HomeMy WebLinkAboutDevcon Construction - Library Construction - Change Order No. 22City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0451; Fax (408) 846 -0429 CHANGE ORDER NO. 22 To contract for : New Gilroy Library Project, Phase 2 Contractor: Devcon Construction Contract Date: 6/15/2010 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work This Change Order provides for the following: Demolition of Paseo area per preliminary plans by Hanna - Brunetti 4 Piped Utilities Robinson & Moretti, Inc: Demolition of Paseo area per preliminary plans by Hanna - Brunetti Subtotal 69 Fee $50,000.00 $50,000.00 �i5u,uuu.uu 10.00% $5,000.00 Total $55,000.00 71 Amount applied to Contingency $0.00 72 Amount applied to OT Allowance $0.00 Net change order amount $55,000.00 These changes will add approximately 10 working days to the completion date. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $55,000.00 C TRACTOR Glr By: �,:u Date: /L f v Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost Percentage Initial $18,177,226.00 $930,929.00 5.12% hh- $19,108,155.00 $55,000.00 $985,929.00 5.42% 04- $19,163,155.00 RECOMMENDED BY: ACCEPTED BY: City 46min / f/� Date G Date // (� / / Z- Project Engineer`/ I Date CPR 145 Project: Gilroy Community Library Devcon Job #: 10 -296 Date: 2/9/2012 We submit for your approval the following estimate of changes in work: Demolition of Paseo area per preliminary plans by Hanna - Brunetti 4 Piped Utilities Robinson & Moretti, Inc: Demolition of Paseo area per preliminary plans by Hanna - Brunetti Subtotal 69 Fee Total 71 Amount applied to Contingency 72 Amount applied to OT Allowance Net change order amount $50,000.00 $50,000.00 $50,000.00 10.00% $5,000.00 $55,000.00 $0.00 $0.00 $55,000.00 ❑ We have proceeded with this change per the direction of: • We will not proceed with this change until r eipt of a signed copy of this proposal. • This proposal must be accepted by: xx/ xx in order to avoid additional extension or expense. x These changes will add approximate 10 working days to the completion date. Submitted by: Approved by: -Bob Roseberry mes Kuhn, Nova Partners Date: Date: Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163 Robinson & Moretti, Inc. * A Land Improvement Contractor 7780 Holsclaw Road Gilroy, California 95020 Phone No. (408) 842 -5593 Fax No. (408) 842 -7763 Owner/ Contractor: Devcon Attn: Bob Roseberry POJECT NAME: LIBRARY PLAZA DEMO DATE: 2/8/ 2012 DEMO IMPROVEMENTS: $50,000.00 - DEMO PER PRELIMINARY PLANS BY HANNA - BRUNETTI PROJECT TOTAL: $50,000.0 PROJECT EXCL USIONS. contaminated soil export, permits, encroachment permits, submittals, grinding by others, overlay by others, slurry seal by others "DUE TO VOLATILITY OF LIQUID ASPHALT AND NATURAL GAS PRICING, THE HOT MIX ASPHALT PRICE QUOTED WILL BE IN EFFECT FOR ASPHALT PURCHASED WITHIN 30 DAYS AFTER THIS QUOTATION. AFTER THAT TIME THE HOT MIX ASPHALT PRICE WILL BE ADJUSTED IN RELATION TO ANY MATERIAL CHANGE IN THE MARKET PRICE OF LIQUID ASPHALTAND NATURAL GAS AND THAT COST WILL BE PASSED ON TO CONTRACTOR $xxx /ton." Excludes: soils testing, staking, & permits. Fees or expenses related to additional insurance requirements; such as waiver ofsubrogation, wrap insurance program or additional certificates. WE PROPOSE to furnish labor and material -- complete in accordance with above specifications, and subject to conditions found on this agreement, for the sum of :_ dollars (US $) Net 30 -days Terms of payment: days ACCEPTED. The above prices, specifications and conditions are satisfactory Respectfully Submitted, and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Robinson & Moretti Inc., License No. 418843A Date of Acceptance By: /S/ Rich Robinson/ Alex Mango, P.E. By Note: We may withdraw this proposal if not accepted within 30 days.