HomeMy WebLinkAboutDevcon Construction - Library Construction - Change Order No. 17 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408)846-0451; Fax (408) 846-0429 CHANGE ORDER NO. 17 To contract for: New Public Library Contractor: Devcon Construction Contract Date: 6/15/20 I 0 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work This Change Order provides for the following: Changes to bridge room, g" diameter circular opening and misc. drywall changes 28 Glass and Glazing Silicon Valley Glass Bull 16: Frosted tempered 3 piece at 9' x 3' glass 29 Portland Cement Plaster O'Donnell Plastering, Inc. : Added area of acoustic ceiling, change to soffit near 7.8 & 0.8, detail2A5.102 31 Gypsum Board Custom Drywall, Inc. Numerous changes, see attached support documentation 57 Electrical SFO-25 Lighting in 9' circle Subtotal 69 Fee Total 71 Amount applied to Contingency 72 Amount applied to OT Allowance Net change order amount $3,376.00 $3,376.00 $2,095.00 $2,095.00 $33,113.00 $33,113.00 $7,374.00 $7,374.00 $45,958.00 10.00% $4,596.00 $50,554.00 $0.00 $0.00 $50,554.00 All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $50,554.00 Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost $18,177,226.00 $780,172.00 $18,957,398.00 $50,554.00 $830,726.00 $19,007,952.00 4.57% l11UJ/V [(VJ57, I ~ BY{;,t tX;CTOR 0,,, 2 It ))l , I Percentage Initial 4.29% RECOMMENDED BY: ( ~fr- ACCEPTED BY: I:EII"'~ CPR 1 00 Project: Gilroy Community Library Devcon Job #: 10-296 Date: 1/27/2012 We submit for your approval the following estimate of changes in work: Changes to bridge room and g'dia. circular opening. $3,376.00 28 Glass and Glazing Silicon Valley Glass Bull 16: Frosted tempered 3 piece at 9' x 3' glass 29 Portland Cement Plaster O'Donnell Plastering, Inc. : Added area of acoustic ceiling, change to soffit near 7.8 & 0.8, detail 2A5.102 31 Gypsum Board Custom Drywall, Inc. Add depth to appearance of 10' dia. circular opening at 7.6/ine det. 3NA6.002 Custom Drywall, Inc. Per FO 19 bridge room POg wall to be type 3 Custom Drywall, Inc. 1628: Per FO 13 demo for added curb Custom Drywall, Inc. 1713: Framing at window 121 first and second floors Custom Drywall, Inc. 1714: Wrap joists above room 208 per direction of CoG Inspector Custom Drywall, Inc. 1712: Drywall work in support of elevator rails Custom Drywall, Inc. 1629: Infill openings at low roof Custom Drywall, Inc. 1707: Elevator shaft wall west side at low roof mezzanine Custom Drywall, Inc. 1627: Additional backing for signage not shown on plans Custom Drywall, Inc. 3275: Patch wall where conduit for Mural was run Custom Drywall, Inc. 3277: Stair curb detail changes Custom Drywall, Inc. 3280: Soffit in room 117 detail changed by architect to accomodate hvac register Custom Drywall, Inc. 1704: Backing for signage not shown on drawings Custom Drywall, Inc. 1706, 1632: Inspector directed work in elevator shaft Custom Drywall, Inc. 1702, 1703, 1705: Field order 19 57 Electrical SFO-25 Lighting in 9' circle Subtotal 69 Fee Total 71 Amount applied to Contingency 72 Amount applied to OT Allowance Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942-8200 $3,376.00 $2,095.00 $2,095.00 $33,113.00 $850.00 $7,488.00 $1,806.00 $884.00 $2,820.00 $1,525.00 $1,549.00 $1,108.00 $1,023.00 $1,579.00 $1,670.00 $2,072.00 $1,023.00 $2,353.00 $5,363.00 $7,374.00 $7,374.00 $45,958.00 10.00% $4,596.00 $50,554.00 $0.00 $0.00 F. (408)262-2342 Lie. #399163 Net change order amount $50,554.00 D We have proceeded with this change per the direction of: D We will not proceed with this change until receipt of a signed copy of this proposal. D This proposal must be accepted by: xx/xx/xx in order to avoid additional extension or expense. D These changes will add approximately xx working days to the completion date. Submitted by: Date: Devcon -Bob Roseberry Approved by: Date: Owner's Representative: James Kuhn, Nova Partners Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942-8200 F. (408)262-2342 Lie. #399163 CUSTOM DRYWALL, INC. LICENSE #263495 1570 Gladding Court, Milpitas, California 95035, (.t08) 263-1616 Devcon Gilroy Library Field work order #19 Attn: Mr. Bob Roseberry 8-27-11 PROJECT: Gilroy Library INCLUDED ITEMS The Bridge Room P09 is to receive wall Type 3 Set Up Time: Added framing, 70 LF @ 20' height: Added framing @ radius circle opening: Added drywall level 4 finish: $ 390.00 4130.00 650.00 2100.00 Cost for this application is: $ 1040.00 Sincerely Yours, Material: $1258.00 Labor: $6230 .00 Ed Gibson CUSTOM DRYWALL, INC. LICENSE #263495 1570 Gladding Court, Milpitas, California 95035, (4081 263-1616 Devcon Gilroy Library Field work order #20 Attn: Mr. Bob Roseberry 8-27-11 PROJECT: Gilroy Library INCLUDED ITEMS Match the depth of the 10' circle framed into the west wall of the Bridge room P09 to the depth of the 10' circle framed into the opposite west wall of room 213. Added framing @ radius circle opening: Added drywall level 4 finish: Cost for this application is : Sincerely Yours, $ 650.00 $ 200.00 Material: $255.00 Labor: $595 .00 Ed Gibson Bob Roseberry From: Sent: To: Subject: David Fleming <dfleming@siliconvalleyglass.com> Monday, November 28, 2011 9:36 AM Bob Roseberry Pricing Items Below are the additional items you requested pricing for $ 3,376 - Install frosted tempered GLASS in three pieces with two vertical butt joints at 9' circle detail as requested. Glass will be install in three rectangle pieces to the back side of the proposed opening with polished edges at exposed vertical seams. $17,285 - Install3-form glass in circular cove per supplied detail. Glass will be adhered to compatible substrate material (provided by others). This material has a potentially long lead time and will required a deposit before being released to the vendor. RFI510 $ 6,372 - Replaced door supplied with non electric hardware group 05 at DR 105 with hardware similar to specified in group 28 per RFI 510 $ 853 - ADD if new jamb mullion is required at DR 105(current mullion has prep for mortise lock that would not be used. This prep can remain and will be concealed anytime the door is closed. $ 3,104 - Supply door IlIA with electric hardware similar to group 12 in lieu of the specified group 45 Door 217 Mentioned in RFI 510 is a Wood door in HM frame not in my scope. David Fleming Silicon Valley Glass P 408-475-0784 F 408-778-8203 ~~ CCN# CCN Date 500/700# Project Name: Project Number: Page Number: 20 9/8/2011 710 GILROY LIBRARY 2678 1 ..1~.:.....<:-;,_;::rfim.(..f.": /S60 S /cf.$~ S4tt {k..:, e-l <iS1l2 r,{ t/Cy-Z<:S- S/Sq (<1,. t/Cy-2~S-21S2 Client Address: PROPOSED CHANGE ORDER DEVCON CONSTRUCTION Contact: Bob Roseberry 690 Gibraltar Drive Milpitas, CA 95035 Work Description CHANGE ORDER COST FIELD ORDER #25 TO INSTALL BRIDGE LIGHTING. (4) 8' SINGLE LAMP DIMMING FIXTURES & (1) DIMMING SWITCH, AND ASSOCIATED CONDUIT AND WiRE...................... $ 7,374.00 . We reserve the right to correct this quote for errors and omissions. . This quote covers direct costs only and we reserve the right to claim for impact and consequential costs. . This price is good for acceptance within 1Q days from the date of receipt. . We request a time extension of ~ days. . We will supply and install all materials, labor, and equipment as per your instructions on PCO #20 I. Exclusions: . Overtime and shift work . Xray of floors or walls . Fire proofing patching . Cutting & patching of any type . Demolition of any type . Painting . Dumpster fees . Access panels . Roof patching . Ceiling seismic support wires . Con sealed and unforeseen conditions . Upgrade of existing code violations . Acoustical box pads and caulking at STC rated walls . Fire rated box pads and caulking at fire rated walls II. Clarifications: . All work is to be completed between the hours of 7:00am through 3:30pm Monday through Friday. III. General Conditions: . All applicable taxes are included in our submission . The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and equipment 'specified or supplied by others . Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the 'manufacturer . The contractor shall not be liable for indirect loss or damage . Unless included in this proposal, all bonding and/or special insurance requirements are supplied at additional cost . If a formal contract is required, its conditions must not deviate from this proposal without our permission . Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void . We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions ORIGINAL PROPOSED CHANGE ORDER Client Address: DEVCON CONSTRUCTION 690 Gibraltar Drive Milpitas, CA 95035 This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into between the owner and the contractor. We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project. Please contact our office if you have any questions for if additional information is needed. Sincerely, SPRIG ELECTRIC COMPANY Ron Piovesan Senior Project Manager Itemized Breakdown Description 1/2" EMT CONDUIT 1/2" EMT STL SS CONN 1/2" EMT STL SS CPLG 1/2" STRAIGHT FLEX CONN 1/2" STEEL FLEX #12 THHN BLACK #12 THHN GREEN B2-1 RED WIRE CONN 4x1 1/2" SO BOX COMB KO 4x2 1/8" SO BOX COMB KO 4" SO BLANK COVER 4" SO 1 G PLSTR RING 5/8" RISE GROUND SCREW W/ INSUL #12 LEAD 1 G TGL SWITCH PLATE - PLASTIC IVY DYMOLABEL PLATE SLIDE DIMMER DECOR FLUOR SIP 12-LJ # 8-10x 7/8 PLAS ANCHOR (3/16) 12 GAUGE JACK CHAIN #10x 1 P/H SELF-TAP SCREW TY -523M TY -RAP ( 4") 812M24 1/2-3/4" CONDUIT 1/4" FLNG 20A 1P BREAKER BOLT-ON 8' INDUSTRIAL F32T8/SPX35 LAMP 1" DIAM CORE 6" THICK FLOOR Totals Qty 260 8 27 8 40 964 274 28 1 3 3 1 4 1 1 1 6 48 11 12 32 1 4 16 2 Net Price U 80.03 C 159.83 C 212.08 C 163.14 C 98.16 C 360.06 M 360.06 M 17.22 C 942.87 C 1,501.70 C 350.62 C 601.80 C 323.21 C 54.75 C 15.00 C 5,653.00 C 6.38C 37.00 C 9.75C 15.20 C 125.64 C 25.08 E 198.00 E O.OOE 125.00 E Total Mat($) 208.08 12.79 57.26 13.05 39.26 347.10 98.66 4.82 9.43 45.05 10.52 6.02 12.93 0.55 0.15 56.53 0.38 17.76 1.07 1.82 40.20 25.08 792.00 0.00 250.00 2,050.51 LaborU 4.50C 8.00 C 4.00C 10.80 C 4.00C 6.00M 6.00M 2.60C 30.00 C 30.00 C 8.00C 15.00 C 3.25C 10.00 C 0.16 E 40.00 C 15.00 C 2.60C 16.00 C 3.90C 10.66 C 0.34E 1.06 E 0.10 E 0.75E Total Hours 11.70 0.64 1.08 0.86 1.60 5.78 1.64 0.73 0.30 0.90 0.24 0.15 0.13 0.10 0.16 0.40 0.90 1.25 1.76 0.47 3.41 0.34 4.24 1.60 1.50 41.89 Summary General Materials Material Subtotal Material Tax Material Markup (@ 9.250 %) (@ 10.000 %) Material Total Foreman Journeyman Labor Markup (12.57 Hrs @$100.73) (29.32 Hrs @ $90.79) (@ 25.000 %) Total labor ORIGINAL 2,050.51 2,050.51 189.67 224.02 2,464.20 1,266.18 2,661.96 982.04 4,910.18 PROPOSED CHANGE ORDER Client Address: DEVCON CONSTRUCTION 690 Gibraltar Drive Milpitas, CA 95035 Summary (Cont'd) Total Material & labor 7,374.38 Final Amount $7,374.00 ORIGINAL 9/7/2011 Project Name: Gilroy Public Library ..p~YPfGib'oy 7387 Rosllnna Street . .(;ilroy,CA '$020 FIELD ORJ)ER NQ.25 Project Name: Contract Date; To Contractor: Address: Gilroy Public Lil;>rllry 07/26/2010 . Deyc()l1(::(jnsttl1ction Incorporated 690 Gibrallarprive MilpiUls,CA9,5035 DESCRIPTION OF WORK: Supplementary lighting instructions to FO # 20; see HED attachment sketch 9/612011. Es(imated Adjustment of Contract Sum: T&M James Kuhn I PM . (Name of Co uction Managerffitle - type<i o!,printed) By: Date: 9171201 ] (Name of Contractor Representative/TiUe- typ~d or printed) (Signature) Date: Note: This Field Orde,' will be superseded by analloV'anseacfjust111ent O/' a Change Order that will include the scope althe change in the Work and any actual acfju.s.l.lJ.{e. n... /.s...........0.1.. JheContra.cISum.and the Contract Time. ., "'.",. ". ','., . . Attachment: liED Sketch 9/6/2011 ~! ~~ ~i ! ~ I .. ~~ ~~ ~ ~ .~ .'0 1, 2, OR 3 lAMP STANDARD STRIP (/) w USA PROUD ~76 w (/) m/8" K.O. -*-- - 2" 18 ~ 3-5/8" r-IO Oj3a3_7/," L .\.1/4" cD o W Dimming ~ Strip I- >J w o <( I- ...J 1 101 000 o > o o SPECI F/CATIONS FEATURES . HOUSING - 22-gauge die-formed C.R.S. or optional .040" thick aluminum. . FINISH - 92% minimum average reflective white powder coat with multi.stage Iron/phosphate prepared metal. . ElECTRICAL - Electronic ballast standard (where available). rated Class P. . LABELS - Ul/CUllisted as fluorescent luminaire suitable for dry or damp locations. . MOUNTING - Surface or suspended. . Factory-mounted. prewired sockets cut installation time. . Hinging/lacking lamp bracket cuts in. lallation lime. . One quarter-turn Fa.tener secures wireway cover 10 housing. . Channel connector furnished for continuou. row application.. . Ballast .ecured by two captive bolts and nuts 10 ensure ollghl. reliable Fit for maximum heat dissipation and minimal ballast noise. . All ports painted aFter Fabrication to Facilitate installation, increase efficiency. and Inhibit corrosion. . This fixture is proudly made in the USA. SUBMITTAL INFORMATION ~' 432 EBD2*LU*HILUME3D V~ NOMINAL LENGTH 2 D 2 Ft. 3=3Ft. iTOTAl LAMPS 4 D 4 fl. jJOLTAGE 120 D 120V LUMINAIRE SERIES l t 2, 3, 4, or 6 ~: ~ ::.' 277 _ 277V 7 6-4-232-0PTI ON S-EB2-120 T AlUM = Alum:num Fixture, --C-;:-ALLAST TYPE (Dependent on speciFied lamp Iypel painted after fabricalian EBI = 1-lamp electronic ballast EM? A - Emergency battery pack EB2 D 2-lamp electronic ballasl (B70A) or equivalent EB4 = 4-lamp electronic ballast WG-7611 - lI-gauge white,/owder coat wireguar WG-7614 = 14-gauge white powder coal wireguard T8: EB defaults to Instant slarl For more options. accessorie., and product details, refer 10 Information section. lAMP WATTAGE/TYPE 17 = 2', 17-walt T8 25 - 3', 25-watt T8 32 D 4', 32-walt T8 59 D 8', 59-walt T8. .Iimline 86.. 8', 86-watt T8. HO H.E. Williams. nc. · ~Jams Issouri · www.hewilliams.com · 417-358-4065 . Fax: 417-358-6015 Strip poge 7 FLUORESCENT LIGHTING V) w 76 ~ w V) PHOTOMETRY INFORMATION Williams Catalog #76-4-232-EB2-120 Test Report #8591.0, Dated 12/27/95 lamp Type: F32T8/SPX35/RS lamp Quantity: 2 CANDLEPOWER DISTRIBUTION VERT. HORIZONTAL ANGLE ZONAL ANG. 0 45 90 lUMENS 0 1128. 1128. 1128. 5 1135. 1135. 1142. 108.4 15 1120. 1155. 1192. 327.3 25 1033. 1117. 1191. 515.1 35 897. 1044. 1166. 651.8 45 740. 977. 1150. 744.2 55 555. 860. 1093. 759.7 65 361. 763. 1025. 728.6 75 171. 597. 761. 566.8 85 29. 394. 495. 350.2 90 3. 244. 403. 95 O. 309. 468. 303.0 105 O. 323. 574. 321.9 115 O. 237. 441. 219.0 125 O. ISO. 333. 136.7 135 O. 68. 200. 63.9 145 O. 13. . 90. 19.2 155 O. O. 13. 2.3 165 o. O. o. .0 175 O. O. O. .0 180 O. O. o. LUMEN SUMMARY ZONE lUMENS % lAMP % fiXTURE 0-30 951. 16.1 16.3 0-40 1603. 27.2 27.5 0-60 3107. 52.7 53.4 0-90 4752. 80.5 81.7 90 - 120 844. 14.3 14.5 90 - 130 981. 16.6 16.9 90 - 150 1064. 18.0 18.3 90 - 180 1066. 18.1 18.3 Tolallumlnolre 0-180 5818. 98.6 100.0 TOTAL LUMINAIRE OPTICAL EFFICIENCY = 98.6 % SPACING CRITERIA: ACROSS= 1.6 AlONG= 1.3 1&0" 170' "" :Hi/)::.~,~ ~ w,~i;,\'?\t;!'~J\' : ... .. .....,.@].... ~<~'\')"i:;:~' i :l\(!l:t~,:}..?,:/.- . -.... . f'..} ." '" 1 r.,.:~'{;{!<,'::':<" ~ . ))' t ..' O' ~' 20' ZONAL CAVITY COEFFICIENTS EfFECTIVE flOOR CAVITY REFl. ~ .20 CEILING .10 .70 .50 WAll .70 .50 .30 .70 .50 .30 .50 .30 .10 RCR 0 III 113 113 loa 108 106 Loo 100 100 1 101 .96 .91 .97 .92 .87 .84 .81 76 2 .91 .62 75 .67 79 72 72 .07 .62 3 .eJ 72 .63 79 .69 .61 .63 .s7 .51 4 75 .eJ .54 72 .6G .52 .56 .49 .43 5 .68 .55 .46 .65 .53 .H .49 .41 36 6 .63 .49 .40 .59 .47 ~ .43 30 .31 7 ..16 .44 .35 .55 ..42 .34 .39 .32 .26 8 ..$3 .39 .30 .SO .38 .29 35 .28 .23 9 .49 35 27 .46 .34 .26 .31 .24 .19 10 .45 32 .24 .43 31 23 .28 .22 .17 BACK V IE W NOTE: 2' K.O. and 13J 7/8' K.m Ore on ,4', 6', &. 8J units only 1. " 2.1/16"-1 , ~!ams 1l.E. WILLIAMS, INC. H.E. Williams, Inc. . Carthage, Missouri · www.hewilliams.com InformolTon contolned herein rs subfect to change without notice. · 417-358-4065 · Fax: 417-358-6015 HEWJP43033 09/0l/lIRJ 1627 JOB WORK ORDER CUSTOM DRYWALL, INC. 1570 GLADDING CT. MILPITAS, CA 95035 (408 )263-1616 (408)263~1142 Fax BIll TO: ORDER DATE: 0.- :J."3-I( ()-€Y ) ("I'M Ct'J vtS'1-. ORDERED BY: Rav ( fJe ~I('(.I", ,l)~,~i. ) JOB NAME/LOCATION: / (;j-/rdv 1- /hrz?f" V OVER TIME ON CONTRACT WORK / ~ DOUBlE TIME ON CONTRACT WORK JOB PHONE: EXTRA TO CONTRACT WORK "f:' PCO#: I FWO#: I OTHER REF #: DESCRIPTION OF WORK: oAJd nrresS'ar' \of h~/c!c/~ -f ~I" 1-4 fA !. ( . QJ'}/I) ,C<l I (;U) Lr>fJJ ;(/",J' (VI'> ,~p .+;.:;>....,/'" ,.,.p / I? Ol't-t:'. , (,T QTY. MATERIAL TYPE OF LABOR HOURS II t/ nes- t; U._ ;} 0 GI/- - 10 ('jf'4.l~, I ;i~(-5. .1 %: I, - :'J.6 (;4 - i9 cs''f"..ls II 0 ~C.>~ Q.. ~";:J. t,._ ~o G'~- io '..sf-"j/.s ,6~-' J I ,. I '" ~ 1 G . 91) OM. ciao/ . CJ ILles ","" x: .5 - G.,If- , .- as -1/ - F" 1'<1..... i^'l 4/",:s G - ~ iI--il - I'" i ~ /1 /'"-5 ;- t''a: ii<. r I" b-'().7-11.- ;:: r4..' :" / C, AI'S Moot"" . cO~~J5 -If- t:....r::r ",,',,: R' hJ/"s 17 5:: ' ~ ~ltV'.s ,-,-,"T!!-I' ..... $, C i'l . ~ i-/ t:., i1 1"-;e; h" WORK ORDERED BY: ;&}11", ~ 47 SIGNATURE: 0", , I hereby acknowledge th~ry completion of t e \ _ described work. Jf L 7~ - /J ~...n:r/~ o;Zc:-<-e1-- jJPiJl~ ;.J tlc-/C ,'~ yafY ,_~pLC:-O ~~ j /Vd uEr/CJ.d"YV 1570 Giaddlng Couri:, f\/liipH:c:s, California 95035. (408l 263-1616 DEVCON CONSTRUCTION 1627 Gilroy Library 1628 JOB WORK. ORDER CUSTOM DRYWALL. INC. 1570 GLADDING CT. MILPITAS, CA 95035 (408)263-1616 (408)263-1142 Fax R.?l BILL TO: ORDER DATE: c,-C:;~II O.....-R...::r ..1P f "3 lJeu co/! CtJ fL5 'f , ORDERED BY: ;{t:tv (f) eVCCfJ! .5'w,,1 1--. ) JOB NAME/LOCATION: / Gi;-dV L :h,.,A.l,," Y' OVER TIME ON CONTRACT WORK / , DOUBLE TIME ON CONTRACT WORK JOB PHONE: EXTRA TO CONTRACT WORK )C PCO#: I FWO#: I OTHER REF #: DESCRIPTION OF WORK: Per- ;::::,<i& o/;:l~r- -d::i>-/? /1 e iY'-O .-.{.. ;"'4.- /"""IJ.. raj col u..,/I.-;\. 10 h.erw""'j ."S (__ /J-f') ( ;-..i.-\ ..r:;, c c(..~j, 'IcJ hI.? /A-F: tul/J iJe,.. f="/..,() Ot"lu. :if i~. t;. )C"I I ,,.. r::::trrI? .....'...?' /1/ t"t'!'Z...ey' ccJlt..ni ei-.:r.f , v . Q1Y. MATERIAL TYPE OF LABOR HOURS t./1tJ c;..S to if - ::to GA -Ir~(k (;=?3fHd h ~r~ c (,; 'r' '::JJJr:.A - Ii I ",l., G ' I) C) - CJ. "..</1.. 33""., . t:; -,,1JI I ~ - jje~;""6 e::,it1"'5 ~-&-il It -e'- ~;-,tp" p Uhz.!{S ) 0 Itf~5 t::;' IJ,..t'!r ....,'s/o '1 j hr- - l"'7 It ~< I - J. WORK ORDEREi) BY: ;(~ /2-of/V\.f/~ SIGNATVI'<E: ~LC -- _, I hereby acknowledge the satisfactory completion of the above described work. /..., 0"\.. y;.~ )-n p. /~ 7-~ .,>V"O ~ ~ ? CUSTOM DRYWALL. INC. ',) LfCErlSE #263495 1570 Gladding Court, Milpitas, California 95035, (40B! 263-1616 DEVCON CONSTRUCTION 1628 Gilroy Library Per 'field order #13, demo framing @ column 10 between C & 0 for curb to be DESCRIPTION OF CHANGE: installed, framing had already been completed. location of Change Work Order Date 6/6/2011 COST PER OPENING Pieces Length Lineal or SF Labor Hours Cost per Ft. Cost Per Hour Cost per Unit 5/8" Type X 0 32 0 $0.280 $0.00 1 " core board 2x12 0 24 0 $0.510 $0.00 1/4" Type X 0 32 0 $0.280 $0.00 135/8" metal studs 20 GA 0 10 0 $0.000 $0.00 1 5/8" track 20 GA 0 10 0 $0.440 $0.00 4" 20GA shaft J runner 0 12 0 $0.893 $0.00 2 1/2" stud 20 GA 0 10 0 $0.000 $0.00 6" 20GA -12' studs 6 12 72 $0.892 $64.22 5" 20ga track structural 4 10 40 $0.803 $32.12 2 1/2" Track 20 GA 0 10 0 $0.490 $0.00 Comer Bead 0 9 0 $0.270 $0.00 1-1/2 X 1-1/290 metal 0 10 0 $0.000 $0.00 RC-1 channel 0 10 0 $0.420 $0.00 Furring Channel 0 10 0 $0.420 $0.00 Z metal 0 10 0 $0.420 $0.00 Hot Mud 0 1 0 $8.750 $0.00 box of Mud 0 1 0 $8.250 $0.00 CRC 16ga 0 10 0 $0.400 $0.00 Screws. tape & Misc. 0 0 $0.00 Sub-Total Cost for Material 0 $96.34 Tax @8.25% 8.250% $7.95 Cost of Material $104.29 Stocking of Material, Delivery 112 $0.070 $7.84 Labor Layout 0 $87.540 $0.00 Foreman/supervision 1 $87.540 $87.54 Taping Labor 0 $93.480 $0.00 Labor Demo 6 $85.670 $514.02 Framing and Drywall Labor 10 $85.670 $856.70 Clean Up 0 $49.820 $0.00 Supervision 0 $101.300 $0.00 Man Lift 0 $10.000 $0.00 Dump Fees $0.00 Cost Per Location $1,570.39 Overhead and Profit Material 15.000% $16.82 Overhead and Profit Labor 15.000% $218.74 Price per location $1,805.95 Number of locations 1 Total Material Cost $112.13 Total Labor Cost $1,458.26 Total Cost of Change I $1,805.95 ~ 1629 JOB WORK ORDER CUSTOM DRYWALL, INC. 1570 GLADDING CT. MILPITAS, CA 95035 (408)263-1616 (408)263-1142 Fax '01'\.-1 ORDER DATE: .~. 30-11 ORDERED BY: JOB PHONE: OVER TIME ON CONTRACT WORK DOUBLE TIME ON CONTRACT WORK EXTRA TO CONTRACT WORI<: )(' , OTHER REF #: ..,-P QTY. TYPE OF LABOR HOURS WORK ORDERED BY: SIGNATURE: r hereby acknowledge the sa . rac ory completion of the above described work. #- jO j~ 66f~~~ht:'J~d b /tc/JJ~ 'i..f.vv k~)' 'LtJ /- ~v,'I,t- ~ M.~: / ;,1/ A....-~ ':7 .f . .tY"~ 4 f f ~ -<- A' I / &--\ -e.,...,..... 1 ~ '/0 CV5 H~ 1/7 ~ If rr- f v-r .. .J / 7 CUSTOM DRYVVALL. UK. / UCENSE (1263495 1\':70 Gladding Court, lVUlpitES, California 55035, (408l 263-1616 DEVCON CONSTRUCTION 1629 Gilroy Library Added 8 LF of 6" wall with dens glass gold on both sides at low roof between DESCRIPTION OF CHANGE: columns 1 & 1.2 @ C.5 & 0.5 for exterior plaster. No wall type shown on plans. Location of Change Work Order Date 6/30/2011 COST PER OPENING Pieces Length Lineal or SF Labor Hours Cost per Ft. Cost Per Hour Cost per Unit 5/8" Type X 0 32 0 $0.280 $0.00 1/2" Desnglass 8 32 256 $0.520 $133.12 1/4" Type X 0 32 0 $0.280 $0.00 6" x 20ga. @ 12' with 1 5/8" leg 10 12 120 $0.892 $107.04 6" x 20ga.track 2 10 20 $0.803 $16.06 3 5/8" Slotted Track 20 GA 0 10 0 $1.800 $0.00 2 1/2" stud 20 GA 0 10 0 $0.460 $0.00 2112" Track 20 GA 0 10 0 $0.460 $0.00 Corner Bead 0 9 0 $0.240 $0.00 1-112 X 1-1/290 metal 0 10 0 $0.430 $0.00 RC-1 channel 0 10 0 $0.420 $0.00 Furring Channel 0 10 0 $0.420 $0.00 Z metal 0 10 0 $0.420 $0.00 Hot Mud 0 1 0 $8.750 $0.00 box of Mud 0 1 0 $8.250 $0.00 Box liquid nails 0 0 0 $0.000 $0.00 sand block 0 $2. 190 $0.00 sand paper 0 $0.00 roll of plastic 0 $0.00 box of respirators 0 $0.00 Shot and Pins X-C32M x 1 1/4" 0 1 0 $0.000 $0.00 Shot and Pins c20M x 3/4 0 0 0 $0.000 $0.00 CRC 16ga 0 10 0 $0.400 $0.00 Screws., hot mud &. Misc. 0 0 $0.00 Sub-Total Cost for Material 0 $256.22 Tax 8.25% 8.250% $21.14 Cost of Material $277.36 Stocking of Material, Delivery 396 $0.070 $27.72 Labor Layout 0 $86.800 $0.00 Foreman/supervision 1 $86.800 $86.80 Taping Labor 0 $77.510 $0.00 Framing and Drywall Labor 10 $79.600 $796.00 stocking by Journeyman 2 $79.600 $159.20 Clean Up 0 $48.670 $0.00 Supervision 0 $102.000 $0.00 Man Lift 0 $10.000 $0.00 Dump Fees $0.00 Cost Per Location $1,347.08 Overhead and Profit Material 15.000% $45.76 Overhead and Profit labor 15.000% $156.30 Price per location $1,549.14 Number of locations 1 Total Material Cost $305.08 Total labor Cost $1,042.00 Total Cost of Change I $1,549.14 , '~} Y CUSTOM DRYI.AfALL, IrK. .. j LICENSE #263495 1S70 GladdinG Court, rvWpitas, California S5035. (401$)263-1616 Gilroy Library DEVCON CONSTRUCTION 1702 DESCRIPTION OF CHANGE: Location of Change Work Order Date COST PER OPENING 5/8" Type X 1" core board 2x12 1/4" Type X 3518 radius track 2D GA 1 5/8" track 20 GA 4" 20GA shaft J runner 2 1/2" stud 20 GA 16' 6" 20GA -slotted track 6" 20GA -18' studs 6" 20ga track structural 2 112" Track 20 GA Corner Bead 1-1/2 X 1-1/2 90 metal RC-1 channel Furring Channel Z metal Hot Mud box of Mud CRC 16ga 32' Scissor lift - Sub-Total Cost for Material Tax @ 8.25% Cost of Material Stocking of Material, Delivery Labor Layout Foreman/supervision Taping Labor stocking by journeyman Framing and Drywall Labor Clean Up Supervision Man Lift Dump Fees Cost Per Location Overhead and Profit Overhead and Profit Price per location Total Material Cost Total Labor Cost Total Cost of Change Add cost for (6) gyp. Bd. Pilasters 34' high for electrical purposes on line 0.9 between column 4 & 7. not show on drawings per sheet A5.101 and A5.202 detail 2. (REF. sheet A7.202 detail 10 (window header) 10/10/2011 Pieces Length Lineal or SF Labor Hours Cost per Ft. Cost Per Hour Cost per Unit 0 32 0 $0.280 $0.00 0 24 0 $0.510 $0.00 0 32 0 $0.280 $0.00 0 10 0 $2.900 $0.00 0 10 0 $0.440 $0.00 0 12 0 $0.893 $0.00 24 16 384 $0.318 $122.11 0 10 0 $1.304 $0.00 0 18 0 $0.521 $0.00 0 10 0 $0.511 $0.00 10 10 100 $0.308 $30.80 0 9 0 $0.270 $0.00 0 10 0 $0.000 $0.00 0 10 0 $0.420 $0.00 0 10 0 $0.420 $0.00 0 10 0 $0.420 $0.00 0 1 0 $8.750 $0.00 0 1 0 $8.250 $0.00 0 10 0 $0.400 $0.00 0 0 $450.000 $0.00 0 $152.91 8.250% $12.62 $165.53 484 $0.070 $33.88 0 $87.540 $0.00 1 $87.540 $87.54 0 $93.480 $0.00 0 $85.670 $0.00 8 $85.670 $685.36 0 $49.820 $0.00 0 $101.300 $0.00 0 $10.000 $0.00 $0.00 $972.31 Material 15.000% $29.91 labor 15.000% $115.94 $1,118.15 Number of locations 1 $199.41 $772.90 , $1,118.15 l 1702 JOB WORK ORDER CUSTOM DRYWALL, INC. 1570 GLADDING CT. MILPITAS, CA 95035 (408)263-1616 (408)263-1142 Fax BIll TO: ,~ Ct."}f1..>' ORDER DATE: 0-/0-/1 I I<C. ,"t. ORDERED BY: !(a JOB PHONE: OVER TIME ON CONTRACT WORK DOUBLE TIME ON CONTRACT WORK EXTRA TO CONTRACT WORK X peo #: DESCRIPTION OF WORK: TYPE OF lABOR HOURS qAt" 11tJ'" WORK ORDEREi) BY: b.-II b; ~llc-!-.'/l.lJ,{t SIGNATUKE: I hereby acknowledge the satis y completion of the above described work. 1 rt/ CUSTOM DRYWALL. INC. .....c..c.......! f ICe'.IS'" ':?6~ _0'" ... ,- / _ ~~. ....1,_ J~J.,J '1570 Gladding CQurt, MifpitES, California 95035, (402) 263-1616 Gilroy Library DEVCON CONSTRUCTION 1703 DESCRIPTION OF CHANGE: Location of Change Work Order Date COST PER OPENING 5/8" Type X 1" core board 2x12 1/4" Type X 35/8 radius track 20 GA 1 5/8" track 20 GA 4" 20GA shaft J runner 2 1/2" stud 20 GA 8' 6" 20GA -slotted track 6" 20GA -18' studs 6" 20ga track structural 2 1/2" Track 20 GA Corner Bead 1-1/2 X 1-1/2 90 metal RC-1 channel Furring Channel Z metal Hot Mud box of Mud CRC 16ga 32' Scissor lift - Sub-Total Cost for Material Tax @J. 8.25% Cost of Material Stocking of Material, Delivery Labor Layout Foreman/supervision Taping Labor stocking by journeyman Framing and Drywall Labor Clean Up Supervision Man Lift Dump Fees Cost Per Location Overhead and Profit Overhead and Profit Price per location Total Material Cost Total Labor Cost Total Cost of Change Add cost to delete upper portions of gyp bd. Pilasters and connect remaining across top of window head and bookcase niches. 3 new window head connections and 2 new furred bands at bookcase niches. 1703 JOB WORK ORDER CUSTOM DRYWALL, INC. 1570 GLADDING CT. MILPITAS, CA 95035 (408)263-1616 (408)263-1142 Fax ORDER DATE: O.-/CI - / / ORDERED BY: (~,.. C71'''cA s*'i'fcl, JOB PI-IONE: OVER TIME ON CONTRACT WORK DOUBLE TIME ON CONTRACT WORK EXTRA TO CONTRACT WORK X' II -eel TYPE OF LABOR HOURS htS ~ tW5' I ro Itr . WORK ORDERED BY: 15v lie 1-,'1 .:;fIb h/II H! SIGNATURE: I hereby acknowledge th e a ove described work. . CUSTOM DRYWALL, l!'J.c. UCE,'-!5E #263495 1570 Gladding Court, fo.'Hlprtas, California 95025, (408) 263.1616 Gilroy Library DEVCON CONSTRUCTION 1704 DESCRIPTION OF CHANGE: Location of Change Work Order Date COST PER OPENING 5/8" Type X 1" core board 2x12 6" 16GA flat strap backing 35/8 radius track 20 GA 1 5/8" tracl< 20 GA 4" 20GA shaft J runner 2 1/2" stud 20 GA 8' 6" 20GA -slotted track 6" 20GA -18' studs . 6" 20ga track structural 2 1/2" Track 20 GA Corner Bead 1-1/2 X 1-1/2 90 metal RC-1 channel Furring Channel Z metal Hot Mud box of Mud CRC 16ga 32' Scissor lift - Sub-Total Cost for Material Tax @ 8.25% Cost of Material Stocking of Material, Delivery labor Layout Foreman/supervision Taping Labor stocking by journeyman Framing and Drywall labor Clean Up Supervision Man Lift Dump Fees Cost Per Location Overhead and Profit Overhead and Profit Price per location Total Material Cost Total Labor Cost Total Cost of Change Signage backing needed by sign contractor (locations given by sigh contractor on 8/16/11. Add cost for install of backing for signage (see sketch drawing for location and give heights *Note: these signs not shown on floorplan or elevations 10/3/2011 Pieces Length Lineal or SF Labor Hours Cost per Ft. Cost Per Hour Cost per Unit 0 32 0 $0.280 $0.00 0 24 0 $0.510 $0.00 12 10 120 $0.833 $99.96 0 10 0 $2.900 $0.00 0 10 0 $0.440 $0.00 0 12 0 $0.893 $0.00 0 8 0 $0.318 $0.00 0 10 0 $1.304 $0.00 0 18 0 $0.521 $0.00 0 10 0 $0.511 $0.00 0 10 0 $0.308 $0.00 0 10 0 $0.270 $0.00 0 10 0 $0.000 $0.00 0 10 0 $0.420 $0.00 0 10 0 $0.420 $0.00 0 10 0 $0.420 $0.00 0 1 0 $8.750 $0.00 0 1 0 $8.250 $0.00 0 10 0 $0.400 $0.00 0 0 $450.000 $0.00 0 $99.96 8.250% $8.25 $108.21 120 $0.070 $8.40 0 $87.540 $0.00 1 $87.540 $87.54 0 $93.480 $0.00 0 $85.670 $0.00 8 $85.670 $685.36 0 $49.820 $0.00 0 $101.300 $0.00 0 $10.000 $0.00 0 $0.00 0 $889.51 Material 15.000% $17.49 Labor 15.000% $115.94 $1,022.93 Number of locations 1 $116.61 $772.90 I $1,022.93 I 1704 JOB WORK ORDER. CUSTOM DRYWALL, ING. 1570 GLADDING CT. MILPITAS, CA 95035 (408)263-1616 (408)263-1142 Fax BIll TO: ORDER DATE: '.- 3 --I / ,JOB PHONE: OVER TIME ON CONTRACT WORK DOUBLE TIME ON CONTRACT WORK EXTRA TO CONTRACT WORK X ORDERED BY: peo#-: DESCRIPTION OF WORK: Ore ill?' "-,, ~ c..... . , HOURS Sidek. ) e:t" ,:1 . - (. ~rrt .1 Av- WOR!( ORDEREi:> BY: SIGNATUF-E: I hereby acknowledge th atisfactory completion of the above described work. ....~ CUSTOM DRYWALL, If'.ie. ..... j LICENSE #2634-95 '1570 Gladding Court, MHpltas, CalIfornia 95035, 14QB) 263-1616 Gilroy Library DEVCON CONSTRUCTION 1705 DESCRIPTION OF CHANGE: Location of Change Work Order Date .COST PER OPENING 5/8" Type X 1" core board 2x12 6" 16GA flat strap backing 35/8 radius track 20 GA 1 518" track 20 GA 4" 20GA shaft J runner 2 1/2" stud 20 GA 8' 6" 20GA -slotted track 6" 20GA-18' studs 6" 209a track structural 2 1/2" Track 20 GA Corner Bead 1-1/2 X 1-1/2 90 metal RC-1 channel Furring Channel Z metal Hot Mud box of Mud CRC 16ga 32' Scissor lift - Sub-Total Cost for Material Tax (cl! 8.25% Cost of Material Stocking of Material, Delivery Labor Layout Foreman/supervision Taping Labor stocking by journeyman Framing and Drywall Labor Clean Up Supervision Man Lift Dump Fees Cost Per Location Overhead and Profit Overhead and Profit Price per location Total Material Cost Total Labor Cost Total Cost of Change Furred east wall room 113 mens restroom. Add cost to furr easat wall room 113 (mens restroom) 7/8" to allow finishes to pass by the new roof dreain for 2nd floor. Roof drain installed already before curbs were poured. Curbs poured in wrong location!. reframed recessed light pocket to accomadate new furred wall 9/16/2011 Pieces Length Lineal or SF Labor Hours Cost per Ft. Cost Per Hour Cost per Unit 0 32 0 $0.280 $0.00 0 24 0 $0.510 $0.00 0 10 0 $0.833 $0.00 0 10 0 $2.900 $0.00 0 10 0 $0.440 $0.00 0 12 0 $0.893 $0.00 0 8 0 $0.318 $0.00 0 10 0 $1.304 $0.00 0 18 0 $0.521 $0.00 0 10 0 $0.511 $0.00 0 10 0 $0.308 $0.00 0 10 0 $0.270 $0.00 0 10 0 $0.000 $0.00 0 10 0 $0.420 $0.00 0 10 0 $0.420 $0.00 10 10 100 $0.464 $46.40 0 1 0 $8.750 $0.00 0 1 0 $8.250 $0.00 0 10 0 $0.400 $0.00 0 0 $450.000 $0.00 0 $46.40 8.250% $3.83 $50.23 100 $0.070 $7.00 0 $87.540 $0.00 1 $87.540 $87.54 0 $93.480 $0.00 0 $85.670 $0.00 5 $85.670 $428.35 0 $49.820 $0.00 0 $101.300 $0.00 0 $10.000 $0.00 0 $0.00 0 $573.12 Material 15.000% $8.58 labor 15.000% 577.38 $659.09 Number of locations 1 $57.23 $515.89 $659.09 1705 JOB WORK ORDER CUSTOM DRYWALL, INC. 1570 GLADDING CT. MILPITAS, CA 95035 (408)263-1616 (408)263-1142 Fax ORDER DATE: 'G--/I ORDERED BY: JOB PHONE: OVER TIME ON CONTRACf WORK DOUBlE TIME ON CONTRACf WORK EXTRA TO CONTRAcr WORK )( HOURS II - 2. - i.... ~ Y. C't I .5 Ars . \ , lot ~fVI<;IC At' WORK ORDERED BY: ( ~~~ Fr'C /A bt'll fp ~~ A~ vi '1,./'" isfactory completion of the above described work. U ~ ;;Ii Ii SIGNATURE: I hereby acknowledge the s 1570 Gladding Court, Milpltas, Caliiornir; 95035, {408j 2.63-1616 Gilroy Library DEVCON CONSTRUCTION 1706 DESCRJPTION OF CHANGE: Location of Change Work Order Date COST PER OPENING 5/8" Type X . 1" core board 2x12 6" 16GA flat strap backing 35/8 radius track 20 GA 1 5/8" track 20 GA 4" 20GA shaft J runner 2 1/2" stud 20 GA 8' 6" 20GA -slotted tracl< 6" 20GA _18' studs 6" 20ga track structural 2 1/2" Track 20 GA Corner Bead 1-1/2 X 1-1/2 90 metal RC-1 channel Furring Channel Z metal Hot Mud box of Mud CRC 16ga 32' Scissor lift - Sub-Total Cost for Material Tax @ 8.25% Cost of Material Stocking of Material, Delivery Labor Layout Foreman/supervision Taping Labor stocking by journeyman Framing and Drywall Labor Clean Up Supervision Man Lift Dump Fees Cost Per Location Overhead and Profit Overhead and Profit Price per location Total Material Cost Total Labor Cost Total Cost of Change South elevator line D.6-E columns 7-7.6 Low roof plan - add cost to re-rock cering. Rock removed tdo provide access to wood strucurral beam for a hoist beam to install elevator. Delay of elevator contractor to install elevator per schedule 1706 JOB WORK ORDER CUSTOM DRYWALL, INC. 1570 GLADDING CT. MILPITAS, CA 95035 (408)263-1616 (408)263-1142 Fax BILL TO: ORDER DATE: - /1-11 -,! \-~ t..(.J;" ORDERED BY: JOB PHONE: OVER TIME ON CONTRACT WORK DOUBLE TIME ON CONTRACT WORK EXTRA TO CONTRACT WORK X PCO#: DESCRIPTION OF WORK: I. 1-0 - , if.; - E c..,(u..... )-). b 0-. -, b c,-fall eli'Wl~"'r MATERIAL ere( <'S- "> 01' Ei~I.r.:I,,'r HOURS . AI' ~Ar ~ WORK ORDEREi:> BY: r~ F~1: /e( SIGNATUKE: 6,( /.f-t;: /f) j I hereby acknowledge the sat' factory completion of the above described work. (/ ,,--- t7l. -r"""'" #/1 ') J I CUSiOM DRVWAlL. INt. __ -.J -/ LICENSE {t263495 Gilroy Library DEVCON CONSTRUCTION 1570 Gladding Court, P,,1!!pitas. California 95035, (4081263.1516 DESCRIPTION OF CHANGE: Location of Change Work Order Date COST PER OPENING 518" Type X 1" core board 2x10 6" 16GA flat strap backing 35/8 radius track 20 GA 4" shaft wall studs 10' 4" 20GA shaft J runner 2 1/2" stud 20 GA 8' 6" 20GA -slotted track 6" 20GA -18' studs 6" 20ga track structural 21/2" Track 20 GA Corner Bead 1-1/2 X 1-1/2 90 metal RC-1 channel Furring Channel Z metal Hot Mud box of Mud CRC 16ga 32' Scissor lift - Sub-Total Cost for Material Tax @ 8.25% Cost of Material Stocking of Material, Delivery Labor Layout Foreman/supervision Taping Labor stocking by journeyman Framing and Drywall Labor Clean Up Supervision Man Lift Dump Fees Cost Per Location Overhead and Profit Overhead and Profit Price per location Total Material Cost Total labor Cost Total Cost of Change Pieces 3 4 o o 4 4 o o o o o o o o o o o o o o Material Labor $183.18 $780.71 1707 Add cost to frame 8 Lf of 10' high shaftwall. (wall type 12) at west wall on low roof mezzanine level within elev shaft. North and south wall shown on low roof plan. West wall shown as wall type 9A but sits on a 12" concrete knee wall- therefore leaving a approx 7" step in the plane of the wall on the interior side of the elev shaft. Length 32 20 10 10 10 12 8 10 18 10 10 10 10 10 10 10 1 1 10 10/11/2011 Lineal or SF Labor Hours 96 80 o o 40 48 o o o o o o o o o o o o o o o 264 o 1 1 1 6 o o o o o Cost per Ft. $0.280 $0.510 $0.833 $2.900 $1.040 $0.893 $0.318 $1.304 $0.521 $0.511 $0.308 $0.270 $0.000 $0.420 $0.420 $0.464 $8.750 $8.250 $0.400 $450.000 8.250% $0.070 15.000% 15.000% Cost Per Hour $87.540 $87.540 $93.480 $85.670 $85.670 $49.820 $101.300 $10.000 Number of locations Cost per Unit $26.88 $40.80 $0.00 $0.00 $41.60 $42.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $152.14 $12.55 $164.70 $18.48 $0.00 $87.54 $93.48 $85.67 $514.02 $0.00 $0.00 $0.00 $0.00 $963.89 $27.48 $117.11 $1,108.47 1 I $1,108.47 I 1707 JOB WORK ORDER CUSTOM DRYWALL, INC. 1570 GLADDING CT. MILPIT AS, CA 95035 (408)263-1616 (408)263-1142 Fax BILL TO: ORDER DATE: '/ - /1-/1 i....) '..) CJ r I '.- I.e/!. " " ORDERED BY: /{A. JOB PHONE: OVER TIME ON CONTRACT' WORK DOUBLE TIME ON CONTRACT WORK EXTRA TO CONTRACT WORK '/or" - c;:~/I:.. Il",~r ec'l ,'0 i' ~ WORK ORDERED BY: t) i""'''1' J.. .I! L p Fr C/o!. /./ II j TrJ 4' {)yd-v-- e tisfact~ry completion of tIi bove described work. #:-/7 SIGNATURE: I hereby acknow ledge ,'} ! f CUSTOiv. DRYWALL, INC. LICENSE #263495 1510 Gladding Court, Milpitas, Caliiornia 95035, {40BJ 263-1616 Gilroy Library DEVCON CONSTRUCTION 1706 DESCRJPTlON OF CHANGE: Location of Change Work Order Date COST PER OPENING 5/8" Type X 1" core board 2x12 6" 16GA flat strap bacl<ing 35/8 radius track 20 GA 1 5/8" track 20 GA 4" 20GA shaft J runner 21/2" stud 20 GA 8' 6" 20GA -slotted tracl< 6" 20GA -18' studs 6" 20ga tracl< structural 2 1/2" Track 20 GA Corner Bead 1-1/2 X 1-1/2 90 metal RC-1 channel Furring Channel Z metal Hot Mud box of Mud CRC 16ga 32' Scissor lift - Sub-Total Cost for Material Tax @ 8.25% Cost of Material Stocking of Material, Delivery labor Layout Foreman/supervision Taping Labor stocking by journeyman Framing and Drywall Labor Clean Up Supervision Man Lift Dump Fees Cost Per Location Overhead and Profit Overhead and Profit Price per location Total Material Cost Total labor Cost Total Cost of Change South elevator line D.6-E columns 7-7.6 Low roof plan - add cost to re-rock celing. Rock removed tdo provide access to wood strucurral beam for a hoist beam to install elevator. Delay of elevator contractor to install elevator per schedule 10/11/2011 Pieces Length Lineal or SF Labor Hours Cost per Ft. Cost Per Hour Cost per Unit 8 32 256 $0.280 $71.68 0 24 0 $0.510 $0.00 0 10 0 $0.833 $0.00 0 10 0 $2.900 $0.00 0 10 0 $0.440 $0.00 0 12 0 $0.893 $0.00 0 8 0 $0.318 $0.00 0 10 0 $1.304 $0.00 0 18 0 $0.521 $0.00 0 10 0 $0.511 $0.00 0 10 0 $0.308 $0.00 0 10 0 $0.270 $0.00 0 10 0 $0.000 $0.00 0 10 0 $0.420 $0.00 0 10 0 $0.420 $0.00 0 10 0 $0.464 $0.00 0 1 0 $8.750 $0.00 0 1 0 $8.250 $0.00 0 10 0 $0.400 $0.00 0 0 $450.000 $0.00 0 $71.68 8.250% $5.91 $77.59 256 $0.070 $17.92 0 $87.540 $0.00 1 $87.540 $87.54 2 $93.480 $186.96 0 $85.670 $0.00 3 $85.670 $257.01 0 $49.820 $0.00 0 $101.300 $0.00 0 $10.000 $0.00 0 $0.00 0 $627.02 Material 15.000% $14.33 Labor 15.000% $79.73 $721.08 Number of locations 1 $95.51 $531.51 $721.08 JOB WORK ORDER CUSTOM DRYWALL. INC. 1570 GLADDING CT. MILPITAS, CA 95035 (408)263-1616 (408)263-1142 Fax BILL TO: ORDER DATE: - /1-1/ -.! ...' co J" ORDERED BY: OVER TIME ON CONTRACT WORK DOUBLE TIME ON CONTRACT WORK EXTRA TO CONTRACT WORK X ,JOB PHONE: PCO#: DESCRIPTION Of WORK: I. 70 - FWO#: Sc;u iI, OTHER REF #: , ;(; -E c,.,{u....... )-). b F; r: /e:( SIGNATUKE: 6,(1 f-z,;;1') _J I hereby acknowledge the sat' factory completion of the above described work. (/ r PI -r............. #=/1 0.- " b c,.fQ{{ e/i'vl'L~"'t' -/"t!,- MATERIAL WORK ORDEREi:> BY: r .A..----' 1706 5~." . Cl'Cl' es- . "> 01' /31... wi,,'r HOURS . 111' <: ~ ),r ~ ') ! ! CUSTOM DRYWALL.Ir'K. -.., LICENSE t;263<i95 Gilroy Library DEVCON CONSTRUCTION 1570 G!<lddlng Court, f>.a1!plt<ls, CaHfornia S5035, (4081263.1516 DESCRIPTION OF CHANGE: Location of Change Work Order Date COST PER OPENING 5/8" Type X 1" core board 2x10 6" 16GA flat strap backing 35/8 radius track 20 GA 4" shaft wall studs 10' 4" 20GA shaft J runner 2 1/2" stud 20 GA 8' 6" 20GA -slotted track 6" 20GA -18' studs 6" 20ga track structural 21/2" Track 20 GA Corner Bead 1-1/2 X 1-1/2 90 metal RC-1 channel Furring Channel Z metal Hot Mud box of Mud CRe 16ga 32' Scissor lift - Sub-Total Cost for Material Tax @ 8.25% Cost of Material Stocking of Material. Delivery Labor Layout Foreman/supervision Taping Labor stocking by journeyman Framing and Drywall Labor Clean Up Supervision Man Lift Dump Fees Cost Per Location Overhead and Profit Overhead and Profit Price per location Total Material Cost Total labor Cost Total Cost of Change Pieces 3 4 o o 4 4 o o o o o o o o o o o o o o Material Labor $183.18 $780.71 1707 Add cost to frame 8 Lf of 10' high shaftwall. (wall type 12) at west wall on low roof mezzanine level within elev shaft. North and south wall shown on low roof plan. West wall shown as wall type 9A but sits on a 12" concrete knee wall- therefore leaving a approx 7" step in the plane of the wall on the interior side or the elev shaft Length 32 20 10 10 10 12 8 10 18 10 10 10 10 10 10 10 1 1 10 10/11/2011 Lineal or SF Labor Hours 96 80 o o 40 48 o o o o o o o o o o o o o o o 264 Cost per Ft. $0.280 $0.510 $0.833 $2.900 $1.040 $0.893 $0.318 $1.304 $0.521 $0.511 $0.308 $0.270 $0.000 $0.420 $0.420 $0.464 $8.750 $8.250 $0.400 $450.000 8.250% $0.070 o 1 1 1 6 o o o o o 15.000% 15.000% Cost Per Hour $87.540 $87.540 $93.480 $85.670 $85.670 $49.820 $101.300 $10.000 Number of locations Cost per Unit $26.88 $40.80 $0.00 $0.00 $41.60 $42.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $152.14 $12.55 $164.70 $18.48 $0.00 $87.54 $93.48 $85.67 $514.02 $0.00 $0.00 $0.00 $0.00 $963.89 $27.48 $117.11 $1,108.47 1 I $1,108.47 I 1707 JOB WORK ORDER CUSTOM DRYWALL, INC. 1570 GLADDING CT. MILPITAS, CA 95035 (408)263-1616 (408)263-1142 Fax ORDER DATE: .) -/1-/1 ORDERED BY: . fi.A .rOB PHONE: OVER TIME ON CONTRACT WORK DOUBLE TIME ON CONTRACT WORK EXTRA TO CONTRACT WORK QTY. ,:-t" - c.'a~/I.:. t'e'! .'0" ~ WORK ORDERED BY: tJJ-'/ J...I/ L ? F,. c / d f./ /1/ TO ., {!)yd-v-- bove described work. 1i-- ! 1 SIGNATURE: I hereby acknow ledge JOB WORK ORDER CUSTOM DRYWALL, INC. 1570 GLADDING CT. MILPITAS, CA 95035 (408)263-1616 (408)263-1142 Fax BILL TO: ORDER DATE: 'f? - ?-;;z.~11 e I..J ,~o:'l. CO/1St: ORDERED BY: Jea JOB PHONE: OVER TIME ON CONTRACT WORK DOUBLE TIME ON CONTRACT" WORK EXTRA TO CONTRACT WORK PCO#: TYPE OF lABOR WORK ORDEREb BY: f:, / 7 /20fr1r~ '-- --., SIGNATUf,;E: I hereby acknowledge the S tOry completion of the above described work. -h tt' /10 tv w'? ') ,40 h . t ',-" S .4 /1 s v~j1'/...-k I ~b-( :7 4----c /. ;Z::;'c ~I op-rl--rr- .L1d /!t.,;.J /,,!:.,,- #tl~i 1.712 Or:..(;(~""f S'.:- 11: x HOURS /0 lLV" . A,..,S I i3 ;-4 ;' I k ",} JY CUSTOM DRYWALL. !NC. LICENSE !:263495 \ 1570 Gledding Court, Miipitas, California 95Q35, (408i 263-1616 DEVCON CONSTRUCTION 1712 Gilroy Library DESCRIPTION OF CHANGE: location of Change North Elevator 1st and 2nd floor - reframed north and south walls of north elevator (wall tupe 12) for stuctural steel to be installed Work Order Date COST PER OPENING 5/8" Type X 1" core board 2x12 1/4" Type X 1 5/8" metal studs 20 GA 1 5/8" track 20 GA 4" 20GA shaft J runner 2 1/2" stud 20 GA 2 1/2" Track 20 GA Corner Bead 1-112 X 1-1/2 90 metal RC-1 channel Furring Channel Z metal Hot Mud box of Mud Box liquid nails sand block sand paper roll of plastic box of respirators Shot and Pins X-C32M x 1 114" Shot and Pins c20M x 3/4 CRC 16ga Screws, hot mud & Misc. Sub-Total Cost for Material Tax@8.25% Cost of Material Stocking of Material, Delivery labor Layout Foreman/supervision Taping Labor Framing and Drywall Labor Clean Up Supervision Man Lift Dump Fees Cost Per Location Overhead and Profit Overhead and Profit Price per location Total Material Cost Total labor Cost lotal Costaf Change JOB WORK ORDER CUSTOM DRYWALL, INC. 1570 GLADDING CT. MILPITAS. CA 95035 (408)263-1616 (408)263-1142 Fax BILL TO: ()~VCJ" ORDER DATE: fI-~ 3--1/ ORDERED BY: !Co. JOB PHONE: OVER TIME ON CONTRACf WORK DOUBLE TIME ON CONTRACT WORK EXTRA TO CONTRACT WORK 171.3 );J-(.l-.C".... ~ j, x TYPE OF LABOR WORK ORDERED BY: ;t. t) I'1't I ~ "" SIGNATURE: I hereby acknowledge the s isfactory completion of the above described work. ;0" A..c // (1.--/ V" 1 J, jJ cI ;/"tI c.V I ~"'j ~ l.../;~ , I-SO 5 v-r:/r ,;:-. .. .........~ .> /v"1 HOURS It,-s "1. / f .> v-c.... LfCENSE fi26-3495 1570 Gfadding Court, fI!Hipitas, California 95035, [<lOg} 263-1616 DEVCON CONSTRUCTION 1713 Gilroy Library Window 121 1st and 2nd floor at line 4. Add framing in alignment with structural steel window support to match. North and south elevator to match west Elev Ext at DESCRIPTION OF CHANGE: header ht. no structural street use metal studs to create header. location of Change Work Order Date 8/22/2011 COST PER OPENING Pieces Length Lineal or SF Labor Hours Cost per Ft. Cost Per Hour Cost per Unit 5/8" Type X 0 32 0 $0.280 $0.00 1" core board 2x12 0 24 0 $0.00 1/4" Type X 0 32 0 $0.280 $0.00 1 5/8" metal studs 20 GA 0 12 0 $0.460 $0.00 1 5/8" track 20 GA 0 10 0 $0.440 $0.00 4" 20GA shaft J runner 0 12 0 $0.00 21/2" stud 20 GA 0 10 0 $0.510 $0.00 6" 16GA - track 4 10 40 $1.244 $49.76 6" 16ga 8' studs 2 8 16 $1.345 $21.52 2112" Track 20 GA 0 10 0 $0.490 $0.00 Corner Bead 0 9 0 $0.270 $0.00 1-1/2 X 1-1/2 90 metal 0 10 0 $0.430 $0.00 RC-1 channel 0 10 0 $0.420 $0.00 Furring Channel 0 10 0 $0.420 $0.00 Z metal 0 10 0 $0.420 $0.00 Hot Mud 0 1 0 $8.750 $0.00 box of Mud 0 1 0 $8.250 $0.00 CRC 16ga 0 10 0 $0.400 $0.00 Screws, hot mud & Misc. 0 0 $0.00 Sub-Total Cost for Material 0 $71.28 Tax @ 8.25% 8.250% $5.88 Cost of Material $77.16 Stocking of Material, Delivery 56 $0.070 $3.92 Labor Layout 0 $87.540 $0.00 Foremanlsupervision 1 $87.540 $87.54 Taping Labor 0 $93.480 $0.00 Framing and Drywall Labor 7 $85.670 $599.69 Clean Up 0 $49.820 $0.00 Supervision 0 $101.300 $0.00 Man Lift 0 $10.000 $0.00 Dump Fees $0.00 Cost Per Location $768.31 Overhead and Profit Material 15.000% $12.16 Overhead and Profit labor 15.000% $103.08 Price per location $883.56 Number of locations 1 Total Material Cost $81.08 Total labor Cost $687.23 Total Cost of Change $883.56 .....--- 1714 -- JOB WORK ORDER CUSTOM DRYWALL, INC. 1570 GLADDING CT. MILPITAS, CA 95035 (408 )263-1616 (408)263-1142 Fax BILL TO: ORDER DATE: -e i) CO!'1 CO I<$.' ' ORDERED BY: /J.t'VCi."" 5';., ~ JOB NAME/LOCATION: G. "0 1-.. ihn:li"1.r JOB PHONE: OVER TIME ON CONTRACT WORK DOUBlE TIME ON CONTRACT WORK EXTRA TO CONTRACT WORK A:: ~ TYPE OF LABOR HOURS I~ /;.;u -= /' Itr~ WORK ORDEREL> BY: ~ 1'k4-A k r;:: . S~l!",v'~i~"rl..l (..'t.."-~;~~ ,;'''''...., ..i.;. p.1-t..- .- V"- j;'\~ -/I4o..htl.''Z'"I-b" :;lShrs/ SIGNATUKE: I hereby acknowledge the sa Isfactory completion of the above described work. ~'t:A 4 p.-( I- ~i F: c) J~ f ~< > /,'C-/ C i-I; j'...., y,-r- C-~ ~ -'1 '"'t 1~'l!ff'JE&it ) !',:":_-,t.i!::'if t (&.;"7.f;".'{,.~./!j! CUSTOM DRYWALL INC. C .. . ...... / LICENSE #263495 1570 Gladding Court, Miipitas, California 9SG35, (408] 263-1616 DEVCON CONSTRUCTION 1714 Gilroy Library