HomeMy WebLinkAboutDevcon Construction - Library Construction - Change Order No. 21
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0451; Fax (408) 846-0429
CHANGE ORDER NO. 21
To contract for: New Public Library
Contractor:
Devcon Construction
Contract Date:
6/15/2010
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work:
Description of Work This Change Order provides for the following:
Additional shelvin~ reauired for access clearance
46 Library Stack System
Systems & Space COR 2: Additional shelving to ensure
code compliant aisleways
$22,322.00
$22,322.00
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to aT Allowance
Net change order amount
10.00%
$22,322.00
$2.232.00
$24,554.00
$0.00
$0.00
$24,554.00
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss
of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives
any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with
the Extra Work.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $24,554.00
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost Percentage Initial
$18,177,226.00
$906,375.00 4.99%
$19,083,601.00
$24,554.00
$930,929.00 5.12%
$19,108,155.00
Date: 2/ z J / 2..
( {
Co
I "2-
RECOMMENDED BY:
ACCEPTED BY:
CPR 137
I:::EL'"~
Project: Gilroy Community Library
Devcon Job #: 10-296
Date: 1/27/2012
We submit for your approval the following estimate of changes in work:
Additional shelving required for access clearance
$22,322.00
46 Library Stack System
Systems & Space COR 2: Additional shelving to ensure
code compliant aisleways
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to aT Allowance
Net change order amount
$22,322.00
10.00%
D We have proceeded with this change per the direction of:
D We will not proceed with this change until receipt of a signed copy of this proposal.
D This proposal must be accepted by: xx/xx/xx in order to avoid additional extension or expense.
D These changes will add approximately xx working days to the completion date.
$22,322.00
$2,232.00
$24,554.00
$0.00
$0.00
$24,554.00
Submitted by:
Date:
Devcon -Bob Roseberry
Approved by:
Date:
Owner's Representative: James Kuhn, Nova Partners
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942-8200 F. (408)262-2342 Lic. #399163
..I.iii ( ( I
',.. ) )
Partners in Progressive
storage Solutions
Systems & SDace. Inc. 925.426.1955
500 Boulder Court, Suite B 925.426.0882 FAX
Pleasanton, CA 94566 www.systemsnspace.com
License # 599899
SENT TO:
Devcon Construction
Re: Gilroy Public Library, 11512 Library Stack Systems
ATTN: John Dunn & Bob Roseberry
7387 Rosanna Street,
Gilroy, CA 95020
PHONE: (408) 942-8200
DATE: 1/27/12
We are hereby transmitting 2 Dages:
Certified
Remarks: The following pricing reflects changes to shelving sections (regular and raceway frames and shelves) to 30", changes from
dual-sided to singled-sided sections, changes to base shelves. See attached red bubbled areas and notes associated with pricing.
Lead time is 8 weeks.
Qty Part no Description Unit Cost Ext Cost 15% Sale Price
Section C31
2 CSBG-11 L Cant. - Base,Gusset,Single $67.13 $134.25 $20.14 $154.39
CSBG-11R Cant. - Base,Gusset,Single $67.13 $67.13 $10.07 $77.19
3 CCTS-3611 CANT. - CANOPY TOP,SINGLE $48.75 $146.25 $21.94 $168.19
Section C32, Alternative 1
7 CWF3-9030 Cant. Welded Frame w/3 Sprd $181.00 $1,267.00 $190.05 $1,457.05
10 CBSF-30 Cant. - Base Shelf Filler $12.94 $129.38 $19.41 $148.78
20 CBSP-3011 CANT. - BASE SHELF,PLAIN $24.75 $495.00 $74.25 $569.25
10 CCTD-3011 CANOPY TOP - DOUBLE $83.25 $832.50 $124.88 $957.38
120 CSP-3011 SHELF-PLAIN ADJ CANT 53136.15 $22.50 $2,700.00 $405.00 $3,105.00
3 XCWF39030RW4 Raceway Frame $209.00 $627.00 $94.05 $721.05
Section C33, Alternative 2
CWF3-9030 Cant. Welded Frame w/3 Sprd $181.00 $181.00 $27.15 $208.15
2 CBSPB-3012 Cant. Base Shelf, Plain $37.88 $75.75 $11.36 $87.11
CBSF-30 Cant. - Base Shelf Filler $12.94 $12.94 $1.94 $14.88
CCTDB-3012 Canopy Top - Double $105.00 $105.00 $15.75 $120.75
12 CSP-3011 SHELF-PLAIN ADJ CANT 53136.15 $22.50 $270.00 $40.50 $310.50
Section C35, Alternative 1
24 CBSSB-3611 Cant. Base Shelf - Slotted $51.38 $1,233.00 $184.95 $1,417.95
96 CFD-11 Cant. - File Divider $2.74 $262.80 $39.42 $302.22
Section C36, Alternative 2
2 CWF3-6630 Cant. Welded Frame w(3 Sprd $181.00 $362.00 $54.30 $416.30
11 CBSPB-3611 Cant. Base Shelf, Plain $34.88 $383.63 $57.54 $441.17
1
2 CBSF-30 Cant. - Base Shelf Filler $12.94 $25.88 $3.88 $29.76
4 CAT ASB-3006 Cantilever- Audio Tape $50.25 $201.00 $30.15 $231.15
34 CAT ASB-3606 Cantilever- Audio Tape $50.25 $1,708.50 $256.28 $1,964.78
4 CBSP-3011 CANT. - BASE SHELF,PLAIN $24.75 $99.00 $14.85 $113.85
2 CCTD-3011 CANOPY TOP - DOUBLE $83.25 $166.50 $24.98 $191.48
-4 40630.01 bracket $4.05 -$16.20 -$2.43 -$18.63
-4 40630.02 bracket $4.05 -$16.20 -$2.43 -$18.63
Section C37, Alternative 1
CWF3-9030 Cant. Welded Frame w/3 Sprd $181.00 $181.00 $27.15 $208.15
CBSF-30 Cant. - Base Shelf Filler $12.94 $12.94 $1.94 $14.88
2 CBSP-3011 CANT. - BASE SHELF,PLAIN $24.75 $49.50 $7.43 $56.93
CCTD-3011 CANOPY TOP - DOUBLE $83.25 $83.25 $12.49 $95.74
12 CSP-3011 SHELF-PLAIN ADJ CANT 53136.15 $22.50 $270.00 $40.50 $310.50
Section C46, Alternative 2
14 CBSPB-3612 Cant. Base Shelf, Plain $37.88 $530.25 $79.54 $609.79
Section C47
CBSPB-3612 Cant. Base Shelf, Plain $37.88 $37.88 $5.68 $43.56
Section Misc (C36), Alternative 1
29 CEB-11 L CANT. - END BRACKET $5.33 $154.43 $23.16 $177.59
29 CEB-11 R CANT. - END BRACKET $5.33 $154.43 $23.16 $177.59
Materials $12,926.75 $1,939.01 $14,865.76
Tax (8.25%) $1,226.43
Freight $1,375.00
Administration $1,875.00
Union Labor $2,600.00 $390.00 $2,990.00
Total $22,332.19
SIGNED
Leilani Ruiz
Senior Planner
(925) 426-1955 Ext.229
925-426-0882 fax
lei Ian i@svstemsnsDace.com
2