CHANGE ORDER NO. 27
To contract for: New Gilroy Library Project, Phase 2
Contractor: Devcon Construction
Contract Date: 6/15/2010
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Tlhic (hnnaa ()rriar nrnviriac fnr tha fnllrnvina-
Design and Install post system for hanging signs in high ceiling areas
1 General Requirements -
$1,183.00
Devcon : 24 Labor hours @$49.30 to chip out for sign
$1,183.00
bases and fill with grout.
59 Allowance #1 - Signage
$22,157.00
Martinelli Environmental Graphics: Design and Install
$22,157.00
post system for hanging signs in high ceiling areas
Subtotal
$23,340.00
69 Fee
0.00% $0.00
Total $23,340.00
71 Amount applied to Contingency
$0.00
72 Amount applied to OT Allowance
$0.00
Net change order amount
$23,340.00
Additional components needed on the First floor to fit field conditions.
46 Library Stack System
$15,875.46
Systems & Space : Additional components needed on
$15,875.46
the First floor to fit field conditions.
Subtotal
$15,875.46
69 Fee
10.00% $1,588.00
Total
$17,463.46
71 Amount applied to Contingency
$0.00
72 Amount applied to OT Allowance
$0.00
Net change order amount
$17,463.46
Add a Security camera at the top of stair 2
50 Intrusion Detection
$2,792.00
Comtel Systems Tech Inc.: Add a Security camera at
$2,792.00
the top of stair 2
57 Electrical
$1,263.00
Sprig Electric : Conduit and box in support of Added
$1,263.00
Camera at stair 2.
Subtotal
$4,055.00
69 Fee
0.00% $0.00
Total $4,055.00
71 Amount applied to Contingency
$0.00
72 Amount applied to OT Allowance
$0.00
Net change order amount
$4,055.00
TOTAL for CO # 26
$44,858.46
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption, loss
of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives
any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with
the Extra Work.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $44,858.46
..- C,QNTRACTOR
l J
By: � �; ��^ 6`D.. �-r�c_ Date:
i
Cost
Percentage Initial
Original Contract Price
$18,177,226.00
Previous Change Orders
$1,215,542.00
6.69%tr
Total to Date
$19,392,768.00
This Change Order
$44,858.46
Total Change Orders to Date
$1,260,400.46
6.93%
Revised Contract Price
$19,437,626.46
CPR 132
DE1/IGDV
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 12/21/2011
We submit for your approval the following estimate of changes in work:
Design and Install post system for hanging signs in high ceiling areas
1 General Requirements
Devcon : 24 Labor hours @$49.30 to chip out for sign
bases and fill with grout.
59 Allowance #1 - Signage
Martinelli Environmental Graphics : Design and Install
post system for hanging signs in high ceiling areas
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to OT Allowance
Net change order amount
$1,183.00
$1,183.00
$22,157.00
$22,157.00
$23,340.00
0.00% $0.00
$23,340.00
$0.00
$0.00
$23,340.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx/xx/xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
DATE: ' 121611
*i9nage
CLIENT::
:PROJECT:::
rroposai
PREPARED BY.:
Devcon Loren Clemens
Gilroy Library Signage - Change Order No. 4, Post Mounted Sign Installation System
Sign #
Change Order Description
QtY
Unit
Fabrication
Total
Fabrication
Sales Tax
Unit Install—
Totalinstall
Sign Total
Post Mount Installation System
7
2350.00
16450.00
1357.13
450.00
3150.00
$ 20,957.13
This sign installation system is the proposed replacement for
0.00
0.00
0.00
$ -
an overhead cable-based system for seven signs which were
0.00
0.00
0.00
$
I originally spedd to hang from the vaulted ceiling on level 2.
0.00
0.00
0.00
$
These signs can instead be hung from a steel post with a
0.00
0.00
0�00
$
projecting arm, constucted at various heights to keep the same
0.00
0.00
0.00
$
floor-to-sign-base height for the varying heights of sign panels
0.00
0.00
0.00
$
involved. Posts systems will be painted to match the anodized
0.00
0.00
0.00
$
bronze color in the project, and will be bolted to chipped-out
locations in the concrete floor (chipping done by others to a
Marti nel li-s pecified depth and quality). Posts' steel structures will
be fabricated by Martinelli to agreed-upon specs TBD in shop
drawings prepared upon C.O. No.4's approval.
1 Shop Drawings
0.001
0.001
$ 1,200.00
Notes:
°The seven signs which would bv installed with this system are: L8-324.L8-325.O-338.o-3*5.c7-344.L7-345 &L7-547.
** Installation costs included here are add-ons to our originally-quoted installation costs.
°Fabrication costs are for the post systems only sign panel costs are already included mMartine||i's existing contract.
°Concept sketch with added notes by Martinelli isattached shop drawings will proceed from this point.
Martinelli Change Order No. 4 Attachment
Notes in Red by Martinelli.
bolt heads
concrete
chip -out
depth: 1 112"
plywood or
other spacer
welded joint
TBD
Steel tube cannot be a smalled dimension than this
without compromising the rigidity of this sign post.
leight varies in order to maintain
90" clearance to base of
variable- height signs
A larger stabilizing steel sleeve
will need to be added to the
lower portion of the post,
exact dimensions TBD
x;1 /2" thick steel
CPR 150
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 3/5/2012
We submit for your approval the following estimate of changes in work:
Additional components needed on the First floor to fit field conditions.
46 Library Stack System
Systems & Space : Additional components needed on
the First floor to fit field conditions.
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to OT Allowance
Net change order amount
$15,875.46
$15,875.46
$15,875.46
10.00% $1,588.00
$17,463.46
$0.00
$0.00
$17,463.46
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx/xx/xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
gill
o11 SSI
Partners in Progressive
Storage Solutions
SENT TO:
Systems & Space. Inc.
500 Boulder Court, Suite B
Pleasanton, CA 94566
License # 599899
Devcon Construction
Re: Gilroy Public Library, 11 S 12 Library Stack Systems
ATTN: John Dunn & Bob Roseberry
7387 Rosanna Street,
Gilroy, CA 95020
PHONE: (408) 942 -8200
925.426.1955
925.426.0882 FAX
www.systemsnspace.com
DATE: 2/23/12
We are hereby transmitting 1 pages: Via x E Mail ❑ Hand ❑ Certified
Remarks: Lead time is 8 weeks.
Shelving
Part #
Quantity
Description
Section
C9
CWF3 -6630
1
66 "hx30 "w Cantilever frame
CBSP -3011
1
30 "wx11 "d base shelves w/ out brackets
CSP -3011
4
30 "wx11 "d cantilever adjustable shelves w/ out brackets
CCTS -3011
1
Single 36 "x11" Canopy Tops w/ out brackets
CBSF -30
1
30 "w cantilever base frame filler
C23
CWF3 -6630
2
66 "hx30 "w Cantilever frame
530267.002
8
30 "wx12 "d adjustable shelf
w/ out brackets
CSP -3012
6
30 "wx12 "d periodical adjustable shelf
w/ out brackets
CBSP -3012
2
30 "wx12 "d periodical base shelf
w/ out brackets
CCTS -3012
2
30 "wx11 "d Canopy tops w/ out brackets
CBSF -30
2
30 "w cantilever base frame filler
C24
CWF3 -9024
1
90 "hx24 "w regular cantilever frame
CWF3 -9030
1
90 "hx30 "w regular cantilever frame
CBSP -2411
1
24 "x11 "d cantilever base shelf w/ out brackets
CBSP -3011
1
30 "x11 "d cantilever base shelf w/ out brackets
CSP -2411
6
24 "wx11 "d cantilever adjustable shelves w/ out brackets
CSP -3011
6
30 "wx11 "d cantilever adjustable shelves w/ out brackets
CCTS -2411
1
24 "wx11 "d Single Canopy top w/ out brackets
CCTS -3011
1
30 "wx11 "d Sinlge Canopy top w/ out brackets
CBSF -24
1
24 "w cantilever base frame filler
CBSF -30
1
30 "w cantilever base frame filler
C22 CBSPB -3611 27 36 "x11 "d cantilever base shelf w/ brackets
CEB -11L 2 11" Left cantilever shelf brackets
CEB -11R 2 11" Right cantilever shelf brackets
CATAS -3606 36 2 tier audio tape shelf 36 "wx6 "d w/ out brackets
C21
C20
C13
CBSS -3611
CEB -11L
CEB -11R
CFD -11
CBSPB -3611
CBSS -3612
CEB -12L
CEB -12R
CFD -12
C14 CBSPB -3612
CEB -12L
CEB -12R
CATAS -3606
C5 CBSPB -3612
CEB -12L
CEB -12R
36 36 "wx11 "d Cantilever slotted base shelves w/ out
brackets w/ out backstops
2 11" Left cantilever shelf brackets
2 11" Right cantilever shelf brackets
144 6 "hx9 "d Cantilever file divider
0 36 "x11 "d cantilever base shelf w/ brackets
2 36 "wx12 "d Cantilever slotted base shelves w/ out
brackets w/ out backstops
2 12" Left cantilever shelf brackets
2 12" Right cantilever shelf brackets
8 6 "hx10 "d Cantilever file divider
0 36 "wx12 "d base shelf w/ brackets
12 12" Left cantilever shelf brackets
12 12" Right cantilever shelf brackets
12 2 tier audio tape shelf 36 "wx6 "d w/ out brackets
7 36 "wx12 "d base shelf w/ brackets
1 12" Left cantilever shelf brackets
1 12" Right cantilever shelf brackets
Total $15,875.46
Cost 15% Sale Price
Materials
$9,629.25 $1,444.39 $11,073.64
Tax
(8.25 %)
$913.58
Freight
$898.24
Union
Labor
$2,600 $390 $2,990.00
Total $15,875.46
Shelving
part #
Quantity
Reason
Section
Replacing base audio tape shelf with standard adjustable audio tape shelf,
3606
C9
CWF3 -6630
1
Current Frame blocking window, frame required to be shortened
CEB -11L
CBSP -3011
1
New base shelf required for the size change
2
CSP -3011
4
New shelves required for the size change
New dividers required with new bottom depth shelf
CCTS -3011
1
New Canopy required due to size change
3611
CBSF -30
1
Replacing 36 "w filler with 30 "w filler
C23
CWF3 -6630
2
Current Frames too large to fit into opening
530267.002
8
replacing all 8 periodical display hardware sets due to shelf size change
CSP -3012
6
Replace 6 adjustable cantilever shelves due to size change
CBSP -3012
2
Replace 2 cantilever base shelves due to size change
CCTS -3012
2
Replacing all 36 "w double canopy tops with 30 "w doubles canopy tops
CBSF -30
2
Replacing 36 "w fillers with 30 "w fillers
C24
CWF3 -9024
1
Replacing 1 regular 36 "w cantilever frame with 24" due to doorway
CWF3 -9030
1
Replacing 1 regular 36 "w cantilever frame with 30" due aisle obstruction
CBSP -2411
1
1 base shelf required to be changed due to doorway
CBSP -3011
1
1 base shelf required to be changed due to aisle obstruction
CSP -2411
6
Replacing all shelves due to frame size change
CSP -3011
6
Replacing all shelves due to frame size change
CCTS -2411
1
Replacing Canopy due to frame size change
CCTS -3011
1
Replacing Canopy due to frame size change
CBSF -24
1
Replacing 36 "w filler with 24 "w filler
CBSF -30
1
Replacing 36 "w filler with 30 "w filler
C22
CBSPB-
27
Required to cover the anchor heads on the gussets,
3611
7 on hand from C5 Sections w/ brackets, 1 from C20 w/ out, 1 from C9 w/ out brackets
CEB -11L
2
2 each 36x11 on hand, need brackets to fulfill the shelving requirement
CEB -11R
2
2 each 36x11 on hand, need brackets to fulfill the shelving requirement
CATAS-
36
Replacing base audio tape shelf with standard adjustable audio tape shelf,
3606
will sit atop cantilever base shelf
C21 CBSS -3611
36
36 total base shelves to be added to cover anchor heads on gussets, reuse field back stops
CEB -11L
2
need brackets to fulfill the shelving requirement
CEB -11R
2
need brackets to fulfill the shelving requirement
CFD -11
144
New dividers required with new bottom depth shelf
C20 CBSPB-
0
Adding base shelf to cover anchor heads on gussets of one side only, l from C5 sections
3611
C13 CBSS -3612
2
2 total base shelves to be added to cover anchor heads on gussets, reuse field back stops
CEB -12L
2
need brackets to fulfill the shelving requirement
CEB -12R
2
need brackets to fulfill the shelving requirement
CFD -12
8
New dividers required with new bottom depth shelf
C14 CBSPB-
0
Required to cover the anchor heads on the gussets, 12 on hand w/ out brackets,
3612
from stock and C23 section
CEB -12L
12
12 each 36x12 on hand, need brackets to fulfill the shelving requirement
CEB -12R
12
12 each 36x12 on hand, need brackets to fulfill the shelving requirement
CATAS-
12
Replacing base audio tape shelf with standard adjustable audio tape shelf,
3606
will sit atop cantilever base shelf
C5 CBSPB-
7
Required to cover the anchor heads on the gussets on one side of C5 only
3612
1 each 36x12 on hand from C23 section
CEB -12L
1
1 each 36x12 on hand, need brackets to fulfill the shelving
requirement, Section C23
CEB -12R
1
1 each 36x12 on hand, need brackets to fulfill the shelving
requirement, Section C23
SIGNED
Leilani Ruiz
Senior Planner
(925) 426 -1955 Ext.229
925 - 426 -0882 fax
IeilaniPsystemsnspace.com
CPR 154
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 3/5/2012
We submit for your approval the following estimate of changes in work:
Add a Security camera at the top of stair 2
50 Intrusion Detection
Comtel Systems Tech Inc.: Add a Security camera at
the top of stair 2
57 Electrical
Sprig Electric : Conduit and box in support of Added
Camera at stair 2.
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to OT Allowance
Net change order amount
$2,792.00
$2,792.00
$1,263.00
$1,263.00
$4,055.00
0.00% $0.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx /xx/xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
$4,055.00
$0.00
$0.00
$4,055.00
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lie. #399163
■ •
was t
■anil
swunsE
• �'
• TEL
SYSTEMS TECHNOLOGY:'. INC
HEALTHCARE -EDUCATION -SECURITY
Date: 2/3/12
Quote #: ER4120- 2 -3 -12
To: Devcon
Attention: Bob Roseberry
Re: Gilroy Library
Our Quotation for $2,792.00 includes:
Comtel will provide and install a camera on the wall in the South Stairwell to view personnel coming
down the stairs.
Provide and install:
• 1 Panasonic VWSW355 Camera
• 1 IP ONSSI Camera License
1 Patch Cord
• Cable
• Programming
• Check and test
NOTES:
• Flush single gang rough in and conduit stub to drop tile ceiling by others.
• Roof penetrations, by others.
• Patching and painting by others.
• Comtel will make every effort to take good care of existing ceiling tile, but cannot be
held responsible for damage that occurs
• All work to be performed during normal business hours, unless specified.
• Any electric locking hardware is required to be 24vdc.
• All other terms and conditions remain the same as base contract.
• Submittals are not included in this quotation.
Eric Ready- Project Manager
1292 Hammerwood Avenue, Sunnyvale, CA 94089
Main (408) 543 -5600 ♦ Service (408) 543 -5655 ♦ Fax (408) 543 -5699
License # 420981