CHANGE ORDER NO.6
To contract for: New Gilroy Library Project, Phase 2
Contractor:
Devcon Construction
Contract Date:
6/15/2010
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
This Change Order provides for the following:
Support for Wood ceiling at Reference Desk
Performance Contracting Inc COR 3: Added cost to
suspend Wood Ceiling
Performance Contracting Ine COR 2: Engineering
reference Wood Ceiling
15 Metal Fabrications
Steel Frame
38 Interior Painting
Custom Painting CPR 66: Paint Steel support for wood
ceiling
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to OT Allowance
Net change order amount
v
$4,769.00
$3,019.00
$1,750.00
$8,209.00
$8,209.00
$750.00
$750.00
$13,728.00
0.00% $1.373.00
$15,101.00
$0.00
$0.00
$15,101.00
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are
in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss
of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives
any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with
the Extra Work.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $15,101.00
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost Percentage Initial
$18,177,226.00
$283,309.00 1.56% ~
$18,460,535.00
$15,101.00
$298,410.00 1.64% ~
$18,475,636.00
JWUJAJ
Byi ItI::;CTOR
Date: r / It) /1/
{
ACCEPTED BY:
Date
RECOMMENDED BY'
If
~a::N
Change Proposal Request: 66
Project: Gilroy Community Library
Devcon Job #: 10-296
Date: 5/12/2011
We submit for your approval the following estimate of changes in work:
Support for Wood ceiling at Reference Desk
Performance Contracting Inc COR 3: Added cost to
suspend Wood Ceiling
Performance Contracting Inc COR 2: Engineering
reference Wood Ceiling
15 Metal Fabrications
Steel Frame
38 Interior Painting
Custom Painting CPR 66: Paint Steel support for wood
ceiling
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to aT Allowance
Net change order amount
$4,769.00
$3,019.00
$1,750.00
$8,209.00
$8,209.00
$750.00
$750.00
$13,728.00
0.00% $1,373.00
$15,101.00
$0.00
$0.00
$15,101.00
D We have proceeded with this change per the direction of:
D We will not proceed with this change until receipt of a signed copy of this proposal.
D This proposal must be accepted by: xx/xx/xx in order to avoid additional extension or expense.
D These changes will add approximately xx working days to the completion date.
Submitted by:
Devcon -Bob Roseberry
Approved by:
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942-8200 F. (408)262-2342 Lic. #399163
W ES T CO IRON \" ORKS
Structural Steel [i Miscellaneous Metals
Fabricators & Erectors
License #860762
4/15/2011 (Rev. 5/12/11)
Mr. Bob Roseberry
Devcon ConstUl'ction
690 Gibraltar Dr
Milpitas, CA. 95035
Gilroy Public Library
Support steel per Oevcons Request
1224-4-J
Reference: E-Mail sent by Devcon on 4/5; Reference attached for material that was taken off for CO.
Dear Mr.Roseberry,
We submit the following quotation for work in our trade for the above-referenced project.
SCOPE BREAKDOWN
1 Furnish and install 3"PI and 4x4 support steeL Material to receive I-standard shop coat ofprirner.
No radius pieces needed.
Material (1'('.); included)
Detailing
Engineering and Cales
Fabrication
Load i Paint / Ship
Erection
Equipmcnt
Subtotal:
Profit 15%
$533
S550
$2,000
$1,461
$278
$2,317
$0
S7,139
$1,071
$8,209
8.00 hrs.@
16.00 hrs.@
21.00 hrs.@
4.00 hrs.@
24.00 hrs.@
$68.70
$125.00
$69.57
$69.57
$96.53
Total acid this change
The above Change Order Proposal is based upon the receipt of writ tell acceptance within
follrteen (14) calendar days and will be subject to price and schedule confimmtion after
May 26, 2011
Please be advised that we will withhold all actions related to these changes until such time
written acceptance is received.
Very Truly Yours
WESTc() lnON WORKS
~~--
Nick Hleber
Estil11a~or ( Project Manager
437 Queens r ,anc, San Jose, California 95112
Corporate Oflice (408) 436.07] 1 Production Plant (209) 862-1501
FAX (408) 436-8138 FAX (209) 862-1911
www.westcoironworks.com .
. .
B.PC I Performance Contracting Inc.
~ . 123485 Connecticut Street
n .l~\ S~l/~?~~~S,} Hayward, CA 94545
Phone: (510) 887-0995/ Fax: (510) 264-4926
Change Order Cost Proposal
DATE:
CONTRACTOR:
June 2, 2011
Devcon Construction
COCP # 1
PCI Job # 7237
ATTN:
Bob Roseberry
EMAIL: Broseberry@devcon.const.com
PROJECT NAME:
DESCRIPTION:
Gilroy Public Library
Engineering costs for Wood Ceiling about Reference Desk
SUBCONTR:
COST BREAKDOWNS
DESCRIPTION REG 1.5X I 2X REG I O.T. D.T.
"project Manager 0 I ~_Jl---L~s i @. $ 130.43_~ I $
~~~~~i~t~rn::r~~an . ~ r ~ I ~.\ ~~:j:~ ... l~Hi I ~ ~~~:~~l'~" ~:~:~~} ... :
:c~~p~.~t~i~0~~~~~'."""...""'J?~+~~q~.o.+~~1j~:L~i~0+~~0i;Q~j.$.i~-.io~.$"-=~:::-=."."'"
___~~~~~ION _______~_~~_L_~____~~~~_____ ______________
Engineering Costs D-~....i~~-..!-2~---L' $ 1,750
.- - -- - -.- -. I 1 - -;~ ~ - 1 I.. . .{....- -- .
, I ~ $ , l $
... - .-- . .. --.... -. =i= j. : :...$. : t_-.:_. "'$- m_
-- .----. t-+~i.l-;-~-~ ---~-;-
~ ,=t
........-.....--......-.......... . .......... -L-l........... j: ~ . .....j.....J .....~..... ._.........:....
ycissorLi~DeliV~L--________1___~a :: t---~-1------ ~
~~~~rLift_______________-L___L~~~_i___~_J______L-_____i_____~
-l---!----1~L--~..J------~ $
I I ! @ $ . I I $
... ........... +...1....... ...;@..s......................-I-........ ..... ..1..... - $
@
AMOUNT
LABOR:
MATERIALS:
STOCKING:
EQUIPMENT:
SINCERELY,
PERFORMANCE CONTRACTING, INC.
STOCKING SUBTOTAL $
~~~_M~~~~~~~~~~________i_______
SUBTOTAL $ 1,750
LABOR MARK UP 15% $
MATERIAL MARK UP 0% $
......-.....--........-..,--...... ......-........-....-....-.................-........-....-....-..
SUBTOTAL $ 1,750
SUBCONTRSUBTOTAL $
SUBCONTR MARKUP 5% $
----------------------------
MBC BOND/CDI 0.0% $
such as but not limited to interference, disruptions, rescheduling, change in sequence of
work, delays and/or acceleration, directly or indirectly
This change order request is based on the usual cost elements such as labor, material and
markup and does not include any amount for impacts
associates with this change order request. We expressly reserve the right to resubmit our
request for any items should we be faced with performing
this or other work under any of these conditions.
Cldam fllai61i
Adam Raish
Project Engineer
TOTAL AMOUNT $
1,750
. .
. ....PC." I Performance Contracting Inc.
~ . 123485 Connecticut Street
r~ )~lS~~~~\I,(Y:'I\;! Hayward, CA 94545
Phone: (510) 887-0995 / Fax: (510) 264-4926
Change Order Cost Proposal
DATE:
CONTRACTOR:
June 2, 2011
Devcon Construction
COCP # 1
PCI Job # 7237
ATTN:
Bob Roseberry
EMAIL: Broseberry@devcon-const.com
PROJECT NAME:
DESCRI PTION:
Gilroy Public Library
Wood Ceiling above Reference Desk
Cost includes supplying and installing track/studs and strap above tube steel structure to support
suspended wood ceiling (32 Hrs). Credit also given for differences between new suspension system, and
that shown on the original bid documents. (4 hrs credit for removal of compression post/bracing)
SINCERELY,
PERFORMANCE CONTRACTING, INC.
COST BREAKDOWNS
DESCRIPTION REG I 1.SX I 2X REG I O.T. I D.T.
.~r.?t~.~..~.~~~~~L....w..9.J..g.l. 9.1~~s.~ $.~~9:~?t.. ..... ...I...........---........,..L .. ...............:...
2~~~~i~t?~~~~~~~~;;............_.Z4.J61~L! ~~: :: ~ . .~~.Hi.!...~...-iij.~H.I~-.}:~~}_..~.... ... .......... i;i43'
Carpenter Journe~ 0 hrs @ $ 82.91 I $ 109.01 i $ 135.10 $ 1,161
I I I i
........ ...[)~.S~~I~I()f'j.. ..__ .. ..... ... I QTY I ' . PRICE 1- . .. --t- . -. .. - -- - --.. ---- ..
_::E~~~~=-l1ili~: LJiLL-- -t~
I I . @ $ . I I $ -
_1.:..5/8" 20 Ga. po~___________~_-=-~-l-~~~_i__l.~~~_____+ $ (20)
BraCing ~ Ea @ $ 2.40i___ $ (10)
L-J :@ $ - I =t= $ ---
....1 ......l..;~ t...........: l...............+--........_?_--.........:
o' m.. ...... . ............... ..... ... "'I"'I'i~' ~ ... =..+.....t...--.. .{.......,,=. ....
Scissor Lift Delivery -=1---1 ea @ $ -1--1 $ -
li'@$ . I I $
Scissor Lift I~ ea @ $ . I t $ -
- ------ll-iilu ~lmm~I~- l--:-
li.@s - i 1 s -
-----------~-~---=F= ;~- ~ --=~-i-- -l---t-~-
LABOR SUBTOTAL _ $ ~~
MATERIAL SUBTOTAL $ 202
~~_____________~~% S____~~
~~ING SUBTOTAL $.
EQUIPMENT SUBTOTAL $.
SUBTOTAL $ 2,625
. ..................._ ................................._m..................._.. ......_ ....... ......... . ..._ ._...... ......_..__............_
LABOR MARK UP 15% $ 361
MATERIAL MARK UP 15% $ 33
~~BTOTAL $ 3,019
SUBCONTR SUBTOTAL $-
--.------------------------------
SUBCONTR MARKUP 5% $ -
..,...... ........,_................." .. . H...... . 'H_.'''H.'_H''_H''H... _...."..*_....~..." .,,"_....._... .._........._._.._...._...
MBC BOND/CDI 0.0% $ -
AMOUNT
LABOR:
MATERiALS:
STOCKING:
EQUIPMENT:
SUBCONTR:
This change order request is based on the usual cost elements such as labor, material and
markup and does not include any amount for impacts
such as but not limited to interference, disruptions, rescheduling, change in sequence of
work, delays and/or acceleration, directly or indirectly
associates with this change order request. We expressly reserve the right to resubmit our
request for any items should we be faced with performing
this or other work under any of these conditions.
<<dam !Jlai",{i
Adam Raish
Project Engineer
TOTAL AMOUNT $
3,019