HomeMy WebLinkAboutGabel Paving, Inc. - Camino Arroyo Bridge Project No. 07-CDD-141 - Change Order No. 3
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0451; Fax (408) 846-0429
CHANGE ORDER NO.3
To contract for: Camino Arroyo Bridge Project, Phase I
Project No. 07-CDD-141
Contractor: Galeb Paving, Inc.
Contract Date:
7/16/2007
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
This Change Order provides for the following:
Replace catch basin top at northeast comer of Sixth/Rogers.
Additional paving on south side of Sixth/Alexander, south side of SixthlF orest, north and south sides of
Sixth/Chestnut.
Replace three water meter boxes at various locations on Sixth Street.
Stake elevation points for sidewalk on north side of Sixth/Rogers.
Re-install stop sign at northwest comer of Sixth/Railroad.
Sub-excavate wet subgrade and backfill at southeast comer of Sixth/Forest and southeast comer of Sixth/Alexander.
Adjust existing manhole to grade at southeast comer of Sixth/Maple.
- Remove concrete footing beneath sidewalk at northwest comer of Sixth/Railroad.
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in fuJl satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss
of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives
any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with
the Extra Work.
RECOMMENDED BY:
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost Percentage Initial
$2,438,986.62 /1/1
$41,719.59 l.71%~
$2,480,706.21
$18,711.01 /'AiI
$60,430.60 2.48% ~
$2,499,417.22
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $18,711.01
By: A----
ACCEPTED BY:
or
Date
---------
GALEB PAVINGy INC.
General Engineering Contractors Since 1975
State License No. 325912
12340 Saratoga. Sunnyvale Rd., Saratoga, OA 95070
T9/ephone: (4.08) 253-4747
Facsimile: (408) 253-4753
City of Gilroy
Attention: Charlie Kreuger
7351 Rosanna Sheet
Gilroy, Ca 95020
JOB SITE: CAMINO ARROYO BRIDGE PHASE I, PROJECT *07~CDD-141
EXTRA WORK
10-10-07 C. Aparicio Cement Contractor, Inc.
(see attached breakdown)
Replace catch Basin top on 6th street
at Northeast corner o~ Rodgers & 6th St.
SUB-TO'tAL:
5% P. ~ 0.:.
SUB-TOTAL:
1% BOND:
TOTAL:
, 10-31-07
$ 1,620.59
$ .81.03
$ 1,701.62
$ 17.02
$ 1,718.64
Sincerely,
Via Facsimile: 408-846-0429
~()~ ~Ce.b~
Slobodan Galeb
P~ge 1 of 2
2':0/10 38'ii'd
:)NI 8NIA'ii'd B3"l'ii'8
1::9L 1:>1::92': 801:>
11:01 L002':/11::/01
01/10/?008 15:37
4082534753
GALEE PAVING INC
PAGE 01/01
GALEB PAVING, INC.
General Engineering Contractors Since 1975
State IJcens9 No. 325912
11340 Saratoga - Sunnyvale Rd., Saratoga, CA 95070
Telephone: (408) 253-4747
Fac$imlle: (40a) 253-4753
1-10-08
City of Gilroy
Attention: Charlie Kreuger
'1351 Rosanna Street
Gilroy, Ca 95020
JOB SI'l'E: CAMINO ARROYO BRIDGE PliASE I, PROJECT oft07.CDD.141
EXTRA WORK
Extra Paving at the following intersections;
6th & Alexander South Side
6th & Forest South Side
6th & Chestnut North & South Side
.. f
:
I. Gr1nd existing p.vement I Clean up! 6 Cat Grinder $ 175.00 S 1,050.00
Off-Haul 6 Foreman/PIckup $ 81.00 S 486.00
B Trsctot $ 100.00 $ BOO.OO
4 Sweeper $ 125.00 S SO'O.OO
12 Shovelers $ 50.00 $ GOO.OO
8 Oump Truck $ eli.OO S 880.00
Tr.a.ff1c Control - NO CHARGE $ - $ -
1 pump Fee $ 100.00 $ 100.00
n. PlaCo Fabrtc. & 011 100 100 GallonS 011 G $3.00 I gilllon $ 3.00 $ 300.00
4 Forerna.n/Plckup $ 81.00 $ 324.00
8 I..borer $ 50.00 S 400.00
Tr,.fIic Control - NO CH....RGE $ - $ .
Fabtlc - NO CHARGE $ - $ .
IlL PI.ce A.C. (Additional Labor & Equip. S CAT paver $ 210.00 IS 1,680.00
added to A.C. unl\ p,i;;a) 6 Scn...d operators $ 5<5.00 $ 440.00
2 Ttactor $ 100.00 $ 200.00
2 Roller $ 100.00 IS 200.00
6 Raken; $ 65.00 $ 330.00
6 ShovoloJ'S $ 50.00 $ 300.00
4 Fo~m',,'/PI;;kup $ 81.00. $ 324.00
sua.TOTAL:
1S% P. .. 0.:
SUB- 'l'01'AL,
1% IIONO:
TO'tA1.:
$ 8,614.00
$ 1,277.10
S 9,791.10
$ 51.91
$ 9.889.01
Sincerely,
,._...w---.-'----::;:>' I d
~,,:'.~.::.. ,.~...-== "t-~ - .1/tAL----.
Tomo. Galeb '
V;tt f(AC~;M.( I~
(foB') 't I{lP - oti-~ 1
~
GALES PAVING, INC.
General Engineering Contractors Since 1975
State License No. 325912
12340 Saratoga - Sunnyvale Rd., Saratoga, CA 95070
Telephone: (408) 253-4747
Facsimile: (408) 253-4753
RECEIVED
FEB 6 2008
ENGINEERING
City of Gilroy
Attention: Charlie Kreuger
7351 Rosanna Street
Gilroy, Ca 95020
JOB SITE: CAMINO ARROYO BRIDGE PHASE I, PROJECT #07-CDD-141
EXTRA WORK
1/31/08
1/17/08 George D. Garcia, Inc.
(see attached breakdown)
Replace water meter box with new
B16, Pick up new box & haul to
Gilroy
$ 1,551.34
SUB-TOTAL:
5% P. & 0.:
SUB-TOTAL:
1% BOND:
TOTAL:
$ 1,551.34
$ 77.57
$ 1,628.91
$ 16.29
$ 1,645.20
Sincerely,
J-----~..
Slobodan GaiL" 'I'r/
Page 1 of 3
~
~.
GALEB PAVING, INC.
General Engineering Contractors Since 1975
State License No. 325912
12340 Saratoga - Sunnyvale Rd., Saratoga, CA 95070
Telephone: (408) 253-4747
Facsimile: (408) 253-4753
City of Gilroy
Attention: Charlie Kreuger
7351 Rosanna Street
Gilroy, Ca 95020
RECEIVED
FEB 6 2008
ENGINEERING
1-31-08
JOB SITE: CAMINO ARROYO BRIDGE PHASE I, PROJECT #07-CDD-141
EXTRA WORK
11/16/07 Ruggeri-Jensen-Azar & Associates
(see attached breakdown)
1,099.00
SUB-TOTAL:
5%P.&O.:
SUB-TOTAL:
1% BOND:
TOTAL:
$ 1,099.00
$ 54.95
$ 1,153.95
$ 11.54
$ 1,165.49
Sincerely,
L:::::::P-
Page 1 of 3
GALES PAVING, INC.
General Engineering Contractors Since 1975
RECEIVED
MAR 5 - 2008
ENGINEERING
State License No. 325912
12340 Saratoga - Sunnyvale Rd., Saratoga, CA 95070
Telephone: (408) 253-4747
Facsimile: (408) 253-4753
3-4-08
Hand Delivered @ Mta. 3-5-08
City of Gilroy
Attention: Charlie Kreuger
7351 Rosanna Street
Gilroy, Ca 95020
JOB SITE: CAMINO ARROYO BRIDGE PHASE I, PROJECT #07-CDD-141
EXTRA WORK
Galeb Paving Inc. - Re-Install stop sign
at NW corner of 6th & Railroad
150.00
Sincerely,
~~
J-
J.
o
d/tr
Tomo Galeb
'./',
GALES PAVING, INC.
General Engineering Contractors Since 1975
RECEIVED
MAR 5 2008
ENGINt:ERING
State License No. 325912
12340 Saratoga - Sunnyvale Rd., Saratoga, CA 95070
Telephone: (408) 253-4747
Facsimile: (408) 253-4753
4-Mar-08
Hand Delivered A Mtg. on 3-5-08
City of Gilroy
Attention: Charlie Kreuger
7351 Rosanna Street
Gilroy, Ca 95020
JOB SITE: CAMINO ARROYO BRIDGE PHASE I, PROJECT #07-CDD-141
EXTRA WORK
The following is extra work performed on the S.E. corner of 6th St. & Forest and 6th St. & Alexander.
Subexcavate wet subgrade and backfill with CL I AS and native soil.
Galeb Pavingt Inc. Work: 690,00
Work performed by George D. Garcia, Inc. Dig out wet subgrade & plug $ 1,358.42
(see attached extra work report) with CL 2 AB at S/E corner of
Forest & 6th & Alexander & 6th
Galeb Paving, Inc.
650B Tractor
Laborer
$
$
100.00 $
50.00 $
4
4
SUB-TOTAL:
15% P. & 0.:
SUB-TOTAL:
5% P. & 0.:
SUB-TOTAL:
1 % BOND:
George D. Garcia, Inc. Work:
TOTAL EXTRA WORK:
400.00
200.00
$ 600.00
$ 90.00
$
$ 1,358.42
$ 67.92
$ 1,426.34
$ 14.26
$ 1,440.60
$ 2,130.60
Sincerely,
A~ it!
.._,....,..........wi--
,
~-----
Torno Galeb
Page 1 of 2
frs-c
M4 Y 'SIVI2"D
I2IVGI/v, 1 9 2008
~IIVG
05/16/2008 14:26
4082534753
GALEB PAVING INC
GALEBPAVlNG, INC.
General Engineering Contractors Since 1975
State UoenSl!J N\;>. 325912
12340 Saratoga - Sunnvvale Rd., Saratoga, CA gs070
Telephone: (408) 253-4747
f'liI(;simlle; (0408) 253-4753
City of Gllroy
Attention: Charlie Kreucer
7351 Rosanna Street
Gfiroy, Ca 95020
JOB SITB: CAMINO ARROYO BRIDGE PHASE I, PROJECT t07-CDD-141
EXTRA WORK PROPOSAL
PAGE 01/01
~>~:~!:1) rlE,:~~I~1~?1 ~~\~i'" rC-~: "(~~~;~'-r;:'-l-:-:_~:;:: ,~}~{~~? ~'. ~~ l~:~;'~7 :;:;\~:;7;' \1 ,J_ .:: \: ;t.~ :~;~~\,,. :,ti ~3~~m~~ ,~,:'~~L; 1\ :1 ,~~I-~"~_~ :~f::~~,_:~~;,: '~I 'L : h,~ ::~ :'}?'": :'~i : ,~," ~ t:~ :~; \\L~;: \~;~. ~~~:~f
I. Lower & Ralll. lI)!isting manhole IltUtod
at 6111 & Maple. The worll. _. nlcauary
to IIClc:omadate tOllIl improvlmllnt
A.) Lower Manhole 1 fDRIman & Pickup S 8'.00 $ 81.00
3 LBboret (Jackhammer Operator) $ 50.00 $ 15&.00
0.5 Compl'llsoor 1t:il dllY S 126.00
SOB-'l'oTAL:
L5% P. .. o~:
A. StlB-TOTAL:
r~
B. BUB-TOTAL:
Alii. SUB-TO'l'AL:
1% BOND:
'1"OTAL:
B.) _ ~RBIS& Mar'lhOI~
rump Sum
$
$
$
I'
$
$
$
$
356.01l
53.40
~.<IO
4&0.00
450.00
859.060
B.SS
1117.91
Sincerely,
;L---3
Slobodan Galeb
Vi It ..:r; l ~ 1/11 i /-e-.
(4f1j) 8 tf-b -0,/.27
05/20/2008 12:42
4082534753
GALEB PAVING, INC.
G&neraf Engineering Contractof$ Since 1975
State lIcel'lSA No. 325912
12940 &ratoga. Sutl~ Rd_. Sa~gc. CA 95070
Tel~phone: (408) 253-4747
Facsimile: (408) 253--4153
City or Gikoy
Attention: Charlie Kreuger
7351 Rosanna Street
Onroy, Ca 95020
GALEE PAVING INC
JOB SITE: CAKI1'IO ARROYO BRIDGE PHASE I, PROJECT f07.CDD.141
EXTRA WORK
5/19/08
Dear Charlie,
The following Is a cost breakdown to remove a concrete footing underneath the
concrete sidewalk as identified on 9/11/07 located at NW corner of 6th & Railroad.
n.
Baekl" & R.emakB Subgrede at Curb &
Gutter. 9/11/07
Sincerely,
/"--
SlobodanGaleo
~
/
(
1
1
5
:::-
Via facaimlle:
(408) 846-042S
Page 1 of 2
8VD-TOII'AL:
15% P. & 0.:
SUB-TOTAL:
1% aOND:
TOTAL:
$ 115.00 $
$ 95.00 $
$ SO.OO $
$ 65.00 $
$ 60.00 S
S 5D.00 $
$ 115.00 $
$ $
$ 65.00 $
$
$
$
$
$
PAGE 01/02
116.00
95.00
~50.00
65.00
80.00
50.00
115.00
50.00
85.00
nUO
141.75
1,132.76
1t.n
1.144.08