HomeMy WebLinkAboutGabel Paving, Inc. - Camino Arroyo Bridge Project No. 07-CDD-141 - Change Order No. 3 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0451; Fax (408) 846-0429 CHANGE ORDER NO.3 To contract for: Camino Arroyo Bridge Project, Phase I Project No. 07-CDD-141 Contractor: Galeb Paving, Inc. Contract Date: 7/16/2007 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work This Change Order provides for the following: Replace catch basin top at northeast comer of Sixth/Rogers. Additional paving on south side of Sixth/Alexander, south side of SixthlF orest, north and south sides of Sixth/Chestnut. Replace three water meter boxes at various locations on Sixth Street. Stake elevation points for sidewalk on north side of Sixth/Rogers. Re-install stop sign at northwest comer of Sixth/Railroad. Sub-excavate wet subgrade and backfill at southeast comer of Sixth/Forest and southeast comer of Sixth/Alexander. Adjust existing manhole to grade at southeast comer of Sixth/Maple. - Remove concrete footing beneath sidewalk at northwest comer of Sixth/Railroad. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in fuJl satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. RECOMMENDED BY: Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost Percentage Initial $2,438,986.62 /1/1 $41,719.59 l.71%~ $2,480,706.21 $18,711.01 /'AiI $60,430.60 2.48% ~ $2,499,417.22 I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $18,711.01 By: A---- ACCEPTED BY: or Date --------- GALEB PAVINGy INC. General Engineering Contractors Since 1975 State License No. 325912 12340 Saratoga. Sunnyvale Rd., Saratoga, OA 95070 T9/ephone: (4.08) 253-4747 Facsimile: (408) 253-4753 City of Gilroy Attention: Charlie Kreuger 7351 Rosanna Sheet Gilroy, Ca 95020 JOB SITE: CAMINO ARROYO BRIDGE PHASE I, PROJECT *07~CDD-141 EXTRA WORK 10-10-07 C. Aparicio Cement Contractor, Inc. (see attached breakdown) Replace catch Basin top on 6th street at Northeast corner o~ Rodgers & 6th St. SUB-TO'tAL: 5% P. ~ 0.:. SUB-TOTAL: 1% BOND: TOTAL: , 10-31-07 $ 1,620.59 $ .81.03 $ 1,701.62 $ 17.02 $ 1,718.64 Sincerely, Via Facsimile: 408-846-0429 ~()~ ~Ce.b~ Slobodan Galeb P~ge 1 of 2 2':0/10 38'ii'd :)NI 8NIA'ii'd B3"l'ii'8 1::9L 1:>1::92': 801:> 11:01 L002':/11::/01 01/10/?008 15:37 4082534753 GALEE PAVING INC PAGE 01/01 GALEB PAVING, INC. General Engineering Contractors Since 1975 State IJcens9 No. 325912 11340 Saratoga - Sunnyvale Rd., Saratoga, CA 95070 Telephone: (408) 253-4747 Fac$imlle: (40a) 253-4753 1-10-08 City of Gilroy Attention: Charlie Kreuger '1351 Rosanna Street Gilroy, Ca 95020 JOB SI'l'E: CAMINO ARROYO BRIDGE PliASE I, PROJECT oft07.CDD.141 EXTRA WORK Extra Paving at the following intersections; 6th & Alexander South Side 6th & Forest South Side 6th & Chestnut North & South Side .. f : I. Gr1nd existing p.vement I Clean up! 6 Cat Grinder $ 175.00 S 1,050.00 Off-Haul 6 Foreman/PIckup $ 81.00 S 486.00 B Trsctot $ 100.00 $ BOO.OO 4 Sweeper $ 125.00 S SO'O.OO 12 Shovelers $ 50.00 $ GOO.OO 8 Oump Truck $ eli.OO S 880.00 Tr.a.ff1c Control - NO CHARGE $ - $ - 1 pump Fee $ 100.00 $ 100.00 n. PlaCo Fabrtc. & 011 100 100 GallonS 011 G $3.00 I gilllon $ 3.00 $ 300.00 4 Forerna.n/Plckup $ 81.00 $ 324.00 8 I..borer $ 50.00 S 400.00 Tr,.fIic Control - NO CH....RGE $ - $ . Fabtlc - NO CHARGE $ - $ . IlL PI.ce A.C. (Additional Labor & Equip. S CAT paver $ 210.00 IS 1,680.00 added to A.C. unl\ p,i;;a) 6 Scn...d operators $ 5<5.00 $ 440.00 2 Ttactor $ 100.00 $ 200.00 2 Roller $ 100.00 IS 200.00 6 Raken; $ 65.00 $ 330.00 6 ShovoloJ'S $ 50.00 $ 300.00 4 Fo~m',,'/PI;;kup $ 81.00. $ 324.00 sua.TOTAL: 1S% P. .. 0.: SUB- 'l'01'AL, 1% IIONO: TO'tA1.: $ 8,614.00 $ 1,277.10 S 9,791.10 $ 51.91 $ 9.889.01 Sincerely, ,._...w---.-'----::;:>' I d ~,,:'.~.::.. ,.~...-== "t-~ - .1/tAL----. Tomo. Galeb ' V;tt f(AC~;M.( I~ (foB') 't I{lP - oti-~ 1 ~ GALES PAVING, INC. General Engineering Contractors Since 1975 State License No. 325912 12340 Saratoga - Sunnyvale Rd., Saratoga, CA 95070 Telephone: (408) 253-4747 Facsimile: (408) 253-4753 RECEIVED FEB 6 2008 ENGINEERING City of Gilroy Attention: Charlie Kreuger 7351 Rosanna Street Gilroy, Ca 95020 JOB SITE: CAMINO ARROYO BRIDGE PHASE I, PROJECT #07-CDD-141 EXTRA WORK 1/31/08 1/17/08 George D. Garcia, Inc. (see attached breakdown) Replace water meter box with new B16, Pick up new box & haul to Gilroy $ 1,551.34 SUB-TOTAL: 5% P. & 0.: SUB-TOTAL: 1% BOND: TOTAL: $ 1,551.34 $ 77.57 $ 1,628.91 $ 16.29 $ 1,645.20 Sincerely, J-----~.. Slobodan GaiL" 'I'r/ Page 1 of 3 ~ ~. GALEB PAVING, INC. General Engineering Contractors Since 1975 State License No. 325912 12340 Saratoga - Sunnyvale Rd., Saratoga, CA 95070 Telephone: (408) 253-4747 Facsimile: (408) 253-4753 City of Gilroy Attention: Charlie Kreuger 7351 Rosanna Street Gilroy, Ca 95020 RECEIVED FEB 6 2008 ENGINEERING 1-31-08 JOB SITE: CAMINO ARROYO BRIDGE PHASE I, PROJECT #07-CDD-141 EXTRA WORK 11/16/07 Ruggeri-Jensen-Azar & Associates (see attached breakdown) 1,099.00 SUB-TOTAL: 5%P.&O.: SUB-TOTAL: 1% BOND: TOTAL: $ 1,099.00 $ 54.95 $ 1,153.95 $ 11.54 $ 1,165.49 Sincerely, L:::::::P- Page 1 of 3 GALES PAVING, INC. General Engineering Contractors Since 1975 RECEIVED MAR 5 - 2008 ENGINEERING State License No. 325912 12340 Saratoga - Sunnyvale Rd., Saratoga, CA 95070 Telephone: (408) 253-4747 Facsimile: (408) 253-4753 3-4-08 Hand Delivered @ Mta. 3-5-08 City of Gilroy Attention: Charlie Kreuger 7351 Rosanna Street Gilroy, Ca 95020 JOB SITE: CAMINO ARROYO BRIDGE PHASE I, PROJECT #07-CDD-141 EXTRA WORK Galeb Paving Inc. - Re-Install stop sign at NW corner of 6th & Railroad 150.00 Sincerely, ~~ J- J. o d/tr Tomo Galeb './', GALES PAVING, INC. General Engineering Contractors Since 1975 RECEIVED MAR 5 2008 ENGINt:ERING State License No. 325912 12340 Saratoga - Sunnyvale Rd., Saratoga, CA 95070 Telephone: (408) 253-4747 Facsimile: (408) 253-4753 4-Mar-08 Hand Delivered A Mtg. on 3-5-08 City of Gilroy Attention: Charlie Kreuger 7351 Rosanna Street Gilroy, Ca 95020 JOB SITE: CAMINO ARROYO BRIDGE PHASE I, PROJECT #07-CDD-141 EXTRA WORK The following is extra work performed on the S.E. corner of 6th St. & Forest and 6th St. & Alexander. Subexcavate wet subgrade and backfill with CL I AS and native soil. Galeb Pavingt Inc. Work: 690,00 Work performed by George D. Garcia, Inc. Dig out wet subgrade & plug $ 1,358.42 (see attached extra work report) with CL 2 AB at S/E corner of Forest & 6th & Alexander & 6th Galeb Paving, Inc. 650B Tractor Laborer $ $ 100.00 $ 50.00 $ 4 4 SUB-TOTAL: 15% P. & 0.: SUB-TOTAL: 5% P. & 0.: SUB-TOTAL: 1 % BOND: George D. Garcia, Inc. Work: TOTAL EXTRA WORK: 400.00 200.00 $ 600.00 $ 90.00 $ $ 1,358.42 $ 67.92 $ 1,426.34 $ 14.26 $ 1,440.60 $ 2,130.60 Sincerely, A~ it! .._,....,..........wi-- , ~----- Torno Galeb Page 1 of 2 frs-c M4 Y 'SIVI2"D I2IVGI/v, 1 9 2008 ~IIVG 05/16/2008 14:26 4082534753 GALEB PAVING INC GALEBPAVlNG, INC. General Engineering Contractors Since 1975 State UoenSl!J N\;>. 325912 12340 Saratoga - Sunnvvale Rd., Saratoga, CA gs070 Telephone: (408) 253-4747 f'liI(;simlle; (0408) 253-4753 City of Gllroy Attention: Charlie Kreucer 7351 Rosanna Street Gfiroy, Ca 95020 JOB SITB: CAMINO ARROYO BRIDGE PHASE I, PROJECT t07-CDD-141 EXTRA WORK PROPOSAL PAGE 01/01 ~>~:~!:1) rlE,:~~I~1~?1 ~~\~i'" rC-~: "(~~~;~'-r;:'-l-:-:_~:;:: ,~}~{~~? ~'. ~~ l~:~;'~7 :;:;\~:;7;' \1 ,J_ .:: \: ;t.~ :~;~~\,,. :,ti ~3~~m~~ ,~,:'~~L; 1\ :1 ,~~I-~"~_~ :~f::~~,_:~~;,: '~I 'L : h,~ ::~ :'}?'": :'~i : ,~," ~ t:~ :~; \\L~;: \~;~. ~~~:~f I. Lower & Ralll. lI)!isting manhole IltUtod at 6111 & Maple. The worll. _. nlcauary to IIClc:omadate tOllIl improvlmllnt A.) Lower Manhole 1 fDRIman & Pickup S 8'.00 $ 81.00 3 LBboret (Jackhammer Operator) $ 50.00 $ 15&.00 0.5 Compl'llsoor 1t:il dllY S 126.00 SOB-'l'oTAL: L5% P. .. o~: A. StlB-TOTAL: r~ B. BUB-TOTAL: Alii. SUB-TO'l'AL: 1% BOND: '1"OTAL: B.) _ ~RBIS& Mar'lhOI~ rump Sum $ $ $ I' $ $ $ $ 356.01l 53.40 ~.<IO 4&0.00 450.00 859.060 B.SS 1117.91 Sincerely, ;L---3 Slobodan Galeb Vi It ..:r; l ~ 1/11 i /-e-. (4f1j) 8 tf-b -0,/.27 05/20/2008 12:42 4082534753 GALEB PAVING, INC. G&neraf Engineering Contractof$ Since 1975 State lIcel'lSA No. 325912 12940 &ratoga. Sutl~ Rd_. Sa~gc. CA 95070 Tel~phone: (408) 253-4747 Facsimile: (408) 253--4153 City or Gikoy Attention: Charlie Kreuger 7351 Rosanna Street Onroy, Ca 95020 GALEE PAVING INC JOB SITE: CAKI1'IO ARROYO BRIDGE PHASE I, PROJECT f07.CDD.141 EXTRA WORK 5/19/08 Dear Charlie, The following Is a cost breakdown to remove a concrete footing underneath the concrete sidewalk as identified on 9/11/07 located at NW corner of 6th & Railroad. n. Baekl" & R.emakB Subgrede at Curb & Gutter. 9/11/07 Sincerely, /"-- SlobodanGaleo ~ / ( 1 1 5 :::- Via facaimlle: (408) 846-042S Page 1 of 2 8VD-TOII'AL: 15% P. & 0.: SUB-TOTAL: 1% aOND: TOTAL: $ 115.00 $ $ 95.00 $ $ SO.OO $ $ 65.00 $ $ 60.00 S S 5D.00 $ $ 115.00 $ $ $ $ 65.00 $ $ $ $ $ $ PAGE 01/02 116.00 95.00 ~50.00 65.00 80.00 50.00 115.00 50.00 85.00 nUO 141.75 1,132.76 1t.n 1.144.08