HomeMy WebLinkAboutDevcon Construction - Library Construction - Change Order No. 13 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0451; Fax (408) 846-0429 CHANGE ORDER NO. 13 To contract for: New Public Library Contractor: Devcon Construction Contract Date: 6/15/2010 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work This Change Order provides for the following: Chanaes to Grev Water System 4 Piped Utilities Robinson & Moretti, Inc GREY WATER LIFT STATION PROPOSAL: Added Lift Station Robinson & Moretti, Inc COR 6: Additional details of Gray Water System Robinson & Moretti, Inc Additional work per Delta 11 Robinson & Moretti, Inc Storm/water cap: Re-route SD, Cap existing water service Robinson & Moretti, Inc Add 3" backflow assembly with 2" bypass 57 Electrical Sprig Electric Added circuits necessary for the gray water lift station Sprig Electric COR 33: Install fixtures, conduit and power for added tree well. Sprig Electric COR-26: Relocate Conduit for Verizon Subtotal 69 Fee Total 71 Amount applied to Contingency 72 Amount applied to OT Allowance Net change order amount Chanae Orders 12-14 add 22 days to the construction comoletion date $61,062.00 $9,887.00 $21,300.00 $14,465.00 $3,720.00 $11,690.00 $19,184.00 $12,164.00 $2,500.00 $4,520.00 $80,246.00 10.00% $8,025.00 $88,271.00 $0.00 $0.00 $88,271.00 ----- All requirements of the original Contract Documents shall apply to the above work except as specitically moditied by this By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $88,271.00 Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost Percentage Initial $18,177,226.00 $590,042.00 3.25% $18,767,268.00 $88,271.00 $678,313.00 3.73% $18,855,539.00 Devcon Construction .<, .' CVTRACTOR By: h~/b tv~ Date: 1// .r / Jz.. RECOMMENDED BY: ACCEPTED BY: Date 1:ELf'"~ CPR 116 Project: Gilroy Community Library Devcon Job #: 10-296 Date: 11/5/2011 We submit for your approval the following estimate of changes in work: Changes to Gray Water System 4 Piped Utilities Robinson & Moretti, Inc GREY WATER LIFT STATION PROPOSAL: Added Lift Station Robinson & Moretti, Inc COR 6: Additional details of Gray Water System Robinson & Moretti, Inc Additional work per Delta 11 Robinson & Moretti, Inc Storm/water cap: Re-route SD, Cap existing water service Robinson & Moretti, Inc Add 3" backflow assembly with 2" bypass 57 Electrical Sprig Electric Added circuits necessary for the gray water lift station Sprig Electric COR 33: Install fixtures, conduit and power for added tree well. Sprig Electric COR-26: Relocate Conduit for Verizon Subtotal 69 Fee Total 71 Amount applied to Contingency 72 Amount applied to OT Allowance Net change order amount $61,062.00 $9,887.00 $21,300.00 $14,465.00 $3,720.00 $11,690.00 $19,184.00 $12,164.00 $2,500.00 $4,520.00 $80,246.00 10.00% $8,025.00 $88,271.00 $0.00 $0.00 $88,271.00 D We have proceeded with this change per the direction of: D We will not proceed with this change until receipt of a signed copy of this proposal. D This proposal must be accepted by: xx/xx/xx in order to avoid additional extension or expense. D These changes will add approximately xx working days to the completion date. Submitted by: Devcon -Bob Roseberry Approved by: Owner's Representative: James Kuhn, Nova Partners Date: Date: Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942-8200 F. (408)262-2342 Lie. #399163 ~ ZCJ o III > ii: c::<( <Co. c::~ COo ....IUZ ~ ~g z~~ ::>c~ ~~~ ~ <( o~ UI- > III 00..... c::Uet ....I~b l!)~1- t~ LI.J w ..... ~ ~sln Q.>o wU c:: C)~ ::J u Z i: w c:: o ~ cI:l Z .-i o .-i V! 0 z~ as '<t ON c::~ c:: a I- U et c:: I- LU Z I- a et U 0 V! LU I- o Z .-i ';>L' I- 0.. Z z ii: et LU 0 I- ~ a .-i I- Z U ~ Vl' LU er: ~ ~ ~ ~ et z '::1' a "",,' z 0..' ::J er: "'" l.9 ~ 0 ~ ~ ii: ::J a a !:C ao..~UVl o o c:i o co .-i' .-i <.I} ..... ~ o I- l- V! o U o o c:i o co .-i' ..-i <.I} ~ ::J Vl ..... .-i ';>L' Z et I- ..-i o in ..... ~ 0..' \3 ~ ii: ~ a ..-i o o c:i u; m u;' ..-i <.I} o o c:i u; m u;' ..-i <.I} Vl ..... ~ .-i Z o i= c.. a: U V! w o u3" 0...... ..... ~ 8 ::J ::J 0 g 0.. .-i ~ I- Z LU ~ I- et LU er: I- er: LU I- et 5 >- LU er: l.9 er:' ~' LU LU ..... I- ..... V1 a >- er: Vl 1-1- ' Z Z ';>L a LU z U, ~ ;:: Z LU l.9 Q ~ Z I-zo ::s et -' ~ ~ ~ I- 0.. -' Vl er: et ZOl.9 ~ w !:: .-i z' a <:t i= ....... U m et 1-' 0.. 0: ~ ';>L a z U et 0 I- Z et et er: -' \;< ~ z et LU ';>L a er: LUUi=1- I- et ::s r;s et c:l -' > ';>L' et ..... etUl-etl- U Vl r;s ~ z ~ Vl' LU -' a :I: z Vl et I- ~ ::J LU' a 0.. z c: ~ Vl -' VlU o o LIi N u; m' ..-i <.I} o o LIi N m u;' N <.I} o o LIi N u; m' .-i <.I} Vl -' ..-i ';>L er: a 5 V1 V1 o in -' et I- a I- o o c:i u; O'l u;' o o c:i o I'll .-i' N <Il- <.I} o o c:i u; O'l lf1 <.I} Vl -' ..-i N m p~ Robinson & Moretti, Inc. * A Land Improvement Contractor * 7780 Holsclaw Road Gilroy, California 95020 Phone No. (408) 842-5593 Fax No. (408) 842-7763 Owner: Devcon Project: GilroyLibrary lift station proposal Date on plans: Field inspected, Date: August 15, 2011 Grev Water Lift Station Proposal: Qty (1) model DH071-93 grinder pump station, 93" length Hi Density Polyethylene (HDPE) Basin, 70 gallon wet well capacity, invert depth of 55", cover over discharge of 46", standard Outdoor cover, 4" grommet inlet, standard 6 conductor cable 32' long, standard vent for stations with access way, standard outdoor cover, candy cane discharge for access way application. Optional lengths of cable can be provided at additional cost if requested. Qty (1) E/One 240 VAC, 60 Hz, 1 phase, 1 Hp grinder pump. Qty (1) Simplex 240V control panel in a NEMA 4X fiberglass enclosure with pump breakers, visual and audible alarm, alarm breaker, push to run button, push to silence button, padlock. Optional features that can be provided at additional cost, if requested, are: Remote Sentry capable, GFCI receptacle, generator receptacle with automatic transfer switch, auto dialer. Qty (1) Trip for Start-up Supervisory Service Assistance. 2 year manufacturer's warranty Approximate station weight is #270 Cover & Accessway Assemblies - With Band Clamp, Cover Shroud, No Lid - Slip-On - 4' Duplex, Standard Pit excavation, rock base, concrete collar, Backfill and compaction Piping from 4" grey water line to lift station to holding tank. Electrical runs/conduit by others $9,887.00 ITotal Base Bid: $9,887.0~ Project Exclusions: Chain link fence installation and removal, other trade spoil off-haul, footings by others, concrete by others, concrete demo and off-haul "DUE TO VOLATILITY OF LIQUID ASPHALT AND NATURAL GAS PRICING, THE HOT MIX ASPHALT PRICE QUOTED WILL BE IN EFFECT FOR ASPHALT PURCHASED WITHIN 30 DAYS AFTER THIS QUOTA nON. AFTER THAT TIME THE HOT MIX ASPHALT PRICE WILL BE ADJUSTED IN RELATION TO ANY MATERIAL CHANGE IN THE MARKET PRICE OF LIQUID ASPHALT AND NATURAL GAS AND THAT COST WILL BE PASSED ON TO CONTRACTOR." Excludes: soils testing, staking, & permits. Fees or expenses related to additional insurance requirements; such as waiver of subrogation, wrap insurance program or additional certificates. WE PROPOSE to furnish labor and material -- complete in accordance with above specifications, and subject to conditions found on this agreement, for the sum of: dollars (US $ ) Net 30-days Terms of payment: _days ACCEPTED. The above prices, specifications and conditions are satisfactory Respectfully submitted, and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Robinson & Moretti Inc. License No. 418843A Date of Acceptance /S/ Rich Robinson/Alex Manzo, PE By By By Note: We may withdraw this proposal if not accepted within 30 days. ~~ CCN# CCN Date 500/700# Project Name: Project Number: Page Number: 14 6/30/2011 706 GILROY LIBRARY 2678 1 -:".t\L.~t..'1:r_ ~572.::-. (1.'7 /%60 S /cf S-<:~u' $zit fl~~', e-l <;S//2 M </C5'-Z<:'.Y-SlSq la' </CS'-Z<:'.5'-Z/SZ Client Address: PROPOSED CHANGE ORDER DEVCON CONSTRUCTION Contact: Bob Roseberry 690 Gibraltar Drive Milpitas, CA 95035 Work Description CHANGE ORDER COST FOR SUBMITTAL #177 RESPONSE TO RELOCATE 1" CONDUIT FROM PNL DPM TO ML2 FOR (2) 20 AMP 120 VOLT CIRCUITS FOR GRAY WATER PUMPS, AND ADD (1) 30 AMP 240 VOLT CIRCUIT FOR LIFT STATION PER SUBMITTAL AND CONFIRMATION FROM INSTALLING CONTRACTOR. PRICING INCLUDES CREDIT FOR ORIGINAL CIRCUIT AND EQUIPMENT CONNECTIION FROM DPM-------$12,164.00 . We reserve the right to correct this quote for errors and omissions. . This quote covers direct costs only and we reserve the right to claim for impact and consequential costs. . We request a time extension of 1 days. . We will supply and install all materials, labor, and equipment as per your instructions on PCO #14 I. Exclusions: . Overtime and shift work . Permits . Temporary power and lighting . Xray of floors or walls . Fire proofing patching . Cutting & patching of any type . Demolition of any type . Painting . Temperature control provisions . Dumpster fees . Access panels . Consealed and unforeseen conditions . Upgrade of existing code violations . Provisions for contaminated ground water and trench spoil . Pipe protection posts . Provisions for contending with hidden obstructions encountered during excavation . Energy management system (EMS) provisions II. Clarifications: . All work is to be completed between the hours of 7:00am through 3:30pm Monday through Friday. III. General Conditions: . All applicable taxes are included in our submission . The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and equipment 'specified or supplied by others . Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the 'manufacturer . The contractor shall not be liable for indirect loss or damage ORIGINAL PROPOSED CHANGE ORDER Client Address: DEVCON CONSTRUCTION 690 Gibraltar Drive Milpitas, CA 95035 . Unless included in this proposal, all bonding and/or special insurance requirements are supplied at additional cost . If a formal contract is required, its conditions must not deviate from this proposal without our permission . Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void . We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into between the owner and the contractor. We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project. Please contact our office if you have any questions for if additional information is needed. Sincerely, SPRIG ELECTRIC COMPANY Ron Piovesan Senior Project Manager Itemized Breakdown Description Qty Net Price U Total Mat($) laborU Total Hours 1" EMT CONDUIT 90 269.22 C 242.30 5.50C 4.95 1" EMT STL SS CONN 2 446.76 C 8.94 12.00 C 0.24 1" EMT STL SS CPLG 9 501.38 C 45.12 6.00C 0.54 1" EMT 1-H STEEL STRAP 90 162.06 C 145.85 4.00C 3.60 3/4" STEEL LOCKNUT 8 54.12 C 4.33 17.50C 1.40 3/4" PLASTIC BUSHING 8 70.34 C 5.63 35.00 C 2.80 3/4" PVC 60 29.80 C 17.88 4.00C 2.40 3/4" PVC TERM ADAPTER 8 67.62 C 5.41 16.00 C 1.28 3/4" PVC COUPLING 8 38.80 C 3.10 16.00 C 1.28 3/4" PVC 90 DEG ELBOW 6 143.34 C 8.60 30.00 C 1.80 PVC CEMENT (1-QUART) 0 28.72 E 0.00 O.OOE 0.00 1/2" L T FLEX 6 265.00 C 15.90 6.00C 0.36 1/2" L T STRAIGHT CONN 4 386.54 C 15.46 12.00 C 0.48 #12 THHN BLACK 20 360.06 M 7.20 6.00M 0.12 #10 THHN BLACK 513 556.34 M 285.40 7.50 M 3.85 #8 THHN BLACK 1,147 840.36 M 963.89 10.00 M 11.47 #12 THHN GREEN 10 360.06 M 3.60 6.00M 0.06 #10 THHN GREEN 180 556.34 M 100.14 7.50M 1.35 12-10 NYLON INSUL FORK RC10-6F 2 123.16 C 2.46 10.00 C 0.20 B2-1 RED WIRE CONN 9 17.22 C 1.55 2.60C 0.23 4x2 1/8" SQ BOX COMB KO 1 1,501.70 C 15.02 30.00 C 0.30 4" SQ BLANK COVER 1 350.62 C 3.51 8.00C 0.08 1 7/8" DEEP HANDY BOX 1/2" KO 2 809.12 C 16.18 25.00 C 0.50 HANDY BOX TGL SW COVER 2 303.00 C 6.06 8.00 C 0.16 GROUND SCREW W/INSUL #12 LEAD 1 323.21 C 3.23 3.25C 0.03 P-1000 1 5/8 STRUT 32 716.90 C 229.41 12.00 C 3.84 1/2 SPRING NUT 48 217.35 C 104.33 6.00C 2.88 CORNER ANGLE P-1325GR 8 567.70 C 45.42 10.40 C 0.83 POST BASE P-2072A 4 4,310.70 C 172 .43 10.40 C 0.42 1/2-13x 23/4 WEDGE ANCHOR - 21/4 Mil 16 163.13 C 26.10 20.00 C 3.20 # 8-10x 7/8 PLAS ANCHOR (3/16) 13 6.38C 0.83 15.00 C 1.95 1/2-13x 1 1/2 BOLT - PL TD STL 48 35.10C 16.85 11.20 C 5.38 1/2 FLAT WASHER - PL TD STL 48 4.97C 2.39 1.30C 0.62 1/2 LOCK WASHER - PL TD STL 48 5.54C 2.66 1.30 C 0.62 ORIGINAL PROPOSED CHANGE ORDER Client Address: DEVCON CONSTRUCTION 690 Gibraltar Drive Milpitas, CA 95035 Description #10x 1 PIH SELF-TAP SCREW 1 P MAN STARTER OPEN CONTROL NPL 20A 1 P BREAKER BOLT-ON 30A 2P BREAKER BOLT-ON #12-2C+GRD 208V MOTOR TERM CHRISTY J-BOX 2" DIAM CORE 6" THICK FLOOR INTERCEPT EXIST COND TO DPM JBOX TO CHRISTY BOX CHRISTY BOX TO PUMPS Totals Qty 13 2 2 2 1 2 1 2 1 1 2 Net Price U 9.75C 75.00 E 5.00 E 25.08 E 57.15 E 0.00 E 75.00 E 125.00 E 5.00 E 0.00 E 0.00 E Total Mat($) 1.27 150.00 10.00 50.16 57.15 0.00 75.00 250.00 5.00 0.00 0.00 3,125.75 laborU 16.00 C OAOE 0.06E 0.34E 0.58E 1.10 E 1.30 E 0.50E 2.00E O.OOE O.OOE Total Hours 2.08 0.80 0.12 0.68 0.58 2.20 1.30 1.00 2.00 0.00 0.00 69.99 Summary General Materials Material Subtotal Material Tax Material Markup (@ 8.250 %) (@ 10.000 %) Material Total Foreman Journeyman Labor Markup (21.00 Hrs @ $100.73) (48.99 Hrs @ $90.79) (@ 25.000 %) Total Labor Total Material & Labor SPRIG ENG (@ 2.000 %) Adjustments Subtotal Final Amount ORIGINAL 3,125.75 3,125.75 257.87 338.36 3,721.98 2,115.33 4,447.80 1,640.78 8,203.91 11,925.89 238.52 238.52 $12,164.00 ROBINSON & MORETTI, INC. 7780 HOLSCLAW ROAD GILROY, CA 95020 PHONE 408-842-5593 FAX 408-842-7763 EXTRA WORK ORDER JOB NAME: Gilroy Community library CONTRACTOR: Devcon Construction, Inc. DATE June 24, 2011 690 Gibraltar Drive Milpitas, Ca 95035 You are hereby authorized to perform the following specifically described additional work:: Change Order #6 Grey Water System - Extra Supply and install the gray water treatment system as outlined below: Excavation pits for tanks, rock base, connect sanitary sewer lateral, clean-outs, diverter valve, excludes s po i I off -h a u I). -----------------------------------------------"----------------------------------------------- 21 300.00 Quanics Advanced Filtration Svstem Confiqured as Follows: - Gray Water Treatment System -- 6' AeroCell Module (ABOVE GROUND) -- Simplex Control Panel -- 1/3 HP Submersible Pump -- Filter Modules -- Recirculation Device -- Risers and Lids -- Retrofit Tank Adapter -- 750 Gallon Pre-Cast Holding Tank for dosing (not rated for traffic). -- 1,000 Gallon Pre-Cast Holding Tank for treated water storage (not rated for traffic). -- Includes delivery and setting of both tanks. - 1.5" Drip Irrigation Management System including the following: -- Simplex Control Panel -- Up to a 30 gpm Turbine Pump -- 26" x 12" polyethylene basin with lid -- Spin filter, 2 solenoid valves, pressure gauge, air release valve, quick disconnects Ilnstallation of the Quanics System as follow~: - Installation of treatment module including labor and materials to: -- Set unit in the ground. - Retrofit of the dosing tank and storage tank. -- Connection of inlet, recirculation, pump, and discharge lines from dosing to storage Tank. -- Connection of discharge lines to irrigation control system. - Installation of the Treatment Control Panel Unit including labor and materials to: -- Mount Control Panel on 4x4 treated post cemented in ground. -- Connect from the supplied power feed stub-out (by others) to Junction Box and Control Panel up to 30'. -- Connect pump to the Control PanellJunction Box within 10'. - Installation of the Irrigation Control Panel Unit including labor and materials to: -- Mount Control Panel on 4x4 treated post cemented in ground. -- Connect from the supplied power feed stub-out (by others) to Junction Box and Control Panel up to 30'. -- Connect pump to the Control PanellJunction Box within 10'. To be provided by others: - Drip Irrigation piping, valves, and controller. - Trenching for electrical conduits, gravity inlet and discharge. - Stub out 120 V AC electrical to within 30' of control panel location. - Fresh Water Supply. Unless specifically included in scope of work above, the following items are excluded: permits, licenses and taxes; liquidated, consequential or incidental damages; installation of pump core, system testing and start up services; excavation in hazardous or contaminated materials, buried debris, sand, rock, base, digging through or around rocks or boulders, or other unusual soil conditions; erosion control, import or export of material. CONDITIONS: 1. Water source must be available onsite with cost of water and meter feed to be the Responsibility of owner or general contractor. 2. 11 OV AC electricity must be available onsite with cost of electricity and meter feed to be the responsibility of owner or general contractor. 4. Will not be responsible for any underground utilities or lines that are not properly staked and marked prior to commencement of the installation project. Above additional work to be performed under the same conditions as specified in the Original Contract unless otherwise stipulated above. This revision becomes part of, and in conformance with, the existing Contract. Submitted by: (Subcontractor) Rich Robinson & Moretti, Ine. Tide: Supervisor Date: 06/24/2011 Work authorized by: (Contractor) Tide: Date: This is Change Order # 6 2 ROBINSON & MORETTI, INC. 7 7 8 0 H 0 L S C L .-\ W R 0 A D GILROY, CA 95020 PHONE 408-842-5593 F .-\ X 4 0 8 - 8 4 2 - 7 7 6 3 EXTRA WORK ORDER JOB NAME: Gilroy Community library CONTRACTOR: Devcon Construction, lnc. DATE November 29, 2011 690 Gibraltar Drive Milpitas, Ca 95035 You are hereby authorized to perform the following specifically described additional work:: Change Order Re: Domestic Water Supply & install: 1 each 4" By Pass per WA-14 for 3" meter supplied by others. 1 each 3" Backflow Preventer per W A-19C. $8,340.00 $3,350.00 (Excludes Enclosure) Total $11,690.00 Above additional work to be performed under the same conditions as specified in the Original Contract unless otherwise stipulated above. This revision becomes part of, and in conformance with, the existing Contract. Submitted by: (Subcontractor) Rich Robinson & Moretti, Inc. Title: Supervisor Date: 11/29/11 Work authorized by: (Contractor) Title: Date: This is Change Order l~rtJttJ& tj~&~ Robinson & Moretti, Inc. * A Land Improvement Contractor * 7780 Holsclaw Road Gilroy, California 95020 Phone No. (408) 842-5593 - Fax No. (408) 842-7763 Owner: Devcon, Inc Project: Gilroy Library Date on plans: FIELD INSPECTED Date: 10/18/ 2011 Work completed on 10/10/11 Storm Drain Fiel Change Improvements: RE-ROUTED EXISTING SD LINE FROM EX. RCP LINE 60 LF OF 8" SDR-35 1 ea V64 CB $3,200.00 2" Water Service Abandonement: POT-HOLE AND CAP EXISTING 2" WATER SERVICE $520.00 !Total Change Order Request: $3,720.0~ Excludes: soils testing, staking, & permits. Fees or expenses related to additional insurance requirements; such as waiver of subrogation, wrap insurance program or additional certificates. WE PROPOSE to furnish labor and material-- complete in accordance with above specifications, and subject to conditions found on this agreement, for the sum of: dollars (US $ ) Net 30-days Terms of payment: _days ACCEPTED. The above prices, specifications and conditions are satisfactory Respectfully submitted, and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Robinson & Moretti Inc. License No. 418843A Date of Acceptance /S/ Rich Robinson/Alex Manzo, P.E. By By By Note: We may withdraw this proposal ifnot accepted within 30 days. 'P~ Robinson & Moretti, Inc. * A Land Improvement Contractor * 7780 Holsclaw Road Gilroy, California 95020 Phone No. (408) 842-5593 - Fax No. (408) 842-7763 Owner: Devcon, Inc Project: Gilroy Library Date on plans: 8/17/11 Rev. 12 Date: August 19,2011 Storm Drain Change Improvements: 240 If of Removal and Dispose of existing RCP U23 boxes 12" HOPE SDMH Concrete Cap in parking area approx 15 If as shown on plans over 12" HOPE 240 If 4ea 79 If 1 ea 151f @$10/ft @ $1,250.00/ ea @$35/ft @ $3,250.00/ ea @$70/ft $2.400.00 $5,000.00 $2,765.00 $3,250.00 $1,050.00 rrotal Base Bid: $14,465.0~ "DUE TO VOLATILITY OF LIQUID ASPHALT AND NATURAL GAS PRICING, THE HOT MIX ASPHALT PRICE QUOTED WILL BE IN EFFECT FOR ASPHALT PURCHASED WITHIN 30 DAYS AFTER THIS QUOTATION. AFTER THAT TIME THE HOT MIX ASPHALT PRICE WILL BE ADJUSTED IN RELATION TO ANY MATERIAL CHANGE IN THE MARKET PRICE OF LIQUID ASPHALTAND NATURAL GAS AND THAT COST WILL BE PASSED ON TO CONTRACTOR." Excludes: soils testing, staking, & permits. Fees or expenses related to additional insurance requirements; such as waiver of subrogation, wrap insurance program or additional certificates. WE PROPOSE to furnish labor and material -- complete in accordance with above specifications, and subject to conditions found on this agreement, for the sum of: dollars (US $ ) Net 30-days Terms of payment: _days ACCEPTED. The above prices, specifications and conditions are satisfactory Respectfully submitted, and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Robinson & Moretti Inc. License No. 4l8843A Date of Acceptance /S/ Rich Robinson/Alex Manzo, P.E. By By By Note: We may withdraw this proposal ifnot accepted within 30 days. ~~ CCN# CCN Date 500/700# Project Name: Project Number: Page Number: 33 11123/2011 ...!0.;.:~\'-;'J? Z'6fZ'. (lC /S60' S /cf s..~.u SUt fk..:. e....; </5//2 t..:t' q(},f-2fJS'-SI34 1m. q(}S"-~S'-21S2 GILROY LIBRARY 2678 1 Client Address: PROPOSED CHANGE ORDER DEVCON CONSTRUCTION Contact: Bob Roseberry 690 Gibraltar Drive Milpitas, CA 95035 Work Description CHANGE ORDER COST FOR DELTA #11 REVISION TO ADD (1) TYPE-S8a 277 VOLT FIXTURE----- $1361.00 NOTE: Price does not include trenching. To be provided by others. . We reserve the right to correct this quote for errors and omissions. . This quote covers direct costs only and we reserve the right to claim for impact and consequential costs. . This price is good for acceptance within 1Q days from the date of receipt. . We request a time extension of 1.Qays. . We will supply and install all materials, labor, and equipment as per your instructions on PCO #33 I. Exclusions: . Overtime and shift work . Dumpster fees . Consealed and unforeseen conditions . Upgrade of existing code violations . Provisions for contaminated ground water and trench spoil . Provisions for contending with hidden obstructions encountered during excavation II. Clarifications: . All work is to be completed between the hours of 7:00am through 3:30pm Monday through Friday. III. General Conditions: . All applicable taxes are included in our submission . The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and equipment 'specified or supplied by others . Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the 'manufacturer . The contractor shall not be liable for indirect loss or damage . Unless included in this proposal, all bonding andlor special insurance requirements are supplied at additional cost . If a formal contract is required, its conditions must not deviate from this proposal without our permission . Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void . We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into between the owner and the contractor. We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project. Please contact our office if you have any questions for if additional information is needed. ORIGINAL PROPOSED CHANGE ORDER Client Address: DEVCON CONSTRUCTION 690 Gibraltar Drive Milpitas, CA 95035 Sincerely, SPRIG ELECTRIC COMPANY Ron Piovesan Senior Project Manager Itemized Breakdown Description Type-S8a 277 volt 3/4" STEEL LOCKNUT 3/4" PLASTIC BUSHING 3/4" PVC 3/4" PVC TERM ADAPTER 3/4" PVC COUPLING 3/4" PVC 90 DEG ELBOW PVC CEMENT (1-QUART) #12 THHN BLACK #12 THHN GREEN B1-1 YELLOW WIRE CONN Totals Qty Net Price U Total Mat($) LaborU Total Hours 1 438.08 E 438.08 2.00 E 2.00 2 54.12 C 1.08 17.50C 0.35 2 70.34 C 1.41 35.00 C 0.70 20 29.80 C 5.96 4.00C 0.80 2 67.62 C 1.35 16.00 C 0.32 4 38.80 C 1.55 16.00 C 0.64 2 143.34C 2.87 30.00 C 0.60 0 28.72 E 0.00 O.OOE 0.00 44 360.06 M 15.84 6.00M 0.26 42 360.06 M 15.12 6.00M 0.25 3 12.75 C 0.38 1.95 C 0.06 483.65 5.98 Summary General Materials 483.65 Material Subtotal Material Tax Material Markup (@ 9.250 %) (@ 10.000 %) 483.65 44.74 52.84 Material Total Foreman Labor Markup (5.98 Hrs @ $100.73) (@ 25.000 %) 581.23 602.37 150.59 Total labor 752.96 Total Material & labor Sprig Eng (@ 2.000 %) 1,334.19 26.68 Adjustments Subtotal 26.68 Final Amount $1,361.00 ORIGINAL ~~ CCN# CCN Date 500/700# Project Name: Project Number: Page Number: 26 10/17/2011 712 GILROY LIBRARY 2678 1 -!.t-,.:~..-1:1. ?"6iZ'-(1'IJ /%60 S /cf .$"':..u' SUt fk.:. e-l <is//2 t..;{ <<JS'-21S'-S/StI (;::, <<JS'-21li'-2B2 Client Address: PROPOSED CHANGE ORDER DEVCON CONSTRUCTION Contact: Bob Roseberry 690 Gibraltar Drive Milpitas. CA 95035 Work Description CHANGE ORDER COST FOR FWO #712 TO RELOCATE (2) 4" CONDUITS FROM CIVIC CENTER TELE/DATA VAULT AS SHOWN ON SITE PLAN #E2.001 TO VERIZON VAUL T------------- $ 4,520.00 . We reserve the right to correct this quote for errors and omissions. . This quote covers direct costs only and we reserve the right to claim for impact and consequential costs. . This price is good for acceptance within 1.Q days from the date of receipt. . We request a time extension of 1 days. . We will supply and install all materials, labor, and equipment as per your instructions on PCO #26 I. Exclusions: . Overtime and shift work . Permits . Utility company fees, including Secondary cabling costs . Painting . Dumpster fees . Consealed and unforeseen conditions . Upgrade of existing code violations . Provisions for contaminated ground water and trench spoil . Pipe protection posts II. Clarifications: . All work is to be completed between the hours of 7:00am through 3:30pm Monday through Friday. III. General Conditions: . All applicable taxes are included in our submission . The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and equipment 'specified or supplied by others . Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the 'manufacturer . The contractor shall not be liable for indirect loss or damage . Unless included in this proposal, all bonding andlor special insurance requirements are supplied at additional cost . If a formal contract is required, its conditions must not deviate from this proposal without our permission . Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void . We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into between the owner and the contractor. We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project. ORIGINAL PROPOSED CHANGE ORDER Client Address: DEVCON CONSTRUCTION 690 Gibraltar Drive Milpitas, CA 95035 Please contact our office if you have any questions for if additional information is needed. Sincerely, SPRIG ELECTRIC COMPANY Ron Piovesan Senior Project Manager Itemized Breakdown Description 4" PVC 4" PVC COUPLING 4" PVC 45 DEG ELBOW 4" PVC END BELL PVC CEMENT (1-QUART) CONDUIT MEASURING TAPE FWO # 712 LABOR Totals Qty Net Price U Total Mat($) laborU Total Hours 40 266.18 C 106.47 O.OOC 0.00 6 581.51 C 34.89 O.OOC 0.00 4 2,905.36 C 116.21 O.OOC 0.00 2 1,291.46 C 25.83 O.OOC 0.00 1 28.72 E 28.72 0.00 E 0.00 220 36.02 M 7.92 O.OOM 0.00 1 0.00 E 0.00 9.00 E 9.00 320.05 9.00 Summary General Materials 320.05 Material Subtotal Material Tax Material Markup (@ 8.250 %) (@ 10.000 %) 320.05 26.40 34.65 Material Total Foreman Labor Markup (9.00 Hrs @ $100.73) (@ 25.000 %) 381.10 906.57 226.64 Total Labor 1,133.21 1,514.31 Total Material & Labor SUBCONTRACTORS CORING VAULT EXCAVATION ($300.00 + 0.000 % + 0.000 % + 10.000 %) ($2,432.24 + 0.000 % + 0.000 % + 10.000 %) 330.00 2,675.46 Final Amount $4,520.00 ORIGINAL ~~ CA Lic # 296728.C10 tN lic # 57803-C2 1860 S. 1 Qlh Street San Jose, CA 95112 Phone 408.298-3134 Fax 408-298-2132 BILL TO: jRR,... Re /(ouleel (~) '1 /) C(i/~ e/~ LI /1 t/evyrt .,,,,/ Iv VCr; 2-1,v U I':l l..'- It . .. .. . '. . WORK ORDER # 7 (L CUSTOMER PHONE NO, DATE OF ORDER ORDER TAKEN BY CUSTOMER ORDER NUMBER DT&M QUOTE NUMBER o CONTRACT LI 61'(;(1'" '. '. .'. . I. _ . .... -.,..,- lo/t7 ; 0 hK .....> ....,.,.", .)L&7I 7lChDI{) it "71 Ui)lA/ o N.T.E. 6'78 REG., HRS.' 8 / , ';f:s~ -f S'Ec </J11; j!12.) ./till. eK:(./hJ.!,;5~./ ciS ,'p?D/" ~ t" l7.u kl{;J , , .. ....,.' '",' .",'" ,,' ',"','" '."..,","'......'...UD"',,'. ". .....,'....".,'. i> DU'!j rrt' /1 C> ~ 1': J, / ~ "11,,-1 S IU,;JA LA A h ,(7}j C r U f.1 ~ It I ;. t; I'l'!. r/r/I/f'/'/ /J(.)u It. ~1~/t/ ij"' //1neo/'u:t. /nu k /, J 1.( d' th.U) ,d? loll f. 61 tu I.t /~, L l/ ,- T/( jJ C i i V ( 17 11 ~/ /..L //t. . /1.' 1/' 7lJ ~' tj ~t::4 l/o Pih'c Lj.; -f't $"so vll'" e Jlll."'J 10" Y /.of P//L- (-1.."1 U r L'rvl6.S 2.""" y 11 6/11 j.) C ;f'LLJ /cl- C:;/v&- c. '.L 2z.0 M v / 'f: 14.4' <1,. .' - '" , ", ,,' ~ " , ,"" DAYS - ,', TOTALS~ $'66 -frle:>J , c.(){.e.. ~ /ltI.'.')~ ./ Wr2~:::RED BY tpLr2:L~';':~"~_i '~<V~~ /2;'r &'1 ti~:.;:~~~~~TED AUTHORIZE;O SIGNATURE /-T Ii, I ~ l;.' / ,,-( /./17 /i __.:''''''- _j .. '. k--/,I \..~__~--.----. "\ I'J-"7 /~ ':'1..'''1 "l HEt;lE~ACKNOWLEDGE THE SATISFACTORY COMPLETlOI'V6F THE ABOVE DESCRIBED WORK t',..,.... TOTAL HOURS~ 9 ~ .-- t' .~ ~ ., .. .. ., r ~ {) il! r\""J I i ~r . ~ ~ ~ ~ ~ ~ 0.. 0" jjj M:! ~ ~ If ~~ oc~ ~ fill;!. I UJ ~o~ a: ~~i~ ~ UJ15 I-' a: 0. II: ~ ~~88 <( a: E 1..Jm h I I I I fil~ji ~ co:./ '::::" ~5 ~ ~ 1.'i~ I- I-~. \ d ~w b .1 .. oc'"' Ii: ::><( 1-_ ( o ~; t:: '-- ~ ~ '.~ "'-- I ~ '" 01< ~ I ~ o ~ g g U 0 1 3 .~ ~ .\ ~ o ),~ -( ~ ( ~ ~I ~ ';;.: 15 m z ~ ~ ~ 5 ~ f3 <( Q - I I f- f I r II I I ~ .... ' <( .. lJ .~ ::l '" ++ (:) . S1'p~! ~Io , (0 ~t5.~ .:r;: cSf:x;< 1.d6 .............. I <( en ::5. e?- < -- << II: t ~ 2 s :5 : lL. I- ~ o rJl . I- 8 ~ '" lI: ~ ~ 1 ~. o 0 l- . ~ i ~ -1 ~ t; ~ o OJ t) ;:; <c ll. Q - 5 2 5 is Il~ I I I '--'~V ~ 'I I^~ ~ (J) c: ! ~ ~,~ i 0: 0 ~ ~ Ii: g ~ ~ i ~ la -I- - UJ ~ ~ II ~ ~ ~ ~~ ~ ; I~I I~~I I J ( - I I Ion on I , I ~ IE d d ~ ZI Z l1. CIJ ttl ..... i hi "'WLiJ I f.) 0 ~ ~ m uI ffi ~ m .~ ~ ~ ~ f- 0 ~.' )<, '>c c; . cl '" fil '"' ,,: ::>. d '" ~ ~ ~ ~ ~ ~ ~ d 0: 0 ~. fil '"'0: ill ~ ~ 0 a: 0 .. 0: 0 0:: \- ~ o r; 5' .~ :"i? (. L I...... __ V lid I D:z ~~ S - o :I:. !/l' 'a: ::> a. =F.. - 111 .~di1 ~~L~J 5 =? .,J :::< ,... \.J .:: ... 'lil.' 1 :. J " '~ ,~ci r---l-t......- ~L...,-L 1--.... - I ...., ~ '- l- ...) ~t; w8 f;j'!= $5 'w a~ I :.0 ~d a:z O. ~ ,'II:' '0 .Cr jz <:(Q 'm~ ~.l;l '~.:g :~. .:n~' . ,~... I-.~;i~ 11L:~;~ - I - f- - A ..- \' .=t ~ ~ {) I"\' ~ ';;) . , b: o 0.... ill a:. 6: o 0- w ex: ~ a: o S <( a:. E 00 "</' 6!: M QO Q ~ ~ :i i< - S ~c ~; I -< . f? ._ = \c:> ~ ~ I, <:1\ . ~ ~ "J' 8 ~;> ~ O\.~ U ~ ~ ~ E-i ~ 00 Mr. Z -Ie O~ U ~.. tf.l Cl'\ ~ ~ ~ t: ~ f o E-o ~ <It VI II) <.9 W II: C ~ ~ 0 it ffi ~ ~ . <( (J) g ~ 5 ~ q ~ ~ Cl 3 ~ n: ~ d z III ~ I- ~ ~ ~ ~ 8 o ... UJ II: . I :E 0 0 II: Il. Z f2 ::g b :20.:: In 11.. ~ ~ Il. 0 !z a: ~ ~ 0 0 iSooo I 11 ~, .) ~I ~ 0 D ~ 5~g 0( /( ----....i ( .. ~ if .. ~ L I 11.. ~j>= 0 to Z ~ Q ! a: ~ /-0' 0 a: :J: (,) ::l .~ ffi ro <( 0 I .,.1 I I I I fil~ oz ~:~ :;l;~ .'.:. c/):~ ~'v) f'o....r 'a::;" IV ~ r- =>,., . .' ~;; cl I-' fa '; tl! d a: I I I I I I I I I I I " .:: ....;....:. ffi ~ r: ci r-: ffi ci r: w 0 a: ci r: 0 a: r: r: UJ II: 0 W 0 II: 0 0 II: " ...~:.~ '.tl ~:~ ~:::. ~ ~ .~:.~ ~ ] ":I.~~ ~ .... I J ..';;,_ C"'" a:d I 0.:;;:: @m' o!z, Z ::J. ~'~.' .?1l.~ - ., ~ui .~~' O. :t-... ~: ", :! >~I ., ~ . -;; . n 5j~ :'l\ Slj f, ;': ': ~.} i... j'c€i ~~ ;(z;~ <;: . 'w., r "if.! /, '/ J "-, --.J} I.';" ....~.'.A '.~- .,-,~ '- /". l.- .'.....O......:..;.....:f..>::( ~ 'W" ...j. 7+ . le.,. .' ,,~ ,;' f#r\',:-;:" ." rr.:"/i' ",,~ i:5~.I-I-I""""1 1"::m~.;II. L ~II I "<0,", ,.,;,' " ~ :' t:; . ~" (..,;..: \,~:i;::.~ - -- . . '. ..~ '.''';;''- " ; .~.~. 7' ':'(J)~ ~-lli '/~;~ :;.J11.: => ~.~ci ~.;z a...a.:."'> -r'G: ...;:>., .'.>.:~ ;/&! 'll~i~t;l; ~!i.~ -~ '. ,:Z ~~t;Q t~l~ ;'~IUJ ':~,o f~' ''''''''''1 1L~~:~1 I-- . J I J . I I I - ". "-l' < .',.:;1):. .~ ::J: 'en. I I I I I I I ~ ~ I I I .I d 0 'ZI zl I I -+-- I I I I I I I I J LlI ":'.., '.'., .... ': /.... '. . :,., ',.<::>. r: .,..\" 01 : :.'. Ui z o Vi ~ a: . Il. -l ~ W ~ W W .. e ". I I...;.;':.... ~ wi ,:,,:\.\,' ~ '81 ~ ,.\) (",: ffi ~ Gj a::1 I}l.~ i ! i ~ I"'{\: :.:~ .....} -- "~ l-jXli ~ I c.; ~ II: CJ ~ 0.. 0: fr fi1 Ii: w u ~ I 1_ I I I I - 1 11 --...--.... <C CO ~e, f ( -- f L g; 4 C tII ~ :) u.. o f- en o o -l ~ g f- ~ cn N o u: o to ~ ( g; to 1 ! ex: w ~ -i :a f- ~ ~ Z o ~ a:: Il. g 5 :5 1D z Z o 0 I - I~ fi !i: III <1J W a:. l>. w a:. o w N ;;: 1 a: III w I~ % III I- 'Z w e III I~ ~ 0: ~ o ~ ~ ~ 0:: W !.t :;;; ~ :!: w 0.. > ~ ~ ~ ~ I~! i ld ": 0 () 111:; II BREAK9ATATAY Concrete Cutting .11, Y n. . 2025 Stone Ave, San Jose, CA 95125 (408) 920.9668 Fax (408) 920.9763 CA Contractor Lie, #812385 Invoice InvoIce No: 02769 Invoice Date: 10/24/2011 PO No.: 2678 Requisition No.: alex Site Address: 7387 Roseanna St Gilroy, CA 95020 Terms: Net 30 Days Bill To: Sprig Electric, Inc. 1860 S. 10th Street San Jose, CA 95112 DI of Srv wo# Sub Total: $ 300.00 0.00 Invoice Total: $ 300.00' THANK YOU I RECEIVED u cr 7, ~~, 2011 SPRIG ELECTRIC JINANCE DEPT. bf(GA D\)I ri)sgliD ~C Page 1 of 1 1 ~ a: o $: LL o Z o i= n.. a: o (J) w o i: ~ z <( ::l o ',D ...... I. Ij) \i"\ co -"::: (1;) C'J Q ,-,e C\J F \0- r- (1;) ~ ...Cl (2i <.:i 0 :::; J :j:j: (ti Q <:0 .,... 0> <:\J , C\l T"' .,... tOe<) ~ 0)(0 <(l"- ocr 0 "C\l ~ 3;0> O~ ,co cO (1j::!, ~~ t> ......LL ~r OJ OJ " '- ~~ ""'co ({)W .J::W .....0> G 0, ;:: "'-0 ~a .C\1 zo> ..-.. ""'00 ~ 0)0 O'<;j' ,..... '-" i 1- -.l :) . , ...., ':T '\ ..... -' , (l. /\ I,,:::: \J \j .r l.::.:J~ ~. t~) c-/ (~, ;'v ., )~ -.j , \: \; '-) "-/ ('0 . <...1) " ! I ',.I ~j -' >' ~- aJ @J' ) ; z Ul l1J ~- ! -- if:., ><: z ~ 0 , \ a: ... J-. a: IL ::; l1J ~o \f\ ffl 0 '-.) a: <( 'of':- -' <( 0 o -- Ul jl cL f ....._~. .~t <r \ ~) <' /'Z , cl.. \~ c0 :2 0 <;( w _J V'J C\ a: ....J w f0 0 Ii. a: w 0 I rtl w 'J l Iii ::; ~ "-1--- l_ D C9 c! :> ~ r ~ z () .. 10 to: pI IL 0 0 r-.. ..: 1ii i~~~~~ .., 0 [1- \;~. :2 (0 ~ ( !\ .J - ,I \ f"/) ( ._~ ~ (\ f"- ,",J ~ ~_! t;.J- ~ )-. "'- ~ Ii. :>: (:!. W w Q) ~ w () ii~..l} m 0 f-' Z :;; w Z U \ 0-- 1-0 . 0 :> a: 0 ... lj <( ") Z W ~.i a: I 0 0 I l1J n. a: n. ov. IL a: 0 -" u 0 ,. UJ Cl 1ij UJ en a: UJ aJ a: :z: o en z o f=: Ci z w.., ~ 8 ~ >~ ~ I- ',\ UJ <( ",0 en I- Z;2 ~. ~a: a: \J: fu ~ ~ ,;j () UJ a: I--:;"""v~~ 0 oo "'V I ~LU~:: .')... ':1 >< g;;:1 \., . , .-/ w ~ I- a.. o I- oo ~ ~~ D "t >- z ct :;;; o () ~ &1 (L ~ a: ill I f- o "5 ~ lr a: l- "b III '" III "5 -l ...J ~ "t:; ~ z III UJ :5 a.../I) (f) (f) ,,'" a: 0 ~~Q 0_," ---7" .. ? ~ 1:ELf'"~ CPR 128 Project: Gilroy Community Library Devcon Job #: 10-296 Date: 9/25/2011 We submit for your approval the following estimate of changes in work: 6th Street Conform 1 General Requirements Devcon Inv 9345: Addional Staking for Delta 11 5 Earthwork Jos. J. Albanese G&P : Additional offhaul of soil from footings Jos. J. Albanese: Demo, Grind and Pave 6th and Rosanna per Hannah-Brunetti job #00173 dwg 1 Subtotal 69 Fee Total 71 Amount applied to Contingency 72 Amount applied to OT Allowance Net change order amount $3,200.00 $3,200.00 $52,594.00 $9,735.00 $42,859.00 10.00% $55,794.00 $5,579.00 $61,373.00 $0.00 $0.00 $61,373.00 D We have proceeded with this change per the direction of: D We will not proceed with this change until receipt of a signed copy of this proposal. D This proposal must be accepted by: xx/xx/xx in order to avoid additional extension or expense. D These changes will add approximately xx working days to the completion date. Submitted by: Date: Devcon -Bob Roseberry Approved by: Date: Owner's Representative: James Kuhn, Nova Partners Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942-8200 F. (408)262-2342 Lie. #399163 pj- J05. J. Albanese, Inc. Concrete Construction cm:mACTOIiS LICENSE NO<2Y9S80 \Vv'/v/.jja i be: nese.com .""""",,~ ~~___OC~- ., .<1 J t :-~...~,.'~',A_~~~~liflI:l.ii~ IWl_ 986 Walsh Avenue Santa Clara, CA 95050-2649 01' P.O. Box 667 Sa n ta Cia ra, Ct, 95052-0667 408-727-5700 Fax 408-727-0366 November 17, 2011 Devcon -Phone -Fax Attn: Bob Roseberry Re: Gilroy Library - Grind/Pave, 6th/Rosanna St. Dear Bob, Per plan sheet #1, Intersection Grading Plan, there is a new 4" AC and 10" Agg. base section in front of the library driveway, and a 2" grind and overlay to conform out into 61h and Rosanna St. Not shown, but we also include the demo/grading of the handicap ramp across the street to prep it for concrete. Jos. J. Albanese can perform this work for the lump sum total of $42,895.00. This price includes the following: · Demo of roadway and handicap ramp . Grinding of conform areas · Grading of new AC surface and handicap ramp · Baserock for new AC surface and handicap ramp . Paving of roadway · Traffic Control (for our scope of work) Anticipate closing roadway during work. Breakout: . Labor - . Equipment - . Material - . Markup- . Total - $15,900 $ 9,800 $11,600 $ 5,595 $42,895 All prior contract inclusions and exclusions will apply for this extra work. No concrete has been included in this proposal. If YOLl have any questions, please let me know. Thank you, Mike Aiken Project Manager Joseph J. Albanese, Inc. JRQC >- 0:: <( 0:: al :J >- I- Z ::J ~ ~ o (J >- o 0:: ..J C> 015 Ql - -<.D :J..... "0..... Ql - .c:<.D (,)0 en..... -I/) (,)0::: .~o.. eu 0..0 - ... o .;: a.. ~ II 'lI> u ~ 0. co ('II ..... 1- "-1 10 :.= ..JE S .0 . ~tl 2 ~ :::J en ~ ;-~~ O;:a~ . w'~t .... ;: (/)' f"..: J " ~-- s I ! W! "C ~ c U o 0:> q ~= ~yn.;..a '0 ~ ~ ~..-~f.l ~ .[ !.1;J ~ .... ,"l-b - ~ f' ir ~~ -.J :;: ._-~.~._---_.~-- ... .... .... .... ... " " " " " ~ ~ ~ ~ ~ ~ i::J "'C :J ::J c:: ii5:~ ~ ~ ~ ~ --'-~--~----~-'---'-~-- ... ..... ..... ..... ..... ..... .... ..... ..... ... .... .... ..... -- --- ~ M ~ ~ ~ .... ~ ~ M o ~ C:! ~ ~ E : : : : ~ ~ e : ~ ~ ~ ~ ~ ~ ~ -~ ~ IJ o N ~ . ." ; ~jr~ t> l:i~ .,". ~ f.; ~ ~ -o.+,j ':'=!! I4ct~ ;3 L;.~ :: ~l~ 1~r~ ~ .go.J-.1 ~rt~ 41 .. ~--~ ... ." ~ ~ J '0 ~ r: dl ~ ~ L ~ ~ t~ 5 .. .- UJ,!; V 711~',l~ ~::} : i'~ ! ~~ tHiel?' ,,2~ ~J r{ +"' N ! " ~ o ~ ~ ~ - ~ : c. ~j [><-1 !.. (} ! " I I ~ ;:: -~--E--~-~-;:'"~-E ;:: ;:: ~E ;:: ~-~--~---~-~--;:-'-~-~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ \ i i i i ~ ~ i ~ ~ i ~ ~ ~ ~ i ~ ~ ~ ~ ~ ~ I i '" <II >. VI >,! >- :>. (ll >- C1l' ~ ell "C ftI "C l "'0 '0 .... "C ....1 O,('J M ~ ~ -~-~s-~-~ ~ en ~ ~ ~ ~ ~ ~ :; r- ~ ~ ~ ~ ~ .= . ~ ~ ~ ~ ~ ~ . ~ ~ ~ ~ . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ! ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . . . ~ . ~ . ~ . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . . . . . " " ." . " . . . " . . " . . . . . . . . . . . . . . . . . " ." ." ." " " " " " ." ." " " " " " " " " " ." ." " " ." ." ." ." .. N .. ~ It It N 0 ~ It 0 It .... '" ~ ~ ~ ~ ~ ~ N .. ~ .... <0 ~ .. .. .. m ~ N '" ~ " go ~ .[ ~ 2 -g , , ~ 0 .. 01 ~ ~ 01 ." ~ 5 (ij 1ii E .g <( " (/) ~ :J W ~ l/'J .x (tI :t ;;: C Q.l ~ e '~:~;'~ 0. 'E od III Q.l a ~.~ ~ : l~~~u ~8.~~~~ ~ ~ e ~ 0 -- .g -g 113 'E ~,g ~ ~ ~"t:: ~ ~ ~ 5 1ii .E 4) ~:_~a5~5; -_~~ -'c...... :-.~_@eOlelll - ~~ ~~ ~ ~ ! ~ & ~ ~ ~ ~ I -5 Q.l ~ g' ~ "5 ii ~ ~ ~ ,~Q.l ~ ~ ~ i E: ~ E ~ r ~ :! i ~~~~ fig~il~og~~ z ,! ~ I ~ Q.l Q.l ~ ~ (/)~ =_; -_i '",~ j Q.l I ~ ..... en -; c.. (I) .... .=:!: ........ ...:: c:: cu ~. m In a-~'" '.N "M f. :.;;;lr---l(OI:;\~l~l~-r;'-i~kl;-~-~-:~-;-lo -r:--~-~i'<t II~ - ~~;~:~ -~ l~ i~1~l~;~!~ l~ \~ i~ i~ i~ l~ i~:~ i~ I~ i~)~ i~ i~,~ ~ i ~ .. ~ c 1 ~ ~ 8. ti c: ~ OJ ~ ~ Q. CD < .. ~ . 01 ~ 01 01 . ~ '" "0 :S ~ ~ ~ : ~ ~ ~ ~ ~ ~ ! ~ - ... ~ ~ ~ Q.l ::> u: en . .- ~ c ~ E ~ e ~ .0 0... . ~ ~ ~ ~ g 8. 'E o ~ 0 u ~ ~ .~ j ~ ~ ! ! ~ :3 .!!! .~ .!!! 8.~~~ od .., od od ~ ~ ~ ~ u. a. ii:' a. ~ Q. .. ~ . "- '" c ~l ~ .. i ; '" '" ~ ~ ~ .. .. ~ ~ u u . . ii: a ~ i~ ~ ~ i~l..~ ~ ~.~ i~j~ i~ iN iN -N N iN .~ N N N "N :N iN ~ ~ ~ .0 ~ E .0 ~ i ~ III "co .~ ~ 8. ~ . ;; ~ . c W .. c '" o '" ~ : : ~ : i ~ ~ l; i~!l~i ~~~~~~g'! ~ - ...,. '" ::. ~ "g: ~ g'~ .2 ~ '5 Q.l .!; c: '~~'~~8iii~'. 0 v.... e"" ~o~ ~~';;:_~(iu~l ~ .... s <n ~ '; cr: i u .~ !~ l~ i~ i~ r:-ril ~ r '" >- ~ <( ~ en ::i >- I- Z ::::> ~ ~ o o >- o ~ ..J C> ~ <IJ . _<D :3.... '0.... <IJ . J:<D yO en.... _Ul yo::: .!!!.o. eu 0.0 - ... o 'C 0. it ~ ~ ~ C. lIS ~ ...J ~~ ;L~~-IUm --. 1 ' ..J 'I J, ~ ~ ~ ;4 ~ '"~_ I ~iil~ 11.... ;; ,,;! Tl ) ; " N:! ~4_;1 ..: ! j 1 v' ~' :1-] I le, N N ~~' i i ....: . C o u :E 0 iii ~ ~ ~ Co. ..J~ ~ 5i: 'g ....4., ~:;1 ~,~~ ;110'1 {i !~: ~ ;i ." :E j",) ~ : ',~~; ~ O_t~~; ,AJ 9 ..., ~,: G ; ., I ;:~! fj' co N .... 'en' i 1 g,-"I Qi :1-1 ! r---- ~ "t'] ~ ;,1 >- 0 ~l Q.l U ':'1 ~ ~ ~,]::-.] m ~ q.-..,):.t >o~~r ~ .~ II ~~ w ~ t-! ~ to ~~: > I~ . ~ i el5 - I c.... t :}...I ';;:, i I I : IJ..~ ~ i gi:2' _tDJ' ..J ..J "' I I I i I I 1 i n fH'~:1 f'~ \. d~ .. v1 to ~.li '~ i 1/). >0 P ~ ~ ~ ;; ~ \1 ~ >0 ~j ~9 },~y i;1 !J "'I cfJ ;1; ~--:."l~ , , I ~ f~Tilrrrfrrrrr~11--~lIrrrrrrr~ fllIl1 ~ II ~ ;~ ~ ~ ~ ~ ~ ~ 5 ~ ~ 5 g ~ ~ ~ E ~I-~ ~ ~ ~ ~ ~ ~ c i ; ~ ; g ~ ~ ~ ~ ~ ~ ~! , sS:S: ::!:1-s:~~.=~1-1- t=1-~ I-I-~I-~I-t=..::; >>..::;t-i i "" i~ >0 >0 ~ ~ >0 ~ ~ ~ >0 . ~ ~ ~ >0 >0 >0 >0 ~ ~ ~ >0 I/) . >0 ~ . ~ ~ ~ ~ ~ >0 >0 ~: ~ >0 >0 >0 ~ >0 >0 >0 >0 >0 >0 >0 >0 >0 >0 . ,., >0 >0 >0 >0 >0 >0 i;' >0 o 0 '0 0 0 . . '0 . 0 0 0 . 0 . 0 0 0 0 0 . . . '0 ~ 0 0 . 0 0 . 0 '0 '0 Of 0 ;"'0 '0 ." '0 '0 '0 '0 '0 '0 '0 '0 '0 '0 '0 '0 '0 '0 '0 '0 '0 ~ .. '0 '0 '0 '0 '0 '0 '0 ." '0 '0, 0 iN ~ ~ 0 ~ - 0 '" ~ ~ ~ '" ~ ~ ~ ~ 0 0 0 ~ 'tl '" 0 ~ 0 ~ .. .. '" N 01 z 0 N N N <D N '" N 0 ~ l;i .; D \._l? .- .r:. I:: - ~ ~ ~ ~ ~ l~ ,.~. lI.l III ~ ~ ~ "8 Q;I .... 0. - Vl e 01 ~ ~ Q) ;'0; .[ ~ ~ :, ~ g !:i (: ~ ~ ~ ~ ~.~ ~ 0 ~ ~ i~ 0 ~ ~ ~ .~ ~ ~ t -; '" ..~ ~ ig c ~ K ~ ~ e E C ~ ; ~ ~ '" g ~ ~ .. .~ .;" g '0 : 2 'E .. E ~ .~~~~ ~_M~ i 'Oi~~~ ~;! ~ ~.~ \i ~ .~ -g : ,~_ ~ ..~_ ~ ti :g ~ 41 ~:ii G Q; 'O~~gc: ~~-'Ui:,~ V1g~g~1S.C1:ca; !~ ~ t ~ :-,~1l,,,. :_g~ ~ ~ (ij ~ 0 !:: ~ ~ 41 ~ 8 ~ ~ C i g- .,~o ~ B -g v, V ~ ~ ': ~o ~ S ~ .'O~ ~ ~ ~ ~ g ~ ~ ~ 8 '" _..~ - ~~ oo.~;E\O=2:Q..41Vl~ ~ !~ ~ ~ i w : ~ ~ ~ ; ~ i ~ .. ~ .. .. ~; : ~ ~ z ~~ ~ ~ ~ ~a. i ",. w~ ~ ~ ~ ~ ~ : g ~ ~ ~ ~ 'g -_~ 4l Q.l : ;0:: :::J 0 Lij..... Q... e::: :::J :J u::: U) LL.. .... 0:: a... .E .3 - ri5 u; ; '~\i1i!iriT~1~i~TE-!~:~liT~Ti-~:~:~ i~ ~ i~ i~i-'~ ~ (; N ,...: ~ .; w -' ::l Cl w 13 . r.n :e Cl 5 z a. Z .. o go (i5 'c Ul 0 ~ .~ :;; 'e o ~ u u ~ E E .., * ~ ~ g' ~ ~ > , J: '" " '" . 0 U5 u: en .g: :1 l! i .~ CI!l ~ ~ VI ~ od ~ E ~ III 1 ~ ~ I w .~ ~ ~ !(J') '0 ,..... )~ t~ f~ ~.~ ,~ o ~ ~ i ~ ~ ~ .~ 1 ~~'~i.:!!; .~ 1ij ~ ~: 8. fr"* ~ ~ \ .5 ~ ~ ~ .~! iii u: U5 &: a: i c u: ~ :~ :~.l~ .'~lil N .. '0 ~ ~ o o u o ~ o o U ~ i <Il >- '~ c6 <( ~ ~ :- m 0 :i ~ >- Q) 0:: -0.. I- .g <.> Z~.s :J ~.~ :2: 'O-g :2:.~~ 0'- o....u Uo..g III >- < o '0 ~ [ .....I .E C) II fi ~::!: 7'); ;1-' ""jc/i ....' i ~: i O;__j i: S, ! i co N T'" i > :W 1 ;:' ! ~f ui p ! 1 ;1-: 2 ~ ~ .. ~ n ~ ~ ~1 ~ ~ ~J : ~~ m(m~ r~~ Wf~ w .\ ~j U Ii ~fj o ~ ;/, I I I I " ,^i_l :< q ~ ~ 't-+. . ILL; ~ ~ ~ ~ : I ~ ..~ IJ .... ~-l ~}~lf r~.r'~ rJ i! . il-i ' I I' !-11 I .m ~ic/}I ;.) I g I <,i I ~ ~-~ m;_~ rl-r~rfr:--~-:m~ rrrIl ~ ~ c ~ c c ~.... ~........ ~ ~. c ~ ~ c ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Q) E i= Is ! l~ [as ~ ''0 U5 :~ I -,.;;:'- .. ,'" " ~ o ;"11 ! ~) -g fl :E ~.,tA > DI!J : 1;',1 ea ~4 'l~ ~~i L ~ ~'l ~ 'I ~~" -~! ~ ri > ~lH ~ d \:j :~.j LA... >- ~ ~ m ~ >- ~ ~...'; ~ ;1t++. [p i ~~ III _ W M , > '~;~ .. . C~1 g4,. ~m t~~ o ,..... M M I:? CD (0 II) CO C '0 't:I ~ ~ ~ ~ -:r--;::---r-'-~---~-""'-l 1::: ;:: 0 Vl ~ '1', : ~ ~ ~ l ~U:~~~~! I i .....--.=- -..= -....- ..... --~ -.r;.-- o M M ~ ~ r-- (0 co co co 01 01 ~ ~ ~ ~ ~ ~ ~ ~ ~ c!ii;fiiiiiiiiiiiiiiiiiiliiii~iii'i ! il"- M ~ III r.() on Itl '" N CO ll'I ,.... <0 Itl CO 00 CO 01 U") M : N \I") 1.1") 0 co I"- o i i i i 'I i i o tl'J ...... ~ en M r.() III .:.:: n: :t :~ ~ ~ ~ Il.l <U .;; ~ ~ ! ; ~ I en i 1 :1 ~ i i"g ij ~ ~ ~ ,~ i"~ ~ 5 1ii .E :~ B g ~ ~ ~ ,~,~ @ e ~, 0 ~=~o~~~ z \~ ... -g a ::: lW 0 :J 0::: :J . >- , ;~r~-r~~-'li- ~--r~ ~: : ;g ~ -Q~~ ~ ~ :~ ~ -'=: ~ : "~. C) E a6 ...... $"cu C) ~ ~ olJ "'Cg : :. goo - . 0. $_ ~ ~ ! ~ (1) 'e m g ~ ~ -~: 3: ~ f ~~ ~ : ~ ~! i I~ i i~~o ~ ~l (1) ~o-u ~~_ (1):g :[ ~~. . m:~ g ~ ~ I ~ E E ; ~~ ..~~~~_ ~ 01_ _ a6 t: 4).ll/JCl~ U) ~-:: :-._w,_ ; (1)(ij~'~ ~.[:~ ~ ~ !5i~ "~!, .E ~ ~ ~ m m 2 ro ~ ~ u ~ ~ 8 m ~ ~ i u ~ : ~ - ~ :~~ J3l~~i;L~!g~~l;:1?~:lto.g; ~l!~~~ i!i ~".. a~~~"-;d"-OI~1?:;.~~~g{:~~~l~~;;"i ~! :}~ !~~~~~li_-,!,~!~~'~~~~~~~.I~~~ ~!~ g~ m 8.~: t: ::: ~ g 8 ~ ~ ~ ~ ~ : : :_~ . ~ ~ i 1 ~ ; ~ ~ ~ ~ - _ ~ ~ i i ~ : i i i ~:JLt u..~E~5:g:_w u;__~O:::O:::::>OWo..lD~Wa..o:::;:)::>U::~u..~! .r~' '1;:t-;-;; T~-~'N !M~-:I- . co :;:r:;-r:-:-~r:-T~-r;-T~~-T:".'~-"i~-~-r:.-l~-::-!~~l:-l;-T;-T~i;-T~ i~ ,'<t I...,. ,'<t 1<n ,lJ'J ',lJ'J t<n<n l<n ,l.fl .to <n :lJ'J lco '<0 \,<0 ,<0 .<0 lCO ,<0 [<0 lea 1<0 II- :1- iI-II- il- :r- ir- [r- il- ir- ico j :N iN iN iN iN :('\4 ,N iNN iN iN N iN :N iN ;N :N iN ;N iN iN ~N ~N iN N iN :N ,N iN !N ,N iN :N iN iN : N .. ~ GI: gi 0: vi :<1 .! : 0, *i 0.. , 0' N , ~ I ~; ~ 'j! ~) ~j NJ I i ~ o o ~ v 0. ~ u Ii5 r '" co N ..... >- 0::: <x: 0::: co ::i >- i- Z ~.s :J ~.~ :2: ti ~ :2: .~ rn 0'- o ... () ()a.~ III >- <( o ti 0::: ~ ....J .5 C> cIS to ..... ..... c.O o ..... III ClJD:: -a. .gU il .. ::1 N .. . " ~ 'f- ~ ~ :i r; ~ ~ ':; - ~8 ~ g , ;>1 ; ct ! ~,; : ilL: ;~ 111,1 i" ' :! i'! I~ ~ ,~-------- ~~' 2 <1 !:;:] :~; I~, ~ ::rt,: I '_.~ 'tJ c' ,,; 5-.:"1 I~ M N t ,.L ~' ~_J...c.,'. '..'\ " ~J ,. ;2 ~ ~ ,. '" , C : ;1'11 'I-'..J~} " I i 1 \ i , 1 ..J ..J .. ..J ..J .. ." , , ~~ ii, i' ,"'1 :'1 ri i:l r.'l }---1:'1 J! ~ 'I I ;1 r; ~ f':1 ~ = f1 ~. ~..j ~ fi "-..:.. 1:1 A ;:j~i ' ~. .1.1 I;: , , , I ~ ! iU>; - i g~ -j o! , , \1-1 i " 'IL Ii ! ' d-I ~:!:i ~: i t! I I 1 ! iI-I , i i t ! j ~ 1 ! . ,r I ~ i r i I I l--rt-lr~ r: rrr:l~~--~! ~ ~i ~i~~i~~~~~i~! ClJ E j:: 11 :~ OOj oJ ! ~: i i i ; I ~ ;:', i, J 1 ...1 L____~~,n i~ ~ ~ ~ ~ 1ij \~ ~ ~ ; ~ Ci5 :5 ::2 ~ ~ I- 1:2 , i~ - - - ~ ~ ~ <II ~ ~ ~ . >- I. . . . . . " C I:;; " " " " " - '" 0 0 ~ 0 0 ~ '0 . I- N N '" 0 :! 0 . - . ~ ~ - i ~ ~ ~ ~ ~ ~ ~ ~ ~ . . ~ ! . . . . . . . " " . .. " " " " " " - - " ;:\ 0 ~ 0 .. .. "' N 0 M N .; I i I I , ~ ~ !~ ~ ~ , o(l i:i] \i : ~ I ~ ill ! L i ~. - - i~~ ~ ~._'3~ ~ ~r;;'fl'~.~ 5~ i~ u ~c. i Cl .~~ Q) C> ~ ~-r;; -;;; .~ "" ." 0. ~ ,is C Co ,', jiii 5 c: 8 g ~ Z c.. _ 'E l/l ~ E :3:tJlII~ IIlQ)EoZ ~ ElIl~~c.o(l~C: :~ii l~ ~ .~ g' ~ ~~- u 0 g' u g 8 ~c. __ III .1 EO:: ~ t ~ Iii i i ~ H ~ i ~I ~ 11 ~ ~ I ! ! ~ i~ i ~ iD... 0::: (/) e (i) 0 po.... ~ iii u: LU :E LU Ui ~ u: iii [l) a.. :-i~ T~ !~ i~-!~ i-~ !~~-i :~gj-'i-~ ,i-~-i~~-l~-i~ t~1 ~ C o ~ ~ (J ~ :- III