HomeMy WebLinkAboutDevcon Construction - Library Construction - Change Order No. 26City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846 -0451; Fax (408) 846 -0429
CHANGE ORDER NO. 26
To contract for : New Gilroy Library Project, Phase 2
Contractor: Devcon Construction
Contract Date: 6/15/2010
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
This Chnnoe nrrler nrnvicles fnr the followinp:
Stain and matt finish beams at high ceilina
38 Interior Painting -
$14,800.00
Custom Painting - Stain and matt $14,800.00
finish beams at high roof
Subtotal
$14,800.00
69 Fee
10.00%
$1.480.00
Total
$16,280.00
71 Amount applied to Contingency
$0.00
72 Amount applied to OT Allowance
$0.00
Net change order amount
$16,280.00
Added work, not shown on drawings, acoustic plaster ceilings
29 Portland Cement Plaster
$19,532.00
O'Donnell Plastering, Inc.: Added work $12,631.00
O'Donnell Plastering, Inc.: Added detail $6,901.00
31 Gypsum Board
$15,737.00
Custom Drywall, Inc.: Rip detail, not shown
$10,178.00
Custom Drywall, Inc. 1709 & 3274: Added work
$5,559.00
Subtotal
$35,269.00
69 Fee
10.00%
$3.527.00
Total
$38,796.00
71 Amount applied to Contingency
$0.00
72 Amount applied to OT Allowance
$0.00
Net change order amount
$38,796.00
Terrazzo Compatable Moisture Vapor Barrier System
1 General Requirements
$650.00
Devcon : Calcium Chloride Verification Test
$650.00
33 Terrazzo Flooring
$32,886.00
Top End Constructors: Moisture Vapor $32,886.00
Barrier
Subtotal
$33,536.00
69 Fee
10.00%
$3,354.00
Total
$36,890.00
71 Amount applied to Contingency
$0.00
72 Amount applied to OT Allowance
$0.00
Net change order amount
$36,890.00
TOTAL for CO # 26
$91,966.00
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption, loss
of efficiency and any and all other direct and/or indirect costs, or expenses associated with the Extra Work and hereby waives
any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with
the Extra Work.
Cost Percentage Initial
I (We) agree to make the above change Original Contract Price $18,177,226.00
subject to the terms of this Change Order Previous Change Orders $1,123,576.00 6.18% f•'a=
for the NET INCREASE of $91,966.00 Total to Date $19,300,802.00
This Change Order $91,966.00
Total Change Orders to Date $1,215,542.00 6.69%
Revised Contract Price $19,392,768.00
CO iTRACTOR %
By: 4 - Date:
CPR 112
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 10/13/2011
We submit for your approval the following estimate of changes in work:
Stain and matt finish beams at high ceiling
38 Interior Painting
Custom Painting - Stain and matt finish beams at high
roof
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to OT Allowance
Net change order amount
$14,800.00
$14,800.00
$14,800.00
10.00% $1,480.00
$16,280.00
$0.00
$0.00
$16,280.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx/xx/xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:_
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
CUSTOM PAINTING, INC.
97 RICKENBACKER CIR.
LIVERMORE CA. 94551
OFFICE 925- 443 -3500
FAX 925- 294 -5910
PROPOSAL SUBMITTED
Devcon Const.
2010 W. Fremont St Ste A
Estimate
Stockton, Ca. 95203 -1913
408 - 262 -2342, Fax
PHONE # Mark Thissell Lic. #512717
DATE ESTIMATE #
JOB LOCATION: Gilroy 10/11/2011 6763
ITEM
DESCRIPTION
TOTAL
PAINT
Gilroy Library
PAINT
Credit for not painting the wood beams in the open ceilings.
- 5,070.00
PAINT
To Stain and Matt Finish the exposed wood beams in the second floor ceilings.
19 870.00
TOTAL $14,800.00
Under the Mechanics' Lien Law any subcontractor who helps to improve your property and is not
paid for his services, has a right to enforce his claim against your property. Under the law, you may
protect yourself against such claims by filing, before commencing such work of improvement, an
original contract for the work of improvement or a modification therof, in the office of the county
recorder of the county where the property is situated and requiring that contractors payment bond be
recorded in such office. Said bond shall be in an amount not less than fifty percent (50 %) of the
contract price and shall, in addition to any conditions for payment in full of the claims of all persons
furnishing labor, services, equipment or materials for the work described in said contract. The above
prices, and specifications are satisfactory and are accepted. Custom Painting is authorized to do the
work as specified. Payment will be made upon completion. Please sign to accept this contract.
SIGNATUR
CPR 134
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 1/10/2012
We submit for your approval the following estimate of changes in work:
Terrazzo Compatable Moisture Vapor Barrier System
1 General Requirements
Devcon : Calcium Chloride Verification Test
33 Terrazzo Flooring
Top End Constructors : Moisture Vapor Barrier
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to OT Allowance
Net change order amount
$650.00
$650.00
$32,886.00
$32,886.00
$33,536.00
10.00% $3,354.00
$36,890.00
$0.00
$0.00
$36,890.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx/xx /xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
TOP END CONSTRUCTORS, INC.
January 4, 2012
Bob Roseberry Project Manager
Devcon Construction, Inc.
690 Gilbraltar Drive
Milpitas, CA 95035
408 - 942 -8200 Main Office /408- 422 -8707 Cell
408 - 519 -8424 Direct/Voice Mail
408 - 262 -2342 Fax
Re: Explanation of costs for lump sum pricing Moisture mitigation system
Two components are used to complete the entire system. The moisture vapor primer is used in
conjunction with a second primer.
Coverage on the product data sheet is approximate and does not take into consideration waste,
unused quantities (open containers) or excess application.
Cost for materials (including miscellaneous products) run approximately $1.50 - $1.75 psf. With
shipping cost will be on the higher end.
Labor runs from $1.25 - $1.65 psf
There is a small amount for overhead and profit (generally 10 -20 %)
The balance is for the warranty against failure due to moisture vapor. Your readings were high
(above 5).
Cost for second floor 2403 sf is $10,813.50
Cost for the first floor 4915 sf is $22,072.50
Respectfully submitted by:
Richard Orlando
Chief Estimator /Project coordinator
10755 Sherman Way PHONE (818) 503 -1282
Suite #7 FAX (818) 332 -3046
Sun Valley, CA 91352 E -MAIL ro84 @topendconstructors.com
WEB SITE www.topendconstructors.com
CC TEST
Page 1
CALCIUM CHLORIDE TEST RESULTS
DEVCON
RAY ROMINE
408-690 -9994
GILROY LIBRARY
7187 ROSANNA ST.
GILROY
JOB 010 -296
TRAMEX
BEGINNING
ENDING
I
NET HRS
GAIN IN
TOTAL
ELECTRONIC
DECIMAL
LOCATION
WEIGHT
WEIGHT
STARTTIMEIDAY
ENDTIMEIDAY
EXPOSED
WEIGHT rams
PRESSURE Ibs
METER%
MINUTES
HOURS
1ST FL N. ENTRY
32.6
35.00
1/62012 12:48 m
1/92012 12:21 p.
71.55
2.400
305
4.80
27
0.45
1 ST FLR JANITORS
32.5
35.40
1162012 12:57 m
1/9/2012 12:23 m
71.43
2.900
4.41
$.60
34
0.57
EASTSTAIRS
32.3
34.90
1162012 1:08
1/9/2012 12:19 m
71.18
2.600
3.97
5.10
49
0.82
1 ST FLR WEST BATH
32.8
35.60
1/6/2012 12:41 m
1/9/2012 12:30 m
71.82
2.800
4 ?4
5.20
11
0.18
2ND FLR EAST BATH
32.5
35.60
1/62012 1:16
1/9/2012 12:08 m
70.87
3.100
4.76
5.80
68
1.13
2ND FLR ELECT RM
32.5
35.20
1/62012 1:21
1/92012 12:12 m
70.85
2.700
4.14
5.40
69
1.15
2ND FLR SOUTH EAST RM
32.4
35.70
1/62012 1:30 m
1/92012 12:16 m
70.77
3.300
5.07
5.80
74
1.23
Page 1
FACSIMILE TRANSMISSION
DATE: January 10, 2012
TO: Devcon Construction
690 Gibraltar Drive
Milpitas, CA 95035
ATI N: Bob Roseber y
Fax #: 408- 262 -2342
FROM: Lynda J. Cowley, Office Manager
SUBJ: Job #10 -296, Gilroy Library
Invoice No. 2012009
2 pages (including this cover page)
Please process the attached invoice for payment.
IF YOU DO NOT RECEIVE ALL PAGES, PLEASE CALL BACK AS SOON AS POSSIBLE.
This transmission may contain restricted information and is intended only for the person or entity to which it is addressed
Any review, retransmissio % dissemination or othcr use of or taking of any action by persons or entities odd than the iawxled
Recipient is prohibited. if you are not the intended recipient, please destroy document and contact the sender.
i i,
. rcA"emme, Riot iNosmo .. *mv vt#lipty t '!r 4 -r INS
?Ii
P:v. Box 7<-. - LIESTaV.14,.CA 95327-
20949 11-1242 Fax NO-:904-12157
Toll Free 809- FLATIA -le 888- 43r2854
fL4TUNE. fLOOIZ6
PO an"MmFmas
BILL TO
Devcon Construction Incorporated
690 Gibraltar Drive
Milpitas, CA 95035
PROJECT: Job #10 -296
A t7MikW of atmisoa non*udimn Con "W hm
Invoice
DATE: 1/10/2012
INVOICE NO. 2012009
DUE DATE
1/10/2012
DESCRIPTION QTY PRICE AMOUNT DUE
Job #10 -296: Gilroy Library, 7387 Rosanna Street, Gilroy, CA
Calcium Chloride Testing, 3.test minimum 450.00 450.00
Additional 4 tests Q $50.00 each 4 50.00 200.00
Total S6$a00
Payments /Credits $0.00
Balance Due $650.00
TERMS:
PAYABLE AS FOLLOWS: 100% DUE UPON COMPLETION OF WORK, UNLESS OTHER WRITTEN ARRANGEMENTS HAVE
BEEN APPROVED IN ADVANCE. OVERDUE ACCOUNTS WILL INCUR A FINANCE CHARGE OF 24% PER YEAR (2% PER
MONTH).
Contractors are required by law to be licensed and regulated by the Contractors' State License Board which has jurisdiction to investigate
complaints against contractors if a complaint regarding a latent act or omission is filed within four years of the date of the alleged violation. A
complaint regarding a latent act or omission pertaining to structural defects must be filed within 10 years of the date of the alleged violation. Any
questions concerning a contractor may be referred to the Registrar, Contractors' State License Board, P. 0. Box 26000, Sacramento, CA 95826.
- - natumMe s Twig wmi cp .. eg vu)m gr a TAME
Post. Office Box 7, Jamestown, CA 95327 • 209 - 984 -1242 • Fax 209 - 984 -1257 • wwwgypsumf! ing.com
Tall Free 888- 4FLATLINE • 888 - 435 -2854
CPR 141
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 1/27/2012
We submit for your approval the following estimate of changes in work:
Added work, not shown on drawings, acoustic plaster ceilings
29 Portland Cement Plaster
O'Donnell Plastering, Inc.: Added work, not shown on
drawings, cut and fit around backing for wood ceilings.
O'Donnell Plastering, Inc.: Added detail, not on
drawings, access panels in acoustic plaster ceiling
31 Gypsum Board
Custom Drywall, Inc.: Rip detail, not shown on plan, for
acoustic plaster ceilings
Custom Drywall, Inc. 1709 & 3274: Added work for
access panels not shown on plan.
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to OT Allowance
Net change order amount
$19,532.00
$12,631.00
$6,901.00
$15,737.00
$10,178.00
$5,559.00
$35,269.00
10.00% $3,527.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx/xx/xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
$38,796.00
$0.00
$0.00
$38,796.00
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
O'Donnell Plastering Inc.
Change Order Request
TO: Devcon Construction
Job: Gilroy library
License No. 429061
ATTN: Bob Roseberry
Date: 12/29/11
Description of work ODP COR #12
Amount
Additional labor & material required to accommodate ceiling access panels
in acoustical plaster ceilings. Panels not shown on drawings
Added labor for cutting -in, trimming & in- filling panel - 2 hrs ea.
New panels - 35 ea Labor @ 78 - 70 hrs
$5,460.00
1st floor - 25 Material
$500.00
2nd floor - 10 Tax on Material 8.25%
$41.25
$6,001.25
Sub Total
0 &P -15%
$900.19
Sub Total
$6,901.44
Sanded Edge Primer & Mesh - 2 ea
Total Cost
.
Accepted by:
* No work shall begin without a signed Change Order, Please sign and send back.
Net
$6,901
Santa Clara, Ca 95050 PH:408- 988 -4965 FX:988 -6241
O'Donnell Plastering Inc.
Change Order Request
TO: Devcon Construction
Job: Gilroy Library
License No. 429061
ATTN: Bob Roseberry
Date: 12/29/11
Description of work ODP COR #13
Amount
Additional labor & material required to accommodate backing for the
wood ceiling system which is not shown on the drawings.
Added labor involves cutting -in & sanding around, then trimming
& priming the backing strips.
Labor @ 78 -120 hrs
$9,360.00
Material
$1,500.00
Tax on Material 8.25%
$123.75
Sub Total
$10,983.75
0 & P - 15%
$1,647.56
Sub Total
$12,631.31
Sanded Edge Primer & Mesh - 6 ea
Total Cost
Accepted by:
* No work shall begin without a signed Change Order, Please sign and send back.
Net
$12,631
Santa Clara, Ca 95050 PH:408- 988 -4965 FX:988 -6241
CUSTOtA DPYWALL, INC.
LfCEIN SEE '262495
1570 Gfaduina G'II ri'tilpiLas, California 95035, (408) 263 -1616
Gilroy Library
3402
Interior plaster system. Addition to previous tag # 3278, add for gyp board ripp per
intrior plaster system (Fellec submital) @ 1st and 2nd floors acoustical plaster. All
DESCRIPTION OF CHANGE: access panels and mechanicel registers.
Location of Change
Work Order Date
/1/1612011
11117/2011
COST PER OPENING
Pieces
Length
Lineal or SF
Labor Hours
Cost per Ft.
Cost Per Hour
Cost per Unit
112" type C
6
32
192
$0.350
$67.20
1" core board 2x12
0
24
0
$0.00
114" Type X
0
32
0
$0.280
$0.00
1 518" metal studs 20 GA
0
12
0
$0.460
$0.00
15/8" track 20 GA
0
10
0
$0.440
$0.00
4" 20GA shaft J runner
0
12
0
$0.00
2 1/2" stud 20 GA
0
10
0
$0.510
$0.00
6" 16GA - track
0
10
0
$0.00
6" 16ga 8' studs
0
8
0
$0.00
2 1/2" Track 20 GA
0
10
0
$0.490
$0.00
Corner Bead
0
9
0
$0.270
$0.00
1 -1/2 X 1 -1/2 90 metal
0
10
0
$0.430
$0.00
RC -1 channel
0
10
0
$0.420
$0.00
Furring Channel
0
10
0
$0.420
$0.00
Z metal
0
10
0
$0.420
$0.00
Hot Mud
0
1
0
$8.750
$0.00
box of Mud
0
1
0
$8.250
$0.00
CRC 16ga
0
10
0
$0.400
$0.00
Screws, tape & Misc.
0
0
$0.00
Sub -Total Cost for Material
0
$67.20
Tax 0- 8.25%
8.250%
$5.54
Cost of Material
$72.74
Stocking of Material, Delivery
192
$0.070
$13.44
Labor
Layout
0
$87.540
$0.00
Foreman /supervision
1
$87.540
$87.54
Taping Labor
$93.480
$0.00
Framing and Drywall Labor
24
$85.670
$2,056.08
Clean Up
0
$49.820
$0.00
Supervision
0
$101.300
$0.00
Man Lift
0
$10.000
$0.00
Dump Fees
$0.00
Cost Per Location
$2,229.80
Overhead and Profit
Material
15.000%
$12.93
Overhead and Profit
Labor
15.000%
$321.54
Price per location
$2,564.27
Plumber of locations
1
Total Material Cost
$86.18
Total Labor Cost
$2,143.62
Total Cost of Change I $2,564.27
O± ORDER 3402
CVSTOM DRYWALL, INCGLAWING CT.
NaLPITAS, CA X95035
(408) o6a3 !A-1616
(408)263 -1142 Fax
RILL TO:
ORDER DA"T"E:
JOB NAME/LOCATION:
OT T >ERED TAY:
OVERTIME ON CONTRACT WORK:
JOTS PHONE:
OOUBL.E TIME ON CONTRACT WORK:
EXTRA TO CONTRACT WORK:
PCO : W0#.
DESCRIPTION OF WORK:
Undisputed Charge Order Work:
F" CJr
I
/��'t`'" �1
( 7l 0.)i3
Teas
ATV:
MATERIAL:
TYPE OF LABOR:
HOURS:
_ ji -ei ,
w
_
_
. _ ,'
r� z;.wll o� , C
A
5'
` it
r
WORK ORDEREb $Y:
SIGNATURE:
I hereby acknowledge the satisfactory completion of the above described work.
r
E L ;
CUSO PA DR 4'WALL. INC.
LICENSE ,' 26-Y ?5
1574 Gsad^ing Co4=-t; It ilrlcas, California 95435, (4081 263-1616
Gilroy Library
3278
Interior plaster system, add drywall rip and plastic corner beads per submittal of
interior plaster system (Fellect Submittal). Interior plaster contractor requested for
drywall contractor to install prior to acoustical plaster to be installed, per Devcon
DESCRIPTION OF CHANGE: construction.
Location of Change
Work Order Date
11/3/2011
11/10/2011
COST PER OPENING
Pieces
Length
Lineal or SF
Labor Hours
Cost per Ft.
Cost Per Hour
Cost per Unit
1/2" type C drywall
8
32
256
$0.350
$89.60
1/2" type C drywall
10
48
480
$0.350
$168.00
Trim -Tex 4110 archway comer beat
22
10
220
$0.270
$59.40
Other comer bead supplied by cont
0
12
0
$0.460
$0.00
1 518" track 20 GA
0
10
0
$0.440
$0.00
4" 20GA shaft J runner
0
10
0
$1.040
$0.00
2 1/2" stud 20 GA
0
10
0
$0.510
$0.00
6" 16GA - track
0
10
0
$0.00
6" 16ga 8' studs
0
8
0
$0.00
2 1/2" Track 20 GA
0
10
0
$0.490
$0.00
Comer Bead
0
9
0
$0.270
$0.00
1 -112 X 1 -1/2 90 metal
0
10
0
$0.430
$0.00
RC -1 channel
0
10
0
$0.420
$0.00
Furring Channel
0
10
0
$0.420
$0.00
Z metal
0
10
0
$0.420
$0.00
Hot Mud
0
0
0
$8.750
$0.00
box of Mud
0
0
0
$8.250
$0.00
CRC 16ga
0
10
0
$0.400
$0.00
Screws, tape & Misc.
0
0
$0.00
Sub -Total Cost for Material
0
$317.00
Tax 0a 8.25%
8.250%
$26.15
Cost of Material
$343.15
Stocking of Material, Delivery
956
$0.070
$66.92
Labor
Layout
0
$87.540
$0.00
Foreman/supervision
1
$87.540
$87.54
Taping Labor
28
$93.480
$2,617.44
Framing and Drywall Labor
38
$85.670
$3,255.46
Clean Up
0
$49.820
$0.00
Supervision
0
$101.300
$0.00
Man Lift 19'2 weeks
1
$250.000
$250.00
Dump Fees
$0.00
Cost Per Location
$6,620.51
Overhead and Profit
Material
15.000%
$61.51
Overhead and Profit
Labor
15.000%
$931.57
Price per location
$7,613.59
Number of locations
1
Total Material Cost
$410.07
Total Labor Cost
cc %'Y1n AA
4- V.T
Total Cost of Change 1 $7,613.59
BILL TO:
ORDER DATE:/
-! %
(JGCyi+ :2s` Uis lCJt^
JOB NAME/LOCATION:
CJ � e'K✓i�i'C r^
ORNREl) BY:
��%� y � M` �c•�: /t " C� Jt C 1t
gyp �
NT
OVERTIME ON CONTRACT WORK:
JOS PHONE:
DOUBLE TIME ON CONTRACT WORK:
EXTRA TO CONTRACT WORK :
PCO # : IFWO#- Undisputed Chawle Order Work:
DESCRIPTION OF WORK.
,�, ., r [ b :-.. � cr J-i l� . "� IG `: • t�r ��= fc._ ''t' u.r+t'�. =e,1% "�- r
^ Lori rc� .�,r � � t c =/ �:'i• - �t.: Cz'CC %:rs� -i �U !' ter` G F�
f.�t_�
QTY:
MATERIAL:
TYPE OF LABOR:
HOVAS:
1 V Fl cr�
C.
r
.
t /Uo
s
rJ( !
IQ i. sL+ (t�rGr �• ['o:.tl�r:..�..
d
C`c�["..-id.�rr.�:c: °`-
e)
rU �1r+5
WORK ORC ERED BY:
SIGNATURE:
I hereby acknowledge the satisfactory completion of the above described weak.
Soffit with Fellert to
Vertical GWB
Fully d here System
a
GWB (BY OTHERS) `
GWB "RIPPER" I \
GRID (BY OTHERS)
GWB (BY OTHERS)
FELLERT ADHESIVE
`-- FELLERT 1" OR 1.5` (25MM OR
36MM} FIBERGLASS BOARD
FELLERT ACOUSTICAL PLASTER
APPROX.118 'THICK (3MM)
2' (SQMM ) SELF ADHESIVE MESH
TAPE PLUS FELLERT PRIMER
(PRIME ENTIRE RIPPER)
Trim-Tex 4008
'General Notes: Not to Scale. This detail should be Included in the project mock -up.
Trim Tex product is shown for example purposes only.
Fellert North America
4629 S. 1361h Street. Omaha, NE 68137
Phone: 402 - 896 -2005
Fax: 402 -895 -7238
E -mail: sates@fellertna.com
Web: www.fellertna.com
Fellert,
P.O. Box 1209 SE -50112 Boras Swet
Phone: +46 33 430 23
Fax: +46 33 22 27
E -mail: info @fallert.c
Web: www.feltert.c
a b
b
a�6s
�ba
~
Comer Bead
'General Notes: Not to Scale. This detail should be Included in the project mock -up.
Trim Tex product is shown for example purposes only.
Fellert North America
4629 S. 1361h Street. Omaha, NE 68137
Phone: 402 - 896 -2005
Fax: 402 -895 -7238
E -mail: sates@fellertna.com
Web: www.fellertna.com
Fellert,
P.O. Box 1209 SE -50112 Boras Swet
Phone: +46 33 430 23
Fax: +46 33 22 27
E -mail: info @fallert.c
Web: www.feltert.c
Angled Soffit
Fully Adhered Sys-tem
GRID (BY OTHERS)
\ \0 /"- GW8 (BY OTHERS)
I
NOW
Trim -Tex 4s 10
Comer Bead
71
FELLERTADHESIVE
FELLERT 1" OR 1.5" (25MM OR
38MM) FIBERGLASS BOARD
2" (50MM) SELF ADHESIVE MESH TAPE
PLUS FELLERT PRIMER
(NOTE. PRIME ENTIRE OWS RIPPER)
GWB"RIPPER'
FELLERT ACOUSTICAL PLASTER
APPROX. 1184 THICK (SMM)
ER-BEAD
fo--CORN
'General Notes. Not to Scale. This detail should be Included In the project mock-up.
Trim FTex product Is shown for example purposes only.
Felled Nodh A merica
5 Zww
g
P.O: Box 1209
5E 5011;
�A .
4629 S. 136th Street, Omaha, NE 68137,
Phone: 402 -B96 -2005
Phone: +
Fax: 402-895L7238
Fax:
E-mail: salea@reRerins.com
E-mall,
Web: www.feilerina.com
Web:
CUSTOM, DRYWALL, H
NC.
1 LICR4SE #263495
OAOIATI
Gilroy Library
1E570 G€adv €rig Coc=a: N?i €pftas, California 95635, (4061263-1616
3274
Framing access panels for MEP's access per Devcon and Arch, walk thru on 10 -28-
11 / 10 -31 -11 Hard lid ceilings already framed. Delay of access panels location
DESCRIPTION OF CHANGE: and sizes.
Location of Change
Work Order Date
1111/2011
111212011
COST PER OPENING
Pieces
Length
Lineal or SF Labor Hours
ss
Cost Per Hour
Cost per Unit
5/8" dyrwall
0
8
32
$0.280
$0.00
2; x 8' core board (shaft liner)
0
0
0
$0.475
$0.00
Trim -Tex 4110 archway corner beat
0
10
0
$0.250
$0.00
Other corner bead supplied by coat;
0
12
0
$0.460
$0.00
3 5/8" 20ga. Metal stud
0
10
0
$0.339
$0.00
2 1/2 " 20ga. Metal track
30
10
300
$0.331
$99.30
2 1/2" stud 20 GA
10,
10
100
$0.320
$32.00
4" 20 ga. track
6
10
60
$0.399
$23.94
4" 20ga. Stud
4
10
40
$0.430
$17.20
4" flex tape
0
10
0
$0.490
$0.00
Comer Bead
0
10
0
$0.270
$0.00
1 -1/2 X 1 -1/2 90 metal
0
10
0
$0.430
$0.00
2 "x2" x 20ga. 90 metal
10
10
100
$0.480
$48.00
Furring Channel
0
10
0
$0.420
$0,00
Z metal
0
10
0
$0.420
$0.00
Hot Mud
0
1
0
$8.750
$0.00
box of Mud
0
1
0
$8.250
$0.00
CRC 16ga
0
10
0
$0.400
$0.00
Screws, tape & Misc.
0
0
$0.00
Sub -Total Cost for Material
0
$220.44
Tax 0 - 8.25%
8.250%
$18.19
Cost of Material
$238.63
Stocking of Material, Delivery
632
$0.070
$44.24
Labor
Layout
2
$87.540
$175.08
Foreman /supervision
1
$87.540
$87.54
Taping Labor
0
$93.480
$0.00
Framing and Drywall Labor
24
$85.670
$2,056.08
Clean Up
0
$49.820
$0.00
Supervision
0
$101.300
$0.00
Man Lift 1 week 32 ' lift.
1
1
0
$0.000
$240.00
Dump Fees
$0.00
Cost Per Location
$2,841.57
Overhead and Profit
Material
15.000%
$42.43
Overhead and Profit
Labor
15.000%
$383.81
Price per location
$3,267.80
Number of locations
1
Total Material Cost
$282.87
Total Labor Cost
$2,558.70
Total Cost of Change 1 $3,267.80
BILL _TO: iL' is �tii^ . ✓C7 i.
"' (tC� �
ORDER DATE:
E: /�
—( / /! / — - /
JOB NAME /LOCATION:
19rl.:YF^"
ORDERED BY: /
%�C7. !jr 2:.!_.�'.� 5u t �C�6'in �, •.t
1�}
�/j
/7r7
OVERTIME ON CONTRACT WORK:
�t
JOS PHONE:
DOUBLE TIME ON CONTRACT WORK:
EXTRA TO CONTRACT WORK=
PCO #:
FWO#:
Undisputed Change Order Work-.
DESCRIPTION OF WORK:
//''y�/
C7 J11 f —lit l/L C C C'
Cc, c
°' /mot C C'"
C4 ez A 7A
n
QTY:
MATERIAL:
TYPE OF LABOR:
HOURS;
iK V
WORK ORDERED BY;
;
SIGNATURE:
I hereby acknowledge the satisfactory completion of the above described work.
4ffft
CUSTOM D? ''WALL, INC.
1570 C=ladding Court, i ri ipitas, California °5035, (4061263-1616
Gilroy Library
1709
Frame -in access panes[ for MRP's, access per Devcon and Arch walk -thru on 10-
18 -11. Hard -lid ceilings already framed. Delay of access panel location and sizes,
DESCRIPTION OF CHANGE: re- mobilization and coordination. 31 access panels, listed on Job Work Order.
Location of Change
Work Order Date
10/18/2011
10/21/2011
COST PER OPENING
Pieces
Length
Lineal or SF
Labor Hours
Cost per Ft.
Cost Per Hour
Cost per Unit
518" dyrwall
0
8
32
$0.280
$0.00
2; x 8' core board (shaft liner)
0
0
0
$0.475
$0.00
Trim -Tex 4110 archway comer beai
0
10
0
$0.250
$0.00
3 5/8" 20ga metal track
6
12
72
$0.045
$3.22
3 5/8" 20ga. Metal stud
4
10
40
$0.451
$18.04
2 1/2 " 20ga. Metal track
10
10
100
$0.300
$30.00
2 1/2" stud 20 GA
6
10
60
$0.320
$19.20
6" 16GA - track
0
10
0
$0.00
6" 16ga 8' studs
0
8
0
$0.00
4" flex tape
0
10
0
$0.490
$0.00
Comer Bead
0
10
0
$0.270
$0.00
2" x 2" 90 angle.
4
10
40
$0.430
$1720
RC -1 channel
0
10
0
$0.420
$0.00
Furring Channel
0
10
0
$0.420
$0.00
Z metal
0
10
0
$0.420
$0.00
Hot Mud
0
1
0
$8.750
$0.00
box of Mud
0
1
0
$8.250
$0.00
CRC 16ga
0
10
0
$0.400
$0.00
Screws, tape & Misc.
0
0
$0.00
Sub -Total Cost for Material
0
$87.66
Tax 0. 8.25%
8.250%
$7.23
Cost of Material
$94.89
Stocking of Material, Delivery
344
$0.070
$24.08
Labor
Layout
2
$87.540
$175.08
Foreman /supervision
1
$87.540
$87.54
Taping Labor
0
$93.480
$0.00
Framing and Drywall Labor
16
$85.670
$1,370.72
Clean Up
0
$49.820
$0.00
Supervision
0
$101.300
$0.00
Man Lift 1 week 32 ' lift.
1
1
0
$0.000
$240.00
Dump Fees
$0.00
Cost Per Location
$1,992.31
Overhead and Profit
Material
15.000%
$17.85
Overhead and Profit
Labor
15.000%
$281.00
Price per location
$2,291.16
Number of locations
1
Total Material Cost
$118.97
Total Labor Cost
$1,873.34
Total Cost of Change 1 $2,291.16
1.709
BILL TO:
ti-' ii CC7 F^ 4.-CJ i�S'I N C� C
ORDER DATE:
ORDERED BY:
JOB NAME/LOCATION:
J o
OVER TIME ON CONTRACT WORK
DOUBLE TIME ON CONTRACT WORK
EXTRA TO CONTRACT WORK
JOB PHONE:
PCO
FWO#:
OTHER REF #:
DESCRIPTION OF WORK: f
-,`
S cc� s , :eK �s r cc�s
e -2t,"
y
iKO�r rzr rDn VL _ U
QTY-
MATERIAL
TYPE OF LABOR
HOURS
.G cs
- �G G .��;
cs
_�
3 ,�. - 9,0 G'4. «� c
Cdc�;4 .� �� -- t�... t<= i �, �. =f
qtr.
c -
sl" - 9 -d -
r "
6 i
nn /Cry �t
rat -�-a ` AV 1.�/A ,V �S�VtIS
S' irV `S to ri
�� /��I
J-A
Co
/i
7
CFX
t C i a :jam Ct CCta
D;, J C
he _
UfJva
O — CICC�S Cruet S
try
C �� Sf ^ar b �(CCYSS r,: -).S
Kc7Cs„ dy f / -6bkiy
WORK ORDERED BY:
aj- dLee-'S Pnx215
SIGNATURE:
I hereby acknowledge the satisfactory completion of the above described work.