HomeMy WebLinkAboutDevcon Construction - Library Construction - Change Order No. 17
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408)846-0451; Fax (408) 846-0429
CHANGE ORDER NO. 17
To contract for: New Public Library
Contractor:
Devcon Construction
Contract Date:
6/15/20 I 0
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work This Change Order provides for the following:
Changes to bridge room, g" diameter circular opening and misc. drywall changes
28 Glass and Glazing
Silicon Valley Glass Bull 16: Frosted tempered 3 piece
at 9' x 3' glass
29 Portland Cement Plaster
O'Donnell Plastering, Inc. : Added area of acoustic
ceiling, change to soffit near 7.8 & 0.8, detail2A5.102
31 Gypsum Board
Custom Drywall, Inc. Numerous changes, see attached
support documentation
57 Electrical
SFO-25 Lighting in 9' circle
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to OT Allowance
Net change order amount
$3,376.00
$3,376.00
$2,095.00
$2,095.00
$33,113.00
$33,113.00
$7,374.00
$7,374.00
$45,958.00
10.00% $4,596.00
$50,554.00
$0.00
$0.00
$50,554.00
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss
of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives
any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with
the Extra Work.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $50,554.00
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$18,177,226.00
$780,172.00
$18,957,398.00
$50,554.00
$830,726.00
$19,007,952.00
4.57%
l11UJ/V [(VJ57, I ~
BY{;,t tX;CTOR 0,,,
2 It ))l
, I
Percentage Initial
4.29%
RECOMMENDED BY:
( ~fr-
ACCEPTED BY:
I:EII"'~
CPR 1 00
Project: Gilroy Community Library
Devcon Job #: 10-296
Date: 1/27/2012
We submit for your approval the following estimate of changes in work:
Changes to bridge room and g'dia. circular opening.
$3,376.00
28 Glass and Glazing
Silicon Valley Glass Bull 16: Frosted tempered 3 piece
at 9' x 3' glass
29 Portland Cement Plaster
O'Donnell Plastering, Inc. : Added area of acoustic
ceiling, change to soffit near 7.8 & 0.8, detail 2A5.102
31 Gypsum Board
Custom Drywall, Inc. Add depth to appearance of 10'
dia. circular opening at 7.6/ine det. 3NA6.002
Custom Drywall, Inc. Per FO 19 bridge room POg wall
to be type 3
Custom Drywall, Inc. 1628: Per FO 13 demo for added
curb
Custom Drywall, Inc. 1713: Framing at window 121 first
and second floors
Custom Drywall, Inc. 1714: Wrap joists above room
208 per direction of CoG Inspector
Custom Drywall, Inc. 1712: Drywall work in support of
elevator rails
Custom Drywall, Inc. 1629: Infill openings at low roof
Custom Drywall, Inc. 1707: Elevator shaft wall west
side at low roof mezzanine
Custom Drywall, Inc. 1627: Additional backing for
signage not shown on plans
Custom Drywall, Inc. 3275: Patch wall where conduit
for Mural was run
Custom Drywall, Inc. 3277: Stair curb detail changes
Custom Drywall, Inc. 3280: Soffit in room 117 detail
changed by architect to accomodate hvac register
Custom Drywall, Inc. 1704: Backing for signage not
shown on drawings
Custom Drywall, Inc. 1706, 1632: Inspector directed
work in elevator shaft
Custom Drywall, Inc. 1702, 1703, 1705: Field order 19
57 Electrical
SFO-25 Lighting in 9' circle
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to OT Allowance
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942-8200
$3,376.00
$2,095.00
$2,095.00
$33,113.00
$850.00
$7,488.00
$1,806.00
$884.00
$2,820.00
$1,525.00
$1,549.00
$1,108.00
$1,023.00
$1,579.00
$1,670.00
$2,072.00
$1,023.00
$2,353.00
$5,363.00
$7,374.00
$7,374.00
$45,958.00
10.00% $4,596.00
$50,554.00
$0.00
$0.00
F. (408)262-2342 Lie. #399163
Net change order amount
$50,554.00
D We have proceeded with this change per the direction of:
D We will not proceed with this change until receipt of a signed copy of this proposal.
D This proposal must be accepted by: xx/xx/xx in order to avoid additional extension or expense.
D These changes will add approximately xx working days to the completion date.
Submitted by:
Date:
Devcon -Bob Roseberry
Approved by:
Date:
Owner's Representative: James Kuhn, Nova Partners
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942-8200 F. (408)262-2342 Lie. #399163
CUSTOM DRYWALL, INC.
LICENSE #263495
1570 Gladding Court, Milpitas, California 95035, (.t08) 263-1616
Devcon
Gilroy Library
Field work order #19
Attn: Mr. Bob Roseberry
8-27-11
PROJECT: Gilroy Library
INCLUDED ITEMS
The Bridge Room P09 is to receive wall Type 3
Set Up Time:
Added framing, 70 LF @ 20' height:
Added framing @ radius circle opening:
Added drywall level 4 finish:
$ 390.00
4130.00
650.00
2100.00
Cost for this application is: $ 1040.00
Sincerely Yours,
Material: $1258.00 Labor: $6230 .00
Ed Gibson
CUSTOM DRYWALL, INC.
LICENSE #263495
1570 Gladding Court, Milpitas, California 95035, (4081 263-1616
Devcon
Gilroy Library
Field work order #20
Attn: Mr. Bob Roseberry
8-27-11
PROJECT: Gilroy Library
INCLUDED ITEMS
Match the depth of the 10' circle framed into the west wall of the Bridge room P09
to the depth of the 10' circle framed into the opposite west wall of room 213.
Added framing @ radius circle opening:
Added drywall level 4 finish:
Cost for this application is :
Sincerely Yours,
$ 650.00
$ 200.00
Material: $255.00 Labor: $595 .00
Ed Gibson
Bob Roseberry
From:
Sent:
To:
Subject:
David Fleming <dfleming@siliconvalleyglass.com>
Monday, November 28, 2011 9:36 AM
Bob Roseberry
Pricing Items
Below are the additional items you requested pricing for
$ 3,376 - Install frosted tempered GLASS in three pieces with two vertical butt joints at 9' circle detail as
requested. Glass will be install in three rectangle pieces to the back side of the proposed opening with polished
edges at exposed vertical seams.
$17,285 - Install3-form glass in circular cove per supplied detail. Glass will be adhered to compatible substrate
material (provided by others). This material has a potentially long lead time and will required a deposit before
being released to the vendor.
RFI510
$ 6,372 - Replaced door supplied with non electric hardware group 05 at DR 105 with hardware similar to
specified in group 28 per RFI 510
$ 853 - ADD if new jamb mullion is required at DR 105(current mullion has prep for mortise lock that would
not be used. This prep can remain and will be concealed anytime the door is closed.
$ 3,104 - Supply door IlIA with electric hardware similar to group 12 in lieu of the specified group 45
Door 217 Mentioned in RFI 510 is a Wood door in HM frame not in my scope.
David Fleming
Silicon Valley Glass
P 408-475-0784
F 408-778-8203
~~
CCN#
CCN Date
500/700#
Project Name:
Project Number:
Page Number:
20
9/8/2011
710
GILROY LIBRARY
2678
1
..1~.:.....<:-;,_;::rfim.(..f.":
/S60 S /cf.$~ S4tt {k..:, e-l <iS1l2
r,{ t/Cy-Z<:S- S/Sq (<1,. t/Cy-2~S-21S2
Client Address:
PROPOSED CHANGE ORDER
DEVCON CONSTRUCTION
Contact: Bob Roseberry
690 Gibraltar Drive
Milpitas, CA 95035
Work Description
CHANGE ORDER COST FIELD ORDER #25 TO INSTALL BRIDGE LIGHTING. (4) 8' SINGLE LAMP DIMMING
FIXTURES & (1) DIMMING SWITCH, AND ASSOCIATED CONDUIT AND WiRE...................... $ 7,374.00
. We reserve the right to correct this quote for errors and omissions.
. This quote covers direct costs only and we reserve the right to claim for impact and consequential costs.
. This price is good for acceptance within 1Q days from the date of receipt.
. We request a time extension of ~ days.
. We will supply and install all materials, labor, and equipment as per your instructions on PCO #20
I. Exclusions:
. Overtime and shift work
. Xray of floors or walls
. Fire proofing patching
. Cutting & patching of any type
. Demolition of any type
. Painting
. Dumpster fees
. Access panels
. Roof patching
. Ceiling seismic support wires
. Con sealed and unforeseen conditions
. Upgrade of existing code violations
. Acoustical box pads and caulking at STC rated walls
. Fire rated box pads and caulking at fire rated walls
II. Clarifications:
. All work is to be completed between the hours of 7:00am through 3:30pm Monday through Friday.
III. General Conditions:
. All applicable taxes are included in our submission
. The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and
equipment 'specified or supplied by others
. Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the
'manufacturer
. The contractor shall not be liable for indirect loss or damage
. Unless included in this proposal, all bonding and/or special insurance requirements are supplied at additional cost
. If a formal contract is required, its conditions must not deviate from this proposal without our permission
. Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void
. We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions
ORIGINAL
PROPOSED CHANGE ORDER
Client Address:
DEVCON CONSTRUCTION
690 Gibraltar Drive
Milpitas, CA 95035
This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually
satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into
between the owner and the contractor.
We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project.
Please contact our office if you have any questions for if additional information is needed.
Sincerely,
SPRIG ELECTRIC COMPANY
Ron Piovesan
Senior Project Manager
Itemized Breakdown
Description
1/2" EMT CONDUIT
1/2" EMT STL SS CONN
1/2" EMT STL SS CPLG
1/2" STRAIGHT FLEX CONN
1/2" STEEL FLEX
#12 THHN BLACK
#12 THHN GREEN
B2-1 RED WIRE CONN
4x1 1/2" SO BOX COMB KO
4x2 1/8" SO BOX COMB KO
4" SO BLANK COVER
4" SO 1 G PLSTR RING 5/8" RISE
GROUND SCREW W/ INSUL #12 LEAD
1 G TGL SWITCH PLATE - PLASTIC IVY
DYMOLABEL PLATE
SLIDE DIMMER DECOR FLUOR SIP 12-LJ
# 8-10x 7/8 PLAS ANCHOR (3/16)
12 GAUGE JACK CHAIN
#10x 1 P/H SELF-TAP SCREW
TY -523M TY -RAP ( 4")
812M24 1/2-3/4" CONDUIT 1/4" FLNG
20A 1P BREAKER BOLT-ON
8' INDUSTRIAL
F32T8/SPX35 LAMP
1" DIAM CORE 6" THICK FLOOR
Totals
Qty
260
8
27
8
40
964
274
28
1
3
3
1
4
1
1
1
6
48
11
12
32
1
4
16
2
Net Price U
80.03 C
159.83 C
212.08 C
163.14 C
98.16 C
360.06 M
360.06 M
17.22 C
942.87 C
1,501.70 C
350.62 C
601.80 C
323.21 C
54.75 C
15.00 C
5,653.00 C
6.38C
37.00 C
9.75C
15.20 C
125.64 C
25.08 E
198.00 E
O.OOE
125.00 E
Total Mat($)
208.08
12.79
57.26
13.05
39.26
347.10
98.66
4.82
9.43
45.05
10.52
6.02
12.93
0.55
0.15
56.53
0.38
17.76
1.07
1.82
40.20
25.08
792.00
0.00
250.00
2,050.51
LaborU
4.50C
8.00 C
4.00C
10.80 C
4.00C
6.00M
6.00M
2.60C
30.00 C
30.00 C
8.00C
15.00 C
3.25C
10.00 C
0.16 E
40.00 C
15.00 C
2.60C
16.00 C
3.90C
10.66 C
0.34E
1.06 E
0.10 E
0.75E
Total Hours
11.70
0.64
1.08
0.86
1.60
5.78
1.64
0.73
0.30
0.90
0.24
0.15
0.13
0.10
0.16
0.40
0.90
1.25
1.76
0.47
3.41
0.34
4.24
1.60
1.50
41.89
Summary
General Materials
Material Subtotal
Material Tax
Material Markup
(@ 9.250 %)
(@ 10.000 %)
Material Total
Foreman
Journeyman
Labor Markup
(12.57 Hrs @$100.73)
(29.32 Hrs @ $90.79)
(@ 25.000 %)
Total labor
ORIGINAL
2,050.51
2,050.51
189.67
224.02
2,464.20
1,266.18
2,661.96
982.04
4,910.18
PROPOSED CHANGE ORDER
Client Address:
DEVCON CONSTRUCTION
690 Gibraltar Drive
Milpitas, CA 95035
Summary (Cont'd)
Total Material & labor
7,374.38
Final Amount
$7,374.00
ORIGINAL
9/7/2011
Project Name: Gilroy Public Library
..p~YPfGib'oy
7387 Rosllnna Street
. .(;ilroy,CA '$020
FIELD ORJ)ER NQ.25
Project Name:
Contract Date;
To Contractor:
Address:
Gilroy Public Lil;>rllry
07/26/2010 .
Deyc()l1(::(jnsttl1ction Incorporated
690 Gibrallarprive
MilpiUls,CA9,5035
DESCRIPTION OF WORK:
Supplementary lighting instructions to FO # 20; see HED attachment sketch 9/612011.
Es(imated Adjustment
of Contract Sum: T&M
James Kuhn I PM
. (Name of Co uction Managerffitle - type<i o!,printed)
By:
Date: 9171201 ]
(Name of Contractor Representative/TiUe- typ~d or printed)
(Signature)
Date:
Note: This Field Orde,' will be superseded by analloV'anseacfjust111ent O/' a Change Order that will include the
scope althe change in the Work and any actual acfju.s.l.lJ.{e. n... /.s...........0.1.. JheContra.cISum.and the Contract Time.
., "'.",. ". ','., . .
Attachment: liED Sketch 9/6/2011
~!
~~
~i
!
~ I
.. ~~
~~
~
~
.~
.'0
1, 2, OR 3 lAMP STANDARD STRIP
(/)
w
USA
PROUD
~76
w
(/)
m/8" K.O.
-*-- -
2" 18 ~ 3-5/8"
r-IO Oj3a3_7/,"
L .\.1/4"
cD
o
W Dimming
~ Strip
I-
>J
w
o
<(
I-
...J
1
101
000
o
>
o
o
SPECI F/CATIONS
FEATURES
. HOUSING - 22-gauge die-formed C.R.S. or optional
.040" thick aluminum.
. FINISH - 92% minimum average reflective white
powder coat with multi.stage Iron/phosphate
prepared metal.
. ElECTRICAL - Electronic ballast standard
(where available). rated Class P.
. LABELS - Ul/CUllisted as fluorescent luminaire
suitable for dry or damp locations.
. MOUNTING - Surface or suspended.
. Factory-mounted. prewired sockets cut installation time.
. Hinging/lacking lamp bracket cuts in. lallation lime.
. One quarter-turn Fa.tener secures wireway cover 10 housing.
. Channel connector furnished for continuou. row application..
. Ballast .ecured by two captive bolts and nuts 10 ensure ollghl.
reliable Fit for maximum heat dissipation and minimal
ballast noise.
. All ports painted aFter Fabrication to Facilitate installation,
increase efficiency. and Inhibit corrosion.
. This fixture is proudly made in the USA.
SUBMITTAL
INFORMATION
~' 432 EBD2*LU*HILUME3D V~
NOMINAL LENGTH
2 D 2 Ft.
3=3Ft.
iTOTAl LAMPS 4 D 4 fl. jJOLTAGE
120 D 120V
LUMINAIRE SERIES l t 2, 3, 4, or 6 ~: ~ ::.' 277 _ 277V
7 6-4-232-0PTI ON S-EB2-120
T AlUM = Alum:num Fixture, --C-;:-ALLAST TYPE (Dependent on speciFied lamp Iypel
painted after fabricalian EBI = 1-lamp electronic ballast
EM? A - Emergency battery pack EB2 D 2-lamp electronic ballasl
(B70A) or equivalent EB4 = 4-lamp electronic ballast
WG-7611 - lI-gauge white,/owder
coat wireguar
WG-7614 = 14-gauge white powder
coal wireguard
T8: EB defaults to Instant slarl
For more options. accessorie., and product
details, refer 10 Information section.
lAMP WATTAGE/TYPE
17 = 2', 17-walt T8
25 - 3', 25-watt T8
32 D 4', 32-walt T8
59 D 8', 59-walt T8. .Iimline
86.. 8', 86-watt T8. HO
H.E. Williams. nc. ·
~Jams
Issouri · www.hewilliams.com · 417-358-4065 . Fax: 417-358-6015
Strip poge 7
FLUORESCENT LIGHTING
V)
w
76 ~
w
V)
PHOTOMETRY
INFORMATION
Williams Catalog #76-4-232-EB2-120
Test Report #8591.0, Dated 12/27/95
lamp Type: F32T8/SPX35/RS
lamp Quantity: 2
CANDLEPOWER DISTRIBUTION
VERT. HORIZONTAL ANGLE ZONAL
ANG. 0 45 90 lUMENS
0 1128. 1128. 1128.
5 1135. 1135. 1142. 108.4
15 1120. 1155. 1192. 327.3
25 1033. 1117. 1191. 515.1
35 897. 1044. 1166. 651.8
45 740. 977. 1150. 744.2
55 555. 860. 1093. 759.7
65 361. 763. 1025. 728.6
75 171. 597. 761. 566.8
85 29. 394. 495. 350.2
90 3. 244. 403.
95 O. 309. 468. 303.0
105 O. 323. 574. 321.9
115 O. 237. 441. 219.0
125 O. ISO. 333. 136.7
135 O. 68. 200. 63.9
145 O. 13. . 90. 19.2
155 O. O. 13. 2.3
165 o. O. o. .0
175 O. O. O. .0
180 O. O. o.
LUMEN SUMMARY
ZONE lUMENS % lAMP % fiXTURE
0-30 951. 16.1 16.3
0-40 1603. 27.2 27.5
0-60 3107. 52.7 53.4
0-90 4752. 80.5 81.7
90 - 120 844. 14.3 14.5
90 - 130 981. 16.6 16.9
90 - 150 1064. 18.0 18.3
90 - 180 1066. 18.1 18.3
Tolallumlnolre
0-180 5818. 98.6 100.0
TOTAL LUMINAIRE
OPTICAL EFFICIENCY = 98.6 %
SPACING CRITERIA: ACROSS= 1.6 AlONG= 1.3
1&0" 170'
""
:Hi/)::.~,~ ~
w,~i;,\'?\t;!'~J\' :
... .. .....,.@]....
~<~'\')"i:;:~' i
:l\(!l:t~,:}..?,:/.-
. -.... . f'..} ." '"
1 r.,.:~'{;{!<,'::':<" ~
. ))'
t ..'
O'
~'
20'
ZONAL CAVITY COEFFICIENTS
EfFECTIVE flOOR CAVITY REFl. ~ .20
CEILING .10 .70 .50
WAll .70 .50 .30 .70 .50 .30 .50 .30 .10
RCR
0 III 113 113 loa 108 106 Loo 100 100
1 101 .96 .91 .97 .92 .87 .84 .81 76
2 .91 .62 75 .67 79 72 72 .07 .62
3 .eJ 72 .63 79 .69 .61 .63 .s7 .51
4 75 .eJ .54 72 .6G .52 .56 .49 .43
5 .68 .55 .46 .65 .53 .H .49 .41 36
6 .63 .49 .40 .59 .47 ~ .43 30 .31
7 ..16 .44 .35 .55 ..42 .34 .39 .32 .26
8 ..$3 .39 .30 .SO .38 .29 35 .28 .23
9 .49 35 27 .46 .34 .26 .31 .24 .19
10 .45 32 .24 .43 31 23 .28 .22 .17
BACK
V IE W
NOTE:
2' K.O. and 13J 7/8' K.m
Ore on ,4', 6', &. 8J units only
1. "
2.1/16"-1
,
~!ams
1l.E. WILLIAMS, INC.
H.E. Williams, Inc. . Carthage, Missouri · www.hewilliams.com
InformolTon contolned herein rs subfect to change without notice.
· 417-358-4065 · Fax: 417-358-6015
HEWJP43033 09/0l/lIRJ
1627
JOB WORK ORDER
CUSTOM DRYWALL, INC.
1570 GLADDING CT.
MILPITAS, CA 95035
(408 )263-1616
(408)263~1142 Fax
BIll TO: ORDER DATE: 0.- :J."3-I(
()-€Y ) ("I'M Ct'J vtS'1-.
ORDERED BY: Rav ( fJe ~I('(.I", ,l)~,~i. )
JOB NAME/LOCATION: /
(;j-/rdv 1- /hrz?f" V OVER TIME ON CONTRACT WORK
/ ~ DOUBlE TIME ON CONTRACT WORK
JOB PHONE: EXTRA TO CONTRACT WORK "f:'
PCO#: I FWO#: I OTHER REF #:
DESCRIPTION OF WORK: oAJd nrresS'ar' \of h~/c!c/~ -f ~I" 1-4 fA !. ( .
QJ'}/I) ,C<l I
(;U) Lr>fJJ ;(/",J' (VI'> ,~p .+;.:;>....,/'" ,.,.p / I? Ol't-t:'. ,
(,T
QTY. MATERIAL TYPE OF LABOR HOURS
II t/ nes- t; U._ ;} 0 GI/- - 10 ('jf'4.l~,
I ;i~(-5. .1 %: I, - :'J.6 (;4 - i9 cs''f"..ls
II 0 ~C.>~ Q.. ~";:J. t,._ ~o G'~- io '..sf-"j/.s
,6~-' J I ,. I '" ~ 1 G . 91) OM. ciao/
. CJ ILles ","" x: .5 - G.,If-
, .- as -1/ - F" 1'<1..... i^'l 4/",:s
G - ~ iI--il - I'" i ~ /1 /'"-5
;- t''a: ii<. r I"
b-'().7-11.- ;:: r4..' :" / C, AI'S
Moot"" .
cO~~J5 -If- t:....r::r ",,',,: R' hJ/"s
17
5:: ' ~ ~ltV'.s
,-,-,"T!!-I' ..... $, C i'l
. ~
i-/ t:., i1 1"-;e;
h"
WORK ORDERED BY:
;&}11", ~
47
SIGNATURE: 0", ,
I hereby acknowledge th~ry completion of t e \ _ described work. Jf
L 7~ - /J ~...n:r/~ o;Zc:-<-e1--
jJPiJl~ ;.J tlc-/C ,'~ yafY ,_~pLC:-O ~~ j /Vd uEr/CJ.d"YV
1570 Giaddlng Couri:, f\/liipH:c:s, California 95035. (408l 263-1616
DEVCON CONSTRUCTION
1627
Gilroy Library
1628
JOB WORK. ORDER
CUSTOM DRYWALL. INC.
1570 GLADDING CT.
MILPITAS, CA 95035
(408)263-1616
(408)263-1142 Fax
R.?l
BILL TO: ORDER DATE: c,-C:;~II O.....-R...::r ..1P f "3
lJeu co/! CtJ fL5 'f ,
ORDERED BY: ;{t:tv (f) eVCCfJ! .5'w,,1 1--. )
JOB NAME/LOCATION: /
Gi;-dV L :h,.,A.l,," Y' OVER TIME ON CONTRACT WORK
/ , DOUBLE TIME ON CONTRACT WORK
JOB PHONE: EXTRA TO CONTRACT WORK )C
PCO#: I FWO#: I OTHER REF #:
DESCRIPTION OF WORK:
Per- ;::::,<i& o/;:l~r- -d::i>-/? /1 e iY'-O .-.{.. ;"'4.- /"""IJ.. raj col u..,/I.-;\. 10 h.erw""'j
."S
(__ /J-f') ( ;-..i.-\ ..r:;, c c(..~j, 'IcJ hI.? /A-F: tul/J iJe,.. f="/..,() Ot"lu. :if i~.
t;. )C"I I ,,..
r::::trrI? .....'...?' /1/ t"t'!'Z...ey' ccJlt..ni ei-.:r.f ,
v .
Q1Y. MATERIAL TYPE OF LABOR HOURS
t./1tJ c;..S to if - ::to GA -Ir~(k (;=?3fHd
h ~r~ c (,; 'r' '::JJJr:.A - Ii I ",l., G ' I)
C) - CJ. "..</1.. 33"".,
. t:; -,,1JI I ~ - jje~;""6 e::,it1"'5
~-&-il It -e'- ~;-,tp" p Uhz.!{S ) 0 Itf~5
t::;' IJ,..t'!r ....,'s/o '1 j hr-
-
l"'7 It ~<
I
- J.
WORK ORDEREi) BY: ;(~ /2-of/V\.f/~
SIGNATVI'<E: ~LC -- _,
I hereby acknowledge the satisfactory completion of the above described work.
/..., 0"\.. y;.~ )-n p. /~
7-~ .,>V"O ~
~
? CUSTOM DRYWALL. INC.
',) LfCErlSE #263495
1570 Gladding Court, Milpitas, California 95035, (40B! 263-1616
DEVCON CONSTRUCTION
1628
Gilroy Library
Per 'field order #13, demo framing @ column 10 between C & 0 for curb to be
DESCRIPTION OF CHANGE: installed, framing had already been completed.
location of Change
Work Order Date 6/6/2011
COST PER OPENING Pieces Length Lineal or SF Labor Hours Cost per Ft. Cost Per Hour Cost per Unit
5/8" Type X 0 32 0 $0.280 $0.00
1 " core board 2x12 0 24 0 $0.510 $0.00
1/4" Type X 0 32 0 $0.280 $0.00
135/8" metal studs 20 GA 0 10 0 $0.000 $0.00
1 5/8" track 20 GA 0 10 0 $0.440 $0.00
4" 20GA shaft J runner 0 12 0 $0.893 $0.00
2 1/2" stud 20 GA 0 10 0 $0.000 $0.00
6" 20GA -12' studs 6 12 72 $0.892 $64.22
5" 20ga track structural 4 10 40 $0.803 $32.12
2 1/2" Track 20 GA 0 10 0 $0.490 $0.00
Comer Bead 0 9 0 $0.270 $0.00
1-1/2 X 1-1/290 metal 0 10 0 $0.000 $0.00
RC-1 channel 0 10 0 $0.420 $0.00
Furring Channel 0 10 0 $0.420 $0.00
Z metal 0 10 0 $0.420 $0.00
Hot Mud 0 1 0 $8.750 $0.00
box of Mud 0 1 0 $8.250 $0.00
CRC 16ga 0 10 0 $0.400 $0.00
Screws. tape & Misc. 0 0 $0.00
Sub-Total Cost for Material 0 $96.34
Tax @8.25% 8.250% $7.95
Cost of Material $104.29
Stocking of Material, Delivery 112 $0.070 $7.84
Labor
Layout 0 $87.540 $0.00
Foreman/supervision 1 $87.540 $87.54
Taping Labor 0 $93.480 $0.00
Labor Demo 6 $85.670 $514.02
Framing and Drywall Labor 10 $85.670 $856.70
Clean Up 0 $49.820 $0.00
Supervision 0 $101.300 $0.00
Man Lift 0 $10.000 $0.00
Dump Fees $0.00
Cost Per Location $1,570.39
Overhead and Profit Material 15.000% $16.82
Overhead and Profit Labor 15.000% $218.74
Price per location $1,805.95
Number of locations 1
Total Material Cost $112.13
Total Labor Cost $1,458.26
Total Cost of Change I $1,805.95 ~
1629
JOB WORK ORDER
CUSTOM DRYWALL, INC.
1570 GLADDING CT.
MILPITAS, CA 95035
(408)263-1616
(408)263-1142 Fax
'01'\.-1
ORDER DATE:
.~. 30-11
ORDERED BY:
JOB PHONE:
OVER TIME ON CONTRACT WORK
DOUBLE TIME ON CONTRACT WORK
EXTRA TO CONTRACT WORI<:
)('
,
OTHER REF #:
..,-P
QTY.
TYPE OF LABOR
HOURS
WORK ORDERED BY:
SIGNATURE:
r hereby acknowledge the sa . rac ory completion of the above described work.
#- jO j~ 66f~~~ht:'J~d b /tc/JJ~
'i..f.vv k~)' 'LtJ /- ~v,'I,t- ~ M.~: /
;,1/ A....-~ ':7 .f . .tY"~ 4 f f ~ -<- A' I / &--\ -e.,...,..... 1 ~
'/0 CV5 H~ 1/7 ~ If rr- f v-r ..
.J
/
7 CUSTOM DRYVVALL. UK.
/ UCENSE (1263495
1\':70 Gladding Court, lVUlpitES, California 55035, (408l 263-1616
DEVCON CONSTRUCTION 1629
Gilroy Library
Added 8 LF of 6" wall with dens glass gold on both sides at low roof between
DESCRIPTION OF CHANGE: columns 1 & 1.2 @ C.5 & 0.5 for exterior plaster. No wall type shown on plans.
Location of Change
Work Order Date 6/30/2011
COST PER OPENING Pieces Length Lineal or SF Labor Hours Cost per Ft. Cost Per Hour Cost per Unit
5/8" Type X 0 32 0 $0.280 $0.00
1/2" Desnglass 8 32 256 $0.520 $133.12
1/4" Type X 0 32 0 $0.280 $0.00
6" x 20ga. @ 12' with 1 5/8" leg 10 12 120 $0.892 $107.04
6" x 20ga.track 2 10 20 $0.803 $16.06
3 5/8" Slotted Track 20 GA 0 10 0 $1.800 $0.00
2 1/2" stud 20 GA 0 10 0 $0.460 $0.00
2112" Track 20 GA 0 10 0 $0.460 $0.00
Corner Bead 0 9 0 $0.240 $0.00
1-112 X 1-1/290 metal 0 10 0 $0.430 $0.00
RC-1 channel 0 10 0 $0.420 $0.00
Furring Channel 0 10 0 $0.420 $0.00
Z metal 0 10 0 $0.420 $0.00
Hot Mud 0 1 0 $8.750 $0.00
box of Mud 0 1 0 $8.250 $0.00
Box liquid nails 0 0 0 $0.000 $0.00
sand block 0 $2. 190 $0.00
sand paper 0 $0.00
roll of plastic 0 $0.00
box of respirators 0 $0.00
Shot and Pins X-C32M x 1 1/4" 0 1 0 $0.000 $0.00
Shot and Pins c20M x 3/4 0 0 0 $0.000 $0.00
CRC 16ga 0 10 0 $0.400 $0.00
Screws., hot mud &. Misc. 0 0 $0.00
Sub-Total Cost for Material 0 $256.22
Tax 8.25% 8.250% $21.14
Cost of Material $277.36
Stocking of Material, Delivery 396 $0.070 $27.72
Labor
Layout 0 $86.800 $0.00
Foreman/supervision 1 $86.800 $86.80
Taping Labor 0 $77.510 $0.00
Framing and Drywall Labor 10 $79.600 $796.00
stocking by Journeyman 2 $79.600 $159.20
Clean Up 0 $48.670 $0.00
Supervision 0 $102.000 $0.00
Man Lift 0 $10.000 $0.00
Dump Fees $0.00
Cost Per Location $1,347.08
Overhead and Profit Material 15.000% $45.76
Overhead and Profit labor 15.000% $156.30
Price per location $1,549.14
Number of locations 1
Total Material Cost $305.08
Total labor Cost $1,042.00
Total Cost of Change I $1,549.14 ,
'~}
Y CUSTOM DRYI.AfALL, IrK.
.. j LICENSE #263495
1S70 GladdinG Court, rvWpitas, California S5035. (401$)263-1616
Gilroy Library
DEVCON CONSTRUCTION
1702
DESCRIPTION OF CHANGE:
Location of Change
Work Order Date
COST PER OPENING
5/8" Type X
1" core board 2x12
1/4" Type X
3518 radius track 2D GA
1 5/8" track 20 GA
4" 20GA shaft J runner
2 1/2" stud 20 GA 16'
6" 20GA -slotted track
6" 20GA -18' studs
6" 20ga track structural
2 112" Track 20 GA
Corner Bead
1-1/2 X 1-1/2 90 metal
RC-1 channel
Furring Channel
Z metal
Hot Mud
box of Mud
CRC 16ga
32' Scissor lift -
Sub-Total Cost for Material
Tax @ 8.25%
Cost of Material
Stocking of Material, Delivery
Labor
Layout
Foreman/supervision
Taping Labor
stocking by journeyman
Framing and Drywall Labor
Clean Up
Supervision
Man Lift
Dump Fees
Cost Per Location
Overhead and Profit
Overhead and Profit
Price per location
Total Material Cost
Total Labor Cost
Total Cost of Change
Add cost for (6) gyp. Bd. Pilasters 34' high for electrical purposes on line 0.9
between column 4 & 7. not show on drawings per sheet A5.101 and A5.202 detail
2. (REF. sheet A7.202 detail 10 (window header)
10/10/2011
Pieces Length Lineal or SF Labor Hours Cost per Ft. Cost Per Hour Cost per Unit
0 32 0 $0.280 $0.00
0 24 0 $0.510 $0.00
0 32 0 $0.280 $0.00
0 10 0 $2.900 $0.00
0 10 0 $0.440 $0.00
0 12 0 $0.893 $0.00
24 16 384 $0.318 $122.11
0 10 0 $1.304 $0.00
0 18 0 $0.521 $0.00
0 10 0 $0.511 $0.00
10 10 100 $0.308 $30.80
0 9 0 $0.270 $0.00
0 10 0 $0.000 $0.00
0 10 0 $0.420 $0.00
0 10 0 $0.420 $0.00
0 10 0 $0.420 $0.00
0 1 0 $8.750 $0.00
0 1 0 $8.250 $0.00
0 10 0 $0.400 $0.00
0 0 $450.000 $0.00
0 $152.91
8.250% $12.62
$165.53
484 $0.070 $33.88
0 $87.540 $0.00
1 $87.540 $87.54
0 $93.480 $0.00
0 $85.670 $0.00
8 $85.670 $685.36
0 $49.820 $0.00
0 $101.300 $0.00
0 $10.000 $0.00
$0.00
$972.31
Material 15.000% $29.91
labor 15.000% $115.94
$1,118.15
Number of locations 1
$199.41
$772.90
, $1,118.15 l
1702
JOB WORK ORDER
CUSTOM DRYWALL, INC.
1570 GLADDING CT.
MILPITAS, CA 95035
(408)263-1616
(408)263-1142 Fax
BIll TO:
,~
Ct."}f1..>'
ORDER DATE:
0-/0-/1
I
I<C. ,"t.
ORDERED BY: !(a
JOB PHONE:
OVER TIME ON CONTRACT WORK
DOUBLE TIME ON CONTRACT WORK
EXTRA TO CONTRACT WORK X
peo #:
DESCRIPTION OF WORK:
TYPE OF lABOR
HOURS
qAt"
11tJ'"
WORK ORDEREi) BY:
b.-II b; ~llc-!-.'/l.lJ,{t
SIGNATUKE:
I hereby acknowledge the satis
y completion of the above described work.
1
rt/ CUSTOM DRYWALL. INC.
.....c..c.......! f ICe'.IS'" ':?6~ _0'"
... ,- / _ ~~. ....1,_ J~J.,J
'1570 Gladding CQurt, MifpitES, California 95035, (402) 263-1616
Gilroy Library
DEVCON CONSTRUCTION
1703
DESCRIPTION OF CHANGE:
Location of Change
Work Order Date
COST PER OPENING
5/8" Type X
1" core board 2x12
1/4" Type X
35/8 radius track 20 GA
1 5/8" track 20 GA
4" 20GA shaft J runner
2 1/2" stud 20 GA 8'
6" 20GA -slotted track
6" 20GA -18' studs
6" 20ga track structural
2 1/2" Track 20 GA
Corner Bead
1-1/2 X 1-1/2 90 metal
RC-1 channel
Furring Channel
Z metal
Hot Mud
box of Mud
CRC 16ga
32' Scissor lift -
Sub-Total Cost for Material
Tax @J. 8.25%
Cost of Material
Stocking of Material, Delivery
Labor
Layout
Foreman/supervision
Taping Labor
stocking by journeyman
Framing and Drywall Labor
Clean Up
Supervision
Man Lift
Dump Fees
Cost Per Location
Overhead and Profit
Overhead and Profit
Price per location
Total Material Cost
Total Labor Cost
Total Cost of Change
Add cost to delete upper portions of gyp bd. Pilasters and connect remaining
across top of window head and bookcase niches. 3 new window head
connections and 2 new furred bands at bookcase niches.
1703
JOB WORK ORDER
CUSTOM DRYWALL, INC.
1570 GLADDING CT.
MILPITAS, CA 95035
(408)263-1616
(408)263-1142 Fax
ORDER DATE:
O.-/CI - / /
ORDERED BY:
(~,.. C71'''cA
s*'i'fcl,
JOB PI-IONE:
OVER TIME ON CONTRACT WORK
DOUBLE TIME ON CONTRACT WORK
EXTRA TO CONTRACT WORK X'
II -eel
TYPE OF LABOR
HOURS
htS
~ tW5'
I ro Itr .
WORK ORDERED BY:
15v lie 1-,'1 .:;fIb
h/II H!
SIGNATURE:
I hereby acknowledge th
e a ove described work.
.
CUSTOM DRYWALL, l!'J.c.
UCE,'-!5E #263495
1570 Gladding Court, fo.'Hlprtas, California 95025, (408) 263.1616
Gilroy Library
DEVCON CONSTRUCTION
1704
DESCRIPTION OF CHANGE:
Location of Change
Work Order Date
COST PER OPENING
5/8" Type X
1" core board 2x12
6" 16GA flat strap backing
35/8 radius track 20 GA
1 5/8" tracl< 20 GA
4" 20GA shaft J runner
2 1/2" stud 20 GA 8'
6" 20GA -slotted track
6" 20GA -18' studs
. 6" 20ga track structural
2 1/2" Track 20 GA
Corner Bead
1-1/2 X 1-1/2 90 metal
RC-1 channel
Furring Channel
Z metal
Hot Mud
box of Mud
CRC 16ga
32' Scissor lift -
Sub-Total Cost for Material
Tax @ 8.25%
Cost of Material
Stocking of Material, Delivery
labor
Layout
Foreman/supervision
Taping Labor
stocking by journeyman
Framing and Drywall labor
Clean Up
Supervision
Man Lift
Dump Fees
Cost Per Location
Overhead and Profit
Overhead and Profit
Price per location
Total Material Cost
Total Labor Cost
Total Cost of Change
Signage backing needed by sign contractor (locations given by sigh contractor on
8/16/11. Add cost for install of backing for signage (see sketch drawing for
location and give heights *Note: these signs not shown on floorplan or elevations
10/3/2011
Pieces Length Lineal or SF Labor Hours Cost per Ft. Cost Per Hour Cost per Unit
0 32 0 $0.280 $0.00
0 24 0 $0.510 $0.00
12 10 120 $0.833 $99.96
0 10 0 $2.900 $0.00
0 10 0 $0.440 $0.00
0 12 0 $0.893 $0.00
0 8 0 $0.318 $0.00
0 10 0 $1.304 $0.00
0 18 0 $0.521 $0.00
0 10 0 $0.511 $0.00
0 10 0 $0.308 $0.00
0 10 0 $0.270 $0.00
0 10 0 $0.000 $0.00
0 10 0 $0.420 $0.00
0 10 0 $0.420 $0.00
0 10 0 $0.420 $0.00
0 1 0 $8.750 $0.00
0 1 0 $8.250 $0.00
0 10 0 $0.400 $0.00
0 0 $450.000 $0.00
0 $99.96
8.250% $8.25
$108.21
120 $0.070 $8.40
0 $87.540 $0.00
1 $87.540 $87.54
0 $93.480 $0.00
0 $85.670 $0.00
8 $85.670 $685.36
0 $49.820 $0.00
0 $101.300 $0.00
0 $10.000 $0.00
0 $0.00
0
$889.51
Material 15.000% $17.49
Labor 15.000% $115.94
$1,022.93
Number of locations 1
$116.61
$772.90
I $1,022.93 I
1704
JOB WORK ORDER.
CUSTOM DRYWALL, ING.
1570 GLADDING CT.
MILPITAS, CA 95035
(408)263-1616
(408)263-1142 Fax
BIll TO:
ORDER DATE:
'.- 3 --I /
,JOB PHONE:
OVER TIME ON CONTRACT WORK
DOUBLE TIME ON CONTRACT WORK
EXTRA TO CONTRACT WORK X
ORDERED BY:
peo#-:
DESCRIPTION OF WORK:
Ore ill?' "-,, ~ c..... . ,
HOURS
Sidek. ) e:t" ,:1 .
- (. ~rrt
.1 Av-
WOR!( ORDEREi:> BY:
SIGNATUF-E:
I hereby acknowledge th atisfactory completion of the above described work.
....~ CUSTOM DRYWALL, If'.ie.
..... j LICENSE #2634-95
'1570 Gladding Court, MHpltas, CalIfornia 95035, 14QB) 263-1616
Gilroy Library
DEVCON CONSTRUCTION
1705
DESCRIPTION OF CHANGE:
Location of Change
Work Order Date
.COST PER OPENING
5/8" Type X
1" core board 2x12
6" 16GA flat strap backing
35/8 radius track 20 GA
1 518" track 20 GA
4" 20GA shaft J runner
2 1/2" stud 20 GA 8'
6" 20GA -slotted track
6" 20GA-18' studs
6" 209a track structural
2 1/2" Track 20 GA
Corner Bead
1-1/2 X 1-1/2 90 metal
RC-1 channel
Furring Channel
Z metal
Hot Mud
box of Mud
CRC 16ga
32' Scissor lift -
Sub-Total Cost for Material
Tax (cl! 8.25%
Cost of Material
Stocking of Material, Delivery
Labor
Layout
Foreman/supervision
Taping Labor
stocking by journeyman
Framing and Drywall Labor
Clean Up
Supervision
Man Lift
Dump Fees
Cost Per Location
Overhead and Profit
Overhead and Profit
Price per location
Total Material Cost
Total Labor Cost
Total Cost of Change
Furred east wall room 113 mens restroom. Add cost to furr easat wall room 113
(mens restroom) 7/8" to allow finishes to pass by the new roof dreain for 2nd
floor. Roof drain installed already before curbs were poured. Curbs poured in
wrong location!. reframed recessed light pocket to accomadate new furred wall
9/16/2011
Pieces Length Lineal or SF Labor Hours Cost per Ft. Cost Per Hour Cost per Unit
0 32 0 $0.280 $0.00
0 24 0 $0.510 $0.00
0 10 0 $0.833 $0.00
0 10 0 $2.900 $0.00
0 10 0 $0.440 $0.00
0 12 0 $0.893 $0.00
0 8 0 $0.318 $0.00
0 10 0 $1.304 $0.00
0 18 0 $0.521 $0.00
0 10 0 $0.511 $0.00
0 10 0 $0.308 $0.00
0 10 0 $0.270 $0.00
0 10 0 $0.000 $0.00
0 10 0 $0.420 $0.00
0 10 0 $0.420 $0.00
10 10 100 $0.464 $46.40
0 1 0 $8.750 $0.00
0 1 0 $8.250 $0.00
0 10 0 $0.400 $0.00
0 0 $450.000 $0.00
0 $46.40
8.250% $3.83
$50.23
100 $0.070 $7.00
0 $87.540 $0.00
1 $87.540 $87.54
0 $93.480 $0.00
0 $85.670 $0.00
5 $85.670 $428.35
0 $49.820 $0.00
0 $101.300 $0.00
0 $10.000 $0.00
0 $0.00
0
$573.12
Material 15.000% $8.58
labor 15.000% 577.38
$659.09
Number of locations 1
$57.23
$515.89
$659.09
1705
JOB WORK ORDER
CUSTOM DRYWALL, INC.
1570 GLADDING CT.
MILPITAS, CA 95035
(408)263-1616
(408)263-1142 Fax
ORDER DATE:
'G--/I
ORDERED BY:
JOB PHONE:
OVER TIME ON CONTRACf WORK
DOUBlE TIME ON CONTRACf WORK
EXTRA TO CONTRAcr WORK )(
HOURS
II - 2. - i.... ~ Y. C't I
.5 Ars
. \ ,
lot ~fVI<;IC
At'
WORK ORDERED BY:
( ~~~ Fr'C /A
bt'll fp ~~ A~ vi '1,./'"
isfactory completion of the above described work. U ~
;;Ii Ii
SIGNATURE:
I hereby acknowledge the s
1570 Gladding Court, Milpltas, Caliiornir; 95035, {408j 2.63-1616
Gilroy Library
DEVCON CONSTRUCTION
1706
DESCRJPTION OF CHANGE:
Location of Change
Work Order Date
COST PER OPENING
5/8" Type X .
1" core board 2x12
6" 16GA flat strap backing
35/8 radius track 20 GA
1 5/8" track 20 GA
4" 20GA shaft J runner
2 1/2" stud 20 GA 8'
6" 20GA -slotted tracl<
6" 20GA _18' studs
6" 20ga track structural
2 1/2" Track 20 GA
Corner Bead
1-1/2 X 1-1/2 90 metal
RC-1 channel
Furring Channel
Z metal
Hot Mud
box of Mud
CRC 16ga
32' Scissor lift -
Sub-Total Cost for Material
Tax @ 8.25%
Cost of Material
Stocking of Material, Delivery
Labor
Layout
Foreman/supervision
Taping Labor
stocking by journeyman
Framing and Drywall Labor
Clean Up
Supervision
Man Lift
Dump Fees
Cost Per Location
Overhead and Profit
Overhead and Profit
Price per location
Total Material Cost
Total Labor Cost
Total Cost of Change
South elevator line D.6-E columns 7-7.6 Low roof plan - add cost to re-rock
cering. Rock removed tdo provide access to wood strucurral beam for a hoist
beam to install elevator. Delay of elevator contractor to install elevator per
schedule
1706
JOB WORK ORDER
CUSTOM DRYWALL, INC.
1570 GLADDING CT.
MILPITAS, CA 95035
(408)263-1616
(408)263-1142 Fax
BILL TO:
ORDER DATE:
- /1-11
-,! \-~ t..(.J;"
ORDERED BY:
JOB PHONE:
OVER TIME ON CONTRACT WORK
DOUBLE TIME ON CONTRACT WORK
EXTRA TO CONTRACT WORK X
PCO#:
DESCRIPTION OF WORK:
I.
1-0 -
, if.; - E c..,(u..... )-). b
0-.
-, b c,-fall eli'Wl~"'r
MATERIAL
ere( <'S- ">
01' Ei~I.r.:I,,'r
HOURS
. AI'
~Ar
~
WORK ORDEREi:> BY:
r~
F~1: /e(
SIGNATUKE: 6,( /.f-t;: /f) j
I hereby acknowledge the sat' factory completion of the above described work. (/ ,,--- t7l. -r"""'"
#/1
')
J
I CUSiOM DRVWAlL. INt.
__ -.J
-/
LICENSE {t263495
Gilroy Library
DEVCON CONSTRUCTION
1570 Gladding Court, P,,1!!pitas. California 95035, (4081263.1516
DESCRIPTION OF CHANGE:
Location of Change
Work Order Date
COST PER OPENING
518" Type X
1" core board 2x10
6" 16GA flat strap backing
35/8 radius track 20 GA
4" shaft wall studs 10'
4" 20GA shaft J runner
2 1/2" stud 20 GA 8'
6" 20GA -slotted track
6" 20GA -18' studs
6" 20ga track structural
21/2" Track 20 GA
Corner Bead
1-1/2 X 1-1/2 90 metal
RC-1 channel
Furring Channel
Z metal
Hot Mud
box of Mud
CRC 16ga
32' Scissor lift -
Sub-Total Cost for Material
Tax @ 8.25%
Cost of Material
Stocking of Material, Delivery
Labor
Layout
Foreman/supervision
Taping Labor
stocking by journeyman
Framing and Drywall Labor
Clean Up
Supervision
Man Lift
Dump Fees
Cost Per Location
Overhead and Profit
Overhead and Profit
Price per location
Total Material Cost
Total labor Cost
Total Cost of Change
Pieces
3
4
o
o
4
4
o
o
o
o
o
o
o
o
o
o
o
o
o
o
Material
Labor
$183.18
$780.71
1707
Add cost to frame 8 Lf of 10' high shaftwall. (wall type 12) at west wall on low
roof mezzanine level within elev shaft. North and south wall shown on low roof
plan. West wall shown as wall type 9A but sits on a 12" concrete knee wall-
therefore leaving a approx 7" step in the plane of the wall on the interior side of
the elev shaft.
Length
32
20
10
10
10
12
8
10
18
10
10
10
10
10
10
10
1
1
10
10/11/2011
Lineal or SF Labor Hours
96
80
o
o
40
48
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
264
o
1
1
1
6
o
o
o
o
o
Cost per Ft.
$0.280
$0.510
$0.833
$2.900
$1.040
$0.893
$0.318
$1.304
$0.521
$0.511
$0.308
$0.270
$0.000
$0.420
$0.420
$0.464
$8.750
$8.250
$0.400
$450.000
8.250%
$0.070
15.000%
15.000%
Cost Per Hour
$87.540
$87.540
$93.480
$85.670
$85.670
$49.820
$101.300
$10.000
Number of locations
Cost per Unit
$26.88
$40.80
$0.00
$0.00
$41.60
$42.86
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$152.14
$12.55
$164.70
$18.48
$0.00
$87.54
$93.48
$85.67
$514.02
$0.00
$0.00
$0.00
$0.00
$963.89
$27.48
$117.11
$1,108.47
1
I $1,108.47 I
1707
JOB WORK ORDER
CUSTOM DRYWALL, INC.
1570 GLADDING CT.
MILPIT AS, CA 95035
(408)263-1616
(408)263-1142 Fax
BILL TO:
ORDER DATE:
'/ - /1-/1
i....) '..)
CJ
r I
'.- I.e/!. " "
ORDERED BY: /{A.
JOB PHONE:
OVER TIME ON CONTRACT' WORK
DOUBLE TIME ON CONTRACT WORK
EXTRA TO CONTRACT WORK
'/or" - c;:~/I:..
Il",~r
ec'l ,'0 i' ~
WORK ORDERED BY:
t) i""'''1' J.. .I! L p Fr C/o!.
/./ II j TrJ 4' {)yd-v--
e tisfact~ry completion of tIi bove described work. #:-/7
SIGNATURE:
I hereby acknow ledge
,'}
!
f CUSTOiv. DRYWALL, INC.
LICENSE #263495
1510 Gladding Court, Milpitas, Caliiornia 95035, {40BJ 263-1616
Gilroy Library
DEVCON CONSTRUCTION
1706
DESCRJPTlON OF CHANGE:
Location of Change
Work Order Date
COST PER OPENING
5/8" Type X
1" core board 2x12
6" 16GA flat strap bacl<ing
35/8 radius track 20 GA
1 5/8" track 20 GA
4" 20GA shaft J runner
21/2" stud 20 GA 8'
6" 20GA -slotted tracl<
6" 20GA -18' studs
6" 20ga tracl< structural
2 1/2" Track 20 GA
Corner Bead
1-1/2 X 1-1/2 90 metal
RC-1 channel
Furring Channel
Z metal
Hot Mud
box of Mud
CRC 16ga
32' Scissor lift -
Sub-Total Cost for Material
Tax @ 8.25%
Cost of Material
Stocking of Material, Delivery
labor
Layout
Foreman/supervision
Taping Labor
stocking by journeyman
Framing and Drywall Labor
Clean Up
Supervision
Man Lift
Dump Fees
Cost Per Location
Overhead and Profit
Overhead and Profit
Price per location
Total Material Cost
Total labor Cost
Total Cost of Change
South elevator line D.6-E columns 7-7.6 Low roof plan - add cost to re-rock
celing. Rock removed tdo provide access to wood strucurral beam for a hoist
beam to install elevator. Delay of elevator contractor to install elevator per
schedule
10/11/2011
Pieces Length Lineal or SF Labor Hours Cost per Ft. Cost Per Hour Cost per Unit
8 32 256 $0.280 $71.68
0 24 0 $0.510 $0.00
0 10 0 $0.833 $0.00
0 10 0 $2.900 $0.00
0 10 0 $0.440 $0.00
0 12 0 $0.893 $0.00
0 8 0 $0.318 $0.00
0 10 0 $1.304 $0.00
0 18 0 $0.521 $0.00
0 10 0 $0.511 $0.00
0 10 0 $0.308 $0.00
0 10 0 $0.270 $0.00
0 10 0 $0.000 $0.00
0 10 0 $0.420 $0.00
0 10 0 $0.420 $0.00
0 10 0 $0.464 $0.00
0 1 0 $8.750 $0.00
0 1 0 $8.250 $0.00
0 10 0 $0.400 $0.00
0 0 $450.000 $0.00
0 $71.68
8.250% $5.91
$77.59
256 $0.070 $17.92
0 $87.540 $0.00
1 $87.540 $87.54
2 $93.480 $186.96
0 $85.670 $0.00
3 $85.670 $257.01
0 $49.820 $0.00
0 $101.300 $0.00
0 $10.000 $0.00
0 $0.00
0
$627.02
Material 15.000% $14.33
Labor 15.000% $79.73
$721.08
Number of locations 1
$95.51
$531.51
$721.08
JOB WORK ORDER
CUSTOM DRYWALL. INC.
1570 GLADDING CT.
MILPITAS, CA 95035
(408)263-1616
(408)263-1142 Fax
BILL TO:
ORDER DATE:
- /1-1/
-.! ...' co J"
ORDERED BY:
OVER TIME ON CONTRACT WORK
DOUBLE TIME ON CONTRACT WORK
EXTRA TO CONTRACT WORK X
,JOB PHONE:
PCO#:
DESCRIPTION Of WORK:
I.
70 -
FWO#:
Sc;u iI,
OTHER REF #:
, ;(; -E c,.,{u....... )-). b
F; r: /e:(
SIGNATUKE: 6,(1 f-z,;;1') _J
I hereby acknowledge the sat' factory completion of the above described work. (/ r PI -r.............
#=/1
0.-
" b c,.fQ{{ e/i'vl'L~"'t' -/"t!,-
MATERIAL
WORK ORDEREi:> BY:
r .A..----'
1706
5~." .
Cl'Cl' es- . ">
01' /31... wi,,'r
HOURS
. 111' <:
~ ),r
~
')
!
! CUSTOM DRYWALL.Ir'K.
-.., LICENSE t;263<i95
Gilroy Library
DEVCON CONSTRUCTION
1570 G!<lddlng Court, f>.a1!plt<ls, CaHfornia S5035, (4081263.1516
DESCRIPTION OF CHANGE:
Location of Change
Work Order Date
COST PER OPENING
5/8" Type X
1" core board 2x10
6" 16GA flat strap backing
35/8 radius track 20 GA
4" shaft wall studs 10'
4" 20GA shaft J runner
2 1/2" stud 20 GA 8'
6" 20GA -slotted track
6" 20GA -18' studs
6" 20ga track structural
21/2" Track 20 GA
Corner Bead
1-1/2 X 1-1/2 90 metal
RC-1 channel
Furring Channel
Z metal
Hot Mud
box of Mud
CRe 16ga
32' Scissor lift -
Sub-Total Cost for Material
Tax @ 8.25%
Cost of Material
Stocking of Material. Delivery
Labor
Layout
Foreman/supervision
Taping Labor
stocking by journeyman
Framing and Drywall Labor
Clean Up
Supervision
Man Lift
Dump Fees
Cost Per Location
Overhead and Profit
Overhead and Profit
Price per location
Total Material Cost
Total labor Cost
Total Cost of Change
Pieces
3
4
o
o
4
4
o
o
o
o
o
o
o
o
o
o
o
o
o
o
Material
Labor
$183.18
$780.71
1707
Add cost to frame 8 Lf of 10' high shaftwall. (wall type 12) at west wall on low
roof mezzanine level within elev shaft. North and south wall shown on low roof
plan. West wall shown as wall type 9A but sits on a 12" concrete knee wall-
therefore leaving a approx 7" step in the plane of the wall on the interior side or
the elev shaft
Length
32
20
10
10
10
12
8
10
18
10
10
10
10
10
10
10
1
1
10
10/11/2011
Lineal or SF Labor Hours
96
80
o
o
40
48
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
264
Cost per Ft.
$0.280
$0.510
$0.833
$2.900
$1.040
$0.893
$0.318
$1.304
$0.521
$0.511
$0.308
$0.270
$0.000
$0.420
$0.420
$0.464
$8.750
$8.250
$0.400
$450.000
8.250%
$0.070
o
1
1
1
6
o
o
o
o
o
15.000%
15.000%
Cost Per Hour
$87.540
$87.540
$93.480
$85.670
$85.670
$49.820
$101.300
$10.000
Number of locations
Cost per Unit
$26.88
$40.80
$0.00
$0.00
$41.60
$42.86
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$152.14
$12.55
$164.70
$18.48
$0.00
$87.54
$93.48
$85.67
$514.02
$0.00
$0.00
$0.00
$0.00
$963.89
$27.48
$117.11
$1,108.47
1
I $1,108.47 I
1707
JOB WORK ORDER
CUSTOM DRYWALL, INC.
1570 GLADDING CT.
MILPITAS, CA 95035
(408)263-1616
(408)263-1142 Fax
ORDER DATE:
.) -/1-/1
ORDERED BY: .
fi.A
.rOB PHONE:
OVER TIME ON CONTRACT WORK
DOUBLE TIME ON CONTRACT WORK
EXTRA TO CONTRACT WORK
QTY.
,:-t" - c.'a~/I.:.
t'e'! .'0" ~
WORK ORDERED BY:
tJJ-'/ J...I/ L ? F,. c / d
f./ /1/ TO ., {!)yd-v--
bove described work. 1i-- ! 1
SIGNATURE:
I hereby acknow ledge
JOB WORK ORDER
CUSTOM DRYWALL, INC.
1570 GLADDING CT.
MILPITAS, CA 95035
(408)263-1616
(408)263-1142 Fax
BILL TO:
ORDER DATE:
'f? - ?-;;z.~11
e I..J ,~o:'l.
CO/1St:
ORDERED BY:
Jea
JOB PHONE:
OVER TIME ON CONTRACT WORK
DOUBLE TIME ON CONTRACT" WORK
EXTRA TO CONTRACT WORK
PCO#:
TYPE OF lABOR
WORK ORDEREb BY:
f:,
/ 7
/20fr1r~
'-- --.,
SIGNATUf,;E:
I hereby acknowledge the S tOry completion of the above described work.
-h tt' /10 tv w'? ') ,40 h . t ',-" S .4 /1
s v~j1'/...-k I ~b-( :7 4----c /. ;Z::;'c ~I op-rl--rr-
.L1d /!t.,;.J /,,!:.,,- #tl~i
1.712
Or:..(;(~""f S'.:- 11:
x
HOURS
/0 lLV" .
A,..,S
I
i3
;-4 ;' I
k
",}
JY CUSTOM DRYWALL. !NC.
LICENSE !:263495
\
1570 Gledding Court, Miipitas, California 95Q35, (408i 263-1616
DEVCON CONSTRUCTION
1712
Gilroy Library
DESCRIPTION OF CHANGE:
location of Change
North Elevator 1st and 2nd floor - reframed north and south walls of north
elevator (wall tupe 12) for stuctural steel to be installed
Work Order Date
COST PER OPENING
5/8" Type X
1" core board 2x12
1/4" Type X
1 5/8" metal studs 20 GA
1 5/8" track 20 GA
4" 20GA shaft J runner
2 1/2" stud 20 GA
2 1/2" Track 20 GA
Corner Bead
1-112 X 1-1/2 90 metal
RC-1 channel
Furring Channel
Z metal
Hot Mud
box of Mud
Box liquid nails
sand block
sand paper
roll of plastic
box of respirators
Shot and Pins X-C32M x 1 114"
Shot and Pins c20M x 3/4
CRC 16ga
Screws, hot mud & Misc.
Sub-Total Cost for Material
Tax@8.25%
Cost of Material
Stocking of Material, Delivery
labor
Layout
Foreman/supervision
Taping Labor
Framing and Drywall Labor
Clean Up
Supervision
Man Lift
Dump Fees
Cost Per Location
Overhead and Profit
Overhead and Profit
Price per location
Total Material Cost
Total labor Cost
lotal Costaf Change
JOB WORK ORDER
CUSTOM DRYWALL, INC.
1570 GLADDING CT.
MILPITAS. CA 95035
(408)263-1616
(408)263-1142 Fax
BILL TO:
()~VCJ"
ORDER DATE:
fI-~ 3--1/
ORDERED BY:
!Co.
JOB PHONE:
OVER TIME ON CONTRACf WORK
DOUBLE TIME ON CONTRACT WORK
EXTRA TO CONTRACT WORK
171.3
);J-(.l-.C".... ~ j,
x
TYPE OF LABOR
WORK ORDERED BY:
;t. t) I'1't I ~
""
SIGNATURE:
I hereby acknowledge the s isfactory completion of the above described work.
;0" A..c // (1.--/ V"
1 J, jJ cI ;/"tI c.V I ~"'j ~
l.../;~ ,
I-SO 5 v-r:/r
,;:-.
..
.........~ .>
/v"1
HOURS
It,-s
"1.
/ f .> v-c....
LfCENSE fi26-3495
1570 Gfadding Court, fI!Hipitas, California 95035, [<lOg} 263-1616
DEVCON CONSTRUCTION
1713
Gilroy Library
Window 121 1st and 2nd floor at line 4. Add framing in alignment with structural
steel window support to match. North and south elevator to match west Elev Ext at
DESCRIPTION OF CHANGE: header ht. no structural street use metal studs to create header.
location of Change
Work Order Date 8/22/2011
COST PER OPENING Pieces Length Lineal or SF Labor Hours Cost per Ft. Cost Per Hour Cost per Unit
5/8" Type X 0 32 0 $0.280 $0.00
1" core board 2x12 0 24 0 $0.00
1/4" Type X 0 32 0 $0.280 $0.00
1 5/8" metal studs 20 GA 0 12 0 $0.460 $0.00
1 5/8" track 20 GA 0 10 0 $0.440 $0.00
4" 20GA shaft J runner 0 12 0 $0.00
21/2" stud 20 GA 0 10 0 $0.510 $0.00
6" 16GA - track 4 10 40 $1.244 $49.76
6" 16ga 8' studs 2 8 16 $1.345 $21.52
2112" Track 20 GA 0 10 0 $0.490 $0.00
Corner Bead 0 9 0 $0.270 $0.00
1-1/2 X 1-1/2 90 metal 0 10 0 $0.430 $0.00
RC-1 channel 0 10 0 $0.420 $0.00
Furring Channel 0 10 0 $0.420 $0.00
Z metal 0 10 0 $0.420 $0.00
Hot Mud 0 1 0 $8.750 $0.00
box of Mud 0 1 0 $8.250 $0.00
CRC 16ga 0 10 0 $0.400 $0.00
Screws, hot mud & Misc. 0 0 $0.00
Sub-Total Cost for Material 0 $71.28
Tax @ 8.25% 8.250% $5.88
Cost of Material $77.16
Stocking of Material, Delivery 56 $0.070 $3.92
Labor
Layout 0 $87.540 $0.00
Foremanlsupervision 1 $87.540 $87.54
Taping Labor 0 $93.480 $0.00
Framing and Drywall Labor 7 $85.670 $599.69
Clean Up 0 $49.820 $0.00
Supervision 0 $101.300 $0.00
Man Lift 0 $10.000 $0.00
Dump Fees $0.00
Cost Per Location $768.31
Overhead and Profit Material 15.000% $12.16
Overhead and Profit labor 15.000% $103.08
Price per location $883.56
Number of locations 1
Total Material Cost $81.08
Total labor Cost $687.23
Total Cost of Change $883.56
.....---
1714 --
JOB WORK ORDER
CUSTOM DRYWALL, INC.
1570 GLADDING CT.
MILPITAS, CA 95035
(408 )263-1616
(408)263-1142 Fax
BILL TO:
ORDER DATE:
-e i) CO!'1
CO I<$.' '
ORDERED BY:
/J.t'VCi."" 5';., ~
JOB NAME/LOCATION:
G. "0 1-.. ihn:li"1.r
JOB PHONE:
OVER TIME ON CONTRACT WORK
DOUBlE TIME ON CONTRACT WORK
EXTRA TO CONTRACT WORK A::
~
TYPE OF LABOR
HOURS
I~
/;.;u
-=
/'
Itr~
WORK ORDEREL> BY:
~ 1'k4-A k r;::
. S~l!",v'~i~"rl..l (..'t.."-~;~~ ,;'''''...., ..i.;.
p.1-t..- .- V"- j;'\~ -/I4o..htl.''Z'"I-b"
:;lShrs/
SIGNATUKE:
I hereby acknowledge the sa Isfactory completion of the above described work.
~'t:A 4 p.-( I- ~i F: c) J~ f ~< >
/,'C-/ C i-I; j'...., y,-r- C-~
~ -'1 '"'t
1~'l!ff'JE&it )
!',:":_-,t.i!::'if t
(&.;"7.f;".'{,.~./!j! CUSTOM DRYWALL INC.
C .. . ...... / LICENSE #263495
1570 Gladding Court, Miipitas, California 9SG35, (408] 263-1616
DEVCON CONSTRUCTION
1714
Gilroy Library