HomeMy WebLinkAboutDevcon Construction - Library Construction - Change Order No. 23City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0451; Fax (408) 846 -0429 CHANGE ORDER NO. 23 To contract for : New Gilroy Library Project, Phase 2 Contractor: Devcon Construction Contract Date: 6/15/2010 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Descrintion of Work This Change Order provides for the following: Additional Landscaping for the Gilroy Paseo 11 Planting Work Ccllishaw Construction the Gilroy Faseo Subtotal 69 Fee Inc. - Additional Landscaping for 353.500.00 Total 71 Amount applied to Contingency 72 Amount applied to OT Allowance Net change order amount $53,500.00 $53,500.00 10.00 °Va $5,350.00 $58,850.00 $0.00 $0.00 $58,850.00 ❑ We have proceeded with this change per the direction of: ❑ We will no: proceed wth this change until receipt of a signed copy of this proposal. ❑ This proposal must be accepted by: xxfxxlxx in order to avoid additional extension or expense. x These changes wi'I add approximately 1S working days to the completion date. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $58,850.00 B C T "R By: `?� � G,, r � Date: ? C Zr a Cost Percentage Initial Original Contract Price $18,177,226.00 Previous Change Orders $985,929.00 5.42% Total to Date $19,163,155.00 This Change Order $58,850.00 Total Change Orders to Date $1,044,779.00 5.75% Revised Contract Price $19,222,005.00 RECOMMENDED BY: ACCEPTED BY: City City Project Engineer 3� Date �Z CPR 152 Project: Gilroy Community Library Devcon Job #: 10 -296 Date: 3/5/2012 We submit for your approval the following estimate of changes in work: Additional Landscaping for the Gilroy Paseo 11 Planting Work $53,500.00 Collishaw Construction, Inc : Additional Landscaping for $53,500.00 the Gilroy Pasec Subtotal $53,500.00 69 Fee 10.00 %0 $5,350.00 Total $58,850.00 71 Amount applied to Contingency $0.00 72 Amount applied to OT Allowance $0.00 Net change order amount $58,850.00 ❑ We have proceeded with this change per the direction of: ❑ We will not proceed with this change until receipt of a signed copy of this proposal. ❑ This proposal must be accepted by: xxlxx/xx in order to avoid additional extension or expense. x These changes will add approximately 15 working days to the completion date. Submitted by: Date: Devcon -Bob Roseberry Approved by: C Date: 0"74S Representative: James Kuhn, Nova Partners Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163 OLLISHAW ONSTRUCTION, Inc. Site Development March 5, 2012 ATTN: BOB ROSEBERRY RE: GILROY LIBRARY Gilroy plaza Landscape and Irrigation Dear Mr. Roseberry, Our pricing for the above mentioned project is as follows: Landscaping $ 39,500 Including: I EA — 84" Box Quercas Agrifolia w/ install I EA— 48" Box Quercas Agrifolia w/ install 3 EA —48" Box Acer Rubru►n w/ install/ (sub for 36 ", not avail at this time) 100 EA — 5 gal shrubs w/ plant tabs and install 261 EA — i gal shnibs w/ plant tabs and install 9200 SF— Sod 22 CY — 3" of specified mulch 11,500 SF --- Soil prep, amendments, fertilizers and finish grading 90 DAYS — Maintenance Irrigation $ 14,000 Including: 17, EA — Rainbird 1300A -F bubblers 35 EA — Rainbird 3504 -SAM turf rotors 4 EA — Buckner quick coupling valves -vv/ boxes i EA — 1 '/2' Rainbird PEB RCV w/ box 6 EA— 1" Rainbird PEB RCV w/ box 2 EA — Nibco Tit 13 GV w/ box 360 LF — SCH 40 2" mainline w/ fittings 1300 LF —class 200 lateral line w/ fittings 350 LF - Drip irrigation with fittings 240 LF — Sch 40 4" sleeves 80 LF — Sch 40 3" conduit TOTAL: $53,500 The above pricing is based on plans and spees by Harley Ellis Devereaux date 2/27/12 ' Please call me with any questions or concerns. Respectfully, Robert obert Jimenez Jr. 1125 Mabury Road . San Jose, CA 95133 . (408) 995 -3404 • Fax (408) 294 -4586 Mailing Address: P.O. Box 611718 a San Jose, CA 95161 -1718 "An Equal Opportunity Employee' State License #449324