Loading...
HomeMy WebLinkAboutDevcon Construction - Library Construction - Change Order No. 1 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408)846-0451; Fax (408) 846-0429 CHANGE ORDER NO.1 To contract for: New Gilroy Library Project, Phase 2 Contractor: Devcon Construction Contract Date: 6/1 5/20 I 0 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Descriotion of Work This Change Order provides for the following: See attached Devcon Change Proposal Request 17, Devcon Job # 10-296, dated 10/7/2010, Bulletin 1: Architecural woodwork revisions associated with Bulletin # I. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $50,477.00 Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost $18,177,226.00 $0.00 $18,177,226.00 $50,477.00 $50,477.00 $18,227,703.00 Percentage Initial 0.00% 0.28% Y&\JUJl\J Co. I N~ CONTRACTOR. , ~1f,~Ue.Hi1, D',"-',V17/ID " -C> ,--... --"-- ( -- /1/ ? 1----- RECOMMENDE ACCEPTED BY: Date f/t2~" I ate " Change Proposal Request: 17 ~~ Project: Gilroy Community Library Devcon Job #: 10-296 Date: 1017/2010 We submit for your approval the following estimate of changes in work: Bulletin #1: Additional work associated with piped utilities, concrete work and architectural wood work required per Delta 5 drawings dated 6/30/10. 4 Piped Utilities Robinson & Moretti, Inc : Bulletin 1; Furnish and install 4" backflow meter per drawings revision. 11 Concrete Reinforcement Allamillo Rebar, Inc. ; Bulletin #1; Additional reinforcement required structural revisions. 12 Cast in Place Concrete RJS : Bulletin #1 Misc. drawing revisions associated with the concrete scope of work. RJS : Bulletin 1 City of Gilroy Plan Check Revisions: Additional labor associated with revision of anchor bolt spacing from 24" to 12", 17 Architectural Woodwork AmberWood Installation: Bulletin 1; Architectural woodwork revisions associated with Bulletin #1. Subtotal 68 Fee Total 70 Amount applied to Contingency 71 Amount applied to OT Allowance Net change order amount $863.00 $863.00 $971.00 $971.00 $39,042.00 $21,774.00 $17,268.00 $5,012.00 $5,012.00 $45,888.00 10.00% $4,589.00 $50,477.00 $0.00 $50,477.00 D We have proceeded with this change per the direction of: o We will not proceed with this change until receipt of a signed copy of this proposal. D This proposal must be accepted by: xxlxxlxx in order to avoid additional extension or expense. D These changes will add approximately xx working days to the completion date. Submitted by; Devcon -Daisy Pereira Approved by; Owner's Representative: David Marks, Nova Partners Date: Date: Devcon Construction Inc. 690 Gibraltar Dr. Milpitas, CA 95035 P.(408)942-8200 F. (408)262-2342 Lie. #399163 August 11, 2010 Andre Lumsey Jr. Devcon Construction Ph: 408-519-8376 Fax: 408-262-2342 RE: Gilroy Library Underground Change Order Request: Robinson & Moretti, Inc. .. A Land Improvement Contractor .. 7780 Holsclaw Road Gilroy, California 95020 Phone No. (408) 842-5593 Fax No. (408) 842-7763 Add one (1) - 4" 2-1090 valve to scope of work as shown on Bulletin #1 Material Labor P&O Net Change to Contract $ 785 $ 0 $ 78 Respectfully submitted, ACCEPTED. The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Date of Acceptance Robinson & Moretti Inc. License No. 418843A ISI Rich Robinson By By Note: We may withdraw this proposal if not accepted within 30 days. Template: Devcon - Library COR #1 01( $ 863 . . Change Order Request Project: Gilroy Public Ubrary Contact: Andre Lumsey Jr. Address: 7387 Rosanna Street City, State, Zip: Gilroy, CA 95126 Contractor: Devcon Construction Address: 690 Gibraltar Drive City, State, Zip: Milpitas, CA 95035 We are requesting the following ehanges to the Work: Deseription Bu\1etin # 1 (Delta #5 dated 7/9/1 0 ) Material Labor APPROVAL Subcontractor: Alamillo Rebar, Inc. Signature: ~ Typed Name: Eric Noller Date: August 11, 2010 Change Order Number: Date: Unit Unit Units Type Priee 1bs S S -m ~ s 0.50 $ -S ~ $ 67.59 $ $ $ $ $ $ $ S $ Sub-Total: $ Overhead & Profit: $ Grand Total: S Contractor: DevCOl\ Construction Signature: Typed Name: Date: 1 8/11/2008 Dollan 296.50 540.72 837,22 133 .43 970.65 --~.. ...~~.... . RJS ~i,'.!1 Structures 457 Minna Street San Francisco, CA 94103 Change Order Request TO: Devcon Construction Inc 690 Gibraltar Drive Milpitas, CA 95035 PROJECT NAME: Gilroy Public Library RJS PROJECT NUMBER: 2 FROM: James Collins ATTN: Andre lumsey al u m sey@devcon-const.com DATE: 08/04/10 COR NUMBER: 004 SUBJECT: Balance of Bulletin 1 Changes Material Cost 1 Is $ 5,137 $ 5,137 Sales Tax 9.25% $ 475 Freight and Delivery Expense incl $ labor (straight time) 193 Hours $ 62 $ 11,966 labor (1.5X) o Hours $ 90 $ labor (2X) o Hours $ 118 $ Drafting 1 Hours $ 75 $ 75 Supervision 4 Hours $ 90 $ 358 Subcontractor 1 lS $ 44 $ 44 Tools and Equipment 1 lS $ 879 $ 879 Subtotal $ 18,934 *Overhead 15% $ 2,840 TOTAL ~ $ 21,7741 Prices firm for 30 days A Contract Time Extension of o days Material Delivery Time 30 days NOTES: Excludes concrete at millwork as shown on updated details on sheets A9.015 & A9.016, Excludes installing plates that use anchor bolts for attachment. Assumes pumping can be done on the same day as another deck pour. Additional moblization is $3000. Prepared By: James Collins o:t o:t o:t o:t 1;; 8 .D ::I III <Jl. <Jl. <Jl. <Jl. <Jl. <Jl. <Jl. <Jl. <Jl. <Jl. </lo </lo </lo 0 1;; 0 0 iii u ... .2 ::> </lo </lo <Jl. <Jl. <Jl. <Jl. </lo <Jl. <Jl. <Jl. <Jl. </lo </lo <Jl. 0 0 0 0 0 en 0 0 0 0 0 0 0 jij .... 0 .15 :J III 00 0 00 N .-t 1;; N N 00 , \j) \j) on ..... N 00 !::!. 0 m- u ... III :iE </lo <Jl. </lo <Jl. <Jl. <Jl. <Jl. <Jl. <Jl. </lo </lo <Jl. 0 0 0 0 on 0 1;; on 0 0 0 , .-I on 0 m m N " N m u en 00 en ... .-t '2 ::> <Jl. <Jl. <Jl. <Jl. <Jl. <Jl. <Jl. <Jl. <Jl. <Jl. <Jl. </lo <Jl. <Jl. 0 0 00 0 o:t 0 0 en 0 0 0 00 0 8 o:t o:t jij N N .-I .-I .... , 0 ... .15 III :J :iE III ~ 0 \j) 00 o:t ~ 0 00 0 00 o:t .-t 0 N .-t \j) ("'oj C"I'l ~ I ::I 0 .c .. 0 .D III -' 'tS 0 .-t III 0 m 0 00 0 .-t 0 on 0 N 0 .... .-t C"I'l .-t .. D- o \j) 00 0 o:t 0 0 0 00 00 \j) 0 00 ..... 0 '<l' '<l' \j) 8 ci r:i 0 N .-t on .-t .-t ~ .. 0 .D III -' v~ > <Il .... a. e a. QJ <0 a. a. bO a. :J .... :J c: .... E E III c: .... III no !E 'co v 0 !E QJ ..<: 0 ex:: 15 v .... u Co .... U .... III l- v 0 'C ~ :J >- u.. .... .... U III .... .-t E 0 E .... v u.. <0 U IE a. III u V :Il: ~ 1lO~ .0 c: ...... c: u > .. III 'C .... III c: QJ ~ 0 III "OQ. V 0 .... Q) 0 ~ ~ u.. III W Q. ex:: u I- .Ii V'l u a: 'S a:l .... 0 Q) u c: no jij a:l , c: .0 jij 1U 0 III '+:1 Vi :s: QJ Q. ..<: '1: "0 Q) .!:1 u Q) .... Q) .... <Il "0 Qj <Il 0 QJ "0 Q) Q <( 0 .... :s: ::l .... '<l' u 0 - :J 0 ~ .... m lV1 .... :Il: ... 0 0 V'l cu III ex:: cu .-t .-t (2 0 ..c N N u III III V'l ...tI ~...~., RJS ;,.J:~I Structures 457 Minna Street San Francisco, CA 94103 Change Order Request TO: Devcon Construction Inc 690 Gibraltar Drive Milpitas. CA 95035 PROJECT NAME: Gilroy Public Library RJS PROJECT NUMBER: 2 FROM: James Collins ATTN: Andre Lumsey alumsev@devcon-const.com DATE: 08/04/10 COR NUMBER: 004 SUBJECT: Bulletin 1 City of Gilroy Plan Check Revisions Material Cost 1 Is $ $ Sales Tax 9.25% $ Freight and Delivery Expense incl $ Labor (straight time) 224 Hours $ 62 $ 13,888 Labor (1,5X) o Hours $ 90 $ Labor (2X) o Hours $ 118 $ Drafting 1 Hours $ 75 $ 75 Supervision 4 Hours $ 90 $ 358 Subcontractor 1 LS $ $ Tools and Equipment 1 LS $ 694 $ 694 Subtotal $ 15,016 *Overhead 15% $ 2,252 TOTAL J $ 17,2681 Prices firm for 30 days A Contract Time Extension of o days Material Delivery Time 30 days NOTES: Excludes concrete at millwork as shown on updated details on sheets A9,015 & A9.016. Excludes installing plates that use anchor bolts for attachment. Assumes pumping can be done on the same day as another deck pour. Additional moblization is $3000. Prepared By: James Collins . . vi c: 0 'Vi '> <lJ c:: ~ u <lJ ~ U c: to 0: > ~ i:5 '0 > ..... iJ .... =II: c: +:; .!!! "5 a:l ..... <lJ <lJ ..c: ~ III ~ ;:5 ... 0 III 3 ~ <lJ :; co ..... "" u 0 2 0 .;; :II: c:: VI 0 ;:;: u ... III o U .D :;, II) . (- , " AMBERWOOD INSTALLATION DATE: JOB#: CUSTOMER: CONTACT; PROJECT: ADDRESS: RFCO: REFERENCE: 8-18-10 1052 Devcon Construction Andre Lumsey Jr. Gilroy Library o 1 Architectural Delta 5 PRICING BACK-UP QTY Labor DescrIption TOTAL Shop Labor $68 per HR 19 Shop Labor $1,295 Overhead & profit 15% $194 Material List Slabs 2 CaesarStone $2,500 1 Mise I Plywood 1 Plam $200 Material Raw Cost $2,804 Material Tax 9.25% $259 Overhead & profit 15% $460 Subcontractor $85.5 per HR 0 Installation Carpenter $0 $90 per HR 0 Installation Foreman $0 0 Material: adhesive & hardware $0 Overhead & profit 10% $0 TOTAL $5,012 1555 South 7th Street San Jose, CA Phone (408) 938-1600 FAX (408) 938-1345