Loading...
HomeMy WebLinkAboutDokken Engineering - 2004 Agreement - Amendment No. 03 January 22, 2007 Mr. Don Dey, P.E. Proj ect Manager City of Gilroy, Engineering Division 7351 Rosanna Street Gilroy, CA 95020 RE: Camino Arroyo Bridge Project Amendment No.3 Dear Mr. Dey: The purpose of this letter is to request an amendment to the existing contract between the City of Gilroy and Dokken Engineering related to expanded design services for multiple construction contracts, phasing and Sixth Street utility Potholing. The amendment adjusts the project completion date to November 15, 2008. This is the third amendment for this contract and the second related to the Camino Arroyo project. The proposed scope of services is described in the attached Exhibit A - Scope of Services Amendments, Camino Arroyo Bridge Project, Contract Amendment #3, by task and subtasks. The hours associated with each subtask are broken down by firm and personnel on Exhibit B - Estimated Labor Hours and Cost for Camino Arroyo Bridge Project, Contract Amendment 3. This work will be billed on a time and materials basis with a not-to-exceed amount as shown on Exhibit B. The original contract amounts and proposed increase amounts for the Sixth Street Improvements and the Camino Arroyo Bridge are shown in the following table. Camino Arroyo Bridge Project Original Contract $533,115 $454,335 $41,020 $37,760 Amendment 4/26/2006 $127,950 $81,290 $36,700 $9,960 Amendment, 1/23/2007 $128,314 $94,810 $33,504 Contract Totals $789,379 $630,435 $36,700 $50,980 $71,264 The total amendment amount is $128,314 and is approximately attributed to the following additional services: I. Potholing 2. Surveying between Phases 3. Preparing Two Bidding Packages 4. Landscaping 5. Construction Support for Two Bid Packages (Including Caltrans) $12,000 $11,000 $31,000 $24,000 $50,000 2365 Iron Point Road, Suite 200, Folsom, CA 95630 . Tele: 916.858.0642 . Fax: 916.858.0643 . www.dokkenengineering.com Mr. Don Dey January 23, 2007 Page 2 If this amendment request is acceptable to you, please sign below and return a copy to our office at your earliest convenience. Please contact me at (916) 858-0642 if additional information is needed. Dokken Engineering appreciates the opportunity to perform these additional services for the City and we look forward to completing the project development for the Sixth Street Improvements and the Camino Arroyo Bridge Proj ects. Sincerely, DOKKEN ENGINEERING ?/ML1l ~ Approved: Matthew N. Griggs, P.E. Project Manager City Administrator cc: File 1450-052 Date: 2 / 1 3 / 2 0 0 7 2365 Iron Point Road, Suite 200, Folsom, CA 95630 . Tele: 916.858.0642 . Fax: 916.858.0643 . www.dokkenengineering.com , ' .l....~.. Contract Amendment #3 Revised 1/22/06 ARTICLE 1. TERM OF AGREEMENT The term of this agreement shall be amended to continue in effect through November 15, 2008 unless terminated in accordance with the provisions of Article 7 of the original agreement. ARTICLE 4, COMPENSATION The total compensation for this agreement shall be increased by $128,314 for a total Camino Arroyo contract not to exceed amount of $789,379. Request updated rates to take effect 3/1/07. EXHIBIT "A" SCOPE OF SERVICES AMENDMENTS 1.1 Project Management Dokken Engineering will perform additional project management activities related to separating the Camino Arroyo project into two construction packages. Included in this effort is the coordination of Sixth Street Potholing and landscaping sub-consultant design. Also included are any meetings with the City staff necessary to complete the project. 2.1 Surveying Dokken Engineering will perform additional field surveying to establish existing conditions for the Phase II plans. Only one resurvey of the constructed conditions is included in this proposal. 3.3 Utility Potholing Cruz Brothers Locators will perform 15 utility potholes along Sixth Street and Camino Arroyo north of Gilman Road to confirm the location of existing facilities that could potentially be in conflict with the revised storm drain systems. Part of this cost is covered by the original contract item budgeted for 4 potholes. Cruz Brothers will protect the existing roadways during potholing by first saw-cutting a 24 inch square area at the pothole location. After potholing is complete, the roadway will be repaired using hot patch asphalt concrete and machine rolled. 5.3 Specifications Dokken Engineering will revise the 90% specifications and contract documents from 1 construction package to two. Additional specifications addressing cooperation between contracts will be prepared. 5.4 Quantities and Engineer's Estimate New quantities will be prepared based upon field surveyed earthwork put in place by the Phase I construction. The bid item list will be modified for two contracts. The estimate will be revised with appropriate new items and duplicate items on each estimate. 5.6 100% Submittal Dokken Engineering will prepare the Phase I and Phase II 100% plan submittals independently. Each plans set will be arranged and presented as a complete construction package. This will require that the five project layout sheets be revised to represent the work that will be performed with each contract. Some temporary drainage details will also be included. This task includes presenting the Phase I project improvements as the existing conditions for the Phase II project, to the greatest extent possible given the possibility of ongoing construction. EXHIBIT A, Scope of Services Amendments ~~9,~,~,~~ . ' .,....:.. 5.7 Landscape Design Orsee Design Associates will prepare landscape and irrigation design for the project. Design will include the landscape strips created by the project on Camino Arroyo and Gilman in the southwest corner of the intersection. Landscape and Irrigation design will be performed to City of Gilroy, 2005 Standards. 6.2 Construction Support Construction Engineering support will be provided for the two projects. Initial scoping of the constructed support was done when the project was significantly smaller in scope. This additional support is anticipated to address multiple contracts, Caltrans oversight and permit closeout, greater number of as-builts, and Sixth Street final construction. nnnn_ END OF PROJECT CONTRACT AMENDMENT 3 _n_nnn_ EXHIBIT A, Scope of Services Amendments ~~9,~,~,~~ .. m ~ .c .c >< W (II) ~ ... c CD E "C C ... CD .2 E - c( III 0 ... () (,) 'tl ns r:: "- I'll ... l!! c 0 :J () 0 J: I Z~ S ... 0 ~ Q .Cl ~ I'll () .. ...J W ~~ Q 'tl .., ~ .e 0 ~ ~ I'll ~~ ~ E 0::: Q ;; 0. .. III ~~ Q W W ~ " Q ~ > C O~ .lIl 0 .lIl ii: Q ~ "! ...J m a ~~ ~ ~ ~ u. ~ 0 ~ > 0 I- 0::: C3 0::: c( 0 z :E c( () ,.... 0 0 N N N ~ ell ::J c: ell ...., ~ ~ I ~ n n~ I~ ! ~ n p~ ~ Ii( .; II ;i ! ; " " ! to :; ~ I h 8. l n~ ~ I ~ l If Ii ~ ~ , . . = ~ :I , = ! i ; ~ I : Ii !if Ii 0 ~ ~ n ~ ~R ~ i~ e II n ~ 8 ~ . i a ~ ~ !l ~~ ~ ~ ~ :;i oi ~ ~I ~ i i .. i!l I i . . ! !! -- Ii III . . . ~ .. UOIl1lU'l"1.fC11U"1 ! 15 ~ , ~ j ---. ! , , H aoqIpIy""'" ~ ! . i I I I ---.- II ~ ~ I I I ~ ~q IP U p~ i ~ :i II ;i ! :; :; ~ ; ~ ! to ffi~ n I ~~ oi ~ ~ . . . . = ~ = ! . ~ ! : i d e~ ~ . . "" to c . . " " . I I W .......:3/UfUlP't ! ;i I . = . ~ = ~ ~ - 8 to z :; I . a a ~ a · l -.- s a . . . 8 : l -- :; to .......-.............pue~3 ~ = = a -,- ! . . . . 8 . a . a . . ! ~ ~ ; -- ! -J" d A. "JNNOQ HVtU. YN -- ~ I ... .., :g liS . . a . 8 . I . ! ~ '3'd~DM3HllYJI ! II n I % ~ r:: ~ g 0 j I I } i a I i 'C lilll u 1 III I f ill ID Q I I .ll: III . ... ~ :J ~ :: : ::i .; .; .; I'll I-