HomeMy WebLinkAboutDevcon Construction - Library Construction - Change Order No. 40To contract for: New Gilrov Li
Contractor: Devcon Construction
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846 -0451; Fax (408) 846 -0429
CHANGE ORDER NO. 40
Phase 2
Contract Date: 6/15/2010
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work This Change Order provides for the following:
CPR's: 175,197, 198, 203, 204, 205, 209, 210, 211, 212 (see attached CPR's)
CPR 175 - Furnish and install vault on North PL for fiber optics
CPR 197 - 12 extra precast radius cap pieces for Paseo, moterial only
CPR 198 - Furnish and install 6 caps to finish circular seat wall in Paseo
CPR 203 - Pour curbs along 6th St. and Rosanna parking
CPR 204 - Video record Library Systems training sessions
CPR 205 - Dismantle and shorten book theft security wall next to sensors
CPR 209 - Drywall modifications per Architect request
CPR210 - Repair carpet where stacks layout changed
CPR211- Electrical work as requested
CPR212 - Electrical per CM Field direction
CPR214 - Added framing and drywall ar North 10" circle
$6,309.00
$1,045.00
$935.00
$8,084.00
$4,400.00
$3,769.00
$11,712.00
$3,728.00
$5,244.00
$22,141.00
$10,341.00
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are
in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of
efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives
any right to claim any further cost and time impacts at any time during and after completion of the Contract . associated with
the Extra Work.
I (We) agree to make the above change
subject to the terns of this Change Order
for the NET INCREASE of $77,708.00
JiGVK %V
CONTRACTOR
By: Date:--7/2 4
Cost
Percentage Initial
Original Contract Price
$18,177,226.00
Previous Change Orders
$2,142,038.46
11.78%
Total to Date
$20,319,264.46
This Change Order
$77,708.00
Total Change Orders to Date
$2,219,746.46
12.21 %�
Revised Contract Price
$20,396,972.46
CPR 175
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 4/2/2012
We submit for your approval the following estimate of changes in work:
Furnish and install vault on North PL for fiber optics.
4 Piped Utilities
Robinson & Moretti, Inc : Furnish and install vault on
North PL for fiber optics.
Subtotal
69 Fee
Total
71 Amount applied to Contingency
72 Amount applied to OT Allowance
Net change order amount
$5,735.00
$5,735.00
$5,735.00
10.00% $574.00
$6,309.00
$0.00
$0.00
$6,309.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx /xx/xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
ROBINSON & MORETTI, INC.
7780 HOLSCLAW ROAD
GILROY , CA 95020
PHONE 408 - 842 -5593
FAX 408 - 842 -7763
EXTRA WORK ORDER
JOB NAME: DATE
Gilroy Community Library April 2, 2012
CONTRACTOR:
Devcon Construction, Inc.
690 Gibraltar Drive
Milpitas, Ca 95035
You are hereby authorized to perform the following specifically described additional work::
Change Order
Supply & Install ATT Vault near 6`h Street $5,735.00
(Conduit installation by others)
Above additional work to be performed under the same conditions as specified in the
Original Contract unless otherwise stipulated above. This revision becomes part of, and in
conformance with, the existing Contract.
Submitted by: (Subcontractor) Work authorized by: (Contractor)
Rich Robinson & Moretti, Inc.
Title: Supervisor Title:
Date: 04/2/2012 Date:
This is Change Order
CPR 197
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 4/4/2012
We submit for your approval the following estimate of changes in work:
12 extra precast radius cap pieces, material only for Gilroy Paseo
14 Masonry
$950.00
Panatia Masonry : 12 extra precast radius cap pieces,
$950.00
material only for Gilroy Paseo
Subtotal
$950.00
70 Fee
10.00% $95.00
Total
$1,045.00
72 Amount applied to Contingency
$0.00
73 Amount applied to OT Allowance
$0.00
Net change order amount
$1,045.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx /xx /xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
bY00:1SS•wwJ Nogvuna . b9Z0ZZM8 01Sa . VSINa . 91XVAIHJ18G8A8 .1aw1134oIJAe0 a013ed1 Wd 1'6:t OZ UOZ1819 IV aA38 . in 35Vd
HLLJI I IVIVAL VVVKi% A U I HVKILA I WN
PATANIA MASONRY
1176 LOYOLA DR
Salinas, CA 93901
(831) 422 -2769 FAX (831) 422 -0264
ATTENTION BOB ROSEBERRY LIC. #324209
CONTRACTOR
DEVCON CONSTRUCTION
PHONE
408 - 942 -8200 DATE: 5/8/2012
STREET
690 GIBRALTAR DR
FAX
408-262-2342
MY, STATE, aP CODE
MILPITAS, CA 95035
roe:
GILROY LIBRARY
ARCHRECT
LOCAMN
7387 ROSANNA ST
EXW.CONTROATE a NO.
WE NO.
GILROY, CA
You are hereby authorized to perform the following specifically described additional work
CHANGE ORDER
FOR 12 RADIUS CAPS MATERIAL ONLY
$950.00
TO INSTALL CAPS WILL CAHRGE TIME AND MATERIAL
PLEASE APPROVE CHANGE ORDER BEFORE MATERIAL CAN BE
ORDERED.
Due to the current California energy crisis our suppliers may experience difficulties in the production of me
Patania Masonry reserves the right to modify this proposal at any time due to increases of more than 5% i
cost of natural gas, electricity, or petroleum products used in the manufacturing or distribution of the matei
our suppliers. Patania Masonry is not responsible for any delays or non - performance caused by our supp
due to electrical or natural gas shortages.
ADDITIONAL CHARGE FOR ABOVE WORK IS: $ SEE ABOVE
Payment to be made as follows: AS JOB PROGRESSES
I Above additional work to be perfon»ed under same conditions as specified in original contract unless otherwise stipulated.
AUTHORIZING SIGNATURE:
DATE: Owner signs here
We hereby agree to furnish labor and materials - complete in accordance with the above specifications, at above stated price.
I AUTHORIZING SIGNATURE: signs h Date 518/2012
(oOrtUaCtAr are)
II THIS IS CHANGE ORDER NO. 1
li Node: This Revision beoomea part of, and in cOr forrnance with, the ooxraa.
'too/ too 0) 69707.7 UR YVA 67.:bi 7T07. /R0 /50
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 4/4/2012
We submit for your approval the following estimate of changes in work:
Furnish and install 6 caps to finish circular seat wall in Paseo
14 Masonry
$850.00
Panatia Masonry : Furnish and install 6 caps to finish
$850.00
circular seat wall in Paseo
Subtotal
$850.00
70 Fee
10.00% $85.00
Total
$935.00
72 Amount applied to Contingency
$0.00
73 Amount applied to OT Allowance
$0.00
Net change order amount
$935.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx /xx /xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
U4 /1y /ZU1Z 1Z:4U PAX 8314Z2U264 LgjUU1 1UU1
ADDITIONAL WORK AUTHORIZATION
PATANIA MASONRY
1176 LOYOLA DR
Salinas, CA 93901
(831) 422 -2769 FAX (831) 422 -0264
ATTENTION BOB ROSENBERRY LIC. #324209
CONTRACTOR
DEVCON CONSTRUCTION
PHONE
408- 942 -8200 DATE: 4/19/2012
STREET
690 GIBRALTAR OR
FAX
408- 262 -2342
CITY. STATE, ZIP CODE
MILPITAS, CA 950M
Joe:
GILROY LIBRARY
ARCMWCT
wcATIoN
GILROY, CA
EMST.CONTR.O/ATE 6 NO_
JOB NO
You are hereby authorized to perform the following specifically described additional work
SHORT 6 CAPS DUE TO PLANTER NOT BUILT AT
A 12FT RADIUS
$850.00
PLEASE APPROVE BEFORE MATERIAL CAN BE ORDERED
Due to the current California energy crisis our suppliers may experience difficulties in the production of mz
Patania Masonry reserves the right to modify this proposal at any time due to increases of more than 5% 1
cost of natural gas, electricity, or petroleum products used in the manufacturing or distribution of the mate
our suppliers. Patanla Masonry is not responsible for any delays or non - performance caused by our supp
due to electrical or natural gas shortages.
ADDITIONAL CHARGE FOR ABOVE WORK IS: $ SEE ABOVE
Payment to be made as follows: AS JOB PROGRESSES
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
AUTHORIZING SIGNATURE:
DATE: Owner signs here
We hereby agree to furnish labor and materials - Complete in accordance with the above specifications, at above stated price.
AUTHORIZING SIGNATURE: Date 411912012
(coI signs here)
THIS IS CHANGE ORDER NO. 3
Note: This Revision boo mes pad or, and in oorlformarloe with, the adsting ow*act.
PAGE 111 " RCVD AT 411917017 17:16:05 PM rparinr. Daviinht Time.1 • SVR:RICHTFAY16. DNIS,1 " CSID:R314770764I DURATION 1mm- sc1:01•n0
CPR 203
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 5/17/2012
We submit for your approval the following estimate of changes in work:
Pour Curbs along 6th St and Rosanna parking
7 Cement Concrete Paving
$7,349.00
Landava=o Brothers 95 -001: Pour Curbs along 6th St
$3,724.00
Landava=o Brothers 95 -008: Break out curbs where
$2,125.00
incorrectly laid out by survey
Landava=o Brothers 95 -007: Break out curbs that were
$1,500.00
incorrectly surveyed
Subtotal
$7,349.00
70 Fee
10.00%
$735.00
Total
$8,084.00
72 Amount applied to Contingency
$0.00
73 Amount applied to OT Allowance
$0.00
Net change order amount
$8,084.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx /xx /xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
ILA.NDAVAZO DA I LY EXTRA WO R K R E PO RT
BROS. INC. 29280 PACIFIC STREET s HAYWARD, �""ALIFORNIA 94544 m (510) 581-7104 No. IS, " 1 23
CONCRETE CONTRACTOR FAX (510) 581-7423
WORK PERFORMED FO
DESCRIPTION OF WORK
RROJECT / J613 N6:=
PHASE
LABOR
HOURS
HOURLY EXTENDED
RATE,. . AMOUNTS
MATERIAL AND/OR WORK DONE SY SU13-CONTRACTORS
DATE
PERFORMED
R EG.
PHASE
DESCRIPTION O_ UNIT
UNIT COST
OT
GATE
OF
REPORT
RROJECT / J613 N6:=
PHASE
LABOR
HOURS
HOURLY EXTENDED
RATE,. . AMOUNTS
MATERIAL AND/OR WORK DONE SY SU13-CONTRACTORS
ELL,
R EG.
PHASE
DESCRIPTION O_ UNIT
UNIT COST
OT
j i
CONCRETE
I
7
O.T.
I
PATCH MAT.
REG.
O.T.
FORMS
REG.
01
REBAR
REG,
O.T.
REG
CURE
loj
REG
I 1
PHASE
PUMP
HOURS
EQUIPMENT
HOURLY EXTENDED
___._BATE AMOUNT
ol
REG
J
1-TON IFLATBED
TRUCK WITH
PLACE & FINISH TOOLS
01,
1
GENERATOR.
REG
O.T.
COMPRESSOR
CHIPPER
--
REG
ol
I
GRINDER
REG.
OT
TOTAL
. .......... . ..
TOTAL COST OF MATERIALS & EQUIPMENT
TOTAL COST OF LABOR
Er
OVERHEAD & PROFIT
Af LANDAY @R iNVEPRESENTATIVE• I 13OND
CUSTOMER AUTHORIZED REPRESENTATIVE
CUSTOMER P.O. No.:
DAIUY EXTRA WORK REPORT
BROS. C. 29280 PACIFIC STREET - HAYWARD, GALIFORNIA 94644 e (610) 581-7104 No. All, !;�
CONCRETE CONTRACTOR FAX (510) 581-7423
f o DATE PERFORMED
'DATE OF R
PROJECT / JOo NO,
PHASE L
LABOR H
HOURS H
HOURLY EXTENDED
RATE AMOUNTS M
MATERIAL AND /OR WORK DONE BY SUB-CONTRAM)RS j
REG. O
PHASE —
— DESCRIPTION U
jJ
OT C
- -
O.T. P
PATCH MAT,
FORMS
O.T. F
REG,
RESAR
REG,
0 1 E
Lin
— - -- - ---------- -
- -----
REG.
- ----- ----
O.T. P
PHASE H
UIPMENT R
HOURS HOURLY EXTEN'DED
REG P
O.T. -
-TON F
FLATBED TRUCK
REG I
I I P
0 T,
GENERATOR
REG. j
j C
COM tSSOR
U.T. C
CHIPPER
— -------- - -------
REG. i
i I G
GRINDER -
-- ---------
D.T.
REG,
DT
TOTAL COST OF MATERIALS &
& EQUIPMENI
- ----------
TOTAL T
TOTAL COST O
OF LAB or I
X.-
I1 . 0/.
LANDAVAZO ELROS. INC. REPRESENTATIVE
CUSTOMER AUTHORIZED REPRESEN-TATLVE
CUSMM`ER P.O. No,: — .
OVERHEAD & PROFIT
BOND
DAILY EXTRA WORK REPORT No. .0499
BROS. INC. 29280 PACIFIC STREET a HAYWARD, CALIFORNIA 94544. (510) 581-7104
CONCRETE CONTRACTOR FAX (510) 581-7423
WORK PERFORMED FOR
DESCRIPTION OF WORK i. 2
.J
lot I I
REG.
nT
REG.
OT
REG. I
TOTAL
ILANOAVAZO C. REPRES�fj.TATIVE
7e
e ;CUSTOMER AUTHORIZED REPRESENTATIVE
/ l I
MERR.O. No.-
PATCH MAT.
FORMS
FE1=1CURE
W
-------------
PHASE 1-LOURS I IOURLY EXTENDED
All AW)UN-1
PUMP
1-TON FLATBED TRUCK WITH
PLACE & FINISH TOOLS
GENERATOR
COMPRESSOR
_R
CHIPPER
GRINDER
•
------ ---- - ----- . ......
TOTAL COST OF MATERIALS & EQUIPMENT
TOTAL COST OF LABOR
+ OVERHEAD & PROFIT
BOND
to ra
.-Mc
PHASE
LABOR
HOURS
URLY
Ho T
RA E
EXTENDED
AMOUNTS
ANDIOR
MATERIAL WORK DONE BY SUB-CONTRACTORS
O.T.
PH ASE
DESCRIPTION
NO UNIT
COST
REG.
OT
t
CONCRETE
t� i Ikj
7
O.T.
lot I I
REG.
nT
REG.
OT
REG. I
TOTAL
ILANOAVAZO C. REPRES�fj.TATIVE
7e
e ;CUSTOMER AUTHORIZED REPRESENTATIVE
/ l I
MERR.O. No.-
PATCH MAT.
FORMS
FE1=1CURE
W
-------------
PHASE 1-LOURS I IOURLY EXTENDED
All AW)UN-1
PUMP
1-TON FLATBED TRUCK WITH
PLACE & FINISH TOOLS
GENERATOR
COMPRESSOR
_R
CHIPPER
GRINDER
•
------ ---- - ----- . ......
TOTAL COST OF MATERIALS & EQUIPMENT
TOTAL COST OF LABOR
+ OVERHEAD & PROFIT
BOND
to ra
.-Mc
O.T.
REG.
O.T.
REG.
ol
REG.
O.T.
lot I I
REG.
nT
REG.
OT
REG. I
TOTAL
ILANOAVAZO C. REPRES�fj.TATIVE
7e
e ;CUSTOMER AUTHORIZED REPRESENTATIVE
/ l I
MERR.O. No.-
PATCH MAT.
FORMS
FE1=1CURE
W
-------------
PHASE 1-LOURS I IOURLY EXTENDED
All AW)UN-1
PUMP
1-TON FLATBED TRUCK WITH
PLACE & FINISH TOOLS
GENERATOR
COMPRESSOR
_R
CHIPPER
GRINDER
•
------ ---- - ----- . ......
TOTAL COST OF MATERIALS & EQUIPMENT
TOTAL COST OF LABOR
+ OVERHEAD & PROFIT
BOND
to ra
.-Mc
`Z .. T
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 5/18/2012
We submit for your approval the following estimate of changes in work:
Video recording of Library systems training sessions
1 General Requirements $4,000.00
Devcon : Video recording of Library systems training $4,000.00
sessions
Subtotal
70 Fee
Total
72 Amount applied to Contingency
73 Amount applied to OT Allowance
Net change order amount
$4,000.00
10.00% $400.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx/xx /xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
$4,400.00
$0.00
$0.00
$4,400.00
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
Community Media Access Partnership
5055 SANTA TERESA BLVD
GILROY, CA 95020
408 - 846 -4983
Proposed Production
Devcon Construction - Library Training Video
Description of Work Plan
CMAP will videotape five days of training at the new Gilroy Library from Monday March
19 - Friday March 23rd and create a series of DVDs.
CMAP Will:
• Provide crew for videotaping event and editing
• Shoot five days of training sessions.
• Edit the footage and add in titles, lower thirds, logos and credits
• Author DVDs and provide one copy to the client
Service Rates
Live event coverage with crew
Editing and DVD services- one set
Total:
*Please allow for up to four weeks for delivery of final product.
$2,000
$2,000
$4,000
Client Signature CMAP Representative
NOW
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 5/18/2012
We submit for your approval the following estimate of changes in work:
Dismantle and shorten book theft security wall next to sensors
29 Glass and Glazing $3,426.00
Silicon Valley Glass ROM: Dismantle and shorten Glass $3,426.00
wall next to theft detectors
Subtotal
70 Fee
Total
72 Amount applied to Contingency
73 Amount applied to OT Allowance
Net change order amount
$3,426.00
10.00% $343.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx /xx /xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
$3,769.00
$0.00
$0.00
$3,769.00
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
Gilroy Library
Changes Requested by Devcon
Labor Materials Labor Profit Materials Total
Profit Change
Description of Work
TOTAL $ 4,235.87
Field Report 3652 - Caulk Gap Between Threshold & Terrazzo Floor @ Two Openings
$ 220.00
$ -
$ 55.00
$ -
$ 275.00
Field Report 3656 - Caulking at Elevator
$ 132.00
$ 36.00
$ 33.00
$ 3.60
$ 204.60
Field Report 3460 - Cut down door #118B which was rubbing due to an unlevel floor
$ 88.00
$ -
$ 22.00
$ -
$ 110.00
condition
Field Report 3660 - Reconfigure handrail per contractors request due to conflict with
$ 2,552.00
$ 214.79
$ 638.00
$ 21.48
$ 3,426.27
book security system by others.
Field Report 3461- Cut down learning center door #208 which was rubbing due to an
$ 176.00
$ -
$ 44.00
$ -
$ 220.00
unlevel terrazo floor condition
TOTAL $ 4,235.87
N0 3660
220 vineyard Ct FIELD REPORT/ AUTHORIZATION
Suite 150
Morgan Hill, CA 95037 THIS WORK IS
P 408 -778 -7786 Additional Requested By Contractor
F 408 - 778 -8203 ❑ Required Due to Field Conditions
www.siliconvalleyglass.com I ❑ Overtime Approved by Contractor
Project
THIS WORK IS BILLABLE IN ACCORDANCE WITH THE FOLLOWING
Contractor
Y�
Reference
Number Date Issued
DESCRIPTION OF WORK
THIS WORK IS BILLABLE IN ACCORDANCE WITH THE FOLLOWING
Change Order
r _
❑ Work 60hozAon
Number Date Issued
Authorized B
Dale
Signature
BY SINGING HERE YOU ACKNOWLEDGE THIS WORK IS BILLABLE IN ADDITION
TO OUR CONTRACT AND YOU ARE AUTHORIZED TO APPROVE SUCH WORK.
DESCRIPTION OF WORK
Work Date Start Time End Time Hours On Site
OYERIIME
r _
Name
,- -
OYERIIME
DOUBLE
Name
REGULAR
OYERIIME
DOUBLE
Name
REGULAR
OYERIIME
DOUBLE
2.
6.
3.
7.
4.
S.
Regular Hours Overtime Hours Double Time Hours V J Total Hours
p
Pff,pa-red 13Y Can ctors pr entative
L� /G 2y Z
ignature Dals Signature pa
BY SIGNING HERE YOU ACKNOWLEDGE HE ABOVE DESCRIBED WORK HAS BEEN RiERFORMED
white - Office Copy yellow - SVG Field Copy
0 Oldcastle Building Envelope
6850 Stevenson Blvd - Fremont, California 94538
oldcastlebe.com - Phone (510) 651 -2292 - Fax (510) 651 -3076
SILICON VALLEY GLASS,INC.
220 VINEYARD COURT #150
T MORGAN HILL CA 95037
S
H
I
P
T
O
INVOICE
SILICON VALLEY GLASS
220 VINEYARD COURT
MORGAN HILL CA 95037
INVOICE NUMBER
I INVOICE DATE I
CUSTOMER P.O. NUMBER
ORDER NUMBER
ORDER DATE
DATE SHIPPED
WEIGHT
PAGE
4000371463
4/19/12
20167DF
672961
4/17/12
4/19/12
174
1
JOB
REP.
INVOICE TERMS
CUSTOMER NO.
FREIGHT CODE
SHIP VIA
BILL OF LADING NO.
03
1% 10 Days, Net 30
70070 1
PREPAID
OUR TRUCK -LOOSE
695475
BOXING INSTRUCTIONS
SHIPPING INSTRUCTIONS
BOX/LOOSE
BOXES
BACK ORDER/QUOTE
LOOSE
TEN
CITY 090Ee D
PRODUCT CODE/DESCRIPTION
WIDTH DIM.3 15
DIMA /6
CTR.
TOTAL U.O.M.
SHIPPED
B/O
PRICE
U/M
TOTAL
0 dcas
identi
le BE certifies t at the tempere
ied on the product label with an
an or a
SGCC numbe
ted g as
omply wi
p
h
oducts inc
PSC 16 CFR
uded
1201,
this
nd we
invoice,
a fabrica
nd
ed
r as
uring the
date i
dicated on the product label, an
/or betwee
rHEIGHT
e 'Order
Da
e' and 'Da
a Shi
ed' s
own on th
s i
voice,
based
in -house testing and participa
ion in SGC
third p
rt
conformit
asses
ment
ody as it
ust
ated on
the SGC
Record of Compliance Testing a
ailable at
.sgcc.org/ccmpliance.
4/9/12 - 4/30/12 Energy Surcharge
Oldcastle Building Envelope Fremont
is 4.5%
proudly
offers a f
511/12
11
Ener4ry
Line of He vy
Surc
Gla
arge iill
s Ent antes
be 7.5%
& Shz)wei
Doo rs.
Please contact us for your next
project'
1
2
GLS.5
48 /
38 1/ 4
26.66
2
5.6700
SF
151.16
1/2 CLEAR TEMPERED
ROUTE INFO: SPC T/M
PE POLISHED EDGES
LNG:
2 S
ORT
2
.11
IN
38.72
LOGO PER PSK1
MFG'S ENERGY SURCHARGE
.00
4.5000
%
8.54
goy scm
cob z
FRT /DEL CHG BOXING CHG I PREMIUM CHr4INV D I TOTAL TAX
SUB
198.42
.00 16.37
TOTAL
214.79
tt.OD
V( arrant S h fF lr12n61p( anorI�r>linaatedi ala fi llrle �bh t o maeiie�np othe�wa `ant4 ez�ressrorii pl�ie . The N of our
ly, t fla s PP�I �1 fm1 y o
. I Ity sha be either re acement de ective materia F. Shipping omt or, at se ler op ion, to re un the purchase price.
OTHER
BALANCE DUE
214.79
R,eseppoda are not refundable WAhout our.FeF umign. All claims or Trror must b� relartetd�tt receipLDf merchan ISe
aim or �rgage occurring whi g in [rani_ s.ou a made Imm late y to agent a po nt o elivery. ur responsibI ity
up." „—, w .............. Yang. 8 q s pt RLMI I l u:
�r #t�r�ndctiercentdr mo�tti From tt� ou �ie b�IgaG�es�ll��as�whenen tltleda[prpaYmelnt o[ reaspnaple attornee po BOX 742806 be
ees incurred In cone tlon o any and al7f de mquent act unt's o uyer or necessitates DyDUyer's Dreacn of contract. LOS ANGELES, CA 90074
r ..
Project: Gilroy Community Library
Devcon Job #: 10 -296
- Date: 5/29/2012
We submit for your approval the following estimate of changes in work:
Drywall modifications per Architect request
32 Gypsum Board
Custom Drywall, Inc. 3281: Original window 220 $1,596.00
modification for mecco shade
Custom Drywall, Inc. 3731: 1st Modification of projection $3,926.00
screen niche
Custom Drywall, Inc. 3430: 2nd Modification of projector $3,926.00
niche rm 203
Custom Drywall, Inc. 3403 3754: 2nd modification of $1,199.00
mecco shade soffit rm 220
Subtotal
70 Fee
Total
72 Amount applied to Contingency
73 Amount applied to OT Allowance
Net change order amount
$10,647.00
$1.0,647.00
10.00.% $1,065.00
$11,712.00
$0.00
$0.00
$11,712.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx /xx /xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
u
7
CUSiOAA DRYWALL, INC.
l LICENSE 826:3495
1970 C- leddina. Ceus?, Neal k s, C"!I-Forn'*
'a 9E035, (4081 %G3 -tS1a
CO"'NSTRUCTION
Gilroy Library
/
ox�-a€tre}a1+ z fr►�rarnii pf9 e`r per
a c o es otrstairs frame
0� d6�OG5 f]tL3LitC}J� SLaQ1p and rnrk aty� wincln�„r, frame box for
DESCRIPTION OF CHANGE:
for and to -this.
Location of Change
.... �.E�l
Work Order date
311712012
ele-'YK
-5T
COST PER OPENING
Pieces
Length
Lineal or SF labor
Hours Cost per Ft. Cost Per Hour Cost per Unit
518" dyrwafl
2
8
64
$0.280
$17.92
2; x 8' core board (shaft liner)
0
0
0
$0.475
$0.00
Trim -Tex 4110 archway comer bean
0
10
0
$0.250
$0.00
3 518" 20ga metal track
0
0
0
$0.450
$0.00
3 5/8" 20ga. Metal stud
0
0
0
$0.451
$0.00
3 -5/8" 20 ga. track
0
0
0
$0.300
$0.00
2 112" stud 20 GA
0
10
0
$0.320
$0.00
6" 16GA - track
0
10
0
$0.00
6" 16ge 8' studs
0
8
0
$0.00
4" flex tape
1
10
10
$0.490
$4.90
Corner Bead
3
10
30
$0.270
$8.10
2" x 2" 90 angle.
0
10
0
$0.430
$0.00
1 rool visqueen
1
1
1
$5.000
$5.00
Furring Channel
0
10
0
$0.420
$0.00
90 metal
6
10
60
$0.600
$36.00
Hot Mud
4
1
4
$8.750
$35.00
box of Mud
5
1
5
$8.250
$41.25
CRC 16ga
0
10
0
$0.400
$0.00
Screws, tape & Misc.
0
0
$0.00
Sub -Total Cost for Material
0
$148.17
Tax 8.25%
8,250%
$12.22
Cost of Material
$160.39
Stocking of Material, Delivery
174
$0.070
$12.18
Labor
Layout
0
$87.540 $0.00
Foreman /supervision
$87.540 $0.00
Taping Labor
13
$93.480 $1,215.24
!Taming and Drywall Labor
$87.540 $0.00
Clean Up
0
$49.820 $0.00
Supervision
0
$101.300 $0.00
Man Lift 1 week 32 ' lift.
0
0
0
$0.000 $0.00
Dump l=ees
$0.00
Cost Per Location
$1,387.81
Overhead and Profit
Material
15.000%
$25.89
Overhead and Profit
Labor
15.000%
$182.29
Price per location
$1,595 99
Number of locations 1
Total Material Cost
$172.57
Total Labor Cost
$1,215.24
Total Cost of Change 1 $1,595.99
1 .Il .:..v.
SWNATUR •
Z Mreby =L'Mwkdge the staff
cmmpieficrr uf the above deun-bed work.
S�4� L,; /*
06i5;- 915 1,,214 7 afl,,)
1
--,4 Q ���
(f V8�1(04/ /te-"
L � { CUSTMIA DRYWALL, INC.
El
5fi
Tf ®"� r,
4c,l
g% w
1w70 Giaddira Guist, "i €t >i �s. CaliGarris S` 035. {4088} 263-2616
3731
Gilroy Library
Worked on Saturday, 2 framers and 1 taper per John, Patch Holes on stairs frame
new access doors bathroom, frame and rock at bay window, frame box for
DESCRIPTION OF CHANGE: projector and tape all this.
Location of Change
Work Order Date .
3/1712012
COST PER OPENING
Pieces
Length
Lineal or SF
Labor Hours
Cost per Ft.
Cost Per Hour
Cost per Unit
5/8" dyrwali
0
0
0
$0.280
$0.00
2; x 8' core board (shaft liner)
0
0
0
$0.475
$0.00
Trim -Tex 4110 archway comer beat
0
10
0
$0.250
$0.00
3 5/8" 20ga metal track
0
0
0
$0,450
$0.00
3 5/8" 20ga. Metal stud
0
0
0
$0.451
$0.00
3 -5/8" 20 ga. track
0
0
0
$0.300
21/2" stud 20 GA
0
10
0
$0.320
$0.00
6" 16GA - track
0
10
0
$0.00
6" 16ga 8' studs
0
8
0
$0.00
4" Flex tape
1
10
10
$0.490
$4.90
Corner Bead
3
10
30
$0.270
$8.10
2" x 2" 90 angle.
0
10
0
$0.430
$0.00
1 rool visqueen
1
1
1
$5.000
$5.00
Furring Channel
0
10
0
$0.420
$0.00
90 metal
6
10
60
$0,600
$36.00
Hot Mud
4
1
4
$8.750
$35.00
box of Mud
5
1
5
$8.250
$41.25
CRC 16ga
0
10
0
$0.400
$0.00
Screws, tape & Misc.
0
0
$0.00
Sub -Total Cost for Material
0 '
$130.25
Tax @ 8.25%
8250%
$10.75
Cost of Material
$'141.00
Stocking of Material, Delivery
110
$0.070
$7.70
Labor
Layout
0
$87.540
$0.00
Foreman /supervision
1
$87.540
$87.54
Taping Labor
8
$140.220
$1,121.76
Framing and Drywall Labor
16
$128.500
$2,056.00
Clean Up
0
$49.820
$0.00
Supervision
0
$101.300
$0,00
Man Lift i week 32' lift.
0
0
0
$0.000
$0.00
Dump Fees
$0.00
Cost Per Location
$3,414,00
Overhead and Profit
Material
15.000%
$22.30
Overhead and Profit
Labor
15.000%
$489.80
Price per location
$3,826.09
Number of locations
1
Total Material Cost
$148.70
Total labor Cost
$3,265.30
Total Cost of Change 1 $3,926.09
JOB M97ORrK ORDEAR
CVSTOM DkYWALL, INC.
1570 CLADDING CT_
MILPITAS, CA 95035
(408)263-1616
(408)263-1142 Fox
SILL TO:
ORDER bATL
JOB I\JAME/LOCATTON:
Cif I REi3 By,
OVERTIME ON CONTRACT W&RT.—'
JOB PHONE:
DOUBLE TIME ON CONTRACr WORK:
EXTRA TO CONTRACT WORK,
PCO #: 7 W O#:_ Undisputed Change Order Work:
DESMIMON OF WORK- '
Ir_
5p &A z
A7?-� *9Ctf_=5 6210,67-dIL5
po pe3?_ "12
LATERIAL:
TYPE OF LABOR:—
Ho _L)P_ 5 -
7-
-3
WORK ORbERE�Byl.
SIGNATURE:
I hereby acknowledge, the satisfar
,I
completion of the above dezcjtibed work.
JOB WORK ORDER
CUSTOM DRYWALL, INC.
1570 GLAbbING Cr.
=LFTTAS, CA 95035
(408)263-1616
(408)263-1142 Fax
BILL TO:
ORDER I)ATE:
JOB NAME&OCATION:
Okl ERED By:
OVERTIME ON CON11WT !WORK.:
JOB PHONE:
WUBLE TIME ON CONTRACT WORK:
EXTRA TO CONTRACT WORK:
PCO ;FW0#-
Undisputed Char- Se Or�der, Work.-
DESCRIPTION OF WORK.:
7
7-i
-7A,
MATERIAL-
TYPE OF LABOP,-.
HOURS:
L
D
711
WORK ORDEREb BY: ! -.rr, ` / � `
516NATURE:
Z hereby acknowledge the
completion of the abova described work-
J /! CUST01- t DRYWALL, 11KC. 1
r` L1CCENS_ 61265_45
15 "rS ��!�c+ci 1c Gout , ti4si� :gas, CaPifarni �S�f335, l�?s31 sag- ?6 &
DEVFCON COON TI 430
Gilroy Library
3 - 17.12,
Worked on Saturday, 2 framers and 1
taper per John,
Patch Holes on stairs frame
new access doors bathroom, frame
and rock at bay
window, frame box for
DESCRIPTION OF CHANGE:
projector and tape all this.
Location of Change
Work Order Date
3/17120/2
COST PER OPENING
Pieces
Length
Lineal or SF Labor Hours
Cost per Ft. Cost
Per Hour Cost per Unit
5/8" dyrwall
0
0
0
$0.280
$0.00
2; x 8' core board (shaft liner)
0
0
0
$0.475
$0.00
Trim -Tex 4110 archway comer beat
0
10
0
$0.250
$0.00
3 5/8" 20ga metal track
0
0
0
$0.450
$0,00
3 518" 20ga. Metal stud
0
0
0
$0.451
$0.00
3 -518" 20 ga. track
0
0
0
$0.300
$0.00
2 1/2" stud 20 GA
0
10
0
$0.320
$0.00
6" 16GA - track
0
10
0
$0.00
6" 16ga 8' studs
0
8
0
$0.00
4" flex tape
1
10
10
$0.490
$4.90
Corner Bead
3
10
30
$0.270
$8.10
2" x 2" 90 angle.
0
10
0
$0.430
$0.00
1 rool visqueen
1
1
1
$5.000
$5.00
Furring Channel
0
10
0
$0.420
$0.00
90 metal
6
10
60
$0.600
$36.00
Hot Mud
4
1
4
$8.750
$35.00
box of Mud
5
1
5
$8.250
$41.25
CRC 16ga
0
10
0
$0.400
$0.00
Screws, tape & Misc.
0
0
$0.00
Sub -Total Cost for Material
0
$130.25
Tax (a)- 8.25%
8.250%
$10.75
Cost of Material
$141.00
Stocking of Material, Delivery
110
$0.070
$7.70
Labor
Layout
0
$87.540 $0.00
Foreman/supervision
--
$87.540 $87.54
Taping Labor
8
$140220 $1,121.76
Framing and Drywall Labor
g-''
$128.500 $2,056.00
Clean Up
0
$49.820 $0.00
Supervision
0
$101.300 $0,00
Man Lift 1 week 32 'lift.
0
0 0
$0.000 $0.00
Dump Fees
$0.00
Cost Per Location
$3,414.00
overhead and Profit
Material
15.000%
$22.30
Overhead and Profit
Labor
15.000%
$489.80
Price per location
w3,926.09
Number of locations 1
Total Material Cost
$148.70
Total Labor Cost
$3,265.30
Total Cost of Change
r $3,926.09
JOB WORK ORDER� 3 4 13 0
CV TOM DRYWALL, INC.
1570 GLA-0br-N& CT.
M31PITAS, CA 95035
(408)263-1616
0263-1142 Fax
BILL To
JOB NAME1 DCATION,
ORDEREb BY:
L Ac Ir Y'
J,4, �D e
x%35
(v v lelclv
OVERTIME ON CONTRACT WORK,-
JOB PHONE:
LE TIME ON CONTRACT WORK:
E3CTRA TO CONTRACT W_ ---- O-RK-
Pco
FWO#:
Undisputed Change Order Work.
DE$Ckl� �QN QF V_VORK:
r4 e,,. mo,'tf
Qly
T'MATERIAL:
_TYPE OF LABOR:
Ho- U _P_ 5 -
Jr Vt-"' ff
-12
F4
CA
-
.)0 G/4
E_'
19- Boxes
... . ..... ..
WORK ORD -_-REb.,9Y-
SIC7NATURE: DltNN/
I hereby acknowledoe the
ktttt)
CUSTOM DRYWALL, INC.
LTCGN15,2 if 26_1 495
j� t57�3 GiFdidina COO t, r NPRas, California 350135, (400 263 -1616
PL) E 3403
Gilroy Library
4 - n -iz
Added 14 If x 8" high soffit to creat pocket for rnachoshade at wondow 220 2nd
floor. Detail given 11 -8 -12. Job work order 3281 (custom drywall) didn't show a
DESCRIPTION OF CHANGE: dryv✓allsoffit (see attached sketch), repaired soffit north elevation bay window.
Location of Change
Work Order Date
311712012
COST PER OPENING
Pieces
Length
Lineal or SF Labor Hours
Cost per Ft.
Cost Per Hour
Cost per Unit
5/8" dyrwall
2
8
64
$0.280
$17.92
2; x 8' core board (shaft liner)
0
0
0
$0.475
$0.00
Trim -Tex 4110 archway corner bea(
0
10
0
$0.250
$0.00
3 518" 20ga metal track
4
10
40
$0.450
$18.00
3 5/8" 20ga. Metal stud
1
10
10
$0.451
$4.51
3 -5 /8" 20 ga. track
0
0
0
$0.300
$0.00
2 1/2" stud 20 GA
0
10
0
$0.320
$0.00
6" 16GA - track
0
10
0
$0.00
6" 16ga 8' studs
0
8
0
$0.00
4" flex tape
0
10
0
$0.490
$0.00
Corner Bead
0
10
0
$0.270
$0.00
2" x 2" 90 angle.
0
10
0
$0.430
$0.00
1 root visqueen
1
1
1
$5.000
$5.00
Furring Channel
0
10
0
$0.420
$0.00
Z metal
2
10
20
$1.200
$24.00
Hot Mud
4
1
4
$8.750
$35.00
box of Mud
5
1
5
$8.250
$41.25
CRC 16ga
0
10
0
$0.400
$0.00
Screws, tape & Misc.
0
0
$0.00
Sub -Total Cost for Material
0
$145.68
Taxes 8.25%
8.25011/a
$12.02
Cost of Material
$157.70
Stocking of Material, Delivery
144
$0.070
$10.08
Labor
Layout
0
$87.540
$0.00
Foremantsupervision
0
$87.540
$0.00
Taping Labor
0
$93.480
$0.00
Framing and Drywall Labor
10
$87.540
$875.40
Clean Up
0
$49.820
$0.00
Supervision
0
$101.300
$0.00
Man Lift 1 week 32 'lift.
0
0
0
$0.000
$0.00
Dump Fees
$0.00
Cost Per Location
$1,043.18
Overhead and Profit
Material
15.000%
$25.17
Overhead and Profit
Labor
15.000%
$131.31
Price per location
$1,199.66
Number of locations
1
Total Material Cost
$167.78
Total Labor Cost
$875.40
Total Cost of Change $1,199.66
�1
- - 3403
BILL TO.. I,--, "I ,
nits
- - --
ORDeR, bc4TE:
ORDE
JOB NAME/LOCATION-,
OVERTIME ON CONTRACT WORK'
JOB PHONE:
WME TIME 37N– CONTPACT WORK:
EXTRA TO CONTRACT WORK,
Pco #: �
7 wo#: Undisputed Change Order Work-,
DESCRIPTION OF WORK:
L-F
r ? lY/-*lld, /L
4 Nor - I Jlw
MATERIAL.
-Q-T—Y1 MATERIAL. TYPE LABOR: HOURS:
9 0 c- __4
o I - ic
t
it -%
)C f
SIGNATURE:
I hereby acknowledge the
cmpletion of the
w
work.
tA.A �%
So - �7
IWJ /)
PP
f It
En-J
m orb,
cD
0 �-
j/t7etr- //-, ldJS/ .
JOB CORK ORDER
CUSTOM DRYWALL, INC,
2570 GLADbING CT_
MILPITAS, CA 95035
(408)263-1616
(408)263-1142 Fax
7 !L-- I
�.J 4
� -It-
L �To:
ORbER 0ATE
7
ZTOB NAME&OCATION:
ORDERED BY;
OVERTIME ON CONTRAcr WORK..
JOB PHONE:
DOUBLE TIME ON CONTRACT WORK:
EXTRA TO CONTRACT WORK:
POCK #1 FWO#-_
DESCRLM70N OF WORK.,
2
MATERIAL:
TYPE OF LABOR;
T
xy
1 5
WORK QRb,'RED gy.
SIGNATUkE:
I hereby ackn6wledge the
Completion of tbA above-described work.
RO A F
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 5/30/2012
We submit for your approval the following estimate of changes in work:
Repair carpet where stacks layout changed
36 Carpet Tile $3,389.00
Floor Connection Tags: Repair carpet where stacks $3,389.00
layout changed
Subtotal
70 Fee
Total
72 Amount applied to Contingency
73 Amount applied to OT Allowance
Net change order amount
$3,389.00
10.00% $339.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx /xx /xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by: Date:
Devcon -Bob Roseberry
Approved by:
Owner's Representative: James Kuhn, Nova Partners
Date:
$3,728.00
$0.00
$0.00
$3,728.00
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
I
j Floor Connection, Ine. Standard. T111 Time Card
License #665417
I
i
T & M aftiizat on of eYtra'work
bate: a
Hatars'Worked: 7 HR
Contractor's name: lam`. 1- ,
Desaiption of Work,- CAR Pr T 7,144-5
f1,laterials Used;
s
Floor Connection, Inc.
Ucense #665417
Standard TAI I Time Card
T & Mi atl orizatxon. -of extra work
Date , /
Hours Worked,
coutmCtox's name;
Description of Work: PATCH 7P—J Mil- !IZ6.
?COK
,rte"'~'► :; Roes
_Materials Used, - 4tA
Approved by:
Pit
Camp any!
Date;
Floor Connection., Imc
Ll�eh$e #665417
T & M athorizatioa of extra work
StandardT%LM Time Card
Date: 3/
Co_ntractor's name,,LY� ,y'=
DescriptipaofWork: p_�_ ���
hw
A.A
Ufaterials Used; SWM � 0-6r _ �
ti
Approved by:
Company:
Date:
Floor Connection, Inc.
license #665417
T & M athorization of extra work
Standard TINT Time Card
Date: 7
Hom-s Worked: h1,k
Contractor's mine: y 1W e4 P� -- J
Deseription,o£ %r,,i,: Tits 1 Aq4 .4K- A- A 5
L t - e) •
'Materials Used: ` 4 AAMfj- TU.0 -S)
Ap
Gilroy Library T & M
Unit Unit Sales
Materials Quantit Cost Subtotal Tax Freight Total
Patcraft Carpet Tile 41.33 $ 26.24 $ 1,084.50 $ 84.05 $ 1,168.55
Labor Task
Install Carpet tile and base
Man Labor
Hours Rate Total
27 $ 62.32 $ 1,682.64
All wage rates include employers burden
E¢MAiLED AN 2 3
Sub Total $ 1,168.55
10% Profit $ 116.85
Material Total $ 1,285.40
$ 1,682.64
Sub Total $ 1,682.64
25% Profit $ 420.66
Labor Total $ 2,103.30
Total Amount $ 3,388.70
CPR 211
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 5/30/2012
We submit for your approval the following estimate of changes in work:
Electrical work as requested
58 Electrical
Sprig Electric COR 72: Connect Flow switches, FA
signal wire has not been run.
Sprig Electric 62: connect conduit to added Vault
Sprig Electric 70: Add power for security at door 133
Sprig Electric 63: Add FA modules to doors 116 and 133
Sprig Electric COR 73: Replace and rewire fixture on
Wheeler trellis.
Subtotal
70 Fee
Total
72 Amount applied to Contingency
73 Amount applied to OT Allowance
Net change order amount
$4,767.00
$439.00
$258.00
$901.00
$1,686.00
$1,483.00
$4,767.00
10.00% $477.00
$5,244.00
$0.00
$0.00
$5,244.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx /xx/xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
4%i de 'e'0A, '00--
1
A
1&GG 1-af —Su: �kl -,, "5112
rf. 40- 2{S' -Sc4
Client Address:
DEVCON CONSTRUCTION
Contact: Bob Roseberry
690 Gibraltar Drive
Milpitas, CA 95035
CCN # 72
CCN Date 5/15/2012
5001700# 747
Project Name: GILROY LIBRARY
Project Number: 2678
Page Number: 1
PROPOSED CHANGE ORDER
Work Description
CHANGE ORDER COST FOR FWO #747 TO MAKE FINAL CONNECTIONS TO (2) PIV FLOW SWITCHES AT
EXTERIOR LOCATION FOR OLD POLICE STATION BUILDING----------- - - - - -- $439.00
We reserve the right to correct this quote for errors and omissions.
This quote covers direct costs only and we reserve the right to claim for impact and consequential costs.
This price is good for acceptance within 10 days from the date of receipt.
We request a time extension of 1 days.
We will supply and install all materials, labor, and equipment as per your instructions on PCO #72
I. Exclusions:
Overtime and shift work
Permits
Cutting & patching of any type
Demolition of any type
Painting
Dumpster fees
Consealed and unforeseen conditions
Upgrade of existing code violations
II. Clarifications:
• All work is to be completed between the hours of 7:00am through 3:30pm Monday through Friday.
III. General Conditions:
All applicable taxes are included in our submission
The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and
equipment -specified or supplied by others
• Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the
-manufacturer
The contractor shall not be liable for indirect loss or damage
Unless included in this proposal, all bonding and /or special insurance requirements are supplied at additional cost
If a formal contract is required, its conditions must not deviate from this proposal without our permission
Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void
We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions
This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually
satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into
between the owner and the contractor.
We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project.
Please contact our office if you have any questions for if additional information is needed.
ORIGINAL
PROPOSED CHANGE ORDER
Client Address:
DEVCON CONSTRUCTION
690 Gibraltar Drive
Milpitas, CA 95035
Sincerely,
SPRIG ELECTRIC COMPANY
Ron Piovesan
Senior Project Manager
Itemized Breakdown
Description
Qty
Net Price U
Total Mat($)
Labor U
Total Hours
1/2" LT FLEX
25
265.00 C
66.25
0.00 C
0.00
1/2" LT STRAIGHT CONN
2
386.54 C
7.73
0.00 C
0.00
1/2" LT 90 DEG CONN
2
654.18 C
13.08
0.00 C
0.00
A- 6R64HCR 6x6x4 HNGD CVR NEMA 31
1
69.89 E
69.89
0.00 E
0.00
FWO #747 LABOR
1
0.00 E
0.00
2.00 E
2.00
Totals
156.95
2.00
Summary
General Materials
156.95
Material Subtotal
156.95
Material Tax
(@ 8.250 %)
12.95
Material Markup
(@ 10.000 %)
16.99
Material Total
186.89
Foreman
(2.00 Hrs @ $100.73)
201.46
Labor Markup
(@ 25.000 %)
50.37
Total Labor
251.83
Total Material & Labor
438.72
Final Amount
$439.00
ORIGINAL
OW;*O"e'144j���
CA Lic # 296728 -C 10
NV Lic # 57803 -C2
1860 S. 1011 Street San Jose, CA 95112
Phone 408 - 298 -3134 Fax 408 - 298 -2132 p
BILLTO:
pd,b k'-- /� 2,
,
CUSTOMER PHONE NO. DATE OF ORDER
ORDER TAKEN BY CUSTOMER ORDER NUMBER
❑ T &M ❑ CONTRACT ❑ N.T.E.
QUOTE NUMBER
JOB NAME/ NUMBER
JOB LOCATION
JOB CONTACT & PHONE NO.
STARTING DATE
,
t t:
Client Address:
DEVCON CONSTRUCTION
Contact: Bob Roseberry
690 Gibraltar Drive
Milpitas, CA 95035
CCN # 62
CCN Date 3/27/2012
500/700# 737
Project Name: GILROY LIBRARY
Project Number: 2678
` Page Number: 1
PROPOSED CHANGE ORDER
Work Description
CHANGE ORDER COST FOR FWO #737 / FO #47 TO SUB (2) 4" CONDUITS INTO AT &T VAULT -- $258.00
We reserve the right to correct this quote for errors and omissions.
This quote covers direct costs only and we reserve the right to claim for impact and consequential costs.
This price is good for acceptance within 10 days from the date of receipt.
We will supply and install all materials, labor, and equipment as per your instructions on PCO #62
I. Exclusions:
Overtime and shift work
Permits
Painting
•Dumpster fees
Consealed and unforeseen conditions
Upgrade of existing code violations
11. Clarifications:
• All work is to be completed between the hours of 7:00am through 3:30pm Monday through Friday.
III. General Conditions:
All applicable taxes are included in our submission
The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and
equipment -specified or supplied by others
• Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the
-manufacturer
The contractor shall not be liable for indirect loss or damage
Unless included in this proposal, all bonding and /or special insurance requirements are supplied at additional cost
If a formal contract is required, its conditions must not deviate from this proposal without our permission
Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void
We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions
This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually
satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into
between the owner and the contractor.
We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project.
Please contact our office if you have any questions for if additional information is needed.
Sincerely,
SPRIG ELECTRIC COMPANY
Ron Piovesan
ORIGINAL
PROPOSED CHANGE ORDER
Client Address:
DEVCON CONSTRUCTION
690 Gibraltar Drive
Milpitas, CA 95035
Senior Project Manager
Itemized Breakdown
Description
Qty
Net Price U
Total Mat($)
Labor U
Total Hours
4" PVC
20
266.18 C
53.24
0.00 C
0.00
4" PVC COUPLING
8
581.51 C
46.52
0.00 C
0.00
4" PVC 30 DEG ELBOW
4
2,905.36 C
116.21
0.00 C
0.00
FWO #737 LABOR
1
0.00 E
0.00
1.00 E
1.00
Totals
215.97
1.00
Summary
General Materials
215.97
Material Subtotal
215.97
Material Tax
(@ 8.250 %)
17.82
Material Markup
(@ 10.000 %)
23.38
Material Total
257.17
GF
(0.01 Hrs @ $100.67)
1.01
Labor Markup
(@ 25.000 %)
0.25
Total Labor
1.26
Total Material & Labor
Final Amount
ORIGINAL
258.43
$258.00
CA Lic # 296728 -C 10
NV Lic # 57803 -C2
1860 S. 1011, Street San Jose, CA 95112
Phone 408 - 298 -3134 Fax 408- 298 -2132
BILLTO:
._� .3:7
CUSTOMER PHONE NO. DATE OF ORDER
ORDER TAKEN BY CUSTOMER ORDER NUMBER
(-1 T &M F-1 CONTRACT F-1 N.T.E.
QUOTE NUMBER
OF WORK ! ".
JOB -f�A !'E J/ UMBER
ER
JOB LOCATION
& le"
JOD CO��}}NTACT & PHONE NO.
J ;D
STARTING ATE
�
d 4' ct I`r
OF WORK ! ".
DESCRIPTION
I `J
WORK pERPORMED
HR5 .
r v. ��
�.
e � .
EQUEPMENT
DAYS
WKS
TOTALS
WORK ORDERED BY (PLEASE PRINT) DATE COMPLETED
AUTHORIZED SIGNATURE
I HEREBY ACKNOWLEDGE THE SATISFACTORY COMPLETION OF THE ABOVE DESCRIBED WORK
18GG S 1G� S'.u.' � S�uc �ac•. L >,-r' 95112
4-n: 4.•4 -2'�'3 -2152
Client Address:
DEVCON CONSTRUCTION
Contact: Bob Roseberry
690 Gibraltar Drive
Milpitas, CA 95035
CCN #
CCN Date
500/700#
Project Name:
Project Number:
Page Number:
70
4/17/2012
745
GILROY LIBRARY
2678
1
PROPOSED CHANGE ORDER
Work Description
CHANGE ORDER COST FOR FWO# 745 FOR SECURITY POWER FOR DOORS AT LOBBY NEAR
NEAR ELEVATOR # 1-------------------------------------------------------- - - - - -- $ 901.00
We reserve the right to correct this quote for errors and omissions.
This quote covers direct costs only and we reserve the right to claim for impact and consequential costs.
This price is good for acceptance within 10 days from the date of receipt.
We request a time extension of 1 days.
We will supply and install all materials, labor, and equipment as per your instructions on PCO #70
I. Exclusions:
Overtime and shift work
Fire proofing patching
Cutting & patching of any type
Demolition of any type
Painting
Consealed and unforeseen conditions
Upgrade of existing code violations
II. Clarifications:
• All work is to be completed between the hours of 7:00am through 3:30pm Monday through Friday.
III. General Conditions:
All applicable taxes are included in our submission
The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and
equipment -specified or supplied by others
• Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the
-manufacturer
The contractor shall not be liable for indirect loss or damage
Unless included in this proposal, all bonding and /or special insurance requirements are supplied at additional cost
If a formal contract is required, its conditions must not deviate from this proposal without our permission
Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void
We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions
This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually
satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into
between the owner and the contractor.
We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project.
Please contact our office if you have any questions for if additional information is needed.
ORIGINAL
PROPOSED CHANGE ORDER
Client Address:
DEVCON CONSTRUCTION
690 Gibraltar Drive
Milpitas, CA 95035
Sincerely,
SPRIG ELECTRIC COMPANY
Ron Piovesan
Senior Project Manager
Itemized Breakdown
Description
Qty
Net Price U
Total Mat($)
Labor U
Total Hours
#12/2C CU MC CABLE STL ARMOR 250
861.00 M
215.25
0.00 M
0.00
302 1/2" MC CONN
2
317.45 C
6.35
0.00 C
0.00
DEV BOX 2 1/2" DEEP 1/2" KO
REWORK 1
2,559.51 C
25.60
0.00 C
0.00
BOX SUPPORT HOLD -ITS
1
324.91 C
3.25
0.00 C
0.00
K -8 KON CLIP (1/2 ")
10
33.31 C
3.33
0.00 C
0.00
FWO #745 LABOR
1
0.00 E
0.00
5.00 E
5.00
Totals
253.77
5.00
Summary
General Materials
253.77
Material Subtotal
253.77
Material Tax
(@ 8.250 %)
20.94
Material Markup
(@ 10.000 %)
27.47
Material Total
302.18
Foreman
(2.50 Hrs @ $100.73)
251.83
Journeyman
(2.50 Hrs @ $90.79)
226.98
Labor Markup
(@ 25.000 %)
119.70
Total Labor
598.51
Total Material & Labor
900.69
Final Amount
$901.00
ORIGINAL
CA Lic # 296728 -010
NV Lic # 57803 -C2
1860S. I 01 Street San Jose, CA 95112
Phone 408 - 298 -3134 Fax 408- 298 -2132
BILLTO:
WORK ORDER # 7 yS
CUSTOMER PHONE NO, DATE OF ORDER
ORDER TAKEN BY CUSTOMER ORDER NUMBER
f-1 T &M ❑ CONTRACT C l N.T.E.
QUOTE NUMBER
JO NAME NUMBER
JOB LOCA ION
JOB CONTACT PHONE NO.
STAR ING DATE
DESCRIPTION 43= .,WORK DATE WORK AN REG: PRE
HRSi HRS.
p
WORK PERFORMED HRS.
047 A'k
AztiGiJ2�S� SGlc r' z,p2
1 o jc �
�QUIPMf =NT DAYS ".WKS
TOTALS
WORK ORDERED BY (PLEASE PRINT) DATE COMPLETED
AUTHORIZED SIGNATURE
I HEREBY ACKNOWLEDGE THE SATISFACTORY COMPLETION OF THE ABOVE DESCRIBED WORK TOTAL HOURS
/ 7
I�GG S. 1Gr �•.�: ' Luc �aoc, L >.-r' 95112
Client Address:
DEVCON CONSTRUCTION
Contact: Bob Roseberry
690 Gibraltar Drive
Milpitas, CA 95035
CCN #
63
CCN Date
4/2/2012
5001700#
738
Project Name:
GILROY LIBRARY
Project Number:
2678
Page Number:
1
Work Description
CHANGE ORDER COST FOR FWO # 738 TO INSTALL (2) FIRE ALARM MONITOR MODULES
TO CONTROL SECURITY AT EXIT DOORS--------------------------- - - - - -- $ 1,686.00
We reserve the right to correct this quote for errors and omissions.
This quote covers direct costs only and we reserve the right to claim for impact and consequential costs.
This price is good for acceptance within 10 days from the date of receipt.
We request a time extension of 1 days.
We will supply and install all materials, labor, and equipment as per your instructions on PCO #63
I. Exclusions:
Overtime and shift work
Permits
Demolition of any type
Painting
Dumpster fees
Consealed and unforeseen conditions
Upgrade of existing code violations
II. Clarifications:
• All work is to be completed between the hours of 7:00am through 3:30pm Monday through Friday.
III. General Conditions:
All applicable taxes are included in our submission
The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and
equipment -specified or supplied by others
• Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the
-manufacturer
The contractor shall not be liable for indirect loss or damage
Unless included in this proposal, all bonding and /or special insurance requirements are supplied at additional cost
If a formal contract is required, its conditions must not deviate from this proposal without our permission
Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void
We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions
This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually
satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into
between the owner and the contractor.
We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project.
Please contact our office if you have any questions for if additional information is needed.
14T;TF l•
PROPOSED CHANGE ORDER
Client Address:
DEVCON CONSTRUCTION
690 Gibraltar Drive
Milpitas, CA 95035
Sincerely,
SPRIG ELECTRIC COMPANY
Ron Piovesan
Senior Project Manager
Itemized Breakdown
Description Qty Net Price U Total Mat($) Labor U Total Hours
COORDINATE INSTALLATION 1 0.00 E 0.00 2.00 E 2.00
Totals 0.00 2.00
Summary
Foreman
Labor Markup
Total Labor
SUBCONTRACTORS
FDU ADDED MONITOR MODULES
Final Amount
(2.00 Hrs @ $100.73)
(@ 25.000 %)
($1,303.98 + 0.000 % + 0.000 % + 10.000 %)
ORIGINAL
201.46
50.37
251.83
1,434.38
$1,686.00
FIRE DETECTION UNLIMITED, Inc.
3975 Industrial Way
Suite A
Concord, CA 94520
Bill To
Sprig Electric
1860 S. 10th Street
San Jose, CA 95112
Attn: Accounts Payable
Invoice
Date
Invoice #
4/30/2012
20647 -09
P.O. No. I Terms
Net 30
Description I Amount
Technical labor service performed on 4 -26 -12 (service ticket attached). Placed FA system on test. Meet
with electrician and security contractor to discuss items required. Advised electrician conduit needed.
Pulled data wire for added devices. Installed and programmed 2 added AOM -2RF's address L1 -M041 and
LI -M042. Tested modules. Placed system back on test.
Parts (2) Control Relays, 16/2 FPLP Solid
Freight & Delivery
Project: Gilroy Community Library, 7387 Rosanna Street, Gilroy
Sprig Job #: 2678 -FWO #738
Thank you for your business.
Subtotal
Sales Tax (8.25 %)
Total
Due Date
5/30/2012
930.00
327.00T
20.00
$1,277.00
$26.98
$1,303.98
Balance Due $1,303.98
Phone #
Fax #
E -mail
Web Site
925- 370 -8041
925- 370 -8071
Customerservice3 @firedetect.com
www.firedetect.com
O
u L D� FIRE DETECTION UNLIMITED, INC
MAKING FIRE ALARM SIMPLE 7&"IND "61 sr R 0
;'SU iv :
CA9452G: ON k
925 570 00TAX (925)37N0T: LICENSECI0.603262
FOR INTERNAL USE ONLY
❑ Warranty
TT= SERVICE TICKET ❑ Contract
Customer: '�P w tq. 1&(" f, 4
Address:
City: Zip:
Contact:
Problem/Service Requested:
eBillable
Project/Account#: 13 Quick Quote
Date:
Tech(s): _2&A
Site Name: r L
Phone#:
Panel Normal Upon Arrival. Ef Yes ❑ No (If No, Explain Below)
Panel Normal Upon Departure a/Yes ❑ No (If No, Explain Below)
Explanation:
FDU Follow-Up Required: ❑ Yes d No
Total Labor Hours: 6 @ � 1 U. /hour
r
Tech: ebme In: 53,' c•16' Time Out:
Tech: Time In: Y Time Out:
Tech: Time In: Time Out:
Tech: Time In: Time Out:
Customer Signature:
Signature indicates autborization to perform service and acceptance of above services as satisfactory.
White • FDU Yellow - Technician
Total Labor
Parts Used:
Qty
P/N
Price
$ CA)
Tax
$ ? V
Fuel Surcharge
$ 30.00
Total Due:
$ 13
L
$
Notes:( I)
-7
Panel Normal Upon Arrival. Ef Yes ❑ No (If No, Explain Below)
Panel Normal Upon Departure a/Yes ❑ No (If No, Explain Below)
Explanation:
FDU Follow-Up Required: ❑ Yes d No
Total Labor Hours: 6 @ � 1 U. /hour
r
Tech: ebme In: 53,' c•16' Time Out:
Tech: Time In: Y Time Out:
Tech: Time In: Time Out:
Tech: Time In: Time Out:
Customer Signature:
Signature indicates autborization to perform service and acceptance of above services as satisfactory.
White • FDU Yellow - Technician
Total Labor
$ 41
Materials
T-4p-6har-ge
$ CA)
Tax
$ ? V
Fuel Surcharge
$ 30.00
Total Due:
$ 13
L
Panel Normal Upon Arrival. Ef Yes ❑ No (If No, Explain Below)
Panel Normal Upon Departure a/Yes ❑ No (If No, Explain Below)
Explanation:
FDU Follow-Up Required: ❑ Yes d No
Total Labor Hours: 6 @ � 1 U. /hour
r
Tech: ebme In: 53,' c•16' Time Out:
Tech: Time In: Y Time Out:
Tech: Time In: Time Out:
Tech: Time In: Time Out:
Customer Signature:
Signature indicates autborization to perform service and acceptance of above services as satisfactory.
White • FDU Yellow - Technician
Total Labor
$ 41
Materials
T-4p-6har-ge
$ CA)
Tax
$ ? V
Fuel Surcharge
$ 30.00
Total Due:
$ 13
Date:
Pink - Customer
A de
rz" vL3'-253' �C4 !nr 4C4 2�8 -2/
Client Address:
DEVCON CONSTRUCTION
Contact: Bob Roseberry
690 Gibraltar Drive
Milpitas, CA 95035
CCN # 73
CCN Date 5/15/2012
5001700# 748
Project Name: GILROY LIBRARY
Project Number: 2678
\ t_'6 Page Number: 1
PROPOSED CHANGE ORDER
Work Description
CHANGE ORDER COST FOR FWO # 748 TO REMOVE TEMP WIRING FOR ARBOR LIGHTS AND INSTALL
PERMANENT WIRING AND (1) ADDED FIXTURE-------------------------------------- - - - - -- $1,483.00
We reserve the right to correct this quote for errors and omissions.
This quote covers direct costs only and we reserve the right to claim for impact and consequential costs.
This price is good for acceptance within 10 days from the date of receipt.
We request a time extension of 1 days.
We will supply and install all materials, labor, and equipment as per your instructions on PCO #73
I. Exclusions:
Overtime and shift work
Permits
Cutting & patching of any type
Demolition of any type
Painting
Dumpster fees
Consealed and unforeseen conditions
Upgrade of existing code violations
II. Clarifications:
• All work is to be completed between the hours of 7:00am through 3:30pm Monday through Friday.
Ill. General Conditions:
All applicable taxes are included in our submission
The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and
equipment -specified or supplied by others
• Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the
-manufacturer
The contractor shall not be liable for indirect loss or damage
Unless included in this proposal, all bonding and /or special insurance requirements are supplied at additional cost
If a formal contract is required, its conditions must not deviate from this proposal without our permission
Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void
We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions
This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually
satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into
between the owner and the contractor.
We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project.
Please contact our office if you have any questions for if additional information is needed.
ORIGINAL
PROPOSED CHANGE ORDER
Client Address:
DEVCON CONSTRUCTION
690 Gibraltar Drive
Milpitas, CA 95035
Sincerely,
SPRIG ELECTRIC COMPANY
Ron Piovesan
Senior Project Manager
Itemized Breakdown
Description
Qty
Net Price U
Total Mat($)
Labor U
Total Hours
1/2" EMT CONDUIT
30
80.03 C
24.01
0.00 C
0.00
1/2" EMT STL COMP CONN
4
417.89 C
16.72
0.00 C
0.00
1/2" EMT STL COMP CPLG
3
503.40 C
15.10
0.00 C
0.00
1/2" SPRING STL CONDUIT CLAMP W/ Bi
10
71.83 C
7.18
0.00 C
0.00
1/2" GRC (GALV)
10
490.59 C
49.06
0.00 C
0.00
1/2" T DC BODY, CVR, GSKT
1
13.96 E
13.96
0.00 E
0.00
1/2" LL DC BODY, CVR, GSKT
1
11.94 E
11.94
0.00 E
0.00
1/2" STEEL LOCKNUT
8
34.64 C
2.77
0.00 C
0.00
1 /2 "xCLOSE GRC NIPPLE
2
74.00 C
1.48
0.00 C
0.00
#12 THHN BLACK
350
360.06 M
126.02
0.00 M
0.00
132 -1 RED WIRE CONN
12
17.22 C
2.07
0.00 C
0.00
3M #33+ 3/4 "x66' PLASTIC TAPE
1
4.20 E
4.20
0.00 E
0.00
FWO #748 LABOR
1
0.00 E
0.00
8.00 E
8.00
HUB #NRG -307B 70W HPS
1
125.00 E
125.00
0.00 E
0.00
Totals
399.51
8.00
Summary
General Materials
Material Subtotal
Material Tax
Material Markup
Material Total
Foreman
Labor Markup
Total Labor
Total Material & Labor
Final Amount
(@ 8.250 %)
(@ 10.000 %)
(8.00 Hrs @ $100.73)
(@ 25.000 %)
ORIGINAL
399.51
399.51
32.96
43.25
475.72
805.84
201.46
1,007.30
1,483.02
$1,483.00
;�/7
A
CA Lic # 296728 -C 10
NV Lic # 57803 -C2
1860 S. 101' Street San Jose, CA 95112
Phone 408- 298 -3134 Fax 408- 298 -2132
BILLTO: �i�Jzor Gi,,1"jay
CUSTOMER PHONE NO.
DATE OF ORDER
ORDER TAKEN BY
CUSTOMER ORDER NUMBER
❑ T &M ❑ CONTRACT . l N.T.E.
QUOTE NUMBER
JOB NAME ! NUMBER
JOB LOCATION
JOB CONTACT & PHONE NO.
STARTING DATE
DESCRIPTION 0F VV
%D .6eebe ! /lJiyjS
"" /,✓si,,�l RA c c= wA; ' A,✓�o av'ie i.�C �-z, .�',rG�'cSa
��ft cL� o✓ .vE ^CO r 447- r&,47-- �,,vS Iyivim, v�
/v1�47 .ei d L HR
IVel - 30 7.3 7l>a/ /0's
3a �al 6- 7-
S2 '` r Jt a i� Ti�.rri Cp u G��✓
/ �i GV u E
t"? •G• / Fv cwt/ Eft
3Sd '/z 7.4'.vn/ E✓ixF
/.q ,t'
/Zou., .33 - i )q?Lc
Z �.� 4 G,flRS� M/ LEf Af GoG,rryvTS-
EQUIPMENT DAYS WKS
TOTALS
WORK ORDERED BY (PLEASE PRINT) DATE COMPLETED
AUTHORIZED SIGNATURE
I HEREBY ACKNOWLEDGE THE SATISFACTORY COMPLETION OF THE ABOVE DESCRIBED WORK
CPR 212
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 6/1/2012
We submit for your approval the following estimate of changes in work:
Electrical per CM Field direction
58 Electrical
Sprig Electric 54: Add power where none shown for the
$1,378.00
West exit security doors.
Sprig Electric 51: Add two down lights above the
$822.00
Circulation Desk per Architect request
Sprig Electric 12: Add Exterior Camera Base not on
$389.00
dwgs.
Sprig Electric 29: Change out Z -1 ballasts
$1,767.00
Sprig Electric 31.1: Add Smoke detectors on rooms 110,
$2,560.00
133,214
Sprig Electric 32: Relocate outlets in rm 118
$1,199.00
Sprig Electric 37: Relocate HH fixture on 1st floor
$579.00
Sprig Electric 39: 5' extension for ceiling fan stems
$1,325.00
Sprig Electric 42: Change feed detail for shelving so that
$2,425.00
it works
Sprig Electric 48: Electrician for meeting with gray water
$908.00
install
Sprig Electric 64: Power and Outlets per FO 42
$3,540.00
Sprig Electric 65: Install and deploy Bogen paging
$3,236.00
system
Subtotal
70 Fee
Total
72 Amount applied to Contingency
73 Amount applied to OT Allowance
Net change order amount
$20,128.00
$20,128.00
10.00% $2,013.00
$22,141.00
$0.00
$0.00
$22,141.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx/xx/xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
I.�GIJ -�. IG�S +.k'• xu.,�o:,:. L�-r X511%
Client Address:
DEVCON CONSTRUCTION
Contact: Bob Roseberry
690 Gibraltar Drive
Milpitas, CA 95035
CCN #
CCN Date
500!700#
Project Name:
Project Number:
Page Number:
12
5/5/2011
704
GILROY LIBRARY
2678
1
PROPOSED CHANGE ORDER
Work Description
CHANGE ORDER COST FOR FWO #704 IS FOR ADDITIONAL CAMERA BACK BOX AT NORTH EAST CORNER AT
EAVE(PER NOVA FIELD ORDER) ---------------------------------------------- $389.00
We reserve the right to correct this quote for errors and omissions.
This quote covers direct costs only and we reserve the right to claim for impact and consequential costs.
We request a time extension of 3 days.
We will supply and install all materials, labor, and equipment as per your instructions on PCO #12
I. Exclusions:
Overtime and shift work
Permits
Upgrade of existing code violations
IL Clarifications:
All VvvrN i5 to b8 Cviiij�iG -icu iicivvccil iii8 iiiiiir3 vs i :v('iaiTi tirGuyii �:�(J'N�i� �fGi�uoy iiiiGUyil Friday.
Ill. Gene-rat Conditions:
All applicable taxes are included in our submission
The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and
equipment -specified or supplied by others
Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the
-manufacturer
The contractor shall not be liable for indirect loss or damage
Unless included in this proposal, all bonding and /or special insurance requirements are supplied at additional cost
If a formal contract is required, its conditions must not deviate from this proposal without our permission
Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void
We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions
This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually
satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into between
the owner and the contractor.
We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project.
Please contact our office if you have any questions for if additional information is needed.
Sincerely,
SPRIG ELECTRIC COMPANY
Ron Piovesan
Senior Project Manager
ORIGINAL
PROPOSED CHANGE ORDER
Client Address:
DEVCON CONSTRUCTION
690 Gibraltar Drive
Milpitas, CA 95035
Itemized Breakdown
Description
Qty
Net Price U
Total Mat($)
Labor U
Total Hours
3/4" ALUMINUM FLEX
5
131.64 C
6.58
0.00 C
0.00
3/4" FLEX CONN
2
275.33 C
5.51
0.00 C
0.00
DEV BOX 2 1/2" DEEP COMB KO +EARS
1
1,919.51 C
19.20
0.00 C
0.00
4x1 112" SO BOX COMB KO
1
942.87 C
9.43
0.00 C
0.00
FWO #704 LABOR
3
0.00 E
0.00
1.00 E
3.00
Totals
40.71
3.00
Summary
General Materials
Material Subtotal
Material Tax
Material Markup
Material Total
Journeyman
Labor Markup
Total Labor
Total Material & Labor
Final Amount
(@ 9.250 %)
(@ 10.000 %)
(3.00 Hrs @ $90.79)
(@ 25.000 %)
ORIGINAL
40.71
40.71
3.77
4.45
48.93
272.37
68.09
340.46
389.39
$389.00
CAUu�420u72u'Cm
wv Uc : a/uou-Cx
18G03,1O*Street San Jose, CA95112
Phnne408'298'3134 Fax408'238'2132
BILL TO
WORK ORDER#
ATE OF ORDER.
0P.DER TAKEN BY C-USTONI�R ORDER NUMBER
QUOTE NUMBER
DESCRIPTION OF WORK
DATE
WORKMAN
RFC,
PREM
DESCRIPTION OF WORK
DATE
WORKMAN
RFC,
PREM
EQUIPMENT DAYS
ld
WKS
TOTALSO-
AU-Zll
TOTAL HOURS110-
13
"S C"'O", 3E THE' ATISFACTOF HE ABOVE DESCRIBED INORK
11E LEOG
18665'. 1G� 1'r4z' � S'�uz,�uo«:, t�,.T X5112
Client Address:
DEVCON CONSTRUCTION
Contact: Bob Roseberry
690 Gibraltar Drive
Milpitas, CA 95035
CCN #
CCN Date
500/700#
Project Name:
Project Number
Page Number:
29
11/3/2011
GILROY LIBRARY
2678
1
Work Description
CHANGE ORDER COST FOR FIXTURE TYPE -Z1 FIXTURE MODIFICATIONS TO CHANGE FROM
REMOTE CEILING MOUNTED BALLAST TO 277 VOLT LAMP ADAPTER & BALLAST INSIDE
FIXTURE PER 11 -1 -11 EMAIL.---------------------------------------- - - - - -- $ 1,767.00
We reserve the right to correct this quote for errors and omissions.
This quote covers direct costs only and we reserve the right to claim for impact and consequential costs.
This price is good for acceptance within 10 days from the date of receipt.
We will supply and install all materials, labor, and equipment as per your instructions on PCO #29
I. Exclusions:
Overtime and shift work
Dumpster fees
11. Clarifications:
• All work is to be completed between the hours of 7:00am through 3:30pm Monday through Friday.
111. General Conditions:
All applicable taxes are included in our submission
The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and
equipment -specified or supplied by others
• Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the
-manufacturer
The contractor shall not be liable for indirect loss or damage
Unless included in this proposal, all bonding and /or special insurance requirements are supplied at additional cost
If a formal contract is required, its conditions must not deviate from this proposal without our permission
Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void
We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions
This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually
satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into
between the owner and the contractor.
We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project.
Please contact our office if you have any questions for if additional information is needed.
Sincerely,
SPRIG ELECTRIC COMPANY
Ron Piovesan
Senior Project Manager
C80MVI`LL
PROPOSED CHANGE ORDER
Client Address:
DEVCON CONSTRUCTION
690 Gibraltar Drive
Milpitas, CA 95035
Itemized Breakdown
Description
TYPE -Z1 FIXTURE MODIFICATION
Totals
Summary
General Materials
Material Subtotal
Material Tax
Material Markup
Material Total
Final Amount
(@ 9.250 %)
(@ 10.000 %)
Qty Net Price U Total Mat($)
98 15.00 E 1,470.00
1,470.00
ORIGINAL
Labor U Total Hours
0.00 E 0.00
0.00
1,470.00
1,470.00
135.98
160.60
1,766.58
$1 ,767.00
Page 1 of 1
Ron Piovesan
From: Bob Roseberry [broseberry@Devcon- const.com]
Sent: Tuesday, November 01, 2011 2:12 PM
To: 'david @novapartners.com'; Ron Piovesan; Scott Hodson; Robin Hernandez -Bing; John Dunn; Ray
Romine
Subject: Re: Z1 Light Fixtures
Ok thanks David.
From: David Marks [maiIto:david @novapartners.com]
Sent: Tuesday, November 01, 201102:03 PM
To: Bob Roseberry; Ray Romine; David Richards <dhrichards @hedev.com >; James Kuhn
<jkuhn @novapartners.com>
Subject: Z1 Light Fixtures
:..
This shall serve as formal direction to release spring Electric to release the 277 volt Z1 Light fixtures.
Over the next week the team will explore the following possible mounting solutions as discussed with the
electrician today:
1. Vary heights of fixture cords so fixtures do no collide with each other. We discussed this with Jerry the
Building official today and he was Ok with this concept.
2. Provide custom stems that prevent fixtures from Swaying. David R has contacted manufacturer and we
should have some concepts for this shortly.
In order to not delay future activities we are directing Devcon to proceed with the release of these fixtures
immediately. As we explore the options above we will keep you posted and give formal direction with our
findings.
WE were informed today these fixtures have a 6 -8 week lead time.
Thanks for your help.
David 'Marks
Nova Partners, Inc.
Construction Project Management &
Real Estate Development Services
855 El Camino Real, Palo Alto Ca. 94301
Cell 650.465.2597 Office 650.324.5306
w ww.novanartners.com
11/3/2011
v
Client Address:
DEVCON CONSTRUCTION
Contact: Bob Roseberry
690 Gibraltar Drive
Milpitas, CA 95035
CCN #
CCN Date
500/700#
Project Name:
Project Number:
Page Number:
31.1
11/22/2011
713
GILROY LIBRARY
2678
1
PROPOSED CHANGE ORDER
Work Description
REV CHANGE ORDER COST FOR FWO #713 TO ADD. (3) SMOKE DETECTORES IN ROOMS # 110, #133,
& 214------------------------------------------------------------------------------------ - - - - -- $2,560.00
We reserve the right to correct this quote for errors and omissions.
This quote covers direct costs only and we reserve the right to claim for impact and consequential costs.
This price is good for acceptance within 10 days from the date of receipt.
We request a time extension of 2 days.
We will supply and install all materials, labor, and equipment as per your instructions on PCO #31.1
Exclusions:
Overtime and shift work
Permits
Fire proofing patching
Cutting & patching of any type
Demolition of any type
Painting
Dumpster fees
Access panels
Consealed and unforeseen conditions
Upgrade of existing code violations
Acoustical box pads and caulking at STC rated walls
Fire rated box pads and caulking at fire rated walls
11. Clarifications:
• All work is to be completed between the hours of 7:00am through 3:30pm Monday through Friday.
111. General Conditions:
All applicable taxes are included in our submission
The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and
equipment -specified or supplied by others
• Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the
-manufacturer
The contractor shall not be liable for indirect loss or damage
Unless included in this proposal, all bonding and /or special insurance requirements are supplied at additional cost
If a formal contract is required, its conditions must not deviate from this proposal without our permission
Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void
We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions
This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually
satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into
ORIGINAL
PROPOSED CHANGE ORDER
Client Address:
DEVCON CONSTRUCTION
690 Gibraltar Drive
Milpitas, CA 95035
between the owner and the contractor.
We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project.
Please contact our office if you have any questions for if additional information is needed.
Sincerely,
SPRIG ELECTRIC COMPANY
Ron Piovesan
Senior Project Manager
Itemized Breakdown
Description
Qty
Net Price U
Total Mat($)
Labor U
Total Hours
3/4" EMT CONDUIT
100
158.39 C
158.39
0.00 C
0.00
3/4" EMT STL SS CONN
4
260.08 C
10.40
0.00 C
0.00
3/4" EMT STL SS CPLG
10
319.87 C
31.99
0.00 C
0.00
3/4" EMT 1 -H STEEL STRAP
10
91.51 C
9.15
0.00 C
0.00
#16/2C CU MC CABLE STL ARMOR
60
854.21 M
51.25
0.00 M
0.00
4x2 1/8" SQ BOX 3/4" KO
3
1,592.98 C
47.79
0.00 C
0.00
4" SQ 1.406" DIAM REC COVER
3
606.23 C
18.19
0.00 C
0.00
SMOKE DETECTOR- PEC (ADDRESSABI.
3
0.00 E
0.00
0.00 E
0.00
1/4 PLATED T -ROD
10
226.82 C
22.68
0.00 C
0.00
FWO #713 LABOR
1
0.00 E
0.00
11.00 E
11.00
Totals
349.84
11.00
Summary
General Materials
Material Subtotal
Material Tax
Material Markup
Material Total
Foreman
Journeyman
Labor Markup
Total Labor
Total Material & Labor
SUBCONTRACTORS
FIRE ALARM INSTALL
SPRIG ENG
Adjustments Subtotal
Final Amount
(@ 8.250 %)
(@ 10.000 %)
(1.00 Hrs @ $100.73)
(10.00 Hrs @ $90.79)
(@ 25.000 %)
($756.00 + 0.000 % + 0.000 % + 10.000 %)
(@ 2.000 %)
ORIGINAL
349.84
349.84
28.86
37.87
416.57
100.73
907.90
252.16
1,260.79
1,677.36
831.60
50.18
50.18
$2,560.00
CA Lic # 296728 -C10
NV Lic # 57803 -C2
1860 S. 10 11 Street San Jose, CA 95112
Phone 408- 298 -3134 Fax 408 - 298 -2132
BILLTO:
WOW
1�
CUSTOMER PHONE NO. DATE OF ORDER
ORDER TAKEN BY CUSTOMER ORDER NUMBER
❑ T &M 1-1 CONTRACT 1-1 N.T.E.
QUOTE NUMBER
JOB NAME INUMBER
JOB LOCATIOI
K, j p -': " v
JOB CONTACT & PH E NO.
STARTING DATE
li /� < < �� �,�
ii- r
j DESCRIPTION OE WOR /K�:
�'f n.7 � f °� f�• er! • P �x e
WORK PERFORMED
e _
�l '-7/Y
EQUIPM N DAYS WKS:
TOTA LS 00 I
WORK ORDERED BY (PLEASE PRINT) DATE COMPLETED
6- e--"7 ZIL l/Yt
AUTHORIZ SIGNATURE
-74, HE ACKNOWLEDGE THE SATISFACTORY COMPLETION OF THE ABOVE DESCRIBED WORK
DATE _ WORKPdAN ! REG. PREM
`.
1/-z - eas Z) 1714 rL?
I
i
TOTAL HOURS®
IROU
FIRE DETECTION UNLIMITED, ING,
FIRE DETECTION UNLIMITED, INC.
QUICK QUOTE
FDU Quote #: 20647 M02
DATE: Monday, November 07,201 ]—VALID FOR 30 DAYS
CUSTOMER: PROPERTY:
Sprig Electric Gilroy Community Library
South 10`" Street 7387 Rosanna Street
San Jose, CA Gilroy, CA
FDU Account 420647
QUOTE PROVIDED BY: [Rick Pulver] 925- 370 - 8041 x[23]
SCOPE: FDU will provide three additional smoke detectors; two in IDF rooms and one
in an electrical room. Cost includes parts, design time, programming, and testing. The
fire alarm cost was originally based on a pre - engineered system. All work to be done
during normal business hours.
PART DESCRIPTION
MANUFACTURER
PART NO
UNIT
COST
QTY
TOTAL COST
Analog Photoelectronic Sensor
for dnr duct detectors
ASD -PL2F
$89
3
$267
Base, Flanged, For Use With
Analog Sensor or VelocitiT"
Sensors
B220LP
$12
3
$36
LABOR TECHNICIAN
N/A
N/A
$115
1.5
$172
LABOR DESIGNER
N/A
N/A
$75
3
$225
TOTAL TECHNICAL LABOR
$172
TOTAL DESIGNER LABOR
$225
TOTAL PARTS
$303
SALES TAX
$25
FUELSURCHARGE
$0
FREIGHT
$30
GRAND TOTAL
$756
Authorized By:
PO#:
Customer Authorized Signer
Billing Information:
Date:
3975 Industrial Way, Suite A Concord, CA 94520 — (925) 370 -8041 Telephone
(925) 370 -8071 Fax —License C10- 803262 — www.firedetect.com
Client Address:
DEVCON CONSTRUCTION
Contact: Bob Roseberry
690 Gibraltar Drive
Milpitas, CA 95035
CCN #
CCN Date
500/700#
Project Name:
4 - Project Number:
Page Number:
32
11/22/2011
714
GILROY LIBRARY
2678
1
PROPOSED CHANGE ORDER
Work Description
CHANGE ORDER COST FOR FWO #714 TO DEMO & RELOCATE OUTLES IN ROOM #118 - - -- $ 1.199.00
We reserve the right to correct this quote for errors and omissions.
This quote covers direct costs only and we reserve the right to claim for impact and consequential costs.
This price is good for acceptance within 10 days from the date of receipt.
We request a time extension of 1 days.
We will supply and install all materials, labor, and equipment as per your instructions on PCO #32
Exclusions:
Overtime and shift work
Xray of floors or walls
Fire proofing patching
Cutting & patching of any type
Painting
Dumpster fees
Consealed and unforeseen conditions
Upgrade of existing code violations
Acoustical box pads and caulking at STC rated walls
Fire rated box pads and caulking at fire rated walls
II. Clarifications:
• All work is to be completed between the hours of 7:00am through 3:30pm Monday through Friday.
III. General Conditions: .
All applicable taxes are included in our submission
The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and
equipment -specified or supplied by others
• Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the
-manufacturer
The contractor shall not be liable for indirect loss or damage
Unless included in this proposal, all bonding and /or special insurance requirements are supplied at additional cost
If a formal contract is required, its conditions must not deviate from this proposal without our permission
Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void
We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions
This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually
satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into
between the owner and the contractor.
We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project.
Please contact our office if you have any questions for if additional information is needed.
ORIGINAL
PROPOSED CHANGE ORDER
Client Address:
DEVCON CONSTRUCTION
690 Gibraltar Drive
Milpitas, CA 95035
Sincerely,
SPRIG ELECTRIC COMPANY
Ron Piovesan
Senior Project Manager
Itemized Breakdown
Description
Qty
Net Price U
Total Mat($)
Labor U
Total Hours
3/4" EMT CONDUIT
20
158.39 C
31.68
5.00 C
1.00
#12 THHN BLACK
150
360.06 M
54.01
6.00 M
0.90
#12/2C CU MC CABLE STL ARMOR
25
861.00 M
21.52
35.00 M
0.88
FWO #714 LABOR
1
0.00 E
0.00
9.00 E
9.00
Totals
107.21
11.78
Summary
General Materials 107.21
Material Subtotal
Material Tax
Material Markup
Material Total
Foreman
Journeyman
Labor Markup
Total Labor
Total Material & Labor
SPRIG ENG
Adjustments Subtotal
Final Amount
(@ 9.250 %)
(@ 10.000 %)
(2.00 Hrs @ $100.73)
(7.00 Hrs @ $90.79)
(@ 25.000 %)
(@ 2.000 %)
ORIGINAL
107.21
9.92
11.71
128.84
201.46
635.53
209.25
1.046.24
1,175.08
23.50
23.50
$1,199.00
CA Lic # 296726-C10
NV Lic # 57803-C2
1860 S. 101° Street San Jose, CA 95112
Phone 408-298-3134 Fax 408- 298 -2132
BILLTO:
V
?/f/
CUSTOMER PHONE NO. DATE OF ORDER
ORDER TAKEN BY CUSTOMER ORDER NUMBER
F-1 T&m F-1 com-RAcT F-1 N.T.E.
QUOTE NUMBER
JOB NAME,' NUf,18ER
w / p v /'/ �-!y
z
JOB LOCATION
JOB CONTACT & PH AE NO.
EiTA I 1111 TE
t
- Lt /� () 417. .11 A &
"
7
DAn ORKMAN REG;
PflEm
RS. %,HRS.
lib
phill
TOTAL HOURS00-
17
Client Address:
DEVCON CONSTRUCTION
Contact: Bob Roseberry
690 Gibraltar Drive
Milpitas, CA 95035
CCN #
CCN Date
500/700#
Project Name:
Project Number:
Page Number:
37
1/4/2012
716
GILROY LIBRARY
2678
1
PROPOSED CHANGE ORDER
Work Description
CHANGE ORDER COST FOR FWO #716 TO RELOCATE TYPE -HH FIXTURES ON 1ST
FLOOR------------------------------------------------------------------------------ - - - - -- $ 579.00
We reserve the right to correct this quote for errors and omissions.
This quote covers direct costs only and we reserve the right to claim for impact and consequential costs.
This price is good for acceptance within 10 days from the date of receipt.
We request a time extension of 1 days.
We will supply and install all materials, labor, and equipment as per your instructions on PCO #37
1. Exclusions:
Overtime and shift work
Permits
Fire proofing patching
Cutting & patching of any type
Demolition of any type
Painting
Dumpster fees
Consealed and unforeseen conditions
Upgrade of existing code violations
II. Clarifications:
• All work is to be completed between the hours of 7:00am through 3:30pm Monday through Friday.
III. General Conditions:
All applicable taxes are included in our submission
The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and
equipment -specified or supplied by others
• Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the
-manufacturer
The contractor shall not be liable for indirect loss or damage
Unless included in this proposal, all bonding and /or special insurance requirements are supplied at additional cost
If a formal contract is required, its conditions must not deviate from this proposal without our permission
Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void
We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions
This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually
satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into
between the owner and the contractor.
We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project.
ORIGINAL
PROPOSED CHANGE ORDER
Client Address:
DEVCON CONSTRUCTION
690 Gibraltar Drive
Milpitas, CA 95035
Please contact our office if you have any questions for if additional information is needed.
Sincerely,
SPRIG ELECTRIC COMPANY
Ron Piovesan
Senior Project Manager
Itemized Breakdown
Description Qty Net Price U Total Mat($) Labor U Total Hours
FWO # 716 LABOR 1 0.00 E 0.00 5.00 E 5.00
Totals 0.00 5.00
Summary
Journeyman
Labor Markup
Total Labor
SPRIG ENG
Adjustments Subtotal
Final Amount
(5.00 Hrs @ $90.79)
(@ 25.000 %)
(@ 2.000 %)
ORIGINAL
453.95
113.49
567.44
11.35
11.35
$579.00
CA Lie # 296728 -C 10
NV Lie # 57803 -C2
1860 S. 101, Street San Jose, CA 95112
Phone 408- 298 -3134 Fax 408- 298 -2132
BILLTO:
WORK ORDER #
CUSTOMER. PHONE NO. DATE OF ORDER
ORDER TAKEN BY CUSTOMER ORDER NUMBER
n T &M 1-1 CnNTRA(T I-1 M TF
QUOTE NUMBER
JOBNpMEJNUMBER
J/ I
JOB /L`OCATI
�-
JOB, CONTACT &_PRONE NO.
STARTING DATE
Client Address:
DEVCON CONSTRUCTION
Contact: Bob Roseberry
690 Gibraltar Drive
Milpitas, CA 95035
tr
CCN #
CCN Date
500/700#
Project Name:
Project Number:
Page Number:
39
1/6/2012
GILROY LIBRARY
2678
1
PROPOSED CHANGE ORDER
Work Description
CHANGE ORDER COST TO PROVIDE (6) ADDITIONAL 53" STEMS FOR MINKA FANS - -- $1,325.00
We reserve the right to correct this quote for errors and omissions.
This quote covers direct costs only and we reserve the right to claim for impact and consequential costs.
This price is good for acceptance within 10 days from the date of receipt.
We request a time extension of 1 days.
We will supply and install all materials, labor, and equipment as per your instructions on PCO #39
Exclusions:
Overtime and shift work
Cutting & patching of any type
Demolition of any type
Painting
Dumpster fees
Ceiling seismic support wires
Consealed and unforeseen conditions
Upgrade of existing code violations
Energy management system (EMS) provisions
II. Clarifications:
• All work is to be completed between the hours of 7:00am through 3:30pm Monday through Friday.
III. General Conditions:
All applicable taxes are included in our submission
The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and
equipment -specified or supplied by others
• Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the
-manufacturer
The contractor shall not be liable for indirect loss or damage
Unless included in this proposal, all bonding and /or special insurance requirements are supplied at additional cost
If a formal contract is required, its conditions must not deviate from this proposal without our permission
Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void
We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions
This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually
satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into
between the owner and the contractor.
We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project.
Please contact our office if you have any questions for if additional information is needed.
ORIGINAL
PROPOSED CHANGE ORDER
Client Address:
DEVCON CONSTRUCTION
690 Gibraltar Drive
Milpitas, CA 95035
Sincerely,
SPRIG ELECTRIC COMPANY
Ron Piovesan
Senior Project Manager
Itemized Breakdown
Description Qty Net Price U Total Mat($) Labor U Total Hours
ADD 53" STEM TO FANS 6 85.00 E 510.00 1.00 E 6.00
Totals 510.00
6.00
Summary
General Materials
Material Subtotal
Material Tax
Material Markup
Material Total
Foreman
Journeyman
Labor Markup
Total Labor
Total Material & Labor
Final Amount
(@ 8.250 %)
(@ 10.000 %)
(3.00 Hrs @ $100.73)
(3.00 Hrs @ $90.79)
(@ 25.000 %)
ORIGINAL
510.00
510.00
42.08
55.21
607.29
302.19
272.37
143.64
718.20
1,325.49
$1,325.00
' OA op
18EU 5. 1G� S'uz' .Sr"a fJaoc. C >. T 95112
Client Address:
DEVCON CONSTRUCTION
Contact: Bob Roseberry
690 Gibraltar Drive
Milpitas, CA 95035
CCN #
CCN Date
5001700#
Project Name:
Project Number:
Page Number:
42
1/20/2012
GILROY LIBRARY
2678
1
PROPOSED CHANGE ORDER
Work Description
CHANGE ORDER COST TO MODIFY FEED POINTS FOR BOOK SHELVES AT (45) LOCATIONS
BY ADDING CONDUIT CHASE NIPPLES AND BUSHINGS TO NEW ACCESS HOLES PRE DRILLED
BY OTHERS--- - - - - -- $ 2,425.00
We reserve the right to correct this quote for errors and omissions.
This quote covers direct costs only and we reserve the right to claim for impact and consequential costs.
This price is good for acceptance within 10 days from the date of receipt.
We request a time extension of 3 days.
We will supply and install all materials, labor, and equipment as per your instructions on PCO #42
Exclusions:
Overtime and shift work
Cutting & patching of any type
Demolition of any type
Painting
Dumpster fees
Consealed and unforeseen conditions
Upgrade of existing code violations
II. Clarifications:
• All work is to be completed between the hours of 7:00am through 3:30pm Monday through Friday.
III. General Conditions:
All applicable taxes are included in our submission
The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and
equipment -specified or supplied by others
• Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the
-manufacturer
The contractor shall not be liable for indirect loss or damage
Unless included in this proposal, all bonding and /or special insurance requirements are supplied at additional cost
If a formal contract is required, its conditions must not deviate from this proposal without our permission
Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void
We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions
This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually
satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into
between the owner and the contractor.
We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project.
Please contact our office if you have any questions for if additional information is needed.
ORIGINAL
PROPOSED CHANGE ORDER
Client Address:
DEVCON CONSTRUCTION
690 Gibraltar Drive
Milpitas, CA 95035
Sincerely,
SPRIG ELECTRIC COMPANY
Ron Piovesan
Senior Project Manager
Itemized Breakdown
Description Qty Net Price U Total Mat($) Labor U Total Hours
MODIFY FEED POINT 45 5.00 E 225.00 0.40 E 18.00
Totals 225.00 18.00
Summary
General Materials
Material Subtotal
Material Tax
Material Markup
Material Total
Foreman
Journeyman
Labor Markup
Total Labor
Total Material & Labor
Final Amount
(@ 9.250 %)
(@ 10.000 %)
(9.00 Hrs @ $100.73)
(9.00 Hrs @ $90.79)
(@ 25.000 %)
ORIGINAL
225.00
225.00
20.81
24.58
270.39
906.57
817.11
430.92
2,154.60
2,424.99
$2,425.00
I�GC S. IC.� S`ru' Sou: �occ, t >,-t 95112
Client Address:
DEVCON CONSTRUCTION
Contact: Bob Roseberry
690 Gibraltar Drive
Milpitas, CA 95035
CCN #
CCN Date
500/700#
Project Name:
Project Number:
Page Number:
48
2/13/2012
722
GILROY LIBRARY
2678
1
PROPOSED CHANGE ORDER
Work Description
CHANGE ORDER COST FOR FWO # 722 IS FOR STAND BY FOR LIFT STATION (PER ROBINSON & MORETTI).
-------------------------------------------------- - - - - -- $ 908.00
We reserve the right to correct this quote for errors and omissions.
This quote covers direct costs only and we reserve the right to claim for impact and consequential costs.
This price is good for acceptance within 10 days from the date of receipt.
We request a time extension of 2 days.
We will supply and install all materials, labor, and equipment as per your instructions on PCO #48
Exclusions:
Overtime and shift work
Permits
Fire proofing patching
Cutting & patching of any type
Demolition of any type
Painting
Dumpster fees
Access panels
Consealed and unforeseen conditions
Upgrade of existing code violations
Acoustical box pads and caulking at STC rated walls
Fire rated box pads and caulking at fire rated walls
11. Clarifications:
• All work is to be completed between the hours of 7:00am through 3:30pm Monday through Friday.
III. General Conditions:
All applicable taxes are included in our submission
The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and
equipment -specified or supplied by others
• Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the
-manufacturer
The contractor shall not be liable for indirect loss or damage
Unless included in this proposal, all bonding and /or special insurance requirements are supplied at additional cost
If a formal contract is required, its conditions must not deviate from this proposal without our permission
Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void
We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions
This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually
satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into
between the owner and the contractor.
ORIGINAL
PROPOSED CHANGE ORDER
Client Address:
DEVCON CONSTRUCTION
690 Gibraltar Drive
Milpitas, CA 95035
We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project.
Please contact our office if you have any questions for if additional information is needed.
Sincerely,
SPRIG ELECTRIC COMPANY
Ron Piovesan
Senior Project Manager
►uemizea rsreaKaown
Description
FWO # 722 LABOR
Totals
Qty Net Price U Total Mat($) Labor U Total Hours
1 0.00 E 0.00 8.00 E 8.00
0.00 8.00
ournmary
Journeyman (8.00 Hrs @ $90.79)
726.32
Labor Markup (@ 25.000 %)
181.58
Total Labor
907.90
Final Amount
$908.00
ORIGINAL
1
CA Lic # 296728-C10
NV Lic # 57803 -C2
1860 S. 1011 Street San Jose, CA 95112
Phone 408 -298 -3134 Fax408- 298 -2132
BILL TO:
raw
&) �-
WORK ORDER # ./ '&
CUSTOMER PHONE NO. DATE OF ORDER k
ORDER TAKEN BY CUSTOMER ORDER NUMBER
I-1 T &M F-1 CONTRACT f-1 N.7_E-
QUOTE NUMBER
JOB.NAM /NUMBER
JOB LOCATION /
))
Y 4 L
JO CONTACT & PHONE NO.
STARTING DATE
t°
!�� y i6. b F; �.l ov't--
i
y - -1 1
Client Address:
DEVCON CONSTRUCTION
Contact: Bob Roseberry
690 Gibraltar Drive
Milpitas, CA 95035
CCN # 64
1 CCN Date 4/5/2012
500/700# 739
Project Name: GILROY LIBRARY
Project Number: 2678
Page Number: 1
PROPOSED CHANGE ORDER
Work Description
CHANGE ORDER COST FOR FWO #739 / FO #42 FOR ADDED POWER AND DATA OUTLETS -- $3,540.00
We reserve the right to correct this quote for errors and omissions.
This quote covers direct costs only and we reserve the right to claim for impact and consequential costs.
This price is good for acceptance within 10 days from the date of receipt.
We request a time extension of 3 days.
We will supply and install all materials, labor, and equipment as per your instructions on PCO #64
I. Exclusions:
Overtime and shift work
Permits
Fire proofing patching
Cutting & patching of any type
Demolition of any type
Painting
Dumpster fees
Consealed and unforeseen conditions
Upgrade of existing code violations
11. Clarifications:
• All work is to be completed between the hours of 7:00am through 3:30pm Monday through Friday.
III. General Conditions:
All applicable taxes are included in our submission
The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and
equipment -specified or supplied by others
• Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the
-manufacturer
The contractor shall not be liable for indirect loss or damage
Unless included in this proposal, all bonding and /or special insurance requirements are supplied at additional cost
If a formal contract is required, its conditions must not deviate from this proposal without our permission
Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void
We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions
This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually
satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into
between the owner and the contractor.
We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project.
Please contact our office if you have any questions for if additional information is needed.
ORIGINAL
PROPOSED CHANGE ORDER
Client Address:
DEVCON CONSTRUCTION
690 Gibraltar Drive
Milpitas, CA 95035
Sincerely,
SPRIG ELECTRIC COMPANY
Ron Piovesan
Senior Project Manager
Itemized Breakdown
Description
Qty
Net Price U
Total Mat($)
Labor U
Total Hours
#12/2C CU MC CABLE STL ARMOR
20
861.00 M
17.22
0.00 M
0.00
302 1/2" MC CONN
2
317.45 C
6.35
0.00 C
0.00
DEV BOX 2 1/2" DEEP AC -90 CLAMP REb
1
2,071.73 C
20.72
0.00 C
0.00
GROUND SCREW W/ INSUL #12 LEAD
1
323.21 C
3.23
0.00 C
0.00
1 G DUPLEX REC PLATE - NYLON IVY
1
41.00 C
0.41
0.00 C
0.00
20A 125V DUPLEX REC - IVY (SG)
1
1,980.00 C
19.80
0.00 C
0.00
FWO #739 -1
1
0.00 E
0.00
3.00 E
3.00
FWO #739 -2
1
0.00 E
0.00
29.00 E
29.00
Totals
67.73
32.00
Summary
General Materials
Material Subtotal
Material Tax
Material Markup
Material Total
Data Technican
Foreman
Labor Markup
Total Labor
Total Material & Labor
Final Amount
(@ 8.250 %)
(@ 10.000 %)
(29.00 Hrs @ $85.00)
(3.00 Hrs @ $100.73)
(@ 25.000 %)
ORIGINAL
67.73
67.73
5.59
7.33
80.65
2,465.00
302.19
691.80
3,458.99
3,539.64
$3,540.00
CA Lic # 296728 -C10
NV Lic # 57803 -C2
1860 S. 101" Street San Jose, CA 95112
Phone 408- 298 -3134 Fax 408 -298 -2132
BILL TO: Id
WORK®R®ER #_
CUSTOMER PHONE NO, DATE OF ORDER
ORDER TAKEN BY CUSTOMER ORDER NUMBER
I T &M i-1 cc)WRArT n N T 1=
QUOTE NUMBER
JOB NAME / NUMBER ! /
JOB LOCATION
JOB CONTACT & P ONE NO.
STARTING DATE
rMl "i i) t. i ✓/v
�116
CA Lic # 296728 -C10
NV Lic # 57803 -C2
1860 S. 1011 Street San Jose, CA 95112
Phone 408- 298 -3134 Fax 408 -298 -2132
BILLTO:
A561
bESCRIPTION OF WORK:
I
1
7z
WpRK PERFORMED .. HRS.
E46IPMENT DAYS ` WKS
TOTALS
WORK ORDERED BY (PLEASE PRINT) DATE COMPLETED
AUTHORIZED SIGNATURE
I HERLOYACKNOWLEDGE THE SATISFACTORY COMPLETION OF THE ABOVE DESCRIBED WORK
peo
WORK OR ®ER
CUSTOMER PHONE NO.
DATE OF ORDER
ORDER TAKEN BY
CUSTOMER ORDER NUMBER
U TWO [I CONTRACT f—) N.T.E.
QUOTE NUMBER
WORKMAN `;
JOB NAME /NUMBER
PREM
HRS.
JOB LOCATI N
JOB CONTACT R PHONE NO.
STARTING DATE
DATE
WORKMAN `;
REC.
FIRS.'`
PREM
HRS.
V r?``k
1
TOTAL HOURS®
px
1860 S. 10G S"r�u ^ Stn �llacr, L >. r X5112
Client Address:
DEVCON CONSTRUCTION
Contact: Bob Roseberry
690 Gibraltar Drive
Milpitas, CA 95035
CCN #
CCN Date
500/700#
Project Name:
Project Number:
Page Number:
65
4/5/2012
740
GILROY LIBRARY
2678
1
PROPOSED CHANGE ORDER
Work Description
CHANGE ORDER COST FOR FWO # 740 TO FURNISH AND INSTALL BOGEN PAGING SYSTEM -- $3,236.00
We reserve the right to correct this quote for errors and omissions.
This quote covers direct costs only and we reserve the right to claim for impact and consequential costs.
This price is good for acceptance within 10 days from the date of receipt.
We request a time extension of 2 days.
We will supply and install all materials, labor, and equipment as per your instructions on PCO #65
I. Exclusions:
Overtime and shift work
Permits
Cutting & patching of any type
Demolition of any type
Painting
Dumpster fees
Consealed and unforeseen conditions
Upgrade of existing code violations
II. Clarifications:
• All work is to be completed between the hours of 7:00am through 3:30pm Monday through Friday.
III. General Conditions:
All applicable taxes are included in our submission
The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and
equipment -specified or supplied by others
• Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the
-manufacturer
The contractor shall not be liable for indirect loss or damage
Unless included in this proposal, all bonding and /or special insurance requirements are supplied at additional cost
If a formal contract is required, its conditions must not deviate from this proposal without our permission
Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void
We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions
This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually
satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into
between the owner and the contractor.
We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project.
Please contact our office if you have any questions for if additional information is needed.
Sincerely,
ORIGINAL
PROPOSED CHANGE ORDER
Client Address:
DEVCON CONSTRUCTION
690 Gibraltar Drive
Milpitas, CA 95035
SPRIG ELECTRIC COMPANY
Ron Piovesan
Senior Project Manager
Itemized Breakdown
Description
FWO -740 PAGING EQUIPMENT
FWO -740 INSTALL LABOR
Totals
Qty Net Price U
1 624.00 E
1 0.00 E
Total Mat($)
624.00
0.00
624.00
Labor U Total Hours
0.00 E 0.00
24.00 E 24.00
24.00
Summary
General Materials
624.00
Material Subtotal
624.00
Material Markup
(@ 10.000 %)
62.40
Material Total
686.40
Data Technician
(24.00 Hrs @ $85.00)
2,040.00
Labor Markup
(@ 25.000 %)
510.00
Total Labor
2,550.00
Total Material & Labor
3,236.40
Final Amount
$3,236.00
ORIGINAL
FD
COMMUNICATIONS, INC.
Bill of Materials
Date:
4/4/2012
Company:
PlanNet Consulting
Contact:
Richard Stratford
Ph:
(714) 982 -5800
Project:
Gilroy Library
Steve Mate, CT, CTS
Western Regional Sales Manager
Bogen Communications, Inc.
866 - 934 -9135 Toll -Free Cell
650 - 355 -1450 Office /Fax
Model Description Qty Note
Mixer /Pre - amplifier
VMIX Modular Mixer /Pre - Amplifier, 8- inputs 1
MIC1 S Mic Input, Transformer Balanced, Screw Terminal 1 Mic input
TBL1 S Transformer Balanced Line Input, Screw Terminal 1 Cistera Emergency Message input
RPK87 Rack Mount Kit for Power Vector Amplifiers 1
Emergency Paging Microphone (All -Zone)
MBS1000A Desktop, Dynamic, Uni- directional, Push- Talk/Lock
Voice- Activated Relay
VAR1 Voice - Activated Relay (req. 12V - 24V Power Supply, 100mA)
PRS40C 12V DC, 300mA Power Supply
WARRANTY AND DISCLAIMER FOR PAGING SYSTEM LAYOUT DESIGN WORK.
Bogen will use reasonable efforts to furnish equipment and paging layout recommendations based upon the information provided by the customer to
Bogen, and no such information provided by the customer will be considered confidential or accorded confidential treatment.
The customer agrees to assume all risks related to and /or arising from the installation, activation and /or hook -up of the Equipment. Bogen shall not be
responsible for any damage or injury to person or property resulting from the installation, activation and /or hook -up of the Equipment and the
customer agrees to hold Bogen harmless from any and all such damage or injury or claims pertaining thereto.
Bogen makes no guaranty, representation or warranty, expressed or implied that the selected equipment, layout or resultant system will meet the
customer's performance specifications, needs or requirements. EXCEPT AS PROVIDED UNDER BOGEN's STANDARD PRODUCT
WARRANTY, BOGEN HEREBY EXPRESSLY DISCLAIMS ANY AND ALL WARRANTIES, EXPRESSED OR IMPLIED, RELATIVE TO THE EQUIPMENT,
SYSTEM LAYOUT AND RESULTANT PAGING SYSTEM, AND PERFORMANCE THEREOF, INCLUDING WITHOUT LIMITATION,
WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE.
IN NO EVENT WILL BOGEN BE LIABLE FOR ANY DIRECT, INDIRECT, SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES (INCLUDING
WITHOUT LIMITATION, LOSS OF PROFITS, LOSS OF DATA, LOSS OF USE, AND /OR LOSS OF BUSINESS OPPORTUNITIES)
ARISING OUT OF OR IN CONNECTION WITH THE SYSTEM LAYOUT (ANY STATEMENT, DEPICTION OR IMPLICATION SET FORTH
THEREIN OR OMITTED THEREFROM, OR THE MODIFICATION THEREOF), THE RESULTANT PAGING SYSTEM, THE PERFORMANCE
THEREOF OR ANY EQUIPMENT ASSOCIATED THEREWITH, EVEN IF BOGEN HAS BEEN ADVISED OF THE POSSIBILITY OF
SUCH DAMAGES OR LOSSES.
A/:
CA Lic # 296728 -C10
NV Lic # 57803 -C2 \
1860 S. 101 Street San Jose, CA 95112
Phone 408 - 298 -3134 Fax 408- 298 -2132
BILL TO:
WORK ORDER # 71l o —j
CUSTOMER PHONE NO. DATE OF ORDER
ORDER TAKEN BY CUSTOMER ORDER NUMBER
(-1 TAM F1 r^nM aAi4 f--i ni r c
QUOTE NUMBER
DESCRIPTION OF WORK
<
DATE-,":
JOB NAME I NUMBER
i z/&)
r �i
.26
JOB LOCATION Or
fc
JOB CQL ACT & PHONE NO
.j
STARTING DATE
DESCRIPTION OF WORK
<
DATE-,":
WORKMAN
REG.
HAS:.
PREM
<'H IS.
fc
WORK PERFORMED
HRS:'
VA R
F RZ- I h Pw G f'-, of
a< %pep A
�. v
l - l r Is-
E4UtPMENT ..
DAYS
WKS
TOTALS
WORK O EREO BY LEASE PRINTI DATE COMPLETED
AUTHORIZED GNATURE
I HEREBY ACKNOWLEDGE THE SATISFACTORY COMPLETION OF THE ABOVE DESCRIBED WORK
TOTAL HOURS
® J
do
CA Lic # 296728 -C10
NV Lic # 57803 -C2
1860 S. 10t° Street San Jose, CA 95112
Prone 408- 298 -3134 Fax 408- 298 -2132
61L1_ TO:
WORK ORDER #
CUSTOMER PHONE NO.
DATE OF ORDER
ORDER TAKEN BY
CUSTOMER ORDER NUMBER
QT &M it COMPACT (-1 N.T.E.
QUOTE NUMBER
DESCRIPTION OF WORK.
JOB NAtME /NUMBE
rn 1 'fir
JOB LOCATION
..HRS.
j
[JOB CONTACT 8 PHONE NO,
STARTING DATE
DATE ` EG. PREM
HRS. HRS.
—31 2,4
{
I
I
i
TOTAL HOURS '''--(J
DESCRIPTION OF WORK.
rn 1 'fir
WORK PERFORMED
..HRS.
j
�---
C
EQUIPMENT
DAYS
; WKS .
TOTALS
WORK ORDERED BY (PLEASE PRINT)
DATE COMPLETED
AUTHORIZED SIGNATURE
I HEREBY ACKNOWLEDGE THE SATISFACTORY COMPLETION OF THE ABOVE DESCRIBED WORK
DATE ` EG. PREM
HRS. HRS.
—31 2,4
{
I
I
i
TOTAL HOURS '''--(J
Client Address:
DEVCON CONSTRUCTION
Contact: Bob Roseberry
690 Gibraltar Drive
Milpitas, CA 95035
CCN #
CCN Date
500/700#
Project Name:
Project Number:
Page Number:
54
3/8/2012
729
GILROY LIBRARY
2678
1
PROPOSED CHANGE ORDER
Work Description
CHANGE ORDER COST FOR FWO #729 TO INSTALL POWER ABOVE CEILING FOR SECURITY DOORS.
--------------------------------------------- - - - - -- $ 1,378.00
We reserve the right to correct this quote for errors and omissions.
This quote covers direct costs only and we reserve the right to claim for impact and consequential costs.
This price is good for acceptance within 10 days from the date of receipt.
We request a time extension of 2 days.
We will supply and install all materials, labor, and equipment as per your instructions on PCO #54
Exclusions:
Overtime and shift work
Permits
Fire proofing patching
Cutting & patching of any type
Demolition of any type
Painting
Dumpster fees
Access panels
Consealed and unforeseen conditions
Upgrade of existing code violations
Acoustical box pads and caulking at STC rated walls
Fire rated box pads and caulking at fire rated walls
II. Clarifications:
• All work is to be completed between the hours of 7:00am through 3:30pm Monday through Friday.
III. General Conditions:
All applicable taxes are included in our submission
The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and
equipment -specified or supplied by others
• Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the
-manufacturer
The contractor shall not be liable for indirect loss or damage
Unless included in this proposal, all bonding and /or special insurance requirements are supplied at additional cost
If a formal contract is required, its conditions must not deviate from this proposal without our permission
Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void
We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions
This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually
satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into
between the owner and the contractor.
ORIGINAL
PROPOSED CHANGE ORDER
Client Address:
DEVCON CONSTRUCTION
690 Gibraltar Drive
Milpitas, CA 95035
We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project.
Please contact our office if you have any questions for if additional information is needed.
Sincerely,
SPRIG ELECTRIC COMPANY
Ron Piovesan
Senior Project Manager
Itemized Breakdown
Description
Qty
Net Price U
Total Mat($)
Labor U
Total Hours
1/2" EMT 1 -H STEEL STRAP
10
68.46 C
6.85
0.00 C
0.00
#12/2C CU MC CABLE STL ARMOR
250
861.00 M
215.25
0.00 M
0.00
1/2" AC -90 /MC DC SS CONN
6
147.82 C
8.87
0.00 C
0.00
YEL SCOTCHLOCK ( #18 -12)
10
12.28 C
1.23
0.00 C
0.00
RED SCOTCHLOCK ( #16 -10)
18
17.18 C
3.09
0.00 C
0.00
FWO #729 LABOR
1
0.00 E
0.00
9.00 E
9.00
Totals
235.29
9.00
Summary
General Materials
Material Subtotal
Material Tax
Material Markup
Material Total
GF
Journeyman
Labor Markup
Total Labor
Total Material & Labor
SPRIG ENG
Adjustments Subtotal
Final Amount
(@ 8.250 %)
(@ 10.000 %)
(2.00 Hrs @ $110.67)
(7.00 Hrs @ $90.79)
(@ 25.000 %)
(@ 2.000 %)
ORIGINAL
235.29
235.29
19.41
25.47
280.17
221.34
635.53
214.22
1,071.09
1,351.26
27.03
27.03
$1,378.00
l
CA Lic # 296728 -ClO
NV Lic # 57803 -C2
1860 S. 1011' Street San Jose, CA 95112
Phone 408 -298 -3134 Fax 408 - 298 -2132
BILL T0:
DESCRIPTION OF WORK
X14 6 Ile e,�' el.- tL
�, � 1. ,� r� .,Lrr� %. -�..C: C ��� L/ �_j �'�,� �,•,�n�
WORK PERFORMED HRS.
EQUIPMENT, DAYS WIGS
TOTALS
WORK O ER (PLEASE PRI /M DATE COMPLETED
r0R'Eb SIGNATURE
I HEREBY ACKNOWLEDGE THE SATISFACTORY COMPLETION OF THE ABOVE DESCRIBED WORK
WORK ORDER
,:
CUSTOMER PHONE NO. DATE OF ORDER
ORDER TAKEN BY CUSTOMER ORDER NUMBER
1-1 T &M n CONTRACT F-1 N.T.E.
QUOTE NUMBER
WORKMAN i
_..
JOB NAME fl. /NUMBER
PREM
HRS.:;.
JOB L
(CATION
ON I I '(i 4
JOB CONTACT 6 PHO1JE NO.
STARTING DATE
U A iv . t� (4 V) n
y - 12, .
DATE
WORKMAN i
_..
REG. ,
HRS. ,'(
PREM
HRS.:;.
^i Y
Pei 1° f- j
A"
3/)
fC, ; -
i
i
1
TOTAL HOURS1
Fizo
'�,�
ter! >�
18F�C S IG'� S�.tL! i Scut poi. LET �SI1Z
Client Address:
DEVCON CONSTRUCTION
Contact: Bob Roseberry
690 Gibraltar Drive
Milpitas, CA 95035
CCN # 51
CCN Date 2/28/2012
500/700# 726
Project Name: GILROY LIBRARY
Project Number: 2678
Page Number: 1
PROPOSED CHANGE ORDER
Work Description
CHANGE ORDER COST FOR FWO #726 IS TO ADD (1) TYPE N1 DOWN LIGHT AT RECEPTION DESK ON THE 2ND
FLOOR................................... ............................... $ 822.00
We reserve the right to correct this quote for errors and omissions.
This quote covers direct costs only and we reserve the right to claim for impact and consequential costs.
This price is good for acceptance within 10 days from the date of receipt.
We request a time extension of 3 days.
We will supply and install all materials, labor, and equipment as per your instructions on PCO #51
1. Exclusions:
Overtime and shift work
Permits
Cutting & patching of any type
Painting
Dumpster fees
Ceiling seismic support wires
Consealed and unforeseen conditions
Upgrade of existing code violations
II. Clarifications:
• All work is to be completed between the hours of 7:00am through 3:30pm Monday through Friday.
III. General Conditions:
All applicable taxes are included in our submission
The contractor shall not be held liable for errors or omissions in design by others, nor inadequacies of materials and
equipment -specified or supplied by others
• Equipment and materials supplied by the contractor are warranted only to the extent that the same are warranted by the
-manufacturer
The contractor shall not be liable for indirect loss or damage
Unless included in this proposal, all bonding and /or special insurance requirements are supplied at additional cost
If a formal contract is required, its conditions must not deviate from this proposal without our permission
Anything (verbal or written) expressed or implied elsewhere, which is contrary to these conditions shall be null and void
We will not participate in liquidated damage expenses if damages are due to any cause other than our own actions
This quotation is good for ten days, and is based upon our entering into a subcontract with you in a form which is mutually
satisfactory and having conditions which are no more exacting or unfavorable to us than the contract entered into
between the owner and the contractor.
We appreciate the opportunity extended to Sprig Electric in allowing us to submit our proposal for this important project.
Please contact our office if you have any questions for if additional information is needed.
ORIGINAL
PROPOSED CHANGE ORDER
Client Address:
DEVCON CONSTRUCTION
690 Gibraltar Drive
Milpitas, CA 95035
Sincerely,
SPRIG ELECTRIC COMPANY
Ron Piovesan
Senior Project Manager
Itemized Breakdown
General Materials
391.03
Material Subtotal
391.03
Material Tax (@ 8.250 %)
32.26
Material Markup (@ 10.000 %)
42.33
Description
Qty
Net Price U
Total Mat($)
Labor U
Total Hours
#12/2C CU MC CABLE STL ARMOR
7
861.00 M
6.03
0.00 M
0.00
FWO # 726 LABOR
1
0.00 E
0.00
3.00 E
3.00
N1 Downlight w/ trim and lamp
1
385.00 E
385.00
0.00 E
0.00
Totals
391.03
3.00
Summary
General Materials
391.03
Material Subtotal
391.03
Material Tax (@ 8.250 %)
32.26
Material Markup (@ 10.000 %)
42.33
Material Total
Journeyman
Labor Markup
Total Labor
Total Material & Labor
Sprig Eng
Adjustments Subtotal
Final Amount
(3.00 Hrs @ $90.79)
(@ 25.000 %)
(@ 2.000 %)
ORIGINAL
465.62
272.37
68.09
340.46
806.08
16.12
16.12
$822.00
CA Lic 9 296728 -C 10
NV Lic # 57803 -C2
1860 S. 1011` Street San Jose, CA 95112
Phone 408- 298 -3134 Pax 408- 298 -2132
SILLTO:
\4
DESCRIPTION OF WORK
WORK PERFORMED HRS.
to
q i
EQUIPMENT DAYS WKS
TOTALS
WORK gf38£FiED-'BY (PLEASE INT) DATE COMPLETED
AUTHORIZE IG k
I YER Y ACKNOWLEDGE THE SATISFACTORY COMPLETION OF THE ABOVE DESCRIBED WORK
t
K) .44. 61
WORK ORDER
CUSTOMER PHONE NO. DATE OF ORDER
ORDER TAKEN BY CUSTOMER ORDER NUMBER
F-1 T &M I-1 CONTRACT F-1 N.T.E.
QUOTE NUMBER
JOB N ME ; %NU,MSER
4 �+
JOB LOCATION
JOB CONTACT & PHONE NO.
STARRTIN DATE
CPR 214
Project: Gilroy Community Library
Devcon Job #: 10 -296
Date: 7/9/2012
We submit for your approval the following estimate of changes in work:
Added framing and drywall work at North 10' circle
32 Gypsum Board $9,401.00
Custom Drywall, Inc. 1701: Added framing and drywall $5,969.00
work at North 10' circle
Custom Drywall, Inc. 1708: Add diffuser per FP 21 $1,828.00
Custom Drywall, Inc. 3276: Drywall, tape and finish $1,604.00
beam in room 203
Subtotal
70 Fee
Total
72 Amount applied to Contingency
73 Amount applied to OT Allowance
Net change order amount
$9,401.00
10.00% $940.00
$10,341.00
$0.00
$0.00
$10,341.00
❑ We have proceeded with this change per the direction of:
❑ We will not proceed with this change until receipt of a signed copy of this proposal.
❑ This proposal must be accepted by: xx/xx/xx in order to avoid additional extension or expense.
❑ These changes will add approximately xx working days to the completion date.
Submitted by:
Approved by:
Devcon -Bob Roseberry
Owner's Representative: James Kuhn, Nova Partners
Date:
Date:
Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942 -8200 F. (408)262 -2342 Lic. #399163
CUSTCM', DP,YW .LL, INC.
J LICENSE 26349"
1570 Gadding rc Court, I Milni,a , Calieorn:r- 95036, {4001 263.1G"sG
Gilroy Library
DESCRIPTION OF CHANGE:
Location of Change
Work Order Date
COST PER OPENING
5/8" Type X
1" core board 2x10
6" 16GA flat strap backing
35/8 radius track 20 GA
4" 20 ga track
4" 20GA stud 20'
2 1/2" stud 20 GA 8'
6" 20GA - slotted track
6" 20GA -18' studs
6" 209a track structural
2 112" Track 20 GA
Corner Bead
1 -1/2 X 1 -112 90 metal
RC -1 channel
Furring Channel
Z metal
Hot Mud
box of Mud
CRC 16ga
32' Scissor lift -
Sub -Total Cost for Material
Tax (@ 8.25%
Cost of Material
Stocking of Material, Delivery
Labor
Layout
Foreman /supervision
Taping Labor
demo and reframe
Framing and Drywall Labor
Clean Up
Supervision
Man Lift
Dump Fees
Cost Per Location
Overhead and Profit
Overhead and Profit
Price per location
Total Material Cost
Total Labor Cost
Pieces
0
0
0
0
1
1
6
0
0
0
4
0
0
0
0
0
0
0
0
0
Material
Labor
$68.71
$1,520.74
1708
2nd floor open library room 213 - add framing for new diffuser on line 3 at d -line.
Reframed and drywall and patch. Relocate 3 diffusers on line C between 3 and 4
to be centered with window above. Demo rock reframe - hang new drywall and
patch /taping
118 $0.070
Cost Per Hour Cost per Unit
$0.00
$0.00
$0.00
$0.00
$10.40
$17.86
$15.26
$0.00
$0.00
$0.00
$12.32
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$55.84
$4.61
$60.45
$8.26
0 $87.540
10/17/2011
1 $87.540
Length
Lineal or SF Labor Hours
Cost per Ft.
32
0
$0.280
20
0
$0.510
10
0
$0.833
10
0
$2.900
10
10
$1.040
20
20
$0.893
8
48
$0.318
10
0
$1.304
18
0
$0.521
10
0
$0.511
10
40
$0.308
10
0
$0.270
10
0
$0.000
10
0
$0.420
10
0
$0.420
10
0
$0.464
1
0
$8.750
1
0
$8.250
10
0
$0.400
0
$450.000
0
8.250%
118 $0.070
Cost Per Hour Cost per Unit
$0.00
$0.00
$0.00
$0.00
$10.40
$17.86
$15.26
$0.00
$0.00
$0.00
$12.32
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$55.84
$4.61
$60.45
$8.26
0 $87.540
$0.00
1 $87.540
$87.54
8 $93.480
$747.84
5 $85.670
$428.35
3 $85.670
$257.01
0 $49.820
$0.00
0 $101.300
$0.00
0 $10.000
$0.00
0
$0.00
0
$1,589.45
15.000%
$10.31
15.000%
$228.11
$1,827.87
Number of locations
1
Total Cost of Change 1 $1,827.87
7
BILL TO:
ORDER DATE: j
ORDERED BY:
JOB NAME/LOCATION:
L �`, y,
t
t'r' Lam( /' Crl'• t.tJ r-t' � � /i r w
OVER TIME ON CONTRACT WORK
DOUBLE TIME ON CONTRACT WORK
EXTRA TO CONTRACT WORK
JOB PHONE:
PCO #:
FWO#:
OTHER REF
DESCRIPTION OF WORK: I a„ 01&.%
� k ca' It frf �'•'1 �'— / h E'
.� -•
KSs'/`C V A Lit e 1,... C��v -:2e.� oi. - -i �Je
l2r ed
771 tf tt/ s
Q Y.
MATERIAL
TYPE OF LABOR
HOURS
ri
C
� •
`�
r r� L) r
.l✓ - /fi ". cY f'^t'
�
a info
j
1
it
r 2 0 -f A C. A
q Ft c fkA .
e
WORK ORDERED BY: e.
5I&NATUkE:
I hereby acknowledge i4eXvatisfactory completion of the above described work.
i`G1� t r�cj
< /,-;( Ord,
;t�:Zl
A 1 CUSiOlh GP fVd .Ll, ihtC.
LICENSE `263 4 ?5
1.370 G €ad =[ng Couft, PA€ €pitas, California 95035,(4061263-1616
Gilroy Library
DESCRIPTION OF CHANGE:
Location of Change
Work Order Date
COST PER OPENING
5/8" Type X
1" core board 2x12
1/4" Type X
35/8 radius track 20 GA
1 5/8" track 20 GA
4" 20GA shaft J runner
2 112" stud 20 GA B'
6" 20GA - slotted track
6" 20GA -18' studs
6" 20ga track structural
2 1/2" Track 20 GA
Comer Bead
1 -1/2 X 1 -1/2 90 metal
RC -1 channel
Furring Channel
Z metal
Hot Mud
box of Mud
CRC 16ga
32' Scissor lift -
Sub -Total Cost for Material
Tax (ED 8.25%
Cost of Material
Stocking of Material, Delivery
Labor
Layout
Foreman /supervision
Taping Labor
stocking by journeyman
Framing and Drywall Labor
Clean Up
Supervision
Man Lift
Dump Fees
Cost Per Location
Overhead and Profit
Overhead and Profit
Price per location
Total Material Cost
Total Labor Cost
Pieces
14
0
0
4
0
0
14
4
20
10
0
0
0
0
0
0
0
0
0
2
Material
Labor
$1,665.98
$3,524.26
1701
Bulletin #15 Field Work order #25 -Add 34 LF of 6" wll - 18'high with 4' -6" radius
complete circle tapered to (E) 5' red complete circle. Location East wall at Open
Library 213 Bridge Roam Area
1100 $0.070
Cost Per Hour Cost per Unit
$125.44
$0.00
$0.00
$116.00
$0.00
$0.00
$35.62
$52.16
$187.56
$51.10
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$900.00
$1,467.88
$121.10
$1,588.98
$77.00
0
1017/2011
$0.00
Length
Lineal or SF Labor Hours
Cost per Ft.
32
448
$0.280
24
0
$0.510
32
0
$0.280
10
40
$2.900
10
0
$0.440
12
0
$0.893
8
112
$0.318
10
40
$1.304
18
360
$0.521
10
100
$0.511
10
0
$0.490
9
0
$0.270
10
0
$0.000
10
0
$0.420
10
0
$0.420
10
0
$0.420
1
0
$8.750
1
0
$8.250
10
0
$0.400
0
$450.000
0
8.250%
1100 $0.070
Cost Per Hour Cost per Unit
$125.44
$0.00
$0.00
$116.00
$0.00
$0.00
$35.62
$52.16
$187.56
$51.10
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$900.00
$1,467.88
$121.10
$1,588.98
$77.00
0
$87.540
$0.00
2
$87.540
$175.08
12
$93.480
$1,121.76
2
$85.670
$171.34
24
$85.670
$2,056.08
0
$49.820
$0.00
0
$101.300
$0.00
0
$10.000
$0.00
$0.00
$5,190.24
15.000% $249.90
15.000% $528.64
$5,968.77
Number of locations 1
Total Cost of Change 1 $5,968.77
f
J
�.. 01
JOB WORK ORDER
CUSTOM DRYWALL, INC.
1570 GLADDING CT.
MILPITAS, CA 95035
(408)263 -1616
(408)263 -1142 Fax
BTU. TO:
ORDER DATE:
ORDERED BY: I\av Q { ✓er,,, !+.
sk c �"
JOB l�NAME/LOCATION:
L i'L 10 ,.
OVER TIME ON CONTRACT WORK
DOUBLE TIME ON CONTRACT WORK
EXTRA TO CONTRACT WORK
JOB PHONE:
PCO #:
FWO#:
OTHER REF #:
DESCRIPTION OF WORK: act
(e
aeLn f 5 Gnn�.f ark ()1^: '-
c2j
C:` •.ley
r��
L Occtf � v • LZSr 4r c* � CLl 0
ff /'
&'- Lh ew ' 2-13 fj r ,�,& ,c ooO , +- ea
QTY-
MATERIAL
TYPE OF LABOR
HOURS
1
cK �y �tt G
C' c� -- 1, I' 1 .,("^ s
0
iL 0 G,4 — %—Y`ac. k
lk' .
tr H g 0 614
'3 4 . o 64 ^ ,� %7ae. F-
In aft y i(k ; tr.�.
IL/ 11 p
y �S
� p
� •�K :(P cvC
��•y, jj
G2 f1 rltis oc enk H ^-
- �r'''
wft
i � CC" � 7• c "C,SScr �f 7t'
u z. U; ;i?,,
hw5
• * Iq aq i,
SIGNATURE:
I hereby acknowledge the
completion of the above described work.
CttsTOrr, DRYVVA.E, INC.
1570 Coast, IUfiEpitas, California 95035, (4031263-1 SI6
Gilroy Library
3276
Total Cost of Change 1 $1,604.15
Room 203, Community Room, add 1 layer of 516" drywall to cover wood beam
DESCRIPTION OF CHANGE:
exposed at ridge er arch. Request. Approx 16" wide x 28 If.
Location of Change
Work Order Date
111412011
COST PER OPENING
Pieces
Length
Lineal or SF Labor Hours
Cost per Ft.
Cost Per Hour
Cost per Unit
518" dyrwall
2
8
32
$0.280
$17.92
2; x 8' core board (shaft liner)
0
0
0
$0.475
$0.00
Trim -Tex 4110 archway corner bear
0
10
0
$0.250
$0.00
Other comer bead supplied by contl
0
12
0
$0.460
$0.00
3 5/8" 20ga. Metal stud
0
10
0
$0.339
$0.00
3 5/8" 20ga. Track
0
10
0
$0.331
$0.00
2 1/2" stud 20 GA
0
10
0
$0.510
$0.00
6" 16GA -track
0
10
0
$0.00
6" 16ga 8' studs
0
8
0
$0.00
4" flex tape
6
10
60
$0.490
$29.40
Comer Bead
10
10
100
$0.270
$27.00
1 -112 X 1 -112 90 metal
10
10
100
$0.430
$43.00
RC -1 channel
0
10
0
$0.420
$0.00
Furring Channel
0
10
0
$0.420
$0.00
Z metal
0
10
0
$0.420
$0.00
Hot Mud
2
1
2
$8.750
$17.50
box of Mud
4
1
4
$8.250
$33.00
CRC 16ga
0
10
0
$0.400
$0.00
Screws, tape & Misc.
0
0
$0.00
Sub -Total Cost for Material
0
$167.82
Tax 0 8.25%
8.250%
$13.85
Cost of Material
$181.67
Stocking of Material, Delivery
298
$0.070
$20.86
Labor
Layout
0
$87.540
$0.00
Foreman /supervision
1
$87.540
$87.54
Taping Labor
8
$93.480
$747.84
Framing and Drywall Labor
3
$85.670
$257.01
Clean Up
0
$49.820
$0.00
Supervision
0
$101.300
$0.00
Man Lift 1 week
1
1 0
$0.000
$100.00
Dump Fees
$0.00
Cost Per Location
$1,394.92
Overhead and Profit
Material
15.000%
$30.38
Overhead and Profit
Labor
15.000%
$178.86
Price per location
$1,604.16
Number of locations
1
Total Material Cost
$202.53
Total Labor Cost
$1,192.39
Total Cost of Change 1 $1,604.15
BILL TO.
ORDER DATE:
JOB NAME /LOCATION:
ORDEREt BY:
Ott RT3:ME ON CONTRACT WORK:
JOB PHONE:
DOUBLE TIME ON CONTRACT- WORK:
EXTRA TO CONTRACT WORK:
PCO
EWO : Undisputed Change Order Work:
DESCRIPTION OF WORK:
C)
I
/�. ts, •,t /' c jet`/ // b ... v.'c i �-CJV f" (Y� ?� !`,19e'c:c .:t � �-r:• ,
I� r 1`C'� f} 'J «. C'l f' t ff. L� '.. �t?v� /•�i"G J' ,• (.� r�.'lN K
Tai:
MATERIAL-
TYPE OF LABOR:
HOURS:
it e C ts
(t
aX fJri.'Ge.S
lvic.��. 4v ;;n.i.�ti
c.�-!lc'.� ✓ci$�c.
/�, �.iW'
("GIST
P• *•M 4
SIGNATURE.
T hereby acknowledge the satisfactory completion of the above described work.