Loading...
HomeMy WebLinkAboutDevcon Construction - Library Construction - Change Order No. 28City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0451; Fax (408) 846 -0429 CHANGE ORDER NO. 28 To contract for : New Gilroy Library Project, Phase 2 Contractor: Devcon Construction Contract Date: 6/15/2010 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. This Chnnoe Orrlrr nrnvirles fnr the fnllnwino- Paseo Pavers Base section 10 Unit Pavers European Paving Subtotal $55,010.00 69 Fee Total Paseo Pavers Base section 71 Amount applied to Contingency 72 Amount applied to OT Allowance Net change order amount $55,010.00 $55,010.00 10.00% $5,501.00 $60,511.00 $0.00 $0.00 $60,511.00 All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. I (We) agree to make the above change Original Contract Price subject to the terms of this Change Order Previous Change Orders for the NET INCREASE of $60,511.00 Total to Date This Change Order Total Change Orders to Date Aly6ok Revised Contract Price CONTRACTOR By: Date: Z Cost Percentage Initial $18,177,226.00 $1,260,400.00 6.93 %,? 1Z $19,437,626.00 $60,511.00 $1,320,911.00 7.27% �r $19,498,137.00 RECOMMENDED BY ACCEPTED BY: CPR 155 Project: Gilroy Community Library Devcon Job #: 10 -296 Date: 3/9/2012 We submit for your approval the following estimate of changes in work: Paseo Pavers Base section 10 Unit Pavers European Paving : Paseo Pavers Base section Subtotal 69 Fee Total 71 Amount applied to Contingency 72 Amount applied to OT Allowance Net change order amount $55,010.00 $55,010.00 $55,010.00 10.00% $5,501.00 $60,511.00 $0.00 $0.00 $60,511.00 ❑ We have proceeded with this change per the direction of: ❑ We will not proceed with this change until receipt of a signed copy of this proposal. ❑ This proposal must be accepted by: xx/xx/xx in order to avoid additional extension or expense. ❑ These changes will add approximately xx working days to the completion date. Submitted by: Approved by: Devcon -Bob Roseberry Owner's Representative: James Kuhn, Nova Partners Date: Date: Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163 Professional installations of precast pavers since 1980 Member of the Interlocking Concrete Pavement Institute ICPI Certified Installer Change Order Request -- R05 Date: March 8, 2012 Contractor: Devcon Consruction Ph: 408 -519 -8424 Attn: Bob Roseberry IFax: 408- 262 -2342 Email: boseberry @Devcon- const.com WE ARE SENDING YOU: ❑X ATTACHED I pages total THE FOLLOWING ITEMS: COST BREAKDOWN HELD TAGS THIS WORK: RX Has Has been completed and we are awaiting an Executed Change Order not been completed and is Pending based on receipt of Change Order COPIES DATE NO, DESCRIPTION Project: Gilroy Public Library Contractor Job No.: D10 -296 #23 EPD Job No.: PSI -1668 Reference: 1. Delta 13 Plan Check Revisions dtd 2 -27 -12 (Pasco) a. Sheet A2.201A i. Installation of crushed rock sub -base & base sections for prox 8,768 sf of new paver areas 2. Rework of existing pavers and crushed rock sections at transition of Paseo a. Prox 1,000 sf to revised grades 3. Provision of various temporary paver areas and crushed rock base sections for occupancy a. Prox 500 sf Cost Impact : Add $55,010 Inclusions: 1. Additional crushed rock installation at prox 10,268 of paver areas per Delta 13, field directed added pavers and rework of existing pavers upon mobilization for the Delta 13 work European Paving Designs, Inc. 1474 Berger Drive,San Jose, Ca. 95112 ph: 408 -283 -5230 fx: 408 - 298 -2633 Pricing is valid for 30 days from date of COK