectiveness of the AMI and WATER USE REPORTS PROGRAM, subject to the disclosure requirement outlined in Section 1.e.1. below. This includes number of Water Use Reports sent by month and additional requirements described in EXHIBIT B. 1) All customer-level data provided by GILROY to VALLEY WATER under this COST SHARE AGREEMENT shall be identified by GILROY’s utility account number only. GILROY shall not provide customer names and nothing in this AGREEMENT shall be construed to require GILROY to disclose customer names to VALLEY WATER. VALLEY WATER shall use such account level data solely to quantify water savings, and evaluate the cost effectiveness of the PROGRAMS and shall not use account numbers to obtain names or contact information except as authorized under Section 1.e.2. 2) In accordance with Gov. Code 6254.16 (currently updated as 7927.410) service addresses associated with each account number will only be made available to VALLEY WATER for those customers/account holders from whom Valley Water has obtained written authorization for the release of such information . Where such authorization has not been granted, Gilroy will provide data by account number only or in aggregate form. f. Invoice VALLEY WATER on a bi-annual basis for fifty percent of the contract cost net of any grant funding received by GILROY for GILROY to send Water Use Reports to GILROY properties, up to $2.25 per connection. GILROY shall not invoice VALLEY WATER for any amounts exceeding the per-connection cap or the annual cap set forth in EXHIBIT A. Only costs paid directly to the Water Use Reports vendor shall be included in the bi-annual invoice. g. Invoice VALLEY WATER on an annual basis for eligible AMI water connections meeting all criteria specified in EXHIBIT B, Section 1.a. above, and Section 1.h. below. Reimbursement shall be limited to a total of $10 per eligible AMI water connection per year for the term of this AGREEMENT. GILROY shall not invoice VALLEY WATER for any amounts exceeding the annual cap set forth in EXHIBIT A. h. Provide VALLEY WATER information annually on the number of leak alerts sent, estimated leak volumes and duration, and estimated water savings associated with leak alerts for each month. i. Work cooperatively with VALLEY WATER in appropriately advertising PROGRAMS to targeted customers. 1) Creation and distribution of outreach materials encouraging customer enrollment in leak alerts and active portal engagement. 2) Advertise the AMI and WATER USE REPORTS PROGRAM to the targeted customers. 3) Collaborate with VALLEY WATER regarding developing and delivering targeted marketing through the AMI and WATER USE REPORTS PROGRAM as appropriate and to the extent currently available through GILROY’s vendor. j. Make payment to VALLEY WATER within thirty (30) days of receipt of a bi-annual invoice from VALLEY WATER as described in EXHIBIT A. When submitting an invoice, VALLEY WATER shall provide PROGRAM participation information. PARTIES may mutually agree in writing to extend the deadline for payment sixty (60) days of receipt of an invoice. 2) Valley Water’s Responsibilities a. Administration of VALLEY WATER PROGRAMS as listed in EXHIBIT A, Table A-1, including, but not limited to, Docusign Envelope ID: 88BCCD53-57CF-8A38-8277-E3A70739D567 Page 184 of 232 Agreement Between Valley Water and Gilroy for AMI Water Conservation Program 3 1) Processing the payment of the amounts set forth in EXHIBIT A, to eligible persons, businesses, or institutions residing in GILROY (“ELIGIBLE CUSTOMERS”). 2) Payment of standard PROGRAM amounts to ELIGIBLE CUSTOMERS within 8-12 weeks of approval of GILROY’s applicant’s request. b. At least once per fiscal year, collect and analyze data to determine VALLEY WATER PROGRAM water savings and provide the results to GILROY with GILROY customer participation data . c. Administration of all funds for VALLEY WATER PROGRAMS. d. Invoicing GILROY, on a bi-annual basis, in accordance EXHIBIT A. 1) Invoices shall include an attachment with VALLEY WATER PROGRAM customer information for those GILROY customers who received services during the dates of the invoice. 2) Customer information shall include the rebate number, invoice date, date of notice to proceed, rebate type, customer name, customer site type, customer address, area of converted landscape in square feet (if applicable), total rebate amount in dollars, tot al rebate amount owed by VALLEY WATER and GILROY. 3) In accordance with Gov. Code § 6254.16, VALLEY WATER shall ensure that customer names, home addresses and utility usage data will only be made available to GILROY for those customer account holders from whom VALLEY WATER has obtained written authorization for the release of information. e. Share in the cost of the AMI and WATER USE REPORTS PROGRAM. VALLEY WATER will pay GILROY $10 for each qualifying AMI water connection meeting the specifications in Section 1.g. above and EXHIBIT A. The annual cap for this program is listed in EXHIBIT A. Valley Water will also pay GILROY 50 percent of its costs, up to $2.25 per connection , for providing Water Use Reports to customers consistent with the guidelines set forth in Exhibit B. The annual cap for this program is also listed in EXHIBIT A. f. Make payment to GILROY within thirty (30) days of receipt of an invoice from GILROY. When submitting an invoice, GILROY shall provide a copy of the corresponding Water Use Reports’ vendor invoice and program participation information to VALLEY WATER. PARTIES may mutually agree in writing to extend the deadline for payment sixty (60) days of receipt of an invoice. 3) Hold Harmless and Liability a. The PARTIES agree to defend, indemnify and hold harmless each other, including their officers, board members, employees, and agents from and against any and all third -party claims for injury or loss resulting from or arising out of this AGREEMENT, including its water conservation programs. Provided, however, neither PARTY shall have any duty to defend, indemnify or hold harmless the other from and against any claims arising out of the gross negligence or willful misconduct of the other party. b. The rights, duties, and obligations of the PARTIES as set forth above in this Hold Harmless and Liability section will survive termination, suspension, completion, and expiration of this AGREEMENT. 4) No Power to Incur Debt, Obligation or Liability Neither PARTY shall have any power or ability to incur any future debt, obligation, or liability of other PARTY or otherwise act as an agent of the other PARTY, and Valley Water’s promise of continued fiscal year cost share reimbursement funding is contingent upon funds being allocated for this purpose in future annual budget approvals by its Board of Directors. 5) Audit Rights / Inspection Valley Water and Gilroy will, upon reasonable advance written notice , make available for inspection to the other PARTY their books, records, and other documents relating to the Programs. Docusign Envelope ID: 88BCCD53-57CF-8A38-8277-E3A70739D567 Page 185 of 232 Agreement Between Valley Water and Gilroy for AMI Water Conservation Program 4 6) Effective Date and Term Upon due execution of this AGREEMENT by both Parties, this Agreement shall be deemed effective starting July 1, 2026 (Effective Date). The term of this AGREEMENT (TERM) is seven years, from July 1, 2026 through June 30, 2033, or until all appropriated funds are depleted, whichever occurs first. The term of the AGREEMENT may be extended by mutual written agreement of the PARTIES. Annual funding for this Agreement shall be contingent upon approval of budget appropriations for program funding each fiscal year by both VALLEY WATER’s Board of Directors and by the City Council of GILROY. 7) Invoicing GILROY will invoice VALLEY WATER on bi-annual basis and will submit the invoice to the Water Conservation Program Project Manager for review and approval prior to submission to Accounts Payable. Each invoice must include the following: • Contract or Amendment number. • Supporting documentation as necessary and as required under the terms of the contract. After a draft invoice is approved by the Project Manager, GILROY will submit the final invoice to the Accounts Payable department for processing at apinvoice5750@valleywater.org. 8) Notices Any notice, payment, credit or instrument required or permitted to be given hereunder shall be deemed received upon personal delivery or email (with confirmation of receipt), or five (5) calendar days after deposit in the United States mail, first class postage prepaid and addressed to the PARTY for whom intended. If to VALLEY WATER: Santa Clara Valley Water District 5750 Almaden Expressway San José, CA 95118 Attn: Water Conservation Programs Project Manager Email: jburks@valleywater.org If to GILROY: City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 Attn: Izabela Cirloganu Email: Izabela.Cirloganu@cityofgilroy.org Either PARTY may change such the person (or position or department) or address designated above by notice to the other PARTY as provided in this paragraph. 9) Insurance Each PARTY shall adhere to the insurance requirements that are specified in EXHIBIT C of this AGREEMENT. Either PARTY to this AGREEMENT may submit a letter of self-insurance to satisfy the insurance requirements of EXHIBIT C. 10) Entire Agreement Docusign Envelope ID: 88BCCD53-57CF-8A38-8277-E3A70739D567 Page 186 of 232 Agreement Between Valley Water and Gilroy for AMI Water Conservation Program 5 This AGREEMENT contains the entire AGREEMENT between VALLEY WATER and GILROY relating to the PROGRAMS. Any prior agreements, promises, negotiations, or representations not expressly set forth in this AGREEMENT are of no force or effect. 11) Amendments The AGREEMENT may only be amended by written agreement executed by both PARTIES. 12) Assignment Neither PARTY is allowed to assign, sublet, or transfer this AGREEMENT or any of the rights or interests in this AGREEMENT without the written consent of the other PARTY. 13) Waiver A PARTY’s waiver of any term, condition, covenant, or breach of any term, condition, or covenant shall not be construed as a waiver of any other term, condition, or covenant, or breach of any other term, condition, or covenant. 14) Severability The partial or total invalidity of one or more parts of this AGREEMENT will not affect the intent or validity or remaining parts of this AGREEMENT. 15) Governing Law This AGREEMENT is governed by the laws of the State of California. The federal and state courts within Santa Clara County, California shall have exclusive jurisdiction to adjudicate any dispute arising out of or related to this AGREEMENT unless the PARTIES mutually agree to an alternative informal dispute resolution procedure. Each PARTY expressly consents to the personal jurisdiction of and venue in such courts. 16) Termination This AGREEMENT may be terminated by either PARTY if the other PARTY is in material breach of this AGREEMENT, the other PARTY has been notified of its alleged breach by the non -breaching PARTY, and has been given an opportunity to cure its breach, but has not done so within 45 days of such notice. In addition, this AGREEMENT may be terminated for convenience by either PARTY upon 60 days written notice. 17) Counterparts This AGREEMENT may be executed in counterparts, each of which, when executed and delivered, will be deemed to be an original, and which taken together will be deemed to be one and the same instrument, and will be binding as executed. 18) Electronic Signature Unless otherwise prohibited by law or GILROY or VALLEY WATER policy, the PARTIES agree that an electronic copy of a signed contract, or an electronically signed contract, has the same force and legal effect as a contract executed with an original ink signature. The term "electronic copy of a signed contract" refers to a transmission by facsimile, electronic mail, or other electronic means of a copy of an original signed contract in a portable document format. The term "electronically signed Docusign Envelope ID: 88BCCD53-57CF-8A38-8277-E3A70739D567 Page 187 of 232 Agreement Between Valley Water and Gilroy for AMI Water Conservation Program 6 contract" means a contract that is executed by applying an electronic signature using technology approved by GILROY and VALLEY WATER. 19) Signatures The individuals executing this AGREEMENT represent and warrant that they have the legal, designated authority to do so on behalf of their respective legal entities. IT IS SO AGREED. City of Gilroy Santa Clara Valley Water District By: _________________________ By: _________________________ Matt Morley Melanie Richardson, P.E. City Administrator Interim Chief Executive Officer Date: _________________________ Date: _________________________ Attest: _________________________ Date: _________________________ Docusign Envelope ID: 88BCCD53-57CF-8A38-8277-E3A70739D567 10/30/2026 Page 188 of 232 Agreement Between Valley Water and Gilroy for AMI Water Conservation Program 7 EXHIBIT A WATER CONSERVATION PROGRAMS AND REIMBURSEMENT The reimbursement rates for the PROGRAMS administered by VALLEY WATER and GILROY are specified in Tables A-1 and A-2 below, respectively. PARTIES will be reimbursed for the PROGRAMS listed below, up to a Not -To-Exceed Amount Specified. 1) The compensation to be paid to VALLEY WATER by GILROY for the PROGRAMS listed in EXHIBIT A, Table A-1, shall not exceed $25,000 per year or $175,000 over the AGREEMENT TERM. GILROY may adjust its contribution to any of the rebate amounts for any of the individual PROGRAMS listed in EXHIBIT A, Table A -1 so long as its total contribution for all PROGRAMS does not exceed $25,000 per year or $175,000 over the AGREEMENT TERM. 2) The compensation to be paid to GILROY by VALLEY WATER for GILROY’S AMI and WATER USE REPORTS PROGRAM: i. for Water Use Reports – payment shall not exceed $25,000 per fiscal year or $175,000 over the AGREEMENT TERM; and ii. for eligible AMI connections – payment shall not exceed $159,350 per fiscal year or $1,115,450 over the AGREEMENT TERM. Table A-1 Valley Water Programs – Gilroy Obligations Program GILROY’S Reimbursement Obligations Landscape Conversion Rebate (paid to VALLEY WATER as GILROY’S contribution toward Participant rebate ) $1.00 per square foot up to $1,000 per single-family or multi-family residential site with 4 or fewer units, and for a total up to $20,000 per fiscal year Graywater Conversion Rebate (paid to VALLEY WATER as GILROY’S contribution toward Participant rebate ) $200 per site, for a total of up to $2,500 per fiscal year Submeter Rebate (paid to VALLEY WATER as GILROY’S contribution toward Participant rebate ) $150 per submeter, for a total of up to $2,500 per fiscal year Table A-2 Gilroy Programs – Valley Water Obligations Program VALLEY WATER’S Reimbursement Obligations AMI and Water Use Reports Program $10 per year per qualifying AMI meter, not to exceed $159,350 per fiscal year (July 1 – June 30) or $1,115,450 over the AGREEMENT TERM. Up to $2.25 per connection per year for providing water use reports to customers, not to exceed $25,000 per fiscal year or $175,000 over the AGREEMENT TERM. Docusign Envelope ID: 88BCCD53-57CF-8A38-8277-E3A70739D567 Page 189 of 232 Agreement Between Valley Water and Gilroy for AMI Water Conservation Program 8 EXHIBIT B AMI AND WATER USE REPORT PROGRAM CRITERIA 2023 Valley Water offers a cost sharing program for Advanced Metering Infrastructure (AMI) meters and Water Use Reports, as described below. This cost sharing program is intended for both residential, and commercial, institutional, or industrial (CII) sites. Wa ter use reports are intended for residential customers at a minimum but expansion to CII is encouraged. General Administrative Requirements: 1. Water retailers must provide documentation of the total number of meters (AMI and non -AMI) by account type (e.g., single -family residential, commercial, etc.) in the service area. Water retailers must include in the documentation: a. a description of the retailer’s account types, and b. how they will provide Valley Water accurate and up -to-date meter counts once per fiscal year. 2. Water retailers must provide an approximate implementation plan for AMI deployment, including the anticipated schedule. An implementation plan could include relevant excerpts from planning documents such as Water Supply Master Plans, Urban Water Management Plans, etc. 3. Provide customers with Water Use Reports to provide a detailed and relevant account of their water usage. Water Use Reports must be sent to residential customers and are encouraged for CII customers. Water Use Reports may differ between water retailers, bu t there are some required criteria, as described below: a. Their water usage history covering at least the most recent reporting and/or billing period; b. A specific water-use comparison between the target property and water usage to similar properties in their service area; c. Programmatic and behavioral recommendations to save water that are relevant to the property; d. Easy access to an online water usage portal; and e. Usage/leak alerts using industry best practices. 4. Water retailers must provide Valley Water with leak alert thresholds and report templates at least once per fiscal year unless no template changes occurred. The provision of other examples of program -related messaging (mailers and water-saving recommendations) is encouraged. 5. General administrative requirements affecting Water Use Reports, leak alert notifications, and leak alert thresholds may be adjusted for the purposes of conducting experiments to quantify water savings within specific service areas. Adjustments for this pr ovision require written agreement between Valley Water and the water retailer. These adjustments are limited to a not - to-exceed period of 24 months. There are two options for water retailers to cost share with Valley Water on the AMI and Water Use Report Program (water retailers may only choose one option). Each option will have an annual not -to- exceed cap relative to the full term of the agreement, a nd a budget for the full term of the agreement based on the number of qualifying meters. Valley Water funding will be available as Valley Water’s budget allows, which is subject to annual Board approval (approximately every Spring). Please inform Valley Water of intent to participate in the program as soon as possible. Docusign Envelope ID: 88BCCD53-57CF-8A38-8277-E3A70739D567 Page 190 of 232 Agreement Between Valley Water and Gilroy for AMI Water Conservation Program 9 OPTION 1: AMI Conversion Combined with Water Use Reports1 Valley Water will rebate $10 per AMI conversion currently in operation annually for the next seven years and will fund 50 percent of the cost of the software linked to AMI, up to $2.25 per connection per year, when combined with Water Use Reports. Valley Water’s funding may be used for either capital and/or operations and maintenance costs. Funding for this option in years 2 through 7 will be contingent upon documentation of water savings achieved in the previous yea r(s). Requirements for Option 1: 1. AMI meters eligible for funding must have been active for seven years or less; 2. AMI meters must be read at a minimum of once an hour; 3. AMI meters must be linked to a customer-accessible water usage portal with online access; 4. AMI Alerts: a. Data on leak and high usage alerts by account and zip code are required for the most recent invoicing period. In lieu of identifying leaks by account number, a unique -identifier system for each record in the dataset can instead be provided to aid Valley Water with long-term data querying and tracking. b. Leak alert settings for continuous leaks must not exceed 5 gallons per hour for single - family residential accounts with a duration not to exceed 72 hours; and duration of burst leaks is not to exceed 8 hours. Depending on metering technology advancements, these thresholds can be adjusted with mutual agreement between Valley Water and retailers. c. Leak alert settings (volume and duration thresholds) for continuous leaks or spikes in water use on CII properties must be set by the utility using industry best practices2 d. Utilities must have a plan in place for contacting customers with large leaks3 who cannot be contacted through standard procedures (letters, emails, SMS, or phone calls). Retailers must have a process in place to contact customers whose irrigation does not comply with local restrictions. 5. If Water Use Reports through the online portal are optional, the water retailers shall provide an opt-out option, as opposed to requiring opt-in sign-ups, to access Water Use Reports; 6. Water Use Reports must be sent out a minimum of four times per year indicated clearly in supporting documentation (Item 7); 7. Water retailers must coordinate with Valley Water to promote Valley Water’s conservation programs through Water Use Reports; 8. Water retailers must provide to Valley Water the number of Water Use Reports sent, number of sites Water Use Reports were sent to , number of leak alerts sent, estimated leak volumes and duration, and estimated water savings associated with leak alerts. Data must be sent semi - annually, broken down by utility billing period, provide dates and durations of every leak alert, and include a total water savings estimate based on volume and duration of identified leaks. A data template may be provided by Valley Water. a. Providing Valley Water access to an aggregated dashboard with the above content is preferred over reports or Excel files. Excel files are acceptable. 1 If a water retailer has previously received funding from Valley Water for AMI conversions, those conversions will not be eligible for additional funding. 2 Individual customers may modify their individual use baseline and reset their notifications at their discretion. CII water use is more varied, making it more complex to analyze and making leaks harder to identify. Water retailers may choose to rely on long-term usage averages and multiples thereof to assess CII leak alert notifications and thresholds. CII leak alert notifications and thresholds should align with current industry best practices as demonstrated by primary research or applicable case studies. Custom CII leak alert notifications and thresholds should be provided to Valley Water in the water retailer’s supporting documentation. 3 “Large leaks” may be defined by the water retailer and defined in supporting documentation the water retailer provides Valley Water. Docusign Envelope ID: 88BCCD53-57CF-8A38-8277-E3A70739D567 Page 191 of 232 Agreement Between Valley Water and Gilroy for AMI Water Conservation Program 10 i. If providing reports or Excel files, data must include the applicable cost-share agreement section reference that this requirement is fulfilling. ii. Data must cover the period from the effective date of the contract through the most recent invoicing period. If providing reports or Excel files, data redundancy between the reports/files of subsequent invoicing periods should be avoided. b. Corresponding metadata describing variables, attributes, and analysis conducted to estimate water savings shall be provided or embedded within delivered data. OPTION 2: Water Use Reports Only Valley Water will rebate 50 percent of the cost of Water Use Reports, up to $4.50 per connection per year. No AMI or meter type requirement. Valley Water currently has this program in place. Requirements for Option 2: 1. Customer accessible water usage portal, with mobile and online access; 2. If Water Use Reports through the online portal are optional, the water retailers shall provide an opt-out option, as opposed to requiring opt -in sign ups to access Water Use Reports; 3. Water Use Reports must be sent out a minimum of four times per year indicated clearly in supporting documentation (Item 5); 4. Water retailers must coordinate with Valley Water to promote Valley Water’s conservation programs through Water Use Reports; 5. Water retailers must provide to Valley Water the number of water use reports sent and the number of sites the reports were sent to. Data must be sent semi -annually, broken down by utility billing period. A data template may be provided by Valley Water. a. Providing Valley Water access to an aggregated dashboard with the above content is preferred over reports or Excel files. i. If providing reports or Excel files, data must include the applicable cost -share agreement section reference that this requirement is fulfilling. ii. Data must cover the period from the effective date of the contract through the most recent invoicing period. If providing reports or Excel files, data redundancy between the reports/files of subsequent invoicing periods should be avoided. b. Corresponding metadata describing variables, attributes, and analysis conducted to estimate water savings shall be provided or embedded within delivered data. Valley Water staff will work with water retailers to create new cost sharing agreements or amend existing agreements to include the AMI and Water Use Report Programs. Docusign Envelope ID: 88BCCD53-57CF-8A38-8277-E3A70739D567 Page 192 of 232 Agreement Between Valley Water and Gilroy for AMI Water Conservation Program 11 EXHIBIT C INSURANCE Each PARTY represents and warrants that, at its sole cost and expense it will maintain for the duration of the AGREEMENT insurance or self-insurance against claims for injuries to persons or damages to property that may arise from, or in connection with its (and its agents, representatives’, employees’ or contractors)’ performance of the services and/or operations herein and the indemnit y provisions of this AGREEMENT. A. Types of Coverage and Minimums Each Party shall maintain the following insurance coverages and minimums: (a) Commercial General/Business Liability Insurance with $1,0 00,000 per occurrence and $1,000,000 aggregate limits for bodily injury and property damage; (b) Business Auto Liability Insurance with $1,000,000 combined single limit for bodily injury and property damage per occurrence, covering all owned, non-owned and hired vehicles; (c) statutory California Workers’ Compensation coverage covering all work to performed for not less than $1,000,000 per occurrence; and (d), if appliable, Professional/Errors and Omissions Liability of at least $1,000,000 per claim and $1,000,000 in aggregate. B. Self-Insurance Either PARTY may use self-insurance to satisfy its obligations as provided for under the California Government Code. C. Verification of Coverage Execution of this AGREEMENT shall constitute each PARTY’s representation and warranty as to the coverage required by this AGREEMENT, and authority of the person signing the AGREEMENT to bind coverage on its behalf. D. Contractors Each PARTY shall obtain separate evidence of insurance for each contractor/consultant hired to perform any services under this Agreement Docusign Envelope ID: 88BCCD53-57CF-8A38-8277-E3A70739D567 Page 193 of 232 8.8. City of Gilroy STAFF REPORT Agenda Item Title: Adopt an Ordinance Amending Article II Chapter 16A of the Gilroy Municipal Code Regarding Mobile Vending Meeting Date: November 16, 2026 From: Matt Morley, City Administrator Department: Administration Submitted by: Raissa de la Rosa, Economic Development Director Prepared by: Raissa de la Rosa, Economic Development Director STRATEGIC PLAN GOALS: Promote Economic Development Activities RECOMMENDATION Adopt an ordinance amending Article II Chapter 16A, combining §§16A.13 - 15 into a new §16A.13 establishing mobile vending regulations and consolidating permit procedures, prohibited locations, and operational standards. EXECUTIVE SUMMARY Amending Article II Chapter 16A §§16A.13 - 15 transitions the Mobile Vending Pilot Program established in June 2025 to a permanent regulatory framework. It modernizes and consolidates requirements, integrating pilot provisions into one chapter, officially establishing the vending zones and no-vending areas and providing explicit permitting processes, operational standards, and an enforcement framework. Once adopted, the ordinance will apply to all existing permit holders participating in the pilot program. BACKGROUND The City launched the Mobile Vending Pilot Program in June 2025 (Resolution No. 2025-26) to provide a framework to assess feasibility and public response to food trucks in various city locations, ensure compatibility with nearby land uses and businesses, evaluate impacts on traffic, parking and pedestrian flow, and support economic activity Page 194 of 232 8.8. and place-making efforts. The development of the program was informed by a downtown ad hoc committee, feedback from downtown businesses, comparative analysis of regional mobile vending programs, and modern standards. In January 2026, Council extended the Pilot Program and incorporated enforcement tools that have been added to and expanded in the ordinance. In addition, Section I of Resolution 2026-05 allows the City Administrator to extend the Pilot Program until adoption of a revised Mobile Vending Ordinance; once passed, the existing permits issued under the Pilot Program will be covered under the ordinance. The mobile vending ordinance amending Article II Chapter 16A of the Gilroy Municipal Code was introduced to Council at the November 2, 2026, meeting. ANALYSIS The Mobile Vending Ordinance establishes §16A.13 as a comprehensive framework that replaces previously distributed and outdated sections of the Municipal Code. It consolidates definitions, permit requirements, operational standards, enforcement mechanisms, and designated vending and no-vending locations into a single chapter for improved clarity. Furthermore, the ordinance transitions permit authority from the Chief of Police to the Office of the City Administrator or their designee, making it an administrative function aligned with other business-related City approvals and reducing unnecessary reliance on law enforcement resources. Integrating all requirements into a single chapter simplifies administration, clarifies operational standards and vendor compliance expectations, and enhances transparency. As the City's enforcement authority is limited to time, place, and manner regulations, which are clearly outlined in the ordinance, compliance enforcement of food safety standards and the vending facility (i.e. the food truck) falls within the jurisdictional authority of the County of Santa Clara's Department of Public Health, Environmental Health Division. ALTERNATIVES Council could choose not to adopt the ordinance and maintain the pilot program in its current form. This would prolong temporary rules, create ambiguity for vendors, and delay the benefits of a unified chapter. FISCAL IMPACT/FUNDING SOURCE Adopting the ordinance is not expected to create significant new costs for the City. There may be some shifts in staff workload related to permit administration, but no increase in overall staffing needs is anticipated. Administrative processing, such as reviewing applications, monitoring compliance, and issuing permits, has already been absorbed by existing staff using standard business-permit workflows. Page 195 of 232 8.8. The ordinance may generate modest revenue through permit fees, which help offset administrative costs. Eliminating the Police Department’s role in permit issuance may reduce time spent on non-law-enforcement duties, providing a small operational efficiency gain. No major capital purchases or new enforcement programs are required, and existing enforcement mechanisms (such as suspensions and revocations) are handled using current City processes. PUBLIC OUTREACH Throughout the Pilot Program, staff worked with downtown businesses and mobile vendors to shape the program. In addition, a public hearing was held on November 2, 2026. NEXT STEPS After adoption, the ordinance will take effect on December 16, 2026 (30 days after this second reading and adoption of the ordinance). Attachments: 1. Mobile Vending Ordinance Page 196 of 232 ORDINANCE 2026-XX AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF GILROY AMENDING ARTICLE II SECTIONS 16A.13, 16A.14, AND 16A.15 OF CHAPTER 16A OF THE GILROY MUNICIPAL CODE REGARDING MOBILE VENDING WHEREAS, on June 2, 2025, Council adopted Resolution 2025-26 establishing a Mobile Vending Pilot Program to regulate mobile vending in designated locations while enabling staff to develop permanent code amendments, and; WHEREAS, on January 26, 2026, Council adopted Resolution No. 2026-05 extending the pilot to October 31, 2026, adding enhanced enforcement provisions including permit suspension and revocation, and; WHEREAS, evaluation of the pilot program has demonstrated strong community benefit, enhanced economic development, and manageable operational impacts, and; WHEREAS, the City Council now intends to permanently adopt and codify the mobile vending regulations. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF GILROY DOES HEREBY ORDAIN AS FOLLOWS: SECTION I The forgoing recitals are true and correct and are incorporated herein by this reference. SECTION II §16A.13 of Chapter 16A Article II of the Gilroy City Code is amended to read as follows: SECTION 16A.13 – MOBILE VENDING 16A.13.010 – Purpose and Scope To regulate mobile vending in the public interest, balancing health, safety, economic development, and community standards by establishing definitions, permit requirements, operational standards, and enforcement mechanisms. 16A.13.020 – Definitions For the purposes of this Chapter, the following definitions shall apply: • Downtown Vending Zone: Designated public parking lots or zones as described in §16A.13.080(A). • Mobile Vending Facility: A motorized vehicle or motorized trailer from which food, beverage, or retail goods are sold or displayed. • Mobile Vending Permit: Permit as defined by the City application requirements. • No Vending Zone: Areas where vending is prohibited under §16A.13.090. • Special Event an event permitted by the City requiring coordination with organizers for vending activities. Page 197 of 232 Ordinance No. 2026-XX Ordinance Amending Article II, Chapter 16A of the Gilroy Municipal Code Regarding Mobile Vending City Council Regular Meeting | November 16, 2026 Page 2 of 5 • Mobile Vendor: A person who sells food or merchandise from a Mobile Vending Facility and operating from a nonpermanent location. This term is inclusive of all mobile vendors, peddlers, solicitors, transient businesses, and any other traveling merchant operating in the designated locations as described in §16A.13.080(A). This Chapter does not apply to those Mobile Vendors regulated under Chapter 16B – Sidewalk Vending. 16A.13.030 – Permit Requirements A Vendor shall not operate a Mobile Vending Facility without a valid City-issued Mobile Vending Permit. Requirements include: 1. City of Gilroy Business License 2. Santa Clara County Public Health Permit for food and beverage vendors. 3. A Certificate of Insurance identifying the insurer, policy terms, and coverage limits of not less than a combined single limit of $1 million, or as otherwise established by City Council resolution. The policy must cover public liability, bodily injury, and property damage arising from the permitted activity, name the City as an additional insured, and provide the City with at least thirty (30) days’ advance written notice prior to any amendment or cancellation. 4. Proof of restroom access for vendors operating for longer than one hour. 5. Display of a City-issued Mobile Vending Permit. 6. Payment of all applicable permit fees. 7. Such additional information as may be required by the City Administrator. 8. If vending on private property, Vendor must additionally provide: a. Proof host business hours align with vending (6 am–12 am max). b. Confirmation of no impact on required parking. c. Confirmation not on undeveloped/vacant parcels. 16A.13.040 – Permit Application Procedures A. Applications, signed by the applicant, shall be submitted to the Office of the City Administrator or as designated by the City Administrator. B. Each application shall be accompanied by an application fee established by the City Council. C. Applications shall be reviewed for compliance with all regulatory requirements based upon the information contained in the application, public records, and the recommendations of departmental staff. D. If granting a Mobile Vending Permit would be in compliance with all provisions of this Chapter and the intent of this Article, and it appears that no undue traffic safety, litter, parking, or other health and safety consequences would result from exercise thereof, approved Vendors shall receive a permit for display. E. Mobile Vending Permits may be transferred to a replacement vehicle operated by the same Vendor upon proof of a Mobile Food Facility Permit from the Santa Clara County Department of Public Health. F. A Mobile Vending Permit may be suspended, modified, or revoked by the City should a violation of or noncompliance with the terms of such permit, or with other applicable laws or regulations be found. G. Mobile Vending Permits are valid for one year from issuance and must be renewed on an annual basis as outlined in this Section. Page 198 of 232 Ordinance No. 2026-XX Ordinance Amending Article II, Chapter 16A of the Gilroy Municipal Code Regarding Mobile Vending City Council Regular Meeting | November 16, 2026 Page 3 of 5 16A.13.050 – Suspension and Revocation A. The City may suspend permits for violations including but not limited to operating without required permits, creating public nuisances, violating any provisions of this Chapter, or of any other law or ordinance relating to the business of the licensee. Violations may result in the following consequences, at the discretion of the City: 1. An administrative fine and written notice. 2. Suspension of the Mobile Vending Permit for sixty days up to one year, or permanent revocation. B. The City may issue immediate suspensions in cases of threats to public health or safety. C. Vendors shall have the right to a hearing as set forth in Article IV – Revocation and Suspension of the Gilroy City Code. 16A.13.060 – Operational Standards A. General Requirements 1. Vendors shall not be subject to relocation rules formerly mandated under Chapter 16A Article II (relocation every 10 minutes). 2. Vendors shall maintain sanitary operations and comply with all state and local food safety laws. 3. ADA pathways shall not be obstructed. At no time may a vendor operate in such a fashion that would violate or cause a violation of the Americans with Disabilities Act or state law on accessibility. 4. No tents, tables, canopies, or other temporary structures are allowed. 5. No generators exceeding acceptable noise levels limited to a maximum of 70 dBA (L10) measured at the property line, or as otherwise updated and outlined in §30.41.31(b) (Special Provisions – Noise). 6. Vendors must provide a trash receptacle for customers and employ good faith efforts to ensure proper disposal of customer trash. Vendors are responsible for properly disposing of waste and grease associated with their business and may not use city receptacles for this purpose. 7. When not in use, mobile vending facilities, equipment, supplies, or any other objects associated with the business shall not be left or stored on public property or within the public right-of-way, nor in areas and locations identified in §16A.13.090 (No Vending Zones). 8. Vendors must adhere to the display and signage regulations outlined under §16A.13.070 (Displays and Signage). 9. Vendors must visibly display a valid Santa Clara County Mobile Food Facility (MFF) Permit, and Gilroy Mobile Vending Permit. The Vendor’s Gilroy Business License and California Seller’s Permit (if applicable) must be available for review upon request. 10. Vendors shall not connect to city-owned utilities such as but not limited to electric boxes, water lines, and gas lines. 11. Vendors shall not operate or vend in a way that violates the terms or conditions of their mobile vending permit. 12. Vendors may operate only within City-approved designated areas as outlined in §16A.13.080. Page 199 of 232 Ordinance No. 2026-XX Ordinance Amending Article II, Chapter 16A of the Gilroy Municipal Code Regarding Mobile Vending City Council Regular Meeting | November 16, 2026 Page 4 of 5 B. Hours of Operation 1. Fifth Street Public Parking Lot: Thursday – Sunday, 4:00 PM to 2:00 AM. 2. Eigleberry Street Designated Parking Areas: Daily, 2:00 PM to 10:00 PM. 3. Gourmet Alley Parking Lots: Daily, 2:00 PM to 10:00 PM. 4. Eigleberry Street from 4th-7th Street, in spaces parallel to the curb: Daily, 2:00 PM to 10:00 PM. 5. Private Commercial Property: Daily, 6:00 AM to midnight, with written property owner consent. 16A.13.070 – Displays and Signage A. Signage shall be located and erected only upon the Mobile Vending Facility. B. The maximum permissible total sign area for any signage not painted or applied as a wrap directly onto the Mobile Vending Facility but attached to or extending beyond the main body of the Facility is 2 square feet for each lineal foot of the length of the Mobile Vending Facility. C. Menu displays shall be neat and securely attached. D. Lighting of all signs should be directional to illuminate the sign without producing glare on pedestrians or autos. E. The following are prohibited: 1. Animated LED signs or other types of electronic or digital signs and displays that show moving graphics, logos, texts or other effects. 2. Signs that are designed to rotate, move, or flash. 3. Lighted signs whose surface brightness is a detriment to surrounding property, prevents the peaceful enjoyment of life, or presents a conflict with safe traffic movement; or advertising displays which emit audible sound, odor, or visible matter. 4. Freestanding signage, sidewalk displays and balloons. 16A.13.080 – Authorized Vending Locations A. Authorized Downtown Mobile Vending Locations : Mobile Vending within the Downtown Area is permitted only in locations designated by the City. The City Administrator, or their designee, may add, remove, or modify authorized Downtown Mobile Vending Locations, including operating hours, based on operational needs, public safety, community feedback, economic development goals, or program performance. The following locations are initially designated as authorized Downtown Mobile Vending locations: 1. P3 - Fifth Street Public Parking Lot (Thursday – Sunday, 4:00 PM–2:00 AM) 2. P7 - Eigleberry Street Public Parking Lot (Daily, 2:00 PM to 10:00 PM) 3. P2 + P4 - Gourmet Alley/Paseo Parking Lots (Daily, 2:00 PM to 10:00 PM) 4. Eigleberry Street from 4th-7th Street, in spaces parallel to the curb (Daily, 2:00 PM to 10:00 PM) B. Private Property 1. Mobile vending shall be permitted on commercially zoned private property as defined in and consistent with Chapter 30 (Zoning Ordinance) of the Gilroy City Code, with written permission of the property owner, and except as restricted in § 16A.13.090.A – Authorized Downtown Mobile Vending Locations. Page 200 of 232 Ordinance No. 2026-XX Ordinance Amending Article II, Chapter 16A of the Gilroy Municipal Code Regarding Mobile Vending City Council Regular Meeting | November 16, 2026 Page 5 of 5 16A.13.090 – No Vending Zones Mobile vending is expressly prohibited in: A. Areas visible from the property frontage along Monterey Road from Leavesley Road to Luchessa Avenue; and side streets between 4th Street and 7th Street between Railroad Street south to Eigleberry Street except as allowed in the Downtown Mobile Vending Locations as defined in §16A.13.080 – Authorized Vending Locations. B. City parks unless with exclusive concessionaire agreement or as an allowed vendor during a permitted special event. C. Within 300 ft of a permitted farmers’ market or special event during operation. D. Within 400 ft of a school between 7 am–4 pm on school days. E. Historic District sidewalks, and as restricted or excluded or otherwise regulated under Chapter 16B – Sidewalk Vending. F. Any area where mobile vending is prohibited due to objective public health, safety, or welfare concerns, or as disallowed by private property owner(s), or as established by City Council Resolution. G. Bus stops, school zones, fire lanes, or any other location prohibited by state law or as identified as prohibited locations elsewhere within the Gilroy City Code. H. Upon private property, except with the written permission of the owner of the property. Such permission shall be produced and shown on the demand of any person solicited or of any police officer or official of the City. 16A.13.100 – Special Event Vending A Mobile Vending Permit authorizes a Mobile Vendor to operate at City-approved Special Events, provided the Vendor coordinates with the event organizer and complies with all event specific rules or requirements. 16A.13.110 – Activities Not Considered Mobile Vending Under This Chapter The following are not regulated under this chapter and do not require a Mobile Vending Permit: A. Farmers’ markets or street fairs permitted by the City. B. Vendors operating entirely within licensed brick-and-mortar premises or patios or other outdoor extension of a brick-and-mortar premises. C. Vendors operating exclusively as temporary concessions under a City issued Special Event Permit (regulated under Chapter 13A of the Gilroy City Code) and not acting as Mobile Vendors. D. Sidewalk vending, which is regulated separately under Chapter 16B – Sidewalk Vending. SECTION III Section 16A Chapter 16A.14 - Permit Procedures of the Gilroy City Code has been updated and integrated into the new Article II Chapter 16A.13, allowing for the elimination of Chapter 16A.14. Page 201 of 232 Ordinance No. 2026-XX Ordinance Amending Article II, Chapter 16A of the Gilroy Municipal Code Regarding Mobile Vending City Council Regular Meeting | November 16, 2026 Page 6 of 5 SECTION IV Section 16A Chapter 16A.15 - Prohibited Locations and Prohibition Against Loitering of the Gilroy City Code has been updated and integrated into the new Article II Chapter 16A.13, allowing for the elimination of Chapter 16A.15. SECTION V Except as set forth in this Ordinance, all other provisions of the Gilroy Charter and City Code shall remain in full force and effect. SECTION VI This Ordinance is not intended to and shall not be construed or given effect in a manner that imposes upon the City or any officer or employee thereof a mandatory duty of care towards persons and property within or without the City, so as to provide a basis of civil liability for damages, except as otherwise imposed by law. SECTION VII If any section, subsection, sentence, clause or phrase of this Ordinance is for any reason held to be invalid or unconstitutional, such decision shall not affect the validity of the remaining portions of this ordinance. The City Council of the City of Gilroy hereby declares that it would have passed and adopted this ordinance, and each section, subsection, sentence, clause or phrase hereof, irrespective of the fact that any one or more sections, subsections, sentences, clauses or phrases may be declared invalid or unconstitutional. SECTION VIII This Ordinance shall take effect thirty (30) days after its adoption. The City Clerk is hereby directed to publish this Ordinance or a summary thereof pursuant to Government Code Section 36933. Page 202 of 232 Ordinance No. 2026-XX Ordinance Amending Article II, Chapter 16A of the Gilroy Municipal Code Regarding Mobile Vending City Council Regular Meeting | November 16, 2026 Page 7 of 5 PASSED AND ADOPTED by the City Council of the City of Gilroy this 16th day of November 2026 by the following vote: AYES: COUNCIL MEMBERS: NOES: COUNCIL MEMBERS: ABSTAIN: COUNCIL MEMBERS: ABSENT: COUNCIL MEMBERS: APPROVED: ___________________ Greg Bozzo, Mayor ATTEST: Kim Mancera, City Clerk CERTIFICATE OF THE CLERK I, KIM MANCERA, City Clerk of the City of Gilroy, do hereby certify that the attached Ordinance No. 2026-XX is an original resolution, or true and correct copy of a City Resolution, duly adopted by the Council of the City of Gilroy at a Regular Meeting of said Council held on Monday, Date, with a quorum present. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the Official Seal of the City of Gilroy this Tuesday, XXXXX ____________________________________ Kim Mancera City Clerk of the City of Gilroy Page 203 of 232 9.1. City of Gilroy STAFF REPORT Agenda Item Title: Receive an Update on the Council Legislative Agenda and Department Work Plan Meeting Date: November 16, 2026 From: Matt Morley, City Administrator Department: Administration Submitted by: Matt Morley, City Administrator Prepared by: Matt Morley, City Administrator STRATEGIC PLAN GOALS: RECOMMENDATION Receive an update on the City Council Legislative Agenda and the Department Work Plan. EXECUTIVE SUMMARY This report provides an update on the City Council Legislative Agenda, revamping the tracking and presentation format and discussing highlights. BACKGROUND Annually, the City Council reviews and sets a Legislative Agenda, a list of City Council priority projects and initiatives that staff will work on over a designated period of time. The priorities help to guide the organization, specifically in aligning staff efforts with expectations and folding Council priorities into daily work and Departmental Workplans. The Departmental Workplans are also attached to provide a full flavor of the special project work that underway in the organization. Page 204 of 232 9.1. ANALYSIS The presentation style for this work has been modified to provide an at-a-glance summary sheet, with a supporting one-page detail sheet for each Legislative Agenda or Workplan item. The City Council should take this opportunity to provide feedback on the usefulness of the document and to ask questions on any specific project. The Legislative Agenda now contains 21 projects, an increase from the previous 16. The additional projects result from City Council direction over time. The summary shows key information, including the project title, assigned department, status, and percent complete. Each of the projects listed is a body of work unto itself. The long list of Legislative Priorities, combined with the Departmental Workplan and day-to-day work, together create an often daunting workload. Many of the projects included in the list are multi- year efforts, and some may lead to or shift to ongoing operational efforts. In reviewing the list, a couple of highlights stand out: • Community Development retains responsibility for the largest number of projects, many with significant time requirements. The additional projects added over the last four months also fall to Community Development. The original intent was to address work items through internal staff assignments. This has become untenable, as reflected by the projects in a “delayed” status. To address this, staff has pivoted and is actively retaining the assistance of a consultant that will help with much of the work. • The nature of the policy items leads to discussions which may create other delays. For example, the establishment and work of the Mayor’s Ad Hoc Committee on Homelessness contributed significantly to project six (Policy on Regional Approach to Homelessness). The effort, feedback from Council, and future work affect the project timeline extension. • The addition of new priorities during the course of the year has an impact and manifests in extended timelines and affects staff ability to focus on previously identified projects. Similar to the Legislative Agenda, the Department Workplan provides a list of projects, this list identified by departments to highlight high-priority work above and beyond daily work. This list is extensive, with 72 items currently listed. Both of these lists provide a new and revised view and approach to tracking. Ongoing adjustments to the tracking methodology will occur as departments provide feedback on the usefulness of these formats. These lists together encompass a serious workload effort. As noted in the example Page 205 of 232 9.1. above, staff may not always accomplish the work in the timeline they expect. Efforts to review the approach to project delivery and to adjust will continue and with this the commitment to delivering on priorities remains high. Delays in projects reflect a competition for resources to address these work priorities and remains committed to moving them forward. ALTERNATIVES FISCAL IMPACT/FUNDING SOURCE There is no direct fiscal impact from this report. Individual efforts may have budgetary impacts. Where the costs are not included in department budgets, the Council will have the opportunity to review the need through the annual budget process. PUBLIC OUTREACH Many of the individual efforts include significant public engagement. NEXT STEPS Staff will continue work on these projects. In February, the City Council will begin prioritization of the next Legislative Agenda. Staff will provide a further update on project status at that time. Attachments: 1. Attachment 1 - Legislative Agenda 2. Attachment 2 - Department Workplan Summary Page 206 of 232 Report date November 12, 2026 #Project Department Original completion Revised completion Variance (months)Status % Complete 1 Communication and Support for District-Based Elections Administration – Communication and Engagement Office Nov 7, 2026 Nov 7, 2026 0 Complete 100% 2 Review the Council Policy on General Fund Investment in Recreation Services and Programs Administration – City Administrator's Office Jun 30, 2027 Jun 30, 2027 0 On Track 40% 3 Consideration of Revising the Tobacco Ordinance and a Moratorium on New Tobacco Retailers During Revision Process Community Development Jun 15, 2026 Oct 5, 2026 +4 Complete 100% 4 Review of Campaign Finance Laws/Contribution Limits and Enforcement Options Administration – City Attorney Nov 7, 2028 Nov 7, 2028 0 On Track 50% 5 Evaluate the Annexation of Gilroy Sports Park Administration – City Administrator's Office Jun 30, 2026 May 1, 2027 +11 Delayed 0% 6 Develop a City Policy on a Regional Approach to Housing/Unhoused Challenges Community Development Oct 31, 2026 Jun 30, 2027 +8 Delayed 50% 7 Climate Action Plan Community Development Jun 30, 2027 Dec 31, 2027 +6 Delayed 70% 8 Develop Vehicle Miles Traveled (VMT) Policy and Transportation Demand Management (TDM) Measures Community Development Jun 30, 2027 Dec 31, 2027 +6 Delayed 70% 9 Develop Affordable Housing Policy/Ordinance Community Development Mar 31, 2027 Sep 30, 2027 +6 Delayed 25% 10 Evaluate the City's Transient Occupancy Tax Finance Jun 30, 2026 Jun 30, 2026 0 Complete 100% 11 Conduct Fire Service Evaluation Fire Jun 30, 2028 Jun 30, 2028 0 On Track 40% 12 Police Department Service Level Evaluation and Strategic Plan Police Dec 31, 2028 Dec 31, 2028 0 On Track 5% 13 Beautification Efforts for Gilroy Gateways – Highway 101 and Monterey Public Works, Police, & Community Development Jul 31, 2028 Jul 31, 2028 0 On Track 10% 14 Highway Cloverleafs/Interchange Maintenance Responsibility Public Works Jan 1, 2028 Jan 1, 2028 0 Delayed 5% 15 Update the Parks and Trails Master Plan Public Works Feb 28, 2028 Dec 6, 2027 -2 On Track 10% 16 Downtown/Rule 20A Undergrounding Public Works Dec 30, 2032 Dec 30, 2032 0 On Track 10% 17 Noise Performance Standards Community Development Jan 31, 2027 Jan 31, 2027 0 On Track 40% 18 Architectural and Site Review Permit Proces Community Development Sep 14, 2026 Sep 14, 2026 0 Complete 100% 19 Objective Design Standards for Commercial and Industrial Projects Community Development Dec 31, 2027 Dec 31, 2027 0 On Track 5% 20 Data Center Moratorium and Development Standards Community Development Dec 31, 2027 Dec 31, 2027 0 On Track 5% 21 Detention and Custodial Facility Moratorium and Development Standards Community Development Dec 31, 2027 Dec 31, 2027 0 On Track 5% LEGISLATIVE AGENDA PROJECT TRACKER FY26 and FY27 Council Projects City of Gilroy · City Administrator's Office Original schedules come from the Council Legislative Agenda dated 3/20/2026. Each project has its own one-page tab (P01–P20). Staff enter revised dates, status, and progress on the project tabs; this page updates automatically. Yellow cells are for staff entry. Everything else is formula-driven, so edit dates, status, and progress on each project tab. Click a project name to open its tab. To add a project, enter a title on tab P17 (open slots: P17–P20) and it appears in rows 17–20 here. Sheets are protected without a password (Review > Unprotect Sheet) to keep formulas safe. City of Gilroy · Legislative Agenda Project Tracker Page 207 of 232 Department TIMELINE Starts 2026 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ORIGINAL ★ REVISED ★ # Milestone 1 Milestone 2 Milestone 3 Milestone 4 Milestone 5 Project completion ★ Status Last updated 10/29/2026 Updated by Rachelle Bedell NOTES Post project evaluation - successful outreach. Great feedback from residents at outreach events. Social media showed good knowledge of districts, highlighted by residents correcting other residents when one was posting about not having Council elecitons on their ballot. Completion variance, revised vs. original (months; positive = later)0 PROGRESS Complete % Complete 100% Messaging Campaign focused on voting resources.11/7/2026 11/7/2026 ☑ Project completion 11/7/2026 11/7/2026 ☑ Utility Bill Insert, tabling at San Ysidro Park and National Night Out, ad in the Recreation Guide, placing lawn signs in public parks all focused on finding your Council District. 6/30/2026 8/31/2026 ☑ Messaging Campaign focused on the nomination period, followed by re-run of finding your Council District.8/31/2026 11/7/2026 ☑ Citywide postcard campaign.2/28/2026 3/31/2026 ☑ Messaging Campaign focused on finding your Council District.3/31/2026 6/30/2026 ☑ milestone ★ project completion. The bars draw from the dates in the Milestones table below; change a date and the timeline updates. The first year of the timeline is set in the yellow cell at the left. MILESTONES Milestone Original date Revised date Done BACKGROUND, RESOURCES AND STATUS (AS OF 3/20/2026 AGENDA) The City of Gilroy recently adopted Council Districts with transition to districts beginning with the 2026 election. Resources for completing this outreach include staff of the City Clerk, Communication and Engagement, and IT GIS Support. SCHEDULE ORIGINAL VS. REVISED 2026 2027 2028 2029 2030 2031 2032 2033 Communication and Support for District-Based Elections Administration – Communication and Engagement Office PROJECT DESCRIPTION Communication and outreach plan to inform the community about how to find their Council District and how to vote in district-based elections. City of Gilroy · Legislative Agenda Project Tracker P01 Page 208 of 232 Department TIMELINE Starts 2026 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ORIGINAL ★ REVISED ★ # Milestone 1 Milestone 2 Milestone 3 Milestone 4 Milestone 5 Project completion ★ Status Last updated 11/6/2026 Updated by mm NOTES Completion variance, revised vs. original (months; positive = later)0 PROGRESS On Track % Complete 40% ☐ Project completion 6/30/2027 6/30/2027 ☐ Implement statistically valid survey 12/15/2026 ☐ Present result to City Council 5/17/2026 ☐ Council action to award a consultant contract to conduct the study.4/6/2026 ☑ Public Engagement open house, event tabling 10/10/2026 ☑ milestone ★ project completion. The bars draw from the dates in the Milestones table below; change a date and the timeline updates. The first year of the timeline is set in the yellow cell at the left. MILESTONES Milestone Original date Revised date Done BACKGROUND, RESOURCES AND STATUS (AS OF 3/20/2026 AGENDA) Staff time and contract costs, which will be appropriated once the bids are received and an award is issued by the Council. Consultant's assessment will inform on many Council questions/concerns regarding Recreation, and information to consider for the General Fund investment policy. SCHEDULE ORIGINAL VS. REVISED 2026 2027 2028 2029 2030 2031 2032 2033 Review the Council Policy on General Fund Investment in Recreation Services and Programs Administration – City Administrator's Office PROJECT DESCRIPTION Through the use of a consultant, conduct an assessment on the Recreation Division to address questions related to aquatics services, the General Fund contribution, user fees, and staffing, triggering the full assessment of the division. City of Gilroy · Legislative Agenda Project Tracker P02 Page 209 of 232 Department TIMELINE Starts 2026 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ORIGINAL ★ REVISED ★ # Milestone 1 Milestone 2 Milestone 3 Milestone 4 Milestone 5 Project completion ★ Status Last updated 11/3/2026 Updated by Sharon Goei NOTES The project was completed after three moratoria were created and a few changes in direction. The ordinance amending the Tobacco Retailer Permit section of the City Code was adopted on October 5, 2026, and becomes effective on November 4, 2026. The moratorium on Tobacco Retailer Permits will end on December 31, 2026. Completion variance, revised vs. original (months; positive = later)+4 PROGRESS Complete % Complete 100% Council adoption of ordinance amending Tobacco Retailer Permit section of City Code 10/5/2026 ☑ Project completion 6/15/2026 10/5/2026 ☑ Tobacco Retailer Permit Direction to Council (5/4/2026); Zoning Ordinance update to Planning Commission (5/7/2026) and Council (6/1/2026) 6/1/2026 ☑ Tobacco Retailer Permit Direction from Council (6/1/2026, 8/3/2026); Adopt urgency interim ordinance to prohibit new Tobacco Retailer Permits Citywide (8/3/2026); Introduce ordinance amending Tobacco Retailer Permit section of City Code (9/14/2026) 9/14/2026 ☑ Adopt urgency interim ordinance to prohibit new Tobacco Retailer Permits downtown (11/3/2025); Extension (12/8/2025)12/8/2025 ☑ Adopt urgency interim ordinance to prohibit new Tobacco Retailer Permits Citywide (1/5/2026); Extension (2/9/2026)2/9/2026 ☑ milestone ★ project completion. The bars draw from the dates in the Milestones table below; change a date and the timeline updates. The first year of the timeline is set in the yellow cell at the left. MILESTONES Milestone Original date Revised date Done BACKGROUND, RESOURCES AND STATUS (AS OF 3/20/2026 AGENDA) Developed and received Council adoption of an urgency interim ordinance and its extension to prohibit the issuance of any new tobacco retailer permits downtown, then citywide. Drafting a potential zoning amendment and drafting an ordinance to amend the tobacco retailer permit section of the City Code. SCHEDULE ORIGINAL VS. REVISED 2026 2027 2028 2029 2030 2031 2032 2033 Consideration of Revising the Tobacco Ordinance and a Moratorium on New Tobacco Retailers During Revision Process Community Development PROJECT DESCRIPTION Update the Zoning Ordinance and Tobacco Retailer Permit sections of the Gilroy City Code regarding regulating smoke shops and density of tobacco retailers allowed. City of Gilroy · Legislative Agenda Project Tracker P03 Page 210 of 232 Department TIMELINE Starts 2026 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ORIGINAL ★ REVISED ★ # Milestone 1 Milestone 2 Milestone 3 Milestone 4 Milestone 5 Project completion ★ Status Last updated 11/6/2026 Updated by mm NOTES Council discussed this on May 4, 2026. Council requested more information. Staff to review with Council following 2026 election Completion variance, revised vs. original (months; positive = later)0 PROGRESS On Track % Complete 50% ☐ Project completion 11/7/2028 11/7/2028 ☐ ☐ ☐ Provide a report and receive any Council direction.5/4/2026 ☑ Follow up discussion post 2026 election 4/1/2027 ☐ milestone ★ project completion. The bars draw from the dates in the Milestones table below; change a date and the timeline updates. The first year of the timeline is set in the yellow cell at the left. MILESTONES Milestone Original date Revised date Done BACKGROUND, RESOURCES AND STATUS (AS OF 3/20/2026 AGENDA) Staff is reviewing information previously provided to Council from the City Attorney's Office to return to Council with a report. SCHEDULE ORIGINAL VS. REVISED 2026 2027 2028 2029 2030 2031 2032 2033 Review of Campaign Finance Laws/Contribution Limits and Enforcement Options Administration – City Attorney PROJECT DESCRIPTION Provide information as requested by the City Council. City of Gilroy · Legislative Agenda Project Tracker P04 Page 211 of 232 Department TIMELINE Starts 2026 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ORIGINAL ★ REVISED ★ # Milestone 1 Milestone 2 Milestone 3 Milestone 4 Milestone 5 Project completion ★ Status Last updated 11/6/2027 Updated by Matt Morley NOTES Preoject was on hold pending exploration of sports park improvements. Completion variance, revised vs. original (months; positive = later)+11 PROGRESS Delayed % Complete 0% ☐ Project completion 6/30/2026 5/1/2027 ☐ ☐ ☐ City Administrator's Office determination if to proceed with annexation.6/30/2026 10/15/2026 ☑ Engage with LAFCO for annexation process 1/30/2027 ☐ milestone ★ project completion. The bars draw from the dates in the Milestones table below; change a date and the timeline updates. The first year of the timeline is set in the yellow cell at the left. MILESTONES Milestone Original date Revised date Done BACKGROUND, RESOURCES AND STATUS (AS OF 3/20/2026 AGENDA) Staff time will be required from Administration to evaluate the annexation, and Community Development for completing the application if determination is to proceed. SCHEDULE ORIGINAL VS. REVISED 2026 2027 2028 2029 2030 2031 2032 2033 Evaluate the Annexation of Gilroy Sports Park Administration – City Administrator's Office PROJECT DESCRIPTION City Administrator's Office to evaluate the annexation of the Gilroy Sports Park. If evaluation determines to proceed, direct Community Development Department to apply to LAFCO for annexation. City of Gilroy · Legislative Agenda Project Tracker P05 Page 212 of 232 Department TIMELINE Starts 2026 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ORIGINAL ★ REVISED ★ # Milestone 1 Milestone 2 Milestone 3 Milestone 4 Milestone 5 Project completion ★ Status Last updated 11/3/2026 Updated by Sharon Goei NOTES In April 2026, the City Council formed a Homelessness Ad Hoc Committee to align the City's response efforts with the current need and with the Santa Clara County Community Plan to End Homelessness. The Committee held six meetings between June and September 2026, with membership consisting of Councilmembers, members with lived experience, service providers, and business community reps. City staff also participated and Homebase and Destination: Home provided technical assistance. At the November 2, 2026 Council meeting, the Mayor, on behalf of the Committee, presented the work and recommendation of the Committee - a managed encampment site where an unhoused individual can stabilize while pursuing a pathway to housing. Council requested that detailed data be provided at a future meeting. Completion variance, revised vs. original (months; positive = later)+8 PROGRESS Delayed % Complete 50% Council decision on Ad Hoc Committee recommendation (as part of budget process)6/30/2027 ☐ Project completion 10/31/2026 6/30/2027 ☐ ☐ ☐ Ad Hoc Committee presentation to Council 10/31/2026 11/2/2026 ☑ Re-engage Ad Hoc and develop business plan 1/30/2027 ☐ milestone ★ project completion. The bars draw from the dates in the Milestones table below; change a date and the timeline updates. The first year of the timeline is set in the yellow cell at the left. MILESTONES Milestone Original date Revised date Done BACKGROUND, RESOURCES AND STATUS (AS OF 3/20/2026 AGENDA) Policy is currently being drafted for Council consideration. Subsequently, rather than staff drafting a policy, the City Council formed a Homelessness Ad Hoc Committee to align the City's response efforts with the current need and to develop a recommendation for Council consideration. SCHEDULE ORIGINAL VS. REVISED 2026 2027 2028 2029 2030 2031 2032 2033 Develop a City Policy on a Regional Approach to Housing/Unhoused Challenges Community Development PROJECT DESCRIPTION Develop a City policy for Council consideration regarding the City's efforts towards regional approaches to address housing and unhoused challenges. City of Gilroy · Legislative Agenda Project Tracker P06 Page 213 of 232 Department TIMELINE Starts 2026 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ORIGINAL ★ REVISED ★ # Milestone 1 Milestone 2 Milestone 3 Milestone 4 Milestone 5 Project completion ★ Status Last updated 11/3/2026 Updated by Sharon Goei NOTES The project was delayed due to the timing of the public outreach component of the project, the need for additional review of the draft measures, and the late addition of a VMT bank mitigation measure. The input sessions will be in February 2027 with the Planning Commission and in March 2027 with the City Council. Completion variance, revised vs. original (months; positive = later)+6 PROGRESS Delayed % Complete 70% Final CAP and TDM Guidelines/Adoption 10/31/2027 ☐ Project completion 6/30/2027 12/31/2027 ☐ Public Draft CAP and TDM Guidelines 4/30/2027 ☐ Administrative Final CAP and TDM Guidelines 7/31/2027 ☐ Complete Community-Based Organizations and Technical Advisory Group meetings 4/30/2026 ☑ Planning Commission and City Council review of draft measures 3/15/2027 ☐ milestone ★ project completion. The bars draw from the dates in the Milestones table below; change a date and the timeline updates. The first year of the timeline is set in the yellow cell at the left. MILESTONES Milestone Original date Revised date Done BACKGROUND, RESOURCES AND STATUS (AS OF 3/20/2026 AGENDA) The project is underway with the consultant on board. The project includes both the Climate Action Plan (CAP) and the VMT/GHG Legislative Agenda item (Item 8). SCHEDULE ORIGINAL VS. REVISED 2026 2027 2028 2029 2030 2031 2032 2033 Climate Action Plan Community Development PROJECT DESCRIPTION Develop and adopt a climate action plan to help implement the 2040 General Plan. City of Gilroy · Legislative Agenda Project Tracker P07 Page 214 of 232 Department TIMELINE Starts 2026 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ORIGINAL ★ REVISED ★ # Milestone 1 Milestone 2 Milestone 3 Milestone 4 Milestone 5 Project completion ★ Status Last updated 11/3/2026 Updated by Sharon Goei NOTES The project was delayed due to the timing of the public outreach component of the project, the need for additional review of the draft measures, and the late addition of a VMT bank mitigation measure. The input sessions will be in February 2027 with the Planning Commission and in March 2027 with the City Council. Completion variance, revised vs. original (months; positive = later)+6 PROGRESS Delayed % Complete 70% Final CAP and TDM Guidelines/Adoption 10/31/2027 ☐ Project completion 6/30/2027 12/31/2027 ☐ Public Draft CAP and TDM Guidelines 4/30/2027 ☐ Administrative Final CAP and TDM Guidelines 7/31/2027 ☐ Complete Community-Based Organizations and Technical Advisory Group meetings 4/30/2026 ☑ Planning Commission and City Council review of draft measures 3/15/2027 ☐ milestone ★ project completion. The bars draw from the dates in the Milestones table below; change a date and the timeline updates. The first year of the timeline is set in the yellow cell at the left. MILESTONES Milestone Original date Revised date Done BACKGROUND, RESOURCES AND STATUS (AS OF 3/20/2026 AGENDA) Staff time and additional funding for associated work were identified for these components of the larger project, in conjunction with the awarded Caltrans grant, to complete the project. The project is underway and simultaneous to, and interdependent with, the Climate Action Plan item (Item 7). SCHEDULE ORIGINAL VS. REVISED 2026 2027 2028 2029 2030 2031 2032 2033 Develop Vehicle Miles Traveled (VMT) Policy and Transportation Demand Management (TDM) Measures Community Development PROJECT DESCRIPTION Develop a Citywide VMT Reduction Policy/TDM Guidelines and a GHG Reduction/Climate Action Plan to help the City implement the Gilroy 2040 General Plan and develop a detailed, strategic framework for measuring, planning, and reducing GHG emissions and addressing related climate vulnerabilities, including streamlining project review for applicants' CEQA compliance. City of Gilroy · Legislative Agenda Project Tracker P08 Page 215 of 232 Department TIMELINE Starts 2026 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ORIGINAL ★ REVISED ★ # Milestone 1 Milestone 2 Milestone 3 Milestone 4 Milestone 5 Project completion ★ Status Last updated 11/3/2026 Updated by Sharon Goei NOTES The Regional Nexus Study has been completed, and the City of Gilroy has received its study elements. The City continues to advance multiple Housing Element programs through a coordinated approach that aligns policy development, stakeholder engagement, and outreach efforts. In fall 2026, staff began collaborating with specialized consultants to refine the scope for a Preference Policy, Anti-Displacement Strategies, and Affordable Housing Policy. Staff will engage regional partners to solicit feedback and inform policy development. Staff will incorporate consultant expertise and stakeholder input to establish a comprehensive strategy for advancing the City's affordable housing objectives. Due to staffing changes, limited positions in Housing and Community Services, and increasing workload related to State Law and other housing issues, the timeframe for completion will take longer than originally anticipated. Completion variance, revised vs. original (months; positive = later)+6 PROGRESS Delayed % Complete 25% ☐ Project completion 3/31/2027 9/30/2027 ☐ City Council consideration and adoption 9/30/2027 ☐ ☐ Report and draft framework to Council for direction 9/30/2026 3/31/2027 ☐ Other milestones to be developed based on Council direction ☐ milestone ★ project completion. The bars draw from the dates in the Milestones table below; change a date and the timeline updates. The first year of the timeline is set in the yellow cell at the left. MILESTONES Milestone Original date Revised date Done BACKGROUND, RESOURCES AND STATUS (AS OF 3/20/2026 AGENDA) Staff has been participating in the development of a Regional Grand Nexus Study with the Santa Clara County Planning Collaborative to develop new affordable housing policies to be applied to new development. SCHEDULE ORIGINAL VS. REVISED 2026 2027 2028 2029 2030 2031 2032 2033 Develop Affordable Housing Policy/Ordinance Community Development PROJECT DESCRIPTION Develop a policy and/or ordinance relating to affordable housing. City of Gilroy · Legislative Agenda Project Tracker P09 Page 216 of 232 Department TIMELINE Starts 2026 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4################################################################ ORIGINAL ★ REVISED ★ # Milestone 1 Milestone 2 Milestone 3 Milestone 4 Milestone 5 Project completion ★ Status Last updated 11/2/2026 Updated by Cindy Murphy NOTES Completion variance, revised vs. original (months; positive = later)0 PROGRESS Complete % Complete 100% ☐ Project completion 6/30/2026 6/30/2026 ☑ ☐ ☐ Adoption of the resolution calling for the election and submitting to voters the ballot measure for TOT rate increase and related actions.4/20/2026 5/4/2026 ☑ ☐ milestone ★ project completion. The bars draw from the dates in the Milestones table below; change a date and the timeline updates. The first year of the timeline is set in the yellow cell at the left. MILESTONES Milestone Original date Revised date Done BACKGROUND, RESOURCES AND STATUS (AS OF 3/20/2026 AGENDA) Drafting the staff report and related materials/resolutions calling the election and placing the initiative on the ballot. Coming before Council in April 2026. SCHEDULE ORIGINAL VS. REVISED 2026 2027 2028 2029 2030 2031 2032 2033 Evaluate the City's Transient Occupancy Tax Finance PROJECT DESCRIPTION Council's workplan item to review and adjust City's existing TOT rate, which is one of the lowest in the County, and pursue it as a ballot measure at the November 2026 ballot. City of Gilroy · Legislative Agenda Project Tracker P10 Page 217 of 232 Department TIMELINE Starts 2026 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ORIGINAL ★ REVISED ★ # Milestone 1 Milestone 2 Milestone 3 Milestone 4 Milestone 5 Project completion ★ Status Last updated 11/2/2026 Updated by Rob Fleeup NOTES 1. The Fire Department has completed substantial preliminary evaluation work, including analysis of staffing and deployment, apparatus workload, response-time performance, historical studies, LAFCO recommendations, and long-term operational and capital needs. 2. Milestone 1 was completed early and Initial findings and service-delivery options were presented at the September 2026 Council study session. A follow-up study session is being planned for December 2026 to review additional financial information, municipal investment requirements, and future service-delivery options. Remaining work includes validation of financial assumptions, comparative analysis, and development of the final implementation roadmap. Completion variance, revised vs. original (months; positive = later)0 PROGRESS On Track % Complete 40% Present final comprehensive evaluation and recommended implementation priorities to Council 6/30/2028 ☐ Project completion 6/30/2028 6/30/2028 ☐ Present municipal investment requirements, financial estimates and service-delivery options at follow-up Council study session 12/17/2026 ☐ Complete validated financial and operational comparisons and consolidated implementation roadmap 12/1/2027 ☐ Present initial Fire Service Evaluation findings, historical background, scope, and preliminary service-delivery options to City Council at the September 16, 2026 study session. 6/30/2027 ☑ Complete preliminary technical evaluation of staffing, deployment, workload, response performance and capital needs 11/1/2026 ☑ milestone ★ project completion. The bars draw from the dates in the Milestones table below; change a date and the timeline updates. The first year of the timeline is set in the yellow cell at the left. MILESTONES Milestone Original date Revised date Done BACKGROUND, RESOURCES AND STATUS (AS OF 3/20/2026 AGENDA) -Scope clarification underway based on prior LAFCO recommendations and Council direction. Next step is Council review of scope and options; any further study remains unfunded pending policy direction. The Fire Department has substantially advanced the Fire Service Evaluation through internal analysis of historical studies, LAFCO recommendations, staffing and deployment, apparatus workload, response-time performance, station coverage, organizational needs, and future service-delivery alternatives. - Completed and substantially developed work includes a Fire Service Technical Analysis, September 2026 Response-Time Performance Review, October 2026 Municipal Investment Plan, and supporting staffing, financial, facilities, and operational assessments. These efforts have established a preliminary four-station service model and a phased roadmap for future investment. - Remaining work includes consolidating and validating the existing analyses, completing selected financial and technical assessments, evaluating alternative service-delivery costs, and obtaining Council policy direction on future service levels, priorities, and funding. SCHEDULE ORIGINAL VS. REVISED 2026 2027 2028 2029 2030 2031 2032 2033 Conduct Fire Service Evaluation Fire PROJECT DESCRIPTION Complete a comprehensive Fire Service Evaluation to assess staffing levels, deployment models, response-time performance, station locations, Fire Apparatus work loads, and long-term capital, administrative and operational needs. The evaluation will provide a data-driven roadmap for future service delivery. City of Gilroy · Legislative Agenda Project Tracker P11 Page 218 of 232 Department TIMELINE Starts 2026 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ORIGINAL ★ REVISED ★ # Milestone 1 Milestone 2 Milestone 3 Milestone 4 Milestone 5 Project completion ★ Status Last updated 11/9/2026 Updated by Chief Sanchez NOTES Completion variance, revised vs. original (months; positive = later)0 PROGRESS On Track % Complete 5% ☐ Project completion 12/31/2028 12/31/2028 ☐ ☐ ☐ Department Team Building Workshop will be completed on 3/5/26. 3/5/2026 ☑ POST Staffing Studying and target study 12/1/2027 ☐ milestone ★ project completion. The bars draw from the dates in the Milestones table below; change a date and the timeline updates. The first year of the timeline is set in the yellow cell at the left. MILESTONES Milestone Original date Revised date Done BACKGROUND, RESOURCES AND STATUS (AS OF 3/20/2026 AGENDA) Consultant support (CA POST) for staffing study, TBW (Team Building Workshop), data analysis tools, and leadership facilitation time. SCHEDULE ORIGINAL VS. REVISED 2026 2027 2028 2029 2030 2031 2032 2033 Police Department Service Level Evaluation and Strategic Plan Police PROJECT DESCRIPTION Conduct a comprehensive three-year strategic plan and operational needs assessment to evaluate staffing levels, patrol deployment, beat structure, workload demands, future service expectations, and current and future facility needs, capacity, and infrastructure requirements assessment. City of Gilroy · Legislative Agenda Project Tracker P12 Page 219 of 232 Department TIMELINE Starts 2026 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ORIGINAL ★ REVISED ★ # Milestone 1 Milestone 2 Milestone 3 Milestone 4 Milestone 5 Project completion ★ Status Last updated 11/3/2026 Updated by John Doughty, Sharon Goei NOTES Public Works is and will continue to implement Gateway Beautification outside the planned formal workplan. Staff have been hired and are focused on efforts, notably addressing Leavesley from City limit to Monterey Road. For private properties in the Southern Gateway area, in August 2025, Community Development Code Enforcement staff created a map based on our experience with past concerns received, as well as our own survey of the properties that need improvement. From August through December 2025, the properties conducted clean-up. In 2026, Code Enforcement staff continues to regularly monitor their conditions and take the necessary enforcement actions required to correct any violations observed or reported. The team works with and follows up with individual property owners or their representatives based on violations observed or reported. Most inspections in 2026 confirmed that all locations were clear of abandoned vehicles, unhoused individuals, and debris. Code Enforcement and Police Department continue to collaborate and share information regarding any concerns on private properties. Staff will continue to monitor the properties to ensure the area is clean and well-maintained. Completion variance, revised vs. original (months; positive = later)0 PROGRESS On Track % Complete 10% Allocation of resources (budget)6/7/2027 ☐ Project completion 7/31/2028 7/31/2028 ☐ Hire two devoted Maintenance Workers to address Gateway Beautification Program 10/31/2026 10/21/2026 ☑ Return to Council with detailed work plan and recommended prioritization 5/5/2027 ☐ For private properties, complete clean-up and begin regular maintenance and monitoring 12/31/2026 ☑ Report to Council to receive more specific direction and funding identification.10/31/2026 2/15/2027 ☐ milestone ★ project completion. The bars draw from the dates in the Milestones table below; change a date and the timeline updates. The first year of the timeline is set in the yellow cell at the left. MILESTONES Milestone Original date Revised date Done BACKGROUND, RESOURCES AND STATUS (AS OF 3/20/2026 AGENDA) The City has proceeded with the hiring of 2 full time Maintenance Workers who are devoted to Gateway Beautification. Public Works has initiated beautification efforts at Leavesley and Tenth Street in and outside caltrans right-of-way. Public Works continues to support the QoL team on encampment related clean ups at the South Monterey Road. SCHEDULE ORIGINAL VS. REVISED 2026 2027 2028 2029 2030 2031 2032 2033 Beautification Efforts for Gilroy Gateways – Highway 101 and Monterey Public Works, Police, & Community Development PROJECT DESCRIPTION The Project is intended to commit devoted (2 FTE) staff to the beautification of Council designated Gilroy Gateways including Highway 101 and South Monterey Road interchange area, Highway 101 and Leavesley Road interchange area, and Highway 101 and Tenth Street interchange area. The Project also extends to private properties in the Gateway area. City of Gilroy · Legislative Agenda Project Tracker P13 Page 220 of 232 Department TIMELINE Starts 2026 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ORIGINAL ★ REVISED ★ # Milestone 1 Milestone 2 Milestone 3 Milestone 4 Milestone 5 Project completion ★ Status Last updated 11/3/2026 Updated by John Doughty NOTES Public Works has completed research on recent Caltrans homeless related maintenance agreements. Staff will be prepared in February to discuss and receive direction on whether to commit resources to pursuing an agreement. Existing agreements do not result in full reimbursement of costs. Council will need to determine if the effort warrants commitment of resources to Caltrans Highway 101 right-of-way. This work (agreement) could ultimately include authorization to make landscape/hardscape improvements at interchanges. This too would require substantive investment in professional design, construction and ongoing maintenance. Completion variance, revised vs. original (months; positive = later)0 PROGRESS Delayed % Complete 5% ☐ Project completion 1/1/2028 1/1/2028 ☐ ☐ ☐ Council agenda item to seek further direction on this task.10/31/2026 2/15/2027 ☐ ☐ milestone ★ project completion. The bars draw from the dates in the Milestones table below; change a date and the timeline updates. The first year of the timeline is set in the yellow cell at the left. MILESTONES Milestone Original date Revised date Done BACKGROUND, RESOURCES AND STATUS (AS OF 3/20/2026 AGENDA) No work has commenced to date. No discussions with Caltrans have commenced. Staff will be seeking confirmation of continued interest in taking on additional maintenance obligations and liability. SCHEDULE ORIGINAL VS. REVISED 2026 2027 2028 2029 2030 2031 2032 2033 Highway Cloverleafs/Interchange Maintenance Responsibility Public Works PROJECT DESCRIPTION Hwy 101 cloverleafs are currently maintained by Caltrans. The City Council indicated an interest in assuming maintenance responsibilities in an effort to improve these gateway locations. City of Gilroy · Legislative Agenda Project Tracker P14 Page 221 of 232 Department TIMELINE Starts 2026 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ORIGINAL ★ REVISED ★ # Milestone 1 Milestone 2 Milestone 3 Milestone 4 Milestone 5 Project completion ★ Status Last updated 11/3/2026 Updated by John Doughty NOTES As noted above, KTUA and its subconsultants are in the process of data gathering and inventorying existing parks and recreational trails to formulate an "existing conditions" summary. The Master Plan will include robust community outreach and input over the course of the first 6 months of CY 2027 (January to June). The resulting input along with the facilities assessment will become the basis for the Master Plan document. Completion variance, revised vs. original (months; positive = later)-2 PROGRESS On Track % Complete 10% Council Adoption 12/6/2027 ☐ Project completion 2/28/2028 12/6/2027 ☐ Initiate community outreach including statistically valid survey 1/1/2027 ☐ Parks and Recreation Commission and Planning Commission review, comments, revisions and recommendation 10/1/2027 ☐ Award of contract for consultant services.6/15/2026 ☑ Commencement of Work including creation of website portal ☑ milestone ★ project completion. The bars draw from the dates in the Milestones table below; change a date and the timeline updates. The first year of the timeline is set in the yellow cell at the left. MILESTONES Milestone Original date Revised date Done BACKGROUND, RESOURCES AND STATUS (AS OF 3/20/2026 AGENDA) Funding for a consultant and public outreach is committed. City is under contract with KTUA (Consultant) to prepare Parks and Recreational Trails Master Plan. Work has commenced. Consultant is collecting data, evaluating and inventorying existing parks in order to complete "Existing Conditions" report SCHEDULE ORIGINAL VS. REVISED 2026 2027 2028 2029 2030 2031 2032 2033 Update the Parks and Trails Master Plan Public Works PROJECT DESCRIPTION This project will develop a Parks and Recreational Trails Master Plan to guide City staff on the life cycle, needs, and replacements for Parks facilities. City of Gilroy · Legislative Agenda Project Tracker P15 Page 222 of 232 Department TIMELINE Starts 2026 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ORIGINAL ★ REVISED ★ # Milestone 1 Milestone 2 Milestone 3 Milestone 4 Milestone 5 Project completion ★ Status Last updated 11/3/2026 Updated by John Doughty NOTES The 10-percent completion reflects the formation of the Underground Utility District. As noted previously, it is unlikely that the entiirety of work (design and construction) can be completed with credits on-hand. The Rule 20A program is no longer providing credits to the City. As such, the work will likely require additional local funding. Any proposed undergrounding needs to be coordinated with future sewer and water utiities replacements as well as pavement rehabilitation projects(s). Completion variance, revised vs. original (months; positive = later)0 PROGRESS On Track % Complete 10% ☐ Project completion 12/30/2032 12/30/2032 ☐ ☐ ☐ Meet with PG&E Rule 20A staff to confirm 20A credit balance and process to move forward with the City undergrounding project.7/1/2026 7/1/2027 ☐ ☐ milestone ★ project completion. The bars draw from the dates in the Milestones table below; change a date and the timeline updates. The first year of the timeline is set in the yellow cell at the left. MILESTONES Milestone Original date Revised date Done BACKGROUND, RESOURCES AND STATUS (AS OF 3/20/2026 AGENDA) The City adopted a Utilities Undergrounding District which preserves current Rule 20A credits. Rule 20A program is being phased out and no new credits are being earned by cities. Credits typically equal approximately 50 cents on the dollar. Additional City funding will likely be required to implement. SCHEDULE ORIGINAL VS. REVISED 2026 2027 2028 2029 2030 2031 2032 2033 Downtown/Rule 20A Undergrounding Public Works PROJECT DESCRIPTION This project will underground a total of five poles and associated overhead utilities along Monterey Street between 8th and 10th Street utilizing banked PG&E Rule 20A credits. City of Gilroy · Legislative Agenda Project Tracker P16 Page 223 of 232 Department TIMELINE Starts 2026 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ORIGINAL ★ REVISED ★ # Milestone 1 Milestone 2 Milestone 3 Milestone 4 Milestone 5 Project completion ★ Status Last updated 11/3/2026 Updated by Sharon Goei NOTES Completion variance, revised vs. original (months; positive = later)0 PROGRESS On Track % Complete 40% Council adopt an ordinance amending the Zoning Code relating to noise performance standards 1/25/2027 ☐ Project completion 1/31/2027 1/31/2027 ☐ Present to Planning Commission a modified ordinance amending the Zoning Code relating to noise performance standards 12/3/2026 ☐ Council introduce an ordinance amending the Zoning Code relating to noise performance standards 1/11/2027 ☐ Initial analysis and recommended actions to City Council regarding noise performance standards in the Zoning Code 8/3/2026 ☑ Present to Planning Commission an ordinance amending the Zoning Code relating to noise performance standards 10/1/2026 ☑ milestone ★ project completion. The bars draw from the dates in the Milestones table below; change a date and the timeline updates. The first year of the timeline is set in the yellow cell at the left. MILESTONES Milestone Original date Revised date Done BACKGROUND, RESOURCES AND STATUS Via the FAIR memo process, City Council directed staff to modify the performance standards regarding noise, including prohibiting the use of landscaping power tools during certain times of the day, citywide. SCHEDULE ORIGINAL VS. REVISED 2026 2027 2028 2029 2030 2031 2032 2033 Noise Performance Standards Community Development PROJECT DESCRIPTION Develop an ordinance to modify performance standards regarding noise, including prohibiting landscape power tools during certain times of the day. City of Gilroy · Legislative Agenda Project Tracker P17 Page 224 of 232 Department TIMELINE Starts 2026 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ORIGINAL ★ REVISED ★ # Milestone 1 Milestone 2 Milestone 3 Milestone 4 Milestone 5 Project completion ★ Status Last updated 11/3/2026 Updated by Sharon Goei NOTES Completion variance, revised vs. original (months; positive = later)0 PROGRESS Complete % Complete 100% ☐ Project completion 9/14/2026 9/14/2026 ☑ Council introduce an ordinance amending the Zoning Code relating to Architectural and Site Review Permit process and to enhance public outreach 8/17/2026 ☑ Council adopt an ordinance amending the Zoning Code relating to Architectural and Site Review Permit process and to enhance public outreach 9/14/2026 ☑ Present City Council options for amending the Architectural and Site Review Permit process 6/15/2026 ☑ Present to Planning Commission an ordinance amending the Zoning Code relating to Architectural and Site Review Permit process and to enhance public outreach 7/16/2026 ☑ milestone ★ project completion. The bars draw from the dates in the Milestones table below; change a date and the timeline updates. The first year of the timeline is set in the yellow cell at the left. MILESTONES Milestone Original date Revised date Done BACKGROUND, RESOURCES AND STATUS Via the FAIR Memo process, City Council directed staff to enhance public outreach and amend the Zoning Code to require certain Architectural and Site Review Permits be reviewed and approved by the Planning Commission. SCHEDULE ORIGINAL VS. REVISED 2026 2027 2028 2029 2030 2031 2032 2033 Architectural and Site Review Permit Proces Community Development PROJECT DESCRIPTION Develop an ordinance to enhance public notification, require applicant-led community outreach to solicit feedback, and Planning Commission review and approval for certain Architectural and Site Review Permits City of Gilroy · Legislative Agenda Project Tracker P18 Page 225 of 232 Department TIMELINE Starts 2026 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ORIGINAL ★ REVISED ★ # Milestone 1 Milestone 2 Milestone 3 Milestone 4 Milestone 5 Project completion ★ Status Last updated 11/3/2026 Updated by Sharon Goei NOTES This project will be part of the consultant contract and involves work on the Zoning Code Update. This project's deliverables and timeline match the zoning update project. Completion variance, revised vs. original (months; positive = later)0 PROGRESS On Track % Complete 5% Council first reading (November); second reading and adoption (December)12/31/2027 ☐ Project completion 12/31/2027 12/31/2027 ☐ Public review draft ordinance, map, and crosswalk; CEQA screencheck draft 8/31/2027 ☐ Public hearing draft with new State law matrix update 10/31/2027 ☐ Consultant on board 12/14/2026 ☐ Gap analysis; code structure and compliance working session; CEQA begins and public engagement including data centers and detention facilities 6/30/2027 ☐ milestone ★ project completion. The bars draw from the dates in the Milestones table below; change a date and the timeline updates. The first year of the timeline is set in the yellow cell at the left. MILESTONES Milestone Original date Revised date Done BACKGROUND, RESOURCES AND STATUS This project will be incorporated into the Comprehensive Zoning Ordinance and Zoning Map Project. The timelines below match that project. SCHEDULE ORIGINAL VS. REVISED 2026 2027 2028 2029 2030 2031 2032 2033 Objective Design Standards for Commercial and Industrial Projects Community Development PROJECT DESCRIPTION Develop objective design standards for commercial and industrial projects. City of Gilroy · Legislative Agenda Project Tracker P19 Page 226 of 232 Department TIMELINE Starts 2026 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ORIGINAL ★ REVISED ★ # Milestone 1 Milestone 2 Milestone 3 Milestone 4 Milestone 5 Project completion ★ Status Last updated 11/3/2026 Updated by Sharon Goei NOTES The urgency interim ordinance imposing a temporary moratorium on new data center applications and entitlements Citywide was adopted on September 14, 2026. The extension of the urgency interim ordinance was adopted on October 19, 2026. To create development standards, this project will be part of the consultant contract and involves work on the Zoning Code Update. This project's deliverables and timeline match the zoning update project. Completion variance, revised vs. original (months; positive = later)0 PROGRESS On Track % Complete 5% Council first reading (November); second reading and adoption (December)12/31/2027 ☐ Project completion 12/31/2027 12/31/2027 ☐ Public review draft ordinance, map, and crosswalk; CEQA screencheck draft 8/31/2027 ☐ Public hearing draft with new State law matrix update 10/31/2027 ☐ Consultant on board 12/14/2026 ☐ Gap analysis; code structure and compliance working session; CEQA begins and public engagement including data centers and detention facilities 6/30/2027 ☐ milestone ★ project completion. The bars draw from the dates in the Milestones table below; change a date and the timeline updates. The first year of the timeline is set in the yellow cell at the left. MILESTONES Milestone Original date Revised date Done BACKGROUND, RESOURCES AND STATUS This project will be incorporated into the Comprehensive Zoning Ordinance and Zoning Map Project. The timelines below match that project. SCHEDULE ORIGINAL VS. REVISED 2026 2027 2028 2029 2030 2031 2032 2033 Data Center Moratorium and Development Standards Community Development PROJECT DESCRIPTION Draft an urgency interim ordinance to establish a temporary moratorium on data centers, allowing time to develop appropriate development and operational standards for such facilities City of Gilroy · Legislative Agenda Project Tracker P20 Page 227 of 232 Department TIMELINE Starts 2026 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ORIGINAL ★ REVISED ★ # Milestone 1 Milestone 2 Milestone 3 Milestone 4 Milestone 5 Project completion ★ Status Last updated 11/3/2026 Updated by Sharon Goei NOTES The urgency interim ordinance imposing a temporary moratorium on detention and custodial facility applications and entitlements was adopted on October 5, 2026. The extension of the urgency interim ordinance was adopted on November 2, 2026. To create development standards, this project will be part of the consultant contract and involves work on the Zoning Code Update. This project's deliverables and timeline match the zoning update project. Completion variance, revised vs. original (months; positive = later)0 PROGRESS On Track % Complete 5% Council first reading (November); second reading and adoption (December)12/31/2027 ☐ Project completion 12/31/2027 12/31/2027 ☐ Public review draft ordinance, map, and crosswalk; CEQA screencheck draft 8/31/2027 ☐ Public hearing draft with new State law matrix update 10/31/2027 ☐ Consultant on board 12/14/2026 ☐ Gap analysis; code structure and compliance working session; CEQA begins and public engagement including data centers and detention facilities 6/30/2027 ☐ milestone ★ project completion. The bars draw from the dates in the Milestones table below; change a date and the timeline updates. The first year of the timeline is set in the yellow cell at the left. MILESTONES Milestone Original date Revised date Done This project will be incorporated into the Comprehensive Zoning Ordinance and Zoning Map Project. The timelines below match that project. SCHEDULE ORIGINAL VS. REVISED 2026 2027 2028 2029 2030 2031 2032 2033 BACKGROUND, RESOURCES AND STATUS Detention and Custodial Facility Moratorium and Development Standards Community Development PROJECT DESCRIPTION Draft an urgency interim ordinance to establish a temporary moratorium on detention centers and custodial facilities, allowing time to develop appropriate development and operational standards for such facilities City of Gilroy · Legislative Agenda Project Tracker P21 Page 228 of 232 Report dateNovember 13, 2026# ProjectDepartmentOriginal completionRevised completionVariance (months)Status % Complete1Develop Track 2 Program to Meet State Trash Stormwater RequirementsPublic WorksDec 2, 2030 Dec 2, 2030 0 On Track 55%2Implement District-Based ElectionsAdministration – City ClerkNov 7, 2028 Nov 7, 2026 -24 Complete 100%3Work with the Santa Clara County Fire Department to update Service AgreementFireJul 1, 2028 0%4Complete Regulatory Sign Assessment ProjectPublic WorksJun 30, 2028 On Track 0%5Migration of City's domain to Gilroy.govAdmin/ ITJun 30, 2028 Jun 30, 2028 0 On Track 0%6Update Zoning Code and Zoning Map (including noise impacting residential properties and drive-throughs near residential areas)Community DevelopmentDec 31, 2027 Dec 31, 2027 0 On Track 5%7Conduct Focused and Citywide Fee StudiesCommunity Development, Public Works, and FinanceAug 7, 2027 Oct 4, 2027+2Delayed 25%8Enhance Website Accuracy and UsabilityAdministration/Communications and EngagementJun 30, 2027 Dec 31, 2027+6Delayed 35%9Complete the Update to the Traffic Circulation Master Plan, nexus study and Update of Transportation Impact Fee(s)Public WorksMar 30, 2027 Jun 20, 2027+3On Track 75%10School Zone Speed Limit Reduction ProjectPublic WorksDec 31, 2026 Aug 19, 2026 -4 Complete 100%11Surplus Land Act Notice of Availability and Good Faith Negotiation Process for 4 City Owned Real PropertiesEconomic DevelopmentJul 31, 2026 Jul 13, 2026 0 Complete 100%12Complete Labor Agreements with AFSCME, Local 101 and Gilroy Fire, IAFF, Local 2805Human Resources/Risk ManagementJun 30, 2026 Oct 5, 2026+4Complete 100%13SB707 - Teleconferencing CapabilitiesAdmin/ ITJun 30, 2026 Jun 30, 2026 0 Complete 100%14Civic Center Master PlanPublic WorksJul 1, 2028 On Track 85%15Partner with Santa Clara County and Housing Authority on 8th and Alexander Affordable Housing DevelopmentCommunity DevelopmentDec 31, 2030 Dec 31, 2030 0 On Track 10%16Evaluate Options for Emergency Medical Dispatching (EMD)FireJul 1, 2028 0%17South County Workforce Development CollaborativeEconomic DevelopmentJun 30, 2028 Delayed 15%18Create Density Bonus Implementation ProceduresCommunity DevelopmentDec 31, 2027 Dec 31, 2027 0 On Track 5%19Develop ADU Awareness/Marketing Program and Possible GrantsCommunity DevelopmentDec 31, 2027 Dec 31, 2026 -12 On Track 90%DEPARTMENT WORK PLAN TRACKERDepartment Work PlanCity of Gilroy ꞏ City Administrator's OfficeOriginal schedules come from the FY26 and FY27 Department Workplans dated 3/20/2026. Each project has its own one-page tab (P01–P80). Staff enter revised dates, status, and progress on the project tabs; this page updates automatically. City of Gilroy · Department Work Plan Page 1 of 4Page 229 of 232 # ProjectDepartmentOriginal completionRevised completionVariance (months)Status % Complete20Develop a GIS Program Roadmap/Strategic PlanAdmin/ ITDec 31, 2027 0%21Business Attraction, Retention and Expansion Program DevelopmentEconomic DevelopmentJul 1, 2027 On Track 25%22Prepare Historic Resources Inventory UpdateCommunity DevelopmentJun 30, 2027 Dec 31, 2027+6Delayed 0%23Research Options for Code Enforcement Staffing/ResourcesCommunity DevelopmentJun 30, 2027 Jun 15, 2026 -12 Complete 100%24Evaluate Staffing/Resource Needs and Service Delivery Model for Development ServicesCommunity DevelopmentJun 30, 2027 Jun 30, 2027 0 On Track 0%25Update the City's Employer-Employee Relations Resolution to Incorporate New State LawsHuman Resources/Risk ManagementJun 30, 2027 On Track 0%26Update Human Resources Rules and RegulationsHuman Resources/Risk ManagementJun 30, 2027 On Track 0%27Financial Transparency PortalFinanceJun 30, 2027 On Track 50%28Upgrade of Production Storage System EquipmentAdmin/ ITJun 30, 2027 Apr 30, 2028+100%29Visit Gilroy Tourism Business Improvement District and Welcome Center ContractEconomic DevelopmentJun 30, 2027 Aug 3, 2026 -10 Complete 100%30Update Neighborhood District PolicyCommunity DevelopmentMar 31, 2027 On Hold 0%31Procure and Implement New Software for Integrated Environmental Health Inspection and ComplianceCommunity DevelopmentDec 31, 2026 Jun 30, 2027+6Delayed 70%32Special Event Ordinance, Event Guidelines and Administrative PoliciesEconomic DevelopmentJul 26, 2027 On Track 45%33Create Comprehensive Vehicle Replacement SchedulePublic WorksJul 1, 2027 On Track 45%34Internet Redundancy ImplementationAdmin/ ITDec 31, 2026 Mar 31, 2027+30%35Update Food Truck Ordinance; Update or Establish Administrative Policies and ProcessesEconomic Development / PoliceOct 19, 2026 Nov 2, 2026+1On Track 90%36Consolidate Leases and Partner AgreementsAdministration/City Administrator's OfficeSep 1, 2026 Apr 1, 2027+7Delayed 15%37Customer Service Enhancements (Service Level Expectations - GilroyConnect)Administration/City Administrator's OfficeAug 31, 2026 Aug 31, 2026 0 Complete 100%38Chamber of Commerce ContractEconomic DevelopmentAug 31, 2026 Jun 15, 2026 -2 Complete 100%39Create and Implement Downtown Plywood Storefront OrdinanceCommunity DevelopmentJul 31, 2026 Jul 27, 2026 0 Complete 100%40Create and Implement Downtown Vacancy OrdinanceCommunity DevelopmentJul 31, 2026 Jul 27, 2026 0 Complete 100%41Economic Development Strategic Plan Data Update and 2019 Plan AnalysisEconomic DevelopmentJun 30, 2026 Aug 17, 2026+2Complete 100%42Develop a Comprehensive Citywide Sewer Line Flushing ProgramUtilitiesJun 30, 2026 Jun 1, 2027+12On Track 75% City of Gilroy · Department Work Plan Page 2 of 4Page 230 of 232 # ProjectDepartmentOriginal completionRevised completionVariance (months)Status % Complete43Implement Utility Customer Water Usage Reports and PortalFinanceJun 30, 2026 Jun 30, 2026 0 Complete 100%44Gilroy Entrepreneur Encouragement ProgramEconomic DevelopmentJul 30, 2027 On Track 50%45Prepare Station Area Visioning Study and Develop Station Area PlanCommunity Development & Public WorksDec 31, 2028 Dec 31, 2030+24Delayed 0%46Evaluate Options for Emergency Medical DispatchPoliceJul 1, 2028 0%47Video Monitoring of Sewer Lines City-wideUtilitiesJul 1, 2028 Jun 30, 2027 -13 Delayed 5%48Community Crime Prevention Partnership InitiativePoliceJun 30, 2028 0%49Develop Manhole Rehabilitation ProgramUtilitiesJun 30, 2028 Jun 1, 2027 -12 Delayed 0%50Update Mobile Home Rent Stabilization OrdinanceCommunity DevelopmentDec 31, 2027 Dec 31, 2027 0 On Track 0%51Multimodal PlanningPublic WorksJul 1, 2028 0%52Downtown Community Benefit District Formation ProcessEconomic DevelopmentOct 31, 2027 Jun 1, 2028+8Delayed 10%53Business License Program ReviewFinanceSep 30, 2027 Delayed 0%54Real-Time Information Center (RTIC) Development InitiativePoliceSep 1, 2027 0%55Drone as First Responder Pilot ProgramPoliceSep 1, 2027 0%56Surplus Land Act Strategy DevelopmentEconomic Development with Community DevelopmentJul 1, 2027 On Hold 0%57Roadmap for Gilroy Outlet Mall RevitalizationEconomic Development and Community DevelopmentJun 30, 2027 On Hold 0%58Develop Framework and Strategies for City-Owned Assets to Establish Funding or Programming for Housing-Related NeedsCommunity Development & Economic DevelopmentJun 30, 2027 On Hold 0%59Conduct Senior Housing Parking StudyCommunity DevelopmentJun 30, 2027 Jun 30, 2027 0 On Track 0%60Create and Maintain Citywide Database of Vacant and UnderutilizedIndustrial and Commercial SitesCommunity Development & Economic DevelopmentJun 30, 2027 Jun 30, 2027 0 On Track 0%61Identify, Monitor, and Preserve At-Risk UnitsCommunity DevelopmentJun 30, 2027 Dec 31, 2027+6On Track 20%62Create Displacement Prevention PolicyCommunity DevelopmentJun 30, 2027 Jun 30, 2027 0 On Track 0%63Evaluate the Creamery Property and Prepare for Potential DispositionCommunity DevelopmentJun 30, 2027 Jun 30, 2027 0 On Track 0%64Evaluate the Cherry Blossom Apartments Mixed-Use Property and Prepare for Potential DispositionCommunity DevelopmentJun 30, 2027 Dec 31, 2027+6Delayed 0%65Asset ManagementPublic Works, Public Utilities, City Administrator's OfficeFeb 15, 2028 On Track 15% City of Gilroy · Department Work Plan Page 3 of 4Page 231 of 232 # ProjectDepartmentOriginal completionRevised completionVariance (months)Status % Complete66Conduct a Comprehensive Assessment of the Miller Red Barn to Evaluate Potential Change of Occupancy to Assembly OccupancyCommunity DevelopmentDec 31, 2026 Apr 29, 2026 -8 Complete 100%67Implement Online Development DashboardCommunity DevelopmentDec 31, 2026 Dec 31, 2026 0 On Track 90%68Downtown activation policies (e.g. Gourmet Alley, sidewalk cafés)Economic Development & Community DevelopmentDec 31, 2027 On Hold 0%69Implement State Water Conservation MeasuresUtilitiesMar 1, 2027 On Track 50%70Update Job Descriptions for the Utilities Department StaffUtilitiesMar 1, 2027 On Track 25%71Re-Establish a Chemical Root Control ProgramUtilitiesFeb 1, 2027 Dec 1, 2026 -2 On Track 50%72Re-Start a Fire Hydrant Flushing ProgramUtilities Dec 30, 2027 On Track 50%7374757677787980Yellow cells are for staff entry. Everything else is formula-driven, so edit dates, status, and progress on each project tab. Click a project name to open its tab. To add a project, enter a title on tab P69 (open slots: P69–P80) and it appears in rows 69–80 here. Sheets are protected without a password (Review > Unprotect Sheet) to keep formulas safe. City of Gilroy · Department Work Plan Page 4 of 4Page 232 of 232