HomeMy WebLinkAboutDevcon Construction - Library Construction - Change Order No. 34City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846 -0451; Fax (408) 846 -0429
CHANGE ORDER NO. 34
To contract for : New Gilroy Library Project, Phase 2
Contractor: Devcon Construction
Contract Date: 6/15/2010
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work This Change Order provides for the following:
Installation of lighting fixtures for Gilroy Paseo.
57 Electrical
Sprig Electric : Installation of lighting fixtures for Gilroy
Paseo.
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to OT Allowance
Net change order amount
$60,913.00
$60,913.00
$60,913.00
10.00% $6,091.00
$67,004.00
$0.00
0.00
$67,004.00
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption, loss
of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives
any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with
the Extra Work.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $67,004.00
kP0 &
CONTRACTOR
By: PV, Date: l L
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost Percentage 2nitiL
$18,177,226.00
$1,710,262.00 9.41% R/t
$19,887,488.00
$67,004.00
$1,777,266.00 9.78% C'A.
$19,954,492.00
RECOMMENDED BY:
ACCEPTED BY:
CPR 163
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 3/13/2012
We submit for your approval the following estimate of changes in work:
Installation of lighting fixtures for Gilroy Paseo.
57 Electrical
Sprig Electric : Installation of lighting fixtures for Gilroy
Paseo.
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to OT Allowance
Net change order amount
$60,913.00
$60,913.00
$60,913.00
10.00% $6,091.00
$67,004.00
$0.00
$0.00
$67,004.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx/xx/xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
4;905?7
1A60.5, le .S-ar � .Scut ,4oc, &-i '5112
Ad., ku: 4V3- 9rW -2!T
Client Address:
DEVCON CONSTRUCTION
Contact: Bob Roseberry
690 Gibraltar Drive
Milpitas, CA 95035
CCN #
CCN Date
500/700#
Project Name:
Project Number:
Page Number:
41.4
3/12/2012
GILROY LIBRARY
2678
1
PROPOSED CHANGE ORDER
Work Description
CHANGE ORDER COST FOR GILROY PLAZA LIGHT FIXTURE INSTALLATION PER THE PLANS AND THE
FOLLOWING SCOPE OF WORK----------------------------------------------------------- - - - - -- $60,913.00
SCOPE OF WORK:
- INTERCEPT EXISTING CIRCUIT & ADD CIRCUIT
- REMOVE & RELOCATE EXISTING POLE
-DEMO EXISTING POLE BASE
- INSTALL (12) NEW POLE BASES & 550' TRENCH & BACKFILL
- INSTALL (800') CONDUIT & WIRE
- INSTALL (8) TYPE -S6 FIXTURES
- INSTALL (11) TYPE -SIO FIXTURES
- INSTALL (4) TYPE -S11 FIXTURES & (1) INGROUND TRANSFORMER
We reserve the right to correct this quote for errors and omissions.
This quote covers direct costs only and we reserve the right to claim for impact and consequential costs.
This price is good for acceptance within 10 days from the date of receipt.
We request a time extension of 10 days.
We will supply and install all materials, labor, and equipment as per your instructions on PCO #41.4
I. Exclusions:
Overtime and shift work
Permits
Utility company fees, including Secondary cabling costs
Title 24 and Engineering fees
Painting
Dumpster fees
Consealed and unforeseen conditions
Upgrade of existing code violations
Provisions for contaminated ground water and trench spoil
Pipe protection posts
Offsite utility service extensions
Provisions for contending with hidden obstructions encountered during excavation
II. Clarifications:
• All work is to be completed between the hours of 7:00am through 3:30pm Monday through Friday.
III. General Conditions:
All applicable taxes are included in our submission
The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and
ORIGINAL
PROPOSED CHANGE ORDER
Client Address
DEVCON CONSTRUCTION
690 Gibraltar Drive
Milpitas, CA 95035
equipment -specified or supplied by others
• Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the
-manufacturer
The contractor shall not be liable for indirect loss or damage
Unless included in this proposal, all bonding and /or special insurance requirements are supplied at additional cost
If a formal contract is required, its conditions must not deviate from this proposal without our permission
Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void
We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions
This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually
satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into
between the owner and the contractor.
We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project.
Please contact our office if you have any questions for if additional information is needed.
Sincerely,
SPRIG ELECTRIC COMPANY
Ron Piovesan
Senior Project Manager
Itemized Breakdown
Description
Qty
Net Price U
Total Mat($)
Labor U
Total Hours
3/4" PLASTIC BUSHING
48
70.34 C
33.76
35.00 C
16.80
3/4" PVC
800
29.80 C
238.40
4.00 C
32.00
3/4" PVC TERM ADAPTER
48
67.62 C
32.46
16.00 C
7.68
3/4" PVC COUPLING
96
38.80 C
37.25
16.00 C
15.36
3/4" PVC 90 DEG ELBOW
48
143.34 C
68.80
30.00 C
14.40
PVC CEMENT (1- QUART)
2
28.72 E
57.44
1.30 E
2.60
#14 THHN BLACK
720
234.70 M
168.98
5.00 M
3.60
#12 THHN BLACK
520
360.06 M
187.23
6.00 M
3.12
#10 THHN BLACK
2,200
556.34 M
1,223.95
7.50 M
16.50
#10 THHN GREEN
840
556.34 M
467.33
7.50 M
6.30
132 -1 RED WIRE CONN
96
17.22 C
16.53
2.60 C
2.50
TYPE -S6 RECESSED INCANDESCENT S
8
0.00 E
0.00
2.00 E
16.00
TYPE -S10 LED POLE MTD FIXT
12
0.00 E
0.00
2.02 E
24.24
14' STEEL POLE
12
0.00 E
0.00
3.87 E
46.44
ANCHOR BOLTS
48
0.00 E
0.00
0.26 E
12.48
CAST IN PLACE POLE BASE
12
0.00 E
0.00
1.00 E
12.00
DEMO 3 #10
330
0.00 E
0.00
6.00 M
1.98
INGROUND 277 TO 120 XFMR
1
500.00 E
500.00
4.00 E
4.00
TYPE -S11 IN GIRD LED UPLIGHT
4
0.00 E
0.00
3.00 E
12.00
INTERCEPT EXT CIRCUIT
1
20.00 E
20.00
2.00 E
2.00
REMOVE EXISTING CONDUCTORS
1
0.00 E
0.00
0.00 E
0.00
SPLICE AT EXISTING POLE
1
20.00 E
20.00
2.00 E
2.00
REPULL 4 #10 IN EXIST COND
1
0.00 E
0.00
0.00 E
0.00
REMOVE & DEMO EXT S10 POLE
1
0.00 E
0.00
4.00 E
4.00
CHRISTY SPLICE BOX
1
100.00 E
100.00
3.00 E
3.00
Totals 3,172.13 261.00
Summary
General Materials 3,172.13
ORIGINAL
PROPOSED CHANGE ORDER
Client Address:
DEVCON CONSTRUCTION
690 Gibraltar Drive
Milpitas, CA 95035
Summary (Cont'd)
Material Subtotal 3,172.13
Material Tax (@ 8.250 %) 261.70
Material Markup (@ 10.000 %) 343.38
Material Total
Foreman (130.50 Hrs @ $100.73)
Journeyman (130.50 Hrs @ $90.79)
Labor Markup (@ 25.000 %)
Total Labor
Total Material & Labor
GENERAL EXPENSES
FORKLIFT (per Day) (1.00 @ 5.00 @ $110.00 + 0.000 %)
SUBCONTRACTORS
EXCAVATION ($23,040.00 + 0.000 % + 0.000 % + 10.000 %)
Final Amount
ORIGINAL
3,777.21
13,145.27
11,848.10
6,248.34
31,241.71
35,018.92
550.00
25, 344.00
$60,913.00