HomeMy WebLinkAboutDevcon Construction - Library Construction - Change Order No. 30City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846 -0451; Fax (408) 846 -0429
CHANGE ORDER NO. 30
To contract for : New Gilroy Library Project, Phase 2
Contractor: Devcon Construction
Contract Date: 6/15/2010
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work This Change Order provides for the following:
Miscellaneous Change Preposal Requests (see attached CPRs)
CPR 157 - Radius Concrete Cap for Circular Seat wall $9,125.00
CPR 160 - Furnish and install 7 Benches, 2 trash receptacles, 2 recycle receptacles $15,809.00
CPR 161- Provide and install WR Grace Bituthane at circular planter per L -2 detail $3,098.00
CPR 166 - Conduit and wiring to tie -in new Paseo irrigation to existing system controller $16,000.00
CPR 165 - Add three Concrete Pads for Benches $3,763.00
Total $47,795.00
Net change order amount $47,795.00
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption, loss
of efficiency and any and all other direct and /or indirect costs or expenses associated with the Extra Work and hereby waives
any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with
the Extra Work.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $47,795.00
l PYWAJ
CONTRACTOR
By: cp Date: �z
Cost Percentage Initial
Original Contract Price $18,177,226.00
Previous Change Orders
$1,419,238.00 7.81% �-
Total to Date
$19,596,464.00
This Change Order
$47,795.00
Total Change Orders to Date
$1,467,033.00 8.07% L
Revised Contract Price
$19,644,259.00
CPR 157
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 3/8/2012
We submit for your approval the following estimate of changes in work:
Radius Concrete Cap for Circular Seat wall
14 Masonry
Panatia Masonry: Radius Concrete Cap for Circular
Seat wall
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to OT Allowance
Net change order amount
$8,295.00
$8,295.00
$8,295.00
10.00% $830.00
$9,125.00
$0.00
$0.00
$9,125.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx /xx /xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
ATTENTION
CONTRACTOR
STREET
CITY, STATE, ZIP CODE
ARCHITECT
EXIST.CONTR.DATE & NO.
ADDITIONAL WORK AUTHORIZATION
PATANIA MASONRY
1176 LOYOLA DR
Salinas, CA 93901
(831) 422 -2769 FAX (831) 422 -0264
BOB ROSEBERRY LIC. #324209
690 GIBRALTAR DR.
MILPITAS, CA 95035
NO.
408 - 262 -2342
GILROY LIBRARY
GILROY, CA
DATE: 3/7/2012
You are hereby authorized to perform the following specifically described additional work
REVISED
CAPS AT PLANTER $8,295.00
LEAD TIME ON CAPS 3 TO 4 WEEKS
ONCE CHANGE ORDER APPROVED WE WILL ORDER CAPS.
Due to the current California energy crisis our suppliers may experience difficulties in the production of mater
Patania Masonry reserves the right to modify this proposal at any time due to increases of more than 5% in ti
cost of natural gas, electricity, or petroleum products used in the manufacturing or distribution of the material
our suppliers. Patania Masonry is not responsible for any delays or non - performance caused by our supplier
due to electrical or natural gas shortages.
ADDITIONAL CHARGE FOR ABOVE WORK IS: $ SEE ABOVE
Payment to be made as follows: I AS JOB PROGRESSES
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
AUTHORIZING SIGNATURE:
DATE: I Owner signs here
We hereby agree to furnish labor and materials- complete in accordance with the above specifications, at above stated price.
AUTHORIZING SIGNATURE: Date 3/7/2012
(contractor signs here)
THIS IS CHANGE ORDER N.O. 2
Note: This Revision becomes part of, and in conformance with, the existing contract.
Mwo,
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 3/9/2012
We submit for your approval the following estimate of changes in work:
Furnish and install 7 Benches, 2 trash receptacles, 2 recycle receptacles
1 General Requirements
Devcon : Furnish and install 7 Benches, 2 trash
receptacles, 2 recycle receptacles
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to OT Allowance
Net change order amount
$14,372.00
$14,372.00
$14,372.00
10.00% $1,437.00
$15,809.00
$0.00
$0.00
$15,809.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx /xx /xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
ROSS
recreation equipment
Quote Number 00004370
Project Gilroy Community Library
Opportunity Name Gilroy Community Library 2
Quote Name Gilroy Community Library 2
Prepared By Liz Riehl
Address 7960 B Soquel Drive. #103
Aptos. CA 95003
E -mail lizr @rossrec.com
Phone (831) 689 -9110
Fax (831)689 -9112
Quote Date
3/9/2012
Expiration Date
4/8/2012
Lead Time
4 -6 weeks
Bill To Name Devcon Construction Ship To Name Gilroy Community Library
Bill To 690 Gibraltar Drive Ship To c/o Devcon Construction
Milpitas. CA 95035 7387 Rosanna St
Customer Credit 50% On Order /Balance Net 30 Gilroy, CA 95020
Terms
�^' `" g i^ '.� "E' `` • � i m D
! . iE •
7.00 58 -60 I U CAST BENCH, STEEL SEAT, GREEN
2.00 84 -32 32- GALLON ALL -STEEL RECEPTACLE, GREEN
2.00i 84 -32 84 -32 -RC -007 32- GALLON ALL -STEEL RECEPTACLE W /RECYCLE LID, GREEN
Materials Amount
$9,944.00
Tax Amount
$820.38
Labor Total
$0.00
Freight
52,162.00
Total 512.926.38
Notes to Customer
Bob Roseberry
Signature
Name
Title
Date
$940.00 $6,580.00
$810.00' $1,620.00
$872.00! $1,744.00
CPR 161
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 3/9/2012
We submit for your approval the following estimate of changes in work:
Provide and install WR Grace Bituthane at circular planter per L -2 detail
1 General Requirements $2,816.00
Devcon : Provide and install WR Grace Bituthane at $2,816.00
circular planter per L -2 detail
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to OT Allowance
Net change order amount
$2,816.00
10.00% $282.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx /xx /xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
$3,098.00
$0.00
$0.00
$3,098.00
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
Bob Roseberry
From: Dave Ceraolo <dceraolo @allianceroofingcal.com>
Sent: Friday, March 09, 2012 9:29 AM
To: Bob Roseberry
Subject: Gilroy Library
Sorry Bob, Didn't know this was urgent. Waterproofing one circular planter
Materials. Bituthene 4000 — Hydroduct 220 — Liquid Membrane — Termination Bar.
Labor and Materials - $2,816.00
Please let me know if you need anything further.
Do you have anyone to do your hardscape sealant work?
Regards,
David Ceraolo
Estimator / Project Manager
ALLIANCE ROOFING COMPANY, INC.
1250 Campbell Avenue • San Jose, CA 95126
Office: (408) 261 -2595 x239 • Fax: (408) 261 -2657
Cell: (408) 761 -2198
Email: dceraoloCc allianceroofinacal.com
Website: www.allianceroofinocal.com
r ..
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 3/26/2012
We submit for your approval the following estimate of changes in work:
Conduit and wiring to tie -in new Paseo irrigation to existing system controller
11 Planting Work $14,545.00
Collishaw Construction, Inc.: Conduit and wiring to tie -in $14,545.00
new Paseo irrigation to existing system controller
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to OT Allowance
Net change order amount
$14,545.00
10.00% $1,455.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx /xx /xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owners Representative: James Kuhn, Nova Partners
Date:
Date:
$16,000.00
$0.00
$0.00
$16,000.00
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
e
Lei
Site Development
March 26, 2012
ATTN: BOB ROSEBERRY
RE: GILROY LIBRARY
Connect new Plaza irrigation to Existing Irrigation
Dear Mr. Rosebeii-y,
Our pricing for the above mentioned project is as follows:
Material Cost w1 Tax $ 5,001
400 LF — Sch. 40 2" Conduit with fittings
3 EA — Christy B9 pull boxes wl concrete lid
5,000 LF —14 AWG wires to new controllers from existing
Labor $ 8,222
38 Hrs of Forman labor
74 Hrs of Laborer labor
MARK UPIPROFIT 10% $ 1,322
TOTAL: $ 14,545
Please call me with any questions or concerns.
Respect ly,
i
Robert Jimenez r.
1125 Mabury Road • San Jose, CA 95133 • (408) 995 -3404 • Fax (408) 294 -4586
Mailing Address: P.O. Box 611718 • San Jose, CA 95161 -1718
"An Equal Opportunity Employer' State License #449324
CPR 165
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 3/26/2012
We submit for your approval the following estimate of changes in work:
Add three Concrete Pads for Benches
7 Cement Concrete Paving
Landavazzo Brothers : Add three Concrete Pads for
Benches
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to OT Allowance
Net change order amount
$3,421.00
$3,421.00
$3,421.00
10.00% $342.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx /xx /xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
$3,763.00
$0.00
$0.00
$3,763.00
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
Landavazo Bros. Inc.
29280 Pacific St. Hayward ca. 94544
GC Devconn Const.
Project Gilroy library
ATTN Bob Roseberry
DESCRIPTION OF PROPOSAL
Added bench pads between light poles 3 locations.
( a) Material
( b) Labor
( c) Equipment
(d)
( e) Subcontractor's Overhead & Profit 15%
(f)
(k)
PROPOSED CHANGE ORDER
PCO No.
RFI
Date: 3/23/12
EXTRA
CREDIT
$
825
$ -
$
1,680
$ -
$
470
$ -
Subtotal $
2,975
$ -
$
446
$ -
Subtotal $
3,421
$ -
TOTAL $3,421
By: John Landavazo
davazo Bros. Inc. PROJECT:
Gilroy Library
®
DESCRIPTION
UNIT
Mill