HomeMy WebLinkAboutDevcon Construction - Library Construction - Change Order No. 39City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846 -0451; Fax (408) 846 -0429
CHANGE ORDER NO. 39
To contract for : New Gilroy Library Project, Phase 2
Contractor: Devcon Construction
Contract Date: 6/15/2010
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work This Change Order provides for the following:
Landscaping, Grading, Paving and Labor for Paseo,CPR's: 187, 199 (see attached CPR's)
CPR 187 - Added Landscaping around perimeter of site $21,476.00
Collishaw Construction, Inc.: Added Landscaping by old PD; Added Landscaping
by Family Services and Rosanna dded DG and rework along 6th St.
PR199 E_..'..swrefor6rey- Water -Sy 0 $65,816.00
Piped Utilities , Robinson & More ti, Inc : Grading and Paving and Labor
at Paseo and Rosanna Street
Total $87,292.00
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption, loss
of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives
any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with
the Extra Work.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $87,292.00
CONTRACTOR
By:IS� Date: �b /Z
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost Percentage initial
$18,177,226.00
$2,054,746.46 11.30 %_
$20,231,972.46
$87,292.00
$2,142;038.46 11.78% t4/e
$20,319,264.46
RECOMMENDED BY
ACCEPTED BY:
9-
z
CPR 187
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 4/30/2012
We submit for your approval the following estimate of changes in work:
Added Landscaping around Perimeter of site
11 Planting Work $19,524.00
Collishaw Construction, Inc.: Added Landscaping by old $9,930.00
PD
Collishaw Construction, Inc.: Added Landscaping by $6,491.00
Family Services and Rosanna St.
Collishaw Construction, Inc.: Added DG and rework $3,103.00
along 6th St.
Subtotal
70 Fee
Total
72 Amount applied to Contingency
73 Amount applied to OT Allowance
Net change order amount
$19,524.00
10.00% $1,952.00
$21,476.00
$0.00
$0.00
$21,476.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx/xx /xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Devcon -Bob Roseberry
Approved by:
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
4
OLLISHAW
ONSTRUCTION, Inc.
Site Development
April 30, 2012
Attn: BOB ROSEBERRY
Re: GILROY LIBRARY EXTRAS
T & M Tags for work completed
Dear Mr. Roseber><y,
Our pricing per the above mentioned project is as follows:
T &M Tag dated 4/25/2012 $ 3,103.08
Please review and let me know if you have any questions or concerns.
Respectfully,
Robert Jimenez Jr.
1125 Mabury Road • San Jose, CA 95133 a (408) 995 -3404 • Fax (448) 294 -4586
Mailing Address: P.O. Box 611718 • San Jose, CA 95161 -1718
"An Equal Opportunity Employef' State License #449324
COLLISHAW CONSTRUCTION, INC.
6
CHARGE TO: Aouw1j 6 _,� r Ll 9-My
DESCRIPTION OF WORK: JdL$\ V1eQx_Ny4 L1_NN1,SCe,2_e_
0.Y` cx-k.)p j).
5
P.O. BOX 611718 SAN JOSE, CA 95161 408-995-3404
PAX 408-294-4586
Contractor P.O. or W.O. No.
Contractor Job No.
Coltsbam Construction Job No.
DATE I/ -. - 2 s b
COLUSKAW CONSTRUCTION, INC. REP.
WHITE -OFFICE COPY, CANARY -BOOK COPY, PINK-CUSTOMER
CONTRACTOMP,
Do NOT We In Space Behr
OFFICE USE ONLY
LABOR -NAME CLASSIFICATION
HOURS
RATE
EXTENSION
lei I
_7n(J : lu
SUB-TOTALWAGES
LABOR MARKUP
SUB-TOTAL
a co(V
PLUS
.T 3_1
SUB-TOTAL
EQUIPMENT - Con"te D04UO NUMBER
SUB-TOTAL EQUIPMENT
PLUS
SUB-TOTAL
QUANTITY
MATERIAL
V :�_
7
is
61
55
S
SALES TAX
SUB-TOTAL
b- b
PLUS
SUB-TOTAL
T O T A L
()3,o
COLUSKAW CONSTRUCTION, INC. REP.
WHITE -OFFICE COPY, CANARY -BOOK COPY, PINK-CUSTOMER
CONTRACTOMP,
16
COLLISHAW CONSTRUCTION, INC.
CHARGE TO: be VC -0 p-
DESCRIPTION OFWORK:-afe,G jr,,�,/,,-,—
P.O.]B0X611718 SAN JOSE, CA95161 408-995-3404
FAX 408-294-4586
Contractor P.O. or W.O. No.
Contractor Job No.
Collishaw Construction Job No.
DATE
LABOR -NAME
CLASSIFICATION
HOURS
Do NOT Write In Space Below
OFFICE USE ONLY
RATE
EXTENSION
0,
SUB -TOTAL WAGES1
LABOR MARKUP
SUB-TOTAL
Si
711,
PLUS
SUB-TOTAL
j
5 .055, 6
EQUIPMENT - Complete Description
NUMBER
C. h
SUB-TOTAL EQUIPMENT
PLUS
SUB-TOTAL
QUANTITY
MATERIAL
..........
tl_
F
SALES TAX
b- -x2y)'
-a-
SUB-TOTAL
?'D
PLUS
ELL
L-5, dh
SUB-TOTAL
J
I
TOTAL
COLLISHAW CONSTRUCTION, INC. REP.
TRACTOR'S REP,
6
WHITE- OFFICE COPY, CANARY -BOOK COPY, PtNK - CUSTOMER
COLLISHAW CONSTRUCTION, INC.
CHARGE TO: ___j
DESCRIPTION OF
P.O. BOX 611718 SAN JOSE, CA 95161 408 -995 -3404
FAX 408 - 294 -4586
Contractor P.O. or W.O, No..
Contractor Job No. d —Zl k
Collishaw Construction Job No. / 2/� �,,%
DATE t-/ z cC �4`r�! G=
COLLISHAW CONSTRUCTION, INC. REP.
WHITE -OFFICE COPY, CANARY- BOOK COPY, PINK-CUSTOMER
COf'� IF; T0P'S REP,
_". .
Do NOT Write In Space Below
OFFICE USE ONLY
LABOR - NAME CLASSIFICATION
HOURS
RATE
EXTENSION
lesl' J
�Ji , i>
i 0 1 ^ !
rj�h,
11
SUB -TOTAL WAGES
LABOR MARKUP
4,
i 7 03 .5
SUB -TOTAL
lab ik,
PLUS
aCl
SUB -TOTAL
EQUIPMENT - Complete Description NUMBER
SUB -TOTAL EQUIPMENT(
PLUS
SUB -TOTAL
Ia
QUANTITY
MATERIAL
40
'5.
-1
I X0
SALES TAX
b : �"
1 `b , }0
SUB -TOTAL
b r }D
PLUS
ib a
117 vi-
SUB-TdTAL
) S11 . 5
TOTAL
Cl 930r)
COLLISHAW CONSTRUCTION, INC. REP.
WHITE -OFFICE COPY, CANARY- BOOK COPY, PINK-CUSTOMER
COf'� IF; T0P'S REP,
_". .
OLLISHAW
ONSTRUCTION, Inc.
Site Development
April 23, 2012
Attn: BOB ROSEBERRY
Re: GILROY LIBRARY EXTRAS
T & M Tags for work completed
Dear Mr. Roseberiy,
Our pricing per the above mentioned project is as follows:
T &M Tag dated 4/12/2012 $ 6,491.40
T &M Tag dated 4 /20/2012 $ 9,930.19
TOTAL: $ 16,421.59
PIease review and let me know if you have any questions or concerns.
Respectfully,
obert Jimenez Jr.
1125 Mabury Road • San Jose, CA 95133 • (408) 995 -3404 • Fax (408) 294 -4586
Mailing Address: P.O. Box 611718 • San Jose, CA 95161 -1718
"An Equal Opportunity Employef' State license #449324
a
CPR 199
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 5/9/2012
We submit for your approval the following estimate of changes in work:
Grading and Paving and Labor at Paseo and Rosanna Street
4 Piped Utilities
Robinson & Moretti, Inc : Grading and Paving and Labor
at Paseo and Rosanna Street
Subtotal
70 Fee
Total
72 Amount applied to Contingency
73 Amount applied to OT Allowance
Net change order amount
$59,833.00
$59,833.00
$59,833.00
10.00% $5,983.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx/xx /xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:'
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
$65,816.00
$0.00
$0.00
$65,816.00
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
1i
ROBINSON & MORETTI, INC.
7780 HOLSCL AW ROAD
GILROY, CA 95020
PHONE 408 - 842 -5593
FAX 408 - 842 -7763
EXTRA WORK ORDER
JOB NAME: DATE
Gilroy Community Library May 8, 2012
CONTRACTOR:
Devcon Construction, Inc.
690 Gibraltar Drive
Milpitas, Ca 95035
You are hereby authorized to perform the following specifically described additional work::
Change Order T & M Paseo II
Equipment Rental $8,536.67
Material $11,720.52
Trucking $10,000.00
Misc. Material $3,475.00
Wages -PW $26,100.7 4
$59,832.93
Above additional work to be performed under the same conditions as specified in the
Original Contract unless otherwise stipulated above. This revision becomes part of, and in
conformance with, the existing Contract.
Submitted by: (Subcontractor) Work authorized by: (Contractor)
Rich Robinson & Moretti, Inc.
Title: Supervisor Title:
Date: 05/08/12 Date:
This is Change Order