HomeMy WebLinkAboutDevcon Construction - Library Construction - Change Order No. 36City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846 -0451; Fax (408) 846 -0429
CHANGE ORDER NO. 36
To contract for : New Gilroy Library Project, Phase 2
Contractor: Devcon Construction
Contract Date: 6/15/2010
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work This Change Order provides for the following:
Code Corrections, CPR's: 176.178.189.192,190 (see attached CPR's)
CPR 176 - Modify Cabinets per Library requests
$24,181.00
CPR 178 - Field Modify Cabinetry for clearances
$6,525.00
CPR 189 - Hourly extra work in support of modifications
$18,108.00
CPR 192 - Extend Cu Gutter to trellis per inspector
$579.00
CPR 190 - H/C signage, striping, wheelstops for Paseo and interface
$3,640.00
Total $53,033.00
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption, loss
of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives
any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with
the Extra Work.
Cost Percentage Initial
I (We) agree to make the above change
Original Contract Price
$18,177,226.00
subject to the terms of this Change Order
Previous Change Orders
$1,858,725.46 10.23% 4e
for the NET INCREASE of $53,033.00
Total to Date
$20,035,951.46
This Change Order
$53,033.00
Total Change Orders to Date
$1,911,758.46 10.52% 13R-
%�'
1/ V (FCONTRACTOR
Revised Contract Price
$20,088,984.46
By: b Date: �Z-
rod
Date
Z
CPR 176
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 4/3/2012
We submit. for your approval the following estimate of changes in work:
Modify Cabinets per Library requests
18 Architectural Woodwork
$21,983.00
AmberWood Installation COR 19: Cut down and modify
$4,022.00
cabinet and top at Childrens Reference desk
AmberWood Installation COR 18: Modify ped cabinets
$1,075.00
to accomodate mail slot, room 128
AmberWood Installation COR 17: Furnish and install
$6,180.00
desk in room 130 where none shown
AmberWood Installation COR 16: Labor and materials
$10,706.00
to cut down and modify cabinets, counter and counter
top at main circulation desk.
Subtotal
$21,983.00
69 Fee
10.00%
$2,198.00
Total
$24,181.00
71 Amount applied to Contingency
$0.00
72 Amount applied to OT Allowance
$0.00
Net change order amount
$24,181.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx/xx/xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
3
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
1555 S. 7th St. Bldg 7F 4
A A10% I Rau
s San Jose, G4 95112
1NSTAIIIAT/ON 408- 938 -1600
® ARCHITECTURAL MILL 6 CASEWORK
408 -938 -1345
REQUEST FOR CHANGE ORDER # 16 R -1
To:
Bob Roseberry
Company:
Devcon Construction
Fax:
690 Gibraltar Dr.
Email:
Milpitas, CA 95035
Phone :
408- 519 -8376
Office Fax:
408 - 262 -2342
From:
Andrew Ackerson & Thomas
Mueller
Phone:
(408) 938 - 1600
Fax:
(408) 938 - 1345
Email:
Date:
4 -2 -12
Pages:
2
Project: Gilroy Library Project No.
RFCO Total: $10,706
Reference: Field Order #43 - THIS WORK WAS COMPLETED and
INSTALLED ON 3- 27 -12.
1052
Qualifications: Revise circulation desk to lower the desk top to 34" AFF.
The Stone countertops will need to be modified.
The Veneer die walls will need to be modified.
The casework will need to be rebuilt.
We assume the installation company will provide most of
this work onsite. Amberwood will need to bring back any
cabinets that need to be modified.
Approved By:
Respectfully Submitted,
Date:
Project Team: Andrew Ackerson & Thomas Mueller
RFCO PRICING IS GOOD FOR 30 DAYS. APPROVALS RECEIVED 30 DAYS AFTER ISSUANCE ARE SUBJECT
TO PRICE CHANGE
Medical Corporate Retail Banking Educational
1 of 1
Restaurants
S
AMBERWOOD INSTALLATION
DATE:
JOB #:
CUSTOMER:
CONTACT:
PROJECT:
ADDRESS:
RFCO:
REFERENCE
4 -2 -12
1052
Devcon Construction
Bob Roseberry
Gilroy Library
0
16 R -1
Field Order #43 - THIS WORK WAS COMP
PRICING BACK -UP
LETED and INSTALL
1555 South 7th Street San Jose, CA
Phone (408) 938 -1600 FAX (408) 938 -1345
QTY
Labor Description
TOTAL
Shop Labor
$68 per HR
24
Shop Labor
$1,636
Labor Overhead & profit 15%
$245
Material List
1
Finish Materials
$822
1
Misc / Plywood / Plam
$655
1
Buyout (Countertops)
$2,764
Material Raw Cost
$4,241
Material Tax 8.25%
$350
Mat Overhead & profit 15%
$689
Subcontractor
$80.82 per HR
24
Installation Carpenter
$1,940
$85.86 per HR
16
Installation Foreman
$1,374
TBD
Material: adhesive & hardware
$0
Sub Overhead & profit 10%
$232
TOTAL $10,706
1555 South 7th Street San Jose, CA
Phone (408) 938 -1600 FAX (408) 938 -1345
® I ffillallM191al1 1555 S. 7th St., Bldg 7F
INSTAl RION San Jose, CA 95112
® ARCHITEC7lIFAL NlLl CA$EW�FK 408 - 938 -1600
408 - 938 -1345
REQUEST FOR CHANGE ORDER # 17 R -1
To: Bob Roseberry
Company: Devcon Construction
690 Gibraltar Dr.
Milpitas, CA 95035
Phone : 408 - 519 -8376
Office Fax: 408 - 262 -2342
Project: Gilroy Library Project No.
RFCO Total: $6,180
Reference: Client Request - THIS WORK IS COMPLETED AND
INSTALLED.
1052
Qualifications: Furnish Eucalyptus veneer base cabinets, countertop, and
upper cabinets at Office 130. Transparent Finish.
Installation provided by others. This room was not shown /
included on the original architectural drawings.
Approved By:
Date:
Respectfully Submitted,
Project Team: Andrew Ackerson & Thomas Mueller
RFCO PRICING IS GOOD FOR 30 DAYS. APPROVALS RECEIVED 30 DAYS AFTER ISSUANCE ARE SUBJECT
TO PRICE CHANGE
Medical Corporate Retail Banking Educational
1 of 1
Restaurants
Andrew Ackerson & Thomas
From:
Mueller
Phone:
(408) 938 - 1600
Fax:
(408) 938 - 1345
Email:
Date:
4 -2 -12
Pages:
2
Project: Gilroy Library Project No.
RFCO Total: $6,180
Reference: Client Request - THIS WORK IS COMPLETED AND
INSTALLED.
1052
Qualifications: Furnish Eucalyptus veneer base cabinets, countertop, and
upper cabinets at Office 130. Transparent Finish.
Installation provided by others. This room was not shown /
included on the original architectural drawings.
Approved By:
Date:
Respectfully Submitted,
Project Team: Andrew Ackerson & Thomas Mueller
RFCO PRICING IS GOOD FOR 30 DAYS. APPROVALS RECEIVED 30 DAYS AFTER ISSUANCE ARE SUBJECT
TO PRICE CHANGE
Medical Corporate Retail Banking Educational
1 of 1
Restaurants
7
AMBERWOOD INSTALLATION
DATE:
JOB #:
CUSTOMER:
CONTACT:
PROJECT:
ADDRESS:
RFCO:
REFERENCE:
4 -2 -12
1052
Devcon Construction
Bob Roseberry
Gilroy Library
0
17 R -1
Client Request - THI
PRICING BACK -UP
FED AND INSTALLEI
1555 South 7th Street San Jose, CA
Phone (408) 938 -1600 FAX (408) 938 -1345
QTY
Labor Description
TOTAL
Shop Labor
$68 per HR
32
Shop Labor
$2,181
Labor Overhead & profit 15%
$327
Material List
1
Eucalyptus Materials
$2,200
1
Misc / Plywood / Plam
$750
Material Raw Cost
$2,950
Material Tax 8.25%
$243
Mat Overhead & profit 15%
$479
Subcontractor
$80.82 per HR
0
Installation Carpenter
$0
$85.86 per HR
0
Installation Foreman
$0
TBD
Material: adhesive & hardware
$0
Sub Overhead & profit 10%
$0
TOTAL $6,180
1555 South 7th Street San Jose, CA
Phone (408) 938 -1600 FAX (408) 938 -1345
1555 S. 7th St, Bldg 7F 8
�■� �� j'/j San Jose, CA 95112
® INSTAIIAZI11N 408- 938 -1600
® AACMITECTUAAL MILL 3 CASEWORK
408- 938 -1345
REQUEST FOR CHANGE ORDER # 18 R -1
To:
Bob Roseberry
Company:
Devcon Construction
690 Gibraltar Dr.
Milpitas, CA 95035
Phone :
408 - 519 -8376
Office Fax:
408 -262 -2342
Andrew Ackerson & Thomas
From: Mueller
Phone: (408) 938 - 1600
Fax: (408) 938 - 1345
Email
Date: 4 -2 -12
Pages: 2
Project: Gilroy Library Project No.
RFCO Total: $1,075
Reference: Field Work order - THIS WORK IS COMPLETED AND
INSTALLED.
1052
Qualifications: Modify drawer ped cabinets at room 128 to accomidate
mail slot cabinet clearance. Reference AM RA #17
Approved By:
Respectfully Submitted,
Date:
Project Team: Andrew Ackerson & Thomas Mueller
RFCO PRICING IS GOOD FOR 30 DAYS. APPROVALS RECEIVED 30 DAYS AFTER ISSUANCE ARE SUBJECT
TO PRICE CHANGE
Medical Corporate Retail Banking
1 of 1
Educational Restaurants
0
AMBERWOOD INSTALLATION
DATE:
JOB #:
CUSTOMER
CONTACT:
PROJECT:
ADDRESS:
RFCO:
REFERENCE
Modity
4 -2 -12
1052
Devcon Construction
Bob Roseberry
Gilroy Library
0
18 R -1
Field Work order - THIS WORK IS COMPL
rawer De cabinets at room
PRICING BACK -UP
ETED AND INSTALLI
to accomidate
1555 South 7th Street San Jose, CA
Phone (408) 938 -1600 FAX (408) 938 -1345
QTY
Labor Description
TOTAL
Shop Labor
$68 per HR
4
Shop Labor
$273
Labor Overhead & profit 15%
$41
Material List
1
Finish Materials
$280
0
Misc / Plywood / Plam
$0
Material Raw Cost
$280
Material Tax 8.25%
$23
Mat Overhead & profit 15%
$45
Subcontractor
$80.82 per HR
0
Installation Carpenter
$0
$85.86 per HR
5
Installation Foreman
$386
TBD
Material: adhesive & hardware
$0
Sub Overhead & profit 10%
$27
TOTAL $1,075
1555 South 7th Street San Jose, CA
Phone (408) 938 -1600 FAX (408) 938 -1345
M MIL ,111YI�i�tLlil UM
115LAIIAB ®N
1555 S. 7th St., Bldg 7F
San Jose, CA 95112
408 - 938 -1600
408 -938 -1345
REQUEST FOR CHANGE ORDER # 19 R -1
To: Bob Roseberry
Company: Devcon Construction
690 Gibraltar Dr.
Phone
Office Fax
Milpitas, CA 95035
408- 519 -8376
408 - 262 -2342
Project: Gilroy Library Project No.
RFCO Total: $4,022
Reference: Field Work Order - THIS WORK IS COMPLETED AND
INSTALLED.
1052
Qualifications: Children's Reference Desk: Cut down a section of the desk
to meet ADA requirements. Include stone top modification
to accomidate drop down.
Approved By:
Date:
Respectfully Submitted,
Project Team: Andrew Ackerson & Thomas Mueller
RFCO PRICING IS GOOD FOR 30 DAYS. APPROVALS RECEIVED 30 DAYS AFTER ISSUANCE ARE SUBJECT
TO PRICE CHANGE
Medical Corporate Retail Banking Educational
1 of 1
Restaurants
1-0
Andrew Ackerson & Thomas
From:
Mueller
Phone:
(408) 938 - 1600
Fax:
(408) 938 - 1345
Email:
Date:
4 -2 -12
Pages:
2
Project: Gilroy Library Project No.
RFCO Total: $4,022
Reference: Field Work Order - THIS WORK IS COMPLETED AND
INSTALLED.
1052
Qualifications: Children's Reference Desk: Cut down a section of the desk
to meet ADA requirements. Include stone top modification
to accomidate drop down.
Approved By:
Date:
Respectfully Submitted,
Project Team: Andrew Ackerson & Thomas Mueller
RFCO PRICING IS GOOD FOR 30 DAYS. APPROVALS RECEIVED 30 DAYS AFTER ISSUANCE ARE SUBJECT
TO PRICE CHANGE
Medical Corporate Retail Banking Educational
1 of 1
Restaurants
1-0
m
AMBERWOOD INSTALLATION
DATE:
JOB #:
CUSTOMER:
CONTACT:
PROJECT:
ADDRESS:
RFCO:
REFERENCE
1052
Devcon Construction
Bob Roseberry
Gilroy Library
0
PRICING BACK -UP
=TED AND INSTALL
1555 South 7th Street San Jose, CA
Phone (408) 938 -1600 FAX (408) 938 -1345
QTY
Labor Description
TOTAL
Shop Labor
$68 per HR
8
Shop Labor
$545
Labor Overhead & profit 15%
$0
Material List
1
Finish Materials
$1,526
0
Misc / Plywood / Plam
$0
Material Raw Cost
$1,526
Material Tax 8.25%
$126
Mat Overhead & profit 15%
248
Subcontractor
$80.82 per HR
0
Installation Carpenter
$0
$85.86 per HR
16
Installation Foreman
$1,374
TBD
Material: adhesive & hardware
$100
Sub Overhead & profit 10%
$103
TOTAL $4,022
1555 South 7th Street San Jose, CA
Phone (408) 938 -1600 FAX (408) 938 -1345
I
I W.
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 4/30/2012
We submit for your approval the following estimate of changes in work:
Field Modify Cabinetry for clearances
18 Architectural Woodwork $2,160.00
AmberWood Installation COR 20: Cut down desk for to $2,160.00
allow clearances
19 Cabinet Install $3,772.00
Evans Bros : Field Modify Shelving for clearances $3,772.00
Subtotal
70 Fee
Total
72 Amount applied to Contingency
73 Amount applied to OT Allowance
Net change order amount
$5,932.00
10.00% $593.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx /xx/xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owners Representative: James Kuhn, Nova Partners
Date:
Date:
$6,525.00
$0.00
$0.00
$6,525.00
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
�►B�t�1Na0�
/NSIAR MILL & I/SN
1555 5. 7th 5t., Bldg 7F t3
San Jose, CA 95112
408 - 938 -1600
408- 938 -1345
REQUEST FOR CHANGE ORDER # 20
To:
Bob Roseberry
From:
Company:
Devcon Construction
Phone:
690 Gibraltar Dr.
Fax:
Milpitas, CA 95035
Email:
Phone :
408 - 519 -8376
Date:
Office Fax:
408 -262 -2342
Pages:
Project:
Gilroy Library
Project No.
RFCO Total: $2,160
Reference: Field Order #51
Andrew Ackerson & Thomas
Mueller
(408) 938 - 1600
(408) 938 - 1345
Qualifications: Modification of Existing L- Shaped Countertop.
Approved By:
Date:
4 -23 -12
2
1052
Respectfully Submitted,
Project Team: Andrew Ackerson & Thomas Mueller
RFCO PRICING IS GOOD FOR 30 DAYS. APPROVALS RECEIVED 30 DAYS AFTER ISSUANCE ARE SUBJECT
TO PRICE CHANGE
Medical Corporate Retail Banking Educational Restaurants
1 of 1
1�
AMBERWOOD INSTALLATION
DATE:
JOB #:
CUSTOMER:
CONTACT:
PROJECT:
ADDRESS:
RFCO:
REFERENCE:
12
11052
Devcon Construction
Bob Roseberry
Gilroy Library
0
(Field Order #51
PRICING BACK -UP
1555 South 7th Street San Jose, CA
Phone (408) 938 -1600 FAX (408) 938 -1345
QTY
Labor Description
TOTAL
Shop Labor
$68 per HR
12
Shop Labor
$818
Labor Overhead & profit 15%
$123
Material List
1
Finish Materials
$100
1
Misc / Plywood / Plam
$500
Material Raw Cost
$600
Material Tax 8.25%
$50
Mat Overhead & profit 15%
$97
Subcontractor
$80.82 per HR
0
Installation Carpenter
$0
$85.86 per HR
5
Installation Foreman
$429
TBD
Material: adhesive & hardware
$0
Sub Overhead & profit 10%
$43
TOTAL $2,160
1555 South 7th Street San Jose, CA
Phone (408) 938 -1600 FAX (408) 938 -1345
Project Name: Gilroy Public Library
City Of Gilroy
7387 Rosanna Street
Gilroy, CA 95020
FIELD ORDER
FIELD ORDER NO. 51
Project Name:
Gilroy Public Library
Contract Date:
07/26/2010
To Contractor:
Devcon Construction Incorporated
Address:
690 Gibraltar Drive
Milpitas, CA 95035
DESCRIPTION OF WORK:
Millwork
Project No: 010 -CDD -173
l�
4/11/2012
Please modify the desk in office 218 to provide a 3'0" clearance as indicated in the attachment.
Estimated Adjustment
of Contract Sum: TBD
James Kuhn / PM
(Name of Construction Manager /Title - typed or printed)
i
Date: 4/11/2012
(Name of Contractor Representative /Title - typed or printed)
(Signature)
Date:
Estimated Adjustment
of Contract Time: 0
Note: This Field Order will be superseded by an allowance adjustment or a Change Order that will include the
scope of the change in the Work and any actual adjustments of the Contract Sum.
Attachment: FO 51 DYVG 411112012
Waco ���o�ov
Bra
A F.O.G. -'
N
OI O OI -10�' 1-511 21-cZ" I-all I-&
11 12 12 11-211 12
If
LL R
ADU?-T '
FTAFF WORK RJ —5 — — — — — - -- 0
21'1
E-1
FO 51 4/11/2012
a) 12
2
ca n
4
2
0"
2
215 2 IS>
-10
VP 0 1.R
4
CP
2
tcK
2 J!
1R14
<;
;'Dig SiS <I
II\ C14 I-oil
nx, 20
Cp
3 q Cut down desk
o Ui
ensure 3'
R;!
§
L-A I
fn!
clearance.
0r cpi 07
of II ija' ajl IQ's 1<1
q
%
OFFICE
cA
215
.0013
CNI
CSI
-1
C14
TORAGE
01
1
19
— I
—
E-1
FO 51 4/11/2012
a) 12
2
ca n
4
2
0"
2
215 2 IS>
-10
VP 0 1.R
4
CP
2
tcK
2 J!
1R14
<;
;'Dig SiS <I
II\ C14 I-oil
nx, 20
Cp
3 q Cut down desk
o Ui
ensure 3'
R;!
§
L-A I
fn!
clearance.
0r cpi 07
of II ija' ajl IQ's 1<1
q
1�
=— —\/--,A, �T S
L S V-
9,1063
FY f -f 1C. -4 N 1 6,50 4(y 1 4 Sz-4 F A 6,50 -26 i —99 2 5
NVOICE
IN-VOICENUNIBER: CO-GILROYLIBRARY-001
FRONM: Evans Brothers Cabinets
CUST"'Y"'IER: Dcticojl Construction
JOBNANIE: Gilrox, Library
n
D,,IIF'L: 2(21/2012
Do"Crip'Likoll:.101) I00% ccomilete
2
4
6
S
Change Order' 1
AdJUStCd Contract amount
Percentwe ol.'�Nork complete to dato
"Tvt -I! gross billim-, to date
Nklaterials
Total tills billin"
-ess 109,/ retention
1 0 1011
S 173,105.00,
S 6,888.00
179,993100
100 %,
$
S E3,868.00
688.80
9
Amount due this billing
G , 17.9, 71
Thank you for your business
Net 30 Days
a I D C`: C; Ct } C
P IS O :< L 6? 0
C. A !. 1 C L N S t.
CHANGE ORDER
F V A
B R 0
C A B
A V V 1-
[ 1 C A
y $ �,
N iJ _ 9 8
N S
T H E R S
IN E T S
9
l b_ (: _G
3 4
CUSTOMER: Devcon construction
JOB: Gilroy library
CHANGE ORDER NUiMBER: CO- DE\1GILROY -001
DATE: 01/21/12
ATTENTIOti: Bob Roseberry
The work described in this change order are in addition to the original contract.
1. Approved cost for overtime work Sat 1/28 (24 hrs.), Sat. 2/4 (24 hrs.), Sat. 2/11 (24 ln's.)
Sat 2/18 (32 hrs.), Presidents Day. il,londay. 2/20 (24 hrs.)
Total 104 hrs. Vii% S20.50 and 24 hrs. 41.00 (see field work- orders - 001, 002, 003, 004, 005)
2. Per Jolm Dtznn's dIi'c ^ct10t1 Nt'e Ciit libral} rack CaiiGpleS iiolz'ti lit 20 location t0
allow new narrower metal bookcases to fit into space provided. (30 hrs. L 592.00)
See field work order -006
3. Per John Dunn's direction we drilled holes in canopy tops in 44 locations for lighting
on top of library book shelves. (11 ln"s. Ci
iC1
. .
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 5/2/2012
We submit for your approval the following estimate of changes in work:
Hourly extra work in support of cabinet, furniture and signage modifications
35 Acoustic Ceilings
$6,765.00
Performance Contracting Inc cor 8: Egg Crate above
$1,047.00
Reference Service Desk
Performance Contracting Inc 9: Re -cut wood at Bay
$409.00
.windows per Architect request.
Performance Contracting Inc 11: Overtime to finish
$240.00
changes at wood ceilings
Performance Contracting Inc 10: Wood strips added to
$5,069.00
wood ceiling pieces so that they caould be attached to
perviously installed furring
19 Cabinet Install
$6,308.00
Evans Bros : Hourly carpentry work for cabinet
$2,944.00
modifications and extra installation
Evans Bros : Fascia at Reference Service Deak
$3,364.00
36 Carpet Tile
$3,389.00
Floor Connection : Patch and repair carpet for furniture,
$3,389.00
signage and casework modifications
Subtotal
$16,462.00
70 Fee
10.00%
$1,646.00
Total
$18,108.00
72 Amount applied to Contingency
$0.00
73 Amount applied to OT Allowance
$0.00
Net change order amount
$18,108.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx/xx /xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
CHANGE ORDER
CUSTOMER: Devcon construction
E
V A
N S
CHANGE ORDER NUMBER: CO- DEVGILROY -00.3
DATE: 04120/1.2
-"
B
R U
T I-I E R S 1,
1..lnstalled rubber baseboard in various areas: (17 hrs. @ $92)
C
A B
I N E T S
8 3 1 S W E F N Y
A. V:
is S U
I T E U
K E . D W' O' 0 D C
IT Y
C A
94 0 6 3
P 11 0 b1 E: 6 5 0
7 0 0 - 1 4 9 9
P ,t .X 6 5 0 2 6 1 -9 9 2 5
C A L IC E. N S E
N 0.
79 5 8
3'4
CHANGE ORDER
CUSTOMER: Devcon construction
JOB: Gilroy library
CHANGE ORDER NUMBER: CO- DEVGILROY -00.3
DATE: 04120/1.2
ATTENTION'. Bob Roseberry
The work described in this change order. are in addition to the original contract.
1..lnstalled rubber baseboard in various areas: (17 hrs. @ $92)
�^
$1 „5fr4
See field work order -009
f
2. Modified computer station to clear electrical (4 hrs. @ $92)
$368'
See field work order -010
3. Drilled extra boles for data am power (4 his. @ $92)
$368
See field work order -011
4. Installed decorative trees on glass windows (23 hrs. a $92)
$W-16
See field work order -012
s. Installed plywood cap and seats at patio planter (8 hrs. tt $92)
573E
See field work. order -013
6. Installed microwave, brackets for light fixtures ( 16 hrs. @ $92)
See field work order -014
Original contract value
X173,1.05.
Sum of previous change. orders
510,988
Amount of this change order
New contract value including this change order
$190,717
Thank you
Travis Evans
�r
E V A N S
`_`_- "___ == BROTHERS
CABINETS
831 SW EEN Y AVE., SUITE G
REDWOOD CITY CA. 94063
PHONE: 650 400 -1488 FAX: 650 261 -9925
CA. LICENSE NO. 795834
FIELD WORK ORDER-G- i r
JOB: Gilroy Libran',
DATE: 4/2/12
WORK DONE:
HOURS:
Modified computer station to clear electrical outlet on floor. (4 hours).
�tl�F�
. ,
Electricial sticks out beyond 4
front edge of cabinet.
Total fours: 4
Please sign for approval
Approved by: _
Thank you
Travis Evans
Modified computer desk to clear
electrical outlet at floor.
�'r
04/15,1201-2, 2 21 : 4 7 4fE -362-4444
I C 0
FEDE', 0.1
FE. LD WOU, ORDER - <3
SOB: L V,
P A 11JE, V-3 2-0 1
WOPUK DONS
Please sign for approval.
Approved by:.
Thank, il--ou,
j .
Travis Evan-q
PAGE 03
L-T -Q� J- F-, ; , I
It
-7,7,
E
V A
N S
B
R 0
T H E R. S
4
A B
TjNT E I.' S
U31 S '1V E E N V
lk E,, SUITT:
G
SET) -W 0 0 TD c Y
GA.
94063
h , 0 6 J 0
48$
F A X : 6 J 1 G 2i E 9 9 2 5
A . I � S
0
'9',5834
FE. LD WOU, ORDER - <3
SOB: L V,
P A 11JE, V-3 2-0 1
WOPUK DONS
Please sign for approval.
Approved by:.
Thank, il--ou,
j .
Travis Evan-q
PAGE 03
L-T -Q� J- F-, ; , I
It
-7,7,
F 11ELJ T
D WORI ORDER -
I
JOB: y
DATE:
WORK- DONE:
ic,
Please sign for approval
An roved �? F�, �-L
Thank you
Travis Evans
HOURS:
E
V A
N S
BROTHERS
C
A B
IN E T S
g I S V , , , E E y
A V
F ., S U
I T E G
RED-VV OOD CITY
CA.
94063
PHONE: 650 100-1488
FAX: 6-50 261-9925
CA. L I C E N, SE
N. O.
7 9 -5 8
33 4
F 11ELJ T
D WORI ORDER -
I
JOB: y
DATE:
WORK- DONE:
ic,
Please sign for approval
An roved �? F�, �-L
Thank you
Travis Evans
HOURS:
IFTELD WORIX'- ORDER - � " i
10B:
DATE:
WORK DUNE:
'c
Please sign -for approval,,
Approv ed bv.
Thant: you
Travis Evans
74
HOURS:
I �1-
E
V A
N S
BROTHERS
C
A B
I N S T S
�N, 'Y
g I S E F
AV
E., SUITE
G
REDVV 001) CITY
CA.
94063
PHONE: 650 400.1488
FAX: 650 261-9925
CA. LICENN SE
NO.
795834
IFTELD WORIX'- ORDER - � " i
10B:
DATE:
WORK DUNE:
'c
Please sign -for approval,,
Approv ed bv.
Thant: you
Travis Evans
74
HOURS:
I �1-
Floor Coimeefio-n* Inc. Standard TM Time Card
T & M effio: izat on of axtra work
I/a
i4o,= 7 Hk Z
6ontacto-r's -name:
cisvem4c, pw eegirteu-4
Description of Work,- -rr.4,rn oAl
AMIC-i- PLACEF6 ni/ —�do 156V�R,
Materials Used.- oj�r-
Approved by:
Company-
jj
Floor Conneefion, Incl.
Ucense #665417
T & M athorization of exta work
Description; oMcrk
Matedals Used:
Date;
HaaxsWotked:
CouftwtcTls name-,
xt
lw"4tA
Standard TOM Time Card
AVgrovedby.-
C 0 mp a ny '. vi, ) -6 19J.- 1
Floor Connection, Inc.
Lf�enge #6654.17
Z77
Standard TRM Time Card
T & M athorization of extra work
Date-
Hours Worked'. ';5 tk�
Contractor's name-,
W
I)escripdpa of Work:
2A), A-f AO,-flb-S MA&S
w-i-- -atx> r<
Mwedals Used: iii, 4ARP-4--t
Approvea by.
Company,
Date,,
Floor connection, hic.
1. p"e#666417
Standard TIM Time Card
T & M athorization of extra work I
Hours Worked:
Coutraotor's name:
Descliptioad Wolic F-W-MA- AX',UiwoRK:c5
&A—Sk� ke ;IWO
100 , ZA/ TM 4S 4 do
OF CA MT -MF--
Matenials U8cd: 5 0S CAgPf-j- -ME ( I 2=
Api
N
Gilroy Library T & M
Unit Unit Sales
Materials Quantit Cost Subtotal Tax
Patcraft Carpet Tile 41.33 $ 26.24 $ 1,084.50 $ 84.05
Labor Task
Install Carpet tile and base
Man Labor
Hours Rate Total
27 $ 62.32 $ 1,682.64
All wage rates include employers burden
Freight
Total
1,682.64
$ 1,168.55
Sub Total
$ 1,168.55
10% Profit
$ 116.85
Material Total
$ 1,285.40
$ 1,682.64
Sub Total
$
1,682.64
2S% Profit
$
420.66
Labor Total
$
2,103.30
Total Amount
$
3,388.70
CHANGE ORDER
CUSTOMER; Devcon construction.
JOB- Gilroy library
CHANGE ORDER NUMBER; CO- DEVGILROY 002
DATE: 03120/12
ATTENTION: Bob Roseberry
The work described in this change order are in addition to the original contract.
1. Approved cost. for overtime work Sat 2/25 (16 hrs. L $20.50)
See field work order• -008
2. Installed decorative MDr trees on walls in room no, 116 (8 hrs. @ $92)
See field work order -009
3. Wrapped fraine at rotunda With wood fascia above reference desk in room 21.3
(10 hrs. ir)3 592,00 )..
See field work order -010
4. Cut canopy top to allow room for ADA access on 2..nd floor near room 213.
(3r lirs. cc $92.00)
See field work order -01.1
Original contract value
Sum of previous change orders
Amount of this change order
New contract value including this change order
Thank you
Travis Evans
$328
$2,760
$276.
5.173, t 45
$6,888
t
$184,093
30
E V A
N S
B R 0
T H E R S
z= -
C A B
IN E T S
831 Slit' FLN
.0
Y .A V. E:,, 5U
1T f G
R E W O , D
C.ET Y C A
1) 4 663
P O N ti.: 650
4 00 -1 48 8
F A X 65 6 261 •992 5
CA.L.s " "C EN SF:
NC77958
&4
CHANGE ORDER
CUSTOMER; Devcon construction.
JOB- Gilroy library
CHANGE ORDER NUMBER; CO- DEVGILROY 002
DATE: 03120/12
ATTENTION: Bob Roseberry
The work described in this change order are in addition to the original contract.
1. Approved cost. for overtime work Sat 2/25 (16 hrs. L $20.50)
See field work order• -008
2. Installed decorative MDr trees on walls in room no, 116 (8 hrs. @ $92)
See field work order -009
3. Wrapped fraine at rotunda With wood fascia above reference desk in room 21.3
(10 hrs. ir)3 592,00 )..
See field work order -010
4. Cut canopy top to allow room for ADA access on 2..nd floor near room 213.
(3r lirs. cc $92.00)
See field work order -01.1
Original contract value
Sum of previous change orders
Amount of this change order
New contract value including this change order
Thank you
Travis Evans
$328
$2,760
$276.
5.173, t 45
$6,888
t
$184,093
30
E VAN S
B z
1 0 l' H E R S
CABINETS
9,31 SINE EN Y AVE ., S U, YTF G
RT D�w 0 0 D C 1--r'Y CA. 9406
PH 0 N E : 6 5 0 4 00-1488 FAX! 650 26 1 -992i
C A . L I C S. N S F, !,ql 0 . 7')5.934
R. WORK CARD E -R.
Z�
.JOBi
HOURS:
kr
'T
ast,
P e
I -
sign fot
Approved by
Thank. YOU "
Travis Evans
.......... .....
E V ANT S
11 R0 TH E R. S
,
C A B I N E T S
E NI: Y AVE tit, IT E G
R E D NV O01) CITE' CA. `9406
P H. I N F , 6 5 0 400- .1488 r A X 650 261 -9925
C A 1, IC, E. N SE 0; 79 9 j 4
F IELD WORK. ORDER
JOB: c
DATE C,
WQ&K
0 N, E-
A-
t? A
ploa.se gign for
Approved by:
Thank you
Travis Evans
JjQ-QR�--
cam, V1,0
3z
E V A N S
BROTHERS
1 C A
BINETS
831 SW EEWY AVE., SUITE G
REDIW 001) CITY CA. 94063
PHON,Eb- 610 460-1498 FAX: 650 261-9975
CA,L.ICENTSE NO. 795834
FIELD WORK , ORDER
JOB.
j
DATE:
WORK DONE:- HOURS.
Cul 0
Please sign f
Approved b)
Thank you
C)
77-
Travis Evans
Performance Contracting Inc.
a PCI 23485 Connecticut Street
Ha a rd, CA 94545
yw
Phone: (510) 887-0995 / Fax: (510) 264-4926 Change Order Cost Proposal
DATE: April 18, 2012 COCP # 10
CONTRACTOR: Devcon Construction
PCI Job# 7237
ATTN: Bob Roseberry EMAIL: 6roseberrv1cDdevcon-cons1,.ccm
PROJECT NAME: Gilroy Public Library
DESCRIPTION: EWA 55-2-06775:
Install all backers for wood at Plaster Ceilings (Rooms 105 and 116).
COST BREAKDOWNS
DESCRIPTION j
REG
1.5X
2X
1
1
REG i O.T.
D.T. AMOUNT
LABOR: Project Manager
I 0
0
0
hrs
@ 1
$ 130.43 1
$
Superintendent
0
0
0
hrs
@I
$ 102.85 $ 134.22
$ 165.82 I $ -
Carpenter
6
8
0
hrs
0
$ 88.81 $ 117,52
$ 146.22 $ 1,473
Carpenter Journeyman
12
16
T
hrs
$ 82.91 $ 109.01 i
$ 135.10 $ 2,739
t
DESCRIPTION
MATERIALS: 1-1/4" Brad Pin Nails
CITY
1@
1@
@
@
@!$
PRICE
$ 45.00
$
$
$
$
I
i $ 180
T-S -------------- ------ -----
$
IS
@
$
@
$
@
r $
$
STOCKING: Freight
ea
I @
@
$
$
$
EQUIPMENT: Scissor Lift
ea
@
i $
$
$
$
SUBCONTR:
— ---- -------------------- -- ---
------------ — --------------- -----------
@'[
@
@
--------
$ ------------- ------
$
$ ---------------- ---- ----- --
This change order request is based on the usual cost elements such as labor, material and
markup and does not include any amount for impacts
such as but not limited to interference, disruptions, rescheduling, change in sequence of
work, delays and/or acceleration, directly or indirectly
associates with this change order request. We expressly reserve the right to resubmit our
request for any items should we be faced with performing
this or other work under any ofthese conditions.
SINCERELY,
PERFORMANCE CONTRACTING, INC.
A ndreasve4"
Andrea Steiner
LABOR SUBTOTAL 4,212
MATERIAL SUBTOTAL 180
TAX 8' 50%1 $ 15
STOCKING SUBTOTAL $
1
EQUIPMENT SUBTOTAL j $
SUBTOTAL 1 $ 4,407
LABOR MARK UP 15%1 $ 632
MATERIAL MARK UP 15%1 $ 29
SUBTOTAL $ 5,069
SUBCONTR SUBTOTAL
SUBCONTR MARKUP 5%; $ -
MBC BON D/CDI 0.0%i $ -
TOTAL AMOUNT $ 5,069
Project Manager
3rt�
y
EXTRA R
WORK AUTHORIZATION
ATION 0 6 (( 5
V ��`,
3y
�. EXTRA WORK AUTHORIZATION 0 0 7 7£
Performance Contracting Inc.
IQ PC 1 23485 Connecticut Street
Ha ard, CA 94545
— Phone: (510) 887-0995 / Fax: (510) 264-4926 Change Order Cost Proposal_
DATE: April 18, 2012 COCP # 11
CONTRACTOR: Devcon Construction
PCI Job# 7237
ATTN: Bob Roseberry EMAIL: Broseberrv,-a)rlevcon-const.com
PROJECT NAME: Gilroy Public Library
DESCRIPTION: EWA 55-2-06776:
Premium Time for Saturday work 2/18/12.
COST BREAKDOWNS
DESCRIPTION i
I REG
1.5X
2X
REG I O.T. I D.T. i AMOUNT__
LABOR: Project Manager 0 1
0
0
hrs
@
$ 130.43 $
Superintendent 0
0
0 i
hrs
@
$ 102.85 $ 134.22 $ 165.82 $
Carpenter Foreman j 0
0
0
hrs
@
$ 88.81 1 $ 117.52 $ 146.22 $
Carpenter Journeyman -8
T--
8
0
hrs
@I
$ 82.91 1 $ 109.01 $—I��-10 $ 209
DESCRIPTION
MATERIALS:
----------------------------- ------ --- - -- --- --
CITY
------
@t-
@
PRICE
$ I - --- ---------- -- ----- -- - --r -$
$
@
@
$ $
$ $
@
@Is
@Is
$
$
i 1 $
@1$
$
$ $
STOCKING: Freight
ea
@
@
$ $
$
EQUIPMENT: Scissor Lift
ea
@
@
@
$ - - -T -
$
$ $
@
$ I I $
SUBCONTR:
--------------
I
@1
$
$ -- $
This change order request is based on the usual cost elements such as labor, material and
markup and does not include any amount for impacts
such as but not limited to interference, disruptions, rescheduling, change in sequence of
work, delays and/or acceleration, directly or indirectly
associates with this change order request. We expressly reserve the right to resubmit our
request for any items should we be faced with performing
this or other work under any ofthese conditions.
SINCERELY,
PERFORMANCE CONTRACTING, INC.
A ndil St-84ww
Andrea Steiner
LABOR SUBTOTAL 209
MATERIAL SUBTOTAL $ -
TAX 8.50%� $
STOCKING SUBTOTAL $
EQU I P M E NT SUBTOTAL $ -
SUBTOTAL $ 209
LABOR MARK UP 15%i $ 31
MATERIAL MARK UP 15%11 $ -
f
SUBTOTAL $ 240
SUBCONTR SUBTOTAL $ -
SUBCONTR MARKUP 5%'1 $ -
MBC BOND/CDI 0.0%1 $
TOTAL AMOUNT 240
Project Manager
Vol
06776
G- I �'C, �- j --Vp --j ,
, - y
-7 3.3
WHITE - PCI Office CANARY - File PINK - Customer
?, r
IQ PC �1, Performance Contracting Inc.
23485 Connecticut Street
PI
121 Y)I;ti4 \ "aC I Ha ward, CA 94545
< .c f'N1111< TIN <, 1-,( Y
Phone: (510)887-0995/ Fax: (510)264 -4926 Change Order Cost Proposal
DATE: February 21, 2012 COCP # 8
CONTRACTOR: Devcon Construction
PCI Job # 7237
ATTN: Bob Roseberry EMAIL: Broseberry�devcon- cons`..com
PROJECT NAME: Gilroy Public Library
DESCRIPTION: EWA 55 -2- 06773:
Install Egg Crate in lieu of insulation and pick up materials from supplier.
'Insulation was already purchased, so there won't be a material credit'
Project Manager
COST BREAKDOWNS
DESCRIPTION
REG 1.SX 2X
1 REG O.T.
D.T.
AMOUNT
LABOR: Project Manager
1 0 1 0 0 I hrs @ $ 130.43 ;
: $
Superintendent
Carpenter Foreman
Carpenter Journeyman
0 1 0 0 hrs @II $__1_02.85_; $_13_4.22 $ 165.8_2'• $
—; 2 t 0 0 hrs @; $ 88.81 ' $ 117.52 $ 146.22) $
0 0 0 hrs @ i $ 82 91 $ 109.01 ; $ 135.10 $
_.., - -
-
178
DESCRIPTION
QTY I
PRICE
MATERIALS: Egg Crate -_ -- _-
- -- 248 sf @; $ 2.72
@t $ -- - - - -- ---- - -
$
- - -- $—
676
- - -- - --
1 @1 $
@ $
$
@I $
$
- --
-- - --
@ C $ - -- - -- ---
— —� $—
- - --
STOCKING: Freight
g ........................_....
i ea
.. ._.. ........_ _ ........... -. _ .......
@� $ +
-.
$
- --
EQUIPMENT: Scissor Lift
ea
@ $
— --
— —_ —�
—$
—
SUBCONTR:
------------------
- - - - -- L --
@ $
_
@ $ -- -----
; $
- - - - -! $
- - --
I
@� $
$
This change order request is based on the usual cost elements such as labor, material and
markup and does not include any amount for impacts
such as but not limited to interference, disruptions, rescheduling, change in sequence of
work, delays and /or acceleration, directly or indirectly
associates with this change order request. We expressly reserve the right to resubmit our
request for any items should we be faced with performing
this or other work under any ofthese conditions.
SINCERELY,
PERFORMANCE CONTRACTING, INC.
AVl.d4 ealStieCtl.P.i<'
Andrea Steiner
LABOR SUBTOTAL
! $
178
_
MATERIAL SUBTOTAL { $
676
TAX 8.50W $ 57
STOCKING_ SUBTOTAL_
EQUIPMENT SUBTOTAL $
---------------------------
SUBTOTAL $ 91_1_
LABOR MARK UP 15% $
MATERIAL MARK UP 15% $
27
110_
SUBTOTAL : $
1,047
SUBCONTR SUBTOTAL $
-
_
SUBCONTR MARKUP 5%. $
MBC BOND /CDI 0.0% $
TOTAL AMOUNT $ 1,047
Project Manager
/f O
EXTRA WORK AUTHORIZATION 06773
r
r
A
ce
A(
Performance Contracting Inc.
23485 Connecticut Street
I'[
u` -: C2Kf�E2�9�^ fIN(:, y
Ha ward,CA94545
(_ ti2nC tr�C.
Phone: (510) 887 -0995 / Fax: (510) 264 -4926 Change Order Cost Proposal
DATE: February 21, 2012 COCP # c
CONTRACTOR: Devcon Construction
PCl Job # 7237
ATTN: Bob Roseberry EMAIL: Brow errv^deicor- constCrm
PROJECT NAME: Gilroy Public Library
DESCRIPTION: EWA 55 -2- 06772:
Remove and recut wood in Bay Windows to make a 1/4" reveal at front part of window.
Project Manager
COST BREAKDOWNS,
DESCRIPTION
REG I 1.5X 2X REG O.T.
D.T.
AMOUNT
LABOR: Project Manager
1 0 1 0 0 1 hrs @ I $ 130.43
Superintendent _
Carpenter Foreman
Carpenter Journeyman
1 0 1 0 0 ' hrs @ j $— 102.85 i $ 134.22 i $ 165.82 $
r 4 t 0 0 —hrs @ I $ _ 88.81 $ 117.52 $ 146.22 $
i 0 1 0 0 hrs @ i $ 82 91 $ 109 01 $ 135 10 : $
1...- .. ......
I
-
_ 355
... .. -
DESCRIPTION
QTY I PRICE
MATERIALS:
1 @rt $ - - --
$
I @
@1
[$
-
-- _� --
-
STOCKING: Freight
{ ea @ $
$
EQUIPMENT: Scissor Lift
- -- —
1 ea @ $
- - -- -- 1 @ $ - -- - -- - --
— $
$
--
I @1
SUBCONTR: ' @' $
$
$
$
This change order request is based on the usual cost elements such as labor, material and
markup and does not include any amount for impacts
such as but not limited to interference, disruptions, rescheduling, change in sequence of
work, delays and /or acceleration, directly or indirectly
associates with this change order request. We expressly reserve the right to resubmit our
request for any items should we be faced with performing
this or other work under any of these conditions.
SINCERELY,
PERFORMANCE CONTRACTING, INC.
Andrea Steiner
LABOR SU_BTOT_AL_
$
355
MATERIAL SUBTOTAL
TAX 8.50 %. $
STOCKING SUBTOTAL $
EQUIPMENT SUBTOTAL $
__
-------------- - - - - -- $
SUBTOTAL_
- -- 355_
LABOR MARK UP 15% $
MATERIAL MARK UP 15% $
_
53
SUBTOTAL $
_-
409_
_
SUBCONT_R SUBTOTAL $
SUBCONTR MARKUP 5% $
MBC BOND /CDI 0.0 %. $
_-
TOTAL AMOUNT $
409
Project Manager
4�
VA
RMO'
7
C/ C,
06 77<
A3
a PC 1 Performance Contracting Inc.
23485 Connecticut Street
FII N'Pt )I INI, \\,( i Hayward,CA94545
Phone: (510) 887 -0995 / Fax: (510) 264 -4926 Change Order Cost Proposal
DATE: April 18, 2012 COCP # 10
CONTRACTOR: Devcon Construction
PCI Job # 7237
ATTN: Bob Roseberry EMAIL: Breseberfv!a)devcon -const com
PROJECT NAME: Gilroy Public Library
DESCRIPTION: EWA 55 -2- 06775:
Install all backers for wood at Plaster Ceilings (Rooms 105 and 116).
COST BREAKDOWNS
DESCRIPTION I REG 11.SX
2X
REG I
O.T.
D.T. )
AMOUNT
LABOR: Project Manager j 0 0 j
-0 j
hrs j@
$ 130.4—
3 I
$
Superintendent 0 I 0
Carpenter Foreman 6 8 ;
— — - — — tt
CarpenterJourneyman 12 16 I
- - -- — - - -- -- — — i --
00 j
0
—
0
- — --
hrs
hrs
—
hrs
hrs
@
@ -$
@
—
102.85
88.81$
--
$ 82.91
— -- --
$_134.22
117.1$
----
$ 109.01
- - - --
$__165.82
146.221
- --
$ 135.101
-$ 135.1 - f-
$
$ 1,473
— --
$ 2,739
-- - — --
DESCRIPTION
QTY I
_PRICE
- - - - -- —
MATERIALS: 1-1/4" Brad Pin Nails I
- - - - ----- - - - - j
j
4
bx -{
1
@
@
$ 45,00
I $
1
$ 180
$
- -- - - - - - --
__
—f-
I
- - --
@
IC
$
$ —
STOCKING: Freight
ea
@
I $
$
EQUIPMENT: Scissor Lift
- - - --
- - -- — - --
ea
@R
$ -
$
I---
@
$
$
SUBCONTR:
j
@($
I
$
-
- -
-
-
+- -1
-- --
This change order request is based on the usual cost elements such as labor, material and
LABOR SUBTOTAL
j $
markup and does not include any amount for impacts
MATERIAL SUBTOTAL $
__4,212
180
such as but not limited to interference, disruptions, rescheduling, change in sequence of
work, delays and /or acceleration, directly or indirectly
_
TAX _ 8.50 %1
$ 15
STOCKING SUBTOTAL
—
$ -
associates with this change order request. We expressly reserve the right to resubmit our
-- --- - - - - -- - - — - --
EQUIPMENT SUBTOTAL
r- - -- --- - - - - --
$ -
request for any items should we be faced with performing
- - - --
SUBTOTAL�
$ 4,407
this or other work under any of these conditions.
LABOR MARK UP 15 %1
$ 632
MATERIAL MARK UP 15%i
$ 29
SUBTOTAL
$ 5,069
SINCERELY,
SUBCONTR SUBTOTAL
$ -
PERFORMANCE CONTRACTING, INC.
SUBCONTR MARKUP 5 %1
$
MBC BOND /CDI 0.0 %1
$
A nd4 -e,w sr6*1 Pr
Andrea Steiner
TOTAL AMOUNT
$ 5,069
Project Manager
Apt
EXTIZA. WORK AUTHORIZATION, -7 7 5
06
3-7
7�f
f
EXTRA WORK AUTHOREZATION
0677t'i
I I
4<
Total:
"IF- - PC! Mice CANARY - File PINK - Customer
co
Total:
"IF- - PC! Mice CANARY - File PINK - Customer
k�-
CPR 192
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 5/3/2012
We submit for your approval the following estimate of changes in work:
Extend Cu Gutter over to trellis per Inspector request
24 Sheet Metal
$526.00
Wildcat Metals 18: Extend Cu Gutter over to trellis per
$526.00
Inspector request
Subtotal
$526.00
70 Fee
10.00% $53.00
Total
$579.00
72 Amount applied to Contingency
$0.00
73 Amount applied to OT Allowance
$0.00
Net change order amount
$579.00
❑ We have proceeded with this change per the direction of:
❑, We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx/xx /xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
Al
890 Faulstich Ct.
San Jose, CA
95112
Change Order #18
Customer Name: DEVCON
Contact Name:
Phone #: 0
Fax #: 0 Job Address:
City:
=Additional gutter to be hung: feet
=Additional Downspouts: (lx) 2(x)
X0ther: EXTEND CU'17ER OVER TRELLIS
Office: 40 8-295 -6507
Fax: 408 - 295 -5873
Job #: RA110167
Date:
7387 ROSANNA ST
GILROY
SUPPLY AND INSTALL APPROX. 6' OF 1/2 ROUND COPPER GUTTER TO EXTEND
GUTTER OVER TRELLIS AND MOVE ONE DOWNSPOUT TO DARIN IN DEFFERENT
LOCATION.
r
Additional Amount Due / $526.00
The work covered by this or, er sh -be performed under the same Terms & Conditions
as that included in the Original Contract.
' This re%gs'Oil becomcs part of, and in conformance pith, (lie e�su c Ana /
Date � i%Z_ Authorized Signature /�i p
Date 4/16/2012 Wildcat Contact Kino Cruz
A&
CPR 190
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 5/7/2012
We submit for your approval the following estimate of changes in work:
H/C signage, striping, wheelstops for Paseo and interface.
6 Pavement Markings $3,309.00
Weatherly Striping Co.: H/C signage, striping, $2,564.00
wheelstops for Paseo and interface.
Weatherly Striping Co.: Add a stop sign and pavement $745.00
lettering at exit from parking lot to Hanna St.
Subtotal $3,309.00
70 Fee 10.00% $331.00
Total $3,640.00
72 Amount applied to Contingency $0.00
73 Amount applied to OT Allowance $0.00
Net change order amount $3,640.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx/xx/xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
Weatherly Striping Co., Inc. DAILY FORCE ACCOUNT REPORT
733 Industrial Rd. Ste. A
San Carlos CA 94070
Date of Work:
04/23/12
Description of Work:
ADA, Miscellaneous Work
Devcon Construction
Gilroy Library
Contract No.
Contractor's Job No.
Equip.
No.
Equipment
Day
Day Rate
Extended
Amounts
Labor
Hours
Hourly Rate
Extended
Amounts
Thermoplastic Truck
250.00
F350 Flatbed
1.00
150.00
150.00
Journeyman
Reg. 8.0
53.96
431.68
Truck
125.00
O.T. 1.5
73.63
110.45
,Pickup
Striping Machine
1.00
27.001
27.00
Trainee
Reg. 16.0
40.65
650.40
Striping Machine
1.00
27.00
27.00
O.T. 3.0
54.42
163.26
Striping Machine
1.00
27.00
27.00
Propane Torch
20.00
Traffic Control
35.00
Arrow Board
125.00
Core Driller
1.00
50.00
50.00
Blower
1.00
20.001
20.00
Thermo lastic Liner
75.00
Material
Description
No. Unit
Unit Cost
Added Percentage - (see special provisions)
Subsistence No. 0 (CD
Travel Expense No. 0 @
Other
R99 Sign Panel, ea.
2
9.50
19.00
Sign Post, ea.
4
40.00
160.00
Custom ADA Sign Panel, ea.
6
27.00
162.00
4' Concrete Wheel Stop, ea.
2
24.00
48.001
Total Cost of Labor
A
1355.79
Temporary Tabs, ea.
1.00
Bituminous, block
9.00
+15% on Labor Cost
10
(A)
B
203.37
873.64
Primer, gallon
Traffic Paint, gallons
10
25.00
14.00
140.00
Sales Taxj
0.0825
43.64
Total Cost of Equipment, Materials and Work
><
+15% on Equipment, Material Cost
Sub -Total
For District Use Only
Pd. On Est. No.
Checked By Total This Report
131.05
2563.84
Contractor's Representative
Anronfoii fnr Pmnracc Pavmant
2563.84
Resident Engineer A
WEATHERLY STRIPING COMPANY, INC. P.O. / Contract #
733 Industrial Road Ste. A San Carlos CA 94070 Customer Job #
LICENSE #436961 PHONE 650 - 802 - 9818x14 FAX 650 - 802 -0224
josh�aweatherlvstrioinq com
Proposal and Contract
Date: May 7, 2012
Office Contact: Bob Roseberry
Field Contact:
To: Devcon Construction, Inc. Project Name: Gilroy Community Library
690 Gibraltar Dr. 7387 Rosanna St.
Milpitas, Ca 95035 Gilroy, CA 95020
Attn: Bob Roseberry Stop Sign and Legend
Per phonecall from Bob
furnish labor and material to stripe and /or install:
QNTY DESCRIPTION AMOUNT
ea STOP legend, 8' wlstop bar, 12" white
ea R1 metal STOP sign installed
Total Bid $745.00
Pavement markings to be one coat paint, unless noted otherwise.
Proposal is based on one move -in(s) during normal working hours (Mon. - Fri., 7:00 am - 5:00 pm). Add $350.00 for Saturday
move -in and $500.00 for Sunday move -in. Additional charges will be assessed for move -ins beyond the quantity quoted.
Above price valid for 30 days from proposal date. Signed proposal, purchase order, or contract required to
schedule a project and initiate work.
ame
Josh Crittendon
Estimator / Project Manager
C'o