CHANGE ORDER NO. 11
To contract for: New Public Library
Devcon Construction
Contract Date:
6/15/20 I 0
Contractor:
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
This Change Order provides for the following:
Additional cost associated vvith Delta 6 revisions dated 9/3/"10. This CPR 23 R2
supercedes and voids all previously issued CPR 23s
1 General Requirements
Devcon : Revisions associated with Delta 6 dra\Nings.
The electrical scope of W'ork is excluded.
11 Planting VVork
Collishavv Construction, Inc. Delta 6,7: Site scope added
in Delta 6 and 7 Interface dravvings
67 Allovv #9: Lighting
Bradley Electric: Rosanna Parking and PG&E vvork
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to OT Allovvance
Net change order amount
$492.906.00
$492,906.00
$64,230.00
$64,230.00
$304,690.00
$304,690.00
$861,826.00
$0.00
$861,826.00
(S800,000.00)
$0.00 ~
$61,826.00 V .
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss
of efticiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives
any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with
the Extra Work.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $61,826.00
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost Percentage Initial
$18,177,226.00
$444,137.00 2.44%
$18,621,363.00
$61,826.00
$505,963.00 2.78%
$18,683,189.00
Devcon Construction
~ ','/ ,
By: 1i,~
nONTRACTOR
rU~/
~
D"'#
RECOMMENDED BY:
ACCEPTED BY:
Date
/~f~;/~L
(
~~
CPR 23 R2
Project: Gilroy Community Library
Devcon Job #: 10-296
Date: 12/2/2011
We submit for your approval the following estimate of changes in work:
Additional cost associated with Delta 6 revisions dated 9/3/10. This CPR 23 R2
supercedes and voids all previously issued CPR 23s
1 General Requirements
Devcon : Revisions associated with Delta 6 drawings.
The electrical scope of work is excluded,
11 Planting Work
Collishaw Construction, lnc, Delta 6,7: Site scope added
in Delta 6 and 7 Interface drawings
67 Allow #9: Lighting
Bradley Electric: Rosanna Parking and PG&E work
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to OT Allowance
Net change order amount
$492,906.00
$492,906.00
$64,230.00
$64,230.00
$304,690,00
$304,690.00
$861,826.00
$0,00
$861,826.00
($800,000.00)
$0.00
$61,826.00
D We have proceeded with this change per the direction of:
D We will not proceed with this change until receipt of a signed copy of this proposal.
D This proposal must be accepted by: xx/xx/xx in order to avoid additional extension or expense.
D These changes will add approximately xx working days to the completion date.
Submitted by:
tioh j}~~
De ,0 -Bob Roseberry
Date:
/2-/1- / I /
I (
Approved by:
Date:
Owner's Representative: James Kuhn, Nova Partners
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942-8200 F. (408)262-2342 Lie. #399163
1:I5L""~
Change Proposal Request: 23
Project: Gilroy Community Library
Devcon Job #: 10-296
Date: 3/17/2011 REVISED
We submit for your approval the following estimate of changes in work:
Additional cost associated with Delta 6 revisions dated 9/3/10. The electrical
scope is excluded.
1 General Requirements
Devcon : Revisions associated with Delta 6 drawings.
The electrical scope of work is excluded.
Subtotal
68 Fee
Total
70 Amount appiied to Contingency
71 Amount applied to OT Allowance
Net change order amount
$593,816.00
$593,816.00
$593,816.00
$0.00
$593,816,00
$0.00
($593.816,00)/
$0.00
D We have proceeded with this change per the direction of:
D We will not proceed with this change until receipt of a signed copy of this proposal.
o This proposal must be accepted by: xxlxxlxx in order to avoid additional extension or expense.
D These changes will add approximately xx working days to the completion date.
Submitted by:
Date:
Devcon -Daisy Pereira
Approved by:
?t---
I
Date:
r'1!~\1
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035P.(408)942-8200 F. (408)262-2342 lic. #399163
Devcon Construction
March 10,2011
Delta 6: Added Site Scope of Work Bid Analysis
Scope Item Bidder
Devcon
Clean-up $ 8,539
Grading and Paving $ 189,428
Site demolition INCL
Tree Removal $ 3,755
Demolition of existing enclosures $ 9,000
Site concrete $ 80,286
Fencing $ 4,240
Underground $ 31,138
Site furnishings $ 1,129
Survey $ 6,000
Pavers $ 88,147
Electrical NIC
Electrical substructure work on site NIC
Electrical substructure work off site (Allow) NIC
Masonry $ 8,350
Landscape $ 62,730 <\
Striping $ 3,274
Wood framing $ 20,500
Misc Steel (Trash gates) $ ~.Q.. &:,-,1;
Redwood at trash gate frame $ 2,327
Plaster $ 11 ,264
Painting $ 1,551
Repair of damaged hardscape (Allowance) EXCL
Erosion Control Installation $ 15,000
Erosion Control Maintenance J1..lCL
Subtotal: $ \.. 554,968 .-J/~
Mark-up at 7% $ ....."""t...rTv
Mark-up of 10% applied to cost in excess of $800K N/A
Total: $ .~'6-
',S' c ~
l../
. - r \oi.,''''''
'..~
,:-.. b~''1: \j(lct:
Qualifications
All electrical and PG&E related work has been excluded per the City of Gilroy.
Excludes permits and fees.
Excludes small masonry wall shown on drawings at limit line between the Library and Delta 6 work.
Excludes any costs associated with Delta 7 work.
Bike rack shall match those specified for the library project.
Excludes handling of hazardous/contaminated materials.
Trellis framing shall be Western Red Cedar.
Excludes concealed and unforeseen conditions.
Excludes overtime.
Excludes street lighting.
Excludes unforeseen conditions.
4-f 1- / 1 tJ h
G 4- 2 3-6
~
- r /L . (1 v1~
))"1) /
//00/21 I (yS
City of Gilroy shall reimburse Devcon for costs associated with repairing existing hardscape damage during work.
Change Proposal Request: 58
I:EL"~
Project: Gilroy Community Library
Devcon Job #: 10-296
Date: 4/12/2011
We submit for your approval the following estimate of changes in work:
Bulletin 6 Electrical Work only
67 Allow #10 Rosanna Pkng.
Bradley Electric: Rosanna Parking and PG&E work
Subtotal
68 Fee
Total
70 Amount applied to Contingency
71 Amount applied to OT Allowance
Net change order amount
$304,690.00
$304,690.00
0.00%
$304,690,00
$0.00
$304,690.00
$0.00
$0.00
$304,690.00
o We have proceeded with this change per the direction of:
D We will not proceed with this change until receipt of a signed copy of this proposal.
o This proposal must be accepted by: xx/xx/xx in orderto avoid additional extension or expense.
D These changes will add approximately xx working days to the completion date.
Submitted by:
OJ .
I-;h
"',~,':~ ',,}
') ,
i:"l,t/t<, /
evc<<6/..sOb Roseberry
Date:
t;/z /l/
I t
o/a/l(
;
Approved by:
Date:
Devcon Construction Inc. 690 Gibraltar Dr Milpitas. CA 95035 P.(408)942-B200 F. (40B)262-2342 Lie. #399163
-.-----l
!
,
I
I
i
i
I
"Va
~) T<""'-.f}). A". D'" L"'r'1'f';'! ""7 .F":'\..'.u L" V C' T-' lfJ9 "Vc.
b.i.~ 1: ' ~} ~ 11 ~ ~ ,~'~. ~:~,
"'wFBE NET~TORK SYSTEMS
VVBE TELCOI\-1J:
90! 'ill Road, Nov~to, Ci\ 94945 Phone (,115) ~98-1400 I'lL" (415) 493-2554
Lic~1se No. 3\107,11
To: NOVA PARTNERS, INC
Atl: ME. JAMES KUHN
From: RICK BRUMi\1
Re: GILROY L18R,t..RY -WHEELER PARKING lOT GILROY
Bid Date: 03116/11
\Ve are pleased to provide cur quotation for the subject job as follows:
iTEM DESCRIPTION
UNIT
UNIT$
PG&E SeNice work
1.00
42,71000
42,710.00
42,710.00
The above qU0tation includes fLlishing & installing the PG&E substructure
as shown on drawing 30827023 Underground relocation includes the conduit
& fittings, 04-3371 vault, +- 60 If of asphalt trenching & backfill across Sixth SI. with sidewalk
repair, +- 380 If of dirt trenching & backfiH on the Library property detailed as PG&E location
4,6,7. & 9
if trench spoils can be left on site for use or removal by others you can deduct $3,000.00
from the above quotation +- 40 yards
This work to be completed during the same move-in with the fighting work
Any 3dditional move-in's w'l! be at $3,500.00 ea
Final payment including retention to be made within 30 days from the completion of WBE work
Exclusions: Fees, permits, layout, and staking,
Hazardous materials (testing, training, monitoring, handling, and disposal).
PG&E work, transformers, panels, removals of any existing electrical systelTls
PG&E wire,
8mcl premium,
Eslim~~e #
42€:2
03/16111
TOTAL
l!.. ~. :"'" 1'1,
'\\10 BRADLEY ELECTRIC
WBE NETWORK SYSTEMS
'\VBE TE.LCOM
L____
90HillRoad.Nov:;to,Ci\94945 Phone (415)898.1400 bx (415)493-2554
License No. 390741
03/16/11
To: NOVA PARTNERS, INC
Att: MR. JAMES KUHN
From: RICi< BRUMM
Re: G1LROY liBRARY -WHEELER PARKING LOT GILROY
Bid Date: 03!16/11
We are pleased to provide our quotation for the subject job as follows:
ITEM DESCRIPTION
UNIT
UNITS
TOTAL
PARKING LOT LIGHTING
Delta 6 work
1.00 261,980,00 261,980.00
261,980.00
The above quotation includes (12ea.) Type 89 poles with fixtures,
(23 ea.) Type S10 poles & fIXtures, concrete pole foundations, conduit
& fittings, # 10 thwn lighing wire, dirt trenching with baCkfill ( 4" sand envelope
around conduit the remainder native) per plan sheets E1,001 , E1.201; E1,204
E2.001, E2.201A. E6.005 & E7.001 DELTA 6 worl<
Note:~9:move-ins are included for our work (1st) install all under~round conduit
and p~foundations ,(2) instal! all lighting poles, fixtures, wire clean up
Any additional move-In's will be at $3,500,00 ea
Final payment including retention to be made within 30 days from the completion of WBE work
Exclusions: Fees, permits, layout, and staking.
Hazardous materials (testing, training, monitoring, handling, and disposal).
PG&E work, transformers, panels, removals of any existing electrical systems
Asphalt or Concrete removals, improvements and replacements.
Off haul of spoils.
Bond premium.
Estimate # 4262