HomeMy WebLinkAboutDevcon Construction - Library Construction - Change Order No. 20
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0451; Fax (408) 846-0429
CHANGE ORDER NO. 20
To contract for: New Public Library
Contractor:
Devcon Construction
Contract Date:
6/15/2010
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work This Change Order provides for the following:
Modifv wood panels to fit field conditions
18 Architectural Woodwork
AmberWood Installation FO 31: Modify Column
Cladding Panels
AmberWood Installation: Machining for library stack
end panels
$18,019.00
$11,812.00
$6,207.00
$18,019.00
$1.802.00
$19,821.00
$0.00
$0.00
$19,821.00
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to OT Allowance
Net change order amount
10.00%
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss
of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives
any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with
the Extra Work.
/NC
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total ChaIlge Orders to Date
Revised Contract Price
Cost Percentage Initial
$18,177,226.00
$886,554.00 4.88%
$19,063,780.00
$19,821.00
$906,375.00 4.99%
$19,083,601.00
I (W e) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $19,821.00
By:
Date:
2/2 JIl-
l I
RECOMMENDED BY:
ACCEPTED BY:
ta:-
Date
'7(1 ~2-
Date I
I::EL'"~
CPR 139
Project: Gilroy Community Library
Devcon Job #: 10-296
Date: 1/24/2012
We submit for your approval the following estimate of changes in work:
Modify wood panels to fit field conditions
$18,019.00
18 Architectural Woodwork
AmberWood Installation FO 31: Modify Column
Cladding Panels
AmberWood Installation: Machining for library stack
end panels
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to OT Allowance
Net change order amount
$11,812.00
$6,207.00
10.00%
D We have proceeded with this change per the direction of:
D We will not proceed with this change until receipt of a signed copy of this proposal.
D This proposal must be accepted by: xx/xx/xx in order to avoid additional extension or expense.
D These changes will add approximately xx working days to the completion date.
$18,019.00
$1,802.00
$19,821.00
$0.00
$0.00
$19,821.00
Submitted by:
Date:
Devcon -Bob Roseberry
Approved by:
Date:
Owner's Representative: James Kuhn, Nova Partners
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942-8200 F. (408)262-2342 Lic. #399163
~... NI\\\\\'I\\""
.....~ INSTALLATION
ARCHITECTURAL MILL & CASEWORK
1555 S. 7th St, B/dg 7F
San Jose, C4 95112
408-938-1600
408-938-1345
REQUEST FOR CHANGE ORDER # 10
To:
Company:
Bob Roseberry From: Andrew Ackerson & Thomas Mueller
Devcon Construction Phone: (408) 938 - 1600
690 Gibraltar Dr. Fax: (408) 938 - 1345
Milpitas, CA 95035 Email:
408-519-8376 Date: 1-24-12
408-262-2342 Pages: 2
Gilroy Library Project No. 1052
RFCO Total: $6,207
Phone :
Office Fax:
Project:
Reference: Requested per site conditions (Stack Racks by others)
Qualifications: Added Machining to library rack end panels to accept metal bolts
head located at the base of each rack unit. This detail was not
shown on the bid docs. This issue was discovered during a site
evaluation as the rack unit installation started.
Approved By:
Date:
Respectfully Submitted,
Project Team:
Andrew Ackerson & Thomas Mueller
RFCO PRICING IS GOOD FOR 30 DAYS. APPROVALS RECEIVED 30 DAYS AFTER ISSUANCE ARE SUBJECT
TO PRICE CHANGE
Medical
Corporate
Retail
Banking
Educational
Restaurants
1 of 1
AMBERWOOD INSTAllATION
DATE:
JOB#:
CUSTOMER:
CONTACT:
PROJECT:
ADDRESS:
RFCO:
REFERENCE:
1-24-12
1052
Devcon Construction
Bob Roseberry
Gilroy Library
o
10
Owner Request
PRICING BACK-UP
QTY labor Description TOTAL
Shop labor
$68 per HR 79.20 Shop Labor $5,397
Labor Overhead & profit 15% $810
Material List
0.00 Finish Materials $0
0.00 Misc / Plywood / Plam $0
Material Raw Cost $0
Material Tax 9.25% $0
Mat Overhead & profit 15% $0
Subcontractor
$80.82 per HR 0.00 Installation Carpenter $0
$85.86 per HR 0.00 Installation Foreman $0
TBD Material: adhesive & hardware $0
Sub Overhead & profit 10% $0
TOTAL $6,207
1555 South 7th Street San Jose, CA
Phone (408) 938-1600 FAX (408) 938-1345
JOB NAME:'
DRAWING TITLE: END PANEL
OJ
-0
o
'"
:>
-q
VI
Ol
C
.~
o
0.
o
..c
V1
,./
C
ro
'- .
..0
:..:i
>.
o
.....
19
N
L.f)
o
.--l
,./
VI
..0
o
.....,
,./
N
I
co
.--l
o
ro
'i::
(]J
0.
>-I
-0
(]J
u
c
ro
.."
Jl
VI
(]J
CIJ
E
ro
.....
LL
,./
~
DRAWING BY: VI
REL. RockPon_2nd
GILROY COMMUNITY LIBRARY JOB #: 1052 DATE: 1/19/12
MATERIAL: Quarter-Unfigured Eucalyptus Veneer, (FSC Cert)-Match
Book matched, Center balanced
Stained to Match Approved Sample
Log #4990
TYPE A
1241/8"1
7 3/4" +---t- 1/2" I
VENEER
EDGEBAND ----
1/2" MTL-1
REVEAL
1/2" l
+=
6 1/8"
+-
r241/8'i
VENEER
EDGEBAND
VENEER
EDGEBAND
I 21
VENEER
EDGEBAND
1
1
901/8"
90 1/8"
OUTSIDE FACE
LABEL AS 1052 LIB RACK PANEL 2-nd floor
~6f4 ~ ~-r
~~~ eNb
~L-
~
~.
if
~... .\\\\\'1"""
......-./NSTAllATION
ARCHITECTURAL MILL .& CASEWORK
1555 S. 7th St, B/dg 7F
SanJose, CA 95112
408-938-1600
408-938-1345
REQUEST FOR CHANGE ORDER # 11
To:
Company:
Bob Roseberry From: Andrew Ackerson & Thomas Mueller
Devcon Construction Phone: (408) 938 - 1600
690 Gibraltar Dr. Fax: (408) 938 - 1345
Milpitas, CA 95035 Email:
408-519-8376 Date: 1-24-12
408-262-2342 Pages: 2
Phone :
Office Fax:
Project:
Gilroy Library
Project No.
1052
RFCO Total:
$11,812
Reference: Owner Request (Per Field Order #31)
Qualifications: Revise five (5) columns on 2nd floor (C Line) to incorporate new
design. See attached sketch for details on how Amberwood
priced this. Please note these columns have already been
fabricated and ready to ship.
Approved By:
Date:
Respectfully Submitted,
Project Team:
Andrew Ackerson & Thomas Mueller
RFCO PRICING IS GOOD FOR 30 DAYS. APPROVALS RECEIVED 30 DAYS AFTER ISSUANCE ARE SUBJECT
TO PRICE CHANGE
Medical
Corporate
Retail
Banking
Educational
Restaurants
1 "f 1
AMBERWOOD INSTALLATION
DATE:
JOB#:
CUSTOMER:
CONTACT:
PROJECT:
ADDRESS:
RFCO:
REFERENCE:
1-24-12
1052
Devcon Construction
Bob Roseberry
Gilroy Library
o
11
Owner Request
PRICING BACK-UP
QTY Labor Description TOTAL
Shop Labor
$68 per HR 40.0 Shop Labor $2,726
Labor Overhead & profit 15% $409
Material List
1.0 Hardwood Lumber Cap 1 Trim $2,500
0.0 Misc 1 Plywood 1 Plam $0
Material Tax 8.25% $206
Mat Overhead & profit 15% $406
Su bcontractor
$80.82 per HR 30.0 Installation Carpenter $2,425
$85.86 per HR 30.0 Installation Foreman $2,576
TBD Material: adhesive & hardware $200
Sub Overhead & profit 10% $364
TOTAL $11,812
1555 South 7th Street San Jose, CA
Phone (408) 938-1600 FAX (408) 938-1345
Project Name: Gilroy Public Library
Project No: 010-CDD-173
FIELD ORDER
City Of Gilroy 1117/2012
7387 Rosanna Street
Gilroy, CA 95020
FIELD ORDER NO. 31
Project Name:
Contract Date:
To Contractor:
Address:
Gilroy Public Library
07/26/2010
Devcon Construction Incorporated
690 Gibraltar Drive
Milpitas, CA 95035
DESCRIPTION OF WORK:
Please change the wood cladding at the columns on GL C from fully clad to partially clad on tbe second floor per
Field Memo dated 1117/2012.
Estimated Adjustment
of Contract Sum: TBD
Estimated Adjustment
of Contract Time: (j
/
f^~
hI h~
James Kuhn / PM
(Name of Construction Manager/Title - ~ printed)
Sf r/? ~
By: },IV tV t--
(Signature)
Date: 1/17/2012
(Name of Contractor Representative/Title - typed or printed)
(Signature)
Date:
Note: This Field Order will be superseded by an allowance adjustment or a Change Order that will include the
scope of the change in the Work and any actual adjustments of the Contract Sum.
Attachment: Field Memo 1/17//2
~,\\
ff bt/) !ll8iJl 0 __( j; -;/'2-
~ IlII '-
-I
00
5oUo --:>
-rP--t Iw'\
~
C~~
~ J~
~ ~-)
j
/tDI>eX> ~ f2- -
FAJt- CAP
<f~ ~ l
~5
i
'1't;' :I:-
{?aJSI{j {flO/Jl!1..( CUf;IJ!J(;A:; y f
.
3 5;06 {! f3-z;( ~p 11-~--