HomeMy WebLinkAboutDevcon Construction - Library Construction - Change Order No. 7 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0451; Fax (408) 846-0429 CHANGE ORDER NO. 7 To contract for: New Gilroy Library Project, Phase 2 Contractor: Devcon Construction Contract Date: 6/1512010 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work This Change Order provides for the following: Work Description REVISED CHANGE ORDER COST FOR BULLETIN #7 DELETING FIXTURES IN ROOMS # 106. 111C, 127,128, 129, & 218 AND ADDING (54) LED UNDERCOUNTER LIGHT FIXTURES WITH ADDED SEPERATE CIRCUITS--------------m----------------------------m-----.-.-- $ 40,114 .00 Bulletin #7: Lighting Changes 18 Architectural Woodwork 57 Electrical Sprig Electric Delta 7 Lighting Changes Subtotal 69 Fee Total 71 Amount applied to Contingency 72 Amount applied to OT Allowance Net change order amount $0.00 $40,114.00 $40,114.00 $40,114.00 $4,011.00 $44,125.00 $0.00 $0.00 $44,125.00 All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion ofthe Contract associated with the Extra Work. 7J8vr[)/J ~ ~CTOR By:f7 i . Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost $18,177 ,226.00 $298,410.00 $18,475,636.00 $44,125.00 $342,535.00 $18,519,761.00 Percentage Initial I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $44,125.00 1.64% ~P- "I ~ 1.88% ~J<-- Date: rfrJ/ t-- ACCEPTED BY: fu\\n RECOMMENDED BY: Date er \ O€in ~oh(\SDV\ Change Proposal Request: 37 I:B"~ Project: Gilroy Community Library Devcon Job #: 10-296 Date: 7/28/2011 We submit for your approval the following estimate of changes in work: Bulletin #7: Lighting Changes 18 Architectural Woodwork 57 Electrical Sprig Electric Delta 7 Lighting Changes Subtotal 69 Fee Total 71 Amount applied to Contingency 72 Amount applied to aT Allowance Net change order amount $0.00 $40,114.00 $40,114.00 $40,114.00 $4,011.00 $44,125.00 $0.00 $0.00 $44,125.00 D We have proceeded with this change per the direction of: D We will not proceed with this change until receipt of a signed copy of this proposal. D This proposal must be accepted by: xx/xx/xx in order to avoid additional extension or expense. D These changes will add approximately xx working days to the completion date. Submitted by: Date: Devcon -Bob Roseberry Approved by: Date: Owner's Representative: James Kuhn, Nova Partners Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942-8200 F. (408)262-2342 Lic. #399163 ~MY~ CCN# CCN Date 500/700# Project Name: Project Number: Page Number: 9.1 1/17/2011 L"u~...t.~1~, 2f:672?- (1() 1%60.5. let .5.'1ut:t Salt}'Me. eA 9S11Z nt': 4fJ:;'-Z<;S'-3134 &<r: 4fJ1{-&1S"-Z/3& GILROY LIBRARY 2678 1 Client Address: PROPOSED CHANGE ORDER DEVCON CONSTRUCTION Contact: Bob Roseberry 690 Gibraltar Drive Milpitas, CA 95035 Work Description REVISED CHANGE ORDER COST FOR BULLETIN #7 DELETING FIXTURES IN ROOMS # 106, 111C, 127,128,129, & 218 AND ADDING (54) LED UNDERCOUNTER LIGHT FIXTURES WITH ADDED SEPERATE CIRC UITS_______n___n_n_____nnn__n_n_n._n____n___n__n___ $ 40,114 .00 NOTE: 'Pricing does not include any demo, patching or painting that may be required to install switches and fixtures. . We reserve the right to correct this quote for errors and omissions. . This quote covers direct costs only and we reserve the right to claim for impact and consequential costs. . This price is good for acceptance within 1Q days from the date of receipt. . We request a time extension of 1.Q days. . We will supply and install all materials, labor, and equipment as per your instructions on PCO #9.1 I. Exclusions: . Overtime and shift work . Permits . Fire proofing patching . Cutting & patching of any type . Demolition of any type . Painting . Dumpster fees . Short circuit and coordination studies . Access panels . Ceiling seismic support wires . Consealed and unforeseen conditions . Upgrade of existing code violations . Acoustical box pads and caulking at STC rated walls . Fire rated box pads and caulking at fire rated walls II. Clarifications: . All work is to be completed between the hours of 7:00am through 3:30pm Monday through Friday. III. General Conditions: . All applicable taxes are included in our submission . The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and equipment 'specified or supplied by others . Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the 'manufacturer . The contractor shall not be liable for indirect loss or damage . Unless included in this proposal. all bonding and/or special insurance requirements are supplied at additional cost ORIGINAL PROPOSED CHANGE ORDER Client Address: DEVCON CONSTRUCTION 690 Gibraltar Drive Milpitas, CA 95035 . If a formal contract is required, its conditions must not deviate from this proposal without our permission . Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void . We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into between the owner and the contractor. We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project. Please contact our office if you have any questions for if additional information is needed. Sincerely, SPRIG ELECTRIC COMPANY Ron Piovesan Senior Project Manager Itemized Breakdown Description TYPE-II 21" UND CNT 3/4" EMT CONDUIT 3/4" EMT STL COMP CONN 3/4" EMT STL COMP CPLG 3/4" EMT 1-H STEEL STRAP #12 THHN BLACK #12 THHN GREEN #12/2C CU MC CABLE STL ARMOR 3/8" AC-90/MC DC SS CONN B2-1 RED WIRE CONN 4x1 1/2" SO BOX COMB KO 4" SO BLANK COVER 4" SO 1G PLSTR RING 5/8" RISE GROUND SCREWW/INSUL#12 LEAD 1G TGL SWITCH PLATE - PLASTIC IVY DYMOLABEL PLATE 20A 120-277V SIP SW - TOGGLE IVY (SG # 8-10x 7/8 PLAS ANCHOR (3/16) #8x 3/4 P/H SELF-TAP SCREW #10x 1 P/H SELF-TAP SCREW MAC224SM CBL FLNG SUPPORT H23 SO BOX MTG BRKT LED HWC BOX LED CABLE CONN LED AFC FIXTURE CONN Totals Qty 54 864 50 86 109 2,875 907 72 18 75. 28 10 18 19 9 9 9 147 18 147 18 9 10 1 72 Net Price U 0.00 E 158.39 C 587.46 C 689.37 C 91.51 C 365.86 M 365.86 M 861.00 M 69.85 C 16.16C 800.94 C 297.84 C 511.21C 274.56 C 52.95 C 15.00 C 1,659.93 C 6.38 C 8.16 C 9.75C 103.96 C 131.67 C 0.00 E 0.00 E O.OOE Total Mat($) 0.00 1,368.49 293.73 592.86 99.75 1,051.85 331.84 61.99 12.57 ' 12.12 224.26 29.78 92.02 52.17 4.77 1.35 149.39 9.38 1.47 14.33 18.71 11.85 0.00 0.00 0.00 4,434.67 LaborU 0.68E 5.00C 14.00 C 30.00 C 4.00C 6.00M 6.00M 35.00 M ?BOC 2.60C 30.00 C 8.00C 15.00 C 3.25 C 10.00 C 0.16 E 25 00 C 15.00 C 15.00 C 16.00 C 9.10C 6.50C 0.30 E 0.25 E 0.10 E Total Hours 36.72 43.20 7.00 25.80 4.36 17.25 5.44 2.52 1.40 1.95 8.40 080 2.70 0.62 0.90 1.44 2.25 22.05 2.70 23.52 1.64 0.58 3.00 0.25 7.20 223.70 Summary General Materials LIGHTING FIXTURES Material Subtotal Material Tax Material Markup (@ 9.250 %) (@ 10.000 %) ORIGINAL 4,434.67 6,633.00 11,067.67 1,023.76 1,209.14 . . PROPOSED CHANGE ORDER Client Address: DEVCON CONSTRUCTION 690 Gibraltar Orive Milpitas, CA 95035 Summary (Cont'd) Material Total Foreman Journeyman Labor Markup (67.11 Hrs@ $100.73) (156.59 Hrs @ $90.79) (@ 25.000 %) Total Material & Labor Sprig Record Owg (@ 1.500 %) 13,300.57 6,759.99 14,216.81 5,244.20 26,221.00 39,521.57 592.82 Total Labor Adjustments Subtotal 592.82 Final Amount $40,114.00 ORIGINAL