DOKKEN ENGINEERING
- -~ ~~ ~- -- - - -- - ~ - -- - - - - - -- - - --
Tml1SportlltlOll ~oluti()l1c> frolll COilccpt to COllstmet/Oil
~
August 28, 2007
Mr. Don Dey, P.E.
Project Manager
City of Gilroy, Engineering Division
7351 Rosanna Street
Gilroy, CA 95020
RE: Camino Arroyo Bridge Project
Amendment No.4
Dear Mr. Dey:
The purpose of this letter is to request an amendment to the existing contract between the City of
Gilroy and Dokken Engineering related to expanded design services for the Sixth Street
Streetscaping, Sixth Street Overcrossing and Street Lighting. This is the forth amendment for this
contract and the third related to the Camino Arroyo project.
(
The proposed scope of services is described in the attached Exhibit A - Scope of Services
Amendments, Camino Arroyo Bridge Project, Contract Amendment #4, by task and subtasks. The
hours associated with each subtask are broken down by firm and personnel on Exhibit B -
Estimated Labor Hours and Cost for Camino Arroyo Bridge Project, Contract Amendment 4. This
work will be billed on a time and materials basis with a not-to-exceed amount as shown on
Exhibit B.
The original contract amounts and proposed increase amounts for the Sixth Street Improvements
and the Camino Arroyo Bridge are shown in the following table.
Camino Arroyo
Bridge Project
'(' J W_,,_ -:; \ t r ~j ,;\,-~'~) '" ~"-2~
" .
x { ,j:, . l' ,,~ ' "~ ..
. ." , , 1 [. F, " ,.~ ' y' .'
~\1 ,,' " .,'" .,,, r I ',,,.,,,".\; . .hl,.. ".,
"<{; ~ ' 11 A ~ ,J '!:~ !;lj~_"'", "."".: ."~ -':~~L i " ~:,~ :.1T-lY~
$533,115
$127,950
$128,314
$129,100
$918,479
$454,335
$81,290
$94,810
$88,200
$718,635
$36,700
$41,020 $37,760
$9,960
$33,504
$40,900
$50,980 $112,164
Original Contract
Amendment 4/26/2006
Amendment, 1/2312007
Amendment 8/28/2007
Contract Totals
$36,700
The total amendment amount is $129,100 and is approximately attributed to the following
additional services:
1. Additional Potholing and Utility Coordination
2. Streetscape Design and Additional Curb Extensions
3. Sixth Street Overcrossing Design Modifications
4. Street Lighting Design Standards
5. Project Management and Extended ROW Acquisition
$11,000
$52,000
$27,000
$23,000
$16,000
23(;:=; lTlln Peint Road, Suite 200, Folsom, CA 95630 · T\']e: 916.S58.0642 · Fax: 916,858.06.[\ . www.dokk(;'n,~ngin(;'ering.com
Mr. Don Dey
Ausgust 28, 2007
Page 2
If this amendment request is acceptable to you, please sign below and return a copy to our office at
your earliest convenience. Please contact me at (916) 858-0642 if additional information is
needed.
Dokken Engineering appreciates the opportunity to perform these additional services for the City
and we look forward to completing the project development for the Camino Arroyo Bridge Project
Phases I and II.
Sincerely,
DOKKEN ENGINEERING
~ll.L
~
Matthew N. Griggs, P.E.
Project Manager
Administrator
cc: File 1450-052
Date: September 17, 2007
236:3 Iron Point ROJ.d, Sllite 200, Folsom, CA 95630 · TeJe: 916.858.0642 . fax: 916.858,0643 . w\-\-w.dokkencnein(;'erin2'.com
Contract Amendment #4
Revised 8/28/07
ARTICLE 4, COMPENSATION
The total compensation for this agreement shall be increased by $129,100 for a total Camino Arroyo contract not
to exceed amount of $918,479.
EXHIBIT "A" SCOPE OF SERVICES AMENDMENTS
1.1 Project Management
Dokken Engineering will perform additional project management activities to quickly incorporate
streetscape design features from an additional sub-consultant. Also included are meetings with the City
staff necessary to complete the project phases I and II.
3.3 Utility Potholing
Cruz Brothers Locators will perform 6 additional utility potholes at $1000 each (for a total of 21) along
Sixth Street to confirm the location of existing facilities that are in conflict with the revised storm drain
systems. After potholing is complete, the roadway will be repaired using hot patch asphalt concrete.
These additional 6 potholes were determined to be necessary during the potholing operations as
existing unmarked and unreported utility conditions were encountered. Dokken Engineering felt these
additional potholes were important to minimize construction surprises associated with the storm drain
inlet, pipe and manhole adjustments being designed.
Nathan Donnelly will spend 2 days on site with the potholing crew to denote changes to the Sixth Street
storm drains necessitated by the potholing results. Nathan will also direct the need for supplemental
potholes determined necessary during the progression of work and as related to unmapped or
abandoned facilities. While on site Nathan will layout the configuration of a typical curb ramp for City
review. This review resulted in the identification of the need to enhance the curb extensions with
additional streetscape concepts.
3.6 Right of Way Acquisition
Dokken Engineering provided additional Right-of-Way management services to coordinate extended
negotiations with the commercial real estate owners of three parcels. This included twice weekly calls
to attorneys, managing partners, the City and Universal Field Services to obtain completed agreements
for the three parcels.
While minor revisions to plat maps and legal descriptions are included in the original contract with Ross
Stephenson, resolution with South County Ventures, Costco, and Inland Western Gilroy required
numerous format and grammatical changes to the plat map and legal descriptions. Additionally, a
Temporary Construction Easement was added to the South County Ventures Parcel.
4.4 Utility Coordination
Dokken Engineering has attended two additional field meetings with PG&E and Verizon in efforts to
coordinate the undergrounding, service points for the pillars, street lights and signals. This also
includes coordination with Verizon to perform clean-up design adjacent to the Sixth Street Overcrossing
in cooperation with City Trail on the bridge and approach work.
4.5 Gilman Avenue Overcrosslng Improvements
Preparation of structural analysis for additional dead loading on the overcrossing for the City Trail
features. Dokken Engineering will prepare the structural analysis, design, and details for submittal to
Caltrans Encroachment Permits and Division of Structures for the approval of trail revisions on the
overcrossing. Modification of the overcrossing to accommodate a 10 foot City Trail requires the
addition of a concrete traffic barrier and widening of the eastbound sidewalk to 10 feet. Caltrans is
concerned that this bridge already does not meet current code requirements for shear design, and that
DOKKEN
EXHIBIT A, Scope of Services Amendments
this additional weight will worsen this condition. Dokken Engineering will prepare calculations and
details to increase the shear capacity of the critical girders in the bridge.
4.6 Traffic Calming Construction Details
Additional Sixth Street Improvements at Railroad Street, Rogers Lane and Maple Street will be designed
by Dokken Engineering. Design of these additional improvements includes curb extension layouts,
curb ramp detailing, curb and gutter, drainage modifications, striping revisions, streetscape
coordination and quantity calculations.
4.7 Street lighting Design
Prepare new decorative and standard cobra street lighting standards for the City of Gilroy. The
standards address 5 different street types. This will include the preparation of at least two standard
plan sheets
Prepare revised street lighting design, plans, quantities and specifications on Sixth Street, Gilman and
Camino Arroyo roadway segments. The revisions were to accommodate using decorative lighting at
certain locations.
5.7 Landscaping It Streetscape
Bellinger Foster Steinmetz will provide streetscape design to the curb extensions and planter strips
along Sixth Street from Railroad to Rogers. This scope of services includes Exhibit B "Scope of
Services" dated April 10, 2007 and "Additional Service Request" dated June 6, 2007, both prepared by
Lee Steinmetz.
(
Dokken Engineering will provide project background, existing topography files and sharing of design
files to support development of the streetscape plans as quickly as possible. Dokken will further be
responsible for PS&E coordination and revision of completed contract plans to incorporate the
streetscape plans, specifications and bid items prepared by Steinmetz into the contract documents.
_____un END OF PROJECT CONTRACT AMENDMENT 4 -----------
EXHIBIT A, Scope of Services Amendments
'~~~DOKKEN
~:~ I -;'; I" I:t-.Ill' I;
m : ~.adlqda!i ~
.... ~i
:E i-
:c ~ I~n d I
>< !i J
W r
...,xoll!! . i
.
~-
II
0 n I
~ u . : s
k
WI ~
II m H I
~
u
~ 8 n .
. a !! !
.... ~
t:
CI) Uti all I
E
"0
t: I .;
.. CI)
.e E I H
... c( i
III wnI~lJUI'lIlI"
0 .... I
0 0
"C CIS ~a.lJO!IMS
C ~
.. ....
f t: ~.......o.....f'1
0
~ 0
0
:I: I Z~ e .~V-.le~~'4
(; t- o
U p..."'''....npbII1l"'-'d
J:l 0
os ..
....I W ~;.~ ~!~~~i~;~a~~ ~
0
"C .., ~ Ii
S 0 ~r.l .
.. ~ . ~
E ~ I I
;l a. ~: . F~ .. .
III W . o~u
w .
. C) . Cl fa !; ... ;; a II I ! ! . !i
.
> 0 O~ ... u
...
~ a: 0
"0 .. - " "
....I m ~: ~ I I - - ~
(5 ~ I llnIl~:)J..'f
II. 0 ~ . =::... : !
0 > """" ~ i
0 I .
~ w : I : - - . I
U ~ I ........:1....., ! .
Er: ... .. . . ~ . . - : ! !
c( ......3~Y ~ j
0 ~""""'~~III') .
Z NOIltEInOH1YlllWN X
:E . . . I
-..... !
c( . . ~ .~....=::! ~ I
0 J..... ....." : 5
Td'S&DllWMJtU.Ld X
..... n
0
0
N .
a5 t I P
N C
iil 0
;l i ! I f
::l a.
C> 01:
::l
<( u f
III L,islJU
GI
0 l
'"' I
III H idl n
..
I- :d~=S::::; .
! ! I
Exhibit B
Scope of Services
City of Gilroy: Sixth Street Streetscape Enhancements
April 10, 2007
1.0 PRELIMINARY DESIGN
None
2.0 PRELIMINARY DESIGN
2.01
Base Information
Obtain electronic (AutoCAD) version of base information from City,
./
2.02 Field Review
Review conditions in field for each intersection (Sixth Street between Railroad
Street and Chestnut Street), noting condition of sidewalk, parkway and trees.
Record conditions by hand on site plan
2.03
Intersection Prototypical Design /
Prepare alternative prototypical approaches to intersection bulb-outs, taking into
account sidewalk and parkway treatments. Suggest locations where prototypical
approach should be modified based on field conditions noted in 2.02 above.
(
2.04 Monument Design
Prepare preliminary design of street monument to be placed at Railroad Street
and Chestnut Street Intersections
2.05
City Staff Meeting
Meet with City staff in one meeting to finalize prototypical design approach and
potential modifications, and monument design.
./
3.0 CONSTRUCfION DOCUMENTS
3.01 90% Construction Documents
Based on comments from City staff meeting, proceed to 90% construction
documents, indicating:
Sidewalk treatment
Parkway treatment
Planting and irrigation, if any
Monument sign elevations and plans
SixthSt.Ex.B,doc
1,25 P<Kific Street, SuitE 201. rv\onterey, CA 939'W . ph 831.646,1383 ' Ix 8.>1373.0653 ' em go@bfs!a,('jm ' lie Cl.A 3099
3.02
3.03
3.04
(
3.05
3.06
Civil Coordination
Coordinate plans with Dokken Engineering. Civil plans (prepared by Dokken) to
indicate:
Demolition
Grading and Drainage
Curb, gutter and flow line
Curb ramps
Sign age (other than monuments)
Lighting/Electrical (if needed)
Water points of connection (if needed)
A r \ L r Q)~ -- \ ~>
.' 4\"r .,vo " \ -
( ( .;.. ~~ 'j"'- .
( G I' "'., < \, ,. ,.... <. ~. " <: 0:... oX " J ')
L
CI
Plan Submittal '
\ \1 \ \;,t
Submit 90% Plans to City for staff review. &;' 0- ')'J . ~:\" 9 ( ~. \'''''' \.
,,1- (?"''7 \ ~~ I""'~'
100% Plan Submittal
Based on 90% plan comments, proceed to 100% construction documents,
including details and technical specifications for "landscape" items noted in 3.01
above. Submit to Dokken Engineering for incorporation into plans.
Technical Specifications
Prepare technical specifications for "landscape" items noted in 3.01 and provide
to Dokken for inclusion in Project Manual.
Engineer's Estimate coordination
Coordinate with Dokken in providing "landscape" items for bid form and
Engineer's Estimate.
\ \ ~ ~ S.., \~~
1......(.. '"
4.0 BIDDING AND CONSTRUCTION REVIEW
4.01 City shall have the primary responsibility for the bidding and construction
review phase of the project, including testing and inspection coordination,
payment request processing and all related items.
4.02 Provide technical assistance during the bid process. Respond to questions as
directed by City. Provide written or graphic clarification as appropriate.
4.03 Assist in preparing addenda, reviewing the bids and in preparing any
recommendations to City.
4.04 Review and process submittals as outlined in the specifications; furnish
Bellinger Foster Steinmetz
Page 2 of3
supplemental drawings and revisions to clarify the design intent. Any change
orders will be prepared by City.
4.05 Assist with on-site construction reviews, followed by written field reports.
5.0 ADDITIONAL SERVICES
5.10 Any additional presentations, drawings or documents not identified in the Scope
of Services will be considered additional services. Additional services are
provided only as authorized and on an hourly basis unless otherwise approved.
EXCLUSIONS
The following are excluded from the Scope of Services but may be provided as an
Additional Service:
1. Permitting / Agency Coordination /'
f
2. Public/Neighborhood Meetings
(
Bellinger Foster Steinmetz
Page 3 of 3
Exhibit C
Compensation
City of Gilroy: Sixth Street Streetscape Enhancements
April 10, 2007
1.0 CON CEPTU AL DESIGN ............................................................................. None
2.0 PRELIMINARY DESIGN ...........................................................................$5,755
3.0 CONSTRUCTION DOCUMENTS ........................................................$13,535
4.0 BIDDING & CONSTRUCTION REVIEW...................... To be determined
5.0 ADDITIONAL SERVICES........................................... Hourly as Authorized
(
Reimbursable Expense Budget........................................... ......................................... $650
TOTAL .......... ....... ........ ........ ................... ....... ...... .................... ..... ............. ..................$19,940 V
HOURLY RATES AND REIMBURSABLE EXPENSES: See attached Standard Schedule
of Compensation dated May 2006. All costs for photography, printing, special delivery,
insurance certificate charges, horticultural soils analysis, City business licenses and fees,
consultant services, and all other costs directly related to the project would be billed as a
reimbursable expense at our cost plus a fifteen percent administration charge.
Notice: Landscape architects are regulated by the State of California. Any questions
concerning a landscape architect may be referred to the Landscape Architects
Technical Committee at: Landscape Architects Technical Committee, 400 R
Street, Suite 4000, Sacramento, CA 95814, (916) 445-4954.
SixthS/. Ex. C doc
t.'25 Pacific Street, Suite 201, Monterey, CA 93940. ph 831.646.1.38,3' b.l:S3i.373.8653 . ~m gO(~<Jbfslr.lcoln !II: Ci.A~(j99
. r j I 4" "': ' -;, ~~ ~';;:: }&11 ~:'''i
'i.."!"" i' , 't - ~", ~- \ ",".. \ f'-~" '" ~. ~ ;$", 4/ r'F441.;~~ "",,1't
* ~ I l< . ~ 'I.; ,. r ~ , ! "'~,.. ,;....~..~f3;i.. :%
/ ' ", j ,. '" ':" ; ~Z w~ ,\ ~~;.-;:
f?' " \ I K. ' Wl ttr" (
" ' ' .. ' ,'. Steinmetz, \,,% ',0'
)j.i I _ ~ ~ I ^ - "!> ' J' ~ -,; . z" . .....,. '1;,., :"l.J., ""
, '. . " . k ' ,1 '1 '" , ' .". I ',I.'.m,/<ct/"e, l"rd,lh "nl/,[ .
fj-{; l ." ~ol > f ~f{ #1'i.; ,J '1 _) ~ ;:h> J.d <>" ,;j~%' #, c~ ~ v~~ 'A~ '" ' ,$'7i~}~~ ~.~ "'~
0il J ~i< 1 "" ". , l' ,1.1 Vl'# 'h Ki.5 4 ... ~4.~ d: ~ "'<C 1..,~ \" idi,;; jO ':to<' )
Exhibit D
Schedule
City of Gilroy: Sixth Street Streetscape Enhancements
April 10, 2007
1,0 CONCEFfUAL DESIGN
None
2.0
PRELIMINARY DESIGN
Completed within 2 weeks of authorization to proceed
/
3.0
CONSTRUCTION DOCUMENTS
Completed within 6 weeks of approval of Task 2
(Includes 2 weeks City plan check)
j'
(
4.0
BIDDING & CONSTRUCTION REVIEW
To be determined
5.0 ADDITIONAL SERVICES
To be determined
SiXlhSI.Ex.D,doc
42) Pacific Street, Suite 201, Monterf:1Y. CA 939/jiJ. ph 831,646,1383. 'I. 831.373.8653' enl gO@bfsliJ,culTl' lic eLf\ 30Y9
Bellinger Foster Steinme1z
I .! id..., ,11't 1/ \ ! d, l t If t (~
Additional Service Request
City a/Gilroy: Sixth Street Streetscape Enhancements. Camino Arroyo Bridge Project
June 6, 2007
3.0 CONSTRUCTION DOCUMENTS ADDITIONAL SERVICES
· Revise west side Railroad Ave. intersection to be consistent with Downtown
side street design standards.
Add Maple Street intersection streetscape design.
4.0 BIDDING AND CONSTRUCTION REVIEW
Our original scope included a scope for bidding and construction review, but the fee was
listed as "to be determined." We should set an hourly allowance for this to address
potential issues that may arise during bidding, as well as up to 5 site reviews during
construction.
<.
ADDmONAL COMPENSATION
3.0 CONSTRUCTION DOCUMENTS ..........................................................$3,620
4.0 BIDDING &: CONSTRUCfION REVIEW ALLOWANCE ................$7,340
TOTAL .................................................. ....................................................................... $10,960
HOURLY RATES AND REIMBURSABLE EXPENSES: See attached Standard Schedule
of Compensation dated May 2006. All costs for photography, printing, special delivery,
insurance certificate charges, horticultural soils analysis, City business licenses and fees,
consultant services, and all other costs directly related to the project would be billed as a
reimbursable expense at our cost plus a fifteen percent administration charge.
Notice: Landscape architects are regulated by the State of California. Any questions
concerning a landscape architect may be referred to the Landscape Architects
Technical Committee at: Landscape Architects Technical Committee, 400 R
Street, Suite 4000, Sacramento, CA 95814, (916) 445-4954.
07.040 Add/Svc.doc