HomeMy WebLinkAboutDokken Engineering - 2004 Agreement - Amendment No. 07
AMENDMENT TO THE AGREEMENT FOR SERVICES BETWEEN
CITY OF GILROY AND DOKKEN ENGINEERING FOR CAMINO ARROYO BRIDGE
CONSTRUCTION AND GAP CLOSURE AND THE FARRELL ROAD BRIDGE WIDENING
DATED AUGUST 16.2004
AMENDMENT NO.7
This Amendment shall become effective when it has been signed by the City Administrator,
Project Manager, and Consultant. All copies forwarded to Consultant for signature shall be
returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Consultant's
copy will be returned to him as his authority to proceed with the work.
Preparation of plans, specs and estimates (PS&E) for the Sixth & Eigleberry curb extensions
and various sidewalk repairs on Sixth Street and associated construction support - see
attached scope of work and fee.
This Amendment extends the term of the Agreement for Services between the City of
Gilroy and Dokken Enaineerina, dated Auaust 16. 2006 to December 31. 2012.
All requirements of the original Agreement Documents shall apply to the above work except as
specifically modified by this Amendment. The contract time shall not extend unless expressly
provided for in this Amendment.
Dokken Enaineerina hereby agrees to make the above changes subject to the terms of this
Amendment for ongoing acquisitionlrelocation services.
Consultant: Dokken\Enaineerina
By ~ 11 ~
Matthew N. Griggs, PE
Date If l-z , / Zt:> , I
I I
ACCEPTED:
/-z! /11
Date
November 21. 20 II
t;
U
Mr. Don Dey, P.E.
Project Manager
City of Gilroy, Engineering Division
7351 Rosanna Street
Gilroy, CA 95020
Ef',/
, .~
L:~ L~" r\.
-'~
".,_?I
RE: Camino Arroyo Bridge Project
Amendment No.7 for Additional Sixth Street Improvements
Dear Mr. Dey:
The purpose of this letter is to request an amendment to the existing contract between the City of
Gilroy and Dokken Engineering to assemble design and bidding documents for additional
improvements on Sixth Street in the vicinity of Eig1eberry Street.
The proposed scope of services is described in the attached Exhibit A, Scope of Services, Contract
Amendment #7, by task and subtasks. The hours associated with each subtask are broken down by
personnel on Exhibit B - Estimated Labor Hours and Cost, Sixth Street Improvements, Contract
Amendment #7. This work will be billed on a time and materials basis with a not-to-exceed
amount as shown on Exhibit B.
The existing contract amount, remaining unspent budget and proposed budget for the Amendment
#7 tasks are shown in the following table.
Existing Contract
Amendment 7, 10/18/2011
Contract Totals
$1,105,914
$48,138
$1,154,052
The total amendment amount is $48,138. A summary of the services included in the scope of work
are as follows:
1. Eig1eberry and Sixth Street Curb Extensions
2. Sidewalk Repair Section on Sixth Street
3. Sixth Street Railing Construction Support
TOTAL
$33,018
$10,640
$ 4,480
$48,138
2365 Iron Point Road, Suite 200, Folsom, CA 95630 · Tele: 916.858.0642 · Fax: 916.858.0643 . www.dokkenengineering.com
Mr. Don Dey
November 21, 2011
Page 2
If this amendment request is acceptable to you, please return a copy to our office at your earliest
convenience. Please contact me at (916) 858-0642 if additional information is needed. Dokken
Engineering appreciates the opportunity to perform these services for the City of Gilroy.
Sincerely,
D;;LN;:X:
Matthew N. Griggs, P .E.
Project Manager
cc: File 1450-052
2365 Iron Point Road, Suite 200, Folsom, CA 95630 . Tele: 916.858.0642 · Fax: 916.858.0643 . www.dokkenengineering.com
Contract Amendment #7
Revised 10/18/11
ARTICLE 4, COMPENSATION
This amendment adjusts the scope of work and compensation to design improvements to Sixth Street in the
vicinity of Eigleberry Street per discussions with the City on July 13, 2011, October 4, 2011 and subconsultant
proposal from Harris and Associates dated September 1, 2011. The total compensation for this amendment shall
not exceed $48,138.
EXHIBIT "A" SCOPE OF SERVICES
TASK 3 - CONSTRUCTION SUPPORT FOR RAILING
Task 3.1
Supplemental Inspection
Dokken Engineering (Dokken) will provide inspection of the Sixth Street Barrier removal and finishing of the
barrier cap. Dokken intends to provide inspection for four days to supplement the City management and
inspection of the construction project.
a. Inspection of the barrier removal system and marked sawcut removal line
b. Barrier removal operation (for one day only)
c. Barrier concrete cap operation (for one day only)
d. Installation of the welded iron railing (for one day only)
TASK 4 - EIGLEBERRY AND SIXTH STREET CURB EXTENSIONS
For this task, Dokken will be incorporating curb extension designs prepared by Harris and Associates (Harris) into
the Sixth Street Barrier Project for ease of City contracting. This work was prepared by Harris under a prior
design contract and accepted by the City.
Dokken is subcontracting to Harris for the purpose of packaging the curb extension design only. Dokken is not
responsible for the assumptions, accuracy or quality of the plans prepared by Harris. Dokken's responsibility is to
incorporate the curb extension plans prepared by Harris into the Sixth Street Barrier Project and supplement their
design with traffic handling plans and street lighting modifications.
Task 4.1
Prepare Draft Plans (Base + Add Alternate)
Harris will prepare draft plans for curb extensions, pedestrian ramps, and storm drains at the Sixth Street
and Eigleberry Street Intersection. The plans will differentiate between elements included in the base bid, and
those included in the add-alternate option.
Improvements. Cor.$idered Base Bid Add Alternate
Curb Extensions 2 curb extensions on Sixth St. 4 Curb extensions on Eigleberry St.
Street Lighting None Replace existing cobra head on
PG&E pole with 2 new decorative
lights, 2 doubles and 2 singles.
Storm Drains None None
EXHIBIT A, Scope of Services
~~?I~~'~~
<.
Dokken will prepare draft plans for traffic handling and street lighting at the Sixth Street and Eigleberry Street
Intersection. The plans will differentiate between elements included in the base bid, and those included in the
add-alternate option.
No surveying services are included in this proposal. Harris has been advised by the City to assume the curb
extensions on the east corners of Sixth Street and Eigleberry Street have been constructed to the grades shown
on the plans.
Task 4.2
Prepare Specifications and Quantities
Harris will prepare special provisions and quantities for the curb extensions to be included with the bid of the
Sixth Street Barrier Modification Project.
Dokken will prepare special provisions for the street lights and be responsible for incorporating the work by
Harris into the bid documents. The quantities will be added to the bid schedule in items designated to the
Eigleberry and Sixth Street Intersection. There will be sections in the bid schedule for the base items and the
add-alternative items. The special provisions will be based on 2006 Caltrans Standard Specifications with
modifications for City preferences and standards.
Task 4.3
Revise Plans (Base + Add Alternate)
The draft plans will be revised to address comments from the City and the 100% design detailing. The final
plans will be incorporated In the Sixth Street Barrier Modification Project. The plans will clearly identify that work
covered under the add-alternate bid schedule.
Task 4.4
Construction Support
Dokken will provide assistance during bidding including answering questions from bidders and providing
interpretation of the construction documents. After construction begins, we will provide ongoing consultation and
interpretation of contract documents, as requested. Written responses will be provided to all requests for
information (RFI's) and supplemental or revised drawings may be issued to provide clarity to the Resident
Engineer and contractor. Upon completion of construction, Dokken will prepare the as-built plans or record
drawings based on the information provided by the inspector or resident engineer.
TASK 5 - SIDEWALK REPAIR ON SIXTH STREET
This task includes the preparation of plans and specifications for the replacement of a sidewalk section west
of Monterey Street on the south side of Sixth Street. The project includes replacing a failed section of sidewalk in
between existing glass panel sidewalk sections without disturbing or removing the glass-block panels. It is not
proposed that the sidewalk be replaced in its entirety to match the Sixth Street corridor because of the glass-
block sidewalk sections.
This proposal assumes the sidewalk will be bid as part of the Sixth Street Modification Project.
Task 5.1
Prepare Draft and Final Plans
Dokken will prepare a draft plan for the sidewalk removal, under sidewalk excavation of failing subgrade
material, slurry backfill, and sidewalk replacement. The plan includes leaving the existing glass-block sidewalk
panels in place. Dokken anticipates the placement of slurry backfill under the broken sidewalk section, between
the existing basement buttress walls. We have looked at the buttress walls inside the basement and they appear
to be in good condition. However, we have no way to know exactly what conditions exist behind the buttress
walls, or if any reinforcement exists in them. Therefore, it may be necessary to revise the planned construction
after removal of the sidewalk and some subgrade material.
The City understands that Dokken has no way of knowing what conditions will be found once the sidewalk is
removed. Because of this, it is fully anticipated that a construction change order will be necessary to adjust the
work once the under sidewalk conditions can be observed.
The draft plan will be revised to address comments from the City. The final plan will be incorporated in the
Sixth Street Barrier Modification Project.
EXHIBIT A, Scope of Services
~~?,~~'~~
\.
Task 5.2
Prepare Specifications and Quantities
Dokken will prepare special provisions and quantities for the sidewalk to be included with the bid of the Sixth
Street Barrier Modification Project. The quantities will be added to the bid schedule in items designated to the
Sidewalk Improvements. The special provisions will be based on 2006 Caltrans Standard Specifications with
modifications for City preferences and standards. The following bid items and specifications are expected:
1) Sidewalk Removal
2) Excavation (small space)
3) lean Concrete (slurry backfill)
4) Minor Concrete (sidewalk)
(sf)
(cy)
(cy)
(sqyd)
Task 5.3
Construction Support
Dokken will provide assistance during bidding including answering questions from bidders, providing
consultation and interpretation of the construction documents. After construction begins, we will provide ongoing
consultation and interpretation of contract documents, as requested. Written responses will be provided to all
requests for Information (RFI's) and supplemental or revised drawings may be issued in the event that custom
reinforced concrete corbels or sections are necessary to support the new sidewalk section. Upon completion of
construction, Dokken will prepare an as-built plan for the sidewalk based on the Information provided by the City
and observed at the site.
--------- END OF PROJECT CONTRACT AMENDMENT 7 -----------
EXHIBIT A, Scope of Services
~~9,I5}~,~!'!
,.
to
:!::
.c
J:
><
W
.....
=It:
-
C
CD
E
"C
C
CD
- E
II) <
0
0 -
'tJ U
c as Z~
as ... e
II) - 0
... c (,)
;:, 0 am
0 ~;
J: 0 I::
..
... I ...
0 '"
JJ U) ~~ '"
as I::
...J l- ...
bll
'tJ Z ~~ I::
CD W '"
- I::
as :2 '"
E O~ ..ill
:;:: LIJ ..ill
II) > 0
W 'tl
0 Q~ ~
m a: ~
!:: Q. ~
!!:! :2 ~
J: -
>< I-
w W
W
a:
I-
U)
:I:
I-
~
U)
or-
0r-
a
C\J
cO
or-
.... C
(I)
.0 0
0 a
-
() 'C
0 (J
II)
CI)
C i
~ J
II)
as I
l-
I
..
;j
I.
A CORD... CERTIFICATE OF LIABILITY INSURANCE I DATE (MM/DDNY)
11/16/11
PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
Dealey, Renton & Associates ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
P. O. Box 12675 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
Oakland, CA 94604.2675
510465-3090 INSURERS AFFORDING COVERAGE
INSURED INSURER A: Travelers Property Casualty Co of Am
Dokken Engineering Inc. INSURER B: St. Paul Fire & Marine Ins. Co.
2365 Iron point Road, Suite 200 INSURER C: American Automobile Ins. Co.
Folsom, CA 95630 INSURER D: Hudson Insurance Company
I INSURER E:
Client#. 654
DOKKEENGI
COVERAGES
THE POliCIES OF INSURANCE liSTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POliCIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
NSR TYPE OF INSURANCE POLICY NUMBER P~k!f.! ~f,~~~ p~~~J 1~..xr':J~~N LIMITS
LTR
A ~NERAL LIABILITY 6801613L360 05f31/11 05f31f12 EACH OCCURRENCE $1 000 000
1L :5 MERCIAL GENERAL lIAB ILITY FIRE DAMAGE (Anyone fire) $1 000 000
I-- CLAIMS MADE W OCCUR MED EXP (Any one pereon) $5 000
PERSONAL & ADV INJURY $1 000 000
GENERAL AGGREGATE $2 000 000
n'L AGGR,EfilE lIM IT APPLnIPER: PRODUCTS-COMWOPAGG $2 000 000
POLICY X ~~W;: LOC
A ~TOMOBILE LIABILITY BA1616L429 05/31f11 05l31f12 COMBINED SINGLE LIMIT
AAY AUTO (Eo occident) $1,000,000
I--
~ ALL OWNED AUTOS BODILY INJURY
(Par person) $
- SCHEDULED AUTOS
~ HIRED AUTOS BODILY INJURY $
~ NON.oWNED AUTOS (Par accldont)
PROPERTY DAMAGE $
(Par occldont)
RRAGE LIABILITY AUTO ONLY - EA ACCIDENT $
ANY AUTO OTHER THAA EA ACC $
AUTO ONLY: AGG $
B EXCESS LIABILITY QK06503410 05/31111 05f31/12 EACH OCCURRENCE $5 000 000
m. OCCUR 0 CLAIMS MADE AGGREGATE $5 000 000
$
R DEDUCTIBLE $
RETENTION $ $
C WORKERS COMPENSATION AND WZP80993537 05131/11 05/31f12 X 1.:x~~T~l~-~ I IOJit
EMPLOYERS' LIABILITY E.L. EACH ACCIDENT $1.000,000
E.L. DISEASE - EA EMPL OYEE $1,000,000
E.L. DISEASE - POLICY LIMIT $1.000,000
D OTHER Professional AEE7114406 05/31/11 05f31112 $2,000,000 per Claim
iabillty $2,000,000 Annl Aggr.
DESCRIPTION OF OPERATIONSILOCATIONSNEHICLESlEXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS
General liability Policy excludes claims arising out of the performance of professional
services.
Re: Camino Arroyo Bridge Construction and Gap Closure and the Farrell Road
Bridge Widening (DE-1450). The City of Gilroy, Its officers and employees,
is included as Additional Insured for General and Auto Liability.
CERTIFICATE HOLDER I I ADDIT1ONALINSURED'INSURERLETTER: CANCELLATION _. - .. -
SHOULD ANYOF THE ABOVE DESCRIBED POLICIES BI! CAHCELLED BEfORI! THI! IXPlNATION
City of Gilroy DATE THEREOF, THE ISSUING INSURER WI~X. TO MAIL 3D-DAYS WRITTEN
Attn: Don Dey NOTICETDTHE CERTIFICATE HOLDER NAMED TOTHELEfTJQU(X~k
7351 Rosanna Street ~OUCIt_"Jtx~~Jt~
Gilroy, CA 95020-6141 >8aJtIilOOllU(IOOIe$X
AUT~EDREPR~ENTATIVE
I .~ - A ,/;-, "'Orr J
ACORD 25-5 (7/97)1 of 1
#M283421
NMF @ ACORD CORPORATION 1988
POLICY NUMBER: 6801613L360
COMMERICAL GENERAL LIABILITY
ISSUE DATE: 11/16/2011
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
ADDITIONAL INSURED
(ARCHITECTS, ENGINEERS AND SURVEYORS)
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
SCHEDULE
NAME OF PERSON(S) OR ORGANIZATION(S): The City of Gilroy, its officers and employees.
PROJECT/LOCATION OF COVERED OPERATIONS: All Operations of the Named Insured.
PROVISIONS
A. The following is added to WHO IS AN INSURED
(Section II):
The person or organization shown in the Sched-
ule above is an additional insured on this Cover-
age Part, but only with respect to liability for bod-
ily injury", 'property damage" or 'personal injury
caused, in whole or in part, by your acts or omis-
sions or the acts or omissions of those acting on
your behalf:
The insurance provided to such additional
insured is limited as follows:
d. This insurance does not apply to the render-
ing of or failure to render any "professional
services" .
C. In connection with your work and included
within the "products-completed operations
hazard."
e. The limits of insurance afforded to the addi-
tional insured shall be the limits which you
agreed in that 'contract or agreement requir-
ing insurance" to provide for that additional
insured, or the limits shown in the
Declarations for this Coverage Part,
whichever are less. This endorsement does
not increase the limits of insurance stated in
the LIMITS OF INSURANCE (Section III) for
this Coverage Part.
a. In the performance of your ongoing oper-
ations;
b. In connection with premises owned by or
rented to you; or
Such person or organization does not qualify as
an additional insured for "bodily injury", "property
damage" or "personal injury' for which that person
or organization has assumed liability in a contract
or agreement.
B. The following is added to Paragraph a. of 4.
Other Insurance in COMMERCIAL GENERAL
LIABILITY CONDITIONS (Section IV):
However, if you specifically agree in a contract or
agreement requiring insurance that, for the addI-
tional insured shown in the Schedule, the insur-
ance provided to that additional insured under
this
CG D3 82 09 07
Page 1 of 2
@ 2007 The Travelers Companies, Inc.
Includes the copyrighted material of Insurance Services Office Inc., with Its permission
~
COMMERICAL GENERAL LIABILITY
(1) The "bodily injury" or "property damage"
for which coverage is sought occurs;
and
injury" arising out of "your work" on or for the
project, or at the location, shown in the
Schedule above, performed by you, or on
your behalf, under a "contract or agreement
requiring insurance" with that additional
insured. We waive these rights only where
you have agreed to do so as part of the
"contract or agreement requiring insurance"
with that additional insured entered into by
you before, and in effect when, the "bodily
injury" or "property damage" occurs, or the
"personal injury" offense is committed.
Coverage Part must apply on a primary
basis, or a primary and non-contributory
basis, this insurance is primary to other
insurance that is available to such additional
insured which covers such additional insured
as a named insured, and we will not share
with the other insurance, provided that:
(2) The "personal injury" for which coverage
is sought arises out of an offense
committed;
D. The following definition is added to
DEFINITIONS (Section V):
after you have entered into that "contract or
agreement requiring insurance" for such
additional insured. But this insurance still is
excess over valid and collectible other
insurance, whether primary, excess,
contingent or on any other basis, that is
available to the additional insured when the
additional insured is also an additional
insured under any other insurance.
"Contract or agreement requiring insurance"
means that part of any contract or
agreement under which you are required to
include the person or organization shown in
the Schedule as an additional insured on
this Coverage Part, provided that the "bodily
injury" and "property damage" occurs, and
the "personal injury" is caused by an offense
committed:
C. The following is added to Paragraph 8.
Transfer Of Rights Of Recovery Against
Others To Us in COMMERCIAL GENERAL
LIABILITY CONDITIONS (Section IV):
a. After you have entered into that contract
or agreement;
b. While that part of the contract or
agreement is in effect; and
We waive any rights of recovery we may
have against the additional insured shown in
the Schedule above because of payments
we make for "bodily injury", "property
damage" or "personal
c. Before the end of the policy period.
CG 03 82 09 07
@ 2007 The Travelers Companies, Inc.
Includes the copyrighted material of Insurance Services Office Inc., with its permission
Page 2 of 2