HomeMy WebLinkAboutDevcon Construction - Library Construction - Change Order No. 5 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408)846-0451; Fax (408) 846-0429 CHANGE ORDER NO.5 To contract for: New Gilroy Library Project, Phase 2 Contractor: Devcon Construction Contract Date: 6/15/2010 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work This Change Order provides for the following: Additional WaterDroofinR Details - CPR 60 20 Clay Roof Tiles Rideout Cors 345: Add'l waterproofing per Fa 12 and Consultants report 21 Roofing Andy's Roofing AC-7: Provide 20 yr Warranty Andy's Roofing AC-6: Provide Energy Cap Mop FR in Lieu of Energy Cap 30 FR Andy's Roofing AC-2: Provide hot asphalt in lieu of cold applied 22 Sheet Meta I Wildcat Metals: Add'l roofing details, eqpt pad covers 27 Glass and Glazing Silicon Valley Glass: Caulking 28 Portland Cement Plaster O'Donnell Plastering, Inc. : Building Wrap O'Donnell Plastering, Inc. COR 3.1: Addition flashing and foil SAF O'Donnell Plastering, Inc. COR 5: SAF under all Exterior CJ's Subtotal 68 Fee Total 70 Amount applied to Contingency 71 Amount applied to aT Allowance Net change order amount $5,880.00 $5,880.00 $3,316.00 $0.00 $2,044.00 $1,272.00 $5,215.00 $5,215.00 $0.00 $0.00 $60,052.00 $42,811.00 $9,335.00 $7,906.00 $74,463.00 10% $7.446.00 $81,909.00 $0.00 $0.00 $81,909.00 All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $81,909.00 Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost Percentage Initial $18,177,226.00 $201,400.00 1.11%~1'- $18,378,626.00 $81,909.00 $283,309.00 1.56% HZ $18,460,535.00 )) a/col\J BY~j, ~R D.te 6/2-/ //1 I t ACCEPTED BY: RECOMMENDED B .