Loading...
HomeMy WebLinkAboutDevcon Construction - Library Construction - Change Order No. 8 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0451; Fax (408) 846-0429 CHANGE ORDER NO.8 To contract for: New Gilroy Library Project Contractor: Devcon Construction Contract Date: 6/15/2010 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work This Change Order provides for the following: 1 General Requirements Devcon : Specified Bike Rack (4 ea) Custom Bike Rack (2 ea) Subtotal $10,073.00 69 Fee Total 71 Amount applied to Contingency 72 Amount applied to aT Allowance $10,073.00 ($3,612.00) $13,685.00 10.00% $1,007.00 $11,080.00 $0.00 $0.00 All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. /)GvL{)/J ~TRACTOR By:~. /' Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost P.-ercentage Initial ./ $18,177,226.00 $342,535.00 1.88% $18,519,761.00 $11,080.00/, $353,615.00 1.95% $18,530,841.00 I (W e) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $11,080.00 Date: I/h'tll/ . . ACCEPTED BY: RECOMMENDED B Date I/; '/1/8;/( Date Date Change Proposal Request: 113 1::EII'".a:I\I Project: Gilroy Community Library Devcon Job #: 10-296 Date: 10/19/2011 We submit for your approval the following estimate of changes in work: Change 4 Specified Bike Racks to 2 Custom Racks 1 General Requirements Devcon : Specified Bike Rack (4 ea) Custom Bike Rack (2 ea) Subtotal 69 Fee Total 71 Amount applied to Contingency 72 Amount applied to aT Allowance Net change order amount $10,073.00 ($3,612.00) $13,685.00 10.00% $10,073.00 $1,007.00 $11,080.00 $0.00 $0.00 $11,080.00 D We have proceeded with this change per the direction of: D We will not proceed with this change until receipt of a signed copy of this proposal. D This proposal must be accepted by: xx/xx/xx in order to avoid additional extension or expense. D These changes will add approximately xx working days to the completion date. Submitted by: Date: Devcon -Bob Roseberry Approved by: Date: Owner's Representative: James Kuhn, Nova Partners Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942-8200 F. (408)262-2342 Lie. #399163 Change Proposal Request: 113 1::EII'".a:I\I Project: Gilroy Community Library Devcon Job #: 10-296 Date: 10/19/2011 We submit for your approval the following estimate of changes in work: Change 4 Specified Bike Racks to 2 Custom Racks 1 General Requirements Devcon : Specified Bike Rack (4 ea) Custom Bike Rack (2 ea) Subtotal 69 Fee Total 71 Amount applied to Contingency 72 Amount applied to aT Allowance Net change order amount $10,073.00 ($3,612.00) $13,685.00 10.00% $10,073.00 $1,007.00 $11,080.00 $0.00 $0.00 $11,080.00 D We have proceeded with this change per the direction of: D We will not proceed with this change until receipt of a signed copy of this proposal. D This proposal must be accepted by: xx/xx/xx in order to avoid additional extension or expense. D These changes will add approximately xx working days to the completion date. Submitted by: Date: Devcon -Bob Roseberry Approved by: Date: Owner's Representative: James Kuhn, Nova Partners Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942-8200 F. (408)262-2342 Lic. #399163 OS/20/2010 THU 9:30 FAX ldi002/002 ,~~ .PARKPACI FIC. - - P.O. Box 4999 Walnut Creek, CA 94596 888-460-7275 888-461-7275 fax Quote ~-~-- - ".. Date Estimate # .5112/2010 4818 Spe.A_if1~,J "::;:~:.:,::;::::;..::,::.,..".. ~.~:\1.d\!f1!..: .'........'>t....""...."... .,,^ ., Project Name Location Gilroy Library Gilroy Item Description Qty Rate Total 2170-]1-C Columbia Cascade Original CycLoops@Model # 2170-11-C, Looped Bike Rack, 4 735.00 2,940.00T 2-3/8" O.D. Schedule 40 Steel Pipe, Maximum Bikes: Eleven, Embedment Mount, CASPAX-7 powder-coated color (Coffee Tan) Freight Freight Charges 400.00 400.00 Estimated Lead Time: 30-45 Days * Subtotal $3,340.00 .Shipment can occur AFTER receipt of an acceptable order, paymenl in full or Sales Tax (9.25%) $271.95 ParkPacific approval of pay men I proposal, apPi'Oved submittals (if necessary), and color selection. ParkPacific (erms and billing apply. This quotation is subject 10 all appropriate Total $3,611.95 lax.es. This quotation is valid for 30 days and subjeclto our confirmation thereafter. Products ship unassemblcd in most cases, and include assembly hardware, except Ref. # 0104-0002 anchoring bolts. Shipping packages arc usually heavy llnd awkward and reqllirc mechanical handling to accomplish truck unloading at destination. Truck unloading, job site work, and installalion arc extra and not included in this quotation. Please contact ParkPaciCic if yo II have questions or would like to proceed with an order. Tel II 1-888-460-7275 Fax 111-888-461-7275 PAGE 2/2' RCVO AT 5(20/2010 9:30:58 AM [pacifiC Oaylight Time}' SVR:RIGHTFAXJ6. ONIS:1 . CSIO:. DURATION (mmoss):01-18