HomeMy WebLinkAboutDevcon Construction - Library Construction - Change Order No. 19 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0451; Fax (408) 846-0429 CHANGE ORDER NO. 19 To contract for: New Public Library Contractor: Devcon Construction Contract Date: 6/15/20 I 0 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work This Change Order provides for the following: 6" base in lieu of the 4" orie:it'lallv specified - open areas on Iv 35 Carpet Tile $7,819.00 Floor Connection: 6" base in lieu of the 4" originally specified $7,819.00 Subtotal 69 Fee Total 71 Amount applied to Contingency 72 Amount applied to OT Allowance Net change order amount 10.00% $7,819.00 $782.00 $8,601.00 $0.00 $0.00 $8,601.00 / All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. /JI?J/IJJAJ {j)/1151 " nCONTRACTOR By lJ, kk~ / NL Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost Percentage Initial $18,177,226.00 $877,953.00 4.83% $19,055,179.00 $8,601.00 $886,554.00 4.88% $19,063,780.00 I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $8,601.00 Date: 2-JzJ IL- I I RECOMMENDED BY: ACCEPTED BY: ~~ CPR 138 Project: Gilroy Community Library Devcon Job #: 10-296 Date: 1/18/2012 We submit for your approval the following estimate of changes in work: 6" base in lieu of the 4" originally specified - Open areas only $7,819.00 35 Carpet Tile , Floor Connection: 6" base in lieu of the 4" originally specified Subtotal 69 Fee Total 71 Amount applied to Contingency 72 Amount applied to OT Allowance Net change order amount $7,819.00 10.00% D We have proceeded with this change per the direction of: D We will not proceed with this change until receipt of a signed copy of this proposal. D This proposal must be accepted by: xx/xx/xx in order to avoid additional extension or expense. D These changes will add approximately xx working days to the completion date. , $7,819.00 $782.00 $8,601.00 $0.00 $0.00 $8,601.00 Submitted by: Date: Devcon -Bob Roseberry Approved by: Date: Owner's Representative: James Kuhn, Nova Partners Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942-8200 F. (408)262-2342 Lic. #399163 FLOOR ~ CONNECTION Change Order Proposal License # 665417 141 Brisco Road, Arroyo Grande, CA 93420 Phone (805) 481-2761 Fax (805) 481-2753 To: Devcon Construction Attn: Bob Roseberry Job Name: Gilroy Public Library Date: 1/11/12 CO#: 04 Proposed Change Order Description: Furnish and Install Johnsonite 6" Reveal Millworks Base Color #68 White Sand in lieu of Johnsonite 3.5" Outline Mil/works Base. No credit given for Johnsonite 3.5" due to it being a non returnable item. ADD $7819.00 Addenda as noted: Per Public Contract Code Section 4107.2 all carpet will be subcontracted to one or more of the following licensed and insured subcontractors: R. Haas Carpets (716936), J.W. Flooring (641283), Quaresma Flooring (830806), Devan Elliot Floor Covering (921593), Termeer's Floorcovering (843544), Central Coast Floors (940020), K.D. Flooring (882398), Wooten Flooring (714521), Tony Stuart Floors (956876), or Unltex Flooring of CA (664497). CONTRACTOR AUTHORIZATION: Acceptance of Change Order Proposal: The above process, specifications, and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Date of Acceptance Authorized Signature I FOR OFFICE USE ONLY: lI) '<t O'l rl 0 O'l '<t m O'l n"l rO Lfi ai ai ai (01 m \D O'l rl rl ....r-- r--oce ~ l.O \D~ rl~ r--~ V) V} V} V} V} -.... - o l'll'- l'll ....-.... 1 ~ 0 E 0 ~ lI) I- Q. l- .- ~ ..a....co (0 OJ ::s co,", ._ ..t VI ~ Q) .... V} l'll ~ lI) rl n"ll"- ID X\Lfi ~ - l'll I"- l'll I- o::t VI V} V} On"l -\DI"- l'll . . .... m 0 _ .s~\D - ..a ~ o ::s \D ._ VI ..... V} V} ::J '<tm .~ ~ ~ ..... ~ ~I m 0 <n c 0 \D ..c :) v ::J V} V} ~ ....1... 0 <n 'c lij ~ rl "' ::) ::s rl CQ U') ~ I.. o III S VI G.l ro > c::l .- _ VI VI - Iii 7ii G.l .- -- ClJ .c: :E .... > "0 2 G.l <C l'll a:: 0 ... ~ = \.0 """o,lI \D O'l O G.l G.l .... .... # 'c'c o 0 O VI VI c: c: U ~ ~ o 0 ..... .....